WO2017135159A1 PCT/JP2017/002868 JP2017002868W WO2017135159A1 WO 2017135159 A1 WO2017135159 A1 WO 2017135159A1 JP 2017002868 W JP2017002868 W JP 2017002868W WO 2017135159 A1 WO2017135159 A1 WO 2017135159A1
Authority
WO
WIPO (PCT)
Prior art keywords
enb
sps
base station
uplink
data
Prior art date
Application number
PCT/JP2017/002868
Other languages
English (en)
French (fr)
Inventor
望月 満
福井 範行
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to CN202211709564.3A priority Critical patent/CN116033580A/zh
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to US16/069,285 priority patent/US10764889B2/en
Priority to CN202211708975.0A priority patent/CN115955723A/zh
Priority to JP2017565519A priority patent/JP6968706B2/ja
Priority to EP17747316.2A priority patent/EP3413656A4/en
Priority to CN202211708996.2A priority patent/CN115996363A/zh
Priority to CN201780008687.5A priority patent/CN108605325A/zh
Priority to EP22198692.0A priority patent/EP4145719A1/en
Priority to EP20216932.2A priority patent/EP3833154A1/en
Publication of WO2017135159A1 publication Critical patent/WO2017135159A1/ja
Priority to US16/937,177 priority patent/US20200359377A1/en
Priority to US17/659,132 priority patent/US20220240248A1/en
Priority to US18/466,452 priority patent/US20230422224A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0446Resources in time domain, e.g. slots or frames
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/11Semi-persistent scheduling
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/16Threshold monitoring
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/24Cell structures
    • H04W16/32Hierarchical cell structures
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection
    • H04W48/16Discovering, processing access restriction or access information
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0203Power saving arrangements in the radio access network or backbone network of wireless communication networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/02Selection of wireless resources by user or terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/20Manipulation of established connections
    • H04W76/27Transitions between radio resource control [RRC] states
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0055Transmission or use of information for re-establishing the radio link
    • H04W36/0069Transmission or use of information for re-establishing the radio link in case of dual connectivity, e.g. decoupled uplink/downlink
    • H04W36/00692Transmission or use of information for re-establishing the radio link in case of dual connectivity, e.g. decoupled uplink/downlink using simultaneous multiple data streams, e.g. cooperative multipoint [CoMP], carrier aggregation [CA] or multiple input multiple output [MIMO]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/15Setup of multiple wireless link connections
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Definitions

  • the present invention relates to a communication system that performs wireless communication between a communication terminal device such as a mobile terminal device and a base station device.
  • LTE Long Term Evolution
  • SAE System Architecture Evolution
  • OFDM Orthogonal Frequency Division Multiplexing
  • SC-FDMA Single Carrier Frequency Division Multiple Access
  • W-CDMA Wideband Code Division Multiple Access
  • Non-Patent Document 1 (Chapter 5), 3GPP determination items related to the frame configuration in the LTE system will be described with reference to FIG.
  • FIG. 1 is an explanatory diagram showing a configuration of a radio frame used in an LTE communication system.
  • one radio frame (Radio frame) is 10 ms.
  • the radio frame is divided into ten equally sized subframes.
  • the subframe is divided into two equally sized slots.
  • a downlink synchronization signal (Downlink Synchronization Signal) is included in the first and sixth subframes for each radio frame.
  • the synchronization signal includes a first synchronization signal (Primary Synchronization Signal: P-SS) and a second synchronization signal (Secondary Synchronization Signal: S-SS).
  • Non-Patent Document 1 (Chapter 5) describes the decision items regarding the channel configuration in the LTE system in 3GPP. It is assumed that the same channel configuration as that of the non-CSG cell is used in a CSG (Closed Subscriber Group) cell.
  • a physical broadcast channel (Physical Broadcast Channel: PBCH) is a communication terminal device such as a base station device (hereinafter simply referred to as “base station”) to a mobile terminal device (hereinafter also simply referred to as “mobile terminal”). It is a channel for downlink transmission to (hereinafter sometimes simply referred to as “communication terminal”).
  • a BCH transport block (transport block) is mapped to four subframes in a 40 ms interval. There is no obvious signaling of 40ms timing.
  • the physical control format indicator channel (Physical Control Format Indicator Channel: PCFICH) is a channel for downlink transmission from the base station to the communication terminal.
  • the PCFICH notifies the communication terminal of the number of OFDM (Orthogonal Frequency Division Multiplexing) symbols used for PDCCHs.
  • PCFICH is transmitted for each subframe.
  • the physical downlink control channel (Physical Downlink Control Channel: PDCCH) is a channel for downlink transmission from the base station to the communication terminal.
  • the PDCCH includes resource allocation (allocation) information of a downlink shared channel (DL-SCH), which is one of transport channels described later, and a paging channel (Paging channel: PCH, one of transport channels described later). ) Resource allocation (allocation) information and HARQ (Hybrid Automatic Repeat reQuest) information related to DL-SCH.
  • the PDCCH carries an uplink scheduling grant (Uplink Scheduling Grant).
  • the PDCCH carries Ack (Acknowledgement) / Nack (Negative Acknowledgment) which is a response signal for uplink transmission.
  • the PDCCH is also called an L1 / L2 control signal.
  • a physical downlink shared channel is a channel for downlink transmission from a base station to a communication terminal.
  • a downlink shared channel (DL-SCH) that is a transport channel and PCH that is a transport channel are mapped.
  • the physical multicast channel (Physical Multicast Channel: PMCH) is a channel for downlink transmission from the base station to the communication terminal.
  • a multicast channel (Multicast Channel: MCH) that is a transport channel is mapped to the PMCH.
  • a physical uplink control channel (Physical Uplink Control Channel: PUCCH) is a channel for uplink transmission from a communication terminal to a base station.
  • the PUCCH carries Ack / Nack which is a response signal (response signal) for downlink transmission.
  • the PUCCH carries a CQI (Channel Quality Indicator) report.
  • CQI is quality information indicating the quality of received data or channel quality.
  • the PUCCH carries a scheduling request (SR).
  • SR scheduling request
  • the physical uplink shared channel (Physical Uplink Shared Channel: PUSCH) is a channel for uplink transmission from the communication terminal to the base station.
  • An uplink shared channel (Uplink Shared Channel: UL-SCH), which is one of the transport channels, is mapped to the PUSCH.
  • a physical HARQ indicator channel (Physical Hybrid ARQ Indicator Channel: PHICH) is a channel for downlink transmission from the base station to the communication terminal. PHICH carries Ack / Nack which is a response signal for uplink transmission.
  • a physical random access channel (Physical Random Access Channel: PRACH) is a channel for uplink transmission from a communication terminal to a base station. The PRACH carries a random access preamble.
  • the downlink reference signal (Reference Signal: RS) is a symbol known as an LTE communication system.
  • the following five types of downlink reference signals are defined.
  • Cell specific reference signal Cell-specific Reference Signal: CRS
  • MBSFN reference signal MBSFN Reference Signal
  • UE specific reference signal UE-specific Reference Signal: Signal demodulation reference signal (Demodulation Reference Signal: DM-RS)
  • Position determination reference signal Position determination reference signal
  • PRS Position determination reference signal
  • CSI-RS Channel State Information Reference Signal
  • RSRP reference signal received power
  • Non-Patent Document 1 (Chapter 5) will be described.
  • a broadcast channel (Broadcast Channel: BCH) is broadcast to the entire coverage of the base station (cell).
  • the BCH is mapped to the physical broadcast channel (PBCH).
  • PBCH physical broadcast channel
  • HARQ Hybrid ARQ
  • DL-SCH downlink shared channel
  • the DL-SCH can be broadcast to the entire coverage of the base station (cell).
  • DL-SCH supports dynamic or semi-static resource allocation. Quasi-static resource allocation is also referred to as persistent scheduling.
  • the DL-SCH supports discontinuous reception (DRX) of the communication terminal in order to reduce the power consumption of the communication terminal.
  • the DL-SCH is mapped to the physical downlink shared channel (PDSCH).
  • the paging channel supports DRX of the communication terminal in order to enable low power consumption of the communication terminal.
  • the PCH is required to be broadcast to the entire coverage of the base station (cell).
  • the PCH is mapped to a physical resource such as a physical downlink shared channel (PDSCH) that can be dynamically used for traffic.
  • PDSCH physical downlink shared channel
  • a multicast channel (Multicast Channel: MCH) is used for broadcasting to the entire coverage of a base station (cell).
  • the MCH supports SFN combining of MBMS (Multimedia Broadcast Multicast Service) services (MTCH and MCCH) in multi-cell transmission.
  • MTCH and MCCH Multimedia Broadcast Multicast Service
  • the MCH supports quasi-static resource allocation.
  • MCH is mapped to PMCH.
  • HARQ Hybrid ARQ
  • PUSCH physical uplink shared channel
  • Random Access Channel is limited to control information. RACH is at risk of collision.
  • the RACH is mapped to a physical random access channel (PRACH).
  • PRACH physical random access channel
  • HARQ is a technique for improving the communication quality of a transmission path by a combination of an automatic repeat request (Automatic Repeat reQuest: ARQ) and error correction (Forward Error Correction).
  • ARQ Automatic Repeat reQuest
  • error correction Forward Error Correction
  • HARQ has an advantage that error correction functions effectively by retransmission even for a transmission path whose communication quality changes. In particular, further quality improvement can be obtained by combining the initial transmission reception result and the retransmission reception result upon retransmission.
  • BCCH Broadcast Control Channel
  • BCH Broadcast Control Channel
  • DL-SCH downlink shared channel
  • the paging control channel (Paging Control Channel: PCCH) is a downlink channel for transmitting changes in paging information (Paging Information) and system information (System Information).
  • PCCH is used when the network does not know the cell location of the communication terminal.
  • the PCCH that is a logical channel is mapped to a paging channel (PCH) that is a transport channel.
  • PCH paging channel
  • the common control channel (Common Control Channel: CCCH) is a channel for transmission control information between the communication terminal and the base station. CCCH is used when the communication terminal does not have an RRC connection with the network.
  • CCCH is mapped to a downlink shared channel (DL-SCH) that is a transport channel.
  • DL-SCH downlink shared channel
  • UL-SCH uplink shared channel
  • the multicast control channel (Multicast Control Channel: MCCH) is a downlink channel for one-to-many transmission. MCCH is used for transmission of MBMS control information for one or several MTCHs from a network to a communication terminal. MCCH is used only for communication terminals receiving MBMS.
  • the MCCH is mapped to a multicast channel (MCH) that is a transport channel.
  • the dedicated control channel (Dedicated Control Channel: DCCH) is a channel for transmitting individual control information between the communication terminal and the network on a one-to-one basis.
  • the DCCH is used when the communication terminal is an RRC connection.
  • the DCCH is mapped to the uplink shared channel (UL-SCH) in the uplink, and is mapped to the downlink shared channel (DL-SCH) in the downlink.
  • the dedicated traffic channel (Dedicated Traffic Channel: DTCH) is a channel for one-to-one communication to individual communication terminals for transmitting user information.
  • DTCH exists for both uplink and downlink.
  • the DTCH is mapped to the uplink shared channel (UL-SCH) in the uplink, and is mapped to the downlink shared channel (DL-SCH) in the downlink.
  • UL-SCH uplink shared channel
  • DL-SCH downlink shared channel
  • a multicast traffic channel is a downlink channel for transmitting traffic data from a network to a communication terminal.
  • MTCH is a channel used only for communication terminals receiving MBMS.
  • the MTCH is mapped to a multicast channel (MCH).
  • CGI is a Cell Global Identifier.
  • ECGI is an E-UTRAN cell global identifier (E-UTRAN Cell Global Identifier).
  • LTE Long Term Evolution Advanced
  • UMTS Universal Mobile Telecommunication System
  • a CSG (Closed Subscriber Group) cell is a cell in which an operator identifies an available subscriber (hereinafter, may be referred to as a “specific subscriber cell”).
  • the identified subscribers are allowed to access one or more cells of the PLMN (Public Land Mobile Mobile Network).
  • PLMN Public Land Mobile Mobile Network
  • One or more cells to which the identified subscribers are allowed access are called “CSG cells (CSG cell (s))”.
  • CSG cell (s) Public Land Mobile Mobile Network
  • PLMN Public Land Mobile Mobile Network
  • the CSG cell is a part of the PLMN that broadcasts a unique CSG identity (CSG identity: CSG ID; CSG-ID) and “TRUE” via CSG indication (CSG indication).
  • CSG identity CSG ID; CSG-ID
  • CSG indication CSG indication
  • the CSG-ID is broadcast by the CSG cell or cell. There are a plurality of CSG-IDs in an LTE communication system. The CSG-ID is then used by the communication terminal (UE) to facilitate access of CSG related members.
  • UE communication terminal
  • the location tracking of communication terminals is performed in units of one or more cells.
  • the position tracking is performed to track the position of the communication terminal and call the communication terminal even in the standby state, in other words, to enable the communication terminal to receive a call.
  • This area for tracking the location of the communication terminal is called a tracking area.
  • Non-Patent Document 2 discloses three different modes of access to HeNB and HNB. Specifically, an open access mode (Open access mode), a closed access mode (Closed access mode), and a hybrid access mode (Hybrid access mode) are disclosed.
  • Open access mode Open access mode
  • closed access mode closed access mode
  • Hybrid access mode Hybrid access mode
  • LTE-A Long Term Evolution Advanced
  • Release 10 the Long Term Evolution Advanced (LTE-A) standard is being developed as Release 10 (see Non-Patent Document 3 and Non-Patent Document 4).
  • LTE-A is based on the LTE wireless communication system, and is configured by adding several new technologies.
  • CA Carrier aggregation
  • the UE When CA is configured, the UE has a network (NW) and only one RRC connection (RRC connection). In the RRC connection, one serving cell provides NAS mobility information and security input. This cell is referred to as a primary cell (PCell).
  • a carrier corresponding to PCell is a downlink primary component carrier (Downlink Primary Component Carrier: DL PCC).
  • the carrier corresponding to the PCell in the uplink is an uplink primary component carrier (Uplink Primary Component Carrier: UL PCC).
  • a secondary cell (Secondary Cell: SCell) is configured to form a set of a PCell and a serving cell.
  • the carrier corresponding to the SCell in the downlink is a downlink secondary component carrier (Downlink Secondary Component Carrier: DL SCC).
  • the carrier corresponding to the SCell in the uplink is an uplink secondary component carrier (Uplink Secondary Component Carrier: UL SCC).
  • a set of one PCell and a serving cell composed of one or more SCells is configured for one UE.
  • Non-Patent Document 1 describes CoMP being studied for LTE-A by 3GPP.
  • the amount of mobile network traffic is increasing and the communication speed is increasing.
  • the communication speed is expected to be further increased.
  • a small eNB (hereinafter sometimes referred to as a “small base station apparatus”) that constitutes a small cell.
  • a technology for increasing frequency utilization efficiency and increasing communication capacity by installing a large number of small eNBs and configuring a large number of small cells has been studied.
  • DC dual connectivity
  • Non-Patent Document 1 describes DC.
  • eNBs that perform dual connectivity (DC)
  • master eNB abbreviation: MeNB
  • secondary eNB abbreviation: SeNB
  • 5G fifth-generation wireless access system aimed at starting service after 2020 for mobile communication that is becoming more sophisticated is being studied.
  • 5G requirements are compiled by an organization called METIS (see Non-Patent Document 5).
  • the system capacity is 1000 times
  • the data transmission speed is 100 times
  • the data processing delay is 1/10 (1/10)
  • the simultaneous connection number of communication terminals is 100 times that of the LTE system.
  • MIMO Multiple Input Input Multiple Output
  • the transmission method of the buffer status report (Buffer Status Report (abbreviation: BSR) when the uplink split bearer is being executed shall be a method based on double reporting and a threshold (Double Reporting Threshold And abbreviation: DRAT).
  • DRAT Double Reporting Threshold And abbreviation: 7
  • the UE transmits data to one predetermined eNB when the amount of uplink data is equal to or less than the DRAT threshold, and to the other eNB, Do not send data.
  • An object of the present invention is to provide a communication system capable of stably performing a communication operation between a base station apparatus and a communication terminal apparatus.
  • a communication system includes a first base station device, a second base station device, a communication terminal device capable of wireless communication with the first base station device and the second base station device.
  • the communication terminal apparatus communicates with the first base station apparatus via the first route for directly communicating with the first base station apparatus and the second base station apparatus.
  • the transmission data is transmitted to the first base station apparatus through communication with the first base station apparatus through a second path. If the data amount of the transmission data is set to be less than or equal to the threshold value, the transmission data is transmitted to the first base station device.
  • the data amount of the transmission data is less than or equal to the threshold value.
  • the threshold value is changed so that the transmission data is transmitted to the first base station apparatus and the second base station apparatus.
  • the communication system of the present invention includes a first base station device, a second base station device, and the first base station device and a communication terminal device capable of wireless communication with the second base station device.
  • the communication terminal apparatus communicates with the first base station apparatus via the first route for directly communicating with the first base station apparatus and the second base station apparatus.
  • the transmission data is When it is possible to communicate with the first base station apparatus by the second route to be performed and the amount of transmission data to be transmitted to the first base station apparatus is equal to or greater than a predetermined threshold, the transmission data is When the transmission data is set to be transmitted to the first base station apparatus and the second base station apparatus, and the data amount of the transmission data is less than the threshold, the transmission data is transmitted to the first base station apparatus And do not transmit to the second base station device
  • the second base station apparatus is configured to communicate with the communication terminal apparatus using a periodically allocated radio resource, the amount of transmission data is less than the threshold value
  • the threshold value is changed so that the transmission data is transmitted to the first base station apparatus and the second base station apparatus.
  • the communication system of the present invention includes a first base station device, a second base station device, and the first base station device and a communication terminal device capable of wireless communication with the second base station device.
  • the communication terminal apparatus communicates with the first base station apparatus via the first route for directly communicating with the first base station apparatus and the second base station apparatus.
  • the transmission data is When the transmission data is set to be transmitted to the first base station apparatus and the second base station apparatus, and the data amount of the transmission data is equal to or less than the threshold, the transmission data is transmitted to the first base station apparatus.
  • the communication terminal apparatus has a data amount of the transmission data When the transmission data is less than or equal to the threshold, the transmission data is transmitted to the first base station apparatus, and an end signal indicating the end of communication using the periodically allocated radio resource is transmitted to the second base station apparatus. It is set to transmit to.
  • the communication system of the present invention includes a first base station device, a second base station device, and the first base station device and a communication terminal device capable of wireless communication with the second base station device.
  • the communication terminal apparatus communicates with the first base station apparatus via the first route for directly communicating with the first base station apparatus and the second base station apparatus.
  • the transmission data is When it is possible to communicate with the first base station apparatus by the second route to be performed and the amount of transmission data to be transmitted to the first base station apparatus is equal to or greater than a predetermined threshold, the transmission data is When the transmission data is set to be transmitted to the first base station apparatus and the second base station apparatus, and the data amount of the transmission data is less than the threshold, the transmission data is transmitted to the first base station apparatus And do not transmit to the second base station device If the second base station apparatus is set to communicate with the communication terminal apparatus using a radio resource that is periodically allocated, the communication terminal apparatus has a data amount of the transmission data. When the transmission data is less than the threshold, the transmission data is transmitted to the first base station apparatus, and an end signal indicating the end of communication using the periodically allocated radio resource is transmitted to the second base station apparatus. It is set to transmit to.
  • the data amount of the transmission data is equal to or less than the threshold value.
  • the threshold is changed so that the transmission data is transmitted to the first base station apparatus and the second base station apparatus.
  • the amount of transmission data is less than the threshold value.
  • the threshold is changed so that transmission data is transmitted to the first base station apparatus and the second base station apparatus.
  • the communication terminal apparatus when the second base station apparatus is set to communicate with the communication terminal apparatus using the periodically allocated radio resources, the communication terminal apparatus transmits data of transmission data.
  • the transmission data is transmitted to the first base station apparatus, and an end signal indicating the end of communication using the periodically assigned radio resource is transmitted to the second base station apparatus.
  • the communication terminal apparatus when the second base station apparatus is set to communicate with the communication terminal apparatus using the periodically allocated radio resources, the communication terminal apparatus transmits data of transmission data.
  • the transmission data is transmitted to the first base station apparatus, and an end signal indicating the end of communication using the radio resource that is periodically allocated is transmitted to the second base station apparatus.
  • FIG. 2 is an explanatory diagram showing a configuration of a radio frame used in an LTE communication system.
  • 1 is a block diagram showing an overall configuration of an LTE communication system 200 discussed in 3GPP.
  • FIG. It is a block diagram which shows the structure of the mobile terminal 202 shown in FIG. 2 which is a communication terminal which concerns on this invention.
  • It is a block diagram which shows the structure of the base station 203 shown in FIG. 2 which is a base station which concerns on this invention.
  • 3 is a flowchart illustrating an outline from a cell search to a standby operation performed by a communication terminal (UE) in an LTE communication system.
  • UE communication terminal
  • FIG. 218 is a diagram illustrating an example of a sequence related to a time switching method for beam switching processing in Embodiment 13.
  • FIG. 38 is a diagram showing an exemplary sequence relating to a time reduction method for beam switching processing in Modification 1 of Embodiment 13.
  • FIG. 38 is a diagram showing an exemplary sequence relating to a time reduction method for beam switching processing in Modification 1 of Embodiment 13.
  • FIG. 38 is a diagram illustrating an example of a sequence relating to a method of performing a target beam from initial transmission of data during HARQ processing in Modification 2 of Embodiment 13.
  • FIG. 38 is a diagram showing another example of a sequence relating to a method of performing a target beam from initial transmission of data during HARQ processing in the second modification of the thirteenth embodiment.
  • 218 is a diagram illustrating an example of a sequence related to a method performed by retransmitting data during HARQ processing with a target beam in Modification 2 of Embodiment 13.
  • FIG. 38 is a diagram illustrating an example of a sequence related to a method performed by a target beam from data delivery success (Ack) / delivery failure (Nack) during HARQ processing in Modification 2 of Embodiment 13.
  • FIG. FIG. 2 is a block diagram showing an overall configuration of an LTE communication system 200 discussed in 3GPP.
  • the radio access network is referred to as E-UTRAN (Evolved Universal Terrestrial Radio Access Network) 201.
  • a mobile terminal device hereinafter referred to as “user equipment (UE)”
  • UE user equipment
  • base station E-UTRAN NodeB: eNB
  • signals are transmitted and received by wireless communication.
  • the “communication terminal device” includes not only a mobile terminal device such as a movable mobile phone terminal device but also a non-moving device such as a sensor.
  • the “communication terminal device” may be simply referred to as “communication terminal”.
  • Control protocols for the mobile terminal 202 such as RRC (Radio Resource Control) and user planes such as PDCP (Packet Data Convergence Protocol), RLC (Radio Link Control), MAC (Medium Access Control), PHY (Physical Layer)
  • RRC Radio Resource Control
  • PDCP Packet Data Convergence Protocol
  • RLC Radio Link Control
  • MAC Medium Access Control
  • PHY Physical Layer
  • a control protocol RRC (Radio Resource Control) between the mobile terminal 202 and the base station 203 performs broadcast, paging, RRC connection management (RRC connection management), and the like. As states of the base station 203 and the mobile terminal 202 in RRC, there are RRC_IDLE and RRC_CONNECTED.
  • RRC_IDLE PLMN (Public Land Mobile Mobile Network) selection, system information (System Information: SI) notification, paging, cell re-selection, mobility, and the like are performed.
  • RRC_CONNECTED the mobile terminal has an RRC connection and can send and receive data to and from the network.
  • handover Handover: HO
  • measurement of neighbor cells neighborhbour cells
  • the base station 203 is classified into an eNB 207 and a Home-eNB 206.
  • the communication system 200 includes an eNB group 203-1 including a plurality of eNBs 207 and a Home-eNB group 203-2 including a plurality of Home-eNBs 206.
  • a system composed of EPC (Evolved Packet Core) as a core network and E-UTRAN 201 as a radio access network is referred to as EPS (Evolved Packet System).
  • EPS Evolved Packet System
  • the EPC that is the core network and the E-UTRAN 201 that is the radio access network may be collectively referred to as “network”.
  • the eNB 207 includes a mobility management entity (Mobility Management Entity: MME), an S-GW (Serving Management Gateway), or an MME / S-GW unit including the MME and S-GW (hereinafter, also referred to as “MME unit”) 204.
  • MME mobility management entity
  • S-GW Serving Management Gateway
  • MME / S-GW unit including the MME and S-GW
  • the control information is communicated between the eNB 207 and the MME unit 204 through the S1 interface.
  • a plurality of MME units 204 may be connected to one eNB 207.
  • the eNBs 207 are connected by the X2 interface, and control information is communicated between the eNBs 207.
  • the Home-eNB 206 is connected to the MME unit 204 via the S1 interface, and control information is communicated between the Home-eNB 206 and the MME unit 204.
  • a plurality of Home-eNBs 206 are connected to one MME unit 204.
  • the Home-eNB 206 is connected to the MME unit 204 via a HeNBGW (Home-eNB GateWay) 205.
  • the Home-eNB 206 and the HeNBGW 205 are connected via the S1 interface, and the HeNBGW 205 and the MME unit 204 are connected via the S1 interface.
  • One or more Home-eNBs 206 are connected to one HeNBGW 205, and information is communicated through the S1 interface.
  • the HeNBGW 205 is connected to one or a plurality of MME units 204, and information is communicated through the S1 interface.
  • the MME unit 204 and the HeNBGW 205 are higher-level devices, specifically higher-level nodes, and control the connection between the eNB 207 and Home-eNB 206, which are base stations, and the mobile terminal (UE) 202.
  • the MME unit 204 constitutes an EPC that is a core network.
  • the base station 203 and the HeNBGW 205 constitute an E-UTRAN 201.
  • the X2 interface between Home-eNB 206 is supported. That is, the Home-eNB 206 is connected by the X2 interface, and control information is communicated between the Home-eNB 206. From the MME unit 204, the HeNBGW 205 appears as a Home-eNB 206. From the Home-eNB 206, the HeNBGW 205 appears as the MME unit 204.
  • the interface between the Home-eNB 206 and the MME unit 204 is an S1 interface. The same.
  • the base station 203 may configure one cell or a plurality of cells. Each cell has a predetermined range as a coverage that is a range in which communication with the mobile terminal 202 is possible, and performs wireless communication with the mobile terminal 202 within the coverage. When one base station 203 forms a plurality of cells, each cell is configured to be able to communicate with the mobile terminal 202.
  • FIG. 3 is a block diagram showing a configuration of the mobile terminal 202 shown in FIG. 2, which is a communication terminal according to the present invention.
  • the transmission process of the mobile terminal 202 shown in FIG. 3 will be described.
  • control data from the protocol processing unit 301 and user data from the application unit 302 are stored in the transmission data buffer unit 303.
  • the data stored in the transmission data buffer unit 303 is transferred to the encoder unit 304 and subjected to encoding processing such as error correction.
  • the data encoded by the encoder unit 304 is modulated by the modulation unit 305.
  • the modulated data is converted into a baseband signal, and then output to the frequency conversion unit 306, where it is converted into a radio transmission frequency.
  • a transmission signal is transmitted from the antenna 307 to the base station 203.
  • the reception process of the mobile terminal 202 is executed as follows.
  • a radio signal from the base station 203 is received by the antenna 307.
  • the received signal is converted from a radio reception frequency to a baseband signal by the frequency converter 306, and demodulated by the demodulator 308.
  • the demodulated data is transferred to the decoder unit 309 and subjected to decoding processing such as error correction.
  • control data is passed to the protocol processing unit 301, and user data is passed to the application unit 302.
  • a series of processing of the mobile terminal 202 is controlled by the control unit 310. Therefore, although not shown in FIG. 3, the control unit 310 is connected to the units 301 to 309.
  • FIG. 4 is a block diagram showing a configuration of the base station 203 shown in FIG. 2, which is a base station according to the present invention.
  • the transmission process of the base station 203 shown in FIG. 4 will be described.
  • the EPC communication unit 401 transmits and receives data between the base station 203 and the EPC (such as the MME unit 204) and the HeNBGW 205.
  • the other base station communication unit 402 transmits / receives data to / from other base stations.
  • the EPC communication unit 401 and the other base station communication unit 402 exchange information with the protocol processing unit 403, respectively. Control data from the protocol processing unit 403 and user data and control data from the EPC communication unit 401 and the other base station communication unit 402 are stored in the transmission data buffer unit 404.
  • the data stored in the transmission data buffer unit 404 is passed to the encoder unit 405 and subjected to encoding processing such as error correction. There may exist data directly output from the transmission data buffer unit 404 to the modulation unit 406 without performing the encoding process.
  • the encoded data is subjected to modulation processing by the modulation unit 406.
  • the modulated data is converted into a baseband signal and then output to the frequency conversion unit 407 where it is converted into a radio transmission frequency. Thereafter, a transmission signal is transmitted from the antenna 408 to one or a plurality of mobile terminals 202.
  • the reception processing of the base station 203 is executed as follows. Radio signals from one or more mobile terminals 202 are received by the antenna 408. The received signal is converted from a radio reception frequency to a baseband signal by the frequency conversion unit 407, and demodulated by the demodulation unit 409. The demodulated data is transferred to the decoder unit 410 and subjected to decoding processing such as error correction. Of the decoded data, control data is passed to the protocol processing unit 403 or EPC communication unit 401 and other base station communication unit 402, and user data is passed to the EPC communication unit 401 and other base station communication unit 402. A series of processing of the base station 203 is controlled by the control unit 411. Therefore, although not shown in FIG. 4, the control unit 411 is connected to the units 401 to 410.
  • FIG. 5 is a block diagram showing the configuration of the MME according to the present invention.
  • FIG. 5 shows the configuration of the MME 204a included in the MME unit 204 shown in FIG.
  • the PDN GW communication unit 501 transmits and receives data between the MME 204a and the PDN GW.
  • the base station communication unit 502 performs data transmission / reception between the MME 204a and the base station 203 using the S1 interface.
  • the data received from the PDN GW is user data
  • the user data is passed from the PDN GW communication unit 501 to the base station communication unit 502 via the user plane communication unit 503 and to one or more base stations 203.
  • Sent When the data received from the base station 203 is user data, the user data is passed from the base station communication unit 502 to the PDN GW communication unit 501 via the user plane communication unit 503 and transmitted to the PDN GW.
  • control data is passed from the PDN GW communication unit 501 to the control plane control unit 505.
  • control data is transferred from the base station communication unit 502 to the control plane control unit 505.
  • the HeNBGW communication unit 504 is provided when the HeNBGW 205 exists, and performs data transmission / reception through an interface (IF) between the MME 204a and the HeNBGW 205 depending on the information type.
  • the control data received from the HeNBGW communication unit 504 is passed from the HeNBGW communication unit 504 to the control plane control unit 505.
  • the processing result in the control plane control unit 505 is transmitted to the PDN GW via the PDN GW communication unit 501.
  • the result processed by the control plane control unit 505 is transmitted to one or more base stations 203 via the S1 interface via the base station communication unit 502, and to one or more HeNBGWs 205 via the HeNBGW communication unit 504. Sent.
  • the control plane control unit 505 includes a NAS security unit 505-1, an SAE bearer control unit 505-2, an idle state mobility management unit 505-3, and the like, and performs overall processing for the control plane.
  • the NAS security unit 505-1 performs security of a NAS (Non-Access Stratum) message.
  • the SAE bearer control unit 505-2 performs management of SAE (System Architecture) Evolution bearers and the like.
  • the idle state mobility management unit 505-3 performs mobility management in a standby state (idle state; also referred to as LTE-IDLE state or simply idle), generation and control of a paging signal in the standby state,
  • the tracking area of one or a plurality of mobile terminals 202 is added, deleted, updated, searched, and tracking area list is managed.
  • the MME 204a distributes the paging signal to one or a plurality of base stations 203. Further, the MME 204a performs mobility control (Mobility control) in a standby state (Idle State). The MME 204a manages a tracking area list when the mobile terminal is in a standby state and in an active state (Active State). The MME 204a starts a paging protocol by transmitting a paging message to a cell belonging to a tracking area (tracking area: TrackingTrackArea) where the UE is registered.
  • the idle state mobility management unit 505-3 may perform CSG management, CSG-ID management, and whitelist management of the Home-eNB 206 connected to the MME 204a.
  • FIG. 6 is a flowchart illustrating an outline from a cell search to a standby operation performed by a communication terminal (UE) in an LTE communication system.
  • the communication terminal uses the first synchronization signal (P-SS) and the second synchronization signal (S-SS) transmitted from the neighboring base stations in step ST601, and performs slot timing, frame Synchronize timing.
  • P-SS first synchronization signal
  • S-SS second synchronization signal
  • the P-SS and S-SS are collectively referred to as a synchronization signal (SS).
  • SS synchronization signal
  • a synchronization code corresponding to one-to-one is assigned to the PCI assigned to each cell.
  • 504 patterns are under consideration. Synchronization is performed using the 504 PCIs, and the PCI of the synchronized cell is detected (specified).
  • a cell-specific reference signal that is a reference signal (reference signal: RS) transmitted from the base station to each cell is detected for the synchronized cell.
  • Measure the received power of RS Reference Signal Received Power: RSRP.
  • RS Reference Signal Received Power
  • RS Reference Signal
  • a code corresponding to PCI one to one is used. By correlating with that code, it can be separated from other cells.
  • deriving the RS code of the cell from the PCI specified in step ST601 it is possible to detect the RS and measure the received power of the RS.
  • a cell having the best RS reception quality for example, a cell having the highest RS reception power, that is, the best cell is selected from one or more cells detected in step ST602.
  • step ST604 the PBCH of the best cell is received and the BCCH that is broadcast information is obtained.
  • MIB Master Information Block
  • the MIB information includes, for example, DL (downlink) system bandwidth (also called transmission bandwidth setting (transmission bandwidth configuration: dl-bandwidth)), the number of transmission antennas, SFN (System frame number), and the like.
  • SIB1 includes information related to access to the cell, information related to cell selection, and scheduling information of other SIBs (SIBk; an integer of k ⁇ 2).
  • SIB1 includes a tracking area code (TrackingTrackArea Code: TAC).
  • the communication terminal compares the TAC of SIB1 received in step ST605 with the TAC portion of the tracking area identifier (Tracking Area Identity: TAI) in the tracking area list already held by the communication terminal.
  • the tracking area list is also referred to as a TAI list (TAI list).
  • TAI is identification information for identifying a tracking area, and is composed of MCC (Mobile Country Code), MNC (Mobile Network Code), and TAC (Tracking Area Code).
  • MCC Mobile Country Code
  • MNC Mobile Network Code
  • TAC Track Area Code
  • MCC Mobile Country Code
  • MNC Mobile Network Code
  • TAC Track Area Code
  • step ST606 If, as a result of the comparison in step ST606, the TAC received in step ST605 is the same as the TAC included in the tracking area list, the communication terminal enters a standby operation in the cell. In comparison, if the TAC received in step ST605 is not included in the tracking area list, the communication terminal passes through the cell to a core network (Core Network, EPC) including MME and the like, and TAU (Tracking Area Update). Request tracking area change to do
  • EPC Core Network, EPC
  • MME Mobile Management Entity
  • TAU Track Area Update
  • a device that constitutes a core network performs tracking based on the identification number (UE-ID, etc.) of the communication terminal sent from the communication terminal together with the TAU request signal. Update the area list.
  • the core network side device transmits the updated tracking area list to the communication terminal.
  • the communication terminal rewrites (updates) the TAC list held by the communication terminal based on the received tracking area list. Thereafter, the communication terminal enters a standby operation in the cell.
  • a cell configured by an eNB has a relatively wide range of coverage.
  • a cell is configured to cover a certain area with a relatively wide range of coverage of a plurality of cells configured by a plurality of eNBs.
  • the cell configured by the eNB has a coverage that is narrower than the coverage of the cell configured by the conventional eNB. Therefore, in the same way as in the past, in order to cover a certain area, a larger number of eNBs having a smaller cell size are required as compared with the conventional eNB.
  • a cell having a relatively large coverage such as a cell configured by a conventional eNB
  • a macro cell an eNB configuring the macro cell
  • a cell having a relatively small coverage such as a small cell
  • an eNB configuring the small cell is referred to as a “small eNB”.
  • the macro eNB may be a “wide area base station” described in Non-Patent Document 7, for example.
  • the small eNB may be, for example, a low power node, a local area node, a hot spot, or the like.
  • the small eNB is a pico eNB that constitutes a pico cell, a femto eNB that constitutes a femto cell, a HeNB, an RRH (Remote Radio Unit), an RRU (Remote Radio Unit), an RRE (Remote Radio Equipment), or an RN (Relay Node). There may be.
  • the small eNB may be a “local area base station (Local (Base Station)” or “Home base station (Home Base Station)” described in Non-Patent Document 7.
  • FIG. 7 is a diagram illustrating a concept of a cell configuration when a macro eNB and a small eNB coexist.
  • a macro cell configured by a macro eNB has a relatively wide range of coverage 701.
  • a small cell configured by a small eNB has a coverage 702 having a smaller range than a coverage 701 of a macro eNB (macro cell).
  • the coverage of a cell configured by a certain eNB may be included in the coverage of a cell configured by another eNB.
  • the small cell coverage 702 configured by the small eNB is included in the macro cell coverage 701 configured by the macro eNB. May be.
  • a plurality of, for example, two small cell coverages 702 may be included in one macro cell coverage 701.
  • a mobile terminal (UE) 703 is included in, for example, a small cell coverage 702 and performs communication via the small cell.
  • the macro cell coverage 701 configured by the macro eNB and the small cell coverage 702 configured by the small eNB overlap in a complicated manner. Cases arise.
  • a plurality of small cell coverages 702 configured by a plurality of small eNBs are configured in one macro cell coverage 701 configured by one macro eNB. Sometimes it happens.
  • split bearers are supported.
  • the split bearer is a bearer that is split (split) into a direct path between the MeNB and the UE and a path between the MeNB and the UE via the SeNB.
  • the split bearer supports SPS (Semi-Persistent Scheduling) not only for the MeNB but also for the SeNB (see Non-Patent Document 6). SPS can be set to MeNB and SeNB simultaneously and independently.
  • SPS is a scheduling method that enables radio resources to be semi-statically allocated to UEs over a long period of a plurality of subframes.
  • the eNB can make it unnecessary to transmit DL allocation information or UL grant information on dedicated control channels such as PDCCH and EPDCCH to the UE in each subframe.
  • SPS SPS C-RNTI (Cell-Radio-Network-Temporary-Identifier), and the number of empty transmissions before the UL implicit release (hereinafter also referred to as "the number of empty transmissions before release") in RRC dedicated signaling Is notified to the UE.
  • the parameter “implicitReleaseAfter” is used as the number of empty transmissions before release. In the following description, the number of pre-release empty transmissions may be represented by the symbol “n”.
  • C-RNTI for SPS may be referred to as SPS C-RNTI.
  • SPS starts (activates) and ends (deactivates) execution by PDCCH or EPDCCH.
  • the SPS C-RNTI is masked in the CRC of this PDCCH or EPDCCH.
  • an SPS execution termination method called an implicit release is determined.
  • the UE transmits a MAC PDU (Protocol Data Unit) including at least one of padding bits and padding BSR. This transmission may be referred to as empty transmission or padding transmission.
  • the uplink grant information is immediately cleared.
  • the eNB when the transmission from the UE is continuously received as the number of empty transmissions before the UL implicit release, the setting of the uplink SPS is invalidated.
  • the eNB can use the radio resource allocated in the SPS setting for other UEs by invalidating the SPS setting.
  • FIG. 8 is a diagram for explaining an operation example of uplink SPS.
  • step ST801 the eNB notifies the UE of the SPS resource configuration and the SPS C-RNTI used when receiving the PDCCH by RRC dedicated signaling.
  • Step ST801 the UE that has received the SPS resource configuration and the SPS C-RNTI detects the PDCCH using the SPS C-RNTI.
  • step ST802 the eNB notifies the UE of an SPS execution start (activation) instruction.
  • the UE that has received the SPS execution start instruction in Step ST802 activates the SPS when detecting the first scheduling. That is, the execution of SPS is started. The scheduling continues until it is deactivated, that is, until the execution of the SPS is finished.
  • Step ST803 and Step ST804 SPS is executed between the eNB and the UE using the scheduled SPS resource.
  • the UE transmits uplink data to the eNB using the set SPS resource.
  • Step ST805 when there is no transmission data in the set SPS resource, the UE performs padding transmission.
  • Step ST805 and Step ST806 when the UE continuously performs padding transmission for the number of times set as the number of pre-release empty transmissions, the UE clears the SPS in Step ST807.
  • the number of pre-release empty transmissions is set to two.
  • Step ST805 and Step ST806 when the eNB also receives padding transmission from the UE continuously for the number of times set as the number of pre-release empty transmissions, the eNB releases the setting of the uplink SPS in Step ST807.
  • the transmission method of the buffer status report (Buffer Status Report (abbreviation: BSR) when the uplink split bearer is being executed shall be a method based on double reporting and a threshold (Double Reporting Threshold And abbreviation: DRAT).
  • BSR Buffer Status Report
  • DRAT Double Reporting Threshold And abbreviation
  • FIG. 9 and 10 are diagrams for explaining a transmission method using DRAT.
  • FIG. 9 illustrates a case where the uplink PDCP data amount is equal to or less than a predetermined threshold (Th).
  • FIG. 10 illustrates a case where the uplink PDCP data amount is larger than a predetermined threshold (Th).
  • the UE 905 includes a MAC (Medium Access Control) 907, an RLC (Radio Link Control) 908, a MAC 909, an RLC 910, and a PDCP (Packet Data Convergence Protocol) 911.
  • the MAC 907 is used for the MeNB 901.
  • the RLC 908 is used for the MeNB 901.
  • the MAC 909 is used for the SeNB 902.
  • the RLC 910 is used for the SeNB 902.
  • UE 906 includes MAC 912, RLC 913, MAC 914, RLC 915, and PDCP 916.
  • the MAC 912 is used for the MeNB 903.
  • the RLC 913 is used for the MeNB 903.
  • the MAC 914 is used for the SeNB 904.
  • the RLC 915 is used for the SeNB 904.
  • a buffer status (Buffer Status; abbreviated as BS) is reported to one eNB, that is, MeNB 901 or SeNB 902.
  • BS Buffer Status
  • Which of the MeNB 901 and the SeNB 902 reports the BS is set by RRC signaling.
  • One eNB set as an eNB that reports a BS is referred to as “1st-eNB”.
  • 1st-eNB the case where BS is reported to MeNB901 is shown.
  • BSs having the same data amount of PDCP 916 are reported to both eNBs, that is, 1st-eNB and 2nd-eNB.
  • the 1st-eNB is MeNB 903 and the 2nd-eNB is SeNB 904.
  • the predetermined threshold value is set for each radio bearer (RB).
  • FIG. 9 may be a case where the uplink PDCP data amount is smaller than a predetermined threshold (Th), and FIG. 10 may be a case where the uplink PDCP data amount is equal to or greater than a predetermined threshold (Th).
  • the trigger of the buffer status report matches the eNB that transmits data.
  • DRAT when the data amount of transmission data is less than or equal to the threshold, data is transmitted to one configured eNB (1st-eNB). When the amount of transmission data is larger than the threshold, the data is transmitted to both eNBs (1st-eNB, 2nd-eNB).
  • the UE cannot determine whether or not the SPS resource can be cleared. Also, the eNB cannot determine whether or not to release the SPS resource. Therefore, an unstable operation occurs between the eNB and the UE, which may possibly cause a malfunction.
  • FIG. 11 is a diagram for explaining a problem when SPS is set when UL split bearer is set.
  • the 1st-eNB is MeNB
  • the 2nd-eNB is SeNB.
  • FIG. 11 the case where SPS is respectively set to MeNB and SeNB is shown.
  • Step ST1001 the MeNB notifies the UE of the activation using the uplink grant of the uplink SPS using the PDCCH.
  • the UE receives the PDCCH and activates the uplink SPS. That is, the execution of uplink SPS is started.
  • Step ST1002 to Step ST1007 the UE transmits uplink data to the MeNB using the uplink SPS resource set for the MeNB.
  • Step ST1008 the SeNB notifies the UE of the activation using the uplink grant of the uplink SPS using the PDCCH.
  • the UE receives the PDCCH and activates the uplink SPS.
  • Step ST1009 the UE transmits uplink data to the SeNB using an uplink SPS resource set for the SeNB. It is assumed that the amount of transmission data generated in the UE is equal to or greater than the threshold in DRAT. Although not shown, the UE also transmits data to the MeNB.
  • step ST1010 and step ST1011 when uplink data is not continuously generated in the UE with the uplink SPS resource set for the SeNB, similarly, since the data amount of uplink data is equal to or less than the threshold in DRAT, the UE Therefore, it is determined that uplink data is not transmitted to the SeNB, and padding transmission is not performed.
  • Step ST1012 the UE cannot determine whether or not to clear the SPS resource. Also, the eNB cannot determine whether to release the SPS resource.
  • uplink data is transmitted to both the 1st-eNB and the 2nd-eNB.
  • a DRAT threshold for SPS may be provided.
  • the SPS DRAT threshold can be set to a value different from the DRAT threshold when the SPS is not, and the DRAT operation when the SPS is not the SPS. The operation can be made different from that of the DRAT.
  • a negative value is set as a threshold value of DRAT for SPS. It may be applied when transmitting to both eNBs when the amount of uplink data is larger than the DRAT threshold.
  • uplink data is transmitted to both the 1st-eNB and the 2nd-eNB.
  • transmission of uplink data to both the 1st-eNB and the 2nd-eNB may be statically determined in advance by a standard or the like, or notified to the UE together with the SPS setting. May be. Or you may notify UE with SPS activation.
  • the DRAT threshold when the SPS is set, the DRAT threshold is not provided, the set DRAT threshold is invalidated, the DRAT threshold is set to a negative value, or the DRAT threshold is set. It is statically determined beforehand by a standard or the like to set 0 to 0. This makes it possible to obtain common recognition between the eNB and the UE. In addition, since it is not necessary to signal these pieces of information, the signaling load can be reduced.
  • information for invalidating the set DRAT threshold may be provided, and the information may be notified to the UE together with the SPS setting.
  • a negative value or 0 may be notified to the UE together with the SPS setting as the DRAT threshold.
  • notifications may be sent to the UE separately from the SPS setting. By reporting information that invalidates the set DRAT threshold together with the SPS setting, the signaling load can be reduced. In addition, since the SPS setting and timing can be made the same, the possibility of unstable operation and malfunction can be reduced. For these notifications, UE-specific RRC signaling may be used.
  • information for invalidating the set DRAT threshold may be provided, and the information may be notified to the UE together with the SPS activation.
  • a negative value or 0 may be notified to the UE together with the SPS activation as the DRAT threshold.
  • These notifications may be notified to the UE separately from the SPS activation. By notifying the information that invalidates the set DRAT threshold together with the activation of the SPS, the signaling load can be reduced. In addition, since it is possible to make the timing the same as the activation of the SPS, it is possible to reduce the possibility of unstable operation and malfunction. An L1 / L2 control signal may be used for these notifications.
  • Disclosed is a method for canceling the state in which uplink data is transmitted to both the 1st-eNB and the 2nd-eNB set as described above.
  • information for validating the set DRAT threshold may be provided, and the information may be included in signaling for invalidating the SPS setting and notified to the UE.
  • the DRAT threshold value to be set again may be included in signaling for invalidating the SPS setting and notified to the UE.
  • the state may be canceled by signaling for invalidating the SPS setting.
  • the DRAT threshold can be returned to the conventional value, and the same effect as described above can be obtained.
  • information for validating the set DRAT threshold may be provided, and the information may be included in the SPS deactivation and notified to the UE.
  • the DRAT threshold to be set again may be included in the SPS deactivation and notified to the UE.
  • the state may be canceled by SPS deactivation.
  • the DRAT threshold can be returned to the conventional value, and the same effect as described above can be obtained.
  • FIG. 12 is a diagram for explaining a case where the DRAT threshold is set to 0 when SPS is set. If the amount of uplink data is smaller than the DRAT threshold, it is transmitted only to the 1st-eNB. If the amount of uplink data is greater than or equal to the DRAT threshold, it is transmitted to both the 1st-eNB and the 2nd-eNB eNB. Is the case.
  • the 1st-eNB is MeNB
  • the 2nd-eNB is SeNB. The case where SPS is each set to MeNB and SeNB is shown.
  • FIG. 12 is similar to FIG. 11, and thus different parts will be mainly described.
  • the DRAT threshold 1103 is set to zero.
  • Step ST1008 the SeNB notifies the UE of the activation using the uplink grant of the uplink SPS using the PDCCH.
  • the activation notification includes information for setting the DRAT threshold to 0.
  • the UE receives the PDCCH, activates the uplink SPS, and sets the DRAT threshold to 0.
  • Step ST1009 the UE transmits uplink data to the SeNB using an uplink SPS resource set for the SeNB. Since the DRAT threshold is set to 0, the uplink transmission data generated by the UE can be transmitted to the SeNB. Although not shown, it is possible to transmit data to the MeNB. Therefore, a part of the uplink data generated in the UE is transmitted to the MeNB, and the remaining uplink data is transmitted to the SeNB.
  • Step ST1101 to Step ST1102 when uplink data is not continuously generated in the UE with the uplink SPS resource set for the SeNB, similarly, since the data amount of the uplink data is equal to or greater than the DRAT threshold, the UE , Uplink data can be transmitted to the SeNB. Therefore, it is determined that padding transmission is possible, and padding transmission is performed.
  • step ST1012 When uplink transmission data is not generated continuously for the number of times set as the number of empty transmissions before release and padding transmission is performed, in step ST1012, the UE clears the SPS resource, and the eNB releases the SPS resource.
  • the implicit release is normally performed between the eNB and the UE.
  • uplink data is always transmitted to the 2nd-eNB even when the amount of uplink transmission data generated in the UE is small from the timing when the SPS is set or activated until the cancellation or deactivation. As a result, the power consumption of the UE increases.
  • the uplink data is transmitted to both the 1st-eNB and the 2nd-eNB in accordance with the timing of SPS resource allocation.
  • the SeNB when the SeNB is configured to set SPS, that is, configured to communicate with a communication terminal apparatus using radio resources that are periodically allocated, the data amount of transmission data Is equal to or less than the threshold Th, the threshold Th is changed so that transmission data is transmitted to the MeNB and SeNB.
  • the threshold value Th is set to zero (0).
  • SeNB communication by SPS can be performed. Therefore, it is possible to provide a communication system that can stably perform communication operations between the MeNB and SeNB and the UE. That is, SDR can be enabled when DRAT is executed by an uplink split bearer, and a high-speed and stable communication system can be provided.
  • the threshold value Th may be changed when the amount of transmission data is less than the threshold value Th.
  • the SeNB is configured to communicate with a communication terminal apparatus using radio resources that are set with SPS, that is, periodically allocated, the amount of transmission data is less than the threshold Th
  • the threshold Th may be changed so that the transmission data is transmitted to the MeNB and SeNB.
  • the threshold Th is set to zero (0) as in the present embodiment.
  • SeNB communication by SPS can be performed. Therefore, it is possible to provide a communication system that can stably perform communication operations between the MeNB and SeNB and the UE. That is, SDR can be enabled when DRAT is executed by an uplink split bearer, and a high-speed and stable communication system can be provided.
  • Embodiment 2 When the method disclosed in the first embodiment is used, the DRAT threshold value cannot be substantially set. Therefore, the power consumption of the UE increases.
  • the DRAT threshold is used in UE when distributing uplink transmission data from PDCP to RLC / MAC. Therefore, in order to transmit uplink data to both eNBs in accordance with the set SPS resource allocation timing, fine time management according to the SPS timing is required when distributing the uplink transmission data.
  • malfunctions may occur due to fluctuations in the timing of occurrence of uplink transmission data and fluctuations in PDCP processing time.
  • this embodiment discloses a method different from the method disclosed in the first embodiment.
  • a MAC PDU including at least one of a padding bit and a padding BSR is transmitted as in the prior art. In this way, control in the eNB and the UE can be simplified by using the same padding transmission as that in the past.
  • the UE clears the SPS setting when performing padding transmission to the 2nd-eNB continuously for the number of times set as the number of empty transmissions before release.
  • the 2nd-eNB also releases the SPS resource when the padding transmission is continuously received from the UE a number of times set as the number of pre-release empty transmissions.
  • FIG. 13 is a diagram for explaining a method of supporting implicit release when SPS is set for the 2nd-eNB.
  • the 1st-eNB is MeNB
  • the 2nd-eNB is SeNB. The case where SPS is set for both MeNB and SeNB is shown.
  • FIG. 13 is similar to FIG. 11 and FIG.
  • the DRAT threshold 1201 is set to an arbitrary value Th.
  • Step ST1008 the SeNB notifies the UE of the activation using the uplink grant of the uplink SPS using the PDCCH. Normal activation is sufficient.
  • Step ST1202 to Step ST1203 when uplink data is not continuously generated in the UE with the uplink SPS resource set for the SeNB, similarly, since the amount of uplink data is equal to or greater than the DRAT threshold, the UE , Uplink data can be transmitted to the SeNB. Therefore, it is determined that padding transmission is possible, and padding transmission is performed.
  • step ST1204 When uplink transmission data is not generated continuously for the number of times set as the number of empty transmissions before release and padding transmission is performed, in step ST1204, the UE clears the SPS resource, and the eNB releases the SPS resource.
  • the implicit release is normally performed between the SeNB and the UE.
  • the eNB and the UE can determine to release the SPS resource by the implicit release, and can reduce the occurrence of unstable operation and malfunction.
  • the SeNB when the SeNB is configured to set SPS, that is, configured to communicate with a communication terminal apparatus using radio resources that are periodically allocated, the data amount of transmission data Is transmitted to the MeNB and the end signal indicating the end of the communication using the periodically assigned radio resource is transmitted to the SeNB. Set to do.
  • SeNB communication by SPS can be terminated. Therefore, it is possible to provide a communication system that can stably perform communication operations between the MeNB and SeNB and the UE. That is, SDR can be enabled when DRAT is executed by an uplink split bearer, and a high-speed and stable communication system can be provided.
  • the setting for performing the above padding transmission may be performed when the data amount of the transmission data is less than the threshold value Th.
  • the SeNB is configured to communicate with a communication terminal apparatus using radio resources that are set with SPS, that is, periodically allocated, the amount of transmission data is less than the threshold Th
  • the transmission data is transmitted to the MeNB, and the end signal indicating the end of communication using the periodically allocated radio resource is transmitted to the SeNB, specifically, the padding transmission is set. May be configured.
  • SeNB communication by SPS can be terminated. Therefore, it is possible to provide a communication system that can stably perform communication operations between the MeNB and SeNB and the UE. That is, SDR can be enabled when DRAT is executed by an uplink split bearer, and a high-speed and stable communication system can be provided.
  • Embodiment 2 Modification 1 Another method for solving the problem described in the second embodiment will be disclosed.
  • Information indicating that there is no transmission data is provided, and the information is transmitted from the UE to the eNB using an uplink L1 / L2 control signal.
  • PUCCH is used as the uplink L1 / L2 control signal.
  • the UE maps information indicating that there is no transmission data to the PUCCH and transmits the information to the eNB.
  • the eNB recognizes that there is no uplink transmission data by receiving PUCCH from the UE at the set SPS timing and obtaining information indicating that there is no transmission data.
  • the UE clears the SPS resource when information indicating that there is no transmission data is transmitted continuously for the number of times set as the number of pre-release empty transmissions.
  • the eNB releases the SPS resource.
  • the PUCCH configuration for mapping information indicating that there is no transmission data is set by the eNB and notified to the UE in advance.
  • the configuration of the PUCCH includes a frequency axis direction resource, a time axis direction resource, a sequence used for a reference signal (reference signal: RS) used for the PUCCH, and the like.
  • subcarriers and resource blocks may be set as resources in the frequency axis direction. It may be a minimum resource.
  • the minimum resource may be a minimum unit in transmission.
  • the minimum unit may be, for example, one physical resource block (Physical Resource Block; abbreviation: PRB).
  • PRB Physical Resource Block
  • the timing for transmitting the PUCCH may be arbitrarily set, but may be the timing at which the SPS resource is set. This makes it possible to simplify the timing control in the UE and the eNB.
  • the RS sequence used for PUCCH may be for each cell or for each beam.
  • the eNB can receive even if PUCCH transmissions of a plurality of UEs occur at the same SPS resource timing. Or it is good also as UE individual as a sequence for RS used for PUCCH.
  • the resources in the frequency axis direction and the resources in the time axis direction can share the same PUCCH for a plurality of UEs. Even if PUCCHs of a plurality of UEs exist in the same resource, the eNB can receive the PUCCHs of the UEs by using the UE-specific RS.
  • ENB may include the PUCCH configuration in the SPS settings and notify the UE.
  • the eNB may notify the UE by including the PUCCH configuration in the SPS activation.
  • a conventional PUCCH configuration may be used as the PUCCH configuration for mapping information indicating that there is no transmission data.
  • the UE maps information indicating that there is no transmission data to the PUCCH using the conventional PUCCH configuration.
  • the UE transmits the PUCCH at the timing of the set SPS resource.
  • the eNB does not need to set a PUCCH that maps information indicating that there is no transmission data.
  • information indicating that there is no transmission data may be mapped to the PUSCH.
  • the UE maps information indicating that there is no transmission data to the PUSCH and transmits it to the eNB.
  • the eNB recognizes that there is no uplink transmission data by receiving the PUSCH from the UE at the set SPS timing and obtaining information indicating that there is no transmission data.
  • SPS resources are already set at the SPS timing.
  • a resource for transmitting uplink data is set as the SPS resource. Since PUSCH is used for uplink data transmission, PUSCH resources are set.
  • the UE has already obtained an uplink grant for the PUSCH resource for the SPS set from the eNB. Therefore, the UE can use resources for PUSCH transmission for the configured SPS.
  • the PUSCH resource for transmitting information indicating that there is no transmission data may be part or all of the PUSCH resource for SPS set at the SPS timing.
  • the method in the case of transmitting on the PUCCH described above may be applied.
  • SRS Soliding Reference Signal
  • a specific SRS resource indicating that there is no transmission data is set.
  • the minimum resource on the time axis may be one symbol.
  • the eNB notifies the UE of the setting of the SRS resource.
  • the UE transmits an SRS using the SRS resource.
  • the eNB can recognize that there is no transmission data when the SRS is received from the UE using the SRS resource at the SPS timing.
  • the RS sequence used for SRS may be applied by the above-described method for transmission using PUCCH.
  • an RS sequence indicating that there is no transmission data may be provided, and the sequence may be used for the PUCCH, PUSCH, or SRS RS.
  • Which of PUCCH, PUSCH, and SRS is used may be statically determined in advance, or may be notified from the eNB to the UE.
  • the resource for the channel or signal may be set for each UE.
  • the UE When there is no transmission data at the set SPS timing, the UE transmits a predetermined channel or signal using the RS sequence. When receiving a predetermined channel or signal at the SPS timing, the eNB can recognize that there is no transmission data.
  • the method disclosed in the present modification may be used only when there is no transmission data at the SPS timing set in the 2nd-eNB. For other set SPS, normal padding transmission may be used.
  • Embodiment 3 In the UL split bearer, uplink transmission data having a data amount smaller than the DRAT threshold may occur at the SPS timing set for the 2nd-eNB.
  • the 2nd-eNB when uplink transmission data with a data amount smaller than the DRAT threshold is generated at the SPS timing set for the 2nd-eNB, the 2nd-eNB In this case, no uplink transmission data is generated. Therefore, the UE performs padding transmission to the 2nd-eNB.
  • the SPS setting is invalidated and the SPS resource is released in the UE and the 2nd-eNB due to the implicit release. That is, the SPS resource may be released due to the implicit release even though there is uplink transmission data at the set SPS timing.
  • the UE After the SPS resource is released by the implicit release, in the UE, when uplink transmission data exceeding the DRAT threshold is generated at the SPS timing set for the 2nd-eNB, the UE is set to the 2nd-eNB SPS is no longer applied.
  • the UE Even if the uplink transmission data is generated at the set SPS timing, the UE cannot transmit the uplink data using the SPS resource.
  • the UE generates uplink transmission data at the set SPS timing, and the SPS resource for the 2nd-eNB is released even though the UE transmits the uplink data.
  • uplink data cannot be transmitted using the set SPS resource.
  • FIG. 14 is a diagram for explaining a case where uplink transmission data having a data amount smaller than the DRAT threshold occurs. The case where the method of supporting the implicit release when the SPS is configured for the 2nd-eNB disclosed in the second embodiment is shown.
  • 1st-eNB is MeNB and 2nd-eNB is SeNB.
  • SPS is set for both MeNB and SeNB is shown.
  • FIG. 14 is similar to FIG. 13, and thus different parts will be mainly described.
  • step ST1202 uplink data having a data amount smaller than the DRAT threshold is generated in the UE with the uplink SPS resource set for the SeNB.
  • step ST1301 the UE transmits uplink data to the MeNB.
  • step ST1202 the UE performs padding transmission to the SeNB.
  • the UE Transmits uplink data to the MeNB.
  • the UE performs padding transmission to the SeNB.
  • the UE clears the SPS resource in step ST1204 by implicit release. ENB also releases SPS resources.
  • step ST1303 the uplink SPS resource set for the SeNB generates uplink data having a data amount equal to or greater than the DRAT threshold.
  • the UE transmits uplink data to the MeNB.
  • step ST1303 Since uplink transmission data is generated also to the SeNB, in step ST1303, the UE transmits uplink data to the SeNB. However, since the SPS resource has already been released, the SPS resource cannot be used for transmission of the uplink data.
  • the UE since the resource for uplink transmission data for the SeNB is not allocated, the UE has to start from a new scheduling request (SR) signal transmission.
  • the UE must transmit an SR signal to the SeNB and receive a UL grant from the SeNB.
  • SR scheduling request
  • the uplink split bearer If the uplink split bearer is set, do not invalidate the uplink SPS setting. When the uplink split bearer is set, the uplink SPS resource may not be released. When an uplink split bearer is set, implicit release may not be performed.
  • the UE When the uplink split bearer is set, the UE is set even if it performs padding transmission continuously for the number of times set as the number of empty transmissions before release when the uplink SPS is set in the 2nd-eNB. Do not clear any SPS resources.
  • the 2nd-eNB does not release the set SPS resource even if it receives padding transmission continuously for the number of times set as the number of pre-release empty transmissions.
  • the uplink SPS setting is not invalidated when the uplink split bearer is configured. Can be set dynamically. Thereby, flexible operation is possible according to the communication status and the load status.
  • the above-mentioned number of pre-release empty transmissions may be used as the information indicating that the uplink SPS setting in the method (2) is not invalidated.
  • a value indicating that the SPS setting is not invalidated is set as the number of empty transmissions before release.
  • a value indicating infinity is provided as the number of pre-release empty transmissions.
  • a new value may be provided separately from the existing value.
  • Information indicating that the uplink SPS setting in the method (2) is not invalidated may be notified from the eNB to the UE.
  • the eNB to be notified may be a 1st-eNB or a 2nd-eNB.
  • the UE when notifying the UE from the 2nd-eNB, the UE may be notified directly from the 2nd-eNB, or the UE may be notified from the 2nd-eNB via the 1st-eNB.
  • X2 signaling may be used for notification of information between eNBs.
  • S1 signaling may be used via the MME.
  • the following three (1) to (3) are disclosed as specific examples of the signaling method for notifying the information from the eNB to the UE.
  • RRC signaling For example, the notification may be included in signaling for setting the SPS configuration.
  • MAC CE Control Element
  • MAC signaling For example, a MAC CE (Control Element) including the information may be provided and notified by MAC signaling.
  • L1 / L2 signaling For example, PDCCH or EPDCCH.
  • the notification may be included in the SPS activation.
  • the eNB notifies the UE of information indicating that the uplink SPS setting is not invalidated.
  • the UE that has received the information does not invalidate the uplink SPS setting.
  • the UE performs the implicit transmission even if the padding transmission is continuously performed as many times as the number of pre-release empty transmissions. Does not release and does not clear the set SPS resource.
  • FIG. 15 is a diagram for explaining a method for preventing the setting of the uplink SPS from being invalidated. This shows a case in which information indicating that the setting of the uplink SPS is not invalidated is included in the SPS activation and notified.
  • 1st-eNB is MeNB and 2nd-eNB is SeNB.
  • SPS is set for both MeNB and SeNB. Since FIG. 15 is similar to FIG. 14, different parts will be mainly described.
  • Step ST1008 the SeNB notifies the UE of the activation using the uplink grant of the uplink SPS using the PDCCH.
  • Information indicating that the uplink SPS setting is not invalidated is included in the activation.
  • the UE that has received the SPS activation from the SeNB executes the SPS with the set resource and does not invalidate the uplink SPS setting. Even if the UE performs padding transmission a predetermined number of times to the SeNB, neither the eNB nor the UE performs an implicit release, and the SPS setting is set not to be invalidated.
  • step ST1301 the UE transmits uplink data to the MeNB.
  • step ST1202 the UE performs padding transmission to the SeNB.
  • the UE When uplink data having a data amount smaller than the DRAT threshold is not continuously generated in the UE at the SPS timing set for the SeNB in steps ST1202 to ST1203, similarly, in steps ST1301 to ST1302, the UE Transmits uplink data to the MeNB. The UE performs padding transmission to the SeNB.
  • Step ST1204 in accordance with the setting that does not invalidate the setting of the uplink SPS even when the uplink transmission data is not generated continuously and the padding transmission is performed for the SeNB, the number of times set as the number of empty transmissions before release, The UE does not clear SPS resources. The eNB also does not release SPS resources. In step ST1204, the implicit release is not performed and the SPS resource is not released.
  • the UE exceeds the DRAT threshold.
  • the UE can transmit uplink data to the SeNB using the set SPS resource.
  • the uplink transmission data is generated at the set SPS timing, and the SPS resource for the 2nd-eNB is released even though the UE transmits the uplink data. Can be eliminated. Therefore, when uplink data occurs in the set SPS resource, it is not possible to perform transmission to the 2nd-eNB, and it is possible to eliminate a situation in which starting from transmission of the SR signal is unavoidable.
  • the UE when receiving information indicating that the uplink SPS setting is not invalidated, the UE stops releasing the SPS resource that is a radio resource allocated by the SPS.
  • the information indicating that the uplink SPS setting is not invalidated corresponds to release stop information indicating that the release of the SPS resource is stopped. That is, when the UE receives the release stop information, the UE stops releasing the SPS resource.
  • uplink data is generated with the set SPS resource, it is possible to prevent the transmission to the SeNB, and it is possible to eliminate the situation where the start from the transmission of the SR signal is forced. Therefore, it is possible to suppress an increase in UE power consumption, a decrease in resource usage efficiency due to an increase in PDCCH resources, and an increase in data transmission delay.
  • Embodiment 4 In the method disclosed in the third embodiment, even when there is no actual transmission data at the set SPS timing, the implicit release is not performed, and the SPS resource is not released.
  • the 2nd-eNB continues to allocate the SPS resource to the UE at the SPS timing.
  • Provide a timer that does not invalidate the SPS setting.
  • the eNB sets a period during which the SPS setting is not invalidated and notifies the UE.
  • the above-described timer is used to start the implicit release function.
  • the eNB notifies the UE of a period during which the SPS setting is not invalidated, together with information indicating that the uplink SPS setting is not invalidated.
  • the UE starts the timer, and when a period when the SPS setting is not invalidated has elapsed, the UE starts implicit release and stops the timer.
  • the period during which the SPS setting is not invalidated may be time, the number of radio frames, the number of subframes, the number of slots, and the number of symbols.
  • the period during which the SPS setting is not invalidated may be a positive integer multiple of the set SPS timing interval.
  • the period during which the SPS setting is not invalidated may be statically determined in advance by a standard or the like.
  • an implicit release may be started when the number of padding transmissions continues for a predetermined number of times.
  • the predetermined number of consecutive padding transmissions disclosed in this embodiment may be different from the conventional number of pre-release empty transmissions.
  • implicitReleaseAfter_B n (n is a positive integer) ⁇ implicitReleaseAfter.
  • Embodiment 4 Modification 1 Another method for solving the problem described in the fourth embodiment will be disclosed.
  • Information indicating that the implicit release is started is provided, and the eNB notifies the UE.
  • the eNB notifies the UE of information indicating that the implicit release is started in a state where the setting of the uplink SPS is not invalidated.
  • both the eNB and the UE resume the implicit release.
  • the implicit release is executed and the setting of the uplink SPS becomes invalid.
  • the above-mentioned number of pre-release empty transmissions may be used.
  • An existing value may be set as the number of empty transmissions before release.
  • An implicit release starts when the number of pre-release empty transmissions is set.
  • Information indicating that the implicit release is started may be notified from the eNB to the UE.
  • the eNB to be notified may be a 1st-eNB or a 2nd-eNB.
  • the UE when notifying the UE from the 2nd-eNB, the UE may be notified directly from the 2nd-eNB, or the UE may be notified from the 2nd-eNB via the 1st-eNB.
  • X2 signaling may be used for notification of information between eNBs.
  • S1 signaling may be used via the MME.
  • the following three (1) to (3) are disclosed as specific examples of the signaling method for notifying the UE of information indicating the start of implicit release from the eNB.
  • MAC CE including information indicating that an implicit release is started may be provided and notified by MAC signaling.
  • notification may be performed using PDCCH or EPDCCH.
  • the UE when receiving information indicating that an implicit release is started, the UE resumes the release of the SPS resource.
  • the information indicating that the implicit release is started corresponds to the release restart information indicating that the SPS release is restarted. That is, when receiving the release resumption information, the UE resumes the release of the SPS resource.
  • Embodiment 4 Modification 2 Another method for solving the problem described in the fourth embodiment will be disclosed.
  • Information indicating that the uplink SPS setting is invalidated is provided, and the UE notifies the UE. For example, in a state where it is set not to invalidate the uplink SPS setting, the eNB notifies the UE of information indicating that the uplink SPS setting is invalidated. The eNB determines whether or not to invalidate the uplink SPS setting. When the eNB decides to invalidate the uplink SPS setting, the eNB notifies the UE of information indicating that the uplink SPS setting is invalidated, and invalidates the uplink SPS setting. The UE invalidates the uplink SPS setting by receiving information indicating that the uplink SPS setting is invalidated from the eNB. At this time, the upstream SPS setting is invalidated without performing an implicit release.
  • the uplink SPS setting can be invalidated at an arbitrary timing. As a result, flexible operation is possible according to the communication status and load status.
  • the above-mentioned number of pre-release empty transmissions may be used.
  • An existing value may be set as the number of empty transmissions before release. When the number of pre-release empty transmissions is set, it is preferable to indicate that the uplink SPS setting is invalidated.
  • Information indicating that the uplink SPS setting is invalidated may be notified from the eNB to the UE.
  • the eNB to be notified may be a 1st-eNB or a 2nd-eNB.
  • the UE when notifying the UE from the 2nd-eNB, the UE may be notified directly from the 2nd-eNB, or the UE may be notified from the 2nd-eNB via the 1st-eNB.
  • X2 signaling may be used for notification of information between eNBs.
  • S1 signaling may be used via the MME.
  • the following three (1) to (3) are disclosed as specific examples of the signaling method for notifying the UE of information indicating that the uplink SPS setting is invalidated.
  • MAC CE including information indicating that the uplink SPS setting is invalidated may be provided and notified by MAC signaling.
  • notification may be performed using PDCCH or EPDCCH.
  • FIG. 16 is a diagram for explaining a method of using information indicating that the setting of the uplink SPS is invalidated.
  • the 1st-eNB is MeNB
  • the 2nd-eNB is SeNB.
  • SPS is set for both MeNB and SeNB is shown. Since FIG. 16 is similar to FIG. 15, different parts will be mainly described.
  • Step ST1008 the SeNB notifies the UE of the activation using the uplink grant of the uplink SPS using the PDCCH.
  • Information indicating that the uplink SPS setting is not invalidated is included in the activation.
  • Step ST1202 to Step ST1203 the uplink SPS setting is not invalidated even when padding transmission is performed without uplink transmission data being continuously generated for the SeNB as the number of pre-release empty transmissions.
  • the UE does not clear the SPS resource.
  • the eNB also does not release SPS resources. The implicit release is not performed and the SPS resource is not released.
  • step ST1501 the SeNB sets information indicating that the uplink SPS setting is invalidated and notifies the UE.
  • the eNB invalidates the uplink SPS setting by notifying the information indicating that the uplink SPS setting is invalidated, and the UE receives the information indicating that the uplink SPS setting is invalidated, thereby receiving the uplink SPS. Disable the setting.
  • step ST1204 which is the timing of the subsequent SPS.
  • the eNB can allocate the SPS resource to other UEs.
  • the following six (1) to (6) are disclosed as specific examples of how the eNB determines whether or not to invalidate the uplink SPS setting.
  • the setting of the uplink SPS is invalidated when a predetermined period has elapsed from the setting of the uplink SPS.
  • the predetermined period may be time, the number of radio frames, the number of subframes, the number of slots, and the number of symbols.
  • the predetermined period may be a positive integer multiple of the set SPS timing interval.
  • the predetermined number of times of receiving the padding transmission may be the above-described number of pre-release empty transmissions. Alternatively, it may be a value larger than the number of pre-release empty transmissions.
  • determination is made using the load amount of the own eNB.
  • the load is equal to or greater than a predetermined value, it is determined that the SPS setting is invalidated.
  • the load is lower than a predetermined value, it is determined not to invalidate the SPS setting.
  • the load is higher than a predetermined value, the resources allocated for the SPS are released and can be allocated to other UEs, thereby reducing resource shortage that occurs when the load is high.
  • the determination is made using the communication quality with the UE.
  • the communication quality is smaller than a predetermined value, it is determined that the SPS setting is invalidated. If the communication quality is equal to or higher than a predetermined value, it is determined not to invalidate the SPS setting.
  • the reason why the communication quality is low may be that the communication quality of the SPS resource that has already been set is poor. In such a case, communication quality is improved by reallocating resources for SPS. Therefore, when the communication quality is low, the SPS setting may be invalidated and the SPS can be set again as necessary. As a result, communication quality can be improved. In addition, since resources with poor communication quality can be released at an early stage, resource use efficiency can be improved.
  • the 2nd-eNB recognizes the generation status of uplink transmission data for the 1st-eNB and determines whether or not to invalidate the uplink SPS setting.
  • the following two (6-1) and (6-2) are disclosed as specific examples of a method by which the 2nd-eNB recognizes the generation status of uplink transmission data for the 1st-eNB.
  • the 2nd-eNB acquires information related to the generation of uplink transmission data from the 1st-eNB.
  • the 1st-eNB may notify the 2nd-eNB whether or not uplink transmission data to its own eNB (1st-eNB) has occurred at the SPS timing set for the 2nd-eNB.
  • the 2nd-eNB may notify the 1st-eNB in advance of the SPS timing set for its own eNB. Accordingly, the 1st-eNB can recognize whether or not uplink transmission data from the UE has been received at the SPS timing set for the 2nd-eNB. When the 1st-eNB receives uplink transmission data from the UE at the SPS timing set for the 2nd-eNB, the 1st-eNB determines that uplink transmission data is generated. If the 1st-eNB does not receive uplink transmission data from the UE, the 1st-eNB determines that no uplink transmission data is generated.
  • the 1st-eNB notifies the 2nd-eNB of the presence or absence of uplink transmission data for its own eNB. You may notify only when there is no generation
  • the 2nd-eNB can determine whether or not uplink transmission data exists for the 1st-eNB by receiving information on whether or not uplink transmission data has been generated for its own eNB.
  • the 2nd-eNB determines whether or not to invalidate the uplink SPS setting using the information on whether or not uplink transmission data is generated for the eNB.
  • the uplink SPS setting is invalidated.
  • the 2nd-eNB may notify the 1st-eNB which bearer has set the SPS in the 2nd-eNB.
  • the 1st-eNB may determine whether or not uplink transmission data has occurred in the bearer.
  • the 1st-eNB may notify the 2nd-eNB of the number of consecutive times indicating how many times the uplink transmission data has not been generated.
  • the 2nd-eNB may notify the 1st-eNB of the number of consecutive times in advance.
  • the 1st-eNB counts the number of times that uplink transmission data could not be received at the SPS timing set in the 2nd-eNB, and notifies the 2nd-eNB of the number of times when the number of consecutive transmissions has been reached.
  • a new message may be provided between the eNBs requesting invalidation of SPS settings. For example, the 1st-eNB counts the number of times the uplink transmission data could not be received at the SPS timing set in the 2nd-eNB, and when the continuous number of times is reached, the 2nd-eNB is instructed to invalidate the SPS setting. Notify the requested message.
  • the 2nd-eNB that has received the message requesting invalidation of the SPS setting may decide to invalidate the uplink SPS setting.
  • X2 signaling or S1 signaling may be used. Notification may be made by X2 signaling or by S1 signaling via the MME.
  • the 2nd-eNB measures and detects the uplink power at the 1st-eNB at the SPS timing.
  • the 1st-eNB may notify the 2nd-eNB of the uplink carrier frequency and bandwidth of the 1st-eNB in advance.
  • the 1st-eNB also sets the SPS at the SPS timing set for the 2nd-eNB, the SPS resource may be notified to the 2nd-eNB.
  • 2nd-eNB measures uplink power at the carrier frequency and bandwidth of 1st-eNB at the set SPS timing. As described above, when the 1st-eNB sets the SPS, the uplink power in the SPS resource may be measured.
  • the received signal strength (Received Signal Strength Indicator; abbreviation: RSSI), IoT (Interference Over Thermal Noise), etc. may be measured.
  • RSSI Received Signal Strength Indicator
  • IoT Interference Over Thermal Noise
  • the measured uplink power is higher than a predetermined threshold, it is determined that data is transmitted by the 1st-eNB. If it is lower than the predetermined threshold value, it is determined that data was not transmitted by the 1st-eNB.
  • the 2nd-eNB may decide to invalidate the uplink SPS setting.
  • the method for determining whether or not the eNB disables the uplink SPS setting disclosed in the present modification is a method for determining to start the implicit release disclosed in the first modification of the fourth embodiment. It can also be applied to.
  • Embodiment 5 Another method for solving the problem described in the fourth embodiment will be disclosed. Padding transmission when there is no uplink transmission data at the set SPS timing is different from padding transmission when there is uplink transmission data at the set SPS timing.
  • the UE When there is no uplink transmission data, the UE performs padding transmission when there is no uplink transmission data. When there is uplink transmission data, the UE performs padding transmission when there is uplink transmission data.
  • the eNB determines whether there is uplink transmission data from the UE at the set SPS timing by receiving different padding transmissions. When receiving the padding transmission when there is no uplink transmission data, the eNB determines that there is no uplink transmission data and performs an implicit release. When receiving the padding transmission when there is uplink transmission data, the eNB judges that there is uplink transmission data and does not count the padding transmission when there is no uplink transmission data. Alternatively, the uplink implicit release may not be performed.
  • 17 and 18 are diagrams for explaining a method of differentiating padding transmission when there is no uplink transmission data and padding transmission when there is uplink transmission data.
  • the 1st-eNB is MeNB
  • the 2nd-eNB is SeNB.
  • a case where the amount of uplink transmission data is equal to or less than the DRAT threshold (Th) is shown.
  • the case where SPS is set to SeNB is shown.
  • FIG. 17 shows a case where there is no uplink transmission data at the SPS timing set for the SeNB.
  • FIG. 18 illustrates a case where there is uplink transmission data at the SPSSPS timing set for the SeNB.
  • Padding transmission when there is no uplink transmission data is referred to as “padding (A) transmission”.
  • the padding transmission when there is uplink transmission data is referred to as “padding (B) transmission”.
  • FIG. 17 and FIG. 18 are similar to FIG.
  • the UE 905 when there is no uplink transmission data at the SPS timing set for the SeNB 902, the UE 905 performs padding (A) transmission to the SeNB 902 as indicated by an arrow “1601”. . Since there is no uplink transmission data, uplink data is not transmitted from the UE 905 to the MeNB 901.
  • the UE 905 when there is uplink transmission data at the SPS timing set for the SeNB 902, the UE 905 performs padding (B) transmission to the SeNB 902 as indicated by an arrow “1602”. . Since there is uplink transmission data, uplink data is transmitted from the UE 905 to the MeNB 901 as indicated by an arrow “1603”.
  • FIG. 19 and 20 are diagrams for explaining a method of differentiating padding transmission when there is no uplink transmission data and padding transmission when there is uplink transmission data.
  • Padding transmission when there is no uplink transmission data is referred to as “padding (A) transmission”.
  • the padding transmission when there is uplink transmission data is referred to as “padding (B) transmission”.
  • 1st-eNB is MeNB and 2nd-eNB is SeNB.
  • SPS is set for both MeNB and SeNB is shown. Since FIG. 19 is similar to FIG. 13 and FIG. 20 is similar to FIG.
  • FIG. 19 shows the padding (A) transmission when there is no uplink transmission data.
  • Step ST1008 the SeNB notifies the UE of the activation using the uplink grant of the uplink SPS using the PDCCH.
  • UE which received activation of SPS from SeNB performs SPS with the set resource.
  • Step ST1701 the UE performs padding (A) transmission when there is no uplink transmission data to the SeNB.
  • Step ST1701 to Step ST1702 when no uplink data is continuously generated in the UE at the SPS timing set for the SeNB, the UE similarly performs padding (A) transmission to the SeNB.
  • step ST1204 the eNB releases the set SPS resource by the implicit release.
  • Step ST1204 the UE clears the set SPS resource.
  • FIG. 20 shows the padding (B) transmission when there is uplink transmission data.
  • Step ST1008 the SeNB notifies the UE of the activation using the uplink grant of the uplink SPS using the PDCCH.
  • UE which received activation of SPS from SeNB performs SPS with the set resource.
  • uplink data is generated in the UE at the SPS timing set for the SeNB in step ST1801.
  • the generated uplink data is data having a data amount smaller than the DRAT threshold.
  • uplink data is transmitted to the MeNB, but uplink data is not transmitted to the SeNB.
  • the method disclosed in Embodiment 3 is applied and padding transmission is performed to the SeNB.
  • step ST1801 the UE performs padding (B) transmission when there is uplink transmission data to the SeNB.
  • uplink data is continuously generated in the UE at the SPS timing set for the SeNB, but uplink data is generated for the SeNB with data having a data amount smaller than the DRAT threshold.
  • UE performs padding (B) transmission with respect to SeNB.
  • step ST1204 the eNB does not release the set SPS resource, and in step ST1204, the UE does not clear the set SPS resource.
  • step ST1204 after the padding (B) transmission is continuously performed for the number of times set as the number of pre-release empty transmissions to the SeNB, in step ST1204, at the SPS timing set for the SeNB, the UE performs DRAT.
  • the UE When uplink data having a data amount equal to or greater than the threshold value is generated, in step ST1401, the UE can transmit uplink data using the SPS resource set in the SeNB.
  • the SPS resource set in the SeNB can be used for transmission of the uplink data.
  • the eNB determines whether there is uplink transmission data from the UE at the set SPS timing. Can be determined.
  • ENB can determine that there is no uplink transmission data when receiving the padding transmission when there is no uplink transmission data. Since there is no uplink transmission data from the UE, the eNB may count as padding transmission when performing an implicit release.
  • ENB can determine that there is uplink transmission data when receiving padding transmission when there is uplink transmission data. Since there is uplink transmission data from the UE, the eNB does not count as padding transmission when performing an implicit release.
  • the padding transmission when there is actually no uplink transmission data from the UE is continuously set as the number of pre-release empty transmissions. If done, an implicit release can be made.
  • Disclosed is a method for differentiating padding transmission when there is no uplink transmission data and padding transmission when there is uplink transmission data.
  • the conventional padding transmission described in Embodiment 1 that is, a MAC PDU including at least one of padding bits and padding BSR may be transmitted.
  • the MAC layer processing should be different from the conventional one.
  • the following three (1) to (3) are disclosed as specific examples of the MAC PDU configuration method different from the conventional MAC PDU for padding transmission.
  • a new MAC CE (Control Element) is provided.
  • a MAC CE indicating the presence or absence of transmission is provided.
  • a MAC CE indicating the presence or absence of transmission may be included. It may be a MAC CE indicating that there is transmission.
  • a MAC CE indicating the type of padding transmission may be provided.
  • the MAC CE may indicate whether padding transmission is performed when there is no uplink transmission data or padding transmission is performed when there is uplink transmission data.
  • a MAC CE indicating whether or not there is an implicit release may be provided. This indicates whether the padding transmission including the MAC CE causes an implicit release or no implicit release.
  • a specific value indicating that the padding bit is a padding bit when there is uplink transmission data may be set.
  • any padding bit may be used.
  • a specific value is newly set to indicate padding when there is uplink transmission data. The eNB can recognize whether it is padding transmission when there is uplink transmission data by demodulating the padding bits.
  • a value indicating the presence / absence of uplink transmission data may be provided in the header.
  • a value indicating the presence / absence of uplink transmission data is added as a specific value to the header of the padding bit.
  • the specific value may be added to the header of the padding BSR. As a result, the same effect can be obtained.
  • the specific value may be added to the header of the MAC CE indicating that it is padding transmission when there is uplink transmission data. As a result, it is possible to determine whether there is uplink transmission data in both the MAC CE and the header. Therefore, malfunctions can be reduced.
  • the padding transmission when there is uplink transmission data it is possible to make the processing different from the conventional padding transmission by making the processing of the MAC layer different from the conventional one.
  • the processing of the PHY layer may be different from conventional processing as padding transmission when there is uplink transmission data.
  • the reference signal used for the PUSCH that performs padding transmission when there is uplink transmission data is different from the reference signal that is used for the PUSCH that performs padding transmission when there is no uplink transmission data.
  • At least one of the resource on the frequency axis and the resource on the time axis to which the PUSCH that performs the padding transmission when there is uplink transmission data is mapped by the PUSCH that performs the padding transmission when there is no conventional uplink transmission data It may be different from at least one of the resource on the frequency axis and the resource on the time axis.
  • At least one of the resource on the frequency axis and the resource on the time axis may be different within at least one of the resource on the frequency axis and the resource on the time axis allocated as the SPS resource. That is, both the resource to which the PUSCH that performs padding transmission when there is uplink transmission data and the resource to which the PUSCH that performs padding transmission when there is no uplink transmission data are mapped are allocated as SPS resources. Existing in the specified resource. As a result, it is not necessary to use resources outside the set SPS resources, and an increase in necessary resources can be suppressed.
  • the SPS resource may be made different depending on the resource on the time axis. For example, it is different for each slot. It may be per symbol. Or you may make it differ by the resource on a frequency axis. For example, different subcarriers are used. It may be per resource block.
  • a radio resource (resource on the frequency axis-resource on the time axis) may be provided separately from the SPS resource. For example, when there is no transmission data, padding transmission is performed using the SPS resource. When there is transmission data, it is assumed that padding transmission is performed with a radio resource set separately. As a result, with respect to the conventional padding transmission, since it is not necessary to change the mechanism, the control becomes easy.
  • Separately configured radio resources may be used by multiple UEs. Specifically, it may be multiplexed. For example, time multiplexing, frequency multiplexing, and code multiplexing may be performed. Alternatively, collision-based sharing may be used.
  • the eNB may be decomposed for each UE by using the PUSCH RS transmitted by the UE.
  • it may be switched whether to perform transmission using the L1 / L2 control signal or to perform padding transmission depending on the presence / absence of uplink transmission data. For example, when there is uplink transmission data, transmission using the L1 / L2 control signal is performed instead of padding transmission, and when there is no uplink transmission data, conventional padding transmission is performed.
  • the eNB can recognize the presence / absence of uplink transmission data depending on whether the eNB has received the L1 / L2 control signal or the conventional padding transmission.
  • the method disclosed in the first modification of the second embodiment may be used for the L1 / L2 control signal when there is uplink transmission data.
  • the 2nd-eNB has uplink transmission data with SPS resources, it is possible to prevent the implicit release from being executed.
  • This reserve is not necessary.
  • the use efficiency of PUSCH resources can be improved.
  • a method is disclosed in which DC is set and padding transmission is made different depending on whether there is uplink transmission data at the SPS timing set in the 2nd-eNB.
  • the method disclosed in the present embodiment may be applied to a case where different padding transmissions are sent to one eNB.
  • the UE measures the temporal change in the amount of uplink transmission data generated, and uses the measurement result to derive the probability that uplink transmission data will occur at the uplink transmission timing.
  • the UE predicts the probability of occurrence of uplink transmission data at the uplink transmission timing using the measurement result of the temporal change in the amount of uplink transmission data generated.
  • Statistical processing may be performed to derive the probability that uplink transmission data will occur at the uplink transmission timing.
  • Padding transmission may be made different according to the probability that uplink transmission data will occur at the uplink transmission timing. You may perform the measurement of the time change of the generation amount of uplink transmission data for every bearer. Or you may carry out for every content or every application.
  • the UE determines whether or not the probability that uplink transmission data occurs at the uplink transmission timing is equal to or higher than a predetermined threshold.
  • the threshold value may be determined in advance as a system, or may be set by the eNB and notified from the eNB. Padding transmission is made different depending on whether or not the probability of occurrence of uplink transmission data is equal to or higher than a predetermined threshold.
  • the UE performs padding transmission when uplink transmission data does not actually occur at the set uplink SPS timing. At this time, if the probability of occurrence of uplink transmission data is equal to or greater than the threshold, padding (B) transmission is performed. When the probability of occurrence of uplink transmission data is not equal to or greater than the threshold, that is, when the probability of occurrence of uplink transmission data is less than the threshold, padding (A) transmission is performed.
  • ENB does not release the SPS resource even if the padding (B) is continuously received from the UE for the number of times set as the number of pre-release empty transmissions. Moreover, even if UE transmits padding (B) continuously for the number of times set as the number of pre-release empty transmissions, the UE does not clear the set SPS resource. By doing so, it is possible to prevent the SPS resource from being released when the probability of occurrence of uplink transmission data is high.
  • the SPS resource can be prevented from being released, and the uplink data can be transmitted using the SPS resource at the next SPS timing.
  • ENB releases the SPS resource when receiving the padding (A) continuously from the UE for the number of times set as the number of pre-release empty transmissions. Moreover, UE transmits the set SPS resource, when transmitting padding (A) to the eNB continuously for the number of times set as the number of pre-release empty transmissions. By doing so, the SPS resource can be released when the probability of occurrence of uplink transmission data is low.
  • the present invention is not limited to this, and a plurality of different padding transmissions may be provided to perform the padding transmission.
  • the eNB can change the operation depending on the type of padding transmission.
  • the UE varies the padding transmission according to the downlink reception quality.
  • Two downlink reception quality thresholds may be provided, divided into three reception quality states, and different padding transmissions may be performed according to the three reception quality states.
  • the eNB may schedule UL resources and notify the UE of the uplink grant even when there is no uplink scheduling request from the UE. Since there is no uplink transmission data, the UE performs padding transmission using the uplink resource allocated by the uplink grant. This padding transmission may be a different padding transmission depending on the reception quality state described above. By doing in this way, eNB can recognize UE's downlink reception quality dynamically in a timely manner. By doing as described above, the eNB can perform various and flexible controls on the UE.
  • Embodiment 6 When a UL split bearer is set for a predetermined bearer, an uplink SPS is set in the 2nd-eNB according to the data generation status of the bearer.
  • uplink transmission data occurs at the timing of uplink SPS set on the 2nd-eNB side, not only uplink transmission is performed with the SPS resource to the 2nd-eNB, but depending on the bearer setting conditions, the SPS Upstream transmission is also performed to the 1st-eNB at the timing.
  • the SPS is not set for the 1st-eNB at the SPS timing, it is necessary to start from the transmission of the SR signal to the 1st-eNB.
  • the 1st-eNB can be used for uplink transmission, a delay with respect to the 1st-eNB occurs and causes an increase in transmission delay time.
  • a method for solving such a problem is disclosed.
  • the same SPS setting as that performed for the 2nd-eNB is performed for the 1st-eNB.
  • the SPS may be set for the 1st-eNB.
  • the same setting as the SPS setting for the 2nd-eNB is performed in the SPS for the 1st-eNB.
  • a plurality of SPSs may be set for each eNB.
  • the parameters that have the same settings may not be all parameters.
  • the parameter to be set the same is the SPS interval.
  • the number of pre-release empty transmissions may be the same or different.
  • 1st-eNB When SPS is set in 1st-eNB, when SPS is set in 2nd-eNB, 1st-eNB has the same setting as SPS setting for 2nd-eNB in addition to the already set SPS setting It is good to do.
  • the SPS setting already set in the 1st-eNB is the same as the SPS setting for the 2nd-eNB, for example, even when the SPS timing is the same, it may be set redundantly.
  • the SPS setting already set in the 1st-eNB is the same as the SPS setting for the 2nd-eNB, for example, if the SPS timing is the same, the setting is not repeated and the 1st-eNB already
  • the SPS may be set by combining the set SPS and the SPS setting for the 2nd-eNB.
  • the 2nd-eNB notifies the UE of the SPS setting for the 2nd-eNB. Further, the 2nd-eNB notifies the 1st-eNB of the SPS setting for the 2nd-eNB. X2 signaling may be used for this notification. Or you may carry out using S1 signaling via MME. As a result, the 1st-eNB can recognize the SPS setting of the 2nd-eNB.
  • the 1st-eNB applies a parameter having the same setting of the SPS setting of the 2nd-eNB to the SPS setting of the own eNB.
  • the parameter to be set the same is the SPS interval.
  • the number of pre-release idle transmissions may be the same or different.
  • the C-RNTI for SPS is set independently by the eNB.
  • the 1st-eNB notifies the UE of these SPS settings.
  • the 1st-eNB can set the same SPS setting as the 2nd-eNB in the UE.
  • Disclose other SPS setting methods The same setting as the SPS setting for the 2nd-eNB is performed in the SPS for the 1st-eNB.
  • a plurality of SPSs may be set for each eNB.
  • Parameters with the same settings are all parameters.
  • the SPS interval, CPS RNTI for SPS, and UL pre-release empty transmission count are set to the same setting.
  • a method for notifying the UE of the setting of the SPS and setting it is disclosed.
  • the 2nd-eNB notifies the UE of the SPS setting for the 2nd-eNB. Further, the 2nd-eNB notifies the 1st-eNB of the SPS setting for the 2nd-eNB.
  • X2 signaling may be used for this notification. Or you may carry out using S1 signaling via MME.
  • the 1st-eNB can recognize the SPS setting of the 2nd-eNB.
  • the UE applies the SPS setting for the 2nd-eNB to the SPS setting for the 1st-eNB.
  • the 1st-eNB can set the same SPS setting as the 2nd-eNB in the UE.
  • the same value is set in advance between the 2nd-eNB and the 1st-eNB in cooperation.
  • the SPS C-RNTI to be used is notified in advance to the 1st-eNB.
  • 1st-eNB notifies Ack to 2nd-eNB when notified SPS C-RNTI is available. As a result, the 1st-eNB and the 2nd-eNB can use the same SPS C-RNTI.
  • the 1st-eNB notifies Nack to the 2nd-eNB when the notified SPS C-RNTI cannot be used.
  • the 2nd-eNB selects another SPS C-RNTI value again and notifies the 1st-eNB. Repeat until receiving Ack from 1st-eNB.
  • the same SPS C-RNTI can be used in the 2nd-eNB and the 1st-eNB.
  • X2 signaling may be used for notification of the information between the 2nd-eNB and the 1st-eNB. Or you may carry out using S1 signaling via MME.
  • SPS activation timing determines SPS start timing. Therefore, a method for adjusting the SPS activation timing in both eNBs is required.
  • the 2nd-eNB When the 2nd-eNB decides to notify the UE of the SPS activation, the 2nd-eNB notifies the 1st-eNB of the timing of notifying the UE of the SPS activation. Alternatively, the timing at which the SPS activation is notified to the UE is notified to the 1st-eNB.
  • the timing information may be at least one of a radio frame number and a subframe number.
  • the 1st-eNB uses the received timing information to derive the timing when the SPS setting of the 2nd-eNB is activated for the UE, and notifies the UE of the SPS activation so as to match the timing.
  • the UE may be notified in accordance with the timing after the subsequent SPS interval. Notifications should be made as soon as possible.
  • the SPS activation timing can be matched between both eNBs, and the SPS timings for both eNBs can be matched.
  • X2 signaling may be used for notification of the information between the 2nd-eNB and the 1st-eNB. Or you may carry out using S1 signaling via MME.
  • FIG. 21 is a diagram for explaining a method for performing the same SPS setting as the SPS setting performed for the 2nd-eNB for the 1st-eNB.
  • the 1st-eNB is MeNB
  • the 2nd-eNB is SeNB.
  • the DRAT threshold is indicated by reference numeral “1901”.
  • Step ST1902 the SeNB notifies the UE of the SPS interval, the number of pre-release empty transmissions, and the SPS C-RNTI by RRC dedicated signaling.
  • Step ST1903 the SeNB notifies the MeNB of the set SPS configuration.
  • the set SPS configuration may be notified by X2 signaling.
  • the SPS configuration to be notified may be the SPS interval. Also, the number of pre-release empty transmissions may be notified.
  • the MeNB sets the same value as the received SeNB configuration as the SPS configuration for the MeNB.
  • the SPS C-RNTI is selected by the MeNB without using the same value as the SeNB.
  • Step ST1904 the MeNB notifies the UE of the SPS configuration and SPS C-RNTI for the MeNB by RRC dedicated signaling.
  • UE detects PDCCH using SPS C-RNTI notified from SeNB and MeNB.
  • Step ST1905 the SeNB notifies the MeNB of the timing of SPS activation.
  • the MeNB that has received the SPS activation timing can recognize the timing at which the SeNB activates the SPS.
  • Step ST1906 and Step ST1907 the SeNB and the MeNB each transmit an SPS activation to the UE at the activation timing determined by the SeNB. Thereby, both the SeNB and the MeNB can have the same SPS activation timing for the UE.
  • step ST1905 The order of the notification of the SPS activation timing from the SeNB to the MeNB in step ST1905 and the notification of the timing of the SPS activation from the SeNB to the UE in step ST1906 may be reversed.
  • the SeNB notifies the MeNB of the timing when the SPS activation is notified to the UE. This makes it possible to notify the MeNB of the timing at which SPS activation is actually performed in the SeNB. By notifying the actual SPS activation timing, it is possible to reduce the occurrence of malfunctions in which the SPS activation timing is shifted between the SeNB and the MeNB.
  • the scheduling of the SPS resource from the MeNB and the scheduling of the SPS resource from the SeNB may be different.
  • the MeNB and SeNB may be individually scheduled.
  • the UE recognizes that the SPS is activated for the SeNB and the MeNB by receiving the SPS activation.
  • Step ST1908 and Step ST1909 the UE transmits uplink data to the SeNB and MeNB at the set SPS timing.
  • Step ST1910 when the amount of uplink transmission data of the UE is smaller than the DRAT threshold at the set SPS timing, the UE performs padding transmission to the SeNB. Uplink data is transmitted to the MeNB.
  • step ST1911 When padding transmission is continuously performed to the SeNB for the number of times set as the number of pre-release empty transmissions, in step ST1911, the eNB releases the SPS resource set for the SeNB. The UE also clears the SPS resource set for the SeNB.
  • step ST1911 Since uplink data is transmitted to the MeNB, in step ST1911, the SPS resource set for the MeNB is not released. When there is uplink transmission data, uplink data is transmitted.
  • An eNB that has undergone an implicit release may notify other eNBs of that fact. For example, when an implicit release occurs for the set SPS in the 2nd-eNB, the 2nd-eNB notifies the 1st-eNB that the implicit release has occurred. Alternatively, an SPS resource may be released or an SPS setting may be notified by an implicit release.
  • the 1st-eNB that has received the release of the SPS resource of the 2nd-eNB may invalidate the same SPS setting as that of the 2nd-eNB set in the 1st-eNB. Further, the 1st-eNB may notify the UE that the same SPS setting as that of the 2nd-eNB set in the 1st-eNB is invalidated as appropriate. By receiving the notification, the UE can invalidate the same SPS setting as that of the 2nd-eNB set in the 1st-eNB.
  • the 1st-eNB can invalidate the same SPS setting as that of the 2nd-eNB.
  • the eNB that has notified the UE of information indicating that the uplink SPS setting disclosed in the second modification of the fourth embodiment is invalidated may notify the other eNBs of that fact.
  • the eNB that notifies the UE of information indicating that the uplink SPS setting is invalidated may notify the other eNBs of the fact in advance.
  • the 2nd-eNB when the 2nd-eNB notifies the UE of information indicating that the uplink SPS setting is invalidated, the 2nd-eNB notifies the UE of information indicating that the uplink SPS setting is invalidated to the 1st-eNB. Notice.
  • the 2nd-eNB when the 2nd-eNB notifies the UE of information indicating that the uplink SPS setting is invalidated, the 2nd-eNB notifies the UE of information indicating that the uplink SPS setting is invalidated to the 1st-eNB. Notice. In this case, the 1st-eNB may be notified of the timing for invalidating the uplink SPS setting or the timing for notifying the UE of information indicating that the uplink SPS setting is invalidated.
  • the 1st-eNB that has received the information indicating that the above-described uplink SPS setting is invalidated from the 2nd-eNB is set in the 1st-eNB using the information indicating that the uplink SPS setting is invalidated.
  • the same SPS setting as that of the 2nd-eNB may be invalidated.
  • the same SPS setting as that of the 2nd-eNB set in the 1st-eNB may be modified. For example, the SPS setting previously set for the 1st-eNB may be restored.
  • the 1st-eNB can flexibly change the setting of the SPS set in its own eNB in consideration of the load situation and the like.
  • the 1st-eNB may notify the UE that the same SPS setting as that of the 2nd-eNB that was set in the 1st-eNB is invalidated. By receiving the notification, the UE can invalidate the same SPS setting as that of the 2nd-eNB set in the 1st-eNB.
  • the 1st-eNB may notify the UE at the timing after the next SPS interval when the 2nd-eNB is not in time for notifying the UE of information indicating that the uplink SPS setting is invalidated.
  • the UE may be notified without waiting for the timing after the next SPS interval. Or you may notify immediately.
  • the 1st-eNB can invalidate the same SPS setting as that of the 2nd-eNB.
  • uplink data may be transmitted not only to the 2nd-eNB but also to the 1st-eNB at the SPS timing set for the 2nd-eNB.
  • the SPS is set for the 1st-eNB at the SPS timing set for the 2nd-eNB. Therefore, the UE can transmit uplink data to the 1st-eNB as well as the 2nd-eNB without transmitting an uplink scheduling request at the SPS timing. As a result, the transmission delay time for the 1st-eNB can be reduced.
  • Embodiment 7 FIG.
  • the UE does not transmit the uplink data to the 2nd-eNB when the data amount of the uplink transmission data is equal to or less than the DRAT threshold.
  • the implicit release is not determined based on the number of padding transmissions, so it is useless to perform the padding transmission.
  • the UE does not perform padding transmission when uplink data is not transmitted to the 2nd-eNB at the set SPS timing, and when implicit release is not performed.
  • FIG. 22 is a diagram illustrating a method for preventing padding transmission when implicit release is not performed.
  • the 1st-eNB is MeNB
  • the 2nd-eNB is SeNB.
  • SPS is set for both MeNB and SeNB is shown. Since FIG. 22 is similar to FIG. 15, different parts will be mainly described.
  • Step ST1008 the SeNB notifies the UE of the activation using the uplink grant of the uplink SPS using the PDCCH.
  • Information indicating that the uplink SPS setting is not invalidated is included in the activation. Accordingly, the UE can recognize that the implicit SPS is not performed and the uplink SPS setting is not invalidated.
  • the UE that has received the SPS activation from the SeNB executes the SPS with the set resource, does not perform an implicit release, and does not invalidate the uplink SPS setting. Even if the UE does not generate uplink transmission data a predetermined number of times for the SeNB, neither the eNB nor the UE performs an implicit release, and the setting of the uplink SPS is not invalidated.
  • step ST1301 the UE transmits uplink data to the MeNB. No uplink transmission data is generated for the SeNB.
  • step ST2001 the UE does not perform padding transmission to the SeNB.
  • Step ST2001 to Step ST2002 When uplink data having a data amount smaller than the DRAT threshold is generated in the UE at the SPS timing set for the SeNB in Step ST2001 to Step ST2002, similarly, in Step ST1301 to Step ST1302, the UE Although uplink data is transmitted to the MeNB, padding transmission is not performed to the SeNB.
  • the UE When the uplink transmission data does not continuously occur for the SeNB the number of times set as the number of pre-release empty transmissions, the UE does not perform padding transmission with the SPS resource. In such a case, the UE does not perform the implicit release received in step ST1008. The UE does not clear the SPS resource in step ST1204 according to the setting that does not invalidate the uplink SPS setting. The eNB also does not release SPS resources. In step ST1204, the implicit release is not performed and the SPS resource is not released.
  • step ST1204 when uplink data having a data amount equal to or greater than the DRAT threshold is generated in the UE at the SPS timing set for the SeNB, in step ST1401, the UE uses the SPS resource set in the SeNB. Thus, it is possible to transmit uplink data.
  • padding transmission may be performed.
  • the method disclosed in the fourth embodiment, the first modification of the fourth embodiment, and the second modification of the fourth embodiment may be applied to the method of performing the implicit release.
  • the eNB may notify the UE of information indicating the start of padding transmission together with the notification of the start of the implicit release.
  • the eNB may notify the UE of the information when the implicit release is not performed in the 2nd-eNB.
  • the UE does not perform padding transmission when no uplink data is generated for the 2nd-eNB.
  • the information indicating that the above padding transmission (2) is not performed may be notified from the eNB to the UE.
  • the eNB may be a 1st-eNB or a 2nd-eNB.
  • the UE when notifying the UE from the 2nd-eNB, the UE may be notified directly from the 2nd-eNB, or the UE may be notified from the 2nd-eNB via the 1st-eNB.
  • X2 signaling may be used for notification of information between eNBs.
  • S1 signaling may be used via the MME.
  • the following three (1) to (3) are disclosed as specific examples of the signaling method for notifying the UE of information indicating that padding transmission is not performed.
  • RRC signaling For example, the notification may be included in signaling for setting the SPS configuration.
  • MAC CE including information indicating that padding transmission is not performed may be provided and notified by MAC signaling.
  • L1 / L2 signaling For example, PDCCH or EPDCCH.
  • the notification may be included in the SPS activation.
  • information indicating that no padding transmission is performed and notification from the eNB to the UE may be provided.
  • Information indicating that padding transmission is performed may be notified from the eNB to the UE.
  • Embodiment 8 FIG. In the seventh embodiment, a method of not performing padding transmission when there is no uplink transmission data at the set SPS timing is disclosed.
  • the eNB cannot identify whether the uplink data was actually received but was not received because of no padding transmission.
  • a method for solving such a problem is disclosed.
  • HARQ Even if it is set not to send padding, HARQ is operated.
  • the eNB operates HARQ when it is set not to perform padding transmission.
  • the UE performs HARQ when there is uplink transmission data, and does not perform padding transmission or retransmission when there is no uplink transmission data.
  • padding transmission performed when there is no uplink transmission data at the set SPS timing is subject to HARQ.
  • the eNB can determine whether or not uplink transmission data has been sent by receiving the padding transmission. Therefore, the UE performs padding transmission even when there is no uplink transmission data at the set SPS timing, and when receiving Nack that is a delivery reception unsuccessful (reception unsuccessful) signal from the eNB, the UE retransmits the padding transmission. Will do.
  • the eNB operates HARQ, but the UE does not perform padding transmission when there is no uplink transmission data at the set SPS timing, and is a reception failure signal from the eNB. Even if Nack is received, it is different from the conventional method in that retransmission of padding transmission is not performed.
  • the UE When the UE does not perform padding transmission, the UE does not retransmit the padding transmission even if it receives Nack from the eNB. Therefore, since there is no retransmission from the UE, the eNB fails to receive and transmits Nack again. The UE will receive Nack again from the eNB. Also for this Nack, the UE does not retransmit the padding transmission. Since the UE does not perform padding transmission or retransmission of padding transmission, such an operation is repeated. Therefore, the eNB continues to transmit Nack to the UE. A method for solving such a problem is disclosed.
  • ENB may set the maximum number of retransmissions. For HARQ when initial transmission is performed using an uplink SPS resource, the maximum number of retransmissions may be set.
  • ENB stops HARQ if reception is unsuccessful even if Nack is transmitted for the maximum number of retransmissions when reception failure continues.
  • the maximum number of retransmissions may be statically determined in advance by a standard or the like. Or eNB may determine. Thereby, it becomes possible to change dynamically according to the communication status and the load status. Alternatively, OAM (operation administration and maintenance) may be determined. Thereby, it can determine in consideration of the condition of several eNB. Alternatively, the operator may decide. It may be determined as one of the system design parameters.
  • OAM operation administration and maintenance
  • the maximum number of retransmissions disclosed in the present embodiment may be set differently from the maximum number of retransmissions conventionally set in HARQ.
  • the maximum number of retransmissions disclosed in the present embodiment may be made smaller than the maximum number of retransmissions conventionally set for HARQ.
  • FIG. 23 is a diagram for explaining a HARQ method when no padding transmission is performed.
  • the 1st-eNB is MeNB
  • the 2nd-eNB is SeNB.
  • FIG. 23 illustrates a case where SPS is set in the SeNB.
  • the SeNB notifies the UE of activation using the uplink grant of the uplink SPS using the PDCCH.
  • Information indicating that the uplink SPS setting is not invalidated is included in the activation. Accordingly, the UE can recognize that no padding transmission is performed when no implicit release is performed and no uplink transmission data is generated.
  • Step ST2101 the UE transmits uplink data to the SeNB using the SPS resource set for the SeNB.
  • the eNB receives uplink data from the UE, and is assumed to have been successfully received.
  • Step ST2102 the SeNB transmits Ack, which is a reception success signal, to the UE.
  • Ack which is a reception success signal
  • the UE transmits uplink data to the SeNB at the set SPS timing. It is assumed that the SeNB receives uplink data from the UE and has not received the data successfully. In this case, in Step ST2104, the SeNB transmits Nack to the UE.
  • the UE When receiving the Nack, the UE determines that the uplink data has not been received by the SeNB, and retransmits the uplink data to the SeNB in Step ST2105. In this way, the UE transmits uplink data to the SeNB, and when the Nack is received from the SeNB, the UE retransmits the uplink data.
  • step ST2105 the SeNB receives retransmission of uplink data from the UE, and is successful in reception. In this case, in Step ST2109, the SeNB transmits Ack to the UE.
  • the UE determines that uplink retransmission data has been received by the eNB and does not perform retransmission.
  • step ST2106 uplink data having a data amount smaller than the DRAT threshold is generated in the UE at the SPS timing set for the SeNB.
  • Step ST2110 the UE transmits uplink data to the MeNB, but does not transmit uplink data using the SPS resource set for the SeNB.
  • step ST2108 when uplink transmission data does not occur, since it is set not to perform padding transmission, the UE does not perform padding transmission.
  • Step ST2106 the SeNB does not perform padding transmission from the UE, and thus reception is unsuccessful. In this case, in Step ST2111, the SeNB transmits Nack to the UE.
  • the UE may receive Nack or may not receive Nack. Even if the UE receives Nack, the UE does not perform retransmission. Also, the UE does not perform padding transmission.
  • Step ST2107 since the SeNB does not transmit anything from the UE, reception is unsuccessful. In this case, in Step ST2112, the SeNB transmits Nack to the UE again.
  • the UE may receive Nack or may not receive Nack. Even if the UE receives Nack, the UE does not perform retransmission. Also, the UE does not perform padding transmission.
  • ENB stops HARQ when the number of Nack transmissions reaches the maximum number of transmissions. If the maximum number of retransmissions is not set, Nack transmission is repeated. However, since the maximum number of retransmissions is set in this embodiment, HARQ can be stopped.
  • the UE when there is no uplink transmission data, the UE does not retransmit and does not perform padding transmission even if Nack is transmitted from the eNB.
  • the UE only needs to perform retransmission according to the Nack from the eNB only when uplink data transmission is performed. Therefore, since the UE transmission is limited to the case where uplink data transmission is performed, an increase in power consumption can be reduced.
  • the 2nd-eNB determines whether data has been generated for the 2nd-eNB.
  • the 2nd-eNB determines whether to operate HARQ using the result.
  • the 2nd-eNB notifies the 1st-eNB of the SPS setting of its own eNB in advance.
  • the SPS setting may be the SPS timing. Or the timing which notified the space
  • the 1st-eNB judges whether the amount of uplink transmission data generated from the UE is smaller than the DRAT threshold at the SPS timing of the 2nd-eNB.
  • the 1st-eNB notifies the determination result to the 2nd-eNB.
  • the 2nd-eNB determines whether data is generated for the 2nd-eNB itself based on the determination result received from the 1st-eNB.
  • 2nd-eNB judges that data is not generated for 2nd-eNB itself when the judgment result notified from 1st-eNB is smaller than the threshold of DRAT.
  • the 2nd-eNB determines that data is generated for the 2nd-eNB itself when the determination result notified from the 1st-eNB is equal to or greater than the DRAT threshold.
  • the 2nd-eNB determines that no data is generated for the 2nd-eNB itself, it stops HARQ.
  • data is transmitted to the 2nd-eNB even though the data transmitted to the 1st-eNB is smaller than the DRAT threshold.
  • the scheduling ratio between 1st-eNB and 2nd-eNB when the DRAT threshold is exceeded is set to 1: 2 (1: 2).
  • the data amount of transmission data to the 1st-eNB is 1/3. In such a case, there is a possibility of being smaller than the DRAT threshold.
  • the 1st-eNB acquires the scheduling ratio between the 1st-eNB and the 2nd-eNB. For example, when the 2nd-eNB determines the scheduling ratio, the scheduling ratio may be notified in advance from the 2nd-eNB to the 1st-eNB. When the 1st-eNB determines the scheduling ratio, it is not necessary to notify.
  • the 1st-eNB judges whether or not it is smaller than the DRAT threshold in consideration of the scheduling ratio.
  • the data transmitted to the 1st-eNB is smaller than the DRAT threshold by the scheduling ratio between the 1st-eNB and the 2nd-eNB when the DRAT threshold is exceeded.
  • -HARQ can be prevented from becoming inoperable when data is also transmitted to the eNB.
  • the reception performance of the uplink transmission data can be improved.
  • Embodiment 8 Modification 2 Another method for solving the problem described in the eighth embodiment will be disclosed.
  • the 2nd-eNB measures the uplink power of the SPS resource set for the 2nd-eNB.
  • the 2nd-eNB may measure the uplink communication quality.
  • the 2nd-eNB measures received signal strength (RSSI), IOT (Interference over Thermal noise), RSRP, signal-to-interference noise power ratio (Signal to Interference plus Noise ; power Ratio; abbreviation: SINR) and the like as uplink power. Good.
  • the 2nd-eNB may measure the received power of the PUSCH reference signal used for the configured SPS resource.
  • the 2nd-eNB may measure RSRQ as the uplink communication quality. Alternatively, the 2nd-eNB may measure the reception quality of the PUSCH reference signal.
  • 2nd-eNB determines that uplink data has been transmitted to 2nd-eNB when the uplink power or uplink communication quality of the SPS resource set in itself is higher than a predetermined threshold.
  • 2nd-eNB judges that uplink data has not been transmitted to 2nd-eNB when the uplink power or uplink communication quality of the SPS resource set in itself is lower than a predetermined threshold.
  • signaling between eNBs becomes unnecessary, and an increase in signaling amount can be suppressed.
  • Embodiment 9 FIG.
  • the UE does not transmit uplink data to the 2nd-eNB when the amount of uplink transmission data is equal to or less than the DRAT threshold. Even though no uplink data is transmitted to the 2nd-eNB, performing padding transmission wastes power consumption of the UE.
  • the implicit release when the implicit release is operating, if the padding transmission is not performed, the implicit release is not performed and the set SPS resource is not released. If the SPS resource is not released, the resource cannot be used by another UE, and the usage efficiency of the PUSCH resource is reduced. In the present embodiment, a method for solving such a problem is disclosed.
  • padding transmission method disclosed above when the amount of uplink transmission data is equal to or less than the DRAT threshold, padding transmission is always performed to the 2nd-eNB.
  • padding transmission to be transmitted to 2nd-eNB is thinned out when the amount of uplink transmission data is equal to or less than the DRAT threshold.
  • the case where the padding transmission is thinned once every two times is shown.
  • the UE does not perform padding transmission at the execution timing of the first padding transmission.
  • the UE performs padding transmission at the execution timing of the second padding transmission.
  • padding transmission frequency The number of times padding transmission is performed once, that is, the frequency of performing padding transmission may be referred to as “padding transmission frequency”.
  • the padding transmission frequency is “2”.
  • the padding transmission frequency may be statically determined in advance by a standard or the like, or may be changed semi-statically or dynamically.
  • the padding transmission frequency may be set by the eNB and notified from the eNB to the UE. When notified from the eNB to the UE, it may be included in the SPS setting message or included in the SPS activation.
  • FIG. 24 is a diagram for explaining an implicit release method when padding transmission is thinned out.
  • the 1st-eNB is MeNB
  • the 2nd-eNB is SeNB.
  • the case where SPS is set to SeNB is shown.
  • the case where the padding transmission frequency is “2” is shown.
  • the number of empty transmissions before release for an implicit release is “3”. It is assumed that SPS has already been set for SeNB.
  • Step ST2209 the SeNB notifies the UE of the activation with the uplink grant of the uplink SPS using the PDCCH.
  • Padding transmission frequency information is included in the activation. As a result, the UE can recognize the number of times to thin out the padding transmission.
  • Step ST2201 the UE transmits uplink data to the SeNB using the SPS resource set for the SeNB.
  • Step ST2202 when uplink data having a data amount smaller than the DRAT threshold is generated at the SPS timing set for the SeNB, the UE determines that the padding transmission timing for the SeNB is the first time, and performs padding. Do not send.
  • Step ST2203 when uplink data having a data amount smaller than the DRAT threshold is generated at the SPS timing set for the SeNB, the UE determines that the padding transmission timing for the SeNB is the second time. Since the padding transmission frequency is “2”, the UE performs padding transmission.
  • the UE When the UE performs padding transmission to the SeNB, the UE resets the count of the padding transmission timing.
  • the UE After resetting the count of padding transmission timing in step ST2204, the UE transmits padding transmission timing to the SeNB when uplink data having a data amount smaller than the DRAT threshold is generated at the SPS timing set for the SeNB. Is the first time, and no padding is transmitted.
  • Step ST2205 when uplink data having a data amount smaller than the DRAT threshold is generated at the SPS timing set for the SeNB, the UE determines that the padding transmission timing for the SeNB is the second time. Since the padding transmission frequency is “2”, the UE performs padding transmission.
  • the UE When the UE performs padding transmission to the SeNB, the UE resets the count of the padding transmission timing.
  • step ST2206 the UE does not perform padding transmission to the SeNB.
  • Step ST2207 the UE performs padding transmission to the SeNB. Then, the UE resets the padding transmission timing count.
  • Step ST2203 the SeNB receives the first padding transmission from the UE.
  • Step ST2205 the SeNB receives the second padding transmission from the UE, and in Step ST2207, the SeNB receives the third padding transmission from the UE.
  • Step ST2203 to Step ST2207 the SeNB does not receive uplink data while receiving the padding transmission from the UE, and has received the padding transmission in the number of pre-release empty transmissions, here three consecutive times. Release. Then, in Step ST2208, the SeNB releases the set SPS resource. When the padding transmission is transmitted to the SeNB consecutively before the release, the UE clears the SPS setting in step ST2208.
  • padding transmission is executed, it is possible to operate implicit release. Therefore, it is possible to suppress a reduction in use efficiency of PUSCH resources.
  • the UE resets the count of the padding transmission timing when performing the padding transmission.
  • the UE may reset the count of the padding transmission timing when performing padding transmission and when transmitting uplink data. Even when uplink data is transmitted, the count of the padding transmission timing is reset, so that the number of padding transmissions can be further reduced.
  • the method for resetting the count of the padding transmission timing may be statically determined in advance by a standard or the like, or may be notified from the eNB to the UE.
  • the notification may be included in the SPS setting message or may be included in the SPS activation. You may notify with a padding transmission frequency.
  • FIG. 25 is a diagram showing another example of the implicit release method when padding transmission is thinned out.
  • the 1st-eNB is MeNB
  • the 2nd-eNB is SeNB. The case where SPS is set to SeNB is shown.
  • FIG. 25 is similar to FIG. 24, and therefore, different parts will be mainly described.
  • FIG. 25 shows a case where the padding transmission frequency is “4”.
  • a parameter “implicitReleaseAfter_T” is used as the predetermined number of padding transmission timings for the implicit release.
  • the predetermined number of padding transmission timings for implicit release may be referred to as “number of pre-release empty transmission timings”. In FIG. 25, the number of pre-release empty transmission timings is “8”. The UE may reset the count of the padding transmission timing when performing padding transmission and when transmitting uplink data.
  • the number of pre-release empty transmission timings may be statically determined in advance by a standard or the like, or may be notified from the eNB to the UE. When notified from the eNB to the UE, it may be included in the SPS setting message or included in the SPS activation.
  • Step ST2310 the SeNB notifies the UE of activation using the uplink grant of the uplink SPS using the PDCCH.
  • Padding transmission frequency information is included in the activation.
  • information on the number of pre-release empty transmission timings is included.
  • the UE can recognize the number of padding transmissions to be thinned out and the predetermined number of padding transmission timings for implicit release.
  • Step ST2311 the UE transmits uplink data to the SeNB using the SPS resource set for the SeNB.
  • the UE When the UE transmits uplink data, the UE resets the padding transmission timing count.
  • Step ST2301 when uplink data having a data amount smaller than the DRAT threshold is generated at the SPS timing set for the SeNB, the UE determines that the padding transmission timing is the first time, and performs padding transmission. Not performed.
  • Step ST2302 when uplink data having a data amount smaller than the DRAT threshold is generated at the SPS timing set for the SeNB, the UE determines that the padding transmission timing is the second time, and performs padding transmission. Not performed.
  • step ST2303 when uplink data having a data amount smaller than the DRAT threshold is generated at the SPS timing set for the SeNB, the UE determines that the padding transmission timing is the third time, and performs padding transmission. Not performed.
  • step ST2304 when uplink data having a data amount smaller than the DRAT threshold is generated at the SPS timing set for the SeNB, the UE determines that the padding transmission timing is the fourth time, and the padding transmission frequency Since “4” is “4”, padding transmission is performed.
  • the UE When the UE performs padding transmission, the UE resets the padding transmission timing count.
  • step ST2305 when the uplink data having a data amount smaller than the DRAT threshold is generated at the SPS timing set for the SeNB, the UE has a padding transmission timing of 1 It is determined that this is the first time, and padding transmission is not performed.
  • Step ST2306 and Step ST2307 the UE does not perform padding transmission.
  • Step ST2308 the UE performs padding transmission. Then, the UE resets the padding transmission timing count.
  • Step ST2304 the SeNB receives the first padding transmission from the UE. Since the SeNB has received the padding transmission from the UE once, considering that the padding transmission frequency is “4”, the SeNB determines that the padding transmission timing has become four times or more. Since the number of pre-release empty transmission timings is not 8 or more, the SeNB maintains the SPS resource and performs reception from the UE using the SPS resource.
  • Step ST2308 the SeNB receives the second padding transmission from the UE. Since SeNB received the padding transmission from UE twice continuously, it judges that the number of pre-release empty transmission timings became 8 or more.
  • the UE clears the SPS setting when the padding transmission timing for the SeNB continues for the number of pre-release empty transmission timings. Alternatively, since the padding transmission was performed twice in succession, considering that the padding frequency is “4”, it is determined that the padding transmission timing is continuous more than the number of empty transmission timings before release, and the implicit release is performed. SPS resources that have been deleted may be cleared.
  • the method disclosed in the second modification of the eighth to eighth embodiments may be applied.
  • padding transmission is executed, it is possible to operate implicit release. Therefore, it is possible to suppress a reduction in use efficiency of PUSCH resources.
  • Embodiment 10 FIG.
  • the problems that occur when the SPS is set in the 2nd-eNB during the setting of the UL split bearer are shown, and the solutions are disclosed. In the first place, it is required to reduce the frequency with which such problems occur. In the present embodiment, a method for reducing the frequency with which such problems occur is disclosed.
  • the SPS for the communication or bearer in which data generated in a short cycle exists is set in the 1st-eNB.
  • the 1st-eNB SPS cycle may be set to be equal to or less than the 2nd-eNB SPS cycle (1st-eNB SPS cycle ⁇ 2nd-eNB SPS cycle).
  • the threshold of DRAT should be the maximum value of data amount generated in a short cycle or more. Alternatively, the DRAT threshold may be equal to or less than the minimum value of the amount of data generated in a long cycle.
  • the eNB suitable for the large capacity communication may be set as the 1st-eNB. Since the 1st-eNB can always transmit uplink data, the SPS process suitable for large-capacity communication can be performed by changing the eNB suitable for large-capacity communication to the 1st-eNB.
  • Embodiment 10 Modification 1 Another method for solving the problem described in the tenth embodiment is disclosed. It is preferable that one eNB can set a plurality of SPSs for one UE. For example, for one UE, one eNB performs SPS setting for each bearer. Some bearers can grasp the data generation cycle and the data amount for each bearer to some extent. By setting the SPS for each bearer, it is possible to set the SPS suitable for the data generation cycle and the data amount for each bearer.
  • the DRAT threshold is set for each bearer. Therefore, by setting the SPS for each bearer, it is possible to set the SPS suitable for the data generation cycle and the data amount for each bearer, and set the DRAT threshold. As a result, it is possible to reduce the frequency of occurrence of the problems as shown in the first to ninth embodiments. Further, it is possible to flexibly respond to requests such as desired communication quality and allowable delay amount for each bearer.
  • SPS may be set not for each bearer but for each bearer group including one or more bearers. For example, by setting bearers having the same data generation cycle and data amount in the same group, it is possible to reduce the SPS that the eNB sets for one UE, thereby simplifying the control. It becomes possible.
  • Embodiment 10 Modification 2 Another method for solving the problem described in the tenth embodiment is disclosed.
  • the eNB measures the time change of the data amount of the uplink transmission data from the UE, and derives the time change of the probability that the uplink transmission data occurs using the measurement result. In other words, the eNB predicts a temporal change in the probability that the uplink transmission data is generated using the measurement result of the time change in the data amount of the uplink transmission data.
  • Statistical processing may be performed to derive the probability that uplink transmission data will occur. From the time change in the probability that the derived uplink transmission data is generated, it is derived at which uplink transmission timing the probability that the uplink transmission data is generated is high.
  • ENB performs SPS setting, SPS resource scheduling, and SPS activation and deactivation in accordance with the temporal change in the probability that the derived uplink transmission data occurs. By doing in this way, eNB becomes possible [setting of SPS suitable for the time change of the data amount of the uplink transmission data from UE].
  • the temporal change in the probability of occurrence of uplink transmission data is disclosed, the temporal change in the data generation amount may also be derived. Accordingly, it is possible to derive how much radio resources should be allocated as SPS resources. Therefore, it is possible to perform scheduling of SPS resources with high accuracy.
  • the UE may measure the time change of the data amount of the uplink transmission data from the UE, and disclosed the method of deriving the time change of the probability that the uplink transmission data occurs using the measurement result
  • the time change of the generation amount may be measured, and the time change of the probability that the uplink transmission data is generated may be derived using the measurement result.
  • Statistical processing may be performed to derive the probability that uplink transmission data will occur.
  • the UE derives at which uplink transmission timing the probability of occurrence of uplink transmission data is high from the temporal change in the probability of occurrence of the derived uplink transmission data.
  • the UE notifies the eNB of information regarding a temporal change in the probability that the derived uplink transmission data is generated, or at which uplink transmission timing the probability that the uplink transmission data is generated is high.
  • RRC signaling may be used for this notification. By using RRC signaling, a large amount of information can be notified.
  • Notification may be performed using MAC signaling or L1 / L2 control signals.
  • MAC signaling or L1 / L2 control signals are used, the amount of information that can be notified is reduced, but the time required for notification can be shortened. Therefore, the derived value can be reflected with low delay.
  • the eNB uses the information on the time change of the probability of occurrence of the derived uplink transmission data notified from the UE, or the information on which uplink transmission data has a high probability of occurrence of the uplink transmission data, SPS setting, SPS Perform resource scheduling and SPS activation and deactivation.
  • the UE can directly measure the time change of the uplink transmission data generated in the UE, it is possible to derive the time change of the probability that the uplink transmission data occurs regardless of the radio wave propagation environment. Become.
  • the UE may derive SPS settings, SPS resource scheduling, and SPS timing in accordance with the temporal change in the probability that the derived uplink transmission data will occur.
  • the UE notifies the eNB of information regarding the derived SPS settings, SPS resource scheduling, and SPS timing. By doing in this way, it becomes possible to reduce the information amount notified to eNB from UE.
  • the measurement of the time change of the amount of uplink transmission data or the amount of uplink transmission data generated, and the derivation of the time change of the probability of occurrence of uplink transmission data may be performed for each UE or for each bearer. Or you may carry out for every content or every application. This makes it possible to perform SPS settings suitable for each UE, each bearer, each content, and each application.
  • the time change of the probability of occurrence of uplink transmission data is disclosed, the time change of the generation amount of uplink transmission data may be derived. Or you may derive about the time change of an uplink throughput. By using these values, it is possible to derive how much radio resources should be allocated as SPS resources. Therefore, it is possible to perform scheduling of SPS resources with high accuracy.
  • the SPS setting, the SPS resource scheduling, and the SPS timing are derived in accordance with the time change of the probability that the uplink transmission data is generated.
  • it may be applied to the setting of the DRAT threshold.
  • a DRAT threshold is set in accordance with the temporal change in the probability of occurrence of uplink transmission data.
  • the eNB may notify the other eNB that is performing the DC of the result of deriving the temporal change in the probability that uplink transmission data will occur.
  • Other eNBs may derive temporal changes in the probability that uplink transmission data to the own eNB will occur.
  • Other eNBs may use these information to set the DRAT threshold.
  • the other eNBs can know the time change of the probability that the uplink transmission data to each eNB will occur, so that it is possible to flexibly determine how to set the DRAT threshold.
  • Modification 1 and Modification 2 of Embodiment 10 may be applied to the 1st-eNB. Further, the present invention is not limited to the case where DC is set, and may be applied. Thereby, the same effects as those of Modification 1 and Modification 2 of Embodiment 10 can be obtained.
  • Embodiment 11 FIG. In 3GPP, pre-scheduling is considered as a method for reducing delay when a UE connected to one cell starts uplink transmission.
  • a pre-scheduling method there are a method using SPS and a method using dynamic scheduling (see Non-Patent Document 10). However, these methods are methods when the UE is connected to one cell, and no pre-scheduling method when dual connectivity (DC) is set is discussed.
  • DC in which a UE connects to two eNBs to perform communication is introduced.
  • DC is an important technology for increasing communication capacity.
  • the setting method of the pre-scheduling when DC is set to UE is disclosed.
  • An eNB that supports pre-scheduling may be statically determined in advance according to a standard or the like.
  • an eNB that supports pre-scheduling is not determined, for example, the SeNB sets pre-scheduling for the UE independently, but there is a possibility that the UE does not support pre-scheduling for the SeNB. In such a case, a malfunction may occur and DC may not be executed. Therefore, an eNB that supports pre-scheduling is statically determined in advance, so that a pre-scheduling setting method in DC is clarified between the UE and the eNB, and malfunctions can be reduced.
  • DC can transmit data from both eNBs. Therefore, when only MeNB supports pre-scheduling, the amount of reduction in uplink transmission delay as a bearer is small.
  • the eNB that supports pre-scheduling may be MeNB and SeNB in DC.
  • pre-scheduling may be supported simultaneously.
  • the pre-scheduling settings for the MeNB and SeNB may be the same.
  • pre-scheduling can be set for the SeNB. Therefore, since it is possible to shorten the time for starting transmission of uplink data to the SeNB, it is possible to increase the amount of reduction in uplink transmission delay as a bearer.
  • the pre-scheduling setting in the MeNB may be different from the pre-scheduling setting in the SeNB.
  • Pre-scheduling may be set separately for each of the MeNB and SeNB, that is, independently.
  • the split configuration can be set for each bearer, the data transmitted for each eNB is different.
  • bearer # 1 can set a split bearer using MeNB and SeNB
  • bearer # 2 can set a non-split bearer that is not a split bearer using MeNB. Therefore, since data to be transmitted differs for each eNB set by DC, a delay amount required for each eNB set by DC also differs.
  • the pre-scheduling of each eNB may be set independently for each bearer.
  • the pre-scheduling setting for the MeNB and SeNB of the bearer # 1 and the pre-scheduling setting for the MeNB of the bearer # 2 may be set independently. In this way, by making it possible to independently set the pre-scheduling of each eNB for each bearer, it becomes possible to satisfy different request delay amounts depending on the bearer.
  • Disclosed is a subject for setting pre-scheduling and a method for notifying UE of setting of pre-scheduling.
  • MeNB sets pre-scheduling.
  • MeNB sets the pre-scheduling of MeNB and SeNB.
  • the MeNB notifies the SeNB of the pre-scheduling setting of the SeNB.
  • the setting may include setting cancellation.
  • the SeNB may determine whether or not the pre-scheduling setting notified from the MeNB is permitted (permitted / not permitted).
  • the SeNB may notify the MeNB of information indicating permission.
  • the SeNB may notify the MeNB of information indicating non-permission when disabling the pre-scheduling setting notified from the MeNB.
  • the MeNB may change the pre-scheduling setting and notify the SeNB again.
  • the resetting may be repeated until a permission notification is received from the SeNB.
  • the X2 interface may be used for notification of the pre-scheduling setting performed between the MeNB and SeNB. You may include and notify in the message of addition, cancellation
  • the MeNB notifies the UE of the pre-scheduling setting for at least one of the MeNB and SeNB.
  • the Uu interface may be used for notification of the pre-scheduling setting.
  • the pre-scheduling setting may be notified by being included in a message for setting the DC.
  • the SeNB may set the pre-scheduling of the SeNB.
  • the SeNB notifies the UE of the pre-scheduling setting.
  • the SeNB may notify the MeNB of the pre-scheduling setting of the SeNB.
  • the pre-scheduling setting may be notified using the X2 interface.
  • the MeNB that has received the SeNB pre-scheduling setting from the SeNB may notify the UE of the setting.
  • the pre-scheduling setting largely depends on the bearer setting. Therefore, it is more preferable that MeNB which sets DC using the information set to the bearer sets pre-scheduling.
  • a pre-scheduling setting method when DC is set in the UE has been disclosed. Pre-scheduling may be set for the SeNB when DC is set for the UE, not when DC is set for the UE.
  • the eNB may set pre-scheduling for the SeNB when adding the SeNB. The method disclosed in this embodiment may be appropriately applied to this pre-scheduling setting.
  • the SeNB addition process it becomes possible to omit the scheduling request process that the UE has conventionally performed for the SeNB.
  • the time required for the scheduling request can be reduced, so that the time for setting the DC can be shortened.
  • the method disclosed in the present embodiment is not limited to the case of adding SeNB, but can also be applied to the case of correcting SeNB.
  • the pre-scheduling method disclosed in the present embodiment may be appropriately applied to the modified SeNB. As a result, the same effect as in the present embodiment can be obtained.
  • the split bearer is supported by dual connectivity (DC)
  • DC dual connectivity
  • the present invention can be applied not only to DC but also to multi-connectivity in which communication is performed using a plurality of eNBs.
  • split bearer When split bearer is performed with multi-connectivity, it may be applied when uplink data is not transmitted to one or more eNBs of multi-connectivity according to a predetermined rule. As a result, the same effects as those of the above-described embodiment and modifications thereof can be obtained.
  • the case where the SPS is set when the UL split bearer is set and the DRAT is used is disclosed, but the dynamic scheduling is performed instead of the case where the SPS is set. It may be applied to The DRAT threshold setting method when SPS is set when DRAT is used, and the method related to padding transmission may be applied when dynamic scheduling is performed when DRAT is used.
  • the DRAT threshold when the DRAT threshold is set, when the 2nd-eNB is notified of the uplink grant by dynamic scheduling to the UE, the uplink transmission data does not occur in the UE with the resource of the uplink grant.
  • the same problem as when SPS is set occurs.
  • the threshold of DRAT when the threshold of DRAT is set, the same applies to the case where uplink transmission data does not occur in the UE with pre-scheduled resources when dynamic scheduling by pre-scheduling is performed in the 2nd-eNB. Problem arises.
  • the first embodiment, the second embodiment, the first modification of the second embodiment, the fifth embodiment, the seventh embodiment, the eighth embodiment, and the eighth embodiment are modified.
  • the method disclosed in Example 1 and Modification 2 of Embodiment 8 may be applied as appropriate.
  • a similar effect can be obtained when dynamic scheduling is performed when DRAT is used.
  • Embodiment 12 There is a technique in which when an eNB and a UE communicate with each other, a signal is transmitted using beam forming in which the eNB uses a plurality of antennas to form a beam only in the direction of the UE that is a communication target terminal.
  • a method of covering the service area of the eNB using beam forming there is a method of arranging a plurality of beams whose directions are fixed. In this case, the eNB switches the fixed beam according to the movement of the UE and uses an appropriate beam.
  • FIG. 26 is a diagram illustrating beam forming using a multi-element antenna.
  • the eNB configures the antenna 408 shown in FIG.
  • the eNB forms a beam only in a predetermined direction using a part or all of the plurality of antennas of the multi-element antenna 2401, and communicates with the UE 2402 to be communicated. As shown in FIG. 26, the coverages 2403, 2404, and 2405 of each beam formed by beam forming are narrow coverage. The eNB covers the service area by forming multiple beams with narrow coverage fixed in different directions.
  • the eNB When the UE 2402 exists in the coverage 2403 of the first beam, the eNB communicates with the UE 2402 using the first beam. When the UE 2402 moves to the coverage 2404 of the second beam, the eNB switches from the first beam to the second beam and communicates with the UE 2402.
  • the switching source beam may be referred to as a “source beam”, and the switching destination beam may be referred to as a “target beam”.
  • the service area configured by the eNB is divided into narrow coverages configured by a plurality of beams. Therefore, high-speed beam switching processing is required for movement between the beams of the UE.
  • the eNB may form a plurality of beams using beam forming for each cell. In such a case, a beam switching process occurs in the movement of the UE between beams within one cell.
  • the UE In the beam switching process, the UE must synchronize with the target beam, and the eNB must perform scheduling of radio resources of the target beam to the UE. Therefore, it is required to provide a high-speed and stable communication system that enables high-speed beam switching processing in the movement of the UE between beams.
  • a method for shortening the time for synchronization processing with a target beam and scheduling processing of radio resources in the target beam is disclosed.
  • the synchronization method with the conventional cell may be applied to the synchronization processing with the target cell.
  • the UE receives at least one of a synchronization signal, a reference signal, and a discovery signal transmitted by the target beam, and synchronizes with the target beam. For example, when a synchronization signal such as P-SS and S-SS used in a conventional cell is used as the synchronization signal, synchronization may be performed using the synchronization signal. In this case, a period of at least 6 subframes is required for synchronization.
  • a synchronization code corresponding to one-to-one is assigned to the PCI for each cell.
  • the UE cannot recognize which beam is synchronized.
  • an identifier for each beam may be provided, and a code corresponding to one-to-one correspondence may be assigned to the identifier for each beam in the synchronization signal of each beam.
  • the identifier for each beam may be assigned by being superimposed on the identifier for each cell.
  • the UE can recognize which cell, and further can recognize which beam.
  • a code corresponding to one-to-one may be assigned to the identifier for each beam in the reference signal and the discovery signal.
  • the UE can recognize which beam is the received beam by receiving the reference signal or the discovery signal and obtaining the identifier for each beam.
  • ENB synchronizes beams in the same cell. Synchronization between beams in the eNB may be taken. More specifically, subframe timing synchronization and slot timing synchronization are performed between beams. Also, SFN (System Frame Number), radio frame number, and slot number may be synchronized.
  • SFN System Frame Number
  • radio frame number radio frame number
  • slot number may be synchronized.
  • Downlink radio resource scheduling information is included in downlink control information (DCI).
  • DCI downlink control information
  • the downlink control information is notified to the UE by an L1 / L2 control signal.
  • LTE it is mapped to PDCCH or EPDCCH.
  • An identifier (C-RNTI) assigned to each UE for each cell is masked in the CRC of the L1 / L2 control signal.
  • C-RNTI By detecting its own C-RNTI, the UE can receive the L1 / L2 control signal addressed to itself and acquire downlink control information, and can acquire downlink radio resource scheduling information. It becomes.
  • the same identifier may be used as the UE-specific identifier masked by the CRC of the L1 / L2 control signal.
  • An identifier assigned to each UE for each cell may be used. By doing so, the UE can use the C-RNTI used in the source beam for the target beam even if the beam switching process is performed in the cell.
  • the scheduling information can be received by receiving the L1 / L2 control signal immediately after the synchronization with the target beam.
  • the eNB may notify the UE of C-RNTI in advance.
  • the eNB may notify the UE of the C-RNTI using the source beam. By doing so, also in the beam switching process between cells, it becomes possible to receive the L1 / L2 control signal and receive the scheduling information immediately after synchronizing with the target cell.
  • an identifier (B-RNTI) assigned to each UE for each beam may be provided.
  • the identifier assigned to each UE for each beam may be masked in the CRC of the L1 / L2 control signal.
  • the eNB may notify the UE of the B-RNTI in advance.
  • the eNB may notify the B-RNTI to the UE using the source beam. In this way, in the beam switching process, after synchronizing with the target cell, it is possible to immediately receive the L1 / L2 control signal and receive the scheduling information.
  • uplink radio resource scheduling information is also included in downlink control information (DCI). Therefore, the method disclosed above can be applied.
  • the UE In uplink, the UE needs to request radio resources from the eNB.
  • a request for radio resources is made by a scheduling request (SR) or PRACH.
  • SR scheduling request
  • PRACH PRACH
  • SR and PRACH may not be performed at an arbitrary timing, but must be performed at a predetermined timing set by the eNB. Therefore, the UE must wait until a predetermined timing set by the eNB, resulting in a delay. In the case of narrow coverage beam switching processing, this delay is likely to lead to communication failure.
  • the eNB schedules uplink radio resources with the target beam in advance for the UE.
  • the eNB may perform scheduling of uplink radio resources with the target beam using the source beam in advance for the UE.
  • SPS may be used as a method for scheduling uplink radio resources of the target beam.
  • the eNB may notify the UE of the setting of the uplink SPS with the target beam using the source beam.
  • the notification of the uplink SPS setting may be performed before the UE synchronizes with the target beam.
  • the UE that has received the uplink SPS setting in the target beam performs uplink transmission using the notified uplink SPS setting in the target beam after synchronizing with the target beam.
  • the time interval of SPS resources not only the time interval of SPS resources but also offset and scheduling information may be included.
  • offset a radio frame number and a subframe number may be specified.
  • the time interval of the SPS resource may be set with the source beam. By setting the time interval of the SPS resource with the source beam, setting from the target beam is not required when switching the beam, and the time required for the switching process can be shortened.
  • the scheduling information for the SPS resource may be set using the source beam.
  • setting the scheduling information of the SPS resource with the source beam setting from the target beam is not required when switching the beam, and the time required for the switching process can be shortened.
  • SPS resource scheduling information may be set using a target beam. This makes it possible to set scheduling information such as resource allocation according to the load status of the target beam.
  • SPS activation and deactivation may be performed with the source beam.
  • setting from the target beam is not required at the time of beam switching, and the time required for switching processing can be shortened.
  • activation and deactivation of SPS resources may be performed with the target beam.
  • activation and deactivation according to the load state of the target beam can be performed.
  • resource use efficiency can be improved as compared with the case where the source beam is used in advance. If this is performed in advance with a source beam, the SPS resource is allocated to the target UE from the time when activation and deactivation are performed with the source beam in advance until the target beam is actually switched to SPS. This is because radio resources are wasted because the UE must be continuously allocated.
  • the above-described methods for setting the SPS and activating and deactivating the SPS with the source beam or the target beam may be used in appropriate combination. As a result, it is possible to set according to the load status of the target beam and the delay tolerance.
  • the UE does not need to make an uplink radio resource request to the eNB with the target beam after the beam switching, and thus the delay can be reduced. Therefore, it is possible to shorten the beam switching processing time.
  • uplink SPS is disclosed as a method for scheduling uplink radio resources of the target beam
  • downlink SPS may be used as a method for scheduling downlink radio resources of the target beam.
  • the eNB may notify the UE of the setting of the downlink SPS with the target beam using the source beam. By doing so, the UE can receive the set SPS resource according to the setting of the downlink SPS after switching to the target beam.
  • Dynamic scheduling may be used as another method for scheduling the uplink radio resource of the target beam. Even if the eNB does not receive a scheduling request from the UE, the eNB transmits scheduling information of radio resources to the UE in an arbitrary subframe using the target beam. After the UE synchronizes with the target beam, the UE receives the L1 / L2 control signal in each subframe, thereby enabling the eNB to receive the scheduling information of the radio resource that transmitted an arbitrary subframe. As a result, the UE can perform uplink transmission using the received scheduling information of the uplink radio resource.
  • the UE does not need to make an uplink radio resource request to the eNB, and thus it is possible to reduce the delay. Therefore, it is possible to shorten the beam switching processing time.
  • FIG. 27 is a diagram showing an example of a sequence related to the beam switching processing time reduction method according to the twelfth embodiment.
  • FIG. 27 shows a case where the source beam (S-Bm) is switched to the target beam (T-Bm).
  • step ST2501 the eNB communicates with the UE using a source beam.
  • the eNB synchronizes in advance between the source beam and the target beam.
  • Subframe timing synchronization and slot timing synchronization are performed between the source beam and the target beam.
  • SFN System (Frame Number), radio frame number, and slot number are synchronized.
  • the eNB notifies the UE of uplink scheduling information on the target beam using the source beam.
  • the uplink scheduling information in the target beam is the setting information for uplink SPS in the target beam.
  • the SPS setting information includes not only the time interval of SPS resources but also offset and scheduling information.
  • Information on the target beam may be notified together with uplink scheduling information on the target beam.
  • the information on the target beam include a target beam identifier. Further, when an identifier assigned to each UE for each beam is used, the identifier may be notified.
  • RRC signaling may be used for notification of uplink scheduling information on the target beam and information on the target beam.
  • the eNB notifies the UE of a beam switching instruction using the source beam.
  • Beam switching instruction information may be provided to notify the information.
  • the beam switching instruction information is information serving as a beam switching trigger. In other words, it is information that triggers the UE to receive the L1 / L2 control signal of the target beam.
  • RRC signaling may be used for notification of beam switching instruction information.
  • the UE Since the UE that has received the beam switching instruction information has already been synchronized with the target beam in step ST2502, the UE receives downlink control information for the target beam in step ST2505.
  • the UE receives each subframe PDCCH or EPDCCH.
  • the UE can obtain downlink scheduling information by receiving downlink control information of the target beam, and can receive downlink data according to the scheduling information.
  • Step ST2506 the UE transmits uplink data to the eNB using the SPS resource set for the target beam.
  • step ST2507 communication becomes possible between the UE and the eNB using the target beam.
  • the path distance from the antenna to the UE is substantially the same. Therefore, there is no need to change the uplink transmission timing between the source beam and the target beam.
  • the UE may need to perform uplink synchronization in the target beam.
  • the eNB instructs the UE to perform random access (Random Access: RA) processing in the target beam.
  • the instruction to execute the RA process in the target beam may be performed using the L1 / L2 control signal in the target bee.
  • PDCCH or EPDCCH in the target beam may be used.
  • the UE may perform RA processing in the target beam.
  • the eNB can adjust the uplink transmission timing of the UE. Specifically, the uplink transmission timing is notified to the UE in the RA process. It is also called Timing Advance.
  • the UE can perform uplink synchronization in the target beam.
  • the eNB acquires information regarding the position of the antenna. For example, each antenna acquires information on the position of its own antenna using a global positioning system (abbreviation: GPS) and notifies the eNB of information on the position of its own antenna. Or an operator sets the information regarding the position of an antenna in eNB. Or an operator may set the information regarding the position of an antenna to OAM, and OAM may notify eNB.
  • GPS global positioning system
  • the eNB determines whether uplink synchronization is necessary for the UE that is a target of communication using the target beam, using the acquired information regarding the position of the antenna.
  • the eNB may instruct the UE to perform RA processing in the target beam.
  • the eNB can determine whether or not to perform uplink synchronization as necessary.
  • uplink synchronization is unnecessary, it is possible to dispense with RA processing. Further, even when uplink synchronization is required, RA processing performed by being instructed by the eNB is used, so that there is no collision RA processing, and control can be simplified.
  • the uplink scheduling information in the target beam and the switching instruction to the target beam are notified by separate signaling.
  • uplink scheduling information on the target beam and an instruction to switch to the target beam may be notified by the same signaling. As a result, the same effect can be obtained.
  • Embodiment 13 FIG. In Embodiment 12, it was disclosed that the eNB notifies the UE of a beam switching instruction for switching the beam. For example, the process of step ST2504 in FIG. 27 is shown.
  • Embodiment 12 discloses that RRC signaling is used for notification of beam switching instruction information.
  • RRC signaling since it is divided into a plurality of transport blocks, it is transmitted at a plurality of transmission time intervals (Transmission Time Interval: TTI).
  • TTI Transmission Time Interval
  • retransmission is applied for each transport block. Therefore, the time required for transmission / reception of RRC signaling is increased.
  • a method for shortening the time taken to notify the beam switching instruction in the beam switching process is disclosed.
  • Execute beam switching instruction by MAC signaling or L1 / L2 signaling is executed by MAC signaling or L1 / L2 signaling.
  • a dedicated control channel is used as L1 / L2 signaling.
  • PDCCH or EPDCCH are used as L1 / L2 signaling. Since both MAC signaling and L1 / L2 signaling are performed in 1 TTI, it is possible to shorten the time required for the beam switching instruction as compared with RRC signaling.
  • MAC signaling or L1 / L2 signaling may be determined statically by a standard or the like. Alternatively, both methods may be supported and used quasi-statically or dynamically. For example, depending on the radio wave propagation environment, MAC signaling or L1 / L2 signaling may be used. When the radio wave propagation environment is good, L1 / L2 signaling may be used, and when the radio wave propagation environment is not good, MAC signaling may be used.
  • the MAC protocol in the eNB may determine beam switching.
  • the determination by the MAC, not the RRC, makes it possible to include the determination of which beam to use together with the scheduling or in the scheduling.
  • Each beam may be handled as a radio resource configured on the same time-frequency axis.
  • a plurality of beams may be handled as a plurality of radio resources, and scheduling using the plurality of radio resources may be performed.
  • setting the subject of determining beam switching to MAC is suitable for notifying a beam switching instruction by signaling below MAC.
  • the main body that determines beam switching to be the MAC it is possible to shorten the processing time from beam switching determination to beam switching instruction transmission.
  • beam switching related information information used when the UE performs beam switching.
  • beam switching related information information used when the UE performs beam switching.
  • the above-described specific example (1) will be described more specifically. You may allocate for every predetermined range of a network. For example, it may be assigned for each MME. Or you may allocate for every eNB. Alternatively, the beam identifier may be assigned for each cell. Alternatively, a predetermined number of beam identifiers may be prepared and assigned from among them.
  • Allocation within a narrow range of the network makes it possible to reduce the amount of information required for the beam identifier, for example, the number of bits. For example, by assigning beam identifiers for each cell, it is possible to reduce the information amount of beam switching related information, for example, the number of bits.
  • the above-described specific example (2) will be described more specifically.
  • the same PDCP is used between the beams in the same cell. Therefore, information on whether or not to perform at least one of PDCP reset and reset by beam switching is unnecessary. It may be determined beforehand that neither resetting nor resetting is performed according to the standard.
  • the UE may hold the PDCP setting of the source beam in the beam switching process in the same cell.
  • the same RLC is used between beams in the same cell. Therefore, information on whether or not to perform at least one of RLC reset and reset by beam switching is unnecessary. It may be determined beforehand that neither resetting nor resetting is performed according to a standard or the like.
  • the UE may hold the RLC setting of the source beam in the beam switching process in the same cell.
  • ⁇ Beams in the same cell differ only in part of the MAC settings. Therefore, information on whether or not to perform at least one of MAC reset and resetting by beam switching is unnecessary. That is, resetting is unnecessary, and only different settings should be reset. It may be determined in advance that only settings that differ according to the standard are reset. The UE may hold only the same MAC setting as the source beam in the beam switching process in the same cell.
  • ⁇ Beams in the same cell have different PHY settings. Information on whether or not to perform at least one of PHY reset and resetting is required.
  • (3-1) UE identifier in the target beam For example, C-RNTI or B-RNTI.
  • RadioResourceConfigCommon is used as a common radio resource setting parameter.
  • Mac-MainConfig is used as a parameter for the main setting of the MAC.
  • PhysicalConfigDedicated is used as an individual PHY setting parameter.
  • the information (3-1) to (3-3) described above may be omitted if there is no change from the setting of the source beam. Only those that have changed from the setting of the source beam may be notified. As a result, the amount of information can be reduced.
  • the UE that has received the beam switching instruction information performs communication using the target beam by notifying the UE of information used when the UE performs beam switching. It becomes possible.
  • ENB notifies the beam switching related information to cause the UE to perform beam switching.
  • a method for notifying related information for beam switching is disclosed.
  • ENB notifies the UE of beam switching related information using the source beam.
  • the beam switching related information is notified before the beam switching instruction is notified.
  • the beam switching related information may be notified by RRC signaling.
  • a new message may be newly provided for notification of beam switching related information.
  • a message for notifying configuration information for beam measurement (hereinafter sometimes referred to as “configuration information for beam measurement”) may be provided.
  • the beam measurement configuration information may be CSI measurement configuration information.
  • the UE measures the beam using the beam measurement configuration information notified from the eNB.
  • the UE measures the beam included in the beam measurement configuration information.
  • the UE reports the beam measurement result to the eNB.
  • the setting for reporting may also be notified from the eNB to the UE. It may be notified together with the beam measurement configuration information or included in the beam measurement configuration information.
  • the eNB receives the report of the beam measurement result from the UE, and determines the beam to be used for the UE.
  • the method of reporting the beam measurement results by the UE to the eNB As the measurement of the beam, the received power of the reference signal or discovery signal transmitted for each beam is measured. Or reception quality may be sufficient. Alternatively, an amount including interference power and noise power may be measured. For example, the signal-to-noise ratio (Signal-to-Noise-Ratio; abbreviation: SNR), the signal-to-interference noise power ratio (Signal-to-Interference-plus-Noise-power-Ratio; abbreviation: SINR), and the like.
  • SNR Signal-to-noise ratio
  • SINR Signal-to-interference noise power ratio
  • RRC signaling Conventional cell measurement results are reported using RRC signaling. Although it may be performed by RRC signaling, in the case of RRC signaling, as described above, the time required for transmission and reception of RRC signaling becomes long.
  • notification may be performed by MAC or L1 / L2 signaling. You may notify using MAC CE. Or you may map and notify to PUCCH. Or you may map and notify to PUSCH. Alternatively, a CQI report or a CSI report may be used.
  • FIG. 28 is a diagram illustrating an example of a sequence related to a beam switching process time shortening method according to the thirteenth embodiment.
  • FIG. 28 shows a case where the source beam (S-Bm) is switched to the target beam (T-Bm). The case where the source beam and the target beam are synchronized is shown. It shows a case where scheduling information of radio resources in the target beam is notified in advance using the source beam. Since the sequence shown in FIG. 28 is similar to the sequence shown in FIG. 27, the same steps are denoted by the same step numbers, and common description is omitted. Here, different parts will be mainly described.
  • step STST2601 the eNB notifies the UE of the beam measurement configuration information using the source beam.
  • RRC signaling is used to notify the beam measurement configuration information.
  • Step ST2602 the UE that has acquired the beam measurement configuration information from the eNB measures the reference signal transmitted for each beam with respect to the measurement beam included in the beam measurement configuration information.
  • the UE notifies the eNB of the measurement result obtained in step ST2602 using the source beam.
  • L1 / L2 signaling may be used for notification of measurement results. For example, it reports using PUCCH which is an uplink control channel. As a result, signaling can be speeded up.
  • step ST2603 the UE does not have to report all the measurement results obtained in step ST2602. Only the measurement result of the beam for which the report is triggered may be reported according to a predetermined criterion.
  • Step ST2601 the eNB notifies the UE of these settings together with the beam measurement configuration information.
  • step ST2604 the eNB that has received the report of the beam measurement result in step ST2603 determines whether to perform beam switching for the UE. For example, when the reception quality of the source beam deteriorates below a predetermined threshold and there is a beam with better reception quality than the source beam, the eNB decides to switch to a beam with better reception quality.
  • ENB which decided the beam switching with respect to UE in step ST2604 notifies the relevant information for beam switching of a target beam to UE in step ST2605 using a source beam.
  • RRC signaling may be used for notification of beam switching related information.
  • step ST2503 when the eNB notifies the UE of the scheduling information of the uplink radio resource using the target beam using the source beam, the eNB may notify the UE using the same signaling as the notification.
  • Step ST2606 the eNB notifies the UE of beam switching instruction information to the target beam using the source beam.
  • MAC signaling is used for notification of beam switching instruction information. As a result, signaling can be speeded up.
  • step ST2605 the UE receives the beam switching related information of the target beam.
  • step ST2606 the UE that has received the beam switching instruction information receives the L1 / L2 control signal of the target beam.
  • Step ST2606 the eNB that has transmitted the beam switching instruction information to the target beam to the UE performs scheduling for the UE using the target beam.
  • the beam switching related information and the message for notifying the beam measurement configuration information are notified separately.
  • the beam switching related information may be notified by being included in a message for notifying the beam measurement configuration information.
  • the beam switching related information included in the beam measurement configuration information may be included.
  • the eNB notifies the UE before determining the target beam. Therefore, the target beam included in the beam switching related information has not been determined yet. Therefore, it is preferable to include information about the beam for beam measurement instead of the target beam.
  • One or a plurality of beams for beam measurement may be used.
  • a source beam may be included.
  • the eNB may notify the UE of other beam measurement configuration information again.
  • the message for notifying the beam measurement configuration information may be notified including the beam switching related information.
  • RRC signaling is used for notification of beam switching related information from the eNB to the UE
  • MAC signaling may be used as another method. You may notify by MAC CE. Information necessary for providing a new MAC CE and performing beam switching may be included. You may notify with beam switching instruction information.
  • the information notified by RRC signaling and the information notified by MAC signaling may be separated. For example, information with a large amount of information is notified by RRC signaling, and information with a small amount of information is notified by MAC signaling.
  • the setting information for enabling communication with the target beam of the specific example (3) may be notified by RRC signaling, and the identifier of the target beam of the specific example (1) may be notified by MAC signaling.
  • MAC signaling is performed in 1 TTI.
  • RRC signaling is transmitted by being divided into a plurality of transport blocks, it is performed over a plurality of TTIs. Even if retransmission is taken into consideration, the time required for notification of beam switching instruction information can be shortened by using MAC signaling as compared with the case of using RRC signaling.
  • the time from beam measurement to beam switching can be shortened. As a result, it is possible to perform beam switching for a more optimal beam, and it is possible to reduce communication quality deterioration, communication delay due to switching failure, and communication disconnection.
  • Embodiment 13 Modification 1 In the thirteenth embodiment, a method for reducing the time taken to notify beam switching instruction information has been disclosed. In this modification, another method is disclosed.
  • the eNB determines one or more beams that are candidates for the target beam for the UE to be communicated.
  • a source beam may be put into a target beam candidate.
  • the target beam candidate beam may be referred to as a “target candidate beam”.
  • ENB determines activation or deactivation of some or all of the target candidate beams.
  • ENB notifies the UE of activation or deactivation instructions for some or all of the target candidate beams.
  • the notification is performed using a source beam.
  • MAC signaling or L1 / L2 signaling may be used.
  • the UE performs synchronization with the beam that has received the activation instruction and receives downlink control information (DCI).
  • DCI downlink control information
  • the L1 / L2 control signal may be received.
  • PDCCH or EPDCCH is received.
  • the UE receives PDCCH or EPDCCH, and detects DCI addressed to itself by C-RNTI or B-RNTI.
  • the UE When there are a plurality of beams that have received the activation instruction, the UE receives downlink control information of the plurality of beams.
  • ENB determines the beam to be used for the UE from the activated beams, and switches from the source beam to the determined beam.
  • the eNB communicates with the UE using the switched beam. At this time, the eNB does not need to notify the UE of beam switching instruction information. This is because the UE receives the downlink control information of the beam for which the activation instruction has been received, and therefore can acquire scheduling information for the communication regardless of which beam is started.
  • the eNB After determining the beam switching for the UE, the eNB can immediately communicate with the UE using the switched beam. Therefore, it is possible to reduce the time required for the beam switching process.
  • ENB after determining the target candidate beam, it is good to notify the UE related information for beam switching of the target candidate beam.
  • the method disclosed in the twelfth embodiment can be applied to the notification of the beam switching related information.
  • the target candidate beam is determined as appropriate.
  • the determination of the target candidate beam may be performed periodically, or may be performed according to the report of the measurement result of the beam of the UE.
  • Activating or determining the beam to be activated is performed as appropriate.
  • the activation or the determination of the beam to be activated may be performed periodically, or may be performed in response to the report of the measurement result of the beam of the UE.
  • the beam to be used for the UE is determined as appropriate.
  • the determination of the beam to be used for the UE may be performed periodically, or may be performed in response to a report of the measurement result of the beam of the UE. Thereby, even if the beam used for the UE is changed, it is not necessary to notify the beam switching instruction information.
  • FIG. 29 and FIG. 30 are diagrams showing an example of a sequence related to a method for shortening the beam switching time in the first modification of the thirteenth embodiment.
  • FIG. 29 and FIG. 30 are connected at the position of the boundary line BL1.
  • FIGS. 29 and 30 show a case where the source beam (S-Bm) is switched to the first target beam (T-Bm1). Further, the case of switching from the first target beam (T-Bm1) to the second target beam (T-Bm2) is also shown. Further, the case where the source beam and the target beam are not synchronized is shown. In addition, a case is shown where scheduling information of radio resources in the target beam is not previously performed using the source beam.
  • the sequence shown in FIGS. 29 and 30 is similar to the sequence shown in FIG. 28. Therefore, the same steps are denoted by the same step numbers, and the common description is omitted. Here, different parts will be mainly described.
  • the eNB that has received the report of the beam measurement result in Step ST2603 determines a beam that is a candidate for the target beam for the UE in Step ST2801 using the report of the beam measurement result from the UE. For example, when the measurement result of the reception quality of the UE beam is equal to or higher than a predetermined threshold, the top two beams are selected, and the three beams combined with the source beam are determined as target candidate beams. The eNB may consider other information in addition to reporting the measurement result of the beam in determining the target candidate beam.
  • ENB which determined the target candidate beam with respect to UE in step ST2801, notifies the relevant information for beam switching of a target candidate beam to UE using a source beam in step ST2802.
  • the beam switching related information of the target candidate beam is notified using, for example, RRC signaling.
  • Step ST2820 the eNB determines a beam that performs at least one of activation and deactivation for the UE from among the target candidate beams. For this determination, the report of the measurement result of the beam from the UE received most recently may be used.
  • the eNB notifies the UE of a beam for performing at least one of activation and deactivation.
  • the beam that performs at least one of activation and deactivation is notified using, for example, MAC signaling.
  • the beam to be activated is a source beam (S-Bm), a first target beam (T-Bm1), and a second target beam (T-Bm2).
  • the UE that has received the beam that performs at least one of activation and deactivation in step ST2803 performs synchronization with the beam to be activated in step ST2804, step ST2805, and step ST2806.
  • step ST2807, step ST2808, and step ST2809 the UE receives downlink control information in the beam to be activated.
  • the EPDCCH of the source beam, the first target beam, and the second target beam is received.
  • the beam switching related information of the target candidate beam acquired in step ST2802 may be used.
  • step ST2810 the eNB determines beam switching. Specifically, switching from the source beam to the first target beam is determined. For this determination, the report of the measurement result of the beam from the UE received most recently may be used.
  • the eNB that has decided to switch the beam to the first target beam transmits scheduling information for the UE to the UE using the first target beam in Step ST2811.
  • Scheduling information includes DCI.
  • the DCI includes at least one of downlink scheduling information and uplink scheduling information. Further, downlink data may be transmitted in the same subframe as downlink scheduling information.
  • Step ST2811 the UE that has received the downlink control information for the first target beam in Step ST2808 acquires scheduling information that is transmitted using the first target beam.
  • UE which acquired the scheduling information of the 1st target beam in step ST2811 receives downlink data according to downlink scheduling information, when downlink scheduling information is contained in scheduling information.
  • step ST2812 the UE that has acquired the scheduling information of the first target beam in step ST2811 transmits uplink data to the eNB in accordance with the uplink scheduling information in step ST2812.
  • a scheduling request may be transmitted.
  • a buffer status report (BSR) may be transmitted.
  • the UE and the eNB can communicate with each other using the first target beam in step ST2813.
  • step ST2813 communication with the UE is performed using the first target beam. Therefore, for the UE, the first target beam is the source beam, but here it will be referred to as the first target beam.
  • step ST2814 the UE performs beam measurement.
  • This beam measurement uses the beam measurement settings included in the beam measurement configuration information notified in step ST2601.
  • the measurement may be performed using the measurement setting of the beam.
  • step ST2815 the UE that has measured the beam in step ST2814 reports the beam measurement result to the eNB.
  • the report is made using the first target beam.
  • L1 / L2 signaling may be used for the report. As a result, signaling can be speeded up.
  • step ST2816 the eNB that has received the report of the beam measurement result in ST2815 determines beam switching.
  • the beam switching is performed from among the beams to be activated notified to the UE in step ST2803.
  • Scheduling information includes DCI.
  • the DCI includes at least one of downlink scheduling information and uplink scheduling information. Further, downlink data may be transmitted in the same subframe as downlink scheduling information.
  • Step ST2817 the UE that has received the downlink control information for the second target beam in Step ST2809 obtains scheduling information that is transmitted using the second target beam.
  • the UE that has acquired the scheduling information of the second target beam in ST2817 receives downlink data according to the downlink scheduling information when the scheduling information includes the downlink scheduling information.
  • Step ST2818 the UE that has acquired the scheduling information of the second target beam in Step ST2817 transmits uplink data to the eNB in accordance with the uplink scheduling information in Step ST2818 when the scheduling information includes the uplink scheduling information.
  • a scheduling request may be transmitted.
  • a buffer status report (BSR) may be transmitted.
  • step ST2819 the UE and the eNB can communicate using the second target beam.
  • the UE can limit the number of beams that receive synchronization and control information by notifying the UE of target beam candidate beams. Therefore, the method disclosed above can reduce the processing load on the UE, and can achieve low power consumption, small size, light weight, and low price.
  • the beam to be activated or deactivated is a part or all of the target candidate beams.
  • the beam to be activated may be the same as the target candidate beam. In this case, the determination process of the beam to activate in eNB becomes unnecessary.
  • the notification of the relevant information for switching the target candidate beam may be a notification of activation of the target candidate beam.
  • the UE synchronizes the beam notified by the target candidate beam switching related information as an activated beam, and receives downlink control information.
  • step ST2820 and step ST2803 in FIGS. 29 and 30 are omitted.
  • the maximum number of receivable beams may be determined according to UE capability (UE capability). Alternatively, the maximum number of receivable beams may be provided as a UE capability parameter.
  • the eNB can set the target candidate beam or the number of beams to be activated to be equal to or less than the maximum number of beams that can be received by the UE.
  • the scheduling information of other beams may be included in the downlink control information of a certain beam.
  • scheduling information of the target beam may be included in the downlink control information of the source beam.
  • the eNB notifies the downlink scheduling information or the uplink scheduling information of the first target beam using the source beam.
  • the UE receives the downlink scheduling information or the uplink scheduling information of the first target beam using the source beam.
  • the UE that has recognized that it is the scheduling information of the first target beam receives the radio resource of the first target beam according to the downlink scheduling information.
  • the UE that has recognized the scheduling information of the first target beam transmits the radio resource of the first target beam according to the uplink scheduling information in the case of the uplink scheduling information.
  • the UE can use a plurality of beams, the plurality of beams can be used flexibly.
  • a beam for transmitting control information different from a beam for data communication it is possible to make a beam for transmitting control information different from a beam for data communication.
  • the control information is transmitted using one of the plurality of beams, and the data communication is performed using the other of the plurality of beams.
  • the eNB can use each beam in consideration of the coverage, load, and radio wave propagation status of each beam.
  • the control information may be transmitted using a wide coverage beam, and the data communication may be transmitted using a narrow coverage beam. By doing so, it becomes possible to operate the beam suitable for the characteristics of each beam.
  • Embodiment 13 Modification 2 When the beam switching process occurs in the movement between the beams of the UE when the communication is not yet successful with the source beam, how to handle unsuccessful delivery data becomes a problem.
  • data is retransmitted with the target beam from the data being HARQ processed with the source beam.
  • the UE receives the beam movement instruction, the UE retransmits the target beam from the data being subjected to HARQ processing using the source beam.
  • the eNB transmits a beam movement instruction to the UE, the eNB performs retransmission using the target beam from the data being subjected to HARQ processing using the source beam.
  • the following two (1) and (2) are disclosed as specific examples of the method of retransmitting with the target beam from the data being HARQ processed with the source beam.
  • (2) HARQ is performed using a source beam and a target beam.
  • FIG. 31 is a diagram illustrating an example of a sequence related to a method performed using a target beam from the initial transmission of data during HARQ processing in the second modification of the thirteenth embodiment.
  • a method is shown in which a UE performs a scheduling request (SR) when uplink data is transmitted using a target beam.
  • SR scheduling request
  • step ST2901 the UE receives downlink data from the eNB using a source beam.
  • Step ST2902 the UE transmits uplink data to the eNB using a source beam.
  • Step ST2903 the eNB determines beam switching for the UE.
  • Step ST2904 the eNB gives unreached downlink data information, which is information related to downlink data being HARQ processed in the source beam, to the target beam.
  • the source beam and the target beam are the same eNB, it is performed within the same eNB.
  • information regarding downlink data during HARQ processing may be applied from the source beam to the target beam.
  • the information regarding the downlink data that is being subjected to HARQ processing in the source beam may be information that can identify data to be transmitted in the target beam.
  • Step ST2905 the eNB notifies the UE of beam switching instruction information using the source beam.
  • Step ST2906 the UE that has received the beam switching instruction information synchronizes with the target beam.
  • step ST2907 the eNB performs downlink scheduling to transmit to the UE downlink data that was being subjected to HARQ processing in the source beam using the target beam from the initial transmission.
  • the eNB may use the information related to downlink data that is being subjected to HARQ processing in the source beam, received in Step ST2904.
  • the notification may use a target beam.
  • step ST2907 the eNB that has notified the UE of scheduling information in the target beam for initial transmission of data transmits downlink data being subjected to HARQ processing in the source beam to the UE using the target beam according to the scheduling information.
  • Step ST2908 the UE that has received the downlink scheduling information in Step ST2907 receives the downlink data being subjected to HARQ processing in the source beam in Step ST2908 according to the scheduling information.
  • Step ST2909 the UE that has received the beam switching instruction information in Step ST2905 transmits a scheduling request (SR) to the eNB using the target beam.
  • SR scheduling request
  • the SR is transmitted in order to transmit uplink data during HARQ processing in the source beam.
  • ENB which received SR in ST2909 determines uplink scheduling, and notifies uplink scheduling information to UE using the target beam in step ST2910.
  • Step ST2911 the UE that has received the uplink scheduling information in ST2910 transmits UL data to the eNB according to the scheduling information. Transmission is performed from the initial transmission of uplink data during HARQ processing in the source beam.
  • FIG. 32 is a diagram illustrating another example of a sequence related to a method of performing the target beam from the initial transmission of data during HARQ processing in the second modification of the thirteenth embodiment.
  • FIG. 32 shows a sequence of a method in which the UE does not need SR transmission when uplink data transmission is performed using the target beam. Since the sequence shown in FIG. 32 is similar to the sequence shown in FIG. 31, the same steps are denoted by the same step numbers, and common description is omitted. Here, different parts will be mainly described.
  • the downlink data is the same as that shown in FIG. 31 and will not be described.
  • the uplink data will be described.
  • Step ST3003 the eNB that has decided to switch the beam to the UE in Step ST2903 gives information on uplink data during HARQ processing in the source beam to the target beam in Step ST3001.
  • the source beam and the target beam are the same eNB, it is performed within the same eNB.
  • information regarding uplink data during HARQ processing may be applied from the source beam to the target beam.
  • the information regarding the uplink data that is being subjected to HARQ processing in the source beam may be information that can identify data to be transmitted in the target beam.
  • step ST2905 the eNB that has transmitted the beam switching instruction information to the UE in step ST2905 causes the UE to transmit the uplink data that was being subjected to HARQ processing in the source beam to the UE using the target beam from the initial transmission. Perform uplink scheduling. At this time, the eNB may use information related to uplink data that is received in step ST3001 and is undergoing HARQ processing in the source beam. The notification may use a target beam.
  • Step ST3002 the UE that has received the scheduling information in the target beam for the initial transmission of the uplink data transmits to the eNB from the initial transmission of the uplink data during HARQ processing in the source beam to the eNB using the target beam according to the scheduling information. To do.
  • the UE Since the UE does not need to transmit the SR, it is possible to reduce the power consumption of the UE. In addition, it is possible to reduce the time taken from beam switching to UE uplink data transmission.
  • FIG. 33 is a diagram illustrating an example of a sequence relating to a method of performing a target beam from retransmission of data during HARQ processing in the second modification of the thirteenth embodiment.
  • FIG. 33 shows a sequence of a method in which the UE does not need to transmit SR when transmitting uplink data using the target beam. Since the sequence shown in FIG. 33 is similar to the sequence shown in FIG. 32, the same steps are denoted by the same step numbers and common description is omitted. Here, different parts will be mainly described.
  • Step ST2901 the UE that has failed to receive downlink data from the eNB transmits Nack that is delivery failure (unsuccessful delivery) information to the eNB using the source beam in Step ST3101 by HARQ processing.
  • Step ST2903 the eNB determines beam switching for the UE.
  • the eNB gives unreached downlink data information, which is information regarding downlink data being subjected to HARQ processing in the source beam, to the target beam.
  • the source beam and the target beam are the same eNB, it is performed within the same eNB.
  • information regarding downlink data during HARQ processing may be applied from the source beam to the target beam.
  • the information regarding the downlink data that is being subjected to HARQ processing in the source beam may be information that can identify data to be transmitted in the target beam.
  • the information since the Nack is received from the UE, the information may be information that enables the data for retransmission to be specified.
  • Step ST2905 the eNB notifies the UE of beam switching instruction information using the source beam.
  • Step ST2906 the UE that has received the beam switching instruction information synchronizes with the target beam.
  • Step ST3105 the eNB performs downlink scheduling for transmitting, to the UE, downlink data that was being subjected to HARQ processing in the source beam using a target beam from retransmission.
  • the eNB may use information related to downlink data that is received in step ST3103 and is being subjected to HARQ processing in the source beam.
  • the notification may use a target beam.
  • Step ST3105 the eNB that has notified the UE of the scheduling information for retransmission in the target beam for initial transmission of data, uses the target beam to the UE according to the scheduling information, and the downlink data being subjected to HARQ processing in the source beam Send re-sending data.
  • Step ST3106 the UE that has received the downlink scheduling information in Step ST3105 receives, in Step ST3106, retransmission data of downlink data that is being subjected to HARQ processing in the source beam, in Step ST3106.
  • FIG. 33 discloses the case where the eNB transmits the first retransmission data of the downlink data using the target beam, but is not limited to the first time. The same may be done no matter how many times.
  • Nack continues in the source beam, retransmission data at the time when the beam switching is executed is transmitted by the target beam.
  • the eNB that failed to receive uplink data from the UE in Step ST2902 transmits Nack that is delivery failure (unsuccessful delivery) information to the UE in Step ST3102 by HARQ processing. At this time, uplink scheduling information for retransmission data is notified.
  • Step ST2903 the eNB determines beam switching for the UE.
  • Step ST2903 the eNB that has decided to switch the beam to the UE in Step ST2903 gives unreached uplink data information, which is information regarding uplink data being HARQ processed in the source beam, to the target beam.
  • uplink data information which is information regarding uplink data being HARQ processed in the source beam
  • the target beam When the source beam and the target beam are the same eNB, it is performed within the same eNB. In this case, information regarding uplink data during HARQ processing may be applied from the source beam to the target beam.
  • the information regarding the uplink data that is being subjected to HARQ processing in the source beam may be information that can identify data to be transmitted in the target beam.
  • Nack since Nack is transmitted to the UE, it is preferable to include information that makes it possible to specify scheduling information for uplink retransmission data.
  • the UE that has received the beam switching instruction information from the eNB in Step ST2905 retransmits the uplink data to the eNB using the target beam in Step ST3107 according to the scheduling information for uplink data retransmission received using the source beam in Step ST3102. I do.
  • the uplink scheduling information for retransmission data that the eNB notifies the UE using the source beam may be uplink scheduling information for retransmission data when the target beam is used.
  • step ST3102 the eNB transmits a Nack to the UE using the source beam and notifies uplink scheduling information for retransmission data to the UE.
  • uplink scheduling information for retransmission data may be notified using a target beam.
  • ENB that has transmitted the beam switching instruction information to the UE in Step ST2905 transmits uplink scheduling information for retransmission data to the UE using the target beam in order to transmit the retransmission data using the target beam.
  • the eNB may use the information related to the uplink data being HARQ processed in the source beam, received in step ST3104.
  • Step ST3107 the UE that has received the uplink scheduling information for uplink retransmission data transmits to the eNB from the retransmission of the uplink data being subjected to HARQ processing in the source beam using the target beam according to the scheduling information.
  • FIG. 34 is a diagram illustrating an example of a sequence relating to a method of performing a target beam from data delivery success (Ack) / delivery failure (Nack) during HARQ processing in the second modification of the thirteenth embodiment.
  • FIG. 34 shows a sequence of a method in which the UE does not need to transmit the SR when transmitting the uplink data using the target beam. Since the sequence shown in FIG. 34 is similar to the sequence shown in FIG. 33, the same steps are denoted by the same step numbers, and common description is omitted. Here, different parts will be mainly described.
  • Step ST2901 the eNB transmits downlink data to the UE. It is assumed that the UE has failed to receive this downlink data.
  • Step ST2903 the eNB determines beam switching for the UE.
  • the eNB gives unreached downlink data information, which is information related to downlink data being subjected to HARQ processing in the source beam, to the target beam.
  • the source beam and the target beam are the same eNB, it is performed within the same eNB. In this case, information regarding downlink data during HARQ processing may be applied from the source beam to the target beam.
  • the information regarding the downlink data that is being subjected to HARQ processing in the source beam may be information that can identify data to be transmitted in the target beam. After that, when Nack is received from the UE, it may be information that can specify data for retransmission.
  • the UE that failed to receive downlink data from the eNB in step ST2901 needs to transmit Ack / Nack to the eNB at a predetermined timing by HARQ processing.
  • Ack / Nack it is assumed that beam switching instruction information is received from the eNB.
  • Step ST2906 the UE that has received the beam switching instruction information in Step ST2905 synchronizes with the target beam.
  • Step ST3203 the UE transmits Nack to the eNB using the target beam. If reception of downlink data is successful in step ST2901, Ack is transmitted. Here, since reception is failed, that is, delivery failure, Nack is transmitted.
  • the transmission timing of Ack / Nack may be a predetermined timing determined by the reception timing of downlink data with the source beam.
  • ENB derives the timing at which Ack / Nack is transmitted using information regarding downlink data being subjected to HARQ processing in the source beam received in step ST3201.
  • the eNB receives Nack from the UE at the derived timing.
  • the eNB that has received the Nack from the UE in Step ST3203 transmits, in Step ST3204, the downlink data that was being subjected to HARQ processing in the source beam to the UE by using the target beam from the retransmission using the target beam. Perform scheduling. At this time, the eNB may use the information received in step ST3201 regarding the downlink data being subjected to HARQ processing in the source beam.
  • Step ST3204 the eNB that has notified the UE of scheduling information for retransmission in the target beam, transmits to the UE retransmission data of downlink data being HARQ processed in the source beam, using the target beam, according to the scheduling information.
  • Step ST3205 the UE that has received the downlink scheduling information in Step ST3204 receives, in Step ST3205, retransmission data of downlink data that is being subjected to HARQ processing in the source beam in Step ST3205.
  • Step ST2902 the eNB fails to receive uplink data from the UE.
  • Step ST2903 the eNB determines beam switching for the UE.
  • Step ST3202 the eNB that has decided to switch the beam to the UE in Step ST2903 gives unreached uplink data information, which is information regarding uplink data being HARQ processed in the source beam, to the target beam.
  • uplink data information which is information regarding uplink data being HARQ processed in the source beam
  • the target beam When the source beam and the target beam are the same eNB, it is performed within the same eNB. In this case, information regarding uplink data during HARQ processing may be applied from the source beam to the target beam.
  • the information regarding the uplink data that is being subjected to HARQ processing in the source beam may be information that can identify data to be transmitted in the target beam. When transmitting Nack to UE after this, it is good to set it as information which can specify data for retransmission.
  • the eNB that failed to receive uplink data from the UE in Step ST2902 needs to transmit Ack / Nack to the UE at an arbitrary timing by HARQ processing.
  • Ack / Nack Assume that the eNB transmits beam switching instruction information to the UE in Step ST2905.
  • Step ST2906 the UE that has received the beam switching instruction information in Step ST2905 synchronizes with the target beam.
  • Step ST3206 the eNB transmits a Nack to the UE using the target beam. If reception of uplink data is successful in step ST2902, Ack is transmitted. Here, since reception is failed, that is, delivery failure, Nack is transmitted.
  • the transmission timing of Ack / Nack may be any timing.
  • Step ST3206 the eNB transmits uplink scheduling information for causing the UE to transmit the uplink data, which is being subjected to HARQ processing in the source beam, together with Nack, from the retransmission to the UE using the target beam. To do. At this time, the eNB may use information related to uplink data that is received in step ST3202 and is undergoing HARQ processing in the source beam.
  • uplink scheduling information is transmitted together with Nack, only uplink scheduling information may be used.
  • Nack may be used according to the uplink scheduling information.
  • Information indicating retransmission may be included in the scheduling information.
  • Step ST2905 the UE that has received the beam switching instruction information from the eNB uses the target beam to transmit the uplink data to the eNB in Step ST3207 according to the scheduling information for uplink data retransmission received using the target beam in Step ST3206. Resend.
  • the target beam can be used from the initial transmission, retransmission, or Ack / Nack transmission.
  • beam switching is disclosed.
  • the beam switching the beam switching between the beams in the same cell, the beam switching between the beams of different cells, or the beam switching between the beams of different eNBs are also disclosed in the foregoing embodiments.
  • the methods may be applied in combination as appropriate. As a result, it is possible to reduce communication quality deterioration due to beam switching processing, communication delay and communication disconnection due to switching failure.

Abstract

基地局装置と通信端末装置との間の通信動作を安定して行うことができる通信システムを提供する。UEは、MeNBと直接またはSeNBを介して通信可能である。MeNBに送信する送信データのデータ量が、予め定める閾値Thを超える場合、UEは、送信データをMeNBおよびSeNBに送信するように設定され、閾値Th以下である場合、送信データをMeNBに送信し、SeNBに送信しないように設定される。SeNBが、周期的に割り当てられる無線リソースを用いてUEと通信するように設定されると、送信データのデータ量が閾値Th以下である場合に、送信データがMeNBおよびSeNBに送信されるように、閾値Thが変更される。例えば、閾値Thが0に設定される。

Description

通信システム
 本発明は、移動端末装置などの通信端末装置と基地局装置との間で無線通信を行う通信システムに関する。
 移動体通信システムの規格化団体である3GPP(3rd Generation Partnership Project)において、無線区間についてはロングタームエボリューション(Long Term Evolution:LTE)と称し、コアネットワークおよび無線アクセスネットワーク(以下、まとめて、ネットワークとも称する)を含めたシステム全体構成については、システムアーキテクチャエボリューション(System Architecture Evolution:SAE)と称される通信方式が検討されている(例えば、非特許文献1~10)。この通信方式は3.9G(3.9 Generation)システムとも呼ばれる。
 LTEのアクセス方式としては、下り方向はOFDM(Orthogonal Frequency Division Multiplexing)、上り方向はSC-FDMA(Single Carrier Frequency Division Multiple Access)が用いられる。また、LTEは、W-CDMA(Wideband Code Division Multiple Access)とは異なり、回線交換を含まず、パケット通信方式のみになる。
 非特許文献1(5章)に記載される、3GPPでの、LTEシステムにおけるフレーム構成に関する決定事項について、図1を用いて説明する。図1は、LTE方式の通信システムで使用される無線フレームの構成を示す説明図である。図1において、1つの無線フレーム(Radio frame)は10msである。無線フレームは10個の等しい大きさのサブフレーム(Subframe)に分割される。サブフレームは、2個の等しい大きさのスロット(slot)に分割される。無線フレーム毎に1番目および6番目のサブフレームに下り同期信号(Downlink Synchronization Signal)が含まれる。同期信号には、第一同期信号(Primary Synchronization Signal:P-SS)と、第二同期信号(Secondary Synchronization Signal:S-SS)とがある。
 3GPPでの、LTEシステムにおけるチャネル構成に関する決定事項が、非特許文献1(5章)に記載されている。CSG(Closed Subscriber Group)セルにおいてもnon-CSGセルと同じチャネル構成が用いられると想定されている。
 物理報知チャネル(Physical Broadcast Channel:PBCH)は、基地局装置(以下、単に「基地局」という場合がある)から移動端末装置(以下、単に「移動端末」という場合がある)などの通信端末装置(以下、単に「通信端末」という場合がある)への下り送信用のチャネルである。BCHトランスポートブロック(transport block)は、40ms間隔中の4個のサブフレームにマッピングされる。40msタイミングの明白なシグナリングはない。
 物理制御フォーマットインジケータチャネル(Physical Control Format Indicator Channel:PCFICH)は、基地局から通信端末への下り送信用のチャネルである。PCFICHは、PDCCHsのために用いるOFDM(Orthogonal Frequency Division Multiplexing)シンボルの数を、基地局から通信端末へ通知する。PCFICHは、サブフレーム毎に送信される。
 物理下り制御チャネル(Physical Downlink Control Channel:PDCCH)は、基地局から通信端末への下り送信用のチャネルである。PDCCHは、後述のトランスポートチャネルの1つである下り共有チャネル(Downlink Shared Channel:DL-SCH)のリソース割り当て(allocation)情報、後述のトランスポートチャネルの1つであるページングチャネル(Paging Channel:PCH)のリソース割り当て(allocation)情報、DL-SCHに関するHARQ(Hybrid Automatic Repeat reQuest)情報を通知する。PDCCHは、上りスケジューリンググラント(Uplink Scheduling Grant)を運ぶ。PDCCHは、上り送信に対する応答信号であるAck(Acknowledgement)/Nack(Negative Acknowledgement)を運ぶ。PDCCHは、L1/L2制御信号とも呼ばれる。
 物理下り共有チャネル(Physical Downlink Shared Channel:PDSCH)は、基地局から通信端末への下り送信用のチャネルである。PDSCHには、トランスポートチャネルである下り共有チャネル(DL-SCH)、およびトランスポートチャネルであるPCHがマッピングされている。
 物理マルチキャストチャネル(Physical Multicast Channel:PMCH)は、基地局から通信端末への下り送信用のチャネルである。PMCHには、トランスポートチャネルであるマルチキャストチャネル(Multicast Channel:MCH)がマッピングされている。
 物理上り制御チャネル(Physical Uplink Control Channel:PUCCH)は、通信端末から基地局への上り送信用のチャネルである。PUCCHは、下り送信に対する応答信号(response signal)であるAck/Nackを運ぶ。PUCCHは、CQI(Channel Quality Indicator)レポートを運ぶ。CQIとは、受信したデータの品質、もしくは通信路品質を示す品質情報である。またPUCCHは、スケジューリングリクエスト(Scheduling Request:SR)を運ぶ。
 物理上り共有チャネル(Physical Uplink Shared Channel:PUSCH)は、通信端末から基地局への上り送信用のチャネルである。PUSCHには、トランスポートチャネルの1つである上り共有チャネル(Uplink Shared Channel:UL-SCH)がマッピングされている。
 物理HARQインジケータチャネル(Physical Hybrid ARQ Indicator Channel:PHICH)は、基地局から通信端末への下り送信用のチャネルである。PHICHは、上り送信に対する応答信号であるAck/Nackを運ぶ。物理ランダムアクセスチャネル(Physical Random Access Channel:PRACH)は、通信端末から基地局への上り送信用のチャネルである。PRACHは、ランダムアクセスプリアンブル(random access preamble)を運ぶ。
 下り参照信号(リファレンスシグナル(Reference Signal):RS)は、LTE方式の通信システムとして既知のシンボルである。以下の5種類の下りリファレンスシグナルが定義されている。セル固有参照信号(Cell-specific Reference Signal:CRS)、MBSFN参照信号(MBSFN Reference Signal)、UE固有参照信号(UE-specific Reference Signal)であるデータ復調用参照信号(Demodulation Reference Signal:DM-RS)、位置決定参照信号(Positioning Reference Signal:PRS)、チャネル状態情報参照信号(Channel State Information Reference Signal:CSI-RS)。通信端末の物理レイヤの測定として、リファレンスシグナルの受信電力(Reference Signal Received Power:RSRP)測定がある。
 非特許文献1(5章)に記載されるトランスポートチャネル(Transport channel)について、説明する。下りトランスポートチャネルのうち、報知チャネル(Broadcast Channel:BCH)は、その基地局(セル)のカバレッジ全体に報知される。BCHは、物理報知チャネル(PBCH)にマッピングされる。
 下り共有チャネル(Downlink Shared Channel:DL-SCH)には、HARQ(Hybrid ARQ)による再送制御が適用される。DL-SCHは、基地局(セル)のカバレッジ全体への報知が可能である。DL-SCHは、ダイナミックあるいは準静的(Semi-static)なリソース割り当てをサポートする。準静的なリソース割り当ては、パーシステントスケジューリング(Persistent Scheduling)ともいわれる。DL-SCHは、通信端末の低消費電力化のために通信端末の間欠受信(Discontinuous reception:DRX)をサポートする。DL-SCHは、物理下り共有チャネル(PDSCH)へマッピングされる。
 ページングチャネル(Paging Channel:PCH)は、通信端末の低消費電力を可能とするために通信端末のDRXをサポートする。PCHは、基地局(セル)のカバレッジ全体への報知が要求される。PCHは、動的にトラフィックに利用できる物理下り共有チャネル(PDSCH)のような物理リソースへマッピングされる。
 マルチキャストチャネル(Multicast Channel:MCH)は、基地局(セル)のカバレッジ全体への報知に使用される。MCHは、マルチセル送信におけるMBMS(Multimedia Broadcast Multicast Service)サービス(MTCHとMCCH)のSFN合成をサポートする。MCHは、準静的なリソース割り当てをサポートする。MCHは、PMCHへマッピングされる。
 上りトランスポートチャネルのうち、上り共有チャネル(Uplink Shared Channel:UL-SCH)には、HARQ(Hybrid ARQ)による再送制御が適用される。UL-SCHは、ダイナミックあるいは準静的(Semi-static)なリソース割り当てをサポートする。UL-SCHは、物理上り共有チャネル(PUSCH)へマッピングされる。
 ランダムアクセスチャネル(Random Access Channel:RACH)は、制御情報に限られている。RACHは、衝突のリスクがある。RACHは、物理ランダムアクセスチャネル(PRACH)へマッピングされる。
 HARQについて説明する。HARQとは、自動再送要求(Automatic Repeat reQuest:ARQ)と誤り訂正(Forward Error Correction)との組合せによって、伝送路の通信品質を向上させる技術である。HARQには、通信品質が変化する伝送路に対しても、再送によって誤り訂正が有効に機能するという利点がある。特に、再送にあたって初送の受信結果と再送の受信結果との合成をすることで、更なる品質向上を得ることも可能である。
 再送の方法の一例を説明する。受信側にて、受信データが正しくデコードできなかった場合、換言すればCRC(Cyclic Redundancy Check)エラーが発生した場合(CRC=NG)、受信側から送信側へ「Nack」を送信する。「Nack」を受信した送信側は、データを再送する。受信側にて、受信データが正しくデコードできた場合、換言すればCRCエラーが発生しない場合(CRC=OK)、受信側から送信側へ「Ack」を送信する。「Ack」を受信した送信側は次のデータを送信する。
 非特許文献1(6章)に記載される論理チャネル(ロジカルチャネル:Logical channel)について、説明する。報知制御チャネル(Broadcast Control Channel:BCCH)は、報知システム制御情報のための下りチャネルである。論理チャネルであるBCCHは、トランスポートチャネルである報知チャネル(BCH)、あるいは下り共有チャネル(DL-SCH)へマッピングされる。
 ページング制御チャネル(Paging Control Channel:PCCH)は、ページング情報(Paging Information)およびシステム情報(System Information)の変更を送信するための下りチャネルである。PCCHは、通信端末のセルロケーションをネットワークが知らない場合に用いられる。論理チャネルであるPCCHは、トランスポートチャネルであるページングチャネル(PCH)へマッピングされる。
 共有制御チャネル(Common Control Channel:CCCH)は、通信端末と基地局との間の送信制御情報のためのチャネルである。CCCHは、通信端末がネットワークとの間でRRC接続(connection)を有していない場合に用いられる。下り方向では、CCCHは、トランスポートチャネルである下り共有チャネル(DL-SCH)へマッピングされる。上り方向では、CCCHは、トランスポートチャネルである上り共有チャネル(UL-SCH)へマッピングされる。
 マルチキャスト制御チャネル(Multicast Control Channel:MCCH)は、1対多の送信のための下りチャネルである。MCCHは、ネットワークから通信端末への1つあるいはいくつかのMTCH用のMBMS制御情報の送信のために用いられる。MCCHは、MBMS受信中の通信端末のみに用いられる。MCCHは、トランスポートチャネルであるマルチキャストチャネル(MCH)へマッピングされる。
 個別制御チャネル(Dedicated Control Channel:DCCH)は、1対1にて、通信端末とネットワークとの間の個別制御情報を送信するチャネルである。DCCHは、通信端末がRRC接続(connection)である場合に用いられる。DCCHは、上りでは上り共有チャネル(UL-SCH)へマッピングされ、下りでは下り共有チャネル(DL-SCH)にマッピングされる。
 個別トラフィックチャネル(Dedicated Traffic Channel:DTCH)は、ユーザ情報の送信のための個別通信端末への1対1通信のチャネルである。DTCHは、上りおよび下りともに存在する。DTCHは、上りでは上り共有チャネル(UL-SCH)へマッピングされ、下りでは下り共有チャネル(DL-SCH)へマッピングされる。
 マルチキャストトラフィックチャネル(Multicast Traffic channel:MTCH)は、ネットワークから通信端末へのトラフィックデータ送信のための下りチャネルである。MTCHは、MBMS受信中の通信端末のみに用いられるチャネルである。MTCHは、マルチキャストチャネル(MCH)へマッピングされる。
 CGIとは、セルグローバル識別子(Cell Global Identifier)のことである。ECGIとは、E-UTRANセルグローバル識別子(E-UTRAN Cell Global Identifier)のことである。LTE、後述のLTE-A(Long Term Evolution Advanced)およびUMTS(Universal Mobile Telecommunication System)において、CSG(Closed Subscriber Group)セルが導入される。
 CSG(Closed Subscriber Group)セルとは、利用可能な加入者をオペレータが特定しているセル(以下「特定加入者用セル」という場合がある)である。特定された加入者は、PLMN(Public Land Mobile Network)の1つ以上のセルにアクセスすることが許可される。特定された加入者がアクセスを許可されている1つ以上のセルを「CSGセル(CSG cell(s))」と呼ぶ。ただし、PLMNにはアクセス制限がある。
 CSGセルは、固有のCSGアイデンティティ(CSG identity:CSG ID;CSG-ID)を報知し、CSGインジケーション(CSG Indication)にて「TRUE」を報知するPLMNの一部である。予め利用登録し、許可された加入者グループのメンバーは、アクセス許可情報であるところのCSG-IDを用いてCSGセルにアクセスする。
 CSG-IDは、CSGセルまたはセルによって報知される。LTE方式の通信システムにCSG-IDは複数存在する。そして、CSG-IDは、CSG関連のメンバーのアクセスを容易にするために、通信端末(UE)によって使用される。
 通信端末の位置追跡は、1つ以上のセルからなる区域を単位に行われる。位置追跡は、待受け状態であっても通信端末の位置を追跡し、通信端末を呼び出す、換言すれば通信端末が着呼することを可能にするために行われる。この通信端末の位置追跡のための区域をトラッキングエリアと呼ぶ。
 3GPPにおいて、Home-NodeB(Home-NB;HNB)、Home-eNodeB(Home-eNB;HeNB)と称される基地局が検討されている。UTRANにおけるHNB、およびE-UTRANにおけるHeNBは、例えば家庭、法人、商業用のアクセスサービス向けの基地局である。非特許文献2には、HeNBおよびHNBへのアクセスの3つの異なるモードが開示されている。具体的には、オープンアクセスモード(Open access mode)と、クローズドアクセスモード(Closed access mode)と、ハイブリッドアクセスモード(Hybrid access mode)とが開示されている。
 また3GPPでは、リリース10として、ロングタームエボリューションアドヴァンスド(Long Term Evolution Advanced:LTE-A)の規格策定が進められている(非特許文献3、非特許文献4参照)。LTE-Aは、LTEの無線区間通信方式を基本とし、それにいくつかの新技術を加えて構成される。
 LTE-Aシステムでは、100MHzまでのより広い周波数帯域幅(transmission bandwidths)をサポートするために、二つ以上のコンポーネントキャリア(Component Carrier:CC)を集約する(「アグリゲーション(aggregation)する」とも称する)、キャリアアグリゲーション(Carrier Aggregation:CA)が検討されている。CAについては、非特許文献1に記載されている。
 CAが構成される場合、UEはネットワーク(Network:NW)と唯一つのRRC接続(RRC connection)を有する。RRC接続において、一つのサービングセルがNASモビリティ情報とセキュリティ入力を与える。このセルをプライマリセル(Primary Cell:PCell)と呼ぶ。下りリンクで、PCellに対応するキャリアは、下りプライマリコンポーネントキャリア(Downlink Primary Component Carrier:DL PCC)である。上りリンクで、PCellに対応するキャリアは、上りプライマリコンポーネントキャリア(Uplink Primary Component Carrier:UL PCC)である。
 UEの能力(ケーパビリティ(capability))に応じて、セカンダリセル(Secondary Cell:SCell)が、PCellとサービングセルとの組を形成するために構成される。下りリンクで、SCellに対応するキャリアは、下りセカンダリコンポーネントキャリア(Downlink Secondary Component Carrier:DL SCC)である。上りリンクで、SCellに対応するキャリアは、上りセカンダリコンポーネントキャリア(Uplink Secondary Component Carrier:UL SCC)である。
 一つのUEに対して、一つのPCellと、一つ以上のSCellからなるサービングセルとの組が構成される。
 また、LTE-Aでの新技術としては、より広い帯域をサポートする技術(Wider bandwidth extension)、および多地点協調送受信(Coordinated Multiple Point transmission and reception:CoMP)技術などがある。3GPPでLTE-Aのために検討されているCoMPについては、非特許文献1に記載されている。
 モバイルネットワークのトラフィック量は、増加傾向にあり、通信速度も高速化が進んでいる。LTEおよびLTE-Aが本格的に運用を開始されると、更に通信速度が高速化されることが見込まれる。
 また、3GPPにおいて、将来の膨大なトラフィックに対応するために、スモールセルを構成するスモールeNB(以下「小規模基地局装置」という場合がある)を用いることが検討されている。例えば、多数のスモールeNBを設置して、多数のスモールセルを構成することによって、周波数利用効率を高めて、通信容量の増大を図る技術などが検討されている。具体的には、UEが2つのeNBと接続して通信を行うデュアルコネクティビティ(Dual Connectivity;略称:DC)などがある。DCについては、非特許文献1に記載されている。
 デュアルコネクティビティ(DC)を行うeNBのうち、一方を「マスターeNB(略称:MeNB)」といい、他方を「セカンダリeNB(略称:SeNB)」という場合がある。
 さらに、高度化する移動体通信に対して、2020年以降にサービスを開始することを目標とした第5世代(以下「5G」という場合がある)無線アクセスシステムが検討されている。例えば、欧州では、METISという団体で5Gの要求事項がまとめられている(非特許文献5参照)。
 5G無線アクセスシステムでは、LTEシステムに対して、システム容量は1000倍、データの伝送速度は100倍、データの処理遅延は10分の1(1/10)、通信端末の同時接続数は100倍として、更なる低消費電力化、および装置の低コスト化を実現することが要件として挙げられている。
 このような要求を満たすために、周波数を広帯域で使用してデータの伝送容量を増やすこと、ならびに周波数利用効率を上げてデータの伝送速度を上げることが検討されている。これらを実現するために、空間多重を可能とする、多素子アンテナを用いたMIMO(Multiple Input Multiple Output)およびビームフォーミングなどの技術が検討されている。
3GPP TS36.300 V13.0.0 3GPP S1-083461 3GPP TR 36.814 V9.0.0 3GPP TR 36.912 V10.0.0 "Scenarios, requirements and KPIs for 5G mobile and wireless system"、[online]、平成25(2013)年4月30日、ICT-317669-METIS/D1.1、[平成28年1月25日検索]、インターネット<https://www.metis2020.com/documents/deliverables/> 3GPP R2-144662 3GPP R2-152359 3GPP TS 36.141 V13.0.0 3GPP TS36.321 V12.8.0 3GPP R2-156668
 DCでは、スプリットベアラがサポートされている。スプリットベアラでは、MeNBだけでなく、SeNBに対しても、SPS(Semi-Persistent Scheduling)がサポートされている(非特許文献6参照)。
 3GPPにおいて、上りスプリットベアラを実行しているときのバッファ状態報告(Buffer Status Report;略称:BSR)の送信方法について、二重報告および閾値(Double Reporting And Threshold;略称:DRAT)による方法とすることが提案されている(非特許文献7参照)。上りスプリットベアラでDRATが実行される場合、UEは、上りデータのデータ量がDRATの閾値以下のときには、予め定める1つのeNBに対してデータの送信を行い、もう1つのeNBに対しては、データの送信を行わない。
 しかし、上りデータのデータ量がDRATの閾値以下になったときのSPSの動作、例えばUEによるパディング送信の可否などについては規定が無く、また、何ら議論もされていない。
 SPSの動作の規定がないと、パディング送信によるインプリシットリリース機能が正常に働かない。これによって、eNBとUEとの間で不安定な動作が生じる。ひいては、誤動作が引き起こされる可能性が生じてしまう。
 本発明の目的は、基地局装置と通信端末装置との間の通信動作を安定して行うことができる通信システムを提供することである。
 本発明の通信システムは、第1の基地局装置と、第2の基地局装置と、前記第1の基地局装置および前記第2の基地局装置と無線通信可能な通信端末装置とを備える通信システムであって、前記通信端末装置は、前記第1の基地局装置と直接通信を行う第1の経路と、前記第2の基地局装置を介して前記第1の基地局装置と通信を行う第2の経路とによって、前記第1の基地局装置と通信可能であり、前記第1の基地局装置に送信する送信データのデータ量が、予め定める閾値を超える場合、前記送信データを前記第1の基地局装置および前記第2の基地局装置に送信するように設定され、前記送信データのデータ量が前記閾値以下である場合、前記送信データを前記第1の基地局装置に送信し、前記第2の基地局装置に送信しないように設定され、前記第2の基地局装置が、周期的に割り当てられる無線リソースを用いて前記通信端末装置と通信するように設定されると、前記送信データのデータ量が前記閾値以下である場合に、前記送信データが前記第1の基地局装置および前記第2の基地局装置に送信されるように、前記閾値が変更されることを特徴とする。
 また本発明の通信システムは、第1の基地局装置と、第2の基地局装置と、前記第1の基地局装置および前記第2の基地局装置と無線通信可能な通信端末装置とを備える通信システムであって、前記通信端末装置は、前記第1の基地局装置と直接通信を行う第1の経路と、前記第2の基地局装置を介して前記第1の基地局装置と通信を行う第2の経路とによって、前記第1の基地局装置と通信可能であり、前記第1の基地局装置に送信する送信データのデータ量が、予め定める閾値以上である場合、前記送信データを前記第1の基地局装置および前記第2の基地局装置に送信するように設定され、前記送信データのデータ量が前記閾値未満である場合、前記送信データを前記第1の基地局装置に送信し、前記第2の基地局装置に送信しないように設定され、前記第2の基地局装置が、周期的に割り当てられる無線リソースを用いて前記通信端末装置と通信するように設定されると、前記送信データのデータ量が前記閾値未満である場合に、前記送信データが前記第1の基地局装置および前記第2の基地局装置に送信されるように、前記閾値が変更されることを特徴とする。
 また本発明の通信システムは、第1の基地局装置と、第2の基地局装置と、前記第1の基地局装置および前記第2の基地局装置と無線通信可能な通信端末装置とを備える通信システムであって、前記通信端末装置は、前記第1の基地局装置と直接通信を行う第1の経路と、前記第2の基地局装置を介して前記第1の基地局装置と通信を行う第2の経路とによって、前記第1の基地局装置と通信可能であり、前記第1の基地局装置に送信する送信データのデータ量が、予め定める閾値を超える場合、前記送信データを前記第1の基地局装置および前記第2の基地局装置に送信するように設定され、前記送信データのデータ量が前記閾値以下である場合、前記送信データを前記第1の基地局装置に送信し、前記第2の基地局装置に送信しないように設定され、前記第2の基地局装置が、周期的に割り当てられる無線リソースを用いて前記通信端末装置と通信するように設定されると、前記通信端末装置は、前記送信データのデータ量が前記閾値以下である場合に、前記送信データを前記第1の基地局装置に送信するとともに、前記周期的に割り当てられる無線リソースを用いた通信の終了を表す終了信号を前記第2の基地局装置に送信するように設定されることを特徴とする。
 また本発明の通信システムは、第1の基地局装置と、第2の基地局装置と、前記第1の基地局装置および前記第2の基地局装置と無線通信可能な通信端末装置とを備える通信システムであって、前記通信端末装置は、前記第1の基地局装置と直接通信を行う第1の経路と、前記第2の基地局装置を介して前記第1の基地局装置と通信を行う第2の経路とによって、前記第1の基地局装置と通信可能であり、前記第1の基地局装置に送信する送信データのデータ量が、予め定める閾値以上である場合、前記送信データを前記第1の基地局装置および前記第2の基地局装置に送信するように設定され、前記送信データのデータ量が前記閾値未満である場合、前記送信データを前記第1の基地局装置に送信し、前記第2の基地局装置に送信しないように設定され、前記第2の基地局装置が、周期的に割り当てられる無線リソースを用いて前記通信端末装置と通信するように設定されると、前記通信端末装置は、前記送信データのデータ量が前記閾値未満である場合に、前記送信データを前記第1の基地局装置に送信するとともに、前記周期的に割り当てられる無線リソースを用いた通信の終了を表す終了信号を前記第2の基地局装置に送信するように設定されることを特徴とする。
 本発明の通信システムによれば、第2の基地局装置が、周期的に割り当てられる無線リソースを用いて通信端末装置と通信するように設定されると、送信データのデータ量が閾値以下である場合に、送信データが第1の基地局装置および第2の基地局装置に送信されるように、閾値が変更される。これによって、第2の基地局装置においても、周期的に割り当てられる無線リソースを用いた通信端末装置との通信を実行することができる。したがって、第1および第2の基地局装置と通信端末装置との間の通信動作を安定して行うことができる通信システムを提供することができる。
 また本発明の通信システムによれば、第2の基地局装置が、周期的に割り当てられる無線リソースを用いて通信端末装置と通信するように設定されると、送信データのデータ量が閾値未満である場合に、送信データが第1の基地局装置および第2の基地局装置に送信されるように、閾値が変更される。これによって、第2の基地局装置においても、周期的に割り当てられる無線リソースを用いた通信端末装置との通信を実行することができる。したがって、第1および第2の基地局装置と通信端末装置との間の通信動作を安定して行うことができる通信システムを提供することができる。
 また本発明の通信システムによれば、第2の基地局装置が、周期的に割り当てられる無線リソースを用いて通信端末装置と通信するように設定されると、通信端末装置は、送信データのデータ量が閾値以下である場合に、送信データを第1の基地局装置に送信するとともに、周期的に割り当てられる無線リソースを用いた通信の終了を表す終了信号を第2の基地局装置に送信するように設定される。これによって、第2の基地局装置では、周期的に割り当てられる無線リソースを用いた通信端末装置との通信を終了することができる。したがって、第1および第2の基地局装置と通信端末装置との間の通信動作を安定して行うことができる通信システムを提供することができる。
 また本発明の通信システムによれば、第2の基地局装置が、周期的に割り当てられる無線リソースを用いて通信端末装置と通信するように設定されると、通信端末装置は、送信データのデータ量が閾値未満である場合に、送信データを第1の基地局装置に送信するとともに、周期的に割り当てられる無線リソースを用いた通信の終了を表す終了信号を第2の基地局装置に送信するように設定される。これによって、第2の基地局装置では、周期的に割り当てられる無線リソースを用いた通信端末装置との通信を終了することができる。したがって、第1および第2の基地局装置と通信端末装置との間の通信動作を安定して行うことができる通信システムを提供することができる。
 本発明の目的、特徴、局面、および利点は、以下の詳細な説明と添付図面とによって、より明白となる。
LTE方式の通信システムで使用される無線フレームの構成を示す説明図である。 3GPPにおいて議論されているLTE方式の通信システム200の全体的な構成を示すブロック図である。 本発明に係る通信端末である図2に示す移動端末202の構成を示すブロック図である。 本発明に係る基地局である図2に示す基地局203の構成を示すブロック図である。 本発明に係るMMEの構成を示すブロック図である。 LTE方式の通信システムにおいて通信端末(UE)が行うセルサーチから待ち受け動作までの概略を示すフローチャートである。 マクロeNBとスモールeNBとが混在する場合のセルの構成の概念を示す図である。 上りリンクのSPSの動作例を説明する図である。 DRATによる送信方法について説明するための図である。 DRATによる送信方法について説明するための図である。 ULスプリットベアラが設定された場合に、SPSが設定された場合の問題点を説明する図である。 SPSが設定された場合に、DRATの閾値に0を設定した場合を説明する図である。 2nd-eNBに対してSPSが設定された場合にインプリシットリリースをサポートする方法を説明する図である。 DRATの閾値よりも小さいデータ量の上り送信データが発生する場合を説明する図である。 上りSPSの設定を無効にしないようにする方法を説明する図である。 上りSPSの設定を無効にすることを示す情報を用いる方法を説明する図である。 上り送信データが無い場合のパディング送信と、上り送信データが有る場合のパディング送信とを異ならせる方法を説明する図である。 上り送信データが無い場合のパディング送信と、上り送信データが有る場合のパディング送信とを異ならせる方法を説明する図である。 上り送信データが無い場合のパディング送信と、上り送信データが有る場合のパディング送信とを異ならせる方法を説明する図である。 上り送信データが無い場合のパディング送信と、上り送信データが有る場合のパディング送信とを異ならせる方法を説明する図である。 1st-eNBに対して、2nd-eNBに対して行ったSPSの設定と同じSPSの設定を行う方法について説明する図である。 インプリシットリリースが行われない場合にパディング送信をしないとする方法を説明する図である。 パディング送信をしない場合のHARQの方法について説明する図である。 パディング送信を間引いた場合のインプリシットリリース方法を説明する図である。 パディング送信を間引いた場合のインプリシットリリース方法の他の例を示す図である。 多素子アンテナを用いたビームフォーミングを説明する図である。 実施の形態12におけるビーム切替処理の時間短縮方法に関するシーケンスの一例を示す図である。 実施の形態13におけるビーム切替処理の時間短縮方法に関するシーケンスの一例を示す図である。 実施の形態13の変形例1におけるビーム切替処理の時間短縮方法に関するシーケンスの一例を示す図である。 実施の形態13の変形例1におけるビーム切替処理の時間短縮方法に関するシーケンスの一例を示す図である。 実施の形態13の変形例2におけるHARQ処理中のデータの初送からターゲットビームで行う方法に関するシーケンスの一例を示す図である。 実施の形態13の変形例2におけるHARQ処理中のデータの初送からターゲットビームで行う方法に関するシーケンスの他の例を示す図である。 実施の形態13の変形例2におけるHARQ処理中のデータの再送からターゲットビームで行う方法に関するシーケンスの一例を示す図である。 実施の形態13の変形例2におけるHARQ処理中のデータの送達成功(Ack)/送達失敗(Nack)からターゲットビームで行う方法に関するシーケンスの一例を示す図である。
 実施の形態1.
 図2は、3GPPにおいて議論されているLTE方式の通信システム200の全体的な構成を示すブロック図である。図2について説明する。無線アクセスネットワークは、E-UTRAN(Evolved Universal Terrestrial Radio Access Network)201と称される。通信端末装置である移動端末装置(以下「移動端末(User Equipment:UE)」という)202は、基地局装置(以下「基地局(E-UTRAN NodeB:eNB)」という)203と無線通信可能であり、無線通信で信号の送受信を行う。
 ここで、「通信端末装置」とは、移動可能な携帯電話端末装置などの移動端末装置だけでなく、センサなどの移動しないデバイスも含んでいる。以下の説明では、「通信端末装置」を、単に「通信端末」という場合がある。
 移動端末202に対する制御プロトコル、例えばRRC(Radio Resource Control)と、ユーザプレイン、例えばPDCP(Packet Data Convergence Protocol)、RLC(Radio Link Control)、MAC(Medium Access Control)、PHY(Physical layer)とが基地局203で終端するならば、E-UTRANは1つあるいは複数の基地局203によって構成される。
 移動端末202と基地局203との間の制御プロトコルRRC(Radio Resource Control)は、報知(Broadcast)、ページング(paging)、RRC接続マネージメント(RRC connection management)などを行う。RRCにおける基地局203と移動端末202との状態として、RRC_IDLEと、RRC_CONNECTEDとがある。
 RRC_IDLEでは、PLMN(Public Land Mobile Network)選択、システム情報(System Information:SI)の報知、ページング(paging)、セル再選択(cell re-selection)、モビリティなどが行われる。RRC_CONNECTEDでは、移動端末はRRC接続(connection)を有し、ネットワークとのデータの送受信を行うことができる。またRRC_CONNECTEDでは、ハンドオーバ(Handover:HO)、隣接セル(Neighbour cell)の測定(メジャメント(measurement))などが行われる。
 基地局203は、eNB207と、Home-eNB206とに分類される。通信システム200は、複数のeNB207を含むeNB群203-1と、複数のHome-eNB206を含むHome-eNB群203-2とを備える。またコアネットワークであるEPC(Evolved Packet Core)と、無線アクセスネットワークであるE-UTRAN201とで構成されるシステムは、EPS(Evolved Packet System)と称される。コアネットワークであるEPCと、無線アクセスネットワークであるE-UTRAN201とを合わせて、「ネットワーク」という場合がある。
 eNB207は、移動管理エンティティ(Mobility Management Entity:MME)、あるいはS-GW(Serving Gateway)、あるいはMMEおよびS-GWを含むMME/S-GW部(以下「MME部」という場合がある)204とS1インタフェースにより接続され、eNB207とMME部204との間で制御情報が通信される。一つのeNB207に対して、複数のMME部204が接続されてもよい。eNB207間は、X2インタフェースにより接続され、eNB207間で制御情報が通信される。
 Home-eNB206は、MME部204とS1インタフェースにより接続され、Home-eNB206とMME部204との間で制御情報が通信される。一つのMME部204に対して、複数のHome-eNB206が接続される。あるいは、Home-eNB206は、HeNBGW(Home-eNB GateWay)205を介してMME部204と接続される。Home-eNB206とHeNBGW205とは、S1インタフェースにより接続され、HeNBGW205とMME部204とはS1インタフェースを介して接続される。
 一つまたは複数のHome-eNB206が一つのHeNBGW205と接続され、S1インタフェースを通して情報が通信される。HeNBGW205は、一つまたは複数のMME部204と接続され、S1インタフェースを通して情報が通信される。
 MME部204およびHeNBGW205は、上位装置、具体的には上位ノードであり、基地局であるeNB207およびHome-eNB206と、移動端末(UE)202との接続を制御する。MME部204は、コアネットワークであるEPCを構成する。基地局203およびHeNBGW205は、E-UTRAN201を構成する。
 さらに3GPPでは、以下のような構成が検討されている。Home-eNB206間のX2インタフェースはサポートされる。すなわち、Home-eNB206間は、X2インタフェースにより接続され、Home-eNB206間で制御情報が通信される。MME部204からは、HeNBGW205はHome-eNB206として見える。Home-eNB206からは、HeNBGW205はMME部204として見える。
 Home-eNB206が、HeNBGW205を介してMME部204に接続される場合および直接MME部204に接続される場合のいずれの場合も、Home-eNB206とMME部204との間のインタフェースは、S1インタフェースで同じである。
 基地局203は、1つのセルを構成してもよいし、複数のセルを構成してもよい。各セルは、移動端末202と通信可能な範囲であるカバレッジとして予め定める範囲を有し、カバレッジ内で移動端末202と無線通信を行う。1つの基地局203が複数のセルを構成する場合、1つ1つのセルが、移動端末202と通信可能に構成される。
 図3は、本発明に係る通信端末である図2に示す移動端末202の構成を示すブロック図である。図3に示す移動端末202の送信処理を説明する。まず、プロトコル処理部301からの制御データ、およびアプリケーション部302からのユーザデータが、送信データバッファ部303へ保存される。送信データバッファ部303に保存されたデータは、エンコーダー部304へ渡され、誤り訂正などのエンコード処理が施される。エンコード処理を施さずに、送信データバッファ部303から変調部305へ直接出力されるデータが存在してもよい。エンコーダー部304でエンコード処理されたデータは、変調部305にて変調処理が行われる。変調されたデータは、ベースバンド信号に変換された後、周波数変換部306へ出力され、無線送信周波数に変換される。その後、アンテナ307から基地局203に送信信号が送信される。
 また、移動端末202の受信処理は、以下のように実行される。基地局203からの無線信号がアンテナ307により受信される。受信信号は、周波数変換部306にて無線受信周波数からベースバンド信号に変換され、復調部308において復調処理が行われる。復調後のデータは、デコーダー部309へ渡され、誤り訂正などのデコード処理が行われる。デコードされたデータのうち、制御データはプロトコル処理部301へ渡され、ユーザデータはアプリケーション部302へ渡される。移動端末202の一連の処理は、制御部310によって制御される。よって制御部310は、図3では省略しているが、各部301~309と接続している。
 図4は、本発明に係る基地局である図2に示す基地局203の構成を示すブロック図である。図4に示す基地局203の送信処理を説明する。EPC通信部401は、基地局203とEPC(MME部204など)、HeNBGW205などとの間のデータの送受信を行う。他基地局通信部402は、他の基地局との間のデータの送受信を行う。EPC通信部401および他基地局通信部402は、それぞれプロトコル処理部403と情報の受け渡しを行う。プロトコル処理部403からの制御データ、ならびにEPC通信部401および他基地局通信部402からのユーザデータおよび制御データは、送信データバッファ部404へ保存される。
 送信データバッファ部404に保存されたデータは、エンコーダー部405へ渡され、誤り訂正などのエンコード処理が施される。エンコード処理を施さずに、送信データバッファ部404から変調部406へ直接出力されるデータが存在してもよい。エンコードされたデータは、変調部406にて変調処理が行われる。変調されたデータは、ベースバンド信号に変換された後、周波数変換部407へ出力され、無線送信周波数に変換される。その後、アンテナ408より一つもしくは複数の移動端末202に対して送信信号が送信される。
 また、基地局203の受信処理は以下のように実行される。一つもしくは複数の移動端末202からの無線信号が、アンテナ408により受信される。受信信号は、周波数変換部407にて無線受信周波数からベースバンド信号に変換され、復調部409で復調処理が行われる。復調されたデータは、デコーダー部410へ渡され、誤り訂正などのデコード処理が行われる。デコードされたデータのうち、制御データはプロトコル処理部403あるいはEPC通信部401、他基地局通信部402へ渡され、ユーザデータはEPC通信部401および他基地局通信部402へ渡される。基地局203の一連の処理は、制御部411によって制御される。よって制御部411は、図4では省略しているが、各部401~410と接続している。
 図5は、本発明に係るMMEの構成を示すブロック図である。図5では、前述の図2に示すMME部204に含まれるMME204aの構成を示す。PDN GW通信部501は、MME204aとPDN GWとの間のデータの送受信を行う。基地局通信部502は、MME204aと基地局203との間のS1インタフェースによるデータの送受信を行う。PDN GWから受信したデータがユーザデータであった場合、ユーザデータは、PDN GW通信部501から、ユーザプレイン通信部503経由で基地局通信部502に渡され、1つあるいは複数の基地局203へ送信される。基地局203から受信したデータがユーザデータであった場合、ユーザデータは、基地局通信部502から、ユーザプレイン通信部503経由でPDN GW通信部501に渡され、PDN GWへ送信される。
 PDN GWから受信したデータが制御データであった場合、制御データは、PDN GW通信部501から制御プレイン制御部505へ渡される。基地局203から受信したデータが制御データであった場合、制御データは、基地局通信部502から制御プレイン制御部505へ渡される。
 HeNBGW通信部504は、HeNBGW205が存在する場合に設けられ、情報種別によって、MME204aとHeNBGW205との間のインタフェース(IF)によるデータの送受信を行う。HeNBGW通信部504から受信した制御データは、HeNBGW通信部504から制御プレイン制御部505へ渡される。制御プレイン制御部505での処理の結果は、PDN GW通信部501経由でPDN GWへ送信される。また、制御プレイン制御部505で処理された結果は、基地局通信部502経由でS1インタフェースにより1つあるいは複数の基地局203へ送信され、またHeNBGW通信部504経由で1つあるいは複数のHeNBGW205へ送信される。
 制御プレイン制御部505には、NASセキュリティ部505-1、SAEベアラコントロール部505-2、アイドルステート(Idle State)モビリティ管理部505-3などが含まれ、制御プレインに対する処理全般を行う。NASセキュリティ部505-1は、NAS(Non-Access Stratum)メッセージのセキュリティなどを行う。SAEベアラコントロール部505-2は、SAE(System Architecture Evolution)のベアラの管理などを行う。アイドルステートモビリティ管理部505-3は、待受け状態(アイドルステート(Idle State);LTE-IDLE状態、または、単にアイドルとも称される)のモビリティ管理、待受け状態時のページング信号の生成および制御、傘下の1つあるいは複数の移動端末202のトラッキングエリアの追加、削除、更新、検索、トラッキングエリアリスト管理などを行う。
 MME204aは、1つまたは複数の基地局203に対して、ページング信号の分配を行う。また、MME204aは、待受け状態(Idle State)のモビリティ制御(Mobility control)を行う。MME204aは、移動端末が待ち受け状態のとき、および、アクティブ状態(Active State)のときに、トラッキングエリア(Tracking Area)リストの管理を行う。MME204aは、UEが登録されている(registered)追跡領域(トラッキングエリア:Tracking Area)に属するセルへ、ページングメッセージを送信することで、ページングプロトコルに着手する。MME204aに接続されるHome-eNB206のCSGの管理、CSG-IDの管理、およびホワイトリストの管理は、アイドルステートモビリティ管理部505-3で行われてもよい。
 次に通信システムにおけるセルサーチ方法の一例を示す。図6は、LTE方式の通信システムにおいて通信端末(UE)が行うセルサーチから待ち受け動作までの概略を示すフローチャートである。通信端末は、セルサーチを開始すると、ステップST601で、周辺の基地局から送信される第一同期信号(P-SS)、および第二同期信号(S-SS)を用いて、スロットタイミング、フレームタイミングの同期をとる。
 P-SSとS-SSとを合わせて、同期信号(Synchronization Signal:SS)という。同期信号(SS)には、セル毎に割り当てられたPCIに1対1に対応するシンクロナイゼーションコードが割り当てられている。PCIの数は504通りが検討されている。この504通りのPCIを用いて同期をとるとともに、同期がとれたセルのPCIを検出(特定)する。
 次に同期がとれたセルに対して、ステップST602で、基地局からセル毎に送信される参照信号(リファレンスシグナル:RS)であるセル固有参照信号(Cell-specific Reference Signal:CRS)を検出し、RSの受信電力(Reference Signal Received Power:RSRP)の測定を行う。参照信号(RS)には、PCIと1対1に対応したコードが用いられている。そのコードで相関をとることによって他セルと分離できる。ステップST601で特定したPCIから、該セルのRS用のコードを導出することによって、RSを検出し、RSの受信電力を測定することが可能となる。
 次にステップST603で、ステップST602までで検出された一つ以上のセルの中から、RSの受信品質が最もよいセル、例えば、RSの受信電力が最も高いセル、つまりベストセルを選択する。
 次にステップST604で、ベストセルのPBCHを受信して、報知情報であるBCCHを得る。PBCH上のBCCHには、セル構成情報が含まれるMIB(Master Information Block)がマッピングされる。したがってPBCHを受信してBCCHを得ることで、MIBが得られる。MIBの情報としては、例えば、DL(ダウンリンク)システム帯域幅(送信帯域幅設定(transmission bandwidth configuration:dl-bandwidth)とも呼ばれる)、送信アンテナ数、SFN(System Frame Number)などがある。
 次にステップST605で、MIBのセル構成情報をもとに該セルのDL-SCHを受信して、報知情報BCCHの中のSIB(System Information Block)1を得る。SIB1には、該セルへのアクセスに関する情報、セルセレクションに関する情報、他のSIB(SIBk;k≧2の整数)のスケジューリング情報が含まれる。また、SIB1には、トラッキングエリアコード(Tracking Area Code:TAC)が含まれる。
 次にステップST606で、通信端末は、ステップST605で受信したSIB1のTACと、通信端末が既に保有しているトラッキングエリアリスト内のトラッキングエリア識別子(Tracking Area Identity:TAI)のTAC部分とを比較する。トラッキングエリアリストは、TAIリスト(TAI list)とも称される。TAIはトラッキングエリアを識別するための識別情報であり、MCC(Mobile Country Code)と、MNC(Mobile Network Code)と、TAC(Tracking Area Code)とによって構成される。MCCは国コードである。MNCはネットワークコードである。TACはトラッキングエリアのコード番号である。
 通信端末は、ステップST606で比較した結果、ステップST605で受信したTACがトラッキングエリアリスト内に含まれるTACと同じならば、該セルで待ち受け動作に入る。比較して、ステップST605で受信したTACがトラッキングエリアリスト内に含まれなければ、通信端末は、該セルを通して、MMEなどが含まれるコアネットワーク(Core Network,EPC)へ、TAU(Tracking Area Update)を行うためにトラッキングエリアの変更を要求する。
 コアネットワークを構成する装置(以下「コアネットワーク側装置」という場合がある)は、TAU要求信号とともに通信端末から送られてくる該通信端末の識別番号(UE-IDなど)をもとに、トラッキングエリアリストの更新を行う。コアネットワーク側装置は、通信端末に更新後のトラッキングエリアリストを送信する。通信端末は、受信したトラッキングエリアリストに基づいて、通信端末が保有するTACリストを書き換える(更新する)。その後、通信端末は、該セルで待ち受け動作に入る。
 スマートフォンおよびタブレット型端末装置の普及によって、セルラー系無線通信によるトラフィックが爆発的に増大しており、世界中で無線リソースの不足が懸念されている。これに対応して周波数利用効率を高めるために、小セル化し、空間分離を進めることが検討されている。
 従来のセルの構成では、eNBによって構成されるセルは、比較的広い範囲のカバレッジを有する。従来は、複数のeNBによって構成される複数のセルの比較的広い範囲のカバレッジによって、あるエリアを覆うように、セルが構成されている。
 小セル化された場合、eNBによって構成されるセルは、従来のeNBによって構成されるセルのカバレッジに比べて範囲が狭いカバレッジを有する。したがって、従来と同様に、あるエリアを覆うためには、従来のeNBに比べて、多数の小セル化されたeNBが必要となる。
 以下の説明では、従来のeNBによって構成されるセルのように、カバレッジが比較的大きいセルを「マクロセル」といい、マクロセルを構成するeNBを「マクロeNB」という。また、小セル化されたセルのように、カバレッジが比較的小さいセルを「スモールセル」といい、スモールセルを構成するeNBを「スモールeNB」という。
 マクロeNBは、例えば、非特許文献7に記載される「ワイドエリア基地局(Wide Area Base Station)」であってもよい。
 スモールeNBは、例えば、ローパワーノード、ローカルエリアノード、ホットスポットなどであってもよい。また、スモールeNBは、ピコセルを構成するピコeNB、フェムトセルを構成するフェムトeNB、HeNB、RRH(Remote Radio Head)、RRU(Remote Radio Unit)、RRE(Remote Radio Equipment)またはRN(Relay Node)であってもよい。また、スモールeNBは、非特許文献7に記載される「ローカルエリア基地局(Local Area Base Station)」または「ホーム基地局(Home Base Station)」であってもよい。
 図7は、マクロeNBとスモールeNBとが混在する場合のセルの構成の概念を示す図である。マクロeNBによって構成されるマクロセルは、比較的広い範囲のカバレッジ701を有する。スモールeNBによって構成されるスモールセルは、マクロeNB(マクロセル)のカバレッジ701に比べて範囲が小さいカバレッジ702を有する。
 複数のeNBが混在する場合、あるeNBによって構成されるセルのカバレッジが、他のeNBによって構成されるセルのカバレッジ内に含まれる場合がある。図7に示すセルの構成では、参照符号「704」または「705」で示されるように、スモールeNBによって構成されるスモールセルのカバレッジ702が、マクロeNBによって構成されるマクロセルのカバレッジ701内に含まれる場合がある。
 また、参照符号「705」で示されるように、複数、例えば2つのスモールセルのカバレッジ702が、1つのマクロセルのカバレッジ701内に含まれる場合もある。移動端末(UE)703は、例えばスモールセルのカバレッジ702内に含まれ、スモールセルを介して通信を行う。
 また図7に示すセルの構成では、参照符号「706」で示されるように、マクロeNBによって構成されるマクロセルのカバレッジ701と、スモールeNBによって構成されるスモールセルのカバレッジ702とが複雑に重複する場合が生じる。
 また、参照符号「707」で示されるように、マクロeNBによって構成されるマクロセルのカバレッジ701と、スモールeNBによって構成されるスモールセルのカバレッジ702とが重複しない場合も生じる。
 さらには、参照符号「708」で示されるように、多数のスモールeNBによって構成される多数のスモールセルのカバレッジ702が、1つのマクロeNBによって構成される1つのマクロセルのカバレッジ701内に構成される場合も生じる。
 デュアルコネクティビティ(DC)では、スプリットベアラがサポートされている。スプリットベアラとは、MeNBとUEとの間の直接のパスと、SeNBを介したMeNBとUEとの間のパスとに分割(スプリット(split))されたベアラをいう。
 スプリットベアラでは、MeNBだけでなく、SeNBに対しても、SPS(Semi-Persistent Scheduling)がサポートされている(非特許文献6参照)。SPSは、MeNB、SeNBに対して同時、かつ独立に設定可能である。
 SPSは、複数のサブフレームの長期間にわたって、無線リソースをUEに準静的に割当てることを可能にするスケジューリング方法である。これによって、eNBは、PDCCHおよびEPDCCHなどの個別制御チャネル上のDL割当情報、あるいはULグラント情報を、各サブフレームでUEに送信することを不要とすることができる。
 3GPPにおけるSPSについては、非特許文献9に記載されている。
 RRC個別シグナリングで、SPSの間隔、SPS用のC-RNTI(Cell Radio Network Temporary Identifier)およびULのインプリシットリリース前の空送信回数(以下「リリース前空送信回数」という場合がある)などの設定がUEに通知される。これによって、SPSが実行可能となる。リリース前空送信回数として、「implicitReleaseAfter」というパラメータが用いられる。以下の説明では、リリース前空送信回数を記号「n」で表す場合がある。
 また、RRC個別シグナリングによってSPSを無効にする。これによって、対応するDL割当情報あるいはULグラント情報は廃棄される。SPS用のC-RNTIは、SPS C-RNTIと称される場合がある。
 SPSは、PDCCHあるいはEPDCCHによって、実行開始(アクティベート)、および実行終了(デアクティベート)される。このPDCCHあるいはEPDCCHのCRCに、SPS C-RNTIがマスクされる。
 特に、上りリンクのSPSについては、インプリシットリリース(implicit release)と称されるSPSの実行終了方法が決められている。UEは、上り送信データが無い場合、パディングビットおよびパディングBSRの少なくとも一方を含むMAC PDU(Protocol Data Unit)を送信する。この送信は、空送信またはパディング(padding)送信と称される場合がある。該送信が前述のULのインプリシットリリース前の空送信回数として設定される回数、連続して行われた場合、直ちに上りグラント情報をクリアする。
 これによって、eNBにおいても、UEからの該送信を、ULのインプリシットリリース前の空送信回数として設定される回数連続して受信した場合に、上りSPSの設定を無効にする。eNBは、SPSの設定を無効にすることによって、SPSの設定で割当てていた無線リソースを、他のUEに対して使用することが可能となる。
 図8は、上りリンクのSPSの動作例を説明する図である。
 ステップST801において、eNBは、RRC個別シグナリングで、SPSリソースの構成およびPDCCH受信時に用いるSPS C-RNTIをUEに通知する。
 ステップST801でSPSリソースの構成およびSPS C-RNTIを受信したUEは、PDCCHをSPS C-RNTIで検出する。
 ステップST802において、eNBは、SPSの実行開始(アクティベート)指示をUEに通知する。ステップST802でSPSの実行開始指示を受信したUEは、最初のスケジューリングを検出した場合、SPSをアクティベート(activate)される。すなわち、SPSの実行が開始される。そして、該スケジューリングは、デアクティベート(deactivate)される、すなわちSPSの実行が終了されるまで継続される。
 ステップST803およびステップST804において、eNBとUEとの間で、該スケジューリングされたSPSリソースでSPSが実行される。ステップST803およびステップST804において、UEは、設定されたSPSリソースで、eNBに上りデータの送信を行う。
 ステップST805において、UEは、設定されたSPSリソースで送信データが無くなった場合、パディング送信を行う。
 ステップST805およびステップST806において、UEは、パディング送信を、リリース前空送信回数として設定される回数連続して行った場合、ステップST807において、SPSをクリアする。ここでは、リリース前空送信回数を2回としている。
 ステップST805およびステップST806において、eNBも、UEからのパディング送信を、リリース前空送信回数として設定される回数連続して受信した場合、ステップST807において、上りSPSの設定をリリースする。
 前述したように、DCでは、スプリットベアラがサポートされている。3GPPにおいて、上りスプリットベアラを実行しているときのバッファ状態報告(Buffer Status Report;略称:BSR)の送信方法について、二重報告および閾値(Double Reporting And Threshold;略称:DRAT)による方法とすることが提案されている(非特許文献7参照)。
 図9および図10は、DRATによる送信方法について説明するための図である。図9は、上りPDCPのデータ量が予め定める閾値(Th)以下の場合を示している。図10は、上りPDCPのデータ量が予め定める閾値(Th)より大きい場合を示している。
 図9において、UE905は、MAC(Medium Access Control)907、RLC(Radio Link Control)908、MAC909、RLC910およびPDCP(Packet Data Convergence Protocol)911を含む。MAC907は、MeNB901に対して用いられる。RLC908は、MeNB901に対して用いられる。MAC909は、SeNB902に対して用いられる。RLC910は、SeNB902に対して用いられる。
 図10において、UE906は、MAC912、RLC913、MAC914、RLC915およびPDCP916を含む。MAC912は、MeNB903に対して用いられる。RLC913は、MeNB903に対して用いられる。MAC914は、SeNB904に対して用いられる。RLC915は、SeNB904に対して用いられる。
 DRATでは、図9に示すように、PDCP911のデータ量が予め定める閾値以下である場合は、一つのeNB、すなわちMeNB901あるいはSeNB902に、バッファ状態(Buffer Status;略称:BS)を報告する。MeNB901およびSeNB902のどちらのeNBにBSを報告するかは、RRCシグナリングによって設定される。BSを報告するeNBとして設定された一つのeNBを「1st-eNB」とする。図9では、MeNB901にBSを報告する場合を示している。
 図10に示すように、PDCP916のデータ量が予め定める閾値よりも大きい場合は、両方のeNB、すなわち、1st-eNBおよび2nd-eNBに、同じPDCP916のデータ量のBSを報告する。図10では、1st-eNBをMeNB903とし、2nd-eNBをSeNB904とする。予め定める閾値は、ラジオベアラ(Radio bearer:RB)毎に設定される。
 図9を、上りPDCPのデータ量が予め定める閾値(Th)よりも小さい場合とし、図10を、上りPDCPのデータ量が予め定める閾値(Th)以上である場合としてもよい。
 さらに、3GPPでは、バッファ状態報告(BSR)のトリガと、データを送信するeNBとは一致させることが提案されている。
 これに従うと、DRATでは、送信データのデータ量が閾値以下の場合は、設定された一つのeNB(1st-eNB)にデータを送信する。送信データのデータ量が閾値よりも大きい場合は、両方のeNB(1st-eNB、2nd-eNB)にデータを送信する。
 ULスプリットベアラが設定された状態で、2nd-eNBに対してSPSが設定され、実行開始(アクティベート)された場合を考える。DRATによって、UEは、上りデータのデータ量が閾値以下になった場合、2nd-eNBにデータの送信を行わないことになる。
 2nd-eNBに対して設定されたSPSリソースにおいて、上りデータのデータ量が閾値以下になり、2nd-eNBにデータの送信を行わないようになった場合の動作については何ら規定が無く、何ら議論もされていない。
 したがって、上りデータのデータ量が閾値以下の場合、2nd-eNBにデータの送信が行われないので、設定されたSPSリソースで何も送信されず、パディング送信も行われない可能性が生じる。
 パディング送信が行われないと、インプリシットリリースが正常に行われなくなるので、UEは、SPSリソースをクリアして良いか否かの判断ができない。また、eNBは、SPSリソースをリリースして良いか否かの判断ができない。したがって、eNBとUEとの間で不安定な動作が生じ、ひいては誤動作を引き起こす可能性が生じてしまう。
 図11は、ULスプリットベアラが設定された場合に、SPSが設定された場合の問題点を説明する図である。1st-eNBをMeNBとし、2nd-eNBをSeNBとする。図11では、MeNBとSeNBとに、ぞれぞれ、SPSが設定された場合を示している。
 ステップST1001において、MeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。UEは、該PDCCHを受信して、上りSPSをアクティベートする。すなわち、上りSPSの実行を開始する。
 ステップST1002からステップST1007において、UEは、MeNBに対して設定された上りSPSリソースで、上りデータをMeNBに送信する。
 ステップST1008において、SeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。UEは、該PDCCHを受信して、上りSPSをアクティベートする。
 ステップST1009において、UEは、SeNBに対して設定された上りSPSリソースで、上りデータをSeNBに送信する。UEで発生する送信データのデータ量は、DRATにおける閾値以上であるとする。図示はしていないが、UEは、MeNBにもデータを送信する。
 したがって、UEで発生した上りデータの一部は、MeNBに送信され、残りの上りデータがSeNBに送信される。
 ステップST1010において、SeNBに対して設定された上りSPSリソースで、UEで上りデータが発生しなかった場合を考える。この場合、上りデータのデータ量がDRATにおいて閾値以下となるので、UEは、SeNBに上りデータの送信を行わないと判断し、パディング送信も行わない。
 ステップST1010およびステップST1011において、SeNBに対して設定された上りSPSリソースで、連続してUEで上りデータが発生しない場合、同様に、上りデータのデータ量がDRATにおいて閾値以下となるので、UEは、SeNBに上りデータの送信を行わないと判断し、パディング送信も行わない。
 たとえ、リリース前空送信回数(図11では2回とする)連続して上り送信データが発生しなかったとしても、パディング送信が行われない。したがって、ステップST1012において、UEはSPSリソースをクリアして良いか否かの判断ができなくなる。また、eNBもSPSリソースをリリースして良いか否かの判断ができなくなってしまう。
 したがって、eNBとUEとの間で不安定な動作が生じ、ひいては誤動作を引き起こす可能性が生じてしまう。
 以上のことから、上りスプリットベアラでDRATが実行された場合にSPSを可能とし、高速で安定な通信システムを提供することが求められる。
 本実施の形態では、このような問題を解決する方法を開示する。
 SPSが設定された場合は、1st-eNBにも、2nd-eNBにも上りデータを送信する。
 このようにする方法として、例えば、SPSが設定された場合は、DRATの閾値を設けない。あるいは、SPSが設定された場合は、設定されたDRATの閾値を無効とする。これらのようにすることによって、SPSが設定された場合に、閾値が無くなり、あるいは閾値が無効となり、1st-eNBにも、2nd-eNBにも上りデータが送信されることになる。
 SPS用のDRATの閾値を設けてもよい。SPS用のDRATの閾値を設けることによって、SPS用のDRATの閾値を、SPSで無い場合のDRATの閾値と異なる値を設定することができ、SPSの場合のDRATの動作を、SPSで無い場合のDRATと動作を異ならせることが可能となる。
 両方のeNBに上りデータを送信するようにする他の方法として、例えば、SPS用のDRATの閾値として負の値を設定する。上りデータのデータ量がDRATの閾値よりも大きい場合において両eNBに送信する場合に適用するとよい。
 あるいは、SPS用のDRATの閾値として0を設定する。上りデータのデータ量がDRATの閾値以上の場合において両eNBに送信する場合に適用するとよい。
 これらのようにすることによって、SPSが設定された場合に、1st-eNBにも、2nd-eNBにも上りデータが送信されることになる。
 これらの方法を用いることによって、SPSが設定された場合、1st-eNBにも、2nd-eNBにも上りデータが送信されることになるので、パディング送信も可能となる。したがって、インプリシットリリースが可能となる。
 SPSが設定された場合は、1st-eNBにも、2nd-eNBにも上りデータを送信することは、予め規格などで静的に決めておいてもよいし、SPSの設定とともにUEに通知してもよい。あるいは、SPSアクティベートとともにUEに通知してもよい。
 例えば、SPSが設定された場合は、DRATの閾値を設けないこと、あるいは、設定されたDRATの閾値を無効とすること、あるいは、DRATの閾値を負の値にすること、あるいは、DRATの閾値を0にすることを予め規格などで静的に決めておく。これによって、eNBとUEとの間で共通の認識を得ることが可能となる。また、これらの情報をシグナリングする必要がなくなるので、シグナリングの負荷を低減することができる。
 他の例として、設定されたDRATの閾値を無効とする情報を設け、該情報をSPSの設定とともにUEに通知するとよい。あるいは、DRATの閾値として、負の値、あるいは0を、SPSの設定とともにUEに通知するとよい。
 これらの通知は、SPSの設定とは別途UEに通知してもよい。設定されたDRATの閾値を無効とする情報をSPSの設定とともに通知することによって、シグナリングの負荷を低減することができる。また、SPSの設定とタイミングを同じにすることが可能となるので、不安定な動作および誤動作が発生する可能性を低減することができる。これらの通知には、UE個別のRRCシグナリングを用いるとよい。
 他の例として、設定されたDRATの閾値を無効とする情報を設け、該情報をSPSアクティベートとともにUEに通知するとよい。あるいは、DRATの閾値として、負の値、あるいは0を、SPSアクティベートとともにUEに通知するとよい。
 これらの通知は、SPSアクティベートとは別途UEに通知してもよい。設定されたDRATの閾値を無効とする情報をSPSのアクティベートとともに通知することによって、シグナリングの負荷を低減することができる。また、SPSのアクティベートとタイミングを同じにすることが可能となるので、不安定な動作および誤動作が発生する可能性を低減することができる。これらの通知には、L1/L2制御信号を用いるとよい。
 前述のようにして設定された、1st-eNBにも、2nd-eNBにも上りデータが送信される状態を解除する方法を開示する。
 前述と同様に、SPSの設定が解除された場合、該状態を解除することを予め規格などで静的に決めておく。これによって、前述と同様の効果を得ることができる。
 あるいは、設定されたDRATの閾値を有効とする情報を設け、該情報を、SPSの設定を無効にするシグナリングに含めてUEに通知するとよい。あるいは、再度設定するDRATの閾値を、SPSの設定を無効にするシグナリングに含めてUEに通知するとよい。あるいは、SPSの設定を無効にするシグナリングによって該状態を解除することとしてもよい。これによって、DRATの閾値を従来の値に戻すことができ、前述と同様の効果を得ることができる。
 あるいは、設定されたDRATの閾値を有効とする情報を設け、該情報を、SPSデアクティベートに含めてUEに通知するとよい。あるいは、再度設定するDRATの閾値を、SPSデアクティベートに含めてUEに通知するとよい。あるいは、SPSデアクティベートによって該状態を解除することとしてもよい。これによって、DRATの閾値を従来の値に戻すことができ、前述と同様の効果を得ることができる。
 以上に開示した方法を用いることによって、SPSが設定された場合、1st-eNBにも、2nd-eNBにも上りデータが送信されることになるので、パディング送信も可能となる。したがって、インプリシットリリースが可能となる。
 これによって、eNBとUEとの間で不安定な動作が生じ、ひいては誤動作を引き起こす可能性を低減させることができる。
 図12は、SPSが設定された場合に、DRATの閾値に0を設定した場合を説明する図である。上りデータのデータ量がDRATの閾値よりも小さい場合には1st-eNBのみに送信し、上りデータのデータ量がDRATの閾値以上の場合には1st-eNBおよび2nd-eNBの両eNBに送信する場合である。1st-eNBをMeNBとし、2nd-eNBをSeNBとする。MeNBとSeNBとにそれぞれSPSが設定された場合を示している。
 図12は、図11と類似しているので、主として異なる部分について説明する。
 DRATの閾値1103は、0に設定される。
 ステップST1008において、SeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。該アクティベートの通知に、DRATの閾値に0を設定する情報を含ませる。UEは、該PDCCHを受信して、上りSPSをアクティベートするとともに、DRATの閾値を0に設定する。
 ステップST1009において、UEは、SeNBに対して設定された上りSPSリソースで、上りデータをSeNBに送信する。DRATの閾値を0としたので、UEで発生した上り送信データは、SeNBに送信することが可能となる。図示はしていないが、MeNBにもデータを送信することが可能となる。したがって、UEで発生した上りデータの一部はMeNBに送信され、残りの上りデータがSeNBに送信される。
 ステップST1101において、SeNBに対して設定された上りSPSリソースで、UEで上りデータが発生しなかった場合を考える。この場合、DRATの閾値が0であるので、たとえ上りデータの発生が0であったとしても、SeNBに送信することが可能となる。したがって、パディング送信も可能と判断し、SeNBに、パディング送信を行う。このように、SeNBとUEとの間で上り送信データが無いときも、パディング送信が可能となる。
 ステップST1101からステップST1102において、SeNBに対して設定された上りSPSリソースで、連続してUEで上りデータが発生しない場合、同様に、上りデータのデータ量がDRATの閾値以上となるので、UEは、SeNBに上りデータを送信することが可能となる。したがって、パディング送信が可能と判断し、パディング送信を行う。
 リリース前空送信回数として設定される回数連続して上り送信データが発生せず、パディング送信が行われた場合、ステップST1012において、UEは、SPSリソースをクリアし、eNBもSPSリソースをリリースする。
 これによって、eNBとUEとの間で、インプリシットリリースが正常に行われる。
 以上に開示した方法の場合、SPSリソースが割当てられたタイミングだけでなく、SPSが設定あるいはアクティベートされたタイミングから、解除あるいはデアクティベートまでの間中、両eNBに上りデータの送信が可能となる。データが発生することになる。
 したがって、SPSが設定あるいはアクティベートされたタイミングから、解除あるいはデアクティベートまでの間、UEに発生する上り送信データのデータ量が小さい場合でも、常に2nd-eNBにも上りデータの送信を行うことになるので、UEの消費電力は増大してしまう。
 このような問題を解決する方法を開示する。
 SPSのリソース割当のタイミングのみ、1st-eNBにも、2nd-eNBにも上りデータを送信する。SPSのリソース割当のタイミングに合わせて、1st-eNBにも、2nd-eNBにも上りデータを送信する。
 このようにすることによって、2nd-eNBに対しても上りデータを送信する期間を短縮することができる。したがって、UEの消費電力の増大を抑制することが可能となる。
 以上のように本実施の形態によれば、SeNBが、SPSを設定される、すなわち周期的に割り当てられる無線リソースを用いて通信端末装置と通信するように設定されると、送信データのデータ量が閾値Th以下である場合に、送信データがMeNBおよびSeNBに送信されるように、閾値Thが変更される。例えば、本実施の形態のように、閾値Thがゼロ(0)に設定される。
 これによって、SeNBにおいても、SPSによる通信を実行することができる。したがって、MeNBおよびSeNBとUEとの間の通信動作を安定して行うことができる通信システムを提供することができる。すなわち、上りスプリットベアラでDRATが実行された場合にSPSを可能とすることができるので、高速で安定な通信システムを提供することができる。
 閾値Thの変更は、送信データのデータ量が閾値Th未満である場合に行なわれてもよい。具体的には、SeNBが、SPSを設定される、すなわち周期的に割り当てられる無線リソースを用いて通信端末装置と通信するように設定されると、送信データのデータ量が閾値Th未満である場合に、送信データがMeNBおよびSeNBに送信されるように、閾値Thが変更されるように構成されてもよい。この場合、例えば、本実施の形態のように、閾値Thがゼロ(0)に設定される。
 これによって、本実施の形態と同様の効果を得ることができる。具体的には、SeNBにおいても、SPSによる通信を実行することができる。したがって、MeNBおよびSeNBとUEとの間の通信動作を安定して行うことができる通信システムを提供することができる。すなわち、上りスプリットベアラでDRATが実行された場合にSPSを可能とすることができるので、高速で安定な通信システムを提供することができる。
 実施の形態2.
 実施の形態1で開示した方法を用いた場合、DRATの閾値を実質的に設定できないことになる。したがってUEの消費電力が増大することとなる。
 また、DRATの閾値は、UEにおいて、PDCPからRLC/MACへの上り送信データの分配時に用いられる。したがって、設定されたSPSのリソース割当タイミングに合わせて両eNBに上りデータを送信するには、上り送信データの分配のときに、SPSのタイミングに合わせた細かい時間管理が必要となる。
 このような場合、上り送信データの発生タイミングの変動、およびPDCPの処理時間の変動などによって、誤動作が生じる可能性がある。
 したがって、実施の形態1に記載した問題を解決するために、本実施の形態では、実施の形態1で開示した方法とは異なる方法を開示する。
 2nd-eNBに対してもインプリシットリリースをサポートする。UEは、2nd-eNBにSPSが設定された場合、2nd-eNBに対してパディング送信を可能とする。UEは、2nd-eNBにSPSが設定された場合、設定されたSPSリソースで、上り送信データのデータ量がDRATの閾値よりも小さい場合でも、2nd-eNBに対してパディング送信を行う。このようにすることによって、インプリシットリリースが可能となる。
 パディング送信は、従来のように、パディングビットおよびパディングBSRの少なくとも一方を含むMAC PDUを送信する。このように、従来と同じパディング送信とすることによって、eNBおよびUEにおける制御を簡易にすることができる。
 また、UEは、2nd-eNBに、パディング送信を、リリース前空送信回数として設定される回数連続して行った場合、SPSの設定をクリアする。2nd-eNBもまた、UEからパディング送信を、リリース前空送信回数として設定される回数連続して受信した場合、SPSリソースをリリースする。
 図13は、2nd-eNBに対してSPSが設定された場合にインプリシットリリースをサポートする方法を説明する図である。1st-eNBをMeNBとし、2nd-eNBをSeNBとする。MeNB、SeNBともにSPSが設定された場合を示している。図13は、図11および図12と類似しているので、主として異なる部分について説明する。
 DRATの閾値1201は、任意の値Thに設定されている。
 ステップST1008において、SeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。通常のアクティベートでよい。
 ステップST1202において、SeNBに対して設定された上りSPSリソースで、UEで上りデータが発生しなかった場合を考える。この場合、上りデータのデータ量がDRATの閾値よりも小さくなるが、SeNBに対してSPSが設定されている場合は、SeNBに対してパディング送信が可能であるので、UEは、SeNBにパディング送信を行う。
 このようにすることによって、SeNBとUEとの間で上り送信データが無いときも、パディング送信が可能となる。
 ステップST1202からステップST1203において、SeNBに対して設定された上りSPSリソースで、連続してUEで上りデータが発生しない場合、同様に、上りデータのデータ量がDRATの閾値以上となるので、UEは、SeNBに上りデータの送信が可能となる。したがって、パディング送信が可能と判断し、パディング送信を行う。
 リリース前空送信回数として設定される回数連続して上り送信データが発生せず、パディング送信が行われた場合、ステップST1204において、UEは、SPSリソースをクリアし、eNBもSPSリソースをリリースする。
 これによって、SeNBとUEとの間で、インプリシットリリースが正常に行われる。
 本実施の形態で開示した方法を用いることによって、ULスプリットベアラにおいて、2nd-eNBにSPSが設定された場合に、インプリシットリリースをサポートすることが可能となる。
 eNBおよびUEは、インプリシットリリースによって、SPSリソースをリリースする判断が可能となり、不安定な動作および誤動作の発生を低減させることができる。
 したがって、ULスプリットベアラにおいて2nd-eNBにSPSが設定された場合に、従来のSPS動作が可能となる。
 また、実施の形態1の方法とは異なり、2nd-eNBに対するDRATの閾値も任意の値を設定することが可能となる。したがって、SPSが設定されてから無効になるまでの間に、少量の上り送信データが発生したとしても、上りデータのデータ量がDRATの閾値よりも小さい場合は、2nd-eNBに上りデータを送信する必要が無くなる。したがって、UEの消費電力の増大を低減させることが可能となる。
 また、DRATの閾値設定において動的に細かい制御が不要になるので、誤動作の発生を抑制することが可能となる。
 以上のように本実施の形態によれば、SeNBが、SPSを設定される、すなわち周期的に割り当てられる無線リソースを用いて通信端末装置と通信するように設定されると、送信データのデータ量が閾値Th以下である場合に、送信データをMeNBに送信するとともに、周期的に割り当てられる無線リソースを用いた通信の終了を表す終了信号をSeNBに送信するように、具体的にはパディング送信を行うように設定される。
 これによって、SeNBでは、SPSによる通信を終了することができる。したがって、MeNBおよびSeNBとUEとの間の通信動作を安定して行うことができる通信システムを提供することができる。すなわち、上りスプリットベアラでDRATが実行された場合にSPSを可能とすることができるので、高速で安定な通信システムを提供することができる。
 以上のパディング送信を行うような設定は、送信データのデータ量が閾値Th未満である場合に行なわれてもよい。具体的には、SeNBが、SPSを設定される、すなわち周期的に割り当てられる無線リソースを用いて通信端末装置と通信するように設定されると、送信データのデータ量が閾値Th未満である場合に、送信データをMeNBに送信するとともに、周期的に割り当てられる無線リソースを用いた通信の終了を表す終了信号をSeNBに送信するように、具体的にはパディング送信を行うように設定されるように構成されてもよい。
 これによって、本実施の形態と同様の効果を得ることができる。具体的には、SeNBでは、SPSによる通信を終了することができる。したがって、MeNBおよびSeNBとUEとの間の通信動作を安定して行うことができる通信システムを提供することができる。すなわち、上りスプリットベアラでDRATが実行された場合にSPSを可能とすることができるので、高速で安定な通信システムを提供することができる。
 実施の形態2 変形例1.
 実施の形態2で示した課題を解決するための他の方法を開示する。送信データが無いことを示す情報を設け、UEからeNBへ、上りL1/L2制御信号を用いて該情報を送信する。上りL1/L2制御信号として、例えば、PUCCHを用いる。UEは、設定されたSPSのタイミングで、送信データが無い場合、送信データが無いことを示す情報をPUCCHにマッピングして、eNBに送信する。eNBは、設定したSPSのタイミングで、UEからのPUCCHを受信し、送信データが無いことを示す情報を得ることによって、上り送信データが無いことを認識する。
 UEは、送信データが無いことを示す情報を、リリース前空送信回数として設定される回数連続して送信した場合、SPSリソースをクリアする。eNBは、UEから送信データが無いことを示す情報を、リリース前空送信回数として設定される回数連続して受信した場合、SPSリソースをリリースする。
 このようにすることによって、インプリシットリリースをサポートすることが可能となる。
 送信データが無いことを示す情報をマッピングするPUCCHの構成は、eNBが設定し、予めUEに通知される。PUCCHの構成として、周波数軸方向のリソース、時間軸方向のリソース、PUCCHに用いるリファレンスシグナル(Reference Signal:RS)に用いるシーケンスなどがある。
 周波数軸方向のリソースとしては、例えば、サブキャリア、リソースブロックなどを設定するとよい。最小リソースとしてもよい。最小リソースは、送信における最小単位としてもよい。最小単位は、例えば、1物理リソースブロック(Physical Resource Block;略称:PRB)としてもよい。時間軸方向のリソースとしては、PUCCHを送信するタイミングを設定するとよい。PUCCHを送信するタイミングは任意に設定してもよいが、SPSリソースが設定されたタイミングとしてもよい。これによって、UEおよびeNBにおけるタイミングの制御を簡易にすることが可能となる。
 PUCCHに用いるRS用シーケンスとしては、セル毎あるいはビーム毎としてもよい。PUCCHの周波数軸方向のリソースをUE毎に異ならせることによって、同じSPSリソースタイミングで複数のUEのPUCCH送信が発生しても、eNBは受信することが可能となる。あるいは、PUCCHに用いるRS用シーケンスとしては、UE個別としてもよい。複数のUEに対して、周波数軸方向のリソースおよび時間軸方向のリソースが同じPUCCHを共有することができる。同じリソースに複数のUEのPUCCHが存在しても、UE個別のRSを用いることによって、eNBは各UEのPUCCHを受信することが可能となる。
 eNBは、PUCCHの構成をSPSの設定に含めてUEに通知してもよい。あるいは、eNBは、PUCCHの構成をSPSアクティベートに含めてUEに通知してもよい。
 送信データが無いことを示す情報をマッピングするPUCCHの構成として、従来のPUCCHの構成を用いてもよい。UEは、設定されたSPSリソースタイミングで上り送信データが無い場合、送信データが無いことを示す情報を従来のPUCCH構成を用いてPUCCHにマッピングする。UEは、設定されたSPSリソースのタイミングで該PUCCHを送信する。従来のPUCCHの構成を用いることによって、eNBは、別途送信データが無いことを示す情報をマッピングするPUCCHを設定しなくてもよい。
 他の方法として、送信データが無いことを示す情報をPUSCHにマッピングするようにしてもよい。UEは、設定されたSPSのタイミングで、送信データが無い場合、送信データが無いことを示す情報をPUSCHにマッピングして、eNBに送信する。
 eNBは、設定したSPSのタイミングで、UEからのPUSCHを受信し、送信データが無いことを示す情報を得ることによって、上り送信データが無いことを認識する。
 既にSPSのタイミングにおいてSPSリソースが設定されている。SPSリソースとして、上りデータの送信のためのリソースが設定される。上りデータの送信には、PUSCHが用いられるので、PUSCHのリソースが設定される。
 既にUEは、eNBから設定されたSPSのためのPUSCHリソースに対する上りグラントを得ている。したがって、UEは、設定されたSPSのためのPUSCH送信用のリソースを使用することが可能である。
 既にSPSのタイミングで設定されているSPSのためのPUSCHリソースを用いることによって、PUCCHの構成を別途設定する必要が無くなる。これによって、リソースの使用効率の向上およびシグナリング負荷の低減が可能となる。
 送信データが無いことを示す情報を送信するためのPUSCHのリソースは、SPSのタイミングで設定されているSPSのためのPUSCHリソースの一部または全部であってもよい。
 PUSCHに用いるRS用シーケンスは、前述のPUCCHで送信する場合の方法を適用するとよい。
 他の方法として、SRS(Sounding Reference Signal)を用いて送信データが無いことを示すようにしてもよい。送信データが無いことを示す特定のSRSリソースを設定する。時間軸上の最小リソースは、1シンボルとしてもよい。eNBは、該SRSリソースの設定をUEに通知する。UEは、設定されたSPSのタイミングで送信データが無い場合、該SRSリソースを用いてSRSを送信する。eNBは、SPSのタイミングにおいて該SRSリソースでUEからのSRSを受信した場合、送信データが無いことを認識できる。
 SRSに用いるRS用シーケンスは、前述のPUCCHで送信する場合の方法を適用するとよい。
 他の方法として、送信データが無いことを示すRSのシーケンスを設けて、PUCCHあるいはPUSCHあるいはSRSのRSに該シーケンスを用いてもよい。PUCCH、PUSCH、SRSのいずれを使用するかは予め静的に決めておいてもよいし、eNBからUEへ通知してもよい。この場合、該チャネルあるいは信号のためのリソースは、UE個別に設定しておくとよい。
 UEは、設定されたSPSのタイミングで送信データが無い場合、該RSシーケンスを用いた予め定めるチャネルあるいは信号を送信する。eNBは、SPSのタイミングにおいて予め定めるチャネルあるいは信号を受信した場合、送信データが無いことを認識できる。
 本変形例で開示した方法を用いることによって、送信に必要となる無線リソースを最小限に限定することが可能となる。したがって、最小限のリソースで送信できるので、UEの消費電力の増大をさらに低減することができる。
 また、本変形例で開示した方法を、2nd-eNBに設定されたSPSのタイミングにおいて送信データが無い場合のみに用いてもよい。他に設定されたSPSについては、通常のパディング送信を用いるとよい。
 実施の形態3.
 ULスプリットベアラにおいて、2nd-eNBに対して設定されたSPSのタイミングで、DRATの閾値よりも小さいデータ量の上り送信データが発生する場合がある。
 実施の形態2あるいは実施の形態2の変形例1で開示した方法を適用した場合、以下のような問題が生じる。
 UEにおいて、2nd-eNBに対して設定されたSPSのタイミングで、DRATの閾値よりも小さいデータ量の上り送信データが発生する場合、該上り送信データがあるにも関わらず、2nd-eNBに対しては上り送信データが発生しないことになる。したがって、UEは、2nd-eNBに対してパディング送信を行うことになる。このようなパディング送信が、リリース前空送信回数として設定される回数連続して発生すると、インプリシットリリースによって、UEおよび2nd-eNBで、SPSの設定が無効となり、SPSリソースがリリースされてしまう。つまり、設定されたSPSのタイミングで上り送信データがあるにも関わらず、インプリシットリリースによって、SPSリソースがリリースされてしまう場合が発生する。
 インプリシットリリースによってSPSリソースがリリースされた後、UEにおいて、2nd-eNBに対して設定されていたSPSのタイミングで、DRATの閾値以上の上り送信データが発生する場合、2nd-eNBに設定されたSPSが適用されなくなってしまう。
 UEは、設定されていたSPSのタイミングで上り送信データが発生しても、該SPSリソースを用いて上りデータの送信を行うことができなくなってしまう。
 このように、UEは、設定されたSPSのタイミングで上り送信データが発生し、上りデータを送信しているにも関わらず、2nd-eNBに対するSPSリソースがリリースされてしまうので、2nd-eNBに対しては、設定されたSPSリソースを用いて上りデータの送信を行うことができなくなってしまうのである。
 図14は、DRATの閾値よりも小さいデータ量の上り送信データが発生する場合を説明する図である。実施の形態2で開示した、2nd-eNBに対してSPSが設定された場合にインプリシットリリースをサポートする方法を実行した場合について示している。
 1st-eNBをMeNBとし、2nd-eNBをSeNBとする。MeNB、SeNBともにSPSが設定された場合を示している。図14は、図13と類似しているので、主として異なる部分について説明する。
 ステップST1202において、SeNBに対して設定された上りSPSリソースで、UEでDRATの閾値よりも小さいデータ量の上りデータが発生した場合を考える。
 この場合、ステップST1301において、UEは、MeNBに上りデータを送信する。
 SeNBに対しては上り送信データが発生しないので、ステップST1202において、UEは、SeNBに、パディング送信を行うことになる。
 ステップST1202からステップST1203において、SeNBに対して設定された上りSPSリソースで、連続してUEでDRAT閾値よりも小さいデータ量の上りデータが発生した場合、同様に、ステップST1301からステップST1302において、UEは、MeNBに上りデータの送信を行う。UEは、SeNBに対してはパディング送信を行う。
 SeNBに対して、リリース前空送信回数として設定される回数連続して上り送信データが発生せず、パディング送信が行われた場合、インプリシットリリースによって、ステップST1204において、UEは、SPSリソースをクリアし、eNBもSPSリソースをリリースする。
 しかし、インプリシットリリース後、ステップST1303において、SeNBに対して設定されていた上りSPSリソースで、UEでDRATの閾値以上のデータ量の上りデータが発生した場合を考える。
 この場合、図示はしていないが、UEは、MeNBに上りデータを送信する。
 SeNBに対しても上り送信データが発生するので、ステップST1303において、UEは、SeNBに上りデータの送信を行うことになる。しかし、既にSPSリソースはリリースされているので、該上りデータの送信にSPSリソースを用いることができない。
 このような場合、UEは、SeNBに対する上り送信データ用のリソースが割り当てられていないので、新たにスケジューリング要求(Scheduling Request:SR)信号の送信から開始しなければならない。UEは、SeNBにSR信号を送信し、SeNBからのULグラントを受信しなければならい。
 このことは、UEの消費電力の増大、PDCCHリソースの増大によるリソースの使用効率の低下、およびデータ送信の遅延の増大を引き起こす。本実施の形態では、このような課題を解決する方法を開示する。
 上りスプリットベアラが設定されている場合、上りSPSの設定を無効にしない。上りスプリットベアラが設定されている場合、上りSPSリソースをリリースしないとしてもよい。上りスプリットベアラが設定されている場合、インプリシットリリースを行わないとしてもよい。
 UEは、上りスプリットベアラが設定されている場合において、2nd-eNBに上りSPSが設定された場合、たとえリリース前空送信回数として設定される回数連続してパディング送信を行ったとしても、設定されたSPSリソースをクリアしない。2nd-eNBは、たとえリリース前空送信回数として設定される回数連続してパディング送信を受信したとしても、設定されたSPSリソースをリリースしない。
 上りSPSの設定を無効にしないようにする方法の具体例として、以下の(1),(2)の2つを開示する。
 (1)予め規格などで静的に決めておく。
 (2)上りSPSの設定を無効にしないことを示す情報を設けて、eNBからUEに通知する。
 前述の(1)の方法では、上りスプリットベアラが設定されている場合は、上りSPSの設定を無効にしないことを、静的に決めておく。これを予め規格などで決めておくことによって、eNBとUEとで認識することが可能となるので、整合のとれた動作が可能となり、誤動作を低減させることができる。
 前述の(2)の方法では、上りSPSの設定を無効にしないことを示す情報をeNBからUEに通知することによって、上りスプリットベアラが設定されている場合に上りSPSの設定を無効にしないことを、動的に設定することが可能となる。これによって、通信状況および負荷状況に応じて、柔軟な運用が可能となる。
 前述の(2)の方法における上りSPSの設定を無効にしないことを示す情報として、前述のULのリリース前空送信回数を用いてもよい。リリース前空送信回数として、SPSの設定を無効にしないことを示す値を設ける。あるいは、リリース前空送信回数として、無限大を示す値を設ける。既存の値とは別に新たに設けてもよい。
 前述の(2)の方法における上りSPSの設定を無効にしないことを示す情報は、eNBからUEに通知するとよい。通知するeNBは、1st-eNBであってもよいし、2nd-eNBであってもよい。例えば、2nd-eNBからUEに通知するときに、2nd-eNBから直接UEに通知してもよいし、2nd-eNBから1st-eNBを介してUEに通知してもよい。eNB間の情報の通知には、X2シグナリングを用いてもよい。あるいは、MMEを介してS1シグナリングを用いてもよい。
 該情報をeNBからUEに通知するためのシグナリング方法の具体例として、以下の(1)~(3)の3つを開示する。
 (1)RRCシグナリング。例えば、SPS構成の設定のためのシグナリングに含めて通知してもよい。
 (2)MACシグナリング。例えば、該情報を含むMAC CE(Control Element)を設けて、MACシグナリングによって通知してもよい。
 (3)L1/L2シグナリング。例えば、PDCCHあるいはEPDCCH。例えば、SPSアクティベートに含めて通知してもよい。
 このような方法で、eNBは、上りSPSの設定を無効にしないことを示す情報を、UEに通知する。該情報を受信したUEは、上りSPSの設定を無効にしない。UEは、上りスプリットベアラが設定されている場合に、2nd-eNBに上りSPSが設定された場合、たとえリリース前空送信回数として設定される回数連続してパディング送信を行ったとしても、インプリシットリリースを行わず、設定されたSPSリソースをクリアしない。
 図15は、上りSPSの設定を無効にしないようにする方法を説明する図である。上りSPSの設定を無効にしないことを示す情報をSPSアクティベートに含めて通知する方法の場合を示している。
 1st-eNBをMeNBとし、2nd-eNBをSeNBとする。MeNB、SeNBともにSPSが設定された場合を示している。図15は、図14と類似しているので、主として異なる部分について説明する。
 ステップST1008において、SeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。該アクティベートに、上りSPSの設定を無効にしないことを示す情報を含める。
 SeNBからSPSのアクティベートを受信したUEは、設定されたリソースでSPSを実行するとともに、上りSPSの設定を無効にしない。たとえ、UEがSeNBに対して予め定める回数パディング送信を行ったとしても、eNB、UEともにインプリシットリリースを行わず、SPSの設定を無効にしないように設定する。
 ステップST1202において、SeNBに対して設定されたSPSのタイミングで、UEでDRATの閾値よりも小さいデータ量の上りデータが発生した場合を考える。
 この場合、ステップST1301において、UEは、MeNBに上りデータを送信する。
 SeNBに対しては上り送信データが発生しないので、ステップST1202において、UEは、SeNBに対して、パディング送信を行うことになる。
 ステップST1202からステップST1203において、SeNBに対して設定されたSPSのタイミングで、連続してUEでDRAT閾値よりも小さいデータ量の上りデータが発生しない場合、同様に、ステップST1301からステップST1302において、UEは、MeNBに上りデータの送信を行う。UEは、SeNBに対しては、パディング送信を行う。
 SeNBに対して、リリース前空送信回数として設定される回数連続して上り送信データが発生せず、パディング送信が行われた場合でも、上りSPSの設定を無効にしない設定に従い、ステップST1204において、UEは、SPSリソースをクリアしない。eNBもSPSリソースをリリースしない。ステップST1204において、インプリシットリリースが行われず、SPSリソースがリリースされない。
 したがって、SeNBに対して、リリース前空送信回数として設定される回数連続してパディング送信が行われた後、ステップST1204において、SeNBに対して設定されたSPSのタイミングで、UEでDRATの閾値以上のデータ量の上りデータが発生した場合、ステップST1401において、UEは、SeNBに対して、設定されているSPSリソースで、上りデータの送信を行うことが可能となる。
 本実施の形態で開示した方法を用いることによって、設定されたSPSのタイミングで上り送信データが発生し、UEが上りデータを送信しているにも関わらず、2nd-eNBに対するSPSリソースがリリースされてしまうということを無くすことができる。したがって、設定されたSPSリソースで上りデータが発生した場合に2nd-eNBに送信を行うことができず、SR信号の送信からの開始を余儀なくされる状況を無くすことが可能となる。
 これによって、UEの消費電力の増大、PDCCHリソースの増大によるリソースの使用効率の低下、およびデータ送信の遅延の増大を抑制することが可能となる。
 以上のように本実施の形態では、UEは、上りSPSの設定を無効にしないことを示す情報を受信すると、SPSで割り当てられる無線リソースであるSPSリソースのリリースを停止する。上りSPSの設定を無効にしないことを示す情報は、SPSリソースのリリースを停止することを示すリリース停止情報に相当する。すなわち、UEは、リリース停止情報を受信すると、SPSリソースのリリースを停止する。
 これによって、設定されたSPSリソースで上りデータが発生した場合にSeNBに送信を行うことができなくなることを防ぎ、SR信号の送信からの開始を余儀なくされる状況を無くすことができる。したがって、UEの消費電力の増大、PDCCHリソースの増大によるリソースの使用効率の低下、およびデータ送信の遅延の増大を抑制することが可能となる。
 実施の形態4.
 実施の形態3で開示した方法では、設定されたSPSのタイミングで、実際に送信データが無い場合でも、インプリシットリリースが行われないことになり、SPSリソースはリリースされなくなる。
 SPSリソースがリリースされないと、2nd-eNBは、SPSのタイミングでSPSリソースをUEに対して割当て続けることになる。
 このように、送信データが無くなったUEに対して、PUSCHリソースを割当て続けることは無駄であり、リソースの使用効率を低下させる。本実施の形態では、このような課題を解決する方法を開示する。
 SPSの設定を無効にしない期間のタイマを設ける。eNBは、SPSの設定を無効にしない期間を設定してUEに通知する。
 例えば、上りSPSの設定を無効にしない設定が行われた場合に、インプリシットリリースの機能を開始するために、前述のタイマを用いる。eNBは、UEに、SPSの設定を無効にしない期間を、上りSPSの設定を無効にしないことを示す情報とともに通知する。UEは、上りSPSの設定を無効にしないことが設定されると、該タイマを開始して、SPSの設定を無効にしない期間が経過した場合、インプリシットリリースを開始してタイマを停止する。このようにすることによって、パディング送信が、リリース前空送信回数として設定される回数連続して行われた場合に、インプリシットリリースが行われ、上りSPSリソースがリリースされるようになる。
 SPSの設定を無効にしない期間としては、時間、無線フレーム数、サブフレーム数、スロット数、およびシンボル数であってもよい。SPSの設定を無効にしない期間は、設定されたSPSのタイミング間隔の正の整数倍としてもよい。SPSの設定を無効にしない期間は、予め規格などで静的に決められてもよい。
 他の方法として、パディング送信回数が予め定める回数続いた場合にインプリシットリリースを開始する、としてもよい。本実施の形態で開示したパディング送信の連続する予め定める回数を、従来のリリース前空送信回数と異ならせるとよい。
 具体的には、パディング送信の連続する予め定める回数を表すパラメータを「implicitReleaseAfter_B」とし、従来のリリース前空送信回数を表すパラメータを「implicitReleaseAfter」としたとき、implicitReleaseAfter_B>implicitReleaseAfterとするとよい。
 あるいは、implicitReleaseAfter_B=n(nは正の整数)×implicitReleaseAfterとしてもよい。
 これらのようにすることによって、上り送信データが無い期間に応じて、インプリシットリリースを開始することが可能となる。上り送信データの発生状況に応じて、上りSPSの設定を無効にする期間を設定することが可能となる。
 本実施の形態で開示した方法を用いることによって、上りSPSの設定を無効にしないことが設定されたまま、常にインプリシットリリースが行われない状態を無くすことができる。
 したがって、長期にわたるSPSリソースのリザーブが不要となり、PUSCHリソースの無駄を削減することが可能となる。これによって、リソースの使用効率の向上が可能となる。
 実施の形態4 変形例1.
 実施の形態4で示した課題を解決する他の方法を開示する。インプリシットリリースを開始することを示す情報を設けて、eNBからUEに通知する。例えば、上りSPSの設定を無効にしないことが設定されている状態において、インプリシットリリースを開始することを示す情報を、eNBからUEに通知する。該情報の通知によって、eNB、UEともに、インプリシットリリースを再開する。このようにすることによって、UEからeNBに、パディング送信が、リリース前空送信回数として設定される回数連続して発生した場合に、インプリシットリリースが実行され、上りSPSの設定が無効になる。
 eNBからUEに、インプリシットリリースを開始することを示す情報を通知することによって、任意のタイミングでインプリシットリリースを開始することが可能となる。これによって、通信状況および負荷状況に応じて柔軟な運用が可能となる。
 インプリシットリリースを開始することを示す情報として、前述のULのリリース前空送信回数を用いてもよい。リリース前空送信回数として、既存の値を設定するとよい。リリース前空送信回数が設定された場合に、インプリシットリリースを開始する。
 インプリシットリリースを開始することを示す情報は、eNBからUEに通知するとよい。通知するeNBは、1st-eNBであってもよいし、2nd-eNBであってもよい。例えば、2nd-eNBからUEに通知するときに、2nd-eNBから直接UEに通知してもよいし、2nd-eNBから1st-eNBを介してUEに通知してもよい。eNB間の情報の通知にはX2シグナリングを用いてもよい。あるいは、MMEを介してS1シグナリングを用いてもよい。
 インプリシットリリースを開始することを示す情報をeNBからUEへ通知するためのシグナリング方法の具体例として、以下の(1)~(3)の3つを開示する。
 (1)RRCシグナリング。
 (2)MACシグナリング。例えば、インプリシットリリースを開始することを示す情報を含むMAC CEを設けて、MACシグナリングによって通知してもよい。
 (3)L1/L2シグナリング。例えば、PDCCHあるいはEPDCCHで通知してもよい。
 本変形例で開示した方法を用いることによって、実施の形態4で開示した方法と同様の効果を得ることができる。
 また、任意のタイミングでインプリシットリリースを開始することが可能となるので、SPSリソースの柔軟な設定が可能となる。したがって、より一層PUSCHリソースの使用効率の向上が可能となる。
 以上のように本変形例では、UEは、インプリシットリリースを開始することを示す情報を受信すると、SPSリソースのリリースを再開する。インプリシットリリースを開始することを示す情報は、SPSリリースを再開することを示すリリース再開情報に相当する。すなわち、UEは、リリース再開情報を受信すると、SPSリソースのリリースを再開する。
 これによって、実施の形態4と同様の効果を得ることができる。具体的には、上りSPSの設定を無効にしないことが設定されたまま、常にインプリシットリリースが行われない状態を無くすことができる。これによって、長期にわたるSPSリソースのリザーブが不要となるので、PUSCHリソースの無駄を削減することが可能となる。したがって、リソースの使用効率の向上が可能となる。
 実施の形態4 変形例2.
 実施の形態4で示した課題を解決する他の方法を開示する。上りSPSの設定を無効にすることを示す情報を設けて、eNBからUEに通知する。例えば、上りSPSの設定を無効にしないことが設定されている状態において、上りSPSの設定を無効にすることを示す情報を、eNBからUEに通知する。eNBは、上りSPSの設定を無効にするか否かを判断する。eNBが上りSPSの設定を無効にすることを決定した場合、eNBは、UEに、上りSPSの設定を無効にすることを示す情報を通知し、上りSPSの設定を無効にする。UEは、eNBから上りSPSの設定を無効にすることを示す情報を受信することによって、上りSPSの設定を無効にする。このとき、インプリシットリリースを行わずに、上りSPSの設定を無効にする。
 eNBからUEに、上りSPSの設定を無効にすることを示す情報を通知することによって、任意のタイミングで上りSPSの設定を無効にすることが可能となる。これによって、通信状況および負荷状況に応じて柔軟な運用が可能となる。
 上りSPSの設定を無効にすることを示す情報として、前述のULのリリース前空送信回数を用いてもよい。リリース前空送信回数として、既存の値を設定するとよい。リリース前空送信回数が設定された場合に、上りSPSの設定を無効にすることを示すようにするとよい。
 上りSPSの設定を無効にすることを示す情報は、eNBからUEに通知するとよい。通知するeNBは、1st-eNBであってもよいし、2nd-eNBであってもよい。例えば、2nd-eNBからUEに通知するときに、2nd-eNBから直接UEに通知してもよいし、2nd-eNBから1st-eNBを介してUEに通知してもよい。eNB間の情報の通知にはX2シグナリングを用いてもよい。あるいは、MMEを介してS1シグナリングを用いてもよい。
 上りSPSの設定を無効にすることを示す情報をeNBからUEへ通知するためのシグナリング方法の具体例として、以下の(1)~(3)の3つを開示する。
 (1)RRCシグナリング。
 (2)MACシグナリング。例えば、上りSPSの設定を無効にすることを示す情報を含むMAC CEを設けて、MACシグナリングによって通知してもよい。
 (3)L1/L2シグナリング。例えば、PDCCHあるいはEPDCCHで通知してもよい。
 図16は、上りSPSの設定を無効にすることを示す情報を用いる方法を説明する図である。1st-eNBをMeNBとし、2nd-eNBをSeNBとする。MeNB、SeNBともにSPSが設定された場合を示している。図16は、図15と類似しているので、主として異なる部分について説明する。
 ステップST1008において、SeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。該アクティベートに、上りSPSの設定を無効にしないことを示す情報を含める。
 ステップST1202からステップST1203において、SeNBに対して、リリース前空送信回数として設定される回数連続して上り送信データが発生せず、パディング送信が行われた場合でも、上りSPSの設定を無効にしない設定に従い、UEは、SPSリソースをクリアしない。eNBもSPSリソースをリリースしない。インプリシットリリースが行われず、SPSリソースがリリースされない。
 ステップST1501において、SeNBは、上りSPSの設定を無効にすることを示す情報を設定し、UEに通知する。eNBは、上りSPSの設定を無効にすることを示す情報の通知によって、上りSPSの設定を無効にし、UEは、上りSPSの設定を無効にすることを示す情報を受信することによって、上りSPSの設定を無効にする。
 上りSPSの設定が無効になるので、以降のSPSのタイミングであるステップST1204では、設定されたSPSリソースがリリースされる。これによって、eNBは、該SPSリソースを他のUEに対して割当て可能となる。
 eNBが、上りSPSの設定を無効にするか否かを判断する方法の具体例として、以下の(1)~(6)の6つを開示する。
 (1)SPSの設定からの期間。
 (2)SPSの設定を無効にしないことを設定してからの期間。
 (3)パディング送信の連続受信回数。
 (4)自eNBにおける負荷量。
 (5)UEとの通信品質。
 (6)1st-eNBに対する上り送信データ発生状況。
 前述の(1)の方法では、上りSPSの設定から予め定める期間が経過した場合に、上りSPSの設定を無効にすると決定する。予め定める期間としては、時間、無線フレーム数、サブフレーム数、スロット数、およびシンボル数であってもよい。予め定める期間は、設定されたSPSのタイミング間隔の正の整数倍としてもよい。
 前述の(2)の方法では、上りSPSの設定を無効にしないことを設定してから予め定める期間が経過した場合に、上りSPSの設定を無効にすると決定する。
 前述の(3)の方法では、パディング送信を予め定める回数連続して受信した場合に、上りSPSの設定を無効にすると決定する。パディング送信を受信する予め定める回数としては、前述のリリース前空送信回数であってもよい。あるいは、リリース前空送信回数よりも大きい値であってもよい。
 前述の(4)の方法では、自eNBの負荷量を用いて判断する。負荷が予め定める値以上の場合、SPSの設定を無効にすると決定する。負荷が予め定める値よりも低い場合、SPSの設定を無効にしないと決定する。負荷が予め定める値よりも高い場合には、SPS用に割当てたリソースをリリースして、他のUEに割当て可能とすることによって、負荷が高い場合に生じるリソース不足を低減する。
 前述の(5)の方法では、UEとの通信品質を用いて判断する。通信品質が予め定める値よりも小さい場合、SPSの設定を無効にすると決定する。通信品質が予め定める値以上の場合、SPSの設定を無効にしないと決定する。通信品質が低い原因が、既に設定したSPS用のリソースの通信品質が悪いためである場合がある。このような場合、SPS用のリソースを再度割当てることによって、通信品質が向上する。したがって、通信品質が低い場合にSPSの設定を無効にして、必要に応じて再度SPSを設定可能とするとよい。これによって、通信品質の向上を図ることができる。また、通信品質の悪いリソースを早期にリリースすることができるので、リソースの使用効率を向上させることができる。
 前述の(6)の方法では、2nd-eNBが、1st-eNBに対する上り送信データの発生状況を認識して、上りSPSの設定を無効にするか否かを決定する。
 2nd-eNBが、1st-eNBに対する上り送信データの発生状況を認識する方法の具体例として、以下の(6-1),(6-2)の2つを開示する。
 (6-1)2nd-eNBは、1st-eNBから、上り送信データの発生に関する情報を取得する。
 1st-eNBは、2nd-eNBに、2nd-eNBに対して設定されたSPSのタイミングで、自eNB(1st-eNB)への上り送信データが発生したか否かを通知するとよい。
 2nd-eNBは、自eNBに対して設定されたSPSのタイミングを予め1st-eNBに通知しておくとよい。これによって、1st-eNBは、2nd-eNBに対して設定されたSPSのタイミングで、UEからの上り送信データを受信したか否かを認識することができる。1st-eNBは、2nd-eNBに対して設定されたSPSのタイミングでUEからの上り送信データを受信した場合、上り送信データの発生が有ると判断する。1st-eNBは、前記UEからの上り送信データを受信しなかった場合は、上り送信データの発生が無いと判断する。
 1st-eNBは、自eNBに対する上り送信データの発生の有無を、2nd-eNBに通知する。自eNBに対する上り送信データの発生が無い場合にのみ、あるいは有る場合にのみ通知してもよい。
 2nd-eNBは、自eNBに対する上り送信データの発生の有無の情報を受信することによって、1st-eNBに対して上り送信データが存在したか否かを判断することが可能となる。2nd-eNBは、自eNBに対する上り送信データの発生の有無の情報を用いて、上りSPSの設定を無効にするか否かを決定する。
 例えば、1st-eNBに対する上り送信データが無い情報を、予め定める回数連続して受信した場合に、上りSPSの設定を無効にすると決定するとよい。
 2nd-eNBは、1st-eNBに対して、どのベアラに対して、2nd-eNBでSPSを設定したかを通知してもよい。
 1st-eNBは、該ベアラで上り送信データが発生したか否かを判断してもよい。
 これによって、特定のベアラに対してSPSが設定されるような場合に、該ベアラを特定することができるので有効である。
 1st-eNBは、2nd-eNBに、上り送信データが発生しなかった場合が連続何回続いたかを表す連続回数を通知してもよい。
 あるいは、2nd-eNBが1st-eNBに、予め、該連続回数を通知しておいてもよい。1st-eNBは、2nd-eNBに設定されたSPSのタイミングで上り送信データを受信できなかった回数をカウントし、該連続回数になったとき、2nd-eNBに、その旨を通知する。
 eNB間で、SPSの設定の無効を要求するメッセージを新たに設けてもよい。例えば、1st-eNBは、2nd-eNBに設定されたSPSのタイミングで上り送信データを受信できなかった回数をカウントし、該連続回数になったとき、2nd-eNBに、SPSの設定の無効を要求するメッセージを通知する。
 SPSの設定の無効を要求するメッセージを受信した2nd-eNBは、上りSPSの設定を無効にすると決定してもよい。
 前述の情報をeNB間で通知するためには、X2シグナリングあるいはS1シグナリングを用いてもよい。X2シグナリングで通知、あるいはMMEを介してS1シグナリングで通知してもよい。
 (6-2)2nd-eNBは、SPSのタイミングの、1st-eNBでの上り電力を測定して検出する。
 1st-eNBは、2nd-eNBに、予め、1st-eNBの上りキャリア周波数、帯域幅を通知しておくとよい。2nd-eNBに対して設定されたSPSのタイミングで、1st-eNBもSPSを設定している場合、該SPSリソースを2nd-eNBに通知してもよい。
 2nd-eNBは、設定したSPSのタイミングにおいて、1st-eNBのキャリア周波数、帯域幅で、上り電力を測定する。前述のように1st-eNBがSPSを設定している場合、該SPSリソースにおける上り電力を測定してもよい。
 上り電力としては、受信信号強度(Received Signal Strength Indicator;略称:RSSI)、IoT(Interference over Thermal noise)などを測定するとよい。
 測定した上り電力が、予め定める閾値よりも高い場合、1st-eNBでデータが送信されたと判断する。予め定める閾値よりも低い場合、1st-eNBでデータが送信されなかったと判断する。
 1st-eNBでデータが送信されなかったと判断した場合、2nd-eNBは、上りSPSの設定を無効にすると決定してもよい。
 本変形例で開示した、eNBが、上りSPSの設定を無効にするか否かを判断する方法は、実施の形態4の変形例1で開示した、インプリシットリリースを開始することを判断する方法にも適用することができる。
 本変形例で開示した方法を用いることによって、実施の形態4の変形例1で開示した方法と同様の効果を得ることができる。
 また、インプリシットリリースを行う必要がなく、即座に、SPSの設定を無効にして、SPSリソースをリリースすることが可能となる。したがって、より一層PUSCHリソースの使用効率の向上が可能となる。
 実施の形態5.
 実施の形態4で示した課題を解決する他の方法を開示する。設定されたSPSのタイミングで上り送信データが無い場合のパディング送信と、設定されたSPSのタイミングで上り送信データが有る場合のパディング送信とを異ならせる。
 UEは、上り送信データが無い場合は、上り送信データが無い場合のパディング送信を行う。UEは、上り送信データが有る場合は、上り送信データが有る場合のパディング送信を行う。eNBは、異なるパディング送信を受信することによって、設定されたSPSのタイミングでUEからの上り送信データの有無を判断する。eNBは、上り送信データが無い場合のパディング送信を受信した場合、上り送信データが無いと判断して、インプリシットリリースを行う。eNBは、上り送信データが有る場合のパディング送信を受信した場合、上り送信データが有ると判断して、上り送信データが無い場合のパディング送信とはカウントしない。あるいは、上りインプリシットリリースを行わないとしてもよい。
 図17および図18は、上り送信データが無い場合のパディング送信と、上り送信データが有る場合のパディング送信とを異ならせる方法を説明する図である。1st-eNBをMeNBとし、2nd-eNBをSeNBとする。上り送信データのデータ量がDRATの閾値(Th)以下の場合を示している。SeNBにSPSが設定された場合を示している。
 図17は、SeNBに対して設定されたSPSのタイミングで上り送信データが無い場合を示している。図18は、SeNBに対して設定されたSPSSPSのタイミングで上り送信データが有る場合を示している。上り送信データが無い場合のパディング送信を、「パディング(A)送信」とする。上り送信データが有る場合のパディング送信を、「パディング(B)送信」とする。
 図17および図18は、図9と類似しているので、主として異なる部分について説明する。
 図17に示すように、UE905は、SeNB902に対して設定されたSPSのタイミングで、上り送信データが無い場合、矢符「1601」に示すように、SeNB902に対してパディング(A)送信を行う。上り送信データが無いので、UE905からMeNB901に上りデータは送信されない。
 図18に示すように、UE905は、SeNB902に対して設定されたSPSのタイミングで、上り送信データが有る場合、矢符「1602」に示すように、SeNB902に対してパディング(B)送信を行う。上り送信データが有るので、矢符「1603」に示すように、UE905からMeNB901に上りデータが送信される。
 図19および図20は、上り送信データが無い場合のパディング送信と、上り送信データが有る場合のパディング送信とを異ならせる方法を説明する図である。上り送信データが無い場合のパディング送信を、「パディング(A)送信」とする。上り送信データが有る場合のパディング送信を、「パディング(B)送信」とする。
 1st-eNBをMeNBとし、2nd-eNBをSeNBとする。MeNB、SeNBともにSPSが設定された場合を示している。図19は図13と、図20は図15と類似しているので、主として異なる部分について説明する。
 図19は、上り送信データが無い場合のパディング(A)送信について示している。
 ステップST1008において、SeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。
 SeNBからSPSのアクティベートを受信したUEは、設定されたリソースでSPSを実行する。
 ステップST1701において、SeNBに対して設定されたSPSのタイミングで、UEで上りデータが発生しない場合を考える。
 この場合、ステップST1701において、UEは、SeNBに対して、上り送信データが無い場合のパディング(A)送信を行う。
 ステップST1701からステップST1702において、SeNBに対して設定されたSPSのタイミングで、連続してUEで上りデータが発生しない場合、同様に、UEは、SeNBに対してパディング(A)送信を行う。
 SeNBに対して、リリース前空送信回数として設定される回数連続して上り送信データが発生せず、パディング(A)送信が行われた場合、インプリシットリリースを行う。
 インプリシットリリースによって、ステップST1204において、eNBは、設定されたSPSリソースをリリースする。ステップST1204において、UEは、設定されたSPSリソースをクリアする。
 図20は、上り送信データが有る場合のパディング(B)送信について示している。
 ステップST1008において、SeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。
 SeNBからSPSのアクティベートを受信したUEは、設定されたリソースでSPSを実行する。
 ステップST1801において、SeNBに対して設定されたSPSのタイミングで、UEで上りデータが発生する場合を考える。ここで、発生する上りデータがDRATの閾値よりも小さいデータ量のデータであるとする。この場合、MeNBに上りデータが送信されるが、SeNBには上りデータが送信されない。実施の形態3で開示した方法を適用し、SeNBに対して、パディング送信を行うこととする。
 ただし、本実施の形態で開示する方法では、ステップST1801において、UEは、SeNBに対して上り送信データが有る場合のパディング(B)送信を行う。
 ステップST1801からステップST1802において、SeNBに対して設定されたSPSのタイミングで、連続してUEで上りデータが発生するが、DRATの閾値よりも小さいデータ量のデータで、SeNBに対して上りデータが送信されない場合、同様に、UEは、SeNBに対してパディング(B)送信を行う。
 SeNBに対して、リリース前空送信回数として設定される回数連続してパディング(B)送信が行われたとしても、インプリシットリリースを行わない。
 したがって、ステップST1204において、eNBは、設定されたSPSリソースをリリースせず、ステップST1204において、UEは、設定されたSPSリソースをクリアしない。
 したがって、SeNBに対してリリース前空送信回数として設定される回数連続してパディング(B)送信が行われた後、ステップST1204において、SeNBに対して設定されたSPSのタイミングで、UEでDRATの閾値以上のデータ量の上りデータが発生した場合、ステップST1401において、UEは、SeNBに、設定されているSPSリソースで、上りデータの送信を行うことが可能となる。
 このようにすることによって、上り送信データがあるにも関わらず、インプリシットリリースが行われてしまうことを防ぐことができる。UEでDRATの閾値以上の上り送信データが発生した場合に、SeNBで設定されたSPSリソースを該上りデータの送信に用いることが可能となる。
 前述のように、上り送信データが無い場合のパディング送信と、上り送信データが有る場合のパディング送信とを異ならせることによって、eNBは、設定されたSPSのタイミングでUEからの上り送信データの有無を判断することが可能となる。
 eNBは、上り送信データが無い場合のパディング送信を受信した場合、上り送信データが無いと判断することができる。UEからの上り送信データが無いので、eNBは、インプリシットリリースを行う場合のパディング送信としてカウントすればよい。
 eNBは、上り送信データが有る場合のパディング送信を受信した場合、上り送信データが有ると判断することができる。UEからの上り送信データが有るので、eNBは、インプリシットリリースを行う場合のパディング送信としてカウントしないようにする。
 UEからの上り送信データが無い場合のパディング送信のみをカウントすることによって、UEからの上り送信データの発生が実際に無い場合のパディング送信が、リリース前空送信回数として設定される回数連続して行われた場合に、インプリシットリリースを行うことが可能となる。
 上り送信データが無い場合のパディング送信と、上り送信データが有る場合のパディング送信とを異ならせる方法を開示する。
 上り送信データが無い場合のパディング送信については、実施の形態1で示した、従来のパディング送信、すなわち、パディングビットおよびパディングBSRの少なくとも一方を含むMAC PDUを送信する、とするとよい。
 上り送信データが有る場合のパディング送信を、従来のパディング送信と異ならせる。
 上り送信データが有る場合のパディング送信では、MACレイヤの処理を従来と異ならせるとよい。従来のパディング送信のMAC PDUと異なるMAC PDUの構成方法の具体例として、以下の(1)~(3)の3つを開示する。
 (1)新たなMAC CE(Control Element)を設ける。
 (2)パディングビットに特定の値を設定する。
 (3)ヘッダに特定の値を設定する。
 前述の(1)の方法として、上り送信データが有る場合のパディング送信であることを示すMAC CEを設けるとよい。
 例えば、送信の有無を示すMAC CEを設ける。従来のパディングビットおよびパディングBSRの少なくとも一方に加えて、送信の有無を示すMAC CEを含めるとよい。送信が有ることを示すMAC CEであってもよい。
 あるいは、パディング送信の種類を示すMAC CEを設けてもよい。上り送信データが無い場合のパディング送信か、上り送信データが有る場合のパディング送信かを示すMAC CEとするとよい。
 あるいは、インプリシットリリースの有無を示すMAC CEを設けてもよい。このMAC CEが含まれたパディング送信が、インプリシットリリースを行わせるか、インプリシットリリースを行わせないかを示す。
 このようにすることによって、従来のパディング送信と異ならせることができる。
 前述の(2)の方法として、パディングビットに、上り送信データが有る場合のパディングビットであることを示す特定の値を設定するとよい。従来、パディングビットか否かはヘッダで判断するので、パディングビットは何であってもよかった。ここでは、新たに、上り送信データが有る場合のパディングであることを示す特定の値を設定する。eNBは、パディングビットを復調することによって、上り送信データが有る場合のパディング送信か否かを認識することができる。
 前述の(3)の方法として、ヘッダに、上り送信データの有無を示す値を設けるとよい。例えば、パディングビットのヘッダに、特定の値として、上り送信データの有無を示す値を付加する。これによって、送信データが有ることを示すヘッダの場合、上り送信データが有る場合のパディング送信であることを認識することができる。
 あるいは、パディングBSRのヘッダに、該特定の値を付加してもよい。これによって、同様の効果を得ることができる。
 あるいは、上り送信データが有る場合のパディング送信であることを示すMAC CEのヘッダに、該特定の値を付加してもよい。これによって、MAC CEとヘッダの両方で上り送信データが有るか否かを判断することが可能となる。したがって、誤動作を低減することが可能となる。
 このように、上り送信データが有る場合のパディング送信として、MACレイヤの処理を従来と異ならせることによって、従来のパディング送信と異ならせることが可能となる。
 他の方法としては、上り送信データが有る場合のパディング送信として、PHYレイヤの処理を従来と異ならせてもよい。
 例えば、上り送信データが有る場合のパディング送信を行うPUSCHに用いるリファレンスシグナルを、従来の上り送信データが無い場合のパディング送信を行うPUSCHに用いるリファレンスシグナルと異ならせる。
 あるいは、上り送信データが有る場合のパディング送信を行うPUSCHがマッピングされる周波数軸上のリソースおよび時間軸上のリソースの少なくとも一方を、従来の上り送信データが無い場合のパディング送信を行うPUSCHがマッピングされる周波数軸上のリソースおよび時間軸上のリソースの少なくとも一方と異ならせてもよい。
 周波数軸上のリソースおよび時間軸上のリソースの少なくとも一方は、SPSリソースとして割当てられた周波数軸上のリソースおよび時間軸上のリソースの少なくとも一方内で、異ならせてもよい。すなわち、上り送信データが有る場合のパディング送信を行うPUSCHがマッピングされる該リソースと、上り送信データが無い場合のパディング送信を行うPUSCHがマッピングされる該リソースとが、どちらも、SPSリソースとして割当てられたリソース内に存在することとなる。これによって、設定されたSPSリソース外のリソースを用いなくて済むので、必要となるリソースの増大を抑制することができる。
 SPSリソース内で異ならせる方法としては、時間軸上のリソースで異ならせてもよい。例えば、スロット毎で異ならせる。シンボル毎でもよい。あるいは、周波数軸上のリソースで異ならせてもよい。例えば、サブキャリアで異ならせる。リソースブロック毎でもよい。
 SPSリソースとは別に無線リソース(周波数軸上のリソース-時間軸上のリソース)を設けてもよい。例えば、送信データが無い場合は、SPSリソースでパディング送信とする。送信データが有る場合は、別に設定された無線リソースでパディング送信とする。これによって、従来のパディング送信に関しては、メカニズムを変える必要がないので、制御が容易になる。別に設定された無線リソースは、複数のUEで使用してもよい。具体的には、多重するとよい。例えば、時間多重、周波数多重、およびコード多重などを行うとよい。あるいは、衝突ベースの共用でもよい。eNBが、UEが送信したPUSCHのRSを使用してUE毎に分解するとよい。
 他の方法としては、上り送信データの有無で、L1/L2制御信号での送信を行うか、パディング送信を行うかを切替えてもよい。例えば、上り送信データが有る場合には、パディング送信の代わりにL1/L2制御信号を用いた送信を行い、上り送信データが無い場合には、従来のパディング送信を行う。eNBは、L1/L2制御信号で受信したか、従来のパディング送信で受信したかによって、上り送信データの有無を認識することが可能となる。上り送信データが有る場合のL1/L2制御信号には、実施の形態2の変形例1で開示した方法を用いてもよい。
 このようにすることによって、2nd-eNBが、UEの送信データの有無を認識することが可能となる。2nd-eNBに設定されたSPSのタイミングで上り送信データが無い場合は、インプリシットリリースを実行することが可能となる。2nd-eNBにSPSリソースで上り送信データが有る場合は、インプリシットリリースを実行しないようにすることができる。
 したがって、実施の形態3で開示したように、2nd-eNBに設定されたSPSのタイミングで上り送信データが有る場合を考慮してインプリシットリリースを実行しないようにする場合に生じる、長期にわたるSPSリソースのリザーブが不要となる。これによって、PUSCHリソースの使用効率の向上が可能となる。
 本実施の形態では、DCが設定されており、2nd-eNBに設定されたSPSのタイミングで上り送信データが有るか無いかによって、パディング送信を異ならせる方法を開示した。これに限らず、一つのeNBに、異なるパディング送信を送るような場合に、本実施の形態で開示した方法を適用してもよい。
 例えば、UEは、上り送信データの発生量の時間変化を測定し、その測定結果を用いて、上り送信タイミングにおいて上り送信データが発生する確率を導出する。言い換えると、UEは、上り送信データの発生量の時間変化の測定結果を用いて、上り送信タイミングにおいて上り送信データが発生する確率を予測する。上り送信タイミングにおいて上り送信データが発生する確率を導出するために、統計的処理を行ってもよい。
 上り送信タイミングにおいて上り送信データが発生する確率に応じて、パディング送信を異ならせるようにしてもよい。上り送信データの発生量の時間変化の測定は、ベアラ毎に行ってもよい。あるいは、コンテンツ毎、または、アプリケーション毎に行ってもよい。
 UEは、上り送信タイミングにおいて上り送信データが発生する確率が、予め定める閾値以上か否かを判断する。閾値は、予めシステムとして決められていてもよいし、eNBが設定してeNBから通知されてもよい。上り送信データが発生する確率が、予め定める閾値以上か否かによって、パディング送信を異ならせる。
 UEは、設定された上りSPSタイミングにおいて、実際に上り送信データが発生しなかった場合、パディング送信を行うことになる。このとき、上り送信データが発生する確率が閾値以上の場合、パディング(B)送信を行う。上り送信データが発生する確率が閾値以上でない場合、すなわち上り送信データが発生する確率が閾値未満である場合、パディング(A)送信を行う。
 eNBは、UEから、リリース前空送信回数として設定される回数、連続してパディング(B)を受信したとしても、SPSリソースをリリースしない。また、UEは、eNBに、リリース前空送信回数として設定される回数連続してパディング(B)を送信したとしても、設定されたSPSリソースをクリアしない。このようにすることによって、上り送信データが発生する確率が高い場合は、SPSリソースをリリースしないようにすることができる。
 例えば、本来は上り送信データが発生するが、何らかの遅延によって偶然、その上り送信タイミングで上り送信データが発生しなかったような場合に、SPSリソースをリリースしないようにすることができる。したがって、まだ上り送信データの発生が続くような場合に、SPSリソースをリリースしないようにすることができ、次のSPSタイミングでSPSリソースを用いて上りデータを送信することが可能となる。
 eNBは、UEから、リリース前空送信回数として設定される回数連続してパディング(A)を受信した場合、SPSリソースをリリースする。また、UEは、eNBに、リリース前空送信回数として設定される回数連続してパディング(A)を送信した場合、設定されたSPSリソースをクリアする。このようにすることによって、上り送信データが発生する確率が低い場合は、SPSリソースをリリースすることができる。
 以上のようにすることによって、長期にわたるSPSリソースのリザーブが不要となる。これによって、PUSCHリソースの使用効率の向上が可能となる。
 また、以上に開示した方法では、パディング送信を2種類としたが、これに限らず、複数の異なるパディング送信を設けてパディング送信を行うようにしてもよい。eNBは、パディング送信の種類によって動作を変えることが可能となる。
 例えば、UEは、下り受信品質に応じて、パディング送信を異ならせる。下り受信品質の閾値を2つ設けて、3つの受信品質状態に分割し、3つの受信品質状態に応じて、各々異なるパディング送信を行うようにしてもよい。このようにすることによって、eNBは、UEの下り受信品質がどの程度かを認識することが可能となる。
 また、eNBは、UEにパディング送信を行わせるために、UEからの上りスケジューリング要求が無い場合でも、ULリソースをスケジューリングし、UEに上りグラントを通知してもよい。UEは、上り送信データが無いので、上りグラントで割り当てられた上りリソースでパディング送信を行うことになる。このパディング送信を前述の受信品質状態に応じて異なるパディング送信としてもよい。このようにすることによって、eNBは、適時に、動的に、UEの下り受信品質を認識することができる。以上のようにすることによって、eNBは、UEに対して、多様で柔軟な制御を行うことが可能になる。
 実施の形態6.
 予め定めるベアラに対してULスプリットベアラが設定された場合、該ベアラのデータの発生状況に応じて、2nd-eNBにおいて上りSPSが設定される。
 2nd-eNB側で設定された上りSPSのタイミングにおいて、上り送信データが発生した場合、2nd-eNBに対してSPSリソースで上り送信が行われるだけでなく、ベアラの設定条件によっては、該SPSのタイミングにおいて1st-eNBに対しても上り送信が行われることになる。
 該SPSのタイミングにおいて、1st-eNBに対してSPSの設定が行われていないと、1st-eNBに対してSR信号の送信から開始しなければならなくなる。
 上り送信において1st-eNBも使えるにも関わらず、1st-eNBに対する遅延が生じ、送信遅延時間の増大を引き起こす。本実施の形態では、このような課題を解決する方法を開示する。
 1st-eNBに対して、2nd-eNBに対して行ったSPSの設定と同じSPSの設定を行う。ULスプリットベアラが設定された場合に、1st-eNBに対して、該SPSの設定を行うとしてもよい。
 SPSの設定方法を開示する。1st-eNBに対するSPSに、2nd-eNBに対するSPSの設定と同じ設定を行う。各eNBに対して複数のSPSの設定を可能とするとよい。
 同じ設定とするパラメータは、全部のパラメータでなくてもよい。同じ設定とするパラメータとしては、SPSの間隔がある。異なる設定とするパラメータとしては、SPS用のC-RNTIがある。ULのリリース前空送信回数は、同じとしてもよいし、異なる設定としてもよい。
 1st-eNBにSPSが設定されている場合に、2nd-eNBにSPSが設定された場合、1st-eNBは、既に設定されているSPSの設定に加えて2nd-eNBに対するSPSの設定と同じ設定を行うとよい。1st-eNBで既に設定されているSPSの設定と、2nd-eNBに対するSPSの設定とが同じ場合、例えば、SPSのタイミングが同じ場合も、重複して設定するとよい。
 あるいは、1st-eNBで既に設定されているSPSの設定と、2nd-eNBに対するSPSの設定とが同じ場合、例えば、SPSのタイミングが同じ場合、重複して設定せずに、1st-eNBで既に設定されているSPSの設定と、2nd-eNBに対するSPSの設定とを合わせたSPSの設定を行うとよい。
 このようにすることによって、1st-eNBで既にSPSが設定されている場合に、既存のSPSの設定を中断することなく、1st-eNBに対して、2nd-eNBに対するSPSの設定と同じ設定を行うことが可能となる。
 SPSの設定をUEに通知して設定する方法を開示する。2nd-eNBは、2nd-eNBに対するSPSの設定をUEに通知する。さらに、2nd-eNBは、1st-eNBに、2nd-eNBに対するSPSの設定を通知する。この通知には、X2シグナリングを用いるとよい。あるいは、MMEを介して、S1シグナリングを用いて行ってもよい。これによって、1st-eNBは、2nd-eNBのSPSの設定を認識することが可能となる。1st-eNBは、2nd-eNBのSPSの設定の同じ設定とするパラメータを自eNBのSPSの設定に適用する。同じ設定とするパラメータとしては、SPSの間隔がある。ULのリリース前空送信回数は同じとしてもよいし、異なる設定としてもよい。SPS用のC-RNTIは、自eNBが独立に設定する。1st-eNBは、これらのSPSの設定をUEに通知する。
 このようにすることによって、1st-eNBは、2nd-eNBと同じSPSの設定をUEに設定することが可能となる。
 他のSPSの設定方法を開示する。1st-eNBに対するSPSに、2nd-eNBに対するSPSの設定と同じ設定を行う。各eNBに対して複数のSPSの設定を可能とするとよい。
 同じ設定とするパラメータは、全部のパラメータとする。SPSの間隔、SPS用のC-RNTI、およびULのリリース前空送信回数を同じ設定とする。
 該SPSの設定をUEに通知して設定する方法を開示する。2nd-eNBは、2nd-eNBに対するSPSの設定をUEに通知する。さらに、2nd-eNBは、1st-eNBに、2nd-eNBに対するSPSの設定を通知する。この通知には、X2シグナリングを用いるとよい。あるいは、MMEを介して、S1シグナリングを用いて行ってもよい。これによって、1st-eNBは、2nd-eNBのSPSの設定を認識することが可能となる。UEは、2nd-eNBに対するSPSの設定を、1st-eNBに対するSPSの設定に適用する。
 このようにすることによって、1st-eNBは、2nd-eNBと同じSPSの設定をUEに設定することが可能となる。
 また、このようにすることによって、1st-eNBからUEに、SPSの設定を通知する必要が無くなる。したがって、エアインタフェース上のシグナリング量を削減することが可能となる。
 2nd-eNBと1st-eNBとで同じSPS C-RNTIとする方法を開示する。2nd-eNBと1st-eNBとの間で予め協調して同じ値を設定する。例えば、2nd-eNBがSPSを設定する場合、予め、1st-eNBに対して使用するSPS C-RNTIを通知する。
 1st-eNBは、通知されたSPS C-RNTIを使用可能な場合、2nd-eNBにAckを通知する。これによって、1st-eNBと2nd-eNBとは、同じSPS C-RNTIを使用することが可能となる。
 1st-eNBは、通知されたSPS C-RNTIを使用不可能な場合、2nd-eNBにNackを通知する。この場合、2nd-eNBは、再度他のSPS C-RNTI値を選択し、1st-eNBに通知する。1st-eNBからAckを受信するまで繰り返す。このような方法を行うことによって、2nd-eNBと1st-eNBとで同じSPS C-RNTIを用いることが可能となる。
 2nd-eNBと1st-eNBとの間の該情報の通知には、X2シグナリングを用いるとよい。あるいは、MMEを介して、S1シグナリングを用いて行ってもよい。
 SPSアクティベートのタイミングが、SPSの開始タイミングを決定する。したがって、両eNBでSPSアクティベートタイミングを合わせる方法が必要となる。
 2nd-eNBは、SPSアクティベートをUEに通知することを決定した場合、SPSアクティベートをUEに通知するタイミングを、1st-eNBに通知する。あるいは、SPSアクティベートをUEに通知したタイミングを、1st-eNBに通知する。
 タイミング情報としては、無線フレーム番号およびサブフレーム番号の少なくとも一方とするとよい。
 1st-eNBは、受信したタイミング情報を用いて、2nd-eNBのSPSの設定がUEに対してアクティベートされるタイミングを導出し、該タイミングに合わせるように、SPSアクティベートをUEに通知する。
 2nd-eNBがUEにSPSアクティベートを通知するタイミングに間に合わない場合、以降のSPSの間隔後のタイミングに合わせてUEに通知すればよい。可能な限り早く通知すればよい。
 このようにすることによって、両eNBでSPSアクティベートタイミングを合わせることができ、両eNBに対するSPSのタイミングを一致させることが可能となる。
 2nd-eNBと1st-eNBとの間の該情報の通知には、X2シグナリングを用いるとよい。あるいは、MMEを介して、S1シグナリングを用いて行ってもよい。
 図21は、1st-eNBに対して、2nd-eNBに対して行ったSPSの設定と同じSPSの設定を行う方法について説明する図である。1st-eNBをMeNBとし、2nd-eNBをSeNBとする。
 図21では、DRATの閾値を参照符号「1901」で示す。
 SeNBは、SPSの設定を決定する。ステップST1902において、SeNBは、UEに、RRC個別シグナリングで、SPSの間隔、リリース前空送信回数、およびSPS C-RNTIを通知する。
 また、ステップST1903において、SeNBは、MeNBに、設定したSPS構成を通知する。設定したSPS構成は、X2シグナリングで通知するとよい。通知するSPS構成としては、SPSの間隔とするとよい。また、リリース前空送信回数も通知してもよい。
 MeNBは、受信したSeNB構成と同じ値を、MeNBに対するSPS構成として設定する。SPS C-RNTIは、SeNBと同じ値を用いずに、MeNBが選択する。
 ステップST1904において、MeNBは、UEに、RRC個別シグナリングで、MeNBに対するSPS構成およびSPS C-RNTIを通知する。
 UEは、SeNBおよびMeNBから通知されたSPS C-RNTIを用いて、PDCCHを検出する。
 ステップST1905において、SeNBは、MeNBに、SPSアクティベートのタイミングを通知する。SPSアクティベートのタイミングを受信したMeNBは、SeNBがSPSをアクティベートするタイミングを認識することが可能となる。
 ステップST1906およびステップST1907において、SeNBおよびMeNBは、SeNBが決定したアクティベートのタイミングで、ぞれぞれ、UEにSPSアクティベートを送信する。これによって、SeNB、MeNBともに、UEに対して、同じSPSアクティベートのタイミングとすることが可能となる。
 ステップST1905におけるSeNBからMeNBへのSPSアクティベートのタイミングの通知と、ステップST1906におけるSeNBからUEへのSPSアクティベートのタイミングの通知との順序は逆になってもよい。
 SeNBは、SPSアクティベートをUEに通知したタイミングを、MeNBに通知する。これによって、SeNBで実際にSPSアクティベートを行ったタイミングをMeNBに通知することが可能となる。実際のSPSアクティベートタイミングを通知することによって、SeNBとMeNBとでSPSアクティベートタイミングがずれてしまうような誤動作の発生を低減することが可能となる。
 MeNBからのSPSリソースのスケジューリングと、SeNBからのSPSリソースのスケジューリングとは異なっていてもよい。MeNB、SeNBは、それぞれ、個別にスケジューリングしてもよい。
 UEは、SPSアクティベートを受信することによって、SeNBとMeNBとに対してSPSがアクティベートされたことを認識する。
 ステップST1908およびステップST1909において、UEは、設定されたSPSのタイミングで、SeNBおよびMeNBに、上りデータの送信を行う。
 ステップST1910において、UEは、設定されたSPSのタイミングで、UEの上り送信データのデータ量がDRATの閾値よりも小さい場合、SeNBに対してパディング送信を行う。MeNBに対しては上りデータの送信を行う。
 SeNBに対して、パディング送信が、リリース前空送信回数として設定される回数連続して行われた場合、ステップST1911において、eNBは、SeNBに対して設定されたSPSリソースをリリースする。UEもSeNBに対して設定されたSPSリソースをクリアする。
 MeNBに対しては、上りデータの送信が行われているので、ステップST1911では、MeNBに対して設定されたSPSリソースをリリースしない。上り送信データがある場合は、上りデータの送信を行う。
 SPSリソースのリリースについて開示する。インプリシットリリースが生じたeNBは、他のeNBにその旨を通知してもよい。例えば、2nd-eNBで、設定されたSPSに対してインプリシットリリースが生じた場合、2nd-eNBは、インプリシットリリースが生じたことを1st-eNBに通知する。あるいは、インプリシットリリースによってSPSリソースをリリースあるいはSPSの設定を無効にしたことを通知してもよい。
 2nd-eNBのSPSリソースのリリースを受信した1st-eNBは、1st-eNBで設定していた2nd-eNBと同じSPSの設定を無効にしてもよい。また、適宜、1st-eNBは、UEに、1st-eNBで設定していた2nd-eNBと同じSPSの設定を無効にすることを通知してもよい。UEは、該通知を受信することによって、1st-eNBで設定していた2nd-eNBと同じSPSの設定を無効にすることが可能となる。
 このようにすることによって、1st-eNBは、2nd-eNBと同じSPSの設定を無効にすることが可能となる。
 また、実施の形態4の変形例2で開示した上りSPSの設定を無効にすることを示す情報をUEに通知したeNBは、他のeNBにその旨を通知してもよい。あるいは、上りSPSの設定を無効にすることを示す情報をUEに通知するeNBは、予め、他のeNBにその旨を通知してもよい。
 例えば、2nd-eNBは、上りSPSの設定を無効にすることを示す情報をUEに通知した場合、1st-eNBに、上りSPSの設定を無効にすることを示す情報をUEに通知したことを通知する。
 あるいは、2nd-eNBは、上りSPSの設定を無効にすることを示す情報をUEに通知する場合、1st-eNBに、上りSPSの設定を無効にすることを示す情報をUEに通知することを通知する。この場合、上りSPSの設定を無効にするタイミング、あるいは、上りSPSの設定を無効にすることを示す情報をUEに通知するタイミングを、1st-eNBに通知してもよい。
 2nd-eNBから、前述した上りSPSの設定を無効にすることを示す情報を受信した1st-eNBは、上りSPSの設定を無効にすることを示す情報を用いて、1st-eNBで設定していた2nd-eNBと同じSPSの設定を無効にしてもよい。あるいは、1st-eNBで設定していた2nd-eNBと同じSPSの設定を無効にしないと判断してもよい。あるいは、1st-eNBで設定していた2nd-eNBと同じSPSの設定を修正設定してもよい。例えば、先に1st-eNBに対して設定されていたSPSの設定に戻してもよい。1st-eNBは、負荷状況などを考慮して、柔軟に、自eNBに設定しているSPSの設定を変更することが可能となる。
 また、適宜、1st-eNBは、UEに、1st-eNBで設定していた2nd-eNBと同じSPSの設定を無効にすることを通知してもよい。UEは、該通知を受信することによって、1st-eNBで設定していた2nd-eNBと同じSPSの設定を無効にすることが可能となる。
 1st-eNBは、2nd-eNBが上りSPSの設定を無効にすることを示す情報をUEに通知するタイミングに間に合わない場合、次のSPSの間隔後のタイミングでUEに通知してもよい。あるいは、次のSPSの間隔後のタイミングを待たずにUEに通知してもよい。あるいは、即座に通知してもよい。
 このようにすることによって、1st-eNBは、2nd-eNBと同じSPSの設定を無効にすることが可能となる。
 2nd-eNBに対して設定されたSPSのタイミングにおいて、2nd-eNBだけでなく、1st-eNBに対しても上りデータの送信が行わる場合があることを述べた。
 本実施の形態で開示した方法を用いることによって、2nd-eNBに対して設定されたSPSのタイミングにおいて、1st-eNBに対してSPSの設定が行わることになる。したがって、UEは、2nd-eNBだけでなく、1st-eNBに対しても、SPSのタイミングにおいて、上りスケジューリング要求を送信することなく、上りデータを送信することが可能となる。これによって、1st-eNBに対する送信遅延時間の削減を図ることができる。
 実施の形態7.
 ULスプリットベアラにおいて、UEは、上り送信データのデータ量がDRATの閾値以下の場合、2nd-eNBに上りデータを送信しない。
 2nd-eNBに対して上りデータの送信が無いにも関わらず、パディング送信を行うことは、UEの消費電力の無駄となる。
 特に、パディング送信が予め定める回数連続して発生しても、インプリシットリリースを行わない場合、パディング送信の回数によってインプリシットリリースを判断するわけではないので、パディング送信を行うことは無駄となる。
 このような問題を解決するために、インプリシットリリースが行われない場合、パディング送信をしないとするとよい。
 UEは、設定されたSPSのタイミングで2nd-eNBに対して上りデータの送信が無い場合、かつ、インプリシットリリースが行われない場合、パディング送信をしない。
 図22は、インプリシットリリースが行われない場合にパディング送信をしないようにする方法を説明する図である。1st-eNBをMeNBとし、2nd-eNBをSeNBとする。MeNB、SeNBともにSPSが設定された場合を示している。図22は、図15と類似しているので、主として異なる部分について説明する。
 ステップST1008において、SeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。該アクティベートに、上りSPSの設定を無効にしないことを示す情報を含める。これによって、UEは、インプリシットリリースを行わず、上りSPSの設定を無効にしないようにすることを認識することができる。
 SeNBからSPSのアクティベートを受信したUEは、設定されたリソースでSPSを実行するとともに、インプリシットリリースを行わず、上りSPSの設定を無効にしない。たとえ、UEがSeNBに対して予め定める回数上り送信データが発生しなかったとしても、eNB、UEともにインプリシットリリースを行わず、上りSPSの設定を無効にしないように設定する。
 ステップST1301において、SeNBに対して設定されたSPSのタイミングで、UEでDRATの閾値よりも小さいデータ量の上りデータが発生した場合を考える。
 この場合、ステップST1301において、UEは、MeNBに上りデータを送信する。SeNBに対しては上り送信データが発生しない。
 インプリシットリリースが行われない場合に、上り送信データが発生しない場合は、パディング送信をしないので、ステップST2001において、UEは、SeNBに対して、パディング送信を行わない。
 ステップST2001からステップST2002において、SeNBに対して設定されたSPSのタイミングで、UEでDRATの閾値よりも小さいデータ量の上りデータが発生する場合、同様に、ステップST1301からステップST1302において、UEは、MeNBに上りデータの送信を行うが、SeNBに対してはパディング送信を行わない。
 SeNBに対して、リリース前空送信回数として設定される回数連続して上り送信データが発生しない場合、UEは、そのSPSリソースでパディング送信は行わない。このような場合、UEは、ステップST1008で受信した、インプリシットリリースを行わない。UEは、上りSPSの設定を無効にしない設定に従い、ステップST1204において、SPSリソースをクリアしない。eNBもSPSリソースをリリースしない。ステップST1204において、インプリシットリリースが行われず、SPSリソースがリリースされない。
 ステップST1204において、SeNBに対して設定されたSPSのタイミングで、UEでDRATの閾値以上のデータ量の上りデータが発生した場合、ステップST1401において、UEは、SeNBに、設定されているSPSリソースで、上りデータの送信を行うことが可能となる。
 このようにすることによって、インプリシットリリースが行われない場合、SeNBに対して上り送信データが発生しないときに、パディング送信を行わないようにすることが可能となる。UEは、パディング送信を行わないので、UEの消費電力を削減することが可能となる。また、SeNBに対して上り送信データが発生しないときに、パディング送信を行わないようにすることによって、上りリンクにおける干渉を低減することが可能となる。
 インプリシットリリースが行われる場合は、パディング送信が行われるようにしてもよい。インプリシットリリースを行う方法は、実施の形態4、実施の形態4の変形例1、および実施の形態4の変形例2において開示した方法を適用するとよい。eNBは、UEに、インプリシットリリースの開始の通知とともに、パディング送信を開始することを示す情報を通知するとよい。
 このようにすることによって、インプリシットリリースが行われない場合、2nd-eNBに対して上り送信データが発生しないとき、パディング送信を行わないようにすることが可能となる。また、インプリシットリリースが行われる場合、2nd-eNBに対して上り送信データが発生しないとき、パディング送信を行うようにすることが可能となる。
 これによって、インプリシットリリースを正常に動作させることが可能になるとともに、UEの消費電力を削減することが可能となる。
 インプリシットリリースが行われない場合、2nd-eNBに対して上り送信データが発生しないとき、パディング送信をしないことを設定する方法の具体例として、以下の(1),(2)の2つを開示する。
 (1)予め規格などで静的に決めておく。
 (2)パディング送信をしないことを示す情報を設けて、eNBからUEに通知する。
 前述の(1)の方法では、インプリシットリリースが行われない場合、2nd-eNBに対して上り送信データが発生しないとき、パディング送信をしないことを静的に決めておく。これを予め規格などで決めておくことによって、eNBとUEとで認識することが可能となるので、整合のとれた動作が可能となり、誤動作を低減させることができる。
 前述の(2)の方法では、パディング送信をしないことを示す情報をeNBからUEに通知することによって、2nd-eNBに対して上り送信データが発生しないとき、パディング送信をしないことを、動的に設定することが可能となる。eNBは、2nd-eNBでインプリシットリリースが行われない場合に、UEに該情報を通知してもよい。UEは、パディング送信をしないことを示す情報を受信すると、2nd-eNBに対して上りデータが発生しない場合に、パディング送信を行わない。
 前述の(2)のパディング送信をしないことを示す情報は、eNBからUEに通知するとよい。eNBとしては、1st-eNBであってもよいし、2nd-eNBであってもよい。例えば、2nd-eNBからUEに通知するときに、2nd-eNBから直接UEに通知してもよいし、2nd-eNBから1st-eNBを介してUEに通知してもよい。eNB間の情報の通知には、X2シグナリングを用いてもよい。あるいは、MMEを介してS1シグナリングを用いてもよい。
 パディング送信をしないことを示す情報をeNBからUEに通知するためのシグナリング方法の具体例として、以下の(1)~(3)の3つを開示する。
 (1)RRCシグナリング。例えば、SPS構成の設定のためのシグナリングに含めて通知してもよい。
 (2)MACシグナリング。例えば、パディング送信をしないことを示す情報を含むMAC CEを設けて、MACシグナリングによって通知してもよい。
 (3)L1/L2シグナリング。例えば、PDCCHあるいはEPDCCH。例えば、SPSアクティベートに含めて通知してもよい。
 パディング送信をしないことを示す情報を設けて、eNBからUEに通知することを開示したが、パディング送信を行うことを示す情報を設けてもよい。パディング送信を行うことを示す情報は、eNBからUEに通知してもよい。これによって、インプリシットリリースが行われない場合に、2nd-eNBに対して上り送信データが発生しない場合、パディング送信の有無を動的に設定することが可能となり、2nd-eNBの通信状況および負荷状況に応じて柔軟な運用が可能となる。
 実施の形態8.
 実施の形態7では、設定されたSPSのタイミングで上り送信データが無い場合、パディング送信をしない方法を開示した。
 パディング送信をしないとした場合、eNBは、実際上りデータが送信されたにも関わらず受信できなかったのか、パディング送信が無かったために受信できなかったのかを識別することができなくなる。本実施の形態では、このような問題を解決する方法を開示する。
 パディング送信をしないことが設定された場合でも、HARQを動作させる。eNBは、パディング送信をしないことが設定された場合、HARQを動作させる。UEは、上り送信データがある場合、HARQを行い、上り送信データが無い場合、パディング送信も再送も行わない、とする。
 従来、設定されたSPSのタイミングで上り送信データが無い場合に行われるパディング送信は、HARQの対象となる。eNBは、パディング送信を受信することによって、上り送信データが送られたのか否かを判断することができる。したがって、UEは、設定されたSPSのタイミングで上り送信データが無い場合も、パディング送信を行い、eNBから送達受信不成功(受信不成功)信号であるNackを受信した場合は、パディング送信の再送を行うことになる。
 本実施の形態で開示した方法では、eNBはHARQを動作させるが、UEは、設定されたSPSのタイミングで上り送信データが無い場合、パディング送信を行わず、たとえeNBから受信不成功信号であるNackを受信したとしても、パディング送信の再送を行わないようにするという点で、従来の方法と異なる。
 UEは、パディング送信をしない場合に、eNBからNackを受信したとしても、パディング送信の再送を行わない。したがって、eNBは、UEからの再送が無いので、受信不成功となり、再度Nackを送信する。UEは、eNBから再度Nackを受信することとなる。このNackに対しても、UEは、パディング送信の再送を行わない。UEは、パディング送信もパディング送信の再送も行わないので、このような動作が繰り返されることになる。したがって、eNBは、UEにNackを送信し続けることになる。このような問題を解決する方法を開示する。
 eNBは、最大再送回数を設定するとよい。上りSPSリソースで初送が行われた場合のHARQについては、最大再送回数を設定するとよい。
 eNBは、受信不成功が続いたとき、最大再送回数だけNackを送信しても受信不成功の場合は、HARQを停止する。
 最大再送回数は、予め規格などで静的に決められてもよい。あるいはeNBが決定してもよい。これによって、通信状況および負荷状況に応じて動的に変更することが可能となる。あるいはOAM(operation administration and maintenance)が決定してもよい。これによって、複数のeNBの状況を考慮して決定することができる。あるいはオペレータが決定してもよい。システム設計パラメータの一つとして決定してもよい。
 本実施の形態で開示した最大再送回数は、従来HARQに設定されている最大再送回数と異なる設定としてもよい。例えば、本実施の形態で開示した最大再送回数を、従来HARQに設定されている最大再送回数よりも小さくするとよい。本実施の形態で開示した最大再送回数を小さくすることによって、上り送信データが無く、パディング送信が無い場合に、eNBからUEに送信するNackの数を減らすことが可能となる。これによって、Nack用の無線リソースの無駄を低減することが可能となる。
 図23は、パディング送信をしない場合のHARQの方法について説明する図である。1st-eNBをMeNBとし、2nd-eNBをSeNBとする。図23は、SeNBにSPSが設定された場合を示している。インプリシットリリースが行われない場合に、上り送信データが発生しない場合は、パディング送信をしないようにする場合について示している。ステップST2108において、SeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。該アクティベートに、上りSPSの設定を無効にしないことを示す情報を含める。これによって、UEは、インプリシットリリースが行われず、上り送信データが発生しない場合は、パディング送信をしないことを認識することができる。
 ステップST2101において、SeNBに対して設定されたSPSのタイミングで、UEでDRATの閾値以上のデータ量の上りデータが発生した場合を考える。この場合、ステップST2101において、UEは、SeNBに対して設定されたSPSリソースで、SeNBに上りデータを送信する。eNBは、UEからの上りデータを受信し、受信成功であったとする。この場合、ステップST2102において、SeNBは、受信成功信号であるAckをUEに送信する。UEは、Ackを受信した場合、上りデータがSeNBに受信されたと判断し、再送を行わない。
 次に、ST2103において、UEは、SeNBに、設定されたSPSのタイミングで、上りデータを送信する。SeNBは、UEからの上りデータを受信し、受信不成功であったとする。この場合、ステップST2104において、SeNBは、NackをUEに送信する。
 UEは、Nackを受信した場合、上りデータがSeNBに受信されなかったと判断し、ステップST2105において、SeNBに上りデータの再送を行う。このように、UEは、上りデータをSeNBに送信し、SeNBからNackを受信した場合は、上りデータの再送を行う。
 ステップST2105において、SeNBは、UEからの上りデータの再送を受信して、受信成功であったとする。この場合、ステップST2109において、SeNBは、AckをUEに送信する。
 UEは、Ackを受信した場合、上り再送データがeNBに受信されたと判断し、再送を行わない。
 次に、ステップST2106において、SeNBに対して設定されたSPSのタイミングで、UEでDRATの閾値より小さいデータ量の上りデータが発生した場合を考える。この場合、ステップST2110において、UEは、MeNBに上りデータを送信するが、SeNBに対して設定されたSPSリソースで上りデータを送信しない。ステップST2108において、上り送信データが発生しない場合は、パディング送信をしないようにすることを設定されているので、UEは、パディング送信も行わない。
 ステップST2106において、SeNBは、UEからのパディング送信が行われないので、受信不成功となる。この場合、ステップST2111において、SeNBは、NackをUEに送信する。
 UEは、Nackを受信してもよいし、Nackを受信しなくてもよい。UEは、Nackを受信したとしても、再送を行わない。また、UEは、パディング送信も行わない。
 ステップST2107において、SeNBは、UEから何も送信されないので、受信不成功となる。この場合、ステップST2112において、SeNBは、再度NackをUEに送信する。
 UEは、同様に、Nackを受信してもよいし、Nackを受信しなくてもよい。UEは、Nackを受信したとしても、再送を行わない。また、UEは、パディング送信も行わない。
 eNBは、Nackの送信回数が、最大送信回数に達した場合、HARQを停止する。仮に最大再送回数が設定されていない場合は、Nackの送信が繰り返されることになるが、本実施の形態では最大再送回数が設定されているので、HARQを停止することが可能となる。
 本実施の形態で開示した方法を用いることによって、UEから上りデータの送信が行われた場合に、HARQが動作することになり、上りデータの受信性能が向上する。
 また、UEは、上り送信データが無い場合は、たとえeNBからNackが送信されたとしても、再送することは無く、パディング送信もすることが無い。UEは、上りデータ送信を行ったときのみ、eNBからのNackに従って、再送を行えばよい。したがって、UEの送信は、上りデータの送信が行わる場合に限定されるので、消費電力の増大を低減することが可能となる。
 実施の形態8 変形例1.
 本変形例では、実施の形態8で示した課題を解決する他の方法を開示する。2nd-eNBは、2nd-eNB向けにデータが発生したか否かを判断する。2nd-eNBは、該結果を用いてHARQを動作させるか否かを判断する。
 2nd-eNB向けにデータが発生したか否かを判断する方法を開示する。2nd-eNBは、予め自eNBのSPSの設定を1st-eNBに通知する。SPSの設定としては、SPSのタイミングとするとよい。あるいは、SPSの間隔と、SPSアクティベートとをUEに通知したタイミングであってもよい。
 これによって、1st-eNBは、2nd-eNBで設定されたSPSのタイミングを認識することが可能となる。
 1st-eNBは、2nd-eNBのSPSのタイミングで、UEから発生した上り送信データのデータ量がDRATの閾値よりも小さいか否かを判断する。1st-eNBは、該判断結果を、2nd-eNBに通知する。2nd-eNBは、1st-eNBから受信した判断結果に基づいて、2nd-eNB自身向けにデータが発生したか否かを判断する。
 2nd-eNBは、1st-eNBから通知された判断結果が、DRATの閾値よりも小さい場合、2nd-eNB自身向けにデータが発生していないと判断する。
 2nd-eNBは、1st-eNBから通知された判断結果が、DRATの閾値以上の場合、2nd-eNB自身向けにデータが発生していると判断する。
 2nd-eNBが、HARQを動作させるか否かを判断する方法を開示する。2nd-eNBは、2nd-eNB自身向けにデータが発生したと判断した場合は、HARQを動作させる。
 2nd-eNBは、2nd-eNB自身向けにデータが発生していないと判断した場合は、HARQを停止させる。
 このような方法では、1st-eNBから2nd-eNBに情報を通知する必要がある。この場合、X2インタフェースあるいはS1インタフェースなどのバックホールで通信を行うので、時間的に2nd-eNBで行うHARQに即座に対応できない場合が生じる。
 しかし、たとえ、即座にHARQに対応できないとしても、バックホール通信などによる遅延の後には対応可能となる。したがって、延々とHARQが続くことを防ぐことができる。これによって、2nd-eNBのリソースの使用効率を向上させることが可能となる。
 1st-eNBに送信されたデータが、DRATの閾値よりも小さいにも関わらず、2nd-eNBにもデータが送信される場合がある。例えば、DRATの閾値を超えた場合の1st-eNBと2nd-eNBとのスケジューリング比率が1対2(1:2)と設定された場合などである。この場合、1st-eNBへの送信データのデータ量は、1/3となる。このような場合、DRATの閾値よりも小さくなる可能性がある。
 このような場合、2nd-eNB側でHARQが行われなくなってしまう。2nd-eMBにはデータ送信が行われるにも関わらず、HARQが行われなくなるので、問題となる。このような問題を解決する方法を開示する。
 1st-eNBは、1st-eNBと2nd-eNBとのスケジューリング比率を取得する。例えば、2nd-eNBが該スケジューリング比率を決定する場合、予め、2nd-eNBから1st-eNBに該スケジューリング比率を通知しておくとよい。1st-eNBが該スケジューリング比率を決定する場合は、通知する必要はない。
 1st-eNBは、スケジューリング比率を考慮して、DRATの閾値よりも小さいか否かを判断する。
 このようにすることによって、DRATの閾値を超えた場合の1st-eNBと2nd-eNBとのスケジューリング比率によって、1st-eNBに送信されたデータが、DRATの閾値よりも小さいにも関わらず、2nd-eNBにもデータが送信される場合に、HARQが動作しなくなることを防ぐことができる。
 したがって、2nd-eNBに対して、UEからの上り送信データが有る場合、該上り送信データの受信性能を向上させることができる。
 また、HARQを停止することもできるので、2nd-eNBのリソースの使用効率を向上させることが可能となる。
 実施の形態8 変形例2.
 実施の形態8で示した課題を解決する他の方法を開示する。2nd-eNBは、2nd-eNB向けに設定されたSPSリソースの上り電力を測定する。2nd-eNBは、上り通信品質を測定してもよい。
 2nd-eNBは、上り電力として、受信信号強度(RSSI)、または、IOT(Interference over Thermal noise)、RSRP、信号対干渉雑音電力比(Signal to Interference plus Noise power Ratio;略称:SINR)などを測定するとよい。あるいは、2nd-eNBは、設定されたSPSリソースに用いるPUSCHのリファレンス信号の受信電力を測定してもよい。
 2nd-eNBは、上り通信品質として、RSRQを測定するとよい。あるいは、2nd-eNBは、PUSCHのリファレンス信号の受信品質を測定してもよい。
 2nd-eNBは、自身に設定されたSPSリソースの上り電力あるいは上り通信品質が予め定める閾値よりも高い場合は、2nd-eNBに上りデータが送信されたと判断する。
 2nd-eNBは、自身に設定されたSPSリソースの上り電力あるいは上り通信品質が予め定める閾値よりも低い場合は、2nd-eNBに上りデータが送信されなかったと判断する。
 2nd-eNBが、HARQを動作させるか否かを判断する方法を開示する。2nd-eNBは、2nd-eNB自身向けにデータが送信されたと判断した場合は、HARQを動作させる。2nd-eNBは、2nd-eNB自身向けにデータが送信されていないと判断した場合は、HARQを停止させる。
 測定を必要とするので、時間的に2nd-eNBで行うHARQに即座に対応できない場合がある。しかし、たとえ、即座にHARQに対応できないとしても、測定などによる遅延の後には対応可能となる。したがって、延々とHARQが続くことを防ぐことができる。これによって、2nd-eNBのリソースの使用効率を向上させることが可能となる。
 また、eNB間のシグナリングが不要となり、シグナリング量の増大を抑制することが可能となる。
 実施の形態9.
 UEは、上り送信データのデータ量がDRATの閾値以下の場合、2nd-eNBに上りデータを送信しない。2nd-eNBに上りデータの送信が無いにも関わらず、パディング送信を行うことは、UEの消費電力の無駄となる。
 しかし、インプリシットリリースが動作している場合、パディング送信が行われないと、インプリシットリリースが行われず、設定されたSPSリソースのリリースが行われなくなる。SPSリソースがリリースされないと、該リソースを他のUEに使用させることができず、PUSCHリソースの使用効率が低減する。本実施の形態では、このような課題を解決する方法を開示する。
 上り送信データが無い場合のパディング送信の頻度を変える。具体的には、パディング送信を間引く。
 以上に開示したパディング送信の方法では、上り送信データのデータ量がDRATの閾値以下の場合、常に2nd-eNBにパディング送信を行う。これに対して、本実施の形態で開示する方法では、上り送信データのデータ量がDRATの閾値以下の場合に、2nd-eNBに送信するパディング送信を間引く。
 例えば、パディング送信を2回に1回間引く場合について示す。UEは、1回目のパディング送信の実行タイミングでは、パディング送信を行わない。UEは、2回目のパディング送信の実行タイミングで、パディング送信を行う。
 このように何回に1回パディング送信を行うか、すなわちパディング送信を行う頻度を、「パディング送信頻度」という場合がある。前述の例では、パディング送信頻度は、「2」である。
 パディング送信頻度は、予め規格などで静的に決められてもよいし、準静的あるいは動的に変更されてもよい。パディング送信頻度は、eNBによって設定され、eNBからUEへ通知されてもよい。eNBからUEへ通知される場合、SPSの設定のメッセージに含めてもよいし、SPSアクティベートに含めてもよい。
 図24は、パディング送信を間引いた場合のインプリシットリリース方法を説明する図である。1st-eNBをMeNBとし、2nd-eNBをSeNBとする。SeNBにSPSが設定された場合を示している。パディング送信頻度が「2」の場合について示している。インプリシットリリースのためのリリース前空送信回数を「3」とする。既にSeNBに対するSPSの設定は行われているものとする。
 ステップST2209において、SeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。該アクティベートに、パディング送信頻度の情報を含める。これによって、UEは、パディング送信を間引く回数を認識することができる。
 ステップST2201において、SeNBに対して設定されたSPSのタイミングで、UEでDRATの閾値以上のデータ量の上りデータが発生した場合を考える。この場合、ステップST2201において、UEは、SeNBに対して設定されたSPSリソースで、SeNBに上りデータを送信する。
 ステップST2202において、SeNBに対して設定されたSPSのタイミングで、DRATの閾値よりも小さいデータ量の上りデータが発生した場合、UEは、SeNBに対するパディング送信タイミングが1回目であると判断し、パディング送信を行わない。
 ステップST2203において、SeNBに対して設定されたSPSのタイミングで、DRATの閾値よりも小さいデータ量の上りデータが発生した場合、UEは、SeNBに対するパディング送信タイミングが2回目であると判断する。UEは、パディング送信頻度が「2」であることから、パディング送信を行う。
 UEは、SeNBにパディング送信を行った場合、パディング送信タイミングのカウントをリセットする。
 UEは、パディング送信タイミングのカウントをリセットした後、ステップST2204において、SeNBに対して設定されたSPSのタイミングで、DRATの閾値よりも小さいデータ量の上りデータが発生した場合、SeNBに対するパディング送信タイミングが1回目であると判断し、パディング送信を行わない。
 ステップST2205において、SeNBに対して設定されたSPSのタイミングで、DRATの閾値よりも小さいデータ量の上りデータが発生した場合、UEは、SeNBに対するパディング送信タイミングが2回目であると判断する。UEは、パディング送信頻度が「2」であることから、パディング送信を行う。
 UEは、SeNBにパディング送信を行った場合、パディング送信タイミングのカウントをリセットする。
 同様に、ステップST2206において、UEは、SeNBにパディング送信を行わない。ステップST2207において、UEは、SeNBにパディング送信を行う。そして、UEは、パディング送信タイミングのカウントをリセットする。
 ステップST2203において、SeNBは、UEからの1回目のパディング送信を受信する。また、ステップST2205において、SeNBは、UEからの2回目のパディング送信を受信し、ステップST2207において、SeNBは、UEからの3回目のパディング送信を受信する。
 ステップST2203からステップST2207において、SeNBは、UEからのパディング送信を受信している間に上りデータを受信せず、パディング送信をリリース前空送信回数、ここでは3回連続で受信したので、インプリシットリリースを行う。そして、ステップST2208において、SeNBは、設定されたSPSリソースをリリースする。SeNBに、パディング送信をリリース前空送信回数、ここでは3回連続で送信した場合、ステップST2208において、UEは、SPSの設定をクリアする。
 このようにすることによって、SeNBに対して設定されたSPSのタイミングで、上り送信データが無い場合のパディング送信を減らすことが可能となる。パディング送信を減らすことによって、UEの消費電力の低減が可能となる。
 また、パディング送信は実行されるので、インプリシットリリースを動作させることは可能となる。したがって、PUSCHリソースの使用効率の低減を抑制することが可能となる。
 図24に示す例では、UEは、パディング送信を行った場合、パディング送信タイミングのカウントをリセットするようにした。他の方法として、UEは、パディング送信を行った場合と上りデータの送信を行った場合とに、パディング送信タイミングのカウントをリセットするようにしてもよい。上りデータの送信を行った場合も、パディング送信タイミングのカウントをリセットすることになるので、さらにパディング送信回数を低減することが可能となる。
 パディング送信タイミングのカウントをリセットする方法は、予め規格などで静的に決められていてもよいし、eNBからUEに通知してもよい。該通知は、SPSの設定のメッセージに含めてもよいし、SPSアクティベートに含めてもよい。パディング送信頻度とともに通知してもよい。
 図25は、パディング送信を間引いた場合のインプリシットリリース方法の他の例を示す図である。1st-eNBをMeNBとし、2nd-eNBをSeNBとする。SeNBにSPSが設定された場合を示している。
 図25は、図24と類似しているので、主として異なる部分について説明する。
 図25では、パディング送信頻度が「4」の場合について示している。
 インプリシットリリースのためのリリース前空送信回数ではなく、インプリシットリリースのための予め定めるパディング送信タイミング回数を設ける。インプリシットリリースのための予め定めるパディング送信タイミング回数として、「implicitReleaseAfter_T」というパラメータを用いる。以下の説明では、インプリシットリリースのための予め定めるパディング送信タイミング回数を、「リリース前空送信タイミング回数」という場合がある。図25では、リリース前空送信タイミング回数を「8」とする。UEは、パディング送信を行った場合と上りデータの送信を行った場合とに、パディング送信タイミングのカウントをリセットするようにするとよい。
 リリース前空送信タイミング回数は、予め規格などで静的に決められてもよいし、eNBからUEへ通知されてもよい。eNBからUEへ通知される場合、SPSの設定のメッセージに含めてもよいし、SPSアクティベートに含めてもよい。
 既にSeNBに対するSPSの設定は行われているものとする。ステップST2310において、SeNBは、UEに、PDCCHを用いて、上りSPSの上りグラントでアクティベートを通知する。該アクティベートに、パディング送信頻度の情報を含める。また、リリース前空送信タイミング回数の情報を含める。これによって、UEは、パディング送信を間引く回数と、インプリシットリリースのための予め定めるパディング送信タイミング回数とを認識することができる。
 ステップST2311において、SeNBに対して設定されたSPSのタイミングで、UEでDRATの閾値以上のデータ量の上りデータが発生した場合を考える。この場合、ステップST2311において、UEは、SeNBに対して設定されたSPSリソースで、SeNBに上りデータを送信する。
 UEは、上りデータの送信を行った場合、パディング送信タイミングのカウントをリセットする。
 ステップST2301において、SeNBに対して設定されたSPSのタイミングで、DRATの閾値よりも小さいデータ量の上りデータが発生した場合、UEは、パディング送信タイミングが1回目であると判断し、パディング送信を行わない。
 ステップST2302において、SeNBに対して設定されたSPSのタイミングで、DRATの閾値よりも小さいデータ量の上りデータが発生した場合、UEは、パディング送信タイミングが2回目であると判断し、パディング送信を行わない。
 ステップST2303において、SeNBに対して設定されたSPSのタイミングで、DRATの閾値よりも小さいデータ量の上りデータが発生した場合、UEは、パディング送信タイミングが3回目であると判断し、パディング送信を行わない。
 ステップST2304において、SeNBに対して設定されたSPSのタイミングで、DRATの閾値よりも小さいデータ量の上りデータが発生した場合、UEは、パディング送信タイミングが4回目であると判断し、パディング送信頻度が「4」であることから、パディング送信を行う。
 UEは、パディング送信を行った場合、パディング送信タイミングのカウントをリセットする。
 UEは、パディング送信タイミングのカウントをリセットした後、ステップST2305において、SeNBに対して設定されたSPSのタイミングで、DRATの閾値よりも小さいデータ量の上りデータが発生した場合、パディング送信タイミングが1回目であると判断し、パディング送信を行わない。
 同様に、ステップST2306およびステップST2307において、UEは、パディング送信を行わない。ステップST2308において、UEは、パディング送信を行う。そして、UEは、パディング送信タイミングのカウントをリセットする。
 ステップST2304において、SeNBは、UEからの1回目のパディング送信を受信する。SeNBは、UEからのパディング送信を1回受信したので、パディング送信頻度が「4」であることを考慮して、パディング送信タイミングが4回以上となったと判断する。リリース前空送信タイミング回数は8以上になっていないので、SeNBは、SPSリソースを維持し、該SPSリソースでUEからの受信を行う。
 ステップST2308において、SeNBは、UEからの2回目のパディング送信を受信する。SeNBは、UEからのパディング送信を2回連続で受信したので、リリース前空送信タイミング回数が8以上になったと判断する。
 リリース前空送信タイミング回数が8以上になったと判断したSeNBは、インプリシットリリースを行い、ステップST2309において、設定されたSPSリソースをリリースする。
 UEは、SeNBに対する、パディング送信タイミングがリリース前空送信タイミング回数連続した場合、SPSの設定をクリアする。あるいは、パディング送信を連続2回行ったので、パディング頻度が「4」であることを考慮して、パディング送信タイミングがリリース前空送信タイミング回数以上連続したと判断し、インプリシットリリースを行う、設定されたSPSリソースをクリアしてもよい。
 パディング送信をしない場合のHARQに関しては、実施の形態8から実施の形態8の変形例2で開示した方法を適用してもよい。
 本実施の形態で開示した方法を用いることによって、SeNBに対して設定されたSPSのタイミングで、上りデータの送信が無い場合のパディング送信を減らすことが可能となる。パディング送信を減らすことによって、UEの消費電力の低減が可能となる。
 また、パディング送信は実行されるので、インプリシットリリースを動作させることは可能となる。したがって、PUSCHリソースの使用効率の低減を抑制することが可能となる。
 また、パディング送信頻度を設定可能とすることによって、2nd-eNBに対してSPSが設定されたUE毎あるいはベアラ毎に、該通信の所望の通信品質、許容遅延量、あるいはUEの所望の連続動作時間などの要求に柔軟に応じることが可能となる。
 実施の形態10.
 実施の形態1から実施の形態9では、ULスプリットベアラの設定時、2nd-eNBにSPSを設定した場合に生じる課題を示し、その解決策を開示した。そもそも、そのような課題が生じる頻度を少なくすることが要求される。本実施の形態では、そのような課題が生じる頻度を少なくする方法を開示する。
 複数の通信あるいはベアラでデータの発生周期が異なる場合、短周期で発生するデータが存在する通信あるいはベアラに対するSPSを1st-eNBに設定する。
 1st-eNBのSPSの周期が2nd-eNBのSPS周期以下(1st-eNBのSPSの周期≦2nd-eNBのSPS周期)と設定するとよい。
 DRATの閾値は、短周期で発生するデータ量の最大値あるいはそれ以上とするとよい。あるいは、DRATの閾値は、長周期で発生するデータ量の最小値以下としてもよい。
 このようにすることによって、ULスプリットベアラの設定時、2nd-eNBにSPSを設定した場合に、2nd-eNBで発生するSPSのタイミング回数を少なくすることが可能となる。他方、1st-eNBは、常に上りデータを送信することが可能であるので、通常のSPS処理が可能である。したがって、実施の形態1から実施の形態9で示したような課題が生じる頻度を少なくすることができる。
 eNBおよびUEの不安定な動作および誤動作の発生の低減、無線リソースの使用効率の向上、ならびにUEの低消費電力化を図ることが可能となる。
 複数の異なる通信容量のデータあるいはベアラが存在した場合、大容量の方が短周期で発生する場合、大容量通信に適するeNBを1st-eNBとしてもよい。1st-eNBは、常に上りデータを送信することが可能であるので、大容量通信に適するeNBを1st-eNBにすることによって、大容量通信に適するSPS処理が可能となる。
 実施の形態10 変形例1.
 実施の形態10で述べた課題を解決するための他の方法を開示する。一つのUEに対して、一つのeNBが複数のSPSを設定することを可能とするとよい。例えば、一つのUEに対して、一つのeNBが、ベアラ毎にSPSの設定を行う。ベアラの中には、ある程度、ベアラ毎のデータの発生周期およびデータ量を把握できるものがある。ベアラ毎にSPSの設定を行うことによって、ベアラ毎のデータの発生周期およびデータ量に適したSPSの設定を行うことが可能となる。
 また、DRATの閾値は、ベアラ毎に設定される。したがって、ベアラ毎にSPSの設定を行うことによって、ベアラ毎のデータの発生周期およびデータ量に適したSPSの設定、ならびにDRATの閾値の設定を行うことが可能となる。これによって、実施の形態1から実施の形態9で示したような課題が生じる頻度を少なくすることができる。また、ベアラ毎の所望の通信品質、許容遅延量などの要求に柔軟に応じることが可能となる。
 SPSの設定は、ベアラ毎ではなく、一つ以上のベアラを含むベアラグループ毎としてもよい。例えば、同程度のデータの発生周期およびデータ量を有するベアラを同一グループとすることによって、eNBが一つのUEに対して設定するSPSを少なくすることが可能となり、制御の簡略化を行うことが可能となる。
 実施の形態10 変形例2.
 実施の形態10で述べた課題を解決するための他の方法を開示する。eNBは、UEからの上り送信データのデータ量の時間変化を測定し、その測定結果を用いて、上り送信データが発生する確率の時間変化を導出する。言い換えると、eNBは、上り送信データのデータ量の時間変化の測定結果を用いて、上り送信データが発生する確率の時間変化を予測する。
 上り送信データが発生する確率を導出するために、統計的処理を行ってもよい。導出した上り送信データが発生する確率の時間変化から、どの上り送信タイミングにおいて上り送信データが発生する確率が高いかを導出する。
 eNBは、導出した上り送信データが発生する確率の時間変化に応じて、SPSの設定、SPSリソースのスケジューリング、ならびにSPSのアクティベーションおよびデアクティベーションを行う。このようにすることによって、eNBは、UEからの上り送信データのデータ量の時間変化に適したSPSの設定が可能となる。
 上り送信データが発生する確率の時間変化を導出することを開示したが、データの発生量の時間変化についても導出してもよい。これによって、SPSリソースとして、どの程度無線リソースを割り当てたらよいかを導出することが可能となる。したがって、SPSリソースのスケジューリングを精度良く行うことが可能となる。
 eNBがUEからの上り送信データのデータ量の時間変化を測定し、その測定結果を用いて、上り送信データが発生する確率の時間変化を導出する方法を開示したが、UEが上り送信データの発生量の時間変化を測定し、その測定結果を用いて、上り送信データが発生する確率の時間変化を導出してもよい。上り送信データが発生する確率を導出するために、統計的処理を行ってもよい。UEは、導出した上り送信データが発生する確率の時間変化から、どの上り送信タイミングにおいて上り送信データが発生する確率が高いかを導出する。
 UEは、導出した上り送信データが発生する確率の時間変化、または、どの上り送信タイミングにおいて上り送信データが発生する確率が高いかに関する情報を、eNBに通知する。この通知には、RRCシグナリングを用いるとよい。RRCシグナリングを用いることによって、大きい情報量を通知することが可能となる。
 MACシグナリング、またはL1/L2制御信号を用いて通知してもよい。MACシグナリング、またはL1/L2制御信号を用いた場合、通知できる情報量は小さくなるが、通知に要する時間を短縮することが可能となる。したがって、導出した値を低遅延で反映できることになる。
 eNBは、UEから通知された、導出した上り送信データが発生する確率の時間変化、または、どの上り送信タイミングにおいて上り送信データが発生する確率が高いかに関する情報を用いて、SPSの設定、SPSリソースのスケジューリング、ならびにSPSのアクティベーションおよびデアクティベーションを行う。
 このようにすることによって、UEにおいて発生する上り送信データの時間変化をUEが直接測定できるので、電波伝搬環境によらずに、上り送信データが発生する確率の時間変化を導出することが可能となる。
 UEが、導出した上り送信データが発生する確率の時間変化に応じて、SPSの設定、SPSリソースのスケジューリングおよびSPSタイミングを導出してもよい。UEは、導出したSPSの設定、SPSリソースのスケジューリングおよびSPSタイミングに関する情報を、eNBに通知する。このようにすることによって、UEからeNBに通知する情報量を低減することが可能となる。
 上り送信データのデータ量あるいは上り送信データの発生量の時間変化の測定、および上り送信データが発生する確率の時間変化の導出は、UE毎、またはベアラ毎に行ってもよい。あるいは、コンテンツ毎、または、アプリケーション毎に行ってもよい。これによって、UE毎、ベアラ毎、コンテンツ毎、アプリケーション毎に適したSPSの設定を行うことが可能になる。
 上り送信データが発生する確率の時間変化を導出することを開示したが、上り送信データの発生量の時間変化について導出してもよい。または、上りスループットの時間変化について導出してもよい。これらの値を用いることによって、SPSリソースとして、どの程度無線リソースを割り当てたらよいかを導出することが可能となる。したがって、SPSリソースのスケジューリングを精度良く行うことが可能となる。
 前述の方法を、2nd-eNBのSPSの設定に適用することによって、2nd-eNBにおいてSPSリソースが割り当てられているにも関わらず、UEで上り送信データが発生しないという状況を低減することが可能となる。また、1st-eNBのSPSの設定に適用してもよい。1st-eNBにおいても、適切なSPSの設定が可能となる。
 前述の方法では、上り送信データが発生する確率の時間変化に応じて、SPSの設定、SPSリソースのスケジューリングおよびSPSタイミングを導出することを開示した。他の方法として、DRATの閾値の設定に適用してもよい。上り送信データが発生する確率の時間変化に応じて、DRATの閾値を設定する。
 例えば、eNBは、上り送信データが発生する確率の時間変化を導出した結果を、DCを行っている他のeNBに通知してもよい。また、他のeNBは、自eNBへの上り送信データが発生する確率の時間変化を導出してもよい。他のeNBは、これらの情報を用いて、DRATの閾値の設定を行うとよい。他のeNBは、各eNBへの上り送信データが発生する確率の時間変化が判るので、DRATの閾値をどのように設定したら良いかを柔軟に判断することが可能となる。
 実施の形態10の変形例1および変形例2で開示した方法は、1st-eNBに適用してもよい。また、適宜、DCが設定された場合に限らず適用してもよい。これによって、実施の形態10の変形例1および変形例2と同様の効果を得ることができる。
 実施の形態11.
 3GPPで、一つのセルと接続状態のUEが上り送信を開始する場合の遅延の削減方法として、プレスケジューリングが検討されている。プレスケジューリングの方法として、SPSを用いる方法、ダイナミックスケジューリングを用いる方法がある(非特許文献10参照)。しかし、これらの方法は、UEが一つのセルと接続されている場合の方法であり、デュアルコネクティビティ(DC)が設定されている場合のプレスケジューリングの方法については、何ら議論されていない。
 前述のように、3GPPでは、UEが2つのeNBと接続して通信を行うDCが導入されている。DCは、通信容量の増大を図る上で重要な技術である。本実施の形態では、UEにDCが設定されている場合のプレスケジューリングの設定方法を開示する。
 プレスケジューリングをサポートするeNBをMeNBのみとする。プレスケジューリングをサポートするeNBは、予め規格などで静的に決めておくとよい。
 プレスケジューリングをサポートするeNBを決めておかないと、例えばSeNBが独自にUEにプレスケジューリングを設定するが、UEは、SeNBに対してはプレスケジューリングを対応していない状態が生じる可能性がある。このような場合、誤動作が発生し、DCを実行できなくなってしまう可能性が生じる。したがって、プレスケジューリングをサポートするeNBは、予め静的に決めておくことによって、UEおよびeNB間でDCにおけるプレスケジューリングの設定方法が明確になり、誤動作が生じることを低減することができる。
 DCでは、両eNBからデータの送信が可能である。したがって、MeNBのみプレスケジューリングをサポートした場合、ベアラとしての上り送信の遅延の低減量は少ない。
 したがって、DCでは、SeNBでプレスケジューリングをサポートするとよい。プレスケジューリングをサポートするeNBを、DCでは、MeNBおよびSeNBにするとよい。MeNBおよびSeNBに対して、同時にプレスケジューリングをサポートするとしてもよい。MeNBおよびSeNBに対するプレスケジューリングの設定は同じとするとよい。
 スプリットベアラにおける2nd-eNBのSPSの設定においては、前述の実施の形態で開示した方法を適用してもよい。
 このようにすることによって、SeNBに対してもプレスケジューリングの設定が可能となる。したがって、SeNBに対しても上りデータの送信を開始する時間を短縮することが可能となるので、ベアラとしての上り送信の遅延の低減量を増大させることができる。
 MeNBでのプレスケジューリングの設定と、SeNBでのプレスケジューリングの設定とを異ならせてもよい。MeNBおよびSeNBの各eNBに対して、プレスケジューリングを別々に、つまり独立に設定可能としてもよい。
 DCでは、ベアラ毎にスプリット構成を設定できるので、eNB毎に送信するデータは異なる。例えば、ベアラ#1は、MeNBとSeNBとを用いたスプリットベアラを設定し、ベアラ#2は、MeNBを用いたスプリットベアラではないノンスプリットのベアラを設定することも可能である。したがって、DCで設定するeNB毎に送信するデータは異なってくるので、DCで設定するeNB毎に要求される遅延量も異なる。
 以上のように、eNB毎に独立のプレスケジューリングを設定可能とすることによって、ベアラの設定を考慮したプレスケジューリングの設定が可能となる。これによって、DCが設定されたeNB毎に要求される遅延量を満たすことが可能となる。
 ベアラ毎に各eNBのプレスケジューリングを独立に設定可能としてもよい。例えば、前述の例では、ベアラ#1のMeNBとSeNBとに対するプレスケジューリングの設定と、ベアラ#2のMeNBに対するプレスケジューリングの設定とを独立に設定可能としてもよい。このように、ベアラ毎に各eNBのプレスケジューリングを独立に設定可能とすることによって、ベアラによって異なる要求遅延量を満たすことが可能となる。
 プレスケジューリングを設定する主体、およびプレスケジューリングの設定をUEに通知する方法について開示する。
 MeNBがプレスケジューリングの設定を行う。MeNBがMeNBおよびSeNBのプレスケジューリングの設定を行う。MeNBは、SeNBのプレスケジューリングの設定をSeNBに通知する。該設定には設定解除を含んでもよい。SeNBは、MeNBから通知されたプレスケジューリングの設定に対して、可否(許可/不許可)を判断してもよい。SeNBは、MeNBから通知されたプレスケジューリングの設定を許可する場合、MeNBに、許可を示す情報を通知するとよい。SeNBは、MeNBから通知されたプレスケジューリングの設定を不許可にする場合、MeNBに、不許可を示す情報を通知するとよい。
 MeNBは、SeNBから不許可の通知を受信した場合、プレスケジューリングの設定を変更して、再度SeNBに通知してもよい。SeNBから許可の通知を受信するまで再設定を繰り返すとよい。
 MeNBとSeNBとの間で行われるプレスケジューリングの設定の通知には、X2インタフェースを用いてもよい。SeNBの追加、解除または修正のメッセージに含めて通知してもよい。SeNBとMeNBとの間で行われる許可/不許可を示す情報の通知には、X2インタフェースを用いてもよい。
 MeNBは、MeNBおよびSeNBの少なくとも一方に対するプレスケジューリングの設定を、UEに通知する。プレスケジューリングの設定の通知には、Uuインタフェースを用いてもよい。プレスケジューリングの設定は、DCを設定するためのメッセージに含めて通知してもよい。
 他の方法として、SeNBが、SeNBのプレスケジューリングの設定を行ってもよい。SeNBは、UEに、プレスケジューリングの設定を通知する。
 あるいは、SeNBは、MeNBに、SeNBのプレスケジューリングの設定を通知してもよい。プレスケジューリングの設定は、X2インタフェースを用いて通知してもよい。SeNBから、SeNBのプレスケジューリングの設定を受信したMeNBは、該設定をUEに通知するとよい。
 プレスケジューリングの設定は、ベアラの設定に依存するところが大きい。したがって、ベアラに設定された情報を用いてDCを設定するMeNBが、プレスケジューリングの設定を行うことがより好ましい。
 本実施の形態で開示する方法を用いることによって、UEに2つのeNBと接続して通信を行うDCが設定されている場合にも、プレスケジューリングを行うことが可能となる。
 これによって、通信容量の増大を図るとともに、上り送信の遅延の低減を図ることが可能となり、より短時間に大容量の通信を行うことが可能となる。
 本実施の形態では、UEにDCが設定されている場合のプレスケジューリングの設定方法を開示した。UEにDCが設定されている場合ではなく、UEに対してDCを設定する場合に、SeNBに対してプレスケジューリングを設定するようにしてもよい。eNBは、SeNBを追加するときに、SeNBに対するプレスケジューリングを設定してもよい。このプレスケジューリングの設定に、本実施の形態で開示した方法を適宜適用するとよい。
 このようにすることによって、SeNBの追加処理において、UEがSeNBに対して従来行っていた、スケジューリング要求処理を省略することが可能となる。これによって、スケジューリング要求にかかる時間を削減することが可能となるので、DCを設定する時間を短縮することが可能となる。また、通信における遅延を低減し、より短時間に大容量の通信を行うことが可能となる。
 本実施の形態で開示した方法は、SeNBの追加を行う場合に限らず、SeNBの修正を行う場合にも適用できる。修正後のSeNBに対して、本実施の形態で開示したプレスケジューリング方法を適宜適用するとよい。これによって、本実施の形態と同様の効果を得ることができる。
 以上の実施の形態およびその変形例では、デュアルコネクティビティ(DC)でスプリットベアラがサポートされた場合について開示した。DCに限らず、複数のeNBを用いて通信を行うマルチコネクティビティの場合にも適用することができる。マルチコネクティビティでスプリットベアラが行われた場合に、予め決められた規則に従って、マルチコネクティビティを構成するeNBのうちの一つまたは複数のeNBに上りデータが送信されないような場合に適用するとよい。これによって、以上の実施の形態およびその変形例と同様の効果を得ることができる。
 以上の実施の形態およびその変形例では、ULスプリットベアラが設定されDRATが用いられた場合において、SPSが設定された場合について開示したが、SPSが設定された場合ではなく、ダイナミックスケジューリングが行われた場合に適用してもよい。DRATが用いられた場合においてSPSが設定された場合のDRATの閾値の設定方法、およびパディング送信に関する方法を、DRATが用いられた場合においてダイナミックスケジューリングが行われた場合に適用してもよい。
 例えば、DRATの閾値が設定された場合に置いて、2nd-eNBがUEにダイナミックスケジューリングで上りグラントが通知されたときに、その上りグラントのリソースで、UEで上り送信データが発生しなかった場合に、SPSが設定された場合と同様の問題が生じる。また、DRATの閾値が設定された場合において、2nd-eNBにおいてプレスケジューリングによるダイナミックスケジューリングが行われたときに、プレスケジューリングされたリソースで、UEで上り送信データが発生しなかった場合などにも同様の問題が生じる。
 このような問題を解決するために、実施の形態1、実施の形態2、実施の形態2の変形例1、実施の形態5、実施の形態7、実施の形態8、実施の形態8の変形例1、実施の形態8の変形例2で開示した方法を適宜適用するとよい。DRATが用いられた場合においてダイナミックスケジューリングが行われた場合にも、同様の効果を得ることができる。
 実施の形態12.
 eNBとUEとが通信を行うときに、eNBが複数のアンテナを用いて、通信対象の端末であるUEの方向にのみビームを形成するビームフォーミングを利用して信号を送る技術がある。ビームフォーミングを用いてeNBのサービスエリアをカバーする方法として、方向が固定されたビームを複数並べる方法がある。この場合、eNBは、UEの移動に合わせて固定ビームを切り替え、適切なビームを使用する。
 図26は、多素子アンテナを用いたビームフォーミングを説明する図である。eNBは、図4に示すアンテナ408を、多素子アンテナ2401によって構成する。
 eNBは、多素子アンテナ2401の一部または全部の複数のアンテナを用いて、予め定める方向のみにビームを形成し、通信対象となるUE2402との間で通信を行う。図26に示すように、ビームフォーミングを用いて形成する各ビームのカバレッジ2403,2404,2405は、狭カバレッジとなる。eNBは、異なる方向に固定された狭カバレッジを有する複数のビームを形成することによって、サービスエリアをカバーする。
 UE2402が第1のビームのカバレッジ2403に存在する場合、eNBは、UE2402と、第1のビームを用いて通信を行う。UE2402が、第2のビームのカバレッジ2404に移動した場合、eNBは、第1のビームから第2のビームに切り替えて、UE2402と通信を行う。以下、切替元のビームを「ソースビーム」といい、切替先のビームを「ターゲットビーム」という場合がある。
 ビームフォーミングを用いる場合、eNBによって構成されるサービスエリアは、複数のビームによって構成される狭カバレッジに分割される。したがって、UEのビーム間の移動において高速なビーム切替処理が要求される。
 eNBは、セル毎にビームフォーミングを用いて複数のビームを形成してもよい。このような場合、一つのセル内でUEのビーム間移動においてビーム切替処理が生じる。
 ビーム切替処理において、UEは、ターゲットビームと同期をとり、eNBは、UEに対してターゲットビームの無線リソースのスケジューリングを行わなければならない。したがって、UEのビーム間の移動においてビーム切替処理の高速化を可能とし、高速で安定な通信システムを提供することが求められる。
 ビーム切替処理の高速化を図るためには、このような同期処理および無線リソーススのケジューリング処理に要する時間の短縮が有効となる。
 本実施の形態では、ターゲットビームとの同期処理およびターゲットビームにおける無線リソースのスケジューリング処理の時間の短縮方法を開示する。
 ターゲットセルとの同期処理に、従来のセルとの同期方法を適用してもよい。UEは、ターゲットビームで送信される同期信号、リファレンスシグナルおよびディスカバリーシグナルの少なくともいずれか1つを受信して、ターゲットビームと同期を行う。例えば、同期信号として、従来のセルで用いられているP-SSおよびS-SSなどの同期信号が用いられる場合、該同期信号を用いて同期を行うようにしてもよい。この場合、同期を行うために、少なくとも6サブフレームの期間が必要となる。
 従来のセルで用いられている同期信号は、セル毎のPCIに1対1に対応するシンクロナイゼーションコードが割り当てられている。しかし、セル毎のPCIでは、UEは、どのビームと同期を行ったのかを認識することができない。このような問題を解決するために、ビーム毎の識別子を設け、各ビームの同期信号に、ビーム毎の識別子に1対1に対応するコードを割当てるとよい。
 このようにすることによって、UEは、どのビームに対して同期を行ったかを認識することが可能となる。ビーム毎の識別子は、セル毎の識別子に重畳されて割当てられてもよい。UEは、どのセルかを認識することが可能となり、さらには、どのビームかを認識することが可能となる。
 リファレンスシグナルおよびディスカバリーシグナルにも同様に、ビーム毎の識別子に1対1に対応するコードを割当ててもよい。UEは、リファレンスシグナルまたはディスカバリーシグナルを受信して、ビーム毎の識別子を得ることによって、受信したビームがどのビームかを認識することが可能となる。
 しかし、従来のセルとの同期処理を適用した場合、前述のように、例えば同期信号を用いた場合、UEが同期信号を受信するまでに少なくとも6サブフレームの期間が必要となる。UEにおける同期処理に要する時間を考慮すると、従来のセルとの同期処理に要する時間は、さらに増大する。これらの同期処理に要する時間の短縮方法を開示する。
 eNBは、同一セル内のビーム間の同期をとる。eNB内のビーム間の同期をとるとしてもよい。さらに具体的には、ビーム間で、サブフレームタイミングの同期、スロットタイミングの同期を行う。また、SFN(System Frame Number)、無線フレームナンバ、およびスロットナンバも同期をとるとよい。
 このようにすることによって、UEに対してビーム切替処理が行われたとしても、ターゲットビームに対して同期を行う必要が無くなる。したがって、同期処理に必要とした時間を削減することが可能となる。
 ターゲットビームにおける無線リソースのスケジューリングの処理時間の短縮方法を開示する。下りリンクの無線リソースのスケジューリング情報は、下り制御情報(Downlink Control Information:DCI)に含まれる。下り制御情報は、L1/L2制御信号によって、UEに通知される。LTEでは、PDCCHあるいはEPDCCHにマッピングされる。L1/L2制御信号のCRCに、セル毎にUE個別に割当てられた識別子(C-RNTI)がマスクされる。UEは、自身のC-RNTIを検出することによって、自身宛てのL1/L2制御信号を受信して下り制御情報を取得することができ、下りリンクの無線リソースのスケジューリング情報を取得することが可能となる。
 セル内のビームにおいて、L1/L2制御信号のCRCにマスクするUE個別の識別子に、同じ識別子を用いるとよい。セル毎にUE個別に割当てられた識別子を用いるとよい。このようにすることによって、UEは、セル内でビーム切替処理が行われたとしても、ソースビームで使用していたC-RNTIを、ターゲットビームでも用いることが可能となる。
 したがって、ターゲットビームと同期を行った後、即座にL1/L2制御信号を受信することによって、スケジューリング情報を受信することが可能となる。
 セルを跨ぐビーム切替処理においては、予めeNBはUEに、C-RNTIを通知しておくとよい。eNBは、ソースビームを用いてUEにC-RNTIを通知しておくとよい。このようにすることによって、セル間のビーム切替処理においても、ターゲットセルと同期した後、即座にL1/L2制御信号を受信し、スケジューリング情報を受信することが可能となる。
 他の方法として、ビーム毎にUE個別に割当てる識別子(B-RNTIとする)を設けてもよい。L1/L2制御信号のCRCに、ビーム毎にUE個別に割当てられた識別子をマスクするとよい。ビーム切替処理において、予めeNBはUEに、B-RNTIを通知しておくとよい。eNBは、ソースビームを用いてUEにB-RNTIを通知しておくとよい。このようにすることによって、ビーム切替処理において、ターゲットセルと同期した後、即座にL1/L2制御信号を受信し、スケジューリング情報を受信することが可能となる。
 ビーム毎にUE個別にB-RNTIを割り当てることによって、セル内のビームの切替とセル間のビームの切替とで制御を異ならせる必要が無くなる。したがって、eNBおよびUEにおける制御を容易にすることが可能となる。また、どちらの制御を行うかを判断する必要がなくなるので、判断に要する時間を削減することが可能となる。
 上りリンクの無線リソースのスケジューリング情報も、同様に、下り制御情報(Downlink Control Information:DCI)に含まれる。したがって、以上に開示した方法を適用することができる。
 上りリンクでは、UEがeNBに対して無線リソースの要求を行う必要がある。従来のセルでは、無線リソースの要求は、スケジューリングリクエスト(Scheduling Request:SR)あるいはPRACHで行われる。ビーム切替処理において、UEがターゲットビームに対して無線リソースの要求を行うことになる。
 しかし、SRおよびPRACHは、任意のタイミングで行ってよいわけでなく、eNBによって設定された予め定めるタイミングで行わなくてはならない。したがって、UEは、eNBによって設定された予め定めるタイミングまで待たなくてはならず、遅延が生じることになる。狭カバレッジのビーム切替処理の場合、この遅延は、通信の失敗につながる可能性が高い。
 このような問題を解決する方法を開示する。予めeNBは、UEに対して、ターゲットビームでの上りリンクの無線リソースのスケジューリングを行う。予めeNBは、UEに対して、ソースビームを用いて、ターゲットビームでの上りリンクの無線リソースのスケジューリングを行うとよい。
 例えば、ターゲットビームの上りリンクの無線リソースのスケジューリング方法として、SPSを用いるとよい。eNBは、UEに、ソースビームを用いて、ターゲットビームでの上りSPSの設定を通知するとよい。上りSPSの設定の通知は、UEがターゲットビームと同期を行う前に行うとよい。ターゲットビームでの上りSPSの設定を受信したUEは、ターゲットビームと同期した後、ターゲットビームで、通知された上りSPSの設定を用いて、上り送信を行う。
 SPSの設定として、SPSリソースの時間間隔だけでなく、オフセット、スケジューリング情報を含めてもよい。オフセットとしては、無線フレームナンバ、サブフレームナンバが明示されてもよい。
 ターゲットビームでのSPSの設定およびSPSのアクティベーション方法について開示する。SPSリソースの時間間隔の設定は、ソースビームで行うとよい。SPSリソースの時間間隔の設定をソースビームで行うことによって、ビームの切替時にターゲットビームからの設定を不要とし、切替処理にかかる時間を短縮することが可能となる。
 SPSリソースのスケジューリング情報の設定は、ソースビームで行ってもよい。SPSリソースのスケジューリング情報の設定をソースビームで行うことによって、ビームの切替時にターゲットビームからの設定を不要とし、切替処理にかかる時間を短縮することが可能となる。
 あるいは、SPSリソースのスケジューリング情報の設定は、ターゲットビームで行ってもよい。これによって、ターゲットビームでの負荷状況に応じたリソース割当てなどのスケジューリング情報の設定が可能となる。
 SPSのアクティベーションおよびデアクティベーションは、ソースビームで行ってもよい。SPSのアクティベーションおよびデアクティベーションをソースビームで行うことによって、ビームの切替時にターゲットビームからの設定を不要とし、切替処理にかかる時間を短縮することが可能となる。
 あるいは、SPSリソースのアクティベーションおよびデアクティベーションは、ターゲットビームで行ってもよい。これによって、ターゲットビームでの負荷状況に応じたアクティベーションおよびデアクティベーションが可能となる。また、予めソースビームで行う場合よりも、リソースの使用効率の向上を図ることができる。これは、予めソースビームで行う場合、対象とするUEに対して、予めソースビームでアクティベーションおよびデアクティベーションを行ってから、ターゲットビームに切替えて実際にSPSを行うまでの期間、SPSリソースを該UEに対して割当て続けなければならず、無線リソースの無駄が生じるためである。
 前述の、SPSの設定、ならびにSPSのアクティベーションおよびデアクティベーションを、ソースビームまたはターゲットビームで行う方法を、適宜組み合わせて用いてもよい。これによって、ターゲットビームでの負荷状況および遅延許容量などに応じて設定することが可能となる。
 このようにすることによって、UEは、eNBに対して、ビームの切替後のターゲットビームで上りリンクの無線リソース要求を行う必要が無くなるので、遅延を削減することが可能となる。したがって、ビーム切替処理の時間を短縮することが可能となる。
 ここでは、ターゲットビームの上りリンクの無線リソースのスケジューリング方法として、上りSPSを用いることを開示したが、ターゲットビームの下りリンクの無線リソースのスケジューリング方法として、下りSPSを用いてもよい。eNBは、UEに、ソースビームを用いて、ターゲットビームでの下りSPSの設定を通知してもよい。このようにすることによって、UEは、ターゲットビームに切替えた後、該下りSPSの設定に従って、設定されたSPSリソースを受信することが可能となる。
 ターゲットビームの上りリンクの無線リソースのスケジューリング方法の他の方法として、ダイナミックスケジューリングを用いてもよい。eNBは、UEからのスケジューリング要求を受信しなくても、UEに、ターゲットビームを用いて任意のサブフレームで無線リソースのスケジューリング情報を送信する。UEは、ターゲットビームと同期を行った後、毎サブフレームでL1/L2制御信号を受信することによって、eNBが任意のサブフレームを送信した無線リソースのスケジューリング情報を受信することが可能となる。これによって、UEは、受信した上り無線リソースのスケジューリング情報を用いて、上り送信を行うことが可能となる。
 このようにすることによって、UEは、eNBに対して、上りリンクの無線リソース要求を行う必要が無くなるので、遅延を削減することが可能となる。したがって、ビーム切替処理の時間を短縮することが可能となる。
 図27は、実施の形態12におけるビーム切替処理の時間短縮方法に関するシーケンスの一例を示す図である。図27では、ソースビーム(S-Bm)からターゲットビーム(T-Bm)へ切替える場合について示している。
 ステップST2501において、eNBは、UEとソースビームを用いて通信を行っている。予めeNBは、ソースビームとターゲットビームとの間で同期を行っておく。ソースビームとターゲットビームとの間で、サブフレームタイミングの同期、およびスロットタイミングの同期を行う。また、SFN(System Frame Number)、無線フレームナンバ、およびスロットナンバも同期をとる。このようにすることによって、ステップST2502において、UEは、ソースビームと同期がとれている場合、ターゲットビームとの同期もとれていることになる。ステップST2502において、UEは、ターゲットビームとの同期もとれていることを示す。
 ステップST2503において、eNBは、UEに、ソースビームを用いて、ターゲットビームでの上りスケジューリング情報を通知する。ここでは、ターゲットビームでの上りスケジューリング情報は、ターゲットビームでの上りSPSの設定情報とする。SPSの設定情報としては、SPSリソースの時間間隔だけでなく、オフセットおよびスケジューリング情報を含める。
 ターゲットビームでの上りスケジューリング情報とともに、ターゲットビームに関する情報を通知してもよい。ターゲットビームに関する情報としては、例えば、ターゲットビームの識別子などがある。また、ビーム毎にUE個別に割当てる識別子を用いる場合は、該識別子を通知してもよい。ターゲットビームでの上りスケジューリング情報およびターゲットビームに関する情報の通知は、RRCシグナリングを用いるとよい。
 ステップST2504において、eNBは、UEに、ソースビームを用いて、ビーム切替指示を通知する。ビーム切替指示情報を設けて、該情報を通知するとしてもよい。ビーム切替指示情報は、ビームの切替のトリガとなる情報である。言い換えると、UEにターゲットビームのL1/L2制御信号を受信させるトリガとなる情報である。ビーム切替指示情報の通知には、RRCシグナリングを用いるとよい。
 ビーム切替指示情報を受信したUEは、既にステップST2502においてターゲットビームと同期済みであるので、ステップST2505において、ターゲットビームの下り制御情報を受信する。UEは、毎サブフレームPDCCHあるいはEPDCCHを受信する。UEは、ターゲットビームの下り制御情報を受信することによって、下りスケジューリング情報を得ることができ、該スケジューリング情報に従って、下りデータを受信することが可能となる。
 上り送信データが有る場合、ステップST2506において、UEは、eNBに、ターゲットビーム用に設定されたSPSリソースを用いて、上りデータを送信する。
 このようにすることによって、ステップST2507において、UEとeNBとの間で、ターゲットビームを用いて通信が可能となる。
 本実施の形態で開示した方法を用いることによって、ビームフォーミングによって狭カバレッジになったビーム間をUEが移動してビームを切替える場合に、同期処理および無線リソースのスケジューリング処理に時間がかかることによる通信品質の劣化および通信の断絶を低減することが可能となる。
 ビームを形成する複数のアンテナ素子からなるアンテナの位置が、ビーム毎に同じ場合は、該アンテナからUEへのパスの距離は、ほぼ同じとなる。したがって、上り送信タイミングをソースビームとターゲットビームとで変える必要は無い。しかし、ビーム毎にアンテナの位置が異なるような場合、ターゲットビームにおいて、UEは上りリンクの同期を行う必要がある場合がある。
 上りリンクの同期を行う方法を開示する。eNBは、UEに対して、ターゲットビームにおいてランダムアクセス(Random Access:RA)処理を実行する指示を行う。ターゲットビームにおいてRA処理を実行する指示は、ターゲットビーにおけるL1/L2制御信号を用いて行うとよい。あるいは、ターゲットビームにおけるPDCCHまたはEPDCCHを用いて行うとよい。
 UEは、ターゲットビームにおいてRA処理を実行する指示を受信した場合、ターゲットビームにおいてRA処理を行うとよい。ターゲットビームにおいてRA処理を行うことによって、eNBは、UEの上り送信タイミングの調整を行うことが可能となる。具体的には、RA処理において、上り送信タイミングをUEに通知する。タイミングアドバンス(Timing Advanced)とも称される。
 このようにすることによって、ターゲットビームにおいて、UEは上りリンクの同期を行うことが可能となる。
 eNBが、上りリンクの同期を行うか否かを判断する方法を開示する。eNBは、アンテナの位置に関する情報を取得する。例えば、各アンテナは、全地球測位システム(Global Positioning System;略称:GPS)などを用いて自アンテナの位置に関する情報を取得し、eNBに自アンテナの位置に関する情報を通知する。あるいは、オペレータがアンテナの位置に関する情報をeNBに設定する。あるいは、オペレータがアンテナの位置に関する情報をOAMに設定し、OAMがeNBに通知してもよい。
 eNBは、取得したアンテナの位置に関する情報を用いて、ターゲットビームを用いた通信の対象となるUEに対して上りリンクの同期が必要か否かを判断する。
 eNBは、上りリンクの同期が必要と判断した場合、該UEに対して、ターゲットビームにおいてRA処理を実行する指示を行うとよい。
 このようにすることによって、eNBは、必要に応じて、上りリンクの同期を行うか否かを判断することが可能となる。上りリンクの同期が不要な場合は、RA処理を行わずに済ませることが可能となる。また、たとえ上りリンクの同期が必要な場合であったとしても、eNBから指示されて行うRA処理を用いるので、衝突の無いRA処理となり、制御を簡易にすることができる。
 図27に示す例では、ターゲットビームでの上りスケジューリング情報と、ターゲットビームへの切替指示を別々のシグナリングで通知した。他の例として、ターゲットビームでの上りスケジューリング情報と、ターゲットビームへの切替指示とを同じシグナリングで通知してもよい。これによって、同様の効果を得ることが可能となる。
 実施の形態13.
 実施の形態12では、eNBは、UEに、ビームの切替を行わせるためのビーム切替指示を通知することを開示した。例えば、図27のステップST2504の処理を示した。
 実施の形態12では、ビーム切替指示情報の通知に、RRCシグナリングを用いることを開示した。しかし、RRCシグナリングを用いた場合、複数のトランスポートブロックに分割されるので、複数の送信時間間隔(Transmission Time Interval:TTI)で送信されることになる。また、トランスポートブロック毎に再送が適用される。したがって、RRCシグナリングの送受信にかかる時間は大きくなってしまう。本実施の形態では、ビーム切替処理において、ビーム切替指示の通知にかかる時間の短縮方法を開示する。
 ビーム切替指示をMACシグナリングあるいはL1/L2シグナリングで行う。L1/L2シグナリングとして、個別制御チャネルを用いる。例えば、PDCCHあるいはEPDCCHなどである。MACシグナリングおよびL1/L2シグナリングともに1TTIで行われるので、RRCシグナリングよりもビーム切替指示にかかる時間を短縮することが可能となる。
 MACシグナリングの場合、HARQが適用される。したがって、L1/L2シグナリングを用いる場合に比べて、受信誤り率が低くなるという効果を得ることができる。
 L1/L2シグナリングの場合、HARQは適用されない。したがって、MACシグナリングを用いる場合に比べて、低遅延でビーム切替指示を通知することが可能となる。
 MACシグナリングおよびL1/L2シグナリングのどちらを用いるかは、規格などで静的に決められてもよい。あるいは、両方の方法をサポートしておき、準静的あるいは動的に使い分けてもよい。例えば、電波伝搬環境に応じて、MACシグナリングあるいはL1/L2シグナリングの方法を使い分けてもよい。電波伝搬環境が良好な場合には、L1/L2シグナリングを用い、電波伝搬環境が良好でないような場合には、MACシグナリングを用いるとしてもよい。
 ビームの切替を判断する主体について開示する。eNB内のMACプロトコルがビームの切替を判断するとよい。RRCではなく、MACが判断することによって、どのビームを使用するかの判断を、スケジューリングとともに、あるいは、スケジューリングに含ませることが可能となる。各ビームを同一の時間-周波数軸上に構成される無線リソースとして扱うとよい。複数のビームを複数の無線リソースとして扱い、該複数の無線リソースを用いたスケジューリングを行うようにしてもよい。
 また、ビームの切替を判断する主体をMACとすることは、ビーム切替指示をMAC以下のシグナリングで通知するのに適している。ビームの切替を判断する主体をMACとすることによって、ビームの切替判断からビーム切替指示の送信までの処理時間を短縮することが可能となる。
 ビーム切替指示の他に、UEにビームの切替を実行させる場合に用いる情報の具体例として、以下の(1)~(3)の3つを開示する。以下、UEにビームの切替を実行させる場合に用いる情報を「ビーム切替用関連情報」という場合がある。
 (1)どのビームに切替えるかの情報。例えば、ターゲットビームの識別子。
 (2)ソースビームの各プロトコルのリセットおよびターゲットビームの各プロトコルの設定の情報。
 (3)ターゲットビームで通信を可能にするための情報。
 前述の具体例(1)について、さらに具体的に説明する。ネットワークの予め定める範囲毎に割当てられてもよい。例えば、MME毎に割当てられてもよい。あるいは、eNB毎に割当てられてもよい。あるいは、ビームの識別子は、セル毎に割当てられてもよい。あるいは、予めビームの識別子を予め定める数だけ用意してその中から割当てるようにしてもよい。
 ネットワークの狭い範囲で割り当てることによって、ビームの識別子に必要となる情報量、例えばビット数を、より少なくすることが可能となる。例えばビームの識別子をセル毎に割当てることによって、ビーム切替関連情報の情報量、例えばビット数を低減することが可能となる。
 前述の具体例(2)について、さらに具体的に説明する。同一セル内のビーム間では、同一のPDCPが用いられる。したがって、ビームの切替でPDCPのリセットおよび再設定の少なくとも一方を行うか否かの情報は不要である。予め規格などでリセットも再設定もしないと決めておいてもよい。UEは、同一セル内のビーム切替処理では、ソースビームのPDCPの設定を保持するとよい。
 同一セル内のビーム間では、同一のRLCが用いられる。したがって、ビームの切替でRLCのリセットおよび再設定の少なくとも一方を行うか否かの情報は不要である。予め規格などでリセットも再設定もしないと決めておいてもよい。UEは、同一セル内のビーム切替処理では、ソースビームのRLCの設定を保持するとよい。
 同一セル内のビームは、MACの一部の設定のみが異なる。したがって、ビームの切替でMACのリセットおよび再設定の少なくとも一方を行うか否かの情報は不要である。すなわち、リセットは不要であり、異なる設定のみを再設定するとよい。予め規格などで異なる設定のみを再設定すると決めておいてもよい。UEは、同一セル内のビーム切替処理では、ソースビームと同一のMACの設定のみを保持するとよい。
 同一セル内のビームは、PHYの一部あるいは全部の設定が異なる。PHYのリセットおよび再設定の少なくとも一方を行うか否かの情報が必要となる。
 前述の具体例(3)におけるターゲットビームで通信を可能にするための情報の具体例として、以下の(3-1)~(3-3)の3つを開示する。
 (3-1)ターゲットビームでのUE識別子。例えば、C-RNTI、あるいはB-RNTI。
 (3-2)ターゲットビームのMACおよびPHYに関する情報。例えば、共通の無線リソース設定、MACの主設定、個別のPHYの設定などがある。共通の無線リソース設定のパラメータとしては、「radioResourceConfigCommon」が用いられる。MACの主設定のパラメータとしては、「mac-MainConfig」が用いられる。個別のPHYの設定のパラメータとしては、「physicalConfigDedicated」が用いられる。
 (3-3)ターゲットビームにおけるSCellに関する情報。
 前述の(3-1)~(3-3)の情報は、ソースビームの設定から変更の無いものは省略してもよい。ソースビームの設定から変更のあるもののみを通知するとしてもよい。これによって、情報量を削減することができる。
 ビーム切替指示の他に、UEにビームの切替を実行させる場合に用いる情報を、eNBからUEに通知しておくことによって、ビーム切替指示情報を受信したUEは、ターゲットビームを用いた通信を行うことが可能となる。
 eNBは、UEに、ビームの切替を実行させるために、ビーム切替用関連情報を通知する。ビーム切替用関連情報の通知方法について開示する。
 eNBは、ソースビームを用いて、ビーム切替用関連情報をUEに通知する。ビーム切替用関連情報は、ビーム切替指示を通知する前に通知する。ビーム切替用関連情報は、RRCシグナリングで通知するとよい。ビーム切替用関連情報の通知用に新たなメッセージを新設してもよい。
 ビーム測定用の構成情報(以下「ビーム測定用構成情報」という場合がある)を通知するメッセージを設けてもよい。ビーム測定用構成情報としては、CSI測定用の構成情報としてもよい。
 UEは、eNBから通知されたビーム測定用構成情報を用いてビームを測定する。UEは、ビーム測定用構成情報に含まれるビームを測定する。UEは、ビームの測定結果をeNBに報告する。報告のための設定もeNBからUEに通知してもよい。ビーム測定用構成情報とともに、あるいは、ビーム測定用構成情報に含めて通知してもよい。eNBは、UEからのビームの測定結果の報告を受信し、該UEに対して使用するビームを決定する。
 UEによるビームの測定結果のeNBへの報告方法について開示する。ビームの測定として、ビーム毎に送信されるリファレンスシグナルあるいはディスカバリーシグナルの受信電力を測定する。あるいは受信品質であってもよい。あるいは、干渉電力およびノイズ電力を含んだ量を測定してもよい。例えば、信号対雑音比(Signal to Noise Ratio;略称:SNR)、信号対干渉雑音電力比(Signal to Interference plus Noise power Ratio;略称:SINR)などである。
 従来のセルの測定結果の報告は、RRCシグナリングで行われる。RRCシグナリングで行ってもよいが、RRCシグナリングの場合、前述したように、RRCシグナリングの送受信にかかる時間は大きくなってしまう。
 他の方法として、MACあるいはL1/L2シグナリングで通知してもよい。MAC CEを用いて通知してもよい。あるいは、PUCCHにマッピングして通知してもよい。あるいは、PUSCHにマッピングして通知してもよい。あるいはCQI報告、あるいはCSI報告を利用してもよい。
 このようにすることによって、UEによるビームの測定結果のeNBへの報告を早期に行うことが可能となる。これによって、ビームの測定からビーム切替処理までの期間を短縮することが可能となるので、eNBがより適切なターゲットビームを選択することが可能となる。
 図28は、実施の形態13におけるビーム切替処理の時間短縮方法に関するシーケンスの一例を示す図である。図28では、ソースビーム(S-Bm)からターゲットビーム(T-Bm)へ切替える場合について示している。ソースビームとターゲットビームとの間で同期をとった場合について示している。ターゲットビームでの無線リソースのスケジューリング情報を予めソースビームを用いて通知する場合について示している。図28に示すシーケンスは、図27に示すシーケンスと類似しているので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。ここでは、主として異なる部分について説明する。
 ステップSTST2601において、eNBは、UEに、ソースビームを用いて、ビーム測定用構成情報を通知する。ビーム測定用構成情報の通知には、RRCシグナリングを用いる。
 eNBからビーム測定用構成情報を取得したUEは、ステップST2602において、ビーム測定用構成情報に含まれる測定用のビームについて、ビーム毎に送信されるリファレンスシグナルを測定する。
 ステップST2603において、UEは、ステップST2602で得た測定結果を、eNBに、ソースビームを用いて通知する。測定結果の通知には、L1/L2シグナリングを用いるとよい。例えば、上り制御チャネルであるPUCCHを用いて報告する。これによって、シグナリングの高速化を図ることができる。
 ステップST2603において、UEは、ステップST2602で得た測定結果を全て報告しなくてもよい。予め定めるクライテリアに従って、報告がトリガされたビームの測定結果のみを報告してもよい。eNBは、これらの設定を、ステップST2601において、ビーム測定用構成情報とともにUEに通知する。
 ステップST2603でビームの測定結果の報告を受信したeNBは、ステップST2604において、UEに対してビームの切替を行うか否かを決定する。例えば、ソースビームの受信品質が予め定める閾値以下に劣化し、ソースビームよりも受信品質が良いビームが存在した場合、eNBは、受信品質が良いビームに切替えることを決定する。
 ステップST2604においてUEに対してビームの切替を決定したeNBは、ステップST2605において、ソースビームを用いて、ターゲットビームのビーム切替用関連情報をUEに通知する。ビーム切替用関連情報の通知には、RRCシグナリングを用いるとよい。
 ステップST2503において、eNBが、ソースビームを用いて、ターゲットビームでの上り無線リソースのスケジューリング情報をUEに通知している場合、該通知と同じシグナリングで通知してもよい。
 ステップST2606において、eNBは、ソースビームを用いて、ターゲットビームへのビーム切替指示情報をUEに通知する。ビーム切替指示情報の通知には、MACシグナリングを用いる。これによって、シグナリングの高速化を図ることができる。
 ステップST2605において、ターゲットビームのビーム切替用関連情報を受信し、ステップST2606において、ビーム切替指示情報を受信したUEは、ターゲットビームのL1/L2制御信号を受信する。
 ステップST2606において、UEにターゲットビームへのビーム切替指示情報を送信したeNBは、ターゲットビームを用いて、UEに対してスケジューリングを行う。
 図28に示すシーケンスでは、ビーム切替用関連情報と、ビーム測定用構成情報を通知するメッセージとを別々に通知した。他の方法として、ビーム切替用関連情報を、ビーム測定用構成情報を通知するメッセージに含めて通知してもよい。ビーム測定用構成情報に含まれるビームのビーム切替用関連情報を含めるとよい。この場合、eNBがターゲットビームを決定する前にUEに通知することになる。したがって、ビーム切替用関連情報に含まれるターゲットビームは、まだ決まっていない。そこで、ターゲットビームではなく、ビーム測定用のビームについての情報を含めるとよい。ビーム測定用のビームは、一つであっても複数であってもよい。ソースビームを含めてもよい。
 また、例えば、1回目のビーム測定用構成情報でターゲットビームが決まらなかった場合、eNBは、再度他のビーム測定用構成情報をUEに通知するとよい。該ビーム測定用構成情報を通知するメッセージに、ビーム切替用関連情報を含めて通知するとよい。
 eNBからUEへのビーム切替用関連情報の通知にRRCシグナリングを用いることを開示したが、他の方法として、MACシグナリングを用いてもよい。MAC CEで通知してもよい。新たなMAC CEを設けてビームの切替を実行させるために必要な情報を含ませてもよい。ビーム切替指示情報とともに通知してもよい。
 RRCシグナリングで通知する情報とMACシグナリングで通知する情報とを分けてもよい。例えば、情報量の多い情報をRRCシグナリングで通知し、情報量の少ない情報をMACシグナリングで通知するようにする。前述の具体例(3)のターゲットビームで通信を可能にさせるための設定情報をRRCシグナリングで通知し、前述の具体例(1)のターゲットビームの識別子をMACシグナリングで通知してもよい。情報量の少ない情報をMACシグナリングで通知することによって、ビーム切替指示情報も合わせて1トランスポートブロックでの送信が可能となる。
 ビーム切替指示情報をMACシグナリングで通知するようにした場合、MACシグナリングは1TTIで行われることになる。前述のように、RRCシグナリングは、複数のトランスポートブロックに分割されて送信されるので、複数のTTIにわたって行われることになる。さらに再送を考慮したとしても、MACシグナリングを用いることによって、RRCシグナリングを用いる場合に比べて、ビーム切替指示情報の通知にかかる時間を短縮することが可能となる。
 したがって、本実施の形態で開示した方法を用いることによって、ビームフォーミングによって狭カバレッジになったビーム間をUEが移動してビームを切替える場合に、シグナリングに時間がかかることによる通信品質の劣化および通信の断絶を低減することが可能となる。
 また、ビームの測定結果の報告にL1/L2シグナリングを用いることによって、ビームの測定からビームの切替までの時間を短縮することができる。これによって、より最適なビームに対してビームの切替を行うことが可能となり、通信品質の劣化ならびに切替えの失敗による通信の遅延および通信の断絶を低減することが可能となる。
 実施の形態13 変形例1.
 実施の形態13では、ビーム切替指示情報の通知にかかる時間の短縮方法を開示した。本変形例では、他の方法を開示する。
 eNBは、通信対象のUEに対してターゲットビームの候補となる一つまたは複数のビームを決定する。ターゲットビームの候補にソースビームを入れてもよい。以下、ターゲットビームの候補となるビームを「ターゲット候補ビーム」という場合がある。
 eNBは、ターゲット候補ビームのうちの一部または全部のビームのアクティベーション、デアクティベーションを決定する。
 eNBは、ターゲット候補ビームのうちの一部または全部のビームのアクティベーション、デアクティベーションの指示をUEに通知する。該通知は、ソースビームを用いて行われる。該通知には、MACシグナリングあるいはL1/L2シグナリングを用いるとよい。
 UEは、アクティベーションの指示を受けたビームに対して同期を行い、下り制御情報(DCI)を受信する。L1/L2制御信号を受信するとしてもよい。例えば、PDCCHあるいはEPDCCHを受信する。UEは、PDCCHあるいはEPDCCHを受信し、C-RNTIあるいはB-RNTIで自UE宛てのDCIを検出する。
 アクティベーションの指示を受けたビームが複数の場合、UEは、複数のビームの下り制御情報を受信することとなる。
 eNBは、UEに対して使用するビームをアクティベーションしたビームの中から決定し、ソースビームから決定したビームに切替える。eNBは、切替えたビームを用いてUEと通信を行う。このとき、eNBは、UEにビーム切替指示情報を通知する必要は無い。UEは、アクティベーションの指示を受けたビームの下り制御情報を受信しているので、どのビームで通信が開始されても、該通信のためのスケジューリング情報を取得することが可能だからである。
 このようにすることによって、ビーム切替指示情報の通知を不要とすることができる。eNBは、UEに対するビームの切替を決定した後、即座に、切替えたビームを用いてUEと通信を行うことが可能となる。したがって、ビーム切替処理にかかる時間を短縮することが可能となる。
 eNBは、ターゲット候補ビームを決定した後、UEにターゲット候補ビームのビーム切替用関連情報を通知しておくとよい。ビーム切替用関連情報の通知は、実施の形態12で開示した方法を適用することができる。
 ターゲット候補ビームの決定は、適宜行われる。ターゲット候補ビームの決定は、周期的に行われてもよいし、UEのビームの測定結果の報告に応じて行われてもよい。ターゲット候補ビームが変更された場合、再度、UEにターゲット候補ビームのビーム切替用関連情報を通知しておくとよい。変更、削除または追加するビームのビーム切替用関連情報のみを通知してもよい。削除するビームに関しては、ビーム識別子だけを通知するとしてもよい。
 アクティベーションあるいはアクティベーションするビームの決定は、適宜行われる。アクティベーションあるいはアクティベーションするビームの決定は、周期的に行われてもよいし、UEのビームの測定結果の報告に応じて行われてもよい。アクティベーションあるいはデアクティベーションするビームが変更された場合、再度、UEにビームのアクティベーションあるいはデアクティベーションの指示を通知するとよい。変更するビームのみを通知してもよい。
 UEに対して使用するビームの決定は、適宜行われる。UEに対して使用するビームの決定は、周期的に行われてもよいし、UEのビームの測定結果の報告に応じて行われてもよい。これによって、UEに対して使用するビームが変更されても、ビーム切替指示情報の通知を行わなくて済む。
 図29および図30は、実施の形態13の変形例1におけるビーム切替処理の時間短縮方法に関するシーケンスの一例を示す図である。図29と図30とは、境界線BL1の位置で、つながっている。図29および図30では、ソースビーム(S-Bm)から第1のターゲットビーム(T-Bm1)へ切替える場合について示している。また、第1のターゲットビーム(T-Bm1)から第2のターゲットビーム(T-Bm2)へ切替える場合についても示している。また、ソースビームとターゲットビームとの間で同期をとっていない場合について示している。また、ターゲットビームでの無線リソースのスケジューリング情報を予めソースビームを用いて行っていない場合について示している。図29および図30にシーケンスは、図28に示すシーケンスと類似しているので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。ここでは、主として異なる部分について説明する。
 ステップST2603においてビームの測定結果の報告を受信したeNBは、UEからのビームの測定結果の報告を用いて、ステップST2801において、UEに対してターゲットビームの候補となるビームを決定する。例えば、UEのビームの受信品質の測定結果が予め定める閾値以上となるもので上位2つのビームを選択し、ソースビームと合わせた3つのビームをターゲット候補ビームとして決定する。eNBは、ターゲット候補ビームの決定において、ビームの測定結果の報告のみでなく、他の情報を考慮してもよい。
 ステップST2801においてUEに対してターゲット候補ビームを決定したeNBは、ステップST2802において、ソースビームを用いて、UEにターゲット候補ビームのビーム切替用関連情報を通知する。ターゲット候補ビームのビーム切替用関連情報は、例えばRRCシグナリングを用いて通知する。
 ステップST2820において、eNBは、ターゲット候補ビームの中から、UEに対してアクティベーションおよびデアクティベーションの少なくとも一方を行うビームを決定する。この決定には、直近に受信したUEからのビームの測定結果の報告を用いてもよい。
 ステップST2803において、eNBは、UEに、アクティベーションおよびデアクティベーションの少なくとも一方を行うビームを通知する。アクティベーションおよびデアクティベーションの少なくとも一方を行うビームは、例えばMACシグナリングを用いて通知する。ここでは、アクティベーションするビームを、ソースビーム(S-Bm)、第1のターゲットビーム(T-Bm1)、および第2のターゲットビーム(T-Bm2)とする。
 ステップST2803においてアクティベーションおよびデアクティベーションの少なくとも一方を行うビームを受信したUEは、ステップST2804、ステップST2805、およびステップST2806において、アクティベーションするビームと同期を行う。
 さらにUEは、ステップST2807、ステップST2808、およびステップST2809において、アクティベーションするビームにおける下り制御情報を受信する。例えば、ソースビーム、第1のターゲットビーム、および第2のターゲットビームのEPDCCHを受信する。これらの受信には、ステップST2802で取得したターゲット候補ビームのビーム切替用関連情報を用いるとよい。
 ステップST2810において、eNBは、ビームの切替を決定する。具体的には、ソースビームから第1のターゲットビームへの切替を決定する。この決定には、直近に受信したUEからのビームの測定結果の報告を用いてもよい。
 ST2810において、第1のターゲットビームへのビームの切替を決定したeNBは、ステップST2811において、第1のターゲットビームを用いて、UEに対するスケジューリング情報をUEに送信する。スケジューリング情報としては、DCIなどがある。DCIには、下りスケジューリング情報および上りスケジューリング情報の少なくとも一方が含まれる。また、下りスケジューリング情報と同一のサブフレームで、下りデータを送信してもよい。
 ステップST2808において第1のターゲットビームの下り制御情報を受信しているUEは、ステップST2811において、第1のターゲットビームを用いて送信されるスケジューリング情報を取得する。
 ステップST2811において第1のターゲットビームのスケジューリング情報を取得したUEは、スケジューリング情報に下りスケジューリング情報が含まれている場合、下りスケジューリング情報に従って、下りデータを受信する。
 ステップST2811において第1のターゲットビームのスケジューリング情報を取得したUEは、スケジューリング情報に上りスケジューリング情報が含まれている場合、ステップST2812において、上りスケジューリング情報に従って、eNBに上りデータを送信する。あるいは、スケジューリングリクエストを送信してもよい。あるいは、バッファ状態報告(BSR)を送信してもよい。
 このようにして、UEとeNBとは、ステップST2813において、第1のターゲットビームを用いて通信可能となる。
 図29および図30では、さらにターゲットビームを切替える方法について開示する。ステップST2813においてUEとの通信が第1のターゲットビームを用いて行われている。したがって、UEに対して、第1のターゲットビームがソースビームとなるが、ここでは、引き続き第1のターゲットビームと称することにする。
 ステップST2814において、UEは、ビームの測定を行う。このビームの測定には、ステップST2601で通知されたビーム測定用構成情報に含まれるビームの測定設定を用いる。図示はしていないが、第1のターゲットビームを用いて、新たにビームの測定設定が通知された場合は、該ビームの測定設定を用いて測定を行うとよい。
 ステップST2814において、ビームの測定を行ったUEは、ステップST2815において、ビームの測定結果をeNBに報告する。該報告には、第1のターゲットビームを用いて行う。該報告には、L1/L2シグナリングを用いるとよい。これによって、シグナリングの高速化を図ることができる。
 ST2815においてビームの測定結果の報告を受信したeNBは、ステップST2816において、ビームの切替を決定する。ビームの切替は、ステップST2803においてUEに通知した、アクティベーションするビームの中から行う。
 ステップST2816において第2のターゲットビームへのビームの切替を決定したeNBは、ステップST2817において、第2のターゲットビームを用いて、UEに対するスケジューリング情報をUEに送信する。スケジューリング情報としては、DCIなどがある。DCIには、下りスケジューリング情報および上りスケジューリング情報の少なくとも一方が含まれる。また、下りスケジューリング情報と同一のサブフレームで、下りデータを送信してもよい。
 ステップST2809において第2のターゲットビームの下り制御情報を受信しているUEは、ステップST2817において、第2のターゲットビームを用いて送信されるスケジューリング情報を取得する。
 ST2817において第2のターゲットビームのスケジューリング情報を取得したUEは、スケジューリング情報に下りスケジューリング情報が含まれている場合、下りスケジューリング情報に従って、下りデータを受信する。
 ステップST2817において第2のターゲットビームのスケジューリング情報を取得したUEは、スケジューリング情報に上りスケジューリング情報が含まれている場合、ステップST2818において、上りスケジューリング情報に従って、eNBに上りデータを送信する。あるいは、スケジューリングリクエストを送信してもよい。あるいは、バッファステータスレポート(BSR)を送信してもよい。
 このようにして、UEとeNBとは、ステップST2819において、第2のターゲットビームを用いて通信可能となる。
 このようにすることによって、UEにビーム切替指示情報を通知せずに、ビームを切替えることが可能となる。
 したがって、eNBにおけるビームの切替決定から、UEが決定されたビームに切替えて通信可能とするまでの時間を短縮することが可能となる。
 これによって、ビームの切替が頻繁に発生するような状況においても、より最適なビームへの切替を短時間で行うことが可能となり、通信品質の劣化ならびに切替え失敗による通信の遅延および通信の断絶を低減することが可能となる。
 また、ターゲットビームの候補となるビームをUEに通知することによって、UEは同期をとり制御情報を受信するビームの数を限定することができる。したがって、以上に開示した方法は、UEの処理の負荷を軽減することができ、低消費電力化、小型軽量化、および低価格化を図ることが可能となる。
 以上に開示した例では、アクティベーションまたはデアクティベーションするビームを、ターゲット候補ビームのうちの一部または全部のビームとした。
 他の方法として、アクティベーションするビームをターゲット候補ビームと同じにしてもよい。この場合、eNBにおけるアクティベーションするビームの決定処理は不要となる。
 また、この場合、ターゲット候補ビームの切替用関連情報の通知を、ターゲット候補ビームのアクティベーションの通知としてもよい。
 UEは、ターゲット候補ビームの切替用関連情報で通知されたビームを、アクティベートされたビームとして、該ビームと同期を行い、下り制御情報を受信する。
 例えば図29および図30におけるステップST2820およびステップST2803の処理が省略される。
 このようにすることによって、eNBからUEへのシグナリング量を削減することが可能となる。またeNBとUEとにおける制御を簡易にすることができる。
 UEが最大受信可能なビームの数を設定するとよい。UEのケーパビリティ(UE capability)に応じて、最大受信可能なビームの数を決定してもよい。あるいは、UEのケーパビリティのパラメータとして、最大受信可能なビームの数を設けてもよい。
 UEが最大受信可能なビームの数を、予めUEからeNBに通知しておくとよい。UEのケーパビリティの通知を用いてもよい。
 このようにすることによって、eNBは、ターゲット候補ビーム、あるいは、アクティベーションするビームの数を、UEが最大受信可能なビームの数以下に設定することが可能となる。
 あるビームの下り制御情報に、他のビームのスケジューリング情報を含めてもよい。例えば、ソースビームの下り制御情報に、ターゲットビームのスケジューリング情報を含めてもよい。
 例えば図29および図30では、eNBは、ステップST2811において、ソースビームを用いて、第1のターゲットビームの下りスケジューリング情報あるいは上りスケジューリング情報を通知する。UEは、ステップST2811において、ソースビームを用いて、第1のターゲットビームの下りスケジューリング情報あるいは上りスケジューリング情報を受信する。第1のターゲットビームのスケジューリング情報であることを認識したUEは、下りスケジューリング情報の場合は、該下りスケジューリング情報に従って、第1のターゲットビームの無線リソースを受信する。あるいは、第1のターゲットビームのスケジューリング情報であることを認識したUEは、上りスケジューリング情報の場合は、該上りスケジューリング情報に従って、第1のターゲットビームの無線リソースで送信する。
 このようにすることによって、UEが複数のビームを使用可能な場合、複数のビームの柔軟な使用が可能となる。
 例えば、制御情報を送信するビームとデータ通信を行うビームとを異ならせることが可能となる。制御情報は、複数のビームのうちの一方のビームで送信を行い、データ通信は、複数のビームのうちの他方のビームで行うといった運用が可能となる。eNBは、各ビームのカバレッジ、負荷、および電波伝搬状況などを考慮して、各ビームを用いることが可能となる。例えば、制御情報は、広いカバレッジのビームで送信し、データ通信は、狭いカバレッジのビームで送信するとよい。このようにすることによって、各ビームの特性に適したビームの運用が可能となる。
 実施の形態13 変形例2.
 ソースビームでまだ通信が成功していないときに、UEのビーム間の移動においてビーム切替処理が生じる場合、送達未成功のデータをどのように扱うかが問題となる。
 本変形例では、ビーム切替処理時の送達未成功のデータの取り扱い方法について開示する。ソースビームを用いて送達未成功となったデータを、ターゲットビームを用いて送信する。上りリンクおよび下りリンクともに行うとよい。
 さらに詳細に開示する。PDCPにおいてソースビームを用いて送達未成功となったデータは破棄し、再度ターゲットセルにおいて送信を行う。このようにすることによって、ビームの切替時のデータの損失を抑制することが可能となる。
 ビームフォーミング技術によって形成される狭カバレッジのビーム間をUEが移動する場合、ビームの切替が頻繁に生じる場合がある。このような場合、以上に開示した方法を用いると、PDCPデータの再送が何度も繰り返されることになる。同じPDCPデータの再送が何度も繰り返される場合も生じる。したがって、データの通信に遅延が生じてしまい、要求されるQoSを満たさなくなってしまうなどの問題が生じる。このような問題を解決する方法を開示する。
 ビームの切替えにおいては、ソースビームでHARQ処理中のデータからターゲットビームで再送する。UEは、ビームの移動指示を受信したとき、ソースビームでHARQ処理中のデータからターゲットビームで再送を行う。eNBは、UEにビームの移動指示を送信したとき、ソースビームでHARQ処理中のデータからターゲットビームで再送を行う。
 ソースビームでHARQ処理中のデータからターゲットビームで再送する方法の具体例として、以下の(1),(2)の2つを開示する。
 (1)HARQ処理中のデータの初送からターゲットビームで行う。
 (2)HARQをソースビームとターゲットビームとを用いて行う。
 前述の具体例(1)のHARQ処理中のデータの初送からターゲットビームで行う方法についての具体例を開示する。図31は、実施の形態13の変形例2におけるHARQ処理中のデータの初送からターゲットビームで行う方法に関するシーケンスの一例を示す図である。ターゲットビームで上りデータの送信を行うときに、UEがスケジューリングリクエスト(SR)から行う方法を示す。
 ステップST2901において、UEは、ソースビームでeNBから下りデータを受信している。
 ステップST2902において、UEは、ソースビームでeNBに上りデータを送信している。
 ステップST2903において、eNBは、UEに対してビームの切替を決定する。
 ステップST2904において、eNBは、ソースビームにおいてHARQ処理中の下りデータに関する情報である未達下りデータ情報を、ターゲットビームに与える。ソースビームとターゲットビームとが同一のeNBの場合は、同一のeNB内で行われる。この場合、HARQ処理中の下りデータに関する情報を、ソースビームからターゲットビームに適用するとしてもよい。
 ソースビームにおいてHARQ処理中の下りデータに関する情報は、ターゲットビームにおいて送信すべきデータを特定可能とする情報であればよい。
 ステップST2905において、eNBは、UEに、ソースビームを用いてビーム切替指示情報を通知する。
 ビーム切替指示情報を受信したUEは、ステップST2906において、ターゲットビームと同期を行う。
 ステップST2907において、eNBは、UEに、ソースビームにおいてHARQ処理中であった下りデータについて、初送からターゲットビームを用いて送信するために、下りスケジューリングを行う。このとき、eNBは、ステップST2904で受信した、ソースビームにおいてHARQ処理中の下りデータに関する情報を用いるとよい。該通知は、ターゲットビームを用いるとよい。
 ステップST2907において、データの初送用のターゲットビームにおけるスケジューリング情報をUEに通知したeNBは、該スケジューリング情報に従って、UEに、ターゲットビームを用いて、ソースビームにおいてHARQ処理中の下りデータを送信する。
 ステップST2907において下りスケジューリング情報を受信したUEは、該スケジューリング情報に従って、ステップST2908において、ターゲットビームで、ソースビームにおいてHARQ処理中の下りデータを受信する。
 このようにすることによって、ソースビームにおいてHARQ処理中の下りデータを、ターゲットビームを用いて通信することが可能となる。
 次に、上りデータについて示す。ステップST2905においてビーム切替指示情報を受信したUEは、ステップST2909において、eNBに、ターゲットビームを用いて、スケジューリングリクエスト(SR)を送信する。該SRは、ソースビームにおいてHARQ処理中の上りデータを送信するために送信する。
 ST2909においてSRを受信したeNBは、上りスケジューリングを決定し、ステップST2910において、UEに、ターゲットビームを用いて上りスケジューリング情報を通知する。
 ST2910において上りスケジューリング情報を受信したUEは、ステップST2911において、該スケジューリング情報に従って、eNBにULデータを送信する。ソースビームにおいてHARQ処理中の上りデータの初送から送信する。
 このようにすることによって、ソースビームにおいてHARQ処理中のデータを、ターゲットビームを用いて通信することが可能となる。したがって、ターゲットビームにおいてPDCPデータの再送から行う必要がなくなる。これによって、ビームの切替が頻繁に生じる場合でも、PDCPデータの再送が何度も繰り返されるような状態が発生することを低減させることができる。
 他の方法を開示する。図32は、実施の形態13の変形例2におけるHARQ処理中のデータの初送からターゲットビームで行う方法に関するシーケンスの他の例を示す図である。図32では、ターゲットビームで上りデータ送信を行うときに、UEがSR送信を不要とする方法のシーケンスを示している。図32に示すシーケンスは、図31に示すシーケンスと類似しているので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。ここでは、主として異なる部分について説明する。下りデータに関しては、図31と同様であるので説明を省略し、上りデータに関して説明する。
 ステップST2903において、UEに対してビームの切替を決定したeNBは、ステップST3001において、ソースビームにおいてHARQ処理中の上りデータに関する情報を、ターゲットビームに与える。ソースビームとターゲットビームとが同一のeNBの場合は、同一のeNB内で行われる。この場合、HARQ処理中の上りデータに関する情報を、ソースビームからターゲットビームに適用するとしてもよい。
 ソースビームにおいてHARQ処理中の上りデータに関する情報は、ターゲットビームにおいて送信すべきデータを特定可能とする情報であればよい。
 ステップST2905においてUEにビーム切替指示情報を送信したeNBは、ステップSTST3002において、UEに、ソースビームにおいてHARQ処理中であった上りデータについて、初送からターゲットビームを用いてUEに送信させるために、上りスケジューリングを行う。このとき、eNBは、ステップST3001において受信した、ソースビームにおいてHARQ処理中の上りデータに関する情報を用いるとよい。該通知は、ターゲットビームを用いるとよい。
 ステップST3002において、上りデータの初送用のターゲットビームにおけるスケジューリング情報を受信したUEは、該スケジューリング情報に従って、eNBに、ターゲットビームを用いて、ソースビームにおいてHARQ処理中の上りデータの初送から送信する。
 このようにすることによって、ターゲットビームにおいてUEからのSRの送信を行わなくても、ソースビームにおいてHARQ処理中の上りデータを、ターゲットビームを用いて通信することが可能となる。
 UEは、SRの送信を不要とするので、UEの低消費電力化を図ることができる。また、ビームの切替からUEの上りデータの送信までにかかる時間を短縮することが可能となる。
 前述の具体例(2)のHARQをソースビームとターゲットビームとを用いて行う方法についての具体例を開示する。図33は、実施の形態13の変形例2におけるHARQ処理中のデータの再送からターゲットビームで行う方法に関するシーケンスの一例を示す図である。図33では、ターゲットビームで上りデータの送信を行うときに、UEがSRの送信を行わずに済む方法のシーケンスを示している。図33に示すシーケンスは、図32に示すシーケンスと類似しているので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。ここでは、主として異なる部分について説明する。
 下りデータについて開示する。ステップST2901において、eNBからの下りデータの受信に失敗したUEは、HARQ処理によって、ステップST3101において、eNBに、ソースビームを用いて、送達失敗(送達未成功)情報であるNackを送信する。
 ステップST2903において、eNBは、UEに対してビームの切替を決定する。
 ステップST3103において、eNBは、ソースビームにおいてHARQ処理中の下りデータに関する情報である未達下りデータ情報を、ターゲットビームに与える。ソースビームとターゲットビームとが同一eNBの場合は、同一のeNB内で行われる。この場合、HARQ処理中の下りデータに関する情報を、ソースビームからターゲットビームに適用するとしてもよい。
 ソースビームにおいてHARQ処理中の下りデータに関する情報は、ターゲットビームにおいて送信すべきデータを特定可能とする情報であればよい。ここでは、UEからNackを受信しているので、再送のためのデータを特定可能とする情報とするとよい。
 ステップST2905において、eNBは、UEに、ソースビームを用いてビーム切替指示情報を通知する。
 ビーム切替指示情報を受信したUEは、ステップST2906において、ターゲットビームと同期を行う。
 ステップST3105において、eNBは、UEに、ソースビームにおいてHARQ処理中であった下りデータについて、再送からターゲットビームを用いて送信するための下りスケジューリングを行う。このとき、eNBは、ステップST3103において受信した、ソースビームにおいてHARQ処理中の下りデータに関する情報を用いるとよい。該通知は、ターゲットビームを用いるとよい。
 ステップST3105において、データの初送用のターゲットビームにおける再送のためのスケジューリング情報をUEに通知したeNBは、該スケジューリング情報に従って、UEに、ターゲットビームを用いて、ソースビームにおいてHARQ処理中の下りデータの再送データを送信する。
 ステップST3105において下りスケジューリング情報を受信したUEは、該スケジューリング情報に従って、ステップST3106において、ターゲットビームで、ソースビームにおいてHARQ処理中の下りデータの再送データを受信する。
 このようにすることによって、ソースビームにおいてHARQ処理中の下りデータを、ターゲットビームを用いて通信することが可能となる。
 図33では、eNBが、下りデータの1回目の再送データを、ターゲットビームで送信する場合について開示したが、1回目に限定されない。何回目であっても同様にすればよい。ソースビームでNackが続くような場合、ビームの切替が実行された時点の再送データをターゲットビームで送信する。
 上りデータについて開示する。ステップST2902においてUEからの上りデータの受信に失敗したeNBは、HARQ処理によって、ステップST3102において、UEに、送達失敗(送達未成功)情報であるNackを送信する。このときに、再送データ用の上りスケジューリング情報を通知する。
 ステップST2903において、eNBは、UEに対してビームの切替を決定する。
 ステップST2903において、UEに対してビームの切替を決定したeNBは、ステップST3104において、ソースビームにおいてHARQ処理中の上りデータに関する情報である未達上りデータ情報を、ターゲットビームに与える。ソースビームとターゲットビームとが同一のeNBの場合は、同一のeNB内で行われる。この場合、HARQ処理中の上りデータに関する情報を、ソースビームからターゲットビームに適用するとしてもよい。
 ソースビームにおいてHARQ処理中の上りデータに関する情報は、ターゲットビームにおいて送信すべきデータを特定可能とする情報であればよい。ここでは、UEに対してNackを送信しているので、上り再送データのためのスケジューリング情報を特定可能とする情報を含めるとよい。
 ステップST2905においてeNBからビーム切替指示情報を受信したUEは、ステップST3102においてソースビームを用いて受信した上りデータ再送用のスケジューリング情報に従って、ステップST3107において、ターゲットビームを用いて、eNBに上りデータの再送を行う。
 ステップST3102においてeNBがソースビームを用いてUEに通知する再送データ用の上りスケジューリング情報を、ターゲットビームを用いた場合の再送データ用の上りスケジューリング情報としてもよい。
 図33に示すシーケンスでは、ステップST3102においてeNBがUEに、ソースビームを用いてNackを送信するとともに、再送データ用の上りスケジューリング情報を通知している。他の方法として、再送データ用の上りスケジューリング情報を、ターゲットビームを用いて通知してもよい。
 ステップST2905においてUEにビーム切替指示情報を送信したeNBは、再送データを、ターゲットビームを用いて送信させるために、再送データ用の上りスケジューリング情報を、ターゲットビームを用いてUEに送信する。
 このとき、eNBは、ステップST3104において受信した、ソースビームにおいてHARQ処理中の上りデータに関する情報を用いるとよい。
 上り再送データ用の上りスケジューリング情報を受信したUEは、ステップST3107において、該スケジューリング情報に従って、eNBに、ターゲットビームを用いて、ソースビームにおいてHARQ処理中の上りデータの再送から送信する。
 このようにすることによって、ソースビームの受信品質が劣化したような場合に、ターゲットビームを用いて、再送から通信することが可能となる。
 したがって、初送からターゲットビームを用いて通信する方法に比べて、さらに早期に通信品質を良好にすることが可能となる。
 他の方法を開示する。図34は、実施の形態13の変形例2におけるHARQ処理中のデータの送達成功(Ack)/送達失敗(Nack)からターゲットビームで行う方法に関するシーケンスの一例を示す図である。図34では、ターゲットビームで上りデータの送信を行うときに、UEがSRの送信を行わずに済む方法のシーケンスを示している。図34に示すシーケンスは、図33に示すシーケンスと類似しているので、同一のステップについては同一のステップ番号を付して、共通する説明を省略する。ここでは、主として異なる部分について説明する。
 下りデータについて開示する。ステップST2901において、eNBは、UEに下りデータを送信する。UEは、この下りデータの受信に失敗したとする。
 ステップST2903において、eNBがUEに対してビームの切替を決定する。ステップST3201において、eNBは、ソースビームにおいてHARQ処理中の下りデータに関する情報である未達下りデータ情報を、ターゲットビームに与える。ソースビームとターゲットビームとが同一のeNBの場合は、同一のeNB内で行われる。この場合、HARQ処理中の下りデータに関する情報を、ソースビームからターゲットビームに適用するとしてもよい。
 ソースビームにおいてHARQ処理中の下りデータに関する情報は、ターゲットビームにおいて送信すべきデータを特定可能とする情報であればよい。この後にUEからNackを受信した場合に、再送のためのデータを特定可能とする情報とするとよい。
 ステップST2901においてeNBからの下りデータの受信に失敗したUEは、HARQ処理によって、予め定めるタイミングでeNBにAck/Nackを送信する必要があるが、ここでは、Ack/Nackの送信の前に、ステップST2905において、eNBからビーム切替指示情報を受信したとする。
 ステップST2905においてビーム切替指示情報を受信したUEは、ステップST2906において、ターゲットビームと同期を行う。
 ステップST3203において、UEは、eNBに、ターゲットビームを用いてNackを送信する。ステップST2901において下りデータの受信に成功した場合はAckを送信する。ここでは、受信失敗、すなわち送達失敗であるので、Nackを送信する。Ack/Nackの送信タイミングは、ソースビームでの下りデータの受信タイミングによって決定される、予め定めるタイミングとするとよい。
 eNBは、ステップST3201において受信したソースビームにおいてHARQ処理中の下りデータに関する情報を用いて、Ack/Nackが送信されるタイミングを導出する。ステップST3203において、eNBは、導出したタイミングで、UEからのNackを受信する。
 ステップST3203においてUEからNackを受信したeNBは、ステップST3204において、UEに、ターゲットビームを用いて、ソースビームにおいてHARQ処理中であった下りデータについて、再送からターゲットビームを用いて送信するための下りスケジューリングを行う。このとき、eNBは、ステップST3201において受信した、ソースビームにおいてHARQ処理中の下りデータに関する情報を用いるとよい。
 ステップST3204において、ターゲットビームにおける再送のためのスケジューリング情報をUEに通知したeNBは、該スケジューリング情報に従って、UEに、ターゲットビームを用いて、ソースビームにおいてHARQ処理中の下りデータの再送データを送信する。
 ステップST3204において下りスケジューリング情報を受信したUEは、該スケジューリング情報に従って、ステップST3205において、ターゲットビームで、ソースビームにおいてHARQ処理中の下りデータの再送データを受信する。
 このようにすることによって、ソースビームにおいてHARQ処理中の下りデータを、ターゲットビームを用いて通信することが可能となる。
 上りデータについて開示する。ステップST2902において、eNBは、UEからの上りデータの受信に失敗する。
 ステップST2903において、eNBは、UEに対してビームの切替を決定する。
 ステップST2903において、UEに対してビームの切替を決定したeNBは、ステップST3202において、ソースビームにおいてHARQ処理中の上りデータに関する情報である未達上りデータ情報を、ターゲットビームに与える。ソースビームとターゲットビームとが同一のeNBの場合は、同一のeNB内で行われる。この場合、HARQ処理中の上りデータに関する情報を、ソースビームからターゲットビームに適用するとしてもよい。
 ソースビームにおいてHARQ処理中の上りデータに関する情報は、ターゲットビームにおいて送信すべきデータを特定可能とする情報であればよい。この後にUEにNackを送信する場合に、再送のためのデータを特定可能とする情報とするとよい。
 ステップST2902おいてUEからの上りデータの受信に失敗したeNBは、HARQ処理によって、任意のタイミングでUEにAck/Nackを送信する必要があるが、ここでは、Ack/Nackの送信の前に、ステップST2905において、eNBがUEにビーム切替指示情報を送信したとする。
 ステップST2905においてビーム切替指示情報を受信したUEは、ステップST2906において、ターゲットビームと同期を行う。
 ステップST3206において、eNBは、UEに、ターゲットビームを用いてNackを送信する。ステップST2902において上りデータの受信に成功した場合はAckを送信する。ここでは、受信失敗、すなわち送達失敗であるので、Nackを送信する。Ack/Nackの送信タイミングは、任意のタイミングとするとよい。
 ステップST3206において、eNBは、UEに、Nackとともに、ターゲットビームを用いて、ソースビームにおいてHARQ処理中であった上りデータについて、再送からターゲットビームを用いてUEに送信させるための上りスケジューリング情報を送信する。このとき、eNBは、ステップST3202において受信した、ソースビームにおいてHARQ処理中の上りデータに関する情報を用いるとよい。
 Nackとともに上りスケジューリング情報を送信することを開示したが、上りスケジューリング情報だけでもよい。上りスケジューリング情報によって、Nackとしてもよい。該スケジューリング情報に再送であることを示す情報を含めておくとよい。
 ステップST2905において、eNBからビーム切替指示情報を受信したUEは、ステップST3206においてターゲットビームを用いて受信した上りデータ再送用のスケジューリング情報に従って、ステップST3207において、ターゲットビームを用いて、eNBに上りデータの再送を行う。
 このようにすることによって、ソースビームの受信品質が劣化したような場合に、ターゲットビームを用いて、Ack/Nackの送信から通信することが可能となる。
 したがって、初送からターゲットビームを用いて通信する方法に比べて、さらに早期に通信品質を良好にすることが可能となる。
 本変形例で開示した方法を用いることによって、ソースビームを用いて送達未成功のデータを、ターゲットビームを用いて送信することが可能となる。
 以上に開示した方法を適宜組み合わせることによって、初送、再送、あるいはAck/Nackの送信から、ターゲットビームを用いて行うことが可能となる。
 ビームの切替の決定タイミングに応じて、これらの方法を適宜組み合わせて用いることによって、ビームの切替を、電波環境などに応じて最適なタイミングで行うことが可能となる。
 したがって、ビームの切替が頻繁に発生するような状況においても、より最適なビームへの切替を適切なタイミングで行うことが可能となり、通信品質の劣化ならびに切替え失敗による通信の遅延および通信の断絶を低減することが可能となる。
 実施の形態12から実施の形態13の変形例2では、ビームの切替について開示した。ビームの切替として、同一セル内のビーム間でのビームの切替、異なるセルのビーム間でのビームの切替、あるいは異なるeNBのビーム間でのビームの切替にも、前述の実施の形態で開示した方法を適宜組み合わせて適用するとよい。これによって、ビームの切替処理による通信品質の劣化ならびに切替え失敗による通信の遅延および通信の断絶を低減することが可能となる。
 前述の各実施の形態およびその変形例は、本発明の例示に過ぎず、本発明の範囲内において、各実施の形態およびその変形例を自由に組合せることができる。また各実施の形態およびその変形例の任意の構成要素を適宜変更または省略することができる。
 本発明は詳細に説明されたが、上記した説明は、すべての局面において、例示であって、本発明がそれに限定されるものではない。例示されていない無数の変形例が、本発明の範囲から外れることなく想定され得るものと解される。
 901,903 MeNB、902,904 SeNB、905,906,2402 UE、907,909,912,914 MAC、908,910,913,915 RLC、911,916 PDCP、2401 多素子アンテナ、2403,2404,2405 カバレッジ。

Claims (6)

  1.  第1の基地局装置と、第2の基地局装置と、前記第1の基地局装置および前記第2の基地局装置と無線通信可能な通信端末装置とを備える通信システムであって、
     前記通信端末装置は、
     前記第1の基地局装置と直接通信を行う第1の経路と、前記第2の基地局装置を介して前記第1の基地局装置と通信を行う第2の経路とによって、前記第1の基地局装置と通信可能であり、
     前記第1の基地局装置に送信する送信データのデータ量が、予め定める閾値を超える場合、前記送信データを前記第1の基地局装置および前記第2の基地局装置に送信するように設定され、前記送信データのデータ量が前記閾値以下である場合、前記送信データを前記第1の基地局装置に送信し、前記第2の基地局装置に送信しないように設定され、
     前記第2の基地局装置が、周期的に割り当てられる無線リソースを用いて前記通信端末装置と通信するように設定されると、前記送信データのデータ量が前記閾値以下である場合に、前記送信データが前記第1の基地局装置および前記第2の基地局装置に送信されるように、前記閾値が変更されることを特徴とする通信システム。
  2.  第1の基地局装置と、第2の基地局装置と、前記第1の基地局装置および前記第2の基地局装置と無線通信可能な通信端末装置とを備える通信システムであって、
     前記通信端末装置は、
     前記第1の基地局装置と直接通信を行う第1の経路と、前記第2の基地局装置を介して前記第1の基地局装置と通信を行う第2の経路とによって、前記第1の基地局装置と通信可能であり、
     前記第1の基地局装置に送信する送信データのデータ量が、予め定める閾値以上である場合、前記送信データを前記第1の基地局装置および前記第2の基地局装置に送信するように設定され、前記送信データのデータ量が前記閾値未満である場合、前記送信データを前記第1の基地局装置に送信し、前記第2の基地局装置に送信しないように設定され、
     前記第2の基地局装置が、周期的に割り当てられる無線リソースを用いて前記通信端末装置と通信するように設定されると、前記送信データのデータ量が前記閾値未満である場合に、前記送信データが前記第1の基地局装置および前記第2の基地局装置に送信されるように、前記閾値が変更されることを特徴とする通信システム。
  3.  第1の基地局装置と、第2の基地局装置と、前記第1の基地局装置および前記第2の基地局装置と無線通信可能な通信端末装置とを備える通信システムであって、
     前記通信端末装置は、
     前記第1の基地局装置と直接通信を行う第1の経路と、前記第2の基地局装置を介して前記第1の基地局装置と通信を行う第2の経路とによって、前記第1の基地局装置と通信可能であり、
     前記第1の基地局装置に送信する送信データのデータ量が、予め定める閾値を超える場合、前記送信データを前記第1の基地局装置および前記第2の基地局装置に送信するように設定され、前記送信データのデータ量が前記閾値以下である場合、前記送信データを前記第1の基地局装置に送信し、前記第2の基地局装置に送信しないように設定され、
     前記第2の基地局装置が、周期的に割り当てられる無線リソースを用いて前記通信端末装置と通信するように設定されると、前記通信端末装置は、前記送信データのデータ量が前記閾値以下である場合に、前記送信データを前記第1の基地局装置に送信するとともに、前記周期的に割り当てられる無線リソースを用いた通信の終了を表す終了信号を前記第2の基地局装置に送信するように設定されることを特徴とする通信システム。
  4.  第1の基地局装置と、第2の基地局装置と、前記第1の基地局装置および前記第2の基地局装置と無線通信可能な通信端末装置とを備える通信システムであって、
     前記通信端末装置は、
     前記第1の基地局装置と直接通信を行う第1の経路と、前記第2の基地局装置を介して前記第1の基地局装置と通信を行う第2の経路とによって、前記第1の基地局装置と通信可能であり、
     前記第1の基地局装置に送信する送信データのデータ量が、予め定める閾値以上である場合、前記送信データを前記第1の基地局装置および前記第2の基地局装置に送信するように設定され、前記送信データのデータ量が前記閾値未満である場合、前記送信データを前記第1の基地局装置に送信し、前記第2の基地局装置に送信しないように設定され、
     前記第2の基地局装置が、周期的に割り当てられる無線リソースを用いて前記通信端末装置と通信するように設定されると、前記通信端末装置は、前記送信データのデータ量が前記閾値未満である場合に、前記送信データを前記第1の基地局装置に送信するとともに、前記周期的に割り当てられる無線リソースを用いた通信の終了を表す終了信号を前記第2の基地局装置に送信するように設定されることを特徴とする通信システム。
  5.  前記通信端末装置は、前記周期的に割り当てられる無線リソースのリリースを停止することを示すリリース停止情報を受信すると、前記周期的に割り当てられる無線リソースのリリースを停止することを特徴とする請求項3または4に記載の通信システム。
  6.  前記通信端末装置は、前記周期的に割り当てられる無線リソースのリリースを再開することを示すリリース再開情報を受信すると、前記周期的に割り当てられる無線リソースのリリースを再開することを特徴とする請求項5に記載の通信システム。
PCT/JP2017/002868 2016-02-03 2017-01-27 通信システム WO2017135159A1 (ja)

Priority Applications (12)

Application Number Priority Date Filing Date Title
CN202211708996.2A CN115996363A (zh) 2016-02-03 2017-01-27 通信系统
US16/069,285 US10764889B2 (en) 2016-02-03 2017-01-27 Communication system
CN202211708975.0A CN115955723A (zh) 2016-02-03 2017-01-27 通信系统
JP2017565519A JP6968706B2 (ja) 2016-02-03 2017-01-27 通信システム
EP17747316.2A EP3413656A4 (en) 2016-02-03 2017-01-27 COMMUNICATION SYSTEM
CN202211709564.3A CN116033580A (zh) 2016-02-03 2017-01-27 通信系统
CN201780008687.5A CN108605325A (zh) 2016-02-03 2017-01-27 通信系统
EP22198692.0A EP4145719A1 (en) 2016-02-03 2017-01-27 Communication system, base station and user equipment
EP20216932.2A EP3833154A1 (en) 2016-02-03 2017-01-27 Use of different padding transmissions for releasing radio resources
US16/937,177 US20200359377A1 (en) 2016-02-03 2020-07-23 Communication system, communication terminal, and base station
US17/659,132 US20220240248A1 (en) 2016-02-03 2022-04-13 Communication system, base station and user equipment
US18/466,452 US20230422224A1 (en) 2016-02-03 2023-09-13 Communication system, base station and user equipment

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016019016 2016-02-03
JP2016-019016 2016-02-03

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US16/069,285 A-371-Of-International US10764889B2 (en) 2016-02-03 2017-01-27 Communication system
US16/937,177 Continuation US20200359377A1 (en) 2016-02-03 2020-07-23 Communication system, communication terminal, and base station

Publications (1)

Publication Number Publication Date
WO2017135159A1 true WO2017135159A1 (ja) 2017-08-10

Family

ID=59501084

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/002868 WO2017135159A1 (ja) 2016-02-03 2017-01-27 通信システム

Country Status (5)

Country Link
US (4) US10764889B2 (ja)
EP (3) EP4145719A1 (ja)
JP (4) JP6968706B2 (ja)
CN (4) CN108605325A (ja)
WO (1) WO2017135159A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020528677A (ja) * 2017-09-28 2020-09-24 テレフオンアクチーボラゲット エルエム エリクソン(パブル) Pdcp ul分割および前処理
JP2020533914A (ja) * 2017-09-18 2020-11-19 クアルコム,インコーポレイテッド 制御チャネルシグナリングを介したビーム切替コマンドの送信
JP2022500950A (ja) * 2018-09-21 2022-01-04 維沃移動通信有限公司Vivo Mobile Communication Co., Ltd. リソース配置方法、端末、およびネットワーク機器
US11825537B2 (en) 2017-09-28 2023-11-21 Telefonaktiebolaget Lm Ericsson (Publ) PDCP UL split and pre-processing

Families Citing this family (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10454714B2 (en) 2013-07-10 2019-10-22 Nicira, Inc. Method and system of overlay flow control
GB2542770B (en) * 2015-09-25 2020-01-08 Samsung Electronics Co Ltd Mobile device capability identifier
US10602440B2 (en) * 2016-03-07 2020-03-24 Telefonaktiebolabet Lm Ericsson (Publ) Method and access node for supporting UE as well as a UE and corresponding method carried out by the UE in a wireless communication system
US10367677B2 (en) 2016-05-13 2019-07-30 Telefonaktiebolaget Lm Ericsson (Publ) Network architecture, methods, and devices for a wireless communications network
CN107889220B (zh) * 2016-09-29 2022-01-28 华为技术有限公司 通信方法、基站和终端设备
KR20190073408A (ko) * 2016-11-03 2019-06-26 광동 오포 모바일 텔레커뮤니케이션즈 코포레이션 리미티드 업링크 신호 전송 방법, 단말 기기 및 네트워크측 기기
KR102156668B1 (ko) * 2016-11-16 2020-09-17 주식회사 케이티 차세대 무선망에서 하향링크 신호를 송수신하는 방법 및 그 장치
US10750532B2 (en) * 2016-12-07 2020-08-18 Ofinno, Llc Semi-persistent scheduling transmission selection
CN110100470A (zh) * 2016-12-28 2019-08-06 三菱电机株式会社 通信系统
WO2018136815A1 (en) * 2017-01-19 2018-07-26 Intel IP Corporation Semi-persistent scheduling for autonomous transmission activation and release
CN110731055A (zh) * 2017-03-23 2020-01-24 株式会社Ntt都科摩 用户终端以及无线通信方法
KR102604279B1 (ko) * 2017-03-24 2023-11-20 삼성전자주식회사 무선 통신 시스템에서의 반영구적 스케줄링 및 전력 제어를 위한 장치 및 방법
US20200374048A1 (en) * 2017-08-11 2020-11-26 Lenovo (Beijing) Limited Harq-ack feedback timing for sps pdsch
US10873866B2 (en) * 2017-09-27 2020-12-22 Electronics And Telecommunications Research Institute Method for managing radio resources in communication system and apparatus for the same
EP3685619A4 (en) 2017-09-28 2021-04-07 Samsung Electronics Co., Ltd. METHOD AND NETWORK NODE FOR PERFORMING DATA TRANSMISSION AND MEASUREMENTS ON MULTIPLE PARTS OF BANDWIDTH
US10594516B2 (en) 2017-10-02 2020-03-17 Vmware, Inc. Virtual network provider
US10999100B2 (en) 2017-10-02 2021-05-04 Vmware, Inc. Identifying multiple nodes in a virtual network defined over a set of public clouds to connect to an external SAAS provider
US11115480B2 (en) 2017-10-02 2021-09-07 Vmware, Inc. Layer four optimization for a virtual network defined over public cloud
WO2019088911A1 (en) * 2017-11-06 2019-05-09 Telefonaktiebolaget Lm Ericsson (Publ) Methods and apparatus for synchronizing critical data transmission
US11223514B2 (en) 2017-11-09 2022-01-11 Nicira, Inc. Method and system of a dynamic high-availability mode based on current wide area network connectivity
US11044730B2 (en) * 2018-09-25 2021-06-22 Qualcomm Incorporated Multiple semi-persistent scheduled transmission control by a single downlink control information message
CN113169823A (zh) * 2018-11-22 2021-07-23 瑞典爱立信有限公司 用于同时发送和接收的确认
US11026289B2 (en) * 2018-12-27 2021-06-01 Industrial Technology Research Institute Base station and resource allocation method based on semi-persistent scheduling
US11382068B2 (en) * 2019-04-04 2022-07-05 Qualcomm Incorporated Semi-persistent scheduling for broadcast or multicast
CN110392417B (zh) * 2019-07-30 2022-05-17 Oppo(重庆)智能科技有限公司 功耗管理方法、终端、计算机设备和存储介质
US11121985B2 (en) 2019-08-27 2021-09-14 Vmware, Inc. Defining different public cloud virtual networks for different entities based on different sets of measurements
CN113556805B (zh) * 2020-04-26 2022-09-27 荣耀终端有限公司 减少功耗的方法及终端
US11297553B1 (en) * 2020-08-13 2022-04-05 T-Mobile Innovations Llc Serving access node selection to ensure uplink service
US11601356B2 (en) 2020-12-29 2023-03-07 Vmware, Inc. Emulating packet flows to assess network links for SD-WAN
US11979325B2 (en) 2021-01-28 2024-05-07 VMware LLC Dynamic SD-WAN hub cluster scaling with machine learning
US20220407915A1 (en) * 2021-06-18 2022-12-22 Vmware, Inc. Method and apparatus for deploying tenant deployable elements across public clouds based on harvested performance metrics
US20230074011A1 (en) * 2021-09-05 2023-03-09 Qualcomm Incorporated Managing Unmanned Aerial Vehicle Broadcast Signals
US11943146B2 (en) 2021-10-01 2024-03-26 VMware LLC Traffic prioritization in SD-WAN
US11909815B2 (en) 2022-06-06 2024-02-20 VMware LLC Routing based on geolocation costs

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2352324B1 (en) * 2008-11-28 2017-09-27 NEC Corporation Base station device, method for controlling base station device, communication system, and storage medium having program stored therein
KR102094050B1 (ko) 2012-01-27 2020-03-27 인터디지탈 패튼 홀딩스, 인크 다중 캐리어 기반형 및/또는 의사 조합형 네트워크에서 epdcch를 제공하는 시스템 및/또는 방법
WO2014071581A1 (zh) * 2012-11-07 2014-05-15 华为技术有限公司 半持久调度的方法和基站
KR102049772B1 (ko) 2013-01-15 2019-11-28 삼성전자 주식회사 빔포밍 시스템에서 신호 측정 방법 및 장치
CN117856836A (zh) 2013-01-25 2024-04-09 交互数字专利控股公司 用于确定资源的方法和无线发射/接收单元
GB2525891B (en) * 2014-05-07 2017-06-07 Samsung Electronics Co Ltd Bearer reconfiguration
EP3095288A1 (en) * 2014-01-17 2016-11-23 Idac Holding, Inc. 3gpp mmw access link system architecture
CN104812003A (zh) * 2014-01-28 2015-07-29 上海贝尔股份有限公司 用于主基站和辅基站的流控制方法和设备
GB2522673B (en) 2014-01-31 2016-08-03 Samsung Electronics Co Ltd Method and apparatus for implementing dual connectivity
US10321362B2 (en) * 2014-03-10 2019-06-11 Nec Corporation Apparatus, system and method for DC (dual connectivity)
CN106031257B (zh) * 2014-04-30 2020-05-15 夏普株式会社 终端装置以及方法
CN106416386B (zh) * 2014-06-05 2020-07-07 夏普株式会社 终端装置以及方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
ALCATEL -LUCENT SHANGHAI BELL: "SPS in split mode", 3GPP TSG-RAN WG2 MEETING #85BIS R2-141504, 22 March 2014 (2014-03-22), XP050817872, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsg-ran/WG2_RL2/TSGR2_85bis/Docs/R2-141504.zip> [retrieved on 20170327] *
ITRI: "BSR Trigger for Uplink Split Bearer", 3GPP TSG-RAN WG2 MEETING #90 R2- 152359, 15 May 2015 (2015-05-15), XP050971582, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_90/Docs/R2-152359.zip> [retrieved on 20170327] *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020533914A (ja) * 2017-09-18 2020-11-19 クアルコム,インコーポレイテッド 制御チャネルシグナリングを介したビーム切替コマンドの送信
US10893516B2 (en) 2017-09-18 2021-01-12 Qualcomm Incorporated Transmission of beam switch commands through control channel signaling
US11638244B2 (en) 2017-09-18 2023-04-25 Qualcomm Incorporated Transmission of beam switch commands through control channel signaling
JP2020528677A (ja) * 2017-09-28 2020-09-24 テレフオンアクチーボラゲット エルエム エリクソン(パブル) Pdcp ul分割および前処理
US11825537B2 (en) 2017-09-28 2023-11-21 Telefonaktiebolaget Lm Ericsson (Publ) PDCP UL split and pre-processing
JP2022500950A (ja) * 2018-09-21 2022-01-04 維沃移動通信有限公司Vivo Mobile Communication Co., Ltd. リソース配置方法、端末、およびネットワーク機器
JP7194819B2 (ja) 2018-09-21 2022-12-22 維沃移動通信有限公司 リソース配置方法、端末、およびネットワーク機器

Also Published As

Publication number Publication date
US20220240248A1 (en) 2022-07-28
US20200359377A1 (en) 2020-11-12
CN116033580A (zh) 2023-04-28
CN108605325A (zh) 2018-09-28
US20230422224A1 (en) 2023-12-28
CN115955723A (zh) 2023-04-11
JP6968706B2 (ja) 2021-11-17
CN115996363A (zh) 2023-04-21
JP2022009576A (ja) 2022-01-14
EP3833154A1 (en) 2021-06-09
JP7451642B2 (ja) 2024-03-18
US20190021085A1 (en) 2019-01-17
JP2022177318A (ja) 2022-11-30
JPWO2017135159A1 (ja) 2018-11-22
US10764889B2 (en) 2020-09-01
JP2022188208A (ja) 2022-12-20
EP4145719A1 (en) 2023-03-08
EP3413656A1 (en) 2018-12-12
EP3413656A4 (en) 2019-10-23

Similar Documents

Publication Publication Date Title
JP7451642B2 (ja) 通信システム、基地局およびユーザ装置
JP7086499B2 (ja) 通信システム、基地局および通信端末
US20230199821A1 (en) Mobile communication system, mobile terminal and base station
WO2020031884A1 (ja) 通信システム、通信端末および基地局
JP2023015404A (ja) 通信システム、基地局および端末装置
WO2019244735A1 (ja) 通信システムおよび通信端末装置
JPWO2019098059A1 (ja) 通信システム、通信端末装置および通信ノード
JP7321322B2 (ja) 移動端末装置
JP2024063188A (ja) 通信システム、基地局およびユーザ装置
WO2023013513A1 (ja) 通信システム
WO2023054394A1 (ja) 通信システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17747316

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017565519

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2017747316

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2017747316

Country of ref document: EP

Effective date: 20180903