WO2016139776A1 - 溶湯搬送システムおよび方法 - Google Patents

溶湯搬送システムおよび方法 Download PDF

Info

Publication number
WO2016139776A1
WO2016139776A1 PCT/JP2015/056358 JP2015056358W WO2016139776A1 WO 2016139776 A1 WO2016139776 A1 WO 2016139776A1 JP 2015056358 W JP2015056358 W JP 2015056358W WO 2016139776 A1 WO2016139776 A1 WO 2016139776A1
Authority
WO
WIPO (PCT)
Prior art keywords
ladle
molten metal
pouring
weight
alloy material
Prior art date
Application number
PCT/JP2015/056358
Other languages
English (en)
French (fr)
Inventor
西田 理
星野 正則
Original Assignee
新東工業株式会社
藤和電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 新東工業株式会社, 藤和電気株式会社 filed Critical 新東工業株式会社
Priority to RU2017130926A priority Critical patent/RU2017130926A/ru
Priority to KR1020177024681A priority patent/KR102291995B1/ko
Priority to US15/552,406 priority patent/US10549343B2/en
Priority to EP15883943.1A priority patent/EP3266539B1/en
Priority to JP2015553959A priority patent/JP5934451B1/ja
Priority to CN201580001063.1A priority patent/CN106132594B/zh
Priority to MX2017011267A priority patent/MX2017011267A/es
Priority to BR112017016315-2A priority patent/BR112017016315A2/ja
Priority to PCT/JP2015/056358 priority patent/WO2016139776A1/ja
Publication of WO2016139776A1 publication Critical patent/WO2016139776A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/12Travelling ladles or similar containers; Cars for ladles

Definitions

  • the present invention relates to a molten metal conveyance system and method for conveying molten metal from a furnace to a mold in a casting factory, and more particularly to a molten metal conveyance system and method suitable for adding an alloy material to the molten metal.
  • the molten metal melted in the melting furnace etc. is transported to the pouring device, and the product is cast by pouring into the mold in the pouring device.
  • alloy materials such as Mg, Ce, Ca, Ni, Cr, Cu, Mo, V, and Ti are added to the molten metal in order to increase strength, toughness, corrosion resistance, heat resistance, and wear resistance.
  • such an alloy material is introduced in advance into a ladle that receives the molten metal from the melting furnace to cause a reaction with the poured molten metal.
  • the molten metal before reacting with the alloy material (melted in a melting furnace or the like) and the molten metal after reacting with the alloy material are also simply referred to as “molten metal”.
  • the molten metal and the alloy material generally react violently, and in order to improve the yield of the alloy material, the ladle is required to be about 1.5 to 2.0 times the diameter. Therefore, a processing ladle provided with a pocket for storing an alloy material in a deep ladle is used. In addition, the processing ladle is transported to the reaction chamber to suppress the influence on the surroundings during the reaction. After the reaction is completed, the molten metal is replaced with a crane or the like from the treatment ladle to the pouring ladle and delivered to a pouring machine for pouring the molten metal into the mold. Therefore, such a treatment ladle is also called an empty ladle. It was dangerous work to transport the processing ladle containing the hot molten metal with a crane or to replace the processing ladle with the pouring ladle.
  • a molten metal conveyance line for conveying and replacing the molten metal a ladle conveying emptying carriage that conveys the molten metal receiving ladle on the track, and a moving means that moves in the direction perpendicular to the track on the carriage.
  • a molten metal conveyance line provided with a lifting mechanism that moves up and down on the moving means, a tilting means disposed in the lifting mechanism, and a ladle holding jig that is tilted by the tilting means and detachably holds the hot water ladle. It has been proposed (for example, Japanese Patent No. 5475004).
  • a spheroidizing element Mg, Ce, Ca, etc.
  • the spheroidizing element reacts with the refractory and air in the ladle and is consumed over time. That is, spheroidizing fading (hereinafter simply referred to as “fading”) occurs.
  • fading is a phenomenon in which, after adding a graphite spheroidizing agent to a molten casting, the effect fades with time. Typically, it is said that the effect disappears in about 20 minutes.
  • the effect of the graphite spheroidizing agent is reduced, poor spheroidization occurs. Therefore, it is necessary to end the pouring before spheroidization failure due to fading occurs.
  • this fading timing was started by visual observation of an expert, and the occurrence of poor spheroidization was prevented while checking the fading time.
  • the fading time varies depending on the type and amount of the alloy material and also varies depending on the size of the treatment ladle and the transport method (such as shaking of the treatment ladle).
  • manually put the weighed alloy material into the processing ladle pocket quickly transport the processing ladle before the furnace, receive the molten metal, make it spheroidized, and replace it with the pouring ladle. Doing work. In such a method, it is still necessary for an operator to perform work near the processing ladle containing the molten metal, and problems of work environment and safety have been pointed out.
  • the foundry includes a melting device such as a melting furnace, an alloy material charging device for adding an alloy material, a pouring machine for pouring a mold into a mold, and a processing ladle as an alloy material charging device, Processing ladle transport equipment that moves between melting furnaces, reaction chambers, and pouring ladle positions, and pouring hot water that moves the pouring ladle between the pouring position from the processing ladle and the pouring machine.
  • Ladle transport equipment is provided. Casting factories are wide, and in order to update each device individually, the actual situation is that a controller is installed and controlled for each device. However, as described above, for example, fading starts in the treatment ladle, but it is necessary to consider the influence of fading in the pouring operation from the pouring ladle to the mold.
  • the present invention automates the charging of the alloy material into the treatment ladle and also automates the conveyance of the molten metal from the treatment ladle to the pouring machine, thereby producing a safe and stable quality casting.
  • An object is to provide a molten metal transfer system and method.
  • the molten metal conveyance system according to the first aspect of the present invention is a molten metal conveyance system 1 that conveys molten metal from a furnace F to a pouring machine 100 as shown in FIGS. 1 and 5, for example. Receiving and pouring the processing ladle 10 into the pouring ladle 60, the alloy material loading device 50 for pouring the alloy material into the processing ladle 10, and the molten metal from the processing ladle 10, and transporting it to the pouring machine 100.
  • the alloy material charging device 50 has an alloy material charging device controller 120 for controlling the operation of the alloy material charging device 50; the hot water receiving cart 20 with an air replacement function is equipped with an air replacement function. It has a hot water receiving carriage controller 110 with an air-replacement function for controlling the operation of the hot water receiving carriage 20; the pouring ladle transporting carriage 70 is a pouring ladle conveying car controller that controls the operation of the pouring ladle conveying truck 70. 130, and a data communication between at least two controllers among the pouring machine controller 140, the alloy material charging device controller 120, the hot water receiving bogie controller 110 with an air exchange function, and the pouring ladle transport bogie controller 130. It is made.
  • the alloy material is introduced into the treatment ladle from the alloy material charging device, and the molten metal is received from the furnace into the treatment ladle.
  • the molten metal can be replaced from the processing ladle into the pouring machine.
  • the alloy material can be introduced without human intervention, the molten metal can be transported safely and quickly from the treatment ladle to the pouring machine, and poured into the mold while quality is controlled.
  • the molten metal transfer system according to the second aspect of the present invention is the molten metal transfer system 1 according to the first aspect.
  • the weight of the processing ladle 10 measured with the 1st weight measuring instrument 112 is sent to the hot water supply cart controller 110 with an air replacement function, ,
  • a second weight measuring device 142 for measuring the weight of the pouring ladle 60 is provided, and the weight of the pouring ladle 60 measured by the second weight measuring device 142 is sent to the pouring machine controller 140, and the air exchange function
  • the attached hot water trolley controller 110 receives the weight of the molten metal in the treatment ladle 10 when the treatment ladle 10 has received the molten metal from the furnace F as the first weight information W1, and the pouring machine controller 140 Replace molten metal from 10
  • the weight of the molten metal in the pouring ladle 60 is received as the second weight information W2, and further, the first weight information W1 is received from the hot water receiving cart controller 110 with the air replacement function, and the first weight
  • the amount of molten metal reduced by spilling or leaking while being conveyed from the treatment ladle to the pouring ladle of the pouring machine is checked, and the amount of molten metal that is reduced is above a threshold value. An error signal can be issued. Therefore, it can be confirmed that the molten metal is transported safely and reliably.
  • the molten metal transport system according to the third aspect of the present invention is the molten metal transport system 1 according to the second aspect.
  • the water trolley controller 110 detects the start of fading in the processing ladle 10 from the amount of change in weight measured by the first weight measuring device 112.
  • the molten metal transfer system according to the fourth aspect of the present invention is the same as the molten metal transfer system 1 according to the third aspect.
  • a fading start signal notifying the start of fading or a fading timer signal that is an elapsed time from the start of fading is transmitted to the other controllers 130, 140, 150, 160.
  • the fading elapsed time based on the start of the fading time automatically detected can be managed by the controller, and the fading elapsed time can be accurately grasped.
  • the molten metal transport system according to the fifth aspect of the present invention is the molten metal transport system 1 according to the fourth aspect.
  • the time TF counted from the fading start signal or the elapsed time TF from the start of fading received from another controller before the weight of the molten metal in the pouring ladle 60 becomes equal to or less than a predetermined value.
  • An error signal is issued when the threshold value T2 is exceeded.
  • the molten metal conveyance system according to the sixth aspect of the present invention is an alloy material charging device in the molten metal conveyance system 1 according to any one of the first to fifth aspects, for example, as shown in FIGS. 50 includes a weighing hopper 56 for storing the alloy material to be put into the processing ladle 10, and a third weight measuring device 122 for measuring the weight of the alloy material of the weighing hopper 56, and is measured by the third weight measuring device 122.
  • the weight of the alloy material is sent to the alloy material charging device controller 120 as third weight information W3, and the alloy material charging device controller 120 transmits the third weight information W3 to the hot water supply cart controller 110 with an air exchange function
  • the 1st weight measuring device 112 measures the weight of the alloy material thrown into the processing ladle 10, and transmits it as 4th weight information W4 to the hot water supply trolley controller 110 with an empty replacement function, and the hot water supply trolley controller with an empty replacement function.
  • La 112 emits an error signal if the difference between the third weight information W3 and the fourth weight information W4 exceeds a predetermined third threshold T3.
  • the molten metal transport system according to the seventh aspect of the present invention is an alloy material in the molten metal transport system 1 according to any one of the first to sixth aspects.
  • the weight of the treatment ladle 10 before being charged is measured and transmitted as the fifth weight information W5 to the hot water supply dolly controller 110 with the air replacement function, and the first weight measuring device 112 supplies the molten metal to the pouring ladle 60.
  • the weight of the processing ladle 10 after the replacement is measured and transmitted as sixth weight information W6 to the hot water receiving bogie controller 110 with an empty replacement function.
  • the hot water receiving bogie controller 110 with an empty replacement function includes fifth weight information W5 and An error signal is generated when the difference from the sixth weight information W6 exceeds a predetermined fourth threshold value T4.
  • the molten metal transport system according to the eighth aspect of the present invention is a molten metal transport system 1 according to any one of the first to seventh aspects.
  • An empty inoculation device 80 is further provided for injecting the inoculum into the molten metal that can be replaced by
  • the inoculum can be introduced when the molten metal is replaced from the treatment ladle to the pouring ladle, so that the inoculum can be uniformly mixed in the molten metal in a short time.
  • the molten metal transport system according to the ninth aspect of the present invention moves the hot water receiving carriage 20 with an air replacement function in the molten metal transport system 1 according to any of the first to eighth aspects.
  • Two of the three positions of the insertion position P2, the receiving position P1, and the empty replacement position P4 are the same position.
  • the molten metal transport system includes a molten metal transport system 1 according to any one of the first to ninth aspects,
  • a tilting device 40 that tilts the processing ladle 10 and replaces the molten metal in the pouring ladle 60 is provided.
  • the hot water receiving carriage with an air replacement function includes a tilting device, so that the molten metal can be replaced automatically from the processing ladle to the pouring ladle automatically and safely.
  • the molten metal transport system according to the eleventh aspect of the present invention is the molten metal transport system 1 according to the tenth aspect.
  • the tilting device can be moved up and down, so it is possible to automatically and safely replace the molten metal from the processing ladle to the pouring ladle. it can. Moreover, even if the level of the processing ladle and the pouring ladle is different, the molten metal can be easily replaced.
  • the molten metal transport system according to the twelfth aspect of the present invention is the molten metal transport system 1 according to the tenth aspect.
  • a carriage main body 24 that travels above, a guide pillar 32 installed on the carriage main body 24, and a table 34 that extends horizontally from the guide pillar 32 and that can be raised and lowered on the carriage 20, on which the tilting device 40 is mounted.
  • a lifting table 34 that lifts and lowers the lifting table 34.
  • the hot water receiving cart with an empty replacement function is equipped with a lifting table on which the tilting device is placed and can move the tilting device up and down, so it is safe to automatically replace the molten metal from the processing ladle to the pouring ladle. Can be done. Moreover, even if the level of the processing ladle and the pouring ladle is different, the molten metal can be easily replaced.
  • the hot water receiving carriage 20 with an air replacement function includes wheels 22 and a track R1.
  • the tilting device 40 supports an empty shaft 42 that supports the processing ladle 10 at the center of tilting.
  • a sector gear 44 connected to the processing ladle 10 at a position different from the tilting center, and a sector gear driving device 46 for driving the sector gear 44.
  • the hot water receiving cart with an empty exchange function is provided with the roller conveyor which moves a processing ladle, and a tilting device is provided with the sector gear and the sector gear drive device which drives a sector gear, the pouring ladle from a processing ladle The molten metal can be replaced automatically and safely.
  • the molten metal transport system according to the fourteenth aspect of the present invention is the molten metal transport system 1 according to the sixth aspect.
  • Hopper 54 a plurality of weighing hoppers 56 for flowing a predetermined amount of alloy material from the plurality of hoppers 54 to the charging chute 52, a plurality of third weight measuring devices 122, and an alloy material measured by the weighing hopper 56
  • the third weight information is the total weight measured by the plurality of third weight measuring devices.
  • a predetermined amount of alloy material can be weighed with a weighing hopper and charged into the treatment ladle from the charging chute, so that a predetermined amount of alloy can be quickly prepared and an accurate amount of alloy material can be charged. it can.
  • an alloy material can be input from a plurality of hoppers, a plurality of types of alloy materials can be input in an accurate amount.
  • the molten metal conveying method according to the fifteenth aspect of the present invention is a molten metal conveying method for conveying molten metal from a furnace F to a pouring machine 100, for example, as shown in FIG.
  • the molten metal in the processing ladle 10 is transferred to the pouring ladle 60. Measuring the weight of the treatment ladle 10. Of the molten metal replaced by the pouring ladle 60 from the processing ladle 10 measured by the above and the molten metal replaced by the pouring ladle 60 measured by measuring the weight of the pouring ladle 60. The method further includes calculating a first weight difference from the weight and generating an error signal when the first weight difference exceeds a first threshold value T1.
  • the molten metal conveying method according to the sixteenth aspect of the present invention measures the weight of the treatment ladle 10 that has received molten metal from the furnace F in the molten metal conveying method according to the fifteenth aspect.
  • the process of detecting the start of fading based on the variation in weight and counting the elapsed time from the start of fading, and the weight of the molten metal in the pouring ladle 60 after pouring the molten metal 10 is predetermined.
  • the molten metal conveying method according to the seventeenth aspect of the present invention is, for example, as shown in FIG. 1, in the molten metal conveying method according to the fifteenth or sixteenth aspect, the weight of the alloy material put into the treatment ladle 10 and the treatment
  • the method further includes a step of calculating a second weight difference from the weight of the charged alloy material measured by measuring the weight of the ladle 10 and generating an error signal when the second weight difference exceeds the third threshold T3. .
  • the molten metal conveying method according to the eighteenth aspect of the present invention is the molten metal conveying method according to any of the fifteenth to seventeenth aspects, wherein the charging position P2, the empty replacement position P4, and the receiving position. Two of the three positions of P1 are the same position, and the process ladle is not moved in the process of moving the process ladle 10 at the same position.
  • a molten metal conveyance system is a molten metal conveyance system 1 that conveys molten metal from a furnace F to a pouring machine 100 as shown in FIGS. 1 and 5, for example.
  • the processing ladle 10 for receiving and replacing the pouring ladle 60, the alloy material loading device 50 for pouring the alloy material into the processing ladle 10, and the molten metal from the processing ladle 10 are received and poured into the mold D.
  • the pouring ladle 60, the pouring position P2 for pouring the alloy material into the treatment ladle 10 from the alloy material pouring device 50, the receiving position P1 where the treatment ladle 10 receives the molten metal from the furnace F, and the pouring from the treatment ladle 10 A hot water receiving carriage 20 with an air replacement function for moving the treatment ladle 10 to an empty replacement position P4 where the molten metal is replaced into the hot water pan 60, and a pouring machine for pouring the molten metal of the pouring ladle 60 into the mold D.
  • the pouring machine 100 controls the operation of the pouring machine 100.
  • the alloy material is introduced into the treatment ladle from the alloy material charging device, and the molten metal is received from the furnace into the treatment ladle.
  • the molten metal can be replaced from the processing ladle into the pouring machine.
  • the alloy material can be introduced without human intervention, the molten metal can be transported safely and quickly from the treatment ladle to the pouring machine, and poured into the mold while quality is controlled.
  • (A) is a side view of a sector gear type hot water receiving carriage with an air replacement function
  • (b) is a partial view of the sector gear 44
  • (c) is a diagram for explaining a ladle rotating support installed in a processing ladle. is there. It is a top view in the foundry which has a molten metal conveyance system different from FIG. 1 of one Embodiment of this invention.
  • FIG. 1 is a plan view of a casting factory having a molten metal transfer system 1 according to an embodiment of the present invention.
  • a melting furnace F for receiving molten metal in the processing ladle 10 and a mold D and a mold D that are made by cooling and solidifying the poured molten metal to be a cast product are conveyed.
  • a mold line DL is provided.
  • the molten metal may be put into the treatment ladle 10 from a holding furnace or the like. Further, in the foundry, the molten metal is transferred from the melting furnace F to the treatment ladle 10 and transported, and the molten metal is replaced in the pouring ladle 60 to be poured into the mold D from the pouring machine 100.
  • the transport system 1 includes a processing ladle 10, a hot water receiving cart 20 with an air replacement function, an alloy material charging device 50, a pouring ladle 60, a pouring ladle transport cart 70, and a pouring machine 100. Prepare. Further, an empty inoculation device 80 may be provided.
  • FIG. 2 is a side view showing an example of the treatment ladle 10 used in the molten metal transfer system 1.
  • the treatment ladle 10 is a ladle for receiving molten metal from the furnace F and replacing it with the pouring ladle 60.
  • a pocket 12 is formed that is a depression for previously containing an alloy material that reacts with the molten metal. In addition, the pocket 12 may not be formed in the processing ladle 10.
  • the processing ladle 10 is received by a receiving hot water carriage 20 with an air replacement function (1) a receiving position P1 in front of the melting furnace F where the processing ladle 10 receives the molten metal from the furnace F, and (2) an alloy material charging device 50. (3) Reaction position P3 where the alloy material and molten metal react with each other, (4) Pouring from the treatment ladle 10. It is conveyed to the ladle 60 between the empty change positions P4 where the molten metal is changed.
  • a reaction chamber 90 is preferably provided at the reaction position P3 where the alloy material and the molten metal react. The reaction chamber 90 surrounds the upper portion of the treatment ladle 10.
  • reaction chamber 90 is connected to a duct (not shown) for discharging dust and gas generated from the treatment ladle 10 by the reaction between the alloy material and the molten metal.
  • FIG. 3 is a side configuration diagram illustrating an example of the alloy material charging device 50.
  • the alloy material charging device 50 is a device for charging the treatment ladle 10 with an alloy material to be added to the molten metal.
  • the alloy material includes a graphite spheroidizing agent such as magnesium, cesium, or calcium.
  • an inoculant such as calcium silicon, ferrosilicon, or graphite may be charged by the alloy material charging device 50.
  • the alloy material is put into the treatment ladle 10 before the molten metal is added. Further, the alloy material is preferably put into the pocket 12 in the treatment ladle 10.
  • the alloy material charging device 50 shown in FIG. 3 includes five hoppers 54 that store the alloy material. Therefore, five types of alloy materials can be mixed and put into the treatment ladle 10.
  • the number of hoppers 54 may be one or more, and can be arbitrarily changed according to the application.
  • FIG. 4A and 4B are configuration diagrams illustrating details of the outlet of the hopper 54, in which FIG. 4A is a side view and FIG. 4B is a front view.
  • An electromagnetic feeder 55 is provided at the lower outlet of each hopper 54.
  • the electromagnetic feeder 55 is a device that conveys the alloy material stored in the hopper 54 to the weighing hopper 56 at a predetermined flow rate.
  • the weighing hopper 56 is a hopper that is disposed below each hopper 54 and stores an alloy material conveyed by the electromagnetic feeder 55.
  • the lower part of each weighing hopper 56 is closed by a charging gate 58.
  • the weight of the alloy material stored in each weighing hopper 56 is measured by a load cell 122 as a third weight measuring device.
  • the charging gate 58 is opened, and the alloy material is charged into the treatment ladle 10 through the charging chute 52.
  • the alloy material that has passed through the charging gate 58 may be conveyed to the charging chute 52 by the belt conveyor 51.
  • the pouring ladle 60 is a ladle for receiving molten metal from the treatment ladle 10 and pouring the molten metal into the mold D.
  • the pouring ladle 60 is tilted by the pouring machine 100 and poured into the mold D.
  • the empty replacement position P ⁇ b> 4 is shown at a position away from the pouring machine 100, but the empty replacement position P ⁇ b> 4 may be the same place as the pouring machine 100. That is, the treatment ladle 10 may replace the molten metal in the pouring ladle 60 held in the pouring machine 100.
  • the empty inoculation apparatus 80 is an apparatus for injecting the inoculum when the molten metal is replaced from the processing ladle 10 to the pouring ladle 60.
  • the configuration of the air exchange inoculation device 80 is basically the same as that of the alloy material injection device 50.
  • each inoculum can be charged according to the weight of the molten metal, that is, the weight of the molten metal in the treatment ladle 10.
  • the molten metal weight in the treatment ladle 10 may be changed, and appropriate inoculation becomes possible by introducing an inoculum having a weight suitable for the molten metal.
  • the pouring ladle 60 is conveyed from the empty position P4 to the pouring machine 100 by the pouring ladle conveyance carriage 70.
  • the pouring ladle transport cart 70 includes a cart that travels on the rail R2 and a conveyor that moves the pouring ladle 60 on the cart. More specifically, a rail R3 for the pouring machine 100 is disposed in parallel with the rail R2 for the pouring ladle 60. And in order to transfer the pouring ladle 60 on the pouring ladle transport carriage 70 on the rail R2 to the pouring machine 100 on the rail R3, the actual ladle conveyor S1 and the empty ladle between the rail R2 and the rail R3.
  • a ladle conveyor S2 is provided. And the pouring ladle 60 holding the molten metal is transferred to the pouring machine 100 from the pouring ladle conveying cart 70 via the actual ladle conveyor S1, and the pouring is finished via the empty ladle conveyor S2. The pouring ladle 60 is transferred from the pouring machine 100 to the pouring ladle transport carriage 70.
  • the configurations of the pouring ladle transport carriage 70, the actual ladle conveyor S1, and the empty ladle conveyor S2 may be known configurations, and detailed descriptions thereof are omitted.
  • the pouring machine 100 is a device that tilts the pouring ladle 60 and pours the molten metal in the pouring ladle 60 into the mold D.
  • the mold D is repeatedly moved and stopped along the mold line DL. While the mold D is stopped, the pouring machine 100 pours water from the pouring ladle 60. When pouring is completed, the mold D moves by one frame, and the next empty mold D moves in front of the pouring machine 100 and stops.
  • the pouring machine 100 moves on the rail R3 while the pouring machine 100 pours the mold D, and the mold D moves on the mold line DL. You may do it.
  • FIG. 5 is a schematic configuration diagram illustrating an example of a control system of the molten metal transfer system 1.
  • the hot water receiving trolley 20 with an air replacement function includes a hot water receiving trolley controller 110 with an air replacement function that controls the running and emptying functions of the hot water receiving trolley 20 with an air replacement function.
  • the alloy material charging device 50 includes an alloy material charging device controller 120 that controls the function of the alloy material charging device 50.
  • the pouring ladle transport cart 70 includes a pouring ladle transport cart controller 130 that controls the traveling of the pouring ladle transport cart 70 and the transfer of the pouring ladle 60.
  • the pouring machine 100 includes a pouring machine controller 140 that controls the running of the pouring machine 100 and the tilting of the pouring ladle 60, that is, pouring.
  • the hot water receiving cart controller 110 with an air exchange function, the alloy material charging device controller 120, and the pouring ladle transport cart controller 130 are connected to the transport zone main controller 150 for communication.
  • the pouring machine controller 140 is connected to the pouring zone main controller 160 to perform communication. And the conveyance zone main controller 150 and the pouring zone main controller 160 are connected and communicate. That is, the hot water supply bogie controller 110 with an air exchange function, the alloy material charging device controller 120, the pouring ladle transport cart controller 130, and the pouring machine controller 140, which are controllers of the respective devices, are connected to be communicable.
  • the transport zone main controller 150 and the pouring zone main controller 160 which are the main controllers in each zone in the foundry, are the other controllers (not shown) in each zone or a controller (not shown) that controls the entire foundry. ) To communicate with each other.
  • the transport zone main controller 150 and the pouring zone main controller 160 which are the main controllers of the zone, are not provided, but the hot water receiving cart controller 110 with an air-replacement function, the alloy material charging device controller 120, the pouring hot water, which are the controllers of the respective devices.
  • the ladle carrier cart controller 130 and the pouring machine controller 140 may be directly connected to perform communication.
  • the controllers 110, 120, 130, and 140 of each device may be connected to and communicate with other controllers (not shown) including a controller that controls the entire foundry.
  • the hot water receiving carriage 20 with an air replacement function is provided with a first weight measuring device 112 that measures the weight of the molten metal and the alloy material in the treatment ladle 10.
  • the weight measured by the first weight measuring device 112 is first sent to the hot water receiving bogie controller 110 with an air replacement function.
  • the load cell 122 of the alloy material charging device 50 measures the weight of the alloy material before passing through the charging chute 52 of the alloy material charging device 50 as a third weight measuring device.
  • the weight measured by the third weight measuring device 122 is first sent to the alloy material charging device controller 120.
  • the pouring machine 100 is provided with a second weight measuring device 142 that measures the weight of the molten metal in the pouring ladle 60.
  • the weight measured by the second weight measuring device 142 is first sent to the pouring machine controller 140.
  • the first weight measuring device 112 first measures the weight of the alloy material put into the pocket 12 of the processing ladle 10 from the alloy material feeding device 50, and the weight is provided as the fourth weight information W4 with an air replacement function. It is sent to the hot water bogie controller 110. The place where the alloy material is charged may not be the pocket 12.
  • the 1st weight measuring device 112 measures the weight of the molten metal received from the melting furnace F, and sends the weight to the hot water receiving cart controller 110 with an air replacement function.
  • the weight of the molten metal and the alloy material when the molten metal has been received (simply referred to as “the weight of the molten metal”) is sent as first weight information W ⁇ b> 1 to the hot water receiving cart controller 110 with an air replacement function.
  • the first weight measuring device 112 continues to measure the weight of the molten metal and the alloy material, and sends the weight to the hot water receiving cart controller 110 with an air replacement function.
  • the 1st weight measuring device 112 measures the weight before an alloy material is thrown into the pocket 12 of the processing ladle 10 from the alloy material throwing-in apparatus 50, and the weight is provided as 5th weight information W5 with an air replacement function. You may send to the hot water receiving trolley controller 110. Moreover, the weight of the treatment ladle 10 after emptying the molten metal from the treatment ladle 10 to the pouring ladle 60 is measured, and the weight is used as the sixth weight information W6 to the hot water receiving cart controller 110 with an air exchange function. You may send it. The difference between the sixth weight information W6 and the fifth weight information W5 is the weight of the alloy material that remains in the processing ladle 10 without melting.
  • an error signal is generated and issued.
  • an error signal an alarm sound may be sounded or the alarm lamp may be turned on by the hot water supply dolly controller 110 with an air replacement function, or the error signal may be transmitted to another controller. Further, an error signal may be sent to the pouring ladle transport cart controller 130 to stop pouring in the pouring ladle 60 where the molten metal is replaced.
  • the fifth weight information W5 and the sixth weight information W6 it is possible to prevent casting with a molten metal lacking the alloy material.
  • the 2nd weight measuring device 142 measures the weight of the molten metal in the pouring ladle 60 after emptying the molten metal from the processing ladle 10, and uses the weight as the 2nd weight information W2, and the pouring machine controller 140. Send to. Further, the weight of the molten metal remaining in the pouring ladle 60 when pouring from the pouring ladle 60 into the mold D, that is, the weight of the molten metal poured into the mold D from the pouring machine 100 is measured.
  • the third weight measuring device 122 measures the weight of the alloy material in the lightweight hopper 56 before passing through the charging chute 52 of the alloy material charging device 50, and uses the weight as the third weight information W3 to control the alloy material charging device controller. Send to 120.
  • the weight of the alloy material before passing through the charging chute 52 represents the weight of the alloy material charged by the alloy material charging device 50.
  • the alloy material charging device 50 has a plurality of hoppers 54, that is, a plurality of third weight measuring devices 122
  • the total weight of the alloy materials measured by the third weight measuring devices 122 is the third weight.
  • Information W3 is sent to the alloy material charging device controller 120.
  • the hot water receiving carriage controller 110 with an air exchange function controls the travel of the hot water receiving carriage 20 with an air exchange function. That is, it moves from the loading position P2 to the receiving position P1, to the reaction position P3, and then to the empty replacement position P4.
  • the processing ladle 10 of the hot water receiving carriage 20 with an empty replacement function is raised and then tilted to replace the molten metal with the pouring ladle 60. Thereafter, the processing ladle 10 is lowered, and the hot water receiving carriage 20 with an empty replacement function is moved to the charging position P2. Then, this operation is repeated.
  • the alloy material charging device controller 120 inputs the third weight information W3 that is the weight of the alloy material charged by the alloy material charging device 50 and the alloy material from the plurality of hoppers 54.
  • the third weight information W3 which is the total weight is received.
  • the case of receiving from a certain controller includes not only directly receiving from that controller but also receiving via another controller. And it compares with the 4th weight information W4 which is the weight of the alloy material measured with the 1st weight measuring device 112, and it is judged whether the 2nd weight difference which is the difference is in predetermined 3rd threshold value T3. When the second weight difference is larger than the third threshold T3, an error signal is generated and issued.
  • the second weight difference when the second weight difference is large, it is expected that the alloy material has been spilled and has not been properly put into the processing ladle 10, so an error signal is generated and emitted.
  • an error signal an alarm sound may be sounded or the alarm lamp may be turned on by the hot water supply dolly controller 110 with an air replacement function, or the error signal may be transmitted to another controller.
  • the fourth weight information W4 may be transmitted to the alloy material charging device controller 120 and other controllers.
  • the weight of the molten metal when the hot water is received from the melting furnace F to the treatment ladle 10 is transmitted to the water pouring controller 140 as the first weight information W1. Furthermore, the weight of the molten metal is continuously monitored thereafter.
  • the reaction between the alloy material and the molten metal starts in the treatment ladle 10. Due to the reaction, the measurement value of the first weight measurement value 112 starts to vibrate. That is, since the intense bubbling occurs, the measured value fluctuates.
  • the hot water receiving bogie controller 110 with a spare function detects the start of fading, a fading start signal for notifying the start of fading is transmitted to another controller.
  • the hot water receiving bogie controller 110 with an air replacement function may count an elapsed time TF from the start of fading and transmit a fading timer signal that is the elapsed time TF counted. In this way, by recognizing the start of fading based on the amount of change in the measured value, the elapsed time TF from the start of fading can be accurately counted.
  • the alloy material feeding device controller 120 sends a predetermined alloy material from one or a plurality of hoppers 54 to the weighing hopper 56 via the electromagnetic feeder 55, and after the preparation of the alloy material is ready, Open and put into the treatment ladle 10 from the charging chute 52.
  • the alloy material feeding device controller 120 operates the electromagnetic feeder 55 so that a predetermined weight of the alloy material is sent to the weighing hopper.
  • the weight of the alloy material stored in the weighing hopper 56 measured by the third weight measuring device 122 is transmitted as the third weight information W3 to the hot water receiving bogie controller 110 with the air replacement function.
  • the total weight measured by the plurality of load cells 122 is sent as the third weight information W3. You may transmit to another controller.
  • the third weight information W3 is used to compare with the fourth weight information W4 that is the weight of the alloy material measured by the first weight measuring instrument 112 as described above. It is determined whether the difference and the second weight difference are within a predetermined third threshold T3.
  • the pouring ladle transport cart controller 130 controls the running of the pouring ladle transport cart 70. That is, the pouring ladle transport cart 70 is moved from the empty position P4 to the pouring machine 100. At the position of the pouring machine 100, the pouring ladle 60 is transferred to the pouring machine 100 by a conveyor. In the molten metal conveyance system 1 of FIG. 1, the pouring ladle 60 containing the molten metal is transferred to the actual ladle conveyor S1. The actual ladle conveyor S ⁇ b> 1 that has received the pouring ladle transfers the pouring ladle 60 to the pouring machine 100.
  • the pouring ladle 60 after pouring by the pouring machine 100 is transferred to the empty ladle conveyor S2, and is transferred from the empty ladle conveyor S2 to the pouring ladle conveying cart 70. That is, the pouring ladle transport cart 70 moves from the position of the actual ladle conveyor S1 to the position of the empty ladle conveyor S2.
  • the actual ladle conveyor S1 and the empty ladle conveyor S2 it is possible to use a plurality of the pouring ladle 60 at the same time, the waiting time in each device is shortened, and the efficiency is increased. .
  • the pouring ladle transporting carriage 70 that has received the poured pouring ladle 60 from the pouring machine 100 moves to the empty replacement position P4 and receives the molten metal from the processing ladle 10 again.
  • the operations of the actual ladle conveyor S1 and the empty ladle conveyor S2 are controlled by the transport zone main controller 150, whether controlled by the pouring ladle transport carriage controller 130 or the pouring controller 140. Alternatively, it may be controlled by the pouring zone main controller 160 or may be controlled by another controller.
  • the pouring machine controller 140 controls the operation of the pouring machine 100. That is, the pouring ladle 60 is tilted and a predetermined amount of molten metal is poured into the mold D from the pouring ladle 60. At that time, an accurate amount of molten metal can be poured by pouring the mold M while measuring the weight of the molten metal in the pouring ladle 60, that is, the amount of the molten metal, with the second weight measuring device 142.
  • the hot water controller 140 receives the first weight information W1 indicating the weight of the molten metal received from the melting furnace F to the treatment ladle 10 from the hot water receiving bogie controller 110 with an air replacement function. Furthermore, the weight of the molten metal replaced with the pouring ladle 60 measured by the second weight measuring device 142 is also received as the second weight information W2. And when the 1st weight difference which is the difference of the 1st weight information W1 and the 2nd weight information W2 exceeds predetermined 1st threshold T1, in the middle of conveying molten metal from melting furnace F to pouring machine 100 Since the molten metal is expected to have decreased due to spilling of the molten metal, an error signal is generated and emitted. As an error signal, the hot water controller 140 may sound an alarm sound, turn on an alarm lamp, or send an error signal to another controller.
  • the hot water controller 140 receives a fading start signal from the hot water receiving bogie controller 110 with an air exchange function and counts an elapsed time TF from the start of fading. Alternatively, the elapsed time TF may be received. As is clear from the above description, this elapsed time TF or fading start signal (hereinafter referred to as “elapsed time TF”) is determined for each processing ladle 10, and the processing ladle 10. Is taken over by the pouring ladle 60 where the molten metal is replaced. Therefore, the elapsed time TF is information determined for each pouring ladle 60 transferred to the pouring machine 100.
  • elapsed time TF this elapsed time TF or fading start signal
  • the elapsed time TF is not a single piece of information, but a plurality of pieces of information determined for each processing ladle 10, and is configured to be able to identify which processing ladle 10 is the information.
  • the pouring machine controller 140 recognizes the elapsed time TF for the pouring ladle 60 held by the pouring machine 100.
  • the pouring machine controller 140 when the elapsed time TF exceeds the predetermined second threshold value T2, it is expected that the effect of the alloy material has faded due to fading, so an error signal is generated and issued. This is because if the effect of the alloy material is weakened, the possibility of poor spheroidization increases.
  • the pouring machine controller 140 stops pouring from the pouring ladle 60 and moves the molten metal remaining in the pouring ladle 60 to the starting block U.
  • the starting block U is a container for receiving molten metal, and includes a chute for pouring the molten metal with the pouring ladle 60 inclined.
  • the pouring ladle 60 is tilted in the opposite direction to the pouring of the molten metal into the mold D by the pouring machine 100 and transferred from the pouring ladle 60 to the container via the chute.
  • the molten metal transferred to the starting block U is transported to the furnace and reused.
  • the pouring ladle 60 may be transported from the pouring machine 100 to a waste hot water apparatus (not shown) for processing.
  • the hot water controller 140 may sound an alarm sound, turn on an alarm lamp, or send an error signal to another controller.
  • the second threshold value T2 that is, the elapsed time until the spheroidization failure occurs after the start of fading changes depending on the type and amount of the alloy material, and the size of the processing ladle 10 and the transport method (processing ladle). It is said that it also changes due to the shaking of the Therefore, it is necessary to use a value suitable for the molten metal in the molten metal ladle 60 as the second threshold T2.
  • the second threshold value T2 is stored in advance in the pouring machine controller 140, for example. Then, an appropriate value is used based on measured values such as the type and amount of the alloy material introduced into the treatment ladle 10 from the alloy material introduction device 50 and the amount of molten metal received by the treatment ladle 10.
  • the setting of the second threshold T2 may be performed by the hot water receiving bogie controller 110 with an air replacement function, the alloy material charging device controller 120, the pouring ladle transport bogie controller 130, and other controllers.
  • the hot water receiving cart 20 with the empty replacement function on which the empty processing ladle 10 is placed is controlled by the hot water receiving carriage controller 110 with the empty replacing function and moved to the charging position P2.
  • the hot water receiving cart controller 110 with the air exchange function transmits the position information of the hot water receiving cart 20 with the air exchange function to the other controllers.
  • the alloy material charging device 50 a predetermined amount of alloy material is stored in the weighing hopper 56 from each hopper 54 under the control of the alloy material charging device controller 120.
  • the weight of the stored alloy material is measured by the third weight measuring device 122, sent to the alloy material charging device controller 120, and further sent from the alloy material charging device controller 120 to the hot water receiving bogie controller 110 with an air replacement function. Sent as information W3. Then, when the hot water receiving cart 20 with the air replacement function moves to the charging position P ⁇ b> 2, the charging gate 58 is opened, and the alloy material is charged into the processing ladle 10 through the charging chute 52.
  • the weight of the put alloy material is measured by the first weight measuring device 112.
  • the measured weight is sent as the fourth weight information W4 to the hot water receiving bogie controller 110 with an empty replacement function.
  • the hot water receiving cart controller 110 with the air replacement function the third weight information W3 and the fourth weight information W4 are compared, and an alarm is generated and issued when the second weight difference that is the difference exceeds the third threshold value T3.
  • the operator may judge and stop the processing of the processing ladle 10 or proceed to the next step as it is. Note that the alloy material of the treatment ladle 10 may be automatically emptied and the process may be started from the beginning.
  • the process proceeds to the next step.
  • a cover agent may be charged into the treatment ladle 10 from the alloy material charging device 50 to cover the alloy material.
  • the hot water receiving trolley 20 with an empty replacement function on which the processing ladle 10 charged with the alloy material is placed is controlled by the hot water receiving trolley controller 110 with an empty replacement function and moves to the receiving position P1. Therefore, a predetermined amount of molten metal is poured from the melting furnace F into the treatment ladle 10.
  • the weight of the poured molten metal is measured by the first weight measuring instrument 112 and sent to the hot water receiving cart controller 110 with the air replacement function, and further from the hot water receiving cart controller 110 with the air replacement function as the first weight information W1. It is sent to the pouring machine controller 140.
  • the identification of the processing ladle 10 is also sent together. Further, the weight of the molten metal in the treatment ladle 10 is continuously measured and sent to the hot water receiving bogie controller 110 with an empty replacement function. Here, continuing to measure the weight may be to measure the weight at predetermined intervals.
  • the hot water receiving carriage 20 with the air replacement function is controlled by the hot water receiving carriage controller 110 with the air replacement function and quickly moves to the reaction position P3. That is, the treatment ladle 10 is transferred into the reaction chamber 90 before the reaction between the molten metal and the alloy material becomes intense. By reacting the molten metal and the alloy material in the reaction chamber 90, it is possible to prevent the molten metal from scattering into the foundry due to a violent reaction and to discharge dust and gas generated by the reaction outside the foundry through the duct.
  • the hot water supply cart controller 110 with an air replacement function detects the start of fading. Due to the bubbling caused by the intense reaction between the molten metal and the alloy material, the weight measured by the first weight measuring device 112 varies greatly. Moreover, the hot water supply bogie controller 110 with the air replacement function allows the processing ladle 10 to be further moved into the reaction chamber 90 when the fluctuation amount of the weight continuously measured by the first weight measuring device 112 is controlled within a certain range (first stage). Since there is no need to stay, the hot water receiving carriage 20 with the air replacement function is started to move to the air replacement position P4. The reason why the hot water receiving carriage 20 with the empty replacement function is moved to the empty replacement position P4 in advance is to pour hot water into the mold D as soon as possible after the start of fading.
  • the hot water supply bogie controller 110 with an air-replacement function transmits a fading start signal informing the start of fading and the identification of the processing ladle to the pouring machine controller 140.
  • the hot water receiving bogie controller 110 with an air replacement function may measure an elapsed time TF from the start of fading and transmit the elapsed time TF as a fading timer signal.
  • the molten metal is replaced from the treatment ladle 10 to the pouring ladle 60.
  • the pouring ladle transport cart 70 is controlled by the pouring machine controller 140 to place an empty pouring ladle 60 and stand by at a position where it can be replaced.
  • the hot water receiving carriage 20 with the air replacement function ascends the processing ladle 10 with a tilting device 40 (see FIG. 6 and the like) and a pantograph table elevator 28 (see FIG. 7) or a lifting table 34 (see FIG. 6), which will be described later. Then, the molten metal is replaced by tilting.
  • the molten metal is replaced by tilting the treatment ladle 10 using the sector gear 44 (see FIG. 8).
  • an inoculum may be added to the molten metal from the air replacement inoculation apparatus 80.
  • the pouring ladle transport carriage 70 moves to a position where the pouring ladle 60 is transferred to the actual ladle conveyor S1.
  • the pouring ladle 60 is transferred from the pouring ladle conveying cart 70 to the actual ladle conveyor S1.
  • the pouring ladle 60 is conveyed to the position of the pouring machine 100 by the actual ladle conveyor S1. Then, it is transferred to the pouring machine 100.
  • the weight of the molten metal in the pouring ladle 60 is measured by the second weight measuring device 142 and sent to the pouring machine controller 140 as the second weight information W2.
  • the identification number of the processing ladle 10 is received from the hot water receiving bogie controller 110 with an empty replacement function.
  • the pouring machine controller 140 compares the first weight information W1 and the second weight information W2 regarding the processing ladle 10 having the same identification number. An alarm is generated and issued when the first weight difference, which is the difference, exceeds the first threshold value T1. When an alarm is issued, the operator may judge and stop the processing of the pouring ladle 60 or proceed to the next step as it is.
  • the pouring ladle 60 may be automatically emptied and the start may be started from the beginning.
  • the pouring machine 100 may be moved in front of the starting block U and the molten metal in the pouring ladle 60 may be moved to the starting block U.
  • the first weight difference is not more than the first threshold value T1
  • the process proceeds to the next step.
  • the molten metal is poured from the pouring ladle 60 into the mold D.
  • the mold line DL moves by a distance corresponding to one frame of the mold, and a new mold D comes in front of the pouring machine 100.
  • the pouring machine 100 pours a new mold D.
  • the weight of the molten metal in the pouring ladle 60 is measured by the second weight measuring device 142. That is, the weight of the molten metal remaining in the pouring ladle 60 is measured.
  • the weight of the molten metal poured into the mold D can be measured, and a predetermined amount of molten metal can be poured into the mold D accurately. Furthermore, since the molten metal to be poured into the mold D can be poured while measuring the weight of the molten metal, the molten metal can be poured while controlling the molten metal flow rate more accurately.
  • the pouring machine 100 moves on the rail R3 while pouring from the pouring ladle 60 to the mold D.
  • the mold D may move on the mold line DL in the same direction and at the same speed.
  • the pouring machine 100 returns on the rail R3 by a distance corresponding to one frame of the mold in order to pour the next mold D.
  • the pouring ladle may be moved to a position where it is transferred to the empty ladle conveyor S2.
  • the pouring machine controller 140 counts the elapsed time TF from the start of fading based on the fading start signal related to the molten metal received from the hot water receiving bogie controller 110 with the air exchange function. Or you may receive the elapsed time TF from the fading start which concerns on the said molten metal from the hot water supply cart controller 110 with an empty replacement function. An alarm is generated and issued when the elapsed time TF exceeds the second threshold T2. When an alarm is issued, pouring from the pouring ladle 60 to the mold D is stopped. The operator may judge and continue pouring hot water as it is.
  • the pouring machine 100 When the pouring from the pouring ladle 60 to the mold D is stopped, the pouring machine 100 is moved in front of the starting block U, and the molten metal in the pouring ladle 60 is moved to the starting block U. Therefore, the pouring ladle 60 is tilted in the direction opposite to that for pouring the mold D, and the molten metal is transferred to the starting block U. The molten metal transferred to the starting block U is returned to the furnace and reused.
  • a hot water discharging device (not shown) that tilts the pouring ladle 60 is provided, and the pouring water is poured from the pouring machine 100 to the hot water discharging device.
  • the molten metal may be transferred to the starting block. Moreover, when there is a lot of molten metal remaining in the pouring ladle 60, the molten metal remaining in the pouring ladle 60 is directly returned to the furnace by lifting and transporting the pouring ladle 60 with a crane. It may be.
  • the pouring machine 100 moves the pouring ladle 60 to the empty ladle conveyor S2. Move to the transfer position.
  • the pouring ladle 60 is transferred from the pouring machine 100 to the empty ladle conveyor S2.
  • the pouring ladle 60 is conveyed to the position of the pouring ladle conveying cart 70 by the empty ladle conveyor S2.
  • the pouring ladle transport carriage 70 is waiting on the empty ladle conveyor S2. Therefore, the pouring ladle 60 is transferred to the pouring ladle transport carriage 70 and further moved to a position where it can be replaced.
  • the introduction of the alloy material into the treatment ladle 10 is automated, and the conveyance of the molten metal from the treatment ladle 10 to the pouring machine 100 is automated.
  • the 3rd weight information W3 which is the weight of the alloy material measured with the 3rd weight measuring device 122 of the alloy material injection
  • the subsequent weight is measured, and the start of fading is detected from the amount of change in the weight. Therefore, it is possible to accurately grasp the start of fading.
  • the weight of the molten metal measured with the processing ladle 10 and the weight of the molten metal in the pouring ladle 60 that has been replaced from the processing ladle 10 are measured, and the difference between the first weight information W1 and the second weight information W2 When the first weight difference is over the first threshold value T1, an alarm is generated and issued.
  • the pouring machine 100 generates and issues an alarm when the elapsed time TF from the start of fading of the molten metal poured into the mold D exceeds the third threshold value T3. Therefore, spheroidization failure due to fading can be prevented. Therefore, a safe and stable casting product can be manufactured.
  • FIG. 6 is a side view of a fork lift type hot water receiving carriage 20 ⁇ / b> A with a fork elevating function as one embodiment.
  • 20 A of hot water receiving trolleys with an air exchange function are provided with the trolley
  • a traveling mechanism 26, which is a drive mechanism for traveling the cart body 24, is installed on the cart body 24.
  • a pair of guide pillars 32 is installed on the carriage main body 24.
  • An elevating frame 34 that extends in the horizontal direction and can be moved up and down by placing the processing ladle 10 on the carriage main body 24 is supported on the guide pillar 32.
  • the elevating frame 34 is provided with a ladle moving mechanism 35 that moves the processing ladle 10 in the horizontal direction (a direction orthogonal to the traveling direction of the hot water receiving carriage 20A with an empty replacement function).
  • the ladle moving mechanism 35 is typically a roller conveyor.
  • the ladle moving mechanism 35 moves the treatment ladle 10 in the horizontal direction, receives hot water at an appropriate distance from the melting furnace F, and moves the molten metal into the pouring ladle 60 to a position where it can be easily replaced. Furthermore, when the hot water receiving cart 20A with the air replacement function travels, it can move to the center, reduce vibration, and improve the stability of the hot water receiving cart 20A with the air replacement function as a whole.
  • a load cell 112 as a first weight measuring device is disposed between the lifting frame 34 and the ladle moving mechanism 35.
  • the load cells 112 are arranged at four locations.
  • an elevating frame elevating mechanism 36 as a drive mechanism for elevating the elevating frame 34 is installed on the carriage main body 24.
  • the elevating frame 34 has two holding rollers 33 that are spaced apart in the vertical direction.
  • the guide pillar 32 is provided with a roller guide 31 formed in a vertical direction and having a surface on which the holding roller 33 rolls.
  • the elevating frame 34 is suspended by two chains 37 so as not to incline in the direction perpendicular to the plane of FIG.
  • the elevating frame elevating mechanism 36 winds the chain 37 by rotating a sprocket connected to the output shaft of the elevating motor via a speed reducer or the like.
  • the lifting frame 34 is lifted and lowered by being suspended by the chain 37.
  • the elevating frame 34 is provided with a tilting device 40 that supports and tilts the processing ladle 10.
  • the tilting device 40 typically has a gantry installed on the elevating frame 34, a pair of rotating shafts extending horizontally on the gantry to support the processing ladle 10 from both sides, and rotating the rotating shaft. And a tilting mechanism.
  • the traveling mechanism 26 and the lifting frame lifting mechanism 36 are disposed at a place where the processing ladle 10 is installed, specifically, at a position away from the front end side of the lifting frame 34.
  • the traveling mechanism 26 and the lifting frame lifting / lowering mechanism 36 are arranged in this manner, even if the processing ladle 10 is deteriorated with time and the molten metal leaks from the processing ladle 10, a motor or the like that takes time to repair is damaged. It is possible to repair in a short time without receiving.
  • the motors of the traveling mechanism 26 and the lifting frame lifting mechanism 36 are preferably arranged at a position higher than the height of the bottom of the processing ladle 10 when the lifting frame 34 is lowered.
  • the treatment ladle 10 Since the treatment ladle 10 is often damaged near the bottom due to deterioration over time, the leaked molten metal can be prevented from being applied to the motor. It is preferable that an opening through which the leaked molten metal escapes downward is provided on the upper surface of the elevating frame 34 and the floor surface of the carriage main body 24. Moreover, it is preferable that the power receiving apparatus 38 for drawing in the power cable which receives the electric power from the outside, and the communication cable which communicates information is also arrange
  • the processing ladle 10 When such a hot water receiving carriage 20A with an air replacement function is used, the processing ladle 10 is easily lifted by raising the elevating frame 34, and the processing ladle 10 is tilted by the tilting device 40 in the lifted state.
  • the molten metal can be replaced with the pouring ladle 60. Therefore, the molten metal can be replaced automatically and safely. Moreover, since all are electric, it is hard to generate a fire even if the hot water leaks.
  • the hot water receiving cart controller 112 with the air replacement function may be installed near the route of the hot water receiving cart 20A with the air replacement function along the rail R1, or may be loaded on the car body 24. In the case of being loaded on the carriage, it is preferable to dispose it at a position away from the place where the processing ladle 10 is installed, similarly to the power receiving device 38.
  • FIG. 7 is a side view of a pantograph-type receiving hot water carriage 20B with an air replacement function as one embodiment.
  • the processing ladle 10 is lifted and lowered by the pantograph table lifting machine 28 in the hot water receiving carriage 20B with the air replacement function. That is, the pantograph table elevator 28 is installed on the cart body 24, and the tilting device 40 is installed on the pantograph table elevator 28.
  • the pantograph table elevator 28 has a link mechanism 29 that pivotally connects intersecting fulcrums so as to form a rhombus with two pairs of parallel beams.
  • the link mechanism 29 may have three or more pairs of parallel beams.
  • the processing ladle 10 can be raised and lowered by changing the distance between any two supporting points of the link mechanism 29 with a hydraulic cylinder.
  • the processing ladle 10 can be raised / lowered by changing the angle from the horizontal surface of one beam by the rotational motion obtained from a motor and a reduction gear. Therefore, the processing ladle 10 can be raised and lowered with a simple structure.
  • a hydraulic cylinder is used, a large force can be easily obtained, which is economical.
  • the motor and the speed reducer since they are all electric, a fire does not easily occur even if the hot water leaks. Since the other structure is the same as that of the fork lift type hot water receiving carriage 20A with an air replacement function, the overlapping description is omitted.
  • the treatment ladle 10 is configured to be tiltable also to the furnace F side.
  • the processing ladle 10 is moved up and down and tilted toward the furnace F, so that the processing ladle 10 can be arranged at an appropriate position corresponding to the streamline of the molten metal from the furnace F. Therefore, the molten metal can be received at the bottom without hitting the side surface of the treatment ladle 10 or the like. Therefore, abrasion of the treatment ladle 10 can be prevented, and the reliability of the molten metal transfer system 1 can be further increased.
  • FIG. 8 is a side view of a sector gear type hot water receiving carriage 20C with an air replacement function as one embodiment.
  • (A) is an overall view
  • (b) is a partial view of the sector gear 44
  • (c) is a view for explaining a ladle rotating support 48 installed in the processing ladle 10.
  • a roller conveyor 41 that conveys the processing ladle 10 is installed on the carriage main body 24.
  • Fig.8 (a) although shown so that the processing ladle 10 may be conveyed in the advancing direction of the hot water receiving cart 20C with an air replacement function, it is installed so that the processing ladle 10 may be conveyed in a direction orthogonal to the advancing direction. Also good.
  • the roller conveyor 41 moves the ladle 10 for the same purpose as the ladle moving mechanism 35 of the fork lift-type receiving hot water carriage 20 ⁇ / b> A, and also tilts the ladle rotation support 48 of the ladle 10. Fit to 40 empty spare shafts 42.
  • the roller conveyor 41 may be disposed not directly above the carriage main body 24 but via a column or the like.
  • a load cell 112 as a first weight measuring device is disposed between the roller conveyor 41 and the carriage main body 24, a load cell 112 as a first weight measuring device is disposed.
  • the tilting device 40 supports the processing ladle 10, engages with the spare shaft 42 that is the center of rotation when tilting, the sector gear 44 that rotates around the spare shaft 42, and the sector gear 44.
  • a pinion 45 that rotates 44 and a drive motor 46 that drives the pinion 45 are provided.
  • the sector gear 44 is coupled to the processing ladle 10 at a position different from the empty spare shaft 42 so as to rotate together with the processing ladle 10. Since the sector gear 44 that rotates together with the processing ladle 10 is driven by the pinion 45, the processing ladle 10 can be tilted with small power. Moreover, since all are electric, it is hard to generate a fire even if the hot water leaks. Since the other structure is the same as that of the fork lift type hot water receiving carriage 20A with an air replacement function, the overlapping description is omitted.
  • FIG. 9 is a plan view of the inside of a foundry having the molten metal transfer system 2 according to an embodiment of the present invention, which is different from FIG.
  • the rail R ⁇ b> 1 on which the hot water receiving carriage 20 with an air replacement function travels and the rail R ⁇ b> 2 on which the pouring ladle transport truck 70 travels are arranged in a straight line.
  • the hot water receiving carriage 20 with an empty replacement function can move the treatment ladle 10 in the traveling direction, or the pouring ladle transport carriage 70 can move the pouring ladle 60 in the traveling direction.
  • the other structure is the same as that of the molten metal conveyance system 1, the overlapping description is abbreviate
  • the hot water receiving cart 20 with the air-replacement function travels to the position of the actual ladle conveyer S1 without the pouring ladle transport cart 70, and the molten metal is added to the pouring ladle 60 waiting on the actual ladle conveyor S1. May be replaced.
  • the pouring ladle 60 is transferred to the pouring machine 100 and poured into the mold D.
  • the pouring ladle 60 that has been emptied by pouring is transferred to the actual ladle conveyor S1, and the molten metal is replaced from the processing ladle 10 again.
  • the empty ladle conveyor S2 may not be provided.
  • inoculation apparatus 80 is provided in the rail R2 side of the actual ladle conveyor S1.
  • the molten metal transport systems 1 and 2 have been described as including the pouring ladle transport carriage 70 and the rail R2 for transporting the pouring ladle 60 from the empty position P4 to the pouring machine 100.
  • the molten metal may be directly replaced from the processing ladle 10 to the pouring ladle 60 held by the pouring machine 100 without the pouring ladle transport carriage 70 and the rail R2. That is, the empty position P4 and the pouring machine 100 may be the same position.
  • any of the receiving position P1, the loading position P2, the reaction position P3, and the empty replacement position P4 may be the same position.
  • the shapes of the molten metal transfer systems 1 and 2 can be appropriately changed.
  • the alloy material charging device 50 includes the alloy material charging device controller 120. However, for example, when a certain amount of alloy material is charged, the alloy material charging device 50 is simplified. As a structure, the alloy material charging device controller 120 may not be provided.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

 処理取鍋への合金材の投入を自動化すると共に、処理取鍋から注湯機への溶湯の搬送を自動化し、安全で、かつ、安定した品質の鋳造品を製造できる溶湯搬送システムおよび方法を提供する。炉(F)から注湯機(100)に溶湯を搬送する溶湯搬送システム(1)は、処理取鍋(10)と合金材投入装置(50)と注湯取鍋(60)と空替機能付受湯台車(20)と注湯取鍋搬送台車(70)と注湯機(100)とを備え、注湯機は注湯機コントローラを有し、合金材投入装置は合金材投入装置コントローラを有し、空替機能付受湯台車は空替機能付受湯台車コントローラを有し、注湯取鍋搬送台車は注湯取鍋搬送台車コントローラを有し、注湯機コントローラ、合金材投入装置コントローラ、空替機能付受湯台車コントローラおよび注湯取鍋搬送台車コントローラのうち、少なくとも2つのコントローラ間でデータ通信がなされる。

Description

溶湯搬送システムおよび方法
 本発明は、鋳造工場において炉から鋳型に注湯するまで溶湯を搬送するための溶湯搬送システムおよび方法に関し、特に溶湯に合金材を添加するのに適した溶湯搬送システムおよび方法に関する。
 鋳造工場では溶解炉等で溶解した高温の溶湯を注湯装置まで運び、注湯装置において鋳型に注湯することで製品を鋳造する。製造する鋳鉄によっては、強度や靱性、あるいは、耐食性、耐熱性、耐摩耗性を高めるために、溶湯にMg、Ce、Ca、Ni、Cr、Cu、Mo、V、Tiなどの合金材を添加することがある。溶解炉から溶湯を受ける取鍋内に、このような合金材を予め投入しておき、注がれた溶湯と反応を生じさせるのが一般的である。なお、本書では、合金材と反応する前の(溶解炉等で溶解した)溶湯も、合金材と反応した後の溶湯も、単に「溶湯」という。
 溶湯と合金材とは激しく反応するのが一般的で、合金材の歩留りをよくするために、取鍋は直径に対して1.5~2.0倍程度に深いことが要求される。そこで、深い取鍋内に合金材を収納するポケットを設けた処理取鍋を用いる。また、反応時の周囲への影響を抑えるための反応室に処理取鍋を搬送する。反応が終了した溶湯は、クレーンなどで処理取鍋から注湯取鍋へ空け替えて、鋳型へ溶湯を注湯するための注湯機に渡される。そのため、このような処理取鍋は、空替取鍋とも称される。高温の溶湯を収容する処理取鍋をクレーンで搬送したり、処理取鍋から注湯取鍋へ空け替えるのは、危険な作業であった。
 そこで、溶湯を搬送して空け替える溶湯搬送ラインとして、溶湯を受湯した受湯取鍋を軌道上で搬送する取鍋搬送空け替え台車と、台車上で軌道と直交する方向に移動する移動手段と、移動手段上で昇降する昇降機構と、昇降機構に配設される傾動手段と、傾動手段によって傾動され受湯取鍋を着脱可能に保持する取鍋保持治具を備えた溶湯搬送ラインが提案されている(例えば特許5475004号公報)。
 例えばダクタイル鋳鉄を製造するには、合金材として球状化元素(Mg、Ce、Caなど)を添加するが、球状化元素は、取鍋の耐火物や空気と反応し、時間と共に消耗する。すなわち、球状化のフェーディング(以下、単に「フェーディング」という。)を生ずる。ここで、フェーディングとは、鋳造用溶湯に黒鉛球状化剤を添加した後、その効果が時間の経過と共に薄れていく現象のことである。典型的には、20分程度で効果がなくなると言われている。なお、黒鉛球状化剤の効果が薄れると球状化不良が発生する。そこで、フェーディングによる球状化不良が生ずる前に注湯を終了させる必要がある。
 従来、このフェーディングのタイミングは熟練者の目視でカウント開始し、フェーディンク時間を確認しながら、球状化不良の発生を防止していた。しかし、フェーディング時間は、合金材の種類や量によっても変化し、また、処理取鍋の大きさや、運搬方法(処理取鍋の揺れ等)によっても変化すると言われる。また、人手で、計量された合金材を処理取鍋のポケットに投入し、処理取鍋を炉前に速やかに搬送し、溶湯を受湯し、球状化処理させ、注湯取鍋に空け替える作業を行っている。このような方法では、依然として、作業者が溶湯の入った処理取鍋の近くで作業を行う必要があり、作業環境や安全性の問題点が指摘されていた。
 一方、上記のように、鋳造工場には、溶解炉等の溶解装置と、合金材を添加する合金材投入装置と、鋳型に注湯する注湯機と、処理取鍋を合金材投入装置、溶解炉等、反応室、注湯取鍋との空け替え位置間で移動させる処理取鍋搬送設備と、注湯取鍋を処理取鍋からの空け替え位置と注湯機間で移動させる注湯取鍋搬送設備が備えられる。鋳造工場は広く、また、各装置の更新が個別に行われたりするために、装置ごとにコントローラを設置して制御しているのが実情である。しかし、上述のように、例えばフェーディングは処理取鍋で始まるが、注湯取鍋から鋳型への注湯作業でフェーディングの影響を考慮する必要がある。
 そこで、本発明は、処理取鍋への合金材の投入を自動化すると共に、処理取鍋から注湯機への溶湯の搬送を自動化し、安全で、かつ、安定した品質の鋳造品を製造できる溶湯搬送システムおよび方法を提供することを目的とする。
 本発明の第1の態様に係る溶湯搬送システムは、例えば図1および図5に示すように、炉Fから注湯機100に溶湯を搬送する溶湯搬送システム1であって、炉Fから溶湯を受け取り、注湯取鍋60に空け替えるための処理取鍋10と、処理取鍋10に合金材を投入する合金材投入装置50と、処理取鍋10から溶湯を受け取り、注湯機100に搬送する注湯取鍋60と、合金材投入装置50から処理取鍋10に合金材を投入する投入位置P2と、処理取鍋10が炉Fから溶湯を受け取る受取位置P1と、処理取鍋10から注湯取鍋60へ溶湯を空け替える空替位置P4とに、処理取鍋10を移動させる空替機能付受湯台車20と、注湯取鍋60を注湯機100に渡すために、空替位置P4から注湯取鍋60を移動させる注湯取鍋搬送台車70と、注湯取鍋搬送台車70から注湯取鍋60を受け取り、鋳型Dに溶湯を注湯する注湯機100とを備え;注湯機100は、注湯機100の動作を制御する注湯機コントローラ140を有し;合金材投入装置50は、合金材投入装置50の動作を制御する合金材投入装置コントローラ120を有し;空替機能付受湯台車20は、空替機能付受湯台車20の動作を制御する空替機能付受湯台車コントローラ110を有し;注湯取鍋搬送台車70は、注湯取鍋搬送台車70の動作を制御する注湯取鍋搬送台車コントローラ130を有し;注湯機コントローラ140、合金材投入装置コントローラ120、空替機能付受湯台車コントローラ110および注湯取鍋搬送台車コントローラ130のうち、少なくとも2つのコントローラ間でデータ通信がなされる。
 このように構成すると、空替機能付受湯台車で処理取鍋を搬送することにより、処理取鍋に合金材投入装置から合金材を投入し、炉から溶湯を処理取鍋に受湯し、処理取鍋から注湯機へ溶湯を空け替えることができる。また、各コントローラ間でデータ通信を行うことにより、例えばフェーディング時間を正確に計測し、球状化不良の発生を防止することもできる。よって、人手を介さず合金材を投入し、安全かつ迅速に処理取鍋から注湯機への溶湯の搬送を行い、品質を管理しながら鋳型へ注湯することができる。
 本発明の第2の態様に係る溶湯搬送システムは、例えば図1および図5に示すように、第1の態様に係る溶湯搬送システム1において、空替機能付受湯台車20は、処理取鍋10の重量を計測する第1重量計測器112を備え、第1重量計測器112で計測された処理取鍋10の重量は空替機能付受湯台車コントローラ110に送られ、注湯機100は、注湯取鍋60の重量を計測する第2重量計測器142を備え、第2重量計測器142で計測された注湯取鍋60の重量は注湯機コントローラ140に送られ、空替機能付受湯台車コントローラ110は、処理取鍋10が炉Fから溶湯を受け取り完了したときの処理取鍋10内の溶湯重量を第1重量情報W1として受け取り、注湯機コントローラ140は、処理取鍋10から溶湯を空け替えられた注湯取鍋60内の溶湯の重量を第2重量情報W2として受け取り、さらに、空替機能付受湯台車コントローラ110から第1重量情報W1を受け取り、第1重量情報W1と第2重量情報W2との差が所定の第1閾値T1を超える場合にエラー信号を発する。
 このように構成すると、処理取鍋から注湯機の注湯取鍋に搬送される間にこぼれたり漏れたりすることにより減少した溶湯の量を確認して、減少した溶湯の量が閾値以上の場合にエラー信号を発することができる。よって、安全確実に溶湯の搬送が行われていることを確認することができる。
 本発明の第3の態様に係る溶湯搬送システムは、例えば図1および図5に示すように、第2の態様に係る溶湯搬送システム1において、合金材にはマグネシウムを含み、空替機能付受湯台車コントローラ110は、処理取鍋10内でのフェーディングの開始を第1重量計測器112で計測する重量の変動量から検知する。
 このように構成すると、自動でフェーディング時間の開始を検知することができ、作業者が処理取鍋の近くで監視している必要がなくなり、安全であるとともに、正確にフェーディングの開始を検知できる。
 本発明の第4の態様に係る溶湯搬送システムは、例えば図1および図5に示すように、第3の態様に係る溶湯搬送システム1において、空替機能付受湯台車コントローラ110は、フェーディングの開始を検知すると、フェーディングの開始を知らせるフェーディング開始信号またはフェーディングの開始からの経過時間であるフェーディングタイマ信号を他のコントローラ130、140、150、160に送信する。
 このように構成すると、自動で検知したフェーディング時間の開始に基づくフェーディング経過時間をコントローラで管理することができ、正確にフェーディング経過時間を把握することができる。
 本発明の第5の態様に係る溶湯搬送システムは、例えば図1および図5に示すように、第4の態様に係る溶湯搬送システム1において、注湯機コントローラ140は、溶湯を注湯した後の注湯取鍋60内の溶湯の重量が所定の値以下になる前に、フェーディング開始信号からカウントした時間TFまたは他のコントローラから受信したフェーディングの開始からの経過時間TFが所定の第2閾値T2を超える場合にエラー信号を発する。
 このように構成すると、正確なフェーディング経過時間に基づき、球状化不良が発生する時間が経過していないことを確認でき、フェーディングによる球状化不良を防止することができる。
 本発明の第6の態様に係る溶湯搬送システムは、例えば図1、図3および図5に示すように、第1ないし第5のいずれかの態様に係る溶湯搬送システム1において、合金材投入装置50は、処理取鍋10に投入する合金材を貯留する計量ホッパ56と、計量ホッパ56の合金材の重量を計測する第3重量計測器122とを有し、第3重量計測器122で計測された合金材の重量は第3重量情報W3として合金材投入装置コントローラ120に送られ、合金材投入装置コントローラ120は、第3重量情報W3を空替機能付受湯台車コントローラ110に送信し、第1重量計測器112は処理取鍋10に投入された合金材の重量を計測し第4重量情報W4として空替機能付受湯台車コントローラ110に送信し、空替機能付受湯台車コントローラ112は、第3重量情報W3と第4重量情報W4との差が所定の第3閾値T3を超える場合にエラー信号を発する。
 このように構成すると、合金材投入装置から投入される合金材の重量と処理取鍋に投入された合金材の重量との差を求めるので、合金材投入装置から処理取鍋に投入されなかった合金材の重量が分かる。また、その重量が所定の第3閾値を超える場合にエラー信号を発するので、合金材が適切に投入されていることが確認できる。
 本発明の第7の態様に係る溶湯搬送システムは、例えば図5に示すように、第1ないし第6のいずれかの態様に係る溶湯搬送システム1において、第1重量計測器112で、合金材を投入される前の処理取鍋10の重量を計測し第5重量情報W5として空替機能付受湯台車コントローラ110に送信し、第1重量計測器112で、注湯取鍋60へ溶湯を空け替えた後の処理取鍋10の重量を計測し第6重量情報W6として空替機能付受湯台車コントローラ110に送信し、空替機能付受湯台車コントローラ110は、第5重量情報W5と第6重量情報W6との差が所定の第4閾値T4を超える場合にエラー信号を発する。
 このように構成すると、合金材が充分に溶湯に溶解できず、合金材が不足した溶湯で鋳型に注湯することを防止できる。
 本発明の第8の態様に係る溶湯搬送システムは、例えば図1に示すように、第1ないし第7のいずれかの態様に係る溶湯搬送システム1において、処理取鍋10から注湯取鍋60に空け替えられる溶湯に接種剤を投入する空替接種装置80をさらに備える。
 このように構成すると、処理取鍋から注湯取鍋へ溶湯を空け替えるときに接種剤を投入することができるので、短時間で均一に接種剤を溶湯に混合することができる。
 本発明の第9の態様に係る溶湯搬送システムは、例えば図1に示すように、第1ないし第8のいずれかの態様に係る溶湯搬送システム1において、空替機能付受湯台車20が移動する、投入位置P2、受取位置P1、空替位置P4の3位置のうち、2つが同じ位置である。
 このように構成しても、第1ないし第8のいずれかの態様に係る溶湯搬送システムの効果を得ることができる。
 本発明の第10の態様に係る溶湯搬送システムは、例えば図6に示すように、第1ないし第9のいずれかの態様に係る溶湯搬送システム1において、空替機能付受湯台車20には、処理取鍋10を支持すると共に、処理取鍋10を傾動して注湯取鍋60に溶湯を空け替える傾動装置40を備える。
 このように構成すると、空替機能付受湯台車が傾動装置を備えるので、処理取鍋から注湯取鍋への溶湯の空け替えを自動で安全に行うことができる。
 本発明の第11の態様に係る溶湯搬送システムは、例えば図7に示すように、第10の態様に係る溶湯搬送システム1において、空替機能付受湯台車20は、車輪22を備え軌道R1上を走行する台車本体24と、台車本体24上に設置され、傾動装置40をパンタグラフ式に上下するパンタグラフ式テーブル昇降機28とを備える。
 このように構成すると、空替機能付受湯台車がパンタグラフ式テーブル昇降機を備えて傾動装置を上下できるので、処理取鍋から注湯取鍋への溶湯の空け替えを自動で安全に行うことができる。また、処理取鍋と注湯取鍋のレベルが異なっていても、容易に溶湯を空け替えることができる。
 本発明の第12の態様に係る溶湯搬送システムは、例えば図6に示すように、第10の態様に係る溶湯搬送システム1において、空替機能付受湯台車20は、車輪22を備え軌道R1上を走行する台車本体24と、台車本体24上に設置されるガイド柱32と、ガイド柱32から水平方向に延び、台車20上で昇降可能なテーブル34であって、傾動装置40を載置する昇降テーブル34と、昇降テーブル34を昇降する昇降テーブル昇降装置36とを備える。
 このように構成すると、空替機能付受湯台車が傾動装置を載置する昇降テーブルを備えて傾動装置を上下できるので、処理取鍋から注湯取鍋への溶湯の空け替えを自動で安全に行うことができる。また、処理取鍋と注湯取鍋のレベルが異なっていても、容易に溶湯を空け替えることができる。
 本発明の第13の態様に係る溶湯搬送システムは、例えば図8に示すように、第10の態様に係る溶湯搬送システム1において、空替機能付受湯台車20は、車輪22を備え軌道R1上を走行する台車本体24と、台車本体24上に設置され、処理取鍋10を移動するローラーコンベア41とを備え、傾動装置40は、処理取鍋10を傾動中心で支持する空替軸42と、傾動中心とは異なる位置で処理取鍋10と連結されるセクタギア44と、セクタギア44を駆動するセクタギア駆動装置46とを備える。
 このように構成すると、空替機能付受湯台車が処理取鍋を移動するローラーコンベアを備え、傾動装置がセクタギアとセクタギアを駆動するセクタギア駆動装置とを備えるので、処理取鍋から注湯取鍋への溶湯の空け替えを自動で安全に行うことができる。
 本発明の第14の態様に係る溶湯搬送システムは、例えば図3および図4に示すように、第6の態様に係る溶湯搬送システム1において、合金材投入装置50は、合金材を貯留する複数のホッパ54と、複数のホッパ54から投入シュート52に所定量の合金材を流出するための複数の計量ホッパ56と、複数の第3重量計測器122と、計量ホッパ56で計量した合金材を投入シュート52に流出させる複数の投入ゲート58とを備え、第3重量情報は複数の第3重量計測器で計測した重量の合計である。
 このように構成すると、計量ホッパで所定量の合金材を計量し、投入シュートから処理取鍋へ投入できるので、迅速に所定量の合金を準備し、正確な量の合金材を投入することができる。また、複数のホッパから合金材を投入できるので、複数種類の合金材を正確な量で投入することができる。
 本発明の第15の態様に係る溶湯搬送方法は、例えば図1に示すように、炉Fから注湯機100に溶湯を搬送する溶湯搬送方法であって、炉Fから溶湯を受け取り、注湯取鍋60に空け替えるための処理取鍋10を、合金材を投入する投入位置P2まで移動させる工程と、処理取鍋10に合金材を投入する工程と、合金材が投入された処理取鍋10を、炉Fから溶湯を受け取る受取位置P1まで移動させる工程と、受取位置P1に移動された処理取鍋10に炉Fから溶湯を受湯させる工程と、溶湯を受湯した処理取鍋10を、注湯取鍋60へ溶湯を空け替える空替位置P4に移動させる工程と、空替位置P4に移動された処理取鍋10から、処理取鍋10内の溶湯を注湯取鍋60に空け替える工程とを備え;処理取鍋10の重量を計測することにより計測した処理取鍋10から注湯取鍋60に空け替えられた溶湯の重量と、注湯取鍋60の重量を計測することにより計測した注湯取鍋60に空け替えられた溶湯の重量とから第1重量差を算定し、第1重量差が第1閾値T1を超える場合にエラー信号を発する工程をさらに備える。なお、溶湯搬送方法では、処理取鍋10から溶湯を空け替えられた注湯取鍋60を、注湯機100まで搬送する工程と、注湯取鍋60から鋳型Dに溶湯を注湯する工程とを更に備えてもよい。
 このように構成すると、処理取鍋を計測することにより計測した注湯取鍋に空け替えられた溶湯の重量と、注湯取鍋の重量を計測することにより計測した注湯取鍋に空け替えられた溶湯の重量との重量差が分かるので、処理取鍋から注湯機の注湯取鍋に搬送される間にこぼれたり漏れたりすることにより減少した溶湯の量を確認して、減少した溶湯の量が閾値以上の場合にエラー信号を発することができる。よって、安全確実に溶湯の搬送が行われる溶湯搬送方法となる。
 本発明の第16の態様に係る溶湯搬送方法は、例えば図1に示すように、第15の態様に係る溶湯搬送方法において、炉Fから溶湯を受湯した処理取鍋10の重量を計測し、重量の変動量に基づき、フェーディングの開始を検知し、フェーディングの開始からの経過時間をカウントする工程と、溶湯10を注湯した後の注湯取鍋60内の溶湯の重量が所定の値以下になる前にフェーディングの開始からの経過時間TFが所定の第2閾値T2を超える場合にエラー信号を発する工程とをさらに備える。
 このように構成すると、正確なフェーディング経過時間に基づき、球状化不良が発生する時間が経過していないことを確認でき、フェーディングによる球状化不良を防止することができる。
 本発明の第17の態様に係る溶湯搬送方法は、例えば図1に示すように、第15または第16の態様に係る溶湯搬送方法において、処理取鍋10に投入する合金材の重量と、処理取鍋10の重量を計測することにより計測した投入された合金材の重量とから第2重量差を算定し、第2重量差が第3閾値T3を超える場合にエラー信号を発する工程をさらに備える。
 このように構成すると、処理取鍋に投入する合金材の重量と処理取鍋に投入された合金材の重量との差を求めるので、処理取鍋に投入されなかった合金材の重量が分かる。また、その重量が所定の第3閾値を超える場合にエラー信号を発するので、合金材が適切に投入されていることが確認できる。
 本発明の第18の態様に係る溶湯搬送方法は、例えば図1に示すように、第15ないし第17のいずれかの態様に係る溶湯搬送方法において、投入位置P2、空替位置P4、受取位置P1の3位置のうち、2つが同じ位置であり、処理取鍋10を同じ位置で移動させる工程では処理取鍋を移動させることがない。
 このように構成しても、第15ないし第17のいずれかの態様に係る溶湯搬送方法の効果を得ることができる。
 本発明の第19の態様に係る溶湯搬送システムは、例えば図1および図5に示すように、炉Fから注湯機100に溶湯を搬送する溶湯搬送システム1であって、炉Fから溶湯を受け取り、注湯取鍋60に空け替えるための処理取鍋10と、処理取鍋10に合金材を投入する合金材投入装置50と、処理取鍋10から溶湯を受け取り、鋳型Dに注湯する注湯取鍋60と、合金材投入装置50から処理取鍋10に合金材を投入する投入位置P2と、処理取鍋10が炉Fから溶湯を受け取る受取位置P1と、処理取鍋10から注湯取鍋60へ溶湯を空け替える空替位置P4とに、処理取鍋10を移動させる空替機能付受湯台車20と、注湯取鍋60の溶湯を鋳型Dに注湯する注湯機100とを備え;注湯機100は、注湯機100の動作を制御する注湯機コントローラ140を有し;空替機能付受湯台車20は、空替機能付受湯台車20の動作を制御する空替機能付受湯台車コントローラ110を有し;注湯機コントローラ140と空替機能付受湯台車コントローラ110との間でデータ通信がなされる。
 このように構成すると、空替機能付受湯台車で処理取鍋を搬送することにより、処理取鍋に合金材投入装置から合金材を投入し、炉から溶湯を処理取鍋に受湯し、処理取鍋から注湯機へ溶湯を空け替えることができる。また、注湯機コントローラと空替機能付受湯台車コントローラとの間でデータ通信を行うことにより、例えばフェーディング時間を正確に計測し、球状化不良の発生を防止することもできる。よって、人手を介さず合金材を投入し、安全かつ迅速に処理取鍋から注湯機への溶湯の搬送を行い、品質を管理しながら鋳型へ注湯することができる。
 本発明は以下の詳細な説明により更に完全に理解できるであろう。しかしながら、詳細な説明および特定の実施例は、本発明の望ましい実施の形態であり、説明の目的のためにのみ記載されているものである。この詳細な説明から、種々の変更、改変が、当業者にとって明らかだからである。
 出願人は、記載された実施の形態のいずれをも公衆に献上する意図はなく、開示された改変、代替案のうち、特許請求の範囲内に文言上含まれないかもしれないものも、均等論下での発明の一部とする。
 本明細書あるいは請求の範囲の記載において、名詞及び同様な指示語の使用は、特に指示されない限り、または文脈によって明瞭に否定されない限り、単数および複数の両方を含むものと解釈すべきである。本明細書中で提供されたいずれの例示または例示的な用語(例えば、「等」)の使用も、単に本発明を説明し易くするという意図であるに過ぎず、特に請求の範囲に記載しない限り本発明の範囲に制限を加えるものではない。
本発明の一実施形態の溶湯搬送システムを有する鋳造工場内の平面図である。 処理取鍋の一例を示す側面断面図である。 合金材投入装置の一例を説明する側面構成図である。 ホッパの出口の詳細を説明する構成図であり、(a)は側面図、(b)は正面図である。 溶湯搬送システムの制御系の一例を示す概略構成図である。 フォーク昇降式の空替機能付受湯台車の一例の側面図である。 パンタグラフ式の空替機能付受湯台車の一例の側面図である。 (a)はセクタギア式の空替機能付受湯台車の側面図、(b)はセクタギア44の部分図、(c)は処理取鍋に設置される取鍋回転支えを説明するための図である。 本発明の一実施形態の図1とは別の溶湯搬送システムを有する鋳造工場内の平面図である。
 以下、添付図面に基づいて本発明の一実施形態の溶湯搬送システム1を説明する。なお、各図において、互いに同一又は相当する装置あるいは部材には同一符号を付し、重複した説明は省略する。図1は、本発明の一実施形態の溶湯搬送システム1を有する鋳造工場内の平面図である。図1に示されるように、鋳造工場内には、溶湯を処理取鍋10に受湯させる溶解炉Fや、注湯された溶湯を冷却固化して鋳造品とする鋳型Dと鋳型Dを搬送する鋳型ラインDLが備えられる。なお、溶解炉Fの代わりに保持炉等から処理取鍋10に溶湯を入れてもよい。さらに鋳造工場内には、溶解炉Fから処理取鍋10に溶湯を入れて搬送し、注湯取鍋60に溶湯を空け替えて、注湯機100から鋳型Dに注湯する溶湯搬送システム1が備えられる。搬送システム1は、処理取鍋10と、空替機能付受湯台車20と、合金材投入装置50と、注湯取鍋60と、注湯取鍋搬送台車70と、注湯機100とを備える。更に、空替接種装置80を備えてもよい。
 図2は、溶湯搬送システム1で用いられる処理取鍋10の一例を示す側面図である。図2では、断面を破線で示す。処理取鍋10は、炉Fから溶湯を受け取り、注湯取鍋60に空け替えるための取鍋である。処理取鍋10の内部の底面には、溶湯と反応する合金材を予め入れるための窪みであるポケット12が形成される。なお、処理取鍋10にはポケット12が形成されなくてもよい。
 処理取鍋10は、空替機能付受湯台車20により、(1)溶解炉Fの前である、処理取鍋10が炉Fから溶湯を受け取る受取位置P1、(2)合金材投入装置50の前である、合金材投入装置50から処理取鍋10に合金材を投入する投入位置P2、(3)合金材と溶湯とが反応する反応位置P3、(4)処理取鍋10から注湯取鍋60へ溶湯を空け替える空替位置P4間で搬送される。なお、空替機能付受湯台車20の詳細は、後述する。また、合金材と溶湯とが反応する反応位置P3には、反応室90を設けるのがよい。反応室90は、処理取鍋10の上方を囲む。処理取鍋10の上方を囲むことにより、反応により溶湯の液滴が処理取鍋10から飛散した場合にも周囲に飛散することを防止できる。また、反応室90には、合金材と溶湯との反応により処理取鍋10から発生する粉じんやガスを排出するダクト(不図示)が接続される。
 図3は、合金材投入装置50の一例を説明する側面構成図である。合金材投入装置50は、処理取鍋10に、溶湯に添加する合金材を投入するための装置である。ここで、合金材には、マグネシウム、セシウム、カルシウムなどの黒鉛球状化剤を含む。なお、合金材投入装置50で、カルシウムシリコン、フェロシリコン、黒鉛などの接種剤を投入してもよい。通常、溶湯と合金材との反応が激しいので、溶湯を入れる前に、合金材を処理取鍋10に入れる。また、合金材は処理取鍋10中のポケット12に投入されるのがよい。さらに、所定の溶湯が処理取鍋10に満たされるまで反応を抑制するために、ポケット12中の合金材にカバー剤をかぶせるのがよい。カバー剤は、スチールスクラップ、SiC、ウエスカなど、溶湯と合金材の接触を抑えることができ、製品に悪影響を与えない材料であれば、特に限定されない。図3に示す合金材投入装置50は、合金材を貯留する5つのホッパ54を備える。よって、5種類の合金材を混合して処理取鍋10に投入することができる。なお、ホッパ54の数は、1つでも複数でもよく、用途に応じて任意に変更可能である。
 ここで、図4をも参照して、各ホッパ54の出口の詳細を説明する。図4は、ホッパ54の出口の詳細を説明する構成図であり、(a)は側面図、(b)は正面図である。各ホッパ54の下部出口には、電磁フィーダ55が備えられる。電磁フィーダ55は、ホッパ54が貯蔵する合金材を計量ホッパ56に所定の流量で搬送する装置である。計量ホッパ56は、各ホッパ54の下方に配置され、電磁フィーダ55で搬送される合金材を貯留するホッパである。各計量ホッパ56の下部は、投入ゲート58で閉塞される。各計量ホッパ56に貯められた合金材の重量は、第3重量計測器としてのロードセル122で計測される。そして、合金材を投入するタイミングになると投入ゲート58が開き、合金材は投入シュート52を通って、処理取鍋10に投入される。複数のホッパ54を備える場合には、投入ゲート58を通過した合金材は、ベルトコンベア51で投入シュート52に搬送されるようにしてもよい。
 注湯取鍋60は、処理取鍋10から溶湯を受け取り、その溶湯を鋳型Dに注湯するための取鍋である。注湯取鍋60は、注湯機100により傾動されて、鋳型Dに注湯する。図1では、空替位置P4が注湯機100とは離れた位置で示されるが、空替位置P4が注湯機100と同じ場所であってもよい。すなわち、処理取鍋10が、注湯機100に保持された注湯取鍋60に溶湯を空け替えてもよい。
 空替接種装置80は、処理取鍋10から注湯取鍋60へ溶湯を空け替えるときに、接種剤を投入する装置である。空替接種装置80の構成は、基本的に、合金材投入装置50と同じである。処理取鍋10から注湯取鍋60へ溶湯を空け替えるときに接種剤を投入することにより、短時間で均一に接種剤を溶湯に混合することができる。なお、空替接種装置80を備えずに、人手で接種剤を投入することも可能である。空替接種装置80では、溶湯の重量、すなわち処理取鍋10内の溶湯の重量に応じて各接種剤を投入することができる。処理取鍋10内の溶湯重量を変えることもあり、溶湯の重量に適した重量の接種剤を投入することにより、適切な接種が可能となる。
 図1に示す溶湯搬送システム1では、注湯取鍋60は注湯取鍋搬送台車70により、空替位置P4から注湯機100まで搬送される。注湯取鍋搬送台車70は、図示は省略するが、レールR2上を走行する台車と、台車上で注湯取鍋60を移動するコンベアとを有する。より詳細には、注湯取鍋60用のレールR2と平行して、注湯機100用のレールR3が配設される。そして、レールR2上の注湯取鍋搬送台車70上の注湯取鍋60を、レールR3上の注湯機100に移送するために、レールR2とレールR3間に実取鍋コンベアS1と空取鍋コンベアS2とが配設される。そして、実取鍋コンベアS1を介して、溶湯を保有する注湯取鍋60を注湯取鍋搬送台車70から注湯機100に移送し、空取鍋コンベアS2を介して、注湯を終えた注湯取鍋60を注湯機100から注湯取鍋搬送台車70に移送する。注湯取鍋搬送台車70、実取鍋コンベアS1および空取鍋コンベアS2の構成は、公知の構成でよく、詳細な説明は省略する。
 注湯機100は、注湯取鍋60を傾動して、注湯取鍋60内の溶湯を鋳型Dに注湯する装置である。鋳型Dは、鋳型ラインDL上に並んで移動・停止を繰り返す。鋳型Dが停止中に、注湯機100が注湯取鍋60から注湯する。注湯が終了すると、鋳型Dが1枠分移動し、次の空の鋳型Dが注湯機100の前に移動し、停止する。なお、鋳型Dの移動に要する時間が長い場合には、注湯機100が鋳型Dに注湯しつつ、注湯機100がレールR3上を移動し、鋳型Dが鋳型ラインDL上で移動するようにしてもよい。
 図5は、溶湯搬送システム1の制御系の一例を示す概略構成図である。空替機能付受湯台車20は、空替機能付受湯台車20の走行や空け替え機能を制御する空替機能付受湯台車コントローラ110を備える。合金材投入装置50は、合金材投入装置50の機能を制御する合金材投入装置コントローラ120を備える。注湯取鍋搬送台車70は、注湯取鍋搬送台車70の走行や注湯取鍋60の移送を制御する注湯取鍋搬送台車コントローラ130を備える。注湯機100は、注湯機100の走行や注湯取鍋60の傾動、すなわち注湯を制御する注湯機コントローラ140を備える。
 空替機能付受湯台車コントローラ110と合金材投入装置コントローラ120と注湯取鍋搬送台車コントローラ130は、搬送ゾーンメインコントローラ150に接続され、通信を行う。また、注湯機コントローラ140は、注湯ゾーンメインコントローラ160に接続され、通信を行う。そして、搬送ゾーンメインコントローラ150と注湯ゾーンメインコントローラ160は接続され、通信を行う。すなわち、各装置のコントローラである空替機能付受湯台車コントローラ110、合金材投入装置コントローラ120、注湯取鍋搬送台車コントローラ130および注湯機コントローラ140が通信可能に接続される。なお、鋳造工場内の各ゾーンのメインコントローラである、搬送ゾーンメインコントローラ150および注湯ゾーンメインコントローラ160は、各ゾーン内の他のコントローラ(不図示)あるいは鋳造工場全体を制御するコントローラ(不図示)と接続されて、通信を行ってもよい。
 また、ゾーンのメインコントローラである、搬送ゾーンメインコントローラ150および注湯ゾーンメインコントローラ160を備えず、各装置のコントローラである空替機能付受湯台車コントローラ110、合金材投入装置コントローラ120、注湯取鍋搬送台車コントローラ130および注湯機コントローラ140を直接接続し、通信を行ってもよい。また、各装置のコントローラ110、120、130、140は、鋳造工場全体を制御するコントローラを含め他のコントローラ(不図示)と接続されて、通信を行ってもよい。
 空替機能付受湯台車20には、処理取鍋10内の溶湯、合金材の重量を計測する第1重量計測器112が備えられる。第1重量計測器112で計測した重量は、先ずは空替機能付受湯台車コントローラ110に送られる。合金材投入装置50のロードセル122は、第3重量計測器として、合金材投入装置50の投入用シュート52を通る前の合金材の重量を計測する。第3重量計測器122で計測した重量は、先ずは合金材投入装置コントローラ120に送られる。注湯機100には、注湯取鍋60内の溶湯の重量を計測する第2重量計測器142が備えられる。第2重量計測器142で計測した重量は、先ずは注湯機コントローラ140に送られる。
 第1重量計測器112は、まず、合金材投入装置50から、処理取鍋10のポケット12に投入された合金材の重量を計測して、その重量を第4重量情報W4として空替機能付受湯台車コントローラ110に送る。なお、合金材の投入箇所は、ポケット12ではなくてもよい。次に、第1重量計測器112は、溶解炉Fから受湯する溶湯の重量を計測し、その重量を空替機能付受湯台車コントローラ110に送る。溶湯を受湯し終わったときの溶湯と合金材の重量(単に「溶湯の重量」ともいう)を第1重量情報W1として、空替機能付受湯台車コントローラ110に送る。さらに、第1重量計測器112は、溶湯と合金材の重量を計測し続け、その重量を空替機能付受湯台車コントローラ110に送る。
 第1重量計測器112は、合金材投入装置50から、処理取鍋10のポケット12に合金材が投入される前の重量を計測して、その重量を第5重量情報W5として空替機能付受湯台車コントローラ110に送ってもよい。また、処理取鍋10から注湯取鍋60へ溶湯を空け替えた後の処理取鍋10の重量を計測して、その重量を第6重量情報W6として空替機能付受湯台車コントローラ110に送ってもよい。第6重量情報W6と第5重量情報W5との差は、溶解せずに処理取鍋10内に残留した合金材の重量となる。残留した合金材が多いということは、溶湯に合金材が充分に添加されていないことが予想される。よって、第6重量情報W6と第5重量情報W5との差が所定の第4の閾値T4より大きいときには、エラー信号を生成して発する。エラー信号としては、空替機能付受湯台車コントローラ110で警報音を鳴らしたり、警報ランプを点灯したりしてもよいし、エラー信号を他のコントローラに送信してもよい。さらに、注湯取鍋搬送台車コントローラ130にエラー信号を送って、溶湯を空け替えられた注湯取鍋60での注湯を中止させてもよい。このように、第5重量情報W5と第6重量情報W6を用いることにより、合金材不足の溶湯で鋳造することを防止できる。
 第2重量計測器142は、処理取鍋10から溶湯を空け替えられた後の注湯取鍋60内の溶湯の重量を計測して、その重量を第2重量情報W2として注湯機コントローラ140に送る。また、注湯取鍋60から鋳型Dに注湯しているときの注湯取鍋60内に残存する溶湯の重量、すなわち注湯機100から鋳型Dに注湯した溶湯の重量を計測する。
 第3重量計測器122は、合金材投入装置50の投入用シュート52を通る前の軽量ホッパ56内の合金材の重量を計測して、その重量を第3重量情報W3として合金材投入装置コントローラ120に送る。投入用シュート52を通る前の合金材の重量は、合金材投入装置50が投入する合金材の重量を代表する。なお、合金材投入装置50が複数のホッパ54を有し、すなわち、複数の第3重量計測器122を有するときには、各第3重量計測器122が計測した合金材の重量の合計を第3重量情報W3として合金材投入装置コントローラ120に送る。
 空替機能付受湯台車コントローラ110は、空替機能付受湯台車20の走行を制御する。すなわち、投入位置P2から受取位置P1へ、そして、反応位置P3へ、そして、空替位置P4へ移動する。空替位置P4では、空替機能付受湯台車20の処理取鍋10を上昇させ、その後傾動して、溶湯を注湯取鍋60に空け替える。その後、処理取鍋10を下降させ、空替機能付受湯台車20を投入位置P2へ移動する。そして、この動作を繰り返す。
 空替機能付受湯台車コントローラ110では、合金材投入装置コントローラ120から、合金材投入装置50が投入する合金材の重量である第3重量情報W3、合金材が複数のホッパ54から投入される場合には、その合計の重量である第3重量情報W3を受信する。本書で、あるコントローラから受信するという場合には、直接そのコントローラから受信する場合のほか、他のコントローラを経由して受信する場合を含む。そして、第1重量計測器112で計測した合金材の重量である第4重量情報W4と比較し、その差である第2重量差が所定の第3閾値T3内であるかを判断する。第2重量差が第3閾値T3より大きいときには、エラー信号を生成して発する。すなわち、第2重量差が大きいときには、合金材がこぼれたりして適切に処理取鍋10に投入されなかったことが予想されるので、エラー信号を生成して発する。エラー信号としては、空替機能付受湯台車コントローラ110で警報音を鳴らしたり、警報ランプを点灯したりしてもよいし、エラー信号を他のコントローラに送信してもよい。なお、空替機能付受湯台車コントローラ110では、第4重量情報W4を、合金材投入装置コントローラ120、その他のコントローラに送信してもよい。
 空替機能付受湯台車コントローラ110では、溶解炉Fから処理取鍋10に受湯し終わったときの溶湯の重量を第1重量情報W1として注湯機コントローラ140に送信する。さらに、その後も溶湯の重量を監視し続ける。溶解炉Fから処理取鍋10に溶湯が入れられると、処理取鍋10内では、合金材と溶湯との反応が始まる。反応により第1重量計測値112の計測値は振動し始める。すなわち、激しいバブリングが生ずるので、計測値が変動する。特に、合金材にマグネシウム等の球状化元素を含む場合には、溶湯の重量を計測して、計測値の変動量が大きくなり、その後に所定量より小さくなった時点を、フェーディング開始と認識する。空替機能付受湯台車コントローラ110がフェーディング開始を検知したならば、フェーディング開始を知らせるフェーディング開始信号を他のコントローラに送信する。あるいは、空替機能付受湯台車コントローラ110で、フェーディング開始からの経過時間TFをカウントし、カウントした経過時間TFである、フェーディングタイマ信号を送信してもよい。このように、計測値の変動量でフェーディング開始を認識することで、正確にフェーディング開始からの経過時間TFをカウントできる。
 合金材投入装置コントローラ120は、予め決められた合金材を、1つまたは複数のホッパ54から電磁フィーダ55を介して計量ホッパ56に送り、合金材を投入する準備ができた後に投入ゲート58を開き、投入シュート52から処理取鍋10に投入させる。合金材投入装置コントローラ120は、所定の重量の合金材が計量ホッパに送られるように、電磁フィーダ55を操作する。第3重量計測器122で計測した計量ホッパ56に貯留された合金材の重量を第3重量情報W3として空替機能付受湯台車コントローラ110に送信する。複数のホッパ54から合金材が投入される場合には、複数のロードセル122で計測した重量の合計を、第3重量情報W3として送る。他のコントローラに送信してもよい。空替機能付受湯台車コントローラ110では、第3重量情報W3を用いて、先に説明したように、第1重量計測器112で計測した合金材の重量である第4重量情報W4と比較し、その差、第2重量差が所定の第3閾値T3内であるかを判断する。
 注湯取鍋搬送台車コントローラ130は、注湯取鍋搬送台車70の走行を制御する。すなわち、注湯取鍋搬送台車70を空替位置P4から注湯機100へ移動する。注湯機100の位置では、コンベアで注湯取鍋60を、注湯機100へ移送する。図1の溶湯搬送システム1では、溶湯の入った注湯取鍋60を実取鍋コンベアS1に移送する。注湯取鍋を受け取った実取鍋コンベアS1は、注湯取鍋60を注湯機100に移送する。また、注湯機100で注湯が終了した注湯取鍋60は、空取鍋コンベアS2に移送され、空取鍋コンベアS2から、注湯取鍋搬送台車70に移送される。すなわち、注湯取鍋搬送台車70は、実取鍋コンベアS1の位置から、空取鍋コンベアS2の位置へ移動する。このように、実取鍋コンベアS1と空取鍋コンベアS2を備えることで、複数の注湯取鍋60を同時に使用することが可能となり、各装置での待ち時間が短縮され、効率が高くなる。注湯機100から注湯済みの注湯取鍋60を受け取った注湯取鍋搬送台車70は、空替位置P4へ移動し、再び処理取鍋10から溶湯を受け取る。なお、実取鍋コンベアS1および空取鍋コンベアS2の動作は、注湯取鍋搬送台車コントローラ130によって制御されても、注湯機コントローラ140によって制御されても、搬送ゾーンメインコントローラ150によって制御されても、注湯ゾーンメインコントローラ160によって制御されても、あるいは他のコントローラによって制御されてもよい。
 注湯機コントローラ140は、注湯機100の動作を制御する。すなわち、注湯取鍋60を傾動して、注湯取鍋60から所定量の溶湯を鋳型Dに注入する。その際、第2重量計測器142で注湯取鍋60内の溶湯の重量、すなわち溶湯量を計測しながら鋳型Mに注湯することで、正確な量の溶湯を注湯することができる。
 注湯機コントローラ140は、溶解炉Fから処理取鍋10に受湯された溶湯の重量を示す第1重量情報W1を空替機能付受湯台車コントローラ110から受信する。さらに、第2重量計測器142で計測した注湯取鍋60に空け替えられた溶湯の重量も第2重量情報W2として受信する。そして、第1重量情報W1と第2重量情報W2との差である第1重量差が所定の第1閾値T1を超える場合には、溶解炉Fから注湯機100まで溶湯を搬送する途中で、溶湯がこぼれるなどして溶湯が減少したことが予想されるので、エラー信号を生成して発する。エラー信号としては、注湯機コントローラ140で警報音を鳴らしたり、警報ランプを点灯したりしてもよいし、エラー信号を他のコントローラに送信してもよい。
 注湯機コントローラ140は、空替機能付受湯台車コントローラ110からフェーディング開始信号を受信してフェーディング開始からの経過時間TFをカウントする。あるいは、経過時間TFを受信してもよい。これまでの説明からも明らかなように、この経過時間TFあるいはフェーディング開始信号(以降、「経過時間TF」で代表して説明する)は、処理取鍋10毎に定まり、その処理取鍋10から溶湯を空け替えられた注湯取鍋60に引き継がれる。よって、経過時間TFは、注湯機100に移送される注湯取鍋60毎に決まる情報である。すなわち、溶湯搬送システム1において、経過時間TFは1つの情報ではなく、処理取鍋10毎に定まる複数の情報であり、どの処理取鍋10の情報であるかの識別ができるように構成される。注湯機コントローラ140は、注湯機100が保持する注湯取鍋60用の経過時間TFを認識する。
 注湯機コントローラ140では、経過時間TFが所定の第2閾値T2を超える場合には、フェーディングにより合金材の効果が薄れたことが予想されるので、エラー信号を生成して発する。合金材の効果が薄れると、球状化不良が発生する可能性が高くなるためである。エラー信号が発せられると、典型的には、注湯機コントローラ140は、その注湯取鍋60からの注湯は止め、注湯取鍋60に残っている溶湯をスターティングブロックUに移す。スターティングブロックUは、溶湯を受け入れる容器であり、注湯取鍋60が傾斜して溶湯を注ぐためのシュートを備える。注湯機100により、溶湯を鋳型Dに注湯するのとは逆方向に注湯取鍋60を傾斜させて、注湯取鍋60からシュートを経由して容器に移す。スターティングブロックUに移された溶湯は、炉に運ばれて再利用される。あるいは、注湯機100から注湯取鍋60を廃湯装置(不図示)に運んで処理してもよい。エラー信号としては、注湯機コントローラ140で警報音を鳴らしたり、警報ランプを点灯したりしてもよいし、エラー信号を他のコントローラに送信してもよい。
 なお、第2閾値T2、すなわちフェーディング開始後に球状化不良が発生するまでの経過時間は、合金材の種類や量によって変化し、また、処理取鍋10の大きさや、運搬方法(処理取鍋の揺れ等)によっても変化すると言われている。そこで、第2閾値T2は、溶湯取鍋60の溶湯に適合した値を用いる必要がある。第2閾値T2は、例えば注湯機コントローラ140に予め記憶しておく。そして、合金材投入装置50から処理取鍋10に投入された合金材の種類や量、処理取鍋10が受湯した溶湯の量等の計測値に基づき、適切な値を用いるようにする。なお、第2閾値T2の設定は、空替機能付受湯台車コントローラ110、合金材投入装置コントローラ120、注湯取鍋搬送台車コントローラ130、その他のコントローラで行ってもよい。
 次に、溶湯搬送システム1の運転について説明する。まず、空の処理取鍋10を載置した空替機能付受湯台車20が、空替機能付受湯台車コントローラ110に制御されて、投入位置P2に移動する。空替機能付受湯台車コントローラ110は、空替機能付受湯台車20の位置情報を他のコントローラに送信する。
 合金材投入装置50では、合金材投入装置コントローラ120に制御されて、各ホッパ54から所定量の合金材が計量ホッパ56に貯留される。貯留された合金材の重量は、第3重量計測器122で計測され、合金材投入装置コントローラ120に送られ、さらに合金材投入装置コントローラ120から空替機能付受湯台車コントローラ110に第3重量情報W3として送られる。そして、空替機能付受湯台車20が投入位置P2に移動すると、投入ゲート58が開かれて、合金材が投入用シュート52を通って、処理取鍋10に投入される。
 処理取鍋10に合金材が投入されると、第1重量計測器112で、投入された合金材の重量が計測される。計測された重量は、第4重量情報W4として空替機能付受湯台車コントローラ110に送られる。空替機能付受湯台車コントローラ110では、第3重量情報W3と第4重量情報W4とを比較し、その差である第2重量差が第3閾値T3を超える場合にアラームを生成し発する。アラームが発せられた場合には、オペレータが判断して、この処理取鍋10の処理を停止してもよいし、次の工程にそのまま進んでもよい。なお、自動的に処理取鍋10の合金材を空にして、初めからスタートするようにしてもよい。第2重量差が第3閾値T3以下の場合には、次の工程に進む。なお、合金材を投入し合金材の重量を計測し終わった後に、合金材投入装置50からカバー剤を処理取鍋10に投入し、合金材を覆ってもよい。
 合金材を投入された処理取鍋10を載置する空替機能付受湯台車20は、空替機能付受湯台車コントローラ110に制御されて、受取位置P1に移動する。そこで、溶解炉Fから所定量の溶湯が処理取鍋10に注がれる。注がれた溶湯の重量は、第1重量計測器112で計測され、空替機能付受湯台車コントローラ110に送られ、第1重量情報W1として、さらに空替機能付受湯台車コントローラ110から注湯機コントローラ140に送られる。その処理取鍋10の識別も一緒に送られる。また、処理取鍋10内の溶湯の重量は計測され続け、空替機能付受湯台車コントローラ110に送られる。ここで、重量を計測し続けるとは、所定間隔ごとに重量を計測することでよい。
 処理取鍋10で受湯すると、空替機能付受湯台車20は、空替機能付受湯台車コントローラ110に制御されて、速やかに反応位置P3に移動する。すなわち、溶湯と合金材の反応が激しくなる前に、処理取鍋10を反応室90内に搬送する。溶湯と合金材が反応室90内で反応することにより、激しい反応により溶湯が鋳造工場内に飛散することを防止し、反応により生ずる粉じんやガスをダクトを介して鋳造工場外に排出できる。
 第1重量計測器112で計測し続ける処理取鍋10内の溶湯の重量から、空替機能付受湯台車コントローラ110は、フェーディングの開始を検知する。溶湯と合金材の激しい反応によるバブリングのため、第1重量計測器112で計測する重量は大きく変動する。また空替機能付受湯台車コントローラ110は、第1重量計測器112で計測し続ける重量の変動量が一定幅(第1段階)に治まると、処理取鍋10をそれ以上反応室90内に留まらせる必要がないので、空替機能付受湯台車20を空け替え位置P4に移動させ始める。このように空替機能付受湯台車20を空け替え位置P4に早めに移動させるのは、フェーディング開始後にできるだけ早く鋳型Dに注湯するためである。
 さらに第1重量計測器112で計測し続ける重量の変動量が小さくなり、所定幅(第2段階)以下に治まると、溶湯と合金材の反応の終了と認識し、そのタイミングをフェーディング開始とする。空替機能付受湯台車コントローラ110は、フェーディング開始を知らせるフェーディング開始信号とその処理取鍋の識別を注湯機コントローラ140に送信する。あるいは、空替機能付受湯台車コントローラ110は、フェーディング開始を認識したら、フェーディングの開始からの経過時間TFを計測して、その経過時間TFをフェーディングタイマ信号として送信してもよい。
 空け替え位置P4に移動した空替機能付受湯台車20では、処理取鍋10から注湯取鍋60に溶湯を空け替える。注湯取鍋搬送台車70は、注湯機コントローラ140に制御され、空の注湯取鍋60を載置して、空け替えられる位置に待機する。空替機能付受湯台車20は、後述する傾動装置40(図6等参照)とパンタグラフ式テーブル昇降機28(図7参照)または昇降テーブル34(図6参照)などで、処理取鍋10を上昇して傾動することにより溶湯を空け替える。または、セクタギア44(図8参照)を用いて処理取鍋10を傾動することにより溶湯を空け替える。溶湯を処理取鍋10から注湯取鍋60に空け替えるときに、たとえば空替接種装置80から接種剤を溶湯に添加してもよい。
 注湯取鍋60に溶湯が空け替えられると、注湯取鍋搬送台車70は、注湯取鍋60を実取鍋コンベアS1に移送する位置まで移動する。注湯取鍋60は、注湯取鍋搬送台車70から実取鍋コンベアS1に移送される。注湯取鍋60は、実取鍋コンベアS1により注湯機100の位置まで搬送される。そこで、注湯機100に移送される。
 注湯機100では、注湯取鍋60を受け取ると、第2重量計測器142で注湯取鍋60内の溶湯の重量を計測し、注湯機コントローラ140に第2重量情報W2として送る。併せて、空替機能付受湯台車コントローラ110から当該処理取鍋10の識別番号を受信する。注湯機コントローラ140では、識別番号の一致した処理取鍋10に関する、第1重量情報W1と第2重量情報W2とを比較する。そして、その差である第1重量差が第1閾値T1を超えた場合にアラームを生成し発する。アラームが発せられた場合には、オペレータが判断して、この注湯取鍋60の処理を停止してもよいし、次の工程にそのまま進んでもよい。なお、自動的に注湯取鍋60を空にして、初めからスタートするようにしてもよい。注湯取鍋60を空にするには、注湯機100をスターティングブロックUの前に移動し、注湯取鍋60内の溶湯をスターティングブロックUに移せばよい。第1重量差が第1閾値T1以下の場合には、次の工程に進む。
 注湯機100では、溶湯を注湯取鍋60から鋳型Dに注湯する。1つの鋳型Dに所定量の溶湯を注湯すると、鋳型ラインDLが鋳型の1枠分の距離だけ動いて、新たな鋳型Dが注湯機100の前に来る。すると、注湯機100は、新たな鋳型Dに注湯する。この間、第2重量計測器142で注湯取鍋60内の溶湯の重量を計測する。すなわち、注湯取鍋60内に残る溶湯の重量を計測する。よって、鋳型Dに注湯している溶湯の重量を実測でき、正確に所定量の溶湯を鋳型Dに注湯できる。さらに、鋳型Dに注湯すべき溶湯の重量を計測しながら注湯できるので、より正確に注湯流量を制御しながら注湯できる。なお、鋳型ラインDLが鋳型の1枠分の距離だけ動くのに時間が掛る場合には、注湯取鍋60から鋳型Dに注湯している間に、注湯機100がレールR3上を、そして、鋳型Dが鋳型ラインDL上を同方向に同速度で移動してもよい。鋳型ラインDLが鋳型の1枠分の距離だけ動くのに時間を無駄にすることがなくなる。この場合、注湯機100は、次の鋳型Dに注湯するためにレールR3上を鋳型の1枠分の距離だけ戻る。あるいは、鋳型Dへの注湯ごとには戻らず、注湯取鍋60から所定の量の注湯を終えた場合に、空取鍋コンベアS2に移送する位置に移動することでもよい。
 注湯機コントローラ140では、空替機能付受湯台車コントローラ110から受信した当該溶湯に係るフェーディング開始信号に基づき、フェーディング開始からの経過時間TFをカウントする。あるいは、空替機能付受湯台車コントローラ110から当該溶湯に係るフェーディング開始からの経過時間TFを受信してもよい。そして、この経過時間TFが第2閾値T2を超える場合にアラームを生成し発する。アラームが発せられた場合には、この注湯取鍋60から鋳型Dへの注湯を停止する。オペレータが判断して、そのまま注湯を続けられるようにしてもよい。
 注湯取鍋60から鋳型Dへの注湯を停止すると、注湯機100をスターティングブロックUの前に移動し、注湯取鍋60内の溶湯をスターティングブロックUに移す。そこで、注湯取鍋60を鋳型Dに注湯するのとは逆方向に傾動して、溶湯をスターティングブロックUに移す。スターティングブロックUに移された溶湯は、炉に戻され再利用される。なお、注湯取鍋60から溶湯をスターティングブロックに移すために注湯取鍋60を傾動する装置である排湯装置(不図示)を備えて、注湯機100から排湯装置に注湯取鍋60を移送後に、溶湯をスターティングブロックに移してもよい。また、注湯取鍋60内に残った溶湯が多い場合などの状況では、クレーンで注湯取鍋60を持ち上げて搬送して、注湯取鍋60内に残った溶湯を炉に直接戻すようにしてもよい。
 注湯取鍋60が空になると、あるいは、注湯取鍋60内に残留する溶湯の重量が所定の重量以下になると、注湯機100は、注湯取鍋60を空取鍋コンベアS2に移送する位置まで移動する。注湯取鍋60は、注湯機100から空取鍋コンベアS2に移送される。注湯取鍋60は、空取鍋コンベアS2により注湯取鍋搬送台車70の位置まで搬送される。注湯取鍋搬送台車70は、空取鍋コンベアS2で待機している。そこで、注湯取鍋60は、注湯取鍋搬送台車70に移送され、更に、空け替えられる位置に移動する。
 溶湯搬送システム1によれば、処理取鍋10への合金材の投入を自動化すると共に、処理取鍋10から注湯機100への溶湯の搬送が自動化される。そして、合金材投入装置50の第3重量計測器122で計測した合金材の重量である第3重量情報W3と、空替機能付受湯台車20の第1重量計測器112で計測した処理取鍋10に投入された合金材の重量である第4重量情報W4との差である第2重量差が第3閾値T3を超える場合にはアラームを生成して発する。よって合金材が適切に処理取鍋10に投入されていることが確認される。また、合金材が投入された処理取鍋10に溶湯が注がれると、その後の重量を計測し、重量の変動量からフェーディングの開始を検知する。よって、フェーディング開始を正確に把握できる。また、処理取鍋10で計測した溶湯の重量と、処理取鍋10から空け替えられ注湯取鍋60の溶湯の重量を計測し、それらの第1重量情報W1と第2重量情報W2の差である第1重量差が第1閾値T1を超えるとアラームを生成し発する。よって、溶湯を溶解炉Fから注湯機100へ搬送する過程で溶湯が漏れたりこぼれたりする不具合を見つけだすことができる。さらに、注湯機100は、鋳型Dに注湯している溶湯のフェーディング開始からの経過時間TFが第3閾値T3を超える場合にはアラームを生成し発する。よって、フェーディングによる球状化不良を防止することができる。したがって、安全で、かつ、安定した品質の鋳造品を製造できる。
 次に、空替機能付受湯台車20の詳細を説明する。図6は、一実施形態としてのフォーク昇降式の空替機能付受湯台車20Aの側面図である。空替機能付受湯台車20Aは、車輪22を備えてレールR1上を走行する台車本体24を備える。台車本体24上には、台車本体24を走行させるための駆動機構である走行機構26が設置される。また、台車本体24上には一対のガイド柱32が設置される。ガイド柱32に、水平方向に延び、台車本体24上で処理取鍋10を載置して昇降可能な昇降フレーム34が支持される。昇降フレーム34には、処理取鍋10を水平方向(空替機能付受湯台車20Aの走行方向と直交する方向)に移動する取鍋移動機構35が設置される。取鍋移動機構35は典型的には、ローラーコンベアである。取鍋移動機構35により処理取鍋10を水平方向に移動させて、溶解炉Fから適切な距離で受湯し、また、注湯取鍋60に溶湯を空け替えやすい位置に移動する。さらに、空替機能付受湯台車20Aが走行するときには、中央部に移動して、振動を少なく、かつ、空替機能付受湯台車20A全体として安定性をよくすることができる。また、第1重量計測器としてのロードセル112を昇降フレーム34と取鍋移動機構35の間に配置する。典型的には、4箇所にロードセル112を配置する。台車本体24上には、昇降フレーム34を昇降する駆動機構としての昇降フレーム昇降機構36が設置される。
 昇降フレーム34は、鉛直方向に離間して設置される2つの保持ローラー33を有する。ガイド柱32には、鉛直方向に形成されて保持ローラー33が転がる面を有するローラーガイド31が設けられる。鉛直方向に離間した2つの保持ローラー33がローラーガイド31上で転がるようにすることで、重量物である処理取鍋10を載置することにより昇降フレーム34に生ずるモーメントを受けることが可能になる。昇降フレーム34は、図6の紙面直交方向に傾かないように、2箇所をチェーン37で吊られる。昇降フレーム昇降機構36は、昇降モータの出力軸に減速装置等を介して接続されたスプロケットを回転することで、チェーン37を巻き取る。よって、チェーン37に吊られて、昇降フレーム34が昇降する。
 昇降フレーム34には、処理取鍋10を支持し、かつ、傾動させる傾動装置40が設置される。傾動装置40は、典型的には、昇降フレーム34上に設置された架台と、架台上で水平方向に延在し、処理取鍋10を両側から支持する一対の回転軸と、回転軸を回転させる傾動機構とを備える。
 台車本体24上では、走行機構26や昇降フレーム昇降機構36は、処理取鍋10が設置される場所、具体的には昇降フレーム34の先端側から離れた位置に配置される。このように走行機構26や昇降フレーム昇降機構36を配置することにより、処理取鍋10が経時劣化などをして、処理取鍋10から溶湯が漏れても、修理に時間を要するモータ等が破損を受けず、短時間での修理が可能となる。さらに、走行機構26や昇降フレーム昇降機構36のモータ類は、昇降フレーム34を下降させたときの処理取鍋10の底の高さより高い位置に配置するのがよい。処理取鍋10が経時劣化で損傷するのは、底部近くの場合が多いので、漏れた溶湯がモータに掛らないようにすることができる。昇降フレーム34の上面や台車本体24の床面には、漏れた溶湯が下方へ抜けられる開口が設けられることが好ましい。また、外部からの電力を受電する電力ケーブルや情報を通信する通信ケーブルを引き込むための受電装置38も、処理取鍋10が設置される場所から離れた位置に配置されるのが好ましい。
 このような空替機能付受湯台車20Aを用いると、昇降フレーム34を上昇することで、容易に処理取鍋10を持ち上げ、持ち上げた状態で、傾動装置40により処理取鍋10を傾動させ、溶湯を注湯取鍋60に空け替えることができる。よって、自動で、安全に溶湯を空け替えることができる。また、全て電動であるため、湯漏れしても火災が発生しにくい。なお、空替機能付受湯台車20Aの走行方向に処理取鍋10を傾動するものとして説明したが、走行方向と直交する方向に処理取鍋10を傾動するように構成してもよい。処理取鍋10を炉F側に傾動可能に構成すると、炉Fからの溶湯の流線に対応した適切な位置に処理取鍋10を配置でき、後述の利点が得られる。
 なお、空替機能付受湯台車コントローラ112は、レールR1沿いの空替機能付受湯台車20Aの経路の傍に設置されてもよいし、台車本体24に積載されてもよい。台車上に積載される場合には、受電装置38と同様に、処理取鍋10が設置される場所から離れた位置に配置されるのが好ましい。
 図7は、一実施形態としてのパンタグラフ式の空替機能付受湯台車20Bの側面図である。空替機能付受湯台車20Aでは昇降フレーム34で処理取鍋10を昇降するのに代わりに、空替機能付受湯台車20Bではパンタグラフ式テーブル昇降機28で処理取鍋10を昇降する。すなわち、台車本体24上にパンタグラフ式テーブル昇降機28が設置され、傾動装置40がパンタグラフ式テーブル昇降機28に設置される。パンタグラフ式テーブル昇降機28は、図7に破線で示すように、2対の平行な梁で菱形を形成するようにして、交差する支点を枢動可能に接続したリンク機構29を有する。なお、リンク機構29は、平行な梁を3対以上有してもよい。例えば油圧シリンダで、リンク機構29の任意の2つの支点間の距離を変えることにより、処理取鍋10を昇降することができる。あるいは、モータおよび減速装置から得られる回転運動により、1本の梁の水平面からの角度を変えることにより、処理取鍋10を昇降することができる。よって、簡単な構造で処理取鍋10を昇降することができる。また、油圧シリンダを用いると、大きな力を容易に得ることができ、経済的である。一方、モータおよび減速装置を用いると、全て電動であるため、湯漏れしても火災が発生しにくい。他の構造は、フォーク昇降式の空替機能付受湯台車20Aと同様であるので、重複する説明は省略する。
 また、この空替機能付受湯台車20Bでは、処理取鍋10を炉F側にも傾動可能に構成されている。炉Fから受湯する際に、処理取鍋10が昇降し炉F側に傾動することにより、炉Fからの溶湯の流線に対応した適切な位置に処理取鍋10を配置できる。そのため、処理取鍋10の側面などに当たることなく、溶湯を底面で受けることができる。よって、処理取鍋10の摩耗を防止することができ、溶湯搬送システム1の信頼性をより高くできる。
 図8は、一実施形態としてのセクタギア式の空替機能付受湯台車20Cの側面図である。(a)は全体図を示し、(b)はセクタギア44の部分図を示し、(c)は処理取鍋10に設置される取鍋回転支え48を説明するための図である。セクタギア式の空替機能付受湯台車20Cでは、台車本体24上に処理取鍋10を搬送するローラーコンベア41が設置される。図8(a)では、空替機能付受湯台車20Cの進行方向に処理取鍋10を搬送するように示されるが、進行方向と直交方向に処理取鍋10を搬送するように設置されてもよい。ローラーコンベア41は、フォーク昇降式の空替機能付受湯台車20Aの取鍋移動機構35と同様の目的で処理取鍋10を移動する他、処理取鍋10の取鍋回転支え48を傾動装置40の空替軸42に嵌め合わせる。ローラーコンベア41は、台車本体24の直上ではなく、支柱等を間に介して、配置されてもよい。あるいは、フォーク昇降式の空替機能付受湯台車20Aの昇降フレーム34、パンタグラフ式の空替機能付受湯台車20Bのリンク機構29上に設置されてもよい。ローラーコンベア41と台車本体24との間には、第1重量計測器としてのロードセル112が配置される。
 傾動装置40は、処理取鍋10を支持し、また、傾動するときの回転中心となる空替軸42と、空替軸42を中心に回動するセクタギア44と、セクタギア44と噛み合って、セクタギア44を回動させるピニオン45と、ピニオン45を駆動する駆動モータ46を備える。セクタギア44は、処理取鍋10と一緒に回動するように、空替軸42とは異なる位置で処理取鍋10と結合される。処理取鍋10と一緒に回動するセクタギア44をピニオン45で駆動するので、小さな動力で処理取鍋10を傾動することができる。また、全て電動であるため、湯漏れしても火災が発生しにくい。他の構造は、フォーク昇降式の空替機能付受湯台車20Aと同様であるので、重複する説明は省略する。
 図9は、図1とは別の、本発明の一実施形態の溶湯搬送システム2を有する鋳造工場内の平面図である。溶湯搬送システム2では、空替機能付受湯台車20が走行するレールR1と注湯取鍋搬送台車70が走行するレールR2とが直線上に並ぶ。この場合には、空替機能付受湯台車20が処理取鍋10を走行方向に移動可能であるか、注湯取鍋搬送台車70が注湯取鍋60を走行方向に移動可能であることが好ましい。他の構成は、溶湯搬送システム1と同様であるので、重複する説明は省略する。
 なお、注湯取鍋搬送台車70を備えずに、空替機能付受湯台車20が実取鍋コンベアS1の位置まで走行し、実取鍋コンベアS1上で待機する注湯取鍋60に溶湯を空け替えてもよい。注湯取鍋60は、注湯機100に移送され、鋳型Dに注湯する。注湯して空になった注湯取鍋60は、実取鍋コンベアS1に移送されて、再度、処理取鍋10から溶湯が空け替えられる。この場合、空取鍋コンベアS2を備えなくてもよい。また、空替接種装置80は、実取鍋コンベアS1のレールR2側に設けられる。
 これまでの説明では、溶湯搬送システム1、2は、注湯取鍋60を空替位置P4から注湯機100まで搬送する注湯取鍋搬送台車70とレールR2を備えるものとして説明した。しかし、注湯取鍋搬送台車70とレールR2を備えず、処理取鍋10から注湯機100に保持される注湯取鍋60に直接溶湯を空け替えてもよい。すなわち、空替位置P4と注湯機100とが同じ位置であってもよい。
 また、受取位置P1、投入位置P2、反応位置P3、空替位置P4のいずれかが同じ位置であってもよい。鋳造工場の敷地と、炉Fや鋳型ラインDLの配置によって、溶湯搬送システム1、2の形状は、適宜変更され得る。
 これまでの説明では、合金材投入装置50には合金材投入装置コントローラ120が備えられるとして説明したが、たとえば1種類の定量の合金材を投入する場合には、合金材投入装置50を単純な構造として、合金材投入装置コントローラ120を備えていなくてもよい。
 以下に、本明細書と図面で用いた主な符号を示す。
1、2: 溶湯搬送システム
10: 処理取鍋
12: ポケット部分
20、20A、20B、20C: 空替機能付受湯台車
22: 車輪
24: 台車本体
26: 走行機構
28: パンタグラフ式テーブル昇降機
29: リンク機構
31: ローラーガイド
32: ガイド柱
33: 保持ローラー
34: 昇降テーブル
35: 取鍋移動機構
36: 昇降テーブル昇降装置
38: 受電装置
40: 傾動装置
41: ローラーコンベア
42: 空替軸
44: セクタギア
45: ピニオン
46: セクタギア駆動装置
48: 取鍋回転支え
50: 合金材投入装置
51: ベルトコンベア
52: 投入用シュート
54: ホッパ
55: 電磁フィーダ
56: 計量ホッパ
58: 投入ゲート
60: 注湯取鍋
70: 注湯取鍋搬送台車
80: 空替接種装置
90: 反応室
100: 注湯機
110: 空替機能付受湯台車コントローラ
112; 第1重量計測器(ロードセル)
120: 合金材投入装置コントローラ
122: 第3重量計測器(ロードセル)
130: 注湯取鍋搬送台車コントローラ
140: 注湯機コントローラ
142: 第2重量計測器
150: 搬送ゾーンメインコントローラ
150: 注湯ゾーンメインコントローラ
D: 鋳型
DL: 鋳型ライン
F: 溶解炉(炉)
P1: 処理取鍋が炉から溶湯を受け取る受取位置
P2: 合金材投入装置から処理取鍋に合金材を投入する投入位置
P3: 合金材と溶湯とが反応する反応位置
P4: 処理取鍋から注湯取鍋へ溶湯を空け替える空替位置
R1: (空替機能付受湯台車用)レール
R2: (注湯取鍋搬送台車用)レール
R3: (注湯機用)レール
S1: 実取鍋コンベア
S2: 空取鍋コンベア
T1: 第1閾値
T2: 第2閾値
T3: 第3閾値
T4: 第4閾値
TF: フェーディングの開始からの経過時間
U: スターティングブロック
W1: 第1重量情報
W2: 第2重量情報
W3: 第3重量情報
W4: 第4重量情報
W5: 第5重量情報
W6: 第6重量情報

Claims (19)

  1.  炉から注湯機に溶湯を搬送する溶湯搬送システムであって、
     前記炉から溶湯を受け取り、注湯取鍋に空け替えるための処理取鍋と、
     前記処理取鍋に合金材を投入する合金材投入装置と、
     前記処理取鍋から前記溶湯を受け取り、注湯機に搬送する注湯取鍋と、
     前記合金材投入装置から前記処理取鍋に合金材を投入する投入位置と、前記処理取鍋が前記炉から溶湯を受け取る受取位置と、前記処理取鍋から前記注湯取鍋へ溶湯を空け替える空替位置とに、前記処理取鍋を移動させる空替機能付受湯台車と、
     前記注湯取鍋を前記注湯機に渡すために、前記空替位置から前記注湯取鍋を移動させる注湯取鍋搬送台車と、
     前記注湯取鍋搬送台車から注湯取鍋を受け取り、鋳型に溶湯を注湯する注湯機とを備え;
     前記注湯機は、該注湯機の動作を制御する注湯機コントローラを有し;
     前記合金材投入装置は、該合金材投入装置の動作を制御する合金材投入装置コントローラを有し;
     前記空替機能付受湯台車は、該空替機能付受湯台車の動作を制御する空替機能付受湯台車コントローラを有し;
     前記注湯取鍋搬送台車は、該注湯取鍋搬送台車の動作を制御する注湯取鍋搬送台車コントローラを有し;
     前記注湯機コントローラ、前記合金材投入装置コントローラ、前記空替機能付受湯台車コントローラおよび前記注湯取鍋搬送台車コントローラのうち、少なくとも2つのコントローラ間でデータ通信がなされる;
     溶湯搬送システム。
  2.  前記空替機能付受湯台車は、前記処理取鍋の重量を計測する第1重量計測器を備え、該第1重量計測器で計測された前記処理取鍋の重量は前記空替機能付受湯台車コントローラに送られ、
     前記注湯機は、前記注湯取鍋の重量を計測する第2重量計測器を備え、該第2重量計測器で計測された前記注湯取鍋の重量は前記注湯機コントローラに送られ、
     前記空替機能付受湯台車コントローラは、前記処理取鍋が前記炉から溶湯を受け取り完了したときの前記処理取鍋内の溶湯重量を第1重量情報として受け取り、
     前記注湯機コントローラは、前記処理取鍋から溶湯を空け替えられた前記注湯取鍋内の溶湯の重量を第2重量情報として受け取り、さらに、前記空替機能付受湯台車コントローラから前記第1重量情報を受け取り、前記第1重量情報と前記第2重量情報との差が所定の第1閾値を超える場合にエラー信号を発する;
     請求項1に記載の溶湯搬送システム。
  3.  前記合金材にはマグネシウムを含み、
     前記空替機能付受湯台車コントローラは、前記処理取鍋内でのフェーディングの開始を前記第1重量計測器で計測する重量の変動量から検知する;
     請求項2に記載の溶湯搬送システム。
  4.  前記空替機能付受湯台車コントローラは、前記フェーディングの開始を検知すると、フェーディングの開始を知らせるフェーディング開始信号またはフェーディングの開始からの経過時間であるフェーディングタイマ信号を他のコントローラに送信する;
     請求項3に記載の溶湯搬送システム。
  5.  前記注湯機コントローラは、溶湯を注湯した後の前記注湯取鍋内の溶湯の重量が所定の値以下になる前に、前記フェーディング開始信号からカウントした時間または他のコントローラから受信したフェーディングの開始からの経過時間が所定の第2閾値を超える場合にエラー信号を発する;
     請求項4に記載の溶湯搬送システム。
  6.  前記合金材投入装置は、前記処理取鍋に投入する合金材を貯留する計量ホッパと、前記計量ホッパの合金材の重量を計測する第3重量計測器とを有し、該第3重量計測器で計測された前記合金材の重量は第3重量情報として前記合金材投入装置コントローラに送られ、
     前記合金材投入装置コントローラは、前記第3重量情報を前記空替機能付受湯台車コントローラに送信し、
     前記第1重量計測器は前記処理取鍋に投入された合金材の重量を計測し第4重量情報として前記空替機能付受湯台車コントローラに送信し、
     前記空替機能付受湯台車コントローラは、前記第3重量情報と前記第4重量情報との差が所定の第3閾値を超える場合にエラー信号を発する;
     請求項1ないし5のいずれか1項に記載の溶湯搬送システム。
  7.  前記第1重量計測器で、前記合金材を投入される前の前記処理取鍋の重量を計測し第5重量情報として前記空替機能付受湯台車コントローラに送信し、
     前記第1重量計測器で、前記注湯取鍋へ前記溶湯を空け替えた後の前記処理取鍋の重量を計測し第6重量情報として前記空替機能付受湯台車コントローラに送信し、
     前記空替機能付受湯台車コントローラは、前記第5重量情報と前記第6重量情報との差が所定の第4閾値を超える場合にエラー信号を発する;
     請求項2に記載の溶湯搬送システム。
  8.  前記処理取鍋から前記注湯取鍋に空け替えられる溶湯に接種剤を投入する空替接種装置をさらに備える;
     請求項1ないし7のいずれか1項に記載の溶湯搬送システム。
  9.  前記空替機能付受湯台車が移動する、前記投入位置、前記受取位置、前記空替位置の3位置のうち、2つが同じ位置である;
     請求項6に記載の溶湯搬送システム。
  10.  前記空替機能付受湯台車には、前記処理取鍋を支持すると共に、前記処理取鍋を傾動して前記注湯取鍋に前記溶湯を空け替える傾動装置を備える;
     請求項9に記載の溶湯搬送システム。
  11.  前記空替機能付受湯台車は、
     車輪を備え軌道上を搬送する台車本体と、
     前記台車本体上に設置され、前記傾動装置をパンタグラフ式に上下するパンタグラフ式テーブル昇降機とを備える;
     請求項10に記載の溶湯搬送システム。
  12.  前記空替機能付受湯台車は、
     車輪を備え軌道上を搬送する台車本体と、
     前記台車本体上に設置されるガイド柱と、
     前記ガイド柱から水平方向に延び、前記台車上で昇降可能なテーブルであって、前記傾動装置を載置する昇降テーブルと、
     前記昇降テーブルを昇降する昇降テーブル昇降装置とを備える;
     請求項10に記載の溶湯搬送システム。
  13.  前記空替機能付受湯台車は、
     車輪を備え軌道上を搬送する台車本体と、
     前記台車本体上に設置され、前記処理取鍋を移動するローラーコンベアとを備え、
     前記傾動装置は、前記処理取鍋を傾動中心で支持する空替軸と、前記傾動中心とは異なる位置で前記処理取鍋と連結されるセクタギアと、該セクタギアを駆動するセクタギア駆動装置とを備える;
     請求項10に記載の溶湯搬送システム。
  14.  前記合金材投入装置は、前記合金材を貯留する複数のホッパと、該複数のホッパから前記投入シュートに所定量の合金材を流出するための複数の計量ホッパと、複数の前記第3重量計測器と、該計量ホッパで計量した前記合金材を前記投入シュートに流出させる複数の投入ゲートとを備え、前記第3重量情報は前記複数の第3重量計測器で計測した重量の合計である;
     請求項6に記載の溶湯搬送システム。
  15.  炉から注湯機に溶湯を搬送する溶湯搬送方法であって、
     前記炉から溶湯を受け取り、注湯取鍋に空け替えるための処理取鍋を、合金材を投入する投入位置まで移動させる工程と、
     前記処理取鍋に合金材を投入する工程と、
     前記合金材が投入された処理取鍋を、前記炉から溶湯を受け取る受取位置まで移動させる工程と、
     前記受取位置に移動された処理取鍋に前記炉から溶湯を受湯させる工程と、
     前記溶湯を受湯した処理取鍋を、前記注湯取鍋へ溶湯を空け替える空替位置に移動させる工程と、
     前記空替位置に移動された処理取鍋から、前記処理取鍋内の前記溶湯を前記注湯取鍋に空け替える工程とを備え;
     前記処理取鍋の重量を計測することにより計測した前記処理取鍋から前記注湯取鍋に空け替えられた溶湯の重量と、前記注湯取鍋の重量を計測することにより計測した前記注湯取鍋に空け替えられた溶湯の重量とから第1重量差を算定し、該第1重量差が第1閾値を超える場合にエラー信号を発する工程をさらに備える;
     溶湯搬送方法。
  16.  前記炉から溶湯を受湯した処理取鍋の重量を計測し、重量の変動量に基づき、フェーディングの開始を検知し、フェーディングの開始からの経過時間をカウントする工程と、
     溶湯を注湯した後の前記注湯取鍋内の溶湯の重量が所定の値以下になる前にフェーディングの開始からの経過時間が所定の第2閾値を超える場合にエラー信号を発する工程とをさらに備える;
     請求項15に記載の溶湯搬送方法。
  17.  前記処理取鍋に投入する合金材の重量と、前記処理取鍋の重量を計測することにより計測した投入された合金材の重量とから第2重量差を算定し、該第2重量差が第3閾値を超える場合にエラー信号を発する工程をさらに備える、
     請求項15または16に記載の溶湯搬送方法。
  18.  前記投入位置、前記空替位置、前記受取位置の3位置のうち、2つが同じ位置であり、前記処理取鍋を同じ位置で移動させる工程では処理取鍋を移動させることがない、
     請求項15に記載の溶湯搬送方法。
  19.  炉から注湯機に溶湯を搬送する溶湯搬送システムであって、
     前記炉から溶湯を受け取り、注湯取鍋に空け替えるための処理取鍋と、
     前記処理取鍋に合金材を投入する合金材投入装置と、
     前記処理取鍋から前記溶湯を受け取り、鋳型に注湯する注湯取鍋と、
     前記合金材投入装置から前記処理取鍋に合金材を投入する投入位置と、前記処理取鍋が前記炉から溶湯を受け取る受取位置と、前記処理取鍋から前記注湯取鍋へ溶湯を空け替える空替位置とに、前記処理取鍋を移動させる空替機能付受湯台車と、
     前記注湯取鍋の溶湯を鋳型に注湯する注湯機とを備え;
     前記注湯機は、該注湯機の動作を制御する注湯機コントローラを有し;
     前記空替機能付受湯台車は、該空替機能付受湯台車の動作を制御する空替機能付受湯台車コントローラを有し;
     前記注湯機コントローラと前記空替機能付受湯台車コントローラとの間でデータ通信がなされる;
     溶湯搬送システム。
PCT/JP2015/056358 2015-03-04 2015-03-04 溶湯搬送システムおよび方法 WO2016139776A1 (ja)

Priority Applications (9)

Application Number Priority Date Filing Date Title
RU2017130926A RU2017130926A (ru) 2015-03-04 2015-03-04 Система и способ для транспортировки расплавленного металла
KR1020177024681A KR102291995B1 (ko) 2015-03-04 2015-03-04 용탕 반송 시스템 및 방법
US15/552,406 US10549343B2 (en) 2015-03-04 2015-03-04 System and method for transporting molten metal
EP15883943.1A EP3266539B1 (en) 2015-03-04 2015-03-04 Molten metal carrying system and method
JP2015553959A JP5934451B1 (ja) 2015-03-04 2015-03-04 溶湯搬送システムおよび方法
CN201580001063.1A CN106132594B (zh) 2015-03-04 2015-03-04 熔融金属搬运系统以及方法
MX2017011267A MX2017011267A (es) 2015-03-04 2015-03-04 Sistema y metodo para transportar metal fundido.
BR112017016315-2A BR112017016315A2 (ja) 2015-03-04 2015-03-04 A Molten metal carrier system and a method
PCT/JP2015/056358 WO2016139776A1 (ja) 2015-03-04 2015-03-04 溶湯搬送システムおよび方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/056358 WO2016139776A1 (ja) 2015-03-04 2015-03-04 溶湯搬送システムおよび方法

Publications (1)

Publication Number Publication Date
WO2016139776A1 true WO2016139776A1 (ja) 2016-09-09

Family

ID=56120546

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/056358 WO2016139776A1 (ja) 2015-03-04 2015-03-04 溶湯搬送システムおよび方法

Country Status (9)

Country Link
US (1) US10549343B2 (ja)
EP (1) EP3266539B1 (ja)
JP (1) JP5934451B1 (ja)
KR (1) KR102291995B1 (ja)
CN (1) CN106132594B (ja)
BR (1) BR112017016315A2 (ja)
MX (1) MX2017011267A (ja)
RU (1) RU2017130926A (ja)
WO (1) WO2016139776A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106563795A (zh) * 2016-10-26 2017-04-19 宁夏共享模具有限公司 浇注过程的控制系统及控制方法
CN114905031A (zh) * 2022-05-27 2022-08-16 石嘴山市仟一机械制造有限公司 一种稀土合金自动化生产系统

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019209343A (ja) * 2018-06-01 2019-12-12 新東工業株式会社 管理システムおよび管理方法
JP6995709B2 (ja) 2018-07-06 2022-01-17 新東工業株式会社 鋳鋼鋳物製造システム
CN110863134B (zh) * 2019-11-29 2020-12-01 泛凯斯特汽车零部件(江苏)有限公司 采用球墨铸铁原料的铸件及其制造方法
CN111136254B (zh) * 2020-01-14 2022-03-04 合肥工业大学 一种浇包用的换包装置及换包方法
CN114054729B (zh) * 2021-09-13 2023-08-18 山东杰创机械有限公司 一种高效的铁水自动转运系统
CN114054740B (zh) * 2021-09-22 2023-05-05 山东杰创机械有限公司 一种多工位协同浇注系统的浇注方法
CN115283659B (zh) * 2022-08-08 2023-07-04 河北师范大学 一种基于人工智能的定点浇铸系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009297783A (ja) * 2008-05-16 2009-12-24 Sintokogio Ltd 鋳造ライン駆動装置の制御方法、その制御システムおよびその記憶媒体
WO2010146908A1 (ja) * 2009-06-16 2010-12-23 新東工業株式会社 自動注湯機への溶湯供給方法およびその設備
JP2012525977A (ja) * 2009-05-08 2012-10-25 新東工業株式会社 取鍋搬送あけかえ台車および溶湯搬送ライン

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011030618A1 (ja) * 2009-09-10 2011-03-17 新東工業株式会社 注湯機制御システム、注湯設備及び注湯方法
CN102126019B (zh) * 2010-01-13 2014-12-10 新东工业株式会社 搭载有熔解炉的浇注装置
US10537937B2 (en) * 2015-03-06 2020-01-21 Sintokogio, Ltd. Pouring machine and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009297783A (ja) * 2008-05-16 2009-12-24 Sintokogio Ltd 鋳造ライン駆動装置の制御方法、その制御システムおよびその記憶媒体
JP2012525977A (ja) * 2009-05-08 2012-10-25 新東工業株式会社 取鍋搬送あけかえ台車および溶湯搬送ライン
WO2010146908A1 (ja) * 2009-06-16 2010-12-23 新東工業株式会社 自動注湯機への溶湯供給方法およびその設備

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106563795A (zh) * 2016-10-26 2017-04-19 宁夏共享模具有限公司 浇注过程的控制系统及控制方法
CN114905031A (zh) * 2022-05-27 2022-08-16 石嘴山市仟一机械制造有限公司 一种稀土合金自动化生产系统

Also Published As

Publication number Publication date
CN106132594A (zh) 2016-11-16
JPWO2016139776A1 (ja) 2017-04-27
KR20170120614A (ko) 2017-10-31
MX2017011267A (es) 2018-05-17
EP3266539A4 (en) 2018-11-21
EP3266539B1 (en) 2020-02-19
US10549343B2 (en) 2020-02-04
RU2017130926A (ru) 2019-04-04
CN106132594B (zh) 2019-08-20
BR112017016315A2 (ja) 2018-07-10
EP3266539A1 (en) 2018-01-10
US20180021852A1 (en) 2018-01-25
KR102291995B1 (ko) 2021-08-19
JP5934451B1 (ja) 2016-06-15

Similar Documents

Publication Publication Date Title
JP5934451B1 (ja) 溶湯搬送システムおよび方法
JP5627127B2 (ja) 自動注湯機への溶湯供給方法およびその設備
US20190091763A1 (en) Method for trasporting molten metal
CN106132595B (zh) 浇铸装置以及浇铸方法
JP5640020B2 (ja) 溶解炉を搭載した注湯装置
JP6472899B2 (ja) 鋳造設備および鋳造設備における鋳型の造型データと溶湯の溶湯状態データの管理方法
US4112998A (en) Pouring method and apparatus therefor
TW201832900A (zh) 鑄造設備之資訊顯示系統
CN113280898B (zh) 一种可称重计量的熔融炉连续上料分配装置及方法
CN210689209U (zh) 高精度熔炼系统
WO2018142977A1 (ja) 鋳造設備を構成する複数の装置の異常の原因を検出するシステム
JP3685781B2 (ja) ダクタイル鋳物用溶融鋳鉄の溶製設備
CN110044182B (zh) 高精度熔炼系统及其工作方法
JP4230479B2 (ja) 取鍋搬送台車の停止位置決め方法および装置
CN211546580U (zh) 熔渣收送设备及熔渣处理系统
CN111842869B (zh) 一种钢水集成处理装置及其系统
JP4150694B2 (ja) 取鍋搬送用ローラーテーブル
JP3975187B2 (ja) 溶鋼処理ライン
CN207873116U (zh) 一种铁水称重运输平车
RU2526360C1 (ru) Установка для загрузки шихтовых материалов в индукционную печь для плавки черных и цветных металлов
CA1100764A (en) Method of and apparatus for making a metal product
JPH09182958A (ja) 溶湯取鍋の自動搬送装置

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2015553959

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15883943

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 15552406

Country of ref document: US

REEP Request for entry into the european phase

Ref document number: 2015883943

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 20177024681

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: MX/A/2017/011267

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2017130926

Country of ref document: RU

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112017016315

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112017016315

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20170728