WO2016072243A1 - 太陽光発電システムの検査方法および検査装置 - Google Patents

太陽光発電システムの検査方法および検査装置 Download PDF

Info

Publication number
WO2016072243A1
WO2016072243A1 PCT/JP2015/079303 JP2015079303W WO2016072243A1 WO 2016072243 A1 WO2016072243 A1 WO 2016072243A1 JP 2015079303 W JP2015079303 W JP 2015079303W WO 2016072243 A1 WO2016072243 A1 WO 2016072243A1
Authority
WO
WIPO (PCT)
Prior art keywords
solar cell
inspection
cell string
unit
inspection signal
Prior art date
Application number
PCT/JP2015/079303
Other languages
English (en)
French (fr)
Inventor
豪 竹内
修一 三角
彰彦 佐野
康介 森田
Original Assignee
オムロン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by オムロン株式会社 filed Critical オムロン株式会社
Priority to US15/520,177 priority Critical patent/US10305424B2/en
Priority to EP15857665.2A priority patent/EP3200341B1/en
Priority to PCT/JP2015/079303 priority patent/WO2016072243A1/ja
Publication of WO2016072243A1 publication Critical patent/WO2016072243A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/52Testing for short-circuits, leakage current or ground faults
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/26Testing of individual semiconductor devices
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/28Testing of electronic circuits, e.g. by signal tracer
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L31/00Semiconductor devices sensitive to infrared radiation, light, electromagnetic radiation of shorter wavelength or corpuscular radiation and specially adapted either for the conversion of the energy of such radiation into electrical energy or for the control of electrical energy by such radiation; Processes or apparatus specially adapted for the manufacture or treatment thereof or of parts thereof; Details thereof
    • H01L31/02Details
    • H01L31/02016Circuit arrangements of general character for the devices
    • H01L31/02019Circuit arrangements of general character for the devices for devices characterised by at least one potential jump barrier or surface barrier
    • H01L31/02021Circuit arrangements of general character for the devices for devices characterised by at least one potential jump barrier or surface barrier for solar cells
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01LSEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
    • H01L31/00Semiconductor devices sensitive to infrared radiation, light, electromagnetic radiation of shorter wavelength or corpuscular radiation and specially adapted either for the conversion of the energy of such radiation into electrical energy or for the control of electrical energy by such radiation; Processes or apparatus specially adapted for the manufacture or treatment thereof or of parts thereof; Details thereof
    • H01L31/04Semiconductor devices sensitive to infrared radiation, light, electromagnetic radiation of shorter wavelength or corpuscular radiation and specially adapted either for the conversion of the energy of such radiation into electrical energy or for the control of electrical energy by such radiation; Processes or apparatus specially adapted for the manufacture or treatment thereof or of parts thereof; Details thereof adapted as photovoltaic [PV] conversion devices
    • H01L31/042PV modules or arrays of single PV cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S30/00Structural details of PV modules other than those related to light conversion
    • H02S30/10Frame structures
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S50/00Monitoring or testing of PV systems, e.g. load balancing or fault identification
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S50/00Monitoring or testing of PV systems, e.g. load balancing or fault identification
    • H02S50/10Testing of PV devices, e.g. of PV modules or single PV cells
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Definitions

  • the present invention relates to an inspection method and an inspection apparatus for a photovoltaic power generation system for inspecting whether or not a photovoltaic power generation system has failed.
  • a solar power generation system includes a solar cell string in which a plurality of solar cell modules are connected in series.
  • a failure such as a failure of the solar cell module or a disconnection of a cable connecting the solar cell modules may occur.
  • a technique for examining the presence or absence of a failure of a solar cell string for example, those disclosed in Patent Documents 1 and 2 are known.
  • n solar cell modules are connected in series, an LCR meter is connected to the open end of the first solar cell module, and the open end of the nth solar cell module is opened.
  • a state in which the metal frames of the first to nth solar cell modules are electrically connected is regarded as a first connection form.
  • a state in which any adjacent solar cell modules are disconnected is referred to as a second connection mode.
  • the thing of these 1st and 2nd connection forms is arrange
  • the n solar cell modules connected in series are installed on one metal frame, the metal frame is grounded to the ground, and the other input terminal of the LCR meter is grounded to the ground. Connection form. Further, the first connection form and the second connection form are arranged outdoors, and similarly, the number of solar cell modules up to the disconnection point is obtained.
  • n solar cell modules are connected in series, and one output end of the signal generator and one input end of the waveform observation device are connected to the open end of the first solar cell module.
  • a state in which the output end and the other input end of the waveform observation apparatus are connected to the metal frame is defined as a first connection form.
  • a state in which a failure or deterioration occurs at any location from the signal generator to the open end is defined as a second connection form.
  • first and second connection forms are arranged indoors, and in the first and second connection forms, from the observation signal observed by the waveform observation apparatus for the measurement signal output from the signal generator, the signal generator The distance Lx from the point to the point in the failure or degraded state is obtained.
  • the n solar cell modules connected in series are installed on one metal frame, the metal frame is grounded to the ground, and the other output terminal of the signal generator and the other input terminal of the waveform observation device A state in which is grounded to the ground is defined as a first connection form. Further, the first connection configuration and the second connection configuration are arranged outdoors, and the distance Lx from the signal generator to the location in the failure or degraded state is obtained in the same manner.
  • the configuration is such that the capacitance Cd or the observation signal in a state where the solar cell string in which n solar cell modules are connected in series is not broken (first state) or the observation signal is measured in advance. It has become. For this reason, unless the electrostatic capacitance Cd or the observation signal is measured in advance, it is not possible to cope with the failure of the solar cell string, and the presence or absence of the failure of the solar cell string cannot be easily detected.
  • an object of the present invention is to provide a solar power generation system inspection method and inspection apparatus that can easily and accurately perform a failure inspection of a solar cell string.
  • an inspection apparatus for a photovoltaic power generation system includes an inspection signal generation unit that generates an AC inspection signal, and a positive electrode of a solar cell string that includes a plurality of solar cell modules connected in series. Connection switching for switching the connection of the inspection signal generator so that the inspection signal positive electrode application to which the inspection signal is applied and the inspection signal negative electrode application to which the inspection signal is applied to the negative electrode of the solar cell string are sequentially performed.
  • an index value that measures an index value that varies depending on the number of the solar cell modules from the pole to which the inspection signal is applied to the failure position in the case of applying the inspection signal positive electrode and in the case of applying the inspection signal negative electrode From the ratio between the measurement unit and the index value obtained in the case of the inspection signal positive electrode application and the index value obtained in the case of the inspection signal negative electrode application, It is characterized by and a fault position determining unit for determining the disabled position.
  • the failure position of the solar cell string can be obtained without using the measured index value (for example, impedance).
  • FIG. 2A is a circuit diagram showing a configuration of a ground fault inspection circuit provided in the solar cell string shown in FIG.
  • FIG. 2B is a circuit diagram showing the circuit diagram shown in FIG. 2A in a simplified manner.
  • FIG. 3A is a circuit diagram showing a state where a ground fault has occurred in the circuit shown in FIG.
  • FIG. 3B is a circuit diagram showing the circuit diagram shown in FIG. 3A in a simplified manner.
  • FIG. 1 is a non-power generation state.
  • FIG. 5 is a circuit diagram of an equivalent circuit of the solar cell string corresponding to FIG. 4 when the solar cell string shown in FIG. 1 is in a power generation state. It is a flowchart which shows operation
  • FIG. 9A is a circuit diagram obtained by simplifying the equivalent circuit of FIG. 5 when no failure has occurred in the solar cell string shown in FIG.
  • FIG. 9B is a circuit diagram showing the equivalent circuit of FIG. 8 when the inspection signal P terminal is applied.
  • FIG. 9C is a circuit diagram showing the equivalent circuit of FIG. 8 when the inspection signal N terminal is applied. It is explanatory drawing which shows an example in the state where the cable which connects solar cell modules is disconnected inside the solar cell string shown in FIG.
  • FIG. 2 is a waveform diagram of an inspection signal voltage (upper stage) measured at an application point and an inspection signal voltage (lower stage) detected at an end point when an inspection signal P terminal is applied by the inspection apparatus shown in FIG. 1.
  • FIG. 2 is a waveform diagram of an inspection signal voltage (upper stage) measured at an application point and an inspection signal voltage (lower stage) detected at an end point when an inspection signal N terminal is applied by the inspection apparatus shown in FIG.
  • FIG. 16A is a circuit diagram showing the solar cell module shown in FIG. 1 with solar cells and bypass diodes.
  • FIG. 16B is a circuit diagram in which a bypass diode is added to FIG.
  • FIG. 16C is a circuit diagram in which a bypass diode is added to FIG.
  • FIG. 1 is a block diagram showing a configuration of a photovoltaic power generation system 1 including an inspection apparatus 11 according to an embodiment of the present invention.
  • the solar power generation system 1 includes a solar cell string 3 configured by connecting a plurality of solar cell modules 2 in series.
  • the solar cell module 2 includes a plurality of solar cells connected in series, and is formed in a panel shape.
  • the electric power generated by the solar cell string 3 is supplied to a PCS (Power Conditioning System) 5 through power conducting paths 4a and 4b which are power lines.
  • a backflow preventing diode 6 is provided in the energizing path 4a.
  • the solar cell string 3 has shown the case where ten solar cell modules 2 are connected in series.
  • a ground-to-ground capacitance Cg is generated between each solar cell module 2 and the ground.
  • the inspection device 11 inspects the presence or absence of a failure of the solar cell string 3 at a predetermined cycle such as every day or every several days, or when a predetermined condition is satisfied.
  • the inspection apparatus 11 includes a PV voltage measurement circuit (state detection unit, inter-electrode measurement unit) 21, a PV current measurement circuit (state detection unit, inter-electrode measurement unit) 22, a switching relay (path switching unit) 23P, 23N, inspection energization path 24, switching relay (connection switching unit) 25, signal current measurement circuit (index value measurement unit) 26, signal injection circuit (inspection signal generation unit, frequency adjustment unit) 27, oscillation circuit (inspection signal generation unit) ) 28, a filter circuit (filter processing unit) 29, a signal voltage measurement circuit (index value measurement unit) 30, a filter circuit (filter processing unit) 31, an arithmetic control device 32, and a ground fault inspection circuit 33.
  • PV voltage measurement circuit 21, PV current measurement circuit 22 The PV voltage measurement circuit 21 measures the voltage between the P terminal and the N terminal of the solar cell string 3, that is, the output voltage of the solar cell string 3. This measurement result is input to the arithmetic and control unit 32.
  • the PV current measurement circuit 22 is provided in the power conduction paths 4 a and 4 b and measures the current flowing through the power conduction paths 4 a and 4 b, that is, the output current of the solar cell string 3. This measurement result is input to the arithmetic and control unit 32.
  • the switching relays 23P and 23N are provided in the power energizing paths 4a and 4b, and switch the power supply path output from the solar cell string 3 between the PCS 5 side and the inspection energizing path 24 side.
  • the movable contact 23Pa of the switching relay 23P is connected to the P terminal of the solar cell string 3
  • the fixed contact 23Pb is connected to the PCS 5 via the PV current measuring circuit 22
  • the fixed contact 23Pc is connected to the inspection energizing path 24. It is connected.
  • the movable contact 23Na of the switching relay 23N is connected to the N terminal of the solar cell string 3
  • the fixed contact 23Nb is connected to the PCS 5 via the PV current measuring circuit 22, and the fixed contact 23Nc is connected to the inspection energizing path 24. ing.
  • the switching relay 25 is provided in the inspection energization path 24 and switches the connection of the input terminal of the signal current measuring circuit 26 between the P terminal side and the N terminal side of the solar cell string 3. Specifically, the movable contact 25a of the switching relay 25 is connected to the input terminal of the signal current measuring circuit 26, and the fixed contact 25b is connected to the fixed contact 23Pc of the switching relay 23P via the inspection energizing path 24, and the fixed contact 25c. Is connected to the fixed contact 23Nc of the switching relay 23N through the inspection energizing path 24.
  • the oscillation circuit 28 oscillates the signal used in the signal injection circuit 27 and supplies it to the signal injection circuit 27.
  • the signal injection circuit 27 generates an AC inspection signal to be injected into the solar cell string 3 based on the signal supplied from the oscillation circuit 28, and the generated inspection signal is passed through the switching relay 25 and the switching relay 23P. Supply to the P terminal of the solar cell string 3.
  • the inspection signal is supplied to the N terminal of the solar cell string 3 via the switching relay 25 and the switching relay 23N.
  • the inspection signal is preferably a sinusoidal AC signal, but is not limited to this and may be any AC signal.
  • the frequency of the inspection signal 51 can be 1 kHz to 1 MHz.
  • the inspection signal 51 may be selected and used from the above range.
  • the signal current measuring circuit 26 is a test signal that flows through the solar cell string 3 when the test signal is supplied from the signal injection circuit 27 to the P terminal of the solar cell string 3 (hereinafter referred to as test signal P terminal application). Measure current. Further, in a state where the inspection signal is supplied from the signal injection circuit 27 to the N terminal of the solar cell string 3 (hereinafter referred to as inspection signal N terminal application), the inspection signal current flowing through the solar cell string 3 is measured.
  • the filter circuit 29 is a low-pass filter or a band-pass filter, and removes a noise component from the inspection signal current measured by the signal current measuring circuit 26.
  • the inspection signal current processed by the filter circuit 29 is input to the arithmetic control device 32.
  • the signal voltage measuring circuit 30 measures the voltage of the inspection signal when the inspection signal P terminal is applied. In the case of applying the inspection signal N terminal, the voltage of the inspection signal (inspection signal voltage) is measured.
  • the filter circuit 31 is a low-pass filter or a band-pass filter, and removes a noise component from the inspection signal voltage measured by the signal voltage measurement circuit 30.
  • the inspection signal voltage processed by the filter circuit 31 is input to the arithmetic control device 32.
  • the inspection apparatus 11 may be configured not to include the filter circuits 29 and 31, but to perform processing performed by the filter circuits 29 and 31 by digital signal processing (filter processing). Further, the current and voltage input from the PV voltage measurement circuit 21, the PV current measurement circuit 22, the filter circuit 29, and the filter circuit 31 to the arithmetic and control unit 32 are AD-converted by an AD converter (not shown), You may make it input into the calculation control apparatus 32. FIG. Alternatively, the AD may be performed inside the arithmetic control device 32.
  • the arithmetic control device 32 is configured by a microcomputer having a CPU, and includes a PV voltage calculation unit 41, a PV current calculation unit 42, a PWM variable unit (inspection signal generation unit, frequency adjustment unit) 43, a signal current calculation unit 44, a signal A voltage calculation unit 45, an impedance calculation unit (failure position determination unit) 46, and a control unit (connection switching unit, failure position determination unit, first to fifth control units, disconnection determination unit, resistance value measurement unit) 47 are provided. .
  • the PV voltage calculation unit 41 converts the output voltage of the solar cell string 3 measured by the PV voltage measurement circuit 21 into data suitable for processing by the control unit 47.
  • the PV current calculation unit 42 converts the output current of the solar cell string 3 measured by the PV current measurement circuit 22 into data suitable for processing by the control unit 47.
  • the PWM variable unit 43 controls the oscillation circuit 28 and adjusts the frequency of the signal oscillated by the oscillation circuit 28 to a suitable frequency as a test signal.
  • the signal current calculation unit 44 converts the inspection signal current measured by the signal current measurement circuit 26 and processed by the filter circuit 29 into data suitable for processing by the impedance calculation unit 46.
  • the signal voltage calculation unit 45 converts the inspection signal voltage measured by the signal voltage measurement circuit 30 and processed by the filter circuit 31 into data suitable for processing by the impedance calculation unit 46.
  • the impedance calculation unit 46 is based on the data provided from the signal current calculation unit 44 and the signal voltage calculation unit 45. In the solar cell string 3, the impedance when the test signal P terminal is applied, and the test signal N terminal is applied. Find the impedance.
  • the control unit 47 It is determined whether 3 is in a testable state described later. Moreover, when it determines with the solar cell string 3 being a testable state as a result of this determination, switching of the switching relays 23P and 23N is controlled, and the solar cell string 3 is connected to the test
  • control unit 47 determines the failure of the solar cell string 3 (cable) from the impedance obtained when the test signal P terminal is applied to the solar cell string 3 and the impedance when the test signal N terminal is applied. The presence / absence of disconnection and the failure of the solar cell module 2) and the position of the failure when there is a failure are detected.
  • the ground fault inspection circuit 33 inspects the presence or absence of a ground fault in the solar cell string 3.
  • the impedance Zp, Zn index value
  • the failure inspection of the solar cell string 3 cannot be performed with high accuracy. Therefore, in the failure inspection of the solar cell string 3, it is preferable to first check for the presence or absence of a ground fault in the solar cell string 3, and to stop the failure inspection if a ground fault has occurred.
  • ground fault inspection circuit 33 As the ground fault inspection circuit 33, a conventionally known method, for example, the one described in Patent Document 3 can be used. Alternatively, the ground fault inspection circuit 33 may be configured as shown in FIG.
  • FIG. 2A is a circuit diagram showing a configuration of a ground fault inspection circuit (ground fault inspection unit) 33 provided in the solar cell string 3.
  • FIG. 2B is a circuit diagram showing the circuit diagram shown in FIG. 2A in a simplified manner.
  • FIG. 3A is a circuit diagram showing a state where a ground fault has occurred in the circuit shown in FIG.
  • FIG. 3B is a circuit diagram showing the circuit diagram shown in FIG. 3A in a simplified manner.
  • the ground fault inspection circuit 33 includes a resistor R11, a resistor R12, and a current sensor 61.
  • One end of the resistor R11 is connected to the P terminal of the solar cell string 3.
  • One end of the resistor R12 is connected to the N terminal of the solar cell string 3.
  • the other end of the resistor R11 and the other end of the resistor R12 are connected to each other and grounded.
  • the current sensor 61 is provided in the ground path of the resistor R11 and the resistor R12.
  • the resistors R11 and R12 when the resistors R11 and R12 are connected to the ground through the ground fault inspection and the failure inspection of the solar cell string 3, they are large without affecting the failure inspection. Set to impedance.
  • the resistors R11 and R12 may be connected to the solar cell string 3 via a switch so that the resistors R11 and R12 can be disconnected from the solar cell string 3 in the case of failure inspection.
  • the current detected by the current sensor 61 is input to the arithmetic control device 32.
  • the control unit 47 of the arithmetic control device 32 monitors the occurrence of a ground fault in the solar cell string 3 based on the detection result of the current sensor 61, that is, the current detected by the current sensor 61.
  • the inspection device 11 inspects the solar cell string 3 in a state where the state of the solar cell string 3 is under a predetermined condition in which the solar cell string 3 can be inspected (hereinafter referred to as an inspectable state).
  • the control unit 47 monitors the solar cell string 3 to determine whether or not the solar cell string 3 is in an inspectable state. Specifically, the control unit 47 is measured by the PV voltage measurement circuit 21, measured by the output voltage of the solar cell string 3 provided from the PV voltage calculation unit 41, and the PV current measurement circuit 22. The output current of the solar cell string 3 provided from the calculation unit 42 is monitored.
  • the inspection device 11 performs an inspection for the occurrence of a ground fault in the solar cell string 3 and a failure test for the solar cell string 3.
  • the object of the failure inspection is cable disconnection in the solar cell string 3 and failure of the solar cell module 2.
  • the inspection device 11 determines the impedance Zp of the solar cell string 3 when the inspection signal P terminal is applied and the impedance Zn of the solar cell string 3 when the inspection signal N terminal is applied in the failure inspection of the solar cell string 3. And the presence or absence of the cable disconnection of the solar cell string 3, the presence or absence of the failure of the solar cell module 2, the position of the cable disconnection, and the position of the failed solar cell module 2 are detected from the ratio of these impedances Zp and Zn.
  • the testable state of the solar cell string 3 is a state in which the solar cell string 3 is generating power and the power generation amount (output current) is not more than a predetermined threshold value. Therefore, the control unit 47 switches the movable contact 23Pa of the switching relay 23P to the fixed contact 23Pc side when the solar cell string 3 is in an inspectable state and the specified inspection time has come, and the switching relay 23N The switching relays 23P and 23N are controlled so that the movable contact 23Na is switched to the fixed contact 23Nc side. Thereby, the P terminal and N terminal of the solar cell string 3 are connected to the inspection energization path 24.
  • FIG. 4 is a circuit diagram of an equivalent circuit in which the solar cell string 3 is represented by R, L, and C when the solar cell string 3 is in a non-power generation state.
  • FIG. 5 is a circuit diagram of an equivalent circuit of the solar cell string 3 corresponding to FIG. 4 when the solar cell string 3 is in the power generation state.
  • the solar cell module 2 When the solar cell string 3 is in a non-power generation state, as shown in FIG. 4, the solar cell module 2 includes a series resistance Rs, a junction capacitance Cd at a pn junction, and a parallel resistance Rp.
  • L is the inductance of the connection between the solar cell modules 2
  • Cg is the capacitance Cg between the solar cell module 2 and the ground.
  • the solar cell module 2 includes only the series resistance Rs.
  • the series resistance Rs is a very small value such as 1 ⁇ or less.
  • the inductance L is a very small value with respect to the ground capacitance Cg. Therefore, when the solar cell string 3 is in the power generation state, the impedance Zp of the solar cell string 3 when the inspection signal P terminal is applied and the impedance Zn of the solar cell string 3 when the inspection signal N terminal is applied are accurately determined. Can be requested.
  • the switching relays 23P and 23N are switched from the state where the solar cell string 3 is connected to the PCS 5 to the state where the solar cell string 3 is connected to the inspection energization path 24.
  • the amount of power generation is so low that it is not adversely affected by the occurrence of an arc. Therefore, since such a condition is set as the condition for the inspectable state, the switching relays 23P and 23N can use inexpensive and low breakdown voltage, and can perform the switching operation easily and safely. it can.
  • FIG. 6 is a flowchart showing the operation of the inspection apparatus 11.
  • the inspection device 11 inspects the solar cell string 3
  • it is determined whether the solar cell string 3 is in an inspectable state (a state in which the solar cell string 3 is generating power and the power generation amount is equal to or less than a predetermined threshold).
  • Whether or not the solar cell string 3 is in an inspectable state is determined by the control unit 47 of the arithmetic and control unit 32, and the output voltage and PV current of the solar cell string 3 detected by the PV voltage measurement circuit (state detection unit) 21. The determination is made based on the output current of the solar cell string 3 detected by the measurement circuit (state detection unit) 22.
  • control unit 47 controls the switching relays 23P and 23N to connect the solar cell string 3 to the inspection energization path 24 (S13). .
  • the inspection device 11 uses the ground fault inspection circuit 33 to inspect the occurrence of a ground fault in the solar cell string 3 (S14).
  • the inspection apparatus 11 indicates that a ground fault has occurred in the solar cell string 3, for example, a management device (see FIG. (S16).
  • the inspection device 11 ends the operation without performing a failure inspection of the solar cell string 3.
  • the inspection device 11 performs a failure inspection (inspection for presence / absence of failure) of the solar cell string 3 (S17).
  • the inspection apparatus 11 informs the above management apparatus that there is no failure in the solar cell string 3 as a result of the failure inspection in S17 (S19), and ends the process. On the other hand, if there is a failure in the solar cell string 3 as a result of the failure inspection in S17, the management device is notified of this (S20), and the process is terminated.
  • FIG. 7 is a flowchart showing a flow of the failure inspection of the solar cell string 3 in S17 by the inspection device 11.
  • the inspection apparatus 11 sequentially performs the inspection signal P terminal application and the inspection signal N terminal application in the failure inspection of the solar cell string 3 (S31, S33). This process is out of order.
  • the signal current measuring circuit 26 measures the inspection signal current flowing through the solar cell string 3 in each case (S32, S34).
  • the signal voltage measurement circuit 30 measures the inspection signal voltage in each case (S32, S34).
  • the impedance calculation unit 46 of the arithmetic and control unit 32 determines the solar cell string 3 in the case of applying the inspection signal P terminal from the inspection signal current and the inspection signal voltage in the case of applying the inspection signal P terminal obtained in S32. Impedance Zp is obtained. Further, the impedance calculator 46 obtains the impedance Zn of the solar cell string 3 when the test signal N terminal is applied, from the test signal current and the test signal voltage when the test signal N terminal is applied obtained in S34 (S35). ). An impedance analyzer may be used for impedance measurement.
  • control unit 47 of the arithmetic and control unit 32 determines whether or not there is a failure in the solar cell string 3 (whether there is a cable breakage or a failure in the solar cell module 2) from the ratio between the impedance Zp and the impedance Zn obtained in S35. Presence / absence) and the position of the failure (the position of the cable disconnection, the position of the failed solar cell module 2) are obtained (S36).
  • FIG. 8 is a schematic circuit diagram illustrating an example of a state of failure inspection of the solar cell string 3 by the inspection device 11.
  • a failure has occurred in the seventh solar cell module 2 (PV7) as viewed from the P terminal side.
  • the switching relay 25 is switched and the inspection signal 51 is applied to the P terminal of the solar cell string 3.
  • the switching relay 25 is switched and the inspection signal 51 is applied to the N terminal of the solar cell string 3.
  • the calculation result of the impedance by the impedance calculation unit 46 of the calculation control device 32 and the determination result of the failure of the solar cell string 3 by the control unit 47 are as follows.
  • the impedances Zp and Zn have different values because a failure has occurred in the solar cell string 3. If no failure has occurred, the impedances Zp and Zn have the same value.
  • the impedances Zp and Zn are numerical values corresponding to the position of the solar cell module 2 that has failed.
  • the impedance indicating the failure position of the solar cell string 3 becomes smaller as the position of the failed solar cell module 2 is farther from the position of the terminal (P terminal, N terminal) to which the inspection signal 51 is applied. Therefore, the failure position is obtained by calculating the ratio of Zn / (Zp + Zn) and Zp / (Zp + Zn).
  • FIG. 9A is a circuit diagram in which the equivalent circuit of FIG. 5 (equivalent circuit in which the solar cell string 3 is generating power) in the case where no failure has occurred in the solar cell string 3 is simplified. That is, the equivalent circuit shown in FIG. 5 ignores the series resistance Rs having a low resistance value and the inductance L having a low impedance when no failure has occurred in the solar cell string 3, and the equivalent circuit shown in FIG. Can be shown as:
  • FIG. 9B is a circuit diagram showing the equivalent circuit of FIG. 8 when the inspection signal P terminal is applied.
  • FIG. 9C is a circuit diagram showing the equivalent circuit of FIG. 8 when the inspection signal N terminal is applied.
  • CgP2 is the capacitance Cg between the ground from the solar cell module 2 (PV8) next to the failed solar cell module 2 (PV7) to the last solar cell module 2 (PV10) when viewed from the P terminal side.
  • CgN2 is a capacitance Cg between the ground from the solar cell module 2 (PV6) next to the last solar cell module 2 (PV1) to the last solar cell module 2 (PV1) when viewed from the N terminal side.
  • the resistance value of the series resistance Rs of the solar cell module 2 is a large value such as several hundred ⁇ to several thousand ⁇ . Therefore, the current flowing through the solar cell string 3 by the inspection signal 51 is almost the current Ip1 flowing through CgP1, and the current Ip2 flowing through CgP2 is small. Similarly, in FIG. 9C, the current flowing through the solar cell string 3 by the inspection signal 51 is almost the current In1 flowing through CgN1, and the current In2 flowing through Cgn2 is slight.
  • the impedance Zp can be regarded as being solely due to CgP1
  • the impedance Zn can be regarded as being solely due to CgN1.
  • FIG. 10 is a circuit diagram illustrating an example of a state in which a cable connecting the solar cell modules 2 is disconnected inside the solar cell string 3.
  • the terminal voltage (solar cell) between the P terminal and the N terminal of the solar cell string 3 measured by the PV voltage measurement circuit 21 is almost 0V.
  • the output current of the solar cell string 3 measured by the PV current measuring circuit 22 is approximately 0A.
  • the cable disconnection of the solar cell module 2 measures the voltage between the terminals of the solar cell string 3 or the output current of the solar cell string 3, and when the measured value indicates the cable disconnection, the arithmetic control device 32
  • the control unit 47 can determine that the solar cell string 3 has a cable break. Specifically, for example, the control unit 47 compares the measured value with a predetermined threshold value, and determines that the cable is disconnected when the measured value falls below the threshold value for a certain period.
  • the threshold value for example, a lower limit value of the measured value that can be regarded as not being a cable disconnection can be set. Also, the case where the threshold value is below a certain period of time is to eliminate the case where the measured value instantaneously falls below the threshold value for some reason and to ensure the detection of cable disconnection.
  • the detection operation in this case is the same as the detection operation of the failure position (failed solar cell module 2) of the solar cell string 3 described above. That is, the inspection signal P terminal application and the inspection signal N terminal application are performed on the solar cell string 3 to obtain the impedances Zp and Zn in each case, and Zn / (Zp + Zn): Zp / (Zp + Zn) is calculated. Thus, the position of the cable break is detected.
  • FIG. 11 is a waveform diagram of the inspection signal voltage (upper stage) measured at the application point and the inspection signal voltage (lower stage) detected at the end point when the inspection signal P terminal is applied.
  • FIG. 12 is a waveform diagram of the inspection signal voltage (upper stage) measured at the application point and the inspection signal voltage (lower stage) detected at the end point when the inspection signal N terminal is applied.
  • the voltage waveform of the inspection signal at the end point is added with noise to the voltage waveform of the inspection signal at the application point. Therefore, it is preferable that the inspection signal current (inspection signal current) and the voltage (inspection signal voltage) obtained from the end point are used for impedance calculation in the impedance calculation unit 46 after removing noise components by filtering. Thereby, impedance Zp, Zn can be calculated
  • the inspection signal 51 (inspection signal source) and the solar cell module 2 are shown to be grounded to the same object.
  • the solar cell module 2 need not be grounded to the same object as the inspection signal 51.
  • the solar power generation system 1 has various forms (various grounding forms), and the inspection apparatus 11 of the present embodiment and the inspection apparatus 11 shown in the following embodiments have any form of solar.
  • the grounding form of the solar cell module 2 of the solar cell string 3 may be, for example, grounding to the frame, grounding to the ground, or grounding with respect to the capacity in the air. The failure inspection of the solar cell string 3 can be performed without being affected by the grounding form.
  • FIG. 13 is a schematic circuit diagram showing a state of failure inspection of the solar cell string 3 in the inspection device 11 of the present embodiment.
  • FIG. 13 shows the case where the inspection signal P terminal is applied, and the N terminal is grounded via the termination impedance Zt1. Similarly, when the inspection signal N terminal is applied, the terminal P terminal is grounded via the terminal impedance Zt1 (not shown).
  • the terminal opposite to the terminal to which the inspection signal is applied among the P terminal and the N terminal of the solar cell string 3 via the termination impedance Zt1. Therefore, it is difficult to add noise to the inspection signal. Thereby, the impedances Zp and Zn obtained by measuring the inspection signal current and the inspection signal voltage are accurate.
  • an impedance element such as a capacitor, a resistor, or an inductance that generates impedance can be used as the termination impedance Zt1.
  • FIG. 14 is a schematic circuit diagram showing a failure inspection state of the solar cell string 3 (detection state of the failed solar cell module 2) in the inspection device 11 of the present embodiment. 14 shows a case where the inspection signal P terminal is applied and a case where the solar cell module 2 in the middle position is broken as viewed from the P terminal side and the N terminal side of the solar cell string 3.
  • the impedance Zp when the inspection signal P terminal is applied and the impedance Zn when the inspection signal N terminal is applied have the same value.
  • the solar cell string 3 is provided with an odd number of solar cell modules 2 connected in series
  • the solar cell module 2 at the middle position when viewed from the P terminal side and the N terminal side is out of order.
  • the impedance Zp when the inspection signal P terminal is applied and the impedance Zn when the inspection signal N terminal is applied have the same value.
  • the additional impedance Zt2 is connected to the terminal opposite to the terminal to which the inspection signal is applied among the P terminal and the N terminal, and the terminal is grounded via the additional impedance Zt2.
  • the impedances Zp and Zn are out of balance by the amount of the additional impedance Zt2, and become different values. That is, when the additional impedance Zt2 is connected and the impedances Zp and Zn are different from each other, it is detected that the solar cell module 2 in the middle position is broken as viewed from the P terminal side and the N terminal side. be able to.
  • an impedance element such as a capacitor, a resistor, or an inductance that generates impedance can be used as the termination impedance Zt2.
  • FIG. 15 is a schematic circuit diagram showing a state of failure inspection of the solar cell string 3 (detection state of the failed solar cell module 2) in the inspection device 11 of the present embodiment.
  • the inspection apparatus 11 can detect failures at a plurality of locations in the solar cell string 3.
  • the solar cell string 3 includes, for example, an intermediate relay among the cables connecting the solar cell modules 2, and a disconnect relay that switches between disconnection and conduction of the cable.
  • a switching unit) 63 is provided. That is, the interruption relay 63 is, for example, an intermediate N terminal that is an N terminal of the fifth solar cell module 2 (PV5) as viewed from the P side in the solar cell string 3 in which ten solar cell modules 2 are connected in series. (N1 terminal) and interruption
  • the position where the interruption relay 63 is provided is not limited to the intermediate position of the solar cell string 3, and may be any appropriate position in the middle of the solar cell string 3.
  • the inspection device 11 includes switching relays (connection switching units) 64 and 65 instead of the switching relay 25.
  • the switching relay 64 applies an inspection signal P1 terminal that applies the inspection signal 51 to the P1 terminal that is the original P terminal of the solar cell string 3, and an inspection signal N2 that applies the inspection signal 51 to the N2 terminal that is the original N terminal. Switch to pin application.
  • the switching relay 65 applies a test signal P2 terminal that applies the test signal 51 to the P1 terminal that is the intermediate P terminal of the solar cell string 3, and applies a test signal N1 terminal that applies the test signal 51 to the N1 terminal that is the intermediate N terminal. Switch to.
  • the solar cell string 3 shown in FIG. 15 includes the first solar cell module 2 (PV1) to the fifth solar cell module 2 (PV5) as one solar cell string as viewed from the P side. (First small string) and the sixth solar cell module 2 (PV6) to the tenth solar cell module 2 (PV10) are regarded as one solar cell string (second small string). Can do.
  • the above-described failure inspection performed on the solar cell string 3 is performed in the same manner. As a result, even if a failure location exists in each of the first and second small strings, the failure location can be detected.
  • the switching relay 64 In the case of inspecting the first small string, when the inspection signal P1 terminal is applied, the switching relay 64 is switched to the P1 terminal, and the switching relay 65 is switched to the non-connection terminal 65a. Further, when the inspection signal N1 terminal is applied, the switching relay 65 is switched to the N1 terminal, and the switching relay 64 is switched to the non-connection terminal 65a. Similarly, when inspecting the second small string, when the inspection signal P2 terminal is applied, the switching relay 65 is switched to the P2 terminal, and the switching relay 64 is switched to the non-connection terminal 64a. When the inspection signal N2 terminal is applied, the switching relay 64 is switched to the N2 terminal, and the switching relay 65 is switched to the non-connection terminal 65a.
  • FIG. 16A is a circuit diagram showing the solar cell module 2 shown in FIG. 1 by a solar cell 71 and a bypass diode 72.
  • the inspection device 11 applies a signal of a minute voltage that is not affected by the bypass diode included in the solar cell module 2 as the inspection signal supplied from the signal injection circuit 27 to the solar cell string 3. It has become.
  • the solar cell module 2 includes a plurality of solar cells 71 connected in series, and a bypass diode 72 is provided for the plurality of solar cells 71 connected in series. Connected in parallel.
  • the bypass diode 72 has an anode connected to the negative electrode of the solar cell module 2 and a cathode connected to the positive electrode of the solar cell module 2.
  • FIG. 16 (b) shows a bypass diode 72 added to FIG. 4 (an equivalent circuit in which the solar cell string 3 is represented by R, L, and C when the solar cell string 3 is in a non-power generation state).
  • FIG. FIG. 16C is a circuit diagram in which a bypass diode 72 is added to FIG. 5 (an equivalent circuit of the solar cell string 3 when the solar cell string 3 is in a power generation state, corresponding to FIG. 4).
  • FIG. 17 is a graph showing the forward voltage Vf of the bypass diode 72 shown in FIG.
  • the inspection device 11 uses the inspection signal 51 having a voltage smaller than the forward voltage Vf of the bypass diode 72. Thereby, the impedances Zp and Zn when the inspection signal P terminal is applied and when the inspection signal N terminal is applied can be accurately obtained, and the failure inspection of the solar cell string 3 can be performed with high accuracy.
  • FIG. 18 is a circuit diagram showing a configuration in which the inspection signal 51 is applied to the solar cell string 3 in the inspection device 11 of the present embodiment.
  • the inspection apparatus 11 of the present embodiment includes an inspection signal generation circuit 81.
  • the inspection signal generation circuit 81 includes a PWM variable unit 43, an oscillation circuit (on / off drive unit) 28, and an SSR (Solid State Relay) 82 of the arithmetic control device 32.
  • the PWM variable unit 43 controls the oscillation circuit 28 and adjusts the frequency of the signal oscillated by the oscillation circuit 28 to a suitable frequency as a test signal.
  • the oscillation circuit 28 oscillates a PWM signal supplied to the SSR 82.
  • the SSR 35 is provided in the energization path between the P terminal (in the case of FIG. 18) of the solar cell string 3 and the ground, and opens and closes the energization path based on the PWM signal output from the oscillation circuit 28. Thereby, it can be set as the state where the alternating current inspection signal 51 was applied to the P terminal of the solar cell string 3.
  • FIG. 18 shows the case where the inspection signal P terminal is applied.
  • the inspection signal generation circuit 81 is connected to the N terminal of the solar cell string 3.
  • the SSR 82 is a switching element, and other switching elements may be used instead.
  • the inspection apparatus 11 can be reduced in size and cost.
  • FIG. 19 is a circuit diagram showing a configuration of a main part in the inspection apparatus 11 of the present embodiment.
  • the inspection device 11 obtains the impedances Zp and Zn of the solar cell string 3 when the inspection signal P terminal is applied and when the inspection signal N terminal is applied, and the solar cell is based on these impedances Zp and Zn.
  • the string 3 is configured to perform a failure inspection.
  • the inspection apparatus 11 of the present embodiment obtains the standing wave ratio (or return loss) when the inspection signal P terminal is applied and when the inspection signal N terminal is applied, and the obtained standing wave ratio ( Alternatively, the solar cell string 3 is inspected for failure based on return loss.
  • the line of the solar cell string 3 including the plurality of solar cell modules 2 can be regarded as a monopole antenna. Therefore, when there is a failure in the solar cell string 3, the SWR is different between when the inspection signal P terminal is applied and when the inspection signal N terminal is applied. Therefore, in the inspection device 11 of the present embodiment, the failure inspection of the solar cell string 3 is performed using the difference in the above SWR.
  • the inspection apparatus 11 may include the SWR measuring device 85 in place of the signal current measuring circuit 26 in the configuration illustrated in FIG. 1, for example.
  • the arithmetic and control unit 32 uses the SWR measured by the SWR measuring instrument (for example, WR meter) 85 to apply the inspection signal 51 to the P terminal and the SWR to apply the inspection signal 51 to the N terminal.
  • the presence or absence of cable disconnection in the battery string 3 and the failure position in the solar cell string 3 are obtained.
  • the frequency of the inspection signal 51 is preferably set to a high frequency, for example, in the range of 1 kHz to 1 MHz described above.
  • the frequency of the inspection signal 51 is preferably set so as to resonate with the line of the solar cell string 3 that is regarded as a monopole antenna.
  • the wavelength of the inspection signal 51 is, for example, 1 ⁇ 4 wavelength or 1 ⁇ 2 wavelength with respect to the line length of the solar cell string 3.
  • the applied inspection signal 51 returns from the disconnection position to the application position.
  • the solar cell module 2 fails and becomes high resistance without being disconnected, a part of the applied inspection signal 51 returns from the failure position, and the remaining part passes through the failure position.
  • FIG. 20 is a circuit diagram showing a configuration of a main part of the inspection apparatus 11 in the inspection apparatus 11 of the present embodiment.
  • the inspection apparatus 11 can short-circuit the P terminal and N terminal of the solar cell string 3 via resistors R21 and R22.
  • a relay 91 is provided between the resistor R21 and the P terminal
  • a relay 92 is provided between the resistor R22 and the N terminal.
  • the relay 92 is provided between the resistor R22 and the N terminal. Yes.
  • the ON / OFF operation of these relays (short-circuit / non-short-circuit switching units) 91 and 92 is controlled by the control unit 47 of the arithmetic control device 32.
  • the impedances Zp and Zn are obtained as the inspection signal P terminal application and the inspection signal N terminal application as described above.
  • the failure position of the solar cell module 2 is obtained based on these impedances Zp and Zn.
  • the cable disconnection or the solar cell is not generated in the solar cell string 3 in the case where the cable disconnection or the solar cell module 2 has failed, and in the center position of the solar cell string 3. It can be considered that the module 2 has failed.
  • the relays 91 and 92 are turned on, and the inspection signal 51 is applied to the P terminal or the N terminal, thereby obtaining the overall impedance Zpn of the solar cell string 3.
  • the total impedance Zpn is obtained in the same manner as the case of obtaining the impedances Zp and Zn even when the cable breakage occurs in the solar cell string 3 and when any one of the solar cell modules 2 fails. be able to.
  • the overall impedance Zpn is compared with the impedance Zp or Zn, and if they are different, the control unit 47 has a cable breakage or a failure of the solar cell module 2 at the center position of the solar cell string 3. Can be determined. Moreover, if both are the same value, the control part 47 can determine with the solar cell string 3 having no failure.
  • the series resistance Rs of the solar cell module 2 decreases as the solar cell module 2 deteriorates. If an attempt is made to detect even a failure with a small value of the series resistance Rs, the difference between the series resistance Rs of the normal solar cell module 2 and the series resistance Rs of the failed solar cell module 2 becomes small, and in the failure inspection of the solar cell string 3 This makes it difficult to detect the failed solar cell module 2.
  • the inspection device 11 changes the frequency of the inspection signal 51 in accordance with the value of the series resistance Rs of the solar cell module 2, and relatively reduces the influence of the capacitance impedance on the impedance of the solar cell string 3.
  • the influence of the impedance of the series resistor Rs is made large.
  • the frequency of the inspection signal 51 is increased as the resistance value of the series resistor Rs decreases.
  • a threshold value may be set for the series resistance Rs, and the frequency of the inspection signal 51 may be switched to a plurality of stages with the threshold value as a boundary. Further, the frequency of the inspection signal 51 becomes variable by controlling the oscillation circuit 28 by the PWM variable unit 43 in the inspection apparatus 11 shown in FIG. Further, the value of the series resistance Rs of the solar cell module 2 can be obtained by a conventionally well-known method serving as a resistance value measuring unit, for example, a method disclosed in Patent Document 4.
  • the failure position of the solar cell module 2 can be detected with high precision.
  • the measurement is performed when the inspection signal 51 is applied in the case of the inspection signal P terminal application and the inspection signal N terminal application, respectively.
  • the current (index value) is obtained and the measurement is performed based on the measured current.
  • the voltage value of the measured inspection signal 51 is the same, and only the current value of the measured inspection signal 51 is different. Therefore, instead of the impedances Zp and Zn, a failure inspection of the solar cell string 3 is performed by using the measurement current Ip when the inspection signal P terminal is applied and the measurement current In when the inspection signal N terminal is applied. be able to.
  • the impedance calculation unit 46 of the calculation control device 32 replaces the ratio of impedance Zp and Zn (Zn / (Zp + Zn): Zp / (Zp + Zn)) with the measured current Ip.
  • In ratio (Ip / (Ip + In): In / (Ip + In)) is calculated.
  • the control unit 47 obtains the failure position of the solar cell module 2 based on the ratio (Ip / (Ip + In): In / (Ip + In)) of the measured currents Ip and In.
  • the presence / absence of the failure of the solar cell string 3 and the failure position of the solar cell string 3 can be detected with high accuracy as in the inspection device 11 of the embodiment. It should be noted that the configuration of the inspection apparatus 11 according to the present embodiment (failure inspection method for the solar cell string 3) can be applied to the other embodiments.
  • the inspection device 11 is configured to perform a failure inspection of the solar cell string 3 during power generation of the solar cell string 3.
  • the inspection apparatus 11 becomes a structure which performs a failure test
  • the equivalent circuit when the solar cell string 3 is not generating power is as shown in FIG.
  • the capacitance Cd greatly affects the impedances Zp and Zn when the inspection signal P terminal is applied and the inspection signal N terminal is applied. Therefore, in this embodiment, in order to reduce the impedance due to the capacitance Cd, a test signal 51 having a higher frequency (for example, 1 MHz) in the range of 1 kHz to 1 MHz than that in the case of fault inspection during power generation is used. To do.
  • the capacitance Cd differs depending on the type of the solar cell module 2, but is substantially the same for each solar cell module 2 in the solar cell string 3 using the same solar cell module 2. Moreover, the electrostatic capacitance Cd of each solar cell module 2 will be in the state connected in series in the state where the solar cell module 2 was connected in series. Therefore, the impedance of the solar cell string 3 due to the capacitance Cd increases as the number of solar cell modules 2 connected in series increases.
  • the inspection apparatus 11 since the failure inspection is performed by obtaining the ratio of the impedances Zp and Zn (Zn / (Zp + Zn): Zp / (Zp + Zn)), the impedance due to the capacitance Cp exists. Even so, the influence of the impedance on the test result can be reduced.
  • the inspection device 11 that performs the failure inspection of the solar cell string 3 when the solar cell string 3 is not generating electricity is more static than the inspection device 11 that performs the failure inspection of the solar cell string 3 when the solar cell string 3 generates electricity. Due to the presence of the capacitance Cd, the inspection accuracy of the fault location is inferior. However, the presence or absence of cable disconnection can be determined by comparing the impedances Zp and Zn, and therefore can be detected with high accuracy as in the case of performing a failure inspection of the solar cell string 3 during power generation.
  • the inspection apparatus 11 of this Embodiment detects the presence or absence of the failure of the solar cell string 3, and the failure position of the solar cell string 3 with high precision similarly to the inspection apparatus 11 of the said embodiment. can do. It should be noted that the configuration of the inspection apparatus 11 according to the present embodiment (failure inspection method for the solar cell string 3) can be applied to the other embodiments.
  • An inspection apparatus for a photovoltaic power generation system includes an inspection signal generation unit that generates an alternating inspection signal, and an inspection in which the inspection signal is applied to a positive electrode of a solar cell string having a plurality of solar cell modules connected in series.
  • a connection switching unit for switching the connection of the inspection signal generation unit so that the signal positive electrode application and the inspection signal negative electrode application in which the inspection signal is applied to the negative electrode of the solar cell string are sequentially performed;
  • An indicator value measuring unit that measures an index value that varies depending on the number of the solar cell modules from a pole to which the inspection signal is applied to a failure position, and an inspection signal positive electrode application.
  • a failure position determination unit that obtains the failure position from the ratio of the index value obtained in the case of the above and the index value obtained in the case of applying the inspection signal negative electrode Is a Configurations which includes a.
  • the inspection signal generation unit generates an alternating inspection signal.
  • the connection switching unit is configured such that a test signal is applied to a positive electrode of a solar cell string having a plurality of solar cell modules connected in series, and a test signal is applied to a negative electrode of the solar cell string. Are switched sequentially so that the inspection signal generators are connected.
  • the index value measuring unit is an index value that varies depending on the number of solar cell modules from the pole to which the inspection signal is applied to the failure position, for example, the impedance and the inspection signal, when the inspection signal is applied to the positive electrode and when the inspection signal is applied to the negative electrode Is applied to measure the current flowing through the solar cell string or the standing wave ratio.
  • the failure position determination unit obtains the failure position from the ratio between the index value obtained when the inspection signal positive electrode is applied and the index value obtained when the inspection signal negative electrode is applied.
  • an index value for example, impedance
  • the index value previously measured
  • the inspection device for the solar power generation system detects that the solar cell string is in a power generation state, and a state detection unit that detects whether the solar cell string is in a power generation state, or when the state detection unit detects that the solar cell string is in a power generation state
  • a first control unit that controls each of the units so that a failure inspection of the solar cell string is performed by operations of the units including the inspection signal generation unit, the connection switching unit, the index value measurement unit, and the failure position determination unit. It is good also as a structure provided with the control part.
  • the solar cell string circuit viewed from the impedance is mainly a circuit having only a capacitance between the ground and simplified, for example. Therefore, according to the above configuration, the fault inspection of the solar cell string is performed with higher accuracy from the ratio of the index value obtained when the inspection signal is applied to the positive electrode and the index value obtained when the inspection signal is applied to the negative electrode. be able to.
  • the solar cell module may be configured such that a bypass diode is connected in parallel, and the voltage of the inspection signal is set to a voltage equal to or lower than a forward voltage of the bypass diode. Good.
  • the voltage of the inspection signal is set to a voltage equal to or lower than the forward voltage of the bypass diode of the solar cell module, almost no current flows through the bypass diode.
  • the inspection signal is applied to the positive electrode and the negative electrode of the solar cell string, an appropriate index value corresponding to the failure position of the solar cell string can be obtained, and the failure inspection of the solar cell string can be performed with high accuracy. It can be carried out.
  • the inspection apparatus for a solar power generation system includes a ground fault inspection unit that inspects for the presence or absence of a ground fault in the solar cell string, and includes the inspection signal generation unit, the connection switching unit, the index value measurement unit, and the failure position. Prior to the failure inspection of the solar cell string by the operation of each unit including the determination unit, the inspection by the ground fault inspection unit is performed, and when the ground fault is detected by the ground fault inspection unit, the failure inspection It is good also as a structure provided with the 2nd control part which cancels.
  • the solar power generation system inspection apparatus includes a current measuring unit that measures an output current of the solar cell string, an output path of the solar cell string, a power supply path, the inspection signal generation unit, the connection switching unit, A path switching unit that switches between an inspection path in which a failure inspection of the solar cell string is performed by an operation of each unit including the index value measurement unit and the failure position determination unit; and the failure inspection for the solar cell string Is switched, and the output path of the solar cell string is switched from the power supply path to the inspection device when the output current measured by the current measuring unit is a predetermined threshold value or less. It is good also as a structure provided with the 3rd control part which controls a part.
  • an electric current measurement part measures the output current of a solar cell string, and a 3rd control part is measured in the said electric current measurement part, when a failure test
  • the path switching unit is controlled so that the output path of the solar cell string is switched from the power supply path to the inspection device.
  • the solar power generation system inspection apparatus includes an inter-electrode measurement unit that measures an inter-electrode voltage between a positive electrode and a negative electrode of a solar cell string, or an inter-electrode current between the positive electrode and the negative electrode, It is good also as a structure provided with the disconnection determination part which determines that the said solar cell string has a disconnection, when the said interelectrode current or the said interelectrode voltage shows the cable disconnection of the said solar cell string.
  • the inter-electrode measurement unit measures the inter-electrode voltage between the positive electrode and the negative electrode of the solar cell string or the inter-electrode current between the positive electrode and the negative electrode.
  • the disconnection determination unit determines that the solar cell string is disconnected when the interelectrode current or the interelectrode voltage indicates a cable disconnection of the solar cell string. Thereby, the cable disconnection of the solar cell string can be detected easily and with high accuracy.
  • the index value measuring unit is measured in each case when the inspection signal is applied to the positive electrode and the negative electrode of the solar cell string, Or it is good also as a structure including the filter process part which acquires the said index value from an electric current and a voltage, and performs the filter process which removes a noise component with respect to the said electric current or the said electric current and the said voltage.
  • a filter process part is used for calculating
  • a filtering process for removing noise components is performed on the current measured in step (b) or the current and voltage.
  • the index value measuring unit can acquire an accurate index value, and as a result, a failure inspection of the solar cell string can be performed with high accuracy.
  • the index value measurement unit includes a terminal impedance, and when the inspection signal is sequentially applied to the positive electrode and the negative electrode of the solar cell string, the electrode to which the inspection signal is applied The opposite pole may be connected to the ground via the termination impedance.
  • the index value obtained by applying the inspection signal that is, the inspection signal by connecting the pole opposite to the electrode to which the inspection signal of the solar cell string is applied to the ground via the impedance is It becomes difficult to be affected by noise. Thereby, an accurate index value can be obtained, and a failure inspection of the solar cell string can be performed with high accuracy.
  • the solar power generation system inspection apparatus includes a string division switching unit that switches the solar cell string into a plurality of small strings and an undivided state, and the connection switching unit includes each of the above-described connection switching units.
  • the connection of the inspection signal generation unit is switched so that the inspection signal positive electrode application and the inspection signal negative electrode application are sequentially performed on the small strings, and the first control unit performs the operation on each of the small strings.
  • These parts may be controlled so that failure inspection is performed by the operation of each part including the string division switching unit, the inspection signal generation unit, the connection switching unit, the index value measurement unit, and the failure position determination unit. Good.
  • the solar cell string is divided into a plurality of small strings by the string dividing unit, and a failure inspection is performed on each of the small strings.
  • the solar power generation system inspection apparatus includes a resistance value measuring unit that measures a resistance value of a series resistor that is included in a solar cell module of a solar cell string and that is in a serial connection state between adjacent solar cell modules.
  • the fault test of the solar cell string by the operation of each unit including the test signal generation unit, the connection switching unit, the index value measurement unit, and the fault position determination unit is such that the resistance value of the series resistance is lower than a predetermined threshold value.
  • a resistance value measurement part measures the resistance value of the series resistance which exists in the state of serial connection between adjacent solar cell modules contained in the solar cell module of a solar cell string.
  • the frequency adjusting unit is larger than the predetermined threshold value of the series resistance of the solar cell module The frequency of the inspection signal is increased.
  • the resistance value of the series resistance included in the solar cell module gradually increases as it deteriorates. Therefore, when the deterioration of the solar cell module is early, the difference in the resistance value of the series resistance between the normal solar cell module and the failed solar cell module is small. For this reason, it is difficult to detect a failed solar cell module. Therefore, when the fault inspection of the solar cell string is performed in a state where the resistance value of the series resistor is small, the frequency of the inspection signal is increased. Thereby, in the impedance of the solar cell string, the influence of the impedance of the capacitance is relatively reduced, and the influence of the impedance of the series resistance is increased. As a result, even if the resistance value of the series resistance of the solar cell module is small, the failure position of the solar cell string can be detected with high accuracy.
  • the inspection signal generation unit includes a switching element provided on a line in which one end side is connected to the ground and the other end side is sequentially connected to the positive electrode and the negative electrode, and the switching An on / off drive unit that causes the element to repeatedly perform an on / off operation may be provided.
  • the inspection signal is generated using the power of the solar cell string. Therefore, a separate power source for generating the inspection signal is not necessary. As a result, it is possible to reduce the size and cost of the configuration of the inspection signal generation unit that applies the inspection signal.
  • the index value measurement unit includes an additional impedance, and when it is determined that there is no failure position in the first determination operation for obtaining the failure position by the failure position determination unit, Only the positive electrode or the negative electrode of the solar cell string is connected to the ground through the additional impedance, and in this state, after the inspection signal positive electrode application and the inspection signal negative electrode application are sequentially performed, A control unit that controls the inspection signal generation unit, the connection switching unit, the index value measurement unit, and the failure position determination unit, so that the determination operation of 2 is performed, In the second determination operation, the index value when the test signal positive electrode is applied is compared with the index value when the test signal negative electrode is applied, and both index values are If it is made a value, the fault position of the solar cell strings may be determined configuration with the central position of the solar cell string.
  • the failure position determination unit when it is determined that there is no failure position in the first determination operation for determining the failure position by the failure position determination unit, only the positive or negative electrode of the solar cell string is connected to the ground via the additional impedance. In this state, the inspection signal positive electrode application and the inspection signal negative electrode application are sequentially performed, and then the second determination operation by the failure position determination unit is performed. In the second determination operation, the failure position determination unit compares the index value when the inspection signal positive electrode is applied with the index value when the inspection signal negative electrode is applied, and if these index values are different, the solar cell string Is determined as the center position of the solar cell string.
  • the failure position of the solar cell string is the center position of the solar cell string, the failure position can be detected with high accuracy.
  • the index value is an impedance or a current that flows through the solar cell string by applying the inspection signal, and both electrodes that short-circuit the positive electrode and the negative electrode of the solar cell string
  • both electrodes that short-circuit the positive electrode and the negative electrode of the solar cell string
  • the short circuit non-short circuit switching unit that switches between the short circuit state and the bipolar non-short circuit state in which the positive electrode and the negative electrode are not short-circuited
  • a control unit wherein the failure position determination unit includes the index value in the second determination operation when the test signal positive electrode is applied by the first index value measurement operation or when the test signal negative electrode is applied. It is good also as a structure which determines the failure position of the said solar cell string as the center position of a solar cell string, when the said index value in the case of the both-poles non-short circuit state is compared, and both these index values differ.
  • the index value is an impedance or a current flowing through the solar cell string by applying the inspection signal.
  • the fifth control unit performs a first index value measurement operation by the index value measurement unit to measure the index value when the inspection signal positive electrode is applied and when the inspection signal negative electrode is applied, and determines the failure position by the failure position determination unit.
  • the solar cell string is in a bipolar short circuit state, and in this state, the index value is measured by applying the inspection signal positive electrode or the inspection signal negative electrode, and then the failure is detected.
  • the inspection signal generation unit, the connection switching unit, the index value measurement unit, the failure position determination unit, and the short-circuit / non-short-circuit switching unit are controlled so that the second determination operation by the position determination unit is performed.
  • the failure position determination unit obtains the index value in the case of the inspection signal positive electrode application or the inspection signal negative electrode application by the first index value measurement operation and the index value in the case of the bipolar non-short-circuit state. In comparison, when these two index values are different, the failure position of the solar cell string is determined as the center position of the solar cell string.
  • the failure position of the solar cell string is the center position of the solar cell string, the failure position can be detected with high accuracy and easily.
  • the index value may be an impedance
  • the impedance is obtained from the voltage and current of the inspection signal when an alternating inspection signal is sequentially applied to the positive and negative electrodes of the solar cell string, and the fault inspection of the solar cell string is performed with high accuracy using this impedance. And can be done easily.
  • the index value may be a current flowing through the solar cell string by applying the inspection signal.
  • the voltage of the inspection signal is constant and only the current changes. Therefore, the index value can be only current.
  • the fault inspection of the solar cell string can be performed with high accuracy and easily by the current of the inspection signal when the AC inspection signal is sequentially applied to the positive electrode and the negative electrode of the solar cell string. Moreover, since only the current of the inspection signal is used for the failure inspection of the solar cell string, the failure inspection of the solar cell string can be simplified.
  • the index value may be a standing wave ratio.
  • the standing wave ratio at the time of applying an alternating current inspection signal to the positive electrode and the negative electrode of a solar cell string sequentially is calculated
  • the inspection method of the photovoltaic power generation system of the present invention sequentially applies an AC inspection signal to the positive electrode and the negative electrode of a solar cell string having a plurality of solar cell modules connected in series.
  • an index value measuring step for measuring an index value that varies depending on the number of the solar cell modules from the applied pole to the failure position, and when the index value obtained when the inspection signal is applied to the positive electrode and the negative electrode are applied to the negative electrode
  • a determination step of obtaining the failure position from the ratio with the obtained index value is
  • the present invention can be used for failure inspection of a solar cell string configured by connecting solar cell modules of a photovoltaic power generation system in series.

Abstract

 故障検査を高精度かつ容易に行う。太陽光発電システムの検査装置は、太陽電池ストリング(3)の正極と負極とに交流の検査信号を順次印加し、各々の場合について、検査信号を印加した極から故障位置までの太陽電池モジュール(2)の数により変化する指標値を計測するインピーダンス演算部(46)と、検査信号を正極に印加した場合に得た指標値と負極に印加した場合に得た指標値との比から、故障位置を求める制御部(47)とを備える。

Description

太陽光発電システムの検査方法および検査装置
 本発明は、太陽光発電システムの故障の有無を検査する太陽光発電システムの検査方法および検査装置に関する。
 従来、太陽光発電システムは、複数の太陽電池モジュールが直列接続された太陽電池ストリングを備えている。このような太陽電池ストリングでは、太陽電池モジュールの故障や太陽電池モジュール同士を接続するケーブルの断線などの故障を生じることがある。このため、太陽光発電システムでは、安定した電力供給を行うため、太陽電池ストリングの故障の有無を適宜調べる必要がある。太陽電池ストリングの故障の有無を調べる技術としては、例えば特許文献1,2に開示されたものが知られている。
 特許文献1に開示された構成では、n個の太陽電池モジュールを直列接続し、第1番目の太陽電池モジュールの開放端にLCRメータを接続し、第n番目の太陽電池モジュールの開放端を開放状態のままとし、第1番目から第n番目までの太陽電池モジュールの金属製フレーム間を電気的に接続した状態を第1の接続形態とする。また、第1の接続形態において、いずれかの隣接する太陽電池モジュール間が断線した状態を第2の接続形態とする。さらに、これら第1および第2の接続形態のものを屋内に配置し、LCRメータによって、第1の接続形態で測定された静電容量と、第2の接続形態で測定された静電容量とから、断線箇所までの太陽電池モジュール枚数を求める。
 あるいは、直列接続された上記n個の太陽電池モジュールを一つの金属製架台に設置し、この金属製架台をアースに接地し、LCRメータの他方の入力端をアースに接地した状態を第1の接続形態とする。さらに、この第1の接続形態および上記第2の接続形態のものを屋外に配置し、同様にして、断線箇所までの太陽電池モジュール枚数を求める。
 特許文献2に開示された構成は、n個の太陽電池モジュールを直列接続し、第1番目の太陽電池モジュールの開放端に信号発生器の一方の出力端および波形観測装置の一方の入力端を接続し、第n番目の太陽電池モジュールの開放端を開放状態のままとし、第1番目から第n番目までの太陽電池モジュールの金属製フレーム間を電気的に接続し、信号発生器の他方の出力端および波形観測装置の他方の入力端を金属製フレームに接続した状態を第1の接続形態とする。また、第1の接続形態において信号発生器から開放端までのいずれかの箇所において故障ないし劣化状態にある状態を第2の接続形態とする。さらに、第1および第2の接続形態を屋内に配置し、第1および第2の接続形態において、信号発生器から出力された計測信号に対する波形観測装置で観測された観測信号から、信号発生器から故障ないし劣化状態にある箇所までの距離Lxを求める。
 あるいは、直列接続された上記n個の太陽電池モジュールを一つの金属製架台に設置し、この金属製架台をアースに接地し、信号発生器の他方の出力端および波形観測装置の他方の入力端をアースに接地した状態を第1の接続形態とする。さらに、この第1の接続形態および上記第2の接続形態のものを屋外に配置し、同様にして信号発生器から故障ないし劣化状態にある箇所までの距離Lxを求める。
日本国特許公報「特許第4604250号公報(2010年10月15日登録)」 日本国公開特許公報「特開2009-021341号公報(2009年1月29日公開)」 日本国公開特許公報「特開2012-119382号公報(2012年6月21日公開)」 日本国公表特許公報「特表2013-527613号公報(2013年6月27日公開)」
 しかしながら、上記従来の構成では、n個の太陽電池モジュールが直列接続されている太陽電池ストリングに故障がない状態(第1の状態)の静電容量Cdあるいは観測信号を予め測定しておく構成となっている。このため、予め静電容量Cdあるいは観測信号を測定していなければ、太陽電池ストリングが故障した場合に対応することができず、太陽電池ストリングの故障の有無を容易に検出ことができない。
 また、特許文献1にて測定している対地間静電容量は、天候などにより日々変化するものであるため、予め測定した対地間静電容量を使用した場合には、太陽電池ストリングの故障(故障位置)を高精度に検出することができない。
 したがって、本発明は、太陽電池ストリングの故障検査を高精度かつ容易に行うことができる太陽光発電システムの検査方法および検査装置の提供を目的としている。
 上記の課題を解決するために、本発明の太陽光発電システムの検査装置は、交流の検査信号を生成する検査信号生成部と、直列接続された複数の太陽電池モジュールを有する太陽電池ストリングの正極に前記検査信号が印加される検査信号正極印加、および前記太陽電池ストリングの負極に前記検査信号が印加される検査信号負極印加が順次行われるように、前記検査信号生成部の接続を切り替える接続切替部と、前記検査信号正極印加の場合と前記検査信号負極印加の場合とについて、前記検査信号が印加された極から故障位置までの前記太陽電池モジュールの数により変化する指標値を計測する指標値計測部と、前記検査信号正極印加の場合に得られた前記指標値と前記検査信号負極印加の場合に得られた前記指標値との比から、前記故障位置を求める故障位置判定部とを備えていることを特徴としている。
 本発明の構成によれば、検査対象の太陽電池ストリングについて、故障が発生していない状態の指標値(例えばインピーダンス)を予め計測しておく必要がなく、また、天候などにより日々変化する、予め計測した指標値(例えばインピーダンス)を使用することなく、太陽電池ストリングの故障位置を求めることができる。これにより、太陽電池ストリングの故障検査を高精度かつ容易に行うことができるという効果を奏する。
本発明の実施の形態の太陽光発電システムの検査装置を備えた太陽光発電システムの構成を示すブロック図である。 図2の(a)は、図1に示した太陽電池ストリングに設けられた地絡検査回路の構成を示す回路図である。図2の(b)は、図2の(a)に示した回路図を簡略化して示す回路図である。 図3の(a)は、図2の(a)に示した回路において地絡が発生している状態を示す回路図である。図3の(b)は、図3の(a)に示した回路図を簡略化して示す回路図である。 図1に示した太陽電池ストリングが非発電状態である場合の、太陽電池ストリングをR,L,Cにて表した等価回路を示す回路図である。 図4に対応した、図1に示した太陽電池ストリングが発電状態である場合の太陽電池ストリングの等価回路の回路図である。 図1に示した検査装置の動作を示すフローチャートである。 図6のS17での太陽電池ストリングの故障の有無の検査の流れを示すフローチャートである。 図1に示した太陽電池ストリングの検査装置による故障検査の状態の一例を示す概略の回路図である。 図9の(a)は、図1に示した太陽電池ストリングに故障が発生していない場合の図5の等価回路を簡略化した回路図である。図9の(b)は、検査信号P端子印加の場合の図8の等価回路を示す回路図である。図9の(c)は、検査信号N端子印加の場合の図8の等価回路を示す回路図である。 図1に示した太陽電池ストリングの内部において、太陽電池モジュール同士を接続するケーブルが断線している状態の一例を示す説明図である。 図1に示した検査装置による検査信号P端子印加の場合において、印加点にて測定した検査信号電圧(上段)、および終点にて検出した検査信号電圧(下段)の波形図である。 図1に示した検査装置による検査信号N端子印加の場合において、印加点にて測定した検査信号電圧(上段)、および終点にて検出した検査信号電圧(下段)の波形図である。 本発明の他の実施の形態の検査装置における太陽電池ストリングの故障検査の状態を示す概略の回路図である。 本発明のさらに他の実施の形態の検査装置における太陽電池ストリングの故障検出の状態を示す概略の回路図である。 本発明のさらに他の実施の形態の検査装置における太陽電池ストリングの故障位置の検出状態を示す概略の回路図である。 図16の(a)は、図1に示した太陽電池モジュールを太陽電池セルおよびバイパスダイオードによって示した回路図である。図16の(b)は、図4にバイパスダイオードを追加して示した回路図である。図16の(c)は、図5にバイパスダイオードを追加して示した回路図である。 図16に示したバイパスダイオードの順方向電圧を示すグラフである。 本発明のさらに他の実施の形態の検査装置における、太陽電池ストリングへ検査信号を印加する構成を示す回路図である。 本発明のさらに他の実施の形態の検査装置の要部の構成を示す回路図である。 本発明のさらに他の実施の形態の検査装置の要部の構成を示す回路図である。
 [実施の形態1]
 本発明の実施の形態を図面に基づいて以下に説明する。図1は、本発明の実施の形態の検査装置11を備えた太陽光発電システム1の構成を示すブロック図である。
 〔太陽光発電システム1の構成〕
 図1に示すように、太陽光発電システム1は、複数の太陽電池モジュール2が直列接続されて構成された太陽電池ストリング3を備えている。太陽電池モジュール2は、直列接続された複数の太陽電池セルを備え、パネル状に形成されている。太陽電池ストリング3にて発電された電力は、電力線路である電力通電路4a,4bを通じてPCS(パワーコンディショニングシステム)5に供給される。例えば、通電路4aには、逆流防止用のダイオード6が設けられている。なお、図1では、太陽電池ストリング3は、10個の太陽電池モジュール2が直列接続されている場合を示している。各太陽電池モジュール2とグランドとの間には対地間静電容量Cgが生じている。
 〔検査装置11の構成〕
 検査装置11は、例えば、毎日あるいは数日毎といった所定の周期にて、または所定の条件が満たされたときに、太陽電池ストリング3の故障の有無を検査する。このために、検査装置11は、PV電圧計測回路(状態検出部、極間計測部)21、PV電流計測回路(状態検出部、極間計測部)22、切替えリレー(経路切替部)23P,23N、検査通電路24、切替えリレー(接続切替部)25、信号電流計測回路(指標値計測部)26、信号注入回路(検査信号生成部、周波数調整部)27、発振回路(検査信号生成部)28、フィルタ回路(フィルタ処理部)29、信号電圧計測回路(指標値計測部)30、フィルタ回路(フィルタ処理部)31、演算制御装置32および地絡検査回路33を備えている。
 (PV電圧計測回路21、PV電流計測回路22)
 PV電圧計測回路21は、太陽電池ストリング3のP端子とN端子との間の電圧、すなわち太陽電池ストリング3の出力電圧を計測する。この計測結果は演算制御装置32へ入力される。PV電流計測回路22は、電力通電路4a,4bに設けられ、電力通電路4a,4bを流れる電流、すなわち太陽電池ストリング3の出力電流を計測する。この計測結果は演算制御装置32へ入力される。
 (切替えリレー23P,23N)
 切替えリレー23P,23Nは、電力通電路4a,4bに設けられ、太陽電池ストリング3から出力される電力の供給経路を、PCS5側と検査通電路24側との間で切り替える。具体的には、切替えリレー23Pの可動接点23Paは太陽電池ストリング3のP端子と接続され、固定接点23PbはPV電流計測回路22を介してPCS5と接続され、固定接点23Pcは検査通電路24と接続されている。同様に、切替えリレー23Nの可動接点23Naは太陽電池ストリング3のN端子と接続され、固定接点23NbはPV電流計測回路22を介してPCS5と接続され、固定接点23Ncは検査通電路24と接続されている。
 (切替えリレー25)
 切替えリレー25は、検査通電路24に設けられ、信号電流計測回路26の入力端子の接続を太陽電池ストリング3のP端子側とN端子側との間で切り替える。具体的には、切替えリレー25の可動接点25aは信号電流計測回路26の入力端子と接続され、固定接点25bは検査通電路24を介して切替えリレー23Pの固定接点23Pcと接続され、固定接点25cは検査通電路24を介して切替えリレー23Nの固定接点23Ncと接続されている。
 (発振回路28、信号注入回路27)
 発振回路28は、信号注入回路27にて使用される信号を発振して信号注入回路27へ供給する。信号注入回路27は、発振回路28から供給された信号に基づいて、太陽電池ストリング3へ注入する交流の検査信号を生成し、生成した検査信号を、切替えリレー25および切替えリレー23Pを介して、太陽電池ストリング3のP端子へ供給する。また、上記検査信号を、切替えリレー25および切替えリレー23Nを介して、太陽電池ストリング3のN端子へ供給する。
 (検査信号)
 なお、検査信号は、正弦波の交流信号であることが好ましいものの、これに限定されることなく、どのような交流信号であってもよい。また、検査信号51の周波数は、1kHz~1MHzとすることができる。検査信号51は、上記範囲から適当な周波数のものを選択して使用すればよい。
 (信号電流計測回路26、フィルタ回路29,31、信号電圧計測回路30)
 信号電流計測回路26は、信号注入回路27から太陽電池ストリング3のP端子へ上記検査信号が供給されている状態(以下、検査信号P端子印加と称する)において、太陽電池ストリング3を流れる検査信号電流を計測する。また、信号注入回路27から太陽電池ストリング3のN端子へ上記検査信号が供給されている状態(以下、検査信号N端子印加と称する)において、太陽電池ストリング3を流れる検査信号電流を計測する。
 フィルタ回路29は、ローパスフィルタあるいはバンドパスフィルタであり、信号電流計測回路26にて計測された検査信号電流からノイズ成分を除去する。フィルタ回路29にて処理された検査信号電流は、演算制御装置32へ入力される。
 信号電圧計測回路30は、検査信号P端子印加の場合において、上記検査信号の電圧を計測する。また、検査信号N端子印加の場合において、上記検査信号(検査信号電圧)の電圧を計測する。
 フィルタ回路31は、ローパスフィルタあるいはバンドパスフィルタであり、信号電圧計測回路30にて計測された検査信号電圧からノイズ成分を除去する。フィルタ回路31にて処理された検査信号電圧は、演算制御装置32へ入力される。
 なお、検査装置11は、フィルタ回路29,31を備えずに、フィルタ回路29,31が行う処理を演算制御装置32がデジタル信号処理(フィルタ処理)により行う構成としてもよい。また、PV電圧計測回路21、PV電流計測回路22、フィルタ回路29およびフィルタ回路31から演算制御装置32へ入力される電流および電圧等は、ADコンバータ(図示せず)にてAD変換した後、演算制御装置32へ入力するようにしてもよい。あるいは、上記ADを演算制御装置32の内部にて行ってもよい。
 (演算制御装置32)
 演算制御装置32は、CPUを有するマイクロコンピュータにて構成され、PV電圧演算部41、PV電流演算部42、PWM可変部(検査信号生成部、周波数調整部)43、信号電流演算部44、信号電圧演算部45、インピーダンス演算部(故障位置判定部)46および制御部(接続切替部、故障位置判定部、第1~第5制御部、断線判定部、抵抗値測定部)47を備えている。
 PV電圧演算部41は、PV電圧計測回路21にて計測された太陽電池ストリング3の出力電圧を制御部47での処理に適したデータに変換する。PV電流演算部42は、PV電流計測回路22にて計測された太陽電池ストリング3の出力電流を制御部47での処理に適したデータに変換する。
 PWM可変部43は、発振回路28を制御し、発振回路28が発振する信号の周波数を検査信号として好適な周波数に調整する。
 信号電流演算部44は、信号電流計測回路26にて計測され、フィルタ回路29にて処理された検査信号電流をインピーダンス演算部46での処理に適したデータに変換する。信号電圧演算部45は、信号電圧計測回路30にて計測され、フィルタ回路31にて処理された検査信号電圧をインピーダンス演算部46での処理に適したデータに変換する。
 インピーダンス演算部46は、信号電流演算部44および信号電圧演算部45から提供されるデータに基づいて、太陽電池ストリング3における、検査信号P端子印加の場合のインピーダンス、および検査信号N端子印加の場合のインピーダンスと求める。
 制御部47は、PV電圧演算部41から供給される太陽電池ストリング3の出力電圧を示すデータ、およびPV電流演算部42から供給される太陽電池ストリング3の出力電流を示すデータから、太陽電池ストリング3が後述の検査可能状態かどうかを判定する。また、この判定の結果、太陽電池ストリング3が検査可能状態であると判定した場合に、切替えリレー23P,23Nの切り替えを制御し、太陽電池ストリング3を検査通電路24に接続させる。
 また、制御部47は、インピーダンス演算部46から得た、太陽電池ストリング3における検査信号P端子印加の場合のインピーダンス、および検査信号N端子印加の場合のインピーダンスから、太陽電池ストリング3の故障(ケーブル断線および太陽電池モジュール2の故障)の有無、および故障がある場合の故障の位置を検出する。
 (地絡検査回路33)
 地絡検査回路33は、太陽電池ストリング3における地絡の有無を検査するものであり、例えば検査通電路24において、切替えリレー25と並列に設けられている。太陽電池ストリング3に地絡が発生している場合には、太陽電池ストリング3の故障検査において、インピーダンスZp,Zn(指標値)を正確に得ることができない。このため、太陽電池ストリング3の故障検査を高精度に行うことができない。したがって、太陽電池ストリング3の故障検査においては、まず、太陽電池ストリング3における地絡の有無を検査し、地絡が発生している場合には、故障検査を中止することが好ましい。
 地絡検査回路33には、従来周知の方法によるもの、例えば特許文献3に記載のもの使用することができる。あるいは、地絡検査回路33は、図2の(a)に示す構成のものであってもよい。
 図2の(a)は、太陽電池ストリング3に設けられた地絡検査回路(地絡検査部)33の構成を示す回路図である。図2の(b)は、図2の(a)に示した回路図を簡略化して示す回路図である。図3の(a)は、図2の(a)に示した回路において地絡が発生している状態を示す回路図である。図3の(b)は、図3の(a)に示した回路図を簡略化して示す回路図である。
 図2の(a)および図2の(b)に示すように、地絡検査回路33は、抵抗R11、抵抗R12および電流センサ61を備えている。抵抗R11の一端は太陽電池ストリング3のP端子に接続されている。抵抗R12の一端は太陽電池ストリング3のN端子に接続されている。抵抗R11の他端と抵抗R12の他端とは互いに接続され、接地されている。電流センサ61は、抵抗R11および抵抗R12の接地経路に設けられている。
 なお、図2の(a)および(b)の回路において、抵抗R11,R12を太陽電池ストリング3の地絡検査および故障検査を通してグランドに接続しておく場合には、故障検査に影響のない大きいインピーダンスに設定する。あるいは、故障検査の場合に、抵抗R11,R12を太陽電池ストリング3から切り離すことができるように、抵抗R11,R12はスイッチを介して太陽電池ストリング3に接続しておく構成としてもよい。
 電流センサ61により検出された電流は演算制御装置32へ入力される。演算制御装置32の制御部47は、電流センサ61の検出結果、すなわち電流センサ61にて検出される電流に基づいて、太陽電池ストリング3の地絡の発生の有無を監視する。
 図2の(a)および図2の(b)に示すように、太陽電池ストリング3に地絡が発生していない正常時には、地絡検査回路33に地絡電流が流れず、電流センサ61は電流を検出しない。一方、図3の(a)および図3の(b)に示すように、太陽電池ストリング3に地絡が発生すると、地絡検査回路33に地絡電流I11が流れ、電流センサ61は地絡電流I11を検出する。したがって、演算制御装置32の制御部47は、電流センサ61の検出結果を受けて、地絡が発生と判定する。
 〔太陽光発電システム1の動作〕
 上記の構成において、太陽光発電システム1では、太陽電池ストリング3の発電した電力をPCS5へ供給している場合、切替えリレー23Pは可動接点23Paが固定接点23Pb側に切り替えられ、切替えリレー23Nは可動接点23Naが固定接点23Nb側に切り替えられている。
 〔検査装置11の動作〕
 (検査装置11の動作の概要)
 検査装置11は、太陽電池ストリング3の状態が太陽電池ストリング3の検査が可能な所定の条件下にある状態(以下、検査可能状態と称する)おいて、太陽電池ストリング3の検査を行う。この場合、制御部47は太陽電池ストリング3が検査可能状態であるかどうかを判断するため、太陽電池ストリング3を監視する。具体的には、制御部47は、PV電圧計測回路21にて計測され、PV電圧演算部41から提供される太陽電池ストリング3の出力電圧、およびPV電流計測回路22にて計測され、PV電流演算部42から提供される太陽電池ストリング3の出力電流を監視する。
 検査装置11は、太陽電池ストリング3の地絡発生の有無の検査、並びに太陽電池ストリング3の故障検査を行う。ここで故障検査の対象は、太陽電池ストリング3におけるケーブル断線および太陽電池モジュール2の故障である。検査装置11は、太陽電池ストリング3の故障検査において、検査信号P端子印加の場合の太陽電池ストリング3のインピーダンスZpと、検査信号N端子印加の場合の太陽電池ストリング3のインピーダンスZnとを求める。そして、これらインピーダンスZp,Znの比から、太陽電池ストリング3のケーブル断線の有無および太陽電池モジュール2の故障の有無、並びにケーブル断線の位置および故障している太陽電池モジュール2の位置を検出する。
 (太陽電池ストリング3の検査可能状態)
 本実施の形態において、太陽電池ストリング3の上記検査可能状態は、太陽電池ストリング3が発電しており、かつ発電量(出力電流)が所定の閾値以下である状態としている。そこで、制御部47は、太陽電池ストリング3が検査可能状態になり、かつ規定の検査時期が到来していれば、切替えリレー23Pの可動接点23Paが固定接点23Pc側に切り替えられ、切替えリレー23Nの可動接点23Naが固定接点23Nc側に切り替えられるように、切替えリレー23P,23Nを制御する。これにより、太陽電池ストリング3のP端子およびN端子が検査通電路24と接続される。
 ここで、検査可能状態を太陽電池ストリング3が発電しており、かつ発電量が所定の閾値以下である状態としているのは次の理由よる。図4は、太陽電池ストリング3が非発電状態である場合の、太陽電池ストリング3をR,L,Cにて表した等価回路の回路図である。図5は、図4に対応した、太陽電池ストリング3が発電状態である場合の太陽電池ストリング3の等価回路の回路図である。
 太陽電池ストリング3が非発電状態である場合、図4に示すように、太陽電池モジュール2は、直列抵抗Rs、pn接合における接合容量Cdおよび並列抵抗Rpを含んだ状態となる。また、Lは太陽電池モジュール2間の結線のインダクタンス、Cgは太陽電池モジュール2の対地間静電容量Cgである。
 一方、太陽電池ストリング3が発電状態である場合、図5に示すように、太陽電池モジュール2は、直列抵抗Rsのみを含んだ状態となる。この場合の直列抵抗Rsは、例えば1Ω以下といった非常に小さい値となる。また、インダクタンスLに関しても対地間容量Cgに対して非常に小さい値となる。したがって、太陽電池ストリング3が発電状態である場合には、検査信号P端子印加の場合の太陽電池ストリング3のインピーダンスZpと、検査信号N端子印加の場合の太陽電池ストリング3のインピーダンスZnとを正確に求めることができる。
 また、太陽電池ストリング3の発電量が所定の閾値以下である状態は、太陽電池ストリング3がPCS5に接続されている状態から検査通電路24に接続される状態に、切替えリレー23P,23Nを切り替える場合に、アーク発生による悪影響を受けることがない程度に発電量が低い状態である。したがって、検査可能状態の条件としてこのような条件が設定されていることにより、切替えリレー23P,23Nは、廉価な低耐圧のものを使用可能であり、かつ容易かつ安全に切り替え動作を行うことができる。
 (検査装置11の動作の流れ)
 図6は、検査装置11の動作を示すフローチャートである。検査装置11は、太陽電池ストリング3を検査する場合、太陽電池ストリング3が検査可能状態(太陽電池ストリング3が発電しており、かつ発電量が所定の閾値以下である状態)であるかどうかを判定する(S11)。太陽電池ストリング3が検査可能状態であるかどうかは、演算制御装置32の制御部47が、PV電圧計測回路(状態検出部)21にて検出される太陽電池ストリング3の出力電圧、およびPV電流計測回路(状態検出部)22にて検出される太陽電池ストリング3の出力電流に基づいて判定する。
 この判定の結果、太陽電池ストリング3が検査可能状態であれば (S12)、制御部47は、切替えリレー23P,23Nを制御して、太陽電池ストリング3を検査通電路24に接続させる(S13)。
 次に、検査装置11は、地絡検査回路33により、太陽電池ストリング3における地絡の発生の有無を検査する(S14)。S14での検査の結果、地絡が発生していれば(S15)、検査装置11は、太陽電池ストリング3において地絡が発生していることを、例えば太陽光発電システム1の管理装置(図示せす)に知らせる(S16)。その後、検査装置11は、太陽電池ストリング3の故障検査を行うことなく、動作を終了する。一方、S14での検査の結果、地絡が発生していなければ(S15)、検査装置11は、太陽電池ストリング3の故障検査(故障の有無の検査)を行う(S17)。
 検査装置11は、S17での故障検査の結果、太陽電池ストリング3に故障がなければその旨を上記管理装置に知らせた後(S19)、処理を終了する。一方、S17での故障検査の結果、太陽電池ストリング3に故障があれば、その旨を上記管理装置に知らせた後(S20)、処理を終了する。
 (故障検査の流れ)
 図7は、検査装置11によるS17での太陽電池ストリング3の故障検査の流れを示すフローチャートである。
 検査装置11は、太陽電池ストリング3の故障検査において、検査信号P端子印加と検査信号N端子印加とを順次行う(S31,S33)。この処理は順不動である。信号電流計測回路26は、それぞれの場合について、太陽電池ストリング3を流れる検査信号電流を計測する(S32,S34)。同様に、信号電圧計測回路30は、それぞれの場合について、検査信号電圧を計測する(S32,S34)。
 次に、演算制御装置32のインピーダンス演算部46は、S32にて得られた検査信号P端子印加の場合の検査信号電流および検査信号電圧から、検査信号P端子印加の場合の太陽電池ストリング3のインピーダンスZpを求める。また、インピーダンス演算部46は、S34にて得られた検査信号N端子印加の場合の検査信号電流および検査信号電圧から、検査信号N端子印加の場合の太陽電池ストリング3のインピーダンスZnを求める(S35)。なお、インピーダンスの計測には、インピーダンスアナライザを使用してもよい。
 次に、演算制御装置32の制御部47は、S35にて得られたインピーダンスZpとインピーダンスZnとの比から、太陽電池ストリング3における故障の有無(ケーブル断線の有無、太陽電池モジュール2の故障の有無)および故障の位置(ケーブル断線の位置、故障している太陽電池モジュール2の位置)を求める(S36)。
 (故障位置の検出動作)
 図8は、検査装置11による太陽電池ストリング3の故障検査の状態の一例を示す概略の回路図である。図8の例では、P端子側から見て第7番目の太陽電池モジュール2(PV7)に故障が発生している。図8において、検査信号P端子印加の場合には、切替えリレー25を切り替えて、検査信号51を太陽電池ストリング3のP端子に印加する。同様に、検査信号N端子印加の場合には、切替えリレー25を切り替えて、検査信号51を太陽電池ストリング3のN端子に印加する。
 図8の例に基づいて、演算制御装置32のインピーダンス演算部46によるインピーダンスの演算結果、および制御部47による太陽電池ストリング3の故障の判定結果を示すと次のとおりである。
 検査信号P端子印加の場合の太陽電池ストリング3のインピーダンスZp、検査信号N端子印加の場合の太陽電池ストリング3のインピーダンスZnは、
  Zp=949Ω、Zn=1542Ω
となる。インピーダンスZp,Znが互いに異なる値となるのは、太陽電池ストリング3に故障が発生しているからであり、故障が発生していなければ、インピーダンスZp,Znは同じ値となる。
 また、インピーダンスZp,Znは、故障している太陽電池モジュール2の位置に対応した数値となる。この場合、太陽電池ストリング3の故障位置を示すインピーダンスは、故障している太陽電池モジュール2の位置が検査信号51を印加する端子(P端子、N端子)の位置から遠いほど小さくなる。したがって、故障位置は、Zn/(Zp+Zn)とZp/(Zp+Zn)との比を計算することにより求める。すなわち、Zp+Zn=2491Ωであるから、Zn/(Zp+Zn):Zp/(Zp+Zn)は、
     Zn/(Zp+Zn):Zp/(Zp+Zn)=1542/2491:949/2491                    =0.62:0.38
となる。また、太陽電池モジュール2の数は10枚であるから、
 Zn/(Zp+Zn):Zp/(Zp+Zn)=0.62×10:0.38×10
                      =6.2:3.8
となる。P端子側から見れば6.2なので、太陽電池ストリング3の故障位置は、6枚番目と7番目との間となる。一方、N端子側から見れば3.8なので、太陽電池ストリング3の故障位置は、8番目と7番目との間となる。よって、故障位置は、P端子側から7番目の太陽電池モジュール2と判定する。
 (太陽電池ストリング3の発電中に故障検査することの利点)
 図9の(a)は、太陽電池ストリング3に故障が発生していない場合の図5の等価回路(太陽電池ストリング3が発電中の等価回路)を簡略化した回路図である。すなわち、図5に示した等価回路は、太陽電池ストリング3に故障が発生していない場合、抵抗値が低い直列抵抗Rs、およびインピーダンスが低いインダクタンスLを無視して、図9の(a)のように示すことができる。なお、図9の(a)において、太陽電池ストリング3の対地間静電容量Cgは、m0(m0=10)×Cgである。
 一方、図8の例のように、太陽電池ストリング3において、P端子側から7番目の太陽電池モジュール2(PV7)が故障している場合、図5に示した等価回路は、図9の(b)および図9の(c)のように示すことができる。図9の(b)は、検査信号P端子印加の場合の図8の等価回路を示す回路図である。図9の(c)は、検査信号N端子印加の場合の図8の等価回路を示す回路図である。
 なお、図9の(b)において、CgP1は、P端子側から見た場合の第1番目の太陽電池モジュール2(PV7)から故障している太陽電池モジュール2(PV7)の手前の太陽電池モジュール2(PV6)までの対地間静電容量Cgであり、CgP1=m1(m1=6)×Cgである。CgP2は、P端子側から見た場合の故障している太陽電池モジュール2(PV7)の次の太陽電池モジュール2(PV8)から最後の太陽電池モジュール2(PV10)までの対地間静電容量Cgであり、CgP2=m2(m2=3)×Cgである。
 また、図9の(c)において、CgN1は、N端子側から見た場合の第1番目の太陽電池モジュール2(PV10)から故障している太陽電池モジュール2(PV7)の手前の太陽電池モジュール2(PV8)までの対地間静電容量Cgであり、CgN1=m1(m1=3)×Cgである。CgN2は、N端子側から見た場合の故障している太陽電池モジュール2(PV7)の次の太陽電池モジュール2(PV6)から最後の太陽電池モジュール2(PV1)までの対地間静電容量Cgであり、CgN2=m2(m2=6)×Cgである。
 図9の(b)において、太陽電池モジュール2が故障している場合、その太陽電池モジュール2の直列抵抗Rsの抵抗値は、例えば数百Ω~数千Ωといった大きな値となる。したがって、検査信号51により太陽電池ストリング3を流れる電流は、ほとんどCgP1を流れる電流Ip1となり、CgP2を流れる電流Ip2は僅かなものとなる。同様に、図9の(c)において、検査信号51により太陽電池ストリング3を流れる電流は、ほとんどCgN1を流れる電流In1となり、Cgn2を流れる電流In2は僅かなものとなる。
 したがって、インピーダンスZpはCgP1のみによるものと見なすことができ、インピーダンスZnはCgN1のみによるものと見なすことができる。これにより、太陽電池ストリング3の故障検査を太陽電池ストリング3の発電中に行った場合には、太陽電池ストリング3の故障の有無、および太陽電池ストリング3の故障位置を高精度に検出することができる。
 (太陽電池モジュール2のケーブル断線の検出動作)
 図10は、太陽電池ストリング3の内部において、太陽電池モジュール2同士を接続するケーブルが断線している状態の一例を示す回路図である。
 図10に示すように、太陽電池ストリング3においてケーブル断線が生じている場合、PV電圧計測回路21にて計測される太陽電池ストリング3のP端子とN端子との間の端子間電圧(太陽電池ストリング3の出力電圧)はほぼ0Vとなる。同様に、PV電流計測回路22にて計測される太陽電池ストリング3の出力電流はほぼ0Aとなる。
 したがって、太陽電池モジュール2のケーブル断線は、太陽電池ストリング3の端子間電圧、または太陽電池ストリング3の出力電流を計測し、計測値がケーブル断線を示すものであった場合に、演算制御装置32の制御部47は、太陽電池ストリング3にケーブル断線有りと判定することができる。具体的には、制御部47は、例えば上記計測値を所定の閾値と比較し、上記計測値が閾値を一定期間下回った場合に、ケーブル断線有り判定する。
 なお、上記閾値としては、例えばケーブル断線ではないと見なし得る上記計測値の下限値を設定することができる。また、閾値を一定期間下回った場合としているのは、計測値がなんらかの事情により瞬間的に閾値を下回った場合を排除し、ケーブル断線の検出を確実にするためである。
 また、太陽電池ストリング3の出力電流によりケーブル断線を検出する場合には、切替えリレー23P,23Nを太陽電池ストリング3がPCS5に接続されている状態から検査通電路24に接続される状態に切り替える前に、PV電流計測回路22による検出を行う。
 (太陽電池モジュール2のケーブル断線位置の検出動作)
 太陽電池モジュール2のケーブル断線の検出動作により、太陽電池モジュール2のケーブル断線が検出された場合には、太陽電池モジュール2のケーブル断線位置の検出動作を行う。
 この場合の検出動作は、上述した太陽電池ストリング3の故障位置(故障している太陽電池モジュール2)の検出動作と同様である。すなわち、太陽電池ストリング3に対して、検査信号P端子印加および検査信号N端子印加を行ってそれぞれの場合のインピーダンスZp,Znを求め、Zn/(Zp+Zn):Zp/(Zp+Zn)を計算することにより、ケーブル断線の位置を検出する。
 (検査信号電流および検査信号電圧をフィルタ処理することの利点)
 図11は、検査信号P端子印加の場合において、印加点にて測定した検査信号電圧(上段)、および終点にて検出した検査信号電圧(下段)の波形図である。図12は、検査信号N端子印加の場合において、印加点にて測定した検査信号電圧(上段)、および終点にて検出した検査信号電圧(下段)の波形図である。
 図11および図12に示すように、印加点の検査信号の電圧波形に対して終点の検査信号の電圧波形は、ノイズが付加されたものとなっている。そこで、終点から得られる検査信号電流(検査信号電流)および電圧(検査信号電圧)は、フィルタ処理によりノイズ成分を除去した後に、インピーダンス演算部46でのインピーダンスの演算に使用することが好ましい。これにより、インピーダンスZp,Znを正確に求めることができる。この結果、検査装置11での太陽電池ストリング3の故障検査を高精度に行うことができる。
 なお、例えば図8および図9では、検査信号51(検査信号源)と太陽電池モジュール2とが同じ対象に接地されているように示している。しかしながら、太陽電池モジュール2は、検査信号51と同じ対象に接地されている必要はない。すなわち、太陽光発電システム1には種々の形態(種々の接地形態)が存在し、本実施の形態の検査装置11、および以下の実施の形態に示す検査装置11は、どのような形態の太陽光発電システム1の太陽電池ストリング3の故障検査にも対応可能である。例えば、太陽電池ストリング3の太陽電池モジュール2の接地形態は、例えばフレームへの接地、大地への接地、あるいは空気中の容量に対する接地であってもよく、検査装置11は、太陽光発電システム1の接地形態に影響されることなく、太陽電池ストリング3の故障検査を行うことができる。
 [実施の形態2]
 (ノイズ対策の終端インピーダンスを配置した構成)
 本発明の他の実施の形態を図面に基づいて以下に説明する。図13は、本実施の形態の検査装置11における太陽電池ストリング3の故障検査の状態を示す概略の回路図である。
 図13は、検査信号P端子印加の場合を示しており、N端子が終端インピーダンスZt1を介して接地されている。同様に、検査信号N端子印加の場合には、終端のP端子が終端インピーダンスZt1介して接地される(図示せず)。
 上記の構成によれば、太陽電池ストリング3の故障検査の場合において、太陽電池ストリング3のP端子とN端子とのうち、検査信号が印加される端子と反対側の端子が終端インピーダンスZt1を介して接地されるので、検査信号にノイズが付加され難くなる。これにより、検査信号電流および検査信号電圧を計測して求めるインピーダンスZp,Znは正確なものとなる。
 なお、終端インピーダンスZt1には、インピーダンスを生じるコンデンサ、抵抗あるいはインダクタンス等のインピーダンス素子を使用することができる。
 [実施の形態3]
 (真ん中故障対策の終端インピーダンスを配置した構成)
 本発明のさらに他の実施の形態を図面に基づいて以下に説明する。図14は、本実施の形態の検査装置11における太陽電池ストリング3の故障検査の状態(故障している太陽電池モジュール2の検出状態)を示す概略の回路図である。なお、図14は、検査信号P端子印加の場合、および太陽電池ストリング3のP端子側およびN端子側から見て、真ん中位置の太陽電池モジュール2が故障している場合を示している。
 前述のように、太陽電池ストリング3にケーブル断線および故障が無い場合、検査信号P端子印加の場合のインピーダンスZpと検査信号N端子印加の場合のインピーダンスZnは同じ値となる。
 一方、例えば太陽電池ストリング3が直列接続された奇数枚の太陽電池モジュール2を備えている場合において、P端子側およびN端子側から見て真ん中位置の太陽電池モジュール2が故障している場合にも、同様に、検査信号P端子印加の場合のインピーダンスZpと検査信号N端子印加の場合のインピーダンスZnは同じ値となる。
 そこで、このような場合には、P端子とN端子とのうち、検査信号を印加する端子と反対側の端子に付加インピーダンスZt2を接続し、その端子を付加インピーダンスZt2を介して接地する。これにより、インピーダンスZp,Znは、付加インピーダンスZt2の分だけバランスが崩れ、異なる値となる。すなわち、付加インピーダンスZt2を接続してインピーダンスZp,Znが互いに異なる値となった場合には、P端子側およびN端子側から見て真ん中位置の太陽電池モジュール2が故障していることを検出することができる。
 なお、終端インピーダンスZt2には、インピーダンスを生じるコンデンサ、抵抗あるいはインダクタンス等のインピーダンス素子を使用することができる。
 [実施の形態4]
 (複数個所の故障に対応した構成)
 本発明のさらに他の実施の形態を図面に基づいて以下に説明する。図15は、本実施の形態の検査装置11における太陽電池ストリング3の故障検査の状態(故障している太陽電池モジュール2の検出状態)を示す概略の回路図である。
 本実施の形態の検査装置11は、太陽電池ストリング3における複数個所の故障を検出できるようになっている。このために、太陽電池ストリング3には、図15に示すように、太陽電池モジュール2同士を接続するケーブルのうち、例えば中間位置のケーブルに、ケーブルの遮断と導通とを切り替える遮断リレー(ストリング分断切替部)63が設けられている。すなわち、遮断リレー63は、例えば10枚の太陽電池モジュール2が直列接続されている太陽電池ストリング3において、P側から見て5番目の太陽電池モジュール2(PV5)のN端子である中間N端子(N1端子)と6番目の太陽電池モジュール2(PV6)のP端子である中間P端子(P2端子)との遮断と導通とを切り替えるようになっている。
 なお、遮断リレー63を設ける位置は、太陽電池ストリング3の中間位置に限定されず、太陽電池ストリング3の中途の適当な位置であればよい。
 また、上記のような太陽電池ストリング3の構成に対応し、検査装置11は、切替えリレー25に代えて、切替えリレー(接続切替部)64,65を備えている。切替えリレー64は、検査信号51を太陽電池ストリング3の本来のP端子であるP1端子に印加する検査信号P1端子印加と、検査信号51を本来のN端子であるN2端子に印加する検査信号N2端子印加とに切り替える。切替えリレー65は、検査信号51を太陽電池ストリング3の中間P端子であるP1端子に印加する検査信号P2端子印加と、検査信号51を中間N端子であるN1端子に印加する検査信号N1端子印加とに切り替える。
 (検査装置11の動作)
 上記の構成において、図15に示した太陽電池ストリング3は、P側から見て第1番目の太陽電池モジュール2(PV1)から第5番目の太陽電池モジュール2(PV5)を一つの太陽電池ストリング(第1小ストリング)と見なすことができ、第6番目の太陽電池モジュール2(PV6)から第10番目の太陽電池モジュール2(PV10)を一つの太陽電池ストリング(第2小ストリング)と見なすことができる。これら第1および第2小ストリングに対しては、太陽電池ストリング3に対して行った前述の故障検査を同様にして行う。これにより、第1および第2小ストリングのそれぞれに故障個所が存在していても、それら故障個所を検出することができる。
 なお、第1小ストリングを検査する場合において、検査信号P1端子印加の場合には、切替えリレー64をP1端子に切り替え、切替えリレー65を非接続端子65aに切り替える。また、検査信号N1端子印加の場合には、切替えリレー65をN1端子に切り替え、切替えリレー64を非接続端子65aに切り替える。同様に、第2小ストリングを検査する場合において、検査信号P2端子印加の場合には、切替えリレー65をP2端子に切り替え、切替えリレー64を非接続端子64aに切り替える。また、検査信号N2端子印加の場合には、切替えリレー64をN2端子に切り替え、切替えリレー65を非接続端子65aに切り替える。
 [実施の形態5]
 (検査信号51の電圧を故障検査に好適な電圧に設定する構成)
 本発明のさらに他の実施の形態を図面に基づいて以下に説明する。図16の(a)は、図1に示した太陽電池モジュール2を太陽電池セル71およびバイパスダイオード72によって示した回路図である。
 本実施の形態において、検査装置11は、信号注入回路27から太陽電池ストリング3に供給する検査信号として、太陽電池モジュール2が備えるバイパスダイオードの影響を受けない微小な電圧の信号を印加するようになっている。
 太陽電池モジュール2は、図16の(a)に示すように、複数の太陽電池セル71が直列接続されたものであり、直列接続された複数の太陽電池セル71に対して、バイパスダイオード72が並列に接続されている。バイパスダイオード72は、アノードが太陽電池モジュール2の負極に接続され、カソードが太陽電池モジュール2の正極に接続されている。
 図16の(b)は、図4(太陽電池ストリング3が非発電状態である場合の、太陽電池ストリング3をR,L,Cにて表した等価回路)にバイパスダイオード72を追加して示した回路図である。図16の(c)は、図5(図4に対応した、太陽電池ストリング3が発電状態である場合の太陽電池ストリング3の等価回路)にバイパスダイオード72を追加して示した回路図である。図17は、図16に示したバイパスダイオード72の順方向電圧Vfを示すグラフである。
 図17に示すように、バイパスダイオード72は、順方向電圧Vfよりも小さい電圧を印加した場合、ほとんど電流が流れない。そこで、検査装置11は、検査信号51として、バイパスダイオード72の順方向電圧Vfよりも小さい電圧のものを使用する。これにより、検査信号P端子印加の場合および検査信号N端子印加の場合のインピーダンスZp,Znを正確に求めることができ、太陽電池ストリング3の故障検査を高精度に行うことができる。
 [実施の形態6]
 (太陽電池ストリング3の電力を利用して検査信号51を生成する構成)
 本発明のさらに他の実施の形態を図面に基づいて以下に説明する。本実施の形態の検査装置11は、太陽電池ストリング3が発電する電力を利用して、検査信号51を生成するようになっている。図18は、本実施の形態の検査装置11における、太陽電池ストリング3へ検査信号51を印加する構成を示す回路図である。
 図18に示すように、本実施の形態の検査装置11は、検査信号生成回路81を備えている。検査信号生成回路81は、演算制御装置32のPWM可変部43、発振回路(オンオフ駆動部)28およびSSR(Solid State Relay:ソリッドステートリレー)82により構成されている。
 PWM可変部43は、前述のように、発振回路28を制御し、発振回路28が発振する信号の周波数を検査信号として好適な周波数に調整する。発振回路28は、SSR82へ供給するPWM信号を発振する。SSR35は、太陽電池ストリング3のP端子(図18の場合)とグランドとの間の通電路に設けられ、発振回路28から出力されるPWM信号に基づいて、通電路を開閉する。これにより、太陽電池ストリング3のP端子に交流の検査信号51が印加された状態とすることができる。
 なお、図18は、検査信号P端子印加の場合であり、検査信号N端子印加の場合とする場合には、検査信号生成回路81を太陽電池ストリング3のN端子に接続する。また、SSR82は、スイッチング素子であり、これに代えて他のスイッチング素子を使用してもよい。
 上記の構成によれば、太陽電池ストリング3の電力を利用して、太陽電池ストリング3へ印加する検査信号51を生成するので、検査信号51を生成するための別途電源が不要となっている。これにより、検査装置11の小型化および低コスト化が可能となる。
 [実施の形態7]
 (検査信号51を印加した場合の定在波比により故障検査を行う構成)
 本発明のさらに他の実施の形態を図面に基づいて以下に説明する。本実施の形態の検査装置11は、太陽電池ストリング3に検査信号51を印加した場合の定在波比(SWR: Standing Wave Ratio)を計測し、得られたSWR(指標値)に基づいて、太陽電池ストリング3の故障検査を行うようになっている。図19は、本実施の形態の検査装置11における要部の構成を示す回路図である。
 以上の実施の形態では、検査装置11は、検査信号P端子印加の場合および検査信号N端子印加の場合の太陽電池ストリング3のインピーダンスZp,Znを求め、これらインピーダンスZp,Znに基づいて太陽電池ストリング3の故障検査を行う構成としている。本実施の形態の検査装置11は、これに代えて、検査信号P端子印加の場合および検査信号N端子印加の場合の定在波比(あるいはリターンロス)を求め、求めた定在波比(あるいはリターンロス)に基づいて太陽電池ストリング3の故障検査を行う構成としている。
 すなわち、複数の太陽電池モジュール2を含む太陽電池ストリング3の線路は、モノポールアンテナと見なすことができる。したがって、太陽電池ストリング3に故障がある場合、検査信号P端子印加の場合と検査信号N端子印加の場合とではSWRが異なる。そこで、本実施の形態の検査装置11では、上記のSWRの相違を利用して、太陽電池ストリング3の故障検査を行う。
 この場合、検査装置11は、図19に示すように、図1に示した構成において、例えば信号電流計測回路26に代えてSWR計測器85を備えていればよい。演算制御装置32は、SWR計測器(例えばWRメータ)85にて計測された、P端子に検査信号51を印加した場合のSWRとN端子に検査信号51を印加した場合のSWRとから、太陽電池ストリング3におけるケーブル断線の有無、および太陽電池ストリング3における故障位置を求める。
 また、検査信号51の周波数は、例えば前述した1kHz~1MHzの範囲において、高い周波数に設定しておくことが好ましい。また、検査信号51の周波数は、モノポールアンテナと見なされる太陽電池ストリング3の線路に共振するように設定しておくことが好ましい。この場合、検査信号51の波長は、太陽電池ストリング3の線路長に対して、例えば1/4波長もしくは1/2波長等とする。このような構成では、太陽電池ストリング3に故障が無い場合、SWRは小さい値(例えば1)となる一方、太陽電池ストリング3に故障が有る場合、SWRは大きい値となるので、故障検査が容易である。
 なお、太陽電池ストリング3において、ケーブル断線が生じている場合、印加した検査信号51は、断線位置から印加位置に戻ってくる。一方、断線せずに太陽電池モジュール2が故障して高抵抗となっている場合、印加した検査信号51は一部が故障位置から戻り、残りの一部は故障位置をすり抜ける。故障検査においては、太陽電池ストリング3の終端(検査信号51を印加する端子とは反対側の端子)をシャント抵抗を介してグランドに接続しておくことが好ましい。これにより、太陽電池ストリング3のケーブル断線を確実に検出することができる。
 [実施の形態8]
 (PN端子の短絡により全体のインピーダンスを計測する構成)
 本発明のさらに他の実施の形態を図面に基づいて以下に説明する。本実施の形態の検査装置11は、太陽電池ストリング3のP端子とN端子とを短絡させて、太陽電池ストリング3の全体のインピーダンスを計測するようになっている。図20は、本実施の形態の検査装置11における、検査装置11の要部の構成を示す回路図である。
 図20に示すように、検査装置11は、太陽電池ストリング3のP端子とN端子とを、抵抗R21およびR22を介して短絡できるようになっている。このために、抵抗R21とP端子との間に、これら両者の接続をオンオフするリレー91が設けられ、抵抗R22とN端子との間に、これら両者の接続をオンオフするリレー92が設けられている。これらリレー(短絡非短絡切替部)91,92のオンオフ動作は、演算制御装置32の制御部47によって制御される。
 上記の構成において、太陽電池ストリング3の故障検査を行う場合には、前述のように、検査信号P端子印加および検査信号N端子印加として、インピーダンスZp,Znを求める。次に、これらインピーダンスZp,Znに基づいて、太陽電池モジュール2の故障位置を求める。
 一方、インピーダンスZp,Znが互いに同じ値であれば、太陽電池ストリング3にケーブル断線または太陽電池モジュール2の故障が生じていない場合と、太陽電池ストリング3の中央位置にで、ケーブル断線または太陽電池モジュール2の故障が生じている場合とが考えられる。
 そこで、インピーダンスZp,Znが互いに同じ値である場合には、リレー91,92をオンにし、P端子またはN端子に検査信号51を印加することにより、太陽電池ストリング3の全体インピーダンスZpnを求める。全体インピーダンスZpnは、太陽電池ストリング3にケーブル断線が生じている場合、およびいずれかの太陽電池モジュール2に故障が生じている場合であっても、インピーダンスZp,Znを求める場合と同様にして求めることができる。
 次に、全体インピーダンスZpnとインピーダンスZpまたはZnとを比較し、両者が異なっていれば、制御部47は、太陽電池ストリング3の中央位置にで、ケーブル断線または太陽電池モジュール2の故障が生じていると判定することができる。また、両者が同じ値であれば、制御部47は、太陽電池ストリング3について故障無し、と判定することができる。
 [実施の形態9]
 (検査信号51の周波数を直列抵抗Rsの値に応じて変化させる構成)
 本発明のさらに他の実施の形態を図面に基づいて以下に説明する。本実施の形態の検査装置11は、検査信号51の周波数を直列抵抗Rsの値に応じて変化させる構成となっている。
 太陽電池モジュール2の直列抵抗Rsは、太陽電池モジュール2が劣化することにより小さくなる。直列抵抗Rsの値が小さい故障でも検出しようとすると、正常な太陽電池モジュール2の直列抵抗Rsと故障した太陽電池モジュール2の直列抵抗Rsとの差が小さくなり、太陽電池ストリング3の故障検査において、故障した太陽電池モジュール2の検出が困難となる。
 そこで、検査装置11は、太陽電池モジュール2の直列抵抗Rsの値に応じて検査信号51の周波数を変化させ、太陽電池ストリング3のインピーダンスにおいて、相対的に、静電容量のインピーダンスの影響を小さくし(0に近づけ)、直列抵抗Rsのインピーダンスの影響が大きくなるようにする。具体的には、検査信号51の周波数を直列抵抗Rsの抵抗値が小さくなるほど高くする。
 この場合には、例えば直列抵抗Rsに閾値を設定しておき、その閾値を境界として検査信号51の周波数を複数段階に切り替えるようにしてもよい。また、検査信号51の周波数は、図1に示した検査装置11において、PWM可変部43にて発振回路28を制御することにより可変となる。また、太陽電池モジュール2の直列抵抗Rsの値は、抵抗値測定部となる従来周知の手法、例えば特許文献4に開示されている手法により求めることができる。
 上記の構成によれば、太陽電池モジュール2の直列抵抗Rsの値が低下した場合であっても、太陽電池モジュール2の故障位置を高精度に検出することができる。
 [実施の形態10]
 (計測電流のみにより故障検査を行う構成)
 本発明のさらに他の実施の形態を図面に基づいて以下に説明する。以上の実施の形態の検査装置11では、太陽電池ストリング3の故障検査において、検査信号P端子印加の場合および検査信号N端子印加の場合にてインピーダンスZp,Znを求め、これらインピーダンスZp,Znに基づいて行う構成となっている。
 これに対し、本実施の形態の検査装置11では、太陽電池ストリング3の故障検査において、検査信号P端子印加の場合および検査信号N端子印加の場合にてそれぞれ検査信号51を印加した場合の計測電流(指標値)を求め、それら計測電流に基づいて行う構成としている。
 検査信号P端子印加の場合および検査信号N端子印加の場合では、計測される検査信号51の電圧値は同じであり、計測される検査信号51の電流値のみが異なる。したがって、インピーダンスZp,Znに代えて、検査信号P端子印加の場合での計測電流Ipおよび検査信号N端子印加の場合での計測電流Inを使用することにより、太陽電池ストリング3の故障検査を行うことができる。
 この場合、図1に示した検査装置11において、演算制御装置32のインピーダンス演算部46は、インピーダンスZp,Znの比(Zn/(Zp+Zn):Zp/(Zp+Zn))に代えて、計測電流Ip,Inの比(Ip/(Ip+In):In/(Ip+In))を演算する。制御部47は、計測電流Ip,Inの比(Ip/(Ip+In):In/(Ip+In))に基づいて、太陽電池モジュール2の故障位置を求める。
 上記の構成によれば、前記実施の形態の検査装置11と同様、太陽電池ストリング3の故障の有無、および太陽電池ストリング3の故障位置を高精度に検出することができる。なお、本実施の形態の検査装置11の構成(太陽電池ストリング3の故障検査の手法)は、他の各実施の形態においても適用可能である。
 [実施の形態11]
 (太陽電池ストリング3の非発電時に故障検査を行う構成)
 本発明のさらに他の実施の形態を図面に基づいて以下に説明する。以上の実施の形態では、検査装置11は、太陽電池ストリング3の発電時に太陽電池ストリング3の故障検査を行う構成となっている。これに対し、本実施の形態では、検査装置11は、太陽電池ストリング3の非発電時に故障検査を行う構成となっている。
 太陽電池ストリング3の非発電時の等価回路は図2に示したものとなる。この場合、静電容量Cdは、検査信号P端子印加および検査信号N端子印加の場合のインピーダンスZp,Znに大きく影響する。そこで、本実施の形態では、静電容量Cdによるインピーダンスを小さくするため、検査信号51として、1kHz~1MHzの範囲において、発電時の故障検査の場合よりも高い周波数のもの(例えば1MHz)を使用する。
 なお、静電容量Cdは、太陽電池モジュール2の種類によって異なるものの、同一の太陽電池モジュール2を使用する太陽電池ストリング3内においては、各太陽電池モジュール2についてほぼ同一である。また、各太陽電池モジュール2の静電容量Cdは、太陽電池モジュール2が直列接続された状態では、直列接続された状態となる。したがって、静電容量Cdによる太陽電池ストリング3のインピーダンスは、直列接続された太陽電池モジュール2の数が多くなるほど、大きくなる。
 また、検査装置11では、故障検査をインピーダンスZp,Znの比(Zn/(Zp+Zn):Zp/(Zp+Zn))の比を求めることにより行うので、静電容量Cpによるインピーダンスが存在している場合であっても、そのインピーダンスの検査結果に及ぼす影響は小さくすることができる。
 また、太陽電池ストリング3の故障検査を太陽電池ストリング3の非発電時に行う検査装置11は、太陽電池ストリング3の故障検査を太陽電池ストリング3の発電時に行う検査装置11と比較して、静電容量Cdの存在により、故障位置の検査精度において劣ることになる。しかしながら、ケーブル断線の有無については、インピーダンスZp,Znを比較することにより判定できるので、太陽電池ストリング3の故障検査を発電時に行う場合と同様に、高い精度にて検出することができる。
 上記の構成によれば、本実施の形態の検査装置11は、前記実施の形態の検査装置11と同様、太陽電池ストリング3の故障の有無、および太陽電池ストリング3の故障位置を高精度に検出することができる。なお、本実施の形態の検査装置11の構成(太陽電池ストリング3の故障検査の手法)は、他の各実施の形態においても適用可能である。
 [まとめ]
 本発明の太陽光発電システムの検査装置は、交流の検査信号を生成する検査信号生成部と、直列接続された複数の太陽電池モジュールを有する太陽電池ストリングの正極に前記検査信号が印加される検査信号正極印加、および前記太陽電池ストリングの負極に前記検査信号が印加される検査信号負極印加が順次行われるように、前記検査信号生成部の接続を切り替える接続切替部と、前記検査信号正極印加の場合と前記検査信号負極印加の場合とについて、前記検査信号が印加された極から故障位置までの前記太陽電池モジュールの数により変化する指標値を計測する指標値計測部と、前記検査信号正極印加の場合に得られた前記指標値と前記検査信号負極印加の場合に得られた前記指標値との比から、前記故障位置を求める故障位置判定部とを備えている構成である。
 上記の構成によれば、検査信号生成部は交流の検査信号を生成する。接続切替部は、直列接続された複数の太陽電池モジュールを有する太陽電池ストリングの正極に検査信号が印加される検査信号正極印加、および太陽電池ストリングの負極に検査信号が印加される検査信号負極印加が順次行われるように、検査信号生成部の接続を切り替える。指標値計測部は、検査信号正極印加の場合と検査信号負極印加の場合とについて、検査信号が印加された極から故障位置までの太陽電池モジュールの数により変化する指標値、例えばインピーダンス、検査信号を印加することにより太陽電池ストリングを流れる電流、あるいは定在波比等を計測する。故障位置判定部は、検査信号正極印加の場合に得られた指標値と検査信号負極印加の場合に得られた指標値との比から、故障位置を求める。
 これにより、検査対象の太陽電池ストリングについて、故障が発生していない状態の指標値(例えばインピーダンス)を予め計測しておく必要がなく、また、天候などにより日々変化する、予め計測した指標値(例えばインピーダンス)を使用することなく、太陽電池ストリングの故障位置を求めることができる。これにより、太陽電池ストリングの故障検査を高精度かつ容易に行うことができる。
 上記の太陽光発電システムの検査装置は、前記太陽電池ストリングが発電状態であるかどうかを検出する状態検出部と、前記状態検出部にて太陽電池ストリングが発電状態であることが検出されたときに、前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を含む各部の動作による前記太陽電池ストリングの故障検査が行われるように、これら各部を制御する第1制御部とを備えている構成としてもよい。
 上記の構成において、太陽電池ストリングが発電状態であるときには、太陽電池モジュールに含まれる抵抗や静電容量等のインピーダンスは、小さくなり、検査信号を正極に印加した場合に得た指標値と負極に印加した場合に得た指標値とに及ぼす影響が小さくなる。この結果、インピーダンス(指標値)から見た太陽電池ストリングの回路は、主として例えば対地間静電容量のみの回路となり、単純化される。したがって、上記の構成によれば、検査信号を正極に印加した場合に得た指標値と負極に印加した場合に得た指標値との比から、太陽電池ストリングの故障検査をさらに高精度に行うことができる。
 上記の太陽光発電システムの検査装置において、前記太陽電池モジュールは、バイパスダイオードが並列に接続され、前記検査信号の電圧は、前記バイパスダイオードの順方向電圧以下の電圧に設定されている構成としてもよい。
 上記の構成によれば、検査信号の電圧は、太陽電池モジュールのバイパスダイオードの順方向電圧以下の電圧に設定されているので、バイパスダイオードにはほとんど電流が流れない。これにより、太陽電池ストリングの正極および負極に検査信号を印加したそれぞれの場合において、太陽電池ストリングの故障位置に対応した適正な指標値を得ることができ、太陽電池ストリングの故障検査を高精度に行うことができる。
 上記の太陽光発電システムの検査装置は、前記太陽電池ストリングにおける地絡の有無を検査する地絡検査部を備え、前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を含む各部の動作による前記太陽電池ストリングの故障検査に先立って、前記地絡検査部による検査が行われ、前記地絡検査部にて前記地絡が検出された場合に、前記故障検査を中止させる第2制御部とを備えている構成としてもよい。
 太陽電池ストリングに地絡が発生している場合には、太陽電池ストリングの故障検査において、太陽電池ストリングの正極および負極に検査信号を印加したそれぞれの場合に得られる指標値が不正確なものとなる。このため、太陽電池ストリングの故障検査を高精度に行うことができない。
 したがって、太陽電池ストリングの故障検査においては、まず、太陽電池ストリングにおける地絡の有無を検査し、地絡が発生している場合には、故障検査を中止することが好ましい。これにより、太陽電池ストリングが無駄に行われる事態を防止することができる。
 上記の太陽光発電システムの検査装置は、前記太陽電池ストリングの出力電流を計測する電流計測部と、前記太陽電池ストリングの出力経路を、電力供給経路と前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を含む各部の動作による前記太陽電池ストリングの故障検査が行われる検査経路との間にて切替える経路切替部と、前記太陽電池ストリングに対して前記故障検査が行われる場合、かつ前記電流計測部にて計測される前記出力電流が所定の閾値以下の場合に、前記太陽電池ストリングの出力経路が前記電力供給経路から前記検査装置に切り替えられるように経路切替部を制御する第3制御部とを備えている構成としてもよい。
 上記の構成によれば、電流計測部は太陽電池ストリングの出力電流を計測し、第3制御部は、太陽電池ストリングに対して故障検査が行われる場合、かつ電流計測部にて計測される前記出力電流が所定の閾値以下の場合に、太陽電池ストリングの出力経路が電力供給経路から検査装置に切り替えられるように経路切替部を制御する。
 これにより、太陽電池ストリングの出力経路を切り替える場合に、アーク発生による悪影響を受けることがなく、また、例えば切替えリレーとして廉価な低耐圧のものを使用可能であり、容易かつ安全に切り替え動作を行うことができる。
 上記の太陽光発電システムの検査装置は、太陽電池ストリングの正極と負極との間の極間電圧、または前記正極と前記負極との間の極間電流を計測する極間計測部と、
 前記極間電流または前記極間電圧が前記太陽電池ストリングのケーブル断線を示すものであった場合に、前記太陽電池ストリングを断線有りと判定する断線判定部とを備えている構成としてもよい。
 上記の構成によれば、極間計測部は、太陽電池ストリングの正極と負極との間の極間電圧、または正極と負極との間の極間電流を計測する。断線判定部は、極間電流または極間電圧が太陽電池ストリングのケーブル断線を示すものであった場合に、太陽電池ストリングを断線有りと判定する。これにより、太陽電池ストリングのケーブル断線を容易かつ高精度に検出することができる。
 上記の太陽光発電システムの検査装置において、前記指標値計測部は、前記検査信号を前記太陽電池ストリングの正極に印加した場合と負極とに印加した場合との各々の場合に計測される電流、または電流および電圧から前記指標値を取得し、前記電流、または前記電流および前記電圧に対してノイズ成分を除去するフィルタ処理を行うフィルタ処理部を含んでいる構成としてもよい。
 上記の構成によれば、フィルタ処理部は、指標値計測部において指標値を求めるのに使用する、検査信号を太陽電池ストリングの正極に印加した場合と負極とに印加した場合との各々の場合に計測される電流、または電流および電圧に対して、ノイズ成分を除去するフィルタ処理を行う。
 これにより、前記指標値計測部は正確な指標値を取得することができ、この結果、太陽電池ストリングの故障検査を高精度に行うことができる。
 上記の太陽光発電システムの検査装置において、前記指標値計測部は、終端インピーダンスを備え、前記太陽電池ストリングの正極と負極とに前記検査信号を順次印加する場合、前記検査信号を印加する極と反対側の極を前記終端インピーダンスを介してグランドに接続する構成としてもよい。
 上記の構成によれば、太陽電池ストリングの検査信号を印加する極とは反対側の極をインピーダンスを介してグランドに接続することにより、検査信号、すなわち検査信号を印加して得られる指標値はノイズの影響を受け難いものとなる。これにより、正確な指標値を得ることができ、太陽電池ストリングの故障検査を高精度に行うことができる。
 上記の太陽光発電システムの検査装置は、前記太陽電池ストリングを複数の小ストリングに分断された状態と分断されていない状態とに切り替えるストリング分断切替部を備え、前記接続切替部は、前記の各小ストリングに対して、前記検査信号正極印加および前記検査信号負極印加が順次行われるように、前記検査信号生成部の接続を切り替え、前記第1制御部は、前記の各小ストリングに対して、前記ストリング分断切替部、前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を含む各部の動作による故障検査が行われるように、これら各部を制御する構成としてもよい。
 上記の構成によれば、ストリング分断部により太陽電池ストリングが複数の小ストリングに分断され、各小ストリングに対してそれぞれ故障検査が行われる。これにより、各小ストリングにそれぞれ故障位置が存在し、太陽電池ストリング全体として複数の故障位置が存在する場合であっても、そこら故障位置を適切に検出することができる。
 上記の太陽光発電システムの検査装置は、太陽電池ストリングの太陽電池モジュールに含まれる、隣り合う太陽電池モジュール同士にて直列接続の状態に存在する直列抵抗の抵抗値を測定する抵抗値測定部と、前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を含む各部の動作による前記太陽電池ストリングの故障検査が、前記直列抵抗の抵抗値が所定の閾値よりも小さい状態にて行われる場合に、前記直列抵抗の抵抗値が所定の閾値よりも大きい状態にて前記故障検査が行われる場合よりも、前記検査信号の周波数を高くする周波数調整部とを備えている構成としてもよい。
 上記の構成によれば、抵抗値測定部は、太陽電池ストリングの太陽電池モジュールに含まれる、隣り合う太陽電池モジュール同士にて直列接続の状態に存在する直列抵抗の抵抗値を測定する。周波数調整部は、太陽電池モジュールの故障検査において、太陽電池モジュールの直列抵抗の抵抗値が所定の閾値よりも小さい場合には、太陽電池モジュールの直列抵抗の抵抗値が所定の閾値よりも大きい場合よりも検査信号の周波数を高くする。
 太陽電池モジュールに含まれる直列抵抗は、劣化することにより抵抗値が徐々に大きくなる。したがって、太陽電池モジュールの劣化が初期の場合には、正常な太陽電池モジュールと故障した太陽電池モジュールでの直列抵抗の抵抗値の差は小さい。このため、故障した太陽電池モジュールの検出が困難である。そこで、太陽電池ストリングの故障検査を直列抵抗の抵抗値が小さい状態において行う場合には、検査信号の周波数を高くする。これにより、太陽電池ストリングのインピーダンスにおいて、相対的に、静電容量のインピーダンスの影響が小さくなり、直列抵抗のインピーダンスの影響が大きくなる。この結果、太陽電池モジュールの直列抵抗の抵抗値が小さい場合であっても、太陽電池ストリングの故障位置を高精度に検出することができる。
 上記の太陽光発電システムの検査装置において、前記検査信号生成部は、一端側がグランドに接続され、他端側が前記正極と前記負極とに順次接続される線路に設けられたスイッチング素子と、前記スイッチング素子にオンオフ動作を繰り返し行わせるオンオフ駆動部とを備えている構成としてもよい。
 上記の構成によれば、検査信号は太陽電池ストリングの電力を利用して生成される。したがって、検査信号を生成するための別途電源が不要となっている。これにより、検査信号を印加する検査信号生成部の構成の小型化および低コスト化が可能となる。
 上記の太陽光発電システムの検査装置において、前記指標値計測部は付加インピーダンスを備え、前記故障位置判定部による前記故障位置を求める第1の判定動作にて故障位置無しと判定された場合に、前記太陽電池ストリングの正極または負極のみが前記付加インピーダンスを介してグランドに接続され、この状態にて前記検査信号正極印加および前記検査信号負極印加が順次行われた後、前記故障位置判定部による第2の判定動作が行われるように、前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を制御する第4制御部を備え、前記故障位置判定部は、前記第2の判定動作にて、前記検査信号正極印加の場合の前記指標値と前記検査信号負極印加の場合の前記指標値とを比較し、これら両指標値が異なる値である場合に、前記太陽電池ストリングの故障位置を太陽電池ストリングの中央の位置と判定する構成としてもよい。
 上記の構成によれば、故障位置判定部による故障位置を求める第1の判定動作にて故障位置無しと判定された場合には、太陽電池ストリングの正極または負極のみが付加インピーダンスを介してグランドに接続され、この状態にて検査信号正極印加および検査信号負極印加が順次行われ、その後、故障位置判定部による第2の判定動作が行われる。故障位置判定部は、第2の判定動作にて、検査信号正極印加の場合の指標値と検査信号負極印加の場合の指標値とを比較し、これら両指標値が異なる場合に、太陽電池ストリングの故障位置を太陽電池ストリングの中央の位置と判定する。
 これにより、太陽電池ストリングの故障位置が太陽電池ストリングの中央位置であっても、故障位置を高精度に検出することができる。
 上記の太陽光発電システムの検査装置において、前記指標値は、インピーダンス、または前記検査信号を印加することにより前記太陽電池ストリングを流れる電流であり、前記太陽電池ストリングの正極と負極とを短絡した両極短絡状態と正極と負極とが短絡していない両極非短絡状態とを切り替える短絡非短絡切替部と、前記指標値計測部による、前記検査信号正極印加の場合および前記検査信号負極印加の場合に前記指標値を計測する第1の指標値計測動作が行われ、前記故障位置判定部による前記故障位置を求める第1の判定動作にて故障位置無しと判定された場合に、前記太陽電池ストリングが前記両極短絡状態となり、この状態にて前記検査信号正極印加または前記検査信号負極印加により前記指標値が計測され、その後、前記故障位置判定部による第2の判定動作が行われるように、前記検査信号生成部、前記接続切替部、前記指標値計測部、前記故障位置判定部および前記短絡非短絡切替部を制御する第5制御部とを備え、前記故障位置判定部は、前記第2の判定動作にて、前記第1の指標値計測動作による前記検査信号正極印加の場合または前記検査信号負極印加の場合の前記指標値と前記両極非短絡状態の場合の前記指標値とを比較し、これら両指標値が異なる場合に、前記太陽電池ストリングの故障位置を太陽電池ストリングの中央の位置と判定する構成としてもよい。
 上記の構成によれば、指標値は、インピーダンス、または前記検査信号を印加することにより前記太陽電池ストリングを流れる電流である。第5制御部は、指標値計測部による、検査信号正極印加の場合および検査信号負極印加の場合に指標値を計測する第1の指標値計測動作が行われ、故障位置判定部による故障位置を求める第1の判定動作にて故障位置無しと判定された場合に、太陽電池ストリングが両極短絡状態となり、この状態にて検査信号正極印加または検査信号負極印加により指標値が計測され、その後、故障位置判定部による第2の判定動作が行われるように、検査信号生成部、接続切替部、指標値計測部、故障位置判定部および短絡非短絡切替部を制御する。故障位置判定部は、第2の判定動作にて、第1の指標値計測動作による検査信号正極印加の場合または検査信号負極印加の場合の指標値と両極非短絡状態の場合の指標値とを比較し、これら両指標値が異なる場合に、太陽電池ストリングの故障位置を太陽電池ストリングの中央の位置と判定する。
 これにより、太陽電池ストリングの故障位置が太陽電池ストリングの中央位置であっても、故障位置を高精度かつ容易に検出することができる。
 上記の太陽光発電システムの検査装置において、前記指標値はインピーダンスであってもよい。
 上記の構成によれば、太陽電池ストリングの正極と負極とに交流の検査信号を順次印加した場合の検査信号の電圧および電流からインピーダンスを求め、このインピーダンスにより、太陽電池ストリングの故障検査を高精度かつ容易に行うことができる。
 上記の太陽光発電システムの検査装置において、前記指標値は前記検査信号を印加することにより前記太陽電池ストリングを流れる電流であってもよい。
 太陽電池ストリングの正極および負極に検査信号を印加した場合、検査信号の電圧は一定であり電流のみが変化する。そこで、指標値を電流のみとすることができる。
 上記の構成によれば、太陽電池ストリングの正極と負極とに交流の検査信号を順次印加した場合の検査信号の電流により、太陽電池ストリングの故障検査を高精度かつ容易に行うことができる。また、太陽電池ストリングの故障検査に検査信号の電流のみを使用するので、太陽電池ストリングの故障検査を簡素化することができる。
 上記の太陽光発電システムの検査装置において、前記指標値は定在波比であってもよい。
 上記の構成によれば、太陽電池ストリングの正極と負極とに交流の検査信号を順次印加した場合の定在波比を求め、この定在波比により、太陽電池ストリングの故障検査を高精度かつ容易に行うことができる。
 本発明の太陽光発電システムの検査方法は、直列接続された複数の太陽電池モジュールを有する太陽電池ストリングの正極と負極とに交流の検査信号を順次印加し、各々の場合について、前記検査信号を印加した極から故障位置までの前記太陽電池モジュールの数により変化する指標値を計測する指標値計測工程と、前記検査信号を正極に印加した場合に得た前記指標値と負極に印加した場合に得た前記指標値との比から、前記故障位置を求める判定工程とを備えていることを特徴としている。
 上記の構成によれば、前記太陽光発電システムの検査装置と同様の作用効果を奏する。
 本発明は上述した各実施形態に限定されるものではなく、請求項に示した範囲で種々の変更が可能であり、異なる実施形態にそれぞれ開示された技術的手段を適宜組み合わせて得られる実施形態についても本発明の技術的範囲に含まれる。
 本発明は、太陽光発電システムの太陽電池モジュールを直列接続して構成された太陽電池ストリングの故障検査に利用することができる。
  1  太陽光発電システム
  2  太陽電池モジュール
  3  太陽電池ストリング
 11  検査装置
 21  PV電圧計測回路(状態検出部、極間計測部)
 22  PV電流計測回路(状態検出部、極間計測部)
 23P 切替えリレー(経路切替部)
 23N 切替えリレー(経路切替部)
 24  検査通電路
 25  切替えリレー(接続切替部)
 26  信号電流計測回路(指標値計測部)
 27  信号注入回路(検査信号生成部)
 28  発振回路(検査信号生成部、オンオフ駆動部)
 29  フィルタ回路(フィルタ処理部)
 31  フィルタ回路(フィルタ処理部)
 30  信号電圧計測回路(指標値計測部)
 32  演算制御装置
 33  地絡検査回路(地絡検査部)
 43  PWM可変部(検査信号生成部、周波数調整部)
 46  インピーダンス演算部(故障位置判定部)
 47  制御部(接続切替部、故障位置判定部、第1~第5制御部、断線判定部、抵     抗値測定部)
 51  検査信号
 61  電流センサ
 63  遮断リレー(ストリング分断切替部)
 64  切替えリレー(接続切替部)
 65  切替えリレー(接続切替部)
 71  太陽電池セル
 72  バイパスダイオード
 81  検査信号生成回路(検査信号生成部)
 82  ソリッドステートリレー(SSR、スイッチング素子)
 85  SWR計測器
 91  リレー(短絡非短絡切替部)
 92  リレー(短絡非短絡切替部)
 Rs  直列抵抗
 Zt1  終端インピーダンス
 Zt2  付加インピーダンス

Claims (17)

  1.  交流の検査信号を生成する検査信号生成部と、
     直列接続された複数の太陽電池モジュールを有する太陽電池ストリングの正極に前記検査信号が印加される検査信号正極印加、および前記太陽電池ストリングの負極に前記検査信号が印加される検査信号負極印加が順次行われるように、前記検査信号生成部の接続を切り替える接続切替部と、
     前記検査信号正極印加の場合と前記検査信号負極印加の場合とについて、前記検査信号が印加された極から故障位置までの前記太陽電池モジュールの数により変化する指標値を計測する指標値計測部と、
     前記検査信号正極印加の場合に得られた前記指標値と前記検査信号負極印加の場合に得られた前記指標値との比から、前記故障位置を求める故障位置判定部とを備えていることを特徴とする太陽光発電システムの検査装置。
  2.  前記太陽電池ストリングが発電状態であるかどうかを検出する状態検出部と、
     前記状態検出部にて太陽電池ストリングが発電状態であることが検出されたときに、前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を含む各部の動作による前記太陽電池ストリングの故障検査が行われるように、これら各部を制御する第1制御部とを備えていることを特徴とする請求項1に記載の太陽光発電システムの検査装置。
  3.  前記太陽電池モジュールは、バイパスダイオードが並列に接続され、
     前記検査信号の電圧は、前記バイパスダイオードの順方向電圧以下の電圧に設定されていることを特徴とする請求項1または2に記載の太陽光発電システムの検査装置。
  4.  前記太陽電池ストリングにおける地絡の有無を検査する地絡検査部を備え、
     前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を含む各部の動作による前記太陽電池ストリングの故障検査に先立って、前記地絡検査部による検査が行われ、前記地絡検査部にて前記地絡が検出された場合に、前記故障検査を中止させる第2制御部とを備えていることを特徴とする請求項1から3のいずれか1項に記載の太陽光発電システムの検査装置。
  5.  前記太陽電池ストリングの出力電流を計測する電流計測部と、
     前記太陽電池ストリングの出力経路を、電力供給経路と前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を含む各部の動作による前記太陽電池ストリングの故障検査が行われる検査経路との間にて切替える経路切替部と、
     前記太陽電池ストリングに対して前記故障検査が行われる場合、かつ前記電流計測部にて計測される前記出力電流が所定の閾値以下の場合に、前記太陽電池ストリングの出力経路が前記電力供給経路から前記検査装置に切り替えられるように経路切替部を制御する第3制御部とを備えていることを特徴とする請求項1から4のいずれか1項に記載の太陽光発電システムの検査装置。
  6.  太陽電池ストリングの正極と負極との間の極間電圧、または前記正極と前記負極との間の極間電流を計測する極間計測部と、
     前記極間電流または前記極間電圧が前記太陽電池ストリングのケーブル断線を示すものであった場合に、前記太陽電池ストリングを断線有りと判定する断線判定部とを備えていることを特徴とする請求項1から5のいずれか1項に記載の太陽光発電システムの検査装置。
  7.  前記指標値計測部は、前記検査信号を前記太陽電池ストリングの正極に印加した場合と負極とに印加した場合との各々の場合に計測される電流、または電流および電圧から前記指標値を取得し、前記電流、または前記電流および前記電圧に対してノイズ成分を除去するフィルタ処理を行うフィルタ処理部を含んでいることを特徴とする請求項1から6のいずれか1項に記載の太陽光発電システムの検査装置。
  8.  前記指標値計測部は、終端インピーダンスを備え、前記太陽電池ストリングの正極と負極とに前記検査信号を順次印加する場合、前記検査信号を印加する極と反対側の極を前記終端インピーダンスを介してグランドに接続することを特徴とする請求項1から7のいずれか1項に記載の太陽光発電システムの検査装置。
  9.  前記太陽電池ストリングを複数の小ストリングに分断された状態と分断されていない状態とに切り替えるストリング分断切替部を備え、
     前記接続切替部は、前記の各小ストリングに対して、前記検査信号正極印加および前記検査信号負極印加が順次行われるように、前記検査信号生成部の接続を切り替え、
     前記第1制御部は、前記の各小ストリングに対して、前記ストリング分断切替部、前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を含む各部の動作による故障検査が行われるように、これら各部を制御することを特徴とする請求項2から8のいずれか1項に記載の太陽光発電システムの検査装置。
  10.  太陽電池ストリングの太陽電池モジュールに含まれる、隣り合う太陽電池モジュール同士にて直列接続の状態に存在する直列抵抗の抵抗値を測定する抵抗値測定部と、
     前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を含む各部の動作による前記太陽電池ストリングの故障検査が、前記直列抵抗の抵抗値が所定の閾値よりも小さい状態にて行われる場合に、前記直列抵抗の抵抗値が所定の閾値よりも大きい状態にて前記故障検査が行われる場合よりも、前記検査信号の周波数を高くする周波数調整部とを備えていることを特徴とする請求項1から9のいずれか1項に記載の太陽光発電システムの検査装置。
  11.  前記検査信号生成部は、一端側がグランドに接続され、他端側が前記正極と前記負極とに順次接続される線路に設けられたスイッチング素子と、
     前記スイッチング素子にオンオフ動作を繰り返し行わせるオンオフ駆動部とを備えていることを特徴とする請求項1から10のいずれか1項に記載の太陽光発電システムの検査装置。
  12.  前記指標値計測部は付加インピーダンスを備え、
     前記故障位置判定部による前記故障位置を求める第1の判定動作にて故障位置無しと判定された場合に、前記太陽電池ストリングの正極または負極のみが前記付加インピーダンスを介してグランドに接続され、この状態にて前記検査信号正極印加および前記検査信号負極印加が順次行われた後、前記故障位置判定部による第2の判定動作が行われるように、前記検査信号生成部、前記接続切替部、前記指標値計測部および前記故障位置判定部を制御する第4制御部を備え、
     前記故障位置判定部は、前記第2の判定動作にて、前記検査信号正極印加の場合の前記指標値と前記検査信号負極印加の場合の前記指標値とを比較し、これら両指標値が異なる場合に、前記太陽電池ストリングの故障位置を太陽電池ストリングの中央の位置と判定することを特徴とする請求項1から11のいずれか1項に記載の太陽光発電システムの検査装置。
  13.  前記太陽電池ストリングの正極と負極とを短絡した両極短絡状態と正極と負極とが短絡していない両極非短絡状態とを切り替える短絡非短絡切替部と、
     前記指標値は、インピーダンス、または前記検査信号を印加することにより前記太陽電池ストリングを流れる電流であり、
     前記指標値計測部による、前記検査信号正極印加の場合および前記検査信号負極印加の場合に前記指標値を計測する第1の指標値計測動作が行われ、前記故障位置判定部による前記故障位置を求める第1の判定動作にて故障位置無しと判定された場合に、前記太陽電池ストリングが前記両極短絡状態となり、この状態にて前記検査信号正極印加または前記検査信号負極印加により前記指標値が計測され、その後、前記故障位置判定部による第2の判定動作が行われるように、前記検査信号生成部、前記接続切替部、前記指標値計測部、前記故障位置判定部および前記短絡非短絡切替部を制御する第5制御部を備え、
     前記故障位置判定部は、前記第2の判定動作にて、前記第1の指標値計測動作による前記検査信号正極印加の場合または前記検査信号負極印加の場合の前記指標値と前記両極非短絡状態の場合の前記指標値とを比較し、これら両指標値が異なる場合に、前記太陽電池ストリングの故障位置を太陽電池ストリングの中央の位置と判定することを特徴とする請求項1から11のいずれか1項に記載の太陽光発電システムの検査装置。
  14.  前記指標値はインピーダンスであることを特徴とする請求項1から12のいずれか1項に記載の太陽光発電システムの検査装置。
  15.  前記指標値は前記検査信号を印加することにより前記太陽電池ストリングを流れる電流であることを特徴とする請求項1から12のいずれか1項に記載の太陽光発電システムの検査装置。
  16.  前記指標値は定在波比であることを特徴とする請求項1から12のいずれか1項に記載の太陽光発電システムの検査装置。
  17.  直列接続された複数の太陽電池モジュールを有する太陽電池ストリングの正極と負極とに交流の検査信号を順次印加し、各々の場合について、前記検査信号を印加した極から故障位置までの前記太陽電池モジュールの数により変化する指標値を計測する指標値計測工程と、
     前記検査信号を正極に印加した場合に得た前記指標値と負極に印加した場合に得た前記指標値との比から、前記故障位置を求める判定工程とを備えていることを特徴とする太陽光発電システムの検査方法。
PCT/JP2015/079303 2014-11-07 2015-10-16 太陽光発電システムの検査方法および検査装置 WO2016072243A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US15/520,177 US10305424B2 (en) 2014-11-07 2015-10-16 Solar photovoltaic system inspection method and inspection apparatus
EP15857665.2A EP3200341B1 (en) 2014-11-07 2015-10-16 Method and device for inspecting photovoltaic power generation system
PCT/JP2015/079303 WO2016072243A1 (ja) 2014-11-07 2015-10-16 太陽光発電システムの検査方法および検査装置

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2014227477A JP6390359B2 (ja) 2014-11-07 2014-11-07 太陽光発電システムの検査方法および検査装置
JP2014-227477 2014-11-07
PCT/JP2015/079303 WO2016072243A1 (ja) 2014-11-07 2015-10-16 太陽光発電システムの検査方法および検査装置

Publications (1)

Publication Number Publication Date
WO2016072243A1 true WO2016072243A1 (ja) 2016-05-12

Family

ID=55908970

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/079303 WO2016072243A1 (ja) 2014-11-07 2015-10-16 太陽光発電システムの検査方法および検査装置

Country Status (4)

Country Link
US (1) US10305424B2 (ja)
EP (1) EP3200341B1 (ja)
JP (1) JP6390359B2 (ja)
WO (1) WO2016072243A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180166589A1 (en) * 2016-12-14 2018-06-14 Omron Corporation Photovoltaic power generation system inspection apparatus and inspection method
CN109314488A (zh) * 2016-06-09 2019-02-05 三菱电机株式会社 太阳能电池串的故障诊断方法以及故障诊断装置
CN110244172A (zh) * 2018-12-28 2019-09-17 国网浙江长兴县供电有限公司 一种户表进线零火线检测系统及方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6665767B2 (ja) 2016-12-09 2020-03-13 オムロン株式会社 検査支援装置およびその制御方法、検査システム、並びに制御プログラム
DE202018104044U1 (de) * 2018-07-13 2019-10-15 Wago Verwaltungsgesellschaft Mbh Erdleiter-Überwachung
JP7306605B2 (ja) * 2019-11-25 2023-07-11 株式会社アイテス 太陽電池ストリングの検査装置、及び検査方法
US11456698B2 (en) 2020-02-28 2022-09-27 University Of Cyprus Early detection of potential induced degradation in photovoltaic systems
WO2022176170A1 (ja) * 2021-02-19 2022-08-25 日本電信電話株式会社 雷防護システム、制御装置、雷防護方法およびプログラム
JP7360225B1 (ja) * 2023-03-28 2023-10-12 日本カーネルシステム株式会社 太陽電池ストリングの監視装置及び地絡異常位置特定方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012084809A (ja) * 2010-10-14 2012-04-26 Mitsubishi Electric Corp 太陽電池モジュールの故障診断装置および方法
JP2012238716A (ja) * 2011-05-11 2012-12-06 Hitachi Cable Ltd 太陽電池パネルの異常検知装置
JP2012256771A (ja) * 2011-06-10 2012-12-27 System Jd:Kk 故障診断方法及び被診断体

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4604250B2 (ja) 2006-10-05 2011-01-05 独立行政法人産業技術総合研究所 太陽電池アレイ故障診断方法
JP4780416B2 (ja) 2007-07-11 2011-09-28 独立行政法人産業技術総合研究所 太陽電池アレイ故障診断方法
JP2010206357A (ja) * 2009-03-02 2010-09-16 Fujitsu Ltd 無線送受信装置
CN102869997A (zh) 2010-05-18 2013-01-09 Sma太阳能技术股份公司 用于诊断光伏系统及装置的接触的方法
JP5819602B2 (ja) 2010-11-29 2015-11-24 Jx日鉱日石エネルギー株式会社 地絡検出装置、地絡検出方法、太陽光発電システム、及び地絡検出プログラム
EP2710388B1 (en) * 2011-05-20 2021-05-19 SMA Solar Technology AG Method and system for detecting an arc fault in a power circuit
JP5642031B2 (ja) * 2011-08-01 2014-12-17 Jx日鉱日石エネルギー株式会社 地絡検出装置、地絡検出方法、太陽光発電システム、及び地絡検出プログラム
JP5642030B2 (ja) * 2011-08-01 2014-12-17 Jx日鉱日石エネルギー株式会社 地絡検出装置、地絡検出方法、太陽光発電システム、及び地絡検出プログラム
JP5841906B2 (ja) * 2012-07-03 2016-01-13 Jx日鉱日石エネルギー株式会社 故障検知装置、故障検知システム、及び故障検知方法
DE102013101314A1 (de) * 2013-02-11 2014-08-14 Phoenix Contact Gmbh & Co. Kg Sichere Photovoltaik-Anlage
US9621104B2 (en) * 2013-05-13 2017-04-11 General Electric Company Method and apparatus for registering conditions of performance in a photovoltaic array
DE102013227174B4 (de) * 2013-12-27 2019-06-19 Fronius International Gmbh Vorrichtung und Verfahren zur Ermittlung eines Isolationswiderstandes einer Photovoltaikanlage

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012084809A (ja) * 2010-10-14 2012-04-26 Mitsubishi Electric Corp 太陽電池モジュールの故障診断装置および方法
JP2012238716A (ja) * 2011-05-11 2012-12-06 Hitachi Cable Ltd 太陽電池パネルの異常検知装置
JP2012256771A (ja) * 2011-06-10 2012-12-27 System Jd:Kk 故障診断方法及び被診断体

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109314488A (zh) * 2016-06-09 2019-02-05 三菱电机株式会社 太阳能电池串的故障诊断方法以及故障诊断装置
US20180166589A1 (en) * 2016-12-14 2018-06-14 Omron Corporation Photovoltaic power generation system inspection apparatus and inspection method
EP3337034B1 (en) * 2016-12-14 2019-12-04 Omron Corporation Method of inspection of photovoltaic power generation
US10727357B2 (en) * 2016-12-14 2020-07-28 Omron Corporation Photovoltaic power generation system inspection apparatus and inspection method
CN110244172A (zh) * 2018-12-28 2019-09-17 国网浙江长兴县供电有限公司 一种户表进线零火线检测系统及方法

Also Published As

Publication number Publication date
US10305424B2 (en) 2019-05-28
EP3200341B1 (en) 2018-12-12
US20170310276A1 (en) 2017-10-26
EP3200341A4 (en) 2018-03-14
EP3200341A1 (en) 2017-08-02
JP2016093039A (ja) 2016-05-23
JP6390359B2 (ja) 2018-09-19

Similar Documents

Publication Publication Date Title
JP6390359B2 (ja) 太陽光発電システムの検査方法および検査装置
US9176201B2 (en) Ground fault detection device, ground fault detection method, solar energy system, and ground fault detection program
JP6113220B2 (ja) 太陽電池検査装置および太陽電池検査方法
US8766661B2 (en) Malfunction detecting device for solar cell panel
JP4780416B2 (ja) 太陽電池アレイ故障診断方法
US20130088252A1 (en) Method for diagnosis of contacts of a photovoltaic system and apparatus
JP6158916B2 (ja) 蓄電装置の異常検出回路およびそれを備えた蓄電装置
US10509068B2 (en) Test device for a photovoltaic system having solar cell string
US11404999B2 (en) Method for detecting a contact fault in a photovoltaic system
WO2016199445A1 (ja) 太陽光発電システムの検査方法および検査装置
JP6702168B2 (ja) 太陽光発電システムの検査装置および検査方法
KR20160002378A (ko) 배터리 상태 감시 회로 및 배터리 장치
JP6428396B2 (ja) 太陽光発電システムの検査方法および検査装置
JP2016123232A (ja) 太陽電池の検査方法およびその装置並びに太陽電池検査装置に用いられる信号源
CN103713273B (zh) 一种避雷器泄漏电流监视器故障诊断装置
JP2001035759A (ja) コンデンサのインピーダンス測定装置
JP6189199B2 (ja) コンタクト検査装置、コンタクト検査方法及び電子部品
US11984743B2 (en) Battery pack and charging method for a battery pack
US20210296918A1 (en) Battery pack and charging method for a battery pack
CN117269721A (zh) 一种带有保护电路的电源类芯片自动测试系统及方法
JP2013167521A (ja) 太陽光発電設備の絶縁測定装置及び太陽光発電設備の絶縁測定方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15857665

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 15520177

Country of ref document: US

REEP Request for entry into the european phase

Ref document number: 2015857665

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE