WO2015129321A1 - エネルギー管理システム、及びプログラム - Google Patents

エネルギー管理システム、及びプログラム Download PDF

Info

Publication number
WO2015129321A1
WO2015129321A1 PCT/JP2015/051026 JP2015051026W WO2015129321A1 WO 2015129321 A1 WO2015129321 A1 WO 2015129321A1 JP 2015051026 W JP2015051026 W JP 2015051026W WO 2015129321 A1 WO2015129321 A1 WO 2015129321A1
Authority
WO
WIPO (PCT)
Prior art keywords
power storage
storage battery
storage device
information
management system
Prior art date
Application number
PCT/JP2015/051026
Other languages
English (en)
French (fr)
Inventor
直晃 荻野
裕司 小寺
内田 丈
Original Assignee
日立マクセル株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立マクセル株式会社 filed Critical 日立マクセル株式会社
Publication of WO2015129321A1 publication Critical patent/WO2015129321A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00004Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/0048Detection of remaining charge capacity or state of charge [SOC]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/007Regulation of charging or discharging current or voltage
    • H02J7/0071Regulation of charging or discharging current or voltage with a programmable schedule
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Definitions

  • the present invention relates to an energy management system and a program.
  • a power storage device is provided in a predetermined area such as a house, a building, or a region, and an energy management system that acquires information such as power consumption in various devices in the predetermined area by the power receiving unit and the power storage device is installed.
  • a technique for providing information such as power consumption to a user is known.
  • JP2013-236519A discloses information on rate plans that vary in electricity charges by time zone and unit prices of electricity charges for system power from an information center connected to a HEMS (Home Energy Management System) via a communication network.
  • HEMS Home Energy Management System
  • a technology is disclosed in which HEMS acquires information and sets the charge / discharge time of the storage battery based on the rate plan and the unit price of the electricity rate.
  • JP 2013-246455 A communicates with the home gateway connected to the HEMS and the server device via the IP network, and according to the operation control instruction transmitted from the server device to the home gateway.
  • a technique for controlling each electrical device and power storage device connected to the HEMS is disclosed.
  • JP2013-236519A and JP2013-246455A by controlling devices in a predetermined area based on information transmitted from a server that is connected in communication with the energy management system, Power consumption can be reduced and electricity charges can be saved.
  • a power storage device installed in the energy management system has a built-in storage battery that can be repeatedly charged and discharged. Due to the nature of the storage battery, it is desired that the state of the storage battery is constantly monitored and maintained and managed more reliably.
  • the object of the present invention is to provide a technique capable of more reliably performing maintenance and management of a storage battery in an energy management system.
  • An energy management system includes a storage battery provided in a predetermined area, a power storage device connected via a first communication path to a management device that controls power in the predetermined area, and the management device And a maintenance server connected to the power storage device via a second communication path different from the first communication path, and the power storage device includes a storage battery related to the storage battery in the power storage device.
  • the information is sequentially transmitted at a predetermined timing, and the maintenance server stores in the storage unit an acquisition unit that acquires the storage battery information from the power storage device, a storage unit that stores the storage battery information acquired by the acquisition unit, And a monitoring unit that monitors the state of the storage battery in the power storage device based on the stored storage battery information.
  • FIG. 1 is a schematic diagram showing an energy management system according to the first embodiment.
  • FIG. 2 is a block diagram illustrating the configuration of the power storage device illustrated in FIG. 1.
  • FIG. 3 is a block diagram illustrating the configuration of the maintenance server shown in FIG. 4A is a diagram showing an example of the data structure of the user information DB shown in FIG. 4B is a diagram illustrating a data structure example of the storage battery information DB illustrated in FIG. 3.
  • FIG. 4C is a diagram illustrating a data structure example of the abnormality information DB illustrated in FIG. 3.
  • FIG. 5 is a schematic diagram illustrating a configuration example of the energy management system according to the second embodiment.
  • FIG. 6 is a block diagram illustrating a configuration example of the maintenance server illustrated in FIG. FIG.
  • FIG. 7 is a block diagram illustrating a configuration example of the maintenance server in the third embodiment.
  • FIG. 8 is a diagram schematically showing a temporal change in voltage and current by the constant current constant voltage charging method.
  • FIG. 9 is a diagram schematically showing changes in voltage and current with time when constant current and constant voltage charging is performed by the soft start method.
  • FIG. 10 is a diagram schematically showing changes in voltage and current with time when constant current and constant voltage charging is performed by the soft start method.
  • FIG. 11 is a block diagram illustrating a configuration example of a maintenance server according to the fourth embodiment.
  • FIG. 12 is a flowchart showing the operation of the automatic check mode of the power storage device in the fourth embodiment.
  • FIG. 13 is a block diagram illustrating a configuration example of the maintenance server in the fifth embodiment.
  • FIG. 14 is a flowchart showing the operation of the maintenance server in the modification (11).
  • An energy management system includes a storage battery provided in a predetermined area, and a power storage device connected via a first communication path to a management device that controls power in the predetermined area.
  • a maintenance server connected to the power storage device via a second communication path different from the first communication path without passing through the management device, the power storage device being connected to the maintenance server in the power storage device.
  • the storage battery information regarding the storage battery is sequentially transmitted at a predetermined timing, and the maintenance server acquires the storage battery information from the power storage device, the storage unit stores the storage battery information acquired by the acquisition unit, and And a monitoring unit that monitors a state of the storage battery in the power storage device based on the storage battery information stored in the storage unit.
  • the power storage device installed in the predetermined area is connected to the management device that controls power in the predetermined area via the first communication path, and the maintenance server is connected to the first storage device without the management device.
  • the power storage device is connected via a second communication path different from the one communication path.
  • the maintenance server acquires and stores storage battery information sequentially transmitted from the power storage device at a predetermined timing, and monitors the state of the storage battery in the power storage device based on the stored storage battery information. When the storage battery information is transmitted to the maintenance server via the management device, the storage battery information cannot be transmitted to the maintenance server if a failure occurs in the first communication path.
  • the power storage device and the maintenance server are connected via the second communication path different from the first communication path without using the management device, the storage battery information is transmitted to the maintenance server more reliably.
  • the state of the storage battery can be monitored, and the storage battery can be maintained and managed.
  • the storage battery information may include at least one of a temperature, a voltage, and a capacity of the storage battery.
  • the maintenance server can monitor the state of the storage battery based on at least one of the temperature, voltage, and capacity of the storage battery.
  • the power storage device further transmits abnormality information indicating abnormality of the storage battery in the power storage device to the management device, and transmits the abnormality information to the maintenance server, and the acquisition unit Further, the abnormality information may be acquired from the power storage device. According to this configuration, the abnormality of the storage battery can be grasped in the management device, and the storage battery having the abnormality in the maintenance server can be easily identified.
  • the power storage device acquires device information indicating a state of a device connected to the management device via the first communication path, and performs the maintenance via the second communication path.
  • the information may be transmitted to a server, and the acquisition unit may further acquire the device information from the power storage device.
  • the power storage device can acquire the device information of the device connected to the management device and transmit the device information to the maintenance server. Therefore, in the maintenance server, the state of the device installed in a predetermined area can be determined. Can be confirmed.
  • the monitoring unit predicts an expiration date of the storage battery in the power storage device based on the storage battery information of the power storage device stored in the storage unit, and the maintenance server Furthermore, it is good also as including the notification part which notifies replacement
  • the maintenance server can notify the power storage device of replacement of the storage battery according to the storage battery usable time limit in the power storage device, so that the user can use the storage battery more safely. Become.
  • the power storage device further transmits a measurement result of a charge / discharge capacity of the power storage device in the power storage device over a predetermined period to the maintenance server, and the maintenance server further includes the power storage device from the power storage device.
  • a charge setting unit that acquires the measurement result and sets a charge amount corresponding to the acquired measurement result for the power storage device may be included.
  • the maintenance server can charge according to the charge / discharge capacity of the storage battery in the power storage device.
  • the energy management system may further include the management device.
  • the energy management system may further include a management server connected to the management device via a third communication path different from the first communication path and the second communication path. According to this configuration, communication can be performed between the management apparatus and the management server.
  • the energy management system may further include an information terminal provided in the predetermined area and connected to the maintenance server and the power storage device via the second communication path. According to this configuration, in addition to communication between the power storage device and the maintenance server, communication can be performed between the information terminal and the power storage device, and between the information terminal and the maintenance server.
  • the power storage device may have an inspection mode in which the storage battery is fully charged after a predetermined time has elapsed after the storage battery is completely discharged and the capacity of the storage battery is measured. According to this configuration, in the power storage device, it is possible to check the more accurate capacity of the storage battery in the power storage device.
  • a plurality of the power storage devices connected to the plurality of management devices via the first communication path are installed in the predetermined area, and the maintenance server includes the plurality of storage devices.
  • the storage unit is connected to each of the plurality of power storage devices via the second communication path without passing through each of the management devices, and the storage unit stores the plurality of storage battery information of the plurality of power storage devices for each power storage device.
  • the monitoring unit may monitor the state of the storage battery in the power storage device for each power storage device based on the storage battery information for each power storage device stored in the storage unit.
  • the plurality of power storage devices are connected to the plurality of management devices provided in the predetermined area through the first communication path, and the maintenance server is connected to each power storage device and the power storage device. The connection is made via the second communication path without going through the management device. Therefore, the maintenance server can more reliably acquire the storage battery information for each power storage device in the predetermined area and monitor the state of the storage battery in the power storage device.
  • the predetermined area may be a predetermined specific area.
  • the maintenance server can monitor the state of each storage battery in a plurality of power storage devices installed in a specific area.
  • the predetermined area may be a housing complex in which a plurality of dwelling units are assembled, and the power storage device and the management device may be installed in each of the plurality of dwelling units.
  • the maintenance server can monitor the state of the storage battery in each power storage device installed in a plurality of dwelling units in the apartment house.
  • each of the plurality of power storage devices is an inspection mode in which the storage battery in the power storage device is completely discharged and then the storage battery is fully charged after a predetermined time has elapsed and the capacity of the storage battery is measured.
  • the storage unit stores legal inspection dates for electrical equipment in the apartment house
  • the maintenance server further stores the legal inspection dates stored in the storage unit for the plurality of power storage devices. It is good also as including the inspection mode control part which avoids and sets the operation timing of the said inspection mode. According to this configuration, the plurality of power storage devices in the apartment house can execute the inspection mode while avoiding the legal inspection date.
  • the plurality of power storage devices may transmit the storage battery information to the maintenance server at different timings. According to this configuration, communication traffic between the plurality of power storage devices and the maintenance server can be reduced as compared with the case where the storage battery information is simultaneously acquired from the plurality of power storage devices.
  • each of the plurality of power storage devices includes a charging unit that charges the storage battery in the power storage device
  • the plurality of charging units of the plurality of power storage devices includes a first charging method and Charging is performed using at least one of the second charging methods
  • the first charging method is configured such that the plurality of charging units are mutually connected based on a charging start time preset in the plurality of power storage devices.
  • It is a charging method for charging at different timings
  • the second charging method may be a charging method for starting charging by a soft start method. According to this configuration, since charging is started at mutually different timings in the plurality of power storage devices or charging is performed by the soft start method, in the apartment house when each of the plurality of power storage devices charges the storage battery The instantaneous load of power can be reduced.
  • each of the plurality of power storage devices may maintain the abnormality information when the predetermined time elapses after transmission of the abnormality information indicating the abnormality of the power storage device.
  • the maintenance server may further include a setting unit that sets the predetermined time for each power storage device. According to this configuration, each of the plurality of power storage devices transmits the abnormality information to the maintenance server when a predetermined time set for each power storage device has elapsed after transmitting the abnormality information to the management device.
  • a program according to an embodiment of the present invention is a program for causing a computer to execute an operation of a maintenance server in the energy management system, and sequentially acquiring the storage battery information from the power storage device at a predetermined timing;
  • a storage step of storing the storage battery information acquired in the acquisition step and a monitoring step of monitoring the state of the storage battery in the power storage device based on the storage battery information stored in the storage step are executed in a computer
  • FIG. 1 is a schematic diagram showing an energy management system according to the present embodiment.
  • the energy management system 1 according to the present embodiment is installed in a HEMS 10 installed for each house (hereinafter referred to as a user's house) and a management company that manages the operation of the HEMS 10. It has a HEMS management server 20 and a maintenance server 30 installed in a maintenance company that performs maintenance and management of the power storage device 13.
  • the HEMS 10, the HEMS management server 20, and the maintenance server 30 are connected to a communication network 2 such as the Internet.
  • a communication network 2 such as the Internet.
  • the HEMS management server 20 includes a CPU (Central Processing Unit), a memory including a RAM (Random Access Memory) and a ROM (Read Only Memory), and a communication interface (all not shown).
  • the CPU executes a control program stored in the ROM
  • the HEMS management server 20 is connected to the management device 11 of the HEMS 10 via the communication network 2 via the communication interface, and the management device 11 transmits information about the HEMS 10 (HEMS). Information).
  • the HEMS information includes, for example, information such as power consumption in the HEMS 10.
  • the HEMS 10 includes a management device 11, a HUB 12, a power storage device 13, a device group 14 (14a to 14n), a router 15, and a distribution board 16, as shown in FIG.
  • ECHONET Lite As the communication protocol of HEMS 10, for example, ECHONET Lite is used, and a LAN (Local Area Network) such as Ethernet (registered trademark) is used as a lower layer.
  • the communication protocol of the HEMS 10 includes ECHONET, SEP2.0 (Smart Energy Profile 2.0), KNX, etc. in addition to ECHONET Lite.
  • the router 15 has a LAN interface and a WAN (Wide Area Network) interface.
  • the LAN interface of the router 15 is connected to the management device 11, the HUB 12, and the power storage device 13, and the WAN interface of the router 15 is connected to a broadband line at the user's home.
  • the management device 11 is connected to a power storage device 13 and a device group 14 compliant with ECHONET Lite, and the management device 11 and the power storage device 13 and the device group 14 are based on a protocol defined in a lower layer of ECHONET Lite. Communication is performed with each other via a communication path (first communication path). Further, the management apparatus 11 is connected to the communication network 2 via the WAN interface of the router 15 and can communicate with the HEMS management server 20 via a communication path (third communication path) for connecting to the HEMS management server 20. It has become.
  • the power storage device 13 can communicate with the maintenance server 30 via a communication path (second communication path) for connecting to the maintenance server 30 via the WAN interface of the router 15 without going through the management device 11. It has become. Note that the first communication path and the second communication path may be physically different communication paths, or may be logically different communication paths. In short, it is only necessary that the maintenance server 30 and the power storage device 13 communicate with each other via a communication path different from the communication path in the HEMS 10 without using the management device 11.
  • the management device 11 is provided with a LAN interface, and the devices 14a and 14b are connected to the LAN interface.
  • Devices 14c to 14n are connected to the HUB 12.
  • the devices 14a to 14n are devices that consume power, such as lighting, refrigerators, televisions, and air conditioners that are compatible with ECHONET Lite.
  • the device group 14 is connected to the distribution board 16 and the power storage device 13 via a power line (not shown), and is supplied with power from the distribution board 16 or the power storage device 13 under the control of the management device 11, and performs a predetermined operation. I do.
  • Each of the device groups 14 sends device information about the device including error information generated in the device to the first communication path.
  • the management device 11 includes a CPU, a memory including a RAM and a ROM, a display unit, an operation unit, and a bag communication unit (all not shown).
  • the display unit includes, for example, a liquid crystal display, and displays various information such as an operation screen, power consumption at the user's house, and the usage state of the device group 14.
  • the operation unit has a touch panel provided on the display unit, and accepts user operations.
  • the communication unit communicates with the power storage device 13 and the device group 14 in the user's home, and connects to the communication network 2 via the router 15 to communicate with the HEMS management server 20.
  • the management device 11 controls the operation of the power storage device 13 and the device group 14 according to a preset operation schedule of the HEMS 10, for example. To control. In addition, the management device 11 measures the amount of power supplied from the distribution board 16 to the power storage device 13 and the device group 14 at predetermined time intervals by a power amount measurement sensor (not shown) provided on the distribution board 16. Display the measurement result on the display. Furthermore, the management device 11 is connected to the HEMS management server 20 via the communication network 2 by the router 15 and transmits HEMS information such as power consumption at regular intervals. In addition, when the management device 11 receives a notification notifying the abnormality of the storage battery 131 (see FIG. 2) from the power storage device 13 described later, the management device 11 notifies the HEMS management server 20 of the abnormality of the storage battery 131 via the communication network 2.
  • the power storage device 13 is connected to the management device 11 via the router 15.
  • the power storage device 13 is connected to the communication network 2 by the router 15 at a predetermined timing, and communicates with the maintenance server 30 via the communication network 2.
  • the power storage device 13 transmits information related to the storage battery 131 (hereinafter referred to as storage battery information) and abnormality information indicating abnormality of the storage battery 131 to the maintenance server 30 via the second communication path. Details of the storage battery information and abnormality information will be described later.
  • the power storage device 13 receives device information such as error information transmitted from each of the device groups 14 connected to the management device 11 via the first communication path, and receives the device information via the second communication route. Transmit to the maintenance server 30.
  • the power storage device 13 inquires of the maintenance server 30 about the transmission frequency of the storage battery information, the expiration date of use of the storage battery 131, and the like via the second communication path, and transmits the transmission frequency and the expiration date of use transmitted from the maintenance server 30. The operation is performed based on various information.
  • FIG. 2 is a block diagram illustrating the configuration of the power storage device 13.
  • the power storage device 13 includes a storage battery 131, a temperature sensor 131a, a capacity measurement sensor 131b, a voltage detection sensor 131c, a control unit 132, an inverter 133, a communication interface 134, and a notification unit 135.
  • the storage battery 131 is a rechargeable secondary battery, and a lithium ion battery is used in this embodiment.
  • the storage battery 131 stores the DC power converted by the inverter 133.
  • a temperature sensor 131a, a capacity measurement sensor 131b, and a voltage detection sensor 131c are connected to the storage battery 131.
  • the temperature sensor 131a outputs the result of measuring the temperature of the storage battery 131 to the control unit 132 at regular intervals.
  • the capacity measurement sensor 131b detects the current input / output in the storage battery 131 at regular intervals, and outputs the result of measuring the capacity of the storage battery 131 to the control unit 132.
  • the voltage detection sensor 131c outputs the result of detecting the voltage of the storage battery 131 to the control unit 132 at regular time intervals.
  • the inverter 133 converts the AC power supplied from the distribution board 16 to DC power corresponding to the voltage of the storage battery 131 and outputs it to the storage battery 131 and is discharged from the storage battery 131 under the control of the control unit 132.
  • the DC power is converted into AC power having a predetermined voltage and output to the device group 14.
  • the communication interface 134 communicates with the maintenance server 30 connected to the communication network 2 via the router 15 under the control of the control unit 132 and also communicates with the management apparatus 11 via the router 15.
  • the notification unit 135 includes a plurality of LEDs (Light Emitting Diodes) provided so as to be visible from the outside of the power storage device 13, and a speaker.
  • the notification unit 135 lights the LED under the control of the control unit 132 and outputs a predetermined sound from the speaker.
  • the control unit 132 includes a CPU and a memory including a RAM and a ROM.
  • the control unit 132 controls each unit connected to the control unit 132 and exchanges data with the maintenance server 30 or the management device 11 by the CPU executing a control program stored in the ROM. This will be specifically described below.
  • the control unit 132 controls charging and discharging of the storage battery 131.
  • the function of charging the storage battery 131 in the control unit 132 is referred to as a charging unit, and the function of discharging the storage battery 131 is referred to as a discharging unit.
  • the control unit 132 transmits the storage battery information to the maintenance server 30 via the communication interface 134 at a predetermined transmission timing.
  • the storage battery information includes the temperature detected by the temperature sensor 131a, the capacity detected by the capacity measurement sensor 131b, and the voltage value detected by the voltage detection sensor 131c.
  • the storage battery information is transmitted to the maintenance server 30 at a predetermined transmission frequency (for example, every 15 minutes).
  • the transmission timing of the storage battery information is different from the timing at which the HEMS information is transmitted from the management device 11.
  • the transmission frequency of the storage battery information is set in advance in the power storage device 13, but the control unit 132 inquires of the transmission frequency to the maintenance server 30 to be described later, and stores the storage battery information at the transmission frequency acquired from the maintenance server 30. 30.
  • the inquiry about the transmission frequency to the maintenance server 30 may be performed, for example, every predetermined time or may be performed when the storage battery information is transmitted.
  • the control unit 132 transmits abnormality information indicating abnormality of the storage battery 131 to the management device 11 and also transmits it to the maintenance server 30.
  • the abnormality information is transmitted to the management device 11 and the maintenance server 30 when the control unit 132 determines that the storage battery 131 is abnormal. Whether or not the storage battery 131 is abnormal is determined based on a predetermined threshold value (hereinafter referred to as a first threshold value) corresponding to each of temperature, capacity, and voltage value.
  • a predetermined threshold value hereinafter referred to as a first threshold value
  • the detected temperature is equal to or higher than the predetermined temperature T1 (° C.), or when the detected capacity is equal to or lower than the predetermined capacity C1 (%), or the detected voltage value is predetermined
  • the voltage value V1 is equal to or greater than V1
  • the control unit 132 determines that the storage battery 131 is abnormal
  • the control unit 132 transmits abnormality information including the storage battery information determined to be abnormal to the management device 11 and also transmits the abnormality information to the maintenance server 30 via the communication interface 134.
  • the notification unit 135 turns on an LED indicating the abnormality of the storage battery 131 and outputs a notification sound indicating the abnormality of the storage battery 131 from the speaker.
  • control unit 132 inquires of the maintenance server 30 about the expiration date of the storage battery 131, and acquires replacement information indicating the expiration date of the storage battery 131 from the maintenance server 30.
  • the inquiry about the usable time limit to the maintenance server 30 may be performed, for example, every predetermined period, or may be performed when the storage battery information is transmitted.
  • the control unit 132 receives the replacement information of the storage battery 131 from the maintenance server 30, the control unit 132 turns on an LED indicating the replacement of the storage battery 131 at a timing before a usable period indicated by the replacement information, and replaces the storage battery 131 from the speaker.
  • a notification sound indicating is output.
  • control unit 132 when receiving the device information transmitted from each of the device groups 14, the control unit 132 transmits the received device information to the maintenance server 30 via the communication interface 134.
  • FIG. 3 is a block diagram illustrating a configuration example of the maintenance server 30.
  • the maintenance server 30 includes a control unit 31, a communication interface 32, a storage unit 33, a display unit 34, and an operation unit 35.
  • the storage unit 33 is composed of a nonvolatile storage medium such as a hard disk.
  • the storage unit 33 includes a user information DB (Database) 33a, a storage battery information DB 33b, and an abnormality information DB 33c. Details of the user information DB 33a, the storage battery information DB 33b, and the abnormality information DB 33c will be described later.
  • the display unit 34 has a display such as a liquid crystal display, for example, and displays various data such as information on the storage battery 131 and user information under the control of the control unit 31.
  • the operation unit 35 has an input device such as a keyboard.
  • the operation unit 35 receives an operation of the input device by the operator, and outputs a signal indicating the content of the received operation to the control unit 31.
  • the control unit 31 includes a CPU and a memory including a RAM and a ROM.
  • the control unit 31 implements the functions of the acquisition unit 311, the notification unit 312, and the monitoring unit 313 when the CPU executes a control program stored in the ROM. Each function will be described below.
  • the acquisition unit 311 is connected to the power storage device 13 via the communication network 32 via the communication interface 32, acquires storage battery information from the power storage device 13 at regular intervals, and stores the acquired storage battery information in the storage battery information DB 33b of the storage unit 33. To do. In addition, when the acquisition unit 311 acquires abnormality information from the power storage device 13, the acquisition unit 311 stores the acquired abnormality information in the abnormality information DB 33c. Further, when acquiring the device information transmitted from the device group 14, the acquiring unit 311 stores the acquired device information in a predetermined storage area in the storage unit 33 for each power storage device 13.
  • the monitoring unit 313 monitors the state of the storage battery 131 in the power storage device 13 based on the storage battery information for each power storage device 13 stored in the storage battery information DB 33b.
  • the monitoring unit 313 determines whether or not the storage battery 131 in the power storage device 13 is in a state of issuing a warning (hereinafter, a warning state). Judging. The determination as to whether or not the warning state is present is made based on a second threshold different from the first threshold (T1, C1, V1) corresponding to each of the temperature, capacity, and voltage values included in the storage battery information.
  • T1, C1, V1 the first threshold
  • the monitoring unit 313 has C2 (> C1).
  • the transmission frequency (for example, every 15 minutes) of storage battery information preset in the power storage device 13 determined to be in the warning state is set as the transmission frequency. Higher transmission frequency (for example, every 5 minutes).
  • the monitoring unit 313 estimates the expiration date of the storage battery 131 of each power storage device 13 based on the storage battery information for a certain period for each power storage device 13. That is, the monitoring unit 313 is based on the storage battery information for a certain period of the power storage device 13 in the storage battery information DB 33b and the usage conditions (temperature, voltage, and capacity) for the preset useful life of the storage battery 131. Estimate the expiration date of Specifically, for example, when the average value of the temperature in the storage battery information for a certain period of a certain power storage device 13 is higher than the temperature determined by the use conditions, the monitoring unit 313 stores the storage battery of that power storage device 13. As the usable period 131, a usable period that is shorter than the usable period defined by the preset useful life is estimated.
  • the notification unit 312 makes various notifications to the user or the power storage device 13 via the communication interface 32. Specifically, when the acquisition unit 311 stores abnormality information in the abnormality information DB 33b, the notification unit 311 reads out user information corresponding to the power storage device 13 that has transmitted the abnormality information from the user information DB 33a. And the notification part 312 transmits the mail which shows that the storage battery 131 is abnormal to the mail address of the read user information via the communication interface 32 as a destination. In this case, when the abnormality information is stored in the abnormality information DB 33b, the notification unit 312 reads the user information of the power storage device 13 that has transmitted the abnormality information from the user information DB 33a, and displays the read user information on the display unit 34. The operator of the maintenance server 30 may be notified that the abnormality information has been acquired. Thus, the operator can refer to the user by telephone or the like that the storage battery 131 is abnormal by referring to the telephone number of the displayed user information.
  • the notification unit 312 is set by the monitoring unit 313 for the power storage device 13 in which the storage unit 131 is determined to be in a warning state by the monitoring unit 313 in response to an inquiry about the transmission frequency from the power storage device 13. Information indicating the transmission frequency is transmitted via the communication interface 32. On the other hand, for the power storage device 13 that has not been determined to be in a warning state, the notification unit 312 sends information indicating the same transmission frequency as the transmission frequency preset for the power storage device 13 via the communication interface 32. To send.
  • the notification unit 312 sends exchange information indicating the usable period estimated for each power storage device 13 in the monitoring unit 313 to the power storage device 13 in response to an inquiry about the usable time limit of the storage battery 131 from the power storage device 13. Transmit via the communication interface 32.
  • FIG. 4A is a diagram illustrating a data structure example of the user information DB 33a.
  • the user information DB 33a stores, as user information, data such as a user name, an email address, a telephone number, and an address for each power storage device ID that identifies the power storage device 13 in each user house. Yes.
  • the mail address and the telephone number are stored as, for example, a mail address and a telephone number set for the mobile phone owned by the user as the emergency contact information of the user.
  • the user information is registered by the operator when the power storage device 13 is installed in the HEMS 10, and updated as needed.
  • FIG. 4B is a diagram illustrating a data structure example of the storage battery information DB 33b. As illustrated in FIG. 4B, the storage battery information DB 33b sequentially stores storage battery information (temperature, voltage, capacity) acquired from the power storage device 13 in order of reception time for each power storage device ID.
  • storage battery information temperature, voltage, capacity
  • FIG. 4C is a diagram illustrating a data structure example of the abnormality information DB 33c.
  • the abnormality information DB 33c stores, for each power storage device ID, storage battery information (temperature, voltage, capacity) included in the abnormality information acquired from the power storage device 13 together with the reception time of the abnormality information.
  • the abnormality information is transmitted at a timing at which the storage battery 131 is determined to be abnormal in the power storage device 13, and is stored for each power storage device ID each time the abnormality information is transmitted.
  • abnormality information is received from the power storage device 13 with the power storage device ID “10003” at the reception time “2013/12/20 13:40”, and the storage battery determined to be abnormal in the power storage device 13 in this abnormality information.
  • An example in which information (temperature tx, voltage vx, capacity cx) is included is shown.
  • the power storage device 13 in the HEMS 10 installed in one user's house is not connected to the management device 11 but is connected via a second communication path different from the first communication path. 30 can communicate. Therefore, when an abnormality occurs in the storage battery 131 and the storage apparatus 131 notifies the management apparatus 11 of an abnormality, even if a failure occurs in the first communication path or the management apparatus 11, the second communication path passes through the second communication path. Since the maintenance server 30 can be notified that the storage battery 131 is abnormal, it is possible to quickly cope with the abnormality of the storage battery 131.
  • the maintenance server 30 can acquire and store the storage battery information transmitted from the power storage device 13 at regular intervals, the maintenance server 30 can monitor the state of the storage battery 131 of the power storage device 13 based on the storage battery information. Moreover, when the storage battery 131 is in a warning state, the transmission frequency of the storage battery information can be set high, so that the monitoring of the state of the storage battery 131 can be strengthened to cope with an abnormality occurring in the storage battery 131.
  • the power storage device 13 inquires of the maintenance server 30 about the expiration date of the storage battery 131 and acquires replacement information indicating the expiration date of the storage battery 131 estimated by the maintenance server 30. Since the power storage device 13 notifies the replacement of the storage battery 131 a predetermined period before the usable period indicated by the replacement information, the user can know the replacement time of the storage battery 131 and use the storage battery 131 more safely. it can.
  • the power storage device 13 acquires device information transmitted from the device group 14 and transmits it to the maintenance server 30. Even if a failure occurs in the management device 11 or the third communication path between the management device 11 and the HEMS management server 20, the device information of the device group 14 is transmitted to the maintenance server 30. The state of the device group 14 connected to the management device 11 can be grasped more reliably.
  • the storage battery information may be transmitted to the maintenance server, and each storage battery 131 in the plurality of power storage devices 13 may be monitored in the maintenance server.
  • a communication error may occur between the maintenance server and the plurality of power storage devices 13. Therefore, in the present embodiment, an example will be described in which the maintenance server acquires monitoring information from the plurality of power storage devices 13 so that a communication error does not occur between the plurality of power storage devices 13 and the maintenance server in the apartment house.
  • FIG. 5 is a schematic diagram showing a configuration example of the energy management system in the present embodiment.
  • symbol as 1st Embodiment is attached
  • a configuration different from the first embodiment will be described.
  • the housing complex 100 includes a dedicated unit 101 composed of a plurality of dwelling units (user houses) and a shared unit 102 excluding the dwelling unit.
  • a power receiving unit 103 that receives power from the system power 3 is provided, and power is distributed from the power receiving unit 103 to each user's house in the exclusive unit 101 and each distribution board 16 provided in the shared unit 102.
  • the HEMS 10 similar to that of the first embodiment is provided for each user house in the exclusive unit 101, and the shared unit 102 includes a MEMS (Mansion Energy Management). System) 10a is provided.
  • the HUB 12 is not shown, but the HUB 12 is connected to the router 15 and the device group 14 is connected to the HUB 12 and the management apparatus 11 as in the first embodiment.
  • Each HEMS 10 provided in the exclusive unit 101 and the MEMS 10 a provided in the shared unit 102 are connected to the HEMS / MEMS management server 21 via the communication network 2.
  • the MEMS 10 a is configured by connecting a MEMS management device 111, a power storage device 13, and a device group 141 to the LAN interface of the router 15.
  • the communication protocol of the MEMS 10a uses ECHONET-Lite, and a communication path (first communication path) based on the LAN standard, which is a lower layer, between the MEMS management apparatus 111, the power storage apparatus 13, and the device group 141.
  • the device group 141 is a device that consumes electric power, for example, lighting, air conditioning, an elevator, and the like installed in the shared unit 102 based on ECHONETONLite.
  • the MEMS management device 111 is connected to the communication network 2 by the router 15 and is connected to the HEMS / MEMS management server 21 via a communication path (third communication path) for connecting to the HEMS / MEMS management server 21. Yes.
  • the power storage device 13 connected to the HEMS 10 when the power storage device 13 connected to the HEMS 10 is distinguished from the power storage device 13 connected to the MEMS 10a, the power storage device connected to the HEMS 10 is referred to as a HEMS power storage device and is connected to the MEMS 10a.
  • the obtained power storage device is referred to as a MEMS power storage device.
  • the storage battery information transmission timing is set in advance in each power storage device 13 so that the storage battery information is transmitted from the power storage devices 13 in the apartment house 100 to the maintenance server 30A at different timings.
  • the transmission timing of the storage battery information of each power storage device 13 is, for example, the serial number of the power storage device 13.
  • a time shifted by a predetermined time may be set based on the numerical value included in.
  • the MEMS management device 111 includes a CPU, a memory including a RAM and a ROM, a display unit, an operation unit, and a communication unit (all not shown).
  • the display unit includes, for example, a liquid crystal display, and displays various information such as an operation screen, power consumption in the shared unit 102, and a usage state of the device group 141.
  • the operation unit has a touch panel provided on the display unit, and accepts user operations.
  • the communication unit communicates with the MEMS power storage device 13 and the device group 141 and connects to the communication network 2 via the router 15 to communicate with the HEMS / MEMS management server 21.
  • the MEMS management device 111 controls the operation of the MEMS power storage device 13 and the device group 141 in accordance with a predetermined operation schedule of the MEMS 10a by the CPU executing a control program stored in the ROM, and in the shared unit 102 Control power.
  • the MEMS management device 111 supplies the amount of power supplied from the distribution board 16 to the MEMS power storage device 13 and the device group 141 by a power amount measurement sensor (not shown) provided in the distribution board 16 at predetermined time intervals. Measure and display the measurement result on the display unit.
  • the MEMS management apparatus 111 is connected to the HEMS / MEMS management server 21 via the communication network 2 by the router 15 and transmits information such as the power consumption in the shared unit 102 at regular intervals.
  • the MEMS management device 111 receives abnormality information of the storage battery 131 (see FIG. 2) from the MEMS power storage device 13, the MEMS management device 111 notifies the HEMS / MEMS management server 21 of the abnormality of the storage battery 131.
  • the HEMS / MEMS management server 21 is connected to the plurality of management devices 11 and the MEMS management device 111 via the communication network 2.
  • the HEMS / MEMS management server 21 includes a CPU, a memory including a RAM and a ROM, and a communication interface (all not shown).
  • the HEMS / MEMS management server 21 communicates with the management apparatus 11 and the MEMS management apparatus 111 by connecting to the communication network 2 via the communication interface and executing management programs stored in the ROM. Information related to power consumption and the like is received from the device 11 and the MEMS management device 111.
  • FIG. 6 is a block diagram illustrating a configuration example of the maintenance server 30A.
  • symbol as 1st Embodiment is attached
  • the maintenance server 30 ⁇ / b> A differs from the maintenance server 30 in that the storage battery information is acquired from the plurality of power storage devices 13 in the apartment house 100, but has the same function as the maintenance server 30.
  • a configuration different from the first embodiment will be described.
  • the storage unit 33 includes a user information DB 33a as in the first embodiment.
  • the user information of the MEMS power storage device 13 is stored in the user information DB 33 a.
  • the control unit 31A includes a CPU and a memory including a RAM and a ROM. 31 A of control parts implement
  • the acquisition unit 311A connects to each power storage device 13 in the apartment house 100 via the communication network 32 (second communication path) via the communication interface 32, and stores storage battery information from each power storage device 13 in the apartment house 100 at different timings.
  • the storage battery information acquired is stored in the storage battery information DB 33 b for each power storage device 13.
  • the monitoring unit 313A has the same function as the monitoring unit 313 of the first embodiment, and monitors the state of each storage battery 131 based on the storage battery information of the plurality of power storage devices 13 in the apartment house 100.
  • the notification unit 312A has the same function as the notification unit 312 of the first embodiment, and makes various notifications to the user and the plurality of power storage devices 13 in the apartment house 100.
  • the maintenance server 30A can acquire the storage battery information from the plurality of power storage devices 13 in the apartment house 100, and thus can monitor the state of each storage battery 131 in the apartment house 100. Also, the storage battery information is transmitted from the plurality of power storage devices 13 at mutually different transmission timings, so that the storage server 30A and each power storage are compared with the case where the storage battery information is transmitted simultaneously from the plurality of power storage devices 13 in the apartment house 100. Communication traffic between the devices 13 is suppressed, and stable communication can be performed.
  • FIG. 7 is a block diagram showing a configuration example of the maintenance server in the present embodiment.
  • the control unit 31B of the maintenance server 30B includes a charge control unit 315 in addition to the configuration of the control unit 31A of the maintenance server 30A of the second embodiment.
  • the charging control unit 315 transmits control information regarding charging of the storage battery 131 in the power storage device 13 to each power storage device 13 via the communication interface 32.
  • FIG. 8 is a diagram schematically showing temporal changes in voltage and current due to constant current and constant voltage charging.
  • charging is performed with a constant current C1 indicated by a broken line until the voltage of the storage battery 131 reaches the predetermined voltage V1, and after reaching the predetermined voltage V1, charging is performed with the predetermined voltage V1.
  • the charging method (first charging method) is to reduce the amount of current so that the predetermined voltage V1 is obtained.
  • a constant current C1 is input to the storage batteries 131 of all the power storage devices 13 in the apartment house 100 at the charging start time t0 shown in FIG. 8, an instantaneous load is applied to the power receiving unit 103 and the power is reduced.
  • Each power storage device 13 starts charging at a time obtained by shifting a preset charging start time by a delay time set for each power storage device 13. Specifically, each power storage device 13 starts charging at a time obtained by shifting the charging start time by a delay time obtained by multiplying a predetermined time by a delay coefficient that is different for each power storage device 13.
  • each power storage device 13 inquires of the maintenance server 30B about the delay coefficient of the power storage device 13 in advance, and acquires the delay coefficient from the maintenance server 30B.
  • the charging control unit 315 sets the delay coefficient of the storage battery 131 so that the timing at which the constant current C1 is input to the storage battery 131 of each power storage device 13 in the apartment house 100, that is, the charging start timing of each storage battery 131 is delayed by a predetermined time. In response to an inquiry about the delay coefficient from the power storage device 13, the set delay coefficient is transmitted to the power storage device 13.
  • the current amount is gradually increased so as to become a constant current C1 after a lapse of a predetermined time from the charging start time t0, and after reaching the constant current C1, a soft start for performing constant current and constant voltage charging.
  • the soft start method since the amount of current that is simultaneously input to each power storage device 13 in the apartment 100 is smaller than in the case of FIG. 8, even if the charging start time of each power storage device 13 is the same, The instantaneous load on the power receiving unit 103 can be reduced.
  • the charging control unit 315 When charging by the soft start method, the charging control unit 315 performs a time t1 (hereinafter referred to as a constant current) until each power storage device 13 in the apartment house 100 reaches a constant current C1 from a preset charging start time t0. Time). Then, in response to an inquiry from each power storage device 13, the charge control unit 315 transmits a constant current arrival time t ⁇ b> 1 to each power storage device 13 as charge instruction information by the soft start method. Each power storage device 13 in the housing complex 100 acquires instruction information from the maintenance server 30B, and starts charging from the charging start time t0 so that the current amount becomes C1 at the constant current arrival time t1.
  • a time t1 hereinafter referred to as a constant current
  • the charging control unit 315 is configured such that the charging start timing of at least some of the power storage devices 13 of the plurality of power storage devices 13 in the apartment house 100 is different from the other power storage devices 13.
  • a delay coefficient may be set for. That is, for example, some of the power storage devices 13 set the delay coefficient so as to be delayed by a fixed time from the charging start time t0 of the other power storage devices 13.
  • the charging control unit 315 has a constant current different from that of the other power storage devices 13 for at least some of the power storage devices 13 of the plurality of power storage devices 13 in the apartment house 100.
  • An arrival time may be set. That is, for example, the constant current arrival time t1 shown in FIG. 9 is set for some power storage devices 13 and the constant current arrival time t1 is set for other power storage devices 13 as shown in FIG. A long constant current arrival time t2 may be set.
  • the rate of increase in current input to the storage batteries 131 of other power storage devices 13 is smaller than the rate of increase in current input to the storage batteries 131 of some power storage devices 13.
  • the instantaneous load of the power receiving unit 103 can be reduced as compared with the case where the increasing rates of the input current amounts are all the same.
  • the charging control unit 315 performs charging start timing of other power storage devices 13 for at least some of the power storage devices 13 of the plurality of power storage devices 13 in the apartment house 100.
  • the delay coefficient may be set differently from the above, and a constant current arrival time different from the constant current arrival times of other power storage devices 13 may be set. That is, for example, for some of the power storage devices 13, a delay coefficient is set so as to be delayed by a predetermined time from the charging start time t 0 of the other power storage devices 13, and the constant current arrival time of the other power storage devices 13 is set. A longer constant current arrival time may be set.
  • the charge start time in the some electrical storage apparatus 13 in the apartment house 100, and the increase rate of the electric current amount input into the storage battery 131 can be varied. Therefore, the instantaneous load of power reception unit 103 can be more reliably reduced as compared with the case where the charging start timing and the increase rate of the current amount in the plurality of power storage devices 13 are the same.
  • the maintenance server 30 ⁇ / b> B may set at least one of the delay coefficient and the constant current arrival time for each power storage device 13 in the apartment house 100 as control information for charging in the power storage device 13. it can. Therefore, the instantaneous load of the power receiving unit 103 due to each power storage device 13 charging the storage battery 131 in the apartment house 100 is reduced, and stable power supply can be performed in the apartment house 100.
  • the automatic inspection mode is a mode in which the storage battery 131 is completely discharged at a predetermined time and is fully charged after a predetermined time has elapsed to measure the capacity of the storage battery 131.
  • Legal inspection is mandatory for electrical equipment such as the power receiving unit 103 in the apartment house 100.
  • the automatic inspection mode is operated on the legal inspection day, a power failure occurs during the legal inspection, so that power is not supplied from the power receiving unit 103 to each distribution board 16 and the storage battery 131 cannot be used.
  • control is performed such that the automatic inspection mode is operated in the plurality of power storage devices 13 in the apartment house 100 while avoiding the legal inspection date set for the apartment house 100.
  • FIG. 11 is a block diagram showing a configuration example of the maintenance server in the present embodiment.
  • the storage unit 33 of the maintenance server 30 ⁇ / b> C includes the user information DB 33 a as in the second embodiment, but information indicating the legal inspection date of the collective housing 100 (hereinafter referred to as legal) for the plurality of power storage devices 13 in the collective housing 100. This is different from the second embodiment in that inspection information) is stored.
  • the legal inspection information is registered in advance in the user information DB 33a by the operator of the maintenance server 30C.
  • control unit 31C includes an automatic inspection control unit 316 in addition to the configuration of the control unit 31A of the maintenance server 30A of the second embodiment.
  • the automatic inspection control unit 316 refers to the legal inspection information of each power storage device 13 in the apartment 100 in the user information DB 33a, and the legal inspection information indicated by the legal inspection information as an automatic inspection date for operating the automatic inspection mode in each power storage device 13 Set the date excluding the inspection date.
  • the notification unit 312C performs an automatic check control unit 316 on each power storage device 13 in response to an automatic check date inquiry from each power storage device 13 in the apartment 100. It has a function to notify the set automatic inspection date.
  • Each power storage device 13 makes an inquiry to the maintenance server 30C for an automatic inspection date, and acquires automatic inspection information indicating the automatic inspection date from the maintenance server 30C.
  • the inquiry about the automatic check date may be performed before a predetermined period of the automatic check date set in the power storage device 13 in advance, or may be performed when the storage battery information is transmitted.
  • the electrical storage apparatus 13 starts operation
  • FIG. 12 is a flowchart showing the operation of the power storage device 13 in the automatic inspection mode.
  • the discharging unit (not shown) of the control unit 132 in the power storage device 13 starts discharging the storage battery 131 using the device groups 14 and 141 connected to the HEMS 10 or the MEMS 10a (step S101).
  • the discharge unit of the control unit 132 continues to discharge the storage battery 131 until the storage battery 131 is completely discharged (step S102: NO).
  • Control part 132 will wait until predetermined time passes, if storage battery 131 is discharged completely (Step S102: YES) (Step S103: NO).
  • the predetermined time is preferably 1 hour or more and 24 hours or less.
  • the charging unit (not shown) of the control unit 132 starts charging the storage battery 131 by the constant current constant voltage method after a predetermined time has elapsed (step S103: YES), and fully charges the storage battery 131 (step S104). Moreover, the control part 132 measures the electric current amount at the time of charge of the storage battery 131 by the capacity
  • step S106 when the charge capacity of the storage battery 131 is larger than the preset charge capacity (step S106: NO), the control unit 132 ends the operation in the automatic inspection mode.
  • the automatic inspection date of the storage battery 131 of each power storage device 13 in the apartment house 100 can be set while avoiding the legal inspection date set for the apartment house 100. Therefore, the user can operate the device groups 14 and 141 using the power storage device 13 on the legal inspection date.
  • control unit 132 of the power storage device 13 measures and measures the charge capacity and discharge capacity of the storage battery 131 over a certain period based on the amount of current detected by the capacity measurement sensor 131b provided in the storage battery 131.
  • the charge / discharge information indicating the charged capacity and the discharged capacity is transmitted to the maintenance server 30 via the communication interface 134.
  • FIG. 13 is a block diagram showing a configuration example of the maintenance server in the present embodiment.
  • symbol as 1st Embodiment is attached
  • a configuration different from the first embodiment will be described.
  • the storage unit 33D is different from the storage unit 33 of the first embodiment in that it includes a billing information DB 33d in addition to the user information DB 33a, the storage battery information DB 33b, and the abnormality information DB 33c.
  • the control unit 31D is different from the control unit 31 of the first embodiment in that it includes an acquisition unit 311D instead of the acquisition unit 311 and further includes a charge setting unit 317.
  • the acquiring unit 311D acquires charge / discharge information from the power storage device 13 in addition to the storage battery information and the abnormality information via the communication interface 32.
  • the acquiring unit 311 ⁇ / b> D stores the power storage device ID of the power storage device 13 and the charge / discharge information in association with each other in the charging information DB 33 d.
  • the charging setting unit 317 calculates the charging amount for the charging capacity and discharging capacity of each power storage device 13 stored in the charging information DB 33d based on the charging conditions determined according to the charging capacity and discharging capacity. Then, the billing setting unit 317 reads a mail address corresponding to each power storage device 13 from the user information DB 33a, and transmits a mail indicating the calculated billing amount with the read mail address as a destination.
  • the user who uses the power storage device 13 can receive a mail indicating the charge amount from the maintenance server 30D, and can confirm the charge amount according to the charge / discharge capacity of the storage battery 131 in a certain period, that is, the usage amount of the storage battery 131.
  • the maintenance server 30 may send an email indicating the expiration date of the storage battery 131 to the email address of the user corresponding to the power storage device 13 that has estimated the expiration date. Further, the maintenance server 30 may display the user information corresponding to the power storage device 13 for which the usable time limit is estimated and the usable time limit on the display unit 34. The operator can inform the user of the replacement time of the storage battery 131 by telephone or the like with reference to the user information and the usable time limit displayed on the display unit 34.
  • the serial number of the power storage device 13 is set.
  • the transmission timing may be set as follows. For example, a random number generation program is stored in a plurality of power storage devices 13 and each time the power storage device 13 transmits storage battery information, the serial number of the power storage device 13 is stored in the random number generation program.
  • the transmission timing may be set to a time obtained by taking a certain time from the numerical value obtained by inputting.
  • the transmission timing of the storage battery information of the several electrical storage apparatus 13 may be the same. .
  • the maintenance server 30 ⁇ / b> A sets the number of retransmissions according to the content of the transmission error, and instructs the power storage device 13 in which the transmission error has occurred to retransmit the storage battery information. Good.
  • a communication amount monitoring unit that monitors the communication amount between the plurality of power storage devices 13 and the maintenance server 30A is provided, and each power storage device 13 is set according to the communication amount between the plurality of power storage devices 13 and the maintenance server 30A. May set a delay time when transmitting the storage battery information.
  • a predetermined time When the time has elapsed, the abnormality information may be transmitted from the power storage device 13 to the maintenance server 30A.
  • the predetermined time may be set in advance for each power storage device 13 or a setting unit that sets a different time for each power storage device 13 for each power storage device 13 in the maintenance server 30A. You may comprise so that it may provide.
  • Each power storage device 13 inquires the maintenance server 30A about the predetermined time, and acquires the predetermined time set by the maintenance server 30A in advance.
  • abnormality occurs in the storage battery 131 in the plurality of power storage devices 13 almost simultaneously, and abnormality information is transmitted from the plurality of power storage devices 13 to the maintenance server 30A, communication traffic between the maintenance server 30A and the plurality of power storage devices 13 is increased. In some cases, the abnormality information cannot be transmitted to the maintenance server 30A. In the present modification, the abnormality information is transmitted from the power storage device 13 at a different timing for each power storage device 13, and therefore the abnormality information can be reliably transmitted by the maintenance server 30A.
  • the maintenance server 30A monitors a plurality of power storage devices 13 provided in the apartment house 100 .
  • a BEMS Bact Energy Management System that controls power of a building
  • FEMS Fractory Energy Management System
  • CEMS Cluster or Community Energy Management System
  • each power storage device 13 in the apartment house 100 has been described as an example in which charging is started by acquiring at least one of the delay coefficient and the current arrival time from the maintenance server 30.
  • at least one of the delay coefficient and the current arrival time may be set in advance.
  • the legal inspection date is set.
  • the automatic inspection date is set to avoid is described, it may be configured as follows.
  • the maintenance server 30C determines whether the automatic inspection date and the legal inspection date of each power storage device 13 stored in the user information DB 33a are the same day.
  • the automatic check date of the power storage device 13 is set to a date different from the legal check date.
  • the maintenance server 30 ⁇ / b> C transmits automatic check information indicating the automatic check date corresponding to the power storage device 13 to the power storage device 13.
  • the maintenance server 30C sets an automatic inspection date for each power storage device 13 in the automatic inspection control unit 316, and each power storage device from the user information DB 33a by the notification unit 312A.
  • a mail indicating the set automatic inspection date may be transmitted with the mail address corresponding to 13 as the destination.
  • the discharge that discharges the storage battery 131 during the automatic inspection mode Means may be provided in the power storage device 13.
  • the power storage device 13 measures the discharge capacity based on the load of the discharge means measured in advance, and determines whether or not the discharge characteristics of the storage battery 131 are appropriate based on the complete discharge time and the discharge capacity. May be.
  • the charge capacity of the storage battery 131 after complete discharge may be measured to determine whether the charge / discharge characteristics of the storage battery 131 are appropriate based on the discharge capacity and the charge capacity.
  • the charged capacity and the discharged capacity after the automatic inspection may be transmitted from the power storage device 13 to the maintenance server 30C, and the maintenance server 30C may determine whether the charge / discharge characteristics of the storage battery 131 are appropriate.
  • the power storage device of the first embodiment described above may have an automatic inspection mode similar to that of the power storage device of the fourth embodiment.
  • the aspect of the fourth embodiment may be combined with the energy management system of the third embodiment described above. Moreover, you may combine the aspect of 5th Embodiment with the energy management system of 2nd Embodiment mentioned above to 4th Embodiment.
  • the maintenance server has described an example of acquiring storage battery information including the temperature, capacity, and voltage value of the storage battery 131 from the power storage device 13.
  • storage battery information including the temperature, capacity, and voltage value of the storage battery 131 from the power storage device 13.
  • one or two of the temperature, the capacity, and the voltage value may be acquired from the power storage device 13.
  • the energy management system illustrated in the first to fifth embodiments has been described as including the management device 11 or the MEMS management device 111, the management device 11 and the MEMS management device 111 are included. It does not have to be.
  • the energy management system illustrated in the first to fifth embodiments has been described as including the HEMS management server 20 or the HEMS / MEMS management server 21, the HEMS management server 20 and the HEMS / MEMS management are described.
  • the server 21 may not be included.
  • an information terminal such as a PC (Personal Computer) may be connected to the maintenance server 30 and the power storage device 13 via the second communication path.
  • the information terminal is used for the initial setting of the power storage device 13 when the power storage device 13 is connected to the maintenance server 30, the setting change of the power storage device 13, and the like, and the exchange of data between the maintenance server 30 and the information terminal. .
  • the maintenance servers 30 and 30A to 30D and the HEMS management server 20 or the HEMS / MEMS management server 21 are each configured by independent hardware. Although described, these functions may be logically separated in the same hardware.
  • each information transmission frequency, usable period, delay coefficient, constant current arrival time
  • the maintenance server May transmit each information directly to the power storage device.
  • the maintenance server can directly access each power storage device installed in the predetermined area and remotely control the power storage device, the power control in the predetermined area can be made more efficient.
  • the energy management system of the present invention only needs to include at least a power storage device and a maintenance server.
  • the energy management system of the present invention can be realized by connecting the power storage device and the maintenance server to an environment where HEMS, MEMS, or the like is already installed.
  • the maintenance server in the energy management system of the present invention includes at least an acquisition unit, a storage unit, The maintenance server performs the operation of each step shown in FIG. That is, the maintenance server sequentially acquires the storage battery information regarding the storage battery 131 in the power storage device 13 from the power storage device 13 connected via the communication network 2 by the acquisition unit at a predetermined timing (step S10), and is acquired by the acquisition unit.
  • the storage battery information is stored in the storage unit (step S20).
  • a maintenance server monitors the state of the storage battery 131 based on the storage battery information memorize
  • a program for causing a computer to execute the operation of the maintenance server and a computer-readable recording medium that records the program are included in the present invention.
  • the program is not limited to be provided by a recording medium, but may be provided via a communication network such as an electric communication line, a wireless or wired communication line, or the Internet network.

Abstract

 本発明は、エネルギー管理システムにおける蓄電池の保守及び管理をより確実に行い得る技術を提供することを目的とする。エネルギー管理システム(1)は、所定のエリアに設けられた蓄電池を有し、当該所定のエリアにおける電力を制御する管理装置(11)に第1通信経路を介して接続された蓄電装置(13)と、管理装置(11)を介さずに、第1通信経路と異なる第2通信経路を介して蓄電装置(13)と接続された保守サーバ(30)とを備える。蓄電装置(13)は、保守サーバ(30)に、蓄電装置(13)における蓄電池に関する蓄電池情報を所定タイミングで逐次送信する。保守サーバ(30)は、蓄電装置(13)から蓄電池情報を取得して記憶し、記憶された蓄電池情報に基づいて、蓄電装置(13)における蓄電池の状態を監視する。

Description

エネルギー管理システム、及びプログラム
 本発明は、エネルギー管理システム及びプログラムに関する。
 近年、住宅、ビル、又は地域等の所定エリアに蓄電装置を設け、受電部及び蓄電装置による所定エリア内の各種機器における消費電力等の情報を取得するエネルギー管理システムを設置し、所定エリア内の消費電力などの情報をユーザに提供する技術が知られている。
 特開2013-236519号公報には、通信ネットワークを介してHEMS(Home Energy Management System)と接続された情報センターから、時間帯別に電気料金が異なる料金プランの情報及び系統電力の電気料金の単価の情報をHEMSが取得し、料金プラン及び電気料金の単価に基づいて、蓄電池の充放電時間を設定する技術が開示されている。
 また、特開2013-246455号公報には、HEMSに接続されたホームゲートウェイと、サーバ装置との間でIPネットワークを介して通信を行い、サーバ装置からホームゲートウェイに送信される運転制御指示に従って、HEMSに接続された各電気機器や蓄電装置を制御する技術が開示されている。
 特開2013-236519号公報及び特開2013-246455号公報のように、エネルギー管理システムと通信接続されたサーバから送信される情報に基づいて、所定エリアにおける機器を制御することで、所定エリアにおける消費電力を削減したり、電気料金を節約することができる。
 ところで、エネルギー管理システムに設置される蓄電装置には充放電を繰り返し行うことができる蓄電池が内蔵されている。蓄電池は、その性質上、蓄電池の状態が常時監視され、より確実に保守及び管理されることが望まれる。
 本発明は、エネルギー管理システムにおける蓄電池の保守及び管理をより確実に行い得る技術を提供することを目的とする。
 本発明に係るエネルギー管理システムは、所定のエリアに設けられた蓄電池を有し、当該所定のエリアにおける電力を制御する管理装置に第1通信経路を介して接続された蓄電装置と、前記管理装置を介さずに、前記第1通信経路と異なる第2通信経路を介して前記蓄電装置と接続された保守サーバとを備え、前記蓄電装置は、前記保守サーバに、当該蓄電装置における前記蓄電池に関する蓄電池情報を所定タイミングで逐次送信し、前記保守サーバは、前記蓄電装置から前記蓄電池情報を取得する取得部と、前記取得部で取得された前記蓄電池情報を記憶する記憶部と、前記記憶部に記憶された前記蓄電池情報に基づいて、前記蓄電装置における前記蓄電池の状態を監視する監視部と、を含む。
 本発明の構成によれば、エネルギー管理システムにおける蓄電池の保守及び管理をより確実に行うことができる。
図1は、第1実施形態に係るエネルギー管理システムを示す模式図である。 図2は、図1に示す蓄電装置の構成を例示したブロック図である。 図3は、図1に示す保守サーバの構成を例示したブロック図である。 図4Aは、図3に示すユーザ情報DBのデータ構造例を示す図である。 図4Bは、図3に示す蓄電池情報DBのデータ構造例を示す図である。 図4Cは、図3に示す異常情報DBのデータ構造例を示す図である。 図5は、第2実施形態に係るエネルギー管理システムの構成例を示す模式図である。 図6は、図5に示す保守サーバの構成例を示すブロック図である。 図7は、第3実施形態における保守サーバの構成例を示すブロック図である。 図8は、定電流定電圧充電方式による電圧と電流の時間変化を模式的に表した図である。 図9は、定電流定電圧充電をソフトスタート方式で行う場合の電圧と電流の時間変化を模式的に表した図である。 図10は、定電流定電圧充電をソフトスタート方式で行う場合の電圧と電流の時間変化を模式的に表した図である。 図11は、第4実施形態における保守サーバの構成例を示すブロック図である。 図12は、第4実施形態における蓄電装置の自動点検モードの動作を示すフロー図である。 図13は、第5実施形態における保守サーバの構成例を示すブロック図である。 図14は、変形例(11)における保守サーバの動作を示すフロー図である。
 本発明の一実施形態に係るエネルギー管理システムは、所定のエリアに設けられた蓄電池を有し、当該所定のエリアにおける電力を制御する管理装置に第1通信経路を介して接続された蓄電装置と、前記管理装置を介さずに、前記第1通信経路と異なる第2通信経路を介して前記蓄電装置と接続された保守サーバとを備え、前記蓄電装置は、前記保守サーバに、当該蓄電装置における前記蓄電池に関する蓄電池情報を所定タイミングで逐次送信し、前記保守サーバは、前記蓄電装置から前記蓄電池情報を取得する取得部と、前記取得部で取得された前記蓄電池情報を記憶する記憶部と、前記記憶部に記憶された前記蓄電池情報に基づいて、前記蓄電装置における前記蓄電池の状態を監視する監視部と、を含む。
 上記エネルギー管理システムにおいて、所定のエリアに設置された蓄電装置は、所定のエリアの電力を制御する管理装置に第1通信経路を介して接続され、保守サーバは、管理装置を介さずに、第1通信経路と異なる第2通信経路を介して当該蓄電装置と接続されている。保守サーバは、蓄電装置から所定タイミングで逐次送信される蓄電池情報を取得して記憶し、記憶した蓄電池情報に基づいて、当該蓄電装置における蓄電池の状態を監視する。管理装置を介して保守サーバに蓄電池情報を送信する場合、第1通信経路に障害が発生すると保守サーバに蓄電池情報を送信することができない。この構成によれば、管理装置を介さずに第1通信経路と異なる第2通信経路を介して蓄電装置と保守サーバとが接続されているので、より確実に蓄電池情報を保守サーバに送信して蓄電池の状態を監視し、蓄電池を保守及び管理することができる。
 また、上記エネルギー管理システムにおいて、前記蓄電池情報は、前記蓄電池の温度、電圧、及び容量の少なくともいずれかを含むこととしてもよい。この構成によれば、保守サーバは、蓄電池の温度、電圧、及び容量の少なくともいずれかに基づいて、蓄電池の状態を監視することができる。
 また、上記エネルギー管理システムにおいて、前記蓄電装置は、さらに、当該蓄電装置における前記蓄電池の異常を示す異常情報を前記管理装置に送信するとともに、当該異常情報を前記保守サーバへ送信し、前記取得部は、さらに、前記蓄電装置から前記異常情報を取得することとしてもよい。この構成によれば、管理装置において蓄電池の異常を把握することができ、保守サーバにおいて異常がある蓄電池を容易に特定することができる。
 また、上記エネルギー管理システムにおいて、前記蓄電装置は、前記管理装置に前記第1通信経路を介して接続された機器の状態を示す機器情報を取得して、前記第2通信経路を介して前記保守サーバへ送信し、前記取得部は、さらに、前記蓄電装置から前記機器情報を取得することとしてもよい。この構成によれば、蓄電装置は、管理装置に接続された機器の機器情報を取得して保守サーバへ送信することができるので、保守サーバにおいて、所定のエリアに設置されている機器の状態を確認することができる。
 また、上記エネルギー管理システムにおいて、前記監視部は、前記記憶部に記憶された前記蓄電装置の前記蓄電池情報に基づいて、当該蓄電装置における前記蓄電池の使用可能期限を予測し、前記保守サーバは、さらに、前記監視部の予測結果に基づき、前記蓄電池の交換を通知する通知部を含むこととしてもよい。この構成によれば、保守サーバから蓄電装置に対し、当該蓄電装置における蓄電池の使用可能期限に応じて蓄電池の交換を通知することができるので、ユーザに蓄電池をより安全に使用させることが可能となる。
 また、上記エネルギー管理システムにおいて、前記蓄電装置は、さらに、当該蓄電装置における前記蓄電池の一定期間における充放電容量の測定結果を保守サーバへ送信し、前記保守サーバは、さらに、前記蓄電装置から前記測定結果を取得し、取得した測定結果に応じた課金額を前記蓄電装置に対して設定する課金設定部を含むこととしてもよい。この構成によれば、保守サーバは、蓄電装置における蓄電池の充放電容量に応じて課金することができる。
 また、上記エネルギー管理システムにおいて、さらに、前記管理装置を備えることとしてもよい。また、上記エネルギー管理システムにおいて、さらに、前記第1通信経路、及び前記第2通信経路と異なる第3通信経路を介して前記管理装置に接続された管理サーバを備えることとしてもよい。この構成によれば、管理装置と管理サーバとの間で通信を行うことができる。
 また、上記エネルギー管理システムにおいて、さらに、前記所定のエリアに設けられ、前記第2通信経路を介して、前記保守サーバ、及び前記蓄電装置と接続された情報端末を備えることとしてもよい。この構成によれば、蓄電装置と保守サーバとの間の通信に加え、情報端末と蓄電装置の間、情報端末と保守サーバとの間で通信することができる。
 また、上記エネルギー管理システムにおいて、前記蓄電装置は、前記蓄電池を完全放電させた後、所定時間経過後に前記蓄電池を満充電し、前記蓄電池の容量を測定する点検モードを有することとしてもよい。この構成によれば、蓄電装置において、当該蓄電装置における蓄電池のより正確な容量を点検することができる。
 また、上記エネルギー管理システムにおいて、前記所定のエリアには、複数の前記管理装置に前記第1通信経路を介して接続された複数の前記蓄電装置が設置されており、前記保守サーバは、前記複数の管理装置の各々を介さずに、前記第2通信経路を介して前記複数の蓄電装置の各々と接続され、前記記憶部は、前記複数の蓄電装置の複数の前記蓄電池情報を前記蓄電装置ごとに記憶し、前記監視部は、前記記憶部に記憶された前記蓄電装置ごとの前記蓄電池情報に基づいて、前記蓄電装置ごとに、当該蓄電装置における前記蓄電池の状態を監視することとしてもよい。この構成によれば、所定のエリアに設けられた複数の管理装置に各々第1通信経路を介して複数の蓄電装置が接続され、保守サーバは、各蓄電装置と、当該蓄電装置に接続されている管理装置を介さずに第2通信経路を介して接続される。そのため、保守サーバは、所定エリアにおける蓄電装置ごとに、より確実に蓄電池情報を取得して当該蓄電装置における蓄電池の状態を監視することができる。
 また、上記エネルギー管理システムにおいて、前記所定のエリアは、予め定められた特定の地域であることとしてもよい。この構成によれば、保守サーバは、特定の地域に設置された複数の蓄電装置における各蓄電池の状態を監視することができる。
 また、上記エネルギー管理システムにおいて、前記所定のエリアは、複数の住戸が集合された集合住宅であり、前記複数の住戸のそれぞれに、前記蓄電装置と前記管理装置とが設置されていることとしてもよい。この構成によれば、保守サーバは、集合住宅における複数の住戸に設置された各蓄電装置における蓄電池の状態を監視することができる。
 また、上記エネルギー管理システムにおいて、前記複数の蓄電装置の各々は、当該蓄電装置における前記蓄電池を完全放電させた後、所定時間経過後に前記蓄電池を満充電し、前記蓄電池の容量を測定する点検モードを有し、前記記憶部は、前記集合住宅における電気設備の法定点検日を記憶し、前記保守サーバは、さらに、前記複数の蓄電装置に対し、前記記憶部に記憶された前記法定点検日を避けて前記点検モードの動作タイミングを設定する点検モード制御部を含むこととしてもよい。この構成によれば、集合住宅における複数の蓄電装置は、法定点検日を避けて点検モードを実行することができる。
 また、上記エネルギー管理システムにおいて、前記複数の蓄電装置は、相互に異なるタイミングで前記蓄電池情報を前記保守サーバへ送信することとしてもよい。この構成によれば、複数の蓄電装置から同時に蓄電池情報を取得する場合と比べ、複数の蓄電装置と保守サーバとの間における通信トラフィックを軽減することができる。
 また、上記エネルギー管理システムにおいて、前記複数の蓄電装置の各々は、当該蓄電装置における前記蓄電池を充電する充電部を備え、前記複数の蓄電装置の複数の前記充電部は、第1の充電方法及び第2の充電方法の少なくとも一方の充電方法を用いて充電を行い、前記第1の充電方法は、前記複数の蓄電装置において予め設定された充電開始時間に基づき、前記複数の充電部が相互に異なるタイミングで充電する充電方法であり、前記第2の充電方法は、ソフトスタート方式で充電を開始する充電方法であることとしてもよい。この構成によれば、複数の蓄電装置において相互に異なるタイミングで充電が開始されたり、ソフトスタート方式で充電がなされるため、複数の蓄電装置の各々が蓄電池の充電を行った場合の集合住宅における電力の瞬時負荷を軽減することができる。
 また、上記エネルギー管理システムにおいて、前記複数の蓄電装置の各々は、当該蓄電装置の異常を示す異常情報を前記管理装置の送信後、予め設定された所定時間の経過時に、前記異常情報を前記保守サーバへ送信し、前記保守サーバは、さらに、前記蓄電装置ごとの前記所定時間を設定する設定部を含むこととしてもよい。この構成によれば、複数の蓄電装置の各々は、異常情報を管理装置へ送信後、蓄電装置ごとに設定された所定時間の経過時に保守サーバへ当該異常情報を送信する。そのため、複数の蓄電装置において略同時に異常が発生した場合に、各蓄電装置から保守サーバへ同時に異常情報が送信される場合と比べ、保守サーバと各蓄電装置との間の通信トラフィックが軽減され、各蓄電装置から異常情報をより確実に保守サーバへ送信することができる。
 本発明の一実施形態に係るプログラムは、上記エネルギー管理システムにおける保守サーバの動作をコンピュータに実行させるためのプログラムであって、前記蓄電装置から前記蓄電池情報を所定タイミングで逐次取得する取得ステップと、前記取得ステップで取得された前記蓄電池情報を記憶する記憶ステップと、前記記憶ステップで記憶された前記蓄電池情報に基づいて、前記蓄電装置における前記蓄電池の状態を監視する監視ステップと、をコンピュータに実行させる。
 以下、図面を参照し、本発明の実施の形態を詳しく説明する。図中同一又は相当部分には同一符号を付してその説明は繰り返さない。
 <第1実施形態>
 図1は、本実施形態に係るエネルギー管理システムを示す模式図である。図1に示すように、本実施形態に係るエネルギー管理システム1は、1軒の住宅(以下、ユーザ宅と称する)ごとに設置されるHEMS10と、HEMS10の運用を管理する管理会社に設置されるHEMS管理サーバ20と、蓄電装置13の保守及び管理を行う保守会社に設置される保守サーバ30とを有する。HEMS10、HEMS管理サーバ20、及び保守サーバ30は、インターネット等の通信網2に接続されている。以下、各構成について説明する。
 HEMS管理サーバ20は、CPU(Central Processing Unit)と、RAM(Random Access Memory)及びROM(Read Only Memory)を含むメモリと、通信インタフェースとを有する(いずれも図示略)。HEMS管理サーバ20は、ROMに記憶されている制御プログラムをCPUが実行することにより、通信インタフェースにより通信網2を介してHEMS10の管理装置11と通信接続し、管理装置11からHEMS10に関する情報(HEMS情報)を受信する。HEMS情報には、例えば、HEMS10における消費電力量等の情報が含まれる。
 HEMS10は、図1に示すように、管理装置11、HUB12、蓄電装置13、機器群14(14a~14n)、ルータ15、及び分電盤16を有する。
 HEMS10の通信プロトコルは、例えば、ECHONET Lite等が用いられ、下位レイヤにはイーサネット(登録商標)等のLAN(Local Area Network)が使用されている。なお、HEMS10の通信プロトコルとしては、ECHONET Lite以外に、ECHONET、SEP2.0(Smart Energy Profile 2.0)、及びKNX等が挙げられる。ルータ15は、LANインタフェース及びWAN(Wide Area Network)インタフェースを有する。ルータ15のLANインタフェースには、管理装置11、HUB12、及び蓄電装置13が接続され、ルータ15のWANインタフェースには、ユーザ宅のブロードバンド回線が接続されている。
 管理装置11は、ECHONET Liteに準拠した蓄電装置13及び機器群14が接続されており、管理装置11と蓄電装置13及び機器群14の間は、ECHONET Liteの下位レイヤで規定されたプロトコルに基づく通信経路(第1通信経路)を介して相互に通信される。また、管理装置11は、ルータ15のWANインタフェースを介して通信網2に接続され、HEMS管理サーバ20に接続するための通信経路(第3通信経路)を介してHEMS管理サーバ20と通信可能となっている。
 蓄電装置13は、管理装置11を介さず、ルータ15のWANインタフェースにより通信網2に接続し、保守サーバ30に接続するための通信経路(第2通信経路)を介して保守サーバ30と通信可能となっている。なお、第1通信経路と第2通信経路は物理的に異なる通信経路であってもよいし、論理的に異なる通信経路であってもよい。要は、管理装置11を介さず、HEMS10における通信経路とは異なる通信経路を介して保守サーバ30と蓄電装置13とが通信されていればよい。
 管理装置11には、LANインタフェースが設けられており、LANインタフェースに機器14a及び14bが接続されている。HUB12には、機器14c~14nが接続されている。機器14a~14nは、ECHONET Liteに対応した照明、冷蔵庫、テレビ、エアコン等の電力を消費する機器である。機器群14は、分電盤16及び蓄電装置13と電力線(図示略)を介して接続され、管理装置11の制御の下、分電盤16又は蓄電装置13から電力が供給され、所定の動作を行う。機器群14の各々は、当該機器において発生したエラー情報等を含む、機器に関する機器情報を第1通信経路に送出する。
 管理装置11は、CPUと、RAM及びROMを含むメモリと、表示部と、操作部と、 通信部とを有する(いずれも図示略)。
 表示部は、例えば液晶ディスプレイを有し、操作画面や、ユーザ宅における消費電力及び機器群14の使用状態等の各種情報を表示する。操作部は、表示部の上に設けられたタッチパネルを有し、ユーザ操作を受け付ける。通信部は、ユーザ宅における蓄電装置13及び機器群14と通信を行うとともに、ルータ15を介して通信網2と接続し、HEMS管理サーバ20と通信する。
 管理装置11は、ROMに記憶されている制御プログラムをCPUが実行することにより、例えば、予め設定されたHEMS10の運転スケジュールに従って、蓄電装置13や機器群14の動作を制御し、ユーザ宅における電力を制御する。また、管理装置11は、分電盤16に設けられた電力量計測センサ(図示略)により、分電盤16から蓄電装置13及び機器群14に供給される電力量を所定時間ごとに計測して計測結果を表示部に表示する。さらに、管理装置11は、ルータ15により通信網2を介してHEMS管理サーバ20と接続し、消費電力量等のHEMS情報を一定時間ごとに送信する。また、管理装置11は、後述する蓄電装置13から蓄電池131(図2参照)の異常を知らせる通知を受け取った場合、通信網2を介してHEMS管理サーバ20に蓄電池131の異常を通知する。
 蓄電装置13は、ルータ15を介して管理装置11と接続されている。蓄電装置13は、所定のタイミングで、ルータ15により通信網2に接続し、通信網2を介して保守サーバ30と通信を行う。具体的には、蓄電装置13は、蓄電池131に関する情報(以下、蓄電池情報と称する)及び蓄電池131の異常を示す異常情報を第2通信経路を介して保守サーバ30に送信する。なお、蓄電池情報及び異常情報の詳細は後述する。また、蓄電装置13は、管理装置11に接続された機器群14の各々から送信されたエラー情報等の機器情報を第1通信経路を介して受信し、機器情報を第2通信経路を介して保守サーバ30へ送信する。また、蓄電装置13は、第2通信経路を介して、蓄電池情報の送信頻度や蓄電池131の使用可能期限等を保守サーバ30に問い合わせ、保守サーバ30から送信される送信頻度や使用可能期限等の各種情報に基づいて動作を行う。
 図2は、蓄電装置13の構成を例示したブロック図である。図2に示すように、蓄電装置13は、蓄電池131、温度センサ131a、容量計測センサ131b、電圧検出センサ131c、制御部132、インバータ133、通信インタフェース134、及び報知部135を有する。
 蓄電池131は、繰り返し充放電可能な二次電池であり、本実施形態ではリチウムイオン電池が用いられている。蓄電池131は、インバータ133で変換された直流電力を蓄電する。蓄電池131には、温度センサ131a、容量計測センサ131b、及び電圧検出センサ131cが接続されている。温度センサ131aは、一定時間ごとに蓄電池131の温度を計測した結果を制御部132に出力する。容量計測センサ131bは、一定時間ごとに蓄電池131において入出力される電流を検出し、蓄電池131の容量を計測した結果を制御部132に出力する。電圧検出センサ131cは、一定時間ごとに蓄電池131の電圧を検出した結果を制御部132に出力する。
 インバータ133は、制御部132の制御の下、分電盤16から供給される交流電力を、蓄電池131の電圧に応じた直流電力に変換して蓄電池131に出力するとともに、蓄電池131から放電された直流電力を所定電圧の交流電力に変換して機器群14に出力する。
 通信インタフェース134は、制御部132の制御の下、ルータ15を介して通信網2に接続された保守サーバ30と通信を行うとともに、ルータ15を介して管理装置11と通信を行う。
 報知部135は、蓄電装置13の外側から視認可能に設けられた複数のLED(Light Emitting Diode)と、スピーカとを有する。報知部135は、制御部132の制御の下、LEDを点灯し、スピーカから所定の音声を出力する。
 制御部132は、CPUとRAM及びROMを含むメモリとを有する。制御部132は、ROMに記憶されている制御プログラムをCPUが実行することにより、制御部132に接続された各部を制御するとともに、保守サーバ30又は管理装置11とデータをやりとりする。以下、具体的に説明する。
 制御部132は、蓄電池131の充電と放電を制御する。制御部132における蓄電池131を充電する機能を充電部と称し、蓄電池131を放電する機能を放電部と称する。
 また、制御部132は、予め定められた送信タイミングで、蓄電池情報を、通信インタフェース134を介して保守サーバ30に送信する。蓄電池情報は、温度センサ131aが検出した温度、容量計測センサ131bが検出した容量、及び電圧検出センサ131cが検出した電圧値を含む。蓄電池情報は、予め定められた送信頻度(例えば、15分毎)で保守サーバ30に送信される。蓄電池情報の送信タイミングは、管理装置11からHEMS情報が送信されるタイミングとは異なっている。蓄電池情報の送信頻度は、蓄電装置13において予め設定されているが、制御部132は、後述する保守サーバ30に送信頻度の問い合わせを行い、保守サーバ30から取得した送信頻度で蓄電池情報を保守サーバ30に送信する。保守サーバ30への送信頻度の問い合わせは、例えば、所定時間ごとに行ってもよいし、蓄電池情報を送信する際に行ってもよい。
 また、制御部132は、蓄電池情報の他に、蓄電池131の異常を示す異常情報を管理装置11に送信するとともに、保守サーバ30に送信する。異常情報は、制御部132により、蓄電池131が異常であると判断されたときに管理装置11と保守サーバ30に送信される。蓄電池131が異常であるか否かは、温度、容量、及び電圧値のそれぞれに対応する所定の閾値(以下、第1閾値)に基づいて判断される。制御部132は、検出された温度が所定の温度T1(℃)以上である場合、又は、検出された容量が所定の容量C1(%)以下である場合、又は、検出された電圧値が所定の電圧値V1以上である場合に、蓄電池131が異常であると判断する。
 制御部132は、蓄電池131が異常であると判断した場合、異常と判断した蓄電池情報を含む異常情報を管理装置11へ送信するとともに、通信インタフェース134を介して保守サーバ30に送信する。さらに、制御部132は、蓄電池131が異常であると判断した場合、報知部135において、蓄電池131の異常を表すLEDを点灯し、スピーカから蓄電池131の異常を示す報知音を出力する。
 また、制御部132は、保守サーバ30に対して蓄電池131の使用可能期限の問い合わせを行い、蓄電池131の使用可能期限を示す交換情報を保守サーバ30から取得する。保守サーバ30への使用可能期限の問い合わせは、例えば、所定期間ごとに行ってもよいし、蓄電池情報を送信する際に行ってもよい。制御部132は、保守サーバ30から蓄電池131の交換情報を受け取った場合、交換情報が示す使用可能期限より一定期間前のタイミングで蓄電池131の交換を表すLEDを点灯し、スピーカから蓄電池131の交換を示す報知音を出力する。
 また、制御部132は、機器群14の各々から送信された機器情報を受信した場合、受信した機器情報を、通信インタフェース134を介して保守サーバ30に送信する。
 次に、保守サーバ30について説明する。図3は、保守サーバ30の構成例を示すブロック図である。図3に示すように、保守サーバ30は、制御部31、通信インタフェース32、記憶部33、表示部34、及び操作部35を有する。
 記憶部33は、ハードディスク等の不揮発性記憶媒体で構成される。記憶部33は、ユーザ情報DB(Database)33aと、蓄電池情報DB33bと、異常情報DB33cとを含む。ユーザ情報DB33a、蓄電池情報DB33b、及び異常情報DB33cの詳細は後述する。
 表示部34は、例えば液晶ディスプレイ等のディスプレイを有し、制御部31の制御の下、蓄電池131に関する情報やユーザ情報等の各種データを表示する。
 操作部35は、例えばキーボード等の入力装置を有する。操作部35は、オペレータによる入力装置の操作を受け付け、受け付けた操作の内容を示す信号を制御部31へ出力する。
 制御部31は、CPUとRAM及びROMを含むメモリとを有する。制御部31は、ROMに記憶されている制御プログラムをCPUが実行することにより、取得部311、通知部312、及び監視部313の各機能を実現する。以下、各機能について説明する。
 取得部311は、通信インタフェース32により通信網2を介して蓄電装置13と接続し、蓄電装置13から一定時間ごとに蓄電池情報を取得し、取得した蓄電池情報を記憶部33の蓄電池情報DB33bに記憶する。また、取得部311は、蓄電装置13から異常情報を取得した場合には、取得した異常情報を異常情報DB33cに記憶する。また、取得部311は、機器群14から送信された機器情報を取得した場合、取得した機器情報を記憶部33における所定の記憶領域に蓄電装置13ごとに記憶する。
 監視部313は、蓄電池情報DB33bに記憶された蓄電装置13ごとの蓄電池情報に基づいて、蓄電装置13における蓄電池131の状態を監視する。
 具体的には、監視部313は、蓄電池情報DB33bに記憶された蓄電装置13ごとの蓄電池情報に基づき、その蓄電装置13における蓄電池131が警告を発する状態(以下、警告状態)であるか否かを判断する。警告状態か否かの判断は、蓄電池情報に含まれる温度、容量、及び電圧値のそれぞれに対応する上記第1閾値(T1,C1,V1)とは異なる第2閾値に基づいて判断される。監視部313は、蓄電池131の温度がT1(℃)未満であり、T2(℃)(<T1)以上である場合、又は、蓄電池131の容量がC1(%)より大きく、C2(>C1)(%)以下である場合、又は、蓄電池131の電圧値がV1未満であり、V2(<V1)以上である場合に、蓄電池131が警告状態であると判断する。そして、監視部313は、警告状態であると判断した場合には、警告状態と判断された蓄電装置13に予め設定されている蓄電池情報の送信頻度(例えば、15分ごと)を、その送信頻度よりも高い送信頻度(例えば、5分ごと)に設定する。
 さらに、監視部313は、蓄電装置13ごとの一定期間分の蓄電池情報に基づいて、各蓄電装置13の蓄電池131の使用可能期限を推定する。つまり、監視部313は、蓄電池情報DB33bにおける蓄電装置13の一定期間分の蓄電池情報と、予め設定された蓄電池131の耐用年数に対する使用条件(温度、電圧、及び容量)とに基づいて、蓄電池131の使用可能期限を推定する。具体的には、監視部313は、例えば、ある蓄電装置13の一定期間分の蓄電池情報における温度の平均値が、使用条件で定められている温度より高い場合には、その蓄電装置13の蓄電池131の使用可能期限として、予め設定されている耐用年数で規定される使用可能期限より短い使用可能期限を推定する。
 通知部312は、通信インタフェース32を介して、ユーザ又は蓄電装置13に対して各種通知を行う。具体的には、通知部312は、取得部311によって異常情報DB33bに異常情報が記憶された場合には、その異常情報を送信した蓄電装置13に対応するユーザ情報をユーザ情報DB33aから読み出す。そして、通知部312は、通信インタフェース32を介して、読み出したユーザ情報のメールアドレスを宛先とし、蓄電池131が異常であることを示すメールを送信する。この場合、通知部312は、異常情報DB33bに異常情報が記憶された場合、異常情報を送信した蓄電装置13のユーザ情報をユーザ情報DB33aから読み出し、読み出したユーザ情報を表示部34に表示して、保守サーバ30のオペレータに異常情報を取得したことを通知してもよい。これにより、オペレータは、表示されたユーザ情報の電話番号を参照し、蓄電池131が異常であることを、ユーザに電話等で連絡することができる。
 また、通知部312は、蓄電装置13からの送信頻度の問い合わせに応じて、監視部313において蓄電池131が警告状態であると判断された蓄電装置13に対しては、監視部313で設定された送信頻度を示す情報を、通信インタフェース32を介して送信する。一方、警告状態であると判断されなかった蓄電装置13に対しては、通知部312は、当該蓄電装置13に予め設定されている送信頻度と同じ送信頻度を示す情報を、通信インタフェース32を介して送信する。
 また、通知部312は、蓄電装置13からの蓄電池131の使用可能期限の問い合わせに応じて、監視部313において蓄電装置13ごとに推定された使用可能期限を示す交換情報を、その蓄電装置13に通信インタフェース32を介して送信する。
 ここで、ユーザ情報DB33a、蓄電池情報DB33b、及び異常情報DB33cの各データ構造について説明する。図4Aは、ユーザ情報DB33aのデータ構造例を示す図である。図4Aに示すように、ユーザ情報DB33aは、各ユーザ宅における蓄電装置13を識別する蓄電装置IDごとに、ユーザ情報として、ユーザ名、メールアドレス、電話番号、及び住所等のデータが記憶されている。メールアドレスと電話番号は、例えば、ユーザの緊急連絡先として、ユーザが所有する携帯電話等に設定されているメールアドレスと電話番号が記憶されている。ユーザ情報は、オペレータによって、蓄電装置13がHEMS10に設置された際に登録され、随時更新される。
 図4Bは、蓄電池情報DB33bのデータ構造例を示す図である。図4Bに示すように、蓄電池情報DB33bは、蓄電装置IDごとに、蓄電装置13から取得した蓄電池情報(温度、電圧、容量)を受信時刻の順に逐次記憶する。
 図4Cは、異常情報DB33cのデータ構造例を示す図である。図4Cに示すように、異常情報DB33cは、蓄電装置IDごとに、蓄電装置13から取得した異常情報に含まれる蓄電池情報(温度、電圧、容量)を、その異常情報の受信時刻とともに記憶する。異常情報は、蓄電装置13において蓄電池131が異常であると判断されたタイミングで送信され、異常情報が送信される度に、蓄電装置IDごとに記憶される。図4Cでは、蓄電装置ID「10003」の蓄電装置13から、受信時刻「2013/12/20 13:40」に異常情報を受信し、この異常情報において、蓄電装置13において異常と判断された蓄電池情報(温度tx、電圧vx、容量cx)が含まれている例を示している。
 上述した第1実施形態では、1軒のユーザ宅に設置されたHEMS10における蓄電装置13は、管理装置11を介さずに、第1通信経路と異なる第2通信経路を介して接続された保守サーバ30と通信することができる。そのため、蓄電池131に異常が発生し、蓄電装置13から管理装置11に蓄電池131の異常を通知する際、第1通信経路や管理装置11に障害が発生しても、第2通信経路を介して蓄電池131が異常であることを保守サーバ30に通知することができるので、蓄電池131の異常に対して迅速に対処することができる。
 また、保守サーバ30は、蓄電装置13から一定時間ごとに送信される蓄電池情報を取得して記憶することができるので、蓄電池情報に基づいて蓄電装置13の蓄電池131の状態を監視することができる。さらに、蓄電池131が警告状態の場合、蓄電池情報の送信頻度を高く設定することができるので、蓄電池131の状態の監視を強化し、蓄電池131に異常が発生する前に対処することができる。
 また、蓄電装置13は、蓄電池131の使用可能期限を保守サーバ30に問い合わせ、保守サーバ30において推定された蓄電池131の使用可能期限を示す交換情報を取得する。蓄電装置13は、交換情報が示す使用可能期限から所定期間前に蓄電池131の交換を報知するため、ユーザは、蓄電池131の交換時期を知ることができ、蓄電池131をより安全に使用することができる。
 また、蓄電装置13は、機器群14から送信される機器情報を取得し、保守サーバ30に送信する。管理装置11や、管理装置11とHEMS管理サーバ20の間の第3の通信経路に障害が発生しても、機器群14の機器情報が保守サーバ30に送信されるため、利用者等は、管理装置11に接続されている機器群14の状態をより確実に把握することができる。
 <第2実施形態>
 上述した第1実施形態では、1軒の住宅ごとに設置されたHEMS10における蓄電装置13の蓄電池131を監視する例を説明したが、マンション等の集合住宅に設置される複数の蓄電装置13から第1実施形態と同様に蓄電池情報を保守サーバに送信し、保守サーバにおいて複数の蓄電装置13における各蓄電池131を監視してもよい。この場合、保守サーバに対し複数の蓄電装置13から蓄電池情報が同時に送信されると、保守サーバと複数の蓄電装置13との間で通信エラーが生じる場合がある。そこで、本実施形態では、集合住宅における複数の蓄電装置13と保守サーバとの間において通信エラーが生じないように、保守サーバが複数の蓄電装置13から監視情報を取得する例について説明する。
 図5は、本実施形態におけるエネルギー管理システムの構成例を示す模式図である。図5において、第1実施形態と同様の構成には第1実施形態と同様の符号が付されている。以下、第1実施形態と異なる構成について説明する。
 図5に示すように、集合住宅100は、複数の住戸(ユーザ宅)からなる専有部101と、住戸部分を除く共用部102とを有する。集合住宅100には、系統電力3から電力を受電する受電部103が設けられ、受電部103から専有部101における各ユーザ宅及び共用部102に設けられた各分電盤16に電力が分配される。
 図5に示すように、本実施形態におけるエネルギー管理システム1Aは、専有部101において、ユーザ宅ごとに、第1実施形態と同様のHEMS10が設けられ、共用部102には、MEMS(Mansion Energy Management System)10aが設けられている。図5のHEMS10においては、HUB12の図示を省略しているが、第1実施形態と同様、ルータ15にはHUB12が接続され、HUB12と管理装置11に機器群14が接続されている。
 専有部101に設けられている各HEMS10と共用部102に設けられているMEMS10aは、通信網2を介してHEMS/MEMS管理サーバ21と接続されている。
 MEMS10aは、ルータ15のLANインタフェースに、MEMS管理装置111と、蓄電装置13と、機器群141とが接続されて構成されている。MEMS10aの通信プロトコルは、HEMS10と同様、ECHONET Liteが用いられ、MEMS管理装置111と、蓄電装置13及び機器群141との間は、下位レイヤであるLANの規格に基づく通信経路(第1通信経路)を介して相互に通信される。機器群141は、ECHONET Liteに準拠した、例えば、共用部102に設置されている照明、空調、エレベータ等、電力を消費する機器である。また、MEMS管理装置111は、ルータ15により通信網2に接続し、HEMS/MEMS管理サーバ21と接続するための通信経路(第3通信経路)を介してHEMS/MEMS管理サーバ21に接続されている。
 なお、以下の説明において、HEMS10に接続された蓄電装置13と、MEMS10aに接続された蓄電装置13とを区別する場合、HEMS10に接続された蓄電装置をHEMS用蓄電装置と称し、MEMS10aに接続された蓄電装置をMEMS用蓄電装置と称する。
 本実施形態では、集合住宅100における各蓄電装置13から相互に異なるタイミングで保守サーバ30Aに蓄電池情報が送信されるように、予め、各蓄電装置13に蓄電池情報の送信タイミングが設定されている。各蓄電装置13の蓄電池情報の送信タイミングは、例えば、蓄電装置13のシリアルNo.に含まれる数値を元に一定時間ずつずらした時間が設定されていてもよい。
 MEMS管理装置111は、CPUと、RAM及びROMを含むメモリと、表示部と、操作部と、通信部とを有する(いずれも図示略)。表示部は、例えば液晶ディスプレイを有し、操作画面や、共用部102における消費電力及び機器群141の使用状態等の各種情報を表示する。操作部は、表示部の上に設けられたタッチパネルを有し、ユーザ操作を受け付ける。通信部は、MEMS用蓄電装置13及び機器群141と通信を行うとともに、ルータ15を介して通信網2に接続し、HEMS/MEMS管理サーバ21と通信する。
 MEMS管理装置111は、ROMに記憶された制御プログラムをCPUが実行することにより、予め定められたMEMS10aの運転スケジュールに従って、MEMS用蓄電装置13や機器群141の動作を制御し、共用部102における電力を制御する。また、MEMS管理装置111は、分電盤16に設けられた電力量計測センサ(図示略)により、分電盤16からMEMS用蓄電装置13及び機器群141に供給される電力量を所定時間ごとに計測して計測結果を表示部に表示する。さらに、MEMS管理装置111は、ルータ15により通信網2を介してHEMS/MEMS管理サーバ21に接続し、共用部102における消費電力量等の情報を一定時間ごとに送信する。また、MEMS管理装置111は、MEMS用蓄電装置13から蓄電池131(図2参照)の異常情報を受け取った場合、HEMS/MEMS管理サーバ21に蓄電池131の異常を通知する。
 HEMS/MEMS管理サーバ21は、通信網2を介して、複数の管理装置11とMEMS管理装置111とに接続されている。HEMS/MEMS管理サーバ21は、CPUとRAM及びROMを含むメモリと、通信インタフェースとを有する(いずれも図示略)。
 HEMS/MEMS管理サーバ21は、ROMに記憶されている制御プログラムをCPUが実行することにより、通信インタフェースを介して通信網2に接続して管理装置11及びMEMS管理装置111と通信を行い、管理装置11とMEMS管理装置111から消費電力等に関する情報を受信する。
 保守サーバ30Aは、複数のHEMS用蓄電装置13及びMEMS用蓄電装置13と通信網2(第2通信経路)を介して接続されている。図6は、保守サーバ30Aの構成例を示すブロック図である。図6において、第1実施形態の保守サーバ30(図3参照)と同様の構成には第1実施形態と同様の符号が付されている。保守サーバ30Aは、集合住宅100における複数の蓄電装置13から蓄電池情報を取得する点で保守サーバ30と異なるが、保守サーバ30と同様の機能を有する。以下、第1実施形態と異なる構成について説明する。
 記憶部33は、第1実施形態と同様、ユーザ情報DB33aを含む。本実施形態では、ユーザ情報DB33aに、HEMS用蓄電装置13のユーザ情報に加え、MEMS用蓄電装置13のユーザ情報が記憶される。MEMS用蓄電装置13のユーザ情報としては、共用部102を管理する管理人の携帯端末のメールアドレス、電話番号、住所等が記憶される。
 制御部31Aは、CPUとRAM及びROMを含むメモリとを有する。制御部31Aは、ROMに記憶されている制御プログラムをCPUが実行することにより、取得部311A、通知部312A、及び監視部313Aの各機能を実現する。
 取得部311Aは、通信インタフェース32により通信網2(第2通信経路)を介して集合住宅100における各蓄電装置13と接続し、集合住宅100における各蓄電装置13から相互に異なるタイミングで蓄電池情報を取得し、取得した蓄電池情報を蓄電装置13ごとに蓄電池情報DB33bに記憶する。
 監視部313Aは、第1実施形態の監視部313と同様の機能を有し、集合住宅100における複数の蓄電装置13の蓄電池情報に基づいて各蓄電池131の状態を監視する。また、通知部312Aは、第1実施形態の通知部312と同様の機能を有し、集合住宅100におけるユーザ及び複数の蓄電装置13に対して各種通知を行う。
 上述した第2実施形態では、保守サーバ30Aは、集合住宅100における複数の蓄電装置13から蓄電池情報を各々取得することができるので、集合住宅100における各蓄電池131の状態を監視することができる。また、相互に異なる送信タイミングで複数の蓄電装置13から蓄電池情報が送信されることで、集合住宅100における複数の蓄電装置13から蓄電池情報が同時に送信される場合と比べ、保守サーバ30Aと各蓄電装置13間の通信トラフィックが抑制され、安定した通信を行うことができる。
 <第3実施形態>
 上述した第2実施形態において、集合住宅100における複数の蓄電装置13が、同じ時刻に蓄電池131の充電を開始すると、集合住宅100の受電部103に瞬時に負荷がかかる。本実施形態では、集合住宅100における受電部103の瞬時負荷を軽減するように、各蓄電装置13において定電流定電圧方式(CC-CV方式)で蓄電池131を充電する例を説明する。
 図7は、本実施形態における保守サーバの構成例を示すブロック図である。図7に示すように、保守サーバ30Bの制御部31Bは、第2実施形態の保守サーバ30Aの制御部31Aの構成に加え、充電制御部315を有する。充電制御部315は、集合住宅100における各蓄電装置13からの問い合わせに応じて、蓄電装置13における蓄電池131の充電に関する制御情報を、通信インタフェース32を介して各蓄電装置13へ送信する。
 図8は、定電流定電圧充電による電圧と電流の時間変化を模式的に表した図である。図8に示すように、定電流定電圧充電方式は、蓄電池131の電圧が所定電圧V1に到達するまで破線で示す一定電流C1で充電し、所定電圧V1に到達後は、所定電圧V1で充電し、所定電圧V1となるように電流量を小さくする充電方法(第1の充電方法)である。図8に示す充電開始時刻t0において、集合住宅100における全ての蓄電装置13の蓄電池131に一定電流C1が入力されると、受電部103に瞬時負荷がかかり電力が低下する。
 各蓄電装置13は、予め設定された充電開始時刻を、蓄電装置13ごとに設定された遅延時間だけずらした時刻に各々充電を開始する。具体的には、各蓄電装置13は、所定時間に蓄電装置13ごとに異なる遅延係数を乗算して得られる遅延時間だけ充電開始時刻をずらした時刻に充電を開始する。本実施形態では、各蓄電装置13は、予め、当該蓄電装置13の遅延係数を保守サーバ30Bに問い合わせ、保守サーバ30Bから遅延係数を取得しておく。
 充電制御部315は、集合住宅100における各蓄電装置13の蓄電池131に一定電流C1が入力されるタイミング、つまり、各蓄電池131の充電開始タイミングが一定時間ずつ遅延するように蓄電池131の遅延係数を設定し、蓄電装置13からの遅延係数の問い合わせに応じて、設定した遅延係数を蓄電装置13に送信する。
 これにより、集合住宅100における複数の蓄電装置13の各蓄電池131に一定電流C1が同時に入力されないため、受電部103の瞬時負荷が軽減される。
 また、図9に示すように、充電開始時刻t0から所定時間経過後に一定電流C1となるように電流量を徐々に増加させ、一定電流C1に到達した後は定電流定電圧充電を行うソフトスタート方式の充電(第2の充電方法)を行ってもよい。ソフトスタート方式で充電を行う場合、集合住宅100における各蓄電装置13に同時に入力される電流量は図8の場合と比べて小さいため、各蓄電装置13の充電開始時刻が同じであっても、受電部103の瞬時負荷を軽減することができる。
 ソフトスタート方式で充電を行う場合、充電制御部315は、集合住宅100における各蓄電装置13に対し、予め設定された充電開始時刻t0から一定電流C1に到達するまでの時間t1(以下、定電流到達時間)を設定する。そして、充電制御部315は、各蓄電装置13からの問い合わせに応じて、ソフトスタート方式による充電の指示情報として、定電流到達時間t1を各蓄電装置13に送信する。集合住宅100における各蓄電装置13は、保守サーバ30Bから指示情報を取得し、定電流到達時間t1において電流量がC1となるように、充電開始時刻t0から充電を開始する。
 なお、ソフトスタート方式で充電を行う場合、充電制御部315は、集合住宅100における複数の蓄電装置13のうちの少なくとも一部の蓄電装置13の充電開始タイミングが、他の蓄電装置13と異なるように遅延係数を設定してもよい。つまり、例えば、一部の蓄電装置13は、他の蓄電装置13の充電開始時刻t0よりも一定時間だけ遅延するように遅延係数を設定する。このように構成することにより、集合住宅100における複数の蓄電装置13の充電開始タイミングが同じである場合と比べて、受電部103の瞬時負荷をより軽減することができる。
 また、ソフトスタート方式で充電を行う場合、充電制御部315は、集合住宅100における複数の蓄電装置13のうちの少なくとも一部の蓄電装置13に対しては、他の蓄電装置13と異なる定電流到達時間を設定してもよい。つまり、例えば、一部の蓄電装置13に対しては図9に示す定電流到達時間t1を設定し、他の蓄電装置13に対しては、図10に示すように、定電流到達時間t1よりも長い定電流到達時間t2を設定してもよい。このように構成することで、他の蓄電装置13の蓄電池131に入力される電流の増加率は一部の蓄電装置13の蓄電池131に入力される電流の増加率より小さくなるため、蓄電池131に入力される電流量の増加率が全て同じである場合と比べて受電部103の瞬時負荷を小さくすることができる。
 また、ソフトスタート方式で充電を行う場合、充電制御部315は、集合住宅100における複数の蓄電装置13のうちの少なくとも一部の蓄電装置13に対しては、他の蓄電装置13の充電開始タイミングと異なるように遅延係数を設定するとともに、他の蓄電装置13の定電流到達時間と異なる定電流到達時間を設定してもよい。つまり、例えば、一部の蓄電装置13に対しては、他の蓄電装置13の充電開始時刻t0から一定時間だけ遅延するように遅延係数を設定するとともに、他の蓄電装置13の定電流到達時間よりも長い定電流到達時間を設定してもよい。このように構成することで、集合住宅100における複数の蓄電装置13における充電開始時刻、及び蓄電池131に入力される電流量の増加率を異ならせることができる。そのため、複数の蓄電装置13における充電開始タイミングと電流量の増加率が同じである場合と比べ、より確実に受電部103の瞬時負荷を小さくすることができる。
 上述した第3実施形態では、保守サーバ30Bは、蓄電装置13における充電の制御情報として、遅延係数及び定電流到達時間の少なくとも一方を、集合住宅100における各蓄電装置13に対して設定することができる。そのため、集合住宅100における各蓄電装置13が蓄電池131を充電することによる受電部103の瞬時負荷が軽減され、集合住宅100において安定した電力供給を行うことができる。
 <第4実施形態>
 本実施形態では、第2実施形態における複数の蓄電装置13において、蓄電池131の自動点検モードが設けられている例について説明する。自動点検モードとは、予め定められた時刻に、蓄電池131を完全放電し、所定時間の経過後に満充電して蓄電池131の容量を計測するモードである。
 集合住宅100における受電部103等の電気設備は法定点検が義務付けられている。法定点検日に自動点検モードを動作させると、法定点検の間は停電となるため、受電部103から各分電盤16に対して給電されず、蓄電池131も使用することができない。
 そこで、本実施形態では、集合住宅100に対して定められた法定点検日を避け、集合住宅100における複数の蓄電装置13において自動点検モードを動作させるように制御する。
 図11は、本実施形態における保守サーバの構成例を示すブロック図である。保守サーバ30Cの記憶部33は、第2実施形態と同様にユーザ情報DB33aが含まれるが、集合住宅100における複数の蓄電装置13に対し、集合住宅100の法定点検日を示す情報(以下、法定点検情報)が記憶される点で第2実施形態と異なる。なお、法定点検情報は、予め、保守サーバ30Cのオペレータによってユーザ情報DB33aに登録される。
 また、制御部31Cは、第2実施形態の保守サーバ30Aの制御部31Aの構成に加え、自動点検制御部316を有する。自動点検制御部316は、ユーザ情報DB33aにおいて、集合住宅100における各蓄電装置13の法定点検情報を参照し、各蓄電装置13において自動点検モードを動作させる自動点検日として、法定点検情報が示す法定点検日を除いた日を設定する。
 通知部312Cは、第2実施形態における通知部312Aの機能に加え、集合住宅100における各蓄電装置13からの自動点検日の問い合わせに応じて、各蓄電装置13に対し、自動点検制御部316によって設定された自動点検日を通知する機能を有する。
 各蓄電装置13は、保守サーバ30Cに自動点検日の問い合わせを行い、保守サーバ30Cから自動点検日を示す自動点検情報を取得する。自動点検日の問い合わせは、予め蓄電装置13に設定されている自動点検日の所定期間前に行ってもよいし、蓄電池情報を送信する際に行ってもよい。そして、蓄電装置13は、保守サーバ30Cから取得した自動点検情報が示す日の予め定められた時間に、蓄電池131の自動点検モードの動作を開始する。図12は、蓄電装置13の自動点検モードの動作を示すフロー図である。
 蓄電装置13における制御部132の放電部(図示略)は、HEMS10又はMEMS10aに接続された機器群14,141を用いた蓄電池131の放電を開始する(ステップS101)。制御部132の放電部は、蓄電池131を完全放電させるまで(ステップS102:NO)、蓄電池131の放電を続ける。
 制御部132は、蓄電池131を完全放電させると(ステップS102:YES)、所定時間が経過するまで待機する(ステップS103:NO)。なお、所定時間は、1時間以上、24時間以下が望ましい。
 制御部132の充電部(図示略)は、所定時間の経過後(ステップS103:YES)、定電流定電圧方式による蓄電池131の充電を開始し、蓄電池131を満充電する(ステップS104)。また、制御部132は、容量計測センサ131bにより、蓄電池131の充電時における電流量を計測し、満充電時の充電容量を測定する(ステップS105)。制御部132は、蓄電池131の充電容量が予め設定された充電容量以下である場合には(ステップS106:YES)、充電容量が予め設定された充電容量以下であることを示す自動点検情報を保守サーバ30に送信して自動点検モードの動作を終了する(ステップS107)。なお、ステップS106において、蓄電池131の充電容量が予め設定された充電容量より大きい場合には(ステップS106:NO)、制御部132は、自動点検モードの動作を終了する。
 上述した第4実施形態では、集合住宅100に対して設定された法定点検日を避けて、集合住宅100における各蓄電装置13の蓄電池131の自動点検日を設定することができる。そのため、ユーザは、法定点検日において蓄電装置13を使用して機器群14,141を動作させることができる。
 <第5実施形態>
 本実施形態では、上述した第1実施形態の蓄電装置13における蓄電池131の充放電容量に応じて課金する例について説明する。
 本実施形態において、蓄電装置13の制御部132は、蓄電池131に設けられた容量計測センサ131bにより検出される電流量に基づいて、一定期間における蓄電池131の充電容量と放電容量を計測し、計測した充電容量と放電容量とを示す充放電情報を、通信インタフェース134を介して保守サーバ30に送信する。
 図13は、本実施形態における保守サーバの構成例を示すブロック図である。図13において、第1実施形態と同様の構成には第1実施形態と同じ符号が付されている。以下、第1実施形態と異なる構成について説明する。
 記憶部33Dは、ユーザ情報DB33a、蓄電池情報DB33b、及び異常情報DB33cに加え、課金情報DB33dを含む点で第1実施形態の記憶部33と異なる。
 制御部31Dは、取得部311に替えて取得部311Dを備え、さらに課金設定部317を備える点で第1実施形態の制御部31と異なる。
 取得部311Dは、通信インタフェース32を介して、蓄電池情報及び異常情報に加え、充放電情報を蓄電装置13から取得する。取得部311Dは、蓄電装置13から充放電情報を取得した場合、課金情報DB33dにおいて、蓄電装置13の蓄電装置IDと充放電情報とを対応づけて記憶する。
 課金設定部317は、充電容量及び放電容量に応じて定められた課金条件に基づいて、課金情報DB33dに記憶された各蓄電装置13の充電容量及び放電容量に対する課金額を算出する。そして、課金設定部317は、各蓄電装置13に対応するメールアドレスをユーザ情報DB33aから読み出し、読み出したメールアドレスを宛先として、算出した課金額を示すメールを送信する。
 蓄電装置13を利用するユーザは、保守サーバ30Dから課金額を示すメールを受け取り、一定期間における蓄電池131の充放電容量、つまり、蓄電池131の使用量に応じた課金額を確認することができる。
 <変形例>
 以上、本発明の実施の形態を説明したが、上述した実施の形態は本発明を実施するための例示に過ぎない。よって、本発明は上述した実施の形態に限定されることなく、その趣旨を逸脱しない範囲内で上述した実施の形態を適宜変形して実施することが可能である。以下、本発明の変形例について説明する。
 (1)上述した第1実施形態において、保守サーバ30は、使用可能期限を推定した蓄電装置13に対応するユーザのメールアドレスに、蓄電池131の使用可能期限を示すメールを送信してもよい。また、保守サーバ30は、使用可能期限を推定した蓄電装置13に対応するユーザ情報と、その使用可能期限とを表示部34に表示してもよい。オペレータは、表示部34に表示されたユーザ情報と使用可能期限とを参照して、ユーザに電話等で蓄電池131の交換時期を連絡することができる。
 (2)上述した第2実施形態では、蓄電装置13のシリアルNo.に含まれる数値を元に一定時間ずつずらした時刻が複数の蓄電装置13の送信タイミングとして設定される例を説明したが、以下のようにして送信タイミングを設定してもよい。例えば、複数の蓄電装置13に乱数発生プログラムを記憶し、蓄電装置13が蓄電池情報を送信するごとに、乱数発生プログラムに蓄電装置13のシリアルNo.を入力して得られた数値に一定時間をかけた時刻を送信タイミングとして設定してもよい。
 (3)上述した第2実施形態では、複数の蓄電装置13の蓄電池情報の送信タイミングが相互に異なる例を説明したが、複数の蓄電装置13の蓄電池情報の送信タイミングが同じであってもよい。この場合には、保守サーバ30Aに対して複数の蓄電池情報が同時に送信されるため送信エラーが発生する場合がある。そのため、保守サーバ30Aは、蓄電装置13において送信エラーが発生した場合に、送信エラーの内容に応じて再送回数を設定し、送信エラーが発生した蓄電装置13に蓄電池情報の再送を指示してもよい。また、複数の蓄電装置13と保守サーバ30Aとの間の通信量を監視する通信量監視手段を設け、複数の蓄電装置13と保守サーバ30Aとの間の通信量に応じて、各蓄電装置13が蓄電池情報を送信する際の遅延時間を設定してもよい。
 (4)また、上述した第2実施形態において、蓄電装置13における蓄電池131に異常が発生した場合、蓄電装置13から管理装置11又はMEMS管理装置111に対して異常情報を送信後、所定時間の経過時に、蓄電装置13から保守サーバ30Aに対して異常情報を送信するようにしてもよい。この場合、上記所定時間は、蓄電装置13ごとに異なる時間が予め設定されていてもよいし、保守サーバ30Aにおいて、各蓄電装置13に対し、蓄電装置13ごとに異なる時間を設定する設定部を設けるように構成してもよい。各蓄電装置13は、保守サーバ30Aに対して上記所定時間を問い合わせ、保守サーバ30Aが設定した所定時間を予め取得しておく。複数の蓄電装置13において略同時に蓄電池131に異常が発生し、複数の蓄電装置13から異常情報が保守サーバ30Aに送信されると、保守サーバ30Aと複数の蓄電装置13との間の通信トラフィックが増大し、保守サーバ30Aに異常情報を送信できない場合がある。本変形例では、蓄電装置13ごとに異なるタイミングで蓄電装置13から異常情報を送信するため、保守サーバ30Aにより確実に異常情報を送信することができる。
 (5)上述した第2実施形態では、集合住宅100に設けられた複数の蓄電装置13を保守サーバ30Aが監視する例について説明したが、例えば、ビルの電力を制御するBEMS(Bill Energy Management System)や、工場の電力を制御するFEMS(Factory Energy Management System)に接続された複数の蓄電装置13を保守サーバ30Aよって監視してもよい。また、ある特定の地域の電力を制御するCEMS(Cluster or Community Energy Management System)に接続された複数の蓄電装置13を保守サーバ30Aによって監視してもよい。
 (6)上述した第3実施形態では、集合住宅100における各蓄電装置13は、保守サーバ30から遅延係数及び電流到達時間の少なくとも一方を取得して充電を開始する例を説明したが、各蓄電装置13において、予め、遅延係数及び電流到達時間の少なくとも一方が設定されていてもよい。
 (7)上述した第4実施形態では、集合住宅100における各蓄電装置13の蓄電池131の自動点検日が、集合住宅100に対する法定点検日と同日であるか否かに関わらず、法定点検日を避けて自動点検日を設定する例を説明したが、以下のように構成してもよい。保守サーバ30Cにおいて、各蓄電装置13に定められている自動点検日をユーザ情報DB33aに予め記憶する。そして、オペレータによってユーザ情報DB33aに法定点検日が記憶されたときに、保守サーバ30Cは、ユーザ情報DB33aに記憶された各蓄電装置13の自動点検日と法定点検日とが同日であるか否か判断し、同日である場合には、その蓄電装置13の自動点検日を法定点検日とは異なる日に設定する。保守サーバ30Cは、蓄電装置13からの問い合わせに応じて、その蓄電装置13に対応する自動点検日を示す自動点検情報を蓄電装置13に送信する。
 (8)また、上述した第4実施形態において、保守サーバ30Cは、自動点検制御部316において各蓄電装置13に対して自動点検日を設定し、通知部312Aにより、ユーザ情報DB33aから各蓄電装置13に対応するメールアドレスを宛先として、設定された自動点検日を示すメールを送信してもよい。
 (9)また、上述した第4実施形態では、蓄電装置13の自動点検モード時に、機器群14,141によって蓄電池131を完全放電させる例を説明したが、自動点検モード時に蓄電池131を放電させる放電手段を蓄電装置13に設けてもよい。この場合、蓄電装置13は、予め測定された放電手段の負荷に基づいて放電容量を計測し、完全放電した時間と放電容量とに基づいて蓄電池131の放電特性が適正であるか否か判断してもよい。また、さらに、完全放電後の蓄電池131の充電容量を測定し、放電容量と充電容量とに基づいて蓄電池131の充放電特性が適正であるか否か判断してもよい。また、蓄電装置13から保守サーバ30Cに自動点検後の充電容量と放電容量とを送信し、保守サーバ30Cにおいて、蓄電池131の充放電特性が適正であるか否か判断してもよい。
 (10)上述した第1実施形態の蓄電装置において、第4実施形態における蓄電装置と同様の自動点検モードを有していてもよい。
 (11)上述した第3実施形態のエネルギー管理システムに第4実施形態の態様を組み合わせてもよい。また、上述した第2実施形態から第4実施形態のエネルギー管理システムに第5実施形態の態様を組み合わせてもよい。
 (12)上述した第1実施形態から第5実施形態において、保守サーバは、蓄電装置13から蓄電池131の温度、容量、及び電圧値を含む蓄電池情報を取得する例を説明したが、保守サーバは、温度、容量、及び電圧値のうちの1つ又は2つを蓄電装置13から取得するように構成してもよい。
 (13)上述した第1実施形態から第5実施形態に例示したエネルギー管理システムは、管理装置11又はMEMS管理装置111を含む例を説明したが、管理装置11及びMEMS管理装置111は含まれていなくてもよい。
 (14)上述した第1実施形態から第5実施形態に例示したエネルギー管理システムは、HEMS管理サーバ20又はHEMS/MEMS管理サーバ21を含む例を説明したが、HEMS管理サーバ20及びHEMS/MEMS管理サーバ21が含まれていなくてもよい。
 (15)上述した第1実施形態において、保守サーバ30及び蓄電装置13に、第2通信経路を介してPC(Personal Computer)等の情報端末が接続されていてもよい。情報端末は、保守サーバ30に蓄電装置13を接続する際の蓄電装置13の初期設定や蓄電装置13の設定変更等に用いたり、保守サーバ30と情報端末との間のデータのやりとりに用いられる。
 (16)上述した第1実施形態から第5実施形態において、保守サーバ30,30A~30Dと、HEMS管理サーバ20又はHEMS/MEMS管理サーバ21とは各々独立したハードウェアで構成されている例を説明したが、同じハードウェアにおいて論理的にこれらの機能が分かれていてもよい。
 (17)上述した第1実施形態から第4実施形態では、蓄電装置からの問い合わせに応じて、保守サーバから蓄電装置に対して各情報(送信頻度、使用可能期限、遅延係数、定電流到達時間、又は自動点検日)を送信する例を説明したが、保守サーバと蓄電装置とを接続する第2通信経路がLAN、イントラネット、専用回線等の閉じられたネットワークで構成されている場合、保守サーバが蓄電装置に対して直接各情報を送信するようにしてもよい。このように、所定エリアに設置されている各蓄電装置に対して保守サーバが直接アクセスし、蓄電装置を遠隔操作することができれば、所定エリアにおける電力の制御をより効率化することができる。
 (18)本発明のエネルギー管理システムの例を第1実施形態から第5実施形態において説明したが、本発明のエネルギー管理システムは、蓄電装置と保守サーバとを少なくとも備えていればよい。既にHEMSやMEMS等が設置されている環境に蓄電装置と保守サーバとを接続することにより、本発明のエネルギー管理システムを実現することができる。
 (19)本発明のエネルギー管理システムの例として第1実施形態から第5実施形態及び上記変形例を用いて説明したが、本発明のエネルギー管理システムにおける保守サーバは、少なくとも取得部、記憶部、及び監視部を備えていればよく、保守サーバは、図14に示す各ステップの動作を行う。すなわち、保守サーバは、取得部により、通信網2を介して接続された蓄電装置13から蓄電装置13における蓄電池131に関する蓄電池情報を所定タイミングで逐次取得し(ステップS10)、取得部で取得された蓄電池情報を記憶部において記憶する(ステップS20)。そして、保守サーバは、監視部により、記憶部に記憶された蓄電池情報に基づいて蓄電池131の状態を監視する(ステップS30)。なお、上記保守サーバの動作をコンピュータに実行させるプログラム、及びそのプログラムを記録したコンピュータが読み取り可能な記録媒体は本発明に含まれる。また、上記プログラムは、記録媒体によって提供されるものに限らず、電気通信回線、無線又は有線通信回線、インターネット網等の通信網を介して提供されるものであってもよい。

Claims (18)

  1.  所定のエリアに設けられた蓄電池を有し、当該所定のエリアにおける電力を制御する管理装置に第1通信経路を介して接続された蓄電装置と、
     前記管理装置を介さずに、前記第1通信経路と異なる第2通信経路を介して前記蓄電装置と接続された保守サーバとを備え、
     前記蓄電装置は、前記保守サーバに、当該蓄電装置における前記蓄電池に関する蓄電池情報を所定タイミングで逐次送信し、
     前記保守サーバは、
     前記蓄電装置から前記蓄電池情報を取得する取得部と、
     前記取得部で取得された前記蓄電池情報を記憶する記憶部と、
     前記記憶部に記憶された前記蓄電池情報に基づいて、前記蓄電装置における前記蓄電池の状態を監視する監視部と、
     を含む、エネルギー管理システム。
  2.  請求項1に記載のエネルギー管理システムにおいて、
     前記蓄電池情報は、前記蓄電池の温度、電圧、及び容量の少なくともいずれかを含む、エネルギー管理システム。
  3.  請求項1又は2に記載のエネルギー管理システムにおいて、
     前記蓄電装置は、さらに、当該蓄電装置における前記蓄電池の異常を示す異常情報を前記管理装置に送信するとともに、当該異常情報を前記保守サーバへ送信し、
     前記取得部は、さらに、前記蓄電装置から前記異常情報を取得する、エネルギー管理システム。
  4.  請求項3に記載のエネルギー管理システムにおいて、
     前記蓄電装置は、前記管理装置に前記第1通信経路を介して接続された機器の状態を示す機器情報を取得して、前記第2通信経路を介して前記保守サーバへ送信し、
     前記取得部は、さらに、前記蓄電装置から前記機器情報を取得する、エネルギー管理システム。
  5.  請求項1から4のいずれか一項に記載のエネルギー管理システムにおいて、
     前記監視部は、前記記憶部に記憶された前記蓄電装置の前記蓄電池情報に基づいて、当該蓄電装置における前記蓄電池の使用可能期限を予測し、
     前記保守サーバは、さらに、前記監視部の予測結果に基づき、前記蓄電池の交換を通知する通知部を含む、エネルギー管理システム。
  6.  請求項1から5のいずれか一項に記載のエネルギー管理システムにおいて、
     前記蓄電装置は、さらに、当該蓄電装置における前記蓄電池の一定期間における充放電容量の測定結果を保守サーバへ送信し、
     前記保守サーバは、さらに、
     前記蓄電装置から前記測定結果を取得し、取得した測定結果に応じた課金額を前記蓄電装置に対して設定する課金設定部を含む、エネルギー管理システム。
  7.  請求項1から6のいずれか一項に記載のエネルギー管理システムにおいて、さらに、前記管理装置を備える、エネルギー管理システム。
  8.  請求項1から7のいずれか一項に記載のエネルギー管理システムにおいて、さらに、前記第1通信経路、及び前記第2通信経路と異なる第3通信経路を介して前記管理装置に接続された管理サーバを備える、エネルギー管理システム。
  9.  請求項1から8のいずれか一項に記載のエネルギー管理システムにおいて、さらに、前記所定のエリアに設けられ、前記第2通信経路を介して、前記保守サーバ、及び前記蓄電装置と接続された情報端末を備える、エネルギー管理システム。
  10.  請求項1から9のいずれか一項に記載のエネルギー管理システムにおいて、
     前記蓄電装置は、前記蓄電池を完全放電させた後、所定時間経過後に前記蓄電池を満充電し、前記蓄電池の容量を測定する点検モードを有する、エネルギー管理システム。
  11.  請求項1から10のいずれか一項に記載のエネルギー管理システムにおいて、
     前記所定のエリアには、複数の前記管理装置に前記第1通信経路を介して接続された複数の前記蓄電装置が設置されており、
     前記保守サーバは、前記複数の管理装置の各々を介さずに、前記第2通信経路を介して前記複数の蓄電装置の各々と接続され、
     前記記憶部は、前記複数の蓄電装置の複数の前記蓄電池情報を前記蓄電装置ごとに記憶し、
     前記監視部は、前記記憶部に記憶された前記蓄電装置ごとの前記蓄電池情報に基づいて、前記蓄電装置ごとに、当該蓄電装置における前記蓄電池の状態を監視する、エネルギー管理システム。
  12.  請求項11に記載のエネルギー管理システムにおいて、前記所定のエリアは、予め定められた特定の地域である、エネルギー管理システム。
  13.  請求項11に記載のエネルギー管理システムにおいて、
     前記所定のエリアは、複数の住戸が集合された集合住宅であり、
     前記複数の住戸のそれぞれに、前記蓄電装置と前記管理装置とが設置されている、エネルギー管理システム。
  14.  請求項13に記載のエネルギー管理システムにおいて、
     前記複数の蓄電装置の各々は、当該蓄電装置における前記蓄電池を完全放電させた後、所定時間経過後に前記蓄電池を満充電し、前記蓄電池の容量を測定する点検モードを有し、
     前記記憶部は、前記集合住宅における電気設備の法定点検日を記憶し、
     前記保守サーバは、さらに、前記複数の蓄電装置に対し、前記記憶部に記憶された前記法定点検日を避けて前記点検モードの動作タイミングを設定する点検モード制御部を含む、エネルギー管理システム。
  15.  請求項11から14のいずれか一項に記載のエネルギー管理システムにおいて、
     前記複数の蓄電装置は、相互に異なるタイミングで前記蓄電池情報を前記保守サーバへ送信する、エネルギー管理システム。
  16.  請求項11から15のいずれか一項に記載のエネルギー管理システムにおいて、
     前記複数の蓄電装置の各々は、当該蓄電装置における前記蓄電池を充電する充電部を備え、
     前記複数の蓄電装置の複数の前記充電部は、第1の充電方法、及び第2の充電方法の少なくとも一方の充電方法を用いて充電を行い、
     前記第1の充電方法は、前記複数の蓄電装置に対して予め設定された充電開始時間に基づき、前記複数の充電部が相互に異なるタイミングで充電する充電方法であり、
     前記第2の充電方法は、ソフトスタート方式で充電を開始する充電方法である、エネルギー管理システム。
  17.  請求項11から16のいずれか一項に記載のエネルギー管理システムにおいて、
     前記複数の蓄電装置の各々は、当該蓄電装置の異常を示す異常情報を前記管理装置へ送信後、予め設定された所定時間の経過時に、前記異常情報を前記保守サーバへ送信し、
     前記保守サーバは、さらに、前記蓄電装置ごとの前記所定時間を設定する設定部を含む、エネルギー管理システム。
  18.  請求項1に記載の保守サーバの動作をコンピュータに実行させるためのプログラムであって、
     前記蓄電装置から前記蓄電池情報を所定タイミングで逐次取得する取得ステップと、
     前記取得ステップで取得された前記蓄電池情報を記憶する記憶ステップと、
     前記記憶ステップで記憶された前記蓄電池情報に基づいて、前記蓄電装置における前記蓄電池の状態を監視する監視ステップと、
     をコンピュータに実行させるためのプログラム。
     
PCT/JP2015/051026 2014-02-27 2015-01-16 エネルギー管理システム、及びプログラム WO2015129321A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014036772A JP2015162967A (ja) 2014-02-27 2014-02-27 エネルギー管理システム、及びプログラム
JP2014-036772 2014-02-27

Publications (1)

Publication Number Publication Date
WO2015129321A1 true WO2015129321A1 (ja) 2015-09-03

Family

ID=54008650

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/051026 WO2015129321A1 (ja) 2014-02-27 2015-01-16 エネルギー管理システム、及びプログラム

Country Status (2)

Country Link
JP (1) JP2015162967A (ja)
WO (1) WO2015129321A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3813006A4 (en) * 2018-06-14 2021-11-10 GS Yuasa International Ltd. COMMUNICATION DEVICE, INFORMATION PROCESSING SYSTEM, INFORMATION PROCESSING METHOD AND COMPUTER PROGRAM

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6631153B2 (ja) * 2015-10-23 2020-01-15 株式会社デンソー 選択支援システム
JP6870923B2 (ja) * 2015-12-08 2021-05-12 旭化成ホームズ株式会社 住宅
AU2017215242B2 (en) * 2016-02-05 2019-01-03 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Adaptor and charging control method
CN107533724B (zh) * 2016-02-24 2022-03-08 松下知识产权经营株式会社 服务器装置及其控制方法
JP6194060B1 (ja) * 2016-05-30 2017-09-06 東芝エレベータ株式会社 Bimシステム、方法およびプログラム
KR102392017B1 (ko) * 2017-11-06 2022-05-02 현대자동차주식회사 서버, 그와 통신하는 차량 및 그 제어 방법

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000175369A (ja) * 1998-12-03 2000-06-23 Toyota Autom Loom Works Ltd バッテリ充電装置、及びその充電方法
JP2000306612A (ja) * 1999-04-19 2000-11-02 Toyota Motor Corp 電池評価装置
JP2007028745A (ja) * 2005-07-14 2007-02-01 Ricoh Co Ltd 2次電池の充電方法
JP2013009531A (ja) * 2011-06-24 2013-01-10 Yoshiaki Shiyafu 蓄電池監視システム及び蓄電池監視方法、サーバ装置及び蓄電池制御装置並びにサーバ装置用プログラム及び蓄電池制御装置用プログラム
JP2013027210A (ja) * 2011-07-22 2013-02-04 Toshiba Corp 電気量調整装置、電気量調整方法、電気量調整プログラム及び電力供給システム
JP2013161107A (ja) * 2012-02-01 2013-08-19 Panasonic Corp 充電システム
JP2013225441A (ja) * 2012-04-23 2013-10-31 Hitachi Ltd 電池システムのメンテナンス管理システム及び方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09331301A (ja) * 1996-06-11 1997-12-22 Toshiba Corp コントロールセンタの保守管理システム
JP5887536B2 (ja) * 2012-02-21 2016-03-16 パナソニックIpマネジメント株式会社 機器管理システムおよび機器管理方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000175369A (ja) * 1998-12-03 2000-06-23 Toyota Autom Loom Works Ltd バッテリ充電装置、及びその充電方法
JP2000306612A (ja) * 1999-04-19 2000-11-02 Toyota Motor Corp 電池評価装置
JP2007028745A (ja) * 2005-07-14 2007-02-01 Ricoh Co Ltd 2次電池の充電方法
JP2013009531A (ja) * 2011-06-24 2013-01-10 Yoshiaki Shiyafu 蓄電池監視システム及び蓄電池監視方法、サーバ装置及び蓄電池制御装置並びにサーバ装置用プログラム及び蓄電池制御装置用プログラム
JP2013027210A (ja) * 2011-07-22 2013-02-04 Toshiba Corp 電気量調整装置、電気量調整方法、電気量調整プログラム及び電力供給システム
JP2013161107A (ja) * 2012-02-01 2013-08-19 Panasonic Corp 充電システム
JP2013225441A (ja) * 2012-04-23 2013-10-31 Hitachi Ltd 電池システムのメンテナンス管理システム及び方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3813006A4 (en) * 2018-06-14 2021-11-10 GS Yuasa International Ltd. COMMUNICATION DEVICE, INFORMATION PROCESSING SYSTEM, INFORMATION PROCESSING METHOD AND COMPUTER PROGRAM
US11536774B2 (en) 2018-06-14 2022-12-27 Gs Yuasa International Ltd. Communication device, information processing system, information processing method, and computer program

Also Published As

Publication number Publication date
JP2015162967A (ja) 2015-09-07

Similar Documents

Publication Publication Date Title
WO2015129321A1 (ja) エネルギー管理システム、及びプログラム
JP5816906B2 (ja) 蓄電池状態監視システム
JP6569791B2 (ja) 蓄電池搭載機器の保守運用システム
JP5209957B2 (ja) 直流配電システム
EP3007310A2 (en) Power-storage-system control method and power-storage-system control apparatus
US10715886B2 (en) Power outage-assessment apparatuses and methods
EP3331119B1 (en) Management server and management method
WO2015122196A1 (ja) 在宅状況判定装置、配送システム、在宅状況判定方法、在宅状況判定プログラム、および配送端末
JP2013009531A (ja) 蓄電池監視システム及び蓄電池監視方法、サーバ装置及び蓄電池制御装置並びにサーバ装置用プログラム及び蓄電池制御装置用プログラム
JP6441962B2 (ja) 電力管理システム、中継装置及び電力管理方法
KR20160138925A (ko) 모듈식 축전 방법 및 시스템
US10788537B2 (en) Modular system for monitoring batteries
JP2011250664A (ja) 電気機器制御システム及び電気機器コントローラ
JP2013115885A (ja) 電力需要制御システム、方法及び電源コンセント装置
JP2016158492A (ja) 制御装置及び制御方法
JP6495494B2 (ja) 機器管理システム、上位管理装置及び機器管理方法
JP5842171B2 (ja) 管理システム
JPWO2014076839A1 (ja) 蓄電池電圧平準化装置および蓄電池状態監視システム
JP2015181326A (ja) 電力管理システム及びこれと連携する蓄電池搭載機器
JP2015060775A (ja) 蓄電システムの保守管理システム
KR101708762B1 (ko) 파워 모니터링 시스템 및 장치
JP4966182B2 (ja) 管理システム
JP2021069261A (ja) 制御装置、サーバ装置、及び管理方法
WO2017033400A1 (ja) 蓄電制御装置、電力変換装置、蓄電システム、蓄電制御方法、およびプログラム
JP7379087B2 (ja) 制御装置及び制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15755384

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15755384

Country of ref document: EP

Kind code of ref document: A1