WO2015112745A1 - Procédé et appareil pour lever une structure - Google Patents

Procédé et appareil pour lever une structure Download PDF

Info

Publication number
WO2015112745A1
WO2015112745A1 PCT/US2015/012504 US2015012504W WO2015112745A1 WO 2015112745 A1 WO2015112745 A1 WO 2015112745A1 US 2015012504 W US2015012504 W US 2015012504W WO 2015112745 A1 WO2015112745 A1 WO 2015112745A1
Authority
WO
WIPO (PCT)
Prior art keywords
rail
lifting
jack member
jacking system
vertical
Prior art date
Application number
PCT/US2015/012504
Other languages
English (en)
Inventor
William T. Long
David E. Krueger
Ryan Evan Paddock
Original Assignee
2Ndstoryplus, Llc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 2Ndstoryplus, Llc filed Critical 2Ndstoryplus, Llc
Priority to CA2934319A priority Critical patent/CA2934319C/fr
Publication of WO2015112745A1 publication Critical patent/WO2015112745A1/fr

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/08Devices, e.g. jacks, adapted for uninterrupted lifting of loads screw operated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/08Devices, e.g. jacks, adapted for uninterrupted lifting of loads screw operated
    • B66F3/10Devices, e.g. jacks, adapted for uninterrupted lifting of loads screw operated with telescopic sleeves
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/44Devices, e.g. jacks, adapted for uninterrupted lifting of loads with self-contained electric driving motors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3511Lift-slab; characterised by a purely vertical lifting of floors or roofs or parts thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3522Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by raising a structure and then adding structural elements under it
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3522Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by raising a structure and then adding structural elements under it
    • E04B1/3527Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by raising a structure and then adding structural elements under it the structure being a roof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/163Jacks specially adapted for working-up building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure
    • E04G23/065Lifting of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F2700/00Lifting apparatus
    • B66F2700/04Jacks with screw and nut
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B2001/3561Extraordinary methods of construction, e.g. lift-slab, jack-block adding living space above existing structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B2001/3588Extraordinary methods of construction, e.g. lift-slab, jack-block using special lifting or handling devices, e.g. gantries, overhead conveying rails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging

Definitions

  • This invention pertains to construction and more particularly to expansion of existing houses and the like.
  • the invention enables a method for raising a structure with a jacking system for installation of a building element, which comprises one or more of vertical jack assemblies and a system to control the rate at which the structure can be elevated by the jack assemblies independently of each other jack assembly.
  • An object of this invention is to reduce the time and cost associated with the addition of new level(s) to an existing structure.
  • the invention preserves the existing roof structure, creates a new system to rapidly construct the new level on the existing structure and utilizes pre-manufactured components to further decrease the cost and improve efficiency.
  • the invention is a system and method capable of lifting an entire structure, the roof of a structure or some portion of a structure.
  • the invention uses a system of frames about the periphery of the structure to which jack members are mounted.
  • the jack members extend to raise the desired structure or portion thereof.
  • a control system is also provided to manage the lifting process; the control system monitors the lifting process and controls the rate of the extension of the jack members.
  • the lifting system and method disclosed has many advantages over the previous systems and methods.
  • the invention does not require the use of specialized lifting beams to lift the structure or parts thereof. Additionally, since the installation of the system is within the footprint of the structure, there is minimal clearance required about the structure to be lifted.
  • the system and method When used on a roof structure, the system and method preserves the existing roof by lifting the roof vertically to install an additional story in the structure below.
  • the vertical lifting also minimizes the potential for damage to the roof structure during the construction process since the roof is not moved laterally which can shift or damage the roof structure.
  • the roof typically when a roof is removed to install an additional level in the structure, the roof requires reinforcement before the lifting process can begin, with the invention, the roof does not require such strengthening.
  • FIGS. 1-8 are conceptual drawings showing in perspective view the steps of enlarging a building structure such as a single-story house by raising the roof structure, adding floor structure and installing walls for a second story under the raised roof, using a jacking system according to an embodiment of the invention.
  • FIG. 9 is a side elevation view of the wall jacking installation as initially installed on a side of a building structure and coupled to the roof structure.
  • FIG. 10 is a side elevation view of the wall jacking system of FIG. 9 following an initial lift of the roof structure and placement of lateral bracing.
  • FIG. 11 is a side elevation view of the wall jacking system of FIG. 10 following a final lift of the roof structure, extension of the lateral bracing and installation of new second story floor framing.
  • FIG. 12 is a cross-sectional view through the building wall of FIG. 9 showing details of connection of the jacking system to the sill plate and the roof structure and FIG. 12 A is an enlarged view of the connection to the roof structure.
  • FIG. 13 is a cross-sectional view through the building wall of FIG. 10 showing details of connection of the upper portion of the jacking system and lateral bracing to the upper portion of the existing wall and to the roof structure.
  • FIG. 14 is a top plan view of the drive element 1400 used on the bottom rail for driving one of the wall jacks in FIGS. 9-13.
  • FIG. 15 is a side elevation view of the drive element 1400 of FIG. 14.
  • FIG. 16 is a cross-sectional view of the drive element 1400 of FIG. 15.
  • FIG. 17 is a side view of non-metallic slider blocks in the vertical lifting elements 230.
  • FIG. 18 is a cross sectional view of non-metallic slider blocks in the vertical lifting elements 230 of FIG. 17.
  • FIG. 19A is a perspective view of the non-metallic lifting block 241.
  • FIG. 19B is a side elevation view of the lifting block 241.
  • FIG. 19C is a top plan view of the lifting block 241.
  • FIG. 20 is a side view of the diagonal cross-brace outer tube and 'lock pin block' of FIGS. 11 and 13.
  • FIGS. 21 and 22 are conceptual drawings showing in perspective view the steps of raising an entire building with ajacking system for repair or replacement of sill plates, supporting walls, and or footings, using ajacking system according to an embodiment of the invention.
  • FIG. 23 is an enlarged side elevation view of the drive element 1400 located between the floor joists for lifting an entire building.
  • FIG. 24 is a cross-sectional view of the drive element 1400 of FIG. 23.
  • FIG. 25 A is a side elevation view of the jacking system showing upper and bottom horizontal rails in preparation of securing diagonal bracing and lifting an entire building;
  • FIG. 25B is a plan view of the bottom rail;
  • FIG. 25C is an enlarged view of FIG. 25B showing the interconnection to the vertical lifting element.
  • FIG. 26 is a side elevation view of the jacking system showing diagonal bracing secured to upper and bottom horizontal rails in preparation of and lifting an entire building.
  • FIG. 27 is a side elevation view showing placement of diagonal bracing to provide lateral stability of lifted structure while at same time providing sufficient space to excavate, prep and pour new footings and foundation walls.
  • FIG. 28 is a cross sectional view showing general location of threaded rod support blocks for the jacking system when raising either a roof structure or raising an entire building.
  • FIG. 29 is side elevation view showing general location of threaded rod support blocks for the jacking system when raising either a roof structure or a complete structure as shown in FIG. 25A.
  • FIGS. 30A-30D are cross sectional views of a vertical lifting jack assembly showing the threaded rod support blocks at various sections in FIG. 29.
  • FIG. 31 shows transverse sectional views of the tubing section in its normal location to keep the threaded rod support blocks in place.
  • FIG. 32 shows transverse sectional views of the tubing section in its raised position to either install or replace the threaded rod support blocks.
  • FIG. 1 shows a single story structure 100 to which an additional level(s) will be added.
  • the roof 102 sits atop the main section 104 which is supported by the foundation sill plate 106.
  • FIG. 2 shows the structure of FIG. 1 with the lifting rails 200, 210, and 220 installed around the periphery of the structure 100.
  • the bottom lifting rail 200 is fastened to the sill plate 106 of the structure 100 and will serve as the base of the lifting system.
  • the middle lifting rail 210 is attached about the upper periphery of the structure 100 and below the roof structure 102. Middle rail 210 is attached through the sides of the house and into the vertical studs of the main section 104.
  • the upper lifting rail 220 is installed about the lower periphery of the roof 102 of the structure 100.
  • the rail 220 is attached to the sill of the roof and/or attached to the ends of the rafters of the roof 102.
  • FIG. 3 shows the rails 200, 210 and 220 installed on the structure 100 and roof 102.
  • the rails are interconnected by vertical lifting elements 230.
  • the vertical lifting elements 230 will exert an upward force on upper rail 220 that will cause the roof structure 102 to lift up and away from the structure 100.
  • extendible cross-braces 240 are installed between rails 210 and 220.
  • the bottoms of cross-braces 240 are anchored to brackets affixed to the middle rail 210, the extendible end of the cross-braces 240 are attached to the rail 220 by a bracket, the upper and lower connection points allowing the end of the cross-brace to rotate about the connection points in the vertical plane of the structure.
  • FIG. 4 illustrates the initial phase of the lifting process.
  • the roof 102 is attached to the upper rail 220 that has been raised via the vertical lifting elements 230 to a first position an initial distance above the structure 100.
  • the cross- braces 240 are allowed to automatically extend as the structure 102 is raised, but are prevented from retracting by an internal retaining element.
  • the internal retaining element is a feature that allows the cross-braces to act as compression only members that will provide lateral stability of the existing roof and wall structure during lateral loads from construction, wind or seismic loads.
  • the cross- braces are retractable by a user actuating a release mechanism that releases the internal retaining element thus allowing the cross-braces to retract automatically or by the user.
  • FIG. 5 shows the installation of the additional floor 502 atop the main section 104, which formerly supported the roof 102.
  • the roof 102 is still at the initial position as lifted to in FIG. 4. This initial position is at a minimum height necessary to allow the installation of the floor 502.
  • FIG. 6 illustrates the second phase of the lifting process.
  • the roof 102, attached to rail 220, has been lifted higher than the final height of the new walls.
  • Extendible cross-braces 240 have extended further to continue to provide lateral stability of the roof structure 102 and the existing walls 104.
  • FIG. 7 shows the installation of the new walls 504, framing the periphery of the new level atop floor 502. Once the walls 504 are completed, the roof structure 102 is lowered down upon the new walls and reattached atop the new walls 504 to complete the two-story structure.
  • FIG. 8 shows the completed two-story structure with the lifting system and equipment removed from the building. The structure now has an additional story added to the pre-existing structure at minimal cost and time spent.
  • FIG. 9 is a schematic showing details of the lifting system attached to the structure 100.
  • the bottom lifting rail 200 is attached to the sill plate 106.
  • the bottom lifting rail 200 has holes 202 spaced regularly along the length of the rail 200.
  • Multiple bottom rail elements 200 are interconnected to encircle the perimeter of the sill plate 106.
  • the rail elements 200 are connected to one another using a butt joint 910.
  • the rails 200 have holes 202 A at each end.
  • the butt joint 910 is inserted inside the end of a rail 200 and is locked in place by inserting retaining pins in the end holes 202 A and through the holes on the butt joint.
  • the end holes 202A are spaced to ensure that the spacing of the holes 202 is maintained across the interconnection at the butt joint 910.
  • the interlocked elements of the lower rail 200 form a rigid framework that encircles the sill plate 106 and will act as the lower structure of the lifting system.
  • the top lifting rail 220 is attached to the roof structure 102.
  • the top rail 220 is attached to the structure 102 via the ends of the roof rafters.
  • Rail 220 encircles the roof structure 102 and will support the structure during the lifting process.
  • the roof normally provides structural integrity to the structure 100. It acts as a diaphragm and holds the wall together and, in turn, the walls provide the rigid base on which the roof 102 sits. If separated from the structure 100, the roof structure 102 has a tendency to splay out and deform from the original shape, when this occurs, the roof is typically beyond salvage and must be rebuilt. Using this method and system, the rail 220 will maintain the form and size of the roof structure 102 when it is separated from the structure 100.
  • the middle lifting rail 210 is attached around the upper periphery of the main portion 104 of the structure 100.
  • the middle rail 210 is attached to the studs of the house. Depending on the strength of the existing structure, the middle rail 210 can be attached to every stud or at some other regular or irregular interval.
  • middle rail 210 is made of individual elements that are interconnected using butt joints 910.
  • Rails 210 also have the same hole pattern as that of rail 200 and 220, in this manner, the rail combination has spaced set of vertically arrayed hole patterns. Similar to the top rail 220, the middle rail 210 will maintain the dimensions of the main section 104 during the lifting process. With the roof removed, the walls are not braced for out of plane loads and would have a tendency to warp and move out of position, if not properly restrained in their position. This would necessitate a laborious process of "truing" or straightening the walls back to their original positions before the roof could be attached. The retention of the original dimensions and shape of the main section 104 during the lifting process allows the quick installation of a second story floor and additional walls atop and then the reattachment of the roof with minimal time and cost.
  • the vertical lifting elements 230 are attached at regular or irregular intervals around each side of the house and interconnect the rails 200, 210 and 220. Elements 230 are affixed to each rail using the holes 202 disposed on each rail.
  • the system of holes on each rail allows for the quick attachment and removal of the lifting elements 230, additionally, the vertically-aligned pattern of holes makes it easy for someone installing the lifting elements 230 to space them properly and position them vertically around the periphery.
  • FIG. 10 shows the roof lifted to the initial position.
  • the extendible, diagonal cross-braces 240 have been installed.
  • the upper ends of the diagonal cross-braces may be attached at a common root point 1002 or at separate locations on the top lifting rail 220.
  • the common root point 1002 may be a single bracket or separate brackets attached to the top rail 220, the cross brace ends are attached to the bracket(s) by pin joints 1004.
  • the lower ends of the cross-braces 240 are affixed to the middle lifting rail 210 at points 1006 spaced equidistant from the root point 1002.
  • the connection points 1006 are brackets similar to or the same as bracket 1002, and attach the lower end of the cross-brace 240 to the middle rail 210.
  • the lower end of the cross-brace 240 attaches to the bracket 1006 at a pin joint 1008.
  • the use of the pin joints allows the cross braces to rotate about the joint as the angle between the cross-brace 240 and middle rail 210 changes due to the lifting of the roof 102. As the roof is lifted, the cross-braces 240 will automatically extend and lock in position. In this manner, they provide lateral stability to the roof structure 102.
  • the cross-braces 240 can utilize a ratcheting mechanism that allows them to be extended but will not allow them to be shortened until an external operation releases the ratchet mechanism and allows the extension pieces of the cross-braces to retract back into the main body tube of the cross-braces 240.
  • the locking extension action can also be achieved by shaped frictional rings that allow for free extension but are locked into position upon application of back pressure.
  • shaped frictional rings that allow for free extension but are locked into position upon application of back pressure.
  • the vertical lifting elements 230 are telescoping.
  • the main body 232 of the lifting element 230 is affixed at its top end to the middle lifting bar 210, while the bottom end is affixed to the lower lifting bar 200.
  • the extension portion 234 is moveable within the main body 232 and connects to the top rail 220 and exerts the upward lifting force and motion to raise the roof structure 102 above the main structure 104.
  • the extension portion 234 may be a single telescoping piece that moves within the main body 232, or may contain multiple telescoping pieces that nest within each other.
  • the extension elements 242 of the cross-braces 240 are also seen in FIG. 11.
  • FIG. 12 is a detailed schematic view of the vertical lifting element 230 attached to the top, middle and bottom lifting rails 220, 210 and 200.
  • the bottom lifting rail is attached to the sill plate via brackets 204 that are mounted to the sill plate 106 via mechanical fasteners.
  • the bracket used to mount the lower lifting rail to the sill plate can be integrated into the bracket that holds the vertical lifting element to the lower lifting bar 200 or it may be a separate piece. It is advantageous to use an integrated bracket that performs both functions as the added strength due to mounting of the bracket to the sill plate will help support the loads exerted on the vertical lifting element 230 as the roof load is elevated.
  • the top of the lifting element main tube is attached to the middle rail 210.
  • the middle rail 210 is attached to the studs of the structure 100 by a bracket 214 affixed by mechanical fasteners like the foundation bracket.
  • the middle rail bracket 214 can be similar, attaching both the rail to the stud and the vertical lifting element to the rail.
  • the top of the extension portion 234 of the vertical lifting element 230 is attached to the existing rafters or trusses with a bracket 222 attached to the top rail 220 and the perimeter roof structure 102 as better shown in FIG. 12 A.
  • the top rail 220 attaches to the end rafter or truss top chord just below the roof sheathing similar to the method that the mid rail 210 is attached to the exiting walls 104.
  • FIG. 13 is a detailed schematic view of a wall cross-section showing the detail of the diagonal cross-brace element 240.
  • the bottom end of the element 240 is attached to the middle rail by a bracket 244. Extending from the bracket is a reinforced strap 248 that is further screwed to a wall stud of the building to provide a more secure and unmoving mounting point for the cross-brace 240.
  • the upper end of the cross-brace 240 is attached to the top rail via a bracket
  • FIG. 14 is a top view detailing the mounting of the vertical lifting element drive motor.
  • the drive element 1400 is attached to the lower mounting rail and lower mounting rail bracket.
  • a transformer supplying power to the drive element can be mounted on the lower rail at a nearby position using a set of the pre-drilled holes 202.
  • FIG. 15 shows a detailed side view of the drive element 1400 and bracket 107 A
  • FIG. 16 shows a detailed top view of the drive element 1400 showing lifting rod 1406 in cross-section.
  • the drive element 1400 has a drive motor 1402 that is attached to the drive gear box 1404 that drives a self-locking Acme threaded lifting rod 1406.
  • Each vertical lifting element 230 has a drive block attached to the threaded lifting rod 1406 that elevates the extending portion 234 as the threaded lifting rod 1406 is rotated.
  • the extending portion 234 is driven a predetermined height and then pinned at that height via a cotter pin that slides through the main tube and extending portion.
  • each telescoping portion is pinned through the surrounding tubes to hold them in their extended positions.
  • the internal lifting element is driven upwards by a drive block which engages the thread of the threaded lifting rod 1406.
  • the internal drive block Once the internal drive block has reached the top of the threaded lifting rod 1406, the extending portions of the vertical lifting elements 230 are pinned at that height and the internal drive block is lowered as the threaded lifting rod 1406 is reversed and lowers back to the bottom of the lifting element 230.
  • There a different and second drive block reengages the threaded lifting rod 1406 and is again driven upward, repeating the lifting process.
  • FIG. 17 is an exploded side view of non-metallic slider blocks 241 in the vertical lifting element 230.
  • the vertical lifting element 230 is composed of an inner element 230A, a middle element 230B and a main element 230C.
  • the non- metallic slider blocks 241 are secured in place by a projection that engages holes in the members of the telescoping vertical lifting element 230.
  • the engagement holes on the various elements 23 OA, 23 OB and 230C are of two differing sizes to accommodate two differently sized non-metallic slider blocks 241 A and 24 IB.
  • the nonmetallic slider block 241 A has a sliding surface diameter nearly the width of a face of the inner element 23 OA.
  • the same slider block 241 A is also disposed at an end of the element 230B that inner element 230A extends outwards from an opposite end of the element 230B, slider block 24 IB is disposed, having a diameter nearly the width of the face of the middle element 230B.
  • Main element 230C has a slider block 24 IB disposed at an end.
  • the non-metallic slider blocks align the elements 230A, 230B and 230C of the lifting element 230, which prevents the various elements from rubbing or twisting inside of each other during the lifting process.
  • the outer shape of the non-metallic slider blocks 241 can be round, square, rectangular or a profile not here described.
  • the shape of the projection on the non-metallic slider blocks 241 can be round, square, rectangular or a profile not here described.
  • the non-metallic slider blocks are ideally made of a high molecular weight plastic having a low friction coefficient, but sufficient material strength to resist compression.
  • FIG. 18 is a cross sectional view of the non-metallic slider blocks 241 in the nested vertical lifting elements 230.
  • the projections on the non-metallic slider blocks 241 are shown engaging holes in the members of the vertical lifting elements 230.
  • FIG. 19A is a perspective view of a circular example of the non-metallic lifting block 241.
  • the block has a large diameter 243 and a small diameter 245.
  • the flat face of the large diameter 243 is the friction face that contacts a portion of the lifting element 230 as it slides.
  • the small diameter 245 sits in holes in the lifting elements 230 and provides restraint to hold the nonmetallic slider block 241 in place on the lifting element.
  • FIG. 19B is a side elevation view of the non- metallic slider block 241.
  • FIG. 19C is a plan view of the non-metallic slider block 241.
  • FIG. 20 is a side view of the diagonal cross-brace outer tube and a separate 'lock pin block' item 258.
  • the diagonal cross-braces 240 can utilize an internal ratcheting mechanism here defined as a 'lock pin block' item 258.
  • the 'lock pin block' item 258 engages with the corresponding indentations of the inner tube of the diagonal cross-braces 240, as shown in section G-G. This allows the diagonal cross-braces 240 to be extended but does not allow the diagonal cross-braces 240 to be shortened until an external operation releases the ratchet mechanism or 'lock pin block' item 258.
  • the release of the 'lock pin block' item 258 enables the inner tubes of the cross-brace to retract back into the outer body tube of the cross-brace 240.
  • the spring loaded index plunger as shown in FIG. 20, is an example device that may be used to index and restrain an object, in this case, the removable 'lock pin block' 258.
  • FIG. 21 shows a complete structure 100 which may be lifted for repair or replacement of sill plates, supporting walls, footings and other structural features. Additionally, the building may be lifted to add an additional level(s) to the structure. In a further embodiment, the structure may be lifted and the roof structure may be, simultaneously or separately, lifted to accomplish the desired construction tasks.
  • FIG. 22 shows the structure of FIG. 21 raised with the telescoping wall jacks 230, with diagonal braces 240, installed to avoid wracking.
  • FIG. 23 shows a detailed side view of the drive element 1400 and bracket 107A.
  • FIG. 24 shows a detailed top view of the drive element 1400 of FIG. 23.
  • the drive element 1400 has a drive motor 1402 that is attached to the drive gear box 1404 that drives a self-locking Acme threaded rod 1406.
  • Each vertical lifting element 230 has a drive block attached to the threaded rod 1406 that lowers the extending portion 234 as the threaded lifting rod 1406 is rotated.
  • the extending portion 234 is driven a pre-determined length by an internal drive block and then pinned via a cotter pin that slides through the main tube and extending portion.
  • each telescoping portion is pinned through the surrounding tubes to hold them in their extended positions.
  • the internal lifting element is driven downwards by a drive block which engages with the threads of the threaded rod 1406. Once the internal drive block has reached the end of the threaded lifting rod 1406, the extending portions of the vertical lifting elements 230 are pinned.
  • the internal drive block is returned to an initial position as the threaded rod 1406 is reversed. Once the drive block is returned, a different and second drive block is inserted and reengages the threaded rod 1406. The new drive block is driven downward, repeating the lifting process.
  • each vertical lifting element 230 Having equal lengths of internal lifting element(s) in each vertical lifting element 230 ensures that all the vertical lifting elements 230 extend an equal length with each lifting process. In doing so, the building structure 100 does not get warped or damaged since the weight stays evenly distributed across each of the vertical lifting elements.
  • lifting options available such as hydraulic pistons or jacks.
  • Each drive element 1400 is attached to a central driving control panel that ensures each drive element 1400 is driven, either independently or in unison, such that structure remains level and lift is controlled.
  • An example control means could include monitoring of the amperage drawn by each drive element 1400.
  • a method of monitoring the amperage drawn by each of the drive elements 140 can be an ammeter attached to each drive element.
  • the amperage drawn by each drive element 1400 is correlated to the amount of torque each drive element 1400 is exerting to lift the structure. Should the amount of amperage drawn by a drive element 1400 spike, it can be indicative of unequal loading which could mean that the load is now unbalanced or proceeding at unequal rates.
  • the controller can vary the amount of power and lift rate of each of the drive elements 1400 to rebalance and relevel the structure.
  • An example alignment sensor system is a system of sensors that relay the relative position and/or extension length of a wall jack member in relation to the other wall jack members. Aligning the lifting of each of the wall jack members lifts the structure in a stable and balanced state as desired.
  • FIG. 25 A is a schematic side elevation showing details of the lifting system attached to the structure 100.
  • the top lifting rail 220 is attached to the structure 100 at the underside of the floor joists as also previously shown in FIG. 23.
  • the bottom lifting rail 200 has holes 202 spaced regularly along the length of the rail 200. Section A-A is identified to further define method of attachment of the bottom rail 200.
  • FIG. 25B is a schematic top view of the lifting system and identifies that both top lifting rail 230 and bottom rail 200 are attached to the same side of the outer element 230C of the vertical lifting elements 230.
  • FIG. 25C shows cross Section A-A identifying bracket 247 has an integral locating pin 248 that engages in a hole in the outer element 230C of the vertical lifting elements 230.
  • Hardware connects bracket 247 to the bottom rail 200 through holes 202A, thereby rigidly linking the vertical lifting elements 230 together with top rail 220.
  • Multiple bottom rail elements 200 are interconnected to form a rigid framework that links together predetermined vertical lifting element assemblies 230 and acts as the lower structure of the lifting system.
  • the bottom rail elements 200 are connected to one another using a butt joint 910.
  • the rails 200 have holes 202 A at each end.
  • the butt joint 910 is inserted inside the end of a rail 200 and is locked in place by inserting retaining pins in the end holes 202A and through the holes on the butt joint.
  • the end holes 202 A are spaced to ensure that the spacing of the holes 202 is maintained across the interconnection at the butt joint 910.
  • FIG. 26 shows a detailed method of applying extendible cross-braces 240 between 'pairs' of wall jacks 230 to provide lateral stability of lifted structure.
  • the spacing of the wall jacks 230 and cross-braces 240 provides sufficient space to accomplish the desired construction steps. With the structure raised, workers can excavate, prep and pour new footings and foundation walls and or add an additional level(s) under the original level.
  • the 'lock pin block' item 242 is shown on each extendible cross-braces 240.
  • FIG. 27 shows a detailed method of applying extendible cross-braces 240 between predetermined 'pairs' of wall jacks 230 to provide lateral stability of lifted structure while providing access required to excavate, prep and pour new footings and foundation walls.
  • the vertical lifting elements 230 are attached at regular or irregular intervals around each side of the house, and other predetermined locations to interconnect the rails 200, and 220. Elements 230 are affixed to each rail using the holes 202 disposed on each rail. The system of holes on each rail allows for the quick attachment and removal of the lifting elements 230. Additionally, the vertically-aligned pattern of holes makes it easy for someone installing the lifting elements 230 to space them properly and position them vertically around the periphery or other predetermined locations.
  • FIG. 28 shows a detailed schematic view of a wall cross-section showing the detail of the method using the tube 230D to provide and retain replaceable threaded rod supports 249 thereby limiting deflection due to the applied vertical load when lifting either a roof structure or an entire building.
  • FIG 29 shows a detailed schematic side view of a structure with Section B- B and Section D-D identified to show the detail of the method to provide and retain replaceable threaded rod supports 249 using the tube 230D.
  • FIG. 30A shows a detailed cross Section C-C of outer element 230C of lifting element 230 showing detail of the method to provide replaceable threaded rod supports 249.
  • Location where cross Section C-C is taken is shown in FIG. 32B.
  • Location where cross Section C-C is taken is shown in FIG 32B with the middle element in the raised position when lifting a roof structure, and the middle element in the lowered position when lifting an entire structure.
  • FIG. 30B shows a detailed cross Section B-B of outer element 230C of lifting element 230 showing the detail of the method to provide and retain replaceable threaded rod supports 249. Location where cross Section B-B is taken is shown in FIG. 29.
  • FIG. 30C shows a detailed cross Section CI -CI of outer element 230C and middle element 23 OB of lifting element 230 showing detail of the method to provide replaceable threaded rod supports 249. Location where cross Section Cl- Cl is taken is shown in FIG. 32B with the middle element in the lowered position when lifting a roof structure, and in the middle element in the raised position when lifting an entire structure.
  • FIG. 30D shows a detailed cross Section D-D of middle element 230B of lifting element 230 showing detail of the method to provide replaceable threaded rod supports 249. Location where cross Section D-D is taken is shown in FIG. 29 with the middle element 23 OB in the raised position when lifting a roof structure, and the middle element 23 OB in the lowered position when lifting an entire structure.
  • a drive block attached is to the threaded lifting rod 1406 that elevates the extending portion 234B when raising a roof structure or pushes downward extending portion 234B when raising an entire structure as the threaded lifting rod 1406 is rotated.
  • the extending portion 234B is driven a pre-determined distance and then pinned at that location via a cotter pin that slides through the main tube and extending portion.
  • replaceable threaded rod supports 249 are installed through holes in outer tube 230C of lifting element assembly 230.
  • a length of tubing 230D is utilized to secure and retain replaceable threaded rod supports 249.
  • One or more than one set of replaceable threaded rod supports 249 and section of tube 240D may be used per lifting element assembly 230.
  • FIG. 31 A shows detailed cross Section E-E of lifting element assembly 230 showing the detail of the method to retain the replaceable threaded rod supports 249 with section of tubing 230D in its normal position.
  • Two differently sized non-metallic slider blocks 241 A and 24 IB are inserted in holes in tube section 240D, and make contact with replaceable threaded rod supports 249, thereby serving as a 'stop' and limits the vertical travel of tube section 240D.
  • FIG. 31 B is a detailed cross section of lifting element assembly 230 showing the detail of the method to retain the replaceable threaded rod supports 249 with section of tubing 23 OD in its normal position.
  • FIG. 3 IB identifies where Section E-E is taken.
  • FIG. 32A shows detailed cross Section F-F of lifting element assembly 230 with section of tubing 230D in its raised position to install or replace replaceable threaded rod supports 249.
  • FIG. 32B identifies where Section F-F is taken.
  • the various elements of this apparatus can be made of steel or other suitable materials. These can include aluminum and other metals. Selection of materials is based on the likely loads each element would encounter during the lifting process. In this manner, certain materials can be chosen for their compressive or tensile strength and weight. Composite materials can also be used; the lightweight and high strength of these materials may be optimal, but must be weighed against the cost of manufacturing the various elements. Additionally, each element of this apparatus is reusable, making this system easy to install and remove on multiple building sites. Due to the modular nature of this system, it can be expanded to fit a building of many sizes.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

L'invention concerne un système et un procédé pour lever une structure, ou une partie de celle-ci, le système comprenant des éléments de cric verticaux reliés et disposés autour d'un système de rail fixé autour de la périphérie de la structure. Les éléments de cric verticaux comprennent un manchon externe et une partie interne coulissante qui est entraînée verticalement par une vis de cric et un bloc d'entraînement. Des cales transversales diagonales extensibles stabilisent les éléments de cric et la structure qui est levée.
PCT/US2015/012504 2014-01-22 2015-01-22 Procédé et appareil pour lever une structure WO2015112745A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CA2934319A CA2934319C (fr) 2014-01-22 2015-01-22 Procede et appareil pour lever une structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201461930401P 2014-01-22 2014-01-22
US61/930,401 2014-01-22

Publications (1)

Publication Number Publication Date
WO2015112745A1 true WO2015112745A1 (fr) 2015-07-30

Family

ID=52450631

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2015/012504 WO2015112745A1 (fr) 2014-01-22 2015-01-22 Procédé et appareil pour lever une structure

Country Status (3)

Country Link
US (2) US9637361B2 (fr)
CA (1) CA2934319C (fr)
WO (1) WO2015112745A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106982A (zh) * 2019-05-17 2019-08-09 陈立 一种房屋的建造方法

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107269024A (zh) * 2016-04-08 2017-10-20 五冶集团上海有限公司 塔更换施工中消除塔底板与基础之间吸力方法
US10655335B2 (en) * 2016-11-14 2020-05-19 Innovatech, Llc System and method of assembling and installing commercial roofing
US11313117B2 (en) 2018-03-08 2022-04-26 Raul S. Nieves Method for raising a framed structure
US10683659B2 (en) * 2018-03-08 2020-06-16 Raul S. Nieves Method for raising a framed structure
SE544032C2 (en) * 2019-08-14 2021-11-09 I & P I Norr Ab An adjustment system, and adjustable support, a method of orienting an element, and use of such system
CA3212574A1 (fr) * 2021-03-19 2022-09-22 Benjamin Ora Strout Procede et dispositif pour une construction a invasion minimale d'un niveau supplementaire sur un batiment
FR3127775B1 (fr) * 2021-10-01 2023-12-08 Patrick Claisse Systeme d’elevation de toiture

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4980999A (en) * 1988-07-27 1991-01-01 Terenzoni Robert S System for raising a roof
EP0835703A2 (fr) * 1996-10-08 1998-04-15 Scambia Industrial Developments Aktiengesellschaft Cric et méthode de son fabrication
WO2007068064A1 (fr) * 2005-12-16 2007-06-21 Gregory John Black Systeme, procede et appareil de construction ameliores

Family Cites Families (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US221977A (en) * 1879-11-25 Improvement in processes of manufacturing celluloid collars and cuffs
US2932486A (en) 1955-07-20 1960-04-12 De Long Corp Jacking mechanism and controls
US3036816A (en) * 1956-03-20 1962-05-29 Allan H Stubbs Apparatus for lift-slab building construction
US3029913A (en) * 1959-10-15 1962-04-17 Liesenfeld Peter Adjustable trusses
US3083795A (en) * 1960-06-20 1963-04-02 Warren W Land Building wall and method of construction
US3176963A (en) * 1962-03-23 1965-04-06 Joyce Cridland Co Safety jack with auxiliary safety nut
US3693309A (en) * 1970-08-19 1972-09-26 Jacob H Kutchai Shoring system
US3828513A (en) * 1971-02-11 1974-08-13 Research Corp Method of erecting a multi-story building and apparatus therefor
US3692446A (en) * 1971-02-11 1972-09-19 Research Corp Apparatus for forming and lifting multi-story columns in one story increments
US3920780A (en) * 1972-08-09 1975-11-18 Research Corp Method of erecting a multi-story building and apparatus
US4067448A (en) * 1975-05-19 1978-01-10 Luke Bourgeois Lift and supporting system
US4058952A (en) 1976-09-13 1977-11-22 Donnelly Frank R Expansion of building structure
US4251974A (en) * 1979-04-25 1981-02-24 Peter M. Vanderklaauw Sensing and control apparatus for lifting heavy construction elements
US4238115A (en) * 1979-08-17 1980-12-09 Research-Cottrell, Inc. Jacking device
SE440674C (sv) 1980-01-25 1994-06-06 Aake Knutsson Isolerad byggnad samt sätt att åstadkomma en dylik
US4467585A (en) 1982-05-25 1984-08-28 Busby Richard D Method and apparatus for construction second story additions to pre-existing residential structures
US4601141A (en) * 1984-06-14 1986-07-22 Frank Donnelly Building structure expansion apparatus
US4782634A (en) * 1987-02-12 1988-11-08 G. & M. Fry Pty. Ltd. Building construction
US5084936A (en) * 1989-07-27 1992-02-04 Airline Industrial Machinery, Inc. Apparatus for raising and lowering a rotatable platform
US5397207A (en) * 1992-12-16 1995-03-14 Arellano; Daniel Adjustable ceiling panel installer
US5839239A (en) * 1996-04-04 1998-11-24 Jang; Byung K. Apparatus and method for building construction
US5980160A (en) * 1997-02-19 1999-11-09 Vanderklaauw; Peter M. Apparatus and method for a modular lifting and shoring system
US6299137B1 (en) * 1999-04-28 2001-10-09 Wesley Allen Bainter Hydraulic grain storage bin lifting system
US6848515B2 (en) * 2003-04-24 2005-02-01 Helmerich & Payne, Inc. Modular drilling rig substructure
US6843030B2 (en) * 2003-05-13 2005-01-18 David Zingerman Self-lifting vertically rising mast
CA2750765C (fr) * 2009-02-09 2016-07-19 3L-Innogenie Inc. Systeme de construction et procede pour des batiments a plusieurs etages
NL2002549C2 (en) 2009-02-20 2010-08-24 Marine Structure Consul Jacking system for a leg of a jack-up platform.
US8555564B2 (en) * 2009-06-26 2013-10-15 Integrated Drilling Equipment Company LLC Drilling rig assembly method and apparatus
US8418997B2 (en) * 2009-10-23 2013-04-16 Frank Bastone Extendable support column
WO2013159191A1 (fr) * 2012-04-25 2013-10-31 Ampjack Industries Ltd. Appareil de levage de pylône de service et procédé

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4980999A (en) * 1988-07-27 1991-01-01 Terenzoni Robert S System for raising a roof
EP0835703A2 (fr) * 1996-10-08 1998-04-15 Scambia Industrial Developments Aktiengesellschaft Cric et méthode de son fabrication
WO2007068064A1 (fr) * 2005-12-16 2007-06-21 Gregory John Black Systeme, procede et appareil de construction ameliores

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106982A (zh) * 2019-05-17 2019-08-09 陈立 一种房屋的建造方法

Also Published As

Publication number Publication date
CA2934319A1 (fr) 2015-07-30
US10273129B2 (en) 2019-04-30
CA2934319C (fr) 2020-03-24
US9637361B2 (en) 2017-05-02
US20150204091A1 (en) 2015-07-23
US20170167129A1 (en) 2017-06-15

Similar Documents

Publication Publication Date Title
US10273129B2 (en) Method and apparatus for raising a structure
CA2217124C (fr) Appareil et procede pour systeme modulaire de support et de levage
RU2459058C2 (ru) Рельсовая система самоподъемной опалубки, снабженная элементами удлинения подъемных рельсов
CA2112722C (fr) Verin de levage et d'etaiement
US8944737B2 (en) Construction system, method and apparatus
CA2805655C (fr) Echafaudage avec elements d'echafaudage et procedes pour l'eriger
MXPA03006286A (es) Extraccion de datos de atributo de producto en relacion con un proceso de fabricacion de conversion de tejido.
CA2823814C (fr) Ensemble de montage et procede pour eriger en sections une tour annulaire pour des generateurs eoliens ou heliostatiques dans une installation de parc eolien
US6425712B1 (en) Method and apparatus for providing lateral support to a post
US20180058082A1 (en) Ground anchor bracket for multiple wall braces
KR100760435B1 (ko) 신축조절 가능한 가설 지주
JP4511657B2 (ja) クライミングクレーンの支持方法及び装置
CN202450761U (zh) 悬挑式脚手架
US10196248B2 (en) Jack with two masts
US6430892B1 (en) Apparatus and method for building a domed structure
US4782634A (en) Building construction
JP2003336402A (ja) 既設建物の支持荷重移載工法
JP4027170B2 (ja) 外部足場装置及び外部足場装置の施工方法
CN107060348B (zh) 一种用于高空网架的顶升调整装置
JP6730554B2 (ja) 傾斜家屋ジャッキアップ補助金具およびそれを用いたジャッキアップ工法。
JP6084558B2 (ja) 壁体建て起こし装置および壁体の建て起こし工法
CA2774955A1 (fr) Methodes et appareils pour la construction d'une structure portante
JP2006177083A (ja) 昇降可能な仮設足場を用いた建設物の施工方法
CN115726583A (zh) 一种钢结构安装就位用的临时支架
CN117703068A (zh) 一种超大面积钢桁架高支模体系及架设方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15702925

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2934319

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15702925

Country of ref document: EP

Kind code of ref document: A1