Prior art keywords
ring
carrier ring
tube section
manufacture
shaped tube
Prior art date
Application number
PCT/EP2014/079329
Other languages
English (en)
Inventor
Andreas Birnesser
Johan VERMEER
Peter NOUWS
Original Assignee
Robert Bosch Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Robert Bosch Gmbh filed Critical Robert Bosch Gmbh
Priority to JP2016542923A priority Critical patent/JP6556143B2/ja
Priority to CN201480070856.4A priority patent/CN105848823A/zh
Publication of WO2015097296A1 publication Critical patent/WO2015097296A1/fr

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16GBELTS, CABLES, OR ROPES, PREDOMINANTLY USED FOR DRIVING PURPOSES; CHAINS; FITTINGS PREDOMINANTLY USED THEREFOR
    • F16G5/00V-belts, i.e. belts of tapered cross-section
    • F16G5/16V-belts, i.e. belts of tapered cross-section consisting of several parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Definitions

  • This disclosure relates to a method for manufacturing a ring from steel basic material that is suitable to function as a carrier of transverse elements in a closed- loop drive belt for a continuously variable transmission, comprising the following steps:
  • the tube is annealed prior to such separating.
  • the brittleness that is introduced in the welding process in the weld and heat affected zone is removed by the recovery and the re-crystallization of the material at a temperature considerably above 600 degrees Celsius, e.g. at about 800°C.
  • the tube annealing process is required for the same reason also in view of the rolling process, i.e. for allowing the ring shaped tube section to be elongated without being accompanied by unwanted deformation or even fracturing from within the weld or the heat affected zone thereof.
  • a drive belt for a continuously variable transmission is generally known.
  • a drive belt comprises two sets of endless, i.e. closed-loop rings that carry a multitude of transverse elements of the drive belt, which transverse elements are arranged in an essentially contiguous row along the entire circumference thereof.
  • These carrier rings of the drive belt are relatively flat, i.e. the radial distance between an inner circumference and an outer circumference of the carrier rings is relatively small with respect to the dimension in an axial direction .
  • the drive belt In a continuously variable transmission, the drive belt is disposed between two cooperating pulleys where between a continuously variable speed ratio is realized. During operation, the drive belt transmits a torque from one of the pulleys to the other one pulley, a/o by the transverse elements thereof pushing each other from the said one pulley to the said other one pulley.
  • the carrier rings of the drive belt are exposed to bending and pulling forces and, as a consequence, metal fatigue of a carrier ring will play a role in a possible failure of the drive belt.
  • the resistance of the carrier rings against such metal fatigue is largely determined by the type, quality and treatment of the used steel.
  • a preferred basic material that provides the required material properties for drive belt application of the carrier ring is maraging steel.
  • the separating of a ring-shaped section from the tube is commonly performed by one or more rotating cutting blades that are forced into the material of the tube, which is rotated as well.
  • Several basic arrangements of such separating process are known in the art, as, for example, described in the international patent applications WO2005/039812-A1 and WO2004/089568-A1 and in the European patent applications EP-1130282-A and EP-1108919-A.
  • the cutting blade or blades exert considerable (shear) stresses on the tube that can only be accommodated without fracturing or unwanted deformation, if the material of the tube is sufficiently ductile. In practice this means that after the welding of the tube and prior to separating a ring-shaped section there from, the tube must be annealed.
  • the said shear stresses do not occur. Consequent ⁇ ly, with such melt cutting process the ductility or brittleness of the tube is hardly of influence on the quality of the cut, i.e. of the ring-shaped tube section. In any case the above-mentioned unwanted deformation or fracturing thereof will not occur, not even without annealing the tube prior to the melt cutting thereof.
  • this latter aspect of the melt cutting process appears irrelevant in practice, because the tube annealing process must be carried out anyway, in order for the rolling process to be carried out without damaging or fracturing the ring-shaped tube section.
  • this aspect could still be favorably applied.
  • the annealing after welding is postponed until after separating the ring-shaped tube section from the tube in a melt cutting process.
  • the overall effectiveness, in particular cost effectiveness of the carrier ring manufacturing method is improved.
  • Figure 1 is a schematic illustration of a part of the known drive belt including two ring sets, each represented by a number of mutually nested carrier rings, as well as a plurality of transverse elements.
  • Figure 2 is a diagram representing a known sequence of process steps in a known method for manufacturing a ring set for a drive belt from plate-shaped base material;
  • Figure 3 illustrates a known setup of the process step of separating a ring-shaped section from a tube in the known ring set manufacturing method.
  • Figure 4 illustrates an alternative setup of the process step of separating a ring-shaped section from a tube that is to be applied within the context of the present disclosure .
  • Figure 5 is a diagram representing a novel sequence of process steps as part of the manufacturing of the ring set in accordance with the present disclosure.
  • the known drive belt 3 that is schematically represented in part in figure 1 comprises two sets 31 of mutually nested, annular metal bands denoted carrier rings 32, as well as a several individual metal transverse elements 33, which transverse elements 33 are each provided with a recess 34 on either lateral side thereof wherein the ring sets 31 are provided.
  • the transverse elements 33 form a row that spans and essentially continuously fills the entire circumference of the ring sets 31.
  • the drive belt 3 is held between two transmission pulleys, whereby the ring sets 31 of the belt 3 are tensioned such that the row of transverse elements 33 can transmit a drive force from one pulley to another while being guided by the ring sets 31.
  • Figure 2 diagrammatically shows the major steps in a typical manufacturing method for forming the ring sets 31 of the drive belt 3, which includes the manufacturing of the intermediate product carrier ring.
  • a plate 11 of basic material having a thickness of around 0.4 mm is bend into a cylindrical shape and the meeting side faces 12 of the plate 11 are welded together in a second process step II to form a hollow cylinder or tube 13.
  • the tube 13 is annealed, to recover and re- crystallize the metal lattice, in an industrial oven 16 at a temperature considerably above 600 degree Celsius, e.g. around 800 degree Celsius.
  • a ring-shaped section 14 is separated from the main body of the tube 13.
  • the lateral side faces or edges 15 of the ring- shaped tube section 14 are treated to improve the surface quality and/or the shape thereof.
  • the edge 15 treatment takes place by way of an edge melting process wherein the said edges 15 are reshaped by temporarily being melted by means of a heat source such as a laser 20, which edge melting process is, as such, known from WO-2012 /089228A1.
  • the ring shaped tube section 14 is rolled in a sixth process step VI to reduce the thickness thereof to less than 0.2 mm, typically around 0.185 mm, while being elongated, thus forming the carrier ring 32.
  • the carrier ring 32 is then subjected to a further annealing process step VII for removing the work hardening effect of the previous rolling process (i.e. step five VI) Thereafter, in an eight process step VIII, the carrier ring 32 is calibrated, i.e. is mounted around two rotating rollers and stretched to a predefined circumference length by forcing the said rollers apart. In this eight process step VIII, also an internal stress distribution is imposed on the carrier ring 32. Thereafter, the carrier ring 32 is heat-treated in two separate process steps, namely a ninth process step IX of ageing or bulk precipitation hardening and a tenth process step X of nitriding or case hardening.
  • both such heat-treatments involve heating the carrier ring 32 in an oven chamber that is supplied with process gas that is typically composed of nitrogen and some, e.g. around 5 volume-% of hydrogen for ring ageing and of nitrogen and ammonia for ring nitriding
  • process gas typically composed of nitrogen and some, e.g. around 5 volume-% of hydrogen for ring ageing and of nitrogen and ammonia for ring nitriding
  • Both heat-treatments typically occur within the tempera ⁇ ture range from 400 degrees Celsius to 500 degrees Celsius and can each last for less than 30 to over 120 minutes in dependence on the metal used for the carrier ring 32 (i.e. typically a maraging steel alloy) , as well as on the mechanical properties desired for the carrier ring 32.
  • a laminated ring set 31 is formed by radially stacking, i.e. nesting, a number of thus processed carrier rings 32, as is further indicated in figure 3 in the last depicted eleventh process step XI .
  • the carrier ring 32 of the ring set 31 have to be suitably dimensioned, e.g. have to differ slightly in circumference length to allow the carrier rings 32 to be closely fitted one around the other.
  • the carrier rings 32 of the ring set 31 are typically purposively selected from a stock of carrier rings 32 of varying dimensions.
  • FIG. 3 depicts the tube 13 in cross-section; however, in reality the diameter of the tube 13 is much larger relative its wall thickness.
  • the circles 17 indicate several consecutive radial positions of an essentially cylindrical and rotatable cutting tool 17 relative to the tube 13 during the cutting process. However, in reality the cutting tool 17 has a fixed radial position, whereas the tube 13 is rotated with respect thereto.
  • a counter tool 18 provides a support for the tube 13 when the cutting tool 17 moves radially inward during the cutting process. The actual cutting occurs in two phases I, II.
  • a first phase I of the cutting the cutting tool 17 is gradually moved through the wall thickness (positions Ia-Ic) of the rotating tube 13 thus following a spiral cutting line C in the material of the tube 1. Then, in a second phase II of the cutting, the ring-shaped section is fully separated from the tube 13 in one full rotation of the tube 13. It may be clear that in this known setup of the fourth process step IV a substantial cutting force is exerted on the tube 13 by the cutting tool 17.
  • FIG. 4 An alternative setup of the process step IV of separating the ring-shaped tube section 14 from the tube 13 is schematically illustrated in figure 4.
  • a concentrated heat source e.g. a laser beam
  • a complete circumferential cut is made from a start position S and the ring-shaped section 14 is separated from the tube 13. It may be clear that in this particular setup of the fourth process step IV only minimal forces are exerted on the tube 13 and/or the ring- shaped section 14.
  • the internal stress which is introduced into the material of the tube 13 at welding, in combination with the forces exerted by a mechanical cutting tool 17, 18, such as the one illustrated in figure 3, cause the tube 13 and/or the ring-shaped tube section 14 to be damaged, e.g. by an unwanted deformation thereof, or even to fracture.
  • a melt cutting process no substantial cutting forces are exerted and, hence, the tube 13 and/or the ring-shaped tube section 14 will not be damaged thereby.
  • the third process step III of tube annealing need not necessarily be carried out if the ring- shaped section 14 is separated from the tube 14 (process step IV) by means of a melt cutting process instead of a mechanical cutting process.
  • the resulting ring- shaped tube section 14 must be annealed prior to the rolling thereof, i.e. prior to the sixth process step VI of the manufacturing of the carrier ring 32 and finally of the ring set 31 of the drive belt 3.
  • the annealing of the ring-shaped tube section 14 is favorably postponed, i.e. is carried out only until after the edges 15 thereof are treated in the fifth process step V.
  • the fifth process step V of edge melting can be carried out in accordance with the known art, i.e. including the after treatment of annealing as taught by WO-2012 /089228A1 , however, favorably without a second annealing process step prior to the sixth process step VI of rolling the ring- shaped tube section 14.
  • This novel setup of the relevant part of the manufacturing of the carrier ring is illustrated in figure 5.
  • the tube 13 is immediately cut into a several ring-shaped sections 14 in a melt cutting process, i.e. in the fourth process step IV, thus skipping the third step III of annealing in the conventional manufacturing method.
  • the edges 15 of the ring-shaped tube section 14 are treated by a laser 20 that temporarily melts these edges 15. Only thereafter is the ring-shaped tube section 14 subjected to a process step V-b of annealing, in order to equalize the material properties throughout the ring- shaped tube section 14 by recovery and re-crystallization.
  • the heat affected zones resulting from the welding process step II, the separating process step IV and the edge melting process step V are all removed simultaneously, i.e. favorably in a single process step V-b.
  • the metal crystal structure of the tube 13 still includes the irregularities that were formed therein the second process step II of tube welding, i.e. still includes a weld structure and a heat affected zone.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat Treatment Of Articles (AREA)
  • Laser Beam Processing (AREA)
  • Arc Welding In General (AREA)

Abstract

Cette invention concerne un procédé de fabrication d'un anneau de support (32) en acier, conçu pour être utilisé dans une courroie de transmission (3) pour une transmission à variation continue, ledit procédé comprenant les étapes consistant à : - souder une plaque (11) de matériau de base en forme de tube (13), - séparer une section de forme annulaire (14) dudit tube (13) par découpage par fusion, par exemple au moyen d'un laser (19), - recuire la section de forme annulaire (14) et - traiter la section de tube de forme annulaire (14) recuite afin de former l'anneau de support (32), ledit traitement comprenant au moins l'allongement par laminage de la section de tube annulaire recuite (14).
PCT/EP2014/079329 2013-12-24 2014-12-24 Procédé de fabrication d'un anneau de support adapté à une utilisation dans une courroie de transmission pour une transmission à variation continue WO2015097296A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2016542923A JP6556143B2 (ja) 2013-12-24 2014-12-24 無段変速機用の駆動ベルトにおいて使用するのに適したキャリヤリングを製造する方法
CN201480070856.4A CN105848823A (zh) 2013-12-24 2014-12-24 适于在用于无级变速器的传动带中使用的承载环的制造方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1040566 2013-12-24
NL1040566A NL1040566C2 (en) 2013-12-24 2013-12-24 Method for manufacturing a carrier ring suitable for use in a drive belt for a continuously variable transmission.

Publications (1)

Publication Number Publication Date
WO2015097296A1 true WO2015097296A1 (fr) 2015-07-02

Family

ID=50190627

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2014/079329 WO2015097296A1 (fr) 2013-12-24 2014-12-24 Procédé de fabrication d'un anneau de support adapté à une utilisation dans une courroie de transmission pour une transmission à variation continue

Country Status (4)

Country Link
JP (1) JP6556143B2 (fr)
CN (1) CN105848823A (fr)
NL (1) NL1040566C2 (fr)
WO (1) WO2015097296A1 (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018062532A1 (fr) * 2016-09-30 2018-04-05 アイシン・エィ・ダブリュ株式会社 Procédé de fabrication d'anneaux
WO2018062355A1 (fr) * 2016-09-30 2018-04-05 アイシン・エィ・ダブリュ株式会社 Procédé de fabrication d'anneaux et procédé de polissage d'anneaux
WO2018062549A1 (fr) * 2016-09-30 2018-04-05 アイシン・エィ・ダブリュ株式会社 Procédé de nettoyage d'une partie à souder, système de soudage et procédé de fabrication de bague
CN108202210A (zh) * 2018-01-10 2018-06-26 永嘉县三和弹簧有限公司 一种u型弹性硬密封球阀阀座的加工工艺

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1108919A1 (fr) 1999-12-15 2001-06-20 BorgWarner Inc. Dispositif de fabrication en continu de bandes pour courroie à maillons poussants pour transmission continument variable
EP1130282A1 (fr) 2000-02-29 2001-09-05 Nissan Motor Co., Ltd. Anneau pour courroie métallique stratifiée et son procédé de fabrication
WO2004089568A1 (fr) 2003-04-09 2004-10-21 Honda Motor Co. Ltd. Dispositif de coupe de plaque métallique mince
WO2005039812A1 (fr) 2003-10-24 2005-05-06 Robert Bosch Gmbh Procede de decoupage pour fabrication d'un anneau, dispositif de coupe, anneau et courroie de poussee pourvue d'un anneau
WO2011076397A1 (fr) * 2009-12-23 2011-06-30 Robert Bosch Gmbh Courroie d'entraînement comprenant un anneau en acier
WO2012089228A1 (fr) 2010-12-30 2012-07-05 Robert Bosch G.M.B.H. Procédé et dispositif permettant de traiter un anneau métallique, bande métallique annulaire formée de la sorte et courroie de transmission utilisant la bande métallique annulaire
WO2013000491A1 (fr) * 2011-06-30 2013-01-03 Robert Bosch Gmbh Bague flexible pour courroie de transmission d'une transmission à variation continue et procédé de fabrication de cette bague
WO2013002633A1 (fr) * 2011-06-30 2013-01-03 Robert Bosch Gmbh Procédé de fabrication d'un composant annulaire de courroie d'entraînement
US20130168372A1 (en) * 2011-02-14 2013-07-04 Honda Motor Co., Ltd. Metal ring manufacture method and metal ring manufacture device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5513923B2 (ja) * 2010-02-16 2014-06-04 本田技研工業株式会社 金属リングの製造方法
CN102825435B (zh) * 2012-09-25 2014-09-10 安徽马钢工程技术集团有限公司 一种环件加工系统及其方法及环件搬出装置

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1108919A1 (fr) 1999-12-15 2001-06-20 BorgWarner Inc. Dispositif de fabrication en continu de bandes pour courroie à maillons poussants pour transmission continument variable
EP1130282A1 (fr) 2000-02-29 2001-09-05 Nissan Motor Co., Ltd. Anneau pour courroie métallique stratifiée et son procédé de fabrication
WO2004089568A1 (fr) 2003-04-09 2004-10-21 Honda Motor Co. Ltd. Dispositif de coupe de plaque métallique mince
WO2005039812A1 (fr) 2003-10-24 2005-05-06 Robert Bosch Gmbh Procede de decoupage pour fabrication d'un anneau, dispositif de coupe, anneau et courroie de poussee pourvue d'un anneau
WO2011076397A1 (fr) * 2009-12-23 2011-06-30 Robert Bosch Gmbh Courroie d'entraînement comprenant un anneau en acier
WO2012089228A1 (fr) 2010-12-30 2012-07-05 Robert Bosch G.M.B.H. Procédé et dispositif permettant de traiter un anneau métallique, bande métallique annulaire formée de la sorte et courroie de transmission utilisant la bande métallique annulaire
US20130168372A1 (en) * 2011-02-14 2013-07-04 Honda Motor Co., Ltd. Metal ring manufacture method and metal ring manufacture device
WO2013000491A1 (fr) * 2011-06-30 2013-01-03 Robert Bosch Gmbh Bague flexible pour courroie de transmission d'une transmission à variation continue et procédé de fabrication de cette bague
WO2013002633A1 (fr) * 2011-06-30 2013-01-03 Robert Bosch Gmbh Procédé de fabrication d'un composant annulaire de courroie d'entraînement

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018062532A1 (fr) * 2016-09-30 2018-04-05 アイシン・エィ・ダブリュ株式会社 Procédé de fabrication d'anneaux
WO2018062355A1 (fr) * 2016-09-30 2018-04-05 アイシン・エィ・ダブリュ株式会社 Procédé de fabrication d'anneaux et procédé de polissage d'anneaux
JP2018054081A (ja) * 2016-09-30 2018-04-05 アイシン・エィ・ダブリュ株式会社 リングの製造方法
WO2018062549A1 (fr) * 2016-09-30 2018-04-05 アイシン・エィ・ダブリュ株式会社 Procédé de nettoyage d'une partie à souder, système de soudage et procédé de fabrication de bague
JPWO2018062549A1 (ja) * 2016-09-30 2019-04-11 アイシン・エィ・ダブリュ株式会社 被溶接部の洗浄方法、溶接システムおよびリングの製造方法
CN108202210A (zh) * 2018-01-10 2018-06-26 永嘉县三和弹簧有限公司 一种u型弹性硬密封球阀阀座的加工工艺
CN108202210B (zh) * 2018-01-10 2019-11-15 永嘉县三和弹簧有限公司 一种u型弹性硬密封球阀阀座的加工工艺及成型机器

Also Published As

Publication number Publication date
CN105848823A (zh) 2016-08-10
JP6556143B2 (ja) 2019-08-07
NL1040566C2 (en) 2015-06-26
JP2017511864A (ja) 2017-04-27

Similar Documents

Publication Publication Date Title
WO2015097296A1 (fr) Procédé de fabrication d'un anneau de support adapté à une utilisation dans une courroie de transmission pour une transmission à variation continue
JP2017511864A5 (fr)
JP5817921B2 (ja) 無端金属リングの製造方法及び製造装置
EP2889104B1 (fr) Procédé de formation d'une bague de support adaptée à une utilisation dans une courroie d'entraînement pour une transmission variable en continu
JP5855125B2 (ja) リングの側面を処理する方法及びそれを実施するための装置
JP5768746B2 (ja) 無端金属リングの製造方法
JP2011518672A (ja) 駆動ベルトのリングコンポーネントの製造方法
NL1040571C2 (en) Metal ring component for a drive belt for a continuously variable transmission.
WO2012083974A1 (fr) Procédé de traitement thermique pour un procédé de fabrication d'un composant annulaire métallique de courroie d'entraînement
NL1040567C2 (en) Manufacturing method for a drive belt metal ring component and metal ring manufactured in accordance therewith.
JP4923287B2 (ja) 金属リング周長補正装置
EP2384835B1 (fr) Procédé de fabrication d'un rotor pour un générateur
JP6471444B2 (ja) 熱間鍛造用金型の製造方法
JP5200810B2 (ja) 無端金属ベルトの製造方法
JP5057271B2 (ja) 金属リングの製造方法
EP3087293A1 (fr) Bague en acier souple dotée d'une couche de surface nanocristalline pour une courroie d'entraînement destinée à une transmission à variation continue et procédé de fabrication d'une telle bague
JP2014184478A (ja) 無端金属ベルトの製造方法
RU2218227C2 (ru) Способ изготовления кольцевых заготовок из стареющих никелевых сплавов
JP6934934B2 (ja) マルエージング鋼から形成されかつ窒化された表面層が設けられたフレキシブルな鋼リング
JP6008976B2 (ja) ドライブベルト金属リング要素の製造方法における熱処理プロセス
NL1041103B1 (en) Method for manufacturing a flexible ring suitable for use in a drive belt for a continuously variable transmission.
WO2015039933A1 (fr) Anneau souple en acier pour une courroie d'entraînement pour une transmission variable en continu et son procédé de fabrication
JP2005337339A (ja) 無端状金属ベルトの製造方法
JP2014176900A (ja) 駆動ベルトのリングコンポーネントの製造方法
JP2010242115A (ja) 建築構造用リング鋼材の製造方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14827453

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2016542923

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14827453

Country of ref document: EP

Kind code of ref document: A1