WO2015083972A1 - 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 및 그 시공 방법 - Google Patents

능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 및 그 시공 방법 Download PDF

Info

Publication number
WO2015083972A1
WO2015083972A1 PCT/KR2014/011347 KR2014011347W WO2015083972A1 WO 2015083972 A1 WO2015083972 A1 WO 2015083972A1 KR 2014011347 W KR2014011347 W KR 2014011347W WO 2015083972 A1 WO2015083972 A1 WO 2015083972A1
Authority
WO
WIPO (PCT)
Prior art keywords
shotcrete
wire net
tunnel
wire
integrated
Prior art date
Application number
PCT/KR2014/011347
Other languages
English (en)
French (fr)
Inventor
마상준
Original Assignee
한국건설기술연구원
영인산업 주식회사
주식회사 에이치에스산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국건설기술연구원, 영인산업 주식회사, 주식회사 에이치에스산업 filed Critical 한국건설기술연구원
Publication of WO2015083972A1 publication Critical patent/WO2015083972A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E21D11/22Clamps or other yieldable means for interconnecting adjacent arch members either rigidly, or allowing arch member parts to slide when subjected to excessive pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection

Definitions

  • the present invention relates to a tunnel in which an active support material and shotcrete are integrated with a wire net, and a construction method thereof, and more particularly, a rigid support and a rock bolt, a passive support material (active reinforcing member) for reinforcing a tunnel excavation surface.
  • the present invention relates to a tunnel in which shotcrete, a reinforcing member, is integrated using a non-welding wire-net, and a construction method thereof.
  • the construction of the tunnel is based on at least three kinds of reinforcement, drainage treatment and lining of the tunnel excavation surface.
  • the construction sequence of such a tunnel first reinforces the tunnel excavation surface, then drains, and finally lining.
  • the tunnel excavation surface is a place where the upper ground pressure is transmitted as it is, and is also a place to support and reinforce the upper ground pressure.
  • the support and reinforcement means for the upper ground pressure is usually made of steel reserves, rock bolts and shotcrete.
  • This primary support is a structural material supporting the tunnel excavation surface.
  • Drainage treatment is the installation of waterproofing and nonwoven fabrics on the primary support material to be waterproofed or induced drainage.
  • Lining is a finishing material or interior material for finishing work, unlike the structural material where the primary support material supports the tunnel excavation surface.
  • FIG. 1 is a cross-sectional view showing a tunnel internal structure according to the prior art
  • Figures 2a and 2b is a view for explaining a wire mesh used in the tunnel construction according to the prior art.
  • the tunnel construction method according to the prior art, first excavating the tunnel, and then the required number of rock bolts (10) and the net along the inner wall of the tunnel to prevent settlement and collapse, etc. After fixing the sieve wire mesh 11 with a pin, the first shotcrete 12 of the required thickness is poured by spraying on it.
  • the shotcrete 12 is generally used in tunnel construction as an initial support material due to favorable construction properties such as prevention of excavation of the rock surface, deformation suppression, securing strength to the initial support material, and reduction of formwork cost in the construction of underground structures such as tunnels. Is being applied.
  • the shotcrete is sprayed with concrete mortar on the excavation surface immediately after the excavation of the tunnel and closely adhered to the ground surface, and in cooperation with the surface layer portion of the ground surface to suppress the loosening and development of the inner surface of the ground surface and smoothly finish the surface irregularities, thereby cracking the ground surface due to the concentration of mortar stress. At the same time, it is used for stabilization of the excavated surface, ground reinforcement and support by preventing weathering.
  • Such shotcrete casting is carried out by processing the rucksack and placing the shotcrete on the rock surface or soil layer at 7-8 bar pressure and bonding it to the casting surface, which can prevent accidents caused by the cracking of the rock surface and the collapse of the falling slope of the rock, Air also has the effect of shortening.
  • a nonwoven fabric 13 is attached along the inner wall of the primary shotcrete 12 as a drainage material, and the waterproof membrane sheet 14 is attached again onto the nonwoven fabric 13. And fix.
  • the secondary lining concrete 15 is cast again to a thickness of 30 cm to 40 cm. In this case, formwork is manufactured and installed for placing the secondary lining concrete 15.
  • the above-mentioned shotcrete serves as a passive support material, unlike the stronghold and rock bolts.
  • the shotcrete is applied as an auxiliary support material integrating a strong support material or a steel bolt which is an active support material.
  • steel fibers may be added to the shotcrete, and in this case, the role of the steel fibers in the shotcrete serves to control the crack and maintain the residual strength of the shotcrete after the yield point at breakdown.
  • the shotcrete may be regarded as partially integrated or dualized instead of being integrated with the active support material.
  • the tunnel construction method using the wire mesh described above uses a wire mesh to improve the tensile strength and shear strength of the shotcrete when the shotcrete is likely to be peeled off due to its own weight, but the construction process is complicated and currently It is rarely used in tunnels. For example, it takes a long time to install the wire mesh, and since the secondary shotcrete is poured while the primary shotcrete layer is cured, there is a problem that a joint phenomenon such as a joint joint or a cold joint may occur.
  • the above-described tunnel construction method using the steel fiber has the advantage that the construction process is simple, but there is a problem that the aggregation of the steel fibers in the transfer hose often occurs due to the magnetism between the steel fibers, which hinders the construction.
  • the tunnel construction method using steel fibers has a high material cost, a large material loss due to rebound during shotcrete placement, and difficulty in quality control such as homogeneous strength characteristics by steel fiber reinforcement.
  • the tunnel construction method using the steel fiber has a problem that can be generated environmental problems when recycled to the aggregate after the shredded steel fiber shotcrete is taken out along with the force.
  • the technical problem to be solved by the present invention for solving the above problems is, by placing a shotcrete after fastening a non-welding wire net (wire-Net) using an active support material, such as a rigid support and rock bolts and rings, etc. It is an object of the present invention to provide a tunnel in which a wire net is integrated with an active support material and shotcrete, and a construction method thereof, which can integrate the support material, the wire net, and shotcrete.
  • an active support material such as a rigid support and rock bolts and rings, etc.
  • Another technical problem to be achieved by the present invention is to integrate the wire net with the active support material and the shotcrete, which can improve the shear behavior of the tunnel support material as well as control the cracking of the shotcrete by using the wire net and improve the flexural tensile properties. It is to provide a tunnel and a construction method thereof.
  • the tunnel in which the wire net according to the present invention is integrated with the active support material and the shotcrete includes, as an active support material, a steel support material installed on an excavation surface of the tunnel; An active support member, the rock bolt is installed on the excavation surface of the tunnel; A welding-free net, comprising: a wire net connected to the steel plate and the rock bolt; And shotcrete, which is poured onto the rigid support, rock bolt, and wire net in a state in which the rigid support and the lock bolt are connected to the wire net, wherein the shotcrete is formed of the wire net, the rigid support, and the rock bolt. It is characterized by being integrated.
  • the wire net may be integrated with the stiffener, the rock bolt and the shotcrete to improve the shear behavior of the stiffener and the rockbolt, and to improve the bending tensile characteristics of the shotcrete.
  • the wire net is formed by a non-welding method using a steel wire, strand wire or a high tensile plastic material having good tensile properties, and can improve the bending tensile characteristics of the shotcrete.
  • the stiffener is H-shaped steel, U-shaped steel or lattice girder (lattice girder), and may further include a hook ring for connecting the wire net to the stiffener.
  • the tunnel in which the wire net according to the present invention is integrated with the active support material and the shotcrete may further include an eight-way ring connecting the wire net and the rock bolt, respectively.
  • the tunnel incorporating the wire net according to the present invention with the active support material and shotcrete further includes a rock bolt support plate connecting the wire net to the rock bolt, wherein the rock bolt support plate is formed larger than the mesh of the wire net. It is characterized by.
  • the tunnel construction method of integrating the wire net with the active support and shotcrete comprises the steps of: a) digging a tunnel; b) installing the rigid support and the lock bolt, respectively, on the excavating surface of the tunnel; c) installing a non-welding type wire net on the excavation surface of the tunnel; d) connecting the wire net to the active support; And e) placing and integrating shotcrete on the active support and the wire net, wherein the wire net is integrated with the rigid support, the rock bolt and the shotcrete to shear shear characteristics of the rigid support and the rock bolt. It is characterized in that to improve the bending tensile characteristics of the shotcrete.
  • the wire net of step c) is formed by a non-welding method using a steel wire, a strand wire or a high tensile plastic material having good tensile properties, it is possible to improve the bending tensile characteristics of the shotcrete.
  • step d) it may be connected to the wire net to the rigid retainer using a hook ring.
  • step d) it can be connected to the wire net and the rock bolt using an arm-shaped ring or a rock bolt support plate formed larger than the mesh of the wire net) to connect the wire net to the rock bolt.
  • the active support, wire net and shotcrete can be integrated by placing a shotcrete after fastening a non-welding type wire net by using an active supporter such as a rigid supporter and a lock bolt and a ring. .
  • the use of the wire net can control the crack of the shotcrete and improve the bending tensile characteristics, as well as improve the shear behavior of the tunnel support member, thereby improving the stability of the tunnel structure.
  • the present invention by using a wire net, it is possible to shorten the installation time compared to the tunnel construction method using a conventional wire mesh, and can be installed at 50% or more cheaper than the tunnel construction method using a conventional steel fiber.
  • the present invention it is easy to uniformly control quality of shotcrete bending tensile quality characteristics compared to the conventional tunnel construction method using steel fibers.
  • the existing reinforcing material may not only have high bending tensile characteristics of the shotcrete but also serve as a structure capable of receiving ground stress.
  • the present invention can serve as a safety facility for the rock generated by the discontinuous surface until the shotcrete after installing the wire net.
  • FIG. 1 is a cross-sectional view showing a tunnel internal structure according to the prior art.
  • 2a and 2b is a view for explaining a wire mesh used in the tunnel construction according to the prior art.
  • FIG 3 is a cross-sectional view showing a tunnel in which a wire net is integrated with an active support material and shotcrete according to an embodiment of the present invention.
  • FIG. 4 is a view showing a wire net in a tunnel in which the wire net is integrated with an active support material and shotcrete according to an embodiment of the present invention.
  • FIG. 5 is a diagram illustrating the connection of the wire net and the rigid support in the tunnel integrated with the active net support and shotcrete according to an embodiment of the present invention.
  • FIG. 6 is a diagram illustrating the connection of the wire net and the lock bolt in the tunnel in which the wire net is integrated with the active support and shotcrete according to an embodiment of the present invention.
  • FIG. 7 is a flowchart illustrating a tunnel construction method in which a wire net is integrated with an active support member and shotcrete according to an exemplary embodiment of the present invention.
  • tunnel 200 base plate
  • tunnel excavation surface 110 steel plate material (active paper material)
  • the present invention is a steel plate is installed on the excavation surface of the tunnel; Rock bolts installed on the excavation surface of the tunnel; A non-welding net, comprising: a wire net connected to the steel plate and the rock bolt; And shotcrete, which is poured onto the rigid support, rock bolt, and wire net in a state in which the rigid support and the lock bolt are connected to the wire net, wherein the shotcrete is formed of the wire net, the rigid support, and the rock bolt.
  • FIG. 3 is a cross-sectional view illustrating a tunnel in which a wire net is integrated with an active support material and shotcrete according to an embodiment of the present invention
  • FIG. 4 is a wire net in a tunnel integrating a wire net according to an embodiment of the present invention with an active support material and shotcrete. It is a figure which shows.
  • the tunnel 100 integrating the wire net according to the embodiment of the present invention with the active support and shotcrete, the rigid support 110, which is an active support, lock bolt 120 is an active support, And a wire net 130, shotcrete 140, and liner 150.
  • the tunnel support material installed on the excavation surface after the excavation of the tunnel 100 should be designed to meet the ground behavior characteristics around the tunnel 100 to maintain the stability of the tunnel 100 during or after the completion of the tunnel construction.
  • the support material should be designed to stabilize the excavation ground early and so that the effect of the ground excavation does not impair the stability of the adjacent structure.
  • the support material of the tunnel includes a support material consisting of a steel support material 100, a rock bolt 120, a wire net 130, a shotcrete 140, etc., for the purpose of improving the ease and stability of excavation
  • a supplementary support to be constructed.
  • the rigid support 110 is an active support and is installed on the excavation surface 100s of the tunnel 100.
  • the rigid retainer 110 is integrated with other support materials such as shotcrete 140, rock bolts 120, etc., and the specification and arrangement interval are determined to exert the required support function.
  • the joint of the rigid retainer 110 is determined so that the joint is minimized in consideration of the construction order and construction.
  • the base plate 200 of the excavated tunnel 100 it may be omitted for the paper holding material 110, the paper holding material 110 should be used when the following function is required.
  • the steel retainer 110 is used.
  • the material of the stiffeners 120 should be ductile and have good workability such as bending and welding.
  • SS 400 stipulated in KS D 3503 should be used as a standard, and structural steels having the same or better performance should be used. do.
  • the cross section of the steel retainer 110 is easy to place the shotcrete 140 even after installation of the rigid retainer, and should have a shape that is easy to integrate with the shotcrete 140, for example, H-shaped steel, U Section steel, lattice girders, and the like.
  • the rock bolt 120 is an active support, and is installed on the excavation surface 100s of the tunnel 100.
  • the rock bolt 120 is urgently drilled the rock which is the base 200, inserts a bolt therein, removes the nut, and then uses it as the support hole of the tunnel 100 by gluing or the like. Says the bolt.
  • the rock bolt 120 is made of a deformed bar having a strength of more than the required strength, but in principle, steel pipe, expandable steel pipe or rock bolt of other materials such as fiber reinforced plastic (FRP) having the same strength and function Can also be used, the material and strength should be suitable for the Korea Industrial Standard (KS).
  • FRP fiber reinforced plastic
  • KS Korea Industrial Standard
  • the material of the rock bolt 120 is determined according to the condition and the purpose of use of the base 200, generally used as a material of SD 35 or more, the material tensile strength and elongation is large.
  • the rock bolt 120 should be arranged to reinforce the area affected by the excavation in principle, the arrangement and length of the rock bolt 120 is the purpose of use, ground conditions, the size and shape of the tunnel 100 cross section , Excavation method, joint gap, etc. are considered.
  • the wire net 130 is a non-welding net, and is connected to the rigid retainer 110 and the lock bolt 120.
  • the wire net 130 is formed in a non-welding manner using a steel wire, a stranded wire, or a high tensile plastic material having good tensile properties, and the flexural tensile properties of the shotcrete 140 are shown. Can be improved.
  • the shotcrete 140 is formed on the rigid retainer 110, the rock bolt 120, and the wire net 130 in a state in which the rigid retainer 110 and the rock bolt 120 are connected to the wire net 130. Is poured.
  • the shotcrete 140 has an effect of attaching and self shearing with the base 200, disperses the external force acting on the shotcrete 140 to the base 200, and easily collapses around the tunnel 100. Supporting the rock mass, so that the ground arch is formed near the excavation surface (100s).
  • the shotcrete 140 maintains the ground surface of the excavated surface in the triaxial stress state by applying internal pressure to the surrounding ground by the resistance effect of bending tension or axial force, and prevents the ground strength from falling. 110) or to the rock bolt 120, the function to transfer the ground pressure, and also to prevent the stress concentration phenomenon by filling the bent portion of the excavated base plate 200 and bonded between the joint surface.
  • the cement for shotcrete is to use the first type of ordinary portland cement, for example, fine aggregates should not contain fine grains of 0.1 mm or less in particle size, and the maximum particle diameter of coarse aggregates should be 15 mm or less.
  • Such shotcrete 140 is required to ensure the required strength and durability, and adhesion and construction is good, and should be blended so that the age of compressive strength of 100kg / cm2 or more, the age of more than 180kg / cm2 28 days.
  • a fastener may be used to express early strength of the shotcrete 140.
  • the minimum thickness of the shotcrete 140 used as the support material of the tunnel is determined in consideration of the purpose of use, the ground conditions, the size of the cross section, and the like, and is poured in, for example, 3 cm or more.
  • the liner 150 is formed to be suitable for the purpose of use in consideration of the ground condition, the environmental conditions, and the supporting ability of the main treasures around the tunnel 100 and to have sufficient safety and durability for long-term use.
  • the liner 150 has a mechanical function as a structure, a pressure resistance function in an undrained tunnel, a durability as a permanent structure, and a function of maintaining aesthetics according to the purpose of use.
  • the shotcrete 140 is integrated with the wire net 130, the rigid retainer 110, and the lock bolt 120, that is, the wire net 130 is the rigid retainer 110 and the lock.
  • the bolt 120 and the shotcrete 140 are integrated with each other to improve the shear behavior of the rigid retainer 110 and the rock bolt 120, and to improve the bending tensile characteristics of the shotcrete 140.
  • FIG 5 is a view illustrating the connection of the wire net and the rigid support in the tunnel integrating the wire net with the active support and shotcrete according to an embodiment of the present invention
  • Figure 6 is an active support for the wire net according to an embodiment of the present invention
  • a diagram illustrating the connection of the wire net and the rock bolt in the tunnel integrated with the shotcrete.
  • the rigid support 110 is H-shaped steel, U-shaped steel or lattice girder, as shown in FIG.
  • the wire net 130 may be connected to the rigid retainer 110 using a hook ring 160.
  • the wire net 130 and the lock bolt 120 may be connected to each other using an eight-point ring (not shown).
  • the wire net 130 is connected to the rock bolt using the rock bolt support plate 170. 120, wherein the rock bolt support plate 170 is formed larger than the mesh of the wire net 130. That is, the wire net 130 and the lock bolt 120 may be directly integrated by installing a rock bolt support plate 170 larger than the net hole formed in the wire net 130.
  • the tunnel support pattern having the system support pattern can be applied in the ground condition of 4 or more.
  • the tunnel support pattern is a tunnel support pattern which is set in advance to ensure the stability of the tunnel in consideration of the ground state of the tunnel curtain, the ground state of the tunnel top, the ground state of the upper part, and the constructability.
  • It refers to the supporting method combining shotcrete, strong ground support, rock bolt, etc., which is installed for the purpose of securing the stability of the tunnel, and is determined according to the tunnel design standard of the Ministry of Land, Transport, and Support for the wire net according to the embodiment of the present invention. And in the case of the tunnel integrated with the shotcrete, it can be applied when the ground conditions are four or more.
  • the use of the wire net not only controls the cracking of the shotcrete and improves the bending tensile characteristics, but also improves the shear behavior of the tunnel support material. It can be improved, thereby improving the stability of the tunnel structure.
  • FIG. 7 is a flowchart illustrating a tunnel construction method in which an active support member and shotcrete are integrated with a wire net according to an exemplary embodiment of the present invention.
  • the tunnel 100 is excavated using an excavator or the like (S110).
  • the non-welding wire net (Wire-Net: 130) is installed on the excavation surface (100s) of the tunnel 100 (S130). That is, the wire net 130 is formed in a non-welding manner by using a high tensile strength plastic material having good steel wire, strand wire, or tensile property so as to improve the bending tensile property of the shotcrete 140.
  • the wire net 130 is connected to the active support (110, 120) (S140).
  • the hook net 160 may be used to connect the wire net 130 to the rigid retainer 110, and the wire net 130 and the lock bolt 120 may be connected to each other using an arm shape ring.
  • Each of the wire nets 130 may be connected to the lock bolts 120 using the lock bolt support plates 170 formed larger than the wire net 130 or the wire net 130.
  • the shotcrete 140 is poured into the active support members 110 and 120 and the wire net 130 to be integrated (S150). Accordingly, the wire net 130 is integrated with the rigid retainer 110, the rock bolt 120, and the shotcrete 140 to improve the shear behavior of the rigid retainer 110 and the rock bolt 120. In addition, the bending tensile characteristics of the shotcrete 140 are improved.
  • the tunnel is completed by performing drainage treatment and lining (S160).
  • the tunnel construction method of integrating a wire net with an active support member and shotcrete by using a wire net, installation time can be shortened compared to a tunnel construction method using a conventional wire mesh, and existing steel fibers It can be installed more than 50% cheaper than the tunnel construction method using.
  • it is easier to uniformly control the quality of shotcrete flexural tensile properties compared to the tunnel construction method using conventional steel fibers, and it is structured to be able to receive ground stress as well as high flexural tensile characteristics of shotcrete by integrating with existing reinforcement materials.
  • it can act as a safety facility for the rock mass caused by the discontinuous surface before installing the shotcrete after installing the wire net, and prevents the fall accident in the tunnel when the wire net is installed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

무용접 방식의 와이어 네트(Wire-Net)를 능동형 지보재인 강지보재 및 록볼트와 고리 등을 이용하여 체결한 후에 숏크리트를 타설함으로써 능동형 지보재, 와이어 네트 및 숏크리트를 일체화시킬 수 있고, 또한, 와이어 네트를 사용함으로써 숏크리트의 균열을 제어하고 휨인장 특성을 향상시킬 뿐만 아니라 터널 지보재의 전단거동 특성을 향상시킬 수 있고, 이에 따라 터널 구조물의 안정성을 향상시킬 수 있는, 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 및 그 시공 방법이 제공된다.

Description

능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 및 그 시공 방법
본 발명은 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 및 그 시공 방법에 관한 것으로, 보다 구체적으로, 터널 굴착면의 보강을 위해 능동형 지보재(Active Reinforcing Member)인 강지보재와 록볼트, 수동형 지보재(Passive Reinforcing Member)인 숏크리트(Shotcrete)를 무용접 방식의 와이어 네트(Wire-Net)를 사용하여 일체화시킨 터널 및 그 시공 방법에 관한 것이다.
일반적으로, 터널의 시공은 터널 굴착면의 보강, 배수 처리 및 라이닝 등 적어도 3가지를 기본으로 하여 이루어진다. 이러한 터널의 시공 순서는, 먼저 터널 굴착면을 보강하고, 다음 배수처리를 하며, 마지막으로 라이닝을 실시한다.
이때, 터널 굴착면은 상부 지반압이 그대로 전달되는 곳이기도 하고, 상부 지반압을 지지 및 보강하는 곳이기도 하다. 이때, 상부 지반압에 대한 지지 및 보강수단으로는 통상적으로 강지보재, 록볼트 및 숏크리트로 이루어지고 있다.
이러한 터널 굴착면에 전달된 상부 지반압을 1차적으로 강지보재, 록볼트 및 숏크리트가 지지하고 있다는 점에서 강지보재, 록볼트 및 숏크리트를 1차 지보재라고 부른다. 이러한 1차 지보재는 터널 굴착면을 지지하고 있는 구조재이다.
배수 처리는 1차 지보재위에 방수포와 부직포를 설치하여 방수되게 하거나 유도 배수시키는 것을 말한다.
라이닝은 1차 지보재가 터널 굴착면을 지지하고 있는 구조재와는 달리 끝마무리 작업에 해당되는 마감재 또는 내장재라고 할 수 있다.
도 1은 종래의 기술에 따른 터널 내부 구조를 나타내는 단면도이고, 도 2a 및 도 2b는 종래의 기술에 따른 터널 시공에 사용되는 와이어 메쉬를 설명하기 위한 도면이다.
도 1을 참조하면, 종래의 기술에 따른 터널 시공 방법은, 먼저, 터널을 굴착한 다음, 침하 및 붕괴방지 등을 위해 그 터널의 내벽을 따라 소요 갯수의 록볼트(Rock bolt: 10)와 망체로 된 와이어 메쉬(11)를 핀으로 고정 설치한 후, 그 위에 뿜어 붙이기로 소요 두께의 1차 숏크리트(12)를 타설한다.
구체적으로, 숏크리트(12)는 터널과 같은 지하구조물 건설에 있어서 굴착암면의 이탈방지, 변형억제, 초기 지보재로의 강도확보, 거푸집 제작비 절감 등의 유리한 시공성에 기인하여 초기 지보재로서 터널공사에서 일반적으로 적용되고 있다.
이러한 숏크리트는 터널 굴착 직후에 굴착면에 콘크리트 모르타르를 뿜어 붙여 원지반에 밀착시킴으로써, 원지반의 표층부와 협동해서 원지반 내부의 이완발달을 억제하고 표면의 요철을 매끄럽게 마무리함으로써, 모르타르 응력 집중에 의한 원지반의 균열을 예방함과 동시에 풍화도 방지하여 굴착면의 안정화와 지반보강 및 지보용으로 이용되고 있다. 이러한 숏크리트 타설은 버럭을 처리한 후 숏크리트를 암면 또는 토층에 7∼8 bar 압력으로 타설하여 타설 면에 접착시킴으로써, 암면의 균열, 낙석의 추락사면 붕괴로 인한 사고예방과 안전한 공사를 수행할 수 있고 공기도 단축하게 되는 효과를 갖는다.
다음으로, 상기 1차 숏크리트(12)를 타설한 후에는 배수재로서 상기 1차 숏크리트(12) 내벽을 따라 부직포(13)를 부착시키고, 상기 부직포(13) 위에 다시 방수막 시트(14)를 부착 및 고정시킨다.
이와 같이 1차 숏크리트(12)의 내벽을 따라 부직포(13)를 부착시키고 그 위에 방수막 시트(14)를 고정시킨 후에는 다시 30㎝~40㎝ 두께로 2차 라이닝 콘크리트(15)를 타설하게 되는데, 이때, 상기 2차 라이닝 콘크리트(15) 타설을 위해 거푸집이 제작 및 설치된다.
또한, 상기 2차 라이닝 콘크리트(15)를 타설한 후에는 그 형태 유지를 위해 굳을 때까지 거푸집 밑면에 수개의 강재 동바리 서포트(support) 작업을 수행한다.
전술한 바와 같이 상기 2차 라이닝 콘크리트(15)가 완전히 굳어 그 형태가 형성된 후에는 거푸집 및 동바리를 철수시키고, 마감타일(16)로 라이닝을 실시하여 일련의 터널 시공을 완료하도록 되어 있다.
한편, 전술한 숏크리트는 강지보재나 록볼트와는 다르게 수동적인 지보재 역할을 하고 있다. 이러한 숏크리트를 능동적인 지보재인 강지보재나 록볼트를 일체화 시켜주는 보조적인 지보재로 적용되고 있다.
또한, 이러한 숏크리트에 강섬유를 첨가하여 사용할 수 있으며, 이때, 이러한 숏크리트에서 강섬유의 역할은 균열을 제어하고, 파괴시 항복점 이후에 숏크리트의 잔류강도를 유지시켜 주는 역할을 한다. 여기서 상기 숏크리트는 능동형 지보재와 일체화된 것이 아니라 부분적인 일체화 또는 이원화가 된 것으로 볼 수 있다.
한편, 전술한 와이어 메쉬를 이용한 터널 시공 방법은 타설된 숏크리트가 자중으로 인해 박리될 가능성이 있는 경우 또는 숏크리트의 인장강도 및 전단강도를 향상시키기 위하여 와이어 메쉬를 사용하지만, 그 시공 공정이 복잡하여 현재 터널에서는 거의 쓰이지 않고 있다. 예를 들면, 와이어메쉬를 설치하는데 장시간 소요되고, 1차 숏크리트층이 경화된 상태에서 2차 숏크리트를 타설하므로 이어치기 조인트 또는 콜드조인트 등의 조인트(Joint) 현상이 발생될 수 있다는 문제점이 있다.
또한, 전술한 강섬유를 이용한 터널 시공 방법은, 시공 공정이 단순하다는 장점이 있지만, 강섬유 간의 자성으로 인해서 이송호스에서 강섬유의 뭉침 현상이 자주 발생되어 시공시 장애가 된다는 문제점이 있다. 또한, 강섬유를 이용한 터널 시공 방법은 재료비가 높고, 숏크리트 타설시 리바운드에 의해서 재료 손실이 크며, 강섬유 보강에 의해 균질한 강도특성 등의 품질관리에 어려움이 있다. 또한, 강섬유를 이용한 터널 시공 방법은 탈락된 강섬유 숏크리트가 버력과 함께 반출된 후 파쇄 과정을 거처 골재로 재활용시에 환경문제를 발생시킬 수 있다는 문제점이 있다.
전술한 문제점을 해결하기 위한 본 발명이 이루고자 하는 기술적 과제는, 무용접 방식의 와이어 네트(Wire-Net)를 능동형 지보재인 강지보재 및 록볼트와 고리 등을 이용하여 체결한 후에 숏크리트를 타설함으로써 능동형 지보재, 와이어 네트 및 숏크리트를 일체화시킬 수 있는, 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널 및 그 시공 방법을 제공하기 위한 것이다.
본 발명이 이루고자 하는 다른 기술적 과제는, 와이어 네트를 사용함으로써 숏크리트의 균열을 제어하고 휨인장 특성을 향상시킬 뿐만 아니라 터널 지보재의 전단거동 특성을 향상시킬 수 있는, 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널 및 그 시공 방법을 제공하기 위한 것이다.
전술한 기술적 과제를 달성하기 위한 수단으로서,
본 발명에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널은, 능동형 지보재로서, 터널의 굴착면에 설치되는 강지보재; 능동형 지보재로서, 터널의 굴착면에 설치되는 록볼트; 무용접 방식의 네트로서, 상기 강지보재 및 상기 록볼트에 연결되는 와이어 네트(Wire-Net); 및 상기 강지보재 및 상기 록볼트를 상기 와이어 네트에 연결한 상태에서 상기 강지보재, 록볼트 및 와이어 네트 상에 타설되는 숏크리트를 포함하되, 상기 숏크리트는 상기 와이어 네트, 상기 강지보재 및 상기 록볼트와 일체화되는 것을 특징으로 한다.
여기서, 상기 와이어 네트는 상기 강지보재, 상기 록볼트 및 상기 숏크리트와 일체화되어 상기 강지보재 및 상기 록볼트의 전단거동 특성을 향상시키고, 상기 숏크리트의 휨인장 특성을 향상시킬 수 있다.
여기서, 상기 와이어 네트는 강선, 강연선 또는 인장특성이 양호한 고인장력 플라스틱 소재를 이용하여 무용접 방식으로 형성되고, 상기 숏크리트의 휨인장 특성을 향상시킬 수 있다.
여기서, 상기 강지보재는 H형강, U형강 또는 격자지보(lattice girder)이고, 상기 강지보재에 상기 와이어 네트를 연결하는 후크 고리를 추가로 포함할 수 있다.
본 발명에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널은, 상기 와이어 네트 및 상기 록볼트에 각각 연결하는 팔자형 고리를 추가로 포함할 수 있다.
본 발명에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널은, 상기 와이어 네트를 상기 록볼트에 연결하는 록볼트 지지판을 추가로 포함하며, 상기 록볼트 지지판은 상기 와이어 네트의 망눈보다 크게 형성되는 것을 특징으로 한다.
본 발명에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널 시공 방법은, a) 터널을 굴착하는 단계; b) 상기 터널의 굴착면에 능동형 지보재인 강지보재 및 록볼트를 각각 설치하는 단계; c) 무용접 방식의 와이어 네트(Wire-Net)를 상기 터널의 굴착면에 설치하는 단계; d) 상기 와이어 네트를 상기 능동형 지보재에 연결하는 단계; 및 e) 상기 능동형 지보재 및 상기 와이어 네트에 숏크리트를 타설하여 일체화시키는 단계를 포함하되, 상기 와이어 네트는 상기 강지보재, 상기 록볼트 및 상기 숏크리트와 일체화되어 상기 강지보재 및 상기 록볼트의 전단거동 특성을 향상시키고, 상기 숏크리트의 휨인장 특성을 향상시키는 것을 특징으로 한다.
여기서, 상기 c) 단계의 와이어 네트는 강선, 강연선 또는 인장특성이 양호한 고인장력 플라스틱 소재를 이용하여 무용접 방식으로 형성되고, 상기 숏크리트의 휨인장 특성을 향상시킬 수 있다.
여기서, 상기 d) 단계에서 후크 고리를 사용하여 상기 강지보재에 상기 와이어 네트를 연결할 수 있다.
여기서, 상기 d) 단계에서 팔자형 고리를 사용하여 상기 와이어 네트 및 상기 록볼트에 각각 연결하거나 또는 상기 와이어 네트의 망눈보다 크게 형성된 록볼트 지지판)을 사용하여 상기 와이어 네트를 상기 록볼트에 연결할 수 있다.
본 발명에 따르면, 무용접 방식의 와이어 네트(Wire-Net)를 능동형 지보재인 강지보재 및 록볼트와 고리 등을 이용하여 체결한 후에 숏크리트를 타설함으로써 능동형 지보재, 와이어 네트 및 숏크리트를 일체화시킬 수 있다.
본 발명에 따르면, 와이어 네트를 사용함으로써 숏크리트의 균열을 제어하고 휨인장 특성을 향상시킬 뿐만 아니라 터널 지보재의 전단거동 특성을 향상시킬 수 있고, 이에 따라 터널 구조물의 안정성을 향상시킬 수 있다.
본 발명에 따르면, 와이어 네트를 사용함으로써 기존의 와이어 메쉬를 이용하는 터널 시공 방법에 비해 설치 시간을 단축시킬 수 있고, 기존의 강섬유를 이용하는 터널 시공 방법에 비해 50% 이상 저렴하게 시공할 수 있다.
본 발명에 따르면, 기존의 강섬유를 이용하는 터널 시공 방법에 비해 숏크리트 휨인장 품질 특성에 대해 균일한 품질관리가 용이하다.
본 발명에 따르면, 기존 보강재와 일체화하여 숏크리트의 휨인장 특성이 높을 뿐만 아니라 지반 응력을 받을 수 있을 정도의 구조물 역할을 할 수 있다.
본 발명에 따르면, 와이어 네트를 설치한 후 숏크리트를 타설하기 전까지 불연속면에 의해서 발생되는 암괴에 대한 안전시설물 역할을 할 수 있다.
본 발명에 따르면, 와이어 네트 설치시 터널 내의 낙반 사고를 방지할 수 있다.
도 1은 종래의 기술에 따른 터널 내부 구조를 나타내는 단면도이다.
도 2a 및 도 2b는 종래의 기술에 따른 터널 시공에 사용되는 와이어메쉬를 설명하기 위한 도면이다.
도 3은 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널을 나타내는 단면도이다.
도 4는 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널에서 와이어 네트를 나타내는 도면이다.
도 5는 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널에서 와이어 네트와 강지보재의 연결을 예시하는 도면이다.
도 6은 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널에서 와이어 네트와 록볼트의 연결을 예시하는 도면이다.
도 7은 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널 시공 방법의 동작흐름도이다.
[ 도면 부호의 설명]
100: 터널 200: 원지반
100s: 터널 굴착면 110: 강지보재(능동형 지보재)
120: 록볼트(능동형 지보재) 130: 와이어 네트(Wire-Net)
140: 숏크리트 150: 라이너
160: 후크(Hook) 고리 170: 록볼트 지지판
본 발명은 터널의 굴착면에 설치되는 강지보재; 터널의 굴착면에 설치되는 록볼트; 무용접 방식의 네트로서, 상기 강지보재 및 상기 록볼트에 연결되는 와이어 네트; 및 상기 강지보재 및 상기 록볼트를 상기 와이어 네트에 연결한 상태에서 상기 강지보재, 록볼트 및 와이어 네트 상에 타설되는 숏크리트를 포함하되, 상기 숏크리트는 상기 와이어 네트, 상기 강지보재 및 상기 록볼트와 일체화되도록 하여, 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널을 제공할 수 있게 된다.
아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.
명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.
[능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널(100)]
도 3은 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널을 나타내는 단면도이고, 도 4는 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널에서 와이어 네트를 나타내는 도면이다.
도 3 및 도 4를 참조하면, 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널(100)은, 능동형 지보재인 강지보재(110), 능동형 지보재인 록볼트(120), 와이어 네트(Wire-Net: 130), 숏크리트(140) 및 라이너(150)를 포함한다.
먼저, 터널(100)의 굴착 이후에 굴착면에 설치되는 터널 지보재는 터널(100) 주변의 지반거동 특성에 부합되도록 설계하여 터널 시공 중이나 터널 완공 후에도 터널(100)의 안정을 유지할 수 있도록 하여야 한다. 이때, 지보재는 굴착지반을 조기에 안정시키며 지반굴착에 의한 영향이 인접구조물의 안정을 해치지 않도록 설계되어야 한다.
이러한 터널의 지보재는 강지보재(100), 록볼트(120), 와이어 네트(130), 숏크리트(140) 등으로 구성되어 있는 주지보재를 포함하며, 굴착의 용이성 및 안정성 증진을 목적으로 주지보재에 추가하여 시공하는 보조지보재를 추가로 포함할 수도 있다.
강지보재(110)는 능동형 지보재로서, 터널(100)의 굴착면(100s)에 설치된다. 이때, 상기 강지보재(110)는 숏크리트(140), 록볼트(120) 등의 다른 지보재와 일체가 되어 소요의 지보 기능을 발휘하도록 규격과 배치 간격이 정해진다. 이때, 상기 강지보재(110)의 이음은 시공순서 및 시공성을 고려하여 이음개소가 최소가 되도록 정해진다. 또한, 굴착된 터널(100)의 원지반(200)이 양호한 경우에는 강지보재(110)를 생략할 수도 있으며, 다음의 기능이 요구될 때 강지보재(110)를 사용하여야 한다. 예를 들면, 숏크리트(140) 또는 록볼트(120)의 지보 기능이 발휘되기까지 굴착면(100s)의 안정을 도모할 필요가 있는 경우, 큰 지압으로 인해 지보재의 강성 증가가 필요한 경우, 또는 지표침하 등 지반 변위의 억제가 필요한 경우 등에 강지보재(110)를 사용한다.
이러한 강지보재(120)의 재질은 연성이 크고 휨과 용접 등의 가공성이 양호하여야 하며, 예를 들면, KS D 3503에 규정된 SS 400을 표준으로 하며 이와 동등이상의 성능을 발휘하는 구조용 강재로 하여야 한다. 또한, 상기 강지보재(110)의 단면은 강지보재의 설치 후에도 숏크리트(140)의 타설이 용이하고, 상기 숏크리트(140)와 일체화되기 쉬운 형상을 가진 것이어야 하며, 예를 들면, H형강, U형강, 격자지보(lattice girder) 등을 사용할 수 있다.
록볼트(120)는 능동형 지보재로서, 터널(100)의 굴착면(100s)에 설치된다. 여기서, 상기 록볼트(120)는 터널(100)의 굴착 후, 시급히 원지반(200)인 암반을 천공하여 그 속에 볼트를 삽입하고 너트를 죈 다음에, 접착 등에 의해 터널(100)의 지보공으로서 사용하는 볼트를 말한다.
예를 들면, 상기 록볼트(120)는 소요의 강도 이상을 가지는 이형봉강으로 제작하는 것을 원칙으로 하나 강관, 팽창성 강관 또는 이와 동일한 강도와 기능을 가지는 섬유보강 플라스틱(FRP) 등 기타 소재의 록볼트도 사용할 수 있으며, 재질 및 강도는 한국산업규격(KS)에 적합한 것이어야 한다. 이때, 상기 록볼트(120)의 재질은 원지반(200) 조건 및 사용목적에 따라 정해지며, 일반적으로 SD 35 이상의 강재로서 재질 인장강도 및 연신율이 큰 것을 사용한다.
이러한 록볼트(120)는 원칙적으로 굴착에 의해 영향을 받는 영역을 보강하도록 배치하여야 하며, 상기 록볼트(120)의 배치 및 길이는 그 사용목적, 지반조건, 터널(100) 단면의 크기 및 형상, 굴착공법, 절리의 간격 등을 고려하여 결정된다.
와이어 네트(130)는 무용접 방식의 네트로서, 상기 강지보재(110) 및 상기 록볼트(120)에 연결된다. 이때, 상기 와이어 네트(130)는, 도 4에 도시된 바와 같이, 강선, 강연선 또는 인장특성이 양호한 고인장력 플라스틱 소재를 이용하여 무용접 방식으로 형성되고, 상기 숏크리트(140)의 휨인장 특성을 향상시킬 수 있다.
숏크리트(140)는 상기 강지보재(110) 및 상기 록볼트(120)를 상기 와이어 네트(130)에 연결한 상태에서 상기 강지보재(110), 록볼트(120) 및 와이어 네트(130) 상에 타설된다. 여기서, 상기 숏크리트(140)는 원지반(200)과의 부착 및 자체전단 저항 효과를 갖고, 상기 숏크리트(140)에 작용하는 외력을 원지반(200)에 분산시키고, 터널(100) 주변의 붕락하기 쉬운 암괴를 지지하며, 굴착면(100s) 가까이에 지반아치가 형성될 수 있도록 타설한다.
구체적으로, 상기 숏크리트(140)는 휨인장 또는 축력에 의한 저항효과로 주변 원지반에 내압을 가함으로써 굴착면 주변지반을 3축 응력상태로 유지시켜 지반강도 저하를 방지하며, 또한, 상기 강지보재(110) 또는 록볼트(120)에 지반압을 전달하는 기능을 발휘하고, 또한, 굴착된 원지반(200)의 굴곡부를 메우고 절리면 사이를 접착시킴으로써 응력집중 현상을 피할 수 있게 한다.
여기서, 숏크리트용 시멘트는 제1종 보통 포틀랜드 시멘트를 사용하는 것을 원칙으로 하며, 예를 들면, 잔골재는 입경 0.1mm 이하의 세립물을 포함하지 않아야 하고, 굵은 골재의 최대 입경은 15mm 이하가 되어야 한다. 이러한 숏크리트(140)는 필요한 강도와 내구성이 확보되고 부착성과 시공성이 양호하며 재령 1일 압축강도가 100kg/㎠ 이상, 재령 28일 강도가 180kg/㎠ 이상 되도록 배합하여야 한다.
또한, 상기 숏크리트(140)의 조기강도 발현을 위하여 급결제를 사용할 수 있다. 또한, 터널의 지보재로 사용되는 숏크리트(140)의 최소 두께는 사용목적, 지반조건, 단면의 크기 등을 고려해서 정해지고, 예를 들면, 3cm 이상으로 타설한다.
라이너(150)는 터널(100) 주변의 지반상태, 환경조건 및 주지보재의 지보능력을 고려하여 사용목적에 적합하고 장기간 사용에 충분한 안전성과 내구성을 갖도록 형성된다. 이때, 상기 라이너(150)는 사용 목적에 따라 구조체로서의 역학적 기능, 비배수형 터널에서의 내압기능, 영구 구조물로서의 내구성 확보 및 미관유지 기능 등을 가지며, 이를 감안하여 실시한다.
이에 따라 상기 숏크리트(140)는 상기 와이어 네트(130), 상기 강지보재(110) 및 상기 록볼트(120)와 일체화되고, 즉, 상기 와이어 네트(130)는 상기 강지보재(110), 상기 록볼트(120) 및 상기 숏크리트(140)와 일체화되어 상기 강지보재(110) 및 상기 록볼트(120)의 전단거동 특성을 향상시키고, 상기 숏크리트(140)의 휨인장 특성을 향상시키게 된다.
도 5는 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널에서 와이어 네트와 강지보재의 연결을 예시하는 도면이고, 도 6은 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널에서 와이어 네트와 록볼트의 연결을 예시하는 도면이다.
본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널에서, 상기 강지보재(110)는, 도 5에 도시된 바와 같이, H형강, U형강 또는 격자지보(lattice girder)이고, 후크 고리(160)를 사용하여 상기 강지보재(110)에 상기 와이어 네트(130)를 연결할 수 있다.
본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널에서, 팔자형 고리(도시되지 않음)를 사용하여 상기 와이어 네트(130) 및 상기 록볼트(120)에 각각 연결할 수 있다.
또한, 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널에서, 도 6에 도시된 바와 같이, 록볼트 지지판(170)을 사용하여 상기 와이어 네트(130)를 상기 록볼트(120)에 연결할 수 있는데, 이때, 상기 록볼트 지지판(170)은 상기 와이어 네트(130)의 망눈보다 크게 형성된다. 즉, 와이어 네트(130)에 형성된 망 구멍보다 더 큰 록볼트 지지판(170)을 설치하여 상기 와이어 네트(130)와 록볼트(120)를 직접적으로 일체화시킬 수 있다.
한편, 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널의 경우, 시스템 지보 패턴을 가지는 터널 지보패턴(국토부 터널 설계 기준)이 4 이상인 지반 조건에서 적용할 수 있다. 여기서, 지보패턴(tunnel support pattern)은 터널막장의 지반상태와 터널천단부 및 그 상부의 지반상태, 시공성 등을 고려하여 터널의 안정성이 확보되도록 미리 설정해 놓은 터널 지보형태로서, 터널굴착 후 조기에 설치하여 터널의 안정을 도모할 목적으로 설치하는 숏크리트, 강지보공, 록볼트 등을 조합한 지보방법을 말하며, 국토부 터널 설계 기준에 따라 정해져 있는데, 본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널의 경우, 지반 조건이 4 이상인 경우에 적용할 수 있다.
본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널(100)에 따르면, 와이어 네트를 사용함으로써 숏크리트의 균열을 제어하고 휨인장 특성을 향상시킬 뿐만 아니라 터널 지보재의 전단거동 특성을 향상시킬 수 있고, 이에 따라 터널 구조물의 안정성을 향상시킬 수 있다.
[능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 시공 방법]
도 7은 본 발명의 실시예에 따른 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 시공방법의 동작흐름도이다.
도 7을 참조하면, 본 발명의 실시예에 따른 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 시공방법은, 먼저, 굴착기 등을 사용하여 터널(100)을 굴착한다(S110).
다음으로, 상기 터널(100)의 굴착면(100s)에 능동형 지보재인 강지보재(110) 및 록볼트(120)를 각각 설치한다(S120).
다음으로, 무용접 방식의 와이어 네트(Wire-Net: 130)를 상기 터널(100)의 굴착면(100s)에 설치한다(S130). 즉, 상기 와이어 네트(130)는 숏크리트(140)의 휨인장 특성을 향상시킬 수 있도록 강선, 강연선 또는 인장특성이 양호한 고인장력 플라스틱 소재를 이용하여 무용접 방식으로 형성된다.
다음으로, 상기 와이어 네트(130)를 상기 능동형 지보재(110, 120)에 연결한다(S140). 이때, 후크 고리(160)를 사용하여 상기 강지보재(110)에 상기 와이어 네트(130)를 연결할 수 있고, 또한, 팔자형 고리를 사용하여 상기 와이어 네트(130) 및 상기 록볼트(120)에 각각 연결하거나 또는 상기 와이어 네트(130)의 망눈보다 크게 형성된 록볼트 지지판(170)을 사용하여 상기 와이어 네트(130)를 상기 록볼트(120)에 연결할 수 있다.
다음으로, 상기 능동형 지보재(110, 120) 및 상기 와이어 네트(130)에 숏크리트(140)를 타설하여 일체화시킨다(S150). 이에 따라 상기 와이어 네트(130)는 상기 강지보재(110), 상기 록볼트(120) 및 상기 숏크리트(140)와 일체화되어 상기 강지보재(110) 및 상기 록볼트(120)의 전단거동 특성을 향상시키고, 상기 숏크리트(140)의 휨인장 특성을 향상시키게 된다.
후속적으로, 배수 처리 및 라이닝을 실시하여 터널을 완성한다(S160).
본 발명의 실시예에 따른 와이어 네트를 능동형 지보재 및 숏크리트와 일체화시킨 터널 시공 방법에 따르면, 와이어 네트를 사용함으로써 기존의 와이어 메쉬를 이용하는 터널 시공 방법에 비해 설치 시간을 단축시킬 수 있고, 기존의 강섬유를 이용하는 터널 시공 방법에 비해 50% 이상 저렴하게 시공할 수 있다. 또한, 기존의 강섬유를 이용하는 터널 시공 방법에 비해 숏크리트 휨인장 품질 특성에 대해 균일한 품질관리가 용이하며, 기존 보강재와 일체화하여 숏크리트의 휨인장 특성이 높을 뿐만 아니라 지반 응력을 받을 수 있을 정도의 구조물 역할을 할 수 있다. 또한, 와이어 네트를 설치한 후 숏크리트를 타설하기 전까지 불연속면에 의해서 발생되는 암괴에 대한 안전시설물 역할을 할 수 있고, 와이어 네트 설치시 터널 내의 낙반 사고를 방지할 수 있다.
전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.
본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.

Claims (10)

  1. 터널(100)의 굴착면(100s)에 설치되는 강지보재(110);
    터널(100)의 굴착면(100s)에 설치되는 록볼트(120);
    무용접 방식의 네트로서, 상기 강지보재(110) 및 상기 록볼트(120)에 연결되는 와이어 네트(130); 및
    상기 강지보재(110) 및 상기 록볼트(120)를 상기 와이어 네트(130)에 연결한 상태에서 상기 강지보재(110), 록볼트(120) 및 와이어 네트(130) 상에 타설되는 숏크리트(140)를 포함하되,
    상기 숏크리트(140)는 상기 와이어 네트(130), 상기 강지보재(110) 및 상기 록볼트(120)와 일체화되도록 하는 것을 특징으로 하는 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널.
  2. 제1항에 있어서,
    상기 와이어 네트(130)는 상기 강지보재(110), 상기 록볼트(120) 및 상기 숏크리트(140)와 일체화되어 상기 강지보재(110) 및 상기 록볼트(120)의 전단거동 특성을 향상시키고, 상기 숏크리트(140)의 휨인장 특성을 향상시키는 것을 특징으로 하는 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널.
  3. 제1항에 있어서,
    상기 와이어 네트(130)는 강선, 강연선 또는 인장특성이 양호한 고인장력 플라스틱 소재를 이용하여 무용접 방식으로 형성되고, 상기 숏크리트(140)의 휨인장 특성을 향상시키는 것을 특징으로 하는 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널.
  4. 제1항에 있어서,
    상기 강지보재(110)는 H형강, U형강 또는 격자지보(lattice girder)이고, 상기 강지보재(110)에 상기 와이어 네트(130)를 연결하는 후크 고리(160)를 추가로 포함하는 것을 특징으로 하는 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널.
  5. 제1항에 있어서,
    상기 와이어 네트(130) 및 상기 록볼트(120)에 각각 연결하는 팔자형 고리를 추가로 포함하는 것을 특징으로 하는 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널.
  6. 제1항에 있어서,
    상기 와이어 네트(130)를 상기 록볼트(120)에 연결하는 록볼트 지지판(170)을 추가로 포함하며, 상기 록볼트 지지판(170)은 상기 와이어 네트(130)의 망눈보다 크게 형성되도록 하는 것을 특징으로 하는 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널.
  7. a) 터널(100)을 굴착하는 단계;
    b) 상기 터널(100)의 굴착면(100s)에 능동형 지보재인 강지보재(110) 및 록볼트(120)를 각각 설치하는 단계;
    c) 무용접 방식의 와이어 네트(Wire-Net: 130)를 상기 터널(100)의 굴착면(100s)에 설치하는 단계;
    d) 상기 와이어 네트(130)를 상기 능동형 지보재(110, 120)에 연결하는 단계; 및
    e) 상기 능동형 지보재(110, 120) 및 상기 와이어 네트(130)에 숏크리트(140)를 타설하여 일체화시키는 단계를 포함하되,
    상기 와이어 네트(130)는 상기 강지보재(110), 상기 록볼트(120) 및 상기 숏크리트(140)와 일체화되어 상기 강지보재(110) 및 상기 록볼트(120)의 전단거동 특성을 향상시키고, 상기 숏크리트(140)의 휨인장 특성을 향상시키는 것을 특징으로 하는 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널시공방법.
  8. 제7항에 있어서,
    상기 c) 단계의 와이어 네트(130)는 강선, 강연선 또는 인장특성이 양호한 고인장력 플라스틱 소재를 이용하여 무용접 방식으로 형성되고, 상기 숏크리트(140)의 휨인장 특성을 향상시키는 것을 특징으로 하는 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널시공방법.
  9. 제7항에 있어서,
    상기 d) 단계에서 후크 고리(160)를 사용하여 상기 강지보재(110)에 상기 와이어 네트(130)를 연결하는 것을 특징으로 하는 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널시공방법.
  10. 제7항에 있어서,
    상기 d) 단계에서 팔자형 고리를 사용하여 상기 와이어 네트(130) 및 상기 록볼트(120)에 각각 연결하거나 또는 상기 와이어 네트(130)의 망눈보다 크게 형성된 록볼트 지지판(170)을 사용하여 상기 와이어 네트(130)를 상기 록볼트(120)에 연결하는 것을 특징으로 하는 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널시공방법.
PCT/KR2014/011347 2013-12-04 2014-11-25 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 및 그 시공 방법 WO2015083972A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2013-0150006 2013-12-04
KR1020130150006A KR101597751B1 (ko) 2013-12-04 2013-12-04 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 및 그 시공 방법

Publications (1)

Publication Number Publication Date
WO2015083972A1 true WO2015083972A1 (ko) 2015-06-11

Family

ID=53273679

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2014/011347 WO2015083972A1 (ko) 2013-12-04 2014-11-25 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 및 그 시공 방법

Country Status (2)

Country Link
KR (1) KR101597751B1 (ko)
WO (1) WO2015083972A1 (ko)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106014458A (zh) * 2016-06-29 2016-10-12 河南理工大学 一种大倾角极软煤层回采巷道锚网异形棚分次支护技术
CN108547635A (zh) * 2018-03-15 2018-09-18 华能西藏雅鲁藏布江水电开发投资有限公司 一种管片衬砌与喷锚支护交替隧道围岩加固方法
CN108756948A (zh) * 2018-06-15 2018-11-06 中铁工程设计咨询集团有限公司 一种大跨度隧道预应力锚网支岩壳自承载支护结构
CN108868820A (zh) * 2018-09-30 2018-11-23 西南石油大学 一种软土地基盾构隧道沉降控制结构及使用方法
CN109139022A (zh) * 2018-07-10 2019-01-04 新疆乌京铁建轨道交通有限公司 一种抗活动断层错动的装配式衬砌隧道修建方法
CN109723472A (zh) * 2019-01-08 2019-05-07 贵州大学 一种采用u型棚架混合支护的巷道支护结构及施工方法
CN110593901A (zh) * 2019-09-17 2019-12-20 国家电网有限公司 具备主动防护功能的隧道凿岩安全保护台车
CN110714771A (zh) * 2019-11-21 2020-01-21 中铁四局集团有限公司 一种洞口存在隐伏溶洞的隧道进洞施工方法
CN110924959A (zh) * 2019-12-10 2020-03-27 中铁二十局集团第二工程有限公司 穿越断层破碎带的富水软弱围岩隧道施工方法
CN112610254A (zh) * 2020-12-11 2021-04-06 东北大学 一种基于裂化抑制法的深部地下工程大变形支护控制方法
CN114135314A (zh) * 2021-11-12 2022-03-04 中铁大桥局集团有限公司 一种改善隧道初喷混凝土平整度的方法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190058054A (ko) 2017-11-21 2019-05-29 (재)한국건설생활환경시험연구원 섬유 그물망 부착용 숏크리트 조성물
KR102128933B1 (ko) 2017-11-21 2020-07-01 중앙대학교 산학협력단 터널 지보 숏크리트 보강용 섬유 그물망을 이용한 터널 시공 방법
KR20190059188A (ko) 2017-11-22 2019-05-30 중앙대학교 산학협력단 숏크리트 보강용 섬유 그물망, 숏크리트 보강용 섬유 그물망 제조 방법 및 숏크리트 보강용 섬유 그물망을 이용한 터널 시공 방법
CN107989636B (zh) * 2017-12-08 2019-05-21 安徽恒源煤电股份有限公司 一种煤矿巷道支护锚网固定装置
CN107905799B (zh) * 2017-12-20 2021-03-19 中国建筑土木建设有限公司 一种高铁隧底过水溶洞的加固结构及其施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020089692A (ko) * 2001-05-23 2002-11-30 주식회사유신코퍼레이션 복합부재 지보공틀과 고밀도 폴리에틸렌메시를 이용한터널의 시공법
KR100760977B1 (ko) * 2007-06-14 2007-09-21 주식회사 진화기술공사 고강도 텐션 철망을 이용한 터널 보강구조 및 방법
JP4213839B2 (ja) * 2000-03-03 2009-01-21 財団法人鉄道総合技術研究所 緩衝装置およびこの緩衝装置を備えた防護柵

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004068454A (ja) * 2002-08-07 2004-03-04 Masakatsu Fukuoka アンカーおよびアンカー固定用カプセル

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4213839B2 (ja) * 2000-03-03 2009-01-21 財団法人鉄道総合技術研究所 緩衝装置およびこの緩衝装置を備えた防護柵
KR20020089692A (ko) * 2001-05-23 2002-11-30 주식회사유신코퍼레이션 복합부재 지보공틀과 고밀도 폴리에틸렌메시를 이용한터널의 시공법
KR100760977B1 (ko) * 2007-06-14 2007-09-21 주식회사 진화기술공사 고강도 텐션 철망을 이용한 터널 보강구조 및 방법

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106014458B (zh) * 2016-06-29 2018-06-05 河南理工大学 一种大倾角极软煤层回采巷道锚网异形棚分次支护技术
CN106014458A (zh) * 2016-06-29 2016-10-12 河南理工大学 一种大倾角极软煤层回采巷道锚网异形棚分次支护技术
CN108547635A (zh) * 2018-03-15 2018-09-18 华能西藏雅鲁藏布江水电开发投资有限公司 一种管片衬砌与喷锚支护交替隧道围岩加固方法
CN108756948A (zh) * 2018-06-15 2018-11-06 中铁工程设计咨询集团有限公司 一种大跨度隧道预应力锚网支岩壳自承载支护结构
CN108756948B (zh) * 2018-06-15 2023-06-20 中铁工程设计咨询集团有限公司 一种大跨度隧道预应力锚网支岩壳自承载支护结构
CN109139022A (zh) * 2018-07-10 2019-01-04 新疆乌京铁建轨道交通有限公司 一种抗活动断层错动的装配式衬砌隧道修建方法
CN108868820A (zh) * 2018-09-30 2018-11-23 西南石油大学 一种软土地基盾构隧道沉降控制结构及使用方法
CN109723472A (zh) * 2019-01-08 2019-05-07 贵州大学 一种采用u型棚架混合支护的巷道支护结构及施工方法
CN110593901B (zh) * 2019-09-17 2021-03-19 国家电网有限公司 具备主动防护功能的隧道凿岩安全保护台车
CN110593901A (zh) * 2019-09-17 2019-12-20 国家电网有限公司 具备主动防护功能的隧道凿岩安全保护台车
CN110714771A (zh) * 2019-11-21 2020-01-21 中铁四局集团有限公司 一种洞口存在隐伏溶洞的隧道进洞施工方法
CN110924959B (zh) * 2019-12-10 2021-09-03 中铁二十局集团第二工程有限公司 穿越断层破碎带的富水软弱围岩隧道施工方法
CN110924959A (zh) * 2019-12-10 2020-03-27 中铁二十局集团第二工程有限公司 穿越断层破碎带的富水软弱围岩隧道施工方法
CN112610254A (zh) * 2020-12-11 2021-04-06 东北大学 一种基于裂化抑制法的深部地下工程大变形支护控制方法
CN112610254B (zh) * 2020-12-11 2022-02-15 东北大学 一种基于裂化抑制法的深部地下工程大变形支护控制方法
CN114135314A (zh) * 2021-11-12 2022-03-04 中铁大桥局集团有限公司 一种改善隧道初喷混凝土平整度的方法
CN114135314B (zh) * 2021-11-12 2023-09-26 中铁大桥局集团有限公司 一种改善隧道初喷混凝土平整度的方法

Also Published As

Publication number Publication date
KR20150065000A (ko) 2015-06-12
KR101597751B1 (ko) 2016-03-21

Similar Documents

Publication Publication Date Title
WO2015083972A1 (ko) 능동형 지보재 및 숏크리트를 와이어네트로 일체화시킨 터널 및 그 시공 방법
CN101122132B (zh) 可拆卸复合材料面板土钉支护体系及其施工方法
WO2011126170A1 (ko) 프리스트레스를 도입한 현장타설 콘크리트말뚝 시공방법 및 그 구조
WO2017090975A1 (ko) 선지보와 후지보를 이용한 터널 공법 및 이에 적합한 장치
WO2015142017A1 (ko) 콘크리트 충전강관 구조의 강지보재를 구비한 터널 및 그 시공 방법
WO2010134731A9 (ko) 지하외벽의 연속시공을 위해 채널에 의한 나뭇가지형 스틸프레임을 이용한 역타공법
WO2013176447A1 (ko) 복합 기초구조물 및 그 시공방법
WO2016129826A1 (ko) 안전성이 강화된 피씨 트러스 벽체 구조물 및 이를 이용한 지하구조물 시공방법
WO2018194394A1 (ko) 하부 말뚝이 구비된 현장 타설 일체형 팽이말뚝 기초 및 이의 시공 방법
WO2017047984A1 (ko) 길이조정이 가능한 강관 지보재와 이를 충진ㆍ강성이 강화된 cft 강관 지보재에 의해 강지보공의 2원화 설치시스템 및 이를 이용한 강지보공의 2원화 시공방법 및 2원화 설치용 강관 지보재 구조
WO2020235980A1 (ko) 내진 및 면진 보강용 교좌장치 및 이의 설치공법
WO2009096725A2 (ko) 프리캐스트 가시설 구조체 및 그 시공방법
CN107035064A (zh) 一种装配式预制外墙板结构及施工方法
WO2012093836A2 (ko) 프리캐스트 또는 현장 타설로 만들어진 콘크리트 부재를 구비하는 복합빔 및, 그 시공방법
CN110184948A (zh) 一种大桥主梁施工方法
CN105370038A (zh) 一种钢筋混凝土剪力墙墙体施工缝的接茬方法
CN106760851A (zh) 既有砖混结构新增隔震层的施工方法
WO2016036080A2 (ko) 친환경 흙막이벽 및 그 시공방법
JP3880738B2 (ja) 炭素繊維シート内蔵セメントモルタル複合板によるコンクリート構造物の補強方法
WO2018186612A1 (ko) 현장 타설 보강 팽이말뚝 기초 및 이의 시공방법
CN206722208U (zh) 一种装配式预制外墙板结构
CN206769199U (zh) 后穿式后张法竖向预应力现浇混凝土柱结构
CN101555709A (zh) 一种复合保温隔热混凝土剪力墙的安装工艺
WO2021002534A1 (ko) 하중제어가 가능한 선재하장치 및 이를 이용한 기초보강방법
CN101565953B (zh) 灌注桩静载试验中桩头的固定方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14868484

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 14.11.2016)

122 Ep: pct application non-entry in european phase

Ref document number: 14868484

Country of ref document: EP

Kind code of ref document: A1