WO2015075522A1 - Charging device of a ready-mixed concrete mixing installation - Google Patents

Charging device of a ready-mixed concrete mixing installation Download PDF

Info

Publication number
WO2015075522A1
WO2015075522A1 PCT/IB2014/002466 IB2014002466W WO2015075522A1 WO 2015075522 A1 WO2015075522 A1 WO 2015075522A1 IB 2014002466 W IB2014002466 W IB 2014002466W WO 2015075522 A1 WO2015075522 A1 WO 2015075522A1
Authority
WO
WIPO (PCT)
Prior art keywords
truck
spout
loading device
truck loading
opening
Prior art date
Application number
PCT/IB2014/002466
Other languages
German (de)
French (fr)
Inventor
Alexander LIGHT
Giacinto SALVO
Original Assignee
Holcim Technology Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Holcim Technology Ltd. filed Critical Holcim Technology Ltd.
Publication of WO2015075522A1 publication Critical patent/WO2015075522A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B15/00Preventing escape of dirt or fumes from the area where they are produced; Collecting or removing dirt or fumes from that area
    • B08B15/007Fume suction nozzles arranged on a closed or semi-closed surface, e.g. on a circular, ring-shaped or rectangular surface adjacent the area where fumes are produced
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/16Discharge means, e.g. with intermediate storage of fresh concrete
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/02Loading or unloading land vehicles
    • B65G67/04Loading land vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G69/00Auxiliary measures taken, or devices used, in connection with loading or unloading
    • B65G69/18Preventing escape of dust
    • B65G69/181Preventing escape of dust by means of sealed systems
    • B65G69/182Preventing escape of dust by means of sealed systems with aspiration means

Abstract

The invention relates to a truck loading device (1) of a ready-mixed concrete production installation, comprising a hopper (2) for collecting concrete supplied by the installation and a pouring spout (3) connected to the hopper (2). Said pouring spout (3) has a conical outer surface and a central opening (4) for pouring concrete out of the hopper (2) and at least one air escape opening (5) which is arranged radially outside of the central opening (4) and is connected to a dust collecting pipe (6).

Description

Ladeeinrichtung einer Fertigbetonmischanlage Charging device of a ready mixed concrete plant
Die Erfindung betrifft eine Lastwagenbeladevorrichtung einer Fertigbetonherstellungsanlage . The invention relates to a truck loading device of a ready-mixed concrete production plant.
Fertigbeton ist in einer Anlage hergestellter und dann einer Arbeitsstelle zugeführter Beton. Die Zufuhr erfolgt durch Betonmischlastwagen, welche das Material während des Transports umrühren und mischen. Es gibt zwei Typen von Fertigbetonanlagen: Zentralanlagen (manchmal als "Nassanlagen" bezeichnet) und Trockenmischanlagen. Bei Zentralanlagen wird eine Betoncharge abgewogen und durch einen Be- diener in der Anlage gemischt, bevor sie in den Lastwagen geladen wird. Bei Trockenanlagen werden die Komponenten des Betons getrennt abgewogen und in den Lastwagenmischer geladen, wobei das eigentliche Mischen durch die sich drehende Trommel des Lastwagenmischers vorgenommen wird. Ready-mixed concrete is concrete produced in a plant and then supplied to a workplace. The feed is made by concrete mixer trucks, which stir and mix the material during transport. There are two types of precast concrete plants: central plants (sometimes referred to as "wet plants") and dry mixing plants. In centralized plants, a concrete batch is weighed and mixed by an operator in the plant before being loaded into the truck. In driers, the components of the concrete are weighed separately and loaded into the truck mixer, the actual mixing being done by the rotating drum of the truck mixer.
Die meisten Fertigbetonherstellungsanlagen weisen Beladege- räte einschließlich eines Ausgießers auf, der starr an einer portalartigen Konstruktion montiert ist. Der Lastwagen wird so positioniert, dass der Befüllungstrichter der Lastwagentrommel genau unterhalb des Ausgießers angeordnet ist. Die aktuelle Betonlastwagenbeladeprozedur an Fertigbetonanlagen führt zu einer Ansammlung von Beton (Nasscharge) oder Rohmaterialien (Trockencharge) am Lastwagentrichter und be¬ nachbarten hinteren Geräten des Fertigmischlastwagens. Die Ursache dieser Ansammlung von Resten ist der existierende große Zwischenraum zwischen dem Stutzen, dem Lastwagenbe- füllungstrichter und der Lastwagentrommelöffnung. Diese Reste müssen nach dem Beladen vom Fahrer abgewaschen wer¬ den, was die Auslieferungszykluszeit verlängert, die Mate- Most precast concrete manufacturing plants have loading equipment including a spout that is rigidly mounted to a gantry type structure. The truck is positioned so that the hopper drum is positioned just below the spout. The current concrete truck loading procedure on prefabricated concrete plants leads to an accumulation of concrete (wet batch) or raw materials (dry batch) on the truck jug and be ¬ neighboring rear equipment of the ready mix truck. The cause of this accumulation of debris is the existing large gap between the nozzle, the truck filling hopper and the truck drum opening. These radicals have after loading the driver washed ¬ to what extend the delivery cycle time, Mate
G0NF1RMÄTI0N CGPY rialverschwendung und den Trinkwasserverbrauch erhöht und Staub- und Wasserprobleme am Ort erzeugt. G0NF1RMATI0N CGPY wastewater and drinking water consumption and causes dust and water problems on site.
Eine Aufgabe der Erfindung besteht daher darin, einen Lastwagenbelademechanismus zum Laden von Fertigbeton in einen Betonlastwagen bereitzustellen, wodurch die vorstehenden Nachteile überwunden werden. It is therefore an object of the invention to provide a truck loading mechanism for loading ready-mixed concrete into a concrete truck, overcoming the above drawbacks.
Zur Lösung dieser Aufgabe sieht die Erfindung eine Lastwa- genbeladevorrichtung vor, mit einem Trichter zum Sammeln von Beton ' oder seinen Komponenten, die von einer existierenden Anlagenvorrichtung zugeführt werden, und einem mit dem Trichter verbundenen Ausgießer, wobei der Ausgießer eine konische Außenfläche hat und eine zentrale Öffnung zum Ausgießen von Beton aus dem Trichter in den Lastwagen und mindestens eine Luftentweichöffnung, die radial außerhalb der zentralen Öffnung angeordnet ist und mit einem Staub- sammelrohr verbunden ist, aufweist. Demgemäß erzeugt die Erfindung eine in einem geschlossenen Kreis stattfindende Produktübertragung von der Anlage in den Lastwagen. Der Ausgießer ist vorzugsweise so eingerichtet, dass sich die konische Außenfläche in Auslassrichtung verengt, so dass sie in Passkontakt mit der Lastwagentrommelöffnung gebracht werden kann. Insbesondere sind der Ausgießer der Lastwagen- beladevorrichtung und die Lastwagentrommelöffnung zusammen in der Lage, während des Beiadens einen luftdichten Verschluss zu erreichen und aufrechtzuerhalten. Dies gewährleistet, dass der Lastwagen sauber bleibt, und es wird hierdurch eine Abwaschprozedur unnötig gemacht. Erwartete Verbesserungen sind die Verringerung der Auslieferungszykluszeit, eine Verringerung der Materialverschwendung, ein Unnötigmachen großer Ladepunktstaubsammler, eine Verringerung der Trinkwasserverwendung, eine Verbesserung des Re- genwassermanagements am Ort, eine Verbesserung der Luftqualität und eine Verbesserung der Fahrersicherheit. Die Fahrersicherheit wird verbessert, weil es die Erfindung unnötig macht, dass der Fahrer auf eine Höhe klettert, aus der er den Lastwagen abspülen kann. Die Sicherheit von Fahrzeugführern wird verbessert, weil das Risiko eines Verschüttens von Beton aus der laufenden Trommelöffnung, während der Lastwagen zur Arbeitsstelle fährt, beseitigt wird. Um zwischen dem Ausgießer und der Lastwagentrommelöffnung einen im Wesentlichen luftdichten Verschluss zu verwirklichen, müssen Maßnahmen ergriffen werden, um zu ermöglichen, dass die Luft aus der Lastwagentrommel entweicht, während die Trommel mit der Nass- oder Trockencharge befüllt wird. In diesem Zusammenhang sieht die Erfindung einen Ausgießer vor, der eine zentrale Öffnung zum Gießen. von Beton aus dem Trichter in den Lastwagen und mindestens eine Luftentweichöffnung, die radial außerhalb der zentralen Öffnung angeordnet ist und mit einem Staubsammelrohr verbunden ist, aufweist. Vorzugsweise sind mehrere Luftentweichöffnungen um die zentrale Öffnung herum angeordnet. Bevorzugter sind die Luftentweichöffnungen, in Umfangsrichtung gleichmäßig um die zentrale Öffnung verteilt. Ferner können die Luftentweichöffnungen jeweils über ein Zufuhrrohr mit dem Staubsammelrohr verbunden sein. To achieve this object, the invention provides a Lastwa- genbeladevorrichtung before, with a hopper for collecting concrete 'or its components, which are supplied from an existing system device and a part connected to the funnel spout, wherein the spout has a conical outer surface and a central opening for pouring concrete from the hopper into the truck and at least one air escape opening disposed radially outside the central opening and connected to a dust collecting pipe. Accordingly, the invention produces a closed loop product transfer from the plant to the truck. The spout is preferably arranged so that the conical outer surface narrows in the outlet direction, so that it can be brought into fitting contact with the truck-drum opening. In particular, the spout of the truck loader and the truck drum opening together are capable of achieving and maintaining an airtight seal during barking. This ensures that the truck remains clean, and thereby a washing-up procedure is made unnecessary. Expected improvements include reducing delivery cycle time, reducing material wastage, eliminating the need for large loadpoint dust collectors, reducing drinking water use, improving Local water management, improving air quality and improving driver safety. Driver safety is improved because it eliminates the need for the driver to climb to a height from which he can rinse the truck. The safety of drivers is improved because the risk of spilling concrete out of the current drum opening as the truck drives to work is eliminated. In order to realize a substantially airtight seal between the spout and the truck drum opening, measures must be taken to allow the air to escape from the truck drum as the drum is being filled with the wet or dry charge. In this connection, the invention provides a spout having a central opening for pouring. concrete from the hopper into the truck and at least one air vent opening disposed radially outside the central opening and connected to a dust collecting pipe. Preferably, a plurality of air escape openings are arranged around the central opening. More preferably, the air escape openings are distributed evenly around the central opening in the circumferential direction. Furthermore, the air escape openings may each be connected to the dust collection pipe via a supply pipe.
Um verschiedene Lastwagentypen mit verschiedenen Ladehöhen zu ermöglichen, ohne die dichtende Verbindung zwischen dem Ausgießer und der Lastwagentrommelöffnung zu gefährden, ist eine bevorzugte Ausführungsform der Erfindung so ausgelegt,' dass der Trichter und der Ausgießer in Höhenrichtung einstellbar montiert sind. Ferner sind der Trichter und der Ausgießer vorzugsweise so montiert, dass sie in horizontaler Richtung verschiebbar sind. Bevorzugter umfasst die Erfindung ein automatisches Positionierungssystem oder Sichtsystem, welches den Ausgießer unter Verwendung existieren- der Technologie in Lastwagentrommelöffnungen unterschiedlicher Abmessungen leitet. In order to enable different truck types with different loading heights without jeopardizing the sealing connection between the spout and the truck-drum opening, a preferred embodiment of the invention is designed so that the hopper and the spout are adjustably mounted in the vertical direction. Furthermore, the funnel and the Spout preferably mounted so that they are displaced in the horizontal direction. More preferably, the invention includes an automatic positioning system or vision system that directs the spout into different sized truck jacks using existing technology.
Eine entsprechende Einstellung des Trockenchargen- oder Nasschargenzufuhrsystems wird vorzugsweise durch Bereit- stellen eines flexiblen Einfüllstutzens erreicht. Ferner ist der Einfüllstutzen vorzugsweise teleskopartig ausfahrbar ausgelegt. A corresponding adjustment of the dry batch or wet batch supply system is preferably achieved by providing a flexible filler neck. Furthermore, the filler neck is preferably designed telescopically extendable.
Um einen luftdichten Abschluss zu erreichen, wie vorstehend erwähnt wurde, weist der Ausgießer vorzugsweise eine Dichtung zum Bereitstellen einer dichtenden Verbindung zwischen dem Ausgießer und einer Lastwagentrommelöffnung auf. Gemäß einer bevorzugten Ausführungsform besteht der Ausgießer aus einem elastischen Material, wie Gummi, wobei das elastische Material vorzugsweise die Dichtung bildet. To achieve an airtight seal, as mentioned above, the spout preferably has a seal for providing a sealing connection between the spout and a truck drum opening. According to a preferred embodiment, the spout is made of an elastic material, such as rubber, wherein the elastic material preferably forms the seal.
Die Lastwagentrommelöffnung muss nicht unbedingt ein getrenntes Dichtelement aufweisen. Allerdings wird die Erzeugung eines luftdichten Abschlusses unterstützt, falls, wie gemäß einer bevorzugten Ausführungsform der Erfindung, ein Betätigungselement zum Drücken des Ausgießers gegen eine Lastwagentrommelöff ung bereitgestellt ist. Das Betätigungselement kann als eine hydraulische Zylinder-Kolben- Einheit oder eine andere ähnliche Vorrichtung ausgelegt sein. Nachfolgend wird die Erfindung in weiteren Einzelheiten durch in der Zeichnung schematisch dargestellte als Beispiel dienende Ausführungsformen erklärt. Es zeigen: Figur 1 eine Seitenansicht der Lastwagenbeladevorrichtung gemäß der Erfindung, The truck-drum opening need not necessarily have a separate sealing element. However, the generation of an airtight seal is assisted if, as in a preferred embodiment of the invention, an actuator for pushing the spout against a truck-drum opening is provided. The actuator may be configured as a hydraulic cylinder-piston unit or other similar device. In the following, the invention will be explained in further detail by exemplary embodiments shown schematically in the drawing. 1 shows a side view of the truck loading device according to the invention,
Figur 2 eine Vorderansicht der Lastwagenbeladevorrichtung gemäß der Erfindung,  FIG. 2 is a front view of the truck loading apparatus according to the invention;
Figur 3 eine perspektivische Ansicht einer Lastwagenbelade- Vorrichtung in Kontakt mit der Trommel des zu beladenden Lastwagens und  Figure 3 is a perspective view of a truck loading device in contact with the drum of the truck to be loaded and
Figur 4 eine Vorderansicht einer Lastwagenbeladevorrichtung gemäß der Erfindung, wenn sie mit dem Einfüllstutzen einer Betonherstellungsanlage verbunden ist.  Figure 4 is a front view of a truck loading apparatus according to the invention when connected to the filler neck of a concrete manufacturing plant.
In Figur 1 ist eine Lastwagenbeladevorrichtung mit 1 bezeichnet. Die Lastwagenbeladevorrichtung 1 . weist einen Trichter 2 zum Sammeln von Beton auf, der dem Trichter 2 durch einen Einfüllstutzen 13 (in Figur 4 dargestellt) ei- ner Betonherstellungsanlage zugeführt wird. Ferner weist die Lastwagenbeladevorrichtung 1 einen mit dem Trichter 2 verbundenen Ausgießer 3 auf. Der Ausgießer 3 weist eine ko¬ nische Außenfläche auf und hat eine zentrale Öffnung 4 zum Auslassen von Beton aus dem Trichter 2 in eine Trommel 8 eines Lastwagens 9 (in Figur 3 dargestellt) . In Figure 1, a truck loading device is designated 1. The truck loading device 1. has a hopper 2 for collecting concrete, which is fed to the hopper 2 through a filler neck 13 (shown in Figure 4) a concrete manufacturing plant. Furthermore, the truck loading device 1 has a spout 3 connected to the hopper 2. The spout 3 has a ko ¬ African outer surface and has a central opening 4 for discharging concrete from the hopper 2 in a drum 8 of a truck 9 (shown in Figure 3).
Figur 2 zeigt eine Vorderansicht der Lastwagenbeladevorrichtung 1, welche vier Luftentweichöffnungen .5 aufweist, die radial außerhalb der zentralen Öffnung 4 des Ausgießers 3 angeordnet sind. Die Luftentweichöffnungen 5 sind jeweils durch ein Zufuhrrohr 10 mit einem Staubsammelrohr 6 verbunden. Figur 3 zeigt eine perspektivische Ansicht der Lastwagenbeladevorrichtung 1, die mit der Trommel 8 des zu beladenden Lastwagens 9 zusammengesetzt ist. Der Ausgießer 3 der Lastwagenbeladevorrichtung 1 ist vorzugsweise so ausgelegt, dass sich die konische Außenfläche in Auslassrichtung verengt, so dass sie in Passkontakt mit der konischen Innenfläche der Lastwagentrommelöffnung 7 gebracht werden kann. Der Ausgießer 3 und die Trommelöffnung 7 sind mit dem gleichen Winkel aufgebaut und weisen einen etwas verschiedenen Durchmesser auf (der Ausgießer 3 weist einen kleineren Durchmesser auf als die Trommelöffnung 7). Daher passen die beiden Elemente vollkommen ineinander. Deshalb können der Ausgießer 3 der Lastwagenbeladevorrichtung 1 und die Lastwagentrommelöffnung 7 während des Beiadens der Lastwagen- trommel 8 mit Beton von der Herstellungsanlage einen luftdichten Verschluss erreichen und aufrechterhalten. Figure 2 shows a front view of the truck loading apparatus 1, which has four Luftentweichöffnungen .5, which are arranged radially outside the central opening 4 of the spout 3. The air escape openings 5 are each connected by a supply pipe 10 with a dust collecting pipe 6. Figure 3 shows a perspective view of the truck loading device 1, which is assembled with the drum 8 of the truck to be loaded 9. The spout 3 of the truck loading apparatus 1 is preferably designed so that the conical outer surface narrows in the outlet direction, so that it can be brought into fitting contact with the conical inner surface of the truck-drum opening 7. The spout 3 and the drum opening 7 are constructed at the same angle and have a slightly different diameter (the spout 3 has a smaller diameter than the drum opening 7). Therefore, the two elements fit perfectly together. Therefore, the spout 3 of the truck loading apparatus 1 and the truck drum opening 7 can reach and maintain an airtight seal during loading of the truck drum 8 with concrete from the manufacturing facility.
Um einen im Wesentlichen luftdichten Verschluss zwischen dem Ausgießer 3 und der Lastwagentrommelöffnung 7 zu ver- wirklichen, muss die Luft aus der Lastwagentrommel 8 entweichen können. Daher umfasst der Ausgießer 3 eine zentrale Öffnung 4 zum Ausgießen von Beton aus der Betonherstellungsanlage über den Trichter 2 in die Lastwagentrommel 8 und ferner vier Luftentweichöffnungen 5, die radial außer- halb der zentralen Öffnung 4 angeordnet sind. Wie Figur 2 entnommen werden . kann, sind die Luftentweichöffnungen 5 gleichmäßig um die zentrale Öffnung 4 in ihrer Umfangsrich- tung verteilt. Über das Zufuhrrohr 10 sind die Luftentweichöffnungen 5 mit dem Staubsammelrohr 6 verbunden, wel- ches eine ausreichende Entlüftung und Entstaubung der Lastwagentrommel 8, während Material geladen wird, bereitstellt. Ein Betätigungselement 11 für eine Vertikalbewegung und ein sekundäres Betätigungselement 12 sind bereitgestellt, um den Ausgießer 3 gegen die Lastwagentrommelöffnung 7 zu drücken, wodurch es ermöglicht wird, den luftdichten Ver- schluss zwischen dem Ausgießer 3 und der Lastwagentrommelöffnung 7 zu erzeugen und aufrechtzuerhalten. In order to realize a substantially airtight seal between the spout 3 and the truck-drum opening 7, the air must be able to escape from the truck-drum 8. Therefore, the spout 3 comprises a central opening 4 for pouring concrete from the concrete manufacturing plant via the hopper 2 into the truck drum 8 and further four air escape openings 5 arranged radially outside the central opening 4. As Figure 2 are taken. can, the air escape openings 5 are evenly distributed around the central opening 4 in its circumferential direction. Via the supply pipe 10, the air escape openings 5 are connected to the dust collecting pipe 6, which provides sufficient ventilation and dedusting of the truck drum 8 while material is being charged. A vertical movement operating member 11 and a secondary operating member 12 are provided to press the spout 3 against the truck drum opening 7, thereby making it possible to create and maintain the airtight seal between the spout 3 and the truck drum opening 7.
Figur 4 zeigt eine Vorderansicht der Lastwagenbeladevorrichtung 1, wenn sie mit einem Einfüllstutzen 13 der Beton- herstellungsanlage verbunden ist. Um das Laden von Material in verschiedene Lastwagentypen mit verschiedenen Ladehöhen zu ermöglichen, sind der Trichter 2 und der Ausgießer 3 der Lastwagenbeladevorrichtung 1 so montiert, dass sie in Hö¬ henrichtung entsprechend dem Pfeil 15 einstellbar sind. Da- her ist die Lastwagenbeladevorrichtung 1 über einen Arm 14, der höhenverstellbar montiert ist, mit der Wand 16 der Be¬ tonherstellungsanlage verbunden. Ferner ist der Arm 14 mit der Wand 16 verbunden, so dass er um eine Achse 17 schwenkbar ist. FIG. 4 shows a front view of the truck loading device 1 when it is connected to a filler neck 13 of the concrete production plant. In order to allow the loading of material in different truck types with different loading heights, the hopper 2 and the spout 3 of the truck loading device 1 are mounted so that they are adjustable in Hö ¬ henrichtung according to the arrow 15. Therefore, the truck loading device 1 is connected to the wall 16 of the Be ¬ tonherstellungsanlage via an arm 14 which is mounted vertically adjustable. Further, the arm 14 is connected to the wall 16 so as to be pivotable about an axis 17.
Um eine Höheneinstellung zu gewährleisten, ist der Einfüll¬ stutzen 13 flexibel und teleskopartig ausfahrbar ausgelegt. In order to ensure a height adjustment, the filling ¬ neck 13 is designed to be flexible and telescopically extendable.

Claims

Patentansprüche : Claims:
1. Last'wagenbeladevorrichtung (1) einer Fertigbetonher- stellungsanlage mit einem Trichter (2) zum Sammeln von der Anlage zugeführten Betons und einem mit dem Trichter (2) verbundenen Ausgießer (3) , wobei der Ausgießer (3) eine konische Außenfläche hat und eine zentrale Öffnung (4) zum Ausgießen von Beton aus dem Trichter (2) und mindestens eine Luftentweichöffnung (5.) , die radial außerhalb der zent- ralen Öffnung (4) angeordnet ist und mit einem Staub- sammelrohr (6) verbunden ist, aufweist. 1. Last 'wagenbeladevorrichtung (1) position system with a funnel (2) for collecting the plant supplied concrete and connected one to the funnel (2) a spout (3) a Fertigbetonher-, wherein the pourer (3) has a conical outer surface, and a central opening (4) for pouring concrete out of the hopper (2) and at least one air escape opening (5) arranged radially outside the central opening (4) and connected to a dust collecting pipe (6), having.
2. Lastwagenbeladevorrichtung (1) nach Anspruch 1, dadurch gekennzeichnet, dass der Trichter (2) und der Ausgie- ßer (3) so montiert sind, dass sie in Höhenrichtung einstellbar sind. 2. truck loading device (1) according to claim 1, characterized in that the funnel (2) and the Ausgie- ßer (3) are mounted so that they are adjustable in the height direction.
3. Lastwagenbeladevorrichtung (1) nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass der Trichter (2) und der Aus- gießer (3) so montiert sind, dass sie in horizontaler Richtung verschiebbar sind. 3. truck loading device (1) according to claim 1 or 2, characterized in that the funnel (2) and the spout (3) are mounted so that they are displaceable in the horizontal direction.
4. Lastwagenbeladevorrichtung (1) nach Anspruch 1, 2 oder 3, dadurch gekennzeichnet, dass mehrere Luftentweichöffnun- gen (5) die zentrale Öffnung (4) umgebend angeordnet sind. 4. truck loading device (1) according to claim 1, 2 or 3, characterized in that several Luftentweichöffnun- conditions (5) the central opening (4) are arranged surrounding.
5. Lastwagenbeladevorrichtung (1) nach Anspruch 4, dadurch gekennzeichnet, dass die Luftentweichöffnungen (5) in Umfangsrichtung gleichmäßig um .die zentrale Öffnung (4) verteilt sind. Truck loading device (1) according to claim 4, characterized in that the air escape openings (5) are evenly distributed in the circumferential direction around the central opening (4).
6. Lastwagenbeladevorrichtung (1) nach Anspruch 4 oder 5, dadurch gekennzeichnet, dass die Luftentweichöffnungen (5) jeweils über ein Zufuhrrohr (10) mit dem Staubsammelrohr (6) verbunden sind. 6. truck loading device (1) according to claim 4 or 5, characterized in that the air escape openings (5) are each connected via a supply pipe (10) with the dust collecting pipe (6).
7. Lastwagenbeladevorrichtung (1) nach einem der Ansprü- che 1 bis 6, dadurch gekennzeichnet, dass der Ausgießer (3) eine Dichtung zum Bereitstellen einer Dichtung zwischen dem Ausgießer (3) und einer Lastwagentrommelöffnung (7) aufweist. 7. A truck loading apparatus (1) according to any one of claims 1 to 6, characterized in that the spout (3) has a seal for providing a seal between the spout (3) and a truck-drum opening (7).
8. Lastwagenbeladevorrichtung (1) nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass der Ausgießer (3) aus einem elastischen Material, wie Gummi, besteht, wobei das elastische Material vorzugsweise die Dichtung bildet. 8. A truck loading device (1) according to any one of claims 1 to 7, characterized in that the spout (3) consists of an elastic material, such as rubber, wherein the elastic material preferably forms the seal.
9. Lastwagenbeladevorrichtung (1) nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass ein Betätigungselement (11, 12) bereitgestellt ist, um den Ausgießer (3) gegen eine Lastwagentrommelöffnung (7) zu drücken. A truck loading apparatus (1) according to any one of claims 1 to 8, characterized in that an operating member (11, 12) is provided for urging the spout (3) against a truck-drum opening (7).
10. Lastwagenbeladevorrichtung (1) nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass der Einfüllstutzen (13) flexibel ist. 10. truck loading device (1) according to one of claims 1 to 9, characterized in that the filler neck (13) is flexible.
11. Lastwagenbeladevorrichtung (1) nach einem der Ansprü- che 1 bis 10, dadurch gekennzeichnet, dass der Einfüllstutzen (13) teleskopartig ausfahrbar ausgelegt ist. 11. truck loading device (1) according to any one of claims 1 to 10, characterized in that the filler neck (13) is designed telescopically extendable.
PCT/IB2014/002466 2013-11-19 2014-11-18 Charging device of a ready-mixed concrete mixing installation WO2015075522A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ATA894/2013A AT515165A1 (en) 2013-11-19 2013-11-19 Charging device of a ready mixed concrete plant
ATA0894/2013 2013-11-19

Publications (1)

Publication Number Publication Date
WO2015075522A1 true WO2015075522A1 (en) 2015-05-28

Family

ID=52144751

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2014/002466 WO2015075522A1 (en) 2013-11-19 2014-11-18 Charging device of a ready-mixed concrete mixing installation

Country Status (2)

Country Link
AT (1) AT515165A1 (en)
WO (1) WO2015075522A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110171586A (en) * 2019-05-09 2019-08-27 鲍必道 A kind of cement manufacture plant of filling weight-adjustable section
CN113210306A (en) * 2021-04-19 2021-08-06 福建厚德节能科技发展有限公司 Autoclaved aerated concrete bottom plate cleaning device and method
WO2022094478A1 (en) * 2020-11-02 2022-05-05 Bakery Concepts International, Llc. Splash controller for a hydrated mixture dispenser

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3132240A1 (en) 2022-01-28 2023-08-04 Stns Self-service concrete plant

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3799221A (en) * 1972-10-04 1974-03-26 Consolidated Rock Prod Co Dust collection system
US4557364A (en) * 1980-03-03 1985-12-10 The W. W. Sly Manufacturing Co. Bulk conveyor apparatus

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2716640A1 (en) * 1977-04-15 1978-10-19 Stanelle Karl Heinz LOADING DEVICE FOR RIESELABLE BULK GOODS
US7427182B2 (en) * 2004-12-01 2008-09-23 Intray Consolidated Pty Ltd Agitator loading system
CN102229203A (en) * 2011-05-21 2011-11-02 三一重工股份有限公司 Mixing plant and discharge position regulating device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3799221A (en) * 1972-10-04 1974-03-26 Consolidated Rock Prod Co Dust collection system
US4557364A (en) * 1980-03-03 1985-12-10 The W. W. Sly Manufacturing Co. Bulk conveyor apparatus

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110171586A (en) * 2019-05-09 2019-08-27 鲍必道 A kind of cement manufacture plant of filling weight-adjustable section
CN110171586B (en) * 2019-05-09 2021-04-02 江西上高南方水泥有限公司 Cement production equipment with adjustable filling weight
WO2022094478A1 (en) * 2020-11-02 2022-05-05 Bakery Concepts International, Llc. Splash controller for a hydrated mixture dispenser
CN113210306A (en) * 2021-04-19 2021-08-06 福建厚德节能科技发展有限公司 Autoclaved aerated concrete bottom plate cleaning device and method
CN113210306B (en) * 2021-04-19 2022-08-09 福建厚德节能科技发展有限公司 Autoclaved aerated concrete bottom plate cleaning device and method

Also Published As

Publication number Publication date
AT515165A1 (en) 2015-06-15

Similar Documents

Publication Publication Date Title
DE102005054253B3 (en) Device for producing a mixture of different bulk material components
DE3019888C2 (en)
WO2015075522A1 (en) Charging device of a ready-mixed concrete mixing installation
EP2722103A2 (en) Forced mixer with self-cleaning function and use of air inlets therefor
EP3592477B1 (en) Mixer comprising cleaning nozzle
EP0024719B1 (en) Device for continuously producing and feeding of mortar or the like
DE2453810C2 (en) Feeding device for a dispersing device
WO2018069401A1 (en) Method and device for mixing pulverous or granular materials
DE1275281B (en) Process and device for the production of molded parts, hollow bodies and containers from thermoplastics
EP2754351A1 (en) Mixer with mixing blade with a vertical axis of rotation
DE2901176A1 (en) DEVICE FOR THE DISCONTINUOUS PRODUCTION OF BLOCK FOAM
DE2247518A1 (en) DEVICE FOR DOSING AND MIXING SEVERAL MIX COMPONENTS
DE19621286C2 (en) Mixing and kneading machine
WO2016198223A1 (en) Extrusion device and extrusion method for producing a plastic film
EP0487946A1 (en) Centrifugal finishing apparatus
DE2742415A1 (en) PROCESS AND DEVICE FOR MANUFACTURING THE REFRACTORY LINING OF METALLURGICAL VESSELS
DE10350630B4 (en) Method and device for filling a mold
EP1504810B1 (en) Apparatus for cleaning a mixing drum
DE3638252A1 (en) DEVICE FOR DOSING COMPONENTS OF A LIQUID MIXTURE, ESPECIALLY A COLOR
DE3743667A1 (en) SAND FILLING DEVICE FOR MOLDING MACHINES
AT7986U1 (en) DEVICE FOR FILLING, MIXING AND DISPENSING SHOULDERS
DE2523374A1 (en) Continuous mortar mixer with endless screw metering dry mix - has partly filled mixing chamber with water inlet and screw discharge
DE2831740C2 (en) Device for separating a concrete mix into its various components
DE679921C (en) Machine for loosening, rearranging, sifting or transferring bulk goods into bags
CH403681A (en) Device for cleaning and separating mixtures

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14816377

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14816377

Country of ref document: EP

Kind code of ref document: A1