WO2015062195A1 - 一种特厚煤层固体胶结充填巷式开采方法 - Google Patents

一种特厚煤层固体胶结充填巷式开采方法 Download PDF

Info

Publication number
WO2015062195A1
WO2015062195A1 PCT/CN2014/073349 CN2014073349W WO2015062195A1 WO 2015062195 A1 WO2015062195 A1 WO 2015062195A1 CN 2014073349 W CN2014073349 W CN 2014073349W WO 2015062195 A1 WO2015062195 A1 WO 2015062195A1
Authority
WO
WIPO (PCT)
Prior art keywords
coal
tunnel
mining
roadway
layer
Prior art date
Application number
PCT/CN2014/073349
Other languages
English (en)
French (fr)
Inventor
张吉雄
张强
姜海强
李剑
周楠
郝雄飞
Original Assignee
中国矿业大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国矿业大学 filed Critical 中国矿业大学
Priority to AU2014344670A priority Critical patent/AU2014344670B2/en
Publication of WO2015062195A1 publication Critical patent/WO2015062195A1/zh
Priority to ZA2016/03462A priority patent/ZA201603462B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Abstract

一种特厚煤层固体胶结充填巷式开采方法,将侍采区段内的特厚煤层按层高均匀划分为多个分层H,自上而下开采,按采高及工作面煤壁长度将每个分层分为多个分段L,间隔开采,以避免巷道之间的采动影响;从首个分层的首个分段自保护煤柱边界起沿上山巷道方向掘进采煤,进行宽度为的巷道开采和胶结充填渐进循环作业,利用掘进机在煤体中掘进出煤,在已采巷道中注入胶结材料,胶结材料沿着巷道向另一端流动直至充满整个巷道,胶结材料凝固后有很好的承压能力和抗变形能力,能有效解决"三下"压煤中的特厚煤层的开采问题,实现无煤柱开采,大大提高煤炭资源回收率,减少煤炭资源的浪费,对于特厚煤层上覆岩层的移动具有较好的控制作用。

Description

一种特厚煤层固体胶结充填巷式开采方法
技术领域
本发明涉及煤矿一种特厚煤层固体胶结充填巷式开采方法, 尤其适用于 "三下"压煤 中的特厚煤层的充填开采。
背景技术
"三下 "压煤开采是近期被广泛研究的对象, 对于"三下"压煤开采, 国内外学者做 了大量实验研究并取得诸多成果, 对于薄煤层和中厚煤层一般采用充填开采的方法来控 制地表沉陷, 保护地表建筑物。 对于 10m以上特厚煤层大多采用分层开采和放顶煤的开 采方法, "三下"压煤中的特厚煤层的开采一直是个难题, 传统的分层充填开采虽然能够 在一定程度上控制上覆岩层移动和地表沉陷, 但对于要完全开采 "三下"压煤中的特厚 煤层, 并要保证上覆岩层移动和地表沉陷在需要的范围内, 必然要求充实率达到更高的 标准才能控制等价采高在理想的范围内。 胶结材料凝固后有很好的承压能力和抗变形能 力, 巷式开采利用掘进机在煤体中掘进出煤, 仅造成小范围的采动影响, 对于控制顶板 下沉有着很大的优势, 能为充填物提供良好的空间, 综上所述, 这种将"巷式开采"、 "分 层开采"和 "胶结充填"相结合的一种 "三下"压煤的开采方法在提高煤炭资源回收率、 控制上覆岩层移动、 保护地表构筑物中能够发挥重要作用, 成为解放 "三下"压煤中特 厚煤层开采的首选技术。
发明内容
技术问题: 本发明的目的是克服已有技术中的不足之处, 提供一种易于操作、安全可 靠、 煤炭资源采出率高、 充填效果好的特厚煤层固体胶结充填巷式开采方法。
技术方案:本发明的特厚煤层固体胶结充填巷式开采方法,包括从运输上山巷道在煤 体内自轨道上山巷道至区段边界方向掘进形成运输巷; 从轨道上山巷道在煤体内自运输 上山巷道至区段边界方向掘进形成轨道巷; 从运输巷或轨道巷沿上下山巷道方向掘进形 成联络巷, 贯通运输巷与轨道巷; 其特征在于:
a. 将侍采区段内的特厚煤层按层高均匀划分为 3~5m采高的多个分层 H,自上而下开 采,按 3~5m采高及工作面煤壁长度将每个分层 H分为 25~30m的多个分段 L,间隔开采, 以避免巷道之间的采动影响;
b. 从首个分层的首个分段自保护煤柱边界起沿上山巷道方向掘进采煤, 先布置掘进 机, 并在掘进机后部连接可伸縮运煤带式输送机, 同时在运输巷中布置运煤转载机及其 它巷内配套运煤设备;
c 设备布置完毕, 进行宽度为 3~5m的巷道开采和胶结充填渐进循环作业, 其步骤如 下:
( 1 ) 首先掘采分段 L的首个巷道, 依次启动运煤转载机、 可伸縮运煤带式输送机、 掘进机, 沿上山巷道方向进行掘进, 采出的煤经可伸縮运煤带式输送机、 运煤转载机运 出;
(2)掘采分段 L的首个巷道完成后, 将掘进设备移至下一分段 L的首个巷道, 密封 已采巷道靠近运煤巷一端;
(3) 向首个巷道中注入胶结材料, 完成对首个巷道的充填;
(4)对下一分段 L的首个巷道进行掘采, 完成之后, 在该分段巷道中注入胶结材料 的同时, 再进行下一分段 L的首个巷道掘采;
(5) 重复步骤 4, 直至完成首个分层 H中的所有分段的首个巷道的掘采和充填;
(6)在所有已充填固化的首个巷道侧按分段 L的距离间隔逐一掘采巷道, 直至完成 首个分层 H内所有煤炭的掘采、 充填;
(7) 重复步骤 (1)-(6), 自上而下, 依次对均匀划分采高的每个分层 H进行掘采、 充 填, 直至完成此区段内煤层的掘采与充填。
有益效果: 本发明是一种将 "巷式开采"、 "分层开采"和 "胶结充填"相结合的 "三 下"压煤的开采方法, 利用掘进机在煤体中掘进出煤, 仅造成小范围的采动影响, 这对 于控制顶板下沉有着很大的优势, 能为充填物提供良好的空间。 在已采巷道中注入胶结 材料, 胶结材料沿着巷道向另一端流动直至充满整个巷道, 胶结材料凝固后有很好的承 压能力和抗变形能力, 有效解决了 "三下"压煤中的特厚煤层的开采问题, 实现无煤柱 开采, 大大提高了煤炭资源回收率, 减少了煤炭资源的浪费, 对于特厚煤层上覆岩层的 移动具有很好的控制。 本发明采用胶结材料巷式充填分层开采技术, 使胶结材料完全充 满整个巷道, 充实率高, 胶结材料凝固后形成坚硬的整体, 具有很好的承压能力和抗变 形能力, 使得上覆岩层移动在较低的范围内, 对地表建筑物的影响甚微, 有效控制了矿 压显现与地表沉陷, 对于解放 "三下"压煤中的特厚煤层中显现出极好的技术优势。 其 方法简单, 操作方便, 安全、 效果好, 具有广泛的实用性。
附图说明
图 1 是本发明的巷式充采示意图。 图 2 是本发明的巷式充采 A-A剖视图。
图 3 是本发明第二层巷式充采剖视图。
图 4 是本发明的工作面第一层布置示意图。
图 5 是本发明第一层充填示意图。
图 6 是本发明的工作面第二层布置示意图。
图 7 是本发明第二层充填示意图。
图 8 是本发明的工作面布置俯视示意图。
图中: 1-运输上山巷道, 2-轨道上山巷道, 3-运输巷, 4-轨道巷, 5-联络巷, 6-保护煤 柱, 7-掘进机, 8-可伸縮运煤皮带运输机, 9-运煤转载机, 10-胶结充填材料输送管路, 11-首采巷道, 12-局部通风系统。
具体实施方式
下面结合附图对本发明的一个实施作进一步的描述:
如图 1所示,本发明的特厚煤层固体胶结充填巷式开采方法:从运输上山巷道 1开切 口,并在煤体内自上山巷道至区段边界方向掘进以形成运输巷 3;从轨道上山巷道 2开切 口,并在煤体内自上山巷道至区段边界方向掘进形成轨道巷 4; 当两巷道掘进至区段边界 时, 停止掘进; 然后从运输巷 3或轨道巷 4开切口, 形成联络巷 5, 贯通运输巷 3与轨道 巷 4; 运输巷 3进风, 轨道巷 4回风, 形成初始通风系统;
如图 2所示, 将侍采区段内的特厚煤层划分为若干分层 H, 每个分层 H 的厚度为 3~5m, 自上而下开采; 每个分层沿运输 3巷或轨道巷 4方向分为若干分段 L, 分段 L为 25~30m, 间隔开采, 以避免巷道之间的采动影响; 在联络巷一侧留设保护煤柱 6, 煤柱 宽度根据煤矿具体地质条件而定,沿保护煤柱 6边界布置综掘机 7,沿上山巷道方向掘进, 掘进机后部布置可伸縮运煤带式输送机 8, 同时在运输巷 3中布置运煤转载机 9及其它巷 内配套运煤设备, 并布置局部通风系统 12, 如图 8所示, 以满足掘进工作面的通风, 采 出煤炭经可伸縮运煤带式输送机 8输送至运输巷 3, 从而进一步输送至地面;
设备布置完毕,按宽度为 3~5m进行巷道开采和胶结充填渐进循环作业,其步骤如下:
( 1 ) 首先掘采分段 L的首个巷道 11, 依次启动运煤转载机 9、 可伸縮运煤带式输送 机 8、 掘进机 7, 沿上山巷道方向进行掘进, 采出的煤经可伸縮运煤带式输送机 8、 运煤 转载机 9运出, 如图 4所示;
(2) 掘采分段 L的首个巷道 11完成后, 即待掘进机 7掘完整条巷道后, 移出掘进 机 7、 可伸縮运煤皮带机 8等掘进及运输设备, 将掘进设备移至下一分段 L的首个巷道, 密封已采巷道靠近运煤巷一端, 用矸石袋将已采巷道的靠近运煤巷一端封死, 在靠近轨 道巷的一端布置胶结充填管路 10;
(3)向首个巷道 11中注入胶结材料,胶结材料为黄土、粉煤灰、水泥和水的混合物, 胶结材料沿着巷道向另一端流动直至充满整个巷道, 完成对首个巷道 11的充填, 如图 5 所示;
(4)对下一分段 L的首个巷道进行掘采, 完成之后, 在该分段巷道中注入胶结材料 的同时, 再进行下一分段 L的首个巷道掘采;
(5) 重复步骤 4, 直至完成首个分层 H中的所有分段的首个巷道的掘采和充填, 待 所有分段对应位置均已采完, 此时首采巷道 11中胶结充填材料已经完全凝固, 结构已经 稳定, 贴近此已稳定的巷道开掘巷道出煤, 如此循环, 直至此分层已完全采充完毕;
(6)在所有已充填固化的首个巷道侧按分段 L的距离间隔逐一掘采巷道, 直至完成 首个分层 H内所有煤炭的掘采、 充填;
(7)待本分层开采完毕后, 充填本分层的运输巷 3、轨道巷 4及联络巷 5, 然后接替 下一分层, 重复步骤 1〜6, 自上而下, 依次对均匀划分采高的每个分层 H进行掘采、 充 填, 如图 3、 图 6、 图 7所示, 直至完成此区段内煤层的掘采与充填。

Claims

权利要求书
1. 一种特厚煤层固体胶结充填巷式开采方法, 包括从运输上山巷道 (1 ) 在煤体内自 轨道上山巷道 (2) 至区段边界方向掘进形成运输巷 (3 ); 从轨道上山巷道 (2) 在煤体 内自运输上山巷道 (1 ) 至区段边界方向掘进形成轨道巷 (4) ; 从运输巷 (3 ) 或轨道巷 (4) 沿上下山巷道方向掘进形成联络巷 (5 ), 贯通运输巷 (3 ) 与轨道巷 (4); 其特征 在于:
a. 将侍采区段内的特厚煤层按层高均匀划分为 3~5m采高的多个分层 H, 自上而下开 采, 按 3~5m采高及工作面煤壁长度将每个分层 H分为 25~30m的多个分段 L, 间隔开 采, 以避免巷道之间的采动影响;
b. 从首个分层的首个分段自保护煤柱 (6) 边界起沿上山巷道方向掘进采煤, 先布置 掘进机 (7 ), 并在掘进机 (7 ) 后部连接可伸縮运煤带式输送机 (8 ), 同时在运输巷
(3) 中布置运煤转载机 (9) 及其它巷内配套运煤设备;
c 设备布置完毕, 进行宽度为 3~5m 的巷道开采和胶结充填渐进循环作业, 其步骤如 下:
( 1 ) 首先掘采分段 L的首个巷道 (11 ), 依次启动运煤转载机 (9)、 可伸縮运煤带式 输送机 (8 )、 掘进机 (7 ), 沿上山巷道方向进行掘进, 采出的煤经可伸縮运煤带式输送 机 (8)、 运煤转载机 (9) 运出;
(2) 掘采分段 L 的首个巷道 (11 ) 完成后, 将掘进设备移至下一分段 L 的首个巷 道, 密封已采巷道靠近运煤巷一端;
(3) 向首个巷道 (11 ) 中注入胶结材料, 完成对首个巷道 (11 ) 的充填;
(4) 对下一分段 L 的首个巷道进行掘采, 完成之后, 在该分段巷道中注入胶结材料 的同时, 再进行下一分段 L的首个巷道掘采;
(5) 重复步骤 (4), 直至完成首个分层 H中的所有分段的首个巷道的掘采和充填;
(6) 在所有已充填固化的首个巷道侧按分段 L 的距离间隔逐一掘采巷道, 直至完成 首个分层 H内所有煤炭的掘采、 充填;
(7) 重复步骤 (1)-(6), 自上而下, 依次对均匀划分采高的每个分层 H 进行掘采、 充 填, 直至完成此区段内煤层的掘采与充填。
PCT/CN2014/073349 2013-10-28 2014-03-13 一种特厚煤层固体胶结充填巷式开采方法 WO2015062195A1 (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
AU2014344670A AU2014344670B2 (en) 2013-10-28 2014-03-13 Solid cementation backfill roadway type mining method for ultra-thick seam
ZA2016/03462A ZA201603462B (en) 2013-10-28 2016-05-20 Solid cementation backfill roadway type mining method for ultra-thick seam

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201310517683.3 2013-10-28
CN201310517683.3A CN103527197B (zh) 2013-10-28 2013-10-28 一种特厚煤层固体胶结充填巷式开采方法

Publications (1)

Publication Number Publication Date
WO2015062195A1 true WO2015062195A1 (zh) 2015-05-07

Family

ID=49929505

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2014/073349 WO2015062195A1 (zh) 2013-10-28 2014-03-13 一种特厚煤层固体胶结充填巷式开采方法

Country Status (4)

Country Link
CN (1) CN103527197B (zh)
AU (1) AU2014344670B2 (zh)
WO (1) WO2015062195A1 (zh)
ZA (1) ZA201603462B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109117585A (zh) * 2018-09-06 2019-01-01 中国矿业大学 一种固体充填材料内部应力确定方法
CN110185492A (zh) * 2019-07-07 2019-08-30 长沙智能控制系统有限公司 一种移动分布式井下胶结充填方法及系统
CN114247331A (zh) * 2022-01-19 2022-03-29 中煤科工集团西安研究院有限公司 一种顶板水平井末端双料混合装置、系统及随充凝固方法
US11339658B2 (en) 2018-07-09 2022-05-24 China University Of Mining And Technology Method for recovering room-type coal pillars by cemented filling of reserved roadways

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103527197B (zh) * 2013-10-28 2016-01-06 中国矿业大学 一种特厚煤层固体胶结充填巷式开采方法
CN103993881A (zh) * 2014-05-21 2014-08-20 中国矿业大学 一种长壁巷式胶结充填开采方法
CN104088639A (zh) * 2014-06-25 2014-10-08 西安科技大学 一种大倾角厚煤层走向长壁工作面大采高开采方法
CN104074541A (zh) * 2014-06-25 2014-10-01 中国矿业大学 一种水体下固体充填开采设计方法
CN104358573B (zh) * 2014-09-04 2016-08-31 广东安元矿业勘察设计有限公司 厚大矿体的阶段空场与阶段崩落联合采矿法
CN104675399B (zh) * 2015-01-30 2017-12-05 赤峰西拉沐沦(集团)公格营子煤业有限公司 煤矿采掘充填一体化采煤方法
CN105041319A (zh) * 2015-08-25 2015-11-11 袁伟昊 一种井工煤矿巷邦无人工作面及充填开采方法
CN106014477A (zh) * 2016-06-15 2016-10-12 山东华联矿业股份有限公司 充填体稳定性填充方法
CN107657084B (zh) * 2017-09-05 2019-10-01 太原理工大学 基于滑落失稳的复合残采区上行开采可行性定量判定方法
CN107939401B (zh) * 2017-11-28 2019-05-14 中国矿业大学 一种特厚煤层分层间隔充填采煤方法
CN108590650B (zh) * 2018-04-28 2019-07-30 山东科技大学 一种矿柱及顶板缓慢下沉处理采空区的方法
CN108590652B (zh) * 2018-05-09 2019-05-21 中冶北方(大连)工程技术有限公司 一种沿矿体走向划分一个矿块的无底柱分段崩落法
CN109356582B (zh) * 2018-11-15 2019-09-03 山东科技大学 一种用于综采放顶煤工作面的充填开采方法
CN112282758A (zh) * 2020-10-29 2021-01-29 中煤能源研究院有限责任公司 一种采煤工作面双巷循环采充一体化工艺
CN112963149B (zh) * 2021-04-09 2023-02-10 中国煤炭科工集团太原研究院有限公司 一种近水平厚煤层高效全采全充开采方法
CN117266855B (zh) * 2023-11-23 2024-01-19 太原理工大学 一种本煤层极薄分层开采的卸压增透方法及系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101033689A (zh) * 2007-04-10 2007-09-12 闫振东 一种煤矿井下无煤柱回收方法
US20110018332A1 (en) * 2008-02-04 2011-01-27 Matthew Lumb Method and Apparatus for Mining a Material in an Underground Environment
CN102418526A (zh) * 2011-12-02 2012-04-18 瓮福(集团)有限责任公司 中厚急倾斜含废石夹层磷矿体沿走向高分段分部采矿法
CN102996131A (zh) * 2012-12-10 2013-03-27 中国矿业大学 一种预掘两巷前进式固体充填采煤方法
CN103306720A (zh) * 2013-05-20 2013-09-18 中国矿业大学 一种特厚煤层倾斜分层固体充填采煤方法
CN103527197A (zh) * 2013-10-28 2014-01-22 中国矿业大学 一种特厚煤层固体胶结充填巷式开采方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4198097A (en) * 1977-06-06 1980-04-15 Standard Oil Company Method of mining
HU177046B (hu) * 1979-02-14 1981-06-28 Tatabanyai Szenbanyak Sposob poslojnoj obvalnoj vyrabotki tol'stogo ugol'nogo plasta
CN101871347B (zh) * 2010-07-08 2011-12-14 中南大学 采矿环境再造分层分条中深孔落矿采矿法
CN102392643B (zh) * 2011-11-17 2014-01-15 中国矿业大学 一种建筑物下充填开采回收煤柱的方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101033689A (zh) * 2007-04-10 2007-09-12 闫振东 一种煤矿井下无煤柱回收方法
US20110018332A1 (en) * 2008-02-04 2011-01-27 Matthew Lumb Method and Apparatus for Mining a Material in an Underground Environment
CN102418526A (zh) * 2011-12-02 2012-04-18 瓮福(集团)有限责任公司 中厚急倾斜含废石夹层磷矿体沿走向高分段分部采矿法
CN102996131A (zh) * 2012-12-10 2013-03-27 中国矿业大学 一种预掘两巷前进式固体充填采煤方法
CN103306720A (zh) * 2013-05-20 2013-09-18 中国矿业大学 一种特厚煤层倾斜分层固体充填采煤方法
CN103527197A (zh) * 2013-10-28 2014-01-22 中国矿业大学 一种特厚煤层固体胶结充填巷式开采方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11339658B2 (en) 2018-07-09 2022-05-24 China University Of Mining And Technology Method for recovering room-type coal pillars by cemented filling of reserved roadways
CN109117585A (zh) * 2018-09-06 2019-01-01 中国矿业大学 一种固体充填材料内部应力确定方法
CN109117585B (zh) * 2018-09-06 2022-10-28 中国矿业大学 一种固体充填材料内部应力确定方法
CN110185492A (zh) * 2019-07-07 2019-08-30 长沙智能控制系统有限公司 一种移动分布式井下胶结充填方法及系统
CN114247331A (zh) * 2022-01-19 2022-03-29 中煤科工集团西安研究院有限公司 一种顶板水平井末端双料混合装置、系统及随充凝固方法
CN114247331B (zh) * 2022-01-19 2024-02-09 中煤科工集团西安研究院有限公司 一种顶板水平井末端双料混合装置、系统及随充凝固方法

Also Published As

Publication number Publication date
AU2014344670B2 (en) 2017-04-13
CN103527197B (zh) 2016-01-06
AU2014344670A1 (en) 2016-04-07
CN103527197A (zh) 2014-01-22
ZA201603462B (en) 2017-11-29

Similar Documents

Publication Publication Date Title
WO2015062195A1 (zh) 一种特厚煤层固体胶结充填巷式开采方法
WO2014090108A1 (zh) 一种预掘两巷前进式固体充填采煤方法
CN105317459B (zh) 一种用于控制坚硬顶板大面积垮落灾害的分区充填方法
WO2016074456A1 (zh) 控制覆岩裂隙与地表沉陷的掘采充平行作业的采煤方法
CN105221179B (zh) 一种高瓦斯矿井y型通风方法
WO2014187163A1 (zh) 一种特厚煤层倾斜分层固体充填采煤方法
WO2015090128A1 (zh) 一种跳采式旺格维利采场支巷充填采煤方法
WO2020010696A1 (zh) 一种预留巷道胶结充填回收房式煤柱的方法
WO2019085052A1 (zh) 一种充填采煤回收遗留煤柱并控制隔水关键层稳定的方法
CN103670496A (zh) 单一低透气性突出煤层沿空留巷与预抽区段煤层瓦斯方法
CN103147792B (zh) 进路式采煤充填法
CN102146794B (zh) 注浆固结沿空掘巷工艺方法
WO2019015362A1 (zh) 一种浅埋煤层保水开采方法及其应用
CN103953345B (zh) 一种沿空小断面留巷开采方法
US20220243590A1 (en) Dendritic reverse underground mining method for thin coal seam at end slope of strip mine
CN109869150A (zh) 一种矿山资源分段全采局充开采方法
CN105756702A (zh) 一种巷旁网笼充填支护沿空留巷方法
CN108266189A (zh) 一种巷顶完全沿空掘巷采空区隔绝方法
CN103993881A (zh) 一种长壁巷式胶结充填开采方法
CN104500070A (zh) 一种连续采煤机膏体充填开采方法
CN113833520A (zh) 高陡边坡下部厚煤层的分层条带式无人化开采充填方法
CN102418528B (zh) 使用钢混结构人工假顶的端部放矿崩落法开采工艺
CN109899070B (zh) 基于椭球体放矿结构的缓倾斜中厚矿体无固废充填采矿法
CN112539062B (zh) 一种急倾斜煤层充填开采方法
CN112412461B (zh) 一种露天矿端帮煤充填开采工艺方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14858680

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2014344670

Country of ref document: AU

Date of ref document: 20140313

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14858680

Country of ref document: EP

Kind code of ref document: A1