CN104074541A - 一种水体下固体充填开采设计方法 - Google Patents
一种水体下固体充填开采设计方法 Download PDFInfo
- Publication number
- CN104074541A CN104074541A CN201410291416.3A CN201410291416A CN104074541A CN 104074541 A CN104074541 A CN 104074541A CN 201410291416 A CN201410291416 A CN 201410291416A CN 104074541 A CN104074541 A CN 104074541A
- Authority
- CN
- China
- Prior art keywords
- water body
- mining
- height
- solid filling
- coal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Abstract
Description
Claims (1)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410291416.3A CN104074541A (zh) | 2014-06-25 | 2014-06-25 | 一种水体下固体充填开采设计方法 |
PCT/CN2015/081522 WO2015196939A1 (zh) | 2014-06-25 | 2015-06-16 | 一种水体下固体充填开采设计方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410291416.3A CN104074541A (zh) | 2014-06-25 | 2014-06-25 | 一种水体下固体充填开采设计方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104074541A true CN104074541A (zh) | 2014-10-01 |
Family
ID=51596107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410291416.3A Pending CN104074541A (zh) | 2014-06-25 | 2014-06-25 | 一种水体下固体充填开采设计方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN104074541A (zh) |
WO (1) | WO2015196939A1 (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015196939A1 (zh) * | 2014-06-25 | 2015-12-30 | 黄艳利 | 一种水体下固体充填开采设计方法 |
CN107013215A (zh) * | 2017-05-15 | 2017-08-04 | 太原理工大学 | 一种分区域构造充填开采以减小防水煤岩柱尺寸的方法 |
CN107944148A (zh) * | 2017-11-28 | 2018-04-20 | 中国矿业大学 | 一种充填开采临界充实率设计方法 |
CN108625852A (zh) * | 2018-04-18 | 2018-10-09 | 中国矿业大学 | 短壁开采法回收水体下边角煤开采参数的确定方法 |
CN109139109A (zh) * | 2018-08-02 | 2019-01-04 | 缪协兴 | 一种固体充填采煤技术人造储水地层的方法 |
CN109236296A (zh) * | 2018-08-02 | 2019-01-18 | 缪协兴 | 一种安全开采保水煤柱的设计方法 |
CN109973095A (zh) * | 2019-05-14 | 2019-07-05 | 中国矿业大学 | 一种煤矿固体充填开采再造地下储水空间的方法 |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106979033B (zh) * | 2017-05-09 | 2018-09-14 | 山东科技大学 | 一种厚煤层大采高采空区膏体充填施工方法 |
CN108868770B (zh) * | 2018-06-12 | 2021-02-26 | 中国矿业大学 | 一种充填开采岩层位态精准控制设计方法 |
CN109209380B (zh) * | 2018-09-30 | 2020-10-30 | 中国矿业大学 | 一种矿山采选充控开采设计方法 |
CN110765642B (zh) * | 2019-11-05 | 2023-04-07 | 中煤能源研究院有限责任公司 | 一种煤层、采区或工作面顶板岩层结构的分带评价方法 |
CN113569401B (zh) * | 2021-07-22 | 2022-09-20 | 山东科技大学 | 深埋采场覆岩类型评价标准及薄基岩加厚改造设计方法 |
CN115259758B (zh) * | 2022-07-25 | 2023-06-23 | 中国矿业大学 | 一种毫米级矸石料浆配比优化及制备方法 |
CN116150987B (zh) * | 2023-02-09 | 2023-10-20 | 西安科技大学 | 水资源水量-水质综合保护下充实率及粒径级配设计方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4377353A (en) * | 1978-08-03 | 1983-03-22 | Granges Ab | Method of selective underground mining and stabilization of rock cavities |
CN103510984A (zh) * | 2013-10-23 | 2014-01-15 | 中国矿业大学 | 固体充填采煤充采质量比设计方法 |
CN103513281A (zh) * | 2013-10-23 | 2014-01-15 | 中国矿业大学 | 固体充填采煤覆岩导水裂隙带发育高度预计方法 |
CN103527197A (zh) * | 2013-10-28 | 2014-01-22 | 中国矿业大学 | 一种特厚煤层固体胶结充填巷式开采方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2074960C1 (ru) * | 1994-07-27 | 1997-03-10 | Акционерное общество "Уралкалий" | Способ управления кровлей пологих калийных пластов |
CN101070759B (zh) * | 2007-05-04 | 2010-05-19 | 中国矿业大学 | 一种薄基岩浅埋煤层保水开采适用条件分类方法 |
RU2341658C1 (ru) * | 2007-06-20 | 2008-12-20 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Способ предотвращения затопления калийных рудников и опасных деформаций земной поверхности при прорывах в рудники подземных вод |
CN104074541A (zh) * | 2014-06-25 | 2014-10-01 | 中国矿业大学 | 一种水体下固体充填开采设计方法 |
-
2014
- 2014-06-25 CN CN201410291416.3A patent/CN104074541A/zh active Pending
-
2015
- 2015-06-16 WO PCT/CN2015/081522 patent/WO2015196939A1/zh active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4377353A (en) * | 1978-08-03 | 1983-03-22 | Granges Ab | Method of selective underground mining and stabilization of rock cavities |
CN103510984A (zh) * | 2013-10-23 | 2014-01-15 | 中国矿业大学 | 固体充填采煤充采质量比设计方法 |
CN103513281A (zh) * | 2013-10-23 | 2014-01-15 | 中国矿业大学 | 固体充填采煤覆岩导水裂隙带发育高度预计方法 |
CN103527197A (zh) * | 2013-10-28 | 2014-01-22 | 中国矿业大学 | 一种特厚煤层固体胶结充填巷式开采方法 |
Non-Patent Citations (1)
Title |
---|
李剑: "含水层下矸石充填采煤覆岩导水裂隙演化机理及控制研究", 《中国博士论文全文库》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015196939A1 (zh) * | 2014-06-25 | 2015-12-30 | 黄艳利 | 一种水体下固体充填开采设计方法 |
CN107013215A (zh) * | 2017-05-15 | 2017-08-04 | 太原理工大学 | 一种分区域构造充填开采以减小防水煤岩柱尺寸的方法 |
CN107944148A (zh) * | 2017-11-28 | 2018-04-20 | 中国矿业大学 | 一种充填开采临界充实率设计方法 |
CN108625852A (zh) * | 2018-04-18 | 2018-10-09 | 中国矿业大学 | 短壁开采法回收水体下边角煤开采参数的确定方法 |
CN109139109A (zh) * | 2018-08-02 | 2019-01-04 | 缪协兴 | 一种固体充填采煤技术人造储水地层的方法 |
CN109236296A (zh) * | 2018-08-02 | 2019-01-18 | 缪协兴 | 一种安全开采保水煤柱的设计方法 |
CN109236296B (zh) * | 2018-08-02 | 2019-09-13 | 缪协兴 | 一种安全开采保水煤柱的设计方法 |
CN109973095A (zh) * | 2019-05-14 | 2019-07-05 | 中国矿业大学 | 一种煤矿固体充填开采再造地下储水空间的方法 |
CN109973095B (zh) * | 2019-05-14 | 2020-04-24 | 中国矿业大学 | 一种煤矿固体充填开采再造地下储水空间的方法 |
Also Published As
Publication number | Publication date |
---|---|
WO2015196939A1 (zh) | 2015-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104074541A (zh) | 一种水体下固体充填开采设计方法 | |
CN103867229B (zh) | 一种煤矿大采深与下组煤开采防治水综合治理方法 | |
Cui et al. | Damage features and formation mechanism of the strong water inrush disaster at the Daxing Co Mine, Guangdong Province, China | |
CN103742145A (zh) | 煤矿富水异常区域防治水方法 | |
CN113175325B (zh) | 基于关键层保护的煤与共生砂岩型铀矿协调开采方法 | |
CN107339105B (zh) | 一种分层膏体充填复采特厚煤层残采区停采线煤柱的方法 | |
CN103924976A (zh) | 一种露天复采过残煤区的方法 | |
Zhang et al. | Overburden failure associated with mining coal seams in close proximity in ascending and descending sequences under a large water body | |
Li et al. | A novel treatment method and construction technology of the pipeline gushing water geohazards in karst region | |
CN104763466A (zh) | 一种覆岩隔离注浆充填浆体有效扩散半径的检测方法 | |
CN115749776A (zh) | 一种基于断层注浆改造的煤柱回收方法 | |
CN107762513A (zh) | 基于在矿产开采中对大直径深孔空场嗣后充填采矿的方法 | |
CN103670511B (zh) | 一种顶板岩层破裂程度的分析计算方法 | |
CN108150171A (zh) | 一种大埋深薄基岩区厚煤层综放开采压架突水防治方法 | |
Zhang et al. | Directional drainage grouting technology of coal mine water damage treatment | |
CN107780937A (zh) | 基于在矿产开采中的充填采矿方法 | |
Xu et al. | Water disaster types and water control measures of Hanxing coal mine area | |
CN104763423B (zh) | 利用反井方式凿岩采出粉矿的开采工艺 | |
CN114444266A (zh) | 一种近松散层下煤层提高回采上限安全开采的可行性评价方法 | |
He et al. | Study on gas control methods optimization for mining safety | |
Shi et al. | Water-preserved coal mining in water-shortage mining areas: A case study in the Yonglong mining area of China | |
Chi et al. | Water supply and regulation of underground reservoir in coal mine considering coal-water occurrence relationship | |
Cooper et al. | Advanced 3D geotechnical modeling of Las Cruces Open pit | |
Li et al. | Rock strata failure and subsidence characteristics under the mining of short distance thick coal seams: a case in west China | |
Yuchi | Occurrence characteristics and mining technology of coal seam in Dananhu No. 2 Mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Huang Yanli Inventor after: Zhang Jixiong Inventor after: Guo Shuai Inventor after: Sun Qiang Inventor after: Zhou Nan Inventor after: Wang Xufeng Inventor before: Huang Yanli Inventor before: Zhang Jixiong Inventor before: Guo Shuai Inventor before: Sun Qiang Inventor before: Zhou Nan Inventor before: Wang Xufeng |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20141001 |