WO2015029494A1 - ピストンプルーバ - Google Patents

ピストンプルーバ Download PDF

Info

Publication number
WO2015029494A1
WO2015029494A1 PCT/JP2014/061040 JP2014061040W WO2015029494A1 WO 2015029494 A1 WO2015029494 A1 WO 2015029494A1 JP 2014061040 W JP2014061040 W JP 2014061040W WO 2015029494 A1 WO2015029494 A1 WO 2015029494A1
Authority
WO
WIPO (PCT)
Prior art keywords
measurement
piston
cylinder
measuring
inflow path
Prior art date
Application number
PCT/JP2014/061040
Other languages
English (en)
French (fr)
Inventor
理人 吉本
飯田 一
浩司 渥美
Original Assignee
株式会社オーバル
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オーバル filed Critical 株式会社オーバル
Priority to US14/650,697 priority Critical patent/US9506801B2/en
Priority to SG11201503571SA priority patent/SG11201503571SA/en
Priority to CN201480004023.8A priority patent/CN104903687B/zh
Priority to KR1020157014366A priority patent/KR101658745B1/ko
Publication of WO2015029494A1 publication Critical patent/WO2015029494A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F25/00Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume
    • G01F25/10Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F25/00Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume
    • G01F25/10Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters
    • G01F25/11Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters using a seal ball or piston in a test loop

Definitions

  • the present invention relates to a piston prober, and more particularly to a piston prober with a small reference volume for verifying the accuracy of a flow meter.
  • the verification device for verifying the flowmeter refers to the newly manufactured flowmeter or the flowmeter in use against changes in characteristics due to external factors such as temperature and pressure or internal factors such as movable part wear and the like. It is an apparatus for conducting characteristic tests regularly or at any timing in order to use with reliable accuracy.
  • This characteristic test can be roughly divided into a prober type flowmeter test in which a test is conducted by inserting a flow meter under test into a fixed test apparatus or a flowmeter is inserted into a fluid system. It is done by the device.
  • the prober method is capable of performing the characteristic test of the flow meter online and, if necessary, any characteristic test can be carried out. It is often used for examinations.
  • a movable body such as a piston moves in synchronization with the fluid in the tubular body having a constant cross section, and the fluid discharged by a predetermined section movement of the movable body is defined as a reference volume.
  • the reading of the flow meter when the fluid of the reference volume defined in the puller flows that is, the number of flow pulses emitted from the flow meter, is detected per unit volume.
  • the number of flow pulses transmitted per reference volume is a predetermined number or more.
  • a specified number of pulses or more is given.
  • the reference volume is made smaller, it will not be possible to send out more than the specified number of flow pulses, but the reference volume of the fluid discharged when the moving body such as the piston moves.
  • the flow coefficient can be determined from the relationship with (time). Therefore, even when the number of flow pulses is small, a small-sized prober (small volume prober) can be applied.
  • a piston prober using a piston as a movable body is known.
  • This piston prober basically has a measuring cylinder of constant cross section connected in series with the flow meter under test, and when the piston moving within the measuring cylinder moves a fixed distance, It compares volume and flow meter readings.
  • the volume of fluid is determined from the amount of movement of the piston.
  • a plurality of test results are usually averaged, and a flow coefficient (K factor) is calculated based on the average value.
  • K factor flow coefficient
  • the piston In order to move the piston within the measurement cylinder for a specified distance and return the piston to its original position after the measurement is completed, the piston is moved against the flow of fluid through the piston rod by an actuator using hydraulic pressure or pneumatic pressure. There is a flow path for flowing fluid between the case where the measurement cylinder itself is used and the case where a bypass flow path separately provided parallel to the measurement cylinder is used.
  • a valve function is provided in the piston returned by the actuator, and the valve is closed at the time of measurement and is opened when the piston is returned.
  • This system is called an inner valve system.
  • a bypass valve is provided in the bypass flow channel, and is closed at the time of measurement and opened at the time of return. This system is called an outer valve system.
  • the piston rod acts as a resistance when it receives pressure in the direction in which the measurement piston rotates, etc. There is a problem that it interferes and applies a load to the measuring piston. If the measurement piston is loaded more than necessary, the measurement piston can not move smoothly in the measurement cylinder, and accurate metering can not be performed.
  • a piston prober described in Patent Document 1 has been proposed.
  • the measurement piston and the piston rod are separately formed, and when the measurement piston is returned to a predetermined measurement preparation position, the piston rod moves the measurement piston from the downstream side to the upstream side.
  • the measurement piston is set at a predetermined measurement preparation position, only the piston rod is moved from the upstream side to the downstream side and accommodated in the hydraulic cylinder. This reduces the load on the measuring piston.
  • FIG. 13 is a schematic view for explaining the operation of the piston prober described in Patent Document 1.
  • Fig. 13 (A) shows the state where the measurement piston is at the home position
  • Fig. 13 (B) shows the state where the measurement piston is at the measurement preparation position
  • Fig. 13 (C) shows the state where the measurement piston starts weighing.
  • 200 is a piston prober
  • the piston prober 200 includes a measuring cylinder 201, a hydraulic cylinder 202, a piston rod 203, a measuring piston 204, a flow path switching valve 205, a measurement start valve 206, and a first cylinder inlet 207, A second cylinder inlet 208 is provided.
  • the piston rod 203 and the measuring piston 204 are separately formed.
  • both the flow path switching valve 205 and the measurement start valve 206 are opened. Then, hydraulic pressure is applied to the piston rod 203 in the hydraulic cylinder 202 to move the piston rod 203, move the measurement piston 204 to a predetermined measurement preparation position on the upstream side, and set the measurement piston 204 in the measurement preparation position. The state at this time is shown in FIG. The piston rod 203 is assumed to be returned to the original position in the hydraulic cylinder 202.
  • the predetermined measurement preparation position is an intermediate position between the first cylinder inlet 207 and the second cylinder inlet 208. Then, since both the flow path switching valve 205 and the measurement start valve 206 are open, the measurement piston 204 receives the pressure of the fluid flowing in from the first cylinder inlet 207 and the pressure of the fluid flowing in from the second cylinder inlet 208 And is held at the measurement preparation position. Then, as shown in FIG. 13C, by closing both the flow path switching valve 205 and the measurement start valve 206 (measurement start state), the measurement piston 204 starts to move from the upstream side to the downstream side, To start.
  • the above-mentioned piston prober operates without problems.
  • the measurement piston 204 may move from the measurement preparation position even though the measurement start state is not set, that is, although the flow path switching valve 205 and the measurement start valve 206 are both open. This is because, in the case of a large flow rate, the balance between the pressure of the fluid flowing in from the first cylinder inlet 207 and the pressure of the fluid flowing in from the second cylinder inlet 208 is lost, and the measuring piston 204 is pushed downstream. Is considered to be the cause.
  • the measuring cylinder 201 is divided into two chambers by the measuring piston 204, but the fluid flowing in from the second cylinder inlet 208 flows in the direction of the arrow (see FIG. 13B), It is considered that the pressure in the chamber on the second cylinder inlet 208 side is lower than that in the chamber on the first cylinder inlet 207 side.
  • the present invention has been made to improve the above-mentioned point, and the measuring piston is stopped at a predetermined measurement preparation position even in the case of a large flow rate without applying an excessive load to the measuring piston and accurate It is an object of the present invention to provide a piston prober capable of various weighings.
  • a measuring cylinder having an upstream end and a downstream end, a hydraulic cylinder connected to the downstream end of the measuring cylinder, and the upstream when measuring
  • a measuring piston which moves a predetermined distance in the measuring cylinder from the upstream side to the downstream side by the fluid introduced from the end and discharges a fluid of a reference volume; and a piston rod movably accommodated in the hydraulic cylinder;
  • a piston prober in which the measurement piston and the piston rod are separately formed, and includes measurement preparation position stopping means for stopping the measurement piston at a predetermined measurement preparation position on the upstream side, the measurement piston When returning to the predetermined measurement preparation position, the piston rod moves the measurement piston from the downstream side to the upstream side, and the measurement Measuring piston after stopping at the predetermined measurement preparation position, in which is characterized in that said piston rod only from the upstream side is moved to the downstream side accommodated in the hydraulic cylinder.
  • the second technical means is the first technical means, wherein the measurement preparation position stopping means is a first cylinder inflow path connected to the upstream side of the upstream end side circumferential portion of the measurement cylinder, and the upstream end of the measurement cylinder A second cylinder inflow passage connected to the downstream side of the side peripheral portion; a bypass pipe connecting the first cylinder inflow passage and the upstream end cap of the measurement cylinder; and a return valve provided on the bypass pipe
  • the predetermined measurement preparation position is a position of the first cylinder inflow path, and the measurement piston is closed by closing the return valve in a state where the measurement piston blocks the first cylinder inflow path. To stop.
  • a third technical means is the device according to the second technical means, wherein the measurement preparation position stopping means further includes a measurement rod movably provided on an upstream end lid portion of the measurement cylinder, and the return valve is opened. After that, when the measuring rod pushes out the measuring piston, the measuring piston is moved from the upstream side to the downstream side.
  • a fourth technical means wherein the measurement preparation position stopping means is provided at a first cylinder inflow path connected to the upstream end lid portion of the measurement cylinder, and at an upstream end side circumferential portion of the measurement cylinder.
  • the position is the position of the first cylinder inflow path, and the measurement start valve is closed in a state where the measurement piston blocks the first cylinder inflow path, thereby stopping the measurement piston, and the measurement After the start valve is opened, the measurement rod pushes the measurement piston to move the measurement piston from the upstream side to the downstream side.
  • the fifth technical means is the first technical means, wherein the measurement preparation position stopping means is a first cylinder inflow path connected to the upstream side of the upstream end side circumferential portion of the measurement cylinder, and the upstream end of the measurement cylinder A second cylinder inflow path connected to the downstream side of the side peripheral portion, a bypass pipe connecting the first cylinder inflow path and the upstream end lid portion of the measurement cylinder, a return valve provided on the bypass pipe, A measurement start valve provided in the second cylinder inflow path, the predetermined measurement preparation position is a position of the first cylinder inflow path, and the state in which the measurement piston blocks the first cylinder inflow path Then, by closing the return valve and opening the measurement start valve, the measurement piston is stopped, the return valve is opened, and the measurement start valve is closed. It is obtained by and moving to the downstream side.
  • the measurement preparation position stopping means is a first cylinder inflow path connected to the upstream side of the upstream end side circumferential portion of the measurement cylinder, and the upstream end of the measurement
  • a sixth technical means is the first technical means, wherein the measurement preparation position stopping means is a first cylinder inflow path connected to the upstream side of the upstream end side circumferential portion of the measurement cylinder, and the upstream end of the measurement cylinder A second cylinder inflow passage connected to the downstream side of the side peripheral portion; a first measurement start valve provided in the first cylinder inflow passage; and a second measurement start valve provided in the second cylinder inflow passage
  • the predetermined measurement preparation position is an intermediate position between the first cylinder inflow path and the second cylinder inflow path, and the first measurement start valve is closed in a state where the measurement piston is at the intermediate position.
  • a seventh technical means relates to any one of the first to sixth technical means, wherein the measuring piston has a magnetic body embedded in a circumferential direction, and the measuring cylinder has a magnetic embedded in the measuring piston.
  • the apparatus is characterized in that two detection means for detecting a body are separated by the predetermined distance on the upstream side and the downstream side of the measurement cylinder.
  • An eighth technical means is characterized in that, in any one of the first to seventh technical means, the upstream end and the downstream end of the measuring cylinder are provided with a valve which can be opened and closed and which can be opened and closed. It is.
  • the measurement piston can be stopped at a predetermined measurement preparation position even in the case of a large flow rate without applying a load more than necessary to the measurement piston, so that accurate measurement can be performed. be able to.
  • FIG. 1 It is the figure which showed typically the structural example of the piston prober which concerns on the 4th Embodiment of this invention. It is the figure which showed typically the structural example of the piston prober which concerns on the 5th Embodiment of this invention. It is a figure for demonstrating the example of an initial stage operation
  • FIGS. 1 and 2 are views showing an example of the external appearance of a piston prober according to a first embodiment of the present invention.
  • FIG. 1 is a front view
  • FIG. 2 is a top view.
  • 1 is a piston prober
  • 2 is a measuring cylinder
  • 3 is an upstream end
  • 4 is a downstream end
  • 5 and 6 is an air vent valve
  • 7 is a fluid inlet
  • 8 is a fluid outlet
  • 9 is a measuring piston
  • Reference numeral 11 denotes a magnetic switch
  • 12 denotes a hydraulic cylinder
  • 13 denotes a piston rod
  • d1 and d2 denote drains (drain valves).
  • the piston prober 1 has a measuring cylinder 2 in which an upstream end 3 for introducing a fluid and a downstream end 4 for discharging a fluid are formed, a hydraulic cylinder 12 connected to the downstream end of the measuring cylinder 2, and an upstream end at the time of measurement.
  • the measuring piston 9 moves the inside of the measuring cylinder 2 from the upstream side to the downstream side by a predetermined distance L by the fluid introduced from 3 and discharges the fluid of the reference volume, and the piston rod movably accommodated in the hydraulic cylinder 12 And 13.
  • the measuring piston 9 is made of, for example, aluminum, and the measuring cylinder 2 is made of, for example, SUS (stainless steel).
  • a measuring piston 9 is inserted as a moving body, and at the time of measurement, the measuring piston 9 is moved by the fluid pressure of the measuring fluid to discharge the fluid of the reference volume.
  • a piston rod 13 is inserted into the hydraulic cylinder 12, and the piston rod 13 is supported in a fluid-tight manner by a journal bearing (not shown) provided on an outflow side end plate constituting the downstream end 4. Slide on the hydraulic cylinder 12.
  • the air vent valves 5 and 6 and the drains d1 and d2 are valves that can be opened and closed to communicate with the outside air, and are opened and closed as appropriate according to the operating state of the piston prober 1.
  • the piston prober 1 is provided with the measurement preparation position stopping means 14 for stopping the measurement piston 9 at a predetermined measurement preparation position on the upstream side while the measurement piston 9 and the piston rod 13 are separately formed. There is. Then, in the return operation of returning the measurement piston 9 to the predetermined measurement preparation position on the upstream side, the piston rod 13 moves the measurement piston 9 from the downstream side to the upstream side, and the measurement preparation position stopping means 14 measures the measurement piston 9 After stopping at the predetermined measurement preparation position, only the piston rod 13 is moved from the upstream side to the downstream side and accommodated in the hydraulic cylinder 12.
  • the measurement preparation position stopping means 14 of the present embodiment is located downstream of the first cylinder inflow path 141 connected to the upstream side of the upstream end side circumferential portion 3 b of the measuring cylinder 2 and the upstream end side circumferential portion 3 b of the measuring cylinder 2.
  • a second cylinder inflow path 142 to be connected, a bypass pipe 143 connecting the first cylinder inflow path 141 and the upstream end cap 3 a of the measuring cylinder 2, and a return valve 144 provided in the bypass pipe 143 are provided.
  • the predetermined measurement preparation position is the position of the first cylinder inflow path 141, and the measurement piston 9 closes the first cylinder inflow path 141, and the return valve 144 is closed. 9 is stopped at a predetermined measurement preparation position.
  • the measurement piston 9 only needs to close the first cylinder inflow path 141, and may or may not be in contact with the inner surface of the upstream end cover 3a of the measurement cylinder 2.
  • the measurement piston 9 also has a magnetic body 91 embedded in the circumferential direction.
  • the measuring cylinder 2 includes magnetic switches 10 and 11 corresponding to two detecting means for detecting the magnetic body 91 embedded in the measuring piston 9 by a predetermined distance along the longitudinal direction (upstream side and downstream side) of the measuring cylinder 2 Have a position separated by L.
  • the two magnetic switches 10 and 11 detect that the measuring piston 9 has moved a predetermined distance L. That is, the fluid volume discharged by the movement of the measuring piston 9 by the predetermined distance L is the reference volume.
  • the predetermined distance L between the magnetic switches 10 and 11 can be varied, whereby the reference volume can be adjusted.
  • FIG. 3 is a view schematically showing an example of the structure of an assay system including a piston prober according to the present invention.
  • 15 and 16 are magnetic switches
  • 17 is a pneumatic / hydraulic conversion unit
  • 18 is a flow path switching valve
  • 71 is a first cylinder inlet
  • 72 is a second cylinder inlet
  • 81 is a first cylinder outlet
  • 82 is The second cylinder outlet is shown.
  • the fluid inflow port 7 is connected to the first cylinder inflow port 71 via the first cylinder inflow path 141 and is connected to the second cylinder inflow port 72 via the second cylinder inflow path 142.
  • the fluid outlet 8 is also connected to the first cylinder outlet 81 and the second cylinder outlet 82 via the cylinder outlet. Further, the fluid inlet 7 and the fluid outlet 8 are connected via a flow path switching valve 18.
  • the air hydraulic pressure exchange unit 17 is configured to include an air pressure supply source 171, a switching valve 172 such as a four-way solenoid valve, air hydraulic pressure conversion parts 173 and 174, and pressure supply ports 175 and 176.
  • the air pressure supplied from the air pressure supply source 171 is switched at the supply destination by the switching valve 172, and is supplied to the air pressure conversion unit 173 or the air pressure conversion unit 174.
  • the air pressure conversion unit 173 converts the air pressure supplied from the air pressure supply source 171 into an oil pressure, and supplies the converted oil pressure from the pressure supply port 175 into the hydraulic cylinder 12. Thereby, the piston rod 13 moves in the direction approaching the measuring cylinder 2.
  • the air-oil pressure conversion unit 174 converts the air pressure supplied from the air pressure supply source 171 into an oil pressure, and supplies the converted oil pressure from the pressure supply port 176 into the oil pressure cylinder 12.
  • the piston rod 13 moves away from the measuring cylinder 2. That is, the air pressure conversion unit 17 introduces the oil pressure into the oil pressure cylinder 12 or discharges the oil pressure from the oil pressure cylinder 12 by opening and closing the pressure supply ports 175 and 176, and the piston rod 13 in the oil pressure cylinder 12.
  • a hydraulic pump may be used instead of the air-hydraulic conversion unit.
  • a magnetic body (not shown) is embedded in the circumferential direction of the head portion forming the piston rod 13, and this is detected by two magnetic switches 15 and 16 provided on the outer peripheral surface of the hydraulic cylinder 12. The position of the piston rod 13 in the hydraulic cylinder 12 can be identified.
  • the piston rod 13 is accommodated in the hydraulic cylinder 12 except for the return operation of returning the measurement piston 9 to a predetermined measurement preparation position on the upstream side, but in this state, one end side of the piston rod 13 is Since the magnetic switch 16 is in the vicinity, the magnetic switch 16 is turned on. Therefore, if the magnetic switch 16 is in the on state, it is determined that the piston rod 13 is housed in the hydraulic cylinder 12. Further, in the return operation, since the piston rod 13 moves in the direction approaching the measuring cylinder 2, the magnetic switch 16 changes from on to off. That is, if the magnetic switch 16 is in the off state, it is determined that the piston rod 13 protrudes from the hydraulic cylinder 12 to the measuring cylinder 2 by the return operation. When the measurement piston 9 is returned to the measurement preparation position by this return operation, the magnetic switch 15 changes from off to on.
  • the air-oil pressure conversion unit 17 performs appropriate hydraulic control to move or hold the piston rod 13.
  • the measurement piston 9 and the piston rod 13 are separately formed, and the piston rod 13 moves the measurement piston 9 from the downstream side to the upstream side during the return operation. Move to At this time, the flow path switching valve 18 and the return valve 144 both open. Then, the measurement preparation position stopping means 14 stops the measurement piston 9 at a predetermined measurement preparation position on the upstream side. Specifically, with the measurement piston 9 blocking the first cylinder inflow path 141, the return valve 144 is closed from the open state. Thereby, the measuring piston 9 stops at the position of the first cylinder inflow path 141. Here, it is assumed that fluid flows in from the second cylinder inflow path 142. Then, after the measuring piston 9 is stopped, only the piston rod 13 is moved from the upstream side to the downstream side and accommodated in the hydraulic cylinder 12.
  • the measurement piston 9 after movement is stopped at a predetermined measurement preparation position on the upstream side.
  • the flow path switching valve 18 is open and the return valve 144 is closed.
  • the fluid flowing in from the fluid inlet 7 flows into the measuring cylinder 2 from the bypass pipe 143.
  • the pressure of the fluid causes the measuring piston 9 to move downstream and perform metering.
  • FIG. 4 is a view showing a structural example of a measurement piston.
  • the measurement piston 9 includes a magnetic body 91 such as a magnet, a guide ring 92 formed of reinforced Teflon (Teflon (registered trademark)), an O-ring 93 formed of NBR (nitrile rubber) or the like, an omni seal, etc.
  • a seal member 94 and a discarding tap 95 for piston mounting are provided.
  • a measuring piston is provided with a magnetic body and a simple structure of detecting this with a magnetic switch Therefore, the number of manufacturing steps can be reduced.
  • the piston prober 1 is provided with air vent valves (air vent valves) 5 and 6 as an example of a valve that can be opened and closed to both the upstream end and the downstream end of the measuring cylinder 2. Then, it is possible to check the seal between the measurement cylinder 2 and the measurement piston 9 using one of the air release valves 5 and 6.
  • a common seal check method is to check the differential pressure by applying pressure to the gap and checking the leak from the omni seal of the measuring piston and slide (piston) valve automatically each time the measuring piston is in return operation.
  • a differential pressure generator is separately required, and the structure is complicated, which causes troubles and the like.
  • the measuring piston 9 is set at a predetermined position, for example, the most downstream position of the measuring cylinder 2 and pressure is applied from the upstream with the actual liquid to manually operate the air vent valve 6. I am trying to confirm.
  • the measuring piston 9 is set to the predetermined position on the most upstream side of the measuring cylinder 2 by reversing the upstream and the downstream, and applying pressure by the actual liquid from the downstream to manually operate the air vent valve 5 You may make it confirm.
  • seal check method it is possible to confirm the presence or absence of a leak using only the air vent valve of the measurement cylinder without requiring a component such as a differential pressure generator, thus reducing the number of components. In addition, the number of manufacturing steps can be reduced. In addition, at the time of parts replacement at the time of periodic inspection and the like, only the omni seal of the measuring piston may be sufficient, which facilitates maintenance and the like.
  • FIG. 5 is a view schematically showing a structural example of a piston prober according to a second embodiment of the present invention.
  • 5 (A) shows the state where the measurement piston is at the home position
  • FIG. 5 (B) shows the state where the measurement piston is at the measurement preparation position
  • FIG. 5 (C) shows the state where the measurement piston starts weighing. .
  • the measurement piston 9 starts moving and metering starts in the case of a large flow, but if the flow is small, the measurement is performed even if the return valve 144 is opened.
  • the piston may not move and may not start weighing.
  • the measurement preparation position stopping means 14 of the present embodiment further includes a measurement cylinder.
  • a measurement rod 145 movably provided on the two upstream end lids 3a.
  • the measuring rod 145 is made of, for example, aluminum or the like. At the start of measurement, after the return valve 144 is opened, the measurement piston 9 is pushed out by the measurement rod 145 to move the measurement piston 9 from the upstream side to the downstream side. Thereby, even in the case of a small flow rate, the measurement piston 9 can be moved smoothly and the measurement can be started.
  • both the flow path switching valve 18 and the return valve 144 are opened. Then, hydraulic pressure is applied to the piston rod 13 in the hydraulic cylinder 12 to move the piston rod 13, move the measurement piston 9 to a predetermined measurement preparation position on the upstream side, and stop the measurement piston 9 at the measurement preparation position. Specifically, with the measurement piston 9 blocking the first cylinder inflow path 141, the return valve 144 is closed from the open state. As a result, the fluid flows in only from the second cylinder inflow path 142, and the measurement piston 9 stops at the position of the first cylinder inflow path 141. Then, after the measuring piston 9 is stopped, only the piston rod 13 is moved from the upstream side to the downstream side and accommodated in the hydraulic cylinder 12. The state at this time is shown in FIG. 5 (B).
  • the measurement piston 9 is stopped at the predetermined measurement preparation position on the upstream side.
  • the flow path switching valve 18 is open and the return valve 144 is closed.
  • the measurement is started, as shown in FIG. 5C, by closing the flow path switching valve 18 and opening the return valve 144, the fluid flowing in from the fluid inflow port 7 from the bypass pipe 143 It flows into the measuring cylinder 2.
  • the measuring piston 9 may be pushed out by the measuring rod 145. As a result, the measuring piston 9 moves downstream and performs metering.
  • FIG. 6 is a view schematically showing a structural example of a piston prober according to a third embodiment of the present invention.
  • the measurement preparation position stopping means 14 is connected to the first cylinder inflow passage 146 connected to the upstream end lid 3 a of the measurement cylinder 2 and to the second end peripheral side 3 b of the measurement cylinder 2.
  • a cylinder inflow passage 147, a measurement start valve 148 provided in the first cylinder inflow passage 146, and a measurement rod 149 provided movably on the upstream end lid 3a of the measurement cylinder 2 are provided.
  • the predetermined measurement preparation position for stopping the measurement piston 9 is the position of the first cylinder inflow path 146, and the measurement start valve 148 is closed with the measurement piston 9 blocking the first cylinder inflow path 146.
  • the measurement piston 9 is stopped and the measurement start valve 148 is opened, and then the measurement rod 149 pushes the measurement piston 9 to move the measurement piston 9 from the upstream side to the downstream side.
  • the flow passage switching valve 18 is opened, and in the movement state of the measurement piston 9, the flow passage switching valve 18 is closed.
  • the measuring piston 9 stops in a posture in contact with the inner surface of the upstream end lid 3 a of the measuring cylinder 2.
  • the measurement start valve 148 is provided in the first cylinder inflow passage 146 instead of the return valve. Further, since the first cylinder inflow passage 146 is directly connected to the upstream end lid 3a of the measuring cylinder 2, the bypass pipe is not necessary.
  • the measurement preparation position stopping means 14 includes a first cylinder inflow passage 146 'connected to the upstream side of the upstream end lid side peripheral part 3b of the measurement cylinder 2 and an upstream end side peripheral part of the measurement cylinder 2.
  • a second cylinder inflow passage 147 connected to the downstream side of 3b, a measurement start valve 148 provided in the first cylinder inflow passage 146 ′, and a measurement rod movably provided on the upstream end cover 3a of the measurement cylinder 2
  • a bypass pipe 150 connecting the first cylinder inflow path 146 ′ and the upstream end cap 3 a of the measuring cylinder 2.
  • the measurement start valve 148 is closed to stop the measurement piston 9 and open the measurement start valve 148, and then the measurement rod By pushing the measuring piston 9 out, the measuring piston 9 is moved from the upstream side to the downstream side.
  • the flow passage switching valve 18 is opened, and in the movement state of the measurement piston 9, the flow passage switching valve 18 is closed.
  • FIG. 7 is a view schematically showing a structural example of a piston prober according to a fourth embodiment of the present invention.
  • the measurement preparation position stopping means 14 is connected to the first cylinder inflow path 151 connected to the upstream side of the upstream end side circumferential portion 3 b of the measurement cylinder 2 and to the second side connected to the downstream side of the upstream end side circumferential portion 3 b of the measurement cylinder 2.
  • a measurement start valve 153 provided.
  • the predetermined measurement preparation position for stopping the measurement piston 9 is the position of the first cylinder inflow path 151.
  • the measurement piston 9 closing the first cylinder inflow path 151, the measurement piston 9 is stopped by closing the return valve 155 and opening the measurement start valve 153. Further, the measurement piston 9 is moved from the upstream side to the downstream side by opening the return valve 155 and closing the measurement start valve 153.
  • the flow passage switching valve 18 is opened, and in the movement state of the measurement piston 9, the flow passage switching valve 18 is closed.
  • the measurement rod for pushing out the measurement piston 9 is not necessary, and the operation of stopping and moving the measurement piston 9 is performed by controlling the opening and closing of the measurement start valve 153 and the opening and closing of the return valve 155.
  • FIG. 8 is a view schematically showing a structural example of a piston prober according to a fifth embodiment of the present invention.
  • the measurement preparation position stopping means 14 is connected to the first cylinder inflow passage 156 connected to the upstream side of the upstream end side circumferential portion 3 b of the measuring cylinder 2 and to the second side connected to the downstream side of the upstream end side circumferential portion 3 b of the measuring cylinder 2.
  • a cylinder inflow path 157, a first measurement start valve 158 provided in the first cylinder inflow path 156, and a second measurement start valve 159 provided in the second cylinder inflow path 157 are provided.
  • the predetermined measurement preparation position for stopping the measurement piston 9 is an intermediate position between the first cylinder inflow path 156 and the second cylinder inflow path 157. With the measurement piston 9 at this intermediate position, the measurement piston 9 is stopped by closing the first measurement start valve 158 and opening the second measurement start valve 159. Also, the measurement piston 9 is moved from the upstream side to the downstream side by opening the first measurement start valve 158 and closing the second measurement start valve 159. In the stop state of the measurement piston 9, the flow passage switching valve 18 is opened, and in the movement state of the measurement piston 9, the flow passage switching valve 18 is closed.
  • the measurement rod for pushing out the measurement piston 9, the bypass pipe, and the return valve are unnecessary, and the opening and closing of the two measurement start valves 158 and 159 are controlled to stop and move the measurement piston 9. Configured to perform an action.
  • FIG. 9 to 12 are diagrams for explaining an operation example of a piston prober according to the present invention.
  • FIG. 9 illustrates the initial operation
  • FIG. 10 illustrates the return operation
  • FIG. 11 illustrates the measurement preparation operation
  • FIG. 12 illustrates the measurement operation.
  • 2nd Embodiment FIG. 5
  • 2nd Embodiment FIG. 5
  • movement is the same also in another embodiment. .
  • the piston prober 1 starts passing the fluid from the fluid inlet 7, and when the measurement piston 9 is at the most upstream position (measurement preparation position) P 1, the flow path switching valve 18 Is closed, and the return valve 144 is opened to allow fluid to flow from the second cylinder inflow path 142 and the bypass pipe 143.
  • the measuring piston 9 is moved downstream by the fluid pressure.
  • the measuring piston 9 may be pushed out by the measuring rod 145.
  • the state shown in FIG. 9A is based on the premise that the measurement cylinder 2 is not filled with fluid.
  • the flow path switching valve 18 is closed and the return valve 144 is opened, and the second cylinder inlet 142, the bypass pipe 143, and the first The fluid is allowed to flow from the cylinder inflow path 141.
  • the measurement piston 9 is moved downstream by the fluid pressure.
  • the state of FIG. 9B is also based on the premise that the fluid is not filled in the measuring cylinder 2.
  • the measurement piston 9 moved as described above is set at the downstream home position P3 as shown in FIG. 9 (C).
  • the return valve 144 is already open in either of the cases of FIGS. 9A and 9B, and therefore remains open in FIG. 9C. In either case, the flow path switching valve 18 remains closed.
  • the measuring piston 9 is held at a substantially intermediate position between the first cylinder outlet 81 and the second cylinder outlet 82.
  • the flow path switching valve 18 is opened in a state where the measurement piston 9 is set at the home position P3. Then, oil pressure is applied to the piston rod 13 from the pressure supply port 175, and as shown in FIGS. 10B and 10C, the piston rod 13 is moved to move the measuring piston 9 to the home positions P3 to P4 and the upstream side.
  • the measurement preparation position stopping means 14 stops the measurement piston 9 at the measurement preparation position P1.
  • the return valve 144 is closed in a state where the measurement piston 9 blocks the first cylinder inlet 71.
  • the magnetic switch 16 changes from on to off.
  • the magnetic switch 15 is turned on from off, it is determined that the measurement piston 9 has moved to the measurement preparation position P1.
  • the measurement piston 9 is held at the position of the first cylinder inlet 71.
  • the piston rod from the pressure supply port 176 is reverse to the case of FIG.
  • the hydraulic pressure is applied to 13, and the piston rod 13 is returned to the original position in the hydraulic cylinder 12, as shown in FIGS. 11 (A) and 11 (B).
  • the flow-path switching valve 18 is closed, and measurement preparation is complete
  • the measuring cylinder 2 is filled with fluid.
  • the magnetic switch 15 changes from on to off.
  • the magnetic switch 16 is turned on from off, it is determined that the piston rod 13 has returned to its original position in the hydraulic cylinder 12.
  • the measurement piston 9 is moved downstream by fluid pressure as shown in FIG. 12 (A).
  • the measuring piston 9 may be pushed out by the measuring rod 145.
  • the magnetic switch 10 is turned on, and the measurement is started from here.
  • the measurement piston 9 moves further through the position P6, and as shown in FIG. 12C, the magnetic switch 11 is turned on when the measurement piston 9 reaches the position P7. Be done.
  • the measurement ends as the measurement piston 9 discharges the fluid of the reference volume.
  • the measurement piston 9 is set to the home position P3 shown in FIG. 9C described above, and thereafter, the return operation of FIG. 10, the measurement preparation operation of FIG. 11 and the measurement operation of FIG. Be done.
  • the measuring piston and the piston rod are separate structures, it is possible to move the inside of the measuring cylinder smoothly without applying an excessive load to the measuring piston at the time of measurement. Furthermore, since the measurement piston can be reliably stopped at the predetermined measurement preparation position, accurate measurement can be performed. In addition, since the structure is simpler than that of the conventional product, the number of parts can be reduced and cost reduction can be realized.
  • Piston rod, 14 ... Measurement preparation position stopping means, 141 , 146, 146 ', 151, 156 ... first cylinder inflow path 142, 147, 152, 157 ... second cylinder inflow path 143, 150, 154 ... bypass pipe 144, 155 ... return valve, 1 5, 149: Measuring rod, 148, 153, 158, 159: Measurement start valve, 17: Air pressure conversion unit, 171: Air pressure supply source, 172: Switching valve, 173, 174: Air pressure conversion unit, 175, 176 ... Supply pressure port, 18 ... flow passage switching valve.

Landscapes

  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Actuator (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Testing Or Measuring Of Semiconductors Or The Like (AREA)
  • Measuring Volume Flow (AREA)

Abstract

 プルーバ(1)は、計測シリンダ(2)と、計測シリンダ(2)の下流端側と連結された油圧シリンダ(12)と、計測シリンダ(2)内を上流側から下流側に向けて所定距離移動して基準体積の流体を排出する計測ピストン(9)と、油圧シリンダ(12)に移動可能に収容されたピストンロッド(13)とを備え、計測ピストン(9)とピストンロッド(13)とが別体で形成される。プルーバ(1)は、計測準備位置停止手段(14)を備え、計測ピストン(9)を所定の計測準備位置に戻す際に、ピストンロッド(13)が計測ピストン(9)を下流側から上流側に移動させ、計測準備位置停止手段(14)が計測ピストン(9)を所定の計測準備位置に停止させた後に、ピストンロッド(13)のみを上流側から下流側に移動させて油圧シリンダ(12)内に収容する。

Description

ピストンプルーバ
 本発明は、ピストンプルーバに関し、より詳細には、流量計の精度を検定するための基準体積の小さいピストンプルーバに関する。
 流量計を検定するための検定装置とは、新規に製作された流量計や使用中の流量計を、温度、圧力等の外部要因又は可動部摩耗等の内部要因などによる特性の変化に対して信頼できる精度で使用するために、定期的に又は任意のタイミングで特性試験を行うための装置である。この特性試験は、大別すると、被試験流量計を固定試験装置に介装して試験を行なうキャリブレータにより、あるいは、流量計を流体システム内に介装して試験を行なうプルーバ方式の流量計試験装置により行われる。
 プルーバ方式は、流量計の特性試験をオンラインで行なうことができ、また、必要に応じて任意の特性試験を行なうことができるため、特に配管影響を受け易い推測形の流量計、例えばタービンメータの試験に多く使用されている。プルーバでは、ピストン等の移動体が断面一定な管体内を流体と同期して移動し、この移動体の所定区間移動で排出される流体が基準体積と規定される。
 プルーバ方式による流量計の特性試験では、プルーバに規定された基準体積の流体が流通するときの流量計の読み、すなわち、流量計から発信される流量パルスの数を検知することにより、単位体積当りに発信される流量パルスの数(流量係数)、いわゆるKファクタが算出される。また、必要により複数の被測流量において、流量係数に基づいて連続した流量特性曲線が求められる。
 流量係数を高分解能で求めるためには、基準体積当りに発信される流量パルスの数が所定数以上であることが必要で、例えば基準体積の大きい大型の据置き型プルーバの場合は10,000パルス以上の規定数が与えられる。これに対して基準体積を小さくすると、規定数以上の流量パルスを発信できないが、ピストン等の移動体が移動することで排出される流体の基準体積と、この間に流量計から発信される発信パルス(時間)との関係から流量係数を求めることができる。従って、流量パルス数が少ない場合でも小型のプルーバ(スモールボリュームプルーバ)を適用できる。
 上記のスモールボリュームプルーバ(以下、SVPという)において、移動体にピストンを用いたピストンプルーバが知られている。このピストンプルーバは、基本的には被試験流量計と直列に接続された断面一定な計測シリンダを有し、その計測シリンダ内で移動するピストンが一定距離を移動したとき、輸液される流体の体積と流量計の読みとを比較するものである。実際には、流体の体積はピストンの移動量から求められる。プルービングにおいては、通常、複数回の試験結果を平均し、平均値に基づいて流量係数(Kファクタ)が算出される。このため、各々の観測流量につき、計測シリンダ内でのピストンは試験回数だけ往復移動する。
 計測シリンダ内でピストンを規定区間移動させ、計測を完了してからピストンを再びもとの位置に戻すには、油圧又は空気圧を用いたアクチュエータでピストンロッドを介してピストンを流体の流れに抗して駆動させるが、この間に流体を流通させるための流路は、計測シリンダ自体を利用する場合と、計測シリンダに並列で別に設けられたバイパス流路を利用する場合とがある。計測シリンダに流体を流通させる場合は、アクチュエータで戻されるピストン内に弁機能を設け、計測時に閉弁させ、ピストンを戻す際に開弁させる。この方式を内弁方式と呼ぶ。また、バイパス流路に流体を流通させる場合は、バイパス流路内にバイパス弁を設け、計測時に閉弁させ、戻す際に開弁させる。この方式を外弁方式と呼ぶ。
 このようなSVPは、通常、計測ピストンとピストンロッドとが一体的に固定される構造であるため、計測ピストンが回転する方向に圧力を受けた場合などに、ピストンロッドが抵抗となって回転を妨げ、計測ピストンに負荷をかけてしまうという問題がある。そして、この計測ピストンに必要以上に負荷がかかると、計測ピストンが計測シリンダ内をスムーズに移動できず、正確な計量を行うことができなくなる。
 これに対して、例えば、特許文献1に記載のピストンプルーバが提案されている。このピストンプルーバは、計測ピストンとピストンロッドとが別体で形成され、計測ピストンを所定の計測準備位置に戻す際に、ピストンロッドが計測ピストンを下流側から上流側に移動させる。計測ピストンを所定の計測準備位置にセットした後に、ピストンロッドのみを上流側から下流側に移動させて油圧シリンダ内に収容する。これにより、計測ピストンへの負荷の軽減を図っている。
特許第4782236号公報
 図13は、特許文献1に記載のピストンプルーバの動作を説明するための模式図である。図13(A)は計測ピストンがホームポジションにある状態を示し、図13(B)は計測ピストンが計量準備位置にある状態を示し、図13(C)は計測ピストンが計量開始した状態を示す。図中、200はピストンプルーバで、ピストンプルーバ200は、計測シリンダ201、油圧シリンダ202、ピストンロッド203、計測ピストン204、流路切替弁205、計測開始弁206、第1シリンダ流入口207、第2シリンダ流入口208を備える。上記したように、ピストンロッド203と計測ピストン204とは別体で形成されている。
 図13(A)において、計測ピストン204がホームポジションにセットされた状態で、流路切替弁205、計測開始弁206を共に開にする。そして、油圧シリンダ202内のピストンロッド203に油圧をかけ、ピストンロッド203を移動させ、計測ピストン204を上流側の所定の計測準備位置まで移動させ、計測ピストン204を計測準備位置にセットする。このときの状態を図13(B)に示す。なお、ピストンロッド203は油圧シリンダ202内の元の位置に戻されているものとする。
 図13(B)に示すように、所定の計測準備位置は、第1シリンダ流入口207と第2シリンダ流入口208との中間位置となる。そして、流路切替弁205及び計測開始弁206は共に開であるため、計測ピストン204は、第1シリンダ流入口207から流入する流体の圧力と、第2シリンダ流入口208から流入する流体の圧力とのバランスにより計測準備位置に保持される。そして、図13(C)に示すように、流路切替弁205及び計測開始弁206を共に閉(計量開始状態)にすることで、計測ピストン204は上流側から下流側に移動をはじめ、計量を開始する。
 しかしながら、上記のピストンプルーバは、流量が比較的少ない場合には問題なく動作するが、例えば、シリンダ径の大小にもよるが、流速が1m/s以上になるような大流量を流すと、計量開始状態でない、つまり、流路切替弁205及び計測開始弁206が共に開であるにもかかわらず、計測ピストン204が計測準備位置から動いてしまう場合がある。これは、大流量の場合、第1シリンダ流入口207から流入する流体の圧力と、第2シリンダ流入口208から流入する流体の圧力とのバランスが崩れ、計測ピストン204を下流側に押し出してしまうことが原因と考えられる。より具体的には、計測シリンダ201は、計測ピストン204によって2つの部屋に区切られるが、第2シリンダ流入口208から流入する流体は矢印の方向(図13(B)を参照)に流れるため、第2シリンダ流入口208側の部屋のほうが第1シリンダ流入口207側の部屋よりも圧力が低くなると考えられる。
 本発明は、上述の点を改良すべくなされたもので、計測ピストンに必要以上の負荷をかけず、さらに、大流量の場合であっても計測ピストンを所定の計測準備位置に停止させ、正確な計量を可能とするピストンプルーバを提供することを目的とする。
 上記課題を解決するために、本発明の第1の技術手段は、上流端及び下流端が形成された計測シリンダと、該計測シリンダの下流端側と連結された油圧シリンダと、計測時に前記上流端から流入された流体により前記計測シリンダ内を上流側から下流側に向けて所定距離移動して基準体積の流体を排出する計測ピストンと、前記油圧シリンダに移動可能に収容されたピストンロッドとを備え、前記計測ピストンと前記ピストンロッドとが別体で形成されたピストンプルーバであって、前記計測ピストンを上流側の所定の計測準備位置に停止させる計測準備位置停止手段を備え、前記計測ピストンを前記所定の計測準備位置に戻す際に、前記ピストンロッドが前記計測ピストンを下流側から上流側に移動させ、前記計測準備位置停止手段が前記計測ピストンを前記所定の計測準備位置に停止させた後に、前記ピストンロッドのみを上流側から下流側に移動させて前記油圧シリンダ内に収容することを特徴としたものである。
 第2の技術手段は、第1の技術手段において、前記計測準備位置停止手段は、前記計測シリンダの上流端側周部の上流側に接続する第1シリンダ流入路と、前記計測シリンダの上流端側周部の下流側に接続する第2シリンダ流入路と、前記第1シリンダ流入路と前記計測シリンダの上流端蓋部とを接続するバイパス管と、該バイパス管に設けられたリターン弁とを備え、前記所定の計測準備位置は、前記第1シリンダ流入路の位置であり、前記計測ピストンが前記第1シリンダ流入路を塞いだ状態で、前記リターン弁を閉にすることにより、前記計測ピストンを停止させることを特徴としたものである。
 第3の技術手段は、第2の技術手段において、前記計測準備位置停止手段は、さらに、前記計測シリンダの上流端蓋部に移動可能に設けられた計測ロッドを備え、前記リターン弁を開にした後に、前記計測ロッドが前記計測ピストンを押し出すことにより、前記計測ピストンを上流側から下流側に移動させることを特徴としたものである。
 第4の技術手段は、第1の技術手段において、前記計測準備位置停止手段は、前記計測シリンダの上流端蓋部に接続する第1シリンダ流入路と、前記計測シリンダの上流端側周部に接続する第2シリンダ流入路と、前記第1シリンダ流入路に設けられた計測開始弁と、前記計測シリンダの上流端蓋部に移動可能に設けられた計測ロッドとを備え、前記所定の計測準備位置は、前記第1シリンダ流入路の位置であり、前記計測ピストンが前記第1シリンダ流入路を塞いだ状態で、前記計測開始弁を閉にすることにより、前記計測ピストンを停止させ、前記計測開始弁を開にした後に、前記計測ロッドが前記計測ピストンを押し出すことにより、前記計測ピストンを上流側から下流側に移動させることを特徴としたものである。
 第5の技術手段は、第1の技術手段において、前記計測準備位置停止手段は、前記計測シリンダの上流端側周部の上流側に接続する第1シリンダ流入路と、前記計測シリンダの上流端側周部の下流側に接続する第2シリンダ流入路と、前記第1シリンダ流入路と前記計測シリンダの上流端蓋部とを接続するバイパス管と、該バイパス管に設けられたリターン弁と、前記第2シリンダ流入路に設けられた計測開始弁とを備え、前記所定の計測準備位置は、前記第1シリンダ流入路の位置であり、前記計測ピストンが前記第1シリンダ流入路を塞いだ状態で、前記リターン弁を閉、前記計測開始弁を開にすることにより、前記計測ピストンを停止させ、前記リターン弁を開、前記計測開始弁を閉にすることにより、前記計測ピストンを上流側から下流側に移動させることを特徴としたものである。
 第6の技術手段は、第1の技術手段において、前記計測準備位置停止手段は、前記計測シリンダの上流端側周部の上流側に接続する第1シリンダ流入路と、前記計測シリンダの上流端側周部の下流側に接続する第2シリンダ流入路と、前記第1シリンダ流入路に設けられた第1計測開始弁と、前記第2シリンダ流入路に設けられた第2計測開始弁とを備え、前記所定の計測準備位置は、前記第1シリンダ流入路と前記第2シリンダ流入路との中間位置であり、前記計測ピストンが前記中間位置にある状態で、前記第1計測開始弁を閉、前記第2計測開始弁を開にすることにより、前記計測ピストンを停止させ、前記第1計測開始弁を開、前記第2計測開始弁を閉にすることにより、前記計測ピストンを上流側から下流側に移動させることを特徴としたものである。
 第7の技術手段は、第1~第6のいずれか1の技術手段において、前記計測ピストンは、周方向に埋め込んだ磁性体を有し、前記計測シリンダは、前記計測ピストンに埋め込まれた磁性体を検知する2つの検知手段を、前記計測シリンダの上流側と下流側に前記所定距離離して有することを特徴としたものである。
 第8の技術手段は、第1~第7のいずれか1の技術手段において、前記計測シリンダの上流端及び下流端の両方に開閉可能な外気に連通する弁を備えたことを特徴としたものである。
 本発明によれば、計測ピストンに必要以上の負荷をかけることがなく、さらに、大流量の場合であっても計測ピストンを所定の計測準備位置に停止させることができるため、正確な計量を行うことができる。
本発明の第1の実施形態に係るピストンプルーバの外観構造例を示す正面図である。 本発明の第1の実施形態に係るピストンプルーバの外観構造例を示す上面図である。 本発明の第1の実施形態に係るピストンプルーバを含む検定システムの構造例を模式的に示した図である。 計測ピストンの構造例を示す図である。 本発明の第2の実施形態に係るピストンプルーバの構造例を模式的に示した図である。 本発明の第3の実施形態に係るピストンプルーバの構造例を模式的に示した図である。 本発明の第4の実施形態に係るピストンプルーバの構造例を模式的に示した図である。 本発明の第5の実施形態に係るピストンプルーバの構造例を模式的に示した図である。 本発明によるピストンプルーバの初期動作例を説明するための図である。 本発明によるピストンプルーバのリターン動作例を説明するための図である。 本発明によるピストンプルーバの計量準備動作例を説明するための図である。 本発明によるピストンプルーバの計量動作例を説明するための図である。 特許文献1に記載のピストンプルーバの動作を説明するための模式図である。
 以下、添付図面を参照しながら、本発明のピストンプルーバに係る好適な実施の形態について説明する。
(第1の実施形態)
 図1,2は、本発明の第1の実施形態に係るピストンプルーバの外観構造例を示す図である。図1は正面図、図2は上面図である。図中、1はピストンプルーバ、2は計測シリンダ、3は上流端、4は下流端、5,6は空気抜き弁、7は流体流入口,8は流体流出口、9は計測ピストン、10,11は磁気スイッチ、12は油圧シリンダ、13はピストンロッド、d1,d2はドレイン(排水弁)を示す。
 ピストンプルーバ1は、流体を流入させる上流端3及び流体を流出させる下流端4が形成された計測シリンダ2と、計測シリンダ2の下流端側と連結された油圧シリンダ12と、計測時に上流端3から流入された流体により計測シリンダ2内を上流側から下流側に向けて所定距離L移動して基準体積の流体を排出する計測ピストン9と、油圧シリンダ12に移動可能に収容されたピストンロッド13とを備える。計測ピストン9は例えばアルミで形成され、計測シリンダ2は例えばSUS(ステンレス)などで形成される。
 計測シリンダ2内には、移動体として計測ピストン9が嵌挿され、この計測ピストン9が計測時に測定流体の流体圧により移動され基準体積の流体を排出する。油圧シリンダ12内には、ピストンロッド13が嵌挿され、このピストンロッド13は、下流端4を構成する流出側端面板に設けられたジャーナル軸受(図示せず)により液密に軸承された状態で油圧シリンダ12に摺動する。空気抜き弁5,6及びドレインd1,d2は開閉可能な外気に連通する弁であり、ピストンプルーバ1の動作状態に応じて適宜開閉される。
 本発明によるピストンプルーバ1は、計測ピストン9とピストンロッド13とが別体で形成されると共に、計測ピストン9を上流側の所定の計測準備位置に停止させる計測準備位置停止手段14を備えている。そして、計測ピストン9を上流側の所定の計測準備位置に戻すリターン動作の際に、ピストンロッド13が計測ピストン9を下流側から上流側に移動させ、計測準備位置停止手段14が計測ピストン9を所定の計測準備位置に停止させた後に、ピストンロッド13のみを上流側から下流側に移動させて油圧シリンダ12内に収容する構造である。
 本実施形態の計測準備位置停止手段14は、計測シリンダ2の上流端側周部3bの上流側に接続する第1シリンダ流入路141と、計測シリンダ2の上流端側周部3bの下流側に接続する第2シリンダ流入路142と、第1シリンダ流入路141と計測シリンダ2の上流端蓋部3aとを接続するバイパス管143と、バイパス管143に設けられたリターン弁144とを備える。本例の場合、所定の計測準備位置は第1シリンダ流入路141の位置であり、計測ピストン9が第1シリンダ流入路141を塞いだ状態で、リターン弁144を閉にすることにより、計測ピストン9を所定の計測準備位置に停止させる。なお、計測ピストン9は、第1シリンダ流入路141を塞いでいればよく、計測シリンダ2の上流端蓋部3aの内面に接していても、接していなくてもよい。
 また、計測ピストン9は、周方向に埋め込んだ磁性体91を有する。計測シリンダ2は、計測ピストン9に埋め込まれた磁性体91を検知する2つの検知手段に相当する磁気スイッチ10,11を、計測シリンダ2の長手方向(上流側と下流側)に沿って所定距離Lだけ離した位置に有する。これら2つの磁気スイッチ10,11により、計測ピストン9が所定距離Lを移動したことを検知する。すなわち、計測ピストン9の所定距離L移動で排出される流体体積が基準体積となる。なお、磁気スイッチ10,11間の所定距離Lは可変でき、これにより基準体積を調整可能である。
 図3は、本発明によるピストンプルーバを含む検定システムの構造例を模式的に示した図である。図中、15,16は磁気スイッチ、17は空油圧変換ユニット、18は流路切替弁、71は第1シリンダ流入口、72は第2シリンダ流入口、81は第1シリンダ流出口、82は第2シリンダ流出口を示す。流体流入口7は、第1シリンダ流入路141を介して第1シリンダ流入口71と接続され、第2シリンダ流入路142を介して第2シリンダ流入口72と接続される。また、流体流出口8も同様にシリンダ流出路を介して第1シリンダ流出口81及び第2シリンダ流出口82に接続される。また、流体流入口7と流体流出口8とは流路切替弁18を介して接続される。
 空油圧交換ユニット17は、空気圧供給源171、四方向電磁弁などの切替弁172、空油圧変換部173,174、給圧口175,176を備えて構成される。空気圧供給源171からの空気圧は、切替弁172で供給先が切り替えられ、空油圧変換部173あるいは空油圧変換部174に供給される。空油圧変換部173は、空気圧供給源171から供給された空気圧を油圧に変換し、変換した油圧を給圧口175から油圧シリンダ12内に供給する。これにより、ピストンロッド13は計測シリンダ2に近づく方向に移動する。
 同様に、空油圧変換部174は、空気圧供給源171から供給された空気圧を油圧に変換し、変換した油圧を給圧口176から油圧シリンダ12内に供給する。これにより、ピストンロッド13は計測シリンダ2から離れる方向に移動する。つまり、空油圧変換ユニット17は、給圧口175,176の開閉により、油圧シリンダ12内に油圧を導入し、あるいは、油圧シリンダ12内から油圧を排出して、油圧シリンダ12内のピストンロッド13を移動又は保持するための装置である。なお、計測シリンダの口径によっては、空油圧変換ユニットに代えて油圧ポンプを用いてもよい。
 また、ピストンロッド13を形成するヘッド部の周方向には、図示しない磁性体が埋め込まれており、これを油圧シリンダ12の外周面に設けられた2つの磁気スイッチ15,16で検出することで、ピストンロッド13が油圧シリンダ12のどの位置にあるのかを特定することができる。
 具体的には、計測ピストン9を上流側の所定の計測準備位置に戻すリターン動作以外では、ピストンロッド13は油圧シリンダ12内に収容された状態となるが、この状態ではピストンロッド13の一端側が磁気スイッチ16の近傍にあるため、磁気スイッチ16がオン状態となる。従って、磁気スイッチ16がオン状態であれば、ピストンロッド13が油圧シリンダ12内に収容された状態と特定される。また、上記リターン動作では、ピストンロッド13が計測シリンダ2に近づく方向に移動するため、磁気スイッチ16がオンからオフに変化する。つまり、磁気スイッチ16がオフ状態であれば、リターン動作によりピストンロッド13が油圧シリンダ12から計測シリンダ2に突出した状態と特定される。そして、このリターン動作により計測ピストン9を計測準備位置まで戻したときに、磁気スイッチ15がオフからオンに変化する。
 上記のように、油圧シリンダ12内におけるピストンロッド13の状態に応じて空油圧変換ユニット17が適切な油圧制御を行い、ピストンロッド13を移動あるいは保持する。
 上記の通り、本実施形態のピストンプルーバ1は、計測ピストン9とピストンロッド13とが別体で形成されており、リターン動作の際に、ピストンロッド13が計測ピストン9を下流側から上流側に移動させる。このとき、流路切替弁18及びリターン弁144は共に開となる。そして、計測準備位置停止手段14は、計測ピストン9を上流側の所定の計測準備位置に停止させる。具体的には、計測ピストン9が第1シリンダ流入路141を塞いだ状態で、リターン弁144を開から閉にする。これにより、計測ピストン9は第1シリンダ流入路141の位置に停止する。なお、第2シリンダ流入路142からは流体が流入しているものとする。そして、計測ピストン9を停止させた後に、ピストンロッド13のみを上流側から下流側に移動させて油圧シリンダ12内に収容する。
 上記により、移動後の計測ピストン9は、上流側の所定の計測準備位置に停止されている。この状態では、流路切替弁18が開で、リターン弁144が閉である。そして、計測を開始する場合、流路切替弁18を閉、リターン弁144を開にすることで、流体流入口7から流入される流体がバイパス管143から計測シリンダ2内に流入する。この流体の圧力により計測ピストン9が下流側に移動し計量を行う。
 上記の構造を採用することで、計測中に計測ピストン9が回転等した場合であっても、計測ピストン9に必要以上の負荷がかからず、計測ピストン9が計測シリンダ2内をスムーズに移動することができ、さらに、大流量の場合であっても計測ピストン9を所定の計測準備位置に確実に停止させることができるため、正確な計量を行うことができる。また、前述の図13の構造では、第2シリンダ流入路に大型で高価な計測開始弁を設けていたが、本実施形態の構造では、この計測開始弁の代わりに小型で安価なリターン弁144を設ければよいため、コスト面でも有利となる。
 図4は、計測ピストンの構造例を示す図である。計測ピストン9は、磁石等の磁性体91と、強化テフロン(テフロン:登録商標)等で形成されたガイドリング92と、NBR(ニトリルゴム)等で形成されたOリング93と、オムニシールなどのシール材94と、ピストン装着用棄てタップ95とを備える。従来のディテクタ信号の検出方法では、計測ピストンに固定されているピストンロッドをインバー材で形成し、このインバー材に溝を切ったり、インバー全体にセラミックコーティングする必要があった。このため、コーティング表面研磨や、ディテクタスイッチの取り付けなどの加工が必要となり、製造工数がかかっていたが、本発明では、計測ピストンに磁性体を備え、これを磁気スイッチで検知するという簡単な構造としたため、製造工数を削減することが可能となる。
 また、図3において、ピストンプルーバ1は、計測シリンダ2の上流端及び下流端の両方に開閉可能な外気に連通する弁の一例として、空気抜き弁(エアーベント弁)5,6を備える。そして、空気抜き弁5,6のいずれか一方を用いて計測シリンダ2と計測ピストン9との間のシールチェックを可能とした。一般的なシールチェック方法は、計測ピストンがリターン動作中、毎回自動的に計測ピストン、スライド(ピストン)弁のオムニシールからの漏れを、隙間に圧力をかけて差圧を確認するようになっていた。この場合、差圧発生装置を別途必要とし、構造が複雑で故障等のトラブルの原因にもなっていた。
 本実施形態のシールチェック方法では、計測ピストン9を計測シリンダ2の例えば最下流の所定の位置にセットし、上流から実液による圧力をかけて、空気抜き弁6を手動操作することにより、漏れの確認を行うようにしている。また、上流と下流を逆にして、計測ピストン9を計測シリンダ2の最上流の所定の位置にセットし、下流から実液による圧力をかけて、空気抜き弁5を手動操作することにより、漏れの確認を行うようにしてもよい。
 このように、上記のシールチェック方法によれば、差圧発生装置などの部品を必要とせず、計測シリンダの空気抜き弁のみを用いて漏れの有無を確認することができるため、部品点数を削減すると共に、製造工数を減らすことができる。また、定期点検時等の部品交換では、計測ピストンのオムニシールのみでよいため、メンテナンス等が容易となる。
(第2の実施形態)
 図5は、本発明の第2の実施形態に係るピストンプルーバの構造例を模式的に示した図である。図5(A)は計測ピストンがホームポジションにある状態を示し、図5(B)は計測ピストンが計量準備位置にある状態を示し、図5(C)は計測ピストンが計量開始した状態を示す。上述の第1の実施形態では、大流量の場合、リターン弁144を開にすれば、計測ピストン9が動き出し、計量を開始するが、小流量の場合、リターン弁144を開にしても、計測ピストンが動き出さず、計量を開始しない場合がある。そこで、これを改善するために、本実施形態の計測準備位置停止手段14は、第1シリンダ流入路141、第2シリンダ流入路142、バイパス管143、及びリターン弁144に加え、さらに、計測シリンダ2の上流端蓋部3aに移動可能に設けられた計測ロッド145を有する。
 この計測ロッド145は、例えばアルミなどで形成される。計量開始の際に、リターン弁144を開にした後に、計測ロッド145により計測ピストン9を押し出すことにより、計測ピストン9を上流側から下流側に移動させる。これにより、小流量の場合であっても、計測ピストン9をスムーズに移動させ、計量を開始することができる。
 図5(A)において、計測ピストン9がホームポジションにセットされた状態で、流路切替弁18、リターン弁144を共に開にする。そして、油圧シリンダ12内のピストンロッド13に油圧をかけ、ピストンロッド13を移動させ、計測ピストン9を上流側の所定の計測準備位置まで移動させ、計測ピストン9を計測準備位置に停止させる。具体的には、計測ピストン9が第1シリンダ流入路141を塞いだ状態で、リターン弁144を開から閉にする。これにより、第2シリンダ流入路142からのみ流体が流入している状態となり、計測ピストン9は第1シリンダ流入路141の位置に停止する。そして、計測ピストン9を停止させた後に、ピストンロッド13のみを上流側から下流側に移動させて油圧シリンダ12内に収容する。このときの状態を図5(B)に示す。
 上記により、計測ピストン9は、上流側の所定の計測準備位置に停止されている。この状態では、流路切替弁18が開で、リターン弁144が閉である。そして、計測を開始する場合、図5(C)に示すように、流路切替弁18を閉、リターン弁144を開にすることで、流体流入口7から流入される流体がバイパス管143から計測シリンダ2内に流入する。ここで、計測ピストン9が動き出さない場合には、計測ロッド145により計測ピストン9を押し出してやるとよい。これにより計測ピストン9が下流側に移動し計量を行う。
(第3の実施形態)
 図6は、本発明の第3の実施形態に係るピストンプルーバの構造例を模式的に示した図である。図6(A)において、計測準備位置停止手段14は、計測シリンダ2の上流端蓋部3aに接続する第1シリンダ流入路146と、計測シリンダ2の上流端側周部3bに接続する第2シリンダ流入路147と、第1シリンダ流入路146に設けられた計測開始弁148と、計測シリンダ2の上流端蓋部3aに移動可能に設けられた計測ロッド149とを備える。ここで、計測ピストン9を停止させる所定の計測準備位置は、第1シリンダ流入路146の位置であり、計測ピストン9が第1シリンダ流入路146を塞いだ状態で、計測開始弁148を閉にすることにより、計測ピストン9を停止させ、計測開始弁148を開にした後に、計測ロッド149が計測ピストン9を押し出すことにより、計測ピストン9を上流側から下流側に移動させる。なお、計測ピストン9の停止状態では、流路切替弁18が開となり、計測ピストン9の移動状態では、流路切替弁18が閉となる。
 上記において、図6(A)に示すように、計測ピストン9は、計測シリンダ2の上流端蓋部3aの内面に接する姿勢で停止する。図6(A)の形態によれば、リターン弁の代わりに、計測開始弁148を第1シリンダ流入路146に設けている。また、第1シリンダ流入路146を、計測シリンダ2の上流端蓋部3aに直接接続しているため、バイパス管を不要としている。
 本実施形態の変形例を図6(B)に示す。図6(B)において、計測準備位置停止手段14は、計測シリンダ2の上流端蓋側周部3bの上流側に接続する第1シリンダ流入路146’と、計測シリンダ2の上流端側周部3bの下流側に接続する第2シリンダ流入路147と、第1シリンダ流入路146’に設けられた計測開始弁148と、計測シリンダ2の上流端蓋部3aに移動可能に設けられた計測ロッド149と、第1シリンダ流入路146’と計測シリンダ2の上流端蓋部3aとを接続するバイパス管150とを備える。ここで、計測ピストン9が第1シリンダ流入路146’を塞いだ状態で、計測開始弁148を閉にすることにより、計測ピストン9を停止させ、計測開始弁148を開にした後に、計測ロッド149が計測ピストン9の押し出すことにより、計測ピストン9を上流側から下流側に移動させる。なお、計測ピストン9の停止状態では、流路切替弁18が開となり、計測ピストン9の移動状態では、流路切替弁18が閉となる。
(第4の実施形態)
 図7は、本発明の第4の実施形態に係るピストンプルーバの構造例を模式的に示した図である。計測準備位置停止手段14は、計測シリンダ2の上流端側周部3bの上流側に接続する第1シリンダ流入路151と、計測シリンダ2の上流端側周部3bの下流側に接続する第2シリンダ流入路152と、第1シリンダ流入路151と計測シリンダ2の上流端蓋部3aとを接続するバイパス管154と、バイパス管154に設けられたリターン弁155と、第2シリンダ流入路152に設けられた計測開始弁153とを備える。ここで、計測ピストン9を停止させる所定の計測準備位置は、第1シリンダ流入路151の位置となる。計測ピストン9が第1シリンダ流入路151を塞いだ状態で、リターン弁155を閉、計測開始弁153を開にすることにより、計測ピストン9を停止させる。また、リターン弁155を開、計測開始弁153を閉にすることにより、計測ピストン9を上流側から下流側に移動させる。なお、計測ピストン9の停止状態では、流路切替弁18が開となり、計測ピストン9の移動状態では、流路切替弁18が閉となる。
 本実施形態では、計測ピストン9の押し出しのための計測ロッドを不要とし、計測開始弁153の開閉とリターン弁155の開閉とを制御することで、計測ピストン9の停止、移動の動作を行うように構成される。
(第5の実施形態)
 図8は、本発明の第5の実施形態に係るピストンプルーバの構造例を模式的に示した図である。計測準備位置停止手段14は、計測シリンダ2の上流端側周部3bの上流側に接続する第1シリンダ流入路156と、計測シリンダ2の上流端側周部3bの下流側に接続する第2シリンダ流入路157と、第1シリンダ流入路156に設けられた第1計測開始弁158と、第2シリンダ流入路157に設けられた第2計測開始弁159とを備える。ここで、計測ピストン9を停止させる所定の計測準備位置は、第1シリンダ流入路156と第2シリンダ流入路157との中間位置となる。計測ピストン9がこの中間位置にある状態で、第1計測開始弁158を閉、第2計測開始弁159を開にすることにより、計測ピストン9を停止させる。また、第1計測開始弁158を開、第2計測開始弁159を閉にすることにより、計測ピストン9を上流側から下流側に移動させる。なお、計測ピストン9の停止状態では、流路切替弁18が開となり、計測ピストン9の移動状態では、流路切替弁18が閉となる。
 本実施形態では、計測ピストン9の押し出しのための計測ロッド、バイパス管、及びリターン弁を不要とし、2つの計測開始弁158,159の開閉を制御することで、計測ピストン9の停止、移動の動作を行うように構成される。
 図9~図12は、本発明によるピストンプルーバの動作例を説明するための図である。図9は初期動作、図10はリターン動作、図11は計量準備動作、図12は計量動作をそれぞれ説明する図である。なお、ここでは、計測準備位置停止手段14の形態として、第2の実施形態(図5)の場合を例示して説明するが、他の実施形態であっても基本的な動作は同様である。
 図9の初期動作において、まず、ピストンプルーバ1は、流体流入口7から通液開始するにあたり、計測ピストン9が最上流位置(計測準備位置)P1にある場合には、流路切替弁18を閉、リターン弁144を開として、第2シリンダ流入路142及びバイパス管143から流体を流入させる。これにより、図9(A)に示すように、流体圧力により計測ピストン9が下流側へ移動する。この際、計測ピストン9が動き出さない場合には、計測ロッド145により計測ピストン9を押し出すようにすればよい。なお、図9(A)の状態は、計測シリンダ2内に流体が満たされていないことを前提にしている。
 また、計測ピストン9が磁気スイッチ10,11間の位置P2にある場合には、流路切替弁18を閉、リターン弁144を開として、第2シリンダ流入口142、バイパス管143、及び第1シリンダ流入路141から流体を流入させる。これにより、図9(B)に示すように、流体圧力により計測ピストン9が下流側へ移動する。図9(B)の状態も、図9(A)の場合と同様に、計測シリンダ2内に流体が満たされていないことを前提にしている。
 上記のようにして移動した計測ピストン9は、図9(C)に示すように、下流側のホームポジションP3にセットされる。リターン弁144は、図9(A)及び図9(B)のいずれの場合も既に開になっているため、図9(C)でも開のままである。なお、いずれの場合も流路切替弁18は閉のままとする。このホームポジションP3では、計測ピストン9が第1シリンダ流出口81と第2シリンダ流出口82との略中間位置に保持されるものとする。
 図10のリターン動作において、図10(A)に示すように、計測ピストン9がホームポジションP3にセットされた状態で、流路切替弁18を開とする。そして、給圧口175からピストンロッド13に油圧をかけ、図10(B)、(C)に示すように、ピストンロッド13を移動さ
せ、計測ピストン9をホームポジションP3からP4、そして、上流側の所定の計測準備位置P1まで移動させ、計測準備位置停止手段14が計測ピストン9を計測準備位置P1に停止させる。具体的には、計測ピストン9が第1シリンダ流入口71を塞いだ状態で、リターン弁144を閉にする。ここで、ピストンロッド13が移動すると、磁気スイッチ16がオンからオフに変化する。そして、磁気スイッチ15がオフからオンになると、計測ピストン9が計測準備位置P1まで移動したと判定される。この計測準備位置P1では、計測ピストン9が第1シリンダ流入口71の位置に保持されるものとする。
 図11の計量準備動作において、計測準備位置停止手段14により計測ピストン9を上流側の所定の計測準備位置P1に停止させた後、図10の場合とは逆に、給圧口176からピストンロッド13に油圧をかけ、図11(A)、(B)に示すように、ピストンロッド13を油圧シリンダ12内の元の位置に戻す。そして、図11(B)に示すように、流路切替弁18を閉にして計量準備を終了する。この状態では計測シリンダ2に流体が充填されている。ここで、ピストンロッド13が移動すると、磁気スイッチ15がオンからオフに変化する。そして、磁気スイッチ16がオフからオンになると、ピストンロッド13が油圧シリンダ12内の元の位置に戻ったと判定される。
 図12の計量動作において、リターン弁144を開として、バイパス管143から流体を流入させると、図12(A)に示すように、流体圧力により計測ピストン9が下流側へ移動する。なお、計測ピストン9が動き出さない場合には、計測ロッド145により計測ピストン9を押し出すようにすればよい。この際、計測ピストン9が位置P5にきたときに磁気スイッチ10がオンされ、ここから計量が開始される。そして、図12(B)に示すように、計測ピストン9は位置P6を経てさらに移動し、図12(C)に示すように、計測ピストン9が位置P7に達したときに磁気スイッチ11がオンされる。これにより計測ピストン9が基準体積の流体を排出したものとして計量が終了する。そして、計測ピストン9は前述の図9(C)に示したホームポジションP3にセットされ、以後、図10のリターン動作、図11の計量準備動作、図12の計量動作が必要な回数だけ繰り返し実行される。
 以上のように、本発明によれば、計測ピストンとピストンロッドとを別体構造としたため、計測時に計測ピストンに必要以上の負荷をかけることがなく、計測シリンダ内をスムーズに移動させることができ、さらに、計測ピストンを所定の計測準備位置に確実に停止させることができるため、正確な計量を行うことができる。また、従来品に比べ、シンプルな構造であるため、部品点数を削減し、低コスト化を実現することができる。
1…ピストンプルーバ、2…計測シリンダ、3…上流端、3a…上流端蓋部、3b…上流端側周部、4…下流端、5,6…空気抜き弁、7…流体流入口、71…第1シリンダ流入口、72…第2シリンダ流入口、8…流体流出口、81…第1シリンダ流出口、82…第2シリンダ流出口、9…計測ピストン、91…磁性体、92…ガイドリング、93…Oリング、94…オムニシール、95…ピストン装着用棄てタップ、10,11,15,16…磁気スイッチ、12…油圧シリンダ、13…ピストンロッド、14…計測準備位置停止手段、141,146,146’,151,156…第1シリンダ流入路、142,147,152,157…第2シリンダ流入路、143,150,154…バイパス管、144,155…リターン弁、145,149…計測ロッド、148,153,158,159…計測開始弁、17…空油圧変換ユニット、171…空気圧供給源、172…切替弁、173,174…空油圧変換部、175,176…給圧口、18…流路切替弁。

Claims (8)

  1.  上流端及び下流端が形成された計測シリンダと、該計測シリンダの下流端側と連結された油圧シリンダと、計測時に前記上流端から流入された流体により前記計測シリンダ内を上流側から下流側に向けて所定距離移動して基準体積の流体を排出する計測ピストンと、前記油圧シリンダに移動可能に収容されたピストンロッドとを備え、前記計測ピストンと前記ピストンロッドとが別体で形成されたピストンプルーバであって、
     前記計測ピストンを上流側の所定の計測準備位置に停止させる計測準備位置停止手段を備え、
     前記計測ピストンを前記所定の計測準備位置に戻す際に、前記ピストンロッドが前記計測ピストンを下流側から上流側に移動させ、前記計測準備位置停止手段が前記計測ピストンを前記所定の計測準備位置に停止させた後に、前記ピストンロッドのみを上流側から下流側に移動させて前記油圧シリンダ内に収容することを特徴とするピストンプルーバ。
  2.  請求項1に記載のピストンプルーバにおいて、前記計測準備位置停止手段は、前記計測シリンダの上流端側周部の上流側に接続する第1シリンダ流入路と、前記計測シリンダの上流端側周部の下流側に接続する第2シリンダ流入路と、前記第1シリンダ流入路と前記計測シリンダの上流端蓋部とを接続するバイパス管と、該バイパス管に設けられたリターン弁とを備え、
     前記所定の計測準備位置は、前記第1シリンダ流入路の位置であり、前記計測ピストンが前記第1シリンダ流入路を塞いだ状態で、前記リターン弁を閉にすることにより、前記計測ピストンを停止させることを特徴とするピストンプルーバ。
  3.  請求項2に記載のピストンプルーバにおいて、前記計測準備位置停止手段は、さらに、前記計測シリンダの上流端蓋部に移動可能に設けられた計測ロッドを備え、
     前記リターン弁を開にした後に、前記計測ロッドが前記計測ピストンを押し出すことにより、前記計測ピストンを上流側から下流側に移動させることを特徴とするピストンプルーバ。
  4.  請求項1に記載のピストンプルーバにおいて、前記計測準備位置停止手段は、前記計測シリンダの上流端蓋部に接続する第1シリンダ流入路と、前記計測シリンダの上流端側周部に接続する第2シリンダ流入路と、前記第1シリンダ流入路に設けられた計測開始弁と、前記計測シリンダの上流端蓋部に移動可能に設けられた計測ロッドとを備え、
     前記所定の計測準備位置は、前記第1シリンダ流入路の位置であり、前記計測ピストンが前記第1シリンダ流入路を塞いだ状態で、前記計測開始弁を閉にすることにより、前記計測ピストンを停止させ、
     前記計測開始弁を開にした後に、前記計測ロッドが前記計測ピストンを押し出すことにより、前記計測ピストンを上流側から下流側に移動させることを特徴とするピストンプルーバ。
  5.  請求項1に記載のピストンプルーバにおいて、前記計測準備位置停止手段は、前記計測シリンダの上流端側周部の上流側に接続する第1シリンダ流入路と、前記計測シリンダの上流端側周部の下流側に接続する第2シリンダ流入路と、前記第1シリンダ流入路と前記計測シリンダの上流端蓋部とを接続するバイパス管と、該バイパス管に設けられたリターン弁と、前記第2シリンダ流入路に設けられた計測開始弁とを備え、
     前記所定の計測準備位置は、前記第1シリンダ流入路の位置であり、前記計測ピストンが前記第1シリンダ流入路を塞いだ状態で、前記リターン弁を閉、前記計測開始弁を開にすることにより、前記計測ピストンを停止させ、
     前記リターン弁を開、前記計測開始弁を閉にすることにより、前記計測ピストンを上流側から下流側に移動させることを特徴とするピストンプルーバ。
  6.  請求項1に記載のピストンプルーバにおいて、前記計測準備位置停止手段は、前記計測シリンダの上流端側周部の上流側に接続する第1シリンダ流入路と、前記計測シリンダの上流端側周部の下流側に接続する第2シリンダ流入路と、前記第1シリンダ流入路に設けられた第1計測開始弁と、前記第2シリンダ流入路に設けられた第2計測開始弁とを備え、
     前記所定の計測準備位置は、前記第1シリンダ流入路と前記第2シリンダ流入路との中間位置であり、前記計測ピストンが前記中間位置にある状態で、前記第1計測開始弁を閉、前記第2計測開始弁を開にすることにより、前記計測ピストンを停止させ、
     前記第1計測開始弁を開、前記第2計測開始弁を閉にすることにより、前記計測ピストンを上流側から下流側に移動させることを特徴とするピストンプルーバ。
  7.  請求項1~6のいずれか1項に記載のピストンプルーバにおいて、前記計測ピストンは、周方向に埋め込んだ磁性体を有し、前記計測シリンダは、前記計測ピストンに埋め込まれた磁性体を検知する2つの検知手段を、前記計測シリンダの上流側と下流側に前記所定距離離して有することを特徴とするピストンプルーバ。
  8.  請求項1~7のいずれか1項に記載のピストンプルーバにおいて、前記計測シリンダの上流端及び下流端の両方に開閉可能な外気に連通する弁を備えたことを特徴とするピストンプルーバ。
PCT/JP2014/061040 2013-08-28 2014-04-18 ピストンプルーバ WO2015029494A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US14/650,697 US9506801B2 (en) 2013-08-28 2014-04-18 Piston prover
SG11201503571SA SG11201503571SA (en) 2013-08-28 2014-04-18 Piston prover
CN201480004023.8A CN104903687B (zh) 2013-08-28 2014-04-18 活塞校准仪
KR1020157014366A KR101658745B1 (ko) 2013-08-28 2014-04-18 피스톤 프로버

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013176287A JP5645285B1 (ja) 2013-08-28 2013-08-28 ピストンプルーバ
JP2013-176287 2013-08-28

Publications (1)

Publication Number Publication Date
WO2015029494A1 true WO2015029494A1 (ja) 2015-03-05

Family

ID=52139226

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/061040 WO2015029494A1 (ja) 2013-08-28 2014-04-18 ピストンプルーバ

Country Status (6)

Country Link
US (1) US9506801B2 (ja)
JP (1) JP5645285B1 (ja)
KR (1) KR101658745B1 (ja)
CN (1) CN104903687B (ja)
SG (1) SG11201503571SA (ja)
WO (1) WO2015029494A1 (ja)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10228309B2 (en) 2015-12-18 2019-03-12 Savant Measurement Corporation Hybrid product sampling system
KR101934553B1 (ko) * 2016-08-11 2019-01-02 (주)플로트론 스몰 볼륨 프로바의 밸브 교환장치
WO2019073770A1 (ja) * 2017-10-11 2019-04-18 日立オートモティブシステムズ株式会社 流量発生装置
US10809110B2 (en) * 2018-04-05 2020-10-20 Meter Engineers, Inc. Flow meter prover

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5549242U (ja) * 1978-09-29 1980-03-31
JPS5944625A (ja) * 1982-09-07 1984-03-13 Tokyo Tatsuno Co Ltd パイププル−バ−
JP2012018113A (ja) * 2010-07-09 2012-01-26 Oval Corp ピストンプルーバ

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2796207B2 (ja) * 1991-10-14 1998-09-10 株式会社オーバル スモールボリュームプルーバ
WO1983002825A1 (en) * 1982-02-16 1983-08-18 Maurer, Robert Meter provers
US4811252A (en) * 1986-04-04 1989-03-07 Kabushiki Kaisha Kosumo Keiki Leakage test equipment
US5170656A (en) * 1991-01-22 1992-12-15 Atlantic Richfield Company Pipeline flowmeter prover control system and method
US20010037689A1 (en) * 2000-03-08 2001-11-08 Krouth Terrance F. Hydraulic actuator piston measurement apparatus and method
AU2001241641A1 (en) * 2000-03-08 2001-09-17 Rosemount, Inc. Piston position measuring device
KR200240245Y1 (ko) * 2001-05-07 2001-10-12 한국오발주식회사 소형 기준 체적관
JP2008286761A (ja) * 2007-05-21 2008-11-27 Yamatake Corp ピストンプルーバ
US8161791B2 (en) * 2008-01-10 2012-04-24 Flow Management Devices, Llc Prover self testing and validation apparatus
CN201329284Y (zh) * 2008-11-14 2009-10-21 赵化欣 电子计时精密定量移液器
US8783088B2 (en) * 2011-01-21 2014-07-22 Daniel Measurement And Control, Inc. Apparatus and method for determining displacer position in a flowmeter prover
US8826717B2 (en) * 2011-04-15 2014-09-09 Honeywell International Inc. Small volume prover apparatus and method for providing variable volume calibration
AU2012323851B2 (en) * 2011-10-14 2016-03-24 Emerson Automation Solutions Measurement Systems & Services Llc Low temperature prover and method
US8511138B2 (en) * 2011-10-31 2013-08-20 Honeywell International, Inc. Piston prover apparatus, method and system
US8950235B2 (en) * 2011-12-16 2015-02-10 Honeywell International Inc. Self-flushing small volume prover apparatus, method and system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5549242U (ja) * 1978-09-29 1980-03-31
JPS5944625A (ja) * 1982-09-07 1984-03-13 Tokyo Tatsuno Co Ltd パイププル−バ−
JP2012018113A (ja) * 2010-07-09 2012-01-26 Oval Corp ピストンプルーバ

Also Published As

Publication number Publication date
US20150308882A1 (en) 2015-10-29
KR20150080606A (ko) 2015-07-09
JP5645285B1 (ja) 2014-12-24
SG11201503571SA (en) 2015-06-29
CN104903687A (zh) 2015-09-09
US9506801B2 (en) 2016-11-29
CN104903687B (zh) 2017-12-05
JP2015045551A (ja) 2015-03-12
KR101658745B1 (ko) 2016-09-21

Similar Documents

Publication Publication Date Title
JP2796207B2 (ja) スモールボリュームプルーバ
AU2010217396B2 (en) Pipeline apparatus and method
WO2015029494A1 (ja) ピストンプルーバ
CA2850633C (en) Low temperature prover and method
TW200627077A (en) Lithographic apparatus and position measuring method
JP4782236B1 (ja) ピストンプルーバ
GB2481181A (en) Compact provers
JP3637988B2 (ja) 流量計試験装置
JP4885597B2 (ja) 混合装置
JPH0545203A (ja) スモールボリユームプルーバ
KR200458864Y1 (ko) 자력식 차압계
JP2015087223A (ja) 三方切換弁
JPH0650795A (ja) スモールボリュームプルーバ
RU2321832C2 (ru) Трубопоршневая установка для градуировки и поверки счетчиков и расходомеров
RU79999U1 (ru) Трубопоршневая установка для градуировки и поверки счетчиков и расходомеров
JPH0545202A (ja) スモールボリユームプルーバ
WO2020083758A1 (en) Flow measuring device
KR19980062890U (ko) 관 내압 테스트 플러그

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14839286

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20157014366

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14650697

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14839286

Country of ref document: EP

Kind code of ref document: A1