WO2014108058A1 - 保温板的制造设备 - Google Patents

保温板的制造设备 Download PDF

Info

Publication number
WO2014108058A1
WO2014108058A1 PCT/CN2014/070240 CN2014070240W WO2014108058A1 WO 2014108058 A1 WO2014108058 A1 WO 2014108058A1 CN 2014070240 W CN2014070240 W CN 2014070240W WO 2014108058 A1 WO2014108058 A1 WO 2014108058A1
Authority
WO
WIPO (PCT)
Prior art keywords
sensor
conveyor
insulation board
robot
hole
Prior art date
Application number
PCT/CN2014/070240
Other languages
English (en)
French (fr)
Inventor
杨国辉
Original Assignee
Yang Guohui
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yang Guohui filed Critical Yang Guohui
Priority to CN201480001567.9A priority Critical patent/CN104995030A/zh
Publication of WO2014108058A1 publication Critical patent/WO2014108058A1/zh

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B32LAYERED PRODUCTS
    • B32BLAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
    • B32B37/00Methods or apparatus for laminating, e.g. by curing or by ultrasonic bonding
    • B32B37/0046Methods or apparatus for laminating, e.g. by curing or by ultrasonic bonding characterised by constructional aspects of the apparatus
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B32LAYERED PRODUCTS
    • B32BLAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
    • B32B38/00Ancillary operations in connection with laminating processes
    • B32B38/18Handling of layers or the laminate
    • B32B2038/1891Using a robot for handling the layers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B32LAYERED PRODUCTS
    • B32BLAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
    • B32B2607/00Walls, panels

Definitions

  • the invention relates to a manufacturing device for an insulation board. Background technique
  • the object of the present invention is to overcome the deficiencies of the prior art, and to provide a manufacturing device for an insulation board, which uses an insulation board manufacturing apparatus to manufacture an insulation board, and uses an insulation board to manufacture a shackle to maintain people's health. Especially for young children or the elderly.
  • the thermal insulation board comprises an exterior panel, a foam board, an interior panel and a screw, the foam board is sandwiched between the exterior panel and the interior panel, and the exterior panel and the interior panel are connected to the foam board by screws;
  • a manufacturing equipment for the insulation board is required; the manufacturing equipment of the insulation board includes an outer panel drilling equipment, an interior panel drilling equipment, a thermal insulation board sizing equipment, a thermal insulation board combination device, and a controller.
  • the heat insulation board sizing equipment is located beside the outer slab drilling equipment, and the interior board drilling equipment is located beside the heat insulation board sizing equipment;
  • the outer slab drilling equipment includes the first conveyor, the first drilling machine, the first a robot, a first sensor, and a second sensor;
  • the first sensor is located at a first input end of the first conveyor, the second sensor is located at a position of the first drill, the first robot is located beside the first conveyor, the controller a control line is connected to the first conveyor, the first drilling machine, the first robot, the first sensor and the second sensor;
  • the interior panel drilling device comprises a second conveyor, a second drilling machine a second robot, a third sensor, a four sensor, and an interior panel reversal device; a third sensor located at a second input end of the second conveyor, the fourth sensor Located at the position of the second drilling machine, the second robot is located beside the second conveyor, the trim panel reversing device is disposed at the second output end of the second conveyor, and the trim panel reversing device
  • the outer surface of the outer panel is drilled by the outer panel drilling equipment, and the countersunk hole is drilled by the decorative surface of the outer panel drilling equipment and the interior panel.
  • the first nozzle performs the first sizing on the interior panel
  • the second nozzle of the sizing device of the thermal insulation board performs the second sizing on the foam board, and the interior slab, the bubble board and the outer sizing are used by the second sizing.
  • the plaques are bonded together, and the nuts are positioned by the nut feeder and the nut positioning tool of the thermal insulation board assembly device, and the nuts are positioned on the nut holes of the interior panel, and the screws are sent to the screw holes of the outer panel by the screw feeder and the screw fastening tool.
  • the screw and the nut are connected by a screw fastening tool, and the inner panel, the foam board and the outer panel are fastened by screws and nuts, thereby improving the strength of the heat insulation board, thereby producing a strong strength and having Exterior finish, interior finish and insulated insulation board.
  • the invention has the beneficial effects of: using the manufacturing equipment of the thermal insulation board, using the interior panel, the foam board and the exterior panel as raw materials, using the outer panel drilling equipment, the interior panel drilling equipment, the thermal insulation board sizing equipment and The thermal insulation board assembly equipment automatically processes the raw materials to produce a thermal insulation board with good decorative surface, inner decorative surface and heat insulation; using the thermal insulation board to manufacture a squatting wardrobe to provide people with a harmonious Clothing, especially for young children or the elderly.
  • Figure 1 is a schematic view showing the structure of a manufacturing apparatus of an insulation board. detailed description
  • Figure 1 shows the structure of the manufacturing equipment of the insulation board.
  • the manufacturing equipment of the insulation board includes the outer panel drilling equipment 1, the interior panel drilling equipment 2, the insulation board glue equipment 3, the insulation board combination equipment 4 and the control. 5, the thermal insulation board sizing device 3 is located beside the outer slab drilling equipment 1 , and the interior slab drilling equipment 2 is located beside the thermal insulation board sizing equipment 3;
  • the outer panel drilling apparatus 1 includes a first conveyor 6, a first drilling machine 7, a first robot 8, a first sensor 9, and a second sensor 10, the first sensor 9 being located at the first of the first conveyor 6.
  • the position of the input end 11, the second sensor 10 is located at the position of the first drilling machine 7, the first robot 8 is located beside the first conveyor 6, and the controller 5 is provided with a control line and the first conveyor 6, the first drill
  • the hole machine 7, the first robot 8, the first sensor 9 and the second sensor 10 are connected;
  • the first robot 8 is provided with a first vacuum chuck 20, and the first input end of the first conveyor 6 is provided with a first pallet at the front side 12, for the outer veneer stacked for drilling, the first output port 61 of the first conveyor 6 is provided with a second pallet 13 at the rear for stacking the drilled exterior fascia;
  • the interior panel drilling apparatus 1 includes a second conveyor 14, a second drilling machine 15, a second robot 16, a third sensor 17, an IV sensor 18, and an interior panel reversing device 54, a third sensor 17 Located at the position of the second input end 19 of the second conveyor 14, the fourth sensor 18 is located at the position of the second drilling machine 15, the second robot 16 is located beside the second conveyor 14, and the trim panel reversing device 54 is provided At the second output end 55 of the second conveyor 14, the interior panel reversing device 54 includes a swash plate 56, an electric push rod 57 and a twelfth sensor 58. The swash plate 56 is located at the second output of the second conveyor 14.
  • the electric push rod 57 is disposed on the swash plate 56, the push rod head 59 of the electric push rod 57 is disposed on the push rod hole of the swash plate 56;
  • the controller 5 is provided with the control line and the second conveyor 14, the second The drilling machine 15, the second robot 16, the third sensor 17, the fourth sensor 18, the twelfth sensor 58 and the electric push rod 57 are connected;
  • the second robot 16 is provided with a second vacuum chuck 21, the second conveyor 16
  • a third pallet 60 is disposed at the front of the second input end 19 for stacking the un-drilled interior panel, and a rear panel of the interior panel reversing device 54 is provided with a fourth pallet 22 for stacking the drilled holes.
  • the thermal insulation board sizing apparatus 3 includes a third conveyor 23, a size presser 24, a third robot 25, a fourth robot 37, a fifth robot 41, a fifth sensor 26, a sixth sensor 27, a seventh sensor 28, and a Eight sensors 29, ninth sensor 30, and tenth sensor 31; the glue applicator 24 is provided with a first head 32 and a second head 33, and the first head 32 and the second head 33 are located in the third conveyor of the third conveyor 23.
  • the fifth sensor 26 is located at the third input end 35 of the third conveyor 23, the sixth sensor 27 is located at the position of the first head 32, the eighth sensor 29 is located at the position of the second head 33, and the seventh sensor 28 is located between the sixth sensor 27 and the eighth sensor 29; the ninth sensor 30 is located at the third output port 40 of the third conveyor 23, the tenth sensor 31 is located at the upper portion of the ninth sensor 30; the controller 5 is provided with control Line and third conveyor 23, glue applicator 24, third robot 25, fourth robot 37, fifth robot 41, fifth sensor 26, sixth sensor 27, seventh sensor 28.
  • the eighth sensor 29, the ninth sensor 30, and the tenth sensor 31 are connected; the third robot 25 is provided with a third vacuum chuck 36, the fourth robot 37 is provided with a fourth vacuum chuck 38, and the fifth robot 41 is provided with a fifth a vacuum chuck 42; a third pallet 39 at the front of the third input end 35 of the third conveyor 23 is provided for stacking the foam board;
  • the thermal insulation board assembly device 4 includes a fourth conveyor 43, a nut feeder 44, a screw feeder 45, a nut positioning tool 46, a screw fastening tool 47 and an eleventh sensor 48; the fourth conveyor 43 is provided with two conveyings There is space between the two conveyor belts, the nut feeder 44 and the nut positioning tool 46 are installed below the space between the two conveyor belts, and the screw feeder 45 and the screw fastening tool 47 are mounted on the two conveyor belts. The upper part of the space; the nut output station of the nut feeder 44 and the nut positioning tool 46.
  • the position of the hexagonal key is the same as the nut hole position of the trim panel, the screw output station of the screw feeder 45 and the screw fastening tool 47
  • the position of the hexagonal key is the same; the eleventh sensor 48 is disposed at the fourth output port 49 of the fourth conveyor 43; the rear end of the fourth output port 49 of the fourth conveyor 43 is provided with a packaging line 50 for packaging the thermal insulation board .
  • the working principle of the insulation board manufacturing equipment is:
  • the controller 5 controls the first robot 8 to utilize the first machine
  • the first vacuum chuck 20 of the robot 8 sucks the first outwardly facing outer panel stacked on the first pallet 12 to the position of the first input end 11 of the first conveyor 6, and maintains the outer panel
  • the decorative surface faces upward the first sensor 9 transmits a signal of the position of the outer fascia into the first input end 11 to the controller 5, the controller 5 controls the operation of the first conveyor 6, and the first conveyor 6 sends the outer fascia to the first a position of the drilling machine 7, the second sensor 10 transmits a signal of the outer fascia into the position of the first drilling machine 7 to the controller 5, and the controller 5 controls the first conveyor 6 to stop; meanwhile, the controller 5 controls the A drilling machine 7 drills a hole on the outer panel, and the drilling time is up, the controller 5 controls the first drilling machine 7 to stop.
  • the controller 5 controls the first conveyor 6 to operate, and the drilled hole
  • the outer fascia is conveyed onto the second pallet 13; while the first boring machine 7 is drilling the outer fascia, the controller 5 controls the first vacuum chuck 20 of the first robot 8 to be placed on the first pallet 12.
  • the second outer slab that is not drilled is attracted to the position of the first input end 11 of the first conveyor 6; Fascia drilling device 1 in the automated drilling fascia;
  • the controller 5 controls the second robot 16 to suck the first interior panel of the third pallet 60, which is stacked on the upper side, with the second vacuum chuck 21 of the second robot 16
  • the second input end 19 of the second conveyor 14 is positioned to maintain the decorative surface of the trim panel, and the third sensor 17 transmits a signal of the position of the trim panel to the second input end 19 to the controller 5,
  • the controller 5 Controlling the operation of the second conveyor 14, the second conveyor 14 sends the interior panel to the position of the second drilling machine 15, and the fourth sensor 18 transmits a signal of the interior panel to the position of the second drilling machine 15 to the controller 5, the controller 5 controls the second conveyor 14 to stop; at the same time, the controller 5 controls the second drilling machine 15 to drill holes on the interior panel, the drilling time is up, the controller 5, the second drilling machine 15 stops, drills After the hole is completed, the controller 5 controls the operation of the second conveyor 14, and conveys the drilled interior trim panel to the swash plate 56, and the twelfth sensor
  • the controller 5 controls the second vacuum chuck 21 of the second robot 16 to suck the second interior panel of the third pallet 60 that is not drilled.
  • the controller 5 controls the third vacuum suction cup 36 of the third robot 25 to suck the first interior trim panel of the fourth pallet 22 to the third input of the third conveyor 23.
  • the fifth sensor 26 draws the trim panel to the third conveyor of the third conveyor 23.
  • the signal at the position of the entry end 35 is transmitted to the controller 5, the controller 5 controls the operation of the third conveyor 23, and when the third conveyor 23 sends the trim panel to the position of the sixth sensor 27, the sixth sensor 27 transmits its signal.
  • the controller 5 controls the first spray head 32 of the size presser 24 to sizing the running first interior trim panel as the first trim panel moves away from the sixth sensor 27 with the third conveyor belt 34.
  • the sixth sensor 27 transmits its signal to the controller 5, and the controller 5 controls the first head 32 to stop the sizing; while the first head 32 sizing the running interior panel, the controller 5 controls the third robot 25
  • the third vacuum chuck 36 sucks the drilled second trim panel to the position of the third input end 35 of the third conveyor 23; when the third conveyor 23 sends the trim panel to the seventh sensor 28 position
  • the controller 5 controls the third conveyor 23 to stop running; meanwhile, the controller 5 controls the fourth vacuum chuck 38 of the fourth robot 37 to place the fifth pallet 39.
  • the first foaming plate is sucked onto the interior panel that has been first sized; the fourth vacuum The suction cup 38 sucks the first foaming board to the interior board which has been first sized, and the controller 5 controls the third conveyor 23 to operate.
  • the eighth sensor 29 transmits its signal to the controller 5, and the controller 5 controls the second nozzle 33 of the sizer 24 to sizing the first foaming plate; when the first foaming plate runs with the third conveyor 34
  • the eighth sensor 29 transmits its signal to the controller 5, and the controller 5 controls the second nozzle 33 to stop the sizing; when the first blister plate is moved to the position of the ninth sensor 30,
  • the ninth sensor 30 transmits its signal to the controller 5, and the controller 5 controls the third conveyor 23 to stop running, while the controller 5 controls the fifth vacuum chuck 42 of the fifth robot 41 to drill the second pallet 13.
  • the outer plate of the hole is sucked onto the glued foam board, and the foam board is adhesively sandwiched between the outer panel and the interior panel, and the outer panel and the interior panel are combined with the foam board to form an insulation board.
  • the fifth vacuum chuck 42 sucks the drilled outer panel to the glued foam board.
  • the tenth sensor 31 transmits its signal to the controller 5, the controller 5 controls the third conveyor 23 to operate, and sends the bonded thermal insulation board to the thermal insulation panel assembly device 4;
  • the bonded thermal insulation panels are sent to the fourth conveyor 43 of the thermal insulation panel assembly device 4, so that the two sides of the thermal insulation panel are located above the two conveyor belts, and the screw fastening hole positions of the thermal insulation panels are At the position between the two conveyor belts, when the controller 5 controls the fourth conveyor 43 to send the thermal insulation board to the eleventh sensor 48 position, the eleventh sensor 48 transmits its signal to the controller 5, and the controller 5 controls The fourth conveyor 43 stops running, so that the screw holes of the outer panel of the heat insulation board are aligned with the screw output station of the screw feeder 45 and the position of the hexagonal key of the screw fastening tool 47, and the nut of the interior panel of the heat insulation board The hole is aligned with the nut output station of the nut feeder 44 and The position of the nut positioning tool 46 is a hexagonal key; after the controller 5 controls the fourth conveyor 43 to stop running, the controller 5 controls the nut feeder 44 and the nut positioning tool 46 to send the nut to the nut
  • the first drilling machine 7 is provided with a plurality of units, and each of the first drilling machines 7 is provided with a stroke switch for controlling the stroke of the drilling;
  • a plurality of holes, a plurality of second drilling machines 15 are provided, and each of the second drilling machines 15 is provided with a stroke switch for controlling the stroke of the drilling.
  • the screw hole of the outer fascia is composed of a truncated hole and a circular hole, and the truncated hole is above the circular hole, and the shape of the drill bit of the first drilling machine 7 is the same as the shape of the screw hole;
  • the nut hole is composed of a truncated hole and a circular hole, and the truncated hole is below the circular hole, and the shape of the drill of the second drilling machine 15 is the same as the shape of the nut hole.
  • the conveyor belt of the first conveyor 6 is provided with non-slip bumps, and also reduces the drill bit to the base belt of the conveyor belt;
  • the stability of the second conveyor 14, the conveyor belt of the first conveyor 14 is provided with anti-slip bumps, and also reduces the drill bit to the base belt of the conveyor belt.
  • the distance between each screw hole of the outer panel is equal to the distance of each nut hole of the trim panel, and the first drilling machine 7
  • the distance between the drill bits is equal to the distance between the drill bits of each of the second drilling machines 15.
  • the glue applicator 24 includes a glue barrel 51, a first size solenoid valve 52, and a second size solenoid valve 53, the glue barrel 51.
  • the first sizing solenoid valve 52 is connected to the first squeezing solenoid valve 52
  • the first sizing solenoid valve 52 is connected to the first squeezing solenoid valve 53
  • the second sizing solenoid valve 53 is connected to the second squeezing solenoid valve 53. connection.

Abstract

保温板的制造设备包括有外饰板钻孔设备、内饰板钻孔设备、保温板施胶设备、保温板组合设备以及控制器,以内饰板、泡沬板以及外饰板作为原材料,利用外饰板钻孔设备、内饰板钻孔设备、保温板施胶设备以及保温板组合设备对原材料进行自动化加工,从而制造出一种强度好的、具有外装饰面、内装饰面以及隔热的保温板;利用此保温板制造一种暧衣柜,为人们提供暧和的衣物,特别是幼儿或者老人。

Description

保温板的制造设备
技术领域
本发明涉及一种保温板的制造设备。 背景技术
现有的衣柜在南方使用时, 特别在冬天, 由于室内没有暧气, 室内的 温度较低, 一些地方的室内温度甚至在 0 ° C 以下, 造成衣柜内衣物的温 度较低, 甚至衣物的温度在 0 ° C 以下; 如果将如此冰冷的衣物穿在幼儿 或者老人的身上, 容易使幼儿或者老人受凉, 不利于幼儿或者老人的身体 健康, 一种暧衣柜已成为幼儿或者老人保暧衣物的需要, 制造一种暧衣柜 需要一种保温板; 制造一种保温板, 需要一种保温板的制造设备。 发明内容
本发明的目的是克服现有技术的不足, 提供一种保温板的制造设备, 利用保温板的制造设备制造一种保温板, 利用一种保温板制造一种暧衣 柜, 维护人们的身体健康, 特别是幼儿或者老人。
本发明所采用的技术方案是:
保温板包括有外饰板、 泡沬板、 内饰板以及螺丝, 泡沬板夹于外饰 板与内饰板之间, 外饰板以及内饰板通过螺丝与泡沬板连接在一起; 制造 一种保温板, 需要一种保温板的制造设备; 保温板的制造设备包括有外饰 板钻孔设备、 内饰板钻孔设备、 保温板施胶设备、 保温板组合设备以及控 制器, 保温板施胶设备位于外饰板钻孔设备旁边, 内饰板钻孔设备位于保 温板施胶设备的旁边; 外饰板钻孔设备包括有第一输送机、 第一钻孔机、 第一机械手、 第一传感器以及第二传感器; 第一传感器位于第一输送机 的第一输入端的位置, 第二传感器位于第一钻孔机的位置, 第一机械手位 于第一输送机的旁边, 控制器设有控制线与第一输送机、 第一钻孔机、 第 一机械手、 第一传感器以及第二传感器连接; 内饰板钻孔设备包括有第二 输送机、 第二钻孔机、 第二机械手、 第三传感器、 四传感器以及内饰板反 转装置; 第三传感器位于第二输送机的第二输入端的位置, 第四传感器 位于第二钻孔机的位置, 第二机械手位于第二输送机的旁边, 内饰板反转 装置设于第二输送机的第二输出端, 内饰板反转装置包括有斜板、 电动推 杆以及第十二传感器, 斜板位于第二输送机的第二输出端, 电动推杆设于 斜板上, 电动推杆的推杆头设于斜板的推杆孔; 控制器设有控制线与第二 输送机、 第二钻孔机、 第二机械手、 第三传感器、 第四传感器、 第十二传 感器以及电动推杆连接; 保温板施胶设备包括有第三输送机、 施胶机、 第 三机械手、 第四机械手、 第五机械手、 第五传感器、 第六传感器、 第七传 感器、 第八传感器、 第九传感器以及第十传感器; 施胶机设有第一喷头以 及第二喷头, 第一喷头以及第二喷头位于第三输送机的第三输送带的上 方, 第五传感器位于第三输送机的第三输入端的位置, 第六传感器位于第 一喷头的位置, 第八传感器位于第二喷头的位置, 第七传感器位于第六传 感器与第八传感器之间; 第九传感器位于第三输送机的第三输出口位置, 第十传感器位于第九传感器的上部; 控制器设有控制线与第三输送机、 施 胶机、 第三机械手、 第五传感器、 第六传感器、 第七传感器、 第八传感器、 第九传感器以及第十传感器连接; 保温板组合设备包括有第四输送机、 螺 母送料机、螺丝送料机、螺母定位工具, 螺丝紧固工具以及第十一传感器; 第四输送机设有两条输送带, 两条输送带之间留有空间, 螺母送料机以及 螺母定位工具安装于两条输送带之间的空间的下方, 螺丝送料机以及螺丝 紧固工具安装于两条输送带之间的空间的上方; 螺母送料机的螺母输出工 位以及螺母定位工具六角匙的位置与内饰板的螺母孔位置相同, 螺丝送料 机的螺丝输出工位以及螺丝紧固工具六角匙的位置相同; 第十一传感器设 于第四输送机的第四输出端口位置。
保温板的制造设备工作时, 利用外饰板钻孔设备于外饰板的装饰面 钻沉孔, 利用外饰板钻孔设备与内饰板的装饰面钻沉孔, 利用保温板施胶 设备的第一喷头对内饰板进行第一次施胶, 保温板施胶设备的第二喷头对 泡沬板进行第二次施胶, 利用二次施胶将内饰板、 泡沬板以及外饰板粘合 在一起, 利用保温板组合设备的螺母送料机、 螺母定位工具将螺母定位于 内饰板的螺母孔, 利用螺丝送料机以及螺丝紧固工具将螺丝送到外饰板的 螺丝孔, 利用螺丝紧固工具将螺丝与螺母连接在一起, 利用螺丝与螺母将 内饰板、 泡沬板以及外饰板紧固连接, 提高保温板的强度, 从而制造出一 种强度好的、 具有外装饰面、 内装饰面以及隔热的保温板。 本发明的有益效果是: 利用保温板的制造设备, 以内饰板、 泡沬板以 及外饰板作为原材料, 利用外饰板钻孔设备、 内饰板钻孔设备、 保温板施 胶设备以及保温板组合设备对原材料进行自动化加工, 从而制造出一种强 度好的、 具有外装饰面、 内装饰面以及隔热的保温板; 利用此保温板制造 一种暧衣柜, 为人们提供暧和的衣物, 特别是幼儿或者老人。 附图说明
图 1是保温板的制造设备结构示意图。 具体实施方式
下面结合附图对本发明进行进一步的说明:
图 1 所示的保温板的制造设备结构示意图, 保温板的制造设备包括 有外饰板钻孔设备 1、 内饰板钻孔设备 2、 保温板施胶设备 3、 保温板组合 设备 4以及控制器 5, 保温板施胶设备 3位于外饰板钻孔设备 1旁边, 内 饰板钻孔设备 2位于保温板施胶设备 3的旁边;
外饰板钻孔设备 1包括有第一输送机 6、 第一钻孔机 7、 第一机械手 8、 第一传感器 9以及第二传感器 10, 第一传感器 9位于第一输送机 6的 第一输入端 11的位置, 第二传感器 10位于第一钻孔机 7的位置, 第一机 械手 8位于第一输送机 6的旁边, 控制器 5设有控制线与第一输送机 6、 第一钻孔机 7、 第一机械手 8、 第一传感器 9以及第二传感器 10连接; 第 一机械手 8设有第一真空吸盘 20, 第一输送机 6的第一输入端 11前边设 有第一货盘 12, 用于堆放为钻孔的外饰板, 第一输送机 6 的第一输出口 61后边设有第二货盘 13, 用于堆放已钻孔的外饰板;
内饰板钻孔设备 1包括有第二输送机 14、 第二钻孔机 15、 第二机械 手 16、 第三传感器 17、 以、 四传感器 18以及内饰板反转装置 54, 第三传 感器 17位于第二输送机 14的第二输入端 19的位置, 第四传感器 18位于 第二钻孔机 15的位置, 第二机械手 16位于第二输送机 14的旁边, 内饰 板反转装置 54设于第二输送机 14的第二输出端 55, 内饰板反转装置 54 包括有斜板 56、 电动推杆 57以及第十二传感器 58, 斜板 56位于二输送 机 14的第二输出端 55, 电动推杆 57设于斜板 56上, 电动推杆 57的推杆 头 59设于斜板 56的推杆孔; 控制器 5设有控制线与第二输送机 14、第二 钻孔机 15、 第二机械手 16、 第三传感器 17、 第四传感器 18、 第十二传感 器 58以及电动推杆 57连接; 第二机械手 16设有第二真空吸盘 21, 第二 输送机 16的第二输入端 19前边设有第三货盘 60,用于堆放未钻孔的内饰 板, 内饰板反转装置 54的后边设有第四货盘 22, 用于堆放已钻孔的内饰 板;
保温板施胶设备 3包括有第三输送机 23、施胶机 24、第三机械手 25、 第四机械手 37、 第五机械手 41、 第五传感器 26、 第六传感器 27、 第七传 感器 28、 第八传感器 29、 第九传感器 30以及第十传感器 31 ; 施胶机 24 设有第一喷头 32以及第二喷头 33, 第一喷头 32以及第二喷头 33位于第 三输送机 23的第三输送带 34的上方, 第五传感器 26位于第三输送机 23 的第三输入端 35的位置, 第六传感器 27位于第一喷头 32的位置, 第八 传感器 29位于第二喷头 33的位置, 第七传感器 28位于第六传感器 27与 第八传感器 29之间; 第九传感器 30位于第三输送机 23的第三输出口 40 位置, 第十传感器 31位于第九传感器 30的上部; 控制器 5设有控制线与 第三输送机 23、 施胶机 24、 第三机械手 25、 第四机械手 37、 第五机械手 41、 第五传感器 26、 第六传感器 27、 第七传感器 28、 第八传感器 29、 第 九传感器 30以及第十传感器 31连接; 第三机械手 25设有第三真空吸盘 36, 第四机械手 37设有第四真空吸盘 38, 第五机械手 41设有第五真空吸 盘 42 ; 第三输送机 23的第三输入端 35前边设有第五货盘 39, 用于堆放 泡沬板;
保温板组合设备 4包括有第四输送机 43、 螺母送料机 44、 螺丝送料 机 45、 螺母定位工具 46, 螺丝紧固工具 47以及第十一传感器 48; 第四输 送机 43设有两条输送带, 两条输送带之间留有空间, 螺母送料机 44以及 螺母定位工具 46安装于两条输送带之间的空间的下方, 螺丝送料机 45以 及螺丝紧固工具 47安装于两条输送带之间的空间的上方; 螺母送料机 44 的螺母输出工位以及螺母定位工具 46 六角匙的位置与内饰板的螺母孔位 置相同, 螺丝送料机 45的螺丝输出工位以及螺丝紧固工具 47六角匙的位 置相同; 第十一传感器 48设于第四输送机 43的第四输出端口 49位置; 第四输送机 43的第四输出口 49的后边设有包装线 50, 用于包装保温板。
保温板的制造设备的工作原理是:
外饰板钻孔设备 1工作时, 控制器 5控制第一机械手 8利用第一机 械手 8的第一真空吸盘 20将第一货盘 12堆放的、 装饰面向上的第一块外 饰板吸到第一输送机 6的第一输入端 11 的位置, 并保持外饰板的装饰面 向上, 第一传感器 9将外饰板进入第一输入端 11位置的信号传输给控制 器 5, 控制器 5控制第一输送机 6运行, 第一输送机 6将外饰板送到第一 钻孔机 7的位置, 第二传感器 10将外饰板进入第一钻孔机 7位置的信号 传输给控制器 5, 控制器 5控制第一输送机 6停止; 同时, 控制器 5控制 第一钻孔机 7于外饰板上钻孔, 钻孔时间到, 控制器 5控制第一钻孔机 7 停止, 钻孔完成后, 控制器 5控制第一输送机 6运行, 将已钻孔的外饰板 输送到第二货盘 13上; 在第一钻孔机 7于外饰板钻孔的同时, 控制器 5 控制第一机械手 8的第一真空吸盘 20将第一货盘 12上未钻孔的第二块外 饰板吸到第一输送机 6的第一输入端 11 的位置; 如此不断循环, 利用外 饰板钻孔设备 1于外饰板进行自动化钻孔;
内饰板钻孔设备 2工作时, 控制器 5控制第二机械手 16利用第二机 械手 16的第二真空吸盘 21将第三货盘 60堆放的、 装饰面向上的第一块 内饰板吸到第二输送机 14的第二输入端 19的位置, 并保持内饰板的装饰 面向上, 第三传感器 17将内饰板进入第二输入端 19位置的信号传输给控 制器 5, 控制器 5控制第二输送机 14运行, 第二输送机 14将内饰板送到 第二钻孔机 15的位置, 第四传感器 18将内饰板进入第二钻孔机 15位置 的信号传输给控制器 5, 控制器 5控制第二输送机 14停止; 同时, 控制器 5控制第二钻孔机 15于内饰板上钻孔, 钻孔时间到, 控制器 5第二钻孔机 15停止, 钻孔完成后, 控制器 5控制第二输送机 14运行, 将已钻孔的内 饰板输送到斜板 56上, 斜板 56的第十二传感器 58将其信号传输给控制 器 5, 控制器 5控制电动推杆 57工作, 利用电动推杆 57的推杆头 59于斜 板 56推杆孔推出, 将已钻孔的内饰板推反转于第四货盘 22上, 使内饰板 的装饰面向下, 以适合后工序的需要; 在第二钻孔机 15 于内饰板钻孔的 同时, 控制器 5控制第二机械手 16的第二真空吸盘 21将第三货盘 60上 未钻孔的第二块内饰板吸到第二输送机 14的第二输入端 19的位置; 如此 不断循环, 利用内饰板钻孔设备 2于内饰板进行自动化钻孔;
保温板施胶设备 3工作时, 控制器 5控制第三机械手 25的第三真空 吸盘 36将第四货盘 22 已钻孔的第一块内饰板吸到第三输送机 23的第三 输入端 35的位置, 第五传感器 26将内饰板吸到第三输送机 23的第三输 入端 35位置的信号传输到控制器 5, 控制器 5控制第三输送机 23运行, 第三输送机 23将内饰板送到第六传感器 27的位置时, 第六传感器 27将 其信号传输到控制器 5, 控制器 5控制施胶机 24的第一喷头 32向运行的 第一块内饰板施胶, 当第一块内饰板随第三输送带 34 运行离开第六传感 器 27时, 第六传感器 27将其信号传输给控制器 5, 控制器 5控制第一喷 头 32停止施胶; 在第一喷头 32向运行的内饰板施胶的同时, 控制器 5控 制第三机械手 25的第三真空吸盘 36将已钻孔的第二块内饰板吸到第三输 送机 23的第三输入端 35的位置; 当第三输送机 23将内饰板送到第七传 感器 28位置时, 第七传感器 28将其信号传输给控制器 5, 控制器 5控制 第三输送机 23停止运行; 同时, 控制器 5控制第四机械手 37的第四真空 吸盘 38将第五货盘 39的第一块泡沬板吸到已第一次施胶的内饰板上; 第 四真空吸盘 38 将第一块泡沬板吸到已第一次施胶的内饰板后, 控制器 5 控制第三输送机 23运行, 当第一块泡沬板运行到第八传感器 29位置时, 第八传感器 29将其信号传输给控制器 5, 控制器 5控制施胶机 24的第二 喷头 33向第一块泡沬板施胶; 当第一块泡沬板随第三输送带 34运行离开 第八传感器 29位置时, 第八传感器 29将其信号传输给控制器 5, 控制器 5控制第二喷头 33停止施胶; 当第一块泡沬板运行到第九传感器 30的位 置时, 第九传感器 30将其信号传输给控制器 5, 控制器 5控制第三输送机 23停止运行, 同时, 控制器 5控制第五机械手 41的第五真空吸盘 42将第 二货盘 13 的已钻孔的外板饰吸到已施胶的泡沬板上, 利用胶粘剂将泡沬 板粘夹在外饰板与内饰板之间, 利用外饰板以及内饰板与泡沬板组合成为 保温板; 第五真空吸盘 42 将已钻孔的外板饰吸到已施胶的泡沬板时, 第 十传感器 31将其信号传输给控制器 5,控制器 5控制第三输送机 23运行, 将已粘合的保温板送到保温板组合设备 4;
保温板组合设备 4工作时, 已粘合的保温板被送到保温板组合设备 4 的第四输送机 43, 使保温板的两边位于两条输送带的上面, 保温板的螺丝 紧固孔位置在两条输送带之间的位置, 控制器 5控制第四输送机 43将保 温板送到第十一传感器 48位置时, 第十一传感器 48将其信号传输给控制 器 5, 控制器 5控制第四输送机 43停止运行, 使保温板的外饰板的螺丝孔 对准螺丝送料机 45的螺丝输出工位以及螺丝紧固工具 47六角匙的位置, 以及使保温板的内饰板的螺母孔对准螺母送料机 44 的螺母输出工位以及 螺母定位工具 46六角匙的位置;控制器 5控制第四输送机 43停止运行后, 控制器 5控制螺母送料机 44以及螺母定位工具 46将螺母送到保温板的内 饰板的螺母孔, 同时, 控制器 5控制螺丝送料机 45及螺丝紧固工具 47将 螺丝送到外饰板的螺丝孔, 利用螺母定位工具 46 将螺母固定于内饰板的 螺母孔, 利用螺丝紧固工具 47 将螺丝打入螺丝孔、 并穿过外饰板与内饰 板之间的泡沬板与螺母连接, 将螺丝与螺母将外饰板、 泡沬板以及内饰板 连接在一起; 保温板的外饰板、 泡沬板以及内饰板用螺丝以及螺母连接在 一起后, 控制器 5控制第四输送机 43运行, 将保温板送到包装线 50 ; 第 四输送机 43将保温板送到包装线 50后, 控制器 5控制第三输送机 23将 下一块已粘合的保温板送到保温板组合设备 4, 如此不断循环。
为了于外饰板上钻多个孔, 第一钻孔机 7设有多台, 每台第一钻孔机 7 设有行程开关, 用于控制钻孔的行程; 为了于内饰板上钻多个孔, 第二 钻孔机 15设有多台, 每台第二钻孔机 15设有行程开关, 用于控制钻孔的 行程。
所述的外饰板的螺丝孔由圆台形孔与圆孔构成, 圆台形孔在圆孔的上 方, 第一钻孔机 7的钻头的形状与螺丝孔的形状相同; 所述的内饰板的螺 母孔由圆台形孔与圆孔构成, 圆台形孔在圆孔的下方, 第二钻孔机 15 的 钻头的形状与螺母孔的形状相同。
为了增加外饰板放于第一输送机 6的稳定性, 第一输送机 6的输送皮 带设有防滑凸点, 同时也减少钻头钻到输送皮带的基带上; 为了增加外饰 板放于第二输送机 14的稳定性,第一输送机 14的输送皮带设有防滑凸点, 同时也减少钻头钻到输送皮带的基带上。
为了使外饰板的沉孔与内饰板沉孔的位置相同, 外饰板每个螺丝孔之 间的距离与内饰板每个螺母孔的距离相等, 每台第一钻孔机 7的钻头之间 的距离与每台第二钻孔机 15的钻头之间的距离相等。
为了利用施胶机对内饰板以及泡沬板分开两次施胶, 施胶机 24包括 有施胶桶 51、 第一施胶电磁阀 52以及第二施胶电磁阀 53, 施胶桶 51与 第一施胶电磁阀 52连接, 第一施胶电磁阀 52与第一喷头 32连接; 施胶 桶 51与第二施胶电磁阀 53连接,第二施胶电磁阀 53与第二喷头 33连接。

Claims

权 利 要 求 书
1.保温板的制造设备, 保温板包括有外饰板、 泡沬板、 内饰板以及 螺丝, 泡沬板夹于外饰板与内饰板之间, 外饰板以及内饰板通过螺丝与泡 沬板连接在一起; 制造保温板, 需要保温板的制造设备; 保温板的制造设 备, 其特征在于: 保温板的制造设备包括有外饰板钻孔设备 (1)、 内饰板 钻孔设备 (2)、 保温板施胶设备 (3)、 保温板组合设备 (4) 以及控制器
(5), 保温板施胶设备 (3) 位于外饰板钻孔设备 (1) 旁边, 内饰板钻孔 设备 (2) 位于保温板施胶设备 (3) 的旁边;
外饰板钻孔设备 (1) 包括有第一输送机 (6)、 第一钻孔机 (7)、 第 一机械手 (8)、 第一传感器(9) 以及第二传感器(10); 第一传感器(9) 位于第一输送机 (6) 的第一输入端 (11) 的位置, 第二传感器 (10) 位 于第一钻孔机 (7) 的位置, 第一机械手 (8) 位于第一输送机 (6) 的旁 边, 控制器 (5) 设有控制线与第一输送机 (6)、 第一钻孔机 (7)、 第一 机械手 (8)、 第一传感器 (9) 以及第二传感器 (10) 连接;
内饰板钻孔设备 (1) 包括有第二输送机 (14)、 第二钻孔机 (15)、 第二机械手 (16)、 第三传感器 (17)、 四传感器 (18) 以及内饰板反转装 置 (54); 第三传感器 (17) 位于第二输送机 (14) 的第二输入端 (19) 的位置,第四传感器(18)位于第二钻孔机(15)的位置,第二机械手(16) 位于第二输送机(14)的旁边, 内饰板反转装置(54)设于第二输送机(14) 的第二输出端 (55), 内饰板反转装置 (54) 包括有斜板 (56)、 电动推杆
(57) 以及第十二传感器 (58), 斜板 (56) 位于第二输送机 (14) 的第 二输出端 (55), 电动推杆 (57) 设于斜板 (56) 上, 电动推杆 (57) 的 推杆头 (59) 设于斜板 (56) 的推杆孔; 控制器 (5) 设有控制线与第二 输送机 (14)、 第二钻孔机 (15)、 第二机械手 (16)、 第三传感器 (17)、 第四传感器 (18)、 第十二传感器 (58) 以及电动推杆 (57) 连接;
保温板施胶设备 (3) 包括有第三输送机 (23)、 施胶机 (24)、 第三 机械手 (25)、 第四机械手 (37)、 第五机械手 (41)、 第五传感器 (26)、 第六传感器(27)、第七传感器(28)、第八传感器(29)、第九传感器(30) 以及第十传感器 (31); 施胶机 (24) 设有第一喷头 (32) 以及第二喷头
(33), 第一喷头 (32) 以及第二喷头 (33) 位于第三输送机 (23) 的第 三输送带 (34) 的上方, 第五传感器 (26) 位于第三输送机 (23) 的第三 输入端 (35) 的位置, 第六传感器 (27) 位于第一喷头 (32) 的位置, 第 八传感器 (29) 位于第二喷头 (33) 的位置, 第七传感器 (28) 位于第六 传感器 (27) 与第八传感器 (29) 之间; 第九传感器 (30) 位于第三输送 机(23)的第三输出口(40)位置,第十传感器(31)位于第九传感器(30) 的上部; 控制器 (5) 设有控制线与第三输送机 (23)、 施胶机 (24)、 第 三机械手 (25)、 第四机械手(37)、 第五机械手(41)、 第五传感器(26)、 第六传感器(27)、第七传感器(28)、第八传感器(29)、第九传感器(30) 以及第十传感器 (31) 连接;
保温板组合设备 (4) 包括有第四输送机 (43)、 螺母送料机 (44)、 螺丝送料机 (45)、 螺母定位工具 (46), 螺丝紧固工具 (47) 以及第 ^一 传感器 (48); 第四输送机 (43) 设有两条输送带, 两条输送带之间留有 空间, 螺母送料机 (44) 以及螺母定位工具 (46) 安装于两条输送带之间 的空间的下方, 螺丝送料机 (45) 以及螺丝紧固工具 (47) 安装于两条输 送带之间的空间的上方; 螺母送料机 (44) 的螺母输出工位以及螺母定位 工具 (46) 六角匙的位置与内饰板的螺母孔位置相同, 螺丝送料机 (45) 的螺丝输出工位以及螺丝紧固工具 (47) 六角匙的位置相同; 第十一传感 器 (48) 设于第四输送机 (43) 的第四输出端口 (49) 位置。
2.根据要求 1 所述的保温板的制造设备, 其特征在于: 所述的第一 钻孔机 (7) 设有多台, 每台第一钻孔机 (7) 设有行程开关, 用于控制钻 孔的行程。
3.根据要求 1 所述的保温板的制造设备, 其特征在于: 所述的外饰 板的螺丝孔为沉孔,沉孔由圆台形孔与圆孔构成, 圆台形孔在圆孔的上方, 第一钻孔机 (7) 的钻头的形状与螺丝孔的形状相同。
4.根据要求 1 所述的保温板的制造设备, 其特征在于: 所述的内饰 板的螺母孔为沉孔,沉孔由圆台形孔与圆孔构成, 圆台形孔在圆孔的下方, 第二钻孔机 (15) 的钻头的形状与螺母孔的形状相同。
5.根据要求 1 所述的保温板的制造设备, 其特征在于: 所述的第一 输送机 (6) 的输送皮带设有防滑凸点; 第一输送机 (14) 的输送皮带设 有防滑凸点。
6.根据要求 1 所述的保温板的制造设备, 其特征在于: 所述的外饰 板每个螺丝孔之间的距离与内饰板每个螺母孔的距离相等, 每台第一钻孔 机 (7) 的钻头之间的距离与每台第二钻孔机 (15) 的钻头之间的距离相 等。
7.根据要求 1 所述的保温板的制造设备, 其特征在于: 所述的施胶 机 (24) 包括有施胶桶 (51)、 第一施胶电磁阀 (52) 以及第二施胶电磁 阀 (53), 施胶桶 (51) 与第一施胶电磁阀 (52) 连接, 第一施胶电磁阀 (52) 与第一喷头 (32) 连接; 施胶桶 (51) 与第二施胶电磁阀 (53) 连 接, 第二施胶电磁阀 (53) 与第二喷头 (33) 连接。
PCT/CN2014/070240 2013-01-08 2014-01-07 保温板的制造设备 WO2014108058A1 (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201480001567.9A CN104995030A (zh) 2014-01-07 2014-01-07 保温板的制造设备

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201310027095.1 2013-01-08
CN201310027095.1A CN103112232B (zh) 2013-01-08 2013-01-08 保温板的制造设备

Publications (1)

Publication Number Publication Date
WO2014108058A1 true WO2014108058A1 (zh) 2014-07-17

Family

ID=48410653

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2014/070240 WO2014108058A1 (zh) 2013-01-08 2014-01-07 保温板的制造设备

Country Status (2)

Country Link
CN (1) CN103112232B (zh)
WO (1) WO2014108058A1 (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103112232B (zh) * 2013-01-08 2014-10-01 郑运婷 保温板的制造设备
CN103085420B (zh) * 2013-01-08 2015-04-08 郑运婷 保温板生产线
CN104995030A (zh) * 2014-01-07 2015-10-21 陈启明 保温板的制造设备

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4240285A1 (en) * 1991-12-17 1993-06-24 Sito Metall Und Kunststoffvera Surfacing foam with e.g. scourer layer - by coating moving substrate with fused resin powder from heated roller and bonding prod. to web of surfacing material with pressure roller
CN201141184Y (zh) * 2007-12-24 2008-10-29 陈炳辉 三层式保温装饰复合板材
CN102756281A (zh) * 2012-06-27 2012-10-31 上海电机学院 一种玻璃钢窗装配生产线
CN103085420A (zh) * 2013-01-08 2013-05-08 郑运婷 保温板生产线
CN103112232A (zh) * 2013-01-08 2013-05-22 郑运婷 保温板的制造设备
CN103144150A (zh) * 2013-01-08 2013-06-12 郑运婷 保温板的制造方法
CN203063240U (zh) * 2013-01-08 2013-07-17 郑运婷 保温板生产设备

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101497254A (zh) * 2009-02-19 2009-08-05 佟培杰 一种保温板及其制作和安装方法
CN201979785U (zh) * 2011-01-20 2011-09-21 黄醒帆 一种多功能装饰板材覆膜设备

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4240285A1 (en) * 1991-12-17 1993-06-24 Sito Metall Und Kunststoffvera Surfacing foam with e.g. scourer layer - by coating moving substrate with fused resin powder from heated roller and bonding prod. to web of surfacing material with pressure roller
CN201141184Y (zh) * 2007-12-24 2008-10-29 陈炳辉 三层式保温装饰复合板材
CN102756281A (zh) * 2012-06-27 2012-10-31 上海电机学院 一种玻璃钢窗装配生产线
CN103085420A (zh) * 2013-01-08 2013-05-08 郑运婷 保温板生产线
CN103112232A (zh) * 2013-01-08 2013-05-22 郑运婷 保温板的制造设备
CN103144150A (zh) * 2013-01-08 2013-06-12 郑运婷 保温板的制造方法
CN203063240U (zh) * 2013-01-08 2013-07-17 郑运婷 保温板生产设备

Also Published As

Publication number Publication date
CN103112232A (zh) 2013-05-22
CN103112232B (zh) 2014-10-01

Similar Documents

Publication Publication Date Title
WO2014108061A1 (zh) 保温板生产线
WO2014108060A1 (zh) 保温板的制造方法
WO2014108058A1 (zh) 保温板的制造设备
CN203063240U (zh) 保温板生产设备
CN207210847U (zh) 一种采用双面吸浆方式的纸托生产装置
CN208932478U (zh) 一种传送木质板块的设备
CN205419090U (zh) 中空玻璃生产线传送机构
CN206693554U (zh) 可调式保温装饰板固定件
CN104995030A (zh) 保温板的制造设备
CN206407727U (zh) 一种用于贴面板生产的自动铺纸机
CN204238498U (zh) 一种重组竹组合墙体
CN203808271U (zh) 一种预制保温墙板
CN207453418U (zh) 一种铺设地板或墙面的直角接驳器
CN211691295U (zh) 一种复合木头发泡框
CN205033692U (zh) 一种用于保温复合板的喷胶复合系统
CN116853784B (zh) 一种石膏板翻板装置
CN220661216U (zh) 一种耐老化环保型胶合板生产用去毛刺装置
CN108326995A (zh) 一种改进型环保板材加工装置
CN211363022U (zh) 一种墙壁钻孔用供水装置
CN219496018U (zh) 一种胶合板加工用检测装置
CN107859302A (zh) 一种铺设地板或墙面的直角接驳器
CN213651060U (zh) 一种高效玻璃旋转台
CN221137190U (zh) 一种复合地毯制造用压合装置
CN218439208U (zh) 一种大口径钻机固定装置
CN218028681U (zh) 高效防静电复合地板

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14737965

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14737965

Country of ref document: EP

Kind code of ref document: A1