WO2014069701A1 - Feuille résistante à l'eau pour tunnel - Google Patents

Feuille résistante à l'eau pour tunnel Download PDF

Info

Publication number
WO2014069701A1
WO2014069701A1 PCT/KR2012/009216 KR2012009216W WO2014069701A1 WO 2014069701 A1 WO2014069701 A1 WO 2014069701A1 KR 2012009216 W KR2012009216 W KR 2012009216W WO 2014069701 A1 WO2014069701 A1 WO 2014069701A1
Authority
WO
WIPO (PCT)
Prior art keywords
waterproof sheet
tunnel
fixed
fixing
fused
Prior art date
Application number
PCT/KR2012/009216
Other languages
English (en)
Korean (ko)
Inventor
양우정
Original Assignee
주식회사 대흥산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 대흥산업 filed Critical 주식회사 대흥산업
Priority to CN201280002446.7A priority Critical patent/CN103930651B/zh
Priority to PCT/KR2012/009216 priority patent/WO2014069701A1/fr
Priority to JP2014544653A priority patent/JP6044051B2/ja
Publication of WO2014069701A1 publication Critical patent/WO2014069701A1/fr

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Definitions

  • the present invention relates to a waterproof sheet that is installed for the purpose of waterproofing during the construction of the tunnel, and more particularly to the waterproof sheet for the tunnel so that the discharged water drained from the excavation surface of the tunnel can be smoothly drained while having the simplest structure as possible. It is about.
  • the waterproof sheet used in tunnel construction is to drain the water discharged from the excavated excavation surface of the tunnel before pouring the shotcrete after the excavation of the tunnel.
  • the conventional waterproof sheet 100 is a soft order plate 110 is a synthetic resin that does not pass water, as shown in Figure 7a, and the shotcrete surface on the upper surface of the order plate 110 and A nonwoven fabric 120 made of polyester or polypropylene is attached through heat or high frequency fusion to prevent the order plate from being torn or damaged due to contact.
  • the upper surface of the non-woven fabric is further formed with a fixed wing 130, one end is fixed by fusion, gluing or sealing in order to fix the fixing means such as an anchor to the shotcrete surface.
  • the conventional waterproof sheet used in the tunnel construction is fused by fixing the non-woven fabric to the order plate, and then attaching the fixed wing again on the non-woven fabric through re-fusion work, etc., not only cumbersome manufacturing but also the portion of the fixed wing is attached
  • the order plate part has a problem that wrinkles due to reheating occur.
  • the nonwoven fabric 120 attached to the upper surface of the order plate to protect the order plate 110 does not allow the discharged water discharged from the excavation surface to be smoothly drained, but rather water soaking phenomenon occurs By doing so, it also provided a cause for separating the fixed blade fixed to the excavation surface due to the load generated by the water-eat phenomenon.
  • the present invention has been made to solve the above-mentioned conventional problems, its main purpose is to maintain a high strength while minimizing damage or damage as well as to maintain a simple structure as possible as well as drained from the excavation surface of the tunnel It is to provide a waterproof sheet for the tunnel so that the drainage can be smoothly drained.
  • Another object of the present invention is to fix to the shotcrete surface can be fixed only by the fixing blades.
  • Still another object of the present invention is to provide a dual structure in which no water eating phenomenon occurs.
  • Still another object of the present invention is to minimize damage caused by contact with the excavation surface of the upper portion of the protrusion formed on the upper surface of the first waterproof sheet.
  • Still another object of the present invention is to facilitate connection bonding with other waterproof sheets.
  • the waterproof sheet is a material that does not pass water and the first waterproof sheet of a soft PE material of high strength;
  • a fixed blade having one end fusion-spliced in one or at least one or more front and rear directions on an upper surface of the first waterproof sheet;
  • the top surface of the first waterproof sheet fused with the fixed wing is maintained at a predetermined interval so that the shotcrete surface of the tunnel and the first waterproof sheet does not directly contact with the reinforcement of the first waterproof sheet, and is discharged from the excavated surface of the tunnel.
  • it further comprises a concave-convex portion formed integrally with a plurality of projections are formed to protrude repeatedly before and after, left, right so that drainage of the discharge water is made smoothly.
  • the fixed blades are respectively formed on the middle and both sides of the upper surface of the first waterproof sheet, the uneven portion is characterized in that formed between the fixed blades formed on the central fixed blade and both sides.
  • the fixing blade is formed in the center of the upper surface of the first waterproof sheet, each of the uneven portions are formed on both sides of the fixed blade, between the uneven portions is formed with a fixing surface is not formed projections for fixing to the shotcrete surface,
  • the bottom surface of the first waterproof sheet has an area corresponding to the first waterproof sheet, characterized in that the second waterproof sheet of EVA material is a material that does not pass water is fusion-fixed.
  • the second waterproof sheet is fused to the first waterproof sheet by interposing a fusion member between the first waterproof sheet and the second waterproof sheet, the middle of which is lined with the fixed blades of the first waterproof sheet in the front and rear directions. It is fused, characterized in that the second waterproof sheet is fused at least one point in the front, rear direction to the bottom of the fixing surface of the first waterproof sheet.
  • the protrusion upper portion of the uneven portion is characterized in that it is formed not to be sharp in order to prevent damage when in contact with the excavation surface.
  • the upper surface of the fixing surface is characterized in that the fixing blades are further formed.
  • FIG. 1 is a perspective view of main parts schematically showing the present invention.
  • FIG. 2 is a schematic side view cross sectional view according to FIG. 1;
  • FIG. 2 is a schematic side view cross sectional view according to FIG. 1;
  • FIG. 3 is a main view of the installed state according to FIG.
  • Figure 4a is a schematic exploded cross-sectional view showing another embodiment of the present invention.
  • FIG. 4b is a schematic cross-sectional view of the main parts of the coupled state according to FIG. 4a;
  • FIG. 4c a schematic plan view of the main part according to FIG. 4b;
  • FIG. 5 is a main view schematically showing an installation state according to FIGS. 4A to 4C.
  • FIG. 6 is a main view schematically showing another embodiment of the present invention.
  • Figure 7a is a main view schematically showing a conventional waterproof sheet for the tunnel.
  • FIG. 7B is a schematic main view of the installed state according to FIG. 7A.
  • FIG. 1 is a perspective view illustrating main parts schematically of the present invention
  • FIG. 2 is a schematic cross-sectional side view illustrating the main part of FIG. 1
  • FIG. 3 is a main part of the installed state of FIG. 1.
  • the present invention in order to maintain a high strength while minimizing damage or damage as well as to the simplest structure as well as to smoothly drain the discharged water drained from the excavation surface of the tunnel,
  • the waterproof sheet 100 The waterproof sheet 100,
  • a first waterproof sheet 10 made of soft conventional PE material which is high in strength and high in strength and does not break or damage even when contacted with the shotcrete surface of the tunnel;
  • the top surface of the first waterproof sheet 10 to which the fixing blade 20 is fused further reinforces the strength of the first waterproof sheet formed of the PE material, and the shotcrete surface of the tunnel does not directly contact the first waterproof sheet.
  • the fixing blades 20 are respectively fixed to the middle and both sides of the upper surface of the first waterproof sheet 10 so that the fixed blades can be fixed only by the fixing blades rather than being fixed by a separate Landel, washer and nail. Is formed, the uneven portion 30 is preferably formed between the fixed blade 20 in the middle and the fixed blade 20 formed on both sides. At this time, the fixed blades formed on both sides are fused and fixed at equal intervals to both sides of the fixed blade formed in the middle.
  • the upper part of the protrusion 32 of the uneven portion 30 is not pointed to prevent damage when contacted with the excavation surface, that is, to form a flat surface or a hemispherical curved surface, such as bent on the top desirable.
  • the protrusion has a high response force even after the installation of the shotcrete surface, the pressure in accordance with the subsequent laying the laying work.
  • each end of the waterproof sheet be easily fused by heat or high frequency to each other.
  • the waterproof sheet is made of only one layer of the first waterproof sheet and the fixed wing of the PE material, compared to the waterproof sheet consisting of two layers and the fixed wing of the conventional order plate and nonwoven fabric has a considerably simple structure.
  • the first waterproof sheet is formed of a soft PE material having high strength and irregularities formed on both sides thereof, the discharge water can flow smoothly, and thus, drainage efficiency can be further improved.
  • the upper surface in contact with the shotcrete surface on the first waterproof sheet can be maintained even higher strength due to the uneven portion composed of the projections as well as the first waterproof sheet
  • the first waterproof sheet By being supported not to be in direct contact with the shotcrete surface made of an irregular surface and maintained at a predetermined interval by the protrusions of the uneven surface, it is possible to prevent the first waterproof sheet from being damaged or damaged, as well as to naturally excavate the surface between the protrusions and the protrusions. Drainage can also be made more smoothly as it serves as a drainage can flow out from the discharge.
  • the projections of the uneven part is to have a role that can have a high bearing capacity even after the installation of the waterproof sheet to the shotcrete surface and then the pressure of the fixed laying ring.
  • the present invention performs the role of the waterproof sheet as it is, while having a simple structure of the waterproof sheet used in the tunnel as much as possible, as well as reducing the manufacturing cost due to the simple structure as well as the installation work conditions can be made quickly and easily To have.
  • the present invention has a double structure of two layers as in the conventional conventional waterproof sheet, in order to prevent the water eating phenomenon occurs, described with reference to Figures 4a to 4c and 5 as follows.
  • the fixing blade 20 is formed in the center of the upper surface of the first waterproof sheet 10, the respective uneven portion 30 is formed on both sides of the fixing blade (10).
  • a fixing surface 34 is not formed with projections for fixing with a conventional landel and washer and nail not shown as a shotcrete surface, the first waterproof sheet 10
  • the bottom surface of the second waterproof sheet (40) having an area corresponding to the first waterproof sheet 10 and the water does not pass through the first waterproof sheet of the PE material can be easily fused with the PE waterproof sheet (40) ) Is fused and fixed by ordinary heat or high frequency.
  • the first waterproof sheet serves to protect the second waterproof sheet as in the conventional nonwoven fabric, and of course, the first waterproof sheet is tightly fixed to the shotcrete surface by the conventional landel, washer and nail.
  • the middle is pre-fusion with the fixed blade 20 of the first waterproof sheet 10 to have a predetermined width in the front and rear directions, 1 It is preferable that the second waterproof sheet 40 is fused at least one point in the front and rear directions to the bottom of the fixing surface 34 of the waterproof sheet 10. At this time, the welding member is melted during heat or high frequency fusion to serve as an adhesive for tightly fixing the first waterproof sheet and the second waterproof sheet.
  • the upper part of the protrusion 32 of the uneven part 30 is formed in a hemispherical curved surface or in a planar shape such as notched, in order to prevent damage to contact with the excavation surface. It is preferable to form a joint 12 having no protrusion formed between both ends of the first waterproof sheet 10 and the uneven portion 30 so as to easily fuse when the other waterproof sheet is connected to each other. .
  • the first waterproof sheet is fixed to the shotcrete surface in order to prevent sag by conventional landels, washers, and nails together with the fixing blades, as well as the discharged water discharged from the excavation surface formed before the shotcrete is placed on both sides.
  • the second waterproof sheet fused to the bottom surface of the first waterproof sheet is a secondary to prevent the leakage of some of the water leaked from the first waterproof sheet which is fixed to the shotcrete surface. It is to block completely.
  • first waterproof sheet and the second waterproof sheet are fused through a fusion member as a fused portion, the first waterproof sheet and the second waterproof sheet can be fusion-bonded smoothly without distortion or distortion due to heat or high frequency.
  • another embodiment of the present invention is provided with two layers of double waterproof sheet, the condition that the water eating phenomenon does not occur even by the discharged water discharged from the excavation surface, that is, the first waterproof sheet is a high-strength soft PE material
  • the first waterproof sheet is a high-strength soft PE material
  • the second waterproof sheet fused to the bottom surface of the first waterproof sheet has excellent adhesion and is formed of EVA, both of them quickly discharge the water discharged from the excavation surface formed during the tunnel construction due to the condition that the water does not pass. It has a condition that can drain to both sides.
  • the waterproof sheet 100 having a double structure of the present invention does not fix the above-described first waterproof sheet 10 to the shotcrete surface with a conventional landel, washer and nail, as in the waterproof sheet of the one-ply structure described above.
  • a conventional landel, washer and nail as in the waterproof sheet of the one-ply structure described above.
  • the fixing blade 20 formed in the middle of the first waterproof sheet 10 of PE material is fixed to the fixing surface 34 on which the protrusions are not formed between the uneven parts 30.
  • the fixing blades 20, such as the wings 20, respectively when fixing the first waterproof sheet 10 to the shotcrete surface, the use of fixing the fixing surface with a conventional Landel, washers and nails as described above It can be fixed only with fixed blades, such as a one-ply waterproof sheet.
  • the second waterproof sheet 40 fused to the bottom surface of the first waterproof sheet 10 is fused and fixed in the same manner as described above.
  • the fixed wing formed of the fixed surface is pre-fused with the fixed surface, and may be point-fused as necessary.
  • the present invention is not only to maintain the high strength while minimizing damage or damage, but also to smoothly drain the discharged water drained from the excavation surface of the tunnel, so as to have a simple structure of one layer
  • the manufacturing cost of the waterproof sheet is reduced, and the installation can also be easily performed, and the damage and damage caused by the uneven portion can be minimized to increase the reliability, and drainage can also be made smoothly.
  • the fixing to the shotcrete surface can be fixed only by the fixing blade, thereby having a simple and convenient effect in a short time without the need to be fixed with a separate landel and washer and nail during installation.
  • the upper part of the protrusion formed on the upper surface of the first waterproof sheet to minimize the damage caused by the contact with the shotcrete surface, thereby minimizing the damage or damage of the first waterproof sheet in contact with the shotcrete surface to further increase the reliability
  • it also has the effect of having a high responsiveness to the pressure when laying the waterproofing after installing the waterproof sheet.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

La présente invention concerne une feuille résistante à l'eau disposée pour la résistance à l'eau pendant une construction de tunnel. La feuille résistante à l'eau selon la présente invention possède la structure la plus simple possible et est utilisée pendant une construction de tunnel afin d'évacuer doucement l'eau drainée par la face de déblaiement du tunnel. La feuille résistante à l'eau comprend : une première feuille résistante à l'eau formée d'une matière PE souple qui empêche l'eau de pénétrer ; au moins une lame fixe dont une extrémité est fixée par fusion sur la surface supérieure de la première feuille résistante à l'eau dans les directions avant et arrière ; et une partie concave-convexe ayant plusieurs saillies qui dépassent en continu et de manière répétée dans les directions avant et arrière et les directions gauche et droite sur la surface supérieure de la première feuille résistante à l'eau sur laquelle la lame fixe est fixée par fusion, de manière qu'un espacement constant soit maintenu entre la face de béton projeté du tunnel et la première feuille résistante à l'eau, et que l'eau drainée par la face de déblaiement du tunnel puisse être évacuée.
PCT/KR2012/009216 2012-11-05 2012-11-05 Feuille résistante à l'eau pour tunnel WO2014069701A1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201280002446.7A CN103930651B (zh) 2012-11-05 2012-11-05 隧道用防水板
PCT/KR2012/009216 WO2014069701A1 (fr) 2012-11-05 2012-11-05 Feuille résistante à l'eau pour tunnel
JP2014544653A JP6044051B2 (ja) 2012-11-05 2012-11-05 トンネル用防水シート

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/KR2012/009216 WO2014069701A1 (fr) 2012-11-05 2012-11-05 Feuille résistante à l'eau pour tunnel

Publications (1)

Publication Number Publication Date
WO2014069701A1 true WO2014069701A1 (fr) 2014-05-08

Family

ID=50627591

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2012/009216 WO2014069701A1 (fr) 2012-11-05 2012-11-05 Feuille résistante à l'eau pour tunnel

Country Status (3)

Country Link
JP (1) JP6044051B2 (fr)
CN (1) CN103930651B (fr)
WO (1) WO2014069701A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018096078A (ja) * 2016-12-12 2018-06-21 株式会社松榮技研 トンネル内壁面へのシート張り方法およびシート張りセット
CN112360519A (zh) * 2020-10-28 2021-02-12 中铁隧道局集团有限公司 一种定位土工布及提高隧道防水板铺设质量的土工布定位方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106996300B (zh) * 2017-04-19 2019-02-19 中铁十一局集团第四工程有限公司 一种隧道防水板铺设方法
JP7097711B2 (ja) * 2018-02-09 2022-07-08 藤森工業株式会社 トンネル用防水シート連続体
CN113931665A (zh) * 2021-09-22 2022-01-14 中国建筑第八工程局有限公司 松散土层隧道防水施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100740781B1 (ko) * 2007-03-15 2007-07-19 주식회사 삼송마그마 엠보싱 시트를 이용한 터널내 방수구조 및 공법
KR20100040774A (ko) * 2008-10-11 2010-04-21 양영규 터널방수시트 및 그 제조방법
KR101005027B1 (ko) * 2008-04-07 2010-12-30 연일화섬공업(주) 배수 유도용 시트 적층물과, 그것을 이용하는 터널 방수구조 및 터널 방수 공법
KR20110027956A (ko) * 2009-09-11 2011-03-17 대룡공업주식회사 지수판
KR20120106272A (ko) * 2011-03-18 2012-09-26 범미건설화학 주식회사 고정부를 포함하는 터널 방수 시공용 방수 시트

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03206297A (ja) * 1989-09-29 1991-09-09 Bridgestone Corp トンネル用防水シートおよびその固定構造
JPH09310597A (ja) * 1996-05-24 1997-12-02 Bridgestone Corp 防水シート
JP2001214698A (ja) * 2000-02-01 2001-08-10 Bridgestone Corp 防水シート材
CN101691739B (zh) * 2009-08-31 2011-04-20 天津市水利科学研究院 复合型自粘止水带及制作方法和施工方法
CN102777210A (zh) * 2012-08-22 2012-11-14 中铁二院工程集团有限责任公司 隧道网络防排水板

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100740781B1 (ko) * 2007-03-15 2007-07-19 주식회사 삼송마그마 엠보싱 시트를 이용한 터널내 방수구조 및 공법
KR101005027B1 (ko) * 2008-04-07 2010-12-30 연일화섬공업(주) 배수 유도용 시트 적층물과, 그것을 이용하는 터널 방수구조 및 터널 방수 공법
KR20100040774A (ko) * 2008-10-11 2010-04-21 양영규 터널방수시트 및 그 제조방법
KR20110027956A (ko) * 2009-09-11 2011-03-17 대룡공업주식회사 지수판
KR20120106272A (ko) * 2011-03-18 2012-09-26 범미건설화학 주식회사 고정부를 포함하는 터널 방수 시공용 방수 시트

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018096078A (ja) * 2016-12-12 2018-06-21 株式会社松榮技研 トンネル内壁面へのシート張り方法およびシート張りセット
CN112360519A (zh) * 2020-10-28 2021-02-12 中铁隧道局集团有限公司 一种定位土工布及提高隧道防水板铺设质量的土工布定位方法
CN112360519B (zh) * 2020-10-28 2023-02-17 中铁隧道局集团有限公司 一种定位土工布及提高隧道防水板铺设质量的土工布定位方法

Also Published As

Publication number Publication date
CN103930651A (zh) 2014-07-16
JP2015505919A (ja) 2015-02-26
CN103930651B (zh) 2016-10-12
JP6044051B2 (ja) 2016-12-14

Similar Documents

Publication Publication Date Title
WO2014069701A1 (fr) Feuille résistante à l'eau pour tunnel
KR101226187B1 (ko) 터널용 방수시트
KR20190110012A (ko) 방수방근시트 및 그 시공방법
JP4589344B2 (ja) シート防水構造及び防水工法
CN215751171U (zh) 一种增强型tpo预铺防水卷材
CN202866127U (zh) 防滑瓦片
CN214531547U (zh) 一种女儿墙防渗水结构
JP5686337B2 (ja) 防火・防水外装構造の施工方法
CN209741766U (zh) 一种中心孔型橡胶止水带的连接结构
CN214302281U (zh) 一种防水性好的防水卷材
KR100935417B1 (ko) 방수공법
JPH0813994A (ja) 防水シートの接続固定構造
WO2016060327A1 (fr) Gazon artificiel modulaire
CN217870639U (zh) 一种预铺式的防水卷材
JP2540158Y2 (ja) 防水シートの接続固定構造
CN214834101U (zh) 一种具有保温功能的pvc琉璃瓦
CN211899308U (zh) 一种落差式防水系统
CN202689051U (zh) 预铺反粘防水卷材
CN211312433U (zh) 一种水利渠道预制件拼装结构
CN212026214U (zh) 反应自粘式排水板
JPS60247000A (ja) 起伏形状遮水シ−トを用いた地下構造物施工方法
CN215243383U (zh) 一种建筑构件用防水阻隔机构
CN211165698U (zh) 一种复合型防水卷材
KR20130114338A (ko) 시트 방수 구조물 및 그 시공방법
JP2019138044A (ja) トンネル用防水シート連続体

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2014544653

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12887703

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12887703

Country of ref document: EP

Kind code of ref document: A1