WO2014050073A1 - 電池状態推定装置及び蓄電池システム - Google Patents
電池状態推定装置及び蓄電池システム Download PDFInfo
- Publication number
- WO2014050073A1 WO2014050073A1 PCT/JP2013/005628 JP2013005628W WO2014050073A1 WO 2014050073 A1 WO2014050073 A1 WO 2014050073A1 JP 2013005628 W JP2013005628 W JP 2013005628W WO 2014050073 A1 WO2014050073 A1 WO 2014050073A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- timing
- voltage
- battery
- unit
- parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/3644—Constructional arrangements
- G01R31/3648—Constructional arrangements comprising digital calculation means, e.g. for performing an algorithm
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/382—Arrangements for monitoring battery or accumulator variables, e.g. SoC
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/382—Arrangements for monitoring battery or accumulator variables, e.g. SoC
- G01R31/3835—Arrangements for monitoring battery or accumulator variables, e.g. SoC involving only voltage measurements
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/48—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Definitions
- the present invention relates to a battery state estimation device and a storage battery system.
- the open-circuit voltage of the storage battery can be detected by measuring the terminal voltage of the storage battery when charging / discharging is stopped.
- the impedance circuit in the internal equivalent circuit of the storage battery also includes a capacity component, the terminal voltage fluctuates transiently for a while (for example, several minutes to several hours) after charging or discharging stops.
- a conventional method minimizes the coefficient of the approximate expression including a plurality of exponential terms using the voltage value within a predetermined time after charging and discharging are stopped. It calculates using a square method (refer the following patent document 1).
- the stable open-circuit voltage (open-circuit voltage convergence value) may be estimated by the above-described conventional method, fitting using multiple exponential functions is necessary, so that the parameter setting becomes complicated and the computation load is reduced. heavy.
- an object of the present invention is to provide a battery state estimation device and a storage battery system capable of accurately estimating a stable open-circuit voltage (open-circuit voltage convergence value) by a simple calculation.
- the battery state estimation device includes a measurement value acquisition unit that sequentially acquires a measurement value of a battery voltage, which is a terminal voltage of a storage battery, and a reference timing in a non-energization period after the storage battery is charged or discharged.
- a timing setting unit that sets a second timing that varies only by using the measurement value, a first time difference between the reference timing and the first timing, and a second time difference between the first timing and the second timing, And an open-circuit voltage estimating unit that estimates an open-circuit voltage of the storage battery at a target timing after the second timing.
- the present invention it is possible to provide a battery state estimation device and a storage battery system capable of accurately estimating a stable open-circuit voltage (open-circuit voltage convergence value) by a simple calculation.
- 1 is a schematic overall configuration diagram of a storage battery system according to an embodiment of the present invention. It is an internal equivalent circuit schematic of the battery module which concerns on embodiment of this invention. It is a graph which shows the time transition of the terminal voltage and internal voltage of a battery module concerning embodiment of this invention. It is a figure which shows the time fluctuation of the battery voltage during a non-energization period.
- 1 is an internal block diagram of an open-circuit voltage / charge rate estimation apparatus according to a first embodiment of the present invention. It is an operation
- FIG. 1 is a schematic overall configuration diagram of a storage battery system 1 according to an embodiment of the present invention.
- the storage battery system 1 includes a battery module 11, a current sensor 12, a voltage sensor 13, a temperature sensor 14, and a battery control unit 15. You may think that the electric power block 20 is also contained in the component of the storage battery system 1.
- FIG. 1 is a schematic overall configuration diagram of a storage battery system 1 according to an embodiment of the present invention.
- the storage battery system 1 includes a battery module 11, a current sensor 12, a voltage sensor 13, a temperature sensor 14, and a battery control unit 15. You may think that the electric power block 20 is also contained in the component of the storage battery system 1.
- FIG. 1 is a schematic overall configuration diagram of a storage battery system 1 according to an embodiment of the present invention.
- the storage battery system 1 includes a battery module 11, a current sensor 12, a voltage sensor 13, a temperature sensor 14, and a battery control unit 15. You may think that the electric power block 20 is also contained in the component of the storage battery system 1.
- the battery module 11 includes one or more storage batteries (in other words, secondary batteries).
- the storage battery forming the battery module 11 is any type of storage battery, for example, a lithium ion battery or a nickel metal hydride battery.
- the battery module 11 is formed by a plurality of storage batteries connected in series, but the number of storage batteries forming the battery module 11 may be one. Some or all of the storage batteries included in the battery module 11 may be connected in parallel to each other.
- the battery module 11 is considered as one storage battery.
- discharging and charging means discharging and charging of the battery module 11 unless otherwise specified.
- FIG. 2 is an equivalent circuit in the battery module 11.
- the equivalent circuit in the battery module 11 can be considered as a series connection circuit of a voltage source VS that outputs the voltage V S and has an internal resistance of zero, and an impedance circuit Z that includes a resistance component and a capacitance component.
- the power block 20 is connected to the battery module 11.
- the power block 20 includes a load and a power source.
- the battery module 11 can supply discharge power to a load in the power block 20 and can be supplied with charging power from a power source in the power block 20.
- a power conversion circuit (not shown) may be interposed between the battery module 11 and the load and power source in the power block 20.
- the current sensor 12 is interposed between the battery module 11 and the power block 20 and measures a battery current I which is a current flowing through the battery module 11.
- the voltage sensor 13 measures a battery voltage V that is a terminal voltage of the battery module 11 (that is, a potential difference between the positive electrode and the negative electrode of the battery module 11).
- the temperature sensor 14 measures a battery temperature TMP that is the temperature of the battery module 11.
- the battery temperature TMP is, for example, the surface temperature of the pack that encloses the storage battery in the battery module 11 or the temperature at a specific part in the battery module 11.
- the symbols I, V, and TMP are also used as symbols indicating the value of the battery current, the value of the battery voltage, and the value of the battery temperature, respectively.
- the battery current value I, the battery voltage value V, and the battery temperature TMP measured by the sensors 12, 13, and 14 may be referred to as the measured current value I, the measured voltage value V, and the measured temperature TMP, and the description is simplified.
- the measured values I, V, and T may be referred to for the sake of simplicity.
- the battery control unit 15 controls charging and discharging of the battery module 11 using battery state data including the measurement values I, V, and TMP.
- the battery control unit 15 includes a battery state estimation device 30 that estimates an open voltage of the battery module 11 using the battery state data.
- the battery module 11 Prior to the description of the battery state estimation device 30, a situation as shown in FIG.
- the battery module 11 is not charged and discharged in the period P0 from the timing t A to the timing t B , and then the battery module 11 is discharged in the period P1 from the timing t B to the timing t C , and thereafter Assume that charging and discharging of the battery module 11 are stopped in the period P2 from the timing t C to the timing t D, and discharging of the battery module 11 is performed again in the period P3 after the timing t D.
- Each of the periods P1 and P3 is an energization period in which the battery module 11 is discharged or charged.
- Each of the periods P0 and P2 is a non-energization period in which the battery module 11 is not discharged and charged.
- charging or discharging of the battery module 11 is also expressed as energization of the battery module 11.
- the energization period P1 is a discharge period during which discharge is performed, but the energization period P1 may be a charge period during which charging is performed, and in this case, the timing t C is a charging stop timing. .
- a solid line waveform 301 represents a time transition of the battery voltage V
- a broken line waveform 302 represents a time transition of the voltage V S (see FIG. 2).
- the battery voltage V corresponds to the voltage V S minus the voltage drop due to the resistance component of the impedance circuit Z.
- the battery voltage V gradually increases over a corresponding time (for example, several minutes to several hours) as shown by the waveform 301 due to the presence of the impedance circuit Z, and during the period P2. Converges to a constant stable open-circuit voltage V S —P 2, which is the voltage V S.
- FIG. 4 is an enlarged view of the waveform 301 during the non-energization period P2.
- Timing t 0 ⁇ t n including timing t 0 ⁇ t 4 shows a plurality of times between the timing t C and t D (n is an integer).
- the timing t i + 1 is later than the timing t i, representing the battery voltage V at the timing t i at symbol V i.
- N is a unit quantity (unit voltage quantity) having a positive predetermined value, for example, several tens of millivolts.
- Timing t 0 functions as a reference timing.
- a time length T and a voltage variation parameter (hereinafter also simply referred to as a parameter) R are defined.
- t i + 1 ⁇ t i represents a time length between timings t i and t i + 1 .
- T t 1 ⁇ t 0 (A1)
- R (t 2 ⁇ t 1 ) / (t 1 ⁇ t 0 ) (A2)
- the voltage variation parameter R is represented by a ratio of the second time length “t 2 -t 1 ” to the first time length “t 1 -t 0 ”.
- the first time length “t 1 ⁇ t 0 ” is the time length required for the battery voltage V to change by the unit amount N as viewed from the reference timing t 0
- the second time length “t 2 ⁇ t”. 1 " the time when the battery voltage V as viewed from the reference timing t 0 varies by a unit amount N (starting ie timing t 1) as a starting point, the time required for the battery voltage V is varied by further unit quantity N Length.
- the energization period P1 before the non-energization period P2 is a discharge period
- the fluctuation of the battery voltage V during the non-energization period P2 is “increase”. If the energization period P1 is a charging period, the fluctuation of the battery voltage V during the non-energization period P2 is “decrease”.
- the battery voltage V fluctuates toward the stable open circuit voltage V S — P2 (see FIG. 3), but the fluctuation speed is related to the fact that the impedance circuit Z includes a capacitance component. It gradually decreases with time.
- the voltage variation parameter R has a value corresponding to the rate of change (decrease rate) of the variation rate of the battery voltage V during the non-energization period P2.
- t represents an arbitrary timing during the non-energization period P2.
- t ⁇ t 0 represents an elapsed time from the reference timing t 0 to the timing t.
- ⁇ V represents the fluctuation amount of the battery voltage V between the timings t 0 and t.
- V EST (t) represents the battery voltage V at the timing t, which can be estimated by the battery state estimation device 30.
- the battery state estimation device 30 models the behavior of the battery voltage V after the timing t2 by the equation (A4), and the battery voltage V at the timing t at the time before the timing t based on the estimation equation (A4) " V EST (t) "can be estimated (predicted).
- V EST (t) a future timing t viewed from the current timing (for example, t 2 ) at which this estimation is performed is referred to as a target timing
- V EST (t) is also referred to as an estimated open voltage (predicted open voltage).
- FIG. 5 is an internal block diagram of the open-circuit voltage / charge rate estimation device 50 included in the battery state estimation device 30.
- the estimation apparatus 50 according to the first embodiment includes each part referred to by reference numerals 51 to 56.
- the measurement value acquisition unit 51 periodically acquires the measurement current value I, the measurement voltage value V, and the measurement temperature TMP by sampling the output signals of the sensors 12, 13, and 14 at a predetermined sampling period. However, acquisition of the measured temperature TMP can be omitted.
- the timer 52 measures and acquires the current time, or measures an elapsed time from an arbitrary time. Each part in the battery state estimation device 30 including the estimation device 50 can freely use the acquisition result of the acquisition unit 51 and the acquisition / measurement result of the timer 52.
- the timing setting unit 53 sets the reference timing, the first timing, and the second timing using the measured voltage value V during the non-energization period after the energization of the battery module 11 is stopped.
- the non-energization period includes a voltage fluctuation period in which the battery voltage V fluctuates transiently, and the reference timing, the first timing, and the second timing are set during the voltage fluctuation period. Also in the first embodiment, assuming a period P2 as the de-energized period should be carried out estimation of open circuit voltage, it is assumed that the timing t 0 is set to the reference timing (the same applies to other embodiments described later).
- the timing setting unit 53 sets the reference timing t 0 based on the elapsed time after the energization of the battery module 11 is stopped. More specifically, for example, the time point when a predetermined time has elapsed from the boundary timing t C between the periods P1 and P2 (the timing when the discharge is stopped) is set as the reference timing t 0 .
- the timing setting unit 53 may set the reference timing t 0 based on the voltage fluctuation amount of the battery voltage V after the energization of the battery module 11 is stopped. More specifically, for example, the measured voltage value V is a predetermined voltage amount when viewed from the voltage value V [t C ], which is the measured voltage value V at the boundary timing t C (timing when discharge is stopped) between the periods P1 and P2. The timing increased by only the reference timing t 0 is set. Alternatively, after the timing t C , the fluctuation amount of the battery voltage V per unit time may be monitored as the monitoring target amount, and the timing at which the monitoring target amount decreases and becomes a predetermined value or less may be set as the reference timing t 0. .
- the timing setting unit 53 further includes a first timing at which the battery voltage V varies by a predetermined first voltage amount as viewed from the reference timing t 0 and a predetermined first voltage at which the battery voltage V is greater than the first voltage amount as viewed from the reference timing.
- a second timing that fluctuates by two voltage amounts is set using measurement values V that are sequentially acquired.
- the first voltage amount is equal to the unit amount N described above, and the second voltage amount is twice the unit amount N (see FIG. 4). Then, the first and second timings are the timings t 1 and t 2 in FIG. 4 , respectively.
- the parameter deriving unit 54 is based on the time difference (t 1 -t 0 ) between the reference and the first timing set by the timing setting unit 53 and the time difference (t 2 -t 1 ) between the first and second timings.
- the voltage fluctuation parameter R is derived according to the above equation (A2).
- Open voltage calculating unit 55 at a timing earlier than and target timing t a second timing t 2 after using the voltage fluctuation parameter R derived by deriving unit 54, the target timing in accordance with the above formula (A4) Estimate the open circuit voltage V EST (t) at t.
- the timing setting unit 53 holds the measured voltage value V at the reference timing t 0 as the reference voltage value V 0 , and the calculation unit 55 substitutes the held reference voltage value V 0 into the equation (A4). .
- the value of “T” in the formula (A4) is supplied from the timing setting unit 53 to the calculation unit 55. Further, the calculation unit 55 can recognize the elapsed time (t ⁇ t 0 ) from the reference timing t 0 to the prediction timing t, which is substituted into the equation (A4), using the timer 52.
- Target timing t is any timing of the timing t 2 after.
- the target timing t may be a timing at which a predetermined time (for example, one hour or several hours) has elapsed from the timing t C , t 0, or t 2 .
- a predetermined time for example, one hour or several hours
- the battery voltage V generally reaches the stable open-circuit voltage V S — P ⁇ b> 2 after about 1 hour has passed since the energization stop, so the timing one hour after the timing t C is set to the target timing t. If set, a practical estimated open circuit voltage V EST (t) is obtained, and V EST (t) functions as an estimated value of the stable open circuit voltage V S — P2.
- the open circuit voltage V EST (t) is estimated using the expression (A4). Is equivalent to estimating the open circuit voltage of the battery module 11 assuming that the above-mentioned assumption ASM is correct (assuming the proposition ASM is true).
- the charge rate estimation unit 56 charges the battery module 11 from the estimated open voltage V EST (t) using a predetermined arithmetic expression or table data indicating the relationship between the open voltage of the battery module 11 and the charge rate of the battery module 11. Estimate the rate.
- the charging rate of the battery module 11 is a ratio of the remaining capacity of the battery module 11 to the full charge capacity of the battery module 11, and is generally called SOC (State of Charge).
- FIG. 6 shows an operation flowchart relating to the open-circuit voltage estimation process.
- step S11 periodic acquisition of measurement values I, V, and TMP by the measurement acquisition unit 51 (for example, sequential acquisition with a period of 1 millisecond) is started. However, the acquisition of the measured value TMP can be omitted.
- the timing setting unit 53 monitors the measurement value I to determine whether or not the energization (charging or discharging) of the battery module 11 that has been performed so far has been stopped, and it is confirmed that the energization has been stopped.
- the reference timing t 0 is set according to the method described above, and the measured voltage value at the reference timing t 0 is held as the reference voltage value V 0 (steps S12 and S13). Further, thereafter, the timing setting unit 53 compares the sequentially obtained measurement value V with the reference voltage value V 0 , whereby the measurement value V changes from the reference voltage value V 0 by a first voltage amount (for example, N). And the timing at which the measured value V fluctuates from the reference voltage value V 0 by a second voltage amount (for example, 2 ⁇ N) is extracted and set as the first timing (t 1 ) and the second timing (t 2 ), respectively ( Step S14).
- a voltage fluctuation parameter R is derived from the set reference, first and second timings (step S15), and the open circuit voltage V EST (t) is estimated using the parameter R and the charging rate is estimated (step S15). S16).
- the parameter R necessary for open-circuit voltage estimation can be obtained only by observing the fluctuation amount of the battery voltage V. Therefore, the stable open-circuit voltage (open-circuit voltage convergence value) V S — P2 can be accurately calculated by simple calculation. Can be estimated.
- a solid line waveform V REAL1 and a broken line waveform V EST1 represent experimental waveforms of the measured voltage V and the estimated open circuit voltage V EST (t) in P2 during a non-energization period under a certain condition. It can be seen that both waveforms are in good agreement and a good estimate is made.
- the waveforms V REAL1 and V EST1 in FIG. 7 are obtained under certain temperature conditions (for example, when the battery temperature TMP is 25 ° C.). Depending on the battery temperature TMP, as shown in FIG. The error between the voltage V EST (t) and the actual battery voltage V can be large.
- the solid line waveform V REAL2 and the broken line waveform V EST2 are the measured voltage V and the estimated open-circuit voltage V EST (t) during the non-energization period under low temperature conditions (for example, the condition where the battery temperature TMP is 0 ° C.). ) Represents the experimental waveform.
- the waveform V EST2 is a waveform of the estimated open circuit voltage V EST (t) when the parameter correction described later is not performed.
- V EST the waveform of the estimated open circuit voltage V EST (t) when the parameter correction described later is not performed.
- the second embodiment a configuration for reducing an open-circuit voltage estimation error will be described.
- the behavior of the battery voltage V after stopping charging or discharging is affected by factors other than the battery temperature TMP, it is better to consider various factors that affect the behavior.
- FIG. 9 is an internal block diagram of an open-circuit voltage / charge rate estimating apparatus 50A according to the second embodiment.
- An estimation device 50A can be provided in the battery state estimation device 30 of FIG. By adding the parameter correction unit 57 to the estimation device 50 of FIG. 5, the estimation device 50A of FIG. 9 is formed. Except for the parameter correction unit 57, the configuration and operation of the estimation device 50A are the same as those of the estimation device 50 described in the first embodiment.
- the parameter correction unit 57 corrects the voltage fluctuation parameter R derived by the parameter deriving unit 54 based on the correction index.
- the corrected voltage fluctuation parameter R is represented by the symbol “ RC ”.
- the open-circuit voltage calculation unit 55 uses the parameter R C as “R” in the equation (A4) and then opens the open-circuit voltage at the target timing t according to the equation (A4). Estimate V EST (t).
- the correction index includes one or more of the following first to fourth indices.
- the correction unit 57 may correct the voltage variation parameter R using two, three, or four indexes among the first to fourth indexes.
- the first index is the battery temperature TMP.
- the battery temperature TMP as the first index is a measured temperature TMP at a timing based on the time point when the energization of the battery module 11 is stopped. That is, for example, battery temperature TMP of the first index, the timing t C, the timing t C than the predetermined time before the timing, or a measured temperature TMP in the timing after a predetermined time than the timing t C.
- the second index is the current rate (current amount per unit time) of energization of the battery module 11 during the energization period P1.
- the third index is a change amount ⁇ SOC [P1] of the charging rate of the battery module 11 during the energization period P1.
- the estimation device 50A of FIG. 9 or the battery state estimation device 30 of FIG. 1 integrates the measured current value I during the energization period P1, and the charge as the third index is calculated from the integrated value and the full charge capacity of the battery module 11.
- the rate change amount ⁇ SOC [P1] can be obtained.
- the fourth index is the charging rate SOC [P2] of the battery module 11 in the non-energization period P2.
- the charging rate SOC [P2] of the battery module 11 in the non-energizing period P2 is equal to the charging rate of the battery module 11 at the end point of the energizing period P1 (that is, timing t C ).
- the 1 can determine the charging rate SOC [P0] of the battery module 11 in the non-energization period P0 using the method described in the first embodiment ( That is, it can be obtained from the open circuit voltage estimated during the non-energization period P0), or can be obtained from the open circuit voltage (measured voltage V) measured during the non-energization period P0, and the charge rate SOC [P0] and the above
- the charging rate SOC [P2] can be obtained using the change amount ⁇ SOC [P1].
- the behavior of the battery voltage V during the non-energization period is actually investigated while changing the first to fourth indexes in various ways, and the parameter R is converted to the parameter RC according to the correction index using the survey results. It is preferable to create an arithmetic expression or table data to be performed, and hold the obtained arithmetic expression or table data in the parameter correction unit 57.
- FIG. 10 is an operation flowchart relating to an open-circuit voltage estimation process according to the second embodiment.
- the operation flowchart of FIG. 10 is the same as that of FIG. 6 except that a parameter correction step S20 is inserted between the parameter R deriving step S15 and the open circuit voltage estimating step S16.
- the derived parameter R is corrected to the parameter RC (step S20), and the open circuit voltage V EST (t) is estimated using the parameter RC and the charging rate is estimated (step S16).
- the voltage fluctuation parameter is corrected in consideration of the correction index that affects the behavior of the battery voltage V after the stop of charging or discharging, so that the estimation accuracy of the open-circuit voltage can be improved.
- FIG. 11 is an internal block diagram of an open-circuit voltage / charge rate estimation apparatus 50B according to the third embodiment.
- An estimation device 50B can be provided in the battery state estimation device 30 of FIG.
- the estimation device 50B of FIG. 11 is formed by adding the measurement value holding unit 58 to the estimation device 50 of FIG. Except for the presence of the measurement value holding unit 58 and the contents described later corresponding to the presence, the configuration and operation of the estimation device 50B are the same as those of the estimation device 50 described in the first embodiment.
- Measured value holding unit 58 after the end of the conduction period P1, the measured value of the battery voltage V is sequentially acquired by the measuring value acquisition unit 51, it holds only a predetermined time T Q min. That is, the measurement value holding unit 58 holds the measurement voltage value V acquired during the holding target period 320 of FIG. 12 in association with each measurement time (that is, the measured voltage value V of the holding target period 320 Hold time series data). Holding period 320, the timing t C, a period from the timing t C until time t CQ has elapsed the predetermined time T Q. Measured value holding unit 58 may together hold a measured voltage value V of the time period exceeding a predetermined time T Q.
- the timing setting unit 53 does not set the first and second timings t 1 and t 2 with reference to the reference timing t 0 after setting the reference timing t 0.
- the end timing t CQ of the period 320 is handled as the second timing t 2 (see FIG. 12), and then, based on each measured voltage value V held in the holding unit 58, the reference timing t 2 with the second timing t 2 as a reference. 0 and the first timing t 1 are set.
- the timing setting unit 53 a second timing voltage value measured voltage value V at t 2 as a timing t CQ with defined as the second timing t 2 Treat as V 2 (see FIG. 4).
- the setting unit 53 measures the measured voltage value V (that is, V 1 ) that is lower than the voltage value V 2 by the unit amount N and the measured voltage value V that is lower than the voltage value V 2 by twice the unit amount N (that is, V 0 ).
- the operation after the timings t 0 , t 1 and t 2 are set is as described in the first embodiment.
- the parameter correction unit 57 of FIG. 9 is added to the estimation device 50B of FIG. 11, and the correction of the parameter R described in the second embodiment and the open circuit voltage V EST (t) based on the corrected parameter R (ie, R C ). An estimation may be performed.
- the estimated open circuit voltage at that time is set after the lapse of the predetermined time T Q is a timing t 2 is ensured.
- ⁇ 4th Example A fourth embodiment will be described.
- the parameter update unit 60 (see FIG. 13) according to the fourth embodiment can be mounted on the estimation device 50, 50A or 50B (FIG. 5, FIG. 9, or FIG. 11).
- the update unit 60 The operation of the estimation device 50, 50A or 50B on which is mounted will be described.
- the timing setting unit 53 sets the reference timing t 0 ′ during the non-energization period P2 in addition to the settings of the timings t 0 , t 1 and t 2 , and from the reference timing t 0 ′.
- the battery voltage V changes by the second voltage amount (for example, 2N) as viewed from the first timing t 1 ′ when the battery voltage V changes by the first voltage amount (for example, N) and the reference timing t 0 ′.
- Two timings t 2 ′ are set using the measurement values V acquired sequentially.
- the reference timing t 0 ′ is an arbitrary timing after the reference timing t 0 and may coincide with the timing t 1 or t 2 or may be a predetermined timing after the timing t 2 .
- the timings t 0 ′, t 1 ′, and t 2 ′ function as update timings.
- the parameter derivation unit 54 uses the following formula (B1 ) To obtain the update parameter R ′ (see FIG. 14).
- “t i + 1 ′ ⁇ t i ′” represents a time length between timings t i ′ and t i + 1 ′.
- R ′ (t 2 ′ ⁇ t 1 ′) / (t 1 ′ ⁇ t 0 ′) (B1)
- the update parameter R ′ may be corrected to the update parameter R C ′ based on the correction index as in the method of correcting the parameter R to the parameter RC (FIG. 14). reference).
- the parameter update unit 60 obtains the parameter R UPDATE according to the following formula (B2) or formula (B3).
- the weighting coefficient w in the formulas (B2) and (B3) may be 1, or may have an arbitrary predetermined value within a range satisfying “0 ⁇ w ⁇ 1”.
- R UPDATE (1-w) ⁇ R + w ⁇ R ′ (B2)
- R UPDATE (1-w) ⁇ R C + w ⁇ R C '(B3)
- Open voltage calculating unit 55 before derivation of parameters R UPDATE, but to estimate the open circuit voltage V EST (t) based on the parameters R, or R C, after deriving the parameters R UPDATE, based on the parameter R UPDATE open Estimate the voltage V EST (t). That is, after deriving the parameter R UPDATE , the calculation unit 55 uses the parameter R UPDATE as “R” in the equation (A4), and then calculates the open circuit voltage V EST (t) at the target timing t according to the equation (A4). presume. As described above, the derivation of the parameter R UPDATE updates the voltage fluctuation parameter used for the open circuit voltage estimation (the parameter R UPDATE corresponds to the updated parameter).
- the battery voltage V gradually converges to the stable open voltage V S — P2 while being influenced by various factors inside the battery module 11, but rather than the behavior of the battery voltage V in the initial period of the voltage fluctuation period, The behavior of the battery voltage V in the middle or end of the voltage fluctuation period better represents the state of convergence to the stable open-circuit voltage V S —P2. For this reason, the estimation accuracy of the open circuit voltage can be improved by updating the voltage fluctuation parameter as in the fourth embodiment.
- the operation when the voltage fluctuation parameter is updated only once has been described. According to the same method as described above, a plurality of sets of timings t 0 ′, t 1 ′ and t 2 ′ are set, and the update operation is performed more than once. You can go.
- FIG. 15 is a specific example of timings t 0 , t 1 and t 2 and timings t 0 ′, t 1 ′ and t 2 ′ assumed in the fifth embodiment.
- the battery voltages V at the timings t 0 ′, t 1 ′, and t 2 ′ are V 0 ′, (V 0 ′ + N), and (V 0 ′ + 2N), respectively.
- the parameter deriving unit 54 obtains the voltage fluctuation parameter R and R ′ based on the above (A2) and (B1), and then obtains the voltage fluctuation parameter R J according to the equation (B4).
- the weighting factor w in the formula (B4) is an arbitrary predetermined value within a range satisfying “0 ⁇ w ⁇ 1”, but may be typically 0.5.
- the parameter R J may be corrected to the parameter R JC based on the correction index in the same manner as the method of correcting the parameter R to the parameter R C.
- the calculation unit 55 estimates the open circuit voltage V EST (t) at the target timing t according to the above equation (A4) after using the parameter R J or R JC as “R” in the equation (A4).
- R J (1 ⁇ w) ⁇ R + w ⁇ R ′ (B4)
- the fifth embodiment described above can be said to be a form in which the voltage variation parameter is set at a timing of four or more points. As described below, the voltage variation parameter may be set at a timing of four or more points.
- the timing setting unit 53 sets the timings t 0 , t 1, and t 2 as described above, and further, the third timing at which the battery voltage V fluctuates by a predetermined third voltage amount as viewed from the reference timing t 0 , It sets using the measured value V acquired sequentially.
- the third voltage amount is larger than the first and second voltage amounts described above.
- the first and second voltage amounts are 1 and 2 times the unit amount N, respectively, and the third voltage amount is 3 times the unit amount. Then, the third timing coincides with the timing t 3 in FIG.
- the parameter deriving unit 54 uses t 0 to t 3 as measured values, and calculates the value of the parameter R that accurately satisfies the following expressions (C1) to (C3) using the least square method or the like. To derive.
- the operation after the derivation of the parameter R is as described in the above embodiments.
- the parameter R is determined using the timings t 0 to t 3 of four points, but the parameter R may be determined using timings of five points or more (for example, t 0 to t 4 ). By increasing the number of timings for deriving the parameter R, the parameter R is made more appropriate, and the open-circuit voltage estimation accuracy is improved.
- the variation amount of the battery voltage V from the reference timing t 0 to the i-th timing t i is i times the unit amount N (in other words, the battery voltage between the timings t i and t i + 1 ).
- the fluctuation amount of the battery voltage V between the timings t i and t i + 1 is a logarithmic function or an exponential function depending on the integer i. It may be expressed. For example, when the fluctuation amount of the battery voltage V between the timings t 0 and t 1 is the unit amount N, the fluctuation amount of the battery voltage V between the timings t 1 and t 2 is “logN” and “N m ”. (M is a predetermined value).
- the parameter deriving unit 54 and the open-circuit voltage calculating unit 55 regard the assumption ASM as correct (the proposition ASM is true) and derive the parameter R and the open-circuit voltage V EST (t). (The estimation formula of the open circuit voltage V EST (t) can be changed from the above formula (A4)).
- the estimated open circuit voltage V EST (t) When the voltage fluctuation parameter does not depend on time and does not change, the estimated open circuit voltage V EST (t) according to the above formula (A4) continues to fluctuate with time. Even in that case, if the target timing t is appropriately set (for example, if the timing one hour after the timing t C is set as the target timing t as described in the first embodiment), the estimated open circuit voltage V EST (t) represents the stable open circuit voltage V S — P2 with high accuracy. However, in order to converge the estimated open circuit voltage V EST (t) to the stable open circuit voltage V S — P2, the voltage variation parameter (R, R C , R UPDATE , R J or R JC ) is made a function of time (exponential function, etc.). May be. That is, for example, after derivation of the voltage fluctuation parameter, the value of the voltage fluctuation parameter may be increased with time as shown in FIG.
- an estimation formula is formed using a logarithmic function, but the form of the open-circuit voltage estimation formula is arbitrary, and a function other than the logarithmic function (for example, an exponential function) ) May be used to form an estimation formula for the open circuit voltage.
- the target device that is the battery control unit 15, the battery state estimation device 30, or the estimation device 50, 50A, or 50B can be configured by hardware or a combination of hardware and software.
- Arbitrary specific functions that are all or part of the functions realized in the target device are described as a program, the program is stored in a flash memory that can be mounted on the target device, and the program is executed by the program execution device.
- the specific function may be realized by executing on a microcomputer (for example, a microcomputer that can be mounted on the target device).
- the program can be stored and fixed in an arbitrary recording medium (not shown).
- a recording medium (not shown) for storing and fixing the program may be mounted or connected to a device (such as a server device) different from the target device.
- an open-circuit voltage estimating unit is formed by the parameter deriving unit 54 and the open-circuit voltage calculating unit 55, or by the parameter deriving unit 54, the parameter correcting unit 57, and the open-circuit voltage calculating unit 55 (FIG. 5, FIG. 9 and FIG. 11), the open-circuit voltage estimation unit may be considered to further include a parameter update unit 60 (see FIG. 13).
- a device that excludes the charging rate estimation unit 56 from the estimation device 50, 50A, or 50B functions as an open-circuit voltage estimation device. It is also possible to delete the charging rate estimation unit 56 from the estimation device 50, 50A or 50B.
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Secondary Cells (AREA)
Description
T=t1-t0 …(A1)
R=(t2-t1)/(t1-t0) …(A2)
仮定(命題)ASMが真であるならば、等式"t3-t2=T×R2"、"t4-t3=T×R3"、・・・及び"tn-tn―1=T×Rn-1"が成立すると共に下記式(A3)が成立する。式(A3)から式(A4)が導かれる。
"t-t0"は、基準タイミングt0からタイミングtまでの経過時間を表す。
"ΔV"は、タイミングt0及びt間における電池電圧Vの変動量を表す。
"VEST(t)"は、電池状態推定装置30にて推定可能な、タイミングtにおける電池電圧Vを表す。式(A3)から式(A4)を導く際、 関係式"ΔV=VEST(t)-V0" が利用される。
第1実施例を説明する。図5は、電池状態推定装置30に内包された開放電圧/充電率推定装置50の内部ブロック図である。第1実施例に係る推定装置50は、符号51~56によって参照される各部位を備える。
更にその後、タイミング設定部53は、順次取得される測定値Vを基準電圧値V0と比較することで、測定値Vが基準電圧値V0から第1電圧量(例えばN)だけ変動したタイミング及び測定値Vが基準電圧値V0から第2電圧量(例えば2×N)だけ変動したタイミングを、夫々、第1タイミング(t1)及び第2タイミング(t2)として抽出、設定する(ステップS14)。設定された基準、第1、第2タイミングから電圧変動パラメータRが導出され(ステップS15)、当該パラメータRを用いて開放電圧VEST(t)が推定されると共に充電率が推定される(ステップS16)。
但し、図7の波形VREAL1及びVEST1は或る温度条件下(例えば電池温度TMPが25℃の条件下)で得られるものであり、電池温度TMPによっては、図8に示す如く、推定開放電圧VEST(t)と実際の電池電圧Vとの誤差が大きくなりうる。図8において、実線波形VREAL2及び破線波形VEST2は、低温度条件下(例えば電池温度TMPが0℃の条件下)での非通電期間中P2における測定電圧V及び推定開放電圧VEST(t)の実験波形を表している。但し、波形VEST2は、後述のパラメータ補正を行わなかった場合における推定開放電圧VEST(t)の波形である。第2実施例では、開放電圧の推定誤差を低減する構成を説明する。また、充電又は放電停止後の電池電圧Vの挙動は、電池温度TMP以外の要因にも影響されるため、該挙動に影響を与える様々な要因に配慮した方が良い。
図1の電池状態推定装置30に推定装置50Aを設けておくことができる。図5の推定装置50にパラメータ補正部57を追加することで図9の推定装置50Aが形成される。パラメータ補正部57を除き、推定装置50Aの構成及び動作は、第1実施例で述べた推定装置50のそれらと同じである。
第3実施例を説明する。図11は、第3実施例に係る開放電圧/充電率推定装置50Bの内部ブロック図である。図1の電池状態推定装置30に推定装置50Bを設けておくことができる。図5の推定装置50に測定値保持部58を追加することで図11の推定装置50Bが形成される。測定値保持部58の存在及びその存在に対応する後述の内容を除き、推定装置50Bの構成及び動作は、第1実施例で述べた推定装置50のそれらと同じである。
第4実施例を説明する。第4実施例では、第1~第3実施例と組み合わせ可能なパラメータ更新方法を説明する。推定装置50、50A又は50B(図5、図9又は図11)に第4実施例に係るパラメータ更新部60(図13参照)を搭載可能であり、以下、第4実施例では、更新部60が搭載された推定装置50、50A又は50Bの動作を説明する。
R'=(t2'-t1')/(t1'-t0') …(B1)
RUPDATE=(1-w)・R+w・R' …(B2)
RUPDATE=(1-w)・RC+w・RC' …(B3)
第1~第4実施例と組み合せて実施される第5実施例を説明する。上述の如く設定されたタイミングt0'、t1'及びt2'は、電圧変動パラメータの更新に利用されるのではなく、以下のようにパラメータの設定に利用されても良い。図15は、第5実施例で想定されるタイミングt0、t1及びt2とタイミングt0'、t1'及びt2'の具体例である。
図15の例では、タイミングt0'、t1'、t2'における電池電圧Vは、夫々、V0'、( V0'+N)、 (V0'+2N)である。
RJ=(1-w)・R+w・R' …(B4)
第1~第4実施例と組み合せて実施される第6実施例を説明する。上述の第5実施例は、4点以上のタイミングで電圧変動パラメータを設定する一形態と言える。以下のように、4点以上のタイミングで電圧変動パラメータを設定しても良い。タイミング設定部53は、上述の如くタイミングt0、t1及びt2を設定すると共に、更に、基準タイミングt0から見て電池電圧Vが所定の第3電圧量だけ変動する第3タイミングを、順次取得される測定値Vを用いて、設定する。第3電圧量は、上述の第1及び第2電圧量よりも多い。ここでは、第1、第2電圧量は夫々単位量Nの1倍、2倍であって、第3電圧量は単位量の3倍であるとする。そうすると、第3タイミングは、図4のタイミングt3と一致する。
t1-t0=T …(C1)
t2-t1=T×R …(C2)
t3-t2=T×R2 …(C3)
第7実施例では、第1~第6実施例の何れかに適用可能な幾つかの技術を説明する。
本発明の実施形態は、特許請求の範囲に示された技術的思想の範囲内において、適宜、種々の変更が可能である。以上の実施形態は、あくまでも、本発明の実施形態の例であって、本発明ないし各構成要件の用語の意義は、以上の実施形態に記載されたものに制限されるものではない。上述の説明文中に示した具体的な数値は、単なる例示であって、当然の如く、それらを様々な数値に変更することができる。上述の実施形態に適用可能な注釈事項として、以下に、注釈1~注釈3を記す。各注釈に記載した内容は、矛盾なき限り、任意に組み合わせることが可能である。
上述の実施形態では、放電停止後の非通電期間P2中における開放電圧の推定動作を説明しているが、充電停止後の非通電期間中においても同様の開放電圧推定が可能である。
電池制御部15、電池状態推定装置30又は推定装置50、50A若しくは50Bである対象装置を、ハードウェア、或いは、ハードウェアとソフトウェアの組み合わせによって構成することができる。対象装置にて実現される機能の全部又は一部である任意の特定の機能をプログラムとして記述して、該プログラムを対象装置に搭載可能なフラッシュメモリに保存しておき、該プログラムをプログラム実行装置(例えば、対象装置に搭載可能なマイクロコンピュータ)上で実行することによって、その特定の機能を実現するようにしてもよい。上記プログラムは任意の記録媒体(不図示)に記憶及び固定されうる。上記プログラムを記憶及び固定する記録媒体(不図示)は対象装置と異なる機器(サーバ機器等)に搭載又は接続されても良い。
パラメータ導出部54及び開放電圧演算部55によって、又は、パラメータ導出部54、パラメータ補正部57及び開放電圧演算部55によって、開放電圧推定部が形成されていると考えても良く(図5、図9、図11参照)、開放電圧推定部は、パラメータ更新部60を更に含んでいると考えて良い(図13参照)。推定装置50、50A又は50Bから充電率推定部56を除外した装置は、開放電圧推定装置として機能する。推定装置50、50A又は50Bから充電率推定部56を削除することも可能である。
11 電池モジュール
30 電池状態推定装置
50、50A、50B 推定装置
51 測定値取得部
53 タイミング設定部
54 パラメータ導出部
55 開放電圧演算部
56 充電率推定部
57 パラメータ補正部
58 測定値保持部
60 パラメータ更新部
Claims (10)
- 蓄電池の端子電圧である電池電圧の測定値を順次取得する測定値取得部と、
前記蓄電池の充電又は放電の停止後の非通電期間中において、基準タイミングを設定するとともに、前記基準タイミングから見て前記電池電圧が所定の第1電圧量だけ変動する第1タイミング及び前記基準タイミングから見て前記電池電圧が前記第1電圧量より大きな所定の第2電圧量だけ変動する第2タイミングを前記測定値を用いて設定するタイミング設定部と、
前記基準タイミング及び前記第1タイミング間の第1時間差と、前記第1タイミング及び前記第2タイミング間の第2時間差とに基づき、前記第2タイミングよりも後の対象タイミングにおける前記蓄電池の開放電圧を推定する開放電圧推定部と、を備えた電池状態推定装置。 - 前記開放電圧推定部は、前記第1及び第2時間差に基づき、前記非通電期間中における前記電池電圧の変動速度の変化率に応じたパラメータを導出するパラメータ導出部を有し、前記パラメータを用いて前記対象タイミングにおける前記開放電圧を推定する請求項1に記載の電池状態推定装置。
- 前記パラメータは、第1時間長さに対する第2時間長さの比に相当し、
前記第1時間長さは、前記基準タイミングから見て前記電池電圧が所定の単位量だけ変動するのに要する時間長さであり、
前記第2時間長さは、前記基準タイミングから見て前記電池電圧が前記単位量だけ変動した時点を起点として、前記電池電圧が更に前記単位量だけ変動するのに要する時間長さであり、
前記第1電圧量は前記単位量と一致し、前記第2電圧量は前記単位量に応じた電圧量である請求項2に記載の電池状態推定装置。 - Rは、前記比の値を持ち、
前記開放電圧推定部は、前記非通電期間において、前記電池電圧が前記単位量だけ変動するのに要する時間長さが、前記電池電圧が前記単位量だけ変動するごとにR倍増大するとみなして、前記対象タイミングにおける前記開放電圧を推定する請求項3に記載の電池状態推定装置。 - 前記開放電圧推定部は、前記パラメータ導出部によって導出される前記パラメータを補正用指標に基づき補正するパラメータ補正部を更に有し、補正後のパラメータを用いて前記対象タイミングにおける前記開放電圧を推定し、
前記補正用指標は、
前記蓄電池の温度、
前記蓄電池の充電又は放電が行われていた通電期間中の前記蓄電池の充電又は放電の電流レート、
前記通電期間中における前記蓄電池の充電率の変化量、及び、
前記非通電期間における前記蓄電池の充電率の内、少なくとも1つを含む請求項2~請求項4の何れかに記載の電池状態推定装置。 - 前記タイミング設定部は、前記蓄電池の充電又は放電が停止してからの経過時間、又は、前記蓄電池の充電又は放電の停止後における前記電池電圧の変動量に基づき、前記基準タイミングを設定する請求項1~請求項5の何れかに記載の電池状態推定装置。
- 前記蓄電池の充電又は放電の停止後、所定時間分以上の前記測定値を保持する測定値保持部を更に備え、
前記タイミング設定部は、前記蓄電池の充電又は放電が停止してから前記所定時間だけ経過したタイミングを前記第2タイミングとして設定した後、前記第2タイミングを基準として前記測定値保持部の保持内容を用い前記基準タイミング及び第1タイミングを設定する請求項1~請求項6の何れかに記載の電池状態推定装置。 - 前記タイミング設定部は、前記非通電期間中において、前記基準タイミングより後の更新用基準タイミングを設定するとともに、前記更新用基準タイミングから見て前記電池電圧が前記第1電圧量だけ変動する更新用第1タイミング及び前記更新用基準タイミングから見て前記電池電圧が前記第2電圧量だけ変動する更新用第2タイミングを前記測定値を用いて設定し、
前記開放電圧推定部は、前記更新用基準タイミング及び前記更新用第1タイミング間の時間差と、前記更新用第1タイミング及び前記更新用第2タイミング間の時間差とに基づき、前記第1及び第2時間差を用いて導出した前記パラメータを更新するパラメータ更新部を更に有し、更新後のパラメータを用いて前記対象タイミングにおける前記開放電圧を推定する請求項2~請求項4の何れかに記載の電池状態推定装置。 - 前記開放電圧推定部による推定開放電圧に基づき前記蓄電池の充電率を推定する充電率推定部を更に備えた請求項1~請求項8の何れかに記載の電池状態推定装置。
- 蓄電池と、
請求項1~請求項9の何れかに記載の電池状態推定装置と、を備えた蓄電池システム。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014538171A JP6158195B2 (ja) | 2012-09-26 | 2013-09-24 | 電池状態推定装置及び蓄電池システム |
| US14/428,665 US9846200B2 (en) | 2012-09-26 | 2013-09-24 | Battery state estimation device and storage battery system |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2012211933 | 2012-09-26 | ||
| JP2012-211933 | 2012-09-26 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2014050073A1 true WO2014050073A1 (ja) | 2014-04-03 |
Family
ID=50387511
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2013/005628 Ceased WO2014050073A1 (ja) | 2012-09-26 | 2013-09-24 | 電池状態推定装置及び蓄電池システム |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US9846200B2 (ja) |
| JP (1) | JP6158195B2 (ja) |
| WO (1) | WO2014050073A1 (ja) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017511566A (ja) * | 2014-05-12 | 2017-04-20 | ローベルト ボッシュ ゲゼルシャフト ミット ベシュレンクテル ハフツング | バッテリの温度を定める方法 |
| JPWO2017221899A1 (ja) * | 2016-06-22 | 2018-11-29 | 株式会社豊田自動織機 | 蓄電装置及び蓄電装置の制御方法 |
| WO2025084110A1 (ja) * | 2023-10-16 | 2025-04-24 | パナソニックIpマネジメント株式会社 | 電池状態推定システム、電池状態推定方法、電池状態推定プログラム、及び記録媒体 |
| WO2025197446A1 (ja) | 2024-03-22 | 2025-09-25 | パナソニックIpマネジメント株式会社 | 電池状態推定システム、電池状態推定方法、及び電池状態推定プログラム |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015166710A (ja) * | 2014-03-04 | 2015-09-24 | ソニー株式会社 | 蓄電部材状態推定装置、電池パック、電動車両、蓄電装置および蓄電部材状態推定方法 |
| US11144106B2 (en) | 2015-04-13 | 2021-10-12 | Semiconductor Components Industries, Llc | Battery management system for gauging with low power |
| US10224579B2 (en) | 2015-12-31 | 2019-03-05 | Robert Bosch Gmbh | Evaluating capacity fade in dual insertion batteries using potential and temperature measurements |
| US10263447B2 (en) | 2016-01-29 | 2019-04-16 | Robert Bosch Gmbh | Secondary battery management system |
| US10686321B2 (en) | 2016-01-29 | 2020-06-16 | Robert Bosch Gmbh | Secondary battery management |
| US10243385B2 (en) | 2016-01-29 | 2019-03-26 | Robert Bosch Gmbh | Secondary battery management system |
| US9960625B2 (en) | 2016-03-31 | 2018-05-01 | Robert Bosch Gmbh | Battery management system with multiple observers |
| US10447046B2 (en) | 2016-09-22 | 2019-10-15 | Robert Bosch Gmbh | Secondary battery management system with remote parameter estimation |
| KR102239365B1 (ko) | 2017-10-20 | 2021-04-09 | 주식회사 엘지화학 | 배터리 충전 상태 추정 장치 |
| US20200090425A1 (en) * | 2018-09-18 | 2020-03-19 | Cambridge Mobile Telematics Inc. | Using vehicle electrical system monitored values |
| KR102856950B1 (ko) * | 2019-12-11 | 2025-09-05 | 주식회사 엘지에너지솔루션 | 배터리 퇴화도 진단 장치 및 방법 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004109007A (ja) * | 2002-09-19 | 2004-04-08 | Yazaki Corp | バッテリの開回路電圧推定方法及び装置 |
| JP2008145199A (ja) * | 2006-12-07 | 2008-06-26 | Auto Network Gijutsu Kenkyusho:Kk | 充電深度判定方法及び充電深度判定装置 |
| JP2008256436A (ja) * | 2007-04-03 | 2008-10-23 | Yazaki Corp | 近似式算出装置及びその方法、並びに、バッテリ状態監視装置 |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3869676B2 (ja) * | 2000-12-08 | 2007-01-17 | 矢崎総業株式会社 | 車両用バッテリの開回路電圧推定方法及び装置 |
| JP2003307556A (ja) * | 2002-02-15 | 2003-10-31 | Yazaki Corp | バッテリの開回路電圧推定方法及び装置 |
| JP5170876B2 (ja) | 2005-06-03 | 2013-03-27 | 古河電気工業株式会社 | 充電率/残存容量推定方法、電池の状態検知センサ及び電池電源システム |
| JP5882336B2 (ja) * | 2011-08-30 | 2016-03-09 | 三洋電機株式会社 | バッテリシステム、電動車両、移動体、電力貯蔵装置および電源装置 |
| JP2013083612A (ja) * | 2011-10-12 | 2013-05-09 | Mitsumi Electric Co Ltd | 電池状態計測方法及び電池状態計測装置 |
| JP5867195B2 (ja) * | 2012-03-13 | 2016-02-24 | 日産自動車株式会社 | 二次電池の充電装置および二次電池の充電方法 |
| WO2013141100A1 (ja) * | 2012-03-21 | 2013-09-26 | 三洋電機株式会社 | 電池状態推定装置 |
-
2013
- 2013-09-24 WO PCT/JP2013/005628 patent/WO2014050073A1/ja not_active Ceased
- 2013-09-24 US US14/428,665 patent/US9846200B2/en active Active
- 2013-09-24 JP JP2014538171A patent/JP6158195B2/ja active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004109007A (ja) * | 2002-09-19 | 2004-04-08 | Yazaki Corp | バッテリの開回路電圧推定方法及び装置 |
| JP2008145199A (ja) * | 2006-12-07 | 2008-06-26 | Auto Network Gijutsu Kenkyusho:Kk | 充電深度判定方法及び充電深度判定装置 |
| JP2008256436A (ja) * | 2007-04-03 | 2008-10-23 | Yazaki Corp | 近似式算出装置及びその方法、並びに、バッテリ状態監視装置 |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017511566A (ja) * | 2014-05-12 | 2017-04-20 | ローベルト ボッシュ ゲゼルシャフト ミット ベシュレンクテル ハフツング | バッテリの温度を定める方法 |
| JPWO2017221899A1 (ja) * | 2016-06-22 | 2018-11-29 | 株式会社豊田自動織機 | 蓄電装置及び蓄電装置の制御方法 |
| WO2025084110A1 (ja) * | 2023-10-16 | 2025-04-24 | パナソニックIpマネジメント株式会社 | 電池状態推定システム、電池状態推定方法、電池状態推定プログラム、及び記録媒体 |
| WO2025197446A1 (ja) | 2024-03-22 | 2025-09-25 | パナソニックIpマネジメント株式会社 | 電池状態推定システム、電池状態推定方法、及び電池状態推定プログラム |
Also Published As
| Publication number | Publication date |
|---|---|
| JP6158195B2 (ja) | 2017-07-05 |
| US9846200B2 (en) | 2017-12-19 |
| US20150234013A1 (en) | 2015-08-20 |
| JPWO2014050073A1 (ja) | 2016-08-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6158195B2 (ja) | 電池状態推定装置及び蓄電池システム | |
| JP5897701B2 (ja) | 電池状態推定装置 | |
| TWI384246B (zh) | 藉電池電壓變化模式估測開路電壓以估測電池電阻特徵之裝置及方法 | |
| CN107991623B (zh) | 一种考虑温度和老化程度的电池安时积分soc估计方法 | |
| EP3002597B1 (en) | Battery control device | |
| He et al. | Online model-based estimation of state-of-charge and open-circuit voltage of lithium-ion batteries in electric vehicles | |
| TWI708068B (zh) | 用於測定鋰硫電池之健康狀態及充電狀態的方法及裝置 | |
| JP6441913B2 (ja) | バッテリに蓄積された電荷のモニタリング | |
| KR102347014B1 (ko) | 축전지 잔량 추정 장치, 축전지 잔량 추정 방법, 및 프로그램 | |
| JP5269994B2 (ja) | バッテリーの電圧挙動を用いたバッテリーのsoh推定装置及び方法 | |
| JP4473823B2 (ja) | 電気エネルギー蓄積器のための複数の部分モデルを用いた状態量およびパラメータの推定装置 | |
| JP2014025739A (ja) | 電池状態推定装置 | |
| AU2022266288B2 (en) | Battery management device, and electric power system | |
| JP2014025738A (ja) | 残容量推定装置 | |
| CN106104907B (zh) | 二次电池内部温度推定装置以及二次电池内部温度推定方法 | |
| JP6044512B2 (ja) | 電池特性学習装置 | |
| JP2006275797A (ja) | 蓄電デバイスの残存容量演算装置 | |
| CN105353313A (zh) | 电池荷电状态的估算方法和装置 | |
| JP2014068468A (ja) | 充電制御装置 | |
| JP2011169831A (ja) | 電池状態検知装置及び電池状態検知方法 | |
| JP2013250071A (ja) | 満充電容量検出装置及び蓄電池システム | |
| CN110596604A (zh) | 一种基于安时积分法的锂电池soc估计方法 | |
| JP2013246088A (ja) | 電池の内部抵抗推定方法及びその装置 | |
| CN109669138B (zh) | 一种精准测定动力铅蓄电池组剩余容量的方法 | |
| JP2019060807A (ja) | 二次電池の状態診断装置および状態診断方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13840374 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2014538171 Country of ref document: JP Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 14428665 Country of ref document: US |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 13840374 Country of ref document: EP Kind code of ref document: A1 |
