WO2014006955A1 - 地滑り防止杭、及び、地滑り防止杭の設置方法 - Google Patents

地滑り防止杭、及び、地滑り防止杭の設置方法 Download PDF

Info

Publication number
WO2014006955A1
WO2014006955A1 PCT/JP2013/061482 JP2013061482W WO2014006955A1 WO 2014006955 A1 WO2014006955 A1 WO 2014006955A1 JP 2013061482 W JP2013061482 W JP 2013061482W WO 2014006955 A1 WO2014006955 A1 WO 2014006955A1
Authority
WO
WIPO (PCT)
Prior art keywords
pile
ground
main body
landslide prevention
body portion
Prior art date
Application number
PCT/JP2013/061482
Other languages
English (en)
French (fr)
Inventor
昌敏 和田
栄 丸山
定利 ▲辻▼
公博 中澤
Original Assignee
新日鉄住金エンジニアリング株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 新日鉄住金エンジニアリング株式会社 filed Critical 新日鉄住金エンジニアリング株式会社
Publication of WO2014006955A1 publication Critical patent/WO2014006955A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/801Ground anchors driven by screwing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/808Ground anchors anchored by using exclusively a bonding material
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Definitions

  • the present invention relates to a landslide prevention pile that prevents landslide and a method for installing the landslide prevention pile.
  • This landslide prevention pile which enables landslide prevention in this way is disclosed by patent document 1, for example.
  • This landslide prevention pile is provided with spiral blades on the peripheral surface of a pile body made of steel pipe, and penetrates into the ground while rotating.
  • a bearing plate arranged in contact with the ground surface is provided on the top of the pile body, and a compressive force is applied to the ground from the bearing plate.
  • the support plate is pressed against the ground using a jack device, and in this state, the support plate is fixed to the pile body by welding or the like. Compressive force is applied to the ground.
  • the pile main body to which the bearing plate is fixed is inserted into the ground while rotating, and the compressive force is applied to the ground from the bearing plate by utilizing the propulsive force of the spiral blades.
  • the shear resistance of the ground is improved and the ground is stabilized.
  • the conventional landslide prevention piles including those disclosed in Patent Document 1 have a structure in which compressive force is applied to the ground only by the bearing plate, and it is necessary to ensure the strength of the bearing plate. There will be a large size.
  • a block-shaped member may be used instead of the bearing plate, and an increase in cost is inevitable.
  • the ground surface on which the bearing plate is installed is weathered, or if the ground surface is uneven, it is difficult to reliably install the bearing plate and reliably stabilize the ground.
  • a bearing plate is installed in the state where it is exposed to the ground surface, since the mountain surface will be in the state covered with the bearing plate, it is unpreferable on a landscape.
  • the present invention has been made in consideration of such circumstances, and provides a landslide prevention pile capable of reliably stabilizing the ground while suppressing cost and improving the landscape, and a method for installing the landslide prevention pile.
  • the purpose is to do.
  • the landslide prevention pile according to the present invention is a landslide prevention pile embedded between a moving layer located on the surface layer side and a non-moving layer located on the lower layer side with a sliding surface in the ground as a boundary, and has a tubular shape centering on an axis.
  • a pile main body made of a member, a first blade provided on the outer peripheral surface of the pile main body and arranged in the fixed layer in a spiral shape with the axis as the center, and an outer periphery of the pile main body
  • a second blade portion provided on a surface and arranged in the moving layer in a spiral shape centered on the axis.
  • the whole is buried in the ground, the first blade part is located in the stationary layer, and the second blade part is located in the movable layer.
  • the first blade portion and the second blade portion act to prevent this movement.
  • the area can be adjusted to provide a function sufficient to hold the moving layer in accordance with the ground condition.
  • the pile main body portion is made of a tubular member, and the first blade portion and the second blade portion are formed in a spiral shape around the axis, the landslide prevention pile can be penetrated while rotating into the ground. . For this reason, it is not necessary to provide an excavation hole in advance, it is easy to install the landslide prevention pile, and it can be securely fixed and held in the ground.
  • the landslide prevention pile of the present invention since the first blade portion and the second blade portion are arranged in the ground, a large bearing member can be installed on the ground surface, and the installation pitch can be increased. It is possible to suppress the scenery and improve the landscape, and the ground can be stabilized reliably.
  • the said pile main-body part is divided
  • the landslide prevention pile can be easily penetrated into the ground.
  • the installation can be further facilitated by dividing the pile main body.
  • connection portion may be formed of a tubular member formed integrally with the first pile main body portion.
  • connection part a 1st pile main-body part and a 2nd pile main-body part can be connected reliably, and a moving layer can be hold
  • the installation can be facilitated and the ground can be more reliably stabilized.
  • the pile body portion is formed with a first communication portion that communicates the inside and outside of the pile body portion in the radial direction
  • the connection portion is a second communication portion that communicates the inside and outside of the connection portion in the radial direction.
  • the 3rd communication part which opens toward the exterior of the said ground and connects the inside and outside of the said connection part may be formed.
  • the pile body from the first communicating section Moisture can be introduced into the inside of the part and from the second communication part into the inside of the connection part, and the water introduced into the inside of the pile main body part can be drained to the outside of the ground by the third communication part. Therefore, the frictional force acting between the moving layer and the non-moving layer can be increased on the sliding surface of the ground.
  • the friction force acting from the ground on the outer peripheral surface of the pile body part, and the first blade part and the second blade part is increased by the first communication part, the second communication part, and the third communication part, The effect of retaining the ground can be improved.
  • the ground can be further stabilized by drainage from the ground.
  • the connecting portion may be a rod-shaped member provided as a separate body from the first pile main body portion.
  • connection portion can securely connect the first pile main body portion and the second pile main body portion to hold the moving layer.
  • the landslide prevention pile according to the present invention facilitates the installation and more reliably stabilizes the ground.
  • the first pile body portion is formed with a first continuous portion that communicates the inside and outside of the first pile body portion in the radial direction, and the second pile body portion has an inside and outside of the second pile body portion.
  • a second communication portion communicating in the radial direction and a third communication portion that opens toward the outside of the ground and communicates the inside and the outside of the second pile main body portion are formed, and the connection portion is formed by a tubular member. The one end may open toward the inside of the first pile main body, and the other end may open toward the outside of the ground.
  • ⁇ / RTI> moisture in the ground can be introduced into the first pile body part and the second pile body part. Furthermore, the moisture introduced into the inside of the first pile main body can be drained to the outside of the ground through the connecting portion. Moreover, the water
  • the ground can be further stabilized by drainage from the ground.
  • the landslide prevention pile according to the present invention may further include prestress introduction means for introducing prestress into the first pile main body and the second pile main body.
  • the ground can be stabilized by introducing prestress.
  • the connecting portion has a first threaded portion that is twisted about the axis, and the second pile main body portion can move the connecting portion relative to the second pile main body portion in the axial direction. And having the second screw part screwed to the first screw part, and the second screw part being screwed to the first screw part so that the first pile main body part via the connection part
  • the prestress introducing means includes the first screw portion and the second screw portion, and the prestress is controlled by adjusting a screwed state of the first screw portion and the second screw portion. May be introduced.
  • connection portion can be moved relative to the second pile body portion in the axial direction, so that the screwed portion between the first screw portion and the second screw portion is tightened and loosened.
  • a part can approach a 2nd pile main-body part. That is, the first pile main body can be pulled toward the moving layer side, and in this case, the first pile main body receives the reaction force from the screwed portion with the second main body, and the pulled state is maintained. Prestress is introduced into the first pile body. Therefore, prestress can be introduced only by tightening or loosening the screwed portion in a state where the first pile main body and the second pile main body are embedded in the ground.
  • a force acts in a direction in which the first blade portion and the second blade portion approach each other due to the reaction force of the pre-stress, that is, a compressive force is generated between the moving layer and the non-moving layer. it can.
  • prestress can be easily introduced and the ground can be further stabilized because the second pile body and the connecting portion are screwed and connected.
  • the pre-stress introducing means may be a wedge member driven between the second pile main body portion and the connection portion.
  • Such a wedge member makes it possible to fix the first pile body and the second pile body in a state where the first pile body is pulled toward the moving layer, that is, it is possible to introduce prestress. Therefore, a compressive force can be generated between the moving bed and the non-moving bed.
  • pre-stress can be easily introduced by the wedge member, and the ground can be further stabilized.
  • the pile main body may be composed of a single tubular member.
  • Such a structure can simplify the structure, prevent landslides, and lead to further cost reduction.
  • the cost can be reduced by adopting a simple structure.
  • the pile body portion includes a first communication portion that communicates the inside and outside of the pile body portion in the radial direction of the axis, and a second that opens toward the outside of the ground and communicates the inside and outside of the pile body portion.
  • a communication part may be formed.
  • the ground can be further stabilized by drainage from the ground.
  • the landslide prevention pile according to the present invention may further include a support member provided on the ground surface of the ground and transmitting a transmission force from the pile main body to the ground.
  • the bearing member By providing the bearing member in this way, the ground can be pressed from the ground surface and the effect of preventing landslide can be further improved. Furthermore, by providing the second blade portion and the support member, the size of the support member can be reduced as compared with the case where the movement of the moving layer is prevented only by the support member.
  • the landslide prevention pile of the present invention it is possible to improve the landscape by reducing the size of the bearing member while further stabilizing the ground by providing the bearing member.
  • the installation method of the landslide prevention pile according to the present invention is the installation method of the landslide prevention pile in which the landslide prevention pile is buried over the moving layer located on the surface layer side and the immovable layer located on the lower layer side with the sliding surface in the ground as a boundary.
  • the first blade portion which is provided on the outer peripheral surface of the first pile main body portion made of a tubular member centered on the axis and has a spiral shape centered on the axis is arranged in the immovable layer.
  • a first step of penetrating and embedding the first pile body, and a spiral centered on the axis provided on the outer peripheral surface of the second pile body made of a tubular member centered on the axis A second step of penetrating and embedding the second pile main body portion so that a second blade portion having a shape is disposed in the moving layer, and the second step of embedding in the second step Pile body part, connecting part arranged between the first pile body part and the second pile body part Through it, and a third step of connecting to said first pile body portion on said axis and concentric shaft.
  • the landslide prevention pile According to such an installation method of the landslide prevention pile, there is no need to separately provide a large bearing member on the ground surface of the ground, and it is not necessary to provide a drilling hole in advance. Even if the blade pitch is different, the landslide prevention pile can be easily installed by penetrating while rotating. Therefore, the landslide prevention pile can be securely fixed in the ground and the landslide prevention effect can be sufficiently obtained.
  • the installation method of the landslide prevention pile of the present invention by arranging the first blade portion and the second blade portion in the ground, the cost can be reduced, the scenery can be improved, and the ground can be stably stabilized. Become.
  • the installation method of the landslide prevention pile which concerns on this invention, it is provided in the said 2nd pile main-body part and the 1st screw part which is provided in the said connection part and twists centering on the said axis line after the said 3rd process.
  • the first pile body part and the second pile are screwed together with a second screw part that enables the connection part to move relative to the second pile body part in the axial direction.
  • a fourth step of connecting a main body portion and adjusting a screwed state between the first screw portion and the second screw portion may be further provided.
  • Prestress can be introduced in such a state that the first pile main body and the second pile main body are embedded in the ground by the third step and the fourth step, and the prestress causes a gap between the moving layer and the non-movable layer.
  • a compressive force can be generated.
  • the second pile main body and the connecting portion are screwed and connected in the third step, and the prestress can be easily introduced by further including the fourth step. Further ground stabilization becomes possible.
  • the installation method of the landslide prevention pile according to the present invention is the installation method of the landslide prevention pile in which the landslide prevention pile is buried over the moving layer located on the surface layer side and the immovable layer located on the lower layer side with the sliding surface in the ground as a boundary.
  • the first blade portion having a spiral shape centered on the axis and disposed on the outer peripheral surface of the pile main body portion made of a tubular member centered on the axis is disposed in the immovable layer, and
  • the pile body portion is inserted while being rotated so that a second blade portion having a spiral shape centered on the axis and provided in the outer peripheral surface of the pile body portion is disposed in the moving layer.
  • the process of carrying out is provided.
  • the installation method of the landslide prevention pile of the present invention by arranging the first blade portion and the second blade portion in the ground, the cost can be reduced, the scenery can be improved, and the ground can be stably stabilized. Become.
  • the landslide prevention pile according to the present invention can reliably stabilize the ground while reducing the cost and improving the landscape.
  • the landslide prevention pile 1 which concerns on 1st embodiment of this invention is demonstrated.
  • the landslide prevention pile 1 is embedded in the ground 10 across the movable layer 11 located on the surface layer side and the immovable layer 12 located on the lower layer side with the sliding surface 5 in the ground 10 as a boundary. It is a member which prevents.
  • the landslide prevention pile 1 is composed of an anchor portion (first pile main body portion) 21 embedded in the immovable layer 12 and a bearing portion (second pile main body portion) 26 embedded in the moving layer 11.
  • a pile body 20 is provided.
  • the landslide prevention pile 1 includes a connection portion 23 that connects the anchor portion 21 and the pressure supporting portion 26, a first blade portion 22 provided on the anchor portion 21, and a second blade provided on the pressure supporting portion 26. Part 28.
  • the fixed layer 12 side in the direction of the axis P1 of the landslide prevention pile 1 is the inside, and the moving layer 11 side is the outside.
  • the anchor part 21 in the pile main body part 20 is made of a steel pipe.
  • the first blade portion 22 is a blade member that is provided on the outer peripheral surface 21 c of the anchor portion 21 in a spiral shape around the axis line P ⁇ b> 1 and is located inside the immobile layer 12.
  • the first blade portion 22 may be manufactured integrally with the anchor portion 21, or may be manufactured separately and attached by welding or the like.
  • the first blade portion 22 is provided on the outer peripheral surface 21c at a position near the inner end portion 21a in the axis P1 direction of the anchor portion 21, but is provided so as to be positioned inside the immobile layer 12. What is necessary is just and it is not limited to the above-mentioned position.
  • the connecting portion 23 is made of a steel pipe integrally formed with the anchor portion 21 at the outer end portion 21b of the anchor portion 21 so that the outer end portion 23b in the direction of the axis P1 projects outward from the ground surface 10a of the ground 10. Is provided.
  • the connection portion 23 has a male screw portion (first screw portion) 23a in which a male screw is formed on the outer peripheral surface 23c at a position near the end portion 23b.
  • the bearing portion 26 in the pile main body portion 20 is made of a steel pipe, like the anchor portion 21, so as to cover the connection portion 23 from the outer periphery, and the outer end portion 26 b in the direction of the axis P ⁇ b> 1 is from the ground surface 10 a of the ground 10. It protrudes outward.
  • the supporting pressure part 26 has a nut 27 provided so as to come into contact with the end part 26b from the outside in the direction of the axis P1.
  • the female screw portion (second screw portion, prestress introducing means) 27a of the nut 27 is screwed with the male screw portion 23a of the connection portion 23 so that the anchor portion 21 can be moved relative to the support pressure portion 26. Holds to be.
  • the second blade portion 28 is a blade member that is provided in a spiral shape around the axis P ⁇ b> 1 on the outer peripheral surface 26 c of the pressure bearing portion 26 and is located inside the moving layer 11.
  • the second blade portion 28 may be manufactured integrally with the pressure bearing portion 26, or may be manufactured separately and attached to the pressure bearing portion 26 by welding or the like.
  • the second blade portion 28 is provided on the outer peripheral surface 26 c at a position near the inner end portion 26 a in the axis P ⁇ b> 1 direction of the support pressure portion 26, but is provided so as to be located inside the moving layer 11. The position is not limited to the above.
  • the installation method of the landslide prevention pile 1 includes an anchor portion burying step (first step) S1 for burying the anchor portion 21 and a bearing portion burying step for burying the bearing portion 26 ( (2nd process, 3rd process) S2 and the screw adjustment process (4th process) S3 which adjusts the screwing state of the anchor part 21 and the bearing part 26 are provided.
  • an anchor portion embedding step S1 is executed. That is, the anchor portion 21 is inserted while being rotated so that the first blade portion 22 is disposed inside the immobile layer 12.
  • the connecting portion 23 is installed simultaneously with the anchor portion 21. At this time, the anchor portion 21 is installed such that the outer end portion 23b of the connecting portion 23 in the direction of the axis P1 protrudes from the ground surface 10a.
  • the bearing section embedding step S2 is executed. That is, the pressure supporting part 26 is installed so as to be rotated while the pressure supporting part 26 covers the connection part 23 from the outer periphery so that the second blade part 28 is disposed inside the moving layer 11. At this time, the female thread part 27 a of the nut 27 is screwed into the male thread part 23 a of the connection part 23, and the bearing part 26 is connected to the anchor part 21.
  • a screw adjustment step S3 is executed. That is, by rotating the nut 27, the pressure bearing portion 26 is pushed inward in the direction of the axis P1, and the anchor portion 21 is pulled outward in the direction of the axis P1 via the connecting portion 23.
  • the female screw portion 27a and the male screw portion 23a are right-hand screws
  • the nut 27 is rotated clockwise as viewed from the outside in the direction of the axis P1.
  • the anchor portion 21 receives a reaction force from the screwed portion with the supporting pressure portion 26 and is maintained in a pulled state, that is, prestress is introduced into the anchor portion 21 and the supporting pressure portion 26.
  • the movable layer 11 and the second blade portion are interposed between the immobile layer 12 and the first blade portion 22.
  • the anchor portion 21 and the bearing portion 26 can have a function sufficient to hold the moving layer 11 in accordance with the state of the ground 10. Accordingly, the movement of the moving layer 11 can be surely prevented without separately installing a large bearing member on the ground surface 10a, so that the cost can be reduced and the landscape can be improved.
  • the anchor portion 21 and the support pressure portion 26 are made of steel pipes, and the first blade portion 22 and the second blade portion 28 are formed in a spiral shape around the axis P1, the anchor portion 21 and the support pressure portion 26 are formed. Can be penetrated while rotating in the ground 10. Accordingly, it is not necessary to remove the earth and sand in the ground 10, that is, it is not necessary to provide an excavation hole in advance, the landslide prevention pile 1 can be easily installed, and the anchor portion 21 and the support pressure portion 26 are securely installed in the ground 10. Can be fixed and held. As a result, the landslide prevention effect can be improved.
  • the anchor portion 21 and the pressure bearing portion 26 are penetrated separately, penetration is possible even if the blade pitches of the first blade portion 22 and the second blade portion 28 are different.
  • prestress can be introduced into the anchor portion 21 and the supporting pressure portion 26 only by tightening or loosening the male screw portion 23a and the female screw portion 27a. Therefore, prestress can be introduced only by tightening or loosening the screwing portion in a state where the anchor portion 21 and the support pressure portion 26 are embedded in the ground 10.
  • a force can be applied in a direction in which the two blade portions 28 are about to approach. That is, a compressive force can be generated between the moving layer 11 and the non-moving layer 12, and the landslide can be surely prevented.
  • the anchor portion 21 and the bearing pressure portion 26 are both embedded in the ground 10, thereby reducing the cost and improving the landscape, and also the first blade portion 22 and the second blade.
  • the ground 10 can be reliably stabilized by the portion 28.
  • the landslide prevention pile 31 differs in the shape of the anchor part 41, the connection part 43, and the bearing part 46 from the thing of 1st embodiment.
  • the landslide prevention pile 31 includes an anchor portion (first pile main body portion) 41 embedded in the immovable layer 12 and a bearing portion (second pile main body portion) embedded in the moving layer 11. ) 46 and the pile main body portion 35 is provided.
  • the landslide prevention pile 31 includes a connection portion 43 that connects the anchor portion 41 and the pressure bearing portion 46, a first blade portion 42 provided on the anchor portion 41, and a second portion provided on the pressure bearing portion 46. And a blade portion 48.
  • the anchor part 41 in the pile main body part 35 is made of a steel pipe.
  • the first blade portion 42 is a blade member that is provided on the outer peripheral surface 41 c of the anchor portion 41 in a spiral shape around the axis P ⁇ b> 2 and is located inside the immobile layer 12.
  • the connecting portion 43 is connected to the anchor portion 41 by a nut 44 provided at an outer end portion 41b of the anchor portion 41 in the axis P2 direction, and is a rod-shaped member made of a reinforcing bar or the like extending toward the outer side in the axis P2 direction. It is. Further, an outer end 43b of the connecting portion 43 in the direction of the axis P2 is provided so as to protrude from the ground surface 10a, and the connecting portion 43 has a male screw portion (first screw) formed on the outer peripheral surface 43c of the end portion 43b. 1 screw part, prestress introduction means) 43a.
  • this connection part 43 may be connected to the anchor part 41 by other methods, such as welding, and may be a steel pipe narrower than the anchor part 41 without being limited to a reinforcing bar.
  • the bearing portion 46 in the pile main body portion 35 is made of a steel pipe, like the anchor portion 41, and the outer end portion 46b in the direction of the axis P2 projects outward from the ground surface 10a so as to cover the connection portion 43 from the outer periphery. Is provided.
  • the end 46b has a nut 47 provided so as to come into contact with the pressure-supporting portion 46 from the outside in the direction of the axis P2, and a female screw portion (second screw portion, prestress introducing means) 47a of the nut 47 is provided.
  • the anchor portion 41 is held so as to be relatively movable with respect to the supporting pressure portion 46 by screwing with the male screw portion 43 a of the connecting portion 43.
  • an outer closing plate 50 that closes the outer end portion 46b of the bearing portion 46 in the axis P2 direction is provided in a state of passing through the connecting portion 43, and a nut is provided on the outer surface of the outer closing plate 50. 47 is installed.
  • an inner closing plate 51 that closes the inner end 46 a in the direction of the axis P ⁇ b> 2 is provided in the pressure bearing 46 in a state in which the connecting portion 43 is penetrated.
  • the second blade portion 48 is a blade member that is provided on the outer peripheral surface 46 c of the bearing portion 46 in a spiral shape around the axis P ⁇ b> 2 and is located inside the moving layer 11.
  • the installation method of the landslide prevention pile 31 includes an anchor portion burying step (first step) S11 for burying the anchor portion 41 and a bearing portion burying step for burying the bearing portion 46 ( (2nd process, 3rd process) S12 and the screw adjustment process (4th process) S13 which adjusts the screwing state of the anchor part 41 and the support pressure part 46 are provided.
  • an anchor part embedding step S11 is executed. That is, the anchor portion 41 is inserted while being rotated so that the first blade portion 42 is disposed inside the immobile layer 12. At this time, the outer end 43b of the connecting portion 43 in the direction of the axis P2 is installed so as to protrude from the ground surface 10a.
  • a bearing section burying step S12 is performed. That is, in a state in which the pressure supporting portion 46 covers the connection portion 43 from the outer periphery so that the second blade portion 48 is disposed inside the moving layer 11, the inner closing plate 51 and the outer closing plate 50 are connected to the connecting portion. The pressure bearing 46 is rotated and installed so that 43 penetrates. At this time, the female threaded portion 47 a of the nut 47 is screwed into the male threaded portion 43 a of the connecting portion 43 to connect the anchor portion 41 and the pressure bearing portion 46.
  • the screw adjustment step S13 is executed. That is, by rotating the nut 47, the pressure bearing portion 46 is pushed inward in the direction of the axis P1, and the anchor portion 41 is pulled outward in the direction of the axis P2 via the connection portion 43.
  • the female screw portion 47a and the male screw portion 43a are right-hand screws
  • the nut 47 is rotated clockwise as viewed from the outside in the direction of the axis P2.
  • the anchor portion 41 receives a reaction force from the screwed portion with the supporting pressure portion 46 and is maintained in a pulled state, that is, prestress is introduced into the anchor portion 41 and the supporting pressure portion 46.
  • the anchor part 41 and the bearing part 46 consist of steel pipes, and since the 1st blade
  • the anchor portion 41 and the bearing pressure portion 46 are both embedded in the ground 10, thereby reducing the cost and improving the landscape, and reliably stabilizing the ground 10. It becomes possible.
  • the anchor portion 21 (41) and the pressure bearing portion 26 (46) may be connected by interference fitting or welding without being screwed together, and may be connected using various methods. it can.
  • the prestress that causes the compressive force to act in the ground 10 is, for example, after the anchor portion 70 is embedded, in a state in which a tensile force is applied to the outside in the direction of the axis P ⁇ b> 3. It can also be introduced by driving a wedge member (pre-stress introducing means) 60 between them.
  • the landslide prevention pile 81 which concerns on 3rd embodiment of this invention is demonstrated.
  • symbol is attached
  • the landslide prevention pile 81 of this embodiment differs in the shape of the anchor part 21 (41, 70) and the bearing part 26 (46, 75) from the thing of 1st embodiment and 2nd embodiment.
  • the landslide prevention pile 81 has a structure in which the anchor portion 21 (41, 70) and the support pressure portion 26 (46, 75) are integrated, that is, a steel pipe centering on the axis P 4.
  • the pile main-body part 90 which becomes is provided.
  • the landslide prevention pile 81 includes a first blade portion 92 located inside the immovable layer 12 and a second blade portion 98 located inside the moving layer 11 on the outer peripheral surface 90 a of the pile main body portion 90. Yes.
  • a landslide prevention pile 81 it is not necessary to provide an excavation hole in advance, and the pile main body 90 can be installed in the ground 10 by being inserted while rotating, and the landslide prevention pile can be securely fixed in the ground. It is possible to sufficiently obtain the effect of preventing landslides. Therefore, since a large bearing member is not installed on the ground surface 10a and the installation pitch can be increased, the cost can be reduced, the landscape can be improved, and the ground can be reliably stabilized.
  • prestress is not introduced into the anchor portion 21 and the pressure bearing portion 26 as in the other embodiments, but since the structure is simpler, the cost can be reduced. .
  • first blade portion 92 and the second blade portion 98 have the same blade pitch.
  • the landslide prevention pile 101 which concerns on 4th embodiment of this invention is demonstrated.
  • symbol is attached
  • the landslide prevention pile 101 of this embodiment is based on the landslide prevention pile 1 of the first embodiment, and the pile main body part 105 and the connection part 108 are different from the first embodiment.
  • the pile main body part 105 is made of a steel pipe and includes an anchor part 106 and a bearing part 107.
  • the anchor portion 106 has a plurality of first through-holes (first continuous holes) spaced apart in the circumferential direction and the direction of the axis P5 so as to communicate the inside and outside of the outer circumferential surface 106c in the radial direction.
  • Part) 106A is formed.
  • the first through hole 106A guides moisture in the ground 10 into the anchor portion 106.
  • the anchor portion 106 is provided with a closing plate 109 so as to close the opening of the inner end portion 106a in the direction of the axis P5.
  • the position where the closing plate 109 is provided may not be the end 106a, that is, the tip.
  • the bearing portion 107 includes a plurality of second through holes (first series of holes) spaced apart in the circumferential direction and the direction of the axis P5 so as to communicate the inside and outside in the radial direction on the outer circumferential surface 107c.
  • 107 ⁇ / b> A is formed, and the second through-hole 107 ⁇ / b> A guides moisture in the ground 10 to the inside of the bearing portion 107.
  • the connecting portion 108 is formed integrally with the outer end portion 106b of the anchor portion 106, and, like the anchor portion 106 and the supporting pressure portion 107, in the circumferential direction so as to communicate the inside and outside in the radial direction on the outer peripheral surface 108c.
  • a plurality of third through holes (second communication portions) 108A are formed at intervals in the direction of the axis P5.
  • the third through-hole 108A allows the moisture in the ground 10 to move through the second through-hole 107A of the support pressure portion 107 and through the gap between the support pressure portion 107 and the connection portion 108. It leads to the inside of 108.
  • connecting portion 108 is screwed into the nut 27 provided in the bearing portion 107, and the end portion 108b protrudes outward from the ground surface 10a and is exposed from the ground 10, and is connected to the outer end portion 108b.
  • An opening (third communication portion) 108 ⁇ / b> B is formed so as to open toward the outside of the ground 10.
  • the moisture is first supplied from the first through hole 106A to the inside of the anchor portion 106. And from the second through hole 107 ⁇ / b> A to the inside of the pressure bearing portion 107. Further, moisture from the ground and moisture introduced into the anchor portion 106 and the bearing portion 107 are introduced into the connection portion 108 through the third through hole 108A, and this is introduced from the opening 108B to the outside of the ground 10. Can be drained.
  • the closing plate 109 is provided in the anchor portion 106, when the anchor portion 106 penetrates, the earth and sand from the ground 10 does not flow into the inside. Thereby, the earth and sand which flowed in do not prevent introduction of moisture from the first through hole 106 into the anchor portion 106.
  • the frictional force acting between the moving layer 11 and the non-moving layer 12 on the sliding surface 5 of the ground 10 can be increased, and the outer peripheral surface 106c of the anchor portion 106, the outer peripheral surface 107c of the bearing portion 107, And the effect which restrains the ground 10 by increasing the frictional force which acts from the ground 10 with respect to the 1st blade
  • a through hole (third communication portion) that communicates the inside and outside in the radial direction with the outer peripheral surface 108c of the portion where the connection portion 108 protrudes outside the nut 27 in the direction of the axis P5. It is also possible to communicate the inside of the connecting portion 108 and the outside of the ground 10 and drain the water inside the connecting portion 108 to the outside of the ground 10. That is, as long as the opening 108B opens at least toward the outside of the ground 10, the formation position is not limited to the case of this embodiment.
  • the first through hole 106A, the second through hole 107A, and the third through hole 108A of the present embodiment can be applied. Is possible.
  • the landslide prevention pile 111 which concerns on 5th embodiment of this invention is demonstrated.
  • symbol is attached
  • the landslide prevention pile 111 of this embodiment is based on the landslide prevention pile 31 of the second embodiment, and the pile body 115 and the connection part 118 are different from those of the second embodiment.
  • the pile main body 115 is made of a steel pipe, and includes an anchor portion 116 and a supporting pressure portion 117.
  • the anchor portion 116 has a plurality of first through-holes (first continuous holes) spaced in the circumferential direction and the direction of the axis P6 so as to communicate radially inside and outside on the outer circumferential surface 116c.
  • Part) 116 ⁇ / b> A is formed, and the first through holes 116 ⁇ / b> A guide moisture in the ground 10 to the inside of the anchor part 116.
  • the anchor portion 116 is provided with a closing plate 119 so as to close the opening of the inner end portion 116a in the direction of the axis P6.
  • the position where the closing plate 119 is provided may not be the end 116a, that is, the tip.
  • the pressure-supporting portion 117 has a plurality of second through holes (first series) spaced apart in the circumferential direction and the direction of the axis P6 so as to communicate the inside and outside in the radial direction on the outer circumferential surface 117c.
  • 117 ⁇ / b> A is formed, and these second through holes 117 ⁇ / b> A guide moisture in the ground 10 to the inside of the bearing portion 117.
  • the pressure-supporting portion 117 is provided with an outer closing plate 113 so as to close the outer end portion 117b from the direction of the axis P6, and the nut is provided so as not to interfere with the nut 47 on the outer surface of the outer closing plate 113.
  • a third through-hole (third communication portion) 113A is formed so as to communicate the inner and outer sides of the pressure bearing portion 117 in the direction of the axis P6 at a position that is radially outward of the axis P6 relative to 47. In other words, the pressure support portion 117 is opened toward the outside of the ground 10 by the third through hole 113A.
  • the connecting portion 118 has a rod shape and is hollow inside, and opens toward the inside of the anchor portion 116 at the inner end portion 118a, and opens toward the outside of the ground 10 at the outer end portion 118b. Yes. Thereby, the connection part 118 connects the inside of the anchor part 116 and the outside of the ground 10.
  • the moisture in the ground 10 is first introduced into the anchor portion 116 through the first through-hole 116A, and also introduced into the bearing portion 117 through the second through-hole 117A. .
  • the moisture introduced into the anchor part 116 is drained to the outside of the ground 10 through the opening of the outer end part 118b through the connection part 118. Further, the moisture introduced into the pressure bearing portion 117 is drained to the outside of the ground 10 through the third through hole 113A of the outer closing plate 113.
  • the closing plate 119 is provided in the anchor part 116, when the anchor part 116 penetrates into the ground 10, the earth and sand from the ground 10 do not flow into the anchor part 116. Thereby, the introduction of moisture from the first through hole 116A into the anchor portion 116 is not hindered.
  • the frictional force on the sliding surface 5 of the ground 10 is increased, and the ground 10 is against the outer peripheral surface 116 c of the anchor portion 116, the outer peripheral surface 117 c of the supporting pressure portion 117, and the first blade portion 42 and the second blade portion 48. It is possible to increase the frictional force acting from the ground, and it is possible to further stabilize the ground 10.
  • no through hole is formed in the outer peripheral surface 118c of the connecting portion 118, but a through hole may be formed as in the fourth embodiment.
  • the landslide prevention pile 121 according to the sixth embodiment of the present invention will be described.
  • symbol is attached
  • the landslide prevention pile 121 of this embodiment is based on the landslide prevention pile 81 of the third embodiment, and the pile body 125 is different from the third embodiment.
  • the pile main body 125 has a plurality of first through holes (first series of holes) spaced apart in the circumferential direction and the direction of the axis P ⁇ b> 7 so as to communicate the inside and outside in the radial direction on the outer circumferential surface 125 c. 125A is formed, and these first through holes 125A guide moisture in the ground 10 into the pile main body 125.
  • the pile main body portion 125 is provided with a closing plate 129 so as to close the opening of the inner end portion 125a in the direction of the axis P7. Note that the position where the closing plate 129 is provided may not be the end 125a, that is, the tip.
  • this pile main-body part 125 has the outer edge part 125b protruded outside from the ground surface 10a and is exposed from the ground 10, and an opening part (second communication part) 125B is provided at the outer edge part 125b. An opening is formed toward the outside of the ground 10.
  • the moisture in the ground 10 can be introduced into the pile main body 125 by the first through hole 125A, and the moisture introduced into the ground 10 can be introduced into the ground 10 through the opening 125B. Can be drained to the outside.
  • the pile main body part 125 replaces with opening part 125B, and the pile main body part 125 forms the through-hole (2nd communication part) which communicates the inside and the outside in radial direction in the outer peripheral surface 125c of the part which protrudes outside the ground 10, It is also possible to communicate the inside of the part 125 and the outside of the ground 10 and drain the water inside the pile main body part 125 to the outside of the ground 10. That is, the formation position is not limited to the case of the present embodiment as long as the opening 125B opens at least toward the outside of the ground 10.
  • landslide is prevented only by the first blade portion 22 (42, 72, 92) and the second blade portion 28 (48, 78, 98) embedded in the ground 10.
  • a bearing member (not shown) that supports the connection portion 23 (43, 73) or the pile main body 90 may be further provided on the ground surface 10a.
  • this bearing member can be made small by using the 2nd blade
  • the number of blades and the blade size can be appropriately selected according to the state of the ground 10, and , May be provided discontinuously.
  • the landslide prevention pile 101,111,121 of 4th embodiment to 6th embodiment has a function which drains the water
  • the through holes are preferably formed at positions where the strength of the pile main body portions 105, 115, 125 can be sufficiently maintained. In particular, since a large strength is required in the vicinity of the sliding surface 5, it is preferable to avoid this position. Or the thickness of the steel pipe of the pile main-body parts 105, 115, and 125 may be increased to maintain the strength.
  • the landslide prevention piles 101, 111, 121 of the fourth embodiment to the sixth embodiment having the function of draining, and the landslide prevention piles 1, 31, 81 of the first embodiment to the third embodiment having no drainage function. May be installed on the ground 10 in parallel. In this case, since the drainage from the ground 10 is possible while maintaining the holding effect of the moving layer 11, the ground 10 can be further stabilized.
  • the installation angle of the landslide prevention pile 121 (101, 111) of the fourth embodiment to the sixth embodiment on the ground 10 is determined in consideration of the balance between the drainage effect and the landslide prevention effect. It can be installed almost horizontally.
  • each through-hole may be formed in slit shape instead of hole shape, and should just be formed so that the inside and outside of each member can communicate.
  • the anchor part 21 (41, 70, 106, 116), the bearing part 26 (46, 75, 107, 117), the pile main body part 90 (125), and the connection part 23 (43, 73). , 108, 118), each is formed by a member such as a single steel pipe.
  • these members when it is necessary to lengthen the landslide prevention pile 1 (31, 81, 101, 111, 121), these members have a divided structure configured by joining a plurality of steel pipes or the like through joints. It may be.
  • welding, fitting, fastening with screws, a mechanical joint, or the like can be applied to the joint.
  • the landslide prevention pile according to the present invention is a landslide prevention pile that is buried over a moving layer located on the surface layer side and a non-moving layer located on the lower layer side with a sliding surface in the ground as a boundary, and is a steel pipe centering on an axis.

Abstract

 本発明は、地盤10内の滑り面5を境に表層側に位置する移動層11と下層側に位置する不動層12とにわたって埋設される地滑り防止杭1であって、軸線P1を中心とした管状部材よりなるアンカー部21及び支圧部26と、アンカー部21の外周面21cに設けられて軸線P1を中心とした螺旋状をなして不動層12内に配置された第一羽根部22と、支圧部26の外周面26cに設けられて軸線P1を中心とした螺旋状をなして移動層11内に配置された第二羽根部28と、を備える。

Description

地滑り防止杭、及び、地滑り防止杭の設置方法
 本発明は、地滑りを防止する地滑り防止杭、及び地滑り防止杭の設置方法に関するものである。
 本願は、2012年7月6日に日本に出願された特願2012-152880号、及び2012年11月27日に日本に出願された特願2012-258567号に基づき優先権を主張し、その内容をここに援用する。
 従来より、盛土や斜面の表層崩壊による地滑りを防止して、安定化を図る地山補強土工法が知られている。この工法では、地中に補強材(鉄筋など)を挿入し、地表には補強材に結合されて補強材を保持する支圧板を設置することが一般に行なわれている。
 そして、このように地滑り防止を可能とする地滑り防止杭は、例えば特許文献1に開示されている。この地滑り防止杭は、鋼管よりなる杭本体の周面に螺旋状羽根が設けられており、回転しながら地盤内に貫入される。また地盤面に接触して配置される支圧板が杭本体の上部に設けられ、この支圧板から地盤に対して圧縮力を作用させる。具体的には、杭本体を設置深さまで打設した後、ジャッキ装置を用いて支圧板を地盤に押圧し、この状態において支圧板を杭本体に対して溶接等によって固定することにより、支持板から地盤に対して圧縮力を作用させる。或いは、支圧板が固定された杭本体を回転させながら地盤内に貫入し、螺旋状羽根の推進力を利用することにより、支圧板から地盤に対して圧縮力を作用させる。これにより、地盤のせん断抵抗を向上させて、地盤の安定化を図っている。
日本国特開2012-2012号公報
 しかしながら、特許文献1に示されたものを含め、従来の地滑り防止杭においては、支圧板のみによって、地盤に圧縮力を付与するような構造となっており、この支圧板の強度を確保する必要があり、寸法が大きくなってしまう。また、支圧板に代えてブロック状の部材が用いられることもあり、コストアップは避けられない。さらに、例えば支圧板を設置する地盤面の風化が進行していたり、地盤面の状態が凸凹であったりすると、支圧板を確実に設置して、地盤の安定化を確実に図ることは難しい。そして、支圧板が地盤面に剥き出しの状態で設置されると、山肌が支圧板によって覆われた状態となるため、景観上好ましくない。
 本発明はこのような事情を考慮してなされたものであり、コストを抑えて景観の向上を図りながら、確実に地盤の安定化が可能な地滑り防止杭、及び地滑り防止杭の設置方法を提供することを目的とする。
 上記課題を解決するため、本発明は以下の手段を採用している。
 本発明に係る地滑り防止杭は、地盤内の滑り面を境に表層側に位置する移動層と下層側に位置する不動層とにわたって埋設される地滑り防止杭であって、軸線を中心とした管状部材よりなる杭本体部と、前記杭本体部の外周面に設けられて前記軸線を中心とした螺旋状をなして前記不動層内に配置される第一羽根部と、前記杭本体部の外周面に設けられて前記軸線を中心とした螺旋状をなして前記移動層内に配置される第二羽根部と、を備える。
 このような地滑り防止杭によると、全体が地盤内に埋設されるとともに、第一羽根部が不動層に、第二羽根部が移動層に位置することで、例えば地滑りによって、移動層が不動層に対して相対的に移動しようとすると、第一羽根部と第二羽根部とがこの移動を防止するように作用する。この際、例えば第一羽根部及び第二羽根部の羽根の設置枚数や寸法を適宜変更することで、不動層と第一羽根部との間、移動層と第二羽根部との間の接触面積を調節して、地盤の状態に合わせて移動層を保持するのに十分な機能を持たせることができる。従って、地盤の地表面に大きな支圧部材を別途設置することなく、移動層の移動を確実に防止可能となり、また、地滑り防止杭の設置ピッチを大きくしても地滑りの防止効果を十分に得ることが可能となる。
 さらに、杭本体部は管状部材よりなり、また第一羽根部及び第二羽根部は軸線を中心に螺旋状に形成されているため、地滑り防止杭を地盤内に回転させながら貫入させることができる。このため事前に掘削穴を設ける必要が無く、地滑り防止杭の設置が容易であるとともに確実に地盤内に固定して保持することができる。
 本発明の地滑り防止杭によると、第一羽根部及び第二羽根部を地盤内に配置したことで、地表面に大きな支圧部材を設置することがなく、設置ピッチも大きくできるため、コストを抑えて景観の向上を図り、確実に地盤の安定化が可能となる。
 前記杭本体部は、前記第一羽根部が設けられた第一杭本体部と、前記第二羽根部が設けられた第二杭本体部とで分割されて構成され、前記第一杭本体部と前記第二杭本体部との間に配されて、該第一杭本体部と該第二杭本体部とを接続する接続部をさらに備えていてもよい。
 このように、分割されていることで、仮に第一羽根部と第二羽根部の羽根ピッチが異なっていたとしても、地滑り防止杭を容易に地盤内に貫入することができる。
 本発明の地滑り防止杭によると、杭本体部の分割により、さらに設置を容易化できる。
 前記接続部は、前記第一杭本体部と一体に形成された管状部材よりなっていてもよい。
 このような接続部によって、第一杭本体部と第二杭本体部とを確実に接続して、移動層を保持することができる。
 本発明の地滑り防止杭によると、設置を容易化するとともに、より確実に地盤の安定化が可能となる。
 前記杭本体部には、該杭本体部の内外を径方向に連通する第一連通部が形成され、前記接続部には、該接続部の内外を前記径方向に連通する第二連通部、及び、前記地盤の外部に向かって開口して前記接続部の内外を連通する第三連通部が形成されていてもよい。
 このような第一連通部、第二連通部、第三連通部によって、地盤内の地下水位が高い等で、地盤内に水分が含まれている場合に、第一連通部から杭本体部の内部へ、また第二連通部から接続部の内部へ水分を導入し、杭本体部の内部へ導入された水分を第三連通部によって地盤の外部へ排水することができる。従って、地盤の滑り面において、移動層と不動層との間に作用する摩擦力を増大させることができる。また、第一連通部、第二連通部、第三連通部によって、杭本体部の外周面、及び第一羽根部及び第二羽根部に対して地盤から作用する摩擦力が増大するため、地盤を引き止める効果を向上させることができる。
 本発明の地滑り防止杭によると、地盤からの排水によって、さらなる地盤の安定化が可能となる。
 前記接続部は、前記第一杭本体部とは別体として設けられた棒状部材よりなっていてもよい。
 このような接続部によって、第一杭本体部と第二杭本体部とを確実に接続して、移動層を保持することができる。
 本発明の地滑り防止杭によると、設置を容易化するとともに、より確実に地盤の安定化が可能となる。
 前記第一杭本体部には、該第一杭本体部の内外を径方向に連通する第一連通部が形成され、前記第二杭本体部には、該第二杭本体部の内外を前記径方向に連通する第二連通部、及び、前記地盤の外部に向かって開口して前記第二杭本体部の内外を連通する第三連通部が形成され、前記接続部は、管状部材よりなり、一端が前記第一杭本体部の内部に向かって開口するとともに、他端が前記地盤の外部に向かって開口していてもよい。
 このような第一連通部及び第二連通部によって、第一杭本体部及び第二杭本体部の内部に地盤内の水分を導入できる。さらに第一杭本体部の内部に導入された水分は、接続部を介して地盤の外部へ排水することができる。また、第二杭本体部の内部の水分は第三連通部を介して地盤の外部へ排水することができる。従って、地盤の滑り面での摩擦力を増大させ、第一杭本体部の外周面、第二杭本体部の外周面、及び第一羽根部及び第二羽根部に地盤から作用する摩擦力を増大させることが可能となる。
 本発明の地滑り防止杭によると、地盤からの排水によって、さらなる地盤の安定化が可能となる。
 本発明に係る地滑り防止杭は、前記第一杭本体部と前記第二杭本体部とにプレストレスを導入するプレストレス導入手段をさらに備えていてもよい。
 このようにプレストレスを導入することで、このプレストレスの反力によって第一羽根部と第二羽根部とが接近しようとする方向に力が作用し、これにより移動層と不動層との間に圧縮力を生じさせることができる。
 本発明の地滑り防止杭によると、プレストレスの導入によって、地盤の安定化が可能となる。
 前記接続部は、前記軸線を中心として捩じれる第一ネジ部を有し、前記第二杭本体部は、前記接続部を該第二杭本体部に対して前記軸線方向に相対移動可能となるように前記第一ネジ部に螺合される第二ネジ部を有するとともに、該第二ネジ部が前記第一ネジ部に螺合されることで前記接続部を介して前記第一杭本体部に接続され、前記プレストレス導入手段は、前記第一ネジ部と前記第二ネジ部とから構成されて、前記第一ネジ部と前記第二ネジ部の螺合状態の調節によって前記プレストレスが導入されてもよい。
 このように、接続部を第二杭本体部に対して軸線方向に相対移動可能としたことで、第一ネジ部と第二ネジ部との螺合部分を締緩して、第一杭本体部が第二杭本体部に接近するようにすることができる。即ち、第一杭本体部を移動層側に向かって引っ張ることができ、この場合、第一杭本体部は第二本体部との螺合部分からの反力を受けて引っ張り状態が維持され、第一杭本体部にプレストレスが導入される。従って、地盤内に第一杭本体部及び第二杭本体部を埋設した状態で、螺合部分を締め付ける又は緩めることのみによってプレストレスを導入できる。この結果、このプレストレスの反力によって第一羽根部と第二羽根部とが接近しようとする方向に力が作用し、即ち、移動層と不動層との間に圧縮力を生じさせることができる。
 本発明の地滑り防止杭によると、第二杭本体部と接続部とが螺合して接続されていることで、プレストレスを容易に導入でき、さらなる地盤の安定化が可能となる。
 前記プレストレス導入手段は、前記第二杭本体部と前記接続部との間に打ち込まれたクサビ部材であってもよい。
 このようなクサビ部材によって、第一杭本体部を移動層側に向かって引っ張った状態で、第一杭本体部と第二杭本体部とを固定でき、即ちプレストレスの導入が可能となる。従って、移動層と不動層との間に圧縮力を生じさせることができる。
 本発明の地滑り防止杭によると、クサビ部材によって、プレストレスを容易に導入でき、さらなる地盤の安定化が可能となる。
 前記杭本体部は、一本の管状部材よりなっていてもよい。
 このような構造とすることで、構造をシンプルとすることができ、地滑りの防止効果を得ることができるとともに、さらなるコスト低減につながる。
 本発明の地滑り防止杭によると、シンプルな構造としたことで、コスト低減が可能である。
 前記杭本体部には、該杭本体部の内外を前記軸線の径方向に連通する第一連通部と、前記地盤の外部に向かって開口して前記杭本体部の内外を連通する第二連通部とが形成されていてもよい。
 このような第一連通部によって、杭本体部の内部に地盤内の水分を導入でき、杭本体部の内部に導入された水分を、第二連通部によって地盤の外部へ排水することができる。従って、地盤の滑り面での摩擦力を増大させ、杭本体部の外周面、第一羽根部、第二羽根部に対して地盤から作用する摩擦力を増大させることが可能となる。
 本発明の地滑り防止杭によると、地盤からの排水によって、さらなる地盤の安定化が可能となる。
 本発明に係る地滑り防止杭は、前記地盤の地表面に設けられて、該杭本体部からの伝達力を前記地盤に伝達する支圧部材をさらに備えていてもよい。
 このように支圧部材を設けることで、地表面から地盤を押え付け、地滑り防止の効果をさらに向上させることができる。さらに、第二羽根部と支圧部材とを併設することによって、支圧部材のみで移動層の移動を防止する場合と比較し、この支圧部材の寸法を小さくできる。
 本発明の地滑り防止杭によると、支圧部材を併設することでさらなる地盤の安定化を可能としながら、支圧部材の寸法縮小による景観の向上を図ることができる。
 本発明に係る地滑り防止杭の設置方法は、地盤内の滑り面を境に表層側に位置する移動層と下層側に位置する不動層とにわたって、地滑り防止杭を埋設する地滑り防止杭の設置方法であって、軸線を中心とした管状部材よりなる第一杭本体部の外周面に設けられて該軸線を中心とした螺旋状をなす第一羽根部が前記不動層内に配置されるように、該第一杭本体部を回転させながら貫入して埋設する第一工程と、前記軸線を中心とした管状部材よりなる第二杭本体部の外周面に設けられて該軸線を中心とした螺旋状をなす第二羽根部が前記移動層内に配置されるように、該第二杭本体部を回転させながら貫入して埋設する第二工程と、前記第二工程で埋設された前記第二杭本体部を、該第一杭本体部と該第二杭本体部との間に配された接続部を介して、前記軸線と同心軸上に前記第一杭本体部に接続する第三工程とを備える。
 このような地滑り防止杭の設置方法によると、地盤の地表面に大きな支圧部材を別途設置することなく、事前に掘削穴を設ける必要も無く、また仮に第一羽根部と第二羽根部の羽根ピッチが異なっていたとしても、回転させながら貫入することによって地滑り防止杭を容易に設置できる。
 従って、確実に地盤内に固定して地滑り防止杭を保持し、地滑りの防止効果を十分に得ることができる。
 本発明の地滑り防止杭の設置方法によると、第一羽根部及び第二羽根部を地盤内に配置することで、コストを抑え、また景観の向上を図り、確実に地盤の安定化が可能となる。
 本発明に係る地滑り防止杭の設置方法においては、前記第三工程の後に、前記接続部に設けられて前記軸線を中心として捩れる第一ネジ部と、前記第二杭本体部に設けられて前記接続部を該第二杭本体部に対して前記軸線方向に相対移動可能とする第二ネジ部とを螺合して、前記接続部を介して前記第一杭本体部と前記第二杭本体部とを接続し、前記第一ネジ部と前記第二ネジ部との螺合の状態を調節する第四工程をさらに備えていてもよい。
 このような第三工程、第四工程によって、地盤内に第一杭本体部及び第二杭本体部を埋設した状態でプレストレスを導入でき、このプレストレスによって、移動層と不動層との間に圧縮力を生じさせることができる。
 本発明の地滑り防止杭の設置方法によると、第三工程で第二杭本体部と接続部とが螺合して接続され、また第四工程をさらに備えることで、プレストレスを容易に導入でき、さらなる地盤の安定化が可能となる。
 本発明に係る地滑り防止杭の設置方法は、地盤内の滑り面を境に表層側に位置する移動層と下層側に位置する不動層とにわたって、地滑り防止杭を埋設する地滑り防止杭の設置方法であって、軸線を中心とした管状部材よりなる杭本体部の外周面に設けられて前記軸線を中心とした螺旋状をなす第一羽根部が前記不動層内に配置されるように、かつ、該杭本体部の外周面に設けられて前記軸線を中心とした螺旋状をなす第二羽根部が前記移動層内に配置されるように、該杭本体部を回転させながら貫入して埋設する工程を備える。
 このような地滑り防止杭の設置方法によると、地盤の地表面に大きな支圧部材を別途設置することなく、事前に掘削穴を設ける必要も無く、回転させながら貫入することによって地滑り防止杭を容易に設置できる。従って、確実に地盤内に固定して地滑り防止杭を保持し、地滑りの防止効果を十分に得ることができる。
 本発明の地滑り防止杭の設置方法によると、第一羽根部及び第二羽根部を地盤内に配置することで、コストを抑え、また景観の向上を図り、確実に地盤の安定化が可能となる。
 本発明の地滑り防止杭によると、コストを抑えて景観の向上を図りながら、確実に地盤の安定化を図ることができる。
本発明の第一実施形態に係る地滑り防止杭を地盤内に設置した状態を示す全体図である。 本発明の第一実施形態に係る地滑り防止杭を地盤内に設置する工程を示す図である。 本発明の第一実施形態に係る地滑り防止杭を地盤内に設置する工程を示す図である。 本発明の第一実施形態に係る地滑り防止杭を地盤内に設置する工程を示す図である。 本発明の第二実施形態に係る地滑り防止杭を地盤内に設置した状態を示す全体図である。 本発明の第二実施形態に係る地滑り防止杭を地盤内に設置する工程を示す図である。 本発明の第二実施形態に係る地滑り防止杭を地盤内に設置する工程を示す図である。 本発明の第二実施形態に係る地滑り防止杭を地盤内に設置する工程を示す図である。 本発明の第一実施形態及び第二実施形態の変形例に係る地滑り防止杭である。 本発明の第三実施形態に係る地滑り防止杭を地盤内に設置した状態を示す全体図である。 本発明の第四実施形態に係る地滑り防止杭を地盤内に設置した状態を示す全体図である。 本発明の第四実施形態の変形例に係る地滑り防止杭を地盤内に設置した状態を示す全体図である。 本発明の第五実施形態に係る地滑り防止杭を地盤内に設置した状態を示す全体図である。 本発明の第六実施形態に係る地滑り防止杭を地盤内に設置した状態を示す全体図である。 本発明の第六実施形態の変形例に係る地滑り防止杭を地盤内に設置した状態を示す全体図である。
 以下、本発明の第一実施形態に係る地滑り防止杭1について説明する。
 図1に示すように、地滑り防止杭1は、地盤10内の滑り面5を境に表層側に位置する移動層11と下層側に位置する不動層12とにわたって地盤10内に埋設され、地滑りを防止する部材である。
 地滑り防止杭1は、不動層12中に埋設されるアンカー部(第一杭本体部)21と、移動層11中に埋設される支圧部(第二杭本体部)26とによって構成された杭本体部20を備えている。さらに、地滑り防止杭1は、アンカー部21と支圧部26とを接続する接続部23と、アンカー部21に設けられた第一羽根部22と、支圧部26に設けられた第二羽根部28とを備えている。
 ここで、地滑り防止杭1の軸線P1方向の不動層12側を内側、移動層11側を外側とする。
 杭本体部20におけるアンカー部21は、鋼管よりなる。
 第一羽根部22は、アンカー部21の外周面21cに軸線P1を中心に螺旋状に設けられ、不動層12の内部に位置する羽根部材である。この第一羽根部22は、アンカー部21と一体に製作されてもよいし、別体で製作して溶接等によって取り付けてもよい。
 なお、この第一羽根部22は、アンカー部21の軸線P1方向の内側の端部21a寄りの位置における外周面21cに設けられているが、不動層12の内部に位置するように設けられていればよく、上述の位置には限定されない。
 接続部23は、アンカー部21の外側の端部21bにアンカー部21と一体に形成された鋼管よりなり、軸線P1方向の外側の端部23bが地盤10の地表面10aより外側に突出するように設けられている。この接続部23は、上記端部23b寄りの位置における外周面23cに雄ネジが形成された雄ネジ部(第一ネジ部)23aを有している。
 杭本体部20における支圧部26は、アンカー部21と同様、鋼管よりなり、接続部23を外周から覆うように、また、軸線P1方向の外側の端部26bが地盤10の地表面10aより外側に突出して設けられている。支圧部26は、この端部26bに軸線P1方向の外側から当接するように設けられたナット27を有している。このナット27の雌ネジ部(第二ネジ部、プレストレス導入手段)27aが、接続部23の雄ネジ部23aと螺合して、アンカー部21を支圧部26に対して相対移動可能となるように保持している。
 第二羽根部28は、支圧部26の外周面26cに軸線P1を中心に螺旋状に設けられ、移動層11の内部に位置する羽根部材である。この第二羽根部28は、支圧部26と一体に製作されてもよいし、別体で製作して溶接等によって支圧部26に取り付けてもよい。
 なお、この第二羽根部28は、支圧部26の軸線P1方向の内側の端部26a寄りの位置における外周面26cに設けられているが、移動層11の内部に位置するように設けられていればよく、上述の位置には限定されない。
 次に、本実施形態における地滑り防止杭1の設置方法の手順について説明する。
 図2Aから図2Cに示すように、地滑り防止杭1の設置方法は、アンカー部21を埋設するアンカー部埋設工程(第一工程)S1と、支圧部26を埋設する支圧部埋設工程(第二工程、第三工程)S2と、アンカー部21と支圧部26との螺合状態を調節するネジ調節工程(第四工程)S3とを備えている。
 まず、図2Aに示すように、アンカー部埋設工程S1を実行する。即ち、第一羽根部22が不動層12の内部に配置されるように、アンカー部21を回転させながら貫入して設置する。そしてアンカー部21と同時に接続部23が設置され、この際、接続部23の軸線P1方向の外側の端部23bが地表面10aから突出するようにアンカー部21を設置する。
 次に、図2Bに示すように、支圧部埋設工程S2を実行する。即ち、第二羽根部28が移動層11の内部に配置されるように、支圧部26が接続部23を外周から覆った状態で、支圧部26を回転させながら貫入して設置する。そしてこの際、接続部23の雄ネジ部23aにナット27の雌ネジ部27aを螺合させて、アンカー部21に支圧部26を接続する。
 次に、図2Cに示すように、ネジ調節工程S3を実行する。即ち、ナット27を回すことで、支圧部26を軸線P1方向の内側へ押し込むとともに、接続部23を介してアンカー部21を軸線P1方向の外側に引っ張る。例えば雌ネジ部27a及び雄ネジ部23aが右ネジであれば、軸線P1方向の外側から見てナット27を右回りに回転させる。そしてこの際、アンカー部21は、支圧部26との螺合部分から反力を受けて引っ張り状態が維持され、即ちアンカー部21及び支圧部26にプレストレスが導入される。
 このような地滑り防止杭1においては、アンカー部21、支圧部26がともに地盤10内に埋設され、第一羽根部22が不動層12に、第二羽根部28が移動層11に位置する。このため、地滑りによって、移動層11が不動層12に対して相対的に移動しようとすると、第一羽根部22と第二羽根部28とがこの移動を防止するように移動層11を不動層12に押し付けるように作用する。
 この際、例えば第一羽根部22及び第二羽根部28の羽根の設置枚数や寸法を適宜変更することで、不動層12と第一羽根部22との間、移動層11と第二羽根部28との間の接触面積を調節して、地盤10の状態に合わせて移動層11を保持するのに十分な機能をアンカー部21及び支圧部26に持たせることができる。従って、地表面10aに大きな支圧部材を別途設置することなく、移動層11の移動を確実に防止可能となるため、コストを抑えるとともに、景観の向上が可能となる。
 さらに、地滑り防止杭1の設置ピッチを大きくしても、地滑りの防止効果を十分に得ることができるため、この点においてもコスト抑制につながる。
 そして、アンカー部21及び支圧部26は鋼管よりなり、また第一羽根部22及び第二羽根部28は軸線P1を中心に螺旋状に形成されているため、アンカー部21と支圧部26とを地盤10内に回転させながら貫入することができる。従って、地盤10内の土砂を取り除く必要が無くなり、即ち事前に掘削穴を設ける必要が無く地滑り防止杭1の設置が容易であるとともに、これらアンカー部21及び支圧部26を確実に地盤10内に固定して保持することができる。この結果、地滑りの防止効果を向上できる。
 さらに、アンカー部21と支圧部26とを別々に貫入するため、第一羽根部22と第二羽根部28との羽根ピッチは異なっていても貫入は可能である。
 また、雄ネジ部23aと雌ネジ部27aとを締め付ける又は緩めることのみで、アンカー部21及び支圧部26にプレストレスを導入することができる。
 従って、地盤10内にアンカー部21及び支圧部26を埋設した状態で、螺合部分を締め付ける又は緩めることのみによってプレストレスを導入でき、このプレストレスの反力によって第一羽根部22と第二羽根部28とが接近しようとする方向に力を作用させることが可能となる。即ち、移動層11と不動層12との間に圧縮力を生じさせることができ、確実に地滑りの防止が可能となる。
 本実施形態の地滑り防止杭1によると、アンカー部21及び支圧部26を共に地盤10内に埋設したことで、コストを抑えるとともに景観を向上し、また、第一羽根部22と第二羽根部28とによって確実に地盤10の安定化を図ることができる。
 次に、本発明の第二実施形態に係る地滑り防止杭31について説明する。
 なお、第一実施形態と共通の構成要素には同一の符号を付して詳細説明を省略する。
 本実施形態の地滑り防止杭31は、アンカー部41、接続部43、及び支圧部46の形状が第一実施形態のものとは異なっている。
 図3に示すように、地滑り防止杭31は、不動層12中に埋設されるアンカー部(第一杭本体部)41と、移動層11中に埋設される支圧部(第二杭本体部)46とによって構成された杭本体部35を備えている。さらに、地滑り防止杭31は、これらアンカー部41と支圧部46とを接続する接続部43と、アンカー部41に設けられた第一羽根部42と、支圧部46に設けられた第二羽根部48とを備えている。
 杭本体部35におけるアンカー部41は、鋼管よりなる。
 第一羽根部42は、アンカー部41の外周面41cに軸線P2を中心に螺旋状に設けられ、不動層12の内部に位置する羽根部材である。
 接続部43は、アンカー部41の軸線P2方向の外側の端部41bに設けられたナット44によってアンカー部41に接続され、軸線P2方向の外側に向かって延在する鉄筋等よりなる棒状の部材である。また、この接続部43の軸線P2方向の外側の端部43bは地表面10aから突出して設けられ、接続部43は、端部43bにおける外周面43cに雄ネジが形成された雄ネジ部(第一ネジ部、プレストレス導入手段)43aをさらに有している。なお、この接続部43は、アンカー部41に溶接等の他の方法によって接続されていてもよいし、鉄筋に限らずアンカー部41よりも細い鋼管であってもよい。
 杭本体部35における支圧部46は、アンカー部41同様、鋼管よりなり、接続部43を外周から覆うように、また、軸線P2方向の外側の端部46bが地表面10aより外側に突出して設けられている。そしてこの端部46bには軸線P2方向の外側から支圧部46に当接するように設けられたナット47を有し、ナット47の雌ネジ部(第二ネジ部、プレストレス導入手段)47aが接続部43の雄ネジ部43aと螺合して、アンカー部41を支圧部46に対して相対移動可能となるように保持している。
 さらに本実施形態では、支圧部46の軸線P2方向の外側の端部46bを塞ぐ外側塞ぎ板50が、接続部43を貫通させた状態で設けられ、この外側塞ぎ板50の外側面にナット47が設置されている。またこの支圧部46には、軸線P2方向の内側の端部46aを塞ぐ内側塞ぎ板51が、接続部43を貫通させた状態で設けられている。
 第二羽根部48は、支圧部46の外周面46cに軸線P2を中心に螺旋状に設けられ、移動層11の内部に位置する羽根部材である。
 次に、本実施形態における地滑り防止杭31の設置方法の手順について説明する。
 図4Aから図4Cに示すように、地滑り防止杭31の設置方法は、アンカー部41を埋設するアンカー部埋設工程(第一工程)S11と、支圧部46を埋設する支圧部埋設工程(第二工程、第三工程)S12と、アンカー部41と支圧部46との螺合状態を調節するネジ調節工程(第四工程)S13とを備えている。
 まず、図4Aに示すように、アンカー部埋設工程S11を実行する。即ち、第一羽根部42が不動層12の内部に配置されるように、アンカー部41を回転させながら貫入して設置する。この際、接続部43の軸線P2方向の外側の端部43bが地表面10aから突出するように設置する。
 次に、図4Bに示すように、支圧部埋設工程S12を実行する。即ち、第二羽根部48が移動層11の内部に配置されるように、支圧部46が接続部43を外周から覆った状態で、また、内側塞ぎ板51及び外側塞ぎ板50を接続部43が貫通するように、支圧部46を回転させながら貫入して設置する。そしてこの際、接続部43の雄ネジ部43aにナット47の雌ネジ部47aを螺合させて、アンカー部41と支圧部46とを接続する。
 次に、図4Cに示すように、ネジ調節工程S13を実行する。即ち、ナット47を回すことで、支圧部46を軸線P1方向の内側に押し込むとともに接続部43を介してアンカー部41を軸線P2方向の外側に引っ張る。例えば雌ネジ部47a及び雄ネジ部43aが右ネジであれば、軸線P2方向の外側から見てナット47を右回りに回転させる。そしてこの際、アンカー部41は支圧部46との螺合部分から反力を受けて引っ張り状態が維持され、即ちアンカー部41及び支圧部46にプレストレスが導入される。
 このような地滑り防止杭31においては、例えば地滑りによって、移動層11が不動層12に対して相対的に移動しようとすると、第一羽根部42と第二羽根部48とがこの移動を防止するように移動層11を不動層12に押し付けるように作用する。従って、地表面10aに大きな支圧部材を別途設置する必要がなく、また、地滑り防止杭31の設置ピッチを大きくしても、移動層11を保持するのに十分な機能をアンカー部41及び支圧部46に持たせることができる。この結果、コストを抑えるとともに、景観の向上が可能となる。
 そして、アンカー部41及び支圧部46は鋼管よりなり、また第一羽根部42及び第二羽根部48は、軸線P2を中心に螺旋状に形成されているため、アンカー部41と支圧部46とを地盤10内に回転させながら貫入させ、確実に地盤10内に固定して保持することができ、地滑りの防止効果を向上できる。
 さらに、アンカー部41と支圧部46とを別々に貫入するため、第一羽根部42と第二羽根部48との羽根ピッチは異なっていても貫入は可能である。
 また、雄ネジ部43aと雌ネジ部47aとを締め付ける又は緩めることのみで、アンカー部41及び支圧部46にプレストレスが導入され、これによって移動層11と不動層12との間に圧縮力を生じさせることができ、確実に地滑りの防止が可能となる。
 本実施形態の地滑り防止杭31によると、アンカー部41及び支圧部46を共に地盤10内に埋設したことで、コストを抑えるとともに景観を向上し、また、確実に地盤10の安定化を図ることが可能となる。
 なお、例えばアンカー部21(41)と支圧部26(46)とを螺合して接続せずに、締まり嵌めや、溶接によって接続してもよく、さまざまな手法を用いて接続することができる。また、図5に示すように、地盤10内に圧縮力を作用させるプレストレスは、例えばアンカー部70の埋設後に、軸線P3方向の外側に引っ張り力を与えた状態で支圧部75と接続部73との間にクサビ部材(プレストレス導入手段)60を打ち込むことによっても導入することができる。
 次に、本発明の第三実施形態に係る地滑り防止杭81について説明する。
 なお、第一実施形態及び第二実施形態と共通の構成要素には同一の符号を付して詳細説明を省略する。
 本実施形態の地滑り防止杭81は、アンカー部21(41、70)及び支圧部26(46、75)の形状が、第一実施形態及び第二実施形態のものとは異なっている。
 図6に示すように、地滑り防止杭81は、アンカー部21(41、70)と支圧部26(46、75)とが一体となったような、即ち、軸線P4を中心とした鋼管よりなる杭本体部90を備えている。さらにこの地滑り防止杭81は、杭本体部90の外周面90aにおいて、不動層12の内部に位置する第一羽根部92と、移動層11の内部に位置する第二羽根部98とを備えている。
 このような地滑り防止杭81によると、事前に掘削穴を設ける必要も無く、回転させながら貫入することによって杭本体部90を地盤10内に設置でき、確実に地盤内に固定して地滑り防止杭を保持し、地滑りの防止効果を十分に得ることが可能となる。従って、地表面10aに大きな支圧部材を設置することがなく、設置ピッチも大きくできるため、コストを抑えて景観の向上を図り、確実に地盤の安定化が可能となる。
 なお、本実施形態の場合には、他の実施形態のようにアンカー部21及び支圧部26にプレストレスは導入されないが、よりシンプルな構造となっているため、コストの低減が可能となる。
 ここで、第一羽根部92と第二羽根部98については、羽根ピッチが同一となっている。
 次に、本発明の第四実施形態に係る地滑り防止杭101について説明する。
 なお、第一実施形態から第三実施形態と共通の構成要素には同一の符号を付して詳細説明を省略する。
 本実施形態の地滑り防止杭101は、第一実施形態の地滑り防止杭1を基本構成として、杭本体部105、及び接続部108が第一実施形態とは異なっている。
 杭本体部105は鋼管よりなり、アンカー部106と支圧部107とを備えている。
 図7に示すように、アンカー部106には、外周面106cにおいて内外を径方向に連通するように、周方向及び軸線P5の方向に間隔をあけて複数の第一貫通孔(第一連通部)106Aが形成されている。この第一貫通孔106Aは、地盤10内の水分をアンカー部106の内部に導く。
 さらにこのアンカー部106には、軸線P5方向の内側の端部106aの開口を閉塞するように塞ぎ板109が設けられている。なおこの塞ぎ板109を設ける位置は、端部106a、即ち、先端部でなくてもよい。
 支圧部107には、アンカー部106と同様に、外周面107cにおいて内外を径方向に連通するように、周方向及び軸線P5の方向に間隔をあけて複数の第二貫通孔(第一連通部)107Aが形成され、この第二貫通孔107Aが地盤10内の水分を支圧部107の内部に導く。
 接続部108は、アンカー部106の外側の端部106bに一体に形成されており、アンカー部106及び支圧部107と同様に、外周面108cにおいて内外を径方向に連通するように、周方向及び軸線P5の方向に間隔をあけて複数の第三貫通孔(第二連通部)108Aが形成されている。そして、この第三貫通孔108Aは、地盤10内の水分を、支圧部107の第二貫通孔107Aを介して、また、支圧部107と接続部108との隙間を介して、接続部108の内部に導く。
 さらにこの接続部108は、支圧部107に設けられたナット27に螺合して、端部108bが地表面10aよりも外側に突出して地盤10から露出しており、外側の端部108bには開口部(第三連通部)108Bが、地盤10の外部に向かって開口して形成されている。
 このような地滑り防止杭101によると、地盤10内の地下水位が高い等で、地盤10内に水分が含まれている場合に、この水分をまず、第一貫通孔106Aからアンカー部106の内部へ、また第二貫通孔107Aから支圧部107の内部へ導入する。さらに、地盤内からの水分、アンカー部106及び支圧部107の内部に導入された水分を、第三貫通孔108Aから接続部108の内部に導入し、これを開口部108Bから地盤10の外部へ排水することができる。
 ここで、塞ぎ板109をアンカー部106に設けたことで、アンカー部106を貫入する際に、内部に地盤10からの土砂が流入しない。これにより、第一貫通孔106からアンカー部106の内部への水分の導入を、流入した土砂が妨げてしまうことがない。
 よって、地盤10の滑り面5において、移動層11と不動層12との間に作用する摩擦力を増大させることができ、またアンカー部106の外周面106c、支圧部107の外周面107c、及び第一羽根部22及び第二羽根部28に対して地盤10から作用する摩擦力を増大させて地盤10を引き止める効果を向上でき、地滑り防止の効果を向上できる。この結果、地盤10のさらなる安定化を達成することができる。
 なお、接続部108における開口部108Bに代えて、接続部108がナット27よりも軸線P5方向の外側に突出する部分の外周面108cに内外を径方向に連通する貫通孔(第三連通部)を形成することで、接続部108の内部と地盤10の外部とを連通し、接続部108の内部の水分を地盤10の外部へ排水することも可能である。即ち、開口部108Bは少なくとも地盤10の外部に向かって開口していれば、形成位置は本実施形態の場合に限定されない。
 ここで、図8に示すように、図5に示すクサビ部材60を用いた場合にも、本実施形態の第一貫通孔106A、第二貫通孔107A、第三貫通孔108Aを適用することが可能である。
 次に、本発明の第五実施形態に係る地滑り防止杭111について説明する。
 なお、第一実施形態から第四実施形態と共通の構成要素には同一の符号を付して詳細説明を省略する。
 本実施形態の地滑り防止杭111は、第二実施形態の地滑り防止杭31を基本構成として、杭本体部115、及び接続部118が第二実施形態とは異なっている。
 杭本体部115は鋼管よりなり、アンカー部116と支圧部117とを備えている。
 図9に示すように、アンカー部116には、外周面116cにおいて内外を径方向に連通するように、周方向及び軸線P6の方向に間隔をあけて複数の第一貫通孔(第一連通部)116Aが形成され、これら第一貫通孔116Aが地盤10内の水分をアンカー部116の内部に導く。
 さらにこのアンカー部116には、軸線P6方向の内側の端部116aの開口を閉塞するように塞ぎ板119が設けられている。なおこの塞ぎ板119を設ける位置は、端部116a、即ち、先端部でなくてもよい。
 支圧部117には、アンカー部116と同様に、外周面117cにおいて内外を径方向に連通するように、周方向及び軸線P6の方向に間隔をあけて複数の第二貫通孔(第一連通部)117Aが形成され、これら第二貫通孔117Aが地盤10内の水分を支圧部117の内部に導く。
 さらに、この支圧部117には、外側の端部117bを軸線P6方向から塞ぐように外側塞ぎ板113が設けられており、外側塞ぎ板113の外側面のナット47に干渉しないように、ナット47よりも軸線P6の径方向外側となる位置で、支圧部117の内外を軸線P6方向に連通するように第三貫通孔(第三連通部)113Aが形成されている。即ち、この第三貫通孔113Aによって、支圧部117は、地盤10の外部に向かって開口している。
 接続部118は、棒状をなすとともに内部が中空となっており、内側の端部118aでアンカー部116の内部に向かって開口し、外側の端部118bで地盤10の外部に向かって開口している。これにより、接続部118は、アンカー部116の内部と地盤10の外部とを連通している。
 このような地滑り防止杭111によると、地盤10内の水分をまず、第一貫通孔116Aによってアンカー部116の内部に導入し、また、第二貫通孔117Aによって支圧部117の内部に導入する。アンカー部116内に導入された水分は、接続部118を介して外側の端部118bの開口より地盤10の外部に排水される。さらに、支圧部117内に導入された水分は、外側塞ぎ板113の第三貫通孔113Aを通じて、地盤10の外部に排水される。
 ここで、塞ぎ板119をアンカー部116に設けたことで、アンカー部116を地盤10に貫入する際に、アンカー部116の内部に地盤10からの土砂が流入しない。これにより、第一貫通孔116Aからアンカー部116内部への水分の導入を妨げてしまうことがない。
 よって、地盤10の滑り面5での摩擦力を増大させ、アンカー部116の外周面116c、支圧部117の外周面117c、及び第一羽根部42及び第二羽根部48に対して地盤10から作用する摩擦力を増大させることが可能となり、さらなる地盤10の安定化が可能となる。
 なお、本実施形態では、接続部118の外周面118cには貫通孔が形成されていないが、第四実施形態と同様に貫通孔を形成してもよい。
 次に、本発明の第六実施形態に係る地滑り防止杭121について説明する。
 なお、第一実施形態から第五実施形態と共通の構成要素には同一の符号を付して詳細説明を省略する。
 本実施形態の地滑り防止杭121は、第三実施形態の地滑り防止杭81を基本構成として、杭本体部125が第三実施形態とは異なっている。
 図10に示すように、杭本体部125には、外周面125cにおいて内外を径方向に連通するように、周方向及び軸線P7の方向に間隔をあけて複数の第一貫通孔(第一連通部)125Aが形成され、これら第一貫通孔125Aが地盤10内の水分を杭本体部125の内部に導く。
 さらにこの杭本体部125には、軸線P7方向の内側の端部125aの開口を閉塞するように塞ぎ板129が設けられている。なおこの塞ぎ板129を設ける位置は、端部125a、即ち、先端部でなくてもよい。
 また、この杭本体部125は、外側の端部125bが地表面10aよりも外側に突出して地盤10から露出しており、外側の端部125bには開口部(第二連通部)125Bが、地盤10の外部に向かって開口して形成されている。
 このような地滑り防止杭121によると、第一貫通孔125Aによって杭本体部125の内部に地盤10内の水分を導入することができ、この内部に導入された水分を、開口部125Bによって地盤10の外部へ排水することができる。
 従って、地盤10の滑り面5での摩擦力を増大させ、杭本体部125の外周面、第一羽根部92、第二羽根部98に対して地盤から作用する摩擦力を増大させることが可能となり、地盤10のさらなる安定化が可能となる。
 なお、開口部125Bに代えて、杭本体部125が地盤10の外側に突出する部分の外周面125cに内外を径方向に連通する貫通孔(第二連通部)を形成することで、杭本体部125の内部と地盤10の外部とを連通し、杭本体部125の内部の水分を地盤10の外部へ排水することも可能である。即ち、開口部125Bは少なくとも地盤10の外部に向かって開口していれば、形成位置は本実施形態の場合に限定されない。
 以上、本発明の実施形態について詳細を説明したが、本発明の技術的思想を逸脱しない範囲内において、多少の設計変更も可能である。
 例えば、上述の実施形態では、地盤10内に埋設した第一羽根部22(42、72、92)と第二羽根部28(48、78、98)のみによって地滑りを防止するようにしている。しかし従来から行われているように、地表面10aに、接続部23(43、73)又は杭本体部90を支持する不図示の支圧部材をさらに設けてもよい。この場合には、地表面10aから地盤10を押さえつけて地盤10へ力を伝達し、地盤10の安定化をさらに向上できる。そして、第二羽根部28(48、98)と上記支圧部材とを併設することで、この支圧部材を単独で用いる場合と比較して、この支圧部材の寸法を小さくできるため、景観の向上が可能となる。
 さらに、第一羽根部22(42、72、92)、第二羽根部28(48、78、98)については、羽根枚数や羽根寸法は地盤10の状態に合わせて適宜選択可能であり、また、不連続に設けられていてもよい。
 また、第四実施形態から第六実施形態の地滑り防止杭101、111、121は、各貫通孔、各開口部によって地盤10内の水分を地盤10の外部に排水する機能を有しているが、各貫通孔は杭本体部105、115、125の貫入時の強度を十分に維持可能とするような位置に形成することが好ましい。特に滑り面5の近傍では大きな強度が必要であるため、この位置を避けて形成することが好ましい。または、杭本体部105、115、125の鋼管の肉厚を増大させて強度の維持を図ってもよい。
 さらに、排水する機能を有する第四実施形態から第六実施形態の地滑り防止杭101、111、121と、排水機能を有しない第一実施形態から第三実施形態の地滑り防止杭1、31、81とを並存させて地盤10に設置してもよい。この場合には、移動層11の保持効果を維持しながら地盤10内からの排水も可能となるため、さらなる地盤10の安定化を図ることができる。
 さらに図11に示すように、第四実施形態から第六実施形態の地滑り防止杭121(101、111)の地盤10への設置角度は、排水効果と地滑り防止効果とのバランスを考えて決定すればよく、ほぼ水平に設置することも可能である。
 なお、第四実施形態から第六実施形態において各貫通孔は、孔状ではなくスリット状に形成されていてもよく、各部材の内外を連通可能に形成されていればよい。
 さらに、上述の実施形態では、アンカー部21(41、70、106、116)、支圧部26(46、75、107,117)、杭本体部90(125)、接続部23(43、73、108、118)については、各々が一本の鋼管等の部材によって形成されている。しかし例えば、地滑り防止杭1(31、81、101、111、121)を長くする必要がある場合には、これらの部材は継手を介して複数の鋼管等を継ぐことで構成された分割構造となっていてもよい。ここでこの継手には、例えば溶接や、嵌合、ネジによる締結、機械式継手等が適用可能である。
 また、第四実施形態から第六実施形態の地滑り防止杭101(111、121)においてこのような継手を用いる際には、水分を通過可能な構造とする必要がある。
 本発明の地滑り防止杭は、地盤内の滑り面を境に表層側に位置する移動層と下層側に位置する不動層とにわたって、埋設される地滑り防止杭であって、軸線を中心とした鋼管よりなる杭本体部と、前記杭本体部の外周面に設けられて前記軸線を中心とした螺旋状をなして前記不動層内に配置された第一羽根部と、前記杭本体部の外周面に設けられて前記軸線を中心とした螺旋状をなして前記移動層内に配置された第二羽根部と、を備える。 本発明の地滑り防止杭によれば、コストを抑えて景観の向上を図りながら、確実に地盤の安定化を図ることができる。
1…地滑り防止杭 5…滑り面 10…地盤 10a…地表面 11…移動層 12…不動層 20…杭本体部 21…アンカー部(第一杭本体部) 22…第一羽根部 23…接続部 23a…雄ネジ部(第一ネジ部、プレストレス導入手段) 26…支圧部(第二杭本体部) 27…ナット 27a…雌ネジ部(第二ネジ部、プレストレス導入手段) 28…第二羽根部 P1…軸線 S1…アンカー部埋設工程(第一工程) S2…支圧部埋設工程(第二工程、第三工程) S3…ネジ調節工程(第四工程) 31…地滑り防止杭 35…杭本体部 41…アンカー部 42…第一羽根部 43…接続部 43a…雄ネジ部(第一ネジ部、プレストレス導入手段) 44…ナット 46…支圧部 47…ナット 47a…雌ネジ部(第二ネジ部、プレストレス導入手段) 48…第二羽根部 50…外側塞ぎ板 51…内側塞ぎ板 P2…軸線 S11…アンカー部埋設工程 S12…支圧部埋設工程 S13…ネジ調節工程 60…クサビ部材(プレストレス導入手段) 70…アンカー部 72…第二羽根部 73…接続部 75…支圧部 78…第二羽根部 P3…軸線 81…地滑り防止杭 90…杭本体部 92…第一羽根部 98…第二羽根部 P4…軸線 101…地滑り防止杭 105…杭本体部 106…アンカー部 106A…第一貫通孔(第一連通部) 107…支圧部 107A…第二貫通孔(第一連通部) 108…接続部 108A…第三貫通孔(第二連通部) 108B…開口部(第三連通部) 109…塞ぎ板 P5…軸線 111…地滑り防止杭 113…外側塞ぎ板 113A…第三貫通孔(第三連通部) 115…杭本体部 116…アンカー部 116A…第一貫通孔(第一連通部) 117…支圧部 117A…第二貫通孔(第二連通部) 118…接続部 119…塞ぎ板 P6…軸線 121…地滑り防止杭 125…杭本体部 125A…第一貫通孔(第一連通部) 125B…開口部(第二連通部) 129…塞ぎ板 P7…軸線 

Claims (15)

  1.  地盤内の滑り面を境に表層側に位置する移動層と下層側に位置する不動層とにわたって、埋設される地滑り防止杭であって、
     軸線を中心とした管状部材よりなる杭本体部と、
     前記杭本体部の外周面に設けられて前記軸線を中心とした螺旋状をなして前記不動層内に配置される第一羽根部と、
     前記杭本体部の外周面に設けられて前記軸線を中心とした螺旋状をなして前記移動層内に配置される第二羽根部と、
     を備える地滑り防止杭。
  2.  前記杭本体部は、前記第一羽根部が設けられた第一杭本体部と、
     前記第二羽根部が設けられた第二杭本体部とで分割されて構成され、
     前記第一杭本体部と前記第二杭本体部との間に配されて、該第一杭本体部と該第二杭本体部とを接続する接続部をさらに備える請求項1に記載の地滑り防止杭。
  3.  前記接続部は、前記第一杭本体部と一体に形成された管状部材よりなる請求項2に記載の地滑り防止杭。
  4.  前記杭本体部には、該杭本体部の内外を前記軸線の径方向に連通する第一連通部が形成され、
     前記接続部には、該接続部の内外を前記径方向に連通する第二連通部、及び、前記地盤の外部に向かって開口して前記接続部の内外を連通する第三連通部が形成されている請求項3に記載の地滑り防止杭。
  5.  前記接続部は、前記第一杭本体部と別体で設けられた棒状部材よりなる請求項2に記載の地滑り防止杭。
  6.  前記第一杭本体部には、該第一杭本体部の内外を前記軸線の径方向に連通する第一連通部が形成され、
     前記第二杭本体部には、該第二杭本体部の内外を前記径方向に連通する第二連通部、及び、前記地盤の外部に向かって開口して前記第二杭本体部の内外を連通する第三連通部が形成され、
     前記接続部は、管状部材よりなり、一端が前記第一杭本体部の内部に向かって開口するとともに、他端が前記地盤の外部に向かって開口する請求項5に記載の地滑り防止杭。
  7.  前記第一杭本体部と前記第二杭本体部とにプレストレスを導入するプレストレス導入手段をさらに備える請求項2から6のいずれか一項に記載の地滑り防止杭。
  8.  前記接続部は、前記軸線を中心として捩じれる第一ネジ部を有し、
     前記第二杭本体部は、前記接続部を該第二杭本体部に対して前記軸線方向に相対移動可能となるように前記第一ネジ部に螺合される第二ネジ部を有するとともに、該第二ネジ部が前記第一ネジ部に螺合されることで前記接続部を介して前記第一杭本体部に接続され、
     前記プレストレス導入手段は、前記第一ネジ部と前記第二ネジ部とから構成されて、前記第一ネジ部と前記第二ネジ部の螺合状態の調節によって前記プレストレスが導入される請求項7に記載の地滑り防止杭。
  9.  前記プレストレス導入手段は、前記第二杭本体部と前記接続部との間に打ち込まれたクサビ部材である請求項7に記載の地滑り防止杭。
  10.  前記杭本体部は、一本の管状部材よりなる請求項1に記載の地滑り防止杭。
  11.  前記杭本体部には、
     該杭本体部の内外を前記軸線の径方向に連通する第一連通部と、
     前記地盤の外部に向かって開口して前記杭本体部の内外を連通する第二連通部とが形成されていることを特徴とする請求項10に記載の地滑り防止杭。
  12.  前記地盤の地表面に設けられて、該杭本体部からの伝達力を前記地盤に伝達する支圧部材をさらに備える請求項1から11のいずれか一項に記載の地滑り防止杭。
  13.  地盤内の滑り面を境に表層側に位置する移動層と下層側に位置する不動層とにわたって、地滑り防止杭を埋設する地滑り防止杭の設置方法であって、
     軸線を中心とした管状部材よりなる第一杭本体部の外周面に設けられて該軸線を中心とした螺旋状をなす第一羽根部が前記不動層内に配置されるように、該第一杭本体部を回転させながら地盤内に貫入して埋設する第一工程と、
     前記軸線を中心とした管状部材よりなる第二杭本体部の外周面に設けられて該軸線を中心とした螺旋状をなす第二羽根部が前記移動層内に配置されるように、該第二杭本体部を回転させながら地盤内に貫入して埋設する第二工程と、
     前記第二工程で埋設された前記第二杭本体部を、該第一杭本体部と該第二杭本体部との間に配された接続部を介して、前記軸線と同心軸上に前記第一杭本体部に接続する第三工程とを備える地滑り防止杭の設置方法。
  14.  前記第三工程は、前記接続部に設けられて前記軸線を中心として捩れる第一ネジ部と、前記第二杭本体部に設けられて前記接続部を該第二杭本体部に対して前記軸線方向に相対移動可能とする第二ネジ部とを螺合して、前記接続部を介して前記第一杭本体部と前記第二杭本体部とを接続し、
     前記第一ネジ部と前記第二ネジ部との螺合の状態を調節する第四工程を、前記第三工程の後にさらに備える請求項13に記載の地滑り防止杭の設置方法。
  15.  地盤内の滑り面を境に表層側に位置する移動層と下層側に位置する不動層とにわたって、地滑り防止杭を埋設する地滑り防止杭の設置方法であって、
     軸線を中心とした管状部材よりなる杭本体部の外周面に設けられて前記軸線を中心とした螺旋状をなす第一羽根部が前記不動層内に配置されるように、かつ、該杭本体部の外周面に設けられて前記軸線を中心とした螺旋状をなす第二羽根部が前記移動層内に配置されるように、該杭本体部を回転させながら地盤内に貫入して埋設する工程を備える地滑り防止杭の設置方法。
PCT/JP2013/061482 2012-07-06 2013-04-18 地滑り防止杭、及び、地滑り防止杭の設置方法 WO2014006955A1 (ja)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2012-152880 2012-07-06
JP2012152880 2012-07-06
JP2012258567A JP5998023B2 (ja) 2012-07-06 2012-11-27 地滑り防止杭、及び、地滑り防止杭の設置方法
JP2012-258567 2012-11-27

Publications (1)

Publication Number Publication Date
WO2014006955A1 true WO2014006955A1 (ja) 2014-01-09

Family

ID=49881720

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/061482 WO2014006955A1 (ja) 2012-07-06 2013-04-18 地滑り防止杭、及び、地滑り防止杭の設置方法

Country Status (3)

Country Link
JP (1) JP5998023B2 (ja)
TW (1) TW201402910A (ja)
WO (1) WO2014006955A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951602A (zh) * 2018-03-16 2018-12-07 杭州市建筑设计研究院有限公司 一种嵌岩刚性桩复合地基
JP2019132099A (ja) * 2018-02-02 2019-08-08 日本製鉄株式会社 斜面補強杭、斜面補強工および斜面補強杭の施工方法
CN111733811A (zh) * 2020-08-07 2020-10-02 辽宁沈通电力桩基础研发有限公司 长短螺旋锚

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017218768A (ja) * 2016-06-06 2017-12-14 新日鉄住金エンジニアリング株式会社 土砂構造物の補強方法、土砂構造物の補強構造、及び土砂構造物用の受圧用具
JP2019112927A (ja) * 2017-12-24 2019-07-11 佐伯 英一郎 地盤アンカーとその施工評価方法およびその緊張方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274553A (ja) * 2007-04-25 2008-11-13 Toyo Constr Co Ltd 斜面の安定化工法
JP2011080195A (ja) * 2009-10-02 2011-04-21 Tokyo Seiko Co Ltd アンカー装置およびアンカーの施工法
JP2012002012A (ja) * 2010-06-18 2012-01-05 Nippon Steel Engineering Co Ltd 地すべり防止杭、地すべり防止方法及び地すべり防止杭の施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274553A (ja) * 2007-04-25 2008-11-13 Toyo Constr Co Ltd 斜面の安定化工法
JP2011080195A (ja) * 2009-10-02 2011-04-21 Tokyo Seiko Co Ltd アンカー装置およびアンカーの施工法
JP2012002012A (ja) * 2010-06-18 2012-01-05 Nippon Steel Engineering Co Ltd 地すべり防止杭、地すべり防止方法及び地すべり防止杭の施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019132099A (ja) * 2018-02-02 2019-08-08 日本製鉄株式会社 斜面補強杭、斜面補強工および斜面補強杭の施工方法
JP7168328B2 (ja) 2018-02-02 2022-11-09 日鉄建材株式会社 斜面補強工および斜面補強工の施工方法
CN108951602A (zh) * 2018-03-16 2018-12-07 杭州市建筑设计研究院有限公司 一种嵌岩刚性桩复合地基
CN108951602B (zh) * 2018-03-16 2020-08-25 杭州市建筑设计研究院有限公司 一种嵌岩刚性桩复合地基
CN111733811A (zh) * 2020-08-07 2020-10-02 辽宁沈通电力桩基础研发有限公司 长短螺旋锚

Also Published As

Publication number Publication date
JP5998023B2 (ja) 2016-09-28
JP2014029102A (ja) 2014-02-13
TW201402910A (zh) 2014-01-16

Similar Documents

Publication Publication Date Title
WO2014006955A1 (ja) 地滑り防止杭、及び、地滑り防止杭の設置方法
US20220127812A1 (en) Apparatus and method for fastening a composite pole to the ground
JP5428575B2 (ja) 地盤に施工する壁構造及びその施工方法
JP5882143B2 (ja) 地下構造物の浮上防止杭及び地下構造物の浮上防止工法
JP5595137B2 (ja) 地すべり防止方法
JP2019199692A (ja) 地盤改良構造および掘削方法
WO2011033267A2 (en) A method of forming and installing a j-tube system
JP2010121288A (ja) 杭の回転圧入方法と同方法に用いる回転圧入杭
JP5919675B2 (ja) 複合基礎杭及び複合基礎杭の構築方法
JP4946695B2 (ja) 二重管式杭頭構造の構築方法
JP2019027011A (ja) 補強アンカー
JP2008214981A (ja) 基礎杭
JP3960559B1 (ja) 受圧盤付き補強管、及び地表面の崩落防止工法、並びに斜面の補強工法
KR20170057808A (ko) 복합파일
KR102113859B1 (ko) 두부보강수단을 이용한 파일 및 시공방법
WO2023031576A1 (en) Drilled anchor pile
KR100708825B1 (ko) 굴착날개를 구비하는 강관파일
JP2015148135A (ja) スパイラル杭基礎及びその施工方法
WO1999006639A1 (en) Ground reinforcement or stabilisation method and apparatus
KR20100094215A (ko) 회전관입형 파일 매립장치 및 그 방법
KR100932952B1 (ko) 다양한 선단부를 갖는 말뚝부재
KR20160006273A (ko) 해양구조물 지지장치
KR102305551B1 (ko) 중공콘크리트관을 이용한 가설 흙막이 벽체
JP5071320B2 (ja) 杭の引抜方法
KR101388100B1 (ko) 보조앵커에 의한 인발저항력 향상 구성의 스파이럴 파일 및 그 시공방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13812952

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13812952

Country of ref document: EP

Kind code of ref document: A1