WO2014002274A1 - 火力発電設備、自然エネルギー発電プラント及びその制御方法 - Google Patents
火力発電設備、自然エネルギー発電プラント及びその制御方法 Download PDFInfo
- Publication number
- WO2014002274A1 WO2014002274A1 PCT/JP2012/066782 JP2012066782W WO2014002274A1 WO 2014002274 A1 WO2014002274 A1 WO 2014002274A1 JP 2012066782 W JP2012066782 W JP 2012066782W WO 2014002274 A1 WO2014002274 A1 WO 2014002274A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power generation
- output
- thermal power
- natural energy
- predicted
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
Definitions
- the present invention relates to a thermal power generation facility combined with a natural energy power generation device, a natural energy power generation plant combining a natural energy power generation device with a thermal power generation facility, and a control method thereof.
- the present invention has been made in view of the above circumstances, and an object thereof is to provide a thermal power generation facility, a natural energy power generation plant, and a control method thereof that can suppress fluctuations in total power generation output.
- the present invention calculates a predicted power generation output at a set time in the future of the natural energy power generation apparatus, and calculates a target power generation output of the thermal power generation apparatus at the set time based on the predicted power generation output. In consideration of the response delay time of the thermal power generator, the thermal power generator is controlled prior to the set time.
- the natural energy power plant of the present embodiment is a plant that combines a natural energy power generation device with a thermal power generation facility.
- Natural energy power generation devices refer to devices that convert natural energy into electric power, such as wind power generation devices and solar power generation devices.
- the thermal power generation facility in the present embodiment refers to a package including a thermal power generation device and its control device.
- a natural energy power generation plant can be configured in combination with an existing natural energy power generation device.
- the thermal power generation device refers to a device that converts reaction heat energy of fuel such as petroleum, coal, natural gas, waste, biomass, etc. into electric power, such as a gas turbine device or a combined cycle power generation device.
- the thermal power generation apparatus includes a prime mover engine having a turbine and a generator connected to the turbine, and the power generation output of the thermal power generation apparatus is controlled by controlling the operation of the prime mover engine by the control device.
- the control device is also connected to the natural energy power generation device and contributes to the control of the natural energy power generation device.
- a major feature of the control of the control device is the preceding control of the thermal power generation device based on the predicted power generation output of the natural energy power generation device in the future.
- the predicted power generation output of the natural energy power generation apparatus is calculated by an appropriate calculation model (for example, a neural network) based on weather information and the like, and preferably the calculation model based on an error from the power generation output of the natural energy power generation apparatus measured thereafter. To improve accuracy.
- Necessary weather information items depend on the type of the natural energy power generation device. For example, in the case of a wind power generation device, there are temperature, humidity, wind power, wind direction, and the like.
- the meteorological information is at least the point where the natural energy generator is installed (or the closest point).
- values measured by sensors of the natural energy power generator or sensors installed separately can be used, and in the case of shortage, the weather information provided by the weather information provider is used. You can also.
- the weather information provided from the provider may be input to the database of the control device by the operator, but the information acquired from the weather information provider through the network may be sequentially stored in the database.
- the preceding “preceding control” refers to the time (response delay time) that elapses after the command value is output to the thermal power generation device until the thermal power generation device actually shifts to the operation state corresponding to the command value. In consideration of this, outputting a command to the thermal power generation apparatus prior to the set time so that a target power generation output can be obtained at a set time that is a predetermined time ahead of the current time.
- the target power generation output is obtained at the set time by outputting the command at a time before the response delay time from the set time. Therefore, in order to realize this control, the time that is earlier than the set time by the response delay time must not be the past time, and the future time (or further ahead) by the response delay time from the current time. Time) is set as the set time, and the target power generation output of the thermal power generation apparatus at the set time must be determined.
- the predicted power generation output of the natural energy power generation device at the future set time is calculated, and the target power generation output of the thermal power generation device at the same set time and the command value to the thermal power generation device for obtaining the target power generation output are calculated accordingly.
- the command value is output to the thermal power generator at a time before the response time of the set time.
- the response delay time may be almost constant depending on the operating environment of this natural energy power plant, but the scale of the thermal power generation device may be almost constant, but even with the same thermal power generation device, the response delay time changes over time due to conditions such as temperature and humidity. Can do.
- a predicted value of the response delay time can be calculated based on the intake air temperature and pressure of the compressor, the exhaust gas temperature and pressure, and the like.
- the fluctuation of the total power output per hour of the natural energy power generation plant is suppressed by controlling the thermal power generation device in advance by taking into account the response delay time. Then, the total power generation output can be shifted within an allowable range determined by the connected system. Thus, since the total power output per hour of the plant can be stabilized, it is not necessary to set the target total power output higher than necessary so that the total power output does not fall below the allowable range. If the target total power output is set higher than necessary, surplus power tends to be generated. To utilize the surplus power output, load equipment that consumes the surplus power output, such as an electric boiler or fresh water generator, is prepared. There is a need to.
- the total power output per hour is changed within a desired range, so it is not necessary to install a load device for consumption of surplus power output.
- a small plant can be constructed at low cost by reducing the scale and cost.
- the power generation output is stable, it is highly versatile as a power source, and it is also a great merit that it can be used for a wide variety of systems.
- the natural energy power generation plant of the present embodiment greatly contributes to the utilization of existing natural energy power generation devices.
- a thermal power generation facility including a control device as a package to an existing natural energy power generation device
- the existing natural energy power generation device that was an unstable power source can be replaced with a stable power source that meets the requirements of the connected system, for example. Can be improved.
- FIG. 1 is a schematic diagram showing the overall configuration of a natural energy power plant according to a first embodiment of the present invention.
- the natural energy power generation plant shown in the figure includes a wind power generation device 10 that is a natural energy power generation device and a gas turbine power generation facility that is a thermal power generation facility.
- the gas turbine power generation facility includes a gas turbine power generation device 100 that is a thermal power generation device, a control device 200, and a user interface.
- This natural energy power generation plant may be constructed entirely newly, or, for example, when the wind power generation apparatus 10 is an existing facility, it may be constructed by additionally installing a gas turbine power generation facility.
- the gas turbine power generation device 100 includes a gas turbine that is a driving engine and a generator 3 that is driven by the gas turbine.
- the gas turbine includes a compressor 2 that compresses sucked air, a combustor 4 that combusts compressed air from the compressor 2 together with fuel, and a turbine 1 that is driven by combustion gas from the combustor 4.
- the generator 3 is connected to the turbine 1 via a turbine shaft.
- the gas turbine power generation apparatus 100 is provided with various sensors such as a thermometer, a pressure gauge, a flow meter, and a wattmeter, and during the operation of the gas turbine power generation apparatus 100, these sensors are installed.
- the measured value 140 for example, the intake temperature of the compressor 2, the intake pressure, the exhaust temperature of the turbine 1, the exhaust pressure, the fuel concentration, the fuel flow rate, the intake flow rate, the power generation output of the generator 3, etc. is output to the control device 200 as operation information. Is done. Further, the operation of the gas turbine power generation device 100 is controlled by the fuel injection amount of the combustor 4 and the intake air flow rate of the compressor 2. Specifically, the fuel injection amount is adjusted by the opening degree of the flow rate adjustment valve of the fuel system connected to the fuel injection nozzle in the combustor 4. Specifically, the intake flow rate is adjusted by the opening of an IGV (Inlet Guide Vane) provided at the inlet of the compressor 2.
- IGV Inlet Guide Vane
- the wind power generation device 10 includes a plurality of wind power generators 11.
- Each wind power generator 11 is provided with sensors such as an anemometer and an anemometer that measure the wind speed and the wind direction, for example. These sensors are connected to the control apparatus 200, and the measured value 120 of each sensor is output to the control apparatus 200 as operation information during the operation of the wind power generator 10. Further, the operation of the wind power generator 10 is controlled by the pitch angle of the blades and the orientations of the blades, the hub, and the nacelle. Specifically, the pitch angle of the blade is adjusted by a pitch driving device interposed between the blade and the hub.
- the directions of the blade, the hub and the nacelle are adjusted by a yaw driving device interposed between the tower and the nacelle. These pitch driving device and yaw driving device operate according to the command value 130 from the control device 200.
- the wind power generator 10 usually generates power by driving the generator by rotating the blade by receiving a wind speed of a certain level or more directly facing the wind. For example, in a strong wind, the pitch angle of the blade is changed to reduce the wind receiving area. And stop.
- the power generation output of the wind power generator 10 depends on the wind speed, and the characteristics of the power generation output with respect to the wind speed depend on the design of the wind power generator 11.
- the control device 200 operates the gas turbine power generation device 100 so that the power generation output of the gas turbine power generation device 100 approaches the target power generation output based on the measurement value 140 from the gas turbine power generation device 100. To control.
- the control device 200 includes a related information database 200, a wind power generation prediction unit 300, a control unit 500, and an operation information database 600.
- the related information database 300 includes information related to natural energy including weather information, design information of the wind power generator 10 and the gas turbine power generator 100, and a part of sensors of these power generators 10 and 100. It is the memory
- the control device 200 is connected to a network 700 such as the Internet, and can sequentially acquire weather information provided by a weather information provider (for example, the Japan Meteorological Agency) via the network 700, and the acquired weather information is the related information database 300. Accumulated in. An example of data stored in the related information database 300 will be described later with reference to FIG.
- the operation information database 600 is a storage unit that stores operation information including measurement values 120 and 140 input from the wind turbine generator 10 and the gas turbine generator 100. An example of data stored in the driving information database 300 will be described later with reference to FIG.
- the wind power generation prediction unit 400 reads the information stored in the related information database 300 and calculates the predicted power generation output at the future set time of the wind power generator 10 based on the read information. Fulfills the function of “Set time” refers to the time ahead of the current time by the set time, and “set time” is the response delay time of the gas turbine power generation apparatus 100 or a time set longer than that. Then, it is matched with the response delay time.
- the “response delay time” refers to the time that elapses from when the command value is output to the gas turbine power generation device 100 until the gas turbine power generation device 100 actually shifts to the operation state corresponding to the command value.
- the response delay time can vary depending on conditions such as the intake air temperature of the compressor 2.
- Examples of information necessary for calculating the predicted power generation output of the wind power generation apparatus 10 include atmospheric information such as temperature and humidity, wind speed, power generation output measured by the wind power generation apparatus 10, and the like. An example of calculation of the predicted power generation output will be described later with reference to FIG.
- the control unit 500 calculates the target power generation output of the gas turbine power generation device 100 at the set time based on the predicted power generation output calculated by the wind power generation prediction unit 400, and the target power output is set at the set time.
- the function of outputting the command value 150 based on the target power generation output to the gas turbine power generation device 100 at a timing taking the response delay time into account is obtained.
- the intake flow rate and the fuel flow rate are adjusted based on the command value 150, and the power generation output is controlled.
- the natural energy power plant includes an input device 900, a support tool 910, and an image display device 950 as user interfaces.
- the input device 900 is appropriately configured by a keyboard 901, a mouse 902, and the like.
- the image display device 950 is a touch panel, the image display device 950 can also function as an input device.
- the operator can view various information related to the wind turbine generator 10 and the gas turbine generator 100 by operating the support tool 910 using the input device 900 and the image display device 950.
- the storage information can be browsed by accessing the databases 300 and 600 of the control device 200, and the control values of the wind power generator 10 and the gas turbine power generator 100 can be set.
- the support tool 910 includes an external input interface 920, a data transmission / reception processing unit 930, and an external output interface 940.
- the input signal 800 generated by the input device 900 and the information 210 from the control device 200 are taken into the support tool 910 via the external input interface 920.
- the data transmission / reception processing unit 930 receives the input signal 800, processes the input signal 801 input from the external input interface 920, and transmits it as an output signal 802 to the external output interface 940. For example, when an input signal 800 is input from the input device 900 in response to an operation for instructing display output, image processing is performed from the external output interface 940 as a result of appropriate processing by the data transmission / reception processing unit 930 according to the input signal 800.
- An output signal 803 is input to the device 950 and a desired display output is made to the image display device 950.
- the data transmission / reception processing unit 930 appropriately performs processing according to the input signal 800.
- the external output interface 940 controls the control device 200.
- the output signal 220 is input to the control device 200 to give an instruction.
- the command values 130 and 150 and the measurement values 120 and 140 exchanged between the control device 200, the wind power generator 10 and the gas turbine power generator 100 are stored in a database (not shown) in the maintenance tool 910. You may do it.
- FIG. 2 is a functional block diagram of the control unit 500 of the control device 200.
- control unit 500 of the control device 200 includes a target calculation unit 511, a command calculation unit 512, a response characteristic database 513, a delay time calculation unit 514, a command output unit 515, and a data update unit 516. ing.
- the target calculation unit 511 has a function of calculating the target power generation output of the gas turbine power generation device 100 at the set time based on the predicted power generation output at the set time calculated by the wind power generation prediction unit 400. Fulfill.
- the target power generation output at the set time is, for example, the wind power generation at the same set time from the target value of the total power output per hour of the wind power generator 10 and the gas turbine power generator 100 (target power output per hour of the natural energy power plant). It is obtained by subtracting the predicted power generation output of the device 10.
- the command calculation unit 512 is a command value for the gas turbine power generation device 100 such that the power generation output per hour of the gas turbine power generation device 100 becomes the target power generation output calculated by the target calculation unit 511. It fulfills the function of computing.
- the command value calculated here becomes the command value 150 to the IGV of the compressor 1 and the flow rate adjustment valve of the combustor 4.
- the response characteristic database 513 is a storage unit that stores a predicted value of the response delay time of the gas turbine power generation device 100.
- a predicted value of the response delay time for example, an appropriate value is set for each of various operating conditions of the gas turbine power generator 100 such as the intake temperature of the compressor 1, the intake pressure, the exhaust temperature of the turbine 1, the exhaust pressure, and the fuel concentration. And stored in a table format.
- the delay time calculation unit 514 functions to calculate a predicted value of the response delay time based on the operating conditions of the gas turbine power generator 100. Specifically, the delay time calculation unit 514 reads, for example, the latest operation information (intake air temperature, intake air pressure, exhaust gas temperature, etc.) of the gas turbine power generation device 100 from the operation information database 600, and based on the read operation information. A table corresponding to the information is extracted from the response characteristic database 513. The response delay time set in the extracted table is the response delay time predicted from the current operating state of the gas turbine power generation device 100.
- command output unit 515 precedes the command value 150 by the response delay time of the gas turbine power generation device 100 calculated by the delay time calculation unit 514 before the set time. The function to output to.
- the data update unit 516 when the error between the predicted value of the response delay time stored in the response characteristic database 513 and the measured value exceeds the set value (setting allowable range), the error The function of correcting and updating the response delay time of the response characteristic database 513 based on the above is fulfilled.
- the target of the correction is the response delay time of the driving information (table) that had an error exceeding the set value between the actual response delay time, but the response delay time is also corrected for the table of near driving information You can do that.
- a table of the near driving information mentioned here for example, a table in which the difference is within a certain range with respect to all condition items with respect to the table in which an error exceeding the allowable value in the predicted response delay time is recognized.
- FIG. 3 is a schematic diagram of information stored in the related information database.
- the stored information of the related information database 300 includes weather information at each time until the present time. Further, the weather information stored in the related information database 300 includes at least weather information of a point where the wind power generator 10 is installed (or a point closest to this point), and is reflected in the weather after the set time of the point. Multiple points of weather information that may be included may be included.
- the weather information acquisition interval depends on the information update interval of the weather information provider. However, as long as the weather information in a desired area is known regardless of the weather information provider, the information update interval of the weather information provider is not limited.
- the figure also shows items that do not contribute to the calculation of the predicted power output of wind power generation (for example, the amount of solar radiation), but they are also stored here assuming that solar power generation devices are the target. It is. If it is not desirable to store unnecessary data, only necessary data may be stored.
- weather, temperature, wind direction, wind speed, humidity, and solar radiation for each time are stored.
- the weather is classified according to clear, clear, light cloudy, etc. (for example, 15 types transmitted to the general public by the Japan Meteorological Agency).
- the wind direction it is common to use 16 azimuths in Japan, but in the international style, 360 azimuths expressed by dividing 360 degrees clockwise with reference to true north are used.
- 360 azimuths that can digitize the wind direction in units of 1 degree are shown, but even in 16 azimuths, each direction can be quantified in units of 22.5 degrees.
- the wind direction and the wind speed are values that are also measured by the wind turbine generator 10, and therefore, the measured value 120 from the wind turbine generator 10 can also be stored in addition to the information provided by the weather information provider.
- the design information of the wind turbine generator 10 the design information of the gas turbine generator 100, and the information such as system connection regulations and rules are also stored in the related information database 300. Stored.
- FIG. 4 is a schematic diagram of operation information database storage information.
- the stored information in the operation information database 600 includes measured values 120 and 140 obtained from the wind power generator 10 and the gas turbine power generator 100. That is, measurement information of each sensor of the wind turbine generator 10 and the gas turbine generator 100 is stored for each measurement time.
- the PID number in the figure is a unique number assigned to each measurement item in order to facilitate the utilization of the information stored in the driving information database 600.
- the alphabet below it is a symbol indicating the measurement target. For example, F is a flow value, T is a temperature value, P is a pressure value, E is a power generation output value, D is a concentration value,.
- the flow rate value F actually includes a plurality of information such as an intake flow rate, a fuel flow rate, and an exhaust flow rate.
- the temperature value T, the pressure value P, and the like The same applies to the temperature value T, the pressure value P, and the like.
- operation information is preserve
- FIG. 5 is a model diagram for explaining the operation of the prediction calculation function of the wind power generation prediction unit.
- This model has an input layer, an intermediate layer, and an output layer, and the input layer and the intermediate layer have a plurality of nodes. Each node in the input layer is linked to each node in the intermediate layer, and each node in the intermediate layer is linked to a node in the output layer. Each node is set with a weighting coefficient indicating the strength of the link. That is, there are as many calculation models as the number of connection patterns of nodes in the input layer, intermediate layer, and output layer. Such a model is called a neural network and simulates a human cranial nerve network.
- the wind power generation prediction unit 400 calculates the predicted power generation output of the wind power generator 10 using such a calculation model. Specifically, when the wind power generation output measured by the wind power generation apparatus 10 is input to the input layer in the figure, the wind power generation prediction unit 400 inputs the input value (temperature, An arithmetic model (combination of weighting factors) is extracted that is applied to the stored information of the related information database 300 including wind speed, humidity, and the like to obtain a wind power generation output (measured value). According to the extracted calculation model, the wind power generation output (measured value) can be calculated from the input value before the set time. The wind power generation prediction unit 400 calculates the predicted power generation output of the wind power generation apparatus 10 after the set time by applying the calculation model thus obtained to the new input value.
- the input value temperature
- An arithmetic model combination of weighting factors
- the wind power generation prediction unit 400 repeats learning and models a correlation between input values. As the learning is repeated, the prediction accuracy of the wind power generation output by the calculation model can be improved.
- the function set to the node generally uses an exponential function called a sigmoid function, but is not limited thereto. Many algorithms have been devised for adjusting the weighting coefficient in learning. In general, the back propagation method is used. Details of these algorithms are described in "Simon Haykin" NEURAL NETWORKS: a comprehensive foundation -2nd sd. "Prentice-Hall, Inc. Publishing, 1999”.
- FIG. 6 is a flowchart showing a procedure for generating and outputting a command value (MWD: power generation command) to the gas turbine power generator by the control device.
- MWD power generation command
- step S501 the control device 200 first compares the predicted power generation output calculated based on the input value before the set time with the current or latest wind power generation output (measured value) by the wind power generation prediction unit 400, and determines an error between the two. Is determined to be less than a preset value (threshold value) set as an allowable range.
- the set time is the response delay time of the gas turbine power generation device 100. If it is determined that the error is less than the set value and the current calculation model of the predicted power generation output has ensured the desired accuracy, the procedure proceeds to step S502.
- step S506 the procedure moves to step S506 and the calculation of the predicted power generation output is performed as described above. After re-learning the model, the procedure proceeds to step S502.
- Step S502 the control device 200 causes the wind power generation prediction unit 400 to use the current calculation model (as described in FIG. 5) based on the current or latest input value (after the set time (of the gas turbine power generation device 100).
- a predicted power generation output of the wind turbine generator 10 (at a time earlier by the response delay time) is calculated.
- the calculation model used in this step is the calculation model at the time of execution of step S501 if the error is less than the set value in step S501, and in step S506 if the error is greater than or equal to the set value in step S501. This is a modified calculation model.
- Step S503 the control device 200 uses the target calculation unit 511 to calculate per hour of the gas turbine power generation device 100 after the set time based on the predicted power generation output per time after the set time of the wind power generation device 10 calculated previously.
- the target power generation output is calculated. Specifically, the target power generation output of the gas turbine power generation device 100 after the set time is calculated by subtracting the predicted power generation output of the wind power generation device 10 from the target total power generation output (load target) per hour of the natural energy power plant.
- a command signal (MWD) 150 to the gas turbine power generation device 100 is generated by the command calculation unit 512.
- the target total power generation output per hour of the natural energy power plant is determined by the connection conditions defined for each system to which the natural energy power plant is connected. Although the system connection conditions differ in each country and region, in many cases, the fluctuation range of the power generation output (load fluctuation range) and the fluctuation range of the system frequency are specified. If the power system is already connected to several power sources, even if the output of the gas turbine power generation device 100 is suddenly changed by connecting this plant, the frequency fluctuations are absorbed by the power system. What is necessary is to place importance on the suppression of the width.
- a value between the upper limit value and the lower limit value of the specified range (for example, an average value of both values) ) Is set as the target total power output, and it is desirable to have a margin in both the decreasing and increasing directions.
- the system frequency may be affected if the output of the gas turbine power generation device 100 is rapidly changed. In this case, it is necessary to change the load of the gas turbine power generator 100 at a load change rate that falls within the allowable fluctuation range of the system frequency. This point will be described with reference to FIG.
- FIG. 8 is a graph showing an example of the relationship between the load change rate and the frequency fluctuation range.
- the graph in the figure illustrates the case where the relationship between the load change rate and the frequency fluctuation range is linear, but the relationship between the two is not limited to linear.
- the relationship between the load change rate and the frequency fluctuation range is grasped by a prior characteristic test or a simulation model.
- the frequency fluctuation range is limited, for example, in the graph of FIG. 8, the load change rate y corresponding to the limit value x of the frequency fluctuation range is set as the upper limit value of the allowable load change rate, and the gas turbine power generation device 100 When adjusting the power generation output, the gas turbine power generation device 100 is operated so that the load change rate does not exceed the upper limit value y.
- Steps S504, S507, S508) In subsequent step 504, the control device 200 obtains the response characteristic (transition of power generation output) of the gas turbine power generation device 100 from the measured value 140 from before the set time to the present time, and the corresponding response stored in the response characteristic database 513. It is determined whether the magnitude of the error between the predicted response characteristic value and the measured response characteristic is less than a set value (threshold value).
- the response delay characteristics of the gas turbine power generator are schematically shown in FIG. In the figure, the delay of the power generation output with respect to the command value when the load of the gas turbine power generation device 100 is changed from 75% to 100% is shown.
- step S504 when the control device 200 determines that the error is less than the set value and the predicted value of the response characteristic stored in the response characteristic database 513 has a desired accuracy, the process proceeds to step S505. Move. On the other hand, when it is determined that the error is equal to or greater than the set value and the data currently stored in the response characteristic database 513 does not have the desired accuracy, the control device 200 executes the procedure of steps S507 and S508. After that, the procedure is moved to step S505. In step S507, the predicted value of the response characteristic stored in the response characteristic database 513 is corrected by the error by the data updating unit 516. Along with the correction of the predicted value of the response characteristic, in the subsequent step S508, the set time used for the error determination of the predicted power generation output of the wind turbine generator 10 in step S501 is also changed by the data update unit 516.
- step 505 the command value 150 generated in step 503 is output to the gas turbine power generator 100 by the command output unit 515. Since the command value 150 output here is a command value generated based on the target power generation output of the gas turbine power generation device 100 after the set time, that is, after the response delay time, the power generation output of the gas turbine power generation device 100 is delayed. In response, the target value can be reached after a set time.
- the control device 200 improves the calculation accuracy of the predicted power generation output of the wind power generation device 10 and the estimation accuracy of the response delay time, and is flexible to fluctuations in the power generation output of the wind power generation device 10. In response to this, fluctuations in the power generation output of the natural energy power plant can be suppressed to a desired range.
- the control of the gas turbine power generation device 100 is ideally executed, as shown in FIG. 10, the power generation output and the increase / decrease of the wind power generation device 10 correspond to the fluctuation of the power generation output of the wind power generation device 10.
- the power generation output of the gas turbine power generation device 100 is controlled so as to be reversed, and the total power generation output of the plant, which is the sum of both power generation outputs, becomes substantially constant.
- FIG. 11 to FIG. 14 are examples of screens displayed on the image display device 950.
- the operator uses the keyboard 901 and the mouse 902 to execute operations such as inputting parameter values in blank positions on these screens.
- FIG. 11 is a diagram illustrating an initial screen displayed on the image display device.
- an operation state display button 951 and a trend display button 952 are displayed, and the mouse 952 is used to move the cursor 953 over the selected button and click to display the lower level screen.
- the display changes.
- FIG. 12 is a diagram illustrating an operation state display screen displayed by clicking the operation state display button 951 on the initial screen.
- a system information display field 961 a time designation field 962, a characteristic state display unit 964, a setting condition field 965, a related information display field 966, and the like are displayed.
- various information of the specified time specifically, measurement data of sensors at various locations in the plant is displayed in the display field.
- the characteristic state display unit 964 displays an error from the measured value of the predicted power generation output of the wind turbine generator 10 at the specified time and the response delay time of the gas turbine power generator 10.
- the setting condition column 965 various conditions described in the description of the flowchart of FIG.
- an allowable value of the predicted power output of the wind power generator 10 for example, an allowable value of the predicted power output of the wind power generator 10, an allowable value of fluctuation of the power generation output of the plant, and an allowable value of fluctuation of the frequency. It is also possible to input and set a setting condition in this setting condition column 965.
- items of stored information in the related information database 300 weather, temperature, wind direction, wind speed, humidity, solar radiation amount in FIG. 12
- a desired item is selected from these items.
- the display button 967 the data of the corresponding item at the specified time stored in the related information database 300 is displayed. If the return button 968 is clicked, the screen returns to the initial screen of FIG.
- FIG. 13 is a diagram illustrating a trend display screen displayed by clicking the trend display button 952 on the initial screen.
- This trend display screen is a setting screen for displaying a trend on the image display device 950.
- a desired measurement value is selected from the pull-down menu of each stage in the measurement value display field 981, the range (upper limit / lower limit) is input, the time is specified in the time specification field 982, and the display button 963 is displayed.
- a trend graph is displayed on the image display device 950 as shown in FIG.
- the return button 991 in FIG. 14 is clicked, the screen returns to the screen in FIG.
- the weather is expressed by using, for example, 15 types transmitted to the general public by the Japan Meteorological Agency. Assign a number up to 14 in order of the weather type, such as 0 for clear weather, 1 for clear weather, 2 for light cloudiness, etc., specify the time in the time specification field 985 and click the display button 986 to display a trend graph for the specified time. It is displayed on the image display device 950 as shown in FIG. Clicking the return button 989 on the trend display screen returns to the initial screen of FIG.
- the predicted power generation output at the future set time of the wind turbine generator 10 is calculated, and the target power generation output of the gas turbine power generation device 100 at the same set time is calculated based on the predicted power generation output.
- the gas turbine power generator 100 is controlled prior to the set time in consideration of the response delay time of the gas turbine power generator 100.
- the total power generation output per hour can be stabilized in this way, it is not necessary to set the target total power generation amount higher than necessary so that the total power generation output does not fall below the allowable range. Can be suppressed.
- a load device such as an electric boiler or a fresh water generator that consumes the surplus power output in order to utilize the surplus power output, the scale and cost of the plant can be suppressed. It is also a great merit to be able to provide a natural energy power generation plant that is highly versatile due to the stability of the power generation output and can handle a wide variety of systems.
- the natural energy power generation plant of the present embodiment can also utilize an existing natural energy power generation device. That is, when the wind power generation apparatus 10 exists as an existing facility, the gas turbine power generation facility including the control device 200 is additionally installed in the existing wind power generation apparatus 10 as a package, so that it is an unstable power supply alone. For example, the existing wind power generator 10 can be improved to a stable power source that meets the requirements of the connection system.
- the predicted power generation output calculated by the wind power generation apparatus 10 and the response delay time calculated by the gas turbine power generation output 100 by the wind power generation prediction unit 400 and the control unit 500 data update unit 516. Since the accuracy of the predicted value can be improved with the operation time, the control reliability of the gas turbine power generation device 100 can be improved with time.
- FIG. 15 is a schematic diagram showing the overall configuration of a natural energy power plant according to the second embodiment of the present invention, and corresponds to FIG.
- the same parts as those in the first embodiment are denoted by the same reference numerals as those in the previous drawings, and the description thereof is omitted.
- This embodiment is different from the first embodiment in that a solar power generation device 1000 is used instead of the wind power generation device 10 as a natural energy power generation device.
- the solar power generation device 1000 is a power generation device including a plurality of solar panels 1100.
- the control device 200 is provided with a solar power generation prediction unit 401 instead of the wind power generation prediction unit 400.
- FIG. 16 is a model diagram for explaining the operation of the prediction calculation function of the photovoltaic power generation prediction unit, and corresponds to FIG.
- the solar power generation prediction unit 401 is common to the wind power generation prediction unit 400 in that it is a model having an input layer, an intermediate layer, and an output layer each having a node. It differs from the wind power generator 400 in that the quantity is an essential input value. Moreover, since the degree of sunlight scattering varies depending on the humidity even with the same amount of solar radiation, the humidity is also an important input value. The procedure for learning the calculation model of the photovoltaic power generation output from these input values is the same as that of the wind power generation prediction unit 400. Since the types of the natural energy power generation devices are different, the related measurement values may be different, but the output procedure of the command value 150 for the other devices and the gas turbine power generation device 100 is the same as in the first embodiment.
- the target power generation output of the gas turbine power generation device 100 after the set time is calculated based on the predicted power generation output of the solar power generation device 1000, and the gas turbine power generation device 100 is advanced in consideration of the response delay time.
- the effect similar to 1st Embodiment is acquired, such as being able to respond
- FIG. 17 is a schematic diagram showing the overall configuration of a natural energy power plant according to the third embodiment of the present invention, and corresponds to FIG.
- the same parts as those in the first embodiment are denoted by the same reference numerals as those in the previous drawings, and the description thereof is omitted.
- This embodiment is different from the first embodiment in that the gas turbine power generation device 110 is added to make a plurality of gas turbine power generation devices (two in this embodiment).
- the gas turbine power generation device 11 may be the same as the gas turbine power generation device 10 or may have different specifications. Similar to the gas turbine power generation device 100, the gas turbine power generation device 110 exchanges the measurement value 160 and the command value 170 with the control device 200. Other configurations are the same as those of the first embodiment.
- both the gas turbine power generation devices 100 and 110 are controlled in accordance with fluctuations in the power generation output of the wind power generation device 10 as in the first embodiment, both the gas turbine power generation devices 100 and 110 are illustrated.
- Control according to the flowchart of FIG. the required gas turbine power generation output is shared by the gas turbine power generation devices 100 and 110 at an appropriate ratio (for example, 1: 1), and the power generation output for each share is used as the target power generation output in step S503 in the flowchart of FIG. Determine individually.
- the scale of the plant is different, basically the same effect as in the first embodiment can be obtained.
- one gas turbine power generator 100 can be operated with a constant load, and the other gas turbine power generator 110 can be operated with a variable load as in the first embodiment.
- the target power generation output of the gas turbine power generation device 110 is calculated by subtracting the sum of the predicted power generation output of the wind power generation device 10 and the power generation output of the gas turbine power generation device 100 from the target total power generation output.
- the gas turbine power generation device 100 suppresses frequency fluctuations, it is not necessary to set the upper limit of the load change rate as described with reference to FIG. 7 when the power generation output of the gas turbine power generation device 110 is varied. Adopt load change rate. In this case, the responsiveness of the power generation output of the gas turbine power generator 110 is improved.
- the thermal power generation apparatus is not limited to the gas turbine power generation apparatuses 100 and 110, and a power generation apparatus including a gas turbine such as a combined cycle power generation apparatus can be applied.
- the natural energy power generation device is not limited to the wind power generation device 10 or the solar power generation device 1000, and other natural energy power generation devices such as a wave power generation device can be targeted.
- databases such as the related information database 300 and the operation information database 600 are included in the control device 200 has been described as an example, it goes without saying that a storage device separate from the control device 200 can be applied. Each functional unit of the control device 200 may be divided into separate devices.
- the output mode of these information is displayed on the display device. Not only the output but also other output modes such as a print output to a printer and an audio output to a speaker may be used.
- Wind power generator Natural energy power generator
- 100,110 Gas turbine power generator thermo power generator
- 170 Command value 300
- Related information database 400
- Wind power generation prediction unit (power generation prediction unit) 401
- Photovoltaic power generation prediction unit (power generation prediction unit) 511
- Target calculation unit 512
- Command calculation unit 513
- Response characteristic database 514
- Delay time calculation unit 515
- Command output unit 516
- Operation information database 962
- Time specification unit 964 Characteristic state display (output unit) 965 Setting condition column (input section) 981 Measurement signal display field (output section) 982,985 Time designation unit
- Solar power generation device Natural energy power generation device
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Wind Motors (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Feedback Control In General (AREA)
Abstract
燃料の反応熱エネルギーを電力に変換するガスタービン発電装置(100)と、風力発電装置(10)の未来の設定時刻における予測発電出力を算出する風力発電予測部(400)と、予測発電出力を基に設定時刻におけるガスタービン発電装置(100)の目標発電出力を演算する目標演算部(511)と、ガスタービン発電装置(100)の発電出力が目標発電出力となるようなガスタービン発電装置への指令値(150)を演算する指令演算部(512)と、設定時刻からガスタービン発電装置(100)の応答遅延時間だけ先行して指令値(150)をガスタービン発電装置(100)に出力する指令出力部(515)とを備える。これにより、自然エネルギー発電装置及び火力発電装置の総発電出力の変動を効果的に抑制することができる。
Description
本発明は、自然エネルギー発電装置に組み合わせる火力発電設備、自然エネルギー発電装置に火力発電設備を組み合わせた自然エネルギー発電プラント及びその制御方法に関する。
近年、二酸化炭素低減の観点から自然エネルギーを利用した発電装置(自然エネルギー発電装置)、例えば風力発電装置や太陽光発電装置が普及しつつある。しかし、気象を含めて自然現象は制御できないため自然エネルギー発電装置の発電出力は一般に不安定であり、こうした電源を接続すると系統に対する供給電力量を不安定にし得る。それに対し、ガスタービン発電装置と風力発電装置とを電源として備え、風力発電装置の予測発電出力を基にガスタービン発電装置を制御する重質油改質プラントが提唱されている(特許文献1参照)。
発電装置の規模や気温等の条件によって程度の差はあるが、ガスタービン発電装置を含めて火力発電設備の発電出力の制御には応答遅延が生じる。そのため、自然エネルギー発電装置の発電出力の変動に応じて火力発電設備の発電出力を制御する場合、仮に自然エネルギー発電装置の発電出力が予測通りに推移したとしても、両発電装置の目標総発電出力に対して実際の総発電出力に許容できない過不足が生じ得る。環境保護の観点やエネルギー源の多様化から、今後自然エネルギー発電装置の需要の一層の増加が見込まれ、自然エネルギー発電装置の負荷変動の課題はますます顕著化することが予想される。
本発明は上記事情に鑑みなされたもので、総発電出力の変動を抑制することができる火力発電設備、自然エネルギー発電プラント及びその制御方法を提供することを目的とする。
上記目的を達成するために、本発明は、自然エネルギー発電装置の未来の設定時刻における予測発電出力を算出し、その予測発電出力を基に上記設定時刻における火力発電装置の目標発電出力を演算し、火力発電装置の応答遅延時間を加味して上記設定時刻に先行して火力発電装置を制御する。
本発明によれば、自然エネルギー発電装置及び火力発電装置の総発電出力の変動を効果的に抑制することができる。
本実施の形態の自然エネルギー発電プラントは、自然エネルギー発電装置に火力発電設備を組み合わせたプラントである。自然エネルギー発電装置は、風力発電装置や太陽光発電装置等の自然エネルギーを電力に変換する装置をいう。また、本実施の形態における火力発電設設備は、火力発電装置とその制御装置を含むパッケージをいい、例えば既存の自然エネルギー発電装置に組み合わせて自然エネルギー発電プラントを構成することもできる。火力発電装置は、ガスタービン装置やコンバインドサイクル発電装置等、石油、石炭、天然ガス、廃棄物、バイオマス等の燃料の反応熱エネルギーを電力に変換する装置をいう。
火力発電装置は、タービンを有する原動機関、及びタービンに接続された発電機を備えていて、制御装置によって原動機関の動作が制御されることによって火力発電装置の発電出力が制御される。制御装置は自然エネルギー発電装置にも接続され、自然エネルギー発電装置の制御にも寄与する。制御装置の制御の大きな特徴は、自然エネルギー発電装置の未来の予測発電出力に基づく火力発電装置の先行制御にある。自然エネルギー発電装置の予測発電出力は気象情報等を基に適宜の演算モデル(例えばニューラルネットワーク)により演算され、好ましくはその後に計測される自然エネルギー発電装置の発電出力との誤差を基に演算モデルを修正して精度が高められる。必要な気象情報の項目は自然エネルギー発電装置の種類によるが、例えば風力発電装置の場合、気温、湿度、風力、風向等である。気象情報は少なくとも自然エネルギー発電装置の設置した地点(若しくはこれに最も近い地点)のものである。これらの気象情報は、自然エネルギー発電装置のセンサ類又は別途設置したセンサ類で計測された値を用いることもできるし、不足な場合には気象情報の提供機関が提供する気象情報を利用することもできる。提供機関から提供された気象情報は、オペレータによって制御装置のデータベースに入力しても良いが、気象情報の提供機関からネットワークを通じて取得された情報が逐次データベースに蓄積されるようにすることもできる。
また、先の「先行制御」とは、火力発電装置に指令値を出力してから現実に当該火力発電装置が指令値に応じた運転状態に移行するまでに経過する時間(応答遅延時間)を加味して現在時刻よりも所定時間先の設定時刻に目標の発電出力が得られるように設定時刻に先行して火力発電装置に指令を出力することをいう。例えばある目標の発電出力を現在時刻から所定時間先の設定時刻に火力発電装置で得たい場合、設定時刻に指令を出力するのでは発電出力が目標発値まで増加又は減少するのは設定時刻から応答遅延時間が経過した時刻となるところ、設定時刻から応答遅延時間だけ前の時刻に指令を出力することで設定時刻に目標発電出力が得られる。したがって、本制御を実現するためには、設定時刻から応答遅延時間だけ遡った時刻が過去の時刻であってはならず、現在時刻から応答遅延時間だけ未来の時刻(又はそれよりも更に先の時刻)を設定時刻とし、設定時刻における火力発電装置の目標発電出力が決定されなければならない。すなわち、未来の設定時刻における自然エネルギー発電装置の予測発電出力を算出し、それに応じて同設定時刻における火力発電装置の目標発電出力及び目標発電出力を得るための火力発電装置への指令値を算出し、設定時刻の応答時間前の時刻に当該指令値を火力発電装置に出力することとなる。自然エネルギー発電装置及び火力発電装置の時間当たりの総発電出力を所望の範囲内で推移させる場合、例えば自然エネルギー発電装置の設定時刻の発電出力が予測できれば、その予測値を目標の総発電出力から減じた値を火力発電装置の設定時刻の目標発電出力として決定することができる。
応答遅延時間は、本自然エネルギー発電プラントの稼働環境によっては火力発電装置の規模で概ね一定となることもあり得るが、同一の火力発電装置であっても気温や湿度等の条件で時間とともに変化し得る。この場合、例えばガスタービン発電装置やコンバインドサイクル発電装置では、圧縮機の吸気の温度や圧力、排気の温度や圧力等を基に応答遅延時間の予測値を算出することができる。また、運転に伴って応答遅延時間の予測値と計測値に許容を超える誤差が確認された場合には、その誤差だけ応答遅延時間の予測値を補正することが好ましい。
上記技術思想の下で自然エネルギー発電装置の予測発電出力を基に、応答遅延時間を加味して火力発電装置を先行制御することにより、自然エネルギー発電プラントの時間当たりの総発電出力の変動を抑制し、接続する系統で定められた許容範囲内で総発電出力を推移させ得る。このようにプラントの時間当たりの総発電出力を安定させることができるので、総発電出力が許容範囲を下回らないように目標総発電出力を必要以上に高く設定する必要がない。目標総発電出力を必要以上に高く設定すると発電出力に余剰分が発生しがちとなり、余剰発電出力を活用するためには余剰発電出力を消費する負荷装置、例えば電気ボイラや造水装置等を用意する必要がある。それに対し、本実施の形態の自然エネルギー発電プラントでは、時間当たりの総発電出力を所望の範囲内で推移させるので余剰発電出力の消費用の負荷装置の設置を前提とする必要がなく、プラントの規模やコストを抑制し小型なプラントを低廉に構築することができる。また、発電出力が安定するので電源としての汎用性が高く、多種多様な系統に対応可能であることも大きなメリットである。
加えて、本実施の形態の自然エネルギー発電プラントは、既存の自然エネルギー発電装置の活用にも大きく寄与する。すなわち、制御装置を含めた火力発電設備をパッケージとして既存の自然エネルギー発電装置に追加設置することで、不安定電源であった既存の自然エネルギー発電装置を、例えば接続系統の要求に見合った安定電源に改良することができる。
以下に図面を用いて本発明の実施の形態を説明する。
(第1の実施の形態)
1.構成
(1-1)自然エネルギー発電プラント
図1は本発明の第1の実施の形態に係る自然エネルギー発電プラントの全体構成を表す概略図である。
1.構成
(1-1)自然エネルギー発電プラント
図1は本発明の第1の実施の形態に係る自然エネルギー発電プラントの全体構成を表す概略図である。
同図に示した自然エネルギー発電プラントは、自然エネルギー発電装置である風力発電装置10、火力発電設備であるガスタービン発電設備を備えている。ガスタービン発電設備は、火力発電装置であるガスタービン発電装置100、制御装置200、及びユーザインターフェイスを備えている。この自然エネルギー発電プラントは全く新規に構築されることもあるし、例えば風力発電装置10が既存設備である場合には、これにガスタービン発電設備を追加設置して構築される場合もある。
(1-2)ガスタービン発電装置
ガスタービン発電装置100は、原動機関であるガスタービン、及びガスタービンで駆動する発電機3を備えている。ガスタービンは、吸い込んだ空気を圧縮する圧縮機2、圧縮機2からの圧縮空気を燃料とともに燃焼する燃焼器4、及び燃焼器4からの燃焼ガスで駆動するタービン1を備えている。発電機3はタービン軸を介してタービン1に連結されている。特に図示していないが、ガスタービン発電装置100には、温度計、圧力計、流量計、電力計等の各種センサが各所に設置されていて、ガスタービン発電装置100の運転中、これらセンサの計測値140、例えば圧縮機2の吸気温度、吸気圧力、タービン1の排気温度、排気圧力、燃料濃度、燃料流量、吸気流量、発電機3の発電出力等が、運転情報として制御装置200に出力される。また、ガスタービン発電装置100の動作は燃焼器4の燃料噴射量や圧縮機2の吸気流量で制御される。燃料噴射量は、具体的には燃焼器4において燃料噴射ノズルに接続された燃料系統の流量調整弁の開度で調整される。吸気流量は、具体的には圧縮機2の入口に設けたIGV(Inlet Guide Vane)の開度で調整される。これら流量調整弁やIGVは制御装置200からの指令値150に従って動作する。
ガスタービン発電装置100は、原動機関であるガスタービン、及びガスタービンで駆動する発電機3を備えている。ガスタービンは、吸い込んだ空気を圧縮する圧縮機2、圧縮機2からの圧縮空気を燃料とともに燃焼する燃焼器4、及び燃焼器4からの燃焼ガスで駆動するタービン1を備えている。発電機3はタービン軸を介してタービン1に連結されている。特に図示していないが、ガスタービン発電装置100には、温度計、圧力計、流量計、電力計等の各種センサが各所に設置されていて、ガスタービン発電装置100の運転中、これらセンサの計測値140、例えば圧縮機2の吸気温度、吸気圧力、タービン1の排気温度、排気圧力、燃料濃度、燃料流量、吸気流量、発電機3の発電出力等が、運転情報として制御装置200に出力される。また、ガスタービン発電装置100の動作は燃焼器4の燃料噴射量や圧縮機2の吸気流量で制御される。燃料噴射量は、具体的には燃焼器4において燃料噴射ノズルに接続された燃料系統の流量調整弁の開度で調整される。吸気流量は、具体的には圧縮機2の入口に設けたIGV(Inlet Guide Vane)の開度で調整される。これら流量調整弁やIGVは制御装置200からの指令値150に従って動作する。
(1-3)風力発電装置
風力発電装置10は、複数の風力発電機11を備えている。各風力発電機11には、例えば風速、風向をそれぞれ計測する風速計、風向計等のセンサが設けられている。これらセンサは制御装置200に接続していて、風力発電装置10の運転中、各センサの計測値120が運転情報として制御装置200に出力される。また、風力発電装置10の動作はブレードのピッチ角や、ブレード、ハブ及びナセルの向きで制御される。ブレードのピッチ角は、具体的にはブレードとハブの間に介在するピッチ駆動装置で調整される。ブレード、ハブ及びナセルの向きは、具体的にはタワーとナセルの間に介在するヨー駆動装置で調整される。これらピッチ駆動装置やヨー駆動装置は制御装置200からの指令値130に従って動作する。風力発電装置10は、通常は風に正対して一定以上の風速を受けてブレードが回転することで発電機を駆動させて発電し、例えば強風時にはブレードのピッチ角を変えて受風面積を小さくして停止することもある。風力発電装置10の発電出力は風速に依存し、また風速に対する発電出力の特性は風力発電機11の設計に依存する。
風力発電装置10は、複数の風力発電機11を備えている。各風力発電機11には、例えば風速、風向をそれぞれ計測する風速計、風向計等のセンサが設けられている。これらセンサは制御装置200に接続していて、風力発電装置10の運転中、各センサの計測値120が運転情報として制御装置200に出力される。また、風力発電装置10の動作はブレードのピッチ角や、ブレード、ハブ及びナセルの向きで制御される。ブレードのピッチ角は、具体的にはブレードとハブの間に介在するピッチ駆動装置で調整される。ブレード、ハブ及びナセルの向きは、具体的にはタワーとナセルの間に介在するヨー駆動装置で調整される。これらピッチ駆動装置やヨー駆動装置は制御装置200からの指令値130に従って動作する。風力発電装置10は、通常は風に正対して一定以上の風速を受けてブレードが回転することで発電機を駆動させて発電し、例えば強風時にはブレードのピッチ角を変えて受風面積を小さくして停止することもある。風力発電装置10の発電出力は風速に依存し、また風速に対する発電出力の特性は風力発電機11の設計に依存する。
(1-4)制御装置
制御装置200は、ガスタービン発電装置100からの計測値140を基にガスタービン発電装置100の発電出力がその目標発電出力に近付くように当該ガスタービン発電装置100の動作を制御する。この制御装置200は、関連情報データベース200、風力発電予測部300、制御部500、及び運転情報データベース600を備えている。
制御装置200は、ガスタービン発電装置100からの計測値140を基にガスタービン発電装置100の発電出力がその目標発電出力に近付くように当該ガスタービン発電装置100の動作を制御する。この制御装置200は、関連情報データベース200、風力発電予測部300、制御部500、及び運転情報データベース600を備えている。
(1-4.1)関連情報データベース
関連情報データベース300は、気象情報を含む自然エネルギーに関連する情報、風力発電装置10やガスタービン発電装置100の設計情報、これら発電装置10,100のセンサの一部の計測値等、風力発電装置10の予測発電出力を算出するために必要な情報を格納した記憶部である。制御装置200はインターネット等のネットワーク700に接続しており、ネットワーク700を介して気象情報提供機関(例えば気象庁)が提供する気象情報を逐次取得することができ、取得した気象情報が関連情報データベース300に蓄積される。この関連情報データベース300に格納されるデータの例については後で図3を参照して説明する。
関連情報データベース300は、気象情報を含む自然エネルギーに関連する情報、風力発電装置10やガスタービン発電装置100の設計情報、これら発電装置10,100のセンサの一部の計測値等、風力発電装置10の予測発電出力を算出するために必要な情報を格納した記憶部である。制御装置200はインターネット等のネットワーク700に接続しており、ネットワーク700を介して気象情報提供機関(例えば気象庁)が提供する気象情報を逐次取得することができ、取得した気象情報が関連情報データベース300に蓄積される。この関連情報データベース300に格納されるデータの例については後で図3を参照して説明する。
(1-4.2)運転情報データベース
運転情報データベース600は、風力発電装置10及びガスタービン発電装置100から入力された計測値120,140を含む運転情報を格納する記憶部である。この運転情報データベース300に格納されるデータの例については後で図4を参照して説明する。
運転情報データベース600は、風力発電装置10及びガスタービン発電装置100から入力された計測値120,140を含む運転情報を格納する記憶部である。この運転情報データベース300に格納されるデータの例については後で図4を参照して説明する。
(1-4.3)風力発電予測部
風力発電予測部400は、関連情報データベース300に格納された情報を読み出して、読み出した情報を基に風力発電装置10の未来の設定時刻における予測発電出力を算出する機能を果たす。「設定時刻」とは現在時刻から設定時間だけ進んだ先の時刻をいい、「設定時間」はガスタービン発電装置100の応答遅延時間又はそれよりも長く設定した時間であるが、本実施の形態では応答遅延時間に合わせてある。「応答遅延時間」とはガスタービン発電装置100に指令値を出力してから現実に当該ガスタービン発電装置100が指令値に応じた運転状態に移行するまでに経過する時間をいう。応答遅延時間は圧縮機2の吸気温度等の条件によって変化し得る。風力発電装置10の予測発電出力を算出するために必要な情報としては、例えば、気温や湿度等の大気情報、風速や風力発電装置10で計測された発電出力等が挙げられる。予測発電出力の算出の例については後で図5を参照して説明する。
風力発電予測部400は、関連情報データベース300に格納された情報を読み出して、読み出した情報を基に風力発電装置10の未来の設定時刻における予測発電出力を算出する機能を果たす。「設定時刻」とは現在時刻から設定時間だけ進んだ先の時刻をいい、「設定時間」はガスタービン発電装置100の応答遅延時間又はそれよりも長く設定した時間であるが、本実施の形態では応答遅延時間に合わせてある。「応答遅延時間」とはガスタービン発電装置100に指令値を出力してから現実に当該ガスタービン発電装置100が指令値に応じた運転状態に移行するまでに経過する時間をいう。応答遅延時間は圧縮機2の吸気温度等の条件によって変化し得る。風力発電装置10の予測発電出力を算出するために必要な情報としては、例えば、気温や湿度等の大気情報、風速や風力発電装置10で計測された発電出力等が挙げられる。予測発電出力の算出の例については後で図5を参照して説明する。
(1-4.4)制御部
制御部500は、風力発電予測部400で算出した予測発電出力を基に上記設定時刻におけるガスタービン発電装置100の目標発電出力を算出し、設定時刻に目標発電出力が得られるように応答遅延時間を加味したタイミングで目標発電出力に基づく指令値150をガスタービン発電装置100に出力する機能を果たす。ガスタービン発電装置100では、この指令値150に基づいて吸気流量や燃料流量が調整されて発電出力が制御される。制御部500内の各機能部については後で図2を参照して説明する。また、指令値150の生成・出力の手順については後で図6を参照して説明する。
制御部500は、風力発電予測部400で算出した予測発電出力を基に上記設定時刻におけるガスタービン発電装置100の目標発電出力を算出し、設定時刻に目標発電出力が得られるように応答遅延時間を加味したタイミングで目標発電出力に基づく指令値150をガスタービン発電装置100に出力する機能を果たす。ガスタービン発電装置100では、この指令値150に基づいて吸気流量や燃料流量が調整されて発電出力が制御される。制御部500内の各機能部については後で図2を参照して説明する。また、指令値150の生成・出力の手順については後で図6を参照して説明する。
(1-5)ユーザインターフェイス
自然エネルギー発電プラントには、ユーザインターフェイスとして、入力装置900、支援ツール910、及び画像表示装置950が備えられている。入力装置900はキーボード901やマウス902等で適宜構成されている。画像表示装置950をタッチパネルとする場合には、画像表示装置950も入力装置として機能し得る。オペレータは、入力装置900及び画像表示装置950を用いて支援ツール910を操作することにより、風力発電装置10やガスタービン発電装置100に関する様々な情報を見ることが可能である。また、制御装置200のデータベース300,600等にアクセスして格納情報を閲覧したり、風力発電装置10やガスタービン発電装置100の制御値を設定したりすることができる。
自然エネルギー発電プラントには、ユーザインターフェイスとして、入力装置900、支援ツール910、及び画像表示装置950が備えられている。入力装置900はキーボード901やマウス902等で適宜構成されている。画像表示装置950をタッチパネルとする場合には、画像表示装置950も入力装置として機能し得る。オペレータは、入力装置900及び画像表示装置950を用いて支援ツール910を操作することにより、風力発電装置10やガスタービン発電装置100に関する様々な情報を見ることが可能である。また、制御装置200のデータベース300,600等にアクセスして格納情報を閲覧したり、風力発電装置10やガスタービン発電装置100の制御値を設定したりすることができる。
支援ツール910は、外部入力インターフェイス920、データ送受信処理部930、及び外部出力インターフェイス940を備えている。入力装置900で生成された入力信号800や制御装置200からの情報210は、外部入力インターフェイス920を介して支援ツール910に取り込まれる。データ送受信処理部930では、入力信号800を受けて外部入力インターフェイス920から入力される入力信号801を処理し、出力信号802として外部出力インターフェイス940に送信する。例えば表示出力を指示する操作に応じて入力装置900から入力信号800が入力された場合、当該入力信号800に応じてデータ送受信処理部930で適宜処理がされた結果、外部出力インターフェイス940から画像処理装置950に出力信号803が入力されて画像表示装置950に所望の表示出力がなされる。設定入力を指示する操作に応じて入力装置900から入力信号800が入力された場合、当該入力信号800に応じてデータ送受信処理部930で適宜処理がされた結果、外部出力インターフェイス940から制御装置200に出力信号220が入力されて制御装置200に指示が与えられる。なお、制御装置200と風力発電装置10及びガスタービン発電装置100との間で授受する指令値130,150及び計測値120,140は、保守ツール910内のデータベース(図示せず)に格納されるようにしても良い。
(1-6)制御部の機能部
図2は制御装置200の上記制御部500の機能ブロック図である。
図2は制御装置200の上記制御部500の機能ブロック図である。
同図に示すように、制御装置200の上記制御部500は、目標演算部511、指令演算部512、応答特性データベース513、遅延時間演算部514、指令出力部515、及びデータ更新部516を備えている。
(1-61)目標演算部
目標演算部511は、風力発電予測部400で算出された設定時刻における予測発電出力を基に同設定時刻におけるガスタービン発電装置100の目標発電出力を演算する機能を果たす。この設定時刻における目標発電出力は、例えば風力発電装置10及びガスタービン発電装置100の時間当たりの総発電出力の目標値(自然エネルギー発電プラントの時間当たりの目標発電出力)から同設定時刻における風力発電装置10の予測発電出力を減算して求められる。
目標演算部511は、風力発電予測部400で算出された設定時刻における予測発電出力を基に同設定時刻におけるガスタービン発電装置100の目標発電出力を演算する機能を果たす。この設定時刻における目標発電出力は、例えば風力発電装置10及びガスタービン発電装置100の時間当たりの総発電出力の目標値(自然エネルギー発電プラントの時間当たりの目標発電出力)から同設定時刻における風力発電装置10の予測発電出力を減算して求められる。
(1-62)指令演算部
指令演算部512は、ガスタービン発電装置100の時間当たりの発電出力が目標演算部511で算出された目標発電出力となるようなガスタービン発電装置100への指令値を演算する機能を果たす。ここで算出した指令値は、圧縮機1のIGVや燃焼器4の流量調整弁への指令値150となる。
指令演算部512は、ガスタービン発電装置100の時間当たりの発電出力が目標演算部511で算出された目標発電出力となるようなガスタービン発電装置100への指令値を演算する機能を果たす。ここで算出した指令値は、圧縮機1のIGVや燃焼器4の流量調整弁への指令値150となる。
(1-63)応答特性データベース
応答特性データベース513は、ガスタービン発電装置100の応答遅延時間の予測値を記憶した記憶部である。応答遅延時間の予測値は、例えば、圧縮機1の吸気温度、吸気圧力、タービン1の排気温度、排気圧力、燃料濃度等、ガスタービン発電装置100の種々の作動条件毎に適当な値が設定され、テーブル形式で記憶される。
応答特性データベース513は、ガスタービン発電装置100の応答遅延時間の予測値を記憶した記憶部である。応答遅延時間の予測値は、例えば、圧縮機1の吸気温度、吸気圧力、タービン1の排気温度、排気圧力、燃料濃度等、ガスタービン発電装置100の種々の作動条件毎に適当な値が設定され、テーブル形式で記憶される。
(1-64)遅延時間演算部
遅延時間演算部514は、ガスタービン発電装置100の作動条件を基に応答遅延時間の予測値を算出する機能を果たす。具体的には、この遅延時間演算部514は、例えばガスタービン発電装置100の最新の運転情報(吸気温度、吸気圧力、排気温度等)を運転情報データベース600から読み出し、読み出した運転情報を基に応答特性データベース513から当該情報に該当するテーブルを抽出する。抽出されたテーブルに設定された応答遅延時間が、現在のガスタービン発電装置100の運転状況から予測される応答遅延時間となる。
遅延時間演算部514は、ガスタービン発電装置100の作動条件を基に応答遅延時間の予測値を算出する機能を果たす。具体的には、この遅延時間演算部514は、例えばガスタービン発電装置100の最新の運転情報(吸気温度、吸気圧力、排気温度等)を運転情報データベース600から読み出し、読み出した運転情報を基に応答特性データベース513から当該情報に該当するテーブルを抽出する。抽出されたテーブルに設定された応答遅延時間が、現在のガスタービン発電装置100の運転状況から予測される応答遅延時間となる。
(1-65)指令出力部
指令出力部515は、上記設定時刻よりも遅延時間演算部514で演算されたガスタービン発電装置100の応答遅れ時間だけ先行して指令値150をガスタービン発電装置100に出力する機能を果たす。
指令出力部515は、上記設定時刻よりも遅延時間演算部514で演算されたガスタービン発電装置100の応答遅れ時間だけ先行して指令値150をガスタービン発電装置100に出力する機能を果たす。
(1-66)データ更新部
データ更新部516は、応答特性データベース513に格納された応答遅延時間の予測値と計測値との誤差が設定値(設定の許容範囲)を超えた場合、その誤差を基に応答特性データベース513の応答遅延時間を修正し更新する機能を果たす。修正の対象となるのは、現実の応答遅延時間との間に設定値を超える誤差があった運転情報(テーブル)の応答遅延時間であるが、近い運転情報のテーブルについても応答遅延時間を修正するようにすることはできる。ここで言う近い運転情報のテーブルとしては、例えば、応答遅延時間の予測値に許容を超える誤差が認識されたテーブルに対して全条件項目について差が一定範囲に収まるテーブルを挙げることができる。
データ更新部516は、応答特性データベース513に格納された応答遅延時間の予測値と計測値との誤差が設定値(設定の許容範囲)を超えた場合、その誤差を基に応答特性データベース513の応答遅延時間を修正し更新する機能を果たす。修正の対象となるのは、現実の応答遅延時間との間に設定値を超える誤差があった運転情報(テーブル)の応答遅延時間であるが、近い運転情報のテーブルについても応答遅延時間を修正するようにすることはできる。ここで言う近い運転情報のテーブルとしては、例えば、応答遅延時間の予測値に許容を超える誤差が認識されたテーブルに対して全条件項目について差が一定範囲に収まるテーブルを挙げることができる。
2.データ
ここでは関連情報データベース300及び運転情報データベース600の格納情報を例示する。
ここでは関連情報データベース300及び運転情報データベース600の格納情報を例示する。
(2-1)関連情報データベースの格納情報
図3は関連情報データベースの格納情報の模式図である。
図3は関連情報データベースの格納情報の模式図である。
同図に示したように、関連情報データベース300の格納情報には、現在に至るまでの各時刻における気象情報が含まれている。また、関連情報データベース300に格納される気象情報は、風力発電装置10を設置した地点(又はこの地点から最も近い地点)の気象情報を少なくとも含み、その他、当該地点の設定時間後の気象に反映され得る複数の地点の気象情報が含まれ得る。気象情報の取得間隔は気象情報提供機関の情報の更新間隔による。但し、気象情報提供機関によらず所望の地域の気象情報を知る状況にあれば、気象情報提供機関の情報の更新間隔に制約されない。なお、同図には風力発電の予測発電出力の算出には寄与しない項目(例えば日射量)も表示してあるが、太陽光発電装置を対象とする場合も想定してここでは合わせて格納してある。不要なデータを格納することが望ましくなければ、必要なデータのみを格納するようにすれば良い。
図3の例では、時刻毎の天気、気温、風向、風速、湿度、日射量が格納されている。天気は、快晴、晴れ、薄曇・・・等(例えば気象庁が一般向けに発信する15種類)で区分する。風向きは、日本では16方位を用いるのが一般的であるが、国際式では、真北を基準として時計回りに360度に分割して表現する360方位が用いられている。同図では1度単位で風向が数値化できる360方位を採用した例を示しているが、16方位でも各方位を22.5度単位で風向を数値化することができる。また、風向や風速については、風力発電装置10でも計測される値であるため、気象情報提供機関が提供する情報に限らず、風力発電装置10からの計測値120を格納することもできる。
また、特に図示していないが、図3に示した情報の他、風力発電装置10の設計情報、ガスタービン発電装置100の設計情報、系統接続の規制やルール等の情報も関連情報データベース300に格納されている。
(2-2)運転情報データベースの格納情報
図4は運転情報データベースの格納情報の模式図である。
図4は運転情報データベースの格納情報の模式図である。
同図に示したように、運転情報データベース600の格納情報には、風力発電装置10及びガスタービン発電装置100から得られる計測値120,140が含まれる。すなわち、風力発電装置10及びガスタービン発電装置100の各センサの計測情報が計測時刻毎に記憶されている。図中のPID番号とは、運転情報データベース600の格納情報の活用の容易化のあめに各計測項目に割り当てた固有の番号である。その下にあるアルファベットは、被計測対象を示す記号である。例えば、Fは流量値、Tは温度値、Pは圧力値、Eは発電出力値、Dは濃度値・・・である。なお、同図は模式図であるため詳しくないが、例えば流量値Fといっても、実際には吸気流量、燃料流量、排気流量等、複数の情報がある。温度値T、圧力値P等も同様である。また、同図では1秒周期で運転情報を保存した場合を例示しているが、運転情報の適当なサンプリング周期は対象となるガスタービン発電装置によって異なってくる。
3.風力発電出力の予測
図5は風力発電予測部の予測演算機能の動作説明のためのモデル図である。
図5は風力発電予測部の予測演算機能の動作説明のためのモデル図である。
ここでは風況と現在の風力発電出力から設定時刻の風力発電出力を予測する演算モデルを説明する。本モデルは、入力層、中間層及び出力層を持ち、入力層及び中間層には複数のノードが備わっている。入力層の各ノードは中間層の各ノードにリンクしており、中間層の各ノードは出力層のノードにリンクしている。各ノードにはリンクの強さを表す重み係数が設定されている。つまり、演算モデルは入力層、中間層及び出力層のノードの連結パターンの数だけ存在する。このようなモデルはニューラルネットワークと呼ばれており、人間の脳神経ネットワークを模擬したものである。
風力発電予測部400では、このような演算モデルを用いて風力発電装置10の予測発電出力を算出する。具体的には、風力発電装置10で計測された風力発電出力が同図の入力層に入力されると、風力発電予測部400は、設定時間前に入力層に入力された入力値(気温、風速、湿度等を含む関連情報データベース300の記憶情報)に適用して風力発電出力(計測値)が得られる演算モデル(重み係数の組み合わせ)を抽出する。抽出した演算モデルによれば、設定時間前の入力値から風力発電出力(計測値)が算出され得たこととなる。風力発電予測部400は、こうして求めた演算モデルを新たな入力値に適用して設定時間後の風力発電装置10の予測発電出力を算出する。そして、設定時間後に計測される風力発電出力を予測値と比較し、計測値に対する予測値の誤差が設定値(許容値)以上であれば、重み係数を調整して設定時間前の入力値から現実に計測された風力発電出力が導かれる演算モデルを再学習する。このような手順で風力発電予測部400は学習を繰り返し、入力値間の相関関係をモデル化していく。学習を重ねるほど演算モデルによる風力発電出力の予測精度は向上し得る。ノードに設定する関数はシグモイド関数と呼ばれる指数関数を用いるのが一般的であるが、それには限定されない。また、学習に当たって重み係数を調整するアルゴリズムは多数考案されている。一般的には、バックプロパゲーション法を用いる。これら詳しい計算アルゴリズムについては、「Simon Haykin 著 "NEURAL NETWORKS: a comprehensive foundation -2nd sd." Prentice-Hall, Inc. 出版、1999年」に詳しい。
なお、風力発電機11毎に演算モデルを作成することもできるが、風力発電装置10(ウィンドファーム)全体で1つの演算モデルを作成することもできる。
4.制御手順
図6は制御装置によるガスタービン発電装置に対する指令値(MWD:発電指令)の生成及び出力の手順を表すフローチャートである。
図6は制御装置によるガスタービン発電装置に対する指令値(MWD:発電指令)の生成及び出力の手順を表すフローチャートである。
(ステップS501,S506)
制御装置200はまずステップS501で、風力発電予測部400により、設定時間前の入力値を基に算出した予測発電出力と現在又は最新の風力発電出力(計測値)とを比較し、両者の誤差の大きさが予め許容範囲として定められた設定値(閾値)未満であるか否かを判定する。ここでは、設定時間をガスタービン発電装置100の応答遅延時間とする。誤差が設定値未満であって予測発電出力の現在の演算モデルが所望の精度を確保していると判断した場合には、手順をステップS502に移す。他方、誤差が設定値以上であって予測発電出力の現在の演算モデルに所望の精度が確保されていないと判断した場合には、手順をステップS506に移し、前述したように予測発電出力の演算モデルを再学習した上で手順をステップS502に移す。
制御装置200はまずステップS501で、風力発電予測部400により、設定時間前の入力値を基に算出した予測発電出力と現在又は最新の風力発電出力(計測値)とを比較し、両者の誤差の大きさが予め許容範囲として定められた設定値(閾値)未満であるか否かを判定する。ここでは、設定時間をガスタービン発電装置100の応答遅延時間とする。誤差が設定値未満であって予測発電出力の現在の演算モデルが所望の精度を確保していると判断した場合には、手順をステップS502に移す。他方、誤差が設定値以上であって予測発電出力の現在の演算モデルに所望の精度が確保されていないと判断した場合には、手順をステップS506に移し、前述したように予測発電出力の演算モデルを再学習した上で手順をステップS502に移す。
(ステップS502)
本ステップでは、制御装置200は、風力発電予測部400により、現在の演算モデルを用いて図5で説明したように現在又は最新の入力値を基に設定時間後の(ガスタービン発電装置100の応答遅延時間分だけ先の時刻の)風力発電装置10の予測発電出力を算出する。本ステップで用いる演算モデルは、ステップS501で誤差が設定値未満であった場合にはステップS501の実行時点の演算モデルであり、ステップS501で誤差が設定値以上であった場合にはステップS506で修正した演算モデルである。
本ステップでは、制御装置200は、風力発電予測部400により、現在の演算モデルを用いて図5で説明したように現在又は最新の入力値を基に設定時間後の(ガスタービン発電装置100の応答遅延時間分だけ先の時刻の)風力発電装置10の予測発電出力を算出する。本ステップで用いる演算モデルは、ステップS501で誤差が設定値未満であった場合にはステップS501の実行時点の演算モデルであり、ステップS501で誤差が設定値以上であった場合にはステップS506で修正した演算モデルである。
(ステップS503)
続くステップ503において、制御装置200は、先に算出した風力発電装置10の設定時間後の時間当たりの予測発電出力を基に、目標演算部511によって設定時間後のガスタービン発電装置100の時間当たりの目標発電出力を算出する。具体的には、本自然エネルギー発電プラントの時間当たり目標総発電出力(負荷目標)から風力発電装置10の予測発電出力を差し引くことで設定時間後のガスタービン発電装置100の目標発電出力が算出される。また、目標発電出力に基づき、指令演算部512によってガスタービン発電装置100への指令信号(MWD)150が生成される。
続くステップ503において、制御装置200は、先に算出した風力発電装置10の設定時間後の時間当たりの予測発電出力を基に、目標演算部511によって設定時間後のガスタービン発電装置100の時間当たりの目標発電出力を算出する。具体的には、本自然エネルギー発電プラントの時間当たり目標総発電出力(負荷目標)から風力発電装置10の予測発電出力を差し引くことで設定時間後のガスタービン発電装置100の目標発電出力が算出される。また、目標発電出力に基づき、指令演算部512によってガスタービン発電装置100への指令信号(MWD)150が生成される。
なお、本自然エネルギー発電プラントの時間当たりの目標総発電出力は、本自然エネルギー発電プラントが接続される系統毎に規定された接続条件で定まる。系統の接続条件は国や地域で異なるが、多くの場合は発電出力の変動幅(負荷変動幅)と系統周波数の変動幅を規定している。既に幾つかの電源が接続されている系統であれば、本プラントを接続してガスタービン発電装置100の出力を急激に変化させても周波数の変動が系統で吸収されるため、発電出力の変動幅の抑制を重視すれば良い。なお、発電出力の変動幅の抑制のために発電出力の範囲が規定されている場合、図7に示したように規定範囲の上限値及び下限値の間の値(例えば両値の平均値程度)を目標総発電出力に設定し、減少方向へも増加方向へも裕度を持たせることが望ましい。
一方、アイランドオペレーションに代表されるような他の接続電源が少ない系統に接続する場合、ガスタービン発電装置100の出力を急速に変化させると系統周波数に影響が生じ得る。この場合には、系統周波数の許容変動幅に収まる負荷変化率でガスタービン発電装置100の負荷を変化させる必要がある。この点について図8で説明する。
図8は負荷変化率と周波数の変動幅の関係の一例を表したグラフである。
同図のグラフでは負荷変化率と周波数の変動幅の関係が線型である場合を例示しているが、両者の関係は線型には限られない。負荷変化率と周波数の変動幅の関係は、事前の特性試験やシミュレーションモデルにより把握される。周波数の変動幅に制約がある場合、例えば、図8のグラフにおいて周波数変動幅の制限値xに対応する負荷変化率yを許容される負荷変化率の上限値に定め、ガスタービン発電装置100の発電出力を調整する際に、負荷変化率が上限値yを超えないようにガスタービン発電装置100を運用する。
(ステップS504,S507,S508)
続くステップ504において、制御装置200は、設定時間前から現在に至るまでの計測値140からガスタービン発電装置100の応答特性(発電出力の推移)を求め、応答特性データベース513に格納された対応する応答特性の予測値と計測された応答特性の誤差の大きさが設定値(閾値)未満であるか否かを判定する。なお、ガスタービン発電装置の応答遅延特性を図9に模式的に表した。同図では、ガスタービン発電装置100の負荷を75%から100%に変化したときの指令値に対する発電出力の遅延を表している。
続くステップ504において、制御装置200は、設定時間前から現在に至るまでの計測値140からガスタービン発電装置100の応答特性(発電出力の推移)を求め、応答特性データベース513に格納された対応する応答特性の予測値と計測された応答特性の誤差の大きさが設定値(閾値)未満であるか否かを判定する。なお、ガスタービン発電装置の応答遅延特性を図9に模式的に表した。同図では、ガスタービン発電装置100の負荷を75%から100%に変化したときの指令値に対する発電出力の遅延を表している。
ステップS504において、制御装置200は、誤差が設定値未満であって応答特性データベース513に格納されている応答特性の予測値が所望の精度を確保していると判断した場合にはステップS505に手順を移す。他方、誤差が設定値以上であって応答特性データベース513に現在格納されているデータが所望の精度を有していないと判断した場合には、制御装置200は、ステップS507,S508の手順を実行した上でステップS505に手順を移す。ステップS507では、データ更新部516によって応答特性データベース513に格納されている応答特性の予測値が誤差分だけ修正される。この応答特性の予測値の修正に伴い、続くステップS508において、ステップS501で風力発電装置10の予測発電出力の誤差判定に使用する設定時間もデータ更新部516によって変更される。
(ステップS505)
ステップ505では、ステップ503で生成した指令値150が指令出力部515によってガスタービン発電装置100に出力される。ここで出力される指令値150は設定時間後、すなわち応答遅延時間後のガスタービン発電装置100の目標発電出力を基に生成された指令値であるため、ガスタービン発電装置100の発電出力は遅延して応答し設定時間後に目標値に到達し得る。
ステップ505では、ステップ503で生成した指令値150が指令出力部515によってガスタービン発電装置100に出力される。ここで出力される指令値150は設定時間後、すなわち応答遅延時間後のガスタービン発電装置100の目標発電出力を基に生成された指令値であるため、ガスタービン発電装置100の発電出力は遅延して応答し設定時間後に目標値に到達し得る。
制御装置200は、以上の手順を繰り返し実行することによって、風力発電装置10の予測発電出力の算出精度や応答遅延時間の見積もり精度を向上させていき、風力発電装置10の発電出力の変動に柔軟に対応して自然エネルギー発電プラントの発電出力の変動を所望の範囲に抑制し得る。ガスタービン発電装置100の制御が理想的に実行された場合には、図10に示したように、風力発電装置10の発電出力の変動に対応して、風力発電装置10の発電出力と増減が逆になるようにガスタービン発電装置100の発電出力が制御され、両者の発電出力を合計したプラントの総発電出力が概ね一定になる。
5.操作方法
次に、計測値120、指令値130、関連情報データベース300、設定値、運転情報データベース600等の情報を、支援ツール910を用いて画像表示装置950に表示させる方法について説明する。
次に、計測値120、指令値130、関連情報データベース300、設定値、運転情報データベース600等の情報を、支援ツール910を用いて画像表示装置950に表示させる方法について説明する。
図11-図14は画像表示装置950に表示される画面の例である。オペレータは、キーボード901、マウス902を用いてこれら画面の空欄となっている箇所にパラメータ値を入力する等の操作を実行する。
図11は画像表示装置に表示される初期画面を例示した図である。
この初期画面には、運転状態表示ボタン951、トレンド表示ボタン952が表示されており、マウス902を用いていずれか選択したボタンの上にカーソル953を移動させてクリックすることにより下階層の画面に表示が遷移する。
図12は初期画面で運転状態表示ボタン951をクリックすることで表示される運転状態表示画面を例示した図である。
この運転状態表示画面には、系統情報表示欄961、時刻指定欄962、特性状態表示部964、設定条件欄965、関連情報表示欄966等が表示されている。時刻指定欄962に過去の時刻を入力して指定し、表示ボタン963をクリックすると、指定時刻の各種情報、具体的には、プラント各所のセンサの計測データ等が表示欄に表示される。特性状態表示部964には、指定時刻における風力発電装置10の予測発電出力の計測値との誤差やガスタービン発電装置10の応答遅延時間が表示される。設定条件欄965には、図6のフローチャートの説明で述べた各種条件、例えば風力発電装置10の予測発電出力の誤差の許容値、プラントの発電出力の変動許容値、及び周波数の変動許容値が表示され、またこの設定条件欄965で設定条件を入力設定することもできる。また、関連情報表示欄966では、関連情報データベース300の格納情報の項目(図12では、天気、気温、風向、風速、湿度、日射量)が表示されており、これらの中から所望の項目を選択して表示ボタン967をクリックすることで、関連情報データベース300に格納された指定時刻の該当項目のデータが表示される。また、戻るボタン968をクリックした場合には、図11の初期画面に戻る。
図13は初期画面でトレンド表示ボタン952をクリックすることで表示されるトレンド表示画面を例示した図である。
このトレンド表示画面は、トレンドを画像表示装置950に表示させるための設定画面である。このトレンド表示画面において、計測値表示欄981で所望の計測値を各段のプルダウンメニューで選択し、そのレンジ(上限/下限)を入力し、時刻指定欄982で時刻を指定して表示ボタン963をクリックすると、図14のようにトレンドグラフが画像表示装置950に表示される。図14の戻るボタン991をクリックすると図13の画面に戻る。
また、トレンド表示画面の関連情報表示欄984で天気、気温、風向、風速、湿度、日射量のうちの所望の項目を選択して表示ボタン985をクリックすることで、関連情報データベース300に格納された指定時刻の該当項目のデータが表示される。なお、天気については、前述したように、例えば気象庁が一般向けに発信している15種類を用いて表現する。快晴を0、晴れを1、薄曇を2というように、天気の種類に順次14まで番号を割り振り、時刻指定欄985で時間を指定して表示ボタン986をクリックすると、指定した時間のトレンドグラフが図14のように画像表示装置950に表示される。トレンド表示画面の戻るボタン989をクリックすると図11の初期画面に戻る。
6.効果
以上説明したように、本実施の形態では、風力発電装置10の未来の設定時刻における予測発電出力を算出し、その予測発電出力を基に同設定時刻におけるガスタービン発電装置100の目標発電出力を演算し、ガスタービン発電装置100の応答遅延時間を加味して同設定時刻に先行してガスタービン発電装置100を制御する。これにより、風力発電設備10の発電出力の変動に柔軟に対応して自然エネルギー発電プラントの時間当たりの発電出力(風力発電装置10及びガスタービン発電装置100の時間当たりの総発電出力)の変動を抑制することができ、接続する系統で定められた接続条件も満足し得る。
以上説明したように、本実施の形態では、風力発電装置10の未来の設定時刻における予測発電出力を算出し、その予測発電出力を基に同設定時刻におけるガスタービン発電装置100の目標発電出力を演算し、ガスタービン発電装置100の応答遅延時間を加味して同設定時刻に先行してガスタービン発電装置100を制御する。これにより、風力発電設備10の発電出力の変動に柔軟に対応して自然エネルギー発電プラントの時間当たりの発電出力(風力発電装置10及びガスタービン発電装置100の時間当たりの総発電出力)の変動を抑制することができ、接続する系統で定められた接続条件も満足し得る。
また、このように時間当たりの総発電出力を安定させることができるので、総発電出力が許容範囲を下回らないように目標総発電量を必要以上に高く設定する必要がなく、余剰発電量の発生を抑制することができる。また、余剰発電出力を活用するために余剰発電出力を消費する電気ボイラや造水装置等の負荷装置を用意する必要がないため、プラントの規模やコストを抑制することができる。発電出力の安定性から汎用性も高く、多種多様な系統に対応可能な自然エネルギー発電プラントが提供できることも大きなメリットである。
加えて、本実施の形態の自然エネルギー発電プラントは、既存の自然エネルギー発電装置を活用することもできる。すなわち、風力発電装置10が既存設備として存在していた場合、制御装置200を含めたガスタービン発電設備をパッケージとして既存の風力発電装置10に追加設置することで、単独では不安定電源であった既存の風力発電装置10を、例えば接続系統の要求に見合った安定電源に改良することができる。
また、図5で説明したように風力発電予測部400や制御部500(データ更新部516)によって、風力発電装置10が演算する予測発電出力、及びガスタービン発電出力100が演算する応答遅延時間の予測値の精度が運用時間に伴って向上し得るので、ガスタービン発電装置100の制御の信頼性を時間とともに向上させることができる。
(第2の実施の形態)
図15は本発明の第2の実施の形態に係る自然エネルギー発電プラントの全体構成を表す概略図であって図1に対応する図である。この図において第1の実施の形態と同様の部分には既出図面と同符号を付して説明を省略する。
図15は本発明の第2の実施の形態に係る自然エネルギー発電プラントの全体構成を表す概略図であって図1に対応する図である。この図において第1の実施の形態と同様の部分には既出図面と同符号を付して説明を省略する。
本実施の形態が第1の実施の形態と相違する点は、自然エネルギー発電装置として風力発電装置10に代えて太陽光発電装置1000を用いている点である。太陽光発電装置1000は複数の太陽光パネル1100からなる発電装置である。また、制御装置200には、風力発電予測部400に代えて太陽光発電予測部401が設けられている。
図16は太陽光発電予測部の予測演算機能の動作説明のためのモデル図であって図5に対応する図である。
同図に示すように、太陽光発電予測部401は、それぞれノードを有する入力層、中間層及び出力層を備えたモデルである点で風力発電予測部400と共通するが、風速の代わりに日射量を必須の入力値としている点で風力発電装置400と相違する。また、同じ日射量であっても湿度によって太陽光の散乱度合が変わるため、湿度も重要な入力値である。これら入力値から太陽光発電出力の演算モデルを学習する手順は風力発電予測部400と同様である。自然エネルギー発電装置の種類が異なるので関連する計測値は異なり得るが、その他の装置やガスタービン発電装置100に対する指令値150の出力手順については第1の実施の形態と同様である。
本実施の形態においても、太陽光発電装置1000の予測発電出力を基に設定時間後のガスタービン発電装置100の目標発電出力を演算し、応答遅延時間を加味してガスタービン発電装置100を先行制御することで、太陽光発電設備1000の発電出力の変動に柔軟に対応してプラントの発電出力の変動を抑制できる等、第1の実施の形態と同様の効果が得られる。
(第3の実施の形態)
図17は本発明の第3の実施の形態に係る自然エネルギー発電プラントの全体構成を表す概略図であって図1に対応する図である。この図において第1の実施の形態と同様の部分には既出図面と同符号を付して説明を省略する。
図17は本発明の第3の実施の形態に係る自然エネルギー発電プラントの全体構成を表す概略図であって図1に対応する図である。この図において第1の実施の形態と同様の部分には既出図面と同符号を付して説明を省略する。
本実施の形態が第1の実施の形態と相違する点は、ガスタービン発電装置110を追加してガスタービン発電装置を複数(本実施の形態では2つ)にした点である。ガスタービン発電装置11はガスタービン発電装置10と同一のものでも良いし、仕様の異なるものでも良い。ガスタービン発電装置100と同様、ガスタービン発電装置110は制御装置200との間で計測値160及び指令値170を授受する。その他の構成は第1の実施の形態と同様である。
本実施の形態の場合、ガスタービン発電装置100,110の運用方法によって得られる効果に差が生じる。例えばガスタービン発電装置100,110の双方を第1の実施の形態と同じように風力発電装置10の発電出力の変動に応じて制御する場合には、ガスタービン発電装置100,110の双方を図6のフローチャートに従って制御する。但し、要求されるガスタービン発電出力をガスタービン発電装置100,110に適当な比率(例えば1:1)で分担させ、各分担分の発電出力を図6のフローチャートのステップS503における目標発電出力として個々に定める。この場合、プラントの規模が異なってくるが基本的に第1の実施の形態と同様の効果が得られる。
他方、例えば周波数の安定化を目的として一方のガスタービン発電装置100を一定負荷で運転し、もう一方のガスタービン発電装置110を第1の実施の形態のように変動負荷で運転することもできる。この場合、図6のステップ503では、目標総発電出力から風力発電装置10の予測発電出力とガスタービン発電装置100の発電出力の和を減算してガスタービン発電装置110の目標発電出力を算出する。その際、ガスタービン発電装置100によって周波数の変動が抑制されるので、ガスタービン発電装置110の発電出力を変動させる際に図7で説明したような負荷変化率の上限を定める必要はなく、最大負荷変化率を採用する。この場合、ガスタービン発電装置110の発電出力の応答性が向上する。
(その他)
なお、前にも述べたが、火力発電装置にはガスタービン発電装置100,110に限らず、コンバインドサイクル発電装置等、ガスタービンを含む発電装置を適用することができる。また、自然エネルギー発電装置についても、風力発電装置10や太陽光発電装置1000に限定されず、例えば波力発電装置等の他の自然エネルギー発電装置も対象となり得る。また、関連情報データベース300や運転情報データベース600等のデータベースが制御装置200に含まれる場合を例に挙げて説明したが、制御装置200とは別個の記憶装置が適用できることは言うまでもない。制御装置200の各機能部はそれぞれ別個の装置に分かれていても構わない。また、運転情報データベース600や関連情報データベース300の格納情報や各種情報、設定等を画像表示装置950に表示出力する場合を例に挙げて説明したが、これら情報の出力態様は表示装置への表示出力に限らず、プリンターへの印刷出力やスピーカーへの音声出力等、他の出力態様であっても良い。
なお、前にも述べたが、火力発電装置にはガスタービン発電装置100,110に限らず、コンバインドサイクル発電装置等、ガスタービンを含む発電装置を適用することができる。また、自然エネルギー発電装置についても、風力発電装置10や太陽光発電装置1000に限定されず、例えば波力発電装置等の他の自然エネルギー発電装置も対象となり得る。また、関連情報データベース300や運転情報データベース600等のデータベースが制御装置200に含まれる場合を例に挙げて説明したが、制御装置200とは別個の記憶装置が適用できることは言うまでもない。制御装置200の各機能部はそれぞれ別個の装置に分かれていても構わない。また、運転情報データベース600や関連情報データベース300の格納情報や各種情報、設定等を画像表示装置950に表示出力する場合を例に挙げて説明したが、これら情報の出力態様は表示装置への表示出力に限らず、プリンターへの印刷出力やスピーカーへの音声出力等、他の出力態様であっても良い。
10 風力発電装置(自然エネルギー発電装置)
100,110 ガスタービン発電装置(火力発電装置)
150,170 指令値
300 関連情報データベース
400 風力発電予測部(発電予測部)
401 太陽光発電予測部(発電予測部)
511 目標演算部
512 指令演算部
513 応答特性データベース
514 遅延時間演算部
515 指令出力部
516 データ更新部
600 運転情報データベース
962 時刻指定部
964 特性状態表示(出力部)
965 設定条件欄(入力部)
981 計測信号表示欄(出力部)
982,985 時刻指定部
1000 太陽光発電装置(自然エネルギー発電装置)
100,110 ガスタービン発電装置(火力発電装置)
150,170 指令値
300 関連情報データベース
400 風力発電予測部(発電予測部)
401 太陽光発電予測部(発電予測部)
511 目標演算部
512 指令演算部
513 応答特性データベース
514 遅延時間演算部
515 指令出力部
516 データ更新部
600 運転情報データベース
962 時刻指定部
964 特性状態表示(出力部)
965 設定条件欄(入力部)
981 計測信号表示欄(出力部)
982,985 時刻指定部
1000 太陽光発電装置(自然エネルギー発電装置)
Claims (14)
- 燃料の反応熱エネルギーを電力に変換する火力発電装置と、
自然エネルギー発電装置の未来の設定時刻における予測発電出力を算出する発電予測部と、
前記予測発電出力を基に前記設定時刻における前記火力発電装置の目標発電出力を演算する目標演算部と、
前記火力発電装置の発電出力が前記目標発電出力となるような前記火力発電装置への指令値を演算する指令演算部と、
前記設定時刻から前記火力発電装置の応答遅延時間だけ先行して前記指令値を前記火力発電装置に出力する指令出力部と
を備えたことを特徴とする火力発電設備。 - 請求項1の火力発電設備において、
気象情報を含む自然エネルギーに関連する情報を格納した関連情報データベースと、
この関連情報データベースの情報を基に前記予測発電出力を演算する前記発電予測部と
を備えたことを特徴とする火力発電設備。 - 請求項1の火力発電設備において、
前記目標発電出力は、前記自然エネルギー発電装置及び前記火力発電装置の総発電出力の目標値から前記予測発電出力を減算した値であることを特徴とする火力発電設備。 - 請求項1の火力発電設備において、
前記発電予測部は、前記自然エネルギー発電装置の予測発電出力の計測値に対する誤差が許容値以上である場合、予測発電出力の演算モデルを修正することを特徴とする火力発電設備。 - 請求項1の火力発電設備において、
前記火力発電装置の応答遅延時間の予測値を記憶した応答特性データベースと、
この応答特性データベースの応答遅延時間の予測値の計測値に対する誤差が許容値以上である場合、その誤差分だけ前記応答遅延時間の予測値を修正し更新するデータ更新部と
を備えたことを特徴とする火力発電設備。 - 請求項1の火力発電設備において、
作動流体の温度を含む運転情報を格納した運転情報データベースと、
この運転情報データベースの情報を基に前記火力発電装置の応答遅延時間の予測値を演算する遅延時間演算部と
を備えたことを特徴とする火力発電設備。 - 請求項1の火力発電設備において、
前記自然エネルギー発電装置及び前記火力発電装置の総発電出力の許容変動幅を入力する入力部を備えたことを特徴とする火力発電設備。 - 請求項1の火力発電設備において、
過去の時刻を指定する時刻指定部と、
指定時刻における前記予測発電出力の計測値に対する誤差を出力する出力部と
を備えたことを特徴とする火力発電設備。 - 請求項1の火力発電設備において、
過去の時刻を指定する時刻指定部と、
指定時刻における前記自然エネルギー発電装置及び前記火力発電装置の運転情報を出力する出力部と
を備えたことを特徴とする火力発電設備。 - 請求項1の火力発電設備と、
前記自然エネルギー発電装置と
を備えたことを特徴とする自然エネルギー発電プラント。 - 前記自然エネルギー発電装置は既存の設備であり、この自然エネルギー発電装置に請求項1の火力発電設備を追加設置して構成したことを特徴とする自然エネルギー発電プラント。
- 自然エネルギー発電装置に火力発電設備を組み合わせた自然エネルギー発電プラントの制御方法であって、
前記自然エネルギー発電装置の未来の設定時刻における予測発電出力を算出し、
前記予測発電出力を基に前記設定時刻における前記火力発電設備の目標発電出力を演算し、
前記火力発電設備の発電出力が前記目標発電出力となるように前記火力発電設備への指令値を演算し、
前記設定時刻よりも前記火力発電設備の応答遅延時間だけ先行して前記指令値を前記火力発電設備に出力する
ことを特徴とする自然エネルギー発電プラントの制御方法。 - 請求項11の自然エネルギー発電プラントの制御方法であって、
前記自然エネルギー発電装置の未来の設定時刻における予測発電出力を算出し、
前記火力発電設備の一方を周波数安定のために負荷一定運転し、
前記火力発電設備の他方に関し、前記予測発電出力を基に前記設定時刻における前記火力発電設備の目標発電出力を演算し、
前記火力発電設備の発電出力が前記目標発電出力となるように前記火力発電設備への指令値を演算し、
前記設定時刻よりも前記火力発電設備の応答遅延時間だけ先行して前記指令値を前記火力発電設備に出力する
ことを特徴とする自然エネルギー発電プラントの制御方法。 - 請求項11の自然エネルギー発電プラントの制御方法であって、
前記自然エネルギー発電装置の未来の設定時刻における予測発電出力を算出し、
前記予測発電出力を基に前記設定時刻における複数ある前記火力発電設備の目標発電出力を演算し、
複数ある前記火力発電設備の合計発電出力が前記目標発電出力となるように前記火力発電設備への指令値を演算し、
前記設定時刻よりも前記火力発電設備の応答遅延時間だけ先行して前記指令値を前記火力発電設備に出力する
ことを特徴とする自然エネルギー発電プラントの制御方法。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201280073074.7A CN104272200B (zh) | 2012-06-29 | 2012-06-29 | 火力发电设备、自然能源发电工厂及其控制方法 |
PCT/JP2012/066782 WO2014002274A1 (ja) | 2012-06-29 | 2012-06-29 | 火力発電設備、自然エネルギー発電プラント及びその制御方法 |
JP2014522342A JP5876153B2 (ja) | 2012-06-29 | 2012-06-29 | 火力発電設備、自然エネルギー発電プラント及びその制御方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2012/066782 WO2014002274A1 (ja) | 2012-06-29 | 2012-06-29 | 火力発電設備、自然エネルギー発電プラント及びその制御方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014002274A1 true WO2014002274A1 (ja) | 2014-01-03 |
Family
ID=49782497
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2012/066782 WO2014002274A1 (ja) | 2012-06-29 | 2012-06-29 | 火力発電設備、自然エネルギー発電プラント及びその制御方法 |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP5876153B2 (ja) |
CN (1) | CN104272200B (ja) |
WO (1) | WO2014002274A1 (ja) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104701889A (zh) * | 2015-03-16 | 2015-06-10 | 东北电力大学 | 风电场群风能时空分布差异性定量评价方法 |
JP2017099269A (ja) * | 2015-11-18 | 2017-06-01 | ゼネラル・エレクトリック・カンパニイ | 電力資産を制御および監視するためのシステムおよび方法 |
JP2019503155A (ja) * | 2015-11-24 | 2019-01-31 | ヴォッベン プロパティーズ ゲーエムベーハー | 風力発電設備または風力発電所のための制御命令またはイベントメッセージの出力方法、そのための評価装置およびシステム |
JP2020043757A (ja) * | 2016-05-12 | 2020-03-19 | 株式会社日立製作所 | 電力供給システム |
US10637341B2 (en) | 2016-07-22 | 2020-04-28 | Mitsubishi Power Systems, Ltd. | Two-shaft gas turbine power generating facility and control method for same |
US11181045B2 (en) | 2016-08-31 | 2021-11-23 | Mitsubishi Power, Ltd. | Two-shaft gas turbine power generation equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11159436A (ja) * | 1997-11-26 | 1999-06-15 | Hitachi Eng & Service Co Ltd | 風力発電システム |
JP2004289918A (ja) * | 2003-03-20 | 2004-10-14 | Fujitsu Ltd | 電力供給方法 |
JP2004312797A (ja) * | 2003-04-02 | 2004-11-04 | Tokyo Gas Co Ltd | 出力電力補償システム |
JP2006050691A (ja) * | 2004-07-30 | 2006-02-16 | Canon Inc | 発電装置およびその制御方法 |
JP2011142790A (ja) * | 2010-01-08 | 2011-07-21 | Fuji Electric Co Ltd | 太陽光発電量予測システムおよび太陽光発電量予測方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005312163A (ja) * | 2004-04-20 | 2005-11-04 | Canon Inc | 発電制御装置及び発電システム |
US20090212563A1 (en) * | 2008-02-21 | 2009-08-27 | General Electric Company | System and method for improving performance of power constrained wind power plant |
JP4604111B2 (ja) * | 2008-06-12 | 2010-12-22 | 株式会社日立製作所 | 風力発電装置および風力発電装置群 |
CN101892877A (zh) * | 2010-07-20 | 2010-11-24 | 华北电力大学(保定) | 一种可再生能源辅助燃煤的混合发电系统 |
CN201924972U (zh) * | 2011-01-07 | 2011-08-10 | 中国电力工程顾问集团公司 | 太阳能发电与火力发电复合的汽轮发电机组 |
-
2012
- 2012-06-29 JP JP2014522342A patent/JP5876153B2/ja active Active
- 2012-06-29 CN CN201280073074.7A patent/CN104272200B/zh active Active
- 2012-06-29 WO PCT/JP2012/066782 patent/WO2014002274A1/ja active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11159436A (ja) * | 1997-11-26 | 1999-06-15 | Hitachi Eng & Service Co Ltd | 風力発電システム |
JP2004289918A (ja) * | 2003-03-20 | 2004-10-14 | Fujitsu Ltd | 電力供給方法 |
JP2004312797A (ja) * | 2003-04-02 | 2004-11-04 | Tokyo Gas Co Ltd | 出力電力補償システム |
JP2006050691A (ja) * | 2004-07-30 | 2006-02-16 | Canon Inc | 発電装置およびその制御方法 |
JP2011142790A (ja) * | 2010-01-08 | 2011-07-21 | Fuji Electric Co Ltd | 太陽光発電量予測システムおよび太陽光発電量予測方法 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104701889A (zh) * | 2015-03-16 | 2015-06-10 | 东北电力大学 | 风电场群风能时空分布差异性定量评价方法 |
JP2017099269A (ja) * | 2015-11-18 | 2017-06-01 | ゼネラル・エレクトリック・カンパニイ | 電力資産を制御および監視するためのシステムおよび方法 |
JP7053141B2 (ja) | 2015-11-18 | 2022-04-12 | ゼネラル・エレクトリック・カンパニイ | 電力資産を制御および監視するためのシステムおよび方法 |
JP2019503155A (ja) * | 2015-11-24 | 2019-01-31 | ヴォッベン プロパティーズ ゲーエムベーハー | 風力発電設備または風力発電所のための制御命令またはイベントメッセージの出力方法、そのための評価装置およびシステム |
US10781793B2 (en) | 2015-11-24 | 2020-09-22 | Wobben Properties Gmbh | Method for outputting control instructions or event messages for a first wind farm based on data received from a second wind farm |
JP2020043757A (ja) * | 2016-05-12 | 2020-03-19 | 株式会社日立製作所 | 電力供給システム |
US10637341B2 (en) | 2016-07-22 | 2020-04-28 | Mitsubishi Power Systems, Ltd. | Two-shaft gas turbine power generating facility and control method for same |
US11181045B2 (en) | 2016-08-31 | 2021-11-23 | Mitsubishi Power, Ltd. | Two-shaft gas turbine power generation equipment |
Also Published As
Publication number | Publication date |
---|---|
JP5876153B2 (ja) | 2016-03-02 |
CN104272200A (zh) | 2015-01-07 |
CN104272200B (zh) | 2016-10-12 |
JPWO2014002274A1 (ja) | 2016-05-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6248124B2 (ja) | 再生可能エネルギー対応ガスタービンおよびその制御方法 | |
JP5876153B2 (ja) | 火力発電設備、自然エネルギー発電プラント及びその制御方法 | |
EP3096006B1 (en) | System and methods for controlling noise propagation of wind turbines | |
JP6228316B2 (ja) | 発電システムおよび発電方法 | |
Munteanu et al. | Optimization of variable speed wind power systems based on a LQG approach | |
CN101919134B (zh) | 用于风力涡轮发电机的基于事件的控制系统及控制方法 | |
DK2581600T3 (en) | Method and system for managing wind turbines | |
US9217416B2 (en) | Wind turbine having a control method and controller for performing predictive control of a wind turbine generator | |
US8150641B2 (en) | System, device, and method for estimating possible power output of wind turbines | |
Lin et al. | Coordinated mechanical loads and power optimization of wind energy conversion systems with variable-weight model predictive control strategy | |
EP2910743B1 (en) | Method and system for optimization of combined cycle power plant | |
CN105048499B (zh) | 基于模型预测控制的风电并网实时调度方法及系统 | |
US20130115082A1 (en) | Independent blade pitch control | |
EP3741991B1 (en) | Method for dynamic real-time optimization of the performance of a wind park and wind park | |
CA2704988C (en) | Wind-turbine-dynamic-characteristics monitoring apparatus and method therefor | |
WO2018047564A1 (ja) | 風力発電装置の状態監視装置及びそれを有する状態監視システム並びに風力発電装置の状態監視方法 | |
US10474177B2 (en) | System and method for stability monitoring, analysis and control of electric power systems | |
CN103745281B (zh) | 热电联产机组的n段区间电负荷预测寻优方法 | |
JP2018178900A (ja) | 風力発電システム | |
Poushpas | Wind farm simulation modelling and control | |
JP2014062512A (ja) | ガスタービン制御装置及び制御方法並びに発電システム | |
Mirzaei | Wind turbine control: Robust model based approach | |
Stock et al. | Design and implementation of a wind farm controller using aerodynamics estimated from LIDAR scans of wind turbine blades | |
Kanev et al. | Dynamic robust active wake control | |
Agabus et al. | ESTIMATION OF WIND POWER PRODUCTION THROUGH SHORT-TERM FORECAST. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12879861 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2014522342 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 12879861 Country of ref document: EP Kind code of ref document: A1 |