WO2013139141A1 - 螺旋牵拉与推进联合自行进掘进装置 - Google Patents

螺旋牵拉与推进联合自行进掘进装置 Download PDF

Info

Publication number
WO2013139141A1
WO2013139141A1 PCT/CN2012/085789 CN2012085789W WO2013139141A1 WO 2013139141 A1 WO2013139141 A1 WO 2013139141A1 CN 2012085789 W CN2012085789 W CN 2012085789W WO 2013139141 A1 WO2013139141 A1 WO 2013139141A1
Authority
WO
WIPO (PCT)
Prior art keywords
spiral
pulling
cylinder
propelled
driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2012/085789
Other languages
English (en)
French (fr)
Chinese (zh)
Inventor
卢清国
卢丹蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to JP2015500746A priority Critical patent/JP5771764B2/ja
Publication of WO2013139141A1 publication Critical patent/WO2013139141A1/zh
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10—Making by using boring or cutting machines
    • E21D9/1093—Devices for supporting, advancing or orientating the machine or the tool-carrier
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10—Making by using boring or cutting machines
    • E21D9/11—Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines
    • E21D9/112—Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines by means of one single rotary head or of concentric rotary heads
    • E21D9/113—Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines by means of one single rotary head or of concentric rotary heads having a central part for making a pilot tunnel and a follow-up part for enlarging the pilot tunnel

Definitions

  • the invention relates to a tunneling device and a tunneling method, which provides a new type of tunneling device and method with self-walking forward and turning functions for underground tunnel construction technology, and provides technology for more fully exploiting and utilizing underground space. Support, belonging to the field of trenchless underground tunnels or pipeline construction.
  • the present invention proposes a spiral traction and propulsion joint propulsion self-excavation device.
  • the invention adopts the following technical scheme - the cyclone pulling and propelling combined self-propelled tunneling device, the device comprises more than one cylinder, the cylinders are connected to each other; the first section is fixed on the axis of the cylinder
  • the cycloiding device rotates about its own axis, and the free end of the excavation protrudes into the soil in front of the boring device.
  • the cyclotron pulling device is coupled to a power drive source.
  • the auger Arranging the auger in pairs in the circumferential direction of the cylinder as the driving section; the auger is composed of a cylinder or a rod or body having a cylindrical or polygonal cross section as a rotating shaft and a crepe winding wound in the circumferential direction thereof
  • the axis of the auger is parallel to the axis of the barrel; the auger is twisted inside or behind the tunneling device
  • the tunneling device cylinders are connected by hydraulic cylinders.
  • the spiral pulling device is a solid or hollow shaft which can be externally wound and can bear the axial pulling force, or a shaftless spiral pulling device or a steel skeleton with an embossed structure which can bear the axial pulling force.
  • the power driving source for rotating the driving screw mechanism is arranged inside the tunneling device or in the ramp outside the tunneling device Or placed on the side of the ramp.
  • the driving mode of the driving power source for driving the rotation mechanism is a driving source to drive a screw pulling device to rotate, or a driving source to drive a plurality of screw pulling devices to rotate through a transmission mechanism.
  • the cross-sectional form of the helical puller thread may be triangular, square, trapezoidal, zigzag, circular arc, or circular polygon.
  • the spiral pulling device is connected to the first-section cylinder by a radial bearing or a thrust bearing.
  • the screw pulling device is used for pairing left and right directions; the thread of the twisting and pulling device is a single thread or a multi-start thread.
  • the cyclotron propulsion device is arranged to raise the pressure on the working face soil before the excavating device is advanced;
  • the screwing device pulls all the threads of the auger device to the outside of the tunneling device cylinder or a portion of the thread extending out of the cylinder of the tunneling device.
  • the fraudulent process of the device of the present invention is as follows:
  • the axis is offset to the right; when it is desired to make an upward turn, the axis of the helical pulling device is shifted upwards; when it is intended to turn downward, the axis of the cycloiding device is offset downward.
  • the boring device consisting of a multi-section cylinder, also needs to adopt the A method or the B method, and when the vehicle wants to turn to the left, control the hydraulic cylinder on the right side of the barrel before the extension; Turn right When the hydraulic cylinder on the left side of the front barrel is controlled to be extended; when it is necessary to turn the lining to the raft, the hydraulic cylinder on the lower side of the inner cylinder of the control front is extended; when it is necessary to turn downward At the time of the control, the hydraulic cylinder on the upper side of the inner tube of the previous connection is controlled to extend.
  • the invention uses one or more spring-type spiral or outer spiral end arranged in front of the working face of the tunnel boring device to screw in the soil in the direction of the work front, and the other end of the spiral is connected with the bearing of the boring device, when the spiral is swirling into the soil
  • the tunneling device of the excavating device is driven to advance in the direction of the screwing of the jacking, and the excavating device in front of the excavating device is used to realize the driving technology and corresponding device of the self-driven walking excavation tunnel in the underground soil.
  • the method and device of the invention are combined with manual excavation or mechanical excavation in front, so that the excavation device can be realized.
  • the function of the tunneling device body which is equipped with a front screw pulling device, can be used in the soil.
  • a multi-section boring device body equipped with a screw propulsion device can be matched behind the first section of the boring device cylinder, or a resistance-increasing component and the surrounding body outside the cylinder of the boring device can be matched.
  • the embedding and drag-resisting sleeve of the soil constitutes a self-propelled tunneling device group that constitutes the front spiral pulling and the outer spiral propulsion of the cylinder; the integrated overall improves the thrust in front of the entire working surface, forming a dependence on the current use technology
  • the tunneling technology that the rear artificial structure can advance is also different from the self-propelled tunneling technology and device that relies on the artificially increased resistance outside the tunneling cylinder. It is also different from the tunneling propulsion device that is arranged on the outer side of the tunneling cylinder. Self-propelled tunneling technology and equipment.
  • the shaft is pulled by the shaft or the shaftless single or multi-turning pulling device on the front section of the tunneling device.
  • One end of the device is screwed into the soil in front of the tunnel or the pipe digging machine, and the spiral pulling device is spiraled.
  • the helical rotating motion of the tensioning device of the pulling device is a linear motion, so that the other end of the screw pulling device fixed in the driving device pulls the driving device forward or spirals in the opposite direction of the spiral pulling device. Push the boring device back backwards.
  • the principle of providing a screw-pull forward self-driven walking tunneling technology for a tunneling device and a device thereof is that inside the front casing of the tunneling device, a plurality of one ends are arranged in the tunneling device, and the torque driving source drives the rotation, and one end is extended. Rotating the spiral pulling device in front of the front section of the boring device and screwing into the soil in front of the working surface, so that the boring device can advance or retreat in the soil body.
  • an L (L ⁇ l) joint cylinder body with a screw propulsion device in each section may be used to form a tunneling device composed of a plurality of self-driving sections. The tunnel is excavated by self-driving in the rock and soil body.
  • the boring device can also be combined with the self-propelled method and corresponding device of other self-propelled boring devices to form a self-propelled integrated technology and device for multi-technology driving boring devices.
  • Figure 1 Schematic diagram of the excavation tunnel for the screw-pull and screw-push combination boring device
  • FIG. 1 Schematic diagram of the front of the tunneling device
  • FIG. 3 Schematic diagram of the rear of the tunneling device
  • a cutter head 4 is mounted on the front end of the boring device 6, and a cutter 3 for cutting the soil body 1 is mounted on the cutter head 4, and the rotation of the cutter head 4 is driven by the cutter drive gear 5 engaged with it, the cutter
  • the disk drive gear 5 is coupled to the torque drive source 11 via a bearing 9, a cutter drive shaft 7, and a cutter drive coupling 10, and drives the cutter 3 on the cutter head 4 to cut the soil 1.
  • the advanced cyclone pulling device 2 which protrudes into the soil 1, drives the shaft 14 through the screw pulling device, and then passes through the screw pulling device coupling ⁇ to the torque driving source 18 located in the working space behind the roadheader.
  • the advanced pulling screw device 2 rotates inside the soil 1 and acts on the partition plate 8 through the thrust bearing, and pulls the boring M6 forward.
  • the chip body of the soil 1 cut by the cutter 3 on the cutter head 4 falls into the soil bin in front of the partition plate 8, and is transported through the unloading port 19 to the tunnel 13 which has been excavated behind the roadheader, and then transported by other transportation means. Go outside the tunnel. While the advance pulling device pulls the boring machine forward, the auger 12 around the wall of the boring machine pushes the boring machine 6 forward by the torque driving source 18 disposed in the working chamber behind the boring machine.
  • the same drive source can be used for the cutter head 4 and the lead screw puller 2, that is, when the screw drive device 18 is used to drive the source 18, the cutter drive gear 5 meshing with the cutter head 4 can be engaged by the center drive wheel 15. While driving the lead screw pulling device 2, the cutter head 4 is rotated. In this driving mode, the leading screw 2 can be rotated or rotated separately by the cutter head 4.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
PCT/CN2012/085789 2012-03-20 2012-12-04 螺旋牵拉与推进联合自行进掘进装置 Ceased WO2013139141A1 (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015500746A JP5771764B2 (ja) 2012-03-20 2012-12-04 螺旋牽引及び推進複合型自走式掘進装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201210074610.7A CN102619529B (zh) 2012-03-20 2012-03-20 螺旋牵拉与推进联合自行进掘进装置
CN201210074610.7 2012-03-20

Publications (1)

Publication Number Publication Date
WO2013139141A1 true WO2013139141A1 (zh) 2013-09-26

Family

ID=46559710

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2012/085789 Ceased WO2013139141A1 (zh) 2012-03-20 2012-12-04 螺旋牵拉与推进联合自行进掘进装置

Country Status (3)

Country Link
JP (1) JP5771764B2 (enExample)
CN (1) CN102619529B (enExample)
WO (1) WO2013139141A1 (enExample)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487917A (zh) * 2018-04-25 2018-09-04 中铁隧道局集团有限公司 一种隧道管片手孔封堵器及方法
CN115234243A (zh) * 2022-06-24 2022-10-25 中铁十九局集团第一工程有限公司 一种敞开式tbm撑靴缓冲回正装置
CN116696363A (zh) * 2023-07-17 2023-09-05 山东方大工程有限责任公司 一种综掘机辅助牵引装置

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619529B (zh) * 2012-03-20 2014-06-18 北京工业大学 螺旋牵拉与推进联合自行进掘进装置
CN102913252B (zh) * 2012-11-09 2015-01-07 北京工业大学 一种自进式岩石隧道连续掘进装置和方法
CN105863663B (zh) * 2016-06-08 2019-02-05 薛恒鹤 一种用于隧道暗挖机的刨土装置
CN108643927A (zh) * 2018-03-23 2018-10-12 岩土科技股份有限公司 土体穿梭机
CN109209399B (zh) * 2018-11-14 2020-08-14 卢清国 一种岩土散状体中通道掘进的套筒式自驱动前行掘进装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050428A (zh) * 1989-09-20 1991-04-03 苏联科学院西伯利亚分院南方研究所 巷道掘进机
CN201588634U (zh) * 2010-01-15 2010-09-22 北京工业大学 自行走隧管道掘进机
JP2011184947A (ja) * 2010-03-09 2011-09-22 Nishimatsu Constr Co Ltd シールド機
CN102287201A (zh) * 2011-08-04 2011-12-21 王茂 带中心钻系统的盾构机
CN102587919A (zh) * 2012-03-20 2012-07-18 北京工业大学 一种多螺旋自驱动行走式隧道掘进装置及方法
CN102619528A (zh) * 2012-03-20 2012-08-01 北京工业大学 一种土中螺旋牵拉自行走式隧道掘进装置及掘进方法
CN102619529A (zh) * 2012-03-20 2012-08-01 北京工业大学 螺旋牵拉与推进联合自行进掘进装置

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5814557B2 (ja) * 1976-04-07 1983-03-19 日立造船株式会社 掘進機
JPS543344A (en) * 1977-06-08 1979-01-11 Japan Dev & Construction Method of excavating underground hole by tunnel boring machine
JPS60175699A (ja) * 1984-02-22 1985-09-09 株式会社加賀田組 牽引式シ−ルド掘進法
JPH0489993A (ja) * 1990-07-31 1992-03-24 Komatsu Ltd 自走式回転掘削形地中掘進機
JPH05302495A (ja) * 1992-04-24 1993-11-16 Fujita Corp シールド工法及びシールド機
JPH0681581A (ja) * 1992-09-02 1994-03-22 Fujita Corp シールド掘進機
JPH0791170A (ja) * 1993-09-20 1995-04-04 Kajima Corp シールド工法
JPH0874493A (ja) * 1994-09-08 1996-03-19 Ohbayashi Corp トンネルアーチ部の掘進装置
CN1420240A (zh) * 2001-11-20 2003-05-28 王子仲 管型推进机
JP4603990B2 (ja) * 2006-03-06 2010-12-22 株式会社奥村組 横孔掘削装置
CN100494615C (zh) * 2006-03-21 2009-06-03 高为人 非开挖地下管线洞壁涨力推进机
CN201650301U (zh) * 2010-01-15 2010-11-24 北京工业大学 自行走隧管道掘进机筒体驱动结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050428A (zh) * 1989-09-20 1991-04-03 苏联科学院西伯利亚分院南方研究所 巷道掘进机
CN201588634U (zh) * 2010-01-15 2010-09-22 北京工业大学 自行走隧管道掘进机
JP2011184947A (ja) * 2010-03-09 2011-09-22 Nishimatsu Constr Co Ltd シールド機
CN102287201A (zh) * 2011-08-04 2011-12-21 王茂 带中心钻系统的盾构机
CN102587919A (zh) * 2012-03-20 2012-07-18 北京工业大学 一种多螺旋自驱动行走式隧道掘进装置及方法
CN102619528A (zh) * 2012-03-20 2012-08-01 北京工业大学 一种土中螺旋牵拉自行走式隧道掘进装置及掘进方法
CN102619529A (zh) * 2012-03-20 2012-08-01 北京工业大学 螺旋牵拉与推进联合自行进掘进装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487917A (zh) * 2018-04-25 2018-09-04 中铁隧道局集团有限公司 一种隧道管片手孔封堵器及方法
CN115234243A (zh) * 2022-06-24 2022-10-25 中铁十九局集团第一工程有限公司 一种敞开式tbm撑靴缓冲回正装置
CN116696363A (zh) * 2023-07-17 2023-09-05 山东方大工程有限责任公司 一种综掘机辅助牵引装置
CN116696363B (zh) * 2023-07-17 2025-12-19 山东方大工程有限责任公司 一种综掘机辅助牵引装置

Also Published As

Publication number Publication date
JP5771764B2 (ja) 2015-09-02
CN102619529B (zh) 2014-06-18
JP2015510974A (ja) 2015-04-13
CN102619529A (zh) 2012-08-01

Similar Documents

Publication Publication Date Title
CN102619529B (zh) 螺旋牵拉与推进联合自行进掘进装置
CN110486031B (zh) 一种井下大断面救援通道顶管快速构建方法
CN116044426B (zh) 可变径盾构机及其施工方法
CN111706348B (zh) 一种市政顶管结构及其施工方法
CN102619528B (zh) 一种土中螺旋牵拉自行走式隧道掘进装置及掘进方法
JP2015510974A5 (enExample)
CN110439580A (zh) 带螺旋驱动的集成化微型掘进机顶推系统及其工作方法
CN105649561B (zh) 一种连续油管牵引器
CN102003145A (zh) 一种孔内驱动式水平定向钻反循环扩孔钻头
CN115773126A (zh) 拼装式可变径盾构机及其施工方法
CN112727491B (zh) 一种顶管施工除土装置
CN116771397A (zh) 一种钻锚一体化钻进装置及其使用方法
CN104329094A (zh) 一种螺旋顶管机及其施工工艺
CN116163756A (zh) 一种联络通道用复合式刀盘
CN102587919B (zh) 一种多螺旋自驱动行走式隧道掘进装置及方法
CN115788466A (zh) 可变径盾构机及其洞内变径施工方法
CN111441725A (zh) 一种近水平螺旋钻杆机用变径钻头
CN120592212A (zh) 一种砂浆锚杆施工装置及砂浆锚杆施工方法
CN207673287U (zh) 一种喷气式高效螺旋钻具
GB2454907A (en) Downhole drilling system
CN116857429B (zh) 一种非开挖原位换管施工装置及方法
CN111608678A (zh) 一种易施工的市政顶管装置
CN215292499U (zh) 一种用于地下涵管顶推施工的掘进机头
CN114109427B (zh) 一种基于水压致裂的快速掘进和锚固装置
CN219176331U (zh) 敞开式tbm

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12871729

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2015500746

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12871729

Country of ref document: EP

Kind code of ref document: A1