- Prior art keywords
- fossil
- steam generator
- power
- steam
- flow
- Prior art date
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
- F01K13/02—Controlling, e.g. stopping or starting
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B35/00—Control systems for steam boilers
- F22B35/06—Control systems for steam boilers for steam boilers of forced-flow type
- F22B35/10—Control systems for steam boilers for steam boilers of forced-flow type of once-through type
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22D—PREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
- F22D11/00—Feed-water supply not provided for in other main groups
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22D—PREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
- F22D11/00—Feed-water supply not provided for in other main groups
- F22D11/003—Emergency feed-water supply
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22G—SUPERHEATING OF STEAM
- F22G5/00—Controlling superheat temperature
- F22G5/02—Applications of combustion-control devices, e.g. tangential-firing burners, tilting burners
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22G—SUPERHEATING OF STEAM
- F22G5/00—Controlling superheat temperature
- F22G5/12—Controlling superheat temperature by attemperating the superheated steam, e.g. by injected water sprays
Definitions
- the invention relates to a method for controlling a short-term increase in output of a steam turbine with an upstream fossil-fueled continuous steam generator with a number of a flow path-forming, flowed through by a flow medium economizer, evaporator and Matterhitzersammlung surfaces.
- a fossil-fueled steam generator produces superheated steam using the heat generated by burning fossil fuels.
- Fossil fueled steam generators are mostly used in steam power plants, which are mainly used for power generation.
- the generated steam is fed to a steam turbine.
- the fossil-fueled steam generator also comprises a plurality of pressure stages with different thermal states of the respectively contained water-steam mixture.
- the first (high) pressure level the flow medium passing through the flow path on its first economiser, to use the residual heat Voricar ⁇ mung of the flow medium, and then various levels of dene ⁇ evaporator and superheater.
- the evaporator the flow medium is evaporated, then separated any residual moisture in a separator and further heated the remaining steam in the superheater. Thereafter, the superheated steam in the high pressure part of the steam turbine flows, is there decompressed, and the following print ⁇ stage of the steam generator is supplied. There he is again supplied via ⁇ hitzt (reheat) and the next-pressure part of the steam turbine.
- the heat output transferred to the superheaters can fluctuate greatly. There- It is often necessary to control the overheating temperature. Usually, this is usually achieved by an injection of feed water before or after individual superheater heating surfaces for cooling, ie, an overflow branch branches off from the main flow of the flow medium and leads to injection coolers arranged accordingly there.
- the injection is customarily controlled by a predetermined for the Tempe ⁇ raturabweichungen by a temperature setpoint at the outlet of the superheater characteristic parameter value with the aid of valves.
- Such power changes of a power plant block in the se ⁇ customer area are possible only by a coordinated interaction of steam generator and steam turbine.
- the contribution of fossil fuel-fired steam generator can do this is by using his memory, ie the steam but also the fuel storage, as well as rapid changes in the controlling variable ⁇ SEN feedwater, injection water, fuel and air.
- This measure an increase in performance is achieved within a few seconds. This additional power can be released in a relatively short time, so that the delayed power increase can be at least partially compensated by the increase in the firing capacity.
- the entire block makes by this measure immediately a jump in performance and can also permanently maintain or exceed this level of performance by a subsequent increase in the firing capacity, ⁇ the system was set at the time of additional requested power reserves in the partial load range.
- a permanent throttling of the turbine valves for Vorhal ⁇ tion of a reserve however, always leads to a loss ⁇ efficiency, so that for an economical driving the degree of throttling should be kept as low as absolutely necessary.
- some types of fossil-fueled steam generators such. B. forced flow steam generator may have a significantly smaller storage volume than z. B. natural circulation steam generator.
- the difference in the size of the memory has an influence on the behavior of changes in the power plant block in the method described above.
- the design pressure in the entire steam generator must not be exceeded, so that this measure in the upper load range only limited or can not be applied.
- This object is achieved according to the invention, by increasing the short-term ⁇ power increase of the steam turbine, the flow of fluid medium through the fossil-fired steam generator.
- the invention is based on the consideration that the introduced heat output into the steam generator is determined by the firing capacity and only has a comparatively slow effect in the event of a sudden change.
- a zusiger ⁇ Liche power delivery in the steam turbine should be performed by a use of the stored in the heating surfaces of the steam generator heat energy. The withdrawal of this heat requires a lowering of the average material temperature. This should be achieved by increasing the flow, ie the amount of flow medium flowing through per unit of time. Due to the higher flow with comparatively lower medium temperatures, the average material temperature of all heating surfaces is lowered by this measure and as a result thermal energy is released from all these heating surfaces and released in the steam turbine in the form of additional power.
- the enthalpy desired value is reduced at the exit of an evaporator heating surface .
- the setpoint value for the specific enthalpy is used in the control system of the Dampferzeu ⁇ gers as a control variable for the determination of the desired value for the flow of the flow medium.
- This switching action has two effects: First, the basic setpoint for the evaporator flow rate calculated in the feedwater setpoint determination increases. Second, the increased Enthalpiekor ⁇ rekturregler - especially when the reduction particularly rapidly (suddenly) is carried out - by now larger anste ⁇ rising control deviation to be output to rapidly as possible to reduce the enthalpy at the evaporator outlet. As a result, the amount of feed water at the beginning of this measure even increases disproportionately and it is a particularly fast storage of heat from the heating surfaces with the associated glossentitati in the steam turbine possible.
- the enthalpy desired value is reduced to a given minimum enthalpy value . This is a ⁇ hand in all load conditions, a maximum tripodentbin- while maintaining operational safety.
- the Swiss-Shenthalpiewert is dimensioned such that in all load conditions of the fossil-fueled steam generator complete Verdamp ⁇ tion of the flow medium is achieved in the evaporator heating.
- Verdamp ⁇ tion of the flow medium is achieved in the evaporator heating.
- subcritical operation namely, should be ensured that the enthalpy at the evaporator ⁇ outlet is not lowered too far and consequently a seizure of residual water in a downstream separator can be safely avoided.
- a maximum increase in additional feed water and thus additional performance relief should be achieved with the safest possible driving.
- the parameters of the measures taken are matched to the required power release in the steam turbine and optimized. For this amount and / or duration of the reduction of Enthalpiesollwerts be determined from the Need Beer ⁇ saturated power increase.
- flow medium removed in the flow path in the region of a superheater heating surface of the steam generator is injected for short-term increase in output of the steam turbine.
- Derar ⁇ term injections can in fact make a further contribution to the short-term rapid change in performance.
- the stored thermal energy is used for ei ⁇ ne temporary increase in power of the steam turbine. This thus results in the additional advantage that a particularly high excess power can be maintained at a constant level over a geeig ⁇ designated coordinating all measures available quickly and as long as possible.
- the material load can also be positively influenced.
- the heat input is increased in the fossil-fired steam generator, that is, increases the firing capacity of the burner.
- a temperature reduction at the evaporator outlet can be favorably influenced or even completely avoided by the described method, since the measure acts as a Vorhaltsignal on the Spei ⁇ sewasser.
- the method not only allows a short-term increase in performance, but is also used for faster adjustment of a longer-term performance increase.
- a control system for a fossil-fired steam generator with a number of flow-forming, flowed through by a flow medium economizer, evaporator and Kochhitzersammlungflä- chen means for carrying out the method.
- a fossil-fired steam generator for a steam power plant comprises such a control system and a steam power plant such a fossil-fired steam generator.
- FIG. 1 shows a diagram with simulation results for improving the instantaneous reserve of a fossil-fired continuous steam generator by increasing the feedwater quantity together with injection of high-pressure steam, reheat steam and in each case in both pressure systems in an upper load range, and
- FIG. 2 shows a diagram with simulation results for improving the immediate reserve of a fossil-fueled continuous steam generator by increasing the amount of feed water together with injection of high-pressure steam, reheat steam and in each case in both pressure systems in a lower load range.
- FIG 1 is a diagram showing simulation results by taking advantage of the control method in a fossil-fired steam generator, ie a sudden reduction in the contained ⁇ piesollwerts at the evaporator outlet to increase the feed water flow at constant ⁇ firing.
- Up ⁇ carry the percent additional power is related to full load 1 against time in seconds after a 2 sprunghaf ⁇ th reduction of the target value of the specific enthalpy at the evaporator outlet to 100 kJ / kg at 95% load.
- This reduction tion provides the control concept for an increase in Lucaswas ⁇ ser diehne.
- Curve 4 shows the result without ⁇ additional use of injections
- curves 6 and 8 represent the results for an additional use of injections in the high pressure stage or in the high-pressure and medium-pressure stage.
- additional cure ⁇ ventool 10 shown 12, 14, which results in high pressure stage without raised stabili ⁇ hung the supply amount of water, but by sole use of injections (curve 10), medium-pressure stage (curve 12) and two pressure stages (curve 14 ) demonstrate.
- the injection is achieved by reducing the setpoint for live steam temperature and, if appropriate, reheaction temperature by 20 K.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Water Supply & Treatment (AREA)
- Control Of Turbines (AREA)
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
Abstract
Description
Claims
Priority Applications (8)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/001,281 US9080467B2 (en) | 2011-02-25 | 2012-02-10 | Method for regulating a brief increase in power of a steam turbine |
DK12705819.6T DK2655811T3 (en) | 2011-02-25 | 2012-02-10 | A method for controlling a transient increase in power a steam turbine |
PL12705819T PL2655811T3 (pl) | 2011-02-25 | 2012-02-10 | Sposób regulacji krótkookresowego wzrostu mocy turbiny parowej |
JP2013554845A JP5815753B2 (ja) | 2011-02-25 | 2012-02-10 | 蒸気タービンの短期間の出力増大を調節するための方法 |
KR1020137022263A KR101818090B1 (ko) | 2011-02-25 | 2012-02-10 | 증기 터빈의 단기간 출력 상승의 조절 방법 |
AU2012219798A AU2012219798B2 (en) | 2011-02-25 | 2012-02-10 | Method for regulating a brief increase in power of a steam turbine |
EP12705819.6A EP2655811B1 (de) | 2011-02-25 | 2012-02-10 | Verfahren zur regelung einer kurzfristigen leistungserhöhung einer dampfturbine |
CN201280019457.6A CN103492678B (zh) | 2011-02-25 | 2012-02-10 | 用于调节汽轮机的短期的功率提高的方法 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102011004712 | 2011-02-25 | ||
DE102011004712.3 | 2011-02-25 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2012113662A2 true WO2012113662A2 (de) | 2012-08-30 |
WO2012113662A3 WO2012113662A3 (de) | 2013-03-21 |
Family
ID=45757393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2012/052312 WO2012113662A2 (de) | 2011-02-25 | 2012-02-10 | Verfahren zur regelung einer kurzfristigen leistungserhöhung einer dampfturbine |
Country Status (8)
Country | Link |
---|---|
US (1) | US9080467B2 (de) |
EP (1) | EP2655811B1 (de) |
JP (1) | JP5815753B2 (de) |
KR (1) | KR101818090B1 (de) |
CN (1) | CN103492678B (de) |
DK (1) | DK2655811T3 (de) |
PL (1) | PL2655811T3 (de) |
WO (1) | WO2012113662A2 (de) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102016218763A1 (de) | 2016-09-28 | 2018-03-29 | Siemens Aktiengesellschaft | Verfahren zur kurzfristigen Leistungsanpassung einer Dampfturbine eines Gas-und Dampfkraftwerks für die Primärregelung |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4933002A (de) | 1972-08-04 | 1974-03-26 | ||
FR2401380A1 (fr) * | 1977-08-23 | 1979-03-23 | Sulzer Ag | Generateur de vapeur a circulation forcee |
EP0308728B1 (de) | 1987-09-21 | 1991-06-05 | Siemens Aktiengesellschaft | Verfahren zum Betreiben eines Durchlaufdampferzeugers |
DE4117796A1 (de) * | 1991-05-30 | 1993-01-21 | Ver Energiewerke Ag | Verfahren zur dampftemperaturregelung an ueberhitzern von dampfanlagen |
JP2563099B2 (ja) | 1992-05-04 | 1996-12-11 | シーメンス アクチエンゲゼルシヤフト | 強制貫流蒸気発生器 |
DE19749452C2 (de) | 1997-11-10 | 2001-03-15 | Siemens Ag | Dampfkraftanlage |
DE19750125A1 (de) | 1997-11-13 | 1999-03-11 | Siemens Ag | Verfahren und Vorrichtung zur Primärregelung eines Dampfkraftwerkblocks |
US6230480B1 (en) * | 1998-08-31 | 2001-05-15 | Rollins, Iii William Scott | High power density combined cycle power plant |
US6766646B1 (en) | 2003-11-19 | 2004-07-27 | General Electric Company | Rapid power producing system and method for steam turbine |
US7690201B2 (en) * | 2005-11-07 | 2010-04-06 | Veritask Energy Systems, Inc. | Method of efficiency and emissions performance improvement for the simple steam cycle |
EP2194320A1 (de) * | 2008-06-12 | 2010-06-09 | Siemens Aktiengesellschaft | Verfahren zum Betreiben eines Durchlaufdampferzeugers sowie Zwangdurchlaufdampferzeuger |
DE102010041964A1 (de) | 2010-10-05 | 2012-04-05 | Siemens Aktiengesellschaft | Verfahren zur Regelung einer kurzfristigen Leistungserhöhung einer Dampfturbine |
US9091182B2 (en) * | 2010-12-20 | 2015-07-28 | Invensys Systems, Inc. | Feedwater heater control system for improved rankine cycle power plant efficiency |
US9316122B2 (en) * | 2010-12-20 | 2016-04-19 | Invensys Systems, Inc. | Feedwater heater control system for improved Rankine cycle power plant efficiency |
-
2012
- 2012-02-10 CN CN201280019457.6A patent/CN103492678B/zh active Active
- 2012-02-10 US US14/001,281 patent/US9080467B2/en active Active
- 2012-02-10 WO PCT/EP2012/052312 patent/WO2012113662A2/de active Application Filing
- 2012-02-10 PL PL12705819T patent/PL2655811T3/pl unknown
- 2012-02-10 DK DK12705819.6T patent/DK2655811T3/en active
- 2012-02-10 KR KR1020137022263A patent/KR101818090B1/ko active IP Right Grant
- 2012-02-10 JP JP2013554845A patent/JP5815753B2/ja not_active Expired - Fee Related
- 2012-02-10 EP EP12705819.6A patent/EP2655811B1/de active Active
Non-Patent Citations (1)
Title |
---|
None |
Also Published As
Publication number | Publication date |
---|---|
PL2655811T3 (pl) | 2016-03-31 |
AU2012219798A1 (en) | 2013-08-29 |
DK2655811T3 (en) | 2016-01-11 |
CN103492678A (zh) | 2014-01-01 |
CN103492678B (zh) | 2016-03-09 |
JP5815753B2 (ja) | 2015-11-17 |
KR101818090B1 (ko) | 2018-01-12 |
WO2012113662A3 (de) | 2013-03-21 |
EP2655811B1 (de) | 2015-10-14 |
EP2655811A2 (de) | 2013-10-30 |
US20130327043A1 (en) | 2013-12-12 |
JP2014508272A (ja) | 2014-04-03 |
KR20140007857A (ko) | 2014-01-20 |
US9080467B2 (en) | 2015-07-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2603672B1 (de) | Abhitzedampferzeuger | |
EP2606206B1 (de) | Verfahren zur regelung einer kurzfristigen leistungserhöhung einer dampfturbine | |
EP2812542B1 (de) | Energiespeicherkraftwerk und verfahren zum betreiben eines solchen kraftwerks | |
DE102009036064B4 (de) | rfahren zum Betreiben eines mit einer Dampftemperatur von über 650°C operierenden Zwangdurchlaufdampferzeugers sowie Zwangdurchlaufdampferzeuger | |
EP3025031B1 (de) | Verfahren zum betreiben einer dampfturbinenanlage | |
EP1421317B1 (de) | Verfahren zum anfahren eines dampferzeugers mit einem in einer annähernd horizontalen heizgasrichtung durchströmbaren heizgaskanal und dampferzeuger | |
CH621187A5 (de) | ||
DE10001995A1 (de) | Verfahren zur Einstellung bzw. Regelung der Dampftemperatur des Frischdampfes und/oder Zwischenüberhitzerdampfers in einem Verbundkraftwerk sowie Verbundkraftwerk zur Durchführung des Verfahrens | |
EP3269948B1 (de) | Verfahren zur anpassung der leistung einer dampfturbinen-kraftwerksanlage und dampfturbinen-kraftwerksanlage | |
EP2616643B1 (de) | Verfahren zur regelung einer kurzfristigen leistungserhöhung einer dampfturbine | |
EP3475539A1 (de) | Verfahren zur kurzfristigen leistungsanpassung einer dampfturbine eines gas-und dampfkraftwerks für die primärregelung | |
DE102012204218A1 (de) | Leistungsregelung und/oder Frequenzregelung bei einem solarthermischen Dampfkraftwerk | |
EP2655811B1 (de) | Verfahren zur regelung einer kurzfristigen leistungserhöhung einer dampfturbine | |
WO2012062708A2 (de) | Fossil befeuerter dampferzeuger | |
WO2015028366A2 (de) | Betriebsverfahren für einen extern beheizten zwangdurchlaufdampferzeuger | |
EP2625390B1 (de) | Fossil befeuerter dampferzeuger | |
WO2013149900A1 (de) | Kraftwerk und verfahren zum betreiben einer kraftwerksanlage | |
WO2014032827A1 (de) | Vorrichtung zur schnellen wirkleistungsänderung von kraftwerksanlagen | |
DE112012001451T5 (de) | Wärmerückgewinnungsdampferzeuger und Kraftwerk | |
WO2014146846A2 (de) | Verfahren zum betreiben eines solarthermischen kraftwerks | |
WO2014056772A1 (de) | Verfahren zum flexiblen betrieb einer kraftwerksanlage | |
AT512176A4 (de) | Abhitzedampferzeuger | |
CH338472A (de) | Verfahren zur Regelung von bei hohem Druck betriebenen Zwangdurchlaufdampferzeugern und Einrichtung zur Durchführung des Verfahrens |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201280019457.6 Country of ref document: CN |
|
DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2012705819 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 2013554845 Country of ref document: JP Kind code of ref document: A Ref document number: 20137022263 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14001281 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2012219798 Country of ref document: AU Date of ref document: 20120210 Kind code of ref document: A |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12705819 Country of ref document: EP Kind code of ref document: A2 |