WO2011158364A1 - 信号機サイクル推定装置及び信号機サイクル推定方法 - Google Patents

信号機サイクル推定装置及び信号機サイクル推定方法 Download PDF

Info

Publication number
WO2011158364A1
WO2011158364A1 PCT/JP2010/060302 JP2010060302W WO2011158364A1 WO 2011158364 A1 WO2011158364 A1 WO 2011158364A1 JP 2010060302 W JP2010060302 W JP 2010060302W WO 2011158364 A1 WO2011158364 A1 WO 2011158364A1
Authority
WO
WIPO (PCT)
Prior art keywords
traffic light
travel time
time
traffic
signal
Prior art date
Application number
PCT/JP2010/060302
Other languages
English (en)
French (fr)
Inventor
輝英 林田
中島 弘貴
美蘭 姜
政二 百済
浩史 奥出
陽太 鈴木
Original Assignee
トヨタ自動車株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by トヨタ自動車株式会社 filed Critical トヨタ自動車株式会社
Priority to US13/499,997 priority Critical patent/US8725397B2/en
Priority to PCT/JP2010/060302 priority patent/WO2011158364A1/ja
Priority to CN201080058826.3A priority patent/CN102687181B/zh
Priority to DE112010005667.6T priority patent/DE112010005667B4/de
Priority to JP2011546485A priority patent/JP5435041B2/ja
Publication of WO2011158364A1 publication Critical patent/WO2011158364A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/01Detecting movement of traffic to be counted or controlled
    • G08G1/0104Measuring and analyzing of parameters relative to traffic conditions
    • G08G1/0125Traffic data processing
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/07Controlling traffic signals
    • G08G1/08Controlling traffic signals according to detected number or speed of vehicles

Definitions

  • the present invention relates to a traffic light cycle estimation apparatus and a traffic light cycle estimation method for estimating traffic signal cycle information.
  • a device described in Japanese Patent Application Laid-Open No. 2009-116508 has been proposed.
  • This publication describes a traffic signal information estimation device that estimates the time when a traffic light is switched to a green signal based on the start time of the probe vehicle when the probe vehicle stops before a traffic light at an intersection.
  • This traffic signal information estimation device uses the distance between the intersection and the probe car to calculate the start delay time from the start of the leading vehicle in the train line stopped by the traffic light to the start of the probe car. By using the time and the start time, it is possible to accurately estimate the time when the traffic light is switched to the green light.
  • the present invention efficiently estimates the traffic signal cycle information based on the first travel time group in which the vehicle has not stopped at the traffic light and the second travel time group in which the vehicle has stopped at the traffic light, so that the traffic signal can be efficiently transmitted. It is an object of the present invention to provide a traffic light cycle estimation apparatus and a traffic light cycle estimation method that can estimate the cycle information of the traffic light.
  • a traffic light cycle estimation apparatus is a travel time acquisition unit that acquires a traffic light section travel time that is a time from when a vehicle enters and passes through a predetermined traffic light section corresponding to a traffic light. And a frequency distribution calculation unit that calculates the frequency distribution of the traffic signal section travel time acquired by the travel time acquisition unit, and the vehicle stops at the traffic light based on the frequency distribution of the traffic signal section travel time calculated by the frequency distribution calculation unit.
  • the travel time group determination unit for determining the first travel time group that did not exist and the second travel time group in which the vehicle stopped at the traffic light
  • a traffic light cycle estimation unit for estimating the cycle information of the traffic light
  • the cycle information of the traffic light is obtained based on the difference between the first travel time group in which the vehicle has not stopped at the traffic light and the second travel time group in which the vehicle has stopped at the traffic light. Since estimation is performed, it is possible to estimate cycle information such as red signal time from traffic light section travel time that is generally obtained by analyzing travel time collected from vehicles. Therefore, according to this traffic light cycle estimation device, it is possible to easily collect necessary data as compared with the case of using a special data collection vehicle for estimation of traffic light cycle information. Can be estimated.
  • the traffic light cycle estimation unit estimates a red signal time of the traffic light based on a difference between the first travel time group and the second travel time group.
  • the traffic light cycle estimation device it is considered that the sum of the red light time of the traffic light and the predetermined yellow light time appears in the difference between the first travel time group and the second travel time group.
  • the red light time of the traffic light can be estimated based on the first travel time group and the second travel time group.
  • the traffic light cycle estimation unit estimates the red signal time of the traffic light based on the difference between the peak value of the first travel time group and the peak value of the second travel time group. It is preferable to do.
  • the sum of the red light time of the traffic light and the predetermined yellow light time is the difference between the peak value of the first travel time group and the peak value of the second travel time group. Since it is considered to be most likely to appear, it is possible to realize a reliable estimation of the red signal time based on the difference between these peak values.
  • the traffic light cycle estimation unit estimates green signal times of a plurality of traffic lights based on red signal times estimated for a plurality of traffic lights provided at the same intersection. It is preferable. According to the traffic light cycle estimation apparatus according to the present invention, since the plurality of traffic lights provided at the same intersection are linked based on a predetermined rule, each of the traffic lights is estimated based on the red signal time estimated for each traffic light. It is possible to estimate the green signal time of the traffic lights.
  • the traffic light cycle estimation method includes a travel time acquisition step for acquiring a traffic light section travel time, which is a time from when a vehicle enters a predetermined traffic light section corresponding to a traffic light until it passes, and a travel time acquisition step.
  • a frequency distribution calculating step for calculating the frequency distribution of the traffic light section travel time acquired, and a first travel in which the vehicle has not stopped at the traffic light based on the frequency distribution of the traffic light section travel time calculated in the frequency distribution calculating step.
  • the cycle information of the traffic light A traffic light cycle estimation step for estimating.
  • traffic light cycle information is estimated based on a first travel time group in which the vehicle has not stopped at a traffic light and a second travel time group in which the vehicle has stopped at a traffic light. Therefore, estimation of cycle information can be realized from the traffic section travel time generally obtained by analyzing travel time collected from the vehicle. Therefore, according to this traffic light cycle estimation method, it is possible to easily collect necessary data compared to the case of using a special data collection vehicle for estimation of traffic light cycle information. Can be estimated.
  • the traffic light cycle estimation method it is preferable to estimate the red light time of the traffic light based on the difference between the first travel time group and the second travel time group in the traffic light cycle estimation step.
  • the traffic light cycle estimation method it is considered that the sum of the red light time of the traffic light and the predetermined yellow light time appears in the difference between the first travel time group and the second travel time group.
  • the red light time of the traffic light can be estimated based on the difference between the first travel time group and the second travel time group.
  • the red signal time of the traffic light is estimated based on the difference between the peak value of the first travel time group and the peak value of the second travel time group. It is preferable.
  • the sum of the traffic light red signal time and the predetermined yellow light time is the difference between the peak value of the first travel time group and the peak value of the second travel time group. Since it is considered that it is most likely to appear, it is possible to realize a reliable estimation of the red signal time based on the difference between these peak values.
  • the traffic light cycle estimation method in the traffic light cycle estimation step, green signal times of a plurality of traffic lights are estimated based on red signal times estimated for a plurality of traffic lights provided at the same intersection. Is preferred. According to the traffic light cycle estimation method according to the present invention, since a plurality of traffic lights provided at the same intersection are linked based on a predetermined rule, each traffic light is estimated based on a red traffic light time estimated for each traffic light. It is possible to estimate the green signal time of the traffic lights.
  • a traffic light cycle estimation system 1 analyzes travel time data collected from a vehicle 10 that is a probe vehicle in a traffic light cycle estimation device 2 installed in a traffic information center. Cycle information of traffic lights such as red signal time is estimated.
  • the travel time data includes position data of the vehicle 10 per unit time.
  • the traffic light cycle estimation system 1 analyzes the travel time data collected from the vehicle 10 and acquires the traffic light section travel time that is the time from when the vehicle enters the predetermined traffic light section corresponding to the traffic light until it passes.
  • a traffic light section is a section preset on the road corresponding to each traffic light.
  • the traffic light cycle estimation system 1 calculates the frequency distribution of the traffic light section travel time for a certain traffic light based on the traffic light section travel time of the plurality of vehicles 10.
  • the traffic light cycle estimation system 1 discriminates a first travel time group in which the vehicle has not stopped at the traffic light and a second travel time group in which the vehicle has stopped at the traffic light based on the frequency distribution of the traffic zone travel time. To do.
  • the traffic light cycle estimation system 1 estimates traffic signal cycle information based on the first travel time group and the second travel time group.
  • FIG. 2 is a diagram showing travel time data of four vehicles AD.
  • the vehicles A to D travel between the two traffic lights La and Lb on the same lane.
  • the horizontal axis represents time
  • the vertical axis represents the position of the vehicle.
  • the vehicles A to D are traveling at a constant speed V except when stopped before the traffic light.
  • H shown in FIG. 2 is the length of the traffic signal section N corresponding to the downstream traffic light Lb among the two traffic lights La and Lb.
  • the traffic light section N is set as a section from a point immediately after passage of the upstream traffic light La to a point immediately after passage of the downstream traffic light Lb.
  • the green signal time of the upstream traffic light La is indicated as Ba, the red signal time as Ra, and the yellow signal time as Ya.
  • the green signal time of the downstream traffic light Lb is shown as Bb, the red signal time as Rb, and the yellow signal time as Yb.
  • Vehicles A to D first enter traffic light section N after passing traffic light La at the same green light time Ba. Thereafter, the vehicle A and the vehicle B pass through the traffic light Lb at the green light time Bb and pass through the traffic light section N. On the other hand, the vehicle C and the vehicle D stop before the traffic light Lb that is switched from the green signal time Bb to the yellow signal time Yb and the red signal time Rb. The vehicles C and D pass through the traffic light section N through the traffic light Lb after the traffic light Lb switches again to the green light time Bb.
  • Fig. 3 shows a graph of the frequency distribution of travel time for traffic lights in the case of Fig. 2.
  • the horizontal axis in FIG. 3 is the traffic section travel time, and the vertical axis is the number of vehicles.
  • a group composed of the traffic section travel times of the vehicles A and B that have not stopped at the traffic light Lb is defined as a first travel time group Ga.
  • the traffic section travel time of the first travel time group Ga is defined as free-flow travel time F.
  • a group consisting of the traffic section travel times of the vehicles C and D stopped at the traffic light Lb is defined as a second travel time group Gb.
  • a traffic light section travel time of the second travel time group Gb is defined as a traffic light stop travel time K.
  • the free-flow travel time F of the first travel time group Ga corresponds to a value obtained by dividing the length H of the traffic light section N by the speed V.
  • the traffic light stop travel time K of the second travel time group Gb is the difference between T2 and T1 in the free-flow travel time F of the first travel time group Ga, that is, the sum of the yellow signal time Yb and the red signal time Rb. Approximately equivalent to the time added.
  • a difference between the traffic signal stop travel time K and the free-flow travel time F is defined as a signal delay time P.
  • This signal delay time P is a time length corresponding to the total time of the yellow signal time Yb and the red signal time Rb of the traffic light Lb.
  • FIG. 4 is a graph of the frequency distribution of traffic signal section travel times calculated from travel time data of many vehicles for a certain traffic light.
  • the frequency of the traffic light section travel time is summarized in units of 10 seconds.
  • the frequency distribution varies due to differences in vehicle travel conditions and the like.
  • the first travel time group Ga and the second travel time group Gb are each represented as a mountain graph.
  • the peak value that is the traffic light section travel time with the largest number in the first travel time group Ga is considered to be the traffic light section travel time of a standard vehicle
  • the peak value is determined as the free-flow travel time F.
  • Adopt as.
  • the peak value in the second travel time group Gb is adopted as the traffic light stop travel time K.
  • FIG. 5 is a graph showing the frequency distribution of the signal delay time P.
  • the calculation of the signal delay time P performed based on the travel time data collected within a predetermined unit time is counted as one time.
  • the frequency distribution of the signal delay time P is generally represented as a mountain-shaped graph.
  • the signal delay time P having the largest number of times is indicated as the maximum signal delay time Pm.
  • the maximum signal delay time Pm is the signal delay time P that appears most frequently in the traffic signal section corresponding to a certain traffic signal.
  • the maximum signal delay time Pm is a length of time corresponding to the total time of the yellow signal time and the red signal time of the traffic light.
  • the traffic light cycle estimation system 1 estimates the total time of the yellow signal time and the red signal time of the traffic light based on the maximum signal delay time Pm corresponding to the total time of the yellow signal time and the red signal time of the traffic light. I do. Further, since the traffic light cycle estimation system 1 often has a constant value regardless of the traffic light, the traffic light cycle estimation system 1 estimates the traffic light red signal time by assuming the traffic light time to be a constant value.
  • the traffic light cycle estimation system 1 is linked to a plurality of traffic lights provided at the same intersection based on a predetermined rule, the red light time estimated for each traffic signal provided at the same intersection is obtained. Based on this, the green time of each traffic light is estimated. The traffic light cycle estimation system 1 estimates the cycle length of the traffic light based on the estimated green light time, yellow light time, and red light time.
  • a traffic light cycle estimation system 1 includes a traffic light cycle estimation device 2 installed in a traffic information center and an in-vehicle device 11 mounted on a vehicle 10.
  • the in-vehicle device 11 includes a communication unit 12 and a car navigation system 13.
  • the communication unit 12 performs wireless communication with the traffic information center via a base station configuring a wireless communication network.
  • the car navigation system 13 is a system that detects the position and traveling direction of a vehicle and provides route guidance to a destination.
  • the car navigation system 13 has a GPS [Global Positioning System] function for detecting the position of the vehicle 10 and a timer function for acquiring the current time.
  • the car navigation system 13 generates travel time data from the detected position data of the vehicle 10 and the detection time of the position data.
  • the travel time data generated by the car navigation system 13 is transmitted to the traffic light cycle estimation device 2 of the traffic information center via the communication unit 12.
  • the traffic light cycle estimation device 2 includes a communication unit 3, a travel time acquisition unit 4, and a frequency distribution calculation unit 5.
  • the traffic light cycle estimation apparatus 2 includes a travel time group determination unit 6, a traffic light delay time calculation unit 7, and a traffic light cycle estimation unit 8.
  • the communication unit 3 performs wireless communication with the communication unit 12 of the vehicle 10 via a base station configuring a wireless communication network.
  • the travel time acquisition unit 4 analyzes the travel time data transmitted from the vehicle 10 via the communication unit 3, and thus the traffic section travel that is the time from when the vehicle 10 enters and passes through a predetermined traffic section Time is acquired (see FIG. 2).
  • the traffic light section is set so that a vehicle traveling in a predetermined direction in the traffic signal section faces only one traffic light. When one traffic light is displaying signals in a plurality of directions, different traffic signal sections are set in each direction.
  • the travel time acquisition unit 4 stores information related to traffic light sections in advance in association with road map data.
  • the travel time acquisition unit 4 acquires the traffic signal section travel time for each traffic light based on the travel time data transmitted from the vehicle 10.
  • the travel time acquisition unit 4 functions as a travel time acquisition unit described in the claims.
  • the frequency distribution calculation unit 5 calculates the frequency distribution of the traffic light section travel time based on the traffic light section travel time of the plurality of vehicles acquired by the travel time acquisition unit 4 (see FIGS. 3 and 4).
  • the frequency distribution calculation unit 5 functions as a frequency distribution calculation unit described in the claims.
  • the travel time group determination unit 6 Based on the frequency distribution calculated by the frequency distribution calculation unit 5, the travel time group determination unit 6 includes a first travel time group Ga in which the vehicle has not stopped at the traffic light and a second travel time group in which the vehicle has stopped at the traffic light. Gb is discriminated (see FIG. 4). Specifically, the travel time group determination unit 6 recognizes two groups having different traffic section travel times from the frequency distribution calculated by the frequency distribution calculation unit 5 by using a known information processing technique. The travel time group determination unit 6 recognizes a group having a shorter traffic light section travel time as a first travel time group Ga among the two groups. The travel time group discriminating unit 6 recognizes the group having the longer traffic light section travel time out of the two groups as the second travel time group Gb. The travel time group determination unit 6 functions as a travel time group determination unit described in the claims.
  • the traffic light delay time calculation unit 7 calculates the free-flow travel time F that is the peak value of the first travel time group Ga determined by the travel time group determination unit 6. In addition, the traffic light delay time calculation unit 7 calculates the traffic light stop travel time K that is the peak value of the second travel time group Gb. The traffic light delay time calculation unit 7 calculates a traffic light delay time P that is a difference between the traffic light stop travel time K and the free-flow travel time F (see FIGS. 3 and 4).
  • the traffic signal delay time calculation unit 7 calculates the frequency distribution of the signal delay time P calculated for each predetermined unit time in the same traffic signal section (see FIG. 5). Based on the frequency distribution of the signal delay time P, the traffic signal delay time calculation unit 7 calculates a maximum signal delay time Pm that is the signal delay time P with the largest number of times.
  • the traffic light cycle estimation unit 8 considers that the maximum signal delay time Pm calculated by the traffic signal delay time calculation unit 7 is a value corresponding to the total time of the yellow signal time and the red signal time of the traffic signal. The total time of the yellow signal time and the red signal time of the traffic light is estimated using Pm. The traffic light cycle estimation unit 8 estimates the red light time of the traffic light by assuming the yellow light time to be a predetermined value.
  • the traffic light cycle estimation unit 8 calculates the red signal time estimated for each traffic light provided at the same intersection because a plurality of traffic lights provided at the same intersection are linked based on a predetermined rule. Use to estimate the green time of each traffic light.
  • the traffic light cycle estimation unit 8 estimates the cycle length of the traffic light based on the estimated green signal time, yellow signal time, and red signal time.
  • the traffic light cycle estimation unit 8 functions as a traffic light cycle estimation unit described in claims.
  • the travel time acquisition unit 4 of the traffic light cycle estimation system 1 first analyzes the travel time data collected by transmission from the vehicle 10 that is a probe vehicle, so that the traffic light in a predetermined traffic light section is analyzed.
  • a travel time acquisition process for acquiring a section travel time is performed (S1).
  • the frequency distribution calculation unit 5 performs frequency distribution calculation processing for calculating the frequency distribution of the traffic light section travel time based on the traffic light section travel time of the plurality of vehicles acquired by the travel time acquisition unit 4 (S2). Thereafter, based on the frequency distribution calculated by the frequency distribution calculation unit 5, the travel time group determination unit 6 performs the first travel time group Ga in which the vehicle has not stopped at the traffic light and the second travel in which the vehicle has stopped at the traffic light. A travel time group discrimination process for discriminating the time group Gb is performed (S3).
  • the traffic light delay time calculation unit 7 performs a free flow travel time calculation process for calculating the free flow travel time F that is the peak value of the first travel time group Ga determined by the travel time group determination unit 6.
  • the traffic light delay time calculation unit 7 performs a traffic light stop travel time calculation process for calculating a traffic light stop travel time K that is a peak value of the second travel time group Gb.
  • the traffic light delay time calculation unit 7 performs a traffic light delay time calculation process for calculating a traffic light delay time P that is a difference between the traffic light stop travel time K and the free-flow travel time F (S5). Thereafter, the traffic light delay time calculation unit 7 performs signal delay time distribution calculation processing for calculating the frequency distribution of the signal delay time P based on the calculated traffic light delay time P (S6). Thereafter, the traffic light cycle estimation unit 8 performs traffic light cycle information estimation processing for estimating the cycle information of the traffic light based on the maximum signal delay time Pm having the largest number of times in the frequency distribution of the signal delay time P (S7).
  • the traffic light cycle estimation unit 8 first performs a total time estimation process for estimating the total time of the yellow signal time and the red signal time of the traffic light based on the maximum signal delay time Pm. Next, the traffic light cycle estimation unit 8 performs a red light time estimation process for estimating the red light time of the traffic light by assuming the yellow light time to be a predetermined value.
  • the traffic light cycle estimation unit 8 performs a green light time estimation process for estimating the green light time of each traffic light using the red light time estimated for each traffic light provided at the same intersection.
  • the traffic light cycle estimation unit 8 performs cycle length estimation processing for estimating the cycle length of the traffic light based on the estimated green signal time, yellow signal time, and red signal time.
  • the green light time estimation process and the cycle length estimation process performed by the traffic light cycle estimation unit 8 will be described by taking four traffic lights arranged at the crossroad intersection shown in FIG. 7 as an example.
  • W1 shown in FIG. 7 indicates the approach direction in which the vehicle enters the crossroad intersection.
  • W2 indicates an approach direction that intersects the approach direction W1.
  • the traffic light L1 corresponding to the approach direction W1 and the traffic light L2 corresponding to the approach direction W2 have an interlocking relationship according to a predetermined rule.
  • FIG. 8 shows the interlocking relationship between the traffic light L1 and the traffic light L2.
  • the green signal time of the traffic light L1 is shown as B1, the red signal time as R1, and the yellow signal time as Y1.
  • the green signal time of the traffic light L2 is indicated as B2, the red signal time as R2, and the yellow signal time as Y2.
  • Ar shown in FIG. 8 is the total red signal time in which both the traffic light L1 and the traffic light L2 are red signal times.
  • Ts shown in FIG. 8 is a loss time.
  • the loss time Ts corresponds to the total time of the total red signal time Ar and the yellow signal time Y1.
  • the loss time is a predetermined time within a range of 5 to 7 seconds, for example.
  • Pm1 shown in FIG. 8 is the maximum signal delay time for the traffic light L1.
  • Pm2 is the maximum signal delay time for the traffic light L2.
  • the traffic light cycle estimation unit 8 performs a green light time estimation process for estimating the green light time B1 of the traffic light L1 and the green light time B2 of the traffic light L2 based on the above formulas (1) and (2). Furthermore, since the cycle lengths of the traffic light L1 and the traffic light L2 provided at the same intersection are equal, the traffic light cycle estimation unit 8 estimates the cycle length Cy of the traffic light L1 and the traffic light L2 based on the following equation (3). Perform length estimation processing.
  • the free-flow travel time F of the first travel time group Ga in which the vehicle has not stopped at the traffic light and the second in which the vehicle has stopped at the traffic light Since the cycle information of the traffic light is estimated based on the difference from the traffic light stop travel time K of the travel time group Gb, the cycle information is generally estimated from the traffic zone travel time obtained by analyzing the travel time collected from the vehicle. Can be realized. Therefore, according to this traffic light cycle estimation system 1, since necessary data can be easily collected as compared with the case where a special data collection vehicle is used for estimating the cycle information of the traffic light, the cycle of the traffic light can be efficiently performed. Information can be estimated.
  • the sum of the red light time of the traffic light and the predetermined yellow light time is the free flow travel time F and the second travel time of the first travel time group Ga. Based on the free travel time F of the first travel time group Ga and the traffic stop time K of the second travel time group Gb because it is considered to appear in the difference with the traffic stop time K of the time group Gb.
  • the red signal time of the traffic light can be estimated.
  • the sum of the traffic light red signal time and the predetermined yellow light time is the peak value of the first travel time group Ga and the second travel time group Gb. It is considered that it is most likely to appear in the difference from the peak value of the vehicle, and by adopting these peak values as the free-flow travel time F and the traffic light stop travel time K, a reliable estimation of the red signal time is realized. be able to.
  • the red signal estimated for each traffic light since the plurality of traffic lights provided at the same intersection are linked based on a predetermined rule, the red signal estimated for each traffic light. Based on the time, the green light time of each traffic light can be estimated. Then, the cycle length of the traffic light can be estimated based on the green traffic light time, the yellow traffic light time, and the red traffic light time.
  • the traffic light cycle estimation system 1 and the traffic light cycle estimation method according to the present embodiment it is possible to efficiently estimate traffic light cycle information such as a green light time, a yellow light time, a red light time, and a cycle length. . This contributes to improving the accuracy of destination arrival prediction and traffic jam prediction performance in the car navigation system, so that the convenience of the driver can be improved.
  • the present invention is not limited to the embodiment described above.
  • the free-flow travel time F and the traffic light stop travel time K do not necessarily have to be peak values, and values selected based on the average value of the traffic light section travel time and other appropriate conditions may be used. Further, it is not always necessary to use the maximum signal delay time Pm for estimation of the cycle information of the traffic light, and the cycle information of the traffic signal is estimated using the average value of the frequency distribution of the signal delay time P shown in FIG. Also good.
  • the estimation of the green light time and cycle length is not limited to the traffic lights at the crossroads, but can also be performed for traffic lights at various intersections. Further, it is not always necessary to use the interlocking relationship between traffic lights at intersections for estimation of the green light time and cycle length, and it may be an aspect in which estimation is performed using traffic light parameters obtained by other methods.
  • the present invention can be used in a traffic light cycle estimation device that estimates traffic light cycle information.

Abstract

 本発明に係る信号機サイクル推定装置(2)は、信号機に対応する所定の信号機区間に車両が進入してから通過するまでの時間である信号機区間旅行時間を取得する旅行時間取得部(4)と、旅行時間取得部(4)によって取得された信号機区間旅行時間に基づいて、信号機区間旅行時間の頻度分布を演算する頻度分布演算部(5)と、頻度分布演算部(5)の演算した頻度分布に基づいて、車両が信号機で停止しなかった第1の旅行時間グループと車両が信号機で停止した第2の旅行時間グループとを判別する旅行時間グループ判別部(6)と、第1の旅行時間グループと第2の旅行時間グループとの差分に基づいて、信号機のサイクル情報を推定する信号機サイクル推定部(7)と、を備える。

Description

信号機サイクル推定装置及び信号機サイクル推定方法
 本発明は、信号機のサイクル情報を推定する信号機サイクル推定装置及び信号機サイクル推定方法に関する。
 従来、信号機に関する情報を推定する装置として、例えば特開2009-116508号公報に記載されたものが提案されている。この公報には、交差点の信号機の手前でプローブ車が停止した場合に、プローブ車の発進時刻に基づいて信号機が青信号に切り替わった時刻を推定する信号機情報推定装置が記載されている。この信号機情報推定装置では、交差点とプローブ車との距離を利用して、信号機で停止した車列の先頭車両が発進してからプローブ車が発進するまでの発進遅れ時間を算出し、この発進遅れ時間と発進時刻とを利用することで、信号機が青信号に切り替わった時刻を精度良く推定することができる。
特開2009-116508号公報
 しかしながら、上述した従来の信号機情報推定装置においては、プローブ車の発信時刻などの特殊なデータ収集が必要となるため、特殊なデータ収集用の装置を搭載したプローブ車などを必要があった。このため、従来の信号機情報推定装置においては、必要なデータの収集が容易ではなく、効率的に信号機の情報の推定を行うことが難しかった。
 そこで、本発明は、車両が信号機で停止しなかった第1の旅行時間グループと車両が信号機で停止した第2の旅行時間グループとに基づいて信号機のサイクル情報を推定することで、効率良く信号機のサイクル情報を推定することができる信号機サイクル推定装置及び信号機サイクル推定方法を提供することを目的とする。
 上記課題を解決するため、本発明に係る信号機サイクル推定装置は、信号機に対応する所定の信号機区間に車両が進入してから通過するまでの時間である信号機区間旅行時間を取得する旅行時間取得ユニットと、旅行時間取得ユニットによって取得された信号機区間旅行時間の頻度分布を演算する頻度分布演算ユニットと、頻度分布演算ユニットの演算した信号機区間旅行時間の頻度分布に基づいて、車両が信号機で停止しなかった第1の旅行時間グループと車両が信号機で停止した第2の旅行時間グループとを判別する旅行時間グループ判別ユニットと、第1の旅行時間グループと第2の旅行時間グループとの差分に基づいて、信号機のサイクル情報を推定する信号機サイクル推定ユニットと、を備えることを特徴とする。
 本発明に係る信号機サイクル推定装置によれば、車両が信号機で停止しなかった第1の旅行時間グループと車両が信号機で停止した第2の旅行時間グループとの差分に基づいて信号機のサイクル情報を推定するので、一般的に車両から収集している旅行時間の分析で得られる信号機区間旅行時間から赤信号時間などのサイクル情報の推定を実現することができる。従って、この信号機サイクル推定装置によれば、信号機のサイクル情報の推定のために特殊なデータ収集用の車両を用いる場合と比べて、容易に必要なデータを収集できるので、効率良く信号機のサイクル情報を推定することができる。
 本発明に係る信号機サイクル推定装置においては、信号機サイクル推定ユニットは、第1の旅行時間グループと第2の旅行時間グループとの差分に基づいて、信号機の赤信号時間を推定することが好ましい。
 本発明に係る信号機サイクル推定装置によれば、信号機の赤信号時間と所定の黄信号時間との和が第1の旅行時間グループと第2の旅行時間グループとの差分に現れると考えられることから、第1の旅行時間グループと第2の旅行時間グループとに基づいて信号機の赤信号時間を推定することができる。
 本発明に係る信号機サイクル推定装置においては、信号機サイクル推定ユニットは、第1の旅行時間グループのピーク値と第2の旅行時間グループのピーク値との差分に基づいて、信号機の赤信号時間を推定することが好ましい。
 本発明に係る信号機サイクル推定装置によれば、信号機の赤信号時間と所定の黄信号時間との和は第1の旅行時間グループのピーク値と第2の旅行時間グループのピーク値との差分に最も現れやすいと考えられることから、これらのピーク値の差分に基づいて信頼性の高い赤信号時間の推定を実現することができる。
 本発明に係る信号機サイクル推定装置においては、信号機サイクル推定ユニットは、同一の交差点に設けられた複数の信号機に対してそれぞれ推定された赤信号時間に基づいて、複数の信号機の青信号時間を推定することが好ましい。
 本発明に係る信号機サイクル推定装置によれば、同一の交差点に設けられた複数の信号機は所定のルールに基づいて連動していることから、各々の信号機について推定された赤信号時間に基づいて各々の信号機の青信号時間を推定することができる。
 本発明に係る信号機サイクル推定方法は、信号機に対応する所定の信号機区間に車両が進入してから通過するまでの時間である信号機区間旅行時間を取得する旅行時間取得ステップと、旅行時間取得ステップにおいて取得された信号機区間旅行時間の頻度分布を演算する頻度分布演算ステップと、頻度分布演算ステップにおいて演算された信号機区間旅行時間の頻度分布に基づいて、車両が信号機で停止しなかった第1の旅行時間グループと車両が信号機で停止した第2の旅行時間グループとを判別する旅行時間グループ判別ステップと、第1の旅行時間グループと第2の旅行時間グループとの差分に基づいて、信号機のサイクル情報を推定する信号機サイクル推定ステップと、を含むことを特徴とする。
 本発明に係る信号機サイクル推定方法によれば、車両が信号機で停止しなかった第1の旅行時間グループと車両が信号機で停止した第2の旅行時間グループとに基づいて信号機のサイクル情報を推定するので、一般的に車両から収集している旅行時間の分析で得られる信号機区間旅行時間からサイクル情報の推定を実現することができる。従って、この信号機サイクル推定方法によれば、信号機のサイクル情報の推定のために特殊なデータ収集用の車両を用いる場合と比べて、容易に必要なデータを収集できるので、効率良く信号機のサイクル情報を推定することができる。
 本発明に係る信号機サイクル推定方法では、信号機サイクル推定ステップにおいて、第1の旅行時間グループと第2の旅行時間グループとの差分に基づいて、信号機の赤信号時間を推定することが好ましい。
 本発明に係る信号機サイクル推定方法によれば、信号機の赤信号時間と所定の黄信号時間との和が第1の旅行時間グループと第2の旅行時間グループとの差分に現れると考えられることから、第1の旅行時間グループと第2の旅行時間グループとの差分に基づいて信号機の赤信号時間を推定することができる。
 本発明に係る信号機サイクル推定方法では、信号機サイクル推定ステップにおいて、第1の旅行時間グループのピーク値と第2の旅行時間グループのピーク値との差分に基づいて、信号機の赤信号時間を推定することが好ましい。
 本発明に係る信号機サイクル推定方法によれば、信号機の赤信号時間と所定の黄信号時間との和は第1の旅行時間グループのピーク値と第2の旅行時間グループのピーク値との差分に最も現れやすいと考えられることから、これらのピーク値の差分に基づいて信頼性の高い赤信号時間の推定を実現することができる。
 本発明に係る信号機サイクル推定方法では、信号機サイクル推定ステップにおいて、同一の交差点に設けられた複数の信号機に対してそれぞれ推定された赤信号時間に基づいて、複数の信号機の青信号時間を推定することが好ましい。
 本発明に係る信号機サイクル推定方法によれば、同一の交差点に設けられた複数の信号機は所定のルールに基づいて連動していることから、各々の信号機について推定された赤信号時間に基づいて各々の信号機の青信号時間を推定することができる。
 本発明によれば、効率良く信号機のサイクル情報を推定することができる。
本発明に係る信号機サイクル推定装置の一実施形態の構成を示す図である。 信号機区間旅行時間を説明するための図である。 信号機区間旅行時間の頻度分布を示すグラフである。 多数のプローブ車の信号機区間旅行時間の頻度分布を示すグラフである。 信号遅れ時間の回数分布を示すグラフである。 信号機サイクル推定装置の処理の流れを示すフローチャートである。 4台の信号機が配置された十字路交差点を示す概略平面図である。 図7の信号機の連動関係を示す図である。
 以下、本発明の好適な実施形態について、図面を参照して詳細に説明する。なお、各図において同一又は相当部分には同一符号を付し、重複する説明を省略する。
 図1に示されるように、本実施形態に係る信号機サイクル推定システム1は、交通情報センターに設置された信号機サイクル推定装置2においてプローブ車両である車両10から集めた旅行時間データを分析することで、赤信号時間などの信号機のサイクル情報を推定するものである。旅行時間データには、単位時間毎の車両10の位置データが含まれる。
 信号機サイクル推定システム1は、車両10から集めた旅行時間データを分析して、信号機に対応する所定の信号機区間に車両が進入してから通過するまでの時間である信号機区間旅行時間を取得する。信号機区間とは、信号機一台ごとに対応して道路上に予め設定された区間である。信号機サイクル推定システム1は、複数の車両10の信号機区間旅行時間に基づいて、ある信号機についての信号機区間旅行時間の頻度分布を演算する。信号機サイクル推定システム1は、信号機区間旅行時間の頻度分布に基づいて、車両が当該信号機で停止しなかった第1の旅行時間グループと車両が当該信号機で停止した第2の旅行時間グループとを判別する。信号機サイクル推定システム1は、第1の旅行時間グループと第2の旅行時間グループとに基づいて、信号機のサイクル情報の推定を行う。
 ここで、図2は、四台の車両A~Dの旅行時間データを示す図である。車両A~Dは、同一の車線上で二台の信号機La,Lbの間を走行する。図2では、横軸に時間を示し、縦軸に車両の位置を示している。車両A~Dは、信号機の手前で停止する場合を除いて一定の速度Vで走行している。図2に示すHは、二台の信号機La,Lbのうち下流側の信号機Lbに対応する信号機区間Nの長さである。具体的には、信号機区間Nは、上流側の信号機Laの通過直後の地点から下流側の信号機Lbの通過直後の地点までの区間として設定される。
 図2において、上流側の信号機Laの青信号時間をBa、赤信号時間をRa、黄信号時間をYaとして示す。同様に、下流側の信号機Lbの青信号時間をBb、赤信号時間をRb、黄信号時間をYbとして示す。ここで、信号機Lbが青信号時間Bbから黄信号時間Ybに切り替わった時刻をT1、赤信号時間Rbから青信号時間Bbに切り替わった時刻をT2とすると、黄信号時間Yb及び赤信号時間Rbの合計時間はT2とT1との差分として表される。
 車両A~Dは、まず信号機Laを同一の青信号時間Baに通過して信号機区間Nに進入する。その後、車両A及び車両Bは、青信号時間Bbの信号機Lbを通り抜け、信号機区間Nを通過する。一方、車両C及び車両Dは、青信号時間Bbから黄信号時間Yb、赤信号時間Rbに切り替わった信号機Lbの手前で停止する。車両C及び車両Dは、信号機Lbが青信号時間Bbに再び切り替わった後、信号機Lbを通り抜けて信号機区間Nを通過する。
 図3に、図2の場合における信号機区間旅行時間の頻度分布のグラフを示す。図3の横軸は信号機区間旅行時間であり、縦軸は車両の台数である。図3において、信号機Lbで停止しなかった車両A及び車両Bの信号機区間旅行時間からなるグループを第1の旅行時間グループGaとする。また、第1の旅行時間グループGaの信号機区間旅行時間を自由流旅行時間Fとする。同様に、信号機Lbで停止した車両C及び車両Dの信号機区間旅行時間からなるグループを第2の旅行時間グループGbとする。第2の旅行時間グループGbの信号機区間旅行時間を信号機停止旅行時間Kとする。
 この場合、第1の旅行時間グループGaの自由流旅行時間Fは、信号機区間Nの長さHを速度Vで除した値に相当する。一方、第2の旅行時間グループGbの信号機停止旅行時間Kは、第1の旅行時間グループGaの自由流旅行時間FにT2とT1との差分、すなわち黄信号時間Yb及び赤信号時間Rbの合計時間を加えた時間にほぼ相当する。この信号機停止旅行時間Kと自由流旅行時間Fとの差分を信号遅れ時間Pとする。この信号遅れ時間Pは、信号機Lbの黄信号時間Yb及び赤信号時間Rbの合計時間に対応した時間の長さとなる。
 図4は、ある信号機について、多数の車両の旅行時間データから演算された信号機区間旅行時間の頻度分布のグラフである。図4では、信号機区間旅行時間の頻度が10秒単位でまとめられている。多数の車両の旅行時間データに基づいて信号機区間旅行時間の頻度分布を演算する場合、車両走行状況の違いなどに起因して頻度分布にばらつきが生じる。図4では、第1の旅行時間グループGa及び第2の旅行時間グループGbはそれぞれ山状のグラフとして表されている。
 この場合において、第1の旅行時間グループGaで最も台数の多い信号機区間旅行時間であるピーク値が標準的な車両の信号機区間旅行時間であると考えられることから、ピーク値を自由流旅行時間Fとして採用する。同様に、第2の旅行時間グループGbにおけるピーク値を信号機停止旅行時間Kとして採用する。このように、信号機停止旅行時間K及び自由流旅行時間Fを採用することで、標準的な車両における信号遅れ時間Pを信号機停止旅行時間Kと自由流旅行時間Fとの差分として求めることができる。
 図5は、信号遅れ時間Pの回数分布を示すグラフである。図5では、所定の単位時間内に集められた旅行時間データに基づいて行われる信号遅れ時間Pの演算を1回としてカウントする。図5では、信号遅れ時間Pの回数分布は概ね山状のグラフとして表されている。信号遅れ時間Pの回数分布の中で最も回数の多い信号遅れ時間Pを最大信号遅れ時間Pmとして示す。最大信号遅れ時間Pmは、ある信号機に対応する信号機区間について最も高い頻度で現れる信号遅れ時間Pである。最大信号遅れ時間Pmは、当該信号機の黄信号時間及び赤信号時間の合計時間に対応した時間の長さとなる。
 本実施形態に係る信号機サイクル推定システム1は、信号機の黄信号時間及び赤信号時間の合計時間に対応する最大信号遅れ時間Pmに基づいて、信号機の黄信号時間及び赤信号時間の合計時間の推定を行う。また、信号機サイクル推定システム1は、黄信号時間が信号機によらず一定値である場合が多いことから、黄信号時間を一定値と仮定することで信号機の赤信号時間の推定を行う。
 また、信号機サイクル推定システム1は、同一の交差点に設けられた複数の信号機は所定のルールに基づいて連動していることから、同一の交差点に設けられたそれぞれの信号機について推定した赤信号時間に基づいて、それぞれの信号機の青信号時間を推定する。信号機サイクル推定システム1は、推定した青信号時間、黄信号時間、及び赤信号時間に基づいて、信号機のサイクル長を推定する。
 以下、信号機サイクル推定システム1の構成について説明する。
 図1に示されるように、本実施形態に係る信号機サイクル推定システム1は、交通情報センターに設置された信号機サイクル推定装置2と、車両10に搭載された車載機11と、を備えている。
 車載機11は、通信部12とカーナビゲーションシステム13とを備えている。通信部12は、無線通信ネットワークを構成する基地局などを介して、交通情報センターとの間で無線通信を行う。
 カーナビゲーションシステム13は、車両の位置や走行方向の検出及び目的地までの経路案内などを行うシステムである。カーナビゲーションシステム13は、車両10の位置検出を行うGPS[Global Positioning System]機能と現在時刻を取得するタイマ機能とを有している。カーナビゲーションシステム13は、検出した車両10の位置データ及び位置データの検出時刻から旅行時間データを生成する。カーナビゲーションシステム13が生成した旅行時間データは、通信部12を介して交通情報センターの信号機サイクル推定装置2に送信される。
 信号機サイクル推定装置2は、通信部3、旅行時間取得部4、及び頻度分布演算部5を有している。また、信号機サイクル推定装置2は、旅行時間グループ判別部6、信号機遅れ時間算出部7、及び信号機サイクル推定部8を有している。通信部3は、無線通信ネットワークを構成する基地局などを介して、車両10の通信部12と無線通信を行う。
 旅行時間取得部4は、通信部3を介して車両10から送信された旅行時間データを分析することで、所定の信号機区間に車両10が進入してから通過するまでの時間である信号機区間旅行時間を取得する(図2参照)。なお、信号機区間は、当該信号機区間内を所定の方向に走行する車両が一台の信号機のみと対面するように設定されている。一台の信号機が複数の方向に対して信号表示を行っている場合には、各方向に異なる信号機区間が設定される。旅行時間取得部4は、信号機区間に関する情報を道路地図データと関連付けて予め記憶している。旅行時間取得部4は、車両10から送信された旅行時間データに基づき、信号機毎の信号機区間旅行時間を取得する。旅行時間取得部4は、請求の範囲に記載の旅行時間取得ユニットとして機能する。
 頻度分布演算部5は、旅行時間取得部4が取得した複数の車両の信号機区間旅行時間に基づき、信号機区間旅行時間の頻度分布の演算を行う(図3及び図4参照)。頻度分布演算部5は、請求の範囲に記載の頻度分布演算ユニットとして機能する。
 旅行時間グループ判別部6は、頻度分布演算部5の演算した頻度分布に基づいて、車両が信号機で停止しなかった第1の旅行時間グループGaと車両が信号機で停止した第2の旅行時間グループGbとを判別する(図4参照)。具体的には、旅行時間グループ判別部6は、周知の情報処理技術を用いることで、頻度分布演算部5の演算した頻度分布から信号機区間旅行時間の異なる2つのグループを認識する。旅行時間グループ判別部6は、2つのグループのうち信号機区間旅行時間の短い方のグループを第1の旅行時間グループGaと認識する。旅行時間グループ判別部6は、2つのグループのうち信号機区間旅行時間の長い方のグループを第2の旅行時間グループGbと認識する。旅行時間グループ判別部6は、請求の範囲に記載の旅行時間グループ判別ユニットとして機能する。
 信号機遅れ時間算出部7は、旅行時間グループ判別部6の判別した第1の旅行時間グループGaのピーク値である自由流旅行時間Fを算出する。また、信号機遅れ時間算出部7は、第2の旅行時間グループGbのピーク値である信号機停止旅行時間Kを算出する。信号機遅れ時間算出部7は、信号機停止旅行時間Kと自由流旅行時間Fとの差分である信号機遅れ時間Pを算出する(図3及び図4参照)。
 また、信号機遅れ時間算出部7は、同一の信号機区間において所定の単位時間毎に算出された信号遅れ時間Pの回数分布を演算する(図5参照)。信号機遅れ時間算出部7は、信号遅れ時間Pの回数分布に基づいて、最も回数の多い信号遅れ時間Pである最大信号遅れ時間Pmを算出する。
 信号機サイクル推定部8は、信号機遅れ時間算出部7の算出した最大信号遅れ時間Pmが信号機の黄信号時間及び赤信号時間の合計時間に対応する値であると考えられることから、最大信号遅れ時間Pmを利用して信号機の黄信号時間及び赤信号時間の合計時間を推定する。また、信号機サイクル推定部8は、黄信号時間を所定値と仮定することにより信号機の赤信号時間の推定を行う。
 さらに、信号機サイクル推定部8は、同一の交差点に設けられた複数の信号機は所定のルールに基づいて連動していることから、同一の交差点に設けられたそれぞれの信号機について推定した赤信号時間を利用してそれぞれの信号機の青信号時間を推定する。信号機サイクル推定部8は、推定した青信号時間、黄信号時間、及び赤信号時間に基づいて、信号機のサイクル長を推定する。信号機サイクル推定部8は、請求の範囲に記載の信号機サイクル推定ユニットとして機能する。
 次に、上述した信号機サイクル推定システム1における信号機サイクル推定方法について図面を参照して説明する。
 図6に示されるように、信号機サイクル推定システム1の旅行時間取得部4では、まずプローブ車両である車両10からの送信により集められた旅行時間データを分析することで、所定の信号機区間における信号機区間旅行時間を取得する旅行時間取得処理を行う(S1)。
 次に、頻度分布演算部5は、旅行時間取得部4が取得した複数の車両の信号機区間旅行時間に基づいて、信号機区間旅行時間の頻度分布を演算する頻度分布演算処理を行う(S2)。その後、旅行時間グループ判別部6は、頻度分布演算部5の演算した頻度分布に基づいて、車両が信号機で停止しなかった第1の旅行時間グループGaと車両が信号機で停止した第2の旅行時間グループGbとを判別する旅行時間グループ判別処理を行う(S3)。
 S4において、信号機遅れ時間算出部7は、旅行時間グループ判別部6の判別した第1の旅行時間グループGaのピーク値である自由流旅行時間Fを算出する自由流旅行時間算出処理を行う。また、信号機遅れ時間算出部7は、第2の旅行時間グループGbのピーク値である信号機停止旅行時間Kを算出する信号機停止旅行時間算出処理を行う。
 続いて、信号機遅れ時間算出部7は、信号機停止旅行時間Kと自由流旅行時間Fとの差分である信号機遅れ時間Pを算出する信号機遅れ時間算出処理を行う(S5)。その後、信号機遅れ時間算出部7は、算出した信号機遅れ時間Pに基づいて、信号遅れ時間Pの回数分布を演算する信号遅れ時間分布演算処理を行う(S6)。その後、信号機サイクル推定部8は、信号遅れ時間Pの回数分布のうち最も回数の多い最大信号遅れ時間Pmに基づいて、信号機のサイクル情報を推定する信号機サイクル情報推定処理を行う(S7)。
 S7の信号機サイクル情報推定処理において、信号機サイクル推定部8は、まず最大信号遅れ時間Pmに基づいて、信号機の黄信号時間及び赤信号時間の合計時間を推定する合計時間推定処理を行う。次に、信号機サイクル推定部8は、黄信号時間を所定値と仮定することで信号機の赤信号時間を推定する赤信号時間推定処理を行う。
 さらに、信号機サイクル推定部8は、同一の交差点に設けられたそれぞれの信号機について推定した赤信号時間を利用して、それぞれの信号機の青信号時間を推定する青信号時間推定処理を行う。信号機サイクル推定部8は、推定した青信号時間、黄信号時間、及び赤信号時間に基づいて、信号機のサイクル長を推定するサイクル長推定処理を行う。
 以下、信号機サイクル推定部8が行う青信号時間推定処理及びサイクル長推定処理について、図7に示す十字路交差点に配置された4つの信号機を例に挙げて説明する。
 図7に示すW1は、車両が十字路交差点に進入する進入方向を示している。W2は、進入方向W1と交差する進入方向を示している。この場合、進入方向W1に対応する信号機L1と進入方向W2に対応する信号機L2とは、所定のルールに沿った連動関係を有している。図8に、信号機L1及び信号機L2の連動関係を示す。
 図8において、信号機L1の青信号時間をB1、赤信号時間をR1、黄信号時間をY1として示す。同様に、信号機L2の青信号時間をB2、赤信号時間をR2、黄信号時間をY2として示す。また、図8に示すArは、信号機L1及び信号機L2の両方が赤信号時間である全赤信号時間である。図8に示すTsは、損失時間である。損失時間Tsは、全赤信号時間Ar及び黄色信号時間Y1の合計時間に相当する。損失時間は、例えば5~7秒の範囲内の所定の時間である。
また、図8に示すPm1は、信号機L1についての最大信号遅れ時間である。Pm2は、信号機L2についての最大信号遅れ時間である。
 図8に示す連動関係から下記の式(1)及び(2)が導かれる。
Figure JPOXMLDOC01-appb-M000001
 信号機サイクル推定部8は、上記式(1)及び(2)に基づいて、信号機L1の青信号時間B1と信号機L2の青信号時間B2とを推定する青信号時間推定処理を行う。さらに、信号機サイクル推定部8は、同一交差点に設けられた信号機L1及び信号機L2のサイクル長が等しいことから、下記の式(3)に基づいて信号機L1及び信号機L2のサイクル長Cyを推定するサイクル長推定処理を行う。
Figure JPOXMLDOC01-appb-M000002
 続いて、上述した信号機サイクル推定システム1及び信号機サイクル推定方法の作用効果について説明する。
 本実施形態に係る信号機サイクル推定システム1及び信号機サイクル推定方法によれば、車両が信号機で停止しなかった第1の旅行時間グループGaの自由流旅行時間Fと車両が信号機で停止した第2の旅行時間グループGbの信号機停止旅行時間Kとの差分に基づいて信号機のサイクル情報を推定するので、一般的に車両から収集している旅行時間の分析で得られる信号機区間旅行時間からサイクル情報の推定を実現することができる。従って、この信号機サイクル推定システム1によれば、信号機のサイクル情報の推定のために特殊なデータ収集用の車両を用いる場合と比べて、容易に必要なデータを収集できるので、効率良く信号機のサイクル情報を推定することができる。
 また、この信号機サイクル推定システム1及び信号機サイクル推定方法によれば、信号機の赤信号時間と所定の黄信号時間との和が第1の旅行時間グループGaの自由流旅行時間Fと第2の旅行時間グループGbの信号機停止旅行時間Kとの差分に現れると考えられることから、第1の旅行時間グループGaの自由流旅行時間Fと第2の旅行時間グループGbの信号機停止旅行時間Kに基づいて信号機の赤信号時間を推定することができる。
 さらに、この信号機サイクル推定システム1及び信号機サイクル推定方法によれば、信号機の赤信号時間と所定の黄信号時間との和は第1の旅行時間グループGaのピーク値と第2の旅行時間グループGbのピーク値との差分に最も現れやすいと考えられることから、これらのピーク値を自由流旅行時間F及び信号機停止旅行時間Kとして採用することで、信頼性の高い赤信号時間の推定を実現することができる。
 また、この信号機サイクル推定システム1及び信号機サイクル推定方法によれば、同一の交差点に設けられた複数の信号機は所定のルールに基づいて連動していることから、それぞれの信号機について推定された赤信号時間に基づいてそれぞれの信号機の青信号時間を推定することができる。そして、信号機の青信号時間、黄信号時間、及び赤信号時間に基づいて、信号機のサイクル長を推定することができる。
 このように本実施形態に係る信号機サイクル推定システム1及び信号機サイクル推定方法によれば、青信号時間、黄信号時間、赤信号時間、及びサイクル長などの信号機のサイクル情報を効率良く推定することができる。このことは、カーナビゲーションシステムにおける目的地到着予想の精度向上や渋滞予測性能の向上に寄与するので、運転者の利便性の向上を図ることができる。
 本発明は、上述した実施形態に限定されるものではない。
 例えば、自由流旅行時間Fや信号機停止旅行時間Kは、必ずしもピーク値とする必要はなく、信号機区間旅行時間の平均値その他の適切な条件で選択された値を用いても良い。また、信号機のサイクル情報の推定に最大信号遅れ時間Pmを必ず用いる必要はなく、図5に示す信号遅れ時間Pの回数分布の平均値を用いて信号機のサイクル情報の推定を行う態様であっても良い。
 青信号時間やサイクル長の推定は、十字路交差点の信号機の場合に限られず様々な交差点の信号機に対しても行うことができる。また、青信号時間やサイクル長の推定には、必ずしも交差点の信号機の連動関係を利用する必要はなく、他の方法により取得した信号機のパラメータを利用して推定する態様であっても良い。
 本発明は、信号機のサイクル情報の推定を行う信号機サイクル推定装置に利用可能である。
 1…信号機サイクル推定システム 2…信号機サイクル推定装置 3…通信部 4…旅行時間取得部(旅行時間取得ユニット) 5…頻度分布演算部(頻度分布演算ユニット) 6…旅行時間グループ判別部(旅行時間グループ判別ユニット) 7…信号遅れ時間算出部 8…信号機サイクル推定部(信号機サイクル推定ユニット) 10…車両 11…車載機 12…通信部 13…カーナビゲーションシステム F…第1のピーク値 Ga…第1の旅行時間グループ Gb…第2の旅行時間グループ K…第2のピーク値 P…信号遅れ時間 Pm…最大信号遅れ時間時間 Ts…損失時間

Claims (8)

  1.  信号機に対応する所定の信号機区間に車両が進入してから通過するまでの時間である信号機区間旅行時間を取得する旅行時間取得ユニットと、
     前記旅行時間取得ユニットによって取得された前記信号機区間旅行時間の頻度分布を演算する頻度分布演算ユニットと、
     前記頻度分布演算ユニットの演算した前記信号機区間旅行時間の頻度分布に基づいて、車両が前記信号機で停止しなかった第1の旅行時間グループと車両が前記信号機で停止した第2の旅行時間グループとを判別する旅行時間グループ判別ユニットと、
     前記第1の旅行時間グループと前記第2の旅行時間グループとの差分に基づいて、前記信号機のサイクル情報を推定する信号機サイクル推定ユニットと、
     を備える信号機サイクル推定装置。
  2.  前記信号機サイクル推定ユニットは、前記第1の旅行時間グループと前記第2の旅行時間グループとの差分に基づいて、前記信号機の赤信号時間を推定する請求項1に記載の信号機サイクル推定装置。
  3.  前記信号機サイクル推定ユニットは、前記第1の旅行時間グループのピーク値と前記第2の旅行時間グループのピーク値との差分に基づいて、前記信号機の赤信号時間を推定する請求項2に記載の信号機サイクル推定装置。
  4.  前記信号機サイクル推定ユニットは、同一の交差点に設けられた複数の信号機に対してそれぞれ推定された赤信号時間に基づいて、前記複数の信号機の青信号時間を推定する請求項2又は請求項3に記載の信号機サイクル推定装置。
  5.  信号機に対応する所定の信号機区間に車両が進入してから通過するまでの時間である信号機区間旅行時間を取得する旅行時間取得ステップと、
     前記旅行時間取得ステップにおいて取得された前記信号機区間旅行時間の頻度分布を演算する頻度分布演算ステップと、
     前記頻度分布演算ステップにおいて演算された前記信号機区間旅行時間の頻度分布に基づいて、車両が前記信号機で停止しなかった第1の旅行時間グループと車両が前記信号機で停止した第2の旅行時間グループとを判別する旅行時間グループ判別ステップと、
     前記第1の旅行時間グループと前記第2の旅行時間グループとの差分に基づいて、前記信号機のサイクル情報を推定する信号機サイクル推定ステップと、
     を含む信号機サイクル推定方法。
  6.  前記信号機サイクル推定ステップにおいて、前記第1の旅行時間グループと前記第2の旅行時間グループとの差分に基づいて、前記信号機の赤信号時間を推定する請求項5に記載の信号機サイクル推定方法。
  7.  前記信号機サイクル推定ステップにおいて、前記第1の旅行時間グループのピーク値と前記第2の旅行時間グループのピーク値との差分に基づいて、前記信号機の赤信号時間を推定する請求項6に記載の信号機サイクル推定方法。
  8.  前記信号機サイクル推定ステップにおいて、同一の交差点に設けられた複数の信号機に対してそれぞれ推定された赤信号時間に基づいて、前記複数の信号機の青信号時間を推定する請求項6又は請求項7に記載の信号機サイクル推定方法。
PCT/JP2010/060302 2010-06-17 2010-06-17 信号機サイクル推定装置及び信号機サイクル推定方法 WO2011158364A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US13/499,997 US8725397B2 (en) 2010-06-17 2010-06-17 Traffic signal cycle estimation device and traffic signal cycle estimation method
PCT/JP2010/060302 WO2011158364A1 (ja) 2010-06-17 2010-06-17 信号機サイクル推定装置及び信号機サイクル推定方法
CN201080058826.3A CN102687181B (zh) 2010-06-17 2010-06-17 信号机循环推断装置和信号机循环推断方法
DE112010005667.6T DE112010005667B4 (de) 2010-06-17 2010-06-17 Ampelzyklusschätzvorrichtung und Ampelzyklusschätzverfahren
JP2011546485A JP5435041B2 (ja) 2010-06-17 2010-06-17 信号機サイクル推定装置及び信号機サイクル推定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2010/060302 WO2011158364A1 (ja) 2010-06-17 2010-06-17 信号機サイクル推定装置及び信号機サイクル推定方法

Publications (1)

Publication Number Publication Date
WO2011158364A1 true WO2011158364A1 (ja) 2011-12-22

Family

ID=45347785

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/060302 WO2011158364A1 (ja) 2010-06-17 2010-06-17 信号機サイクル推定装置及び信号機サイクル推定方法

Country Status (5)

Country Link
US (1) US8725397B2 (ja)
JP (1) JP5435041B2 (ja)
CN (1) CN102687181B (ja)
DE (1) DE112010005667B4 (ja)
WO (1) WO2011158364A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102779415A (zh) * 2012-07-30 2012-11-14 北京世纪高通科技有限公司 实时分析交通信号相位的方法与装置
JP2013025551A (ja) * 2011-07-21 2013-02-04 Aisin Aw Co Ltd 信号周期解析システム、方法およびプログラム
JP2013029421A (ja) * 2011-07-28 2013-02-07 Aisin Aw Co Ltd ナビゲーションシステムおよび代表旅行時間の設定方法並びにプログラム

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011157288A1 (en) * 2010-06-15 2011-12-22 Tomtom Belgium N.V. Detecting location, timetable and travel time estimations for barrier crossings in a digital map
EP2803059A4 (en) * 2012-01-10 2016-04-06 Massachusetts Inst Technology METHOD FOR CONTROLLING TRAFFIC SIGNALS AND TRAFFIC SIGNAL CONTROLLER
JP5737316B2 (ja) * 2013-04-17 2015-06-17 株式会社デンソー 隊列走行システム
US9183743B2 (en) * 2013-10-31 2015-11-10 Bayerische Motoren Werke Aktiengesellschaft Systems and methods for estimating traffic signal information
JP6048421B2 (ja) * 2014-01-31 2016-12-21 トヨタ自動車株式会社 信号機のサイクル長推定装置
EP3158547B1 (en) * 2014-06-17 2020-10-07 King Abdullah University Of Science And Technology System and method for traffic signal timing estimation
DE102017208878B4 (de) 2017-05-24 2021-02-25 Vitesco Technologies GmbH Verfahren zum Prognostizieren zumindest eines Ampelschaltzustands während einer Fahrt eines Kraftfahrzeugs sowie Steuervorrichtung und Kraftfahrzeug
DE102018210125A1 (de) * 2018-06-21 2019-12-24 Volkswagen Aktiengesellschaft Zuordnung von Ampel zu zugehörigen Fahrstreifen

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008191909A (ja) * 2007-02-05 2008-08-21 Masahiro Watanabe 交通信号状態推定方法
JP2009116508A (ja) * 2007-11-05 2009-05-28 Toyota Central R&D Labs Inc 信号情報推定装置
JP2009217729A (ja) * 2008-03-12 2009-09-24 Toyota Motor Corp 走行支援装置

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3503040A (en) * 1966-10-05 1970-03-24 Bliss Co Traffic cycle split selectors
US3508192A (en) * 1966-10-14 1970-04-21 Lfe Corp Multi-phase traffic actuated control system
US3613073A (en) * 1969-05-14 1971-10-12 Eugene Emerson Clift Traffic control system
JP2816919B2 (ja) * 1992-11-05 1998-10-27 松下電器産業株式会社 空間平均速度および交通量推定方法、地点交通信号制御方法、交通量推定・交通信号制御機制御装置
US6985090B2 (en) * 2001-08-29 2006-01-10 Siemens Aktiengesellschaft Method and arrangement for controlling a system of multiple traffic signals
JP4159976B2 (ja) 2003-12-17 2008-10-01 株式会社京三製作所 交通信号制御装置と交通信号制御方法及び記憶媒体
JP4118243B2 (ja) 2004-03-19 2008-07-16 株式会社トヨタマップマスター 交差点判定方法。
US8035530B2 (en) * 2006-11-09 2011-10-11 Sridhara Subbiah Ramasubbu RFID intelligent traffic signaling
CN1959759A (zh) * 2006-11-17 2007-05-09 上海城市综合交通规划科技咨询有限公司 基于浮动车数据的交通分析方法
US8755991B2 (en) * 2007-01-24 2014-06-17 Tomtom Global Assets B.V. Method and structure for vehicular traffic prediction with link interactions and missing real-time data
JP4887169B2 (ja) * 2007-02-08 2012-02-29 パナソニック株式会社 交通情報生成装置、交通情報提供システム及び交通情報生成方法
JP4858380B2 (ja) 2007-09-19 2012-01-18 住友電気工業株式会社 交通パラメータ算出システム、算出方法及びコンピュータプログラム
CN101419750B (zh) * 2008-09-28 2012-01-11 华南理工大学 基于数据特征的城市信号控制路口交通状态检测评价方法
CN101727746B (zh) * 2009-09-18 2012-04-25 苏州大学 信号灯控制的城市道路机动车动态行程时间估计方法
CN101702262B (zh) * 2009-11-06 2011-08-17 北京交通大学 一种城市交通流畅通性指标的数据融合方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008191909A (ja) * 2007-02-05 2008-08-21 Masahiro Watanabe 交通信号状態推定方法
JP2009116508A (ja) * 2007-11-05 2009-05-28 Toyota Central R&D Labs Inc 信号情報推定装置
JP2009217729A (ja) * 2008-03-12 2009-09-24 Toyota Motor Corp 走行支援装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013025551A (ja) * 2011-07-21 2013-02-04 Aisin Aw Co Ltd 信号周期解析システム、方法およびプログラム
JP2013029421A (ja) * 2011-07-28 2013-02-07 Aisin Aw Co Ltd ナビゲーションシステムおよび代表旅行時間の設定方法並びにプログラム
CN102779415A (zh) * 2012-07-30 2012-11-14 北京世纪高通科技有限公司 实时分析交通信号相位的方法与装置

Also Published As

Publication number Publication date
CN102687181B (zh) 2015-01-07
US20130103291A1 (en) 2013-04-25
JP5435041B2 (ja) 2014-03-05
DE112010005667T5 (de) 2013-05-29
JPWO2011158364A1 (ja) 2013-08-15
DE112010005667B4 (de) 2017-04-27
CN102687181A (zh) 2012-09-19
US8725397B2 (en) 2014-05-13

Similar Documents

Publication Publication Date Title
JP5435041B2 (ja) 信号機サイクル推定装置及び信号機サイクル推定方法
CN107784835B (zh) 基于交通数据分析的交通状态模式预测系统及其预测方法
CN109074737B (zh) 安全驾驶辅助系统、服务器、车辆、以及程序
JP5900454B2 (ja) 車両用車線案内システム及び車両用車線案内方法
JP4716115B2 (ja) 交通流パラメータ算出システム、方法及びプログラム
CN105474285B (zh) 用于预测至少一个拥堵参数的方法、分析系统和车辆
JP5256924B2 (ja) 渋滞情報生成装置、コンピュータプログラム及び渋滞情報生成方法
JP5424754B2 (ja) リンク旅行時間算出装置及びプログラム
JP5009143B2 (ja) 交通信号制御装置、プログラム及び方法
JP4753084B2 (ja) 交差点における交通量算出システム
KR101617345B1 (ko) 차량의 주행차로 추정 시스템 및 방법
WO2005078679A1 (ja) 交通情報算出装置、交通情報算出方法、交通情報表示方法及び交通情報表示装置
JP5936661B2 (ja) 交通情報推定システム、方法、およびプログラム
JP4935698B2 (ja) 交通情報処理装置、コンピュータプログラム及び交通情報処理方法
JP2010043917A (ja) 経路特定装置、コンピュータプログラム及び経路特定方法
JP2010061435A (ja) 感知器異常検出システム
CN106384524A (zh) 基于导航的辅助驾驶员判断通过红绿灯路口系统及方法
Sauerländer-Biebl et al. Evaluation of a transport mode detection using fuzzy rules
JP6600823B2 (ja) 路側装置、サーバ装置、車載装置、隊列走行判定方法及び交通情報予測システム
JP4038514B2 (ja) 旅行時間計測通知システム
KR101846909B1 (ko) 교통정보 제공 시스템 및 그 방법
JP2004318621A (ja) 交通情報推定装置及び方法
JP5317947B2 (ja) 交通流計測システム、車載器及び路側通信装置
JP4357983B2 (ja) 遅れ時間推定装置、遅れ時間推定方法、遅れ時間推定システムおよび遅れ時間推定プログラム
JP2013206325A (ja) 交通情報予測装置、交通情報予測方法及びコンピュータプログラム

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080058826.3

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2011546485

Country of ref document: JP

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10853245

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 13499997

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 112010005667

Country of ref document: DE

Ref document number: 1120100056676

Country of ref document: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10853245

Country of ref document: EP

Kind code of ref document: A1