WO2011155012A1 - 品質管理システム、端末装置、情報処理方法及びセンタ装置用プログラム - Google Patents

品質管理システム、端末装置、情報処理方法及びセンタ装置用プログラム Download PDF

Info

Publication number
WO2011155012A1
WO2011155012A1 PCT/JP2010/059601 JP2010059601W WO2011155012A1 WO 2011155012 A1 WO2011155012 A1 WO 2011155012A1 JP 2010059601 W JP2010059601 W JP 2010059601W WO 2011155012 A1 WO2011155012 A1 WO 2011155012A1
Authority
WO
WIPO (PCT)
Prior art keywords
quality
product
processing unit
value
information
Prior art date
Application number
PCT/JP2010/059601
Other languages
English (en)
French (fr)
Inventor
今泉裕幸
竹ヶ原浩
Original Assignee
パイオニア株式会社
十和田パイオニア株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パイオニア株式会社, 十和田パイオニア株式会社 filed Critical パイオニア株式会社
Priority to PCT/JP2010/059601 priority Critical patent/WO2011155012A1/ja
Publication of WO2011155012A1 publication Critical patent/WO2011155012A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • H05K13/083Quality monitoring using results from monitoring devices, e.g. feedback loops

Definitions

  • This application belongs to the technical fields of a quality control system, a terminal device, an information processing method, and a program for a center device. More specifically, a quality management system installed in a production base that produces electronic parts, optical parts, etc., a terminal device included in the quality management system, an information processing method executed in the quality management system, and the quality It belongs to the technical field of the program for the center device included in the management system.
  • a product production line includes an assembly process, an adjustment process, and an inspection process.
  • the assembly process is a process of assembling a product using necessary parts.
  • the adjustment process is a process of adjusting the assembled product.
  • the inspection process is a process for inspecting the adjusted product before shipment.
  • the present application has been made in view of the above-mentioned problems, and one example of the problem is quality control that makes it easy to search for a cause when an abnormality occurs and can prevent the occurrence of the abnormality itself proactively.
  • a system, a terminal device included in the quality management system, an information processing method executed in the quality management system, and a program for a center device included in the quality management system are provided.
  • the invention according to claim 1 is directed to a terminal device such as a process terminal provided in a plurality of lines included in a product production line, and a monitoring computer connected to the terminal device.
  • a terminal device such as a process terminal provided in a plurality of lines included in a product production line
  • a monitoring computer connected to the terminal device.
  • the terminal device uses a terminal input such as an input unit used to input a product status in each line by an operator who performs work on each line.
  • terminal transmission means such as an interface for transmitting product status information corresponding to the input product status to the center device, wherein the center device adds the product status information transmitted from the terminal device to the product status information.
  • Comparing means such as a CPU for comparing the management value and the detected quality value, and the quality value indicating the quality when the detected quality changes in a direction that is out of the standard.
  • a notification means such as a display unit for notifying that the quality value has reached the control value when the control value has reached the control value.
  • the invention according to claim 7 is the terminal device included in the quality management system according to any one of claims 1 to 6, wherein the terminal input unit, Terminal transmission means.
  • the invention according to claim 8 is a terminal device such as a process terminal provided in a plurality of lines included in a product production line, and a monitoring computer connected to the terminal device.
  • a quality detection step for detecting the quality of the product for each item and for each line in the center device, and before setting for each of the monitoring items A management value of quality, a management value set as a value to which a quality value indicating the quality reaches before the quality no longer satisfies the standard for the quality, a quality value indicating the detected quality, Comparing in the center device, and when the detected quality changes in a direction that is out of
  • the invention according to claim 9 is a terminal device such as a process terminal provided in a plurality of lines included in a product production line, and a monitoring computer connected to the terminal device.
  • a terminal input unit used for an operator who performs work on each line to input a product status in each line, the quality control system including a center device such as a host computer.
  • a computer included in the center device included in a quality control system comprising: a terminal transmission unit configured to transmit product status information corresponding to the input product status to the center device; Based on product status information, the quality of the product for each of a plurality of monitoring items and for each line set in advance for quality control of the product Quality detection means to detect, the management value of the quality set for each of the monitoring items, set as a value that reaches the quality value indicating the quality before the quality does not meet the quality standard
  • a comparison means for comparing the management value with the quality value indicating the detected quality, and the quality value indicating the quality is changed in a direction in which the detected quality is outside the standard. When the control value is reached, it functions as a notification means for notifying that the quality value has reached the control value.
  • FIG. 1 It is a figure showing outline composition etc. of a quality control system concerning an embodiment
  • (a) is a block diagram showing outline composition of the quality management system concerned
  • (b) is a monitoring computer and a host included in the quality management system concerned
  • (c) is a block diagram which shows the outline structure of the process terminal contained in the said quality control system.
  • (I) which illustrates the example of the database concerning an embodiment.
  • FIG. II It is a figure (II) which illustrates the example of the database concerning an embodiment. It is a flowchart (I) which shows operation
  • FIG. C is a figure (II) which shows the example of a display of a defect count list. It is figure (II) which shows the example of a display in the monitoring computer which concerns on embodiment, (a) is a figure (II) which shows the example of a display of a total menu, (b) is the figure (III) which shows the example of a total menu display (C) is an example (I) of a graph showing performance items. It is an example (II) of the graph figure which shows the performance item in the monitoring computer which concerns on embodiment. It is a flowchart (VIII) which shows operation
  • FIG. 1 It is a flowchart (X) which shows operation
  • the embodiment described below is constructed in a production base that produces products such as electronic components such as circuit boards and optical components such as optical pickups, and the quality management system that manages the manufacturing quality of the products. This is an embodiment when the present application is applied.
  • the quality control system S is constructed in a plurality of production bases FC1 to FCn that can exchange data via a network NT such as the Internet.
  • Each production base FC may be constructed in the same country, or each production base FC may be constructed in a different country.
  • the first production base FC1 is constructed in Japan
  • the second production base FC2 and later are constructed overseas
  • the line L1 constructed in the first production base FC1 is constructed overseas after the second production base FC2. It can also be positioned as a pilot line of the line L constructed in the base.
  • the line L1 in the first production site FC1 that is a pilot line has the same configuration as the line L2 in the second production site FC2, for example.
  • one or a plurality of lines L are constructed in each production site FC.
  • One line L includes at least three processes of an assembly process, an adjustment process, and an inspection process.
  • the assembly process is divided into, for example, one or more detailed assembly processes for each component to be used, and the adjustment process is also divided into one or more adjustment processes for each adjustment item.
  • the inspection process is also divided into one or a plurality of detailed inspection processes for each inspection item.
  • the above processes are connected by, for example, a belt conveyor, and the products mounted on the belt conveyor move between the processes, so that the assembly, adjustment, and inspection processes are configured and executed as a whole. Is done.
  • the assembly process and the adjustment process are usually configured as a pair, and after the assembly process and the adjustment process are completed, the inspection process is performed on the adjusted product.
  • the above assembly process is a process in which the product is assembled mainly by the operator's manual work. Further, in the adjustment process, adjustment such as fine adjustment for the product assembled in the assembly process is performed. Further, in the inspection process, for example, inspection before shipment is performed on the assembled and further adjusted product.
  • an electric screwdriver for example, a dispenser for applying a liquid to a part and a tool such as a soldering iron are used for each operation.
  • the specifications of these tools are automatically controlled by an FA (Factory Automation) device, which will be described later, as an example of an adjustment device and an example of adjustment specification changing means.
  • the specifications in this case are, for example, the tightening torque of the driver, the amount of application at one time in the dispenser, or the tip temperature of the soldering iron.
  • the terminal device is located at a position where the worker can operate and visually check.
  • the process terminal T as an example is installed. This process terminal T is installed one by one in each manual process, and the operator inputs various information when executing his process, or is necessary for executing the process. It is used to provide various information to the worker.
  • one line L includes one or a plurality of the terminal devices T and FA devices described above for executing the assembly process, the adjustment process, and the inspection process.
  • the line L1 in the first production site FC1 illustrated in FIG. 2 includes first to fourth assembly steps, and a first adjustment step between the third assembly step and the fourth assembly step.
  • the second adjustment step immediately after the fourth assembly step and the inspection step are assumed to be configured.
  • process terminals T1 to T4 illustrated in FIG. 2 are provided in each of the first to fourth assembly processes.
  • FA devices FA1 and FA2 are provided for the first and second adjustment processes.
  • an FA device FA3 is provided for the inspection process.
  • one line L includes a monitoring computer 200 as an example of a center device connected to each process terminal T and FA device FA included in the line L.
  • the line L in the first production site FC1 illustrated in FIG. 2 is connected to the process terminals T1 to T4 and the FA devices FA1 to FA3 by a LAN (Local Area Network) 201 or the like, respectively. 200 is included.
  • the monitoring computer 200, the process terminals T1 to T4, and the FA devices FA1 to FA3 can exchange data with each other via the LAN 201.
  • One monitoring computer 200 is installed in each line L of each production site FC, and displays the production status of products in the corresponding line L as described later, and the tool constituting the line L as described later. Are controlled via the corresponding FA device FA.
  • each production base FC is provided with a host computer 100.
  • the host computer 100 is connected to the monitoring computer 200 and each FA device FA in each line L in the production base FC where the host computer 100 is set, for example, via the LAN 201, and can exchange data with each other. It is said that.
  • the host computers 100 in each production site FC are connected to each other via a so-called WAN (Wide101Area Network) 101 that constitutes the network NT, and can exchange data with each other.
  • WAN Wide101Area Network
  • FIG. 3 is a diagram showing a schematic configuration around the work table.
  • the product P placed on the belt conveyor 21 is carried into the work table 20 where the assembly work by the worker is performed.
  • the product P on which work on the work table 20 is performed is placed on the belt conveyor 21 again and carried out to the next process.
  • such a product is carried into the work table 20 from the left in FIG. 3, and is further carried out to the next step in the right direction in FIG.
  • the work table 20 is provided with the corresponding process terminal T.
  • a loading start sensor 22 is installed on the path through which the product P carried into the work table 20 passes.
  • the insertion start sensor 22 is a light emitting unit 22A that emits, for example, a laser beam B that is linear, and a light receiving unit 22B that is disposed at a position facing the light emitting unit 22A and receives the laser beam B emitted from the light emitting unit 22A. It is equipped with.
  • the light receiving unit 22B transmits a signal indicating the fact to the process terminal T.
  • a discharge sensor 23 is installed on the path through which the product P carried out from the work table 20 passes.
  • the discharge sensor 23 is a light-emitting unit 23A that emits, for example, a laser beam B that is straight, and a light-receiving unit 23B that is disposed at a position facing the light-emitting unit 23A and receives the laser beam B emitted from the light-emitting unit 23A. It has.
  • the light receiving unit 23B transmits a signal indicating the fact to the process terminal T.
  • the process terminal T recognizes the timing when the product P is carried into the work table 20 based on the signal from the light receiving unit 22B of the loading start sensor 22. Further, the timing at which the product P is carried out from the work table 20 is recognized based on the signal from the light receiving unit 23 ⁇ / b> B of the discharge sensor 23. These timings are used for calculation of cycle tact time and work tact time, which will be described later.
  • the process terminal T is connected with a barcode reader 15 and, for example, a rotary warning lamp 14 that is visible from the outside.
  • the bar code reader 15 is read by the bar code attached to the product P that has been carried in by being held and operated by an operator who performs the work to be performed on the work table 20 and reads the information. Output to the process terminal T. Thereby, the process terminal T can recognize the product number and lot number of the product P carried into the corresponding work table 20.
  • the warning lamp 14 is lit or blinked when any abnormality occurs in the work on the work table 20 corresponding to the process terminal T to which the warning terminal 14 is connected, thereby recognizing that the abnormality has occurred. .
  • the process terminal T includes a display unit 12 and an input unit 13 composed of a plurality of switches or buttons, as will be described later.
  • monitoring computer 200 and the host computer 100 First, detailed configurations of the monitoring computer 200 and the host computer 100 will be described with reference to FIG. Note that the monitoring computer 200 and the host computer 100 according to the embodiment basically have the same hardware configuration. Therefore, in FIG. 1B, the detailed configuration of the monitoring computer 200 will be described.
  • the monitoring computer 200 includes an example of quality detection means including a CPU, an example of comparison means, an example of change information generation means, an example of compression means, and quality management information generation.
  • a processing unit 1 as an example of means, an interface 2 as an example of a center transmission means and an example of compressed information transmission means, a RAM (Random Access Memory) 3, a ROM (Read Only Memory) 4, and a non-volatile memory, for example
  • the storage unit 5 includes a hard disk drive, a display unit 6 as an example of notification means including a liquid crystal display, and an input unit 7 including a mouse and a keyboard.
  • the interface 2 controls the exchange of data with each process terminal T, FA device FA, and host computer 100 connected to the monitoring computer 200.
  • a program, data, and the like for executing an operation as the monitoring computer 200 described later are stored in advance in a nonvolatile manner.
  • a database according to an embodiment described later with reference to FIG. 4 is stored in the storage unit 5 of the host computer 100 in a nonvolatile manner.
  • data for executing an operation as the monitoring computer 200 described later is stored in a nonvolatile manner.
  • the processing unit 1 reads and executes the above-described program stored in the ROM 4 to execute the operation as the monitoring computer 200 described later while exchanging data between the RAM 3 and the storage unit 5. To do. The operation is executed based on the operation executed in the input unit 7, and the result is displayed on the display unit 6.
  • the input unit 7 and the display unit 6 of the host computer 100 are used only for maintenance and inspection of the host computer 100 itself. Further, in the input unit 7 of the monitoring computer 200, an input operation necessary for executing an operation as the monitoring computer 200 described later is executed, and the result of the operation is displayed on the display unit 6.
  • the process terminal T includes a processing unit 10 as an example of a work time detection unit including a CPU, a RAM, a ROM, and the like, and an interface 11 as an example of a terminal transmission unit.
  • the display unit 12 including a liquid crystal display or the like and the input unit 13 as an example of a terminal input unit.
  • the processing unit 10 is connected to the light receiving units 22B and 23B, the barcode reader 15, and the warning lamp 14.
  • the interface 11 controls data exchange with the monitoring computer 200 connected to the process terminal T.
  • the processing unit 10 reads and executes a process terminal program stored in a ROM (not shown) in the processing unit 10 to execute data transmission between the monitoring computer 200, the barcode reader 15 and the warning lamp 14.
  • the operation as the process terminal T which will be described later, is performed while giving and receiving. The operation is executed based on the operation executed in the input unit 13, and the result is displayed on the display unit 12.
  • FIG. 4 is a diagram showing the configuration of the database according to the embodiment.
  • the term “database” is simply expressed as “DB”.
  • each host computer 100 stores a database shown in FIG. 4 having contents corresponding to the production base FC provided in each storage unit 5. Further, the data in the database respectively stored in the storage unit 5 of the host computer 100 in each production site FC can be shared among the host computers 100.
  • the database stored in the storage unit 5 is a base information database 30, a model information database 40, and a monitoring management database 50 corresponding to the production bases FC provided with the host computer 100, respectively.
  • the base information database 30 includes general data indicating the production base FC including the name of the production base FC and the like.
  • a working time database 31 includes, for example, time data indicating the working time and the rest time for each line L, for example.
  • the production plan database 33 includes data on the production plan of the product imposed on the production base FC where the host computer 100 is provided.
  • the worker skill authorization database 32 includes data on skills related to production work possessed by each worker engaged in an assembly process or the like in the production base FC where the host computer 100 is provided. ing.
  • the certification skills necessary for each process for example, soldering skills, inspection skills, etc.
  • the worker skill authorization database 32 is exemplified in FIG.
  • the model information database 40 includes general data indicating the product P including the name and serial number of the product P produced at the production site FC.
  • a process information database 41 In the model information database 40, a process information database 41, a pass / fail code database 42, an adjustment inspection standard database 43, a production condition standard database 44, and a part information database 45 are stored in association with each other.
  • the process information database 41 includes data indicating processes to be passed before each product P whose data is included in the model information database 40 is produced.
  • the pass / fail code database 42 the pass / fail codes that are set in advance based on the grades of non-defective / defective products in each process for production of each product P whose data is included in the model information database 40 are stored. Data etc. are included.
  • the adjustment inspection standard database 43 includes data indicating standards for the adjustment process and the inspection process to be included in the process of producing each product P whose data is included in the model information database 40.
  • the production condition standard database 44 includes data indicating standards for each process such as an assembly process to be passed before each product P whose data is included in the model information database 40 is produced. Yes.
  • a specific example of the production condition standard database 44 is shown in FIG.
  • the production condition standard database 44 shown in FIG. 5 includes process standard data 44A including data on the torque value of the driver used in each assembly process, data indicating the amount of application in the dispenser, data indicating the temperature of the soldering tip in each soldering iron, and the like.
  • tact time data 44B including data indicating an upper limit value and a lower limit value of the tact time in each process.
  • the specifications of the driver and the like used in each process are controlled by the FA device FA, and the FA device FA performs these controls with reference to the contents of the process standard data 44A.
  • tact time there are two types of tact time of the embodiment, “cycle tact time” and “work tact time”.
  • the “cycle tact time” is the time that elapses from when the discharge sensor 23 provided in a certain process detects the passage of the product P until the discharge sensor 23 detects the passage of the next product P.
  • This cycle tact time is the cycle tact time for discharging to the next process, and includes the waiting time until the product P flows due to the influence of the line tact balance from the above definition to the previous process. Become.
  • the “work tact time” is the time that elapses from when the introduction start sensor 22 provided in a certain process detects the passage of the product P until the discharge sensor 23 of that process detects the passage of the product P. It is.
  • This work tact time is a tact time required only for the actual work in the process, which is not affected by the line tact balance from the above definition to the previous process.
  • the monitoring management database 50 includes general data necessary for quality control of the product P produced at the production site FC.
  • a data file update history database 51 includes each data stored in the storage unit 5 of the host computer 100, data indicating an update history of each data in the monitoring computer 200 connected to the host computer 100, and the like. It is. Specific examples of the data file update history database 51 include those illustrated in FIG.
  • the quality management database 52 includes general data necessary for quality management of the product P produced at the production site FC provided with the host computer 100.
  • the monitoring item warning history database 53 indicates that a warning or the like, which will be described later, is issued for a monitoring item set in advance for quality control in each production site FC provided with the host computer 100. History data etc. are included.
  • the adjustment process offset command history database 54 includes data indicating the history of offset commands transmitted from the monitoring computer 200 provided in the production site FC provided with the host computer 100 to the FA device FA. Yes.
  • the monitoring computer 200 according to the embodiment, for the FA device FA to which the monitoring computer 200 is connected, tools and the like under the control of the FA device FA as will be described later.
  • the specification is changed by sending an offset command to change the specification.
  • the adjustment process offset command history database 54 includes data indicating the history of this offset command, and a specific example thereof is shown in FIG.
  • model traceability database 60, 70,..., N for each model of the product P will be described. Since the model traceability databases 60, 70,..., N basically have the same configuration, the first model traceability database 60 will be described below as a representative.
  • the first model traceability database 60 includes general data necessary for manufacturing management of the product P of the model, such as the name and serial number of the product P as the first model.
  • a traceability database for each process when the product P of the first model is produced and a parts traceability database 61 are stored in association with each other.
  • the first process traceability database 60-1 to the nth process traceability database 60-n are associated with each other. At this time, for example, in the first process traceability database 60-1, when the corresponding first process is one process included in the assembly process, specifically, as illustrated in FIG. And data such as the actual cycle tact time.
  • the n-th process traceability database 60-n when the corresponding n-th process is one of the processes included in the adjustment or inspection process, specifically, as illustrated in FIG. Data such as a serial number and measurement data as an inspection process are included. Furthermore, the part traceability database 61 includes data indicating the part number and lot number of each part incorporated in the corresponding product P. As a specific example, for example, FIG. There are some examples.
  • FIGS. 7 to 11A are flowcharts showing the operations of the process terminal T and the like.
  • the process terminal T is installed for each process in the assembly process in the line L of the embodiment (that is, the manual assembly process by the worker).
  • This process terminal T includes process traceability data (product serial number data, date / time data, worker number data, non-defective / defective item number data and work tact time data) related to each assembly process, and equipment conditions of the equipment for the process. Traceability data (torque data of each driver, soldering iron tip temperature data and dispenser application amount data, etc.), input part lot traceability data, and worker abnormality warning data described later are sent to the monitoring computer 200. To do.
  • the process traceability data and the equipment condition traceability data are exemplified as process traceability data in the first process traceability database 60-1 illustrated in FIG.
  • the barcode reader 15, the insertion start sensor 22, the discharge sensor 23, and the warning lamp 24 are connected to the process terminal T.
  • the monitoring computer 200 stores each data transmitted from these process terminals T in the storage unit 5.
  • step S1 the processing unit 10 of the process terminal T operates the process terminal T by placing an operator who performs the work of the process at the position of the work table 20 where the assembly process is performed. Then, as will be described later, in conjunction with the monitoring computer 200 (step S20), a skill certified person determination operation is executed (step S1). This skill authorized person determination operation is an operation for determining the skill authorization of the corresponding worker. The operation of step S1 will be described in detail later with reference to FIG.
  • step S2 the processing unit 10 cooperates with the monitoring computer 200 (step S21) to execute a production facility inspection operation (step S2).
  • This production facility inspection operation is an operation for inspecting the operation state of a production facility (for example, the driver, the soldering iron, the dispenser, etc.) provided for the operation of the process provided with the process terminal T.
  • the operation in step S2 will be described in detail later with reference to FIG.
  • the processing unit 10 determines whether or not an operation for starting the production work of the product P in the process is performed by the operator in charge at the input unit 13 (step S3). If the operation is not performed in the determination in step S3 (step S3; NO), the processing unit 10 directly proceeds to the operation in step S1. On the other hand, when an operation for starting the production work is performed in the determination in step S3 (step S3; YES), the processing unit 10 next uses, for example, the barcode reader 15 to make a lot as a new part or the like. It is determined whether or not a number input operation has been performed by a worker in charge (step S4).
  • step S4 When the input operation is not performed in the determination of step S4 (step S4; NO), the processing unit 10 proceeds to an operation of step S6 described later. On the other hand, when a new lot number input operation is performed in the determination in step S4 (step S4; YES), the processing unit 10 transmits lot number change information including the input lot number to the monitoring computer 200 ( Step S5).
  • the processing unit 1 of the monitoring computer 200 that has finished the production facility inspection operation in cooperation with the process terminal T monitors whether or not the lot number change information has been transmitted from the process terminal T (step S22). .
  • the processing unit 1 proceeds to an operation in step S24 described later.
  • the processing unit 1 stores the contents in, for example, the RAM 3 (step S23), and will be described later in step S24. Transition to the monitoring operation.
  • step S6 the processing unit 10 of the process terminal T starts measuring the cycle tact time.
  • step S7 determines whether or not it has been detected from the information from the receiving unit 22B of the loading start sensor 22 that the product P has been carried into the process. If it is detected in step S7 that the product P has been carried in (step S7; YES), the processing unit 10 proceeds to an operation in step S9 described later. On the other hand, if it is detected in step S7 that the product P has not been carried in (step S7; NO), then the processing unit 10 uses the input unit 13 to stop the production work of the product P in the process.
  • step S8 It is determined whether or not the operation has been performed by a worker in charge (step S8).
  • step S8 the processing unit 10 directly proceeds to the operation of step S1.
  • step S9 the processing unit 10 next starts measuring the work tact time (step S9), and thereafter It is again determined whether or not the production operation stop operation has been performed at the input unit 13 (step S10).
  • step S10 step S10; YES
  • step S10 step S10; YES
  • step S10 when the operation for stopping the production work is not performed in the determination in step S10 (step S10; NO), the processing unit 10 next indicates that the product P has been carried out of the process by the discharge sensor 23. It is determined whether or not the detection is made based on information from the receiving unit 23B (step S11). If it is detected in step S11 that the product P has been carried out (step S11; YES), the processing unit 10 corresponds to the process, assuming that the assembly work for the product P in the process is completed without any problem.
  • the non-defective product number is stored in a memory (not shown) as a pass / fail code (see reference numeral 60-1 in FIG.
  • step S12 the cycle tact time that has been started by the operation of step 6 is counted, and the step S9 Time counting of the work tact time of the work desk which has started time counting by the operation is simultaneously finished (step S13).
  • the “non-defective product number” stored by the operation of step S12 is a number indicating that the product P for which assembly work has been completed is “non-defective product”, and is, for example, “non-defective product number 0”.
  • step S11 if it is not detected in step S11 that the product P has been carried out (step S11; NO), it is assumed that some problem may have occurred in the assembly work for the product P in the process.
  • the processing unit 10 determines whether or not a defective item number corresponding to the process has been input by the operator via the input unit 13 or the like (step S17). When the input operation of the defective item number is not performed in the determination of step S17 (step S17; NO), the processing unit 10 proceeds to the operation of step S10. On the other hand, when an operation for inputting a defective item number is performed in the operation of step S17 (step S17; YES), the processing unit 10 stores the defective item number as a pass / fail code in a memory (not shown) (step S18). The operation proceeds to step S13.
  • the “defective item number” stored by the operation of step S18 is a number indicating a defective item attached to the product P.
  • the “defective item number” is displayed. No. 1 ”, and when the product P has a defect in the optical component, the item is“ defect item number 2 ”. Further, in the product P, the optical component has a contamination defect. “Bad item number 3”.
  • step S14 the processing unit 10 performs an operation of evaluating the work tact time in the process (step S14).
  • the evaluation operation in step S14 is an operation for evaluating the work tact time for the work in the process for which time measurement has been completed by the operation in step S11. This evaluation operation will be described in detail later with reference to FIG.
  • the processing unit 10 transmits each traceability data relating to the process to the monitoring computer 200 (step S15).
  • This traceability data includes, for example, data indicating the cycle tact time and work tact time that have already been measured, and non-defective item number data or defective item number data stored in the memory by the operation of step S12 or S18. ing.
  • the processing unit 10 determines again whether or not the operation for stopping the production work has been performed in the input unit 13 (step S16). When the operation is performed in the determination of step S16 (step S16; YES), the processing unit 10 proceeds to the operation of step S1 as it is and repeats the operation as the process terminal T described so far.
  • step S16 when the operation for stopping the production work is not performed in the determination of step S16 (step S16; NO), the processing unit 10 proceeds to the operation of step S4, and another operation to be incorporated into the product P next.
  • the operations in steps S4 to S18 are performed on the part.
  • the processing unit 1 of the monitoring computer 200 that has finished the operation of step S23 monitors whether or not each traceability data has been transmitted from the process terminal T (step S24).
  • the processing unit 1 proceeds to the operation in step S20.
  • the processing unit 1 next checks the received traceability data and the equipment conditions stored in the RAM 3 by the operation of step S21. Using the data, for example, process traceability data exemplified by reference numerals 60-1 and 60-n in FIG. Step S26).
  • the processing unit 1 uses the traceability data received in step S24 and the new lot number data included in the lot number change information stored in the RAM 3 by the operation in step S23, for example, as shown in FIG. 6 generates part traceability data exemplified by reference numeral 61 (step S27), and additionally stores it as a data file in the storage unit 5 of the monitoring computer 200 (step S28). Thereafter, the processing unit 1 shifts to the operation of step S20 and repeats the operation as the monitoring computer 200 described so far.
  • the skill certifier determination operation is an operation of determining the skill qualification possessed by the worker who performs the work of the process. Specifically, in the assembly process in the line L, necessary certification skills (soldering skills, inspection skills, etc.) are determined in advance for each of the processes included therein, and an operator can connect to the process terminal T before starting work. When an operation for entering the worker number is performed, it is confirmed whether the worker is a skill certifier for the work necessary for the process, and a person other than the skill certifier tries to perform the work of the configuration. If there is, a warning is displayed at the process terminal T.
  • the processing unit 10 of the process terminal T first performs an operation indicating that the worker who performs the work of the process is changed, for example, the input unit 13 is determined (step S100).
  • the processing unit 10 proceeds to an operation in step S110 described later.
  • the processing unit 10 next indicates a new worker input in accordance with the change operation.
  • the worker number is transmitted to the monitoring computer 200 (step S101), and then the result information from the monitoring computer 200 indicating the result of checking the skill of the worker in a memory (not shown) in the processing unit 10 is set in a reception standby state (step S101). S102).
  • the processing unit 10 starts time measurement in a counter (not shown) that times the reception standby state (step S103).
  • the processing unit 10 determines whether or not a reception time-out state has been established for the result information by counting a preset time in the counter (step S104).
  • the reception time-out state is a state in which result information is not transmitted from the monitoring computer 200 due to some failure.
  • step S104 If the reception time-out state is reached in the determination in step S104 (step S104; YES), the processing unit 10 sets the result information in the memory to the reception time-out state (step S105), and further warns that using, for example, the display unit 12 Is displayed (step S106). Thereafter, the processing unit 10 proceeds to the operation of step S100. On the other hand, if it is determined in step S104 that the reception time-out state has not been reached (step S104; NO), the processing unit 10 next determines whether or not the result information has been received from the monitoring computer 200 (step S107). If the result information is not received in the determination in step S107 (step S107; NO), the processing unit 10 proceeds to the operation in step S104.
  • step S107 when the result information is received in the determination in step S107 (step S107; YES), the processing unit 10 stops the time passage in the counter that has started counting in step S103 (step S108), and further receives the received result information. Is stored in the memory (step S109).
  • step S20 the processing unit 1 of the monitoring computer 200 first monitors whether or not the worker number has been transmitted from the process terminal T (see step S101) (step S200).
  • step S200 the processing unit 1 proceeds to the operation of step S21 shown in FIG.
  • step S200 the processing unit 1 next determines whether or not the worker has been certified for the process based on the received worker number. Then, it is determined by collating with the worker skill authorization database 32 (see FIG. 5) (step S201).
  • step S201 If it is determined in step S201 that the worker indicated by the received worker number is a worker who has been certified for the process, the processing unit 1 sets the determination result to “OK”. On the other hand, when the worker indicated by the received worker number is not a worker whose skill is certified for the process, the processing unit 1 sets the determination result to “NG”. Next, the processing unit 1 transmits the determination result (that is, “OK” or “NG”) to the process terminal T that has transmitted the worker number as the result information (step S202), and further receives it.
  • the worker number is stored in the RAM 3 (step S203), and the operation proceeds to step S21 shown in FIG.
  • step S110 determines whether or not the result information in the memory is in a reception timeout state.
  • step S110; YES the processing unit 10 proceeds to the operation in step S100.
  • step S110; NO the processing unit 10 next refers to the result information stored in the memory and the content is “OK”. Whether or not (step S111).
  • step S111 If it is determined in step S111 that the content of the result information is “OK” (step S111, YES), the processing unit 10 next displays whether or not “skill authorized person” is displayed for the worker on the display unit 12. Is determined (step S114). When the display of “skill authorized person” has already been performed on the display unit 12 in the determination of step S114 (step S114; YES), the processing unit 10 proceeds to the operation of step S2 in FIG. 7 as it is. On the other hand, when the display of “skill authorized person” is not performed on the display unit 12 in the determination of step S114 (step S114; NO), the processing unit 10 displays on the display unit 12 that “skill authorized person” ( Step S115), and then the operation proceeds to Step S2 in FIG.
  • step S111 when the content of the result information is “NG” in the determination in step S111 (step S111; NO), the processing unit 10 next displays “unskilled person” for the worker on the display unit 12. It is determined whether or not it has been performed (step S112).
  • step S112 When the display of “unskilled person” has already been performed on the display unit 12 in the determination of step S112 (step S112; YES), the processing unit 10 directly proceeds to the operation of step S100.
  • step S112 when the display of the “unskilled person” is not performed on the display unit 12 in the determination in step S112 (step S112; NO), the processing unit 10 displays on the display unit 12 that the person is “unskilled person”. (Step S113), and then the operation proceeds to Step S100.
  • the production facility inspection operation is an operation for inspecting the operation state of the production facility provided for the work of the process provided with the process terminal T.
  • the production equipment driver, soldering iron, dispenser, etc.
  • the measured value (torque) , Iron tip temperature or coating amount, etc.) are input using the input unit 13 of the process terminal T, and are stored as traceability data indicating under what conditions each product P was produced.
  • the measurement value is input to the process terminal T, it is confirmed whether the measurement value is within a predetermined standard (condition) range. If the measurement value is out of the standard range, a warning is displayed at the process terminal T. Do.
  • the processing unit 10 of the process terminal T first checks the production equipment used in the process by an operator who performs the work of the process. It is determined whether or not a measurement value input operation has been performed using, for example, the input unit 13 (step S120). When the input operation of the inspection measurement value is not performed in the determination of step S120 (step S120; NO), the processing unit 10 proceeds to an operation of step S130 described later. On the other hand, when the inspection measurement value input operation is performed in the determination of step S120 (step S120; YES), the processing unit 10 next transmits inspection data including the inspection measurement value input by the input operation to the monitoring computer 200.
  • Step S121 the result information from the monitoring computer 200 indicating the production facility inspection result in a memory (not shown) in the processing unit 10 is set in a reception standby state (step S122).
  • the processing unit 10 starts time measurement in a counter (not shown) that times the reception standby state (step S123).
  • the processing unit 10 determines whether or not a reception time-out state has been established for the result information by counting a preset time in the counter (step S124).
  • This reception time-out state is a state in which result information is not transmitted from the monitoring computer 200 due to some kind of failure, as in the case shown in FIG.
  • step S124 If the reception time-out state is reached in the determination in step S124 (step S124; YES), the processing unit 10 sets the result information in the memory to the reception time-out state (step S125), and further warns that using, for example, the display unit 12 (Step S126). Thereafter, the processing unit 10 proceeds to the operation of step S120. On the other hand, if it is determined in step S124 that the reception timeout state has not been reached (step S124; NO), the processing unit 10 next determines whether or not the result information has been received from the monitoring computer 200 (step S127). When the result information is not received in the determination of step S127 (step S127; NO), the processing unit 10 proceeds to the operation of step S124.
  • step S127 when the result information is received in the determination in step S127 (step S127; YES), the processing unit 10 stops the time elapsed in the counter that has started counting in step S123 (step S128), and further receives the received result information. Is stored in the memory (step S129).
  • step S21 the processing unit 1 of the monitoring computer 200 first monitors whether or not the inspection data has been transmitted from the process terminal T (see step S121) (step S210).
  • step S210 the processing unit 1 proceeds to the operation of step S22 shown in FIG.
  • step S210 the processing unit 1 next selects the production facility indicated by the inspection measurement value included in the inspection data based on the received inspection data. For example, it is determined whether or not the state conforms to the standard indicated by the process standard data 44A (see FIG. 5) by comparing with the process standard data 44A (step S211).
  • step S211 when the state of the production facility indicated by the inspection measurement value included in the received inspection data conforms to the standard, the processing unit 1 sets the determination result to “OK”. On the other hand, when the state of the production facility indicated by the received inspection measurement value does not conform to the standard, the processing unit 1 sets the determination result to “NG”. Next, the processing unit 1 transmits the determination result (that is, “OK” or “NG”) to the process terminal T that has transmitted the inspection data as the result information (step S212), and further receives the inspection.
  • the data is stored in the RAM 3 (step S213), and the operation proceeds to step S22 shown in FIG.
  • step S130 determines whether or not the result information in the memory is in a reception timeout state.
  • step S130 determines whether or not the result information in the memory is in a reception timeout state.
  • step S130 determines whether or not the result information in the memory is in a reception timeout state.
  • step S130 determines whether or not the result information in the memory is in a reception timeout state.
  • step S130 determines whether or not the result information in the memory is in a reception timeout state.
  • step S111 when the content of the result information is “OK” (step S131, YES), the processing unit 10 next determines whether or not the production facility is normally displayed on the display unit 12 ( Step S134).
  • step S134 When normal display has already been performed on the display unit 12 in the determination of step S134 (step S134; YES), the processing unit 10 proceeds to the operation of step S3 in FIG. 7 as it is.
  • step S134 when the normal display is not performed on the display unit 12 in the determination of step S134 (step S134; NO), the processing unit 10 performs the normal display on the display unit 12 (step S135), and then the operation of FIG. Migrate to
  • step S131 when the content of the result information is “NG” in the determination in step S131 (step S131; NO), the processing unit 10 next displays whether or not an abnormality warning is displayed for the production facility on the display unit 12. Is determined (step S132). If the abnormality warning display has already been performed on the display unit 12 in the determination of step S132 (step S132; YES), the processing unit 10 proceeds to the operation of step S120 as it is. On the other hand, when the abnormality warning display is not performed on the display unit 12 in the determination of step S132 (step S132; NO), the processing unit 10 performs the abnormality warning display on the display unit 12 (step S133), and then the above step S120. Move to operation.
  • the work tact time evaluation operation is an operation for evaluating the work tact time for the work in the process in which the operation of step S11 is executed. Specifically, in the assembly process in the line L, a threshold value for the work tact time is set in advance for each process, and when the actual work tact time deviates from the threshold value, an abnormality display (tact time) is displayed on the process terminal T. An error is displayed and an alarm is sounded to warn the operator not to transport the product P to the next process.
  • the threshold values at this time are, for example, the lower limit value and the upper limit value indicated by the tact time data 44B shown in FIG.
  • the purpose of the work tact time evaluation of the embodiment is as follows. In general, work is performed at an almost constant rhythm (tact time) in normal operations in each process, so the work quality (production quality) is stable, but if there is an abnormality in the tact time, It is considered that some abnormal state has occurred, and the quality of the product P cannot be guaranteed. In view of this, the quality management system S of the embodiment uses a tact time (work tact time) as a quality evaluation element of the product P.
  • the processing unit 10 of the process terminal T indicates that the operation tact time that has been timed by the operation of step S13 is that of the process. It is determined whether or not the threshold range set in advance as the work tact time is satisfied, that is, whether or not the work tact time is not more than the upper limit value and not less than the lower limit value (step S160). . If it is determined in step S160 that the work tact time satisfies the threshold range (step S160; YES), the processing unit 10 proceeds to the operation in step S15 shown in FIG.
  • step S160 when the work tact time does not satisfy the threshold range in the operation of step S160, that is, the work tact time is either longer than the upper limit value or shorter than the lower limit value as the threshold value (step S160; NO), the processing unit 10 adds the work tact time defect number indicating that the work tact time is defective to the traceability data to be transmitted to the monitoring computer 200 (step S161), and the display unit 12 further displays an abnormality display as the tact error display. And an alarm (not shown) is sounded (step S162). Thereafter, the processing unit 10 determines whether or not an operation for canceling (stopping) the abnormality display and alarm ringing has been performed in the input unit 13 (step S163).
  • step S163 If the operation is not executed in the determination in step S163 (step S163; NO), the operation is awaited while the abnormality display and the alarm sound are continued. On the other hand, if a cancel operation such as an abnormal display is performed in the determination of step S163 (step S163; YES), the processing unit 10 stops the abnormal display or the like (step S164), and then proceeds to the operation of step S17 shown in FIG. To do.
  • FIG. 10 (b) is started when the operator in charge inputs information to that effect using the input unit 13 of the process terminal T when any abnormal state occurs during the process. Operation.
  • the processing unit 10 of the process terminal T monitors whether or not an abnormality warning operation has been performed by the operator at the input unit 13 or the like (step S30).
  • the processing unit 10 continues the monitoring as it is (step S30).
  • the processing unit 10 next sounds an alarm (not shown) and lights a warning lamp corresponding to the operation on the display unit 12, for example.
  • the processing unit 12 starts measuring the warning time in a counter (not shown) (step S32), and further transmits warning status data to the monitoring computer 200 (step S33).
  • This warning time is a time when it is considered that an abnormal state is occurring in the process terminal T, and the warning status data is data indicating that fact.
  • the processing unit 1 of the monitoring computer 200 monitors whether or not the warning status data has been transmitted from the process terminal T (see step S33) (step S50).
  • step S50 When the warning status data is not transmitted in the monitoring in step S50 (step S50; NO), the processing unit 1 shifts to an operation in step S52 described later.
  • step S50 when the warning status data is transmitted in the monitoring of step S50 (step S50; YES), the processing unit 1 displays on the display unit 6 that the process terminal T is under abnormal warning (step S51, reference numeral 23 in FIG. 23). (See G). Thereafter, the processing unit 1 shifts to an operation of step S52 described later.
  • Step S34 the processing unit 10 of the process terminal T monitors whether or not the operator has started a corresponding operation for eliminating the abnormal state corresponding to the abnormal warning.
  • step S34 the processing unit 10 stands by until the corresponding operation is started.
  • step S35 the processing unit 10 next finishes the warning time counting in the counter (step S35), and further stops the alarm sounding.
  • the warning lamp is shifted from a lighting state to a blinking state (step S36).
  • the processing unit 12 starts measuring the corresponding time in the counter (step S37), and further transmits the corresponding status data to the monitoring computer 200 (step S38).
  • This response time is a time when it is considered that a response operation for eliminating the abnormal state is performed in the process terminal T, and the response status data is data indicating that.
  • step S52 Is monitored (step S52).
  • step S52; NO the processing unit 1 proceeds to an operation in step S54 described later.
  • step S52; YES the processing unit 1 displays on the display unit 6 that the corresponding operation is being performed in the process terminal T (step S53, FIG. 23 reference G). Thereafter, the processing unit 1 shifts to an operation of step S55 described later.
  • the processing unit 10 of the process terminal T finishes the response operation by the operator, and performs the operation for inputting the abnormality item number and the operation for canceling the abnormality corresponding to the abnormality warning. It is monitored whether it has been done (step S39).
  • step S39 When the abnormal item number input operation or the like is not executed in the monitoring in step S39 (step S39; NO), the processing unit 10 stands by until the input operation or the like is started.
  • step S40 when an input operation or the like is started in the monitoring in step S39 (step S39; YES), the processing unit 10 next finishes measuring the corresponding time in the counter (step S40), and further displays the contents of the abnormal state.
  • the abnormal warning data shown is transmitted to the monitoring computer 200 (step S41). Thereafter, the processing unit 10 turns off the warning lamp (step S42), and then proceeds to the operation of step S30.
  • the specific contents of the abnormality warning data are illustrated as abnormality warning data MW in FIG.
  • step S54 Is monitored (step S54).
  • step S54 the processing unit 1 proceeds to the operation in step S50.
  • step S54 the processing unit 1 converts the abnormality warning data into a data file and additionally stores it in the storage unit 5 (step S55), and further displays the display unit. 6 is terminated (step S56). Thereafter, the processing unit 1 proceeds to the operation of step S50.
  • the abnormality warning data transmitted from the process terminal T to the monitoring computer 200 and additionally stored is, for example, abnormality warning data AL illustrated in FIG.
  • the FA device FA that is connected to a measuring device, a sensor, a motor, or the like and is computer-controlled is installed. / Traceability data of measurement results is stored as a data file in a storage unit (not shown) of the FA device FA.
  • the FA device FA monitors whether an adjustment process or an inspection process for the assembled product P has been disclosed (step S60).
  • step S60 the operation is not performed in the monitoring in step S60 (step S60; NO)
  • the FA device FA continues monitoring as it is (step S60).
  • step S60 the adjustment process or the inspection process is started (step S60; YES)
  • step S61 the adjustment process or the inspection process is started (step S61), and further performs the above measurement.
  • Each measurement data is acquired from each of the device, the sensor, and the motor (step S62).
  • the FA device FA confirms whether it is a non-defective product or a defective product based on the measurement data, acquires a non-defective product number and a defective product number corresponding to the confirmation result (step S63), and provides traceability data including them. Generate (step S64). Thereafter, the FA device FA additionally stores the generated traceability data in the storage unit (step S65), and proceeds to the operation of step S60.
  • FIGS. 11B and 12 are flowcharts showing the operation of the host computer 100 and the like.
  • all the FA devices FA for the adjustment process and the inspection process and the monitoring computer 200 are connected to each other via the LAN 201, and the host computers 100 of all the production bases FC. They are also connected to each other by the WAN 101.
  • the host computer 100 in each production site FC monitors the update of the traceability data data file and the abnormality warning data AL stored in the FA device FA and the monitoring computer 200, respectively.
  • the data file or abnormality warning data AL is updated, the data file is transferred to the host computer 100, and only the added portion (updated portion) is additionally stored in a database (see FIG. 4) determined in advance for each process. To do. This operation will be specifically described later with reference to FIG.
  • Each host computer 100 transmits a data update information request for each process to the host computer 100 in another production site FC.
  • the host computer 100 in another production site FC creates a data file of only the updated data if there is updated data, and converts the data file into a compressed file format.
  • the data is converted and returned to the requesting host computer 100 as data update information.
  • the host computer 100 converts the data update information sent back based on the update request information from the compressed file format to the original file format, and stores it in a database (see FIG. 4) determined in advance for each process. Add and save. This operation will be specifically described later with reference to FIG.
  • the processing unit 1 of the host computer 100 detects the data files and abnormalities of the traceability data stored in each FA device FA and the monitoring computer 200 in the production base FC in which the host computer 100 is provided.
  • the update time in each of the warning data AL is compared with the data file update history database 51 (step S70), and the update of each of the data file and the abnormal warning data AL is monitored (step S71). If there is no update of any data file in the monitoring in step 71 (step S71; NO), the processing unit 1 returns to step S70 and continues the collating operation.
  • the processing unit 1 transfers the updated data file to the host computer 100 (step S72).
  • the processing unit 1 acquires the last data date and time in the corresponding data file from the data file update history database 51 (step S73). Thereafter, the processing unit 1 appends and saves only the latest data added (updated) to the database for each process (see FIG. 4) (step S74), and further updates the latest data update time and the new last data date and time. Record in the file update history database 51 (step S75). Thereafter, the processing unit 1 proceeds to the operation of step S70.
  • the processing unit 1 of each host computer 100 transmits a data update information request for each process to the host computer 100 in another production site FC (step S80). Thereafter, the processing unit 1 starts the time measurement in a counter (not shown) that measures the standby state for receiving the data update information corresponding to the update information request (step S81). Thereafter, the processing unit 1 determines whether or not a reception time-out state has been reached in the data update information reception standby state by counting a preset time in the counter (step S82). If the reception time-out state is reached in the determination in step S82 (step S104; YES), the processing unit 1 proceeds to the operation in step S80.
  • step S82 determines whether the reception time-out state has been reached. If it is determined in step S82 that the reception time-out state has not been reached (step S82; NO), the processing unit 1 has next received the data update information from the host computer 100 in another production site FC. Is determined (step S83). When the data update information is not received in the determination in step S83 (step S83; NO), the processing unit 1 proceeds to the operation in step S82. On the other hand, when the data update information is received in the determination of step S83 (step S83; YES), the processing unit 1 stops the time elapsed in the counter that has started counting time by the operation of step S81 (step S84), and further receives it. The presence or absence of update data is determined based on the updated data update information (step S85).
  • the processing unit 1 of the host computer 100 at another production site FC monitors whether or not the update information request has been transmitted (see step S80) (step S90).
  • the processing unit 1 continues the monitoring as it is (step S90).
  • the processing unit 1 stores data stored in the storage unit 5 in the host computer 100 in which the processing unit 1 is provided.
  • the file update history database 51 is referred to, and update data for each process corresponding to the update information request is extracted from the file update history database 51 (step S91).
  • the processing unit 1 confirms the content of the extracted update data and determines whether there is updated data (step S92). If there is no updated data in the determination in step S92 (step S92; NO), the processing unit 1 proceeds to an operation in step S95 described later. On the other hand, when there is updated data in the determination in step S92 (step S92; YES), the processing unit 1 next creates a data file including only the updated data (step S93), and the created data file is further created. The data file is converted into a compressed file format (step S94). Thereafter, the processing unit 1 returns the updated data converted into the compressed file format as the data update information to the host computer 100 that has transmitted the update information request (step S96). Thereafter, the processing unit 1 proceeds to the operation of step S90. Thereafter, the returned data update information is received by the host computer 100 that is the transmission source of the update request information (see step S83).
  • step S85 when there is no update data in the determination of step S85, the processing unit 1 of the host computer 100 that is the transmission source of the update request information moves to the operation of step S80.
  • step S85 if there is update data in the determination of step S85 (step S85; YES), the processing unit 1 converts the update data of the compressed file format included in the update file to the original file format based on the data update information received by the operation of step S83. Conversion is performed (step S86).
  • step S87 the processing unit 1 additionally stores the update data converted (returned) into the original file format in the database (see FIG. 4) for each corresponding process.
  • step S87 the processing unit 1 records the update time of the latest data and the new last data date in the data file update history database 51 stored in the storage unit 5 (step S88). Thereafter, the processing unit 1 proceeds to the operation of step S80.
  • FIGS. 13, 17, and 18 are flowcharts showing the operation of the monitoring computer 200 and the like, respectively.
  • each line of another production site FC The current production status for each process included in L is displayed on the display unit 6 in real time (more specifically, in an output unit of data relating to each process (in other words, “process cycle unit”)).
  • the operation includes a data file indicating the production status of each process included in the line L including the monitoring computer 200, a data file corresponding to the production status in the line L in the other production base FC, and each database,
  • the data file corresponding to the production status in the line L in the other production base FC is It is acquired from the host computer 100 installed in another production site FC via the host computer 100 of the production site FC that includes IN L. (See FIG. 12)
  • a plurality of monitoring items can be set for each process included in the line L. Specifically, for example, “production progress”, “production quality”, “failure tendency”, “performance change” can be set as the monitoring items.
  • the monitoring computer 200 sets the permissible range for each monitoring item using two-stage parameters of “management value” and “abnormal value”, and the capability of each line L. And the target achievement level etc. More specifically, the monitoring computer 200 displays the current production status of each process included in each line L of each production site FC in the above two-stage parameters. It was calculated for each monitored item based on chromatography data, and displays the calculation result to easily display unit 6 visible in each process of each line L of production sites FC.
  • the “management value” refers to, for example, a quality that can be recovered to the extent that the original planned number and quality can be satisfied by taking some measures from the present time until the end of the operation of the line L with respect to the deterioration in quality. This is a threshold value for preventing the occurrence of an abnormality.
  • abnormal value means an allowable value of quality that cannot be recovered until the planned number of units and quality can be satisfied even if some measures are taken from the current time to the end of operation of the line L with respect to the deterioration of quality. It is.
  • the value of the process capability index (so-called CPK) of the adjustment inspection value related to the adjustment process and the inspection process is monitored.
  • CPK process capability index
  • the “management value” even if the CPK value reaches the management value, a defect as the product P does not occur. However, if the CPK value is further deteriorated below the management value, the defect is not good. It is set in advance as a value that is likely to occur.
  • the “abnormal value” a value that causes a failure in most cases (in other words, a possibility of occurrence of a failure is very high) is set in advance when the CPK value falls below the abnormal value. The operation of the monitoring computer 200 will be specifically described later with reference to FIG.
  • the monitoring computer 200 displays the details as a warning.
  • the monitoring computer 200 transmits warning display information or the like to the process terminal T of the abnormal process to display the warning, etc.
  • the process operator and, for example, the manager in charge of managing the line L are made aware of the existence of the abnormal process. This operation will be specifically described below with reference to FIG.
  • the processing unit 1 of the monitoring computer 200 first displays a totaling menu corresponding to each process on the display unit 6 based on the operation of the manager in charge of operating the monitoring computer 200 (step S300) Further, in accordance with the tabulation menu, the status of defect tabulation is compared for each line L and each production site FC (step S301).
  • the aggregation menu displayed on the display unit 6 in step S300 is, for example, the aggregation menu illustrated in FIG.
  • examples of the defect aggregation list displayed on the display unit 6 in the situation comparison in step S301 include the defect aggregation lists illustrated in FIGS. 14B and 14C, for example.
  • FIG. 14B is a display example in the case where the defect counts are compared for each production base FC
  • FIG. 14C is a display example in which the defect counts are compared for each line L.
  • the processing unit 1 reads necessary information from the corresponding database (see FIG. 4) in the storage unit 5 of the host computer 100 (step S302), and totals the read information in the monitoring screen of the display unit 6.
  • a list is displayed (step S303).
  • An example of the monitoring screen DP is shown in FIG.
  • the processing unit 1 displays a tabulation menu for comparison between the line L including the processing unit 1 and another line L on the display unit 6 based on the operation of the manager (step S1).
  • step S304 Further, based on the selection of the performance item by the manager in charge of the totaling menu, the graph totaling is executed (step S305).
  • the processing unit 1 of the monitoring computer 100 aggregates the CPK values for items having standard values such as inspection processes, monitors the transition changes, and based on the operation of the manager. Each performance item is displayed in a graph on the display unit 6 as described later (see step S307).
  • the items to be displayed in a graph include the performance item being monitored, and all the performance items are displayed in a graph on the display unit 6 based on the measured values regardless of the presence or absence of the standard value.
  • examples of the aggregation menu displayed on the display unit 6 in step S304 include the aggregation menus illustrated in FIGS. 15A and 15B.
  • the processing unit 1 reads necessary information from the corresponding database (see FIG. 4) in the storage unit 5 of the host computer 100 (step S306), and totals the read information in the monitoring screen DP of the display unit 6. Is displayed as a graph (step S307). Examples of the graph displayed on the display unit 6 in the graph display in step S307 include the graph display illustrated in FIGS. 15C and 16.
  • the processing unit 1 of the monitoring computer 200 has a data file update time and data file update history database 51 corresponding to each process included in each line L in each production site FC.
  • the contents of the corresponding data file are collated (step S170), and it is determined whether any data file has been updated (step S171). If it is determined in step S171 that no data file has been updated (step S171; NO), the processing unit 1 continues the operation of step S170. On the other hand, if it is determined in step S171 that one of the data files has been updated (step S171; YES), the processing unit 1 next reads the data file corresponding to each process (step S172), and further the process.
  • the production progress number, production quality (passage rate), and occurrence status (continuous number or failure rate) for each defective item are tabulated (step S173).
  • the “passing rate also referred to as a non-defective product rate” is a rate at which the product P put into each process passes through the process as “non-defective product”.
  • Passing rate value defined by number of non-defective products / number of inputs.
  • the “defective rate for each defective item” is a ratio for each defective item in which the product P input to each process is determined to be defective.
  • Defect rate value defined by number of defects per defect item / number of inputs.
  • the number of production progress in the process corresponds to “production progress” as the process
  • the production quality (passage rate) corresponds to “production quality” as the process.
  • the occurrence status of each defective item corresponds to the “defect tendency” as the process.
  • the processing unit 1 of the monitoring computer 200 reads data indicating the inspection item from, for example, the process information database 41 shown in FIG. For each monitoring item corresponding to, for example, the transition and change amount of the CPK value every hour are tabulated (step S175). The transition and change amount of the CPK value correspond to “performance change” as the monitoring item.
  • the processing unit 1 of the monitoring computer 200 reads the data in the database of each process from the process information database 41 shown in FIG. 4 in parallel with the operations of steps S170 to S173 and the operations of steps S174 and S175. (Step S176), for each work table 20 corresponding to the read data, the difference in the passing rate related to the next process is tabulated (step S177). This difference in passing rate corresponds to “quality difference” as the monitoring item.
  • the processing unit 1 determines whether or not the total value of each monitoring item has deviated from the abnormal value set for the monitoring item after completing the operations in steps S170 to S177 (step S178). . If it is determined in step S178 that the total value of any monitoring item deviates from the corresponding abnormal value (step S178; YES), whether or not the processing unit 1 is currently displaying an abnormal warning on the display unit 6 or not. Is determined (step S179). When an abnormality warning is displayed in the determination in step S179 (step S179; YES), the processing unit 1 proceeds to an operation in step S181 described later.
  • step S179 when the abnormality warning display is not performed in the determination of step S179 (step S179; NO), the processing unit 1 corresponds to the display of the corresponding process in the monitoring screen DP displayed on the display unit 6, An abnormality warning is displayed for the monitored item (step S180).
  • step S181 determines whether or not the display unit 6 is currently displaying the detailed content of the abnormality warning (step S181).
  • step S181 when the detailed content is displayed in the determination in step S181 (step S181; YES), the processing unit 1 shifts to an operation in step S183 described later.
  • step S181 when the detailed content is not displayed in the determination in step S181 (step S181; NO), the processing unit 1 next sets the monitoring item in the abnormality warning list WL (see FIG. 23) in the monitoring screen DP. Detailed contents of the abnormality warning are added and displayed (step S182).
  • the processing unit 1 determines whether or not the process in which the abnormal state has occurred is a process in the line L including the monitoring computer 200 provided with the processing unit 1 (Step S1). S183). If it is determined in step S183 that the process is not a process in the line L including the processing unit 1 (step S183; NO), the processing unit 1 directly proceeds to the operations in steps S170, S174, and S176. On the other hand, if it is determined in step S183 that the process is a process in the line L including the processing unit 1 (step S183; YES), the processing unit 1 then displays a current abnormality warning display at the process terminal T. Is determined (step S184).
  • step S184 When an abnormality warning is displayed in the determination in step S184 (step S184; YES), the processing unit 1 proceeds to the operations in steps S170, S174, and S176 as it is. On the other hand, when the abnormality warning display is not performed in the determination of step S184 (step S184; NO), the processing unit 1 transmits abnormality warning display information to the process terminal T of the process (step S185). Thereafter, the processing unit 1 proceeds to the operations of steps S170, S174, and S176.
  • step S178 determines that the total value of each monitoring item is It is determined whether or not the management value set for the monitoring item has deviated (step S186). In the determination in step S186, if the total value of any monitoring item deviates from the corresponding management value (step S186; YES), whether or not the processing unit 1 is currently displaying a warning warning on the display unit 6 or not. Is determined (step S187). When a warning warning is displayed in the determination in step S187 (step S187; YES), the processing unit 1 moves to an operation in step S189 described later.
  • step S187 when the abnormality warning display is not performed in the determination of step S187 (step S187; NO), the processing unit 1 corresponds to the display of the corresponding process in the monitoring screen DP displayed on the display unit 6, and A warning warning about the monitoring item is displayed (step S188). Next, the processing unit 1 determines whether or not the detailed content of the caution warning is currently displayed on the display unit 6 (step S189). When the detailed content is displayed in the determination in step S189 (step S189; YES), the processing unit 1 shifts to an operation in step S191 described later.
  • step S189 the processing unit 1 next displays the details of the caution warning related to the monitoring item in the caution warning list (not shown) in the monitoring screen DP. The contents are added and displayed (step S190).
  • the processing unit 1 determines whether or not the process in which the attention state has occurred is a process in the line L including the monitoring computer 200 in which the processing unit 1 is provided (Step S1). S191). If it is determined in step S191 that the process is not a process in the line L including the processing unit 1 (step S191; NO), the processing unit 1 proceeds to the operations of steps S170, S174, and S176 as it is.
  • step S191 if it is determined in step S191 that the process is a process in the line L in which the processing unit 1 is included (step S191; YES), the processing unit 1 next displays a current caution warning display on the process terminal T. It is determined whether or not it is being performed (step S192). When the abnormality warning is displayed in the determination in step S192 (step S192; YES), the processing unit 1 proceeds to the operations in steps S170, S174, and S176 as it is. On the other hand, when the abnormality warning display is not performed in the determination in step S192 (step S192; NO), the processing unit 1 transmits caution warning display information to the process terminal T of the process (step S193). Thereafter, the processing unit 1 proceeds to the operations of steps S170, S174, and S176.
  • step S186 when the total value of any monitoring item does not deviate from the corresponding management value (step S186; NO), the processing unit 1 then displays any warning display on the display unit 6. It is determined whether or not it is being performed (step S194). When any warning display is not performed in the determination of step S194 (step S194; NO), the processing unit 1 proceeds to an operation of step S196 described later. On the other hand, when any warning is displayed in the determination of step S194 (step S194; YES), the processing unit 1 is performed for the monitoring item of the corresponding process in the monitoring screen DP displayed on the display unit 6. The warning display is canceled (step S195).
  • the processing unit 1 determines whether or not the detailed content of any warning is currently displayed on the display unit 6 (step S196). If any detailed content is not displayed in the determination in step S196 (step S196; NO), the processing unit 1 proceeds to an operation in step S198 described later. On the other hand, when any detailed content is displayed in the determination in step S196 (step S196; YES), the processing unit 1 cancels the detailed content display (step S197). Next, the processing unit 1 determines whether or not the process in which the warning display or the like has been performed is a process in the line L including the monitoring computer 200 in which the processing unit 1 is provided ( Step S198).
  • step S198 If it is determined in step S198 that the process is a process in the line L in which the processing unit 1 is included (step S198; YES), the processing unit 1 next displays any warning message at the process terminal T. Is determined (step S199). If any warning display is not performed in the determination of step S199 (step S199; NO), the processing unit 1 proceeds to the operations of steps S170, S174, and S176 as it is. On the other hand, when any warning display is performed in the determination in step S199 (step S199; YES), the processing unit 1 transmits warning display release information for canceling the warning display to the process terminal T of the process. (Step S199-1). Thereafter, the processing unit 1 proceeds to the operations of steps S170, S174, and S176.
  • step S198 determines whether the process is not a process in the line L including the processing unit 1 (step S198; NO). If it is determined in step S198 that the process is not a process in the line L including the processing unit 1 (step S198; NO), the processing unit 1 proceeds to the operations of steps S170, S174, and S176 as it is. .
  • step S185, S193, or S199-1 the operation of the terminal device T to which any one of the abnormality warning display information, the caution warning display information, or the warning display release information is transmitted by the operation of step S185, S193, or S199-1 will be described. I will explain.
  • the processing unit 10 of the process terminal T receives any of the abnormality warning display information, the caution warning display information, and the warning display release information from the monitoring computer 200 directly connected to the process terminal T. Whether or not has been transmitted is monitored (step S220). When abnormality warning display information or the like is not transmitted in the monitoring in step S220 (step S220; NO), the processing unit 10 continues the monitoring operation as it is. On the other hand, when abnormality warning display information or the like has been transmitted in the monitoring in step S220 (step S220; YES), the processing unit 1 then displays the warning display as information detected in the monitoring in step S220. It is determined whether it is release information (step S221).
  • step S221 If the warning display release information has been transmitted in the determination in step S221 (step S221; YES), the processing unit 10 next releases the warning display that should have been executed on the display unit 12 (step S221). In step S222, the warning lamp 14 is further turned off (step S223). Thereafter, the processing unit 10 returns to the operation of step S220.
  • step S221 determines whether or not the information is warning warning display information. If the warning warning display information has been transmitted in the determination in step S224 (step S224; YES), the processing unit 10 next performs a corresponding warning warning display on the display unit 12 (step S225), and further displays a warning light. 14 is turned on for a warning (step S226). Thereafter, the processing unit 10 returns to the operation of step S220.
  • step S224 if the warning warning display information has not been transmitted (step S224; NO), the processing unit 1 then detects that the information detected in the monitoring in step S220 is the above abnormality. It is determined whether it is warning display information (step S227). If the warning warning display information has been transmitted in the determination of step S227 (step S227; YES), the processing unit 10 then displays a corresponding abnormality warning on the display unit 12 (step S228), and further displays a warning light. 14 is turned on for abnormality warning (step S229). Thereafter, the processing unit 10 returns to the operation of step S220. Even when the abnormality warning display information has not been transmitted in the determination of step S227 (step S227; NO), the processing unit 10 returns to the operation of step S220.
  • FIG. 19 is a flowchart showing the automatic feedback operation.
  • the monitoring computer 200 reads data of inspection items related to the adjustment items of the adjustment process set in advance from the process information database 41, and every hour for each FA device FA of the adjustment process. The average value and standard deviation value of each data are aggregated, and the transition change is monitored. When the latest average value and the standard deviation value change and deviate from a preset threshold value for each item, the monitoring computer 200 adjusts the average value and the standard deviation value so that the average value and the standard deviation value are restored within the threshold value. Feedback is automatically performed to offset the adjustment point of the FA device FA. Thereby, the transition of the inspection item data is stabilized, and the performance and quality of the product P are stabilized.
  • the processing unit 1 of the monitoring computer 200 reads the data of the inspection item from the process information database 41 (step S310), and further, each data for every hour for each FA device FA in the adjustment process.
  • the average value and the standard deviation value are tabulated (step S311), and the transition change is monitored.
  • the processing unit 1 determines whether or not the latest average value and the standard deviation value have changed and deviated from the threshold value for each item (step S312). If it is determined in step S312 that the average value and the standard deviation value do not deviate from the threshold values (step S312; NO), the processing unit 1 proceeds to the operation of step S310.
  • step S312 if it is determined in step S312 that the latest average value and standard deviation value deviate from the above-mentioned threshold value for each item (step S312; YES), the processing unit 1 next reads from the adjustment process offset command history database 54.
  • the history of the adjustment offset command to the FA device FA is read (step S313), and it is determined whether or not the average value determined to have deviated from the threshold value in the determination in step S312 is data after the latest offset command. (Step S314). If it is determined in step S314 that the average value determined to have deviated from the threshold value is not data after the latest offset command (step S314; NO), the processing unit 1 proceeds to the operation in step S310.
  • step S314 when the average value determined to have deviated from the threshold in the determination in step S314 is data after the latest offset command (step S314; YES), an offset of the adjustment point is necessary. If there is, then the processing unit 1 calculates the offset amount (step S315), and further uses the instruction to execute the offset and the offset amount calculated by the operation of step S315 as the FA device FA to be offset. (Step S316).
  • the processing unit 1 starts the time measurement in a counter (not shown) that counts the reception standby state of the parameters before and after the change from the FA device FA (that is, the specifications subject to offset in the FA device FA). (Step S317).
  • the processing unit 1 determines whether or not the parameter before and after the change is in a reception timeout state by counting a preset time in the counter (step S318).
  • the reception time-out state is a state in which the parameters before and after the change are not transmitted from the FA device FA due to some failure. If the reception time-out state is reached in the determination in step S318 (step S318; YES), the processing unit 1 proceeds to the operation in step S310.
  • step S318 determines whether or not the parameters before and after the change have been received from the FA device FA (step S319). . If the parameters before and after the change are not received in the determination in step S319 (step S319; NO), the processing unit 1 proceeds to the operation in step S318. On the other hand, when the parameters before and after the change are received in the determination in step S319 (step S319; YES), the processing unit 1 stops the time passage in the counter that has started counting in step S317 (step S320) and further receives it. The parameters before and after the change are recorded in the adjustment process offset command history database 54 (step S321). Thereafter, the processing unit 1 proceeds to the operation of step S310.
  • the FA device FA monitors whether or not the production of the product P using the FA device FA is started (step S330), and the production starts. If not (step S330; NO), the FA device FA continues to monitor step S330.
  • the FA device FA reads parameters as specifications of the tool related to the FA device FA (step S331) and uses them. An adjustment sequence is executed (step S332). Thereafter, the FA device FA monitors whether or not the production is to be ended (step S333). If the production is to be ended (step S333; YES), the operation proceeds to the operation of step S330.
  • step S333 the FA device FA next receives the offset command and the offset amount from the monitoring computer 200 provided in the same line L as the FA device FA. Is determined (see step S316, step S334). If the offset command or the like has not been transmitted in the determination in step S334 (step S334; NO), the FA device FA proceeds to the operation in step S332. On the other hand, if the offset command or the like has been transmitted in the determination in step S334 (step S334; YES), the FA device FA adds the transmitted offset amount to the corresponding original parameter and adds the added value. Record (step S335), and transmit the values before and after the change of the parameter corresponding to the offset amount to the monitoring computer 200 (see step S319; step S336). Thereafter, the FA device FA proceeds to the operation in step S331.
  • FIG. 20A is a flowchart showing the operation of the monitoring computer 200 in the graph display operation.
  • the monitoring computer 200 reads information from each database in the storage unit 5 of the host computer 100, displays a graph with measurement item histograms and scatter diagrams, and displays a transition graph of average values, standard deviation values, and CPK values.
  • information necessary for analysis such as a correlation graph display of the inspection process and the adjustment process and a correlation graph display aggregated for each lot of each input part is displayed on the display unit 6 instantly.
  • the manager or the like can recognize what causes the decrease in the passing rate and the direct rate.
  • the processing unit 1 of the monitoring computer 200 displays in the monitoring screen DP that an abnormality has occurred in the process based on the operation of the manager in charge of operating the monitoring computer 200.
  • a totaling menu corresponding to the current process is displayed on the display unit 6 (step S340), and the totaling items in the totaling menu (that is, the measurement item, average value / standard deviation value / CPK value, or inspection process)
  • a selection screen or the like is displayed on the display unit 6 to allow the manager to select items such as the correlation between the adjustment steps and the correlation for each lot of each part) (step S341).
  • the aggregation menu displayed on the display unit 6 in step S340 is the aggregation menu illustrated in FIGS.
  • the graph displayed on the display unit 6 when the tabulation menu illustrated in FIGS. 21A and 21B is selected includes, for example, the graph display illustrated in FIGS. 21C and 22. .
  • the processing unit 1 reads necessary information from the corresponding database (see FIG. 4) in the storage unit 5 of the host computer 100 (step S342), and totals the read information in the monitoring screen of the display unit 6. For example, a graph is displayed (step S343). Examples of the performance distribution chart include those illustrated in FIG. 15C, FIG. 16, FIG. 21C, or FIG.
  • FIG. 20B is a flowchart showing the operation of the monitoring computer 200 in the setting operation.
  • the monitoring computer 200 manages each monitoring item on the basis of changing factors such as the model of the product P to be produced, the degree of difficulty, the number of production plans, the skill of the worker, and the skill based on the operation of the manager or the like. Set (change) the value before starting production. This makes it possible to monitor the capacity of the current line L and the model of the product P, so that it is possible to prevent management failure due to excessive warnings and problems due to undetected abnormalities to be detected. ⁇ Can be managed.
  • Management value of passing rate and direct rate The daily management value for “how many percent of the direct rate is reached by what day from the start of production introduction” of the new product P is set. As a result, it is possible to grasp the current status of quality and work proficiency with respect to daily planned management values, and to achieve daily management values by responding to abnormal warnings. Therefore, a systematic and early improvement is expected to reach the final target value of the direct rate.
  • Management value of work tact monitoring Based on the model of the product P, the number of production plans, the skill and skill of the worker, the setting of the management value to be abnormal is changed by reviewing the standard work tact.
  • a rank (fatal failure, double failure failure, light failure failure) is provided for each failure item, and a failure occurrence warning management value is set.
  • the management values corresponding to fatal defects are “1”, “Specifically, the management value corresponding to the basic performance and functions of the product is “3 cases”, “minor defects (specifically, defects that do not affect the basic performance and functions of the product) “5 cases” or the like is suitable as the management value corresponding to (appearance defects, etc.)).
  • the processing unit 1 of the monitoring computer 200 for setting the management value first refers to, for example, the production plan database 33 illustrated in FIG. The information is displayed on the display unit 6, thereby causing the manager or the like to check the production model and the number of production of the product P in the line L (step S 350).
  • the processing unit 1 determines the management value of the direct rate based on the data indicating the direct rate target plan for the production model based on the operation using the input unit 7 by the manager or the like (step S351). .
  • the processing unit 1 displays the determined management value and the new management value determined by the operation in step S351 on the display unit 6, and an operation for changing the determined management value is performed by a manager or the like.
  • step S352 It is determined whether or not the process has been performed using the input unit 7 (step S352).
  • step S352 determines whether or not the process has been performed using the input unit 7 (step S352).
  • step S352 determines whether or not the process has been performed using the input unit 7 (step S352).
  • step S352 determines whether or not the process has been performed using the input unit 7 (step S352).
  • step S352 determines whether or not the process has been performed using the input unit 7 (step S352).
  • the processing unit 1 refers to, for example, the production plan database 33 illustrated in FIG. 4, and displays a work tact time totaling screen related to each process worker in the model of the product P on the display unit 6. Thus, the manager or the like is made to confirm the work tact time corresponding to the skill for each worker (step S354).
  • the processing unit 1 determines whether or not an operation for changing the management value of the work tact time of the production model has been performed by the manager or the like using the input unit 7 (step S355). When the operation to change is not performed in the determination in step S355 (step S355; NO), the processing unit 1 proceeds to the operation in step S350.
  • step S355 when an operation for changing the management value of the work tact time is performed (step S356; YES), the processing unit 1 then uses an existing algorithm or the like based on the operation. A management value for a new work tact time is determined (step S356). Thereafter, the processing unit 1 proceeds to the operation of step S350.
  • the quality detected based on the data indicating the status of the product P of each line L input by the process terminal T is out of specification.
  • the control value is reached (see steps S186 to S193 in FIG. 17 and steps S224 to S226 in FIG. 18)
  • the production status of the product P is acquired in real time.
  • a process terminal T is provided for each of a plurality of processes in one line L, and a plurality of monitoring items are “production progress”, “production quality”, “failure tendency”, “performance change”, “quality table”. Since each management value is set as a monitoring item, the management value is changed for each of a plurality of monitoring items, so that the passing rate for each process operation can be improved more finely.
  • the management value is changed in the monitoring computer 200 based on the information transmitted from the process terminal T (see steps S353 and S356 in FIG. 20B), the management value is changed according to the skill of the worker. Thus, it is possible to improve the passage rate and the like for each process operation more finely.
  • the passing rate for each process can be improved more finely.
  • an offset command and an offset amount indicating a change in work specification corresponding to an event that causes deterioration in quality are generated and transmitted to the FA device FA such as an adjustment process to change the adjustment specification (see FIG. 19). It is possible to prevent the quality from becoming out of specification.
  • the updated quality control data is compressed to generate compressed file format data (see steps S93 to S96 in FIG. 12), and the compressed file format data is transmitted to another host computer 100. Even when the computers 100 are separated from each other, the update of the quality control data can be exchanged quickly and reliably.
  • the program corresponding to the flowcharts shown in FIGS. 7 to 13 and FIGS. 17 to 20 is recorded on a recording medium such as a flexible disk or a hard disk, or is acquired and recorded via the network NT.
  • a general-purpose computer such as a microcomputer so that the microcomputer or the like can function as the processing unit 1 or 10 according to the embodiment.

Abstract

 異常発生時の原因探求を容易とすると共に、異常発生自体を予防的に低減させることが可能な品質管理システム等を提供するため、製品の生産ラインに含まれる複数のライン(L)に設けられた工程端末(T)と、工程端末(T)に接続された監視コンピュータ(200)と、を含む品質管理システムにおいて、工程端末(T)は、各ライン(L)における製品状況を作業者が入力するための入力部(13)と、入力された製品状況に対応する製品状況データを監視コンピュータ(200)等に送信する端末送信部と、を備え、監視コンピュータ(200)は、工程端末(T)から送信された製品状況データに基づいて、製品の品質管理について複数の監視項目毎且つライン(L)毎に製品の品質を検出し、各監視項目毎に設定された品質の管理値と、検出された品質とを比較し、検出された品質が管理値に到達したとき、その旨を告知する表示部(6)と、を備える。

Description

品質管理システム、端末装置、情報処理方法及びセンタ装置用プログラム
 本願は、品質管理システム、端末装置、情報処理方法及びセンタ装置用プログラムの技術分野に属する。より詳細には、電子部品や光学部品等を生産する生産拠点内に設置される品質管理システム及び当該品質管理システムに含まれる端末装置、並びに当該品質管理システムにおいて実行される情報処理方法及び当該品質管理システムに含まれるセンタ装置用のプログラムの技術分野に属する。
 一般に、製品の生産ラインには、組み立て工程、調整工程及び検査工程が含まれる。このうち組み立て工程は、必要な部品を用いて製品を組み立てる工程である。調整工程は当該組立後の製品に対して調整を行う工程である。更に検査工程は、調整後の製品に対して出荷前の検査を行う工程である。
 一方、近年では、あらゆる製品における製造品質の向上が望まれている。この点を上記生産ラインに当て嵌めると、具体的には、歩留まりの向上や製造誤差の解消が望まれている。そこで従来の生産ラインには、例えば、上記検査工程における異常発生時に警告を告知することが行われている。このような背景技術を例示する先行技術文献としては、例えば下記特許文献1又は特許文献2が挙げられる。
特開平6-266634号公報 特開2004-133620公報
 しかしながら、上記各特許文献に記載の技術では、検査工程において異常が発生したとき、その原因が当該検査工程より前のどの段階(工程)で発生したものであるかを探求するのが困難であるという問題点があった。また、当該原因追及に必要な時間も膨大となるという問題点もあった。
 そこで、本願は上記の問題点に鑑みて為されたもので、その課題の一例は、異常発生時の原因探求を容易とすると共に、異常発生自体を予防的に低減させることが可能な品質管理システム及び当該品質管理システムに含まれる端末装置、並びに当該品質管理システムにおいて実行される情報処理方法及び当該品質管理システムに含まれるセンタ装置用のプログラムを提供することにある。
 上記の課題を解決するために、請求項1に記載の発明は、製品の生産ラインに含まれる複数のラインに設けられた工程端末等の端末装置と、前記端末装置に接続された監視コンピュータ又はホストコンピュータ等のセンタ装置と、を含む品質管理システムにおいて、前記端末装置は、各前記ラインにおける製品状況を、当該各ラインの作業を行う作業者が入力するために用いられる入力部等の端末入力手段と、前記入力された製品状況に対応する製品状況情報を前記センタ装置に送信するインターフェース等の端末送信手段と、を備え、前記センタ装置は、前記端末装置から送信された前記製品状況情報に基づいて、前記製品の品質管理について予め設定されている複数の監視項目毎且つ前記ライン毎に前記製品の品質を検出するCPU等の品質検出手段と、各前記監視項目毎に設定された前記品質の管理値であって、当該品質についての規格を当該品質が満たさなくなる前に当該品質を示す品質値が到達する値として設定された管理値と、前記検出された品質を示す品質値と、を比較するCPU等の比較手段と、前記検出された品質が前記規格外となる方向に変化しており且つ当該品質を示す前記品質値が前記管理値に到達したとき、当該品質値が当該管理値に到達した旨を告知する表示部等の告知手段と、を備える。
 上記の課題を解決するために、請求項7に記載の発明は、請求項1から6のいずれか一項に記載の品質管理システムに含まれる前記端末装置であて、前記端末入力手段と、前記端末送信手段と、を少なくとも備える。
 上記の課題を解決するために、請求項8に記載の発明は、製品の生産ラインに含まれる複数のラインに設けられた工程端末等の端末装置と、前記端末装置に接続された監視コンピュータ又はホストコンピュータ等のセンタ装置と、を含む品質管理システムにおいて実行される情報処理方法であって、各前記ラインにおける製品状況が当該各ラインの作業を行う作業者により入力されたとき、当該入力された製品状況に対応する製品状況情報を前記端末装置から前記センタ装置に送信する端末送信工程と、前記送信された前記製品状況情報に基づいて、前記製品の品質管理について予め設定されている複数の監視項目毎且つ前記ライン毎に前記製品の品質を前記センタ装置において検出する品質検出工程と、各前記監視項目毎に設定された前記品質の管理値であって、当該品質についての規格を当該品質が満たさなくなる前に当該品質を示す品質値が到達する値として設定された管理値と、前記検出された品質を示す品質値と、を前記センタ装置において比較する比較工程と、前記検出された品質が前記規格外となる方向に変化しており且つ当該品質を示す前記品質値が前記管理値に到達したとき、当該品質値が当該管理値に到達した旨を前記センタ装置において告知する告知工程と、を含む。
 上記の課題を解決するために、請求項9に記載の発明は、製品の生産ラインに含まれる複数のラインに設けられた工程端末等の端末装置と、前記端末装置に接続された監視コンピュータ又はホストコンピュータ等のセンタ装置と、を含む品質管理システムであって、前記端末装置が、各前記ラインにおける製品状況を、当該各ラインの作業を行う作業者が入力するために用いられる端末入力手段と、前記入力された製品状況に対応する製品状況情報を前記センタ装置に送信する端末送信手段と、を備える品質管理システムに含まれる前記センタ装置に含まれるコンピュータを、前記端末装置から送信された前記製品状況情報に基づいて、前記製品の品質管理について予め設定されている複数の監視項目毎且つ前記ライン毎に前記製品の品質を検出する品質検出手段、各前記監視項目毎に設定された前記品質の管理値であって、当該品質についての規格を当該品質が満たさなくなる前に当該品質を示す品質値が到達する値として設定された管理値と、前記検出された品質を示す品質値と、を比較する比較手段、及び、前記検出された品質が前記規格外となる方向に変化しており且つ当該品質を示す前記品質値が前記管理値に到達したとき、当該品質値が当該管理値に到達した旨を告知する告知手段、として機能させる。
実施形態に係る品質管理システムの概要構成等を示す図であり、(a)は当該品質管理システムの概要構成を示すブロック図であり、(b)は当該品質管理システムに含まれる監視コンピュータ及びホストコンピュータの概要構成を示すブロック図であり、(c)は当該品質管理システムに含まれる工程端末の概要構成を示すブロック図である。 実施形態に係る各生産拠点の構成を示す図である。 実施形態に係る作業卓周辺の構成を示す図である。 実施形態に係るデータベースの構成を示す図である。 実施形態に係るデータベースの具体例を例示する図(I)である。 実施形態に係るデータベースの具体例を例示する図(II)である。 実施形態に係る品質管理システムの動作を示すフローチャート(I)である。 実施形態に係る品質管理システムの動作を示すフローチャート(II)である。 実施形態に係る品質管理システムの動作を示すフローチャート(III)である。 実施形態に係る品質管理システムの動作を示すフローチャート(IV)であり、(a)はタクトタイム評価の動作を示すフローチャートであり、(b)は警告表示の動作を示すフローチャートである。 実施形態に係る品質管理システムの動作を示すフローチャート(V)であり、(a)はFA機器の動作を示すフローチャートであり、(b)はホストコンピュータの動作を示すフローチャートである。 実施形態に係る品質管理システムの動作を示すフローチャート(VI)である。 実施形態に係る品質管理システムの動作を示すフローチャート(VII)である。 実施形態に係る監視コンピュータにおける表示例を示す図(I)であり、(a)は集計メニューの表示例を示す図であり、(b)は不良集計一覧の表示例を示す図(I)であり、(c)は不良集計一覧の表示例を示す図(II)である。 実施形態に係る監視コンピュータにおける表示例を示す図(II)であり、(a)は集計メニューの表示例を示す図(II)であり、(b)は集計メニューの表示例を示す図(III)であり、(c)は性能項目を示すグラフ図の例(I)である。 実施形態に係る監視コンピュータにおける性能項目を示すグラフ図の例(II)である。 実施形態に係る品質管理システムの動作を示すフローチャート(VIII)である。 実施形態に係る品質管理システムの動作を示すフローチャート(IX)である。 実施形態に係る品質管理システムの動作を示すフローチャート(X)である。 実施形態に係る品質管理システムの動作を示すフローチャート(XI)であり、(a)は監視コンピュータにおける画面表示制御を示すフローチャートであり、(b)は監視コンピュータにおける管理値の設定動作を示すフローチャートである。 実施形態に係る監視コンピュータにおける表示例を示す図(III)であり、(a)は集計メニューの表示例を示す図(IV)であり、(b)は集計メニューの表示例を示す図(V)であり、(c)は性能項目を示すグラフ図の例(III)である。 実施形態に係る監視コンピュータにおける性能項目を示すグラフ図の例(IV)である。 実施形態に係る表示画面例である。
 次に、本願を実施するため形態について、図1乃至図23を用いて説明する。なお以下に説明する実施形態は、回路基板等の電子部品や光ピックアップ等の光学部品等の製品を生産する生産拠点内に構築され、当該製品の製造上の品質を管理する品質管理システムに対して本願を適用した場合の実施の形態である。
 図1に示すように、実施形態に係る品質管理システムSは、インターネット等のネットワークNTを介してデータの授受が可能な複数の生産拠点FC1乃至FCn内に構築されている。各生産拠点FCは、同一の国内に建設されているものでもよいし、夫々の生産拠点FCが異なる国に夫々建設されているものでもよい。
 なお、例えば第1生産拠点FC1を我が国内に建設し、第2生産拠点FC2以降を海外に建設すると共に、第1生産拠点FC1内に構築されるラインL1を第2生産拠点FC2以降の海外拠点内に構築されるラインLのパイロットラインとして位置付けることも可能である。この場合、パイロットラインたる第1生産拠点FC1内のラインL1は、例えば第2生産拠点FC2内のラインL2とまったく同一の構成とされることになる。
 一方図2に例示するように、各生産拠点FC内には、一又は複数のラインLが構築されている。一つのラインLには、組立工程、調整工程及び検査工程の三工程が少なくとも夫々含まれている。組立工程は、例えば使用する部品毎に一又は複数の詳細な組立工程に区分されており、また調整工程も調整項目毎に一又は複数の調整工程に区分されている。更に検査工程も、検査項目毎に一又は複数の詳細な検査工程に区分されている。なお上記各工程は例えばベルトコンベアにより接続されており、当該ベルトコンベアに搭載された製品が各工程間を移動することにより、組立、調整及び検査の各工程が全体として流れ作業を構成して実行される。この場合通常は、組立工程と調整工程とは対をなして構成され、組立工程及び調整工程が終了した後に、その調整後の製品に対して検査工程が実行される。
 上記組立工程は、主として作業者の手作業により製品の組立が行われる工程である。また調整工程では、組立工程において組み立てられた製品に対する微調整等の調整が行われる。更に検査工程では、組み立てられ更に調整された製品に対する、例えば出荷前の検査等が行われる。これらの工程では、夫々の作業のために、例えば電動のドライバー、例えば部品に液体を塗布するためのディスペンサ及びハンダゴテ等の工具が使用される。これらの工具は、調整装置の一例及び調整仕様変更手段の一例としての後述するFA(Factory Automation)機器によりその諸元が自動的に制御される。この場合の諸元とは、例えば上記ドライバーの締め付けトルク、上記ディスペンサにおける一回の塗布量又は上記ハンダゴテのコテ先温度等である。
 また、特に組立工程のうち、作業者の手作業により組み立てが行われる工程においてその手作業が行われる作業卓には、当該作業者が操作及び視認可能な位置に、実施形態に係る端末装置の一例としての工程端末Tが設置されている。この工程端末Tは、手作業の工程には夫々に一つずつ設置されており、その作業者が自身の工程を実行する上で種々の情報を入力したり、或いは当該工程の実行に必要な種々の情報を当該作業者に提供するために用いられる。
 以上のように、一のラインLには、組立工程、調整工程及び検査工程夫々を実行するための上述した端末装置T及びFA機器が一又は複数含まれている。具体的には、例えば図2に例示する第1生産拠点FC1内のラインL1が、第1乃至第4の組立工程と、第3組立工程と第4組立工程との間の第1調整工程と、第4組立工程直後の第2調整工程と、検査工程と、により構成されているとする。この場合、第1乃至第4の組立工程夫々には、図2に例示する工程端末T1乃至T4が設けられている。また、第1及び第2調整工程用として、FA機器FA1及びFA2が設けられている。更に検査工程用としてFA機器FA3が設けられている。
 他方、一のラインLには、当該ラインLに含まれている各工程端末T及びFA機器FAに夫々接続されているセンタ装置の一例としての監視コンピュータ200が含まれている。例えば図2に例示する第1生産拠点FC1内のラインLには、上記工程端末T1乃至T4及びFA機器FA1乃至FA3に対して夫々例えばLAN(Local Area Network)201等により接続されている監視コンピュータ200が含まれている。この監視コンピュータ200と工程端末T1乃至T4及びFA機器FA1乃至FA3とは、上記LAN201を介して相互にデータの授受が可能とされている。監視コンピュータ200は、各生産拠点FCの各ラインL夫々に一台ずつ設置されており、後述するように、対応するラインLにおける製品の生産状況を表示すると共に、そのラインLを構成する上記工具の諸元を、対応するFA機器FAを介して制御する。
 また、各生産拠点FCには、夫々にホストコンピュータ100が備えられている。このホストコンピュータ100は、それが設定されている生産拠点FC内の各ラインL内の監視コンピュータ200及び各FA機器FAと、例えば上記LAN201を介して接続されており、相互にデータの授受が可能とされている。また各生産拠点FC内のホストコンピュータ100同士は、上記ネットワークNTを構成するいわゆるWAN(Wide Area Network)101を介して接続されており、相互にデータの授受が可能とされている。
 次に、実施形態に係る組立工程において作業者により作業が行われる上記作業卓周辺の構成について、図3を用いて説明する。なお図3は、当該作業卓周辺の概要構成を示す図である。
 図3に示すように、作業者による組み立て作業が実行される作業卓20には、ベルトコンベア21に載置された製品Pが搬入されてくる。また、当該作業卓20における作業が行われた製品Pは、再度ベルトコンベア21に載置されて次の工程に搬出される。図3において、このような製品は図3中左から作業卓20に搬入され、更に図3中右方向に向けて次の工程に搬出される。また作業卓20には、対応する上記工程端末Tが設置されている。
 一方、作業卓20に搬入される製品Pが通過する経路上には、投入開始センサ22が設置されている。投入開始センサ22は、直進性のある例えばレーザ光Bを射出する発光部22Aと、発光部22Aに対面する位置に配置され且つ発光部22Aから射出されたレーザ光Bを受光する受光部22Bと、を備えている。この受光部22Bは、作業卓20に搬入される製品Pが前方を通過することによりレーザ光Bが遮られると、その旨を示す信号を工程端末Tに送信する。
 更に作業卓20から搬出される製品Pが通過する経路上には、排出センサ23が設置されている。排出センサ23は、直進性のある例えばレーザ光Bを射出する発光部23Aと、発光部23Aに対面する位置に配置され且つ発光部23Aから射出されたレーザ光Bを受光する受光部23Bと、を備えている。この受光部23Bは、作業卓20から搬出される製品Pが前方を通過することによりレーザ光Bが遮られると、その旨を示す信号を工程端末Tに送信する。
 そして工程端末Tは、投入開始センサ22の受光部22Bからの上記信号により、作業卓20に製品Pが搬入されたタイミングを認識する。また排出センサ23の受光部23Bからの上記信号により、作業卓20から製品Pが搬出されたタイミングを認識する。これらのタイミングは、後述するサイクルタクトタイム及び作業タクトタイムの算出に夫々用いられる。
 また工程端末Tには、バーコードリーダ15と、外部から視認可能な例えば回転式の警告灯14と、が接続されている。このバーコードリーダ15は、作業卓20上で行われるべき作業を実行する作業者に把持されて操作されることにより、搬入されてきた製品Pに付されているバーコードを読み取り、その情報を工程端末Tに出力する。これにより当該工程端末Tは、対応する作業卓20に搬入された製品Pの製品番号やロット番号を認識することができる。
 また警告灯14は、それが接続されている工程端末Tに対応する作業卓20上の作業において何らかの異常が発生した場合等に点灯又は点滅することにより、当該異常発生の旨を周囲に認識させる。
 更に工程端末Tには、後述するように表示部12と、複数のスイッチ又はボタン等により構成される入力部13と、が含まれている。
 次に、実施形態に係る品質管理システムSを構成する監視コンピュータ200、ホストコンピュータ100及び工程端末Tの構成について、図1(b)及び図1(c)を用いて具体的に説明する。
 先ず当該監視コンピュータ200及びホストコンピュータ100の細部構成について、図1(b)を用いて説明する。なお、実施形態に係る監視コンピュータ200とホストコンピュータ100とは、基本的には同様のハードウエア構成を備える。よって図1(b)では、監視コンピュータ200について、その細部構成を説明する。
 実施形態に係る監視コンピュータ200は、図1(b)に示すように、CPU等からなる品質検出手段の一例、比較手段の一例、変更情報生成手段の一例、圧縮手段の一例及び品質管理情報生成手段の一例としての処理部1と、センタ送信手段の一例及び圧縮情報送信手段の一例としてのインターフェース2と、RAM(Random Access Memory)3と、ROM(Read Only Memory)4と、不揮発性の例えばハードディスクドライブ等からなる記憶部5と、液晶ディスプレイ等からなる告知手段の一例としての表示部6と、マウス及びキーボード等からなる入力部7と、により構成されている。
 この構成においてインターフェース2は、監視コンピュータ200に接続されている各工程端末T、FA機器FA及びホストコンピュータ100との間のデータの授受を制御する。ROM4には、後述する監視コンピュータ200としての動作を実行するためのプログラムやデータ等が予め不揮発性に記憶されている。更に記憶部5については、ホストコンピュータ100の記憶部5には後ほど図4を用いて説明する実施形態に係るデータベースが不揮発性に記憶されている。また監視コンピュータ200の記憶部5には、後述する監視コンピュータ200としての動作を実行するためのデータ等が不揮発性に記憶される。これらにより処理部1は、ROM4に記憶されている上記プログラム等を読み出して実行することにより、RAM3及び記憶部5との間でデータの授受を行いつつ、後述する監視コンピュータ200としての動作を実行する。当該動作は入力部7において実行された操作に基づいて実行されるものであり、その結果は表示部6に表示される。
 なお、ホストコンピュータ100の入力部7及び表示部6は、当該ホストコンピュータ100自体の保守点検等にのみ用いられるものである。また監視コンピュータ200の入力部7においては後述する監視コンピュータ200としての動作を実行する為に必要な入力操作が実行され、また当該動作の結果は表示部6に表示される。
 次に工程端末Tの細部構成について、図1(c)を用いて説明する。
 実施形態に係る工程端末Tは、図1(c)に示すように、CPU、RAM及びROM等からなる作業時間検出手段の一例としての処理部10と、端末送信手段の一例としてのインターフェース11と、液晶ディスプレイ等からなる上記表示部12と、端末入力手段の一例としての上記入力部13と、により構成されている。また処理部10には、上記受光部22B及び23Bと、バーコードリーダ15と、警告灯14と、が接続されている。
 この構成においてインターフェース11は、工程端末Tに接続されている監視コンピュータ200との間のデータの授受を制御する。これらにより処理部10は、処理部10内の図示しないROMに記憶されている工程端末用プログラム等を読み出して実行することにより、監視コンピュータ200、バーコードリーダ15及び警告灯14との間でデータの授受を行いつつ、後述する工程端末Tとしての動作を実行する。当該動作は入力部13において実行された操作に基づいて実行されるものであり、その結果等は表示部12に表示される。
 次に、各ホストコンピュータ100の記憶部5内に記憶されている、実施形態に係る各データベースについて、具体的に図4を用いて説明する。なお図4は実施形態に係るデータベースの構成を示す図である。また図4においては「データベース」なる用語を、単に「DB」と表記している。更に各ホストコンピュータ100は、夫々が備えられている生産拠点FCに対応する内容を有する図4に示すデータベースを、夫々の記憶部5内に記憶している。また各生産拠点FC内のホストコンピュータ100の記憶部5に夫々記憶されているデータベース内のデータは、各ホストコンピュータ100間で相互に共有可能とされている。
 図4に示すように、記憶部5内に記憶されているデータベースは、そのホストコンピュータ100が備えられている生産拠点FCに夫々対応する、拠点情報データベース30、機種情報データベース40、監視管理データベース50並びに製品Pの機種毎の機種トレーサビリディデータベース60、70、…、Nにより構成されている。
 このうち拠点情報データベース30は、その生産拠点FCの名称等を含む、当該生産拠点FCを示す一般的なデータを含んでいる。拠点情報データベース30には、就業時間データベース31と、作業者技能認定データベース32と、生産計画データベース33と、が対応付けられて記憶されている。就業時間データベース31には、例えばラインL毎の就業時間と休み時間を夫々示す時刻データ等が含まれている。生産計画データベース33には、そのホストコンピュータ100が備えられている生産拠点FCに課せられている製品の生産計画についてのデータ等が含まれている。更に作業者技能認定データベース32には、そのホストコンピュータ100が備えられている生産拠点FCにおいて組立工程等に従事する作業者夫々が有している、生産の作業に関する技能についてのデータ等が含まれている。これは、生産拠点FC内の各工程では、その工程毎に必要な認定技能(例えばハンダ付け技能や検査技能等)が予め定められていることに対応して、それらに従事する作業者夫々が有している認定技能をその作業者毎にデータベース化したものである。この作業者技能認定データベース32として具体的には、例えば図5に例示するものがある。
 一方、機種情報データベース40は、その生産拠点FCにおいて生産される製品Pの名称や製造番号等を含む、当該製品Pを示す一般的なデータを含んでいる。機種情報データベース40には、工程情報データベース41と、良否コードデータベース42と、調整検査規格データベース43と、生産条件規格データベース44と、部品情報データベース45と、が対応付けられて記憶されている。工程情報データベース41には、機種情報データベース40にそのデータが含まれている各製品Pが生産されるまでに通過すべき工程を示すデータ等が含まれている。良否コードデータベース42には、機種情報データベース40にそのデータが含まれている各製品Pの生産のための各工程夫々における良品/不良品の程度等に基づいて予め設定されている良否コードについてのデータ等が含まれている。調整検査規格データベース43には、機種情報データベース40にそのデータが含まれている各製品Pが生産される過程に含まれるべき調整工程及び検査工程夫々についての規格を示すデータ等が含まれている。生産条件規格データベース44には、機種情報データベース40にそのデータが含まれている各製品Pが生産されるまでに通過すべき組立工程等の各工程夫々についての規格を示すデータ等が含まれている。この生産条件規格データベース44として具体的には、例えば図5に例示するものがある。図5に示す生産条件規格データベース44には、組立工程夫々において用いられるドライバーのトルク値のデータやディスペンサにおける塗布量を示すデータ及び各ハンダゴテにおけるコテ先の温度を示すデータ等を含む工程規格データ44Aと、各工程におけるタクトタイムの上限値及び下限値を示すデータを含むタクトタイムデータ44Bと、が含まれている。
 上述したように各工程で用いられるドライバー等の諸元はFA機器FAにより制御されるが、当該FA機器FAは、工程規格データ44Aの内容を参照してこれらの制御を行う。また、実施形態のタクトタイムには、「サイクルタクトタイム」と「作業タクトタイム」の二種類がある。「サイクルタクトタイム」とは、ある工程に設けられた排出センサ23が製品Pの通過を検知してからその排出センサ23が次の製品Pの通過を検知するまでに経過する時間である。このサイクルタクトタイムは次の工程へ排出するサイクルのタクトタイムであり、上記の定義付けから、直前の工程までのラインタクトバランスの影響により製品Pが流れてくるまでの待ち時間も含まれることになる。一方、「作業タクトタイム」とは、ある工程に設けられた投入開始センサ22が製品Pの通過を検知してからその工程の排出センサ23がその製品Pの通過を検知するまでに経過する時間である。この作業タクトタイムは、上記の定義付けから、直前の工程までのラインタクトバランスの影響を受けない、その工程における実作業のみに必要なタクトタイムであることになる。
 次に監視管理データベース50は、その生産拠点FCにおいて生産される製品Pの品質管理に必要な一般的なデータを含んでいる。監視管理データベース50には、データファイル更新履歴データベース51と、品質管理データベース52と、監視項目警告履歴データベース53と、調整工程オフセット命令履歴データベース54と、が対応付けられて記憶されている。データファイル更新履歴データベース51は、そのホストコンピュータ100の記憶部5に記憶されている各データや、そのホストコンピュータ100に接続されている監視コンピュータ200内の各データの更新履歴を示すデータ等が含まれている。このデータファイル更新履歴データベース51として具体的には、例えば図5に例示するものがある。品質管理データベース52には、そのホストコンピュータ100が備えられている生産拠点FCにおいて生産される製品Pの品質管理に必要な一般的なデータ等が含まれている。監視項目警告履歴データベース53には、そのホストコンピュータ100が備えられている生産拠点FCにおける各程において、その品質管理上予め設定されている監視項目についての後述する警告等が発せられたことを示す履歴データ等が含まれている。更に調整工程オフセット命令履歴データベース54には、そのホストコンピュータ100が備えられている生産拠点FCに備えられた監視コンピュータ200からFA機器FAに送信されたオフセット命令の履歴を示すデータ等が含まれている。この調整工程オフセット命令履歴データベース54について、実施形態に係る監視コンピュータ200は、その監視コンピュータ200が接続されているFA機器FAに対して、後述するようにそのFA機器FAの制御下にある工具等の諸元を変更する旨のオフセット命令を送信して当該諸元を変更する。調整工程オフセット命令履歴データベース54には、このオフセット命令の履歴を示すデータ等が含まれており、その具体例としては、例えば図5に例示するものがある。
 次に、製品Pの機種毎の機種トレーサビリディデータベース60、70、…、Nについて説明する。なお、機種トレーサビリディデータベース60、70、…、Nは基本的には相互に同一の構成を備えているので、以下ではこれらを代表して第1機種トレーサビリティデータベース60について説明する。
 第1機種トレーサビリティデータベース60は、製品Pの第1機種としての名称やシリアル番号等、その機種の製品Pの製造管理に必要な一般的なデータ等を含んでいる。第1機種トレーサビリティデータベース60には、当該第1機種の製品Pが生産される際の各工程毎のトレーサビリティデータベースと、部品トレーサビリティデータベース61と、が対応付けられて記憶されている。図4に例示する第1機種トレーサビリティデータベース60の場合は、第1工程トレーサビリティデータベース60-1乃至第n工程トレーサビリティデータベース60-nが対応付けられている。このとき例えば第1工程トレーサビリティデータベース60-1は、対応する第1工程が組立工程に含まれる一つの工程であった場合、具体的には図6に例示するように、製品P毎のシリアル番号や実際のサイクルタクトタイム等のデータが含まれている。また例えば第n工程トレーサビリティデータベース60-nは、対応する第n工程が調整又は検査工程に含まれる工程の一つであった場合、具体的には図6に例示するように、製品P毎のシリアル番号や検査工程としての測定データ等のデータが含まれている。更に部品トレーサビリティデータベース61は、対応する製品P内に組み込まれている各部品の夫々について、当該部品の部品番号やロット番号を示すデータ等が含まれており、その具体例としては、例えば図6に例示するものがある。
 次に、実施形態に係る品質管理システムSを構成する監視コンピュータ200等の動作について、具体的に図7乃至図20のフローチャートを用いて説明する。
 初めに、工程端末Tを中心として実行される各工程における当該工程端末T等の動作について、図7乃至図11(a)を用いて説明する。なお図7乃至図11(a)は、当該工程端末T等の動作を夫々示すフローチャートである。
 上述したように、実施形態のラインL内の組立工程(即ち、作業者による手作業の組立工程)には、各工程毎に工程端末Tが設置されている。この工程端末Tは、各組立工程に係る工程トレーサビリティデータ(製品シリアル番号データ、日時データ、作業者番号データ、良品・不良項目番号データ及び作業タクトタイムデータ)と、当該工程用の設備の設備条件トレーサビリティデータ(各ドライバーのトルクデータ、ハンダゴテのコテ先温度データ及びディスペンサにおける塗布量データ等)と、投入部品のロットのトレーサビリティデータと、後述する作業者異常警告データと、を監視コンピュータ200宛に送信する。このうち工程トレーサビリティデータ及び設備条件トレーサビリティデータは、図6に例示する第1工程トレーサビリティデータベース60-1内の工程トレーサビリティデータとして例示されている。また工程端末Tには、上述したようにバーコードリーダ15と、投入開始センサ22及び排出センサ23と、警告灯24と、が接続されている。監視コンピュータ200はこれら工程端末Tから送信された各データをその記憶部5に記憶させる。
 次に、組立工程における工程端末T等の動作について、図7乃至図10を用いて説明する。
 図7に示すように、組立工程において工程端末Tの処理部10は、その組立工程が実行される作業卓20の位置にその工程の作業を行う作業者が配置されて当該工程端末Tを操作すると、後述するように監視コンピュータ200と連携して(ステップS20)、技能認定者判定動作を実行する(ステップS1)。この技能認定者判定動作は、対応する上記作業者が有する技能認定を判定する動作である。このステップS1の動作については、後ほど図8を用いて詳述する。
 次に処理部10は、後述するように監視コンピュータ200と連携して(ステップS21)、生産設備点検動作を実行する(ステップS2)。この生産設備点検動作は、その工程端末Tが備えられている工程の作業に供される生産設備(例えば上記ドライバー、ハンダゴテ及びディスペンサ等)の動作状態を点検する動作である。このステップS2の動作については、後ほど図9を用いて詳述する。
 次に処理部10は、入力部13においてその工程における製品Pの生産作業を開始する旨の操作が担当の作業者により行われたか否かを判定する(ステップS3)。ステップS3の判定において当該操作が行われていない場合(ステップS3;NO)、処理部10はそのまま上記ステップS1の動作に移行する。一方、ステップS3の判定において生産作業を開始する旨の操作が行われた場合(ステップS3;YES)、処理部10は次に、例えばバーコードリーダ15を用いて、新たな部品等としてのロット番号の入力操作が担当の作業者により行われたか否かを判定する(ステップS4)。ステップS4の判定において当該入力操作が行われていない場合(ステップS4;NO)、処理部10は後述するステップS6の動作に移行する。一方、ステップS4の判定において新たなロット番号の入力操作が行われた場合(ステップS4;YES)、処理部10はその入力されたロット番号を含むロット番号変更情報を監視コンピュータ200に送信する(ステップS5)。
 一方、工程端末Tと連携した上記生産設備点検動作を終了した監視コンピュータ200の処理部1は、工程端末Tから上記ロット番号変更情報が送信されてきたか否かを監視している(ステップS22)。ステップS22の監視においてロット番号変更情報を受信していない場合(ステップS22;NO)、処理部1は後述するステップS24の動作に移行する。一方、ステップS22の監視において新たなロット番号を含むロット番号変更情報を受信した場合(ステップS22;YES)、処理部1はその内容を例えばRAM3内に記憶させ(ステップS23)、後述するステップS24の監視動作に移行する。
 他方、上記ステップS5の動作によりロット番号変更情報を監視コンピュータ200に送信後、工程端末Tの処理部10は、上記サイクルタクトタイムの計時を開始する(ステップS6)。次に処理部10は、製品Pがその工程に搬入されてきたことを投入開始センサ22の受信部22Bからの情報により検知したか否かを判定する(ステップS7)。ステップS7の判定において当該製品Pが搬入されてきたことが検知されたら(ステップS7;YES)、処理部10は後述するステップS9の動作に移行する。一方ステップS7の判定において当該製品Pが搬入されてこないことが検知されたら(ステップS7;NO)、次に処理部10は、入力部13においてその工程における製品Pの生産作業を停止する旨の操作が担当の作業者により行われたか否かを判定する(ステップS8)。ステップS8の判定において当該操作が行われた場合(ステップS8;YES)、処理部10はそのまま上記ステップS1の動作に移行する。一方、ステップS8の判定において生産作業を停止する旨の操作が行われていない場合(ステップS8;NO)、処理部10は次に、上記作業タクトタイムの計時を開始し(ステップS9)、その後上記生産作業の停止操作が入力部13において行われたか否かを再度判定する(ステップS10)。ステップS10の判定において当該操作が行われた場合(ステップS10;YES)、処理部10はそのまま上記ステップS1の動作に移行する。一方、ステップS10の判定において生産作業を停止する旨の操作が行われていない場合(ステップS10;NO)、処理部10は次に、製品Pがその工程から搬出されたことを排出センサ23の受信部23Bからの情報により検知したか否かを判定する(ステップS11)。ステップS11の判定において当該製品Pが搬出されたことが検知されたら(ステップS11;YES)、その工程における製品Pに対する組立作業は問題なく終了したとして、次に処理部10はその工程に対応する良品番号を良否コード(図6符号60-1参照)として図示しないメモリ内に記憶させ(ステップS12)、更に上記ステップ6の動作により計時を開始していたサイクルタクトタイムの計時及び上記ステップS9の動作により計時を開始していた作業卓の作業タクトタイムの計時を夫々同時に終了する(ステップS13)。ここで、上記ステップS12の動作により記憶される「良品番号」とは、組立作業が終了した製品Pにつき、それが「良品」であることを示す番号であり、例えば「良品番号0」とされる。一方、上記ステップS11の判定において、当該製品Pが搬出されたことが検知されない場合(ステップS11;NO)、その工程における製品Pに対する組立作業において何らかの問題が発生した可能性があるとして、次に処理部10はその工程に対応する不良項目番号が入力部13等を介して作業者により入力されたか否かを判定する(ステップS17)。ステップS17の判定において不良項目番号の入力操作が行われない場合(ステップS17;NO)、処理部10は上記ステップS10の動作に移行する。他方、ステップS17の動作において不良項目番号の入力操作が行われた場合(ステップS17;YES)、処理部10はその不良項目番号を良否コードとして図示しないメモリ内に記憶させ(ステップS18)、上記ステップS13の動作に移行する。ここで、上記ステップS18の動作により記憶される「不良項目番号」とは、その製品Pにつける不良項目を示す番号であり、例えばその製品Pにおいて接着不良が発生している場合は「不良項目番号1」とされ、またその製品Pにおいて光学部品のキズ不良が発生している場合は「不良項目番号2」とされ、更にはその製品Pにおいて光学部品の汚れ不良が発生している場合は「不良項目番号3」とされる。
 次に処理部10は、当該工程における作業タクトタイムの評価動作を実行する(ステップS14)。このステップS14の評価動作は、上記ステップS11の動作により計時を終了した当該工程における作業についての作業タクトタイムを評価する動作である。この評価動作については、後ほど図10(a)を用いて詳述する。
 その後処理部10は、当該工程に係る各トレーサビリティデータを監視コンピュータ200に送信する(ステップS15)。このトレーサビリティデータには、例えば、計時済みのサイクルタクトタイム及び作業タクトタイム夫々を示すデータや、上記ステップS12又はS18の動作によりメモリ内に記憶されている良品番号データ又は不良項目番号データが含まれている。その後処理部10は、上記生産作業の停止操作が入力部13において行われたか否かを再度判定する(ステップS16)。ステップS16の判定において当該操作が行われた場合(ステップS16;YES)、処理部10はそのまま上記ステップS1の動作に移行し、これまで説明した工程端末Tとしての動作を繰り返す。一方、ステップS16の判定において生産作業を停止する旨の操作が行われていない場合(ステップS16;NO)、処理部10は上記ステップS4の動作に移行し、製品Pに次に組み込むべき他の部品に対して上記ステップS4乃至S18の動作を実行する。
 一方、上記ステップS23の動作を終えた監視コンピュータ200の処理部1は、上記各トレーサビリティデータが工程端末Tから送信されてきたか否かを監視する(ステップS24)。ステップS24の監視において各トレーサビリティデータを受信しない場合(ステップS24;NO)、処理部1は上記ステップS20の動作に移行する。一方ステップS24の監視において各トレーサビリティデータを受信した場合(ステップS24;YES)、処理部1は次に、当該受信したトレーサビリティデータと上記ステップS21の動作によりRAM3内に記憶されている設備条件の点検データとを用いて、例えば図6に符号60-1及び60-nで例示する工程トレーサビリティデータを生成し(ステップS25)、それを監視コンピュータ200の記憶部5内にデータファイルとして追記保存する(ステップS26)。次に処理部1は、ステップS24において受信したトレーサビリティデータと上記ステップS23の動作によりRAM3内に記憶されているロット番号変更情報に含まれている新たなロット番号のデータとを用いて、例えば図6に符号61で例示する部品トレーサビリティデータを生成し(ステップS27)、それを監視コンピュータ200の記憶部5内にデータファイルとして追記保存する(ステップS28)。その後処理部1は上記ステップS20の動作に移行し、これまで説明した監視コンピュータ200としての動作を繰り返す。
 次に、上記ステップS1及びS20において実行される、実施形態に係る技能認定者判定動作について、図8を用いて具体的に説明する。
 上述したように、実施形態に係る技能認定者判定動作は、その工程の作業を行う作業者が有する技能認定を判定する動作である。具体的にラインL内の組立工程においては、それに含まれる各工程毎に必要な認定技能(ハンダ付け技能又は検査技能等)が予め定められており、作業開始前に作業者が工程端末Tに対して作業者番号を入力する操作を行った際に、その作業者がその工程に必要な作業の技能認定者かどうかを確認し、技能認定者以外の者がその構成の作業を実行しようとしている場合には、工程端末Tにおいて警告表示を行う。
 即ち図8に示すように、実施形態に係る技能認定者判定動作において工程端末Tの処理部10は、初めにその工程の作業を実行する作業者が変更された旨の操作が、例えば入力部13を用いて行われたか否かを判定する(ステップS100)。ステップS100の判定において当該変更された旨の操作が行われない場合(ステップS100;NO)、処理部10は後述するステップS110の動作に移行する。一方、ステップS100の判定において作業者が変更された旨の操作が行われた場合(ステップS100;YES)、処理部10は次に、当該変更操作に伴って入力された新たな作業者を示す作業者番号を監視コンピュータ200に送信し(ステップS101)、その後処理部10内の図示しないメモリにおいて作業者の技能の照合判定結果を示す監視コンピュータ200からの結果情報を受信待機状態とする(ステップS102)。次に処理部10は当該受信待機状態を計時する図示しないカウンタにおける当該計時を開始する(ステップS103)。次に処理部10は、当該カウンタにおいて予め設定された時間が計時されることにより結果情報について受信タイムアウト状態となったか否かを判定する(ステップS104)。この受信タイムアウト状態とは、何らかの障害により結果情報が監視コンピュータ200から送信されてこない状態のことである。ステップS104の判定において受信タイムアウト状態となった場合(ステップS104;YES)、処理部10は上記メモリにおける結果情報を受信タイムアウト状態とし(ステップS105)、更にその旨を例えば表示部12を用いて警告として表示する(ステップS106)。その後処理部10は上記ステップS100の動作に移行する。一方ステップS104の判定において、受信タイムアウト状態となっていない場合(ステップS104;NO)、処理部10は次に監視コンピュータ200から上記結果情報を受信したか否かを判定する(ステップS107)。ステップS107の判定において上記結果情報を受信していない場合(ステップS107;NO)、処理部10は、上記ステップS104の動作に移行する。一方ステップS107の判定において結果情報を受信した場合(ステップS107;YES)、処理部10は上記ステップS103により計時を開始していたカウンタにおける当該経時を停止し(ステップS108)、更に受信した結果情報を上記メモリ内に記憶させる(ステップS109)。
 一方、図7に示すステップS20の動作として監視コンピュータ200の処理部1は、先ず、工程端末Tから上記作業者番号が送信されてきたか否か(ステップS101参照)を監視する(ステップS200)。ステップS200の監視において作業者番号を受信しない場合(ステップS200;NO)、処理部1は図7に示すステップS21の動作に移行する。他方ステップS200の監視において作業者番号を受信した場合(ステップS200;YES)、処理部1は次に、受信した作業者番号に基づいてその工程について技能認定された作業者であるか否かを、上記作業者技能認定データベース32(図5参照)と照合して判定する(ステップS201)。このステップS201の判定において、受信した作業者番号により示される作業者がその工程について技能認定された作業者である場合、処理部1は判定結果を「OK」とする。一方、受信した作業者番号により示される作業者がその工程について技能認定された作業者でない場合、処理部1は判定結果を「NG」とする。次に処理部1は、当該判定結果(即ち、「OK」又は「NG」のいずれか)を上記結果情報として作業者番号を送信してきた工程端末Tに送信し(ステップS202)、更に受信した作業者番号をRAM3内に記憶させて(ステップS203)、図7に示すステップS21の動作に移行する。
 他方、上記ステップS109の動作により結果情報をメモリに記憶した後、工程端末Tの処理部10は、上記メモリにおける結果情報が受信タイムアウト状態であるか否かを判定する(ステップS110)。ステップS110の判定において当該結果情報が受信タイムアウト状態である場合(ステップS110;YES)、処理部10は上記ステップS100の動作に移行する。一方ステップS110の判定において当該結果情報が受信タイムアウト状態でない場合(ステップS110;NO)、処理部10は次に、当該メモリに記憶されている結果情報を参照し、その内容が「OK」であるか否かを判定する(ステップS111)。ステップS111の判定において、結果情報の内容が「OK」であった場合(ステップS111、YES)、処理部10は次に、表示部12において作業者について「技能認定者」と表示されているか否かを判定する(ステップS114)。ステップS114の判定において「技能認定者」の表示が表示部12において既に行われている場合(ステップS114;YES)、処理部10はそのまま図7ステップS2の動作に移行する。一方ステップS114の判定において「技能認定者」の表示が表示部12において行われていない場合(ステップS114;NO)、処理部10は「技能認定者」である旨を表示部12に表示し(ステップS115)、その後図7ステップS2の動作に移行する。
 他方、上記ステップS111の判定において、結果情報の内容が「NG」であった場合(ステップS111;NO)、処理部10は次に、表示部12において作業者について「技能未認定者」と表示されているか否かを判定する(ステップS112)。ステップS112の判定において「技能未認定者」の表示が表示部12において既に行われている場合(ステップS112;YES)、処理部10はそのまま上記ステップS100の動作に移行する。一方ステップS112の判定において「技能未認定者」の表示が表示部12において行われていない場合(ステップS112;NO)、処理部10は「技能未認定者」である旨を表示部12に表示し(ステップS113)、その後上記ステップS100の動作に移行する。
 次に、図7に示すステップS2及びS21において実行される、実施形態に係る生産設備点検動作について、図9を用いて具体的に説明する。
 上述したように、実施形態に係る生産設備点検動作は、その工程端末Tが備えられている工程の作業に供される生産設備の動作状態を点検する動作である。具体的にラインL内の組立工程においては、その作業開始前に各工程毎に設置されている生産設備(ドライバー、ハンダゴテ又はディスペンサ等)の点検又は管理測定を行い、当該点検における測定値(トルク、コテ先温度又は塗布量等)を工程端末Tの入力部13を用いて入力し、個々の製品Pがどのような条件で生産されたかのトレーサビリティデータとして保存する。そして、工程端末Tへの測定値の入力時に、当該測定値として予め定められた規格(条件)の範囲内であるかを確認し、当該規格の範囲外であれば工程端末Tにおいて警告表示を行う。
 即ち図9に示すように、実施形態に係る生産設備点検動作において工程端末Tの処理部10は、初めにその工程の作業を実行する作業者により、その工程に用いられる上記生産設備についての点検測定値の入力操作が、例えば入力部13を用いて行われたか否かを判定する(ステップS120)。ステップS120の判定において当該点検測定値の入力操作が行われない場合(ステップS120;NO)、処理部10は後述するステップS130の動作に移行する。一方、ステップS120の判定において点検測定値の入力操作が行われた場合(ステップS120;YES)、処理部10は次に、当該入力操作により入力された点検測定値を含む点検データを監視コンピュータ200に送信し(ステップS121)、その後処理部10内の図示しないメモリにおいて生産設備点検結果を示す監視コンピュータ200からの結果情報を受信待機状態とする(ステップS122)。次に処理部10は当該受信待機状態を計時する図示しないカウンタにおける当該計時を開始する(ステップS123)。次に処理部10は、当該カウンタにおいて予め設定された時間が計時されることにより結果情報について受信タイムアウト状態となったか否かを判定する(ステップS124)。この受信タイムアウト状態とは、図8に示す場合と同様に、何らかの障害により結果情報が監視コンピュータ200から送信されてこない状態のことである。ステップS124の判定において受信タイムアウト状態となった場合(ステップS124;YES)、処理部10は上記メモリにおける結果情報を受信タイムアウト状態とし(ステップS125)、更にその旨を例えば表示部12を用いて警告として表示する(ステップS126)。その後処理部10は上記ステップS120の動作に移行する。一方ステップS124の判定において、受信タイムアウト状態となっていない場合(ステップS124;NO)、処理部10は次に監視コンピュータ200から上記結果情報を受信したか否かを判定する(ステップS127)。ステップS127の判定において上記結果情報を受信していない場合(ステップS127;NO)、処理部10は、上記ステップS124の動作に移行する。一方ステップS127の判定において結果情報を受信した場合(ステップS127;YES)、処理部10は上記ステップS123により計時を開始していたカウンタにおける当該経時を停止し(ステップS128)、更に受信した結果情報を上記メモリ内に記憶させる(ステップS129)。
 一方、図7に示すステップS21の動作として監視コンピュータ200の処理部1は、先ず、工程端末Tから上記点検データが送信されてきたか否か(ステップS121参照)を監視する(ステップS210)。ステップS210の監視において作業者番号を受信しない場合(ステップS210;NO)、処理部1は図7に示すステップS22の動作に移行する。他方ステップS210の監視において点検データを受信した場合(ステップS210;YES)、処理部1は次に、受信した点検データに基づいてその点検データに含まれている点検測定値により示される生産設備の状態が、例えば上記工程規格データ44A(図5参照)により示される規格に適合しているか否かを、当該工程規格データ44Aと照合して判定する(ステップS211)。このステップS211の判定において、受信した点検データに含まれている点検測定値により示される生産設備の状態が当該規格に適合している場合、処理部1は判定結果を「OK」とする。一方、受信した当該点検測定値により示される生産設備の状態が当該規格に適合していない場合、処理部1は判定結果を「NG」とする。次に処理部1は、当該判定結果(即ち、「OK」又は「NG」のいずれか)を上記結果情報として点検データを送信してきた工程端末Tに送信し(ステップS212)、更に受信した点検データをRAM3内に記憶させて(ステップS213)、図7に示すステップS22の動作に移行する。
 他方、上記ステップS119の動作により結果情報をメモリに記憶した後、工程端末Tの処理部10は、上記メモリにおける結果情報が受信タイムアウト状態であるか否かを判定する(ステップS130)。ステップS130の判定において当該結果情報が受信タイムアウト状態である場合(ステップS130;YES)、処理部10は上記ステップS120の動作に移行する。一方ステップS130の判定において当該結果情報が受信タイムアウト状態でない場合(ステップS130;NO)、処理部10は次に、当該メモリに記憶されている結果情報を参照し、その内容が「OK」であるか否かを判定する(ステップS131)。ステップS111の判定において、結果情報の内容が「OK」であった場合(ステップS131、YES)、処理部10は次に、表示部12において生産設備について正常表示されているか否かを判定する(ステップS134)。ステップS134の判定において正常表示が表示部12において既に行われている場合(ステップS134;YES)、処理部10はそのまま図7ステップS3の動作に移行する。一方ステップS134の判定において正常表示が表示部12において行われていない場合(ステップS134;NO)、処理部10は当該正常表示を表示部12において行い(ステップS135)、その後図7ステップS3の動作に移行する。
 他方、上記ステップS131の判定において、結果情報の内容が「NG」であった場合(ステップS131;NO)、処理部10は次に、表示部12において生産設備について異常警告表示がされているか否かを判定する(ステップS132)。ステップS132の判定において異常警告表示が表示部12において既に行われている場合(ステップS132;YES)、処理部10はそのまま上記ステップS120の動作に移行する。一方ステップS132の判定において異常警告表示が表示部12において行われていない場合(ステップS132;NO)、処理部10は当該異常警告表示を表示部12において行い(ステップS133)、その後上記ステップS120の動作に移行する。
 次に、図7に示すステップS14において実行される、実施形態に係る作業タクトタイムの評価動作について、図10(a)を用いて具体的に説明する。
 上述したように、実施形態に係る作業タクトタイムの評価動作は、上記ステップS11の動作が実行された工程における作業についての作業タクトタイムを評価する動作である。具体的にラインL内の組立工程では、各工程毎に作業タクトタイムの閾値が予め設定されており、実際の作業タクトタイムがその閾値を逸脱した場合には、工程端末Tにおいて異常表示(タクトエラー表示)を行うと共にアラームを鳴動させ、製品Pを次の工程へ搬送さないように作業者に警告をする。このときの閾値は、例えば図5に示すタクトタイムデータ44Bにより示される下限値及び上限値である。
 なお実施形態の作業タクトタイム評価の目的は以下の通りである。一般に、各工程における通常作業ではほぼ一定のリズム(タクトタイム)で作業がされているため、作業品質(生産品質)は安定しているが、タクトタイムに異常があった場合はその作業中に何らかの異常状態が発生したことが考えられ、その製品Pの品質を保障することができない。実施形態の品質管理システムSでは、このことに鑑み、製品Pの品質評価要素としてタクトタイム(作業タクトタイム)を用いる。
 即ち図10(a)に示すように、実施形態に係る作業タクトタイムの評価動作において工程端末Tの処理部10は、上記ステップS13の動作により計時が完了している作業タクトタイムがその工程の作業タクトタイムとして予め設定されている上記閾値の範囲を満足しているか否か、即ちその作業タクトタイムが当該閾値としての上限値以下且つ下限値以上であるか否かを判定する(ステップS160)。ステップS160の判定において、作業タクトタイムが当該閾値の範囲を満足している場合(ステップS160;YES)、処理部10は図7に示すステップS15の動作に移行する。一方ステップS160の動作において作業タクトタイムが閾値の範囲を満足していない、即ちその作業タクトタイムが当該閾値としての上限値より長いか又は下限値より短いかのいずれかである場合(ステップS160;NO)、処理部10は作業タクトタイムが不良であることを示す作業タクトタイム不良番号を監視コンピュータ200に送信するトレーサビリティデータに加え(ステップS161)、更に表示部12において上記タクトエラー表示たる異常表示を行うと共に、図示しないアラームを鳴動させる(ステップS162)。その後処理部10は、例えば入力部13において当該異常表示及びアラームの鳴動を解除(停止)させる操作が実行されたか否かを判定する(ステップS163)。ステップS163の判定において当該操作が実行されない場合(ステップS163;NO)、当該異常表示及びアラームの鳴動を継続しつつ当該操作の実行を待つ。一方ステップS163の判定において異常表示等の解除操作が実行された場合(ステップS163;YES)、処理部10は異常表示等を停止させ(ステップS164)、その後図7に示すステップS17の動作に移行する。
 次に、図7に示す組立工程の動作と並行して実行される、実施形態に係る作業者による異常警告に伴う工程端末T等の動作について、図10(b)を用いて具体的に説明する。図10(b)に示す動作は、その工程の作業中に何らかの異常状態が発生したとき、担当している作業者が工程端末Tの入力部13を用いてその旨を入力することにより開始される動作である。
 即ち図10(b)に示すように、工程端末Tの処理部10は、入力部13等において作業者により異常警告操作が為されたか否かを監視している(ステップS30)。ステップS0の監視において当該操作が為されない場合(ステップS30;NO)、処理部10はそのまま監視を継続する(ステップS30)。一方ステップS30の監視において異常警告操作が為された場合(ステップS30;YES)、処理部10は次に、図示しないアラームを鳴動させると共に、例えば表示部12において当該操作に対応した警告ランプを点灯させる(ステップS31)。次に処理部12は、図示しないカウンタにおける警告時間の計時を開始し(ステップS32)、更に警告ステータスデータを監視コンピュータ200に送信する(ステップS33)。この警告時間は工程端末Tにおいて異常状態が発生中であると見なされる時間であり、警告ステータスデータはその旨を示すデータである。
 一方、監視コンピュータ200の処理部1は、工程端末Tから上記警告ステータスデータが送信されてきたか否か(ステップS33参照)を監視する(ステップS50)。ステップS50の監視において警告ステータスデータが送信されてこない場合(ステップS50;NO)、処理部1は後述するステップS52の動作に移行する。一方ステップS50の監視において警告ステータスデータが送信されてきた場合(ステップS50;YES)、処理部1は工程端末Tにおいて異常警告中である旨を表示部6において表示する(ステップS51。図23符号G参照)。その後処理部1は後述するステップS52の動作に移行する。
 他方、警告ステータスデータを監視コンピュータ200に送信した後、工程端末Tの処理部10は、作業者により、上記異常警告に対応する異常状態を解消するための対応操作が開始されたか否かを監視する(ステップS34)。ステップS34の監視において当該対応操作が開始されない場合(ステップS34;NO)、処理部10は対応操作が開始されるまで待機する。一方ステップS34の監視において対応操作が開始された場合(ステップS34;YES)、処理部10は次に、上記カウンタにおける警告時間の計時を終了し(ステップS35)、更にアラームの鳴動を停止させると共に上記警告ランプを点灯状態から点滅状態に移行させる(ステップS36)。次に処理部12は、上記カウンタにおける対応時間の計時を開始し(ステップS37)、更に対応ステータスデータを監視コンピュータ200に送信する(ステップS38)。この対応時間は工程端末Tにおいて異常状態を解消するための対応操作が実行されていると見なされる時間であり、対応ステータスデータはその旨を示すデータである。
 一方、監視コンピュータ200の処理部1は、上記ステップS51の動作により異常警告中である旨の表示を開始した後は、工程端末Tから上記対応ステータスデータが送信されてきたか否か(ステップS38参照)を監視する(ステップS52)。ステップS52の監視において対応ステータスデータが送信されてこない場合(ステップS52;NO)、処理部1は後述するステップS54の動作に移行する。一方ステップS52の監視において対応ステータスデータが送信されてきた場合(ステップS52;YES)、処理部1は工程端末Tにおいて対応操作が実行されている旨を表示部6において表示する(ステップS53。図23符号G参照)。その後処理部1は後述するステップS55の動作に移行する。
 他方、対応ステータスデータを監視コンピュータ200に送信した後、工程端末Tの処理部10は、作業者による対応操作が終了し、上記異常警告に対応する異常項目番号の入力操作及び異常解除操作が実行されたか否かを監視する(ステップS39)。ステップS39の監視において当該異常項目番号の入力操作等が実行されない場合(ステップS39;NO)、処理部10は当該入力操作等が開始されるまで待機する。一方ステップS39の監視において入力操作等が開始された場合(ステップS39;YES)、処理部10は次に、上記カウンタにおける対応時間の計時を終了し(ステップS40)、更に上記異常状態の内容を示す異常警告データを監視コンピュータ200に送信する(ステップS41)。その後処理部10は上記警告ランプを消灯させ(ステップS42)、その後上記ステップS30の動作に移行する。この異常警告データについては、その具体的な内容を図6に異常警告データMWとして例示している。
 一方、監視コンピュータ200の処理部1は、上記ステップS53の動作により対応操作中である旨の表示を開始した後は、工程端末Tから上記異常警告データが送信されてきたか否か(ステップS41参照)を監視する(ステップS54)。ステップS54の監視において異常警告データが送信されてこない場合(ステップS54;NO)、処理部1は上記ステップS50の動作に移行する。一方ステップS54の監視において異常警告データが送信されてきた場合(ステップS54;YES)、処理部1は当該異常警告データをデータファイル化して記憶部5に追記保存し(ステップS55)、更に表示部6における表示を終了させる(ステップS56)。その後処理部1は上記ステップS50の動作に移行する。このとき工程端末Tから監視コンピュータ200に送信されて追記保存される異常警告データは、例えば図6に例示される異常警告データALである。
 次に、調整工程又は検査工程におけるFA機器FA等の動作について、図11(a)を用いて説明する。
 上述したように、上記組立工程後の調整工程及び検査工程には、例えば計測機器、センサ又はモータ等が接続されてコンピュータ制御されるFA機器FAが設置されており、調整工程や検査工程における調整/測定結果のトレーサビリティデータをFA機器FAの図示しない記憶部内へデータファイルとして記憶させる。
 即ち図11(a)に示すように、FA機器FAは、組立後の製品Pに対する調整工程又は検査工程が開示されたか否かを監視している(ステップS60)。ステップS60の監視において当該操作が為されない場合(ステップS60;NO)、FA機器FAはそのまま監視を継続する(ステップS60)。当該調整工程又は検査工程が開始されたら(ステップS60;YES)、FA機器FAは、調整工程又は検査工程としての予め設定されている調整シーケンス又は検査シーケンスを実行し(ステップS61)、更に上記計測機器、センサ及びモータ夫々から夫々の測定データを取得する(ステップS62)。更にFA機器FAは当該測定データに基づいて良品であるか不良品であるかを確認し、その確認結果に対応する良品番号及び不良品番号を取得し(ステップS63)、それらを含むトレーサビリティデータを生成する(ステップS64)。その後FA機器FAは生成されたトレーサビリティデータを記憶部に追記保存し(ステップS65)上記ステップS60の動作に移行する。
 次に、ホストコンピュータ100を中心として実行される、実施形態に係る情報のデータベース化の動作について、図11(b)及び図12を用いて説明する。なお図11(b)及び図12は、当該ホストコンピュータ100等の動作を夫々示すフローチャートである。
 上述したように、実施形態に係る品質管理システムSでは、調整工程及び検査工程用の全てのFA機器FAと監視コンピュータ200とがLAN201により相互に接続され、更に全ての生産拠点FCのホストコンピュータ100同士もWAN101により相互に接続されている。各生産拠点FC内のホストコンピュータ100は、FA機器FAと監視コンピュータ200に夫々保存されているトレーサビリティデータのデータファイルと異常警告データALの更新を夫々監視する。そして各データファイル又は異常警告データALが更新された場合は、それらをホストコンピュータ100に転送させ、その追加分(更新分)のみを予め工程毎に定められたデータベース(図4参照)へ追記保存する。この動作については、図11(b)を用いて後ほど具体的に説明する。
 また各ホストコンピュータ100は、他の生産拠点FC内のホストコンピュータ100に対して各工程毎のデータの更新情報要求を送信する。そして他の生産拠点FC内のホストコンピュータ100は、その更新情報要求に対して、更新されたデータがある場合はその更新されたデータのみのデータファイルを作成し、そのデータファイルを圧縮ファイル形式へ変換し、データ更新情報として要求元のホストコンピュータ100に返信する。この返信を受けたホストコンピュータ100は、上記更新要求情報に基づいて返信されたデータ更新情報を圧縮ファイル形式から元のファイル形式へ変換し、予め工程毎に定められたデータベース(図4参照)へ追記保存する。この動作については、図12を用いて後ほど具体的に説明する。
 次に図11(b)を用いて、ホストコンピュータ100における上記FA機器FAの監視動作及び対応するデータベースの更新動作について、具体的に説明する。
 図11(b)に示すようにホストコンピュータ100の処理部1は、それが備えられている生産拠点FC内の各FA機器FA及び監視コンピュータ200に夫々保存されているトレーサビリティデータのデータファイルと異常警告データAL夫々における更新時間と、データファイル更新履歴データベース51とを照合し(ステップS70)、当該データファイル及び異常警告データAL夫々の更新を監視する(ステップS71)。ステップ71の監視においていずれのデータファイルの更新もない場合(ステップS71;NO)、処理部1はステップS70に戻って照合動作を継続する。一方ステップS71の監視においていずれかのデーアファイルが更新された場合(ステップS71;YES)、処理部1はその更新されたデーアファイルをホストコンピュータ100に転送させる(ステップS72)。その後処理部1は、データファイル更新履歴データベース51から対応するデータファイルにおける最終データ日時を取得する(ステップS73)。その後処理部1は、追加(更新)された最新のデータのみを工程毎のデータベース(図4参照)へ追記保存し(ステップS74)、更に最新のデータの更新時刻と新たな最終データ日時をデータファイル更新履歴データベース51に記録する(ステップS75)。その後処理部1は上記ステップS70の動作に移行する。
 次に図12を用いて、ホストコンピュータ100における他の生産拠点FC内のホストコンピュータ100との連係動作について具体的に説明する。
 図12に示すように、各ホストコンピュータ100の処理部1は、他の生産拠点FC内のホストコンピュータ100に対して各工程毎のデータの更新情報要求を送信する(ステップS80)。その後処理部1は、当該更新情報要求に対応するデータ更新情報の受信の待機状態を計時する図示しないカウンタにおける当該計時を開始する(ステップS81)。その後処理部1は、当該カウンタにおいて予め設定された時間が計時されることにより、上記データ更新情報の受信待機状態について受信タイムアウト状態となったか否かを判定する(ステップS82)。ステップS82の判定において受信タイムアウト状態となった場合(ステップS104;YES)、処理部1は上記ステップS80の動作に移行する。一方ステップS82の判定において、受信タイムアウト状態となっていない場合(ステップS82;NO)、処理部1は次に他の生産拠点FC内のホストコンピュータ100からの上記データ更新情報を受信したか否かを判定する(ステップS83)。ステップS83の判定において上記データ更新情報を受信していない場合(ステップS83;NO)、処理部1は上記ステップS82の動作に移行する。一方ステップS83の判定においてデータ更新情報を受信した場合(ステップS83;YES)、処理部1は上記ステップS81の動作により計時を開始していたカウンタにおける当該経時を停止し(ステップS84)、更に受信したデータ更新情報に基づいて更新データの有無を判定する(ステップS85)。
 一方、他の生産拠点FCのホストコンピュータ100の処理部1は、上記更新情報要求が送信されてきたか否か(ステップS80参照)を監視する(ステップS90)。ステップS90の監視において更新情報要求が送信されてこない場合(ステップS90;NO)、処理部1はそのまま監視を継続する(ステップS90)。一方ステップS90の監視において更新情報要求が送信されてきた場合(ステップS90;YES)、処理部1は、当該処理部1が備えられているホストコンピュータ100内の記憶部5に記憶されているデータファイル更新履歴データベース51を参照し、その中から、上記更新情報要求に対応する工程毎の更新データを抽出する(ステップS91)。次にその処理部1は、抽出された更新データの内容を確認して更新されたデータの有無を判定する(ステップS92)。ステップS92の判定において更新されたデータがない場合(ステップS92;NO)、処理部1は後述するステップS95の動作に移行する。一方ステップS92の判定において更新されたデータがある場合(ステップS92;YES)、処理部1は次に、その更新されたデータのみを含むデータファイルを作成し(ステップS93)、更にその作成されたデータファイルを圧縮ファイル形式に変換する(ステップS94)。その後処理部1は、当該圧縮ファイル形式に変換された更新されたデータを上記データ更新情報として上記更新情報要求を送信してきたホストコンピュータ100に返信する(ステップS96)。その後処理部1は、上記ステップS90の動作に移行する。この後、返信されたデータ更新情報は、更新要求情報の送信元であるホストコンピュータ100において受信される(上記ステップS83参照)。
 次に、更新要求情報の送信元であるホストコンピュータ100の処理部1は、上記ステップS85の判定において更新データがない場合(ステップS85;NO)、処理部1は上記ステップS80の動作に移行する。一方ステップS85の判定において更新データがある場合(ステップS85;YES)、処理部1はステップS83の動作により受信したデータ更新情報に基づいてそれに含まれる圧縮ファイル形式の更新データを元のファイル形式へ変換する(ステップS86)。次に処理部1は、元のファイル形式に変換された(戻された)更新データを、対応する工程毎にデータベース(図4参照)へ追記保存する(ステップS87)。その後処理部1は、最新のデータの更新時刻と新たな最終データ日時を記憶部5に記憶されているデータファイル更新履歴データベース51に記録する(ステップS88)。その後処理部1は上記ステップS80の動作に移行する。
 次に、各ラインLの監視コンピュータ200を中心として実行される、実施形態に係るラインLの状況監視動作について、図13乃至図18を用いて説明する。なお図13及び図17並びに図18は、当該監視コンピュータ200等の動作を夫々示すフローチャートである。
 上述したように、実施形態に係る品質管理システムSに含まれる各ラインLの監視コンピュータ200は、そのラインLに含まれる各工程の現在の生産状況に加えて、他の生産拠点FCの各ラインLに含まれる各工程毎の現在の生産状況を、リアルタイム(より具体的には、各工程に係るデータの出力単位(換言すれば「工程サイクル単位」)に表示部6に表示する。この表示動作は、その監視コンピュータ200が含まれているラインLに含まれる各工程の生産状況を示すデータファイルと、他の生産拠点FC内のラインLにおける生産状況に対応するデータファイル及び各データベースと、から必要なデータを読み出すことにより実行される。なお他の生産拠点FC内のラインLにおける生産状況に対応するデータファイル等は、そのラインLが含まれている生産拠点FCのホストコンピュータ100を介して他の生産拠点FCに設置されているホストコンピュータ100から取得するものである(図12参照)。ここで、監視コンピュータ200では、ラインLに含まれる各工程について、複数の監視項目が設定可能とされている。当該監視項目として具体的には、例えば、「生産進捗」、「生産品質」、「不良傾向」、「性能変化」、「品質卓差」が挙げられる。監視コンピュータ200は、当該各監視項目ごとの許容範囲を「管理値」と「異常値」の二段階のパラメータを用いて設定し、各ラインLの能力及び目標到達度等を表示する。より具体的に監視コンピュータ200は、各生産拠点FCの各ラインLに含まれる各工程毎の現在の生産状況を、上記二段階のパラメータに基づいて各監視項目毎に算出し、その算出結果を各生産拠点FCの各ラインLの各工程毎に視認容易に表示部6に表示する。
 ここで、上記「管理値」とは、例えば、品質の低下に対して現時点からラインLの稼動終了時までに何らかの対応を施すことで、元の計画台数や品質を満足できるまでに回復できる品質の許容値であり、異常発生に至らないように未然防止するための閾値である。一方、「異常値」とは、品質の低下に対して現時点からラインLの稼動終了時までに何らかの対応を施しても、計画台数や品質を満足できるまでに回復できないと考えられる品質の許容値である。より具体的に例えば、監視コンピュータ200による性能変化の監視では、調整工程及び検査工程に係る調整検査値の工程能力指数(いわゆるCPK)の値を監視する。この場合の「管理値」としては、その管理値にまでCPK値が到達しても製品Pとしての不良発生には至らないが、CPK値がその管理値を下回って更に悪化していくと不良発生に至る可能性が出てくる値として予め設定される。また「異常値」としては、その異常値をCPK値が下回った場合は殆どの場合に不良発生に至る(換言すれば、不良発生に至る可能性が非常に高い)値が予め設定される。この監視コンピュータ200の動作については、図13を用いて後ほど具体的に説明する。
 一方監視コンピュータ200は、各監視項目について異常がある場合、その詳細を警告表示する。併せて監視コンピュータ200は、それが含まれるラインL内のいずれかの工程において異常が発生した場合、その異常工程の工程端末Tへ警告表示情報等を送信して警告表示等を行わせ、当該工程の作業者及び例えばそのラインLを管理する管理担当者に対してその異常工程の存在を認識させる。この動作については、図17を用いて以下に具体的に説明する。
 次に図13を用いて、監視コンピュータ200等における上記生産状況の表示動作について、具体的に説明する。
 図13に示すように、監視コンピュータ200の処理部1は、その監視コンピュータ200を操作する管理担当者の操作に基づき、先ず各工程に対応する集計用のメニューを表示部6に表示し(ステップS300)、更にその集計メニューに対応して、ラインL毎及び生産拠点FC毎に不良集計の状況を比較する(ステップS301)。ここで、上記ステップS300において表示部6に表示される集計メニューは、例えば図14(a)に例示する集計メニューが挙げられる。また、上記ステップS301の状況比較において表示部6に表示される不良集計一覧は、例えば図14(b)及び(c)に例示する不良集計一覧が挙げられる。このとき、図14(b)は生産拠点FC別に不良集計を比較した場合の表示例であり、図14(c)はラインL別に不良集計を比較した場合の表示例である。
 次に処理部1は、ホストコンピュータ100の記憶部5内の対応するデータベース(図4参照)から必要な情報を読み取り(ステップS302)、読み取った情報を集計して表示部6の監視画面内に一覧表示する(ステップS303)。この監視画面DPの例を図23に示す。
 図23に例示するように、複数の生産拠点FCにおいて同一の工程を行っているラインLを比較表示することにより、管理担当者として生産拠点FC及びラインL毎の品質差の問題が明確になるため、不良状態のラインLの不良工程を他方の良好状態のラインLに基づいて是正することで、各ラインL夫々における品質の向上が同時に見込めるのである。
 次に処理部1は、上記管理担当者の操作に基づき、処理部1が含まれているラインLと他のラインLとの比較のための集計用のメニューを表示部6に表示し(ステップS304)、更にその集計メニューに対応した管理担当者による性能項目の選択に基づき、そのグラフ集計を実行する(ステップS305)。ここで、「性能項目」として監視コンピュータ100の処理部1は、検査工程等の規格値を有する項目に対して上記CPK値を集計し、その推移変化を監視し、管理担当者の操作に基づいて各性能項目を含めて、後述するように表示部6にグラフ表示する(ステップS307参照)。このグラフ表示させる項目には、監視している性能項目が含まれる他、規格値の有無に関係なく、全ての性能項目について、測定された値に基づいて表示部6にグラフ表示する。また、上記ステップS304において表示部6に表示される集計メニューは、例えば図15(a)及び(b)に例示する集計メニューが挙げられる。
 次に処理部1は、ホストコンピュータ100の記憶部5内の対応するデータベース(図4参照)から必要な情報を読み取り(ステップS306)、読み取った情報を集計して表示部6の監視画面DP内にグラフ表示する(ステップS307)。このステップS307のグラフ表示において表示部6に表示されるグラフ図は、例えば図15(c)及び図16に例示するグラフ表示が挙げられる。
 次に図17及び図18を用いて、監視コンピュータ200等における上記警告表示等の動作について、具体的に説明する。
 図17に示すように、監視コンピュータ200の処理部1は、各生産拠点FC内の各ラインLに含まれる各工程毎に、それに対応するデータファイルの更新時間とデータファイル更新履歴データベース51内の対応するデータファイルの内容とを照合し(ステップS170)、いずれかのデータファイルが更新されているか否かを判定する(ステップS171)。ステップS171の判定において、いずれのデータファイルも更新されていない場合(ステップS171;NO)、処理部1は上記ステップS170の動作を継続する。一方ステップS171の判定において、いずれかのデータファイルが更新されている場合(ステップS171;YES)、処理部1は次に、各工程毎に対応するデータファイルを読み取り(ステップS172)、更にその工程における生産進捗台数、生産品質(通過率)、不良項目毎の発生状況(連続数又は不良率)を集計する(ステップS173)。ここで、上記「通過率(良品率とも言う)」とは、各工程に投入された製品Pが「良品」としてその工程を通過した割合であり、具体的には、
 通過率=良品数/投入数
 で定義される値である。また「不良項目毎の不良率」とは、各工程に投入された製品Pが不良判定された不良項目毎の割合であり、具体的には、
 不良率=不良項目毎の不良数/投入数
 で定義される値である。また、上記各監視項目との対応関係については、その工程における生産進捗台数がその工程としての「生産進捗」に対応し、生産品質(通過率)がその工程としての「生産品質」に対応する。また、不良項目毎の発生状況がその工程としての「不良傾向」に対応する。
 一方、監視コンピュータ200の処理部1は、上記ステップS170からS173の動作と並行して、図4に示す例えば工程情報データベース41等から検査項目を示すデータを読み取り(ステップS174)、当該読み取ったデータに対応する監視項目毎に、例えば一時間毎のCPK値の推移と変化量を集計する(ステップS175)。このCPK値の推移と変化量が、上記監視項目としての「性能変化」に対応する。
 更に監視コンピュータ200の処理部1は、上記ステップS170からS173の動作並びに上記ステップS174及びS175の動作と夫々並行して、図4に示す工程情報データベース41等から各工程のデータベース内のデータを読み取り(ステップS176)、当該読み取ったデータに対応する作業卓20毎に、次の工程に係る通過率の差異を集計する(ステップS177)。この通過率の差異が、上記監視項目としての「品質卓差」に対応する。
 次に処理部1は、上記ステップS170乃至S177の動作を終了後、上記各監視項目の集計値がその監視項目について設定されている上記異常値から逸脱したか否かを判定する(ステップS178)。ステップS178の判定において、いずれかの監視項目の集計値が対応する異常値から逸脱している場合(ステップS178;YES)、処理部1は表示部6において現在異常警告表示を行っているか否かを判定する(ステップS179)。ステップS179の判定において異常警告表示を行っている場合(ステップS179;YES)、処理部1は後述するステップS181の動作に移行する。一方ステップS179の判定において異常警告表示を行っていない場合(ステップS179;NO)、処理部1は、表示部6に表示されている上記監視画面DP内の対応する工程の表示に対応させて、その監視項目についての異常警告表示を行う(ステップS180)。次に処理部1は、表示部6において現在異常警告の詳細内容の表示を行っているか否かを判定する(ステップS181)。ステップS181の判定において詳細内容の表示を行っている場合(ステップS181;YES)、処理部1は後述するステップS183の動作に移行する。一方ステップS181の判定において詳細内容の表示を行っていない場合(ステップS181;NO)、処理部1は次に、監視画面DP内の上記異常警告リストWL(図23参照)内に当該監視項目に係る異常警告の詳細な内容を追記して表示する(ステップS182)。
 次に処理部1は、当該異常状態が発生している工程が、その処理部1が備えられている監視コンピュータ200が含まれているラインL内の工程であるか否かを判定する(ステップS183)。ステップS183の判定において、その工程がその処理部1が含まれているラインL内の工程でない場合(ステップS183;NO)、処理部1はそのまま上記ステップS170、S174及びS176の動作に移行する。一方、ステップS183の判定において、その工程がその処理部1が含まれているラインL内の工程である場合(ステップS183;YES)、処理部1は次に、工程端末Tにおいて現在異常警告表示を行っているか否かを判定する(ステップS184)。ステップS184の判定において異常警告表示を行っている場合(ステップS184;YES)、処理部1はそのまま上記ステップS170、S174及びS176の動作に移行する。一方ステップS184の判定において異常警告表示を行っていない場合(ステップS184;NO)、処理部1は、その工程の工程端末Tに対して異常警告表示情報を送信する(ステップS185)。その後処理部1は上記ステップS170、S174及びS176の動作に移行する。
 一方、上記ステップS178の判定において、いずれの監視項目の集計値も対応する異常値から逸脱していない場合(ステップS178;NO)、次に処理部1は、上記各監視項目の集計値がその監視項目について設定されている上記管理値から逸脱したか否かを判定する(ステップS186)。ステップS186の判定において、いずれかの監視項目の集計値が対応する管理値から逸脱している場合(ステップS186;YES)、処理部1は表示部6において現在注意警告表示を行っているか否かを判定する(ステップS187)。ステップS187の判定において注意警告表示を行っている場合(ステップS187;YES)、処理部1は後述するステップS189の動作に移行する。一方ステップS187の判定において異常警告表示を行っていない場合(ステップS187;NO)、処理部1は、表示部6に表示されている監視画面DP内の対応する工程の表示に対応させて、その監視項目についての注意警告表示を行う(ステップS188)。次に処理部1は、表示部6において現在注意警告の詳細内容の表示を行っているか否かを判定する(ステップS189)。ステップS189の判定において詳細内容の表示を行っている場合(ステップS189;YES)、処理部1は後述するステップS191の動作に移行する。一方ステップS189の判定において詳細内容の表示を行っていない場合(ステップS189;NO)、処理部1は次に、監視画面DP内の図示しない注意警告リスト内に当該監視項目に係る注意警告の詳細な内容を追記して表示する(ステップS190)。次に処理部1は、当該注意状態が発生している工程が、その処理部1が備えられている監視コンピュータ200が含まれているラインL内の工程であるか否かを判定する(ステップS191)。ステップS191の判定において、その工程がその処理部1が含まれているラインL内の工程でない場合(ステップS191;NO)、処理部1はそのまま上記ステップS170、S174及びS176の動作に移行する。一方ステップS191の判定において、その工程がその処理部1が含まれているラインL内の工程である場合(ステップS191;YES)、処理部1は次に、工程端末Tにおいて現在注意警告表示を行っているか否かを判定する(ステップS192)。ステップS192の判定において異常警告表示を行っている場合(ステップS192;YES)、処理部1はそのまま上記ステップS170、S174及びS176の動作に移行する。一方ステップS192の判定において異常警告表示を行っていない場合(ステップS192;NO)、処理部1は、その工程の工程端末Tに対して注意警告表示情報を送信する(ステップS193)。その後処理部1は上記ステップS170、S174及びS176の動作に移行する。
 更に上記ステップS186の判定において、いずれの監視項目の集計値も対応する管理値から逸脱していない場合(ステップS186;NO)、次に処理部1は、表示部6においていずれかの警告表示を行っているか否かを判定する(ステップS194)。ステップS194の判定においていずれの警告表示も行っていない場合(ステップS194;NO)、処理部1は後述するステップS196の動作に移行する。一方ステップS194の判定においていずれかの警告表示を行っている場合(ステップS194;YES)、処理部1は、表示部6に表示されている監視画面DP内の対応する工程の監視項目について行われている警告表示を解除する(ステップS195)。次に処理部1は、表示部6において現在いずれかの警告の詳細内容の表示を行っているか否かを判定する(ステップS196)。ステップS196の判定においていずれの詳細内容の表示も行っていない場合(ステップS196;NO)、処理部1は後述するステップS198の動作に移行する。一方ステップS196の判定においていずれかの詳細内容の表示を行っている場合(ステップS196;YES)、処理部1はその詳細内容表示を解除する(ステップS197)。次に処理部1は、当該警告表示等が行われていた工程が、その処理部1が備えられている監視コンピュータ200が含まれているラインL内の工程であるか否かを判定する(ステップS198)。ステップS198の判定において、その工程がその処理部1が含まれているラインL内の工程である場合(ステップS198;YES)、処理部1は次に、工程端末Tにおいて現在いずれかの警告表示を行っているか否かを判定する(ステップS199)。ステップS199の判定においていずれの警告表示も行っていない場合(ステップS199;NO)、処理部1はそのまま上記ステップS170、S174及びS176の動作に移行する。一方ステップS199の判定においていずれかの警告表示を行っている場合(ステップS199;YES)、処理部1は、その工程の工程端末Tに対して警告表示を解除する旨の警告表示解除情報を送信する(ステップS199-1)。その後処理部1は上記ステップS170、S174及びS176の動作に移行する。一方ステップS198の判定において、その工程がその処理部1が含まれているラインL内の工程でない場合(ステップS198;NO)、処理部1はそのまま上記ステップS170、S174及びS176の動作に移行する。
 次に、上記ステップS185、S193又はS199-1の動作により上記異常警告表示情報、上記注意警告表示情報又は上記警告表示解除情報のいずれかが送信される端末装置Tの動作について、図18を用いて説明する。
 図18に示すように、先ず工程端末Tの処理部10は、その工程端末Tに直接接続されている監視コンピュータ200から上記異常警告表示情報、上記注意警告表示情報又は上記警告表示解除情報のいずれかが送信されてきたか否かを監視する(ステップS220)。ステップS220の監視において異常警告表示情報等が送信されてこない場合(ステップS220;NO)、処理部10はそのまま監視動作を継続する。一方ステップS220の監視において異常警告表示情報等が送信されてきた場合(ステップS220;YES)、次に処理部1は、ステップS220の監視において送信されてきたことが検出された情報が上記警告表示解除情報であるか否かを判定する(ステップS221)。ステップS221の判定において、警告表示解除情報が送信されてきている場合(ステップS221;YES)、処理部10は次に、表示部12においてそれまで実行されていたはずの警告表示を解除し(ステップS222)、更に警告灯14を消灯する(ステップS223)。その後処理部10は上記ステップS220の動作に戻る。
 一方、ステップS221の判定において、警告表示解除情報は送信されてきていない場合(ステップS221;NO)、処理部1は次に、ステップS220の監視において送信されてきたことが検出された情報が上記注意警告表示情報であるか否かを判定する(ステップS224)。ステップS224の判定において、注意警告表示情報が送信されてきている場合(ステップS224;YES)、処理部10は次に、表示部12において対応する注意警告表示を行い(ステップS225)、更に警告灯14を注意警告用に点灯させる(ステップS226)。その後処理部10は上記ステップS220の動作に戻る。
 更にステップS224の判定において、注意警告表示情報も送信されてきていない場合(ステップS224;NO)、処理部1は次に、ステップS220の監視において送信されてきたことが検出された情報が上記異常警告表示情報であるか否かを判定する(ステップS227)。ステップS227の判定において、注意警告表示情報が送信されてきている場合(ステップS227;YES)、処理部10は次に、表示部12において対応する異常警告表示を行い(ステップS228)、更に警告灯14を異常警告用に点灯させる(ステップS229)。その後処理部10は上記ステップS220の動作に戻る。なおステップS227の判定において異常警告表示情報も送信されてきていない場合(ステップS227;NO)も、処理部10は上記ステップS220の動作に戻る。
 次に、実施形態にかかる監視コンピュータ200とFA機器FAとの協働により実行される、調整工程への自動フィードバック動作について、図19を用いて説明する。なお図19は、当該自動フィードバック動作を示すフローチャートである。
 実施形態の自動フィードバック動作において、監視コンピュータ200は、工程情報データベース41から予め設定された調整工程の調整項目と関連性のある検査項目のデータを読み取り、調整工程のFA機器FA毎に一時間毎の各データの平均値と標準偏差値を集計し、その推移変化を監視する。そして最新の当該平均値及び当該標準偏差値が変化して項目毎の予め設定された閾値を逸脱した場合、監視コンピュータ200はその平均値及び標準偏差値を当該閾値内に回復させるべく、調整工程のFA機器FAの調整ポイントをオフセットさせるよう、自動的にフィードバックを行う。これにより、検査項目データの推移を安定させ、製品Pの性能と品質を安定化させる。
 即ち図19左に示すように、監視コンピュータ200の処理部1は、工程情報データベース41から上記検査項目のデータを読み取り(ステップS310)、更に調整工程のFA機器FA毎に一時間毎の各データの平均値と標準偏差値を集計し(ステップS311)、その推移変化を監視する。次に処理部1は、最新の当該平均値及び当該標準偏差値が変化して項目毎の上記閾値を逸脱したか否かを判定する(ステップS312)。ステップS312の判定において、当該平均値及び当該標準偏差値が共に上記閾値を逸脱していない場合(ステップS312;NO)、処理部1は上記ステップS310の動作に移行する。一方、ステップS312の判定において、最新の平均値及び標準偏差値が項目毎の上記閾値を逸脱している場合(ステップS312;YES)、処理部1は次に、調整工程オフセット命令履歴データベース54からそのFA機器FAへの調整オフセット命令の履歴を読み取り(ステップS313)、上記ステップS312の判定において閾値を逸脱したと判定された平均値等が直近のオフセット命令以降のデータであるか否かを判定する(ステップS314)。ステップS314の判定において、閾値を逸脱したと判定された平均値等が直近のオフセット命令以降のデータでない場合(ステップS314;NO)、処理部1は上記ステップS310の動作に移行する。一方、ステップS314の判定において、ステップS314の判定において、閾値を逸脱したと判定された平均値等が直近のオフセット命令以降のデータである場合(ステップS314;YES)、調整ポイントのオフセットが必要であるとして、処理部1は次に、当該オフセット量を算出し(ステップS315)、更にオフセットを実行する旨の命令とステップS315の動作により算出されたオフセット量を、オフセットの対象となるFA機器FAに送信する(ステップS316)。
 その後処理部1は、当該FA機器FAからの変更前後のパラメータ(即ち、そのFA機器FAにおいてオフセットの対象となっている諸元)の受信待機状態を計時する図示しないカウンタにおける当該計時を開始する(ステップS317)。次に処理部1は、当該カウンタにおいて予め設定された時間が計時されることにより上記変更前後のパラメータについて受信タイムアウト状態となったか否かを判定する(ステップS318)。この受信タイムアウト状態とは、何らかの障害により上記変更前後のパラメータがFA機器FAから送信されてこない状態のことである。ステップS318の判定において受信タイムアウト状態となった場合(ステップS318;YES)、処理部1は上記ステップS310の動作に移行する。一方ステップS318の判定において、受信タイムアウト状態となっていない場合(ステップS318;NO)、処理部1は次にFA機器FAから上記変更前後のパラメータを受信したか否かを判定する(ステップS319)。ステップS319の判定において上記変更前後のパラメータを受信していない場合(ステップS319;NO)、処理部1は、上記ステップS318の動作に移行する。一方ステップS319の判定において変更前後のパラメータを受信した場合(ステップS319;YES)、処理部1は上記ステップS317により計時を開始していたカウンタにおける当該経時を停止し(ステップS320)、更に受信した変更前後のパラメータを上記調整工程オフセット命令履歴データベース54に記録する(ステップS321)。その後処理部1は、上記ステップS310の動作に移行する。
 一方、当該自動フォードバック動作においてFA機器FAは、図19右に示すように、そのFA機器FAを用いた製品Pの生産が開始されたか否かを監視し(ステップS330)、当該生産が開始されていない場合(ステップS330;NO)、FA機器FAはステップS330の監視を継続する。一方ステップS330の監視において当該生産が開始された場合(ステップS330;YES)、FA機器FAは、そのFA機器FAの係る工具等の諸元としてのパラメータを読み込み(ステップS331)、それを用いた調整シーケンスを実行する(ステップS332)。その後FA機器FAは当該生産を終了するか否かを監視し(ステップS333)、終了する場合は(ステップS333;YES)上記ステップS330の動作に移行する。一方ステップS333の判定において、当該生産を終了しない場合(ステップS333;NO)、FA機器FAは次に、そのFA機器FAと同じラインL内に備えられた監視コンピュータ200から上記オフセット命令及びオフセット量が送信されてきたか否か判定する(ステップS316参照、ステップS334)。ステップS334の判定において、当該オフセット命令等が送信されてきていない場合(ステップS334;NO)、FA機器FAは上記ステップS332の動作に移行する。一方ステップS334の判定において、当該オフセット命令等が送信されてきている場合(ステップS334;YES)、FA機器FAは、送信されてきたオフセット量を対応する元のパラメータに加算してその加算値を記録し(ステップS335)、そのオフセット量に対応するパラメータの変更前後の値を監視コンピュータ200に送信する(ステップS319参照。ステップS336)。その後FA機器FAは上記ステップS331の動作に移行する。
 次に、各ラインLの監視コンピュータ200を中心として実行される、実施形態に係る調整/検査データ(性能データ)のグラフ化表示動作について、図20(a)を用いて説明する。なお図20(a)は、当該グラフ化表示動作における監視コンピュータ200の動作を示すフローチャートである。
 実施形態に係る監視コンピュータ200は、ホストコンピュータ100の記憶部5内の各データベースから情報を読み取り、測定項目のヒストグラムや散布図によるグラフ表示や、平均値・標準偏差値・CPK値の推移グラフ表示、或いは検査工程と調整工程の相関グラフ表示や各投入部品のロット毎に集計した相関グラフ表示等、解析に必要な情報を瞬時に表示部6に表示する。これにより、通過率及び直行率の低下が何に起因するものなのかを、管理担当者等が認識できる。
 即ち図20(a)に示すように、監視コンピュータ200の処理部1は、その監視コンピュータ200を操作する管理担当者の操作に基づき、工程において異常が発生した旨が監視画面DP内に表示されている工程に対応する集計用のメニューを表示部6に表示し(ステップS340)、更にその集計メニュー内の集計項目(即ち、上記測定項目、平均値・標準偏差値・CPK値、或いは検査工程と調整工程の相関関係や各部品のロット毎の相関関係等の項目)を上記管理担当者に選択させる為の選択画面等を表示部6に表示する(ステップS341)。ここで、上記ステップS340において表示部6に表示される集計メニューは、上記図15(a)及び(b)に例示した集計メニューの他、例えば図21(a)及び(b)に例示する集計メニューが挙げられる。また、図21(a)及び(b)に例示する集計メニューが選択された場合に表示部6に表示されるグラフ図は、例えば図21(c)及び図22に例示するグラフ表示が挙げられる。
 次に処理部1は、ホストコンピュータ100の記憶部5内の対応するデータベース(図4参照)から必要な情報を読み取り(ステップS342)、読み取った情報を集計して表示部6の監視画面内に例えばグラフ表示する(ステップS343)。この性能分布図としては、例えば図15(c)、図16、図21(c)又は図22に例示したものが挙げられる。
 最後に、各ラインLの監視コンピュータ200を中心として実行される、実施形態に係る管理値の設定動作について、図20(b)を用いて説明する。なお図20(b)は、当該設定動作における監視コンピュータ200の動作を示すフローチャートである。
 実施形態に係る監視コンピュータ200は、管理担当者等の操作に基づき、生産する製品Pの機種、難易度、生産計画台数、作業者の習熟や技量等の変化要素に基づき、各監視項目の管理値を生産開始前に設定(変更)する。これにより、現状のラインLの能力や製品Pの機種に見合う監視ができるため、過剰警告による管理能力の破綻や、検知すべき異常の未検出による問題を防ぐことができ、更に計画的な監視・管理することができる。
 ここで、実施形態に係る管理値としては、以下の三つが挙げられる。
(1)通過率・直行率の管理値
 新しい製品Pの「生産導入開始から何日目までに直行率を何%に到達させる」ための日毎の管理値を設定する。これにより、日々の計画的な管理値に対して現在の品質や作業習熟具合などの状況がどうであるかが把握でき、更に異常警告への対応により日々の管理値を達成させていくことにより、直行率の最終到達目標値へ計画的な早期向上が見込まれる。
(2)作業タクト監視の管理値
 製品Pの機種、生産計画台数、作業者の習熟や技量により、基準作業タクトを見直して異常とする管理値の設定を変更する。
(3)不良発生の管理値
 不良項目毎にランク(致命不良、重欠不良、軽欠不良)を設けて不良発生警告の管理値を設定する。これにより、不良警告発生時の作業者又は管理担当者等の行動基準を明確にすることができ、重大な品質異常を見逃すことなく、品質ロスの発生を防ぐことができる。より具体的には、致命不良(具体的には、出荷品質の信頼性を損なう原因が含まれる不良(半導体の静電気破壊等))に対応する管理値として「1件」、「重欠不良(具体的には、製品の基本的な性能や機能に影響する不良)に対応する管理値として「3件」、「軽欠不良(具体的には製品の基本的な性能や機能に影響しない不良(外観的な不良等)、)に対応する管理値として「5件」等が好適である。
 即ち図20(b)に例示するように、管理値の設定を行う監視コンピュータ200の処理部1は、先ず、図4に例示する例えば生産計画データベース33等を参照して、生産計画表等を表示部6に表示し、これにより管理担当者等にその製品PのそのラインLにおける生産機種及び生産台数を確認させる(ステップS350)。次に処理部1は、当該管理担当者等による入力部7を用いた操作に基づき、当該生産機種の直行率目標計画を示すデータに基づいて当該直行率の管理値を決定する(ステップS351)。次に処理部1は、既決定の管理値とステップS351の動作により決定された新たな管理値とを表示部6に表示し、既決定の管理値を変更する旨の操作が管理担当者等により入力部7を用いて行われたか否かを判定する(ステップS352)。ステップS352の判定において当該変更する旨の操作が行われていない場合(ステップS352;NO)、処理部1は後述するステップS354の動作に移行する。一方ステップS352の判定において、管理値を変更する旨の操作が行われた場合(ステップS352;YES)、処理部1は次に、当該操作に基づき、既存のアルゴリズム等を用いて新たな直行率の管理値を決定する(ステップS353)。
 次に処理部1は、図4に例示する例えば生産計画データベース33等を参照して、その製品Pの機種における各工程作業者に係る作業タクトタイム集計画面等を表示部6に表示し、これにより管理担当者等にその作業者毎の技倆に対応する作業タクトタイムを確認させる(ステップS354)。次に処理部1は、当該生産機種の作業タクトタイムの管理値を変更する旨の操作が管理担当者等により入力部7を用いて行われたか否かを判定する(ステップS355)。ステップS355の判定において当該変更する旨の操作が行われていない場合(ステップS355;NO)、処理部1は上記ステップS350の動作に移行する。一方ステップS355の判定において、作業タクトタイムの管理値を変更する旨の操作が行われた場合(ステップS356;YES)、処理部1は次に、当該操作に基づき、既存のアルゴリズム等を用いて新たな作業タクトタイムの管理値を決定する(ステップS356)。その後処理部1は、上記ステップS350の動作に移行する。
 以上説明したように、実施形態に係る品質管理システムSにおける夫々の動作によれば、工程端末Tにより入力された各ラインLの製品Pの状況を示すデータに基づいて検出された品質が規格外となる方向に変化しており且つ管理値に到達したときにその旨を告知するので(図17ステップS186乃至S193及び図18ステップS224乃至S226参照)、製品Pの生産状況をリアルタイムに取得すると共に各ラインLにおいて生産されている製品Pの品質が規格外となる前にその品質を改善するための調整等を行うことで、ラインL全体としての直行率等を向上させることができる。
 また、工程端末Tが一ラインL内の複数の工程毎に設けられており、複数の監視項目が、「生産進捗」、「生産品質」、「不良傾向」、「性能変化」、「品質卓差」のいずれかであり、各管理値を監視項目に設定するので、複数の監視項目毎に管理値を変更することで、よりきめ細かく、工程作業毎の通過率等を向上させることができる。
 更に、工程端末Tから送信されてきた情報に基づいて監視コンピュータ200において管理値を変更するので(図20(b)ステップS353及びS356参照)、作業者の技倆に応じて管理値を変更することで、よりきめ細かく工程作業毎の通過率等を向上させることができる。
 更にまた、一つの製品Pについて工程を実行するために必要な作業タクトタイムが監視項目の一つ(生産進捗)であるので、よりきめ細かく工程毎の通過率等を向上させることができる。
 また、品質の悪化の原因となる事象に対応した作業仕様の変更を示すオフセット命令とオフセット量を生成して調整工程等のFA機器FAに送信して調整仕様を変更させるので(図19参照)、品質が規格外になることを未然に防止できる。
 更にまた、更新された品質管理データのみを圧縮して圧縮ファイル形式のデータを生成し(図12ステップS93乃至S96参照)、その圧縮ファイル形式のデータを他のホストコンピュータ100に送信するので、ホストコンピュータ100同士が離隔している場合であっても、品質管理データの更新分を迅速且つ確実に授受することができる。
 更に、図7乃至図13及び図17乃至図20に示すフローチャートに対応するプログラムをフレキシブルディスク又はハードディスク等の記録媒体に記録しておき、或いはネットワークNTを介して取得して記録しておくことにより、これらをマイクロコンピュータ等の汎用のコンピュータで読み出して実行することにより、当該マイクロコンピュータ等を実施形態に係る処理部1又は10として機能させることも可能である。
 1、10  処理部
 6、12  表示部
 5  記憶部
 13  入力部
 14  警告灯
 15  バーコードリーダ
 20  作業卓
 22  投入開始センサ
 23  排出センサ
 100  ホストコンピュータ
 200  監視コンピュータ
 FC1  第1生産拠点
 FC2  第2生産拠点
 FC3  第3生産拠点
 FCn  第n生産拠点
 T  工程端末
 FA  FA機器
 L  ライン
 P 製品
 DP  監視画面

Claims (9)

  1.  製品の生産ラインに含まれる複数のラインに設けられた端末装置と、前記端末装置に接続されたセンタ装置と、を含む品質管理システムにおいて、
     前記端末装置は、
     各前記ラインにおける製品状況を、当該各ラインの作業を行う作業者が入力するために用いられる端末入力手段と、
     前記入力された製品状況に対応する製品状況情報を前記センタ装置に送信する端末送信手段と、
     を備え、
     前記センタ装置は、
     前記端末装置から送信された前記製品状況情報に基づいて、前記製品の品質管理について予め設定されている複数の監視項目毎且つ前記ライン毎に前記製品の品質を検出する品質検出手段と、
     各前記監視項目毎に設定された前記品質の管理値であって、当該品質についての規格を当該品質が満たさなくなる前に当該品質を示す品質値が到達する値として設定された管理値と、前記検出された品質を示す品質値と、を比較する比較手段と、
     前記検出された品質が前記規格外となる方向に変化しており且つ当該品質を示す前記品質値が前記管理値に到達したとき、当該品質値が当該管理値に到達した旨を告知する告知手段と、
     を備えることを特徴とする品質管理システム。
  2.  請求項1に記載の品質管理システムにおいて、
     前記端末装置は、一つの前記ラインを構成する複数の工程作業毎に設けられており、
     複数の前記監視項目は、各前記工程作業中の前記製品状況における進捗状況、当該工程作業の通過状況、不良製品の発生状況、前記製品の性能状況又は同一の前記工程作業を異なる作業装置を用いて複数行った場合の作業装置差のいずれかであり、
     前記センタ装置においては、前記監視項目毎に前記管理値が変更可能とされていることを特徴とする品質管理システム。
  3.  請求項2に記載の品質管理システムにおいて、
     前記端末装置の前記端末送信手段は、当該端末装置が設けられている前記工程作業を行う前記作業者の作業技倆を示す技倆情報を前記作業状況情報に含めて前記センタ装置に更に送信し、
     前記管理値は、前記送信されてきた技倆情報に基づいて変更可能とされていることを特徴とする品質管理システム。
  4.  請求項2又は3に記載の品質管理システムにおいて、
     前記端末装置は、一つの前記製品について当該端末装置が設けられている前記工程作業を実行するために必要な作業時間を検出する作業時間検出手段を更に備え、
     前記端末送信手段は、前記検出された作業時間を示す作業時間情報を前記製品状況情報に含めて前記センタ装置に更に送信し、
     前記センタ装置の前記品質検出手段、前記比較手段及び前記告知手段は、前記端末装置から送信された前記作業時間情報により示される前記作業時間を前記監視項目の一つとして、前記品質検出手段における前記品質の検出、前記比較手段における比較及び前記告知手段による告知を夫々行うことを特徴とする品質管理システム。
  5.  請求項1から4のいずれか一項に記載の品質管理システムにおいて、
     当該品質管理システムには、組み立てられた前記製品の調整を行う調整ラインが含まれており、当該調整ラインとしての調整動作を行う調整装置を更に備え、
     前記センタ装置は、
     前記検出された品質が前記規格外となる方向に変化しており且つ当該品質を示す前記品質値が前記管理値に到達したとき、前記品質の悪化の原因となる事象に対応した作業仕様の変更を示す変更情報を生成する変更情報生成手段と、
     前記生成された変更情報を前記調整装置に送信するセンタ送信手段と、
     を更に備え、
     前記調整装置は、
     前記センタ装置から送信された前記変更情報に対応する前記作業仕様に基づいて前記調整工程における仕様を変更する調整仕様変更手段を備えることを特徴とする品質管理システム。
  6.  請求項1から5のいずれか一項に記載の品質管理システムにおいて、
     当該品質管理システムには、前記製品状況情報を含み且つ前記製品の品質管理に用いられる品質管理情報を相互に授受可能な複数の前記センタ装置が含まれており、
     各前記センタ装置は、
     他の前記センタ装置に対して送信すべき前記品質管理情報のいずれかが更新されたとき、当該更新された品質管理情報のみを圧縮して圧縮情報を生成する圧縮手段と、
     前記生成された圧縮情報を、当該圧縮情報を送信すべき他の前記センタ装置に送信する圧縮情報送信手段と、
     他の前記センタ装置から送信されてきた圧縮情報に対応する元の前記品質管理情報を、当該送信されてきた圧縮情報に基づいて生成する品質管理情報生成手段と、
     を更に備えることを特徴とする品質管理システム。
  7.  請求項1から6のいずれか一項に記載の品質管理システムに含まれる前記端末装置であて、
     前記端末入力手段と、
     前記端末送信手段と、
     を少なくとも備えることを特徴とする端末装置。
  8.  製品の生産ラインに含まれる複数のラインに設けられた端末装置と、前記端末装置に接続されたセンタ装置と、を含む品質管理システムにおいて実行される情報処理方法であって、
     各前記ラインにおける製品状況が当該各ラインの作業を行う作業者により入力されたとき、当該入力された製品状況に対応する製品状況情報を前記端末装置から前記センタ装置に送信する端末送信工程と、
     前記送信された前記製品状況情報に基づいて、前記製品の品質管理について予め設定されている複数の監視項目毎且つ前記ライン毎に前記製品の品質を前記センタ装置において検出する品質検出工程と、
     各前記監視項目毎に設定された前記品質の管理値であって、当該品質についての規格を当該品質が満たさなくなる前に当該品質を示す品質値が到達する値として設定された管理値と、前記検出された品質を示す品質値と、を前記センタ装置において比較する比較工程と、
     前記検出された品質が前記規格外となる方向に変化しており且つ当該品質を示す前記品質値が前記管理値に到達したとき、当該品質値が当該管理値に到達した旨を前記センタ装置において告知する告知工程と、
     を含むことを特徴とする情報処理方法。
  9.  製品の生産ラインに含まれる複数のラインに設けられた端末装置と、前記端末装置に接続されたセンタ装置と、を含む品質管理システムであって、前記端末装置が、各前記ラインにおける製品状況を、当該各ラインの作業を行う作業者が入力するために用いられる端末入力手段と、前記入力された製品状況に対応する製品状況情報を前記センタ装置に送信する端末送信手段と、を備える品質管理システムに含まれる前記センタ装置に含まれるコンピュータを、
     前記端末装置から送信された前記製品状況情報に基づいて、前記製品の品質管理について予め設定されている複数の監視項目毎且つ前記ライン毎に前記製品の品質を検出する品質検出手段、
     各前記監視項目毎に設定された前記品質の管理値であって、当該品質についての規格を当該品質が満たさなくなる前に当該品質を示す品質値が到達する値として設定された管理値と、前記検出された品質を示す品質値と、を比較する比較手段、及び、
     前記検出された品質が前記規格外となる方向に変化しており且つ当該品質を示す前記品質値が前記管理値に到達したとき、当該品質値が当該管理値に到達した旨を告知する告知手段、
     として機能させることを特徴とするセンタ装置用プログラム。
PCT/JP2010/059601 2010-06-07 2010-06-07 品質管理システム、端末装置、情報処理方法及びセンタ装置用プログラム WO2011155012A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2010/059601 WO2011155012A1 (ja) 2010-06-07 2010-06-07 品質管理システム、端末装置、情報処理方法及びセンタ装置用プログラム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2010/059601 WO2011155012A1 (ja) 2010-06-07 2010-06-07 品質管理システム、端末装置、情報処理方法及びセンタ装置用プログラム

Publications (1)

Publication Number Publication Date
WO2011155012A1 true WO2011155012A1 (ja) 2011-12-15

Family

ID=45097644

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/059601 WO2011155012A1 (ja) 2010-06-07 2010-06-07 品質管理システム、端末装置、情報処理方法及びセンタ装置用プログラム

Country Status (1)

Country Link
WO (1) WO2011155012A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3106948A4 (en) * 2014-02-10 2017-10-25 Omron Corporation Quality management device and method for controlling same
WO2018025477A1 (ja) * 2016-07-31 2018-02-08 Tranzac株式会社 製造管理システム、クラウドサーバおよび端末コンピュータ
JP2019067393A (ja) * 2017-10-02 2019-04-25 フィッシャー−ローズマウント システムズ,インコーポレイテッド 複数のプロセス制御システムの集合健全性を評価するための方法および装置
CN112938046A (zh) * 2021-04-29 2021-06-11 红云红河烟草(集团)有限责任公司 一种条烟缺盒检测的远程监控方法及系统
CN113487122A (zh) * 2020-03-17 2021-10-08 横河电机株式会社 质量稳定化系统、质量稳定化方法和计算机可读取的非临时性存储介质

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0493153A (ja) * 1990-08-06 1992-03-25 Honda Motor Co Ltd 製造管理システム
JPH06112295A (ja) * 1992-09-30 1994-04-22 Matsushita Electric Ind Co Ltd 実装基板生産システム
JPH07200038A (ja) * 1993-12-27 1995-08-04 Honda Motor Co Ltd 製造管理システム
JPH09187086A (ja) * 1995-12-28 1997-07-15 Nec Eng Ltd 遠隔監視システム及び遠隔監視方法
JP2001067109A (ja) * 1999-08-26 2001-03-16 Matsushita Electric Works Ltd 品質管理方法及びその装置、並びに品質管理プログラムを記録した記録媒体
JP2001075900A (ja) * 1999-09-07 2001-03-23 Toshiba Corp 監視制御システムおよび記録媒体
JP2004102389A (ja) * 2002-09-05 2004-04-02 Oki Electric Ind Co Ltd 端末管理システム
JP2005056431A (ja) * 2004-08-30 2005-03-03 Agilent Technol Inc 製造ライン制御装置と、これを含む測定シーケンスを自動的に変更するシステムおよび方法
JP2006146324A (ja) * 2004-11-16 2006-06-08 Omron Corp 特定装置、加工処理システム、特定装置の制御方法、特定装置の制御プログラム、特定装置の制御プログラムを記録した記録媒体
JP2006252229A (ja) * 2005-03-11 2006-09-21 Nec Electronics Corp 異常検出システムおよび異常検出方法
JP2006302096A (ja) * 2005-04-22 2006-11-02 Omron Corp 工程異常検知システム
JP2009301304A (ja) * 2008-06-13 2009-12-24 Sysmex Corp 分析装置の製造支援システム

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0493153A (ja) * 1990-08-06 1992-03-25 Honda Motor Co Ltd 製造管理システム
JPH06112295A (ja) * 1992-09-30 1994-04-22 Matsushita Electric Ind Co Ltd 実装基板生産システム
JPH07200038A (ja) * 1993-12-27 1995-08-04 Honda Motor Co Ltd 製造管理システム
JPH09187086A (ja) * 1995-12-28 1997-07-15 Nec Eng Ltd 遠隔監視システム及び遠隔監視方法
JP2001067109A (ja) * 1999-08-26 2001-03-16 Matsushita Electric Works Ltd 品質管理方法及びその装置、並びに品質管理プログラムを記録した記録媒体
JP2001075900A (ja) * 1999-09-07 2001-03-23 Toshiba Corp 監視制御システムおよび記録媒体
JP2004102389A (ja) * 2002-09-05 2004-04-02 Oki Electric Ind Co Ltd 端末管理システム
JP2005056431A (ja) * 2004-08-30 2005-03-03 Agilent Technol Inc 製造ライン制御装置と、これを含む測定シーケンスを自動的に変更するシステムおよび方法
JP2006146324A (ja) * 2004-11-16 2006-06-08 Omron Corp 特定装置、加工処理システム、特定装置の制御方法、特定装置の制御プログラム、特定装置の制御プログラムを記録した記録媒体
JP2006252229A (ja) * 2005-03-11 2006-09-21 Nec Electronics Corp 異常検出システムおよび異常検出方法
JP2006302096A (ja) * 2005-04-22 2006-11-02 Omron Corp 工程異常検知システム
JP2009301304A (ja) * 2008-06-13 2009-12-24 Sysmex Corp 分析装置の製造支援システム

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3106948A4 (en) * 2014-02-10 2017-10-25 Omron Corporation Quality management device and method for controlling same
WO2018025477A1 (ja) * 2016-07-31 2018-02-08 Tranzac株式会社 製造管理システム、クラウドサーバおよび端末コンピュータ
JP2019067393A (ja) * 2017-10-02 2019-04-25 フィッシャー−ローズマウント システムズ,インコーポレイテッド 複数のプロセス制御システムの集合健全性を評価するための方法および装置
JP7436139B2 (ja) 2017-10-02 2024-02-21 フィッシャー-ローズマウント システムズ,インコーポレイテッド 複数のプロセス制御システムの集合健全性を評価するための方法および装置
CN113487122A (zh) * 2020-03-17 2021-10-08 横河电机株式会社 质量稳定化系统、质量稳定化方法和计算机可读取的非临时性存储介质
CN112938046A (zh) * 2021-04-29 2021-06-11 红云红河烟草(集团)有限责任公司 一种条烟缺盒检测的远程监控方法及系统

Similar Documents

Publication Publication Date Title
WO2011155012A1 (ja) 品質管理システム、端末装置、情報処理方法及びセンタ装置用プログラム
KR102149866B1 (ko) 리소그래피 시스템들과 같은 시스템들을 모델링하거나 시스템들의 예측 유지보수를 수행하는 방법들, 및 연계된 리소그래피 시스템들.
US7272532B2 (en) Method for predicting the quality of a product
WO2007101132A2 (en) System and method to combine and weight multiple sensors with overlapping sensing range to create a measurement system utilized in a high integrity or safety environment
CN101266493A (zh) 生产管理系统以及生产管理方法
KR102140731B1 (ko) 스마트팩토리를 구현하는 시스템
CN110597196A (zh) 数据采集系统及数据采集方法
US7174233B1 (en) Quality/reliability system and method in multilevel manufacturing environment
US11120037B2 (en) Test data integration system and method thereof
CN114860518A (zh) 功能安全系统的检测方法、系统、电子设备、存储介质
KR20220168849A (ko) 정보통신 설비 점검 시스템 및 방법
US20180164779A1 (en) Method, server, and program for providing real-time robot monitoring service
JP7035857B2 (ja) 検査方法、検査システム及びプログラム
KR101166101B1 (ko) 통계적 품질 검사 및 관리 시스템
CN111523805A (zh) 进货检验方法和装置
CN110737256B (zh) 一种用于控制变频传动系统的方法及装置
KR101863047B1 (ko) 실시간 로봇의 키오스크 타입 용접품질판정 장치
KR102102591B1 (ko) 스마트팩토리를 구현하는 시스템
KR102298342B1 (ko) 정보 연동 시스템 및 정보 연동 방법
CN117521432B (zh) 一种面向在役过程设备的失效模式与影响分析方法
JP7035856B2 (ja) 検査方法、検査システム及びプログラム
CN114255577A (zh) 基于大数据物联网平台的监控方法
CN117495156A (zh) 一种产品质量追溯方法、装置、设备及存储介质
Şenol Poisson process approach to determine the occurrence degree in failure mode and effect reliability analysis
CN115840124A (zh) 依据测试结果控制测试治具机台持续运行的系统及方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10852852

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10852852

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP