WO2011120186A1 - Système de voie pour ligne de transport de passagers à suspension magnétique - Google Patents

Système de voie pour ligne de transport de passagers à suspension magnétique Download PDF

Info

Publication number
WO2011120186A1
WO2011120186A1 PCT/CN2010/000391 CN2010000391W WO2011120186A1 WO 2011120186 A1 WO2011120186 A1 WO 2011120186A1 CN 2010000391 W CN2010000391 W CN 2010000391W WO 2011120186 A1 WO2011120186 A1 WO 2011120186A1
Authority
WO
WIPO (PCT)
Prior art keywords
track
rail
passenger
traffic line
line according
Prior art date
Application number
PCT/CN2010/000391
Other languages
English (en)
Chinese (zh)
Inventor
吴祥明
万建军
莫凡
黄靖宇
成广伟
李文沛
何大海
曾国锋
叶丰
陈定祥
洪少枝
刘万明
洛嘉
Original Assignee
上海磁浮交通发展有限公司
上海磁浮交通工程技术研究中心
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 上海磁浮交通发展有限公司, 上海磁浮交通工程技术研究中心 filed Critical 上海磁浮交通发展有限公司
Priority to PCT/CN2010/000391 priority Critical patent/WO2011120186A1/fr
Publication of WO2011120186A1 publication Critical patent/WO2011120186A1/fr

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L13/00Electric propulsion for monorail vehicles, suspension vehicles or rack railways; Magnetic suspension or levitation for vehicles
    • B60L13/10Combination of electric propulsion and magnetic suspension or levitation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/30Tracks for magnetic suspension or levitation vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2200/00Type of vehicles
    • B60L2200/26Rail vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles

Definitions

  • the invention relates to a rail system, in particular to a rail system for a passenger maglev traffic line. Background technique
  • a passenger rail maglev transportation system with a single track arrangement as depicted in Figure 1 does not consider noise reduction measures and accident escape facilities.
  • the maglev train 101 When the maglev train 101 is operated on the track 102, the structure of the cover beam 103 and the cover beam 103 supporting the track beam is much higher than the ground.
  • passengers In the event of an accident, passengers have to use the escape tube to slide down to the ground, limiting the escape time, thus placing high demands on the safety redundancy design of the train 101, making the system costly.
  • the structure of the selected slab track beam 206 is mounted on the simply supported truss 202, and is disposed at the bottom of the simply supported truss 202.
  • the noise reduction partition 204 is used to isolate the aerodynamic noise of the running noise of the train 201.
  • a vehicle lower noise reduction structure 203 and a support structure 205 are further provided at the bottom of the simply supported truss 202 to further limit the motor noise when the train 201 is running.
  • such measures are limited only to the partially improved structural stage, and the track structure of the high-speed maglev transportation system is not considered as a part of the system to take into account its integrated effects.
  • the section of the track beam 301 is designed to be "work" shaped by internal hollowing.
  • the adjustable support 305 disposed between the bottom of the track beam 301 and the track beam supporting cover beam 302 is adjusted in height such that the track function surface: the sliding surface 303 and the stator surface 304 are maintained within the installation deviation required for safe operation of the train.
  • the 187-tonne track beam 301 adopts a factory-made production process, making transportation during project implementation a difficult problem.
  • the track setting of the magnetic floating line still selects a monorail (as shown in Fig.
  • the double track rail beam 301 is empty in the middle. It is supported only by the support cover beam 302. However, in the elevated section, passengers can only use the escape tube to slide to the ground.
  • the "work"-shaped track beam 301 also does not have measures to reduce noise and isolation.
  • feeder cables arranged along the line are all placed in the cable trenches on the ground, which makes the cable arrangement along the line seem messy, and also increases the cable connection between the track and the ground, especially in areas with more rainfall. The rain inside flooded the cable and it was difficult to maintain and replace it.
  • the track beam arrangement of the existing normally-guided high-speed maglev transportation system has the following problems:
  • the existing track beams are factory-made.
  • the heavy-duty factory-produced track beams use coordinate system machining equipment, and the production process is also difficult. At the same time, it also increases the difficulty of rail beam transportation.
  • the trackside equipment of the line has to be arranged on the ground, and many switch stations are set up, which increases the engineering investment;
  • the object of the present invention is to propose a suitable and reasonable rail system layout scheme and a feasible implementation method for the passenger maglev traffic line to solve the above technical problems, realize the optimal integration of the constant guide high speed maglev traffic system and reduce the technical cost of the project.
  • the technical solution of the present invention provides a rail system for a passenger magnetic floating traffic line, which comprises a main structure of a rail beam, and is specifically provided.
  • a bearing platform disposed on the support box beam; a track beam disposed on the railing platform for supporting and guiding the maglev train;
  • the utility model is characterized in that: the above-mentioned rail-bearing platform is integrated with the above-mentioned support box beam, and is used for supporting the basic track structure of the maglev train;
  • the track beam comprises a slab track beam disposed on the track platform and a pi-shaped track beam disposed between adjacent track platforms above the pier column.
  • the support box beam is reliably connected to the pier column of the ground through the adjustable support provided at the bottom; and the installation deviation of the support box beam is controlled by the adjusting device of the adjustable support.
  • the support box beam is a steel beam structure formed by splicing; the above-mentioned bearing platform is integrally connected with the support box beam by a rigid connection manner such as splicing.
  • the above-mentioned rail-bearing table is equal in length to the above-mentioned support box beam, and the above-mentioned slab track beam is provided on the joint of the adjacent rail-bearing table to be reliably connected.
  • the length of the above-mentioned rail-bearing platform is shorter than that of the above-mentioned supporting box girder, and the above-mentioned ⁇ -shaped rail beam is disposed between adjacent rail-bearing platforms to support the adjacent end joints of the box girder.
  • the above-mentioned ⁇ -shaped rail disposed between the adjacent rail-bearing platforms is reliably connected to the support box beam through the movable support provided at the bottom; and the installation deviation of the support box beam is controlled by the height adjustment of the movable support.
  • a set of two or more sets of orbital platforms are arranged on the top surface of the support box beam for single-line, double-line or multi-line operation of the maglev train.
  • the above-mentioned railing platform comprises a linear section bearing platform and a curved section bearing platform; the above-mentioned linear section or the section of the curve section is continuously arranged along the track line.
  • the linear section of the above-mentioned straight section is an I-shaped structure that is internally hollowed out.
  • the above-mentioned curve section of the curve section is set to have a lower step structure on one side of the center of the curve.
  • the upper surface of the stepped structure of the above-mentioned curved section of the railing platform is horizontally connected for reliable connection with the above-mentioned slab track beam.
  • the above-mentioned rail system of the passenger maglev traffic line further includes a vehicle-ground communication structure, and the vehicle-ground communication structure is disposed on both sides of the top surface of the support box beam widened for mounting the vehicle-ground communication equipment along the line and isolating noise.
  • the vehicle-to-vehicle communication structure includes a side wall disposed on both side edges of the top surface of the support box beam and a plurality of layers of cable trays embedded in the side wall.
  • a metal casing cover box is disposed on the cable laid on the cable tray.
  • the vehicle-to-vehicle communication structure further includes a communication post that is spaced apart along the track line, fixed to the side wall, and a communication antenna that is disposed at a top end of the communication column.
  • the above-mentioned rail system of the passenger maglev traffic line further includes a safety escape structure disposed between the train movement limit and the building boundary; the above safety escape structure includes an escape passage, which is disposed between the cable tray and the above-mentioned rail platform Both sides of the box beam.
  • the escape passage is provided with a non-slip concrete grinding surface, and a safety rail is arranged on the side of the train running; the boundary of the safety rail is not intruded into the building boundary.
  • the above safety escape structure further comprises an escape staircase with handrails, the escape stairs being arranged at predetermined distances along the track line and communicating with the escape passage; the predetermined distance being between 800 and 1000 meters.
  • the above-mentioned rail system of the passenger maglev traffic line further comprises a mounting platform for installing the trackside switch cabinet; the above-mentioned mounting platform is disposed at an appropriate position on the outer side of the support rail, and is formed by partially widening the top side of the support box beam.
  • An implementation method of a rail system for a passenger maglev traffic line includes step I of on-site construction and step II of factory prefabrication; forming a support box girder, a track rail, and a rail beam by sequentially casting in the above-mentioned step I;
  • Factory prefabricated structural components include adjustable supports, slab track beams, pi-shaped track beams and movable supports.
  • the above steps of site construction I specifically include:
  • Step 1-1 Set the lower ground foundation and the pier column
  • the site is cast to form a number of independent piers
  • Step 1-2 Set the support box beam
  • the support box girder bottom plate is respectively completed by the construction of the formwork and the inner mold, the on-site binding of the steel bar, the concrete pouring, the demoulding, the tamping maintenance, the pre-tensioning, the creep removal and the tensioning, respectively. And the pouring of the rest;
  • Step 1-3 Set up the railing platform
  • Step 1-4 Set the vehicle communication structure
  • Step 1-5 Set the track beam
  • the slab-type track beam is spanned above the joint of the adjacent rail-bearing platform with the support box beam; the beam end is shorter than the joint of the adjacent rail-supporting platform of the supporting box beam, and is fixed by the movable support Setting a pi-shaped track beam;
  • the above-mentioned step 1-3 is integrally formed with the above-mentioned supporting box beam, and specifically comprises a linear section bearing rail which is internally hollowed out into an I-shape, and a lower stepped structure having a side of the corner of the curve, and A curved section of the track platform at the upper surface of the stepped structure.
  • the above steps 1-4 further include fixing the iron at equal intervals along the track line, by pre-burying the side wall, or fixing the communication column by means of splicing or filling concrete after leaving the hole, and at the top Set the steps for the communication antenna.
  • the implementation manner of the above-mentioned rail system of the passenger maglev traffic line further includes an escape passage provided with an anti-slip concrete surface on both sides of the support box beam between the rail beam and the cable tray, and a step of setting a safety rail; and an interval distance A step of setting up an escape stair with a handrail in communication with the escape passage.
  • the implementation manner of the above-mentioned rail system of the passenger maglev traffic line further includes an appropriate position on the outer side of the railing platform, partially widening the top side of the support box beam to form a mounting platform and setting a trackside switch cabinet, and adjusting the vehicle ground accordingly The steps of the location of the communication structure.
  • the factory prefabricated slab track beam and ⁇ -shaped track beam specifically include the stencil through the stencil, the positioning of the embedded part when the reinforced steel bar is tied, and the pouring of the concrete, and then enter the ⁇ curing period, and finally pass the machining, test inspection, and finished product.
  • the present invention is provided by integrally forming a railing platform integrally formed with a supporting box girder, which is continuously disposed in a straight section and a curved section, and can function together with the supporting box girder to jointly carry the train.
  • the invention is supported by prefabricated or on-site assembled and cast support box beams, and it is not necessary to establish a huge track beam manufacturing plant, and it can be manufactured only by using a small field along the line construction, thereby reducing the requirement of construction precision, thereby effectively reducing The engineering cost of the high-speed maglev system.
  • the invention combines the factory manufacturing technology of the track to produce a plate rail with relatively accurate dimensional tolerance
  • the road beam and the ⁇ -shaped rail beam are connected to the joint of the adjacent rail-bearing table, and the uneven settlement of the joint box girder joint can be further adjusted to control the track installation deviation caused by the settlement during the safe operation of the train;
  • the rail beam and the ⁇ -shaped rail beam are lighter in weight, which solves the problem of difficulty in transporting the existing heavy rail beam.
  • the invention provides a side wall on both sides of the top surface of the supporting box girder, and serves as a mounting base for laying the cable tray of the cable along the line, thereby eliminating the existing cable ditch disposed on the ground, reducing the construction cost and providing maintenance and replacement of the cable along the line.
  • the present invention provides an anti-skid escape passage with handrails and an escape staircase as a passage for passenger evacuation and equipment maintenance due to the use of the limit reserved for train operation.
  • the invention forms a mounting platform by widening the top side of the support box beam at an appropriate position, and provides a rail side switch cabinet, thereby removing the existing large switch station facilities disposed on the line ground, thereby reducing the floor space and reducing the floor space.
  • the factory cost BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic structural view of a conventional passenger magnetic maglev transportation system with a single track arrangement
  • FIG. 2 is a schematic structural view of a conventional passenger magnetic maglev transportation system with a single track improvement
  • FIG. 3 is a structural cross section of a conventional magnetic floating circuit Figure
  • FIG. 4 is a schematic structural view of a conventional dual-track magnetic floating line system
  • FIG. 5 is a schematic view showing the overall structure of a rail system of a passenger maglev traffic line of the present invention
  • FIG. 6 is a schematic cross-sectional view of a rail system of a passenger maglev traffic line of the present invention in a straight section;
  • FIG. 7 is a schematic structural view of a rail system connecting rail joint of a passenger rail maglev traffic line of the present invention.
  • Figure 8 is a schematic cross-sectional view of a rail system of a passenger maglev traffic line of the present invention in a curved section;
  • FIG. 9 is a schematic cross-sectional view of a rail of a passenger traveling maglev traffic line using a ⁇ -shaped rail beam in a straight section;
  • Figure 10 is a view showing the rail system of the passenger maglev traffic line of the present invention using a ⁇ -shaped rail beam to connect the joints Schematic;
  • FIG. 11 is a cross-sectional view of a rail of a rail transit switch cabinet in a curve section of a passenger rail transit line of the present invention
  • Figure 12 is a top plan view of a rail of a rail transit switch cabinet in a linear section of a passenger rail transit line of the present invention
  • Figure 13 is a schematic view showing the safety escape structure of the rail system of the passenger maglev traffic line of the present invention
  • Figure 14 is a schematic structural view of the escape route of the rail system of the passenger maglev traffic line of the present invention
  • Figure 15 is a track system of the passenger maglev traffic line of the present invention
  • FIG. 16 is a schematic view showing the installation of the communication column of the rail system of the passenger maglev traffic line of the present invention
  • FIG. 17 is another schematic diagram of the installation of the communication column of the rail system of the passenger maglev traffic line of the present invention.
  • Figure 18 is a flow chart showing an embodiment of a rail system for a passenger maglev traffic line of the present invention. The best way to implement the invention
  • the rail system of the passenger maglev traffic line comprises a main structure of the rail beam, a safety escape structure 60, and a vehicle-to-ground communication structure 50.
  • the main structure of the track beam as a basic structural component of the maglev train 70 includes a plurality of piers 40 disposed on the ground, a support box girder 10 fixed to the pier 40 by the adjustable support 11, and a support box beam 10 disposed on the support box girder 10
  • the railing table 20 and the rail beam 30 disposed on the railing table 20 includes a plurality of piers 40 disposed on the ground, a support box girder 10 fixed to the pier 40 by the adjustable support 11, and a support box beam 10 disposed on the support box girder 10
  • the railing table 20 and the rail beam 30 disposed on the railing table 20.
  • a plurality of piers 40 are used as the main load-bearing components and are disposed on the ground foundation portion along the normally guided maglev passenger line.
  • the support box beam 10 is a prefabricated or on-site assembled steel beam structure or a cast-in-place reinforced concrete structure.
  • the support box beam 10 is an inverted trapezoid with an upper width and a lower width.
  • the adjustable support 11 provided at the bottom is fixedly disposed on the pier 40, and the height of the adjustable support 11 is adjusted to control the installation deviation caused by ground subsidence and the like. .
  • one or two sets of orbital platforms 20 are arranged on the support box girder 10, respectively, for the single or double line operation of the maglev train 70 When used.
  • the bearing platform 20 and the lower supporting box beam 10 are integrally and jointly carried.
  • the supporting platform 20 adopts a supporting box beam 10 with a reinforced concrete structure.
  • the method of pouring is either reliably connected by welding with the support box girder 10 of the steel beam structure.
  • the railing table 20 is set as a linear section of the railing table 21 (Fig. 6, Fig. 9) and the corner section of the railing table 22 (Fig. 8, Fig.
  • the curve section of the track platform 22 is set to be lower than the one side of the center of the curve; the upper surface level of the step structure of the curve section of the track 20 is used for The slab track beam 31 is reliably connected.
  • the rail beam 30 disposed above the rail-bearing table 20, as the bearing structure of the maglev train 70, and the guiding structure of the floating train 70, which have relatively accurate Tolerance size.
  • the light rail slab beam is generally disposed on the joint of the rail table 20 and the adjacent rail table 20. 31 to support the train 70, at this time the length of the rail table 20 and the support box beam 10 are equal; as shown in Fig. 9, Fig.
  • a lighter ⁇ -shaped rail beam 30 is disposed between the adjacent rail-bearing tables 20 to connect the joints, and the ⁇ -shaped rail beam 32 is reliably connected to the support box girder 10 through the movable support 321 provided at the bottom, and is highly moved by the movable support 321
  • the adjustment makes the pi-shaped track beam 32 at the same horizontal position as the top surface of the slab track beam 31 on both sides, and also facilitates adjustment of the track installation deviation of the safe operation of the train 70 caused by the uneven settlement of the joint.
  • the vehicle-to-ground communication structure 50 and the safety escape structure 60 are disposed on both sides of the top surface of the support box beam 10 by utilizing the wide and narrow structural features of the support box beam 10.
  • the vehicle-to-ground communication structure 50 includes side walls 51 fixed on both sides of the top surface of the support box beam 10 by field casting in the direction of the track line.
  • a plurality of layers of cable trays 52 are embedded in the side walls 51 by means of pre-embedded angle irons, and feeder cables, network fiber optic cables and signal cables are laid along the cable trays 52.
  • the vehicle-to-vehicle communication structure 50 also includes a metal housing cover box 522 overlying the upper portion of the cable 521 for protecting the cable 521.
  • the side of the cable tray 52 adjacent to the rail beam 30 is disposed outside of the building boundary 82 that must be reserved for the train 70 to operate.
  • the vehicle-to-ground communication structure 50 further includes a communication post 53 disposed along the track line, fixed to the side wall 51, and a communication antenna 531 (FIG. 16, FIG. 17) disposed at the top end of the communication post 53 so as to achieve no communication within the range. Area coverage.
  • the communication column 53 is reliably connected by fixing the iron 511 (Fig. 16) on the side wall 51, or by leaving the base hole by welding or filling concrete (Fig. 17).
  • the vehicle-to-ground communication structure 50 serves as the basis for installing the vehicle-to-ground communication equipment, and provides appropriate vehicle-to-ground communication conditions for the safe operation of the train 70, thereby reducing the line footprint and reducing the construction cost, and is also along the line.
  • the replacement and maintenance of the cable 521 provides convenience.
  • the vehicle-to-ground communication structure 50 also serves as a sound barrier facility for isolating noise.
  • the channel-shaped orbital space formed by several layers of cable trays 52 can control the noise diffusion during the operation of the train 70, thereby further improving the environmental impact along the high-speed maglev transportation system. condition.
  • the safety escape structure 60 includes an escape passage 61 disposed along the track line, which uses the train 70 to operate the space between the reserved vehicle motion limit 81 and the building boundary 82. Both sides of the support box beam 10 are between the track beam 30 and the cable tray 52 of the vehicle-to-ground communication structure 50.
  • the escape channel 61 is provided with a non-slip concrete surface, the width of which should meet the relevant technical standards of 750 ⁇ 1200mm.
  • the escape barrier 61 is also placed on the running side of the train 70 as a barrier to safe escape.
  • the building boundary 82 is a limit cross-sectional profile perpendicular to the track centerline, and no obstacles are allowed in the height and width of the space. Therefore, the boundary setting of the above-mentioned safety handrail 611 must not intrude into the limit of the train 70.
  • the safe escape structure 60 also includes an escape stair 62 with a handrail 621 that communicates with the escape passage 61 at an agreed distance of 800 to 1000 meters.
  • the passenger passes through the short ladder on the train 70 to the escape passage 61, and then evacuates to the ground using the escape stairs 62.
  • the escape route 61 and the escape stair 62 of the safe escape structure 60 effectively utilize the reserved train 70 limit as a means of quickly evacuating passengers and also facilitate the maintenance of the track.
  • the top surface of the support box beam 10 is partially widened at an appropriate position on the outer side of the straight section or the track section 22 of the curve section.
  • the side forms a mounting platform for setting a smaller trackside switchgear 90 such that the boundary setting of the trackside switchgear 90 does not intrude into the building boundary 82 of the train 70, nor does it affect the space of the escape passage 61. Therefore, it is also necessary to adjust the position of the vehicle-to-ground communication structure 50 at the installation platform, and the cable tray 52 and the side wall 51 are disposed outside the track-side switch cabinet 90.
  • the installation platform and the arrangement of the trackside switchgear 90 removes the bulk of the existing switchyard installations on the ground floor, thereby reducing floor space and reducing plant costs.
  • the concrete implementation flow of the rail system of the passenger maglev traffic line according to the present invention will be described below with reference to FIG. 18 , taking the reinforced concrete structure supporting box girder 10 provided with the two-way two sets of rail-bearing platforms 20 as an example. Process, including step I of on-site construction and step II of factory prefabrication.
  • the structural components prefabricated by the step II factory include an adjustable support 11, a slab track beam 31, a ⁇ -shaped track beam 32 and a movable support 321 .
  • the first is the support template.
  • the steel bars When the steel bars are tied, the embedded parts must be positioned, and then the concrete is poured into the tamping period. It is possible that this maintenance period will be more For a long time, it is necessary to leave a large yard space in the factory.
  • step 1-1 to complete the construction of the lower ground foundation and pier 40;
  • the steel bars are tied at the site, and a number of independent piers 40 are cast by pouring concrete.
  • the floor form and the inner mold of the prestressed support box girder 10 are set up by the simple strip foundation and scaffolding on the construction site, and the steel bars are placed on the site and then poured through the concrete.
  • the bottom plate of the support box beam 10 is formed; then the side mold and the inner mold supporting the box beam 10 are erected, and the steel bars are tied and rolled to complete the support in the same process. Casting of the box girder 10.
  • the manufacture of the support box girder 10 can be realized only by using a small site along the line construction, without having to build a huge rail beam 30 manufacturing plant; in addition, such a support box girder 10 does not require high construction precision requirements, a simple municipality Road construction technology can be used, which reduces the engineering cost of high-speed maglev systems.
  • the steel bars on the upper surface are turned out, and the template of the support rail 20 is supported according to the position of the center line of the line, the straight line section or the track center line of the curve section, and the field reinforcement is tied and rolled.
  • the linear section railing table 21 or the curve section railing table 22, which is cast integrally with the supporting box girder 10 is made of cast concrete.
  • Both the straight section bearing platform 21 and the corner section bearing platform 22 satisfy the geometrical requirements of the vehicle limit and the vehicle motion limit 81, so that the inside of the straight section railing table 21 is hollowed out into a "work"shape;
  • the stage 22 has a lower step structure on one side of the center of the curve and is horizontal on the upper surface of the step structure.
  • the above-mentioned railing table 20 can be combined with a support box
  • the beams 10 are of equal length, or slightly shorter than the position of the support box girder 10 and the ⁇ -shaped rail beam 32 and the beam end seam are reserved between adjacent rail tables 20.
  • the setting of the vehicle-to-vehicle communication structure 50 is completed in steps 1-4.
  • the side of the vehicle communication structure 50 is formed by the supporting formwork, the tied steel bar, and the pouring. Wall 51.
  • a plurality of layers of the cable tray 52 are embedded in the side wall 51 by means of a pre-embedded supporting angle iron, and a cable 521 is laid on the cable tray 52, and the metal casing cover box 522 of the protection cable 521 is covered.
  • the communication post 539 is fixedly disposed on the side wall 51 at equal intervals along the track line, or the communication post 539 is fixedly disposed by welding or filling the concrete after the base hole is left, and the communication antenna 531 is disposed at the top end.
  • the slab track beam 31 is spanned over the joint of the adjacent linear section railing table 21 or the curved section railing table 22 of the straight section of the railing table 21, which is equal in length to the supporting box beam 10;
  • the ⁇ -shaped rail beam 32 is fixedly disposed on the joint of the adjacent straight section of the box girder 10 by the movable support 321 .
  • Others include an escape passage 61 provided with an anti-slip concrete surface on both sides of the support box girder 10 between the rail beam 30 and the cable tray 52, and a step of setting the safety rail 611; and an arrangement distance setting of 800 to 1000 meters apart
  • the step of the escape stair 62 with the handrail 621 connected to the escape passage 61 is also at an appropriate position on the outer side of the straight section railing table 21 or the curve section railing table 22, and the top side of the supporting box beam 10 is partially widened.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

La présente invention concerne un système de voie, qui est destiné à une ligne de transport de passagers à suspension magnétique, et qui comprend une structure principale de poutres porteuses constituée en l'espèce, d'un support en poutre-caisson (10) servant de corps porteur principal; de supports de voie (20) posés sur le support en poutre-caisson (10); et de poutres porteuses (30) posées sur les supports de voie (20) et utilisées pour supporter et guider un train à suspension magnétique. Les supports de voie (20) sont coulés de façon à s'intégrer au support en poutre-caisson (10) et servent de structure de voie de base de façon à supporter conjointement le train à suspension magnétique. Les poutres porteuses (30) sont constituées, d'une part de poutres porteuses en plaques (31) posées sur le support de voie (20), et d'autre part de poutres porteuses en π (32) posées entre sur les supports de voie sur des piliers (40). En outre, les structures de communication au sol avec les trains (50) peuvent être installées des deux côtés de la surface supérieure du support en poutre-caisson (10), et des structures d'évacuation sécurisées (60) peuvent être installées dans l'emprise de la voie.
PCT/CN2010/000391 2010-03-29 2010-03-29 Système de voie pour ligne de transport de passagers à suspension magnétique WO2011120186A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2010/000391 WO2011120186A1 (fr) 2010-03-29 2010-03-29 Système de voie pour ligne de transport de passagers à suspension magnétique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2010/000391 WO2011120186A1 (fr) 2010-03-29 2010-03-29 Système de voie pour ligne de transport de passagers à suspension magnétique

Publications (1)

Publication Number Publication Date
WO2011120186A1 true WO2011120186A1 (fr) 2011-10-06

Family

ID=44711275

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2010/000391 WO2011120186A1 (fr) 2010-03-29 2010-03-29 Système de voie pour ligne de transport de passagers à suspension magnétique

Country Status (1)

Country Link
WO (1) WO2011120186A1 (fr)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403203A (zh) * 2018-11-30 2019-03-01 中铁磁浮交通投资建设有限公司 一种中低速磁浮交通双线整体式箱梁
CN110029540A (zh) * 2019-03-26 2019-07-19 中铁磁浮交通投资建设有限公司 一种高速磁浮交通双线箱梁与轨道结构
CN110184863A (zh) * 2019-06-28 2019-08-30 上海交通大学 一种宽翼缘梁上板式轨道梁
CN110258204A (zh) * 2019-06-28 2019-09-20 上海交通大学 一种应用于磁浮线路的复合轨道板
CN110258203A (zh) * 2019-06-28 2019-09-20 上海交通大学 一种应用于大跨距高速磁浮线路的梁上π型轨道梁
CN110306387A (zh) * 2019-06-28 2019-10-08 上海交通大学 用于磁浮线路的梁上梁式复合轨道梁
CN110714375A (zh) * 2018-07-11 2020-01-21 比亚迪股份有限公司 一种空中轨道系统和空中轨道交通系统

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268506A (ja) * 1996-03-28 1997-10-14 H S S T Kaihatsu Kk リニアモーターカー用軌道
CN1350948A (zh) * 2000-10-26 2002-05-29 普夫莱德雷尔基础结构技术两合公司 用于快速运输的行车路面
JP2002212903A (ja) * 2001-01-17 2002-07-31 Hitachi Ltd 跨座式モノレール軌道桁及びその設置方法
DE10228960A1 (de) * 2002-06-21 2004-05-27 Heinz Jeschke Magnetschwebebahn Transrapid
CN1621618A (zh) * 2003-11-28 2005-06-01 沃尔特制造有限公司 用于磁悬浮列车的行驶道路
KR100744098B1 (ko) * 2006-11-24 2007-08-01 한국철도기술연구원 자기부상철도 궤도 및 이를 구비한 교량
CN101054793A (zh) * 2007-04-20 2007-10-17 铁道第三勘察设计院集团有限公司 中低速磁浮轨道梁
CN100465376C (zh) * 2005-06-29 2009-03-04 上海磁浮交通工程技术研究中心 高速磁浮叠合式轨道梁连接机构、轨道梁及其制造方法
CN100473781C (zh) * 2006-06-13 2009-04-01 上海市隧道工程轨道交通设计研究院 磁悬浮隧道岸边段轨道梁结构设置方式

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268506A (ja) * 1996-03-28 1997-10-14 H S S T Kaihatsu Kk リニアモーターカー用軌道
CN1350948A (zh) * 2000-10-26 2002-05-29 普夫莱德雷尔基础结构技术两合公司 用于快速运输的行车路面
JP2002212903A (ja) * 2001-01-17 2002-07-31 Hitachi Ltd 跨座式モノレール軌道桁及びその設置方法
DE10228960A1 (de) * 2002-06-21 2004-05-27 Heinz Jeschke Magnetschwebebahn Transrapid
CN1621618A (zh) * 2003-11-28 2005-06-01 沃尔特制造有限公司 用于磁悬浮列车的行驶道路
CN100465376C (zh) * 2005-06-29 2009-03-04 上海磁浮交通工程技术研究中心 高速磁浮叠合式轨道梁连接机构、轨道梁及其制造方法
CN100473781C (zh) * 2006-06-13 2009-04-01 上海市隧道工程轨道交通设计研究院 磁悬浮隧道岸边段轨道梁结构设置方式
KR100744098B1 (ko) * 2006-11-24 2007-08-01 한국철도기술연구원 자기부상철도 궤도 및 이를 구비한 교량
CN101054793A (zh) * 2007-04-20 2007-10-17 铁道第三勘察设计院集团有限公司 中低速磁浮轨道梁

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714375A (zh) * 2018-07-11 2020-01-21 比亚迪股份有限公司 一种空中轨道系统和空中轨道交通系统
CN109403203A (zh) * 2018-11-30 2019-03-01 中铁磁浮交通投资建设有限公司 一种中低速磁浮交通双线整体式箱梁
CN110029540A (zh) * 2019-03-26 2019-07-19 中铁磁浮交通投资建设有限公司 一种高速磁浮交通双线箱梁与轨道结构
CN110184863A (zh) * 2019-06-28 2019-08-30 上海交通大学 一种宽翼缘梁上板式轨道梁
CN110258204A (zh) * 2019-06-28 2019-09-20 上海交通大学 一种应用于磁浮线路的复合轨道板
CN110258203A (zh) * 2019-06-28 2019-09-20 上海交通大学 一种应用于大跨距高速磁浮线路的梁上π型轨道梁
CN110306387A (zh) * 2019-06-28 2019-10-08 上海交通大学 用于磁浮线路的梁上梁式复合轨道梁

Similar Documents

Publication Publication Date Title
EP3404142B1 (fr) Système structural de voie ferrée à dalles préfabriquées pour l'atténuation des vibrations et procédé de construction associé
WO2011120186A1 (fr) Système de voie pour ligne de transport de passagers à suspension magnétique
CN101701439B (zh) 钢弹簧浮置板轨道钢筋笼轨排法施工工艺
CN112727134B (zh) 一种改扩建既有高架运营地铁车站建筑主体结构的施工方法
PL190117B1 (pl) Peron dla pojazdów szynowych
CN103938534B (zh) 高架轨交车站一体化桥梁结构及其应用方法
US6684793B2 (en) Viaduct for a railway line or the like
CN112609912B (zh) 一种高架运营地铁车站新建雨棚的施工方法
CN112727132B (zh) 一种高架运营地铁车站既有雨棚的拆除方法
CN113047094A (zh) 导轨式胶轮系统钢-混组合轨道梁结构及其施工方法
CN110761185A (zh) 一种用于车站的预应力装配式轨道梁及其施工方法
CN102286939A (zh) 既有城市轨道交通高架桥移梁接驳施工工法
CN214005379U (zh) 用于扩建既有高架运营地铁车站站台的预制构件
WO2024041054A1 (fr) Structure de rail préfabriquée pour section de logement de pompe intégrée dans le transport ferroviaire et procédé de construction
CN101899815B (zh) 架桥机安装桥梁过渡跨t型边梁防架桥机侧翻装置
WO2000001888A1 (fr) Systeme de voie ferree, sa structure de support et son procede de construction
CN105926381A (zh) 不中断行车条件下将隧道有砟道床更换为无砟轨道的方法
CN202401382U (zh) 城市轨道交通接触网供电方式山型梁
CN112610244B (zh) 用于扩建既有高架运营地铁车站站台的预制构件及其安装方法
CN212337358U (zh) 一种盾构区间疏散平台在联络通道处的连接结构
CN211171638U (zh) 架桥机逆向架梁施工平台
WO2003014479A1 (fr) Unite prefabriquee destinee a la construction ou a la reconstruction de quais
CN112127942A (zh) 一种盾构区间疏散平台在联络通道处的连接结构
CN110552294A (zh) 架桥机逆向架梁施工平台及其施工方法
CN112281619B (zh) 跨座式单轨盾构法隧道内轨道梁桥及其施工方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10848648

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 05/12/2012)

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205N DATED 05/12/2012)

122 Ep: pct application non-entry in european phase

Ref document number: 10848648

Country of ref document: EP

Kind code of ref document: A1