WO2011103620A1 - A method of reducing subsidence or windblast impacts from longwall mining - Google Patents

A method of reducing subsidence or windblast impacts from longwall mining Download PDF

Info

Publication number
WO2011103620A1
WO2011103620A1 PCT/AU2011/000190 AU2011000190W WO2011103620A1 WO 2011103620 A1 WO2011103620 A1 WO 2011103620A1 AU 2011000190 W AU2011000190 W AU 2011000190W WO 2011103620 A1 WO2011103620 A1 WO 2011103620A1
Authority
WO
WIPO (PCT)
Prior art keywords
holes
hole
footwall
explosive
goaf
Prior art date
Application number
PCT/AU2011/000190
Other languages
French (fr)
Inventor
Paul John Fuller
Original Assignee
Subsidence Control International Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2010900841A external-priority patent/AU2010900841A0/en
Application filed by Subsidence Control International Pty Ltd filed Critical Subsidence Control International Pty Ltd
Publication of WO2011103620A1 publication Critical patent/WO2011103620A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Definitions

  • the present invention relates to a method of reducing subsidence or windblast impacts from longwall mining.
  • the present invention has been developed primarily for use in longwall mining of coal but is also applicable to mining other materials including metalliferous ores and Gold.
  • the invention also finds application in filling tunnels for underground caverns and the creation of stable underground liquid storage caverns.
  • Longwall mining involves the mechanical extraction, under protective hydraulic roof supports, of a horizontal or a sub-horizontal material strata such as a coal seam.
  • the roof supports are moved in the direction of extraction as the strata is extracted, and the overhanging rock (known as a hanging wall) is allowed to collapse into a void (known as a goaf) remaining behind the mining operation.
  • This collapsing of the rock in the hanging wall can propagate to the ground surface above the mining operation and cause:
  • ground movements referred to above cause damage to buildings and other infrastructure, and can alter the flow patterns in natural and constructed drainage.
  • Subsidence caused by longwall mining can also have effect below ground surface and, for example, fracture rock and allow gas and ground water to escape confining layers. This can lead to surface gas emissions and changed aquifer conditions. This can also result in bores into deeper aquifers being lost when movement occurs across horizontal or sub- horizontal fractures. Deep fractures can also drain natural rockfalls and streams into subsurface fractures, with consequent loss in aquatic and riparian habitat and stream flows.
  • a subsidence management plan that attempts to manage impacts by all or some of the following measures: predicting mine subsidence impacts; planning the longwall mine to either avoid sensitive areas or planning longwall panel alignment or width to minimise impact on critical areas; conducting pre-mining dilapidation surveys on buildings, infrastructure and natural features; pre-strengthening buildings and infrastructure to withstand the predicted subsidence impacts; setting aside funds during mining operation to cover mine subsidence impacts; monitoring subsidence impacts after the longwall panel is extracted; and repairing damaged buildings, infrastructure and natural features during the time that subsidence impacts persist.
  • a known method of directly reducing mine subsidence is to backfill the void before the hanging wall collapses into the goaf.
  • the disadvantages associated with this method include: the requirements for a large amount of material to fill the void; the associated two-way handling of the material being difficult in the confined and progressively and unpredictably collapsing space of the goaf; difficulties with completely filling the void with compacted material suitable to resist the collapsing hanging wall; the injury risk associated with working in the goaf void due to imminent and unpredictable roof collapse; and the placement of the backfill material slowing down the longwall mining process.
  • An alternative method has been to hydraulically backfill the mining void with a slurry or grout.
  • a void For example, it is known to fill a void with sand, tailings and coal-fired power station ash mixed with cement to provide strength when cured.
  • the disadvantages of this method include: the relatively high cost; the requirement for, and cost of, impoundments to be progressively constructed behind the longwall extraction face with a second longwall system and crew; and the difficulty in the backfill being able to develop suitable compressive strength to resist collapse before the longwall mining can progress and filling of another section begin. This significantly slows the speed and increases the cost of longwall mining.
  • US Patent No. 4,044,563 and US Patent No. 4,968,187 disclose filling the goaf from above after drilling into it from the surface with a slurry and a dry granular material respectively.
  • Another surface based approach involves injecting grout into the overlying strata as voids are created by weaker strata separating from stronger strata.
  • Disadvantages associated with such surface based approaches include that they: are expensive; require a large height of overburden over the longwall panel with differentially weak and strong layers; require large volumes of fine material of certain specification and water to form the grout; and require surface access over the mined area for drilling and injection which can be problematic in urbanised or protected areas.
  • Windblast is a sudden rush of air or gas created in underground workings due to the sudden collapse of a void.
  • the roof or hanging wall will resist collapse when the hydraulic roof supports advance, and a large area (up to several hectares) of open goaf can develop.
  • the area of roof does does collapse, often will minimal warning, the displaced air or gas occupying the goaf void creates a blast of air and an over pressure wave that propagates through the mine tunnels, often quickly followed by a "suck back" of negative pressure as the air pressure equalises with the low pressure created by voids created higher in the hanging wall.
  • Windblast is one of the most serious events that can occur in an underground mine. They are violent, uncontrolled and their prediction is not yet a certain science.
  • the effects of a windblast include: large displacements of atmosphere from mined out areas into the working place; a shock wave associated with increased air pressures; abnormal pressure differentials; and high velocity (hurricane force) winds.
  • the risks associated with windblast include: objects, from particle size up to in some instances hundreds of kilograms in weight, becoming projectiles; violent displacement of persons including the possibility of being drawn back into the goaf; flammable, noxious and/or irrespirable gases that have accumulated in the goaf inundating the working place; water that has accumulated in the goaf inundating the working place; dusts being raised into suspension including coal dust which can become explosive; massive roof, containing quartz, generating incendive sparks hot enough to provide ignition sources; damage to electrical apparatus during the course of the windblast providing ignition sources.
  • Windblasts have lead to injuries and fatalities. Measures taken by mines with windblast risks to minimise these risks include redesign of tunnels and roadways, monitoring of micro-seismic activity that may indicate an imminent collapse, requiring mine personnel to wear protective gear and have access to safe areas, having sensors that detect windblasts and cut off all electrical power, and careful geotechnical design of the mining. Some mines in Australia have also injected water into the overlying rocks under high pressure to create fractures and reduce the size of the roof collapses.
  • the present invention provides a method of reducing subsidence or windblast impacts from longwall mining, the method comprising the steps of:
  • the present invention provides a method of reducing subsidence impacts from longwall mining, the method comprising the steps of:
  • the present invention provides a method of reducing windblast impacts from longwall mining, the method comprising the steps of:
  • the hole or holes is/are preferably substantially horizontal.
  • the holes or holes is/are preferably horizontal, slightly angled to horizontal or a combination of horizontal and slightly angled to horizontal.
  • the at least one holes is/are preferably drilled with a directional drilling rig or a non-directional drilling rig.
  • the hole or holes preferably extend across all of the footwall region.
  • the hole(s) preferably extend in a direction substantially normal to a direction of mining.
  • the hole or holes are preferably arranged to upwardly expand the material in the footwall into a ridge or arch into the goaf.
  • the holes preferably extend between chain pillars either side of the footwall.
  • the method preferably includes drilling one or more holes a first depth beneath the footwall and one or more holes at a second depth, the second depth deeper than the first depth, and firing the explosive in the hole or holes at the first depth prior to the holes or holes at the second depth.
  • the methods preferably includes drilling one or more holes at plurality of depths beneath the footwall, and firing the explosive in the hole or holes sequentially from lowest depth first to deepest depth last.
  • the holes are preferably arranged in a triangular pattern with a downwardly facing apex.
  • the holes are preferably arranged in a substantially vertical line.
  • the method preferably includes upwardly expanding material in the footwall with a plurality of explosive firings to form a series of said ridges or arches that are spaced apart in, and most preferably perpendicular to, the direction of mining.
  • the method preferably includes supporting the hanging wall above the goaf to minimise collapse during the drilling, loading and firing of the holes or holes.
  • the supporting of the hanging wall preferably includes spacing the explosive firings or controlling the goaf width between blasts.
  • the method preferably includes directly supporting of the hanging wall with one or more hydraulic roof support mechanisms, with sacrificial timber props or with rock bolts.
  • Fig. 1 is a schematic cross-sectional side view of a typical longwall mining operation
  • Fig. 2 shows a longwall mining operation after the drilling and charging of a hole with explosives
  • Fig. 3 shows the longwall mining operation shown in Fig. 2 after firing of the explosives
  • Fig. 4 shows a longwall mining operation after the drilling and charging of 3 holes with explosives
  • Fig. 5 shows the mining operation of Fig. 4 after firing of the explosives
  • Fig. 6 shows a longwall mining operation of Fig. 1 after the drilling and charging of 6 holes with explosives
  • Fig. 7 shows the mining operation of Fig. 6 after firing of the explosives
  • Fig. 8 shows the longwall mining operation of Fig. 7 after firing of several groups of explosives, each similar to those shown in Figs. 4 and 5;
  • Fig. 9 is a schematic cross-sectional end view of a longwall mining operation showing holes for explosives
  • Fig. 10 is a schematic cross-sectional end view of a longwall mining operation showing alternate holes for explosives
  • Fig. 11 is a schematic cross-sectional top view of a longwall mining operation showing holes for explosives
  • Fig. 12 shows a longwall mining operation after the drilling and charging of 2 holes with explosives
  • Fig. 13 shows the mining operation of Fig. 12 after firing of the explosives
  • Fig. 14 shows a longwall mining operation after the drilling and charging of 3 holes with explosives
  • Fig. 15 shows the mining operation of Fig. 14 after firing of the explosives.
  • Fig. 1 shows a schematic cross-sectional side view of a typical longwall coal mining operation proceeding in a mining direction 20.
  • Fig. 1 shows a seam 22 being mined above a footwall 24.
  • a longwall mining face 26 has a goaf 28 created behind it by the extraction of mined material and results in a hanging wall 30 being created above the goaf 28.
  • the hanging wall 30 is supported by a hydraulic roof support mechanism 32.
  • the hydraulic roof support 32 is configured with the objective of having the hanging wall 30 collapse into the goaf 28 as soon as possible, so as to reduce the load on the hydraulic roof support.
  • the hydraulic roof support 32 it is desirable for the hydraulic roof support 32 to include an extension 34, in the opposite direction to the direction of mining 20.
  • the extension 34 is used support the hanging wall 30 and keep the goaf 28 largely free of collapse, as will be explained in more detail below. This process can also be assisted by adding fingers to the back of the hydraulic roof support 32, similar to those on a tunnel boring machine, installing sacrificial timber props in the goaf 28, or rock bolting in the hanging wall 30.
  • Fig. 2 shows a longwall mining operation after the drilling of a hole 36 across most or all of the footwall 24 and beneath the goaf 28.
  • the hole 36 extends across the footwall in a direction which is approximately normal to the direction of mining 20.
  • the hole 36 is then charged with an explosive.
  • Fig. 3 shows the longwall mining of Fig. 2 after the firing of the explosive in the hole 36. As is shown, the firing of the explosive causes the material adjacent the hole to fracture and expand upwardly and into the goaf 28.
  • the extension 34 supports the hanging wall 30 and keeps the goaf 28 largely free of collapse during the drilling, loading and firing steps.
  • the fractured material takes the general form of a ridge or arch 38 formed from: rock segments 40; expanded rock fragments or rubble 42; and voids 44.
  • the hanging wall 30 begins to collapse into the remaining space in the goaf 28 and loads the (expanded) footwall rock and the arch 38 of expanded footwall rock.
  • the arch 38 advantageously resists the hanging wall collapse and reduces the . effective height of the collapse. As a consequence, any subsidence over the mined longwall panel is also reduced.
  • the progress of the mining operation is preferably optimised between blasts in order to minimise collapse of the hanging wall.
  • the optimisation can depend on the competency of the hanging wall strata and the width of the goaf, as the goaf may stay open or have minimal collapse without support for a considerable distance.
  • (modified) hydraulic roof supports mentioned above can be used to support one edge of the hanging wall.
  • the goaf can be supported by sacrificial wooden props or rock-bolting. Regardless of the type support, the aim is to keep the goaf substantially open and for the footwall material to expand into a stable arch or ridge within the goaf. If too much collapse of the hanging wall occurs, the firing of the explosive can be confined and ineffective.
  • Fig. 4 shows a longwall mining operation after the drilling and charging of a triangular pattern of 3 holes 36 with explosive.
  • the explosive in the shallowest hole are then fired first and the explosives in the deeper holes are subsequently fired after a delay. This results in a three part arch 38a being formed over a two-part arch 38b, similarly locked in place with the rubble 42 and the voids 44.
  • Fig. 6 shows a longwall mining operation after the drilling and charging of a triangular pattern of 6 holes 36 with explosive.
  • the explosive are fired sequentially, in layers from shallowest hole to deepest holes. As shown in Fig. 7 this results in the formation of the three layers of arches 38a, 38b and 38c.
  • Fig. 8 shows a longwall mining operation similar to that described with reference to Figs. 4 and 5 after the creation of four arched regions 38, each being created one after another after a subsequent advancement of the mining operation.
  • Fig. 8 also shows ridges 46 of unfractured footwall that are left between each of the arched regions 38. The ridges 46 also assist in supporting the arched regions 38.
  • Fig. 8 also shows that whilst some collapse of the hanging wall 30 into the goaf 28 has occurred, the resulting subsidence has been minimised.
  • Fig. 9 shows a directional drill rig 50 being used to drill holes 36 through the footwall 24 and beneath the goaf 28.
  • the holes 36 have an initial minority downwardly directed section 36a followed by a majority horizontal section 36b.
  • Fig. 10 shows a pair of conventional drilling rigs 52 being used to create slightly downwardly angled holes 36 from extending into the footwall 24 beneath the goaf 28 from opposite directions.
  • Fig. 11 is a top view of longwall mining operation showing the holes 36 behind longwall equipment 60 and unmined seam 22. Support material is also left unmined either side of the seam 22, in the form of chain pillars 62.
  • Fig. 12 shows a longwall mining operation after the drilling and charging of a substantially vertical pattern of 2 holes 36 with explosive.
  • the explosive are fired sequentially, in layers from shallowest hole to deepest hole. As shown in Fig. 13, this results in the formation of the arches 38a and 38b.
  • Fig. 14 shows a longwall mining operation after the drilling and charging of a substantially vertical pattern of 3 holes 36 with explosive.
  • the explosive are fired sequentially, in layers from shallowest hole to deepest hole. As shown in Fig. 15, this results in the formation of the arches 38a, 38b and 38c.
  • a limited amount of material is required to be bought underground - typically less than a kilogram of high explosive can fracture a cubic metre of rock, which can be easily handled in the confined spaces of an underground longwall mine;
  • the method has minimal impact on the longwall mining cycle.
  • the blast holes can be drilled from the chain pillars prior to or during mining, and the only disruption to longwall mining is the time taken to load and fire the explosives in the holes;
  • the above described methods can also mitigate windblast risks in two ways. Firstly, the methods result in the void being filled with broken rock, thereby reducing/minimising the amount of air that can be displaced if the roof collapses. Secondly, the broken rock will decelerate the collapsing roof, reducing the over-pressure and shock wave.
  • rock-bolting or placing sacrificial timber props can be used to minimise collapse of the hanging wall to allow for wider, less frequent blasting of the footwall.
  • directional drilling can be from one chain pillar to break out in the other. This is followed by inserting a plastic pipe liner in the hole, blowing through a string and then, when ready, to blast pulling a string of explosives through the hole. This can reduce the downtime required to load the blast holes.
  • the primary application for the invention is coal mines and the invention performs best with the footwall geology found in coal mines. Around 99% of longwall mining operations are for coal. However, it is also applicable for use in non-coal longwall mining operations, for example Gold mines in South Africa.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

A method of reducing subsidence or windblast impacts from longwall mining (20). The method comprising the steps of: drilling at least one hole (36) across all or part of a footwall region (24) beneath a goaf (28); loading the hole or holes (36) with explosive; and firing the explosive(s) to upwardly expand material in the footwall adjacent the holes or holes (36) into the goaf (28).

Description

A METHOD OF REDUCING SUBSIDENCE OR WINDBLAST IMPACTS FROM LONGWALL MINING
Field of the Invention
The present invention relates to a method of reducing subsidence or windblast impacts from longwall mining.
The present invention has been developed primarily for use in longwall mining of coal but is also applicable to mining other materials including metalliferous ores and Gold. The invention also finds application in filling tunnels for underground caverns and the creation of stable underground liquid storage caverns.
Background of the Invention
Longwall mining involves the mechanical extraction, under protective hydraulic roof supports, of a horizontal or a sub-horizontal material strata such as a coal seam. The roof supports are moved in the direction of extraction as the strata is extracted, and the overhanging rock (known as a hanging wall) is allowed to collapse into a void (known as a goaf) remaining behind the mining operation. This collapsing of the rock in the hanging wall can propagate to the ground surface above the mining operation and cause:
subsidence; compressive and tensile horizontal strains; surface cracking and sink holes; cliff and valley rockfalls; and in certain incised valley terrains compressive stresses can cause rising ground surface levels (known as "upsidence").
The ground movements referred to above cause damage to buildings and other infrastructure, and can alter the flow patterns in natural and constructed drainage.
Subsidence caused by longwall mining can also have effect below ground surface and, for example, fracture rock and allow gas and ground water to escape confining layers. This can lead to surface gas emissions and changed aquifer conditions. This can also result in bores into deeper aquifers being lost when movement occurs across horizontal or sub- horizontal fractures. Deep fractures can also drain natural rockfalls and streams into subsurface fractures, with consequent loss in aquatic and riparian habitat and stream flows.
There have been several known attempts to manage or reduce subsidence impacts from longwall mining. The main management method does not directly minimise the subsidence but instead minimises the consequence of such subsidence impacts on structures and the environment by requiring developments oyer a mining area to be built to withstand the predicted subsidence impacts. A disadvantage of this approach is it increases the cost of the development. Further, in New South Wales, when a new mine, or an extension to an existing mine is proposed, the mining company must typically develop or has imposed on it a subsidence management plan that attempts to manage impacts by all or some of the following measures: predicting mine subsidence impacts; planning the longwall mine to either avoid sensitive areas or planning longwall panel alignment or width to minimise impact on critical areas; conducting pre-mining dilapidation surveys on buildings, infrastructure and natural features; pre-strengthening buildings and infrastructure to withstand the predicted subsidence impacts; setting aside funds during mining operation to cover mine subsidence impacts; monitoring subsidence impacts after the longwall panel is extracted; and repairing damaged buildings, infrastructure and natural features during the time that subsidence impacts persist.
Disadvantages of this approach include that it is very time consuming, expensive, requires a large number of personnel and often results in resources being unable to be extracted.
A known method of directly reducing mine subsidence is to backfill the void before the hanging wall collapses into the goaf. The disadvantages associated with this method include: the requirements for a large amount of material to fill the void; the associated two-way handling of the material being difficult in the confined and progressively and unpredictably collapsing space of the goaf; difficulties with completely filling the void with compacted material suitable to resist the collapsing hanging wall; the injury risk associated with working in the goaf void due to imminent and unpredictable roof collapse; and the placement of the backfill material slowing down the longwall mining process.
An alternative method has been to hydraulically backfill the mining void with a slurry or grout. For example, it is known to fill a void with sand, tailings and coal-fired power station ash mixed with cement to provide strength when cured. The disadvantages of this method include: the relatively high cost; the requirement for, and cost of, impoundments to be progressively constructed behind the longwall extraction face with a second longwall system and crew; and the difficulty in the backfill being able to develop suitable compressive strength to resist collapse before the longwall mining can progress and filling of another section begin. This significantly slows the speed and increases the cost of longwall mining.
US Patent No. 4,044,563 and US Patent No. 4,968,187 disclose filling the goaf from above after drilling into it from the surface with a slurry and a dry granular material respectively. Another surface based approach involves injecting grout into the overlying strata as voids are created by weaker strata separating from stronger strata.
Disadvantages associated with such surface based approaches include that they: are expensive; require a large height of overburden over the longwall panel with differentially weak and strong layers; require large volumes of fine material of certain specification and water to form the grout; and require surface access over the mined area for drilling and injection which can be problematic in urbanised or protected areas.
Underground longwall mines are also subject to a hazard known as windblast. Windblast is a sudden rush of air or gas created in underground workings due to the sudden collapse of a void. In longwall mines with competent rock strata over the extracted seam, the roof or hanging wall will resist collapse when the hydraulic roof supports advance, and a large area (up to several hectares) of open goaf can develop. When the area of roof does does collapse, often will minimal warning, the displaced air or gas occupying the goaf void creates a blast of air and an over pressure wave that propagates through the mine tunnels, often quickly followed by a "suck back" of negative pressure as the air pressure equalises with the low pressure created by voids created higher in the hanging wall.
Windblast is one of the most serious events that can occur in an underground mine. They are violent, uncontrolled and their prediction is not yet a certain science. The effects of a windblast include: large displacements of atmosphere from mined out areas into the working place; a shock wave associated with increased air pressures; abnormal pressure differentials; and high velocity (hurricane force) winds. The risks associated with windblast include: objects, from particle size up to in some instances hundreds of kilograms in weight, becoming projectiles; violent displacement of persons including the possibility of being drawn back into the goaf; flammable, noxious and/or irrespirable gases that have accumulated in the goaf inundating the working place; water that has accumulated in the goaf inundating the working place; dusts being raised into suspension including coal dust which can become explosive; massive roof, containing quartz, generating incendive sparks hot enough to provide ignition sources; damage to electrical apparatus during the course of the windblast providing ignition sources.
Windblasts have lead to injuries and fatalities. Measures taken by mines with windblast risks to minimise these risks include redesign of tunnels and roadways, monitoring of micro-seismic activity that may indicate an imminent collapse, requiring mine personnel to wear protective gear and have access to safe areas, having sensors that detect windblasts and cut off all electrical power, and careful geotechnical design of the mining. Some mines in Australia have also injected water into the overlying rocks under high pressure to create fractures and reduce the size of the roof collapses.
Object of the Invention
It is the object of the present invention to substantially overcome or at least ameliorate one or more of the above known disadvantages.
Summary of the Invention
Accordingly, in a first aspect, the present invention provides a method of reducing subsidence or windblast impacts from longwall mining, the method comprising the steps of:
drilling at least one hole across all or part of a footwall region beneath a goaf; loading the hole or holes with explosive; and
firing the explosive(s) to upwardly expand material in the footwall adjacent the holes or holes into the goaf.
In a second aspect, the present invention provides a method of reducing subsidence impacts from longwall mining, the method comprising the steps of:
drilling at least one hole across all or part of a footwall region beneath a goaf; loading the hole or holes with explosive; and
firing the explosive(s) to upwardly expand material in the footwall adjacent the holes or holes into the goaf.
In a third aspect, the present invention provides a method of reducing windblast impacts from longwall mining, the method comprising the steps of:
drilling at least one hole across all or part of a footwall region beneath a goaf; loading the hole or holes with explosive; and
firing the explosive(s) to upwardly expand material in the footwall adjacent the holes or holes into the goaf.
The hole or holes is/are preferably substantially horizontal. The holes or holes is/are preferably horizontal, slightly angled to horizontal or a combination of horizontal and slightly angled to horizontal. The at least one holes is/are preferably drilled with a directional drilling rig or a non-directional drilling rig.
The hole or holes preferably extend across all of the footwall region.
The hole(s) preferably extend in a direction substantially normal to a direction of mining. The hole or holes are preferably arranged to upwardly expand the material in the footwall into a ridge or arch into the goaf.
The holes preferably extend between chain pillars either side of the footwall.
The method preferably includes drilling one or more holes a first depth beneath the footwall and one or more holes at a second depth, the second depth deeper than the first depth, and firing the explosive in the hole or holes at the first depth prior to the holes or holes at the second depth.
The methods preferably includes drilling one or more holes at plurality of depths beneath the footwall, and firing the explosive in the hole or holes sequentially from lowest depth first to deepest depth last.
In one form, the holes are preferably arranged in a triangular pattern with a downwardly facing apex.
In another form, the holes are preferably arranged in a substantially vertical line.
The method preferably includes upwardly expanding material in the footwall with a plurality of explosive firings to form a series of said ridges or arches that are spaced apart in, and most preferably perpendicular to, the direction of mining.
The method preferably includes supporting the hanging wall above the goaf to minimise collapse during the drilling, loading and firing of the holes or holes.
The supporting of the hanging wall preferably includes spacing the explosive firings or controlling the goaf width between blasts.
The method preferably includes directly supporting of the hanging wall with one or more hydraulic roof support mechanisms, with sacrificial timber props or with rock bolts.
Detailed Description of the Drawings
Preferred embodiments of the invention will now be described, by way of examples only, with reference to the accompanying drawings in which:
Fig. 1 is a schematic cross-sectional side view of a typical longwall mining operation;
Fig. 2 shows a longwall mining operation after the drilling and charging of a hole with explosives;
Fig. 3 shows the longwall mining operation shown in Fig. 2 after firing of the explosives; Fig. 4 shows a longwall mining operation after the drilling and charging of 3 holes with explosives;
Fig. 5 shows the mining operation of Fig. 4 after firing of the explosives;
Fig. 6 shows a longwall mining operation of Fig. 1 after the drilling and charging of 6 holes with explosives;
Fig. 7 shows the mining operation of Fig. 6 after firing of the explosives;
Fig. 8 shows the longwall mining operation of Fig. 7 after firing of several groups of explosives, each similar to those shown in Figs. 4 and 5;
Fig. 9 is a schematic cross-sectional end view of a longwall mining operation showing holes for explosives;
Fig. 10 is a schematic cross-sectional end view of a longwall mining operation showing alternate holes for explosives;
Fig. 11 is a schematic cross-sectional top view of a longwall mining operation showing holes for explosives;
Fig. 12 shows a longwall mining operation after the drilling and charging of 2 holes with explosives;
Fig. 13 shows the mining operation of Fig. 12 after firing of the explosives;
Fig. 14 shows a longwall mining operation after the drilling and charging of 3 holes with explosives; and
Fig. 15 shows the mining operation of Fig. 14 after firing of the explosives.
Detailed Description of the Preferred Embodiments
Fig. 1 shows a schematic cross-sectional side view of a typical longwall coal mining operation proceeding in a mining direction 20. Fig. 1 shows a seam 22 being mined above a footwall 24. A longwall mining face 26 has a goaf 28 created behind it by the extraction of mined material and results in a hanging wall 30 being created above the goaf 28. The hanging wall 30 is supported by a hydraulic roof support mechanism 32.
In a typical longwall mining operation, the hydraulic roof support 32 is configured with the objective of having the hanging wall 30 collapse into the goaf 28 as soon as possible, so as to reduce the load on the hydraulic roof support. However, for the methods that will be described below, it is desirable for the hydraulic roof support 32 to include an extension 34, in the opposite direction to the direction of mining 20. The extension 34 is used support the hanging wall 30 and keep the goaf 28 largely free of collapse, as will be explained in more detail below. This process can also be assisted by adding fingers to the back of the hydraulic roof support 32, similar to those on a tunnel boring machine, installing sacrificial timber props in the goaf 28, or rock bolting in the hanging wall 30.
An embodiment of the method of reducing subsidence in longwall mining shall now be described with reference to Figs. 2 and 3.
Fig. 2 shows a longwall mining operation after the drilling of a hole 36 across most or all of the footwall 24 and beneath the goaf 28. The hole 36 extends across the footwall in a direction which is approximately normal to the direction of mining 20. The hole 36 is then charged with an explosive. Fig. 3 shows the longwall mining of Fig. 2 after the firing of the explosive in the hole 36. As is shown, the firing of the explosive causes the material adjacent the hole to fracture and expand upwardly and into the goaf 28. The extension 34 supports the hanging wall 30 and keeps the goaf 28 largely free of collapse during the drilling, loading and firing steps.
The fractured material takes the general form of a ridge or arch 38 formed from: rock segments 40; expanded rock fragments or rubble 42; and voids 44. When longwall mining recommences, the hanging wall 30 begins to collapse into the remaining space in the goaf 28 and loads the (expanded) footwall rock and the arch 38 of expanded footwall rock. The arch 38 advantageously resists the hanging wall collapse and reduces the . effective height of the collapse. As a consequence, any subsidence over the mined longwall panel is also reduced.
The progress of the mining operation is preferably optimised between blasts in order to minimise collapse of the hanging wall. The optimisation can depend on the competency of the hanging wall strata and the width of the goaf, as the goaf may stay open or have minimal collapse without support for a considerable distance. The
(modified) hydraulic roof supports mentioned above can be used to support one edge of the hanging wall. Alternatively, the goaf can be supported by sacrificial wooden props or rock-bolting. Regardless of the type support, the aim is to keep the goaf substantially open and for the footwall material to expand into a stable arch or ridge within the goaf. If too much collapse of the hanging wall occurs, the firing of the explosive can be confined and ineffective.
Fig. 4 shows a longwall mining operation after the drilling and charging of a triangular pattern of 3 holes 36 with explosive. The explosive in the shallowest hole are then fired first and the explosives in the deeper holes are subsequently fired after a delay. This results in a three part arch 38a being formed over a two-part arch 38b, similarly locked in place with the rubble 42 and the voids 44.
Fig. 6 shows a longwall mining operation after the drilling and charging of a triangular pattern of 6 holes 36 with explosive. The explosive are fired sequentially, in layers from shallowest hole to deepest holes. As shown in Fig. 7 this results in the formation of the three layers of arches 38a, 38b and 38c.
Fig. 8 shows a longwall mining operation similar to that described with reference to Figs. 4 and 5 after the creation of four arched regions 38, each being created one after another after a subsequent advancement of the mining operation. Fig. 8 also shows ridges 46 of unfractured footwall that are left between each of the arched regions 38. The ridges 46 also assist in supporting the arched regions 38. Fig. 8 also shows that whilst some collapse of the hanging wall 30 into the goaf 28 has occurred, the resulting subsidence has been minimised.
Fig. 9 shows a directional drill rig 50 being used to drill holes 36 through the footwall 24 and beneath the goaf 28. The holes 36 have an initial minority downwardly directed section 36a followed by a majority horizontal section 36b.
Fig. 10 shows a pair of conventional drilling rigs 52 being used to create slightly downwardly angled holes 36 from extending into the footwall 24 beneath the goaf 28 from opposite directions.
Fig. 11 is a top view of longwall mining operation showing the holes 36 behind longwall equipment 60 and unmined seam 22. Support material is also left unmined either side of the seam 22, in the form of chain pillars 62.
Fig. 12 shows a longwall mining operation after the drilling and charging of a substantially vertical pattern of 2 holes 36 with explosive. The explosive are fired sequentially, in layers from shallowest hole to deepest hole. As shown in Fig. 13, this results in the formation of the arches 38a and 38b.
Fig. 14 shows a longwall mining operation after the drilling and charging of a substantially vertical pattern of 3 holes 36 with explosive. The explosive are fired sequentially, in layers from shallowest hole to deepest hole. As shown in Fig. 15, this results in the formation of the arches 38a, 38b and 38c.
The advantages of the methods of reducing subsidence in longwall mining described above include: • It is a cost effective way to minimise subsidence, with relatively small amounts of material required (typically less than 1 % of the material required for dry or hydraulic backfilling):
• It causes minimal disruption to the longwall mining cycle;
• A limited amount of material is required to be bought underground - typically less than a kilogram of high explosive can fracture a cubic metre of rock, which can be easily handled in the confined spaces of an underground longwall mine;
• The process is confined underground, and surface access is not required. This means that this process could be adopted in urban environments, adjacent sensitive structures and in protected areas such as National Parks or under stored waters where surface access is difficult or not possible;
• No direct access is required to the hazardous environment of the goaf, with the drilling, loading and firing process being undertaken from the side or sides of the longwall panel;
• The method has minimal impact on the longwall mining cycle. The blast holes can be drilled from the chain pillars prior to or during mining, and the only disruption to longwall mining is the time taken to load and fire the explosives in the holes;
• Can be used in combination with grouting, with such grouting of the voids above and between the arches or in the fractured rock further minimising subsidence impacts;
• The minimised subsidence impacts could potentially allows mining under areas previously restricted areas. For example, within the Southern Coalfield south of Sydney there is an estimated AU$ 100B worth of coal to be longwall mined, and large additional areas adjacent to these mines can not be accessed using existing methods as it is beneath National Park, water storage dams, residential areas, cliffs, or deeply incised creeks or rivers.
The above advantages result in the methods described above being cost-effective techniques for minimising longwall mining subsidence impacts.
In addition to reducing subsidence in longwall mining, the above described methods can also mitigate windblast risks in two ways. Firstly, the methods result in the void being filled with broken rock, thereby reducing/minimising the amount of air that can be displaced if the roof collapses. Secondly, the broken rock will decelerate the collapsing roof, reducing the over-pressure and shock wave.
Although the invention has been described with reference to the preferred embodiments, it will be appreciated by persons skilled in the art that the invention can be embodied in many other forms. For example: rock-bolting or placing sacrificial timber props can be used to minimise collapse of the hanging wall to allow for wider, less frequent blasting of the footwall. Also, directional drilling can be from one chain pillar to break out in the other. This is followed by inserting a plastic pipe liner in the hole, blowing through a string and then, when ready, to blast pulling a string of explosives through the hole. This can reduce the downtime required to load the blast holes.
The primary application for the invention is coal mines and the invention performs best with the footwall geology found in coal mines. Around 99% of longwall mining operations are for coal. However, it is also applicable for use in non-coal longwall mining operations, for example Gold mines in South Africa.

Claims

Claims
1. A method of reducing subsidence or windblast impacts from longwall mining, the method comprising the steps of:
drilling at least one hole across all or part of a footwall region beneath a goaf; loading the hole or holes with explosive; and
firing the explosive(s) to upwardly expand material in the footwall adjacent the holes or holes into the goaf.
2. A method of reducing subsidence impacts from longwall mining, the method comprising the steps of:
drilling at least one hole across all or part of a footwall region beneath a goaf; loading the hole or holes with explosive; and
firing the explosive(s) to upwardly expand material in the footwall adjacent the holes or holes into the goaf.
3. A method of reducing windblast impacts from longwall mining, the method comprising the steps of:
drilling at least one hole across all or part of a footwall region beneath a goaf; loading the hole or holes with explosive; and
firing the explosive(s) to upwardly expand material in the footwall adjacent the holes or holes into the goaf.
4. The method as claimed in claim 1 , 2 or 3, wherein the hole or holes is/are substantially horizontal.
5. The method as claimed in claim 1 , 2 or 3, wherein the holes or holes is/are slightly angled to horizontal.
6. The method, as claimed in claim 1 , 2 or 3, wherein the hole or holes is/ are a combination of horizontal and slightly angled to horizontal.
7. The method as claimed in any one of the preceding claims, wherein the hole or holes is/are drilled with a directional drilling rig.
8. The method as claimed in any one of claims 1 to 6, wherein the at least hole or holes is/are drilled with a non-directional drilling rig.
9. The method as claimed in any one of the preceding claims, wherein the hole or holes extend across all of the footwall region.
10. The method as claimed in any one of the preceding claims, wherein the hole or hole(s) extend in a direction substantially normal to a direction of mining.
11. The method as claimed in any one of the preceding claims, wherein the hole or holes are arranged to upwardly expand the material in the footwall into a ridge or arch into the goaf.
12. The method as claimed in any one of the preceding claims, wherein the hole or holes extend between chain pillars either side of the footwall.
13. The method as claimed in any one of the preceding claims, wherein the method includes drilling one or more holes at a first depth beneath the footwall and one or more holes at a second depth, the second depth deeper than the first depth, and firing the explosive in the hole or holes at the first depth prior to the holes or holes at the second depth.
14. The method as claimed in any one of claims 1 to 12, wherein the methods includes drilling one or more holes at plurality of depths beneath the footwall, and firing the explosive in the hole or holes sequentially from lowest depth first to deepest depth last.
15. The method as claimed in claim 14, wherein the holes are arranged in a triangular pattern with a downwardly, facing apex.
16. The method as claimed in claim 14, wherein the holes are arranged in a substantially vertical line.
17. The method as claimed in any one of the preceding claims, wherein the method includes upwardly expanding material in the footwall with a plurality of explosive firings to form a series of said ridges or arches that are spaced apart in the direction of mining.
18. The method as claimed in any one of claims 1 to 16, wherein the method includes upwardly expanding material in the footwall with a plurality of explosive firings to form a series of said ridges or arches that are spaced apart in, and perpendicular to, the direction of mining.
19. The method as claimed in any one of the preceding claims, wherein the method includes supporting the hanging wall above the goaf to minimise collapse during the drilling, loading and firing of the holes or holes.
20. The method as claimed in claim 19, wherein the supporting of the hanging wall includes spacing the explosive firings or controlling the goaf width between blasts.
21. The method as claimed in claim 19 or 20, wherein the method includes directly supporting of the hanging wall with one or more hydraulic roof support mechanisms, with sacrificial timber props or with rock bolts.
PCT/AU2011/000190 2010-02-26 2011-02-22 A method of reducing subsidence or windblast impacts from longwall mining WO2011103620A1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
AU2010900841 2010-02-26
AU2010900841A AU2010900841A0 (en) 2010-02-26 A method of reducing subsidence impacts
AU2010901817 2010-04-29
AU2010901817A AU2010901817A0 (en) 2010-04-29 A method of reducing subsidence or windblast impacts from longwall mining

Publications (1)

Publication Number Publication Date
WO2011103620A1 true WO2011103620A1 (en) 2011-09-01

Family

ID=44506068

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU2011/000190 WO2011103620A1 (en) 2010-02-26 2011-02-22 A method of reducing subsidence or windblast impacts from longwall mining

Country Status (1)

Country Link
WO (1) WO2011103620A1 (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102705002A (en) * 2012-05-12 2012-10-03 山东科技大学 Roadside proper yielding unequal combined filling structure of gob-side entry retaining and construction method
CN102704934A (en) * 2012-06-28 2012-10-03 中钢集团马鞍山矿山研究院有限公司 High-yield and low-cost subsequent filling mining method for underground mine
CN102705001A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section two-hole split-layer grouting filling well location method for mining overburden rock
CN103614984A (en) * 2013-12-14 2014-03-05 山东建筑大学 Ecological treatment method oriented to geological environment disasters caused by riverway goafs
CN103953390A (en) * 2014-05-08 2014-07-30 中国矿业大学 Water-preserved-mining roof-contacted filling method for controlling fissure of overlying strata and surface subsidence
CN104484713A (en) * 2014-11-24 2015-04-01 辽宁工程技术大学 Prediction method for height of filling and mining water flowing fracture zone
CN104564075A (en) * 2015-01-30 2015-04-29 河北煤炭科学研究院 Process for instructing filling mining by observing variation of filling sensitive layer
CN105221185A (en) * 2015-08-26 2016-01-06 冀中能源股份有限公司邢东矿 A kind of coal winning technology
CN105604552A (en) * 2015-12-21 2016-05-25 冀中能源集团有限责任公司 Solid material filling mining gob side entry retaining method
CN106014480A (en) * 2016-07-29 2016-10-12 山东唐口煤业有限公司 Method for collaborative governance of gas and coal spontaneous combustion of fully-mechanized caving face with single thick coal seam
CN106677780A (en) * 2017-02-21 2017-05-17 中冶北方(大连)工程技术有限公司 Upward and downward staged rock drilling, sublevel bottom cutting and ore removal subsequent backfilling mining method
CN108412540A (en) * 2018-03-08 2018-08-17 山东科技大学 A kind of expansion filling method based on waste filling
CN108590655A (en) * 2018-03-27 2018-09-28 山东科技大学 Assemble the method that wall realizes gob side entry retaining
CN108757022A (en) * 2018-05-29 2018-11-06 中国煤炭地质总局勘查研究总院 The restorative procedure of mined-out region
CN109667569A (en) * 2019-01-07 2019-04-23 中国矿业大学 Caving Roof Coal Mining Face coal caving ability Enhancement Method
CN109854297A (en) * 2019-02-22 2019-06-07 中煤科工集团西安研究院有限公司 A kind of coalfield mined-out Areas grouting method based on directional drilling technique
CN110863828A (en) * 2019-11-12 2020-03-06 山东科技大学 A quantitative solution to the tight replacement of gob-side roadway in extra thick coal seam
CN111042821A (en) * 2019-11-12 2020-04-21 山东科技大学 Double-index method for quantitatively judging excavation time of gob-side roadway of extra-thick coal seam
WO2020098033A1 (en) * 2018-11-16 2020-05-22 山东科技大学 Supporting structural body for local goaf filling under hard roof conditions and construction method therefor
CN111305896A (en) * 2020-03-11 2020-06-19 西安科技大学 Method for reducing damage by utilizing filling point source type interval support of hydraulic support rear bag
CN112114359A (en) * 2020-08-13 2020-12-22 中南大学 Dangerous area detection method, system, terminal and readable storage medium based on active and passive source signals
CN112632717A (en) * 2020-12-10 2021-04-09 扎赉诺尔煤业有限责任公司 Method for predicting movement deformation of dam in coal mining subsidence area
CN112695739A (en) * 2020-12-18 2021-04-23 中国矿业大学(北京) Grouting reinforcement method for thick flowing sand layer under mining influence area building structure group
CN113756282A (en) * 2021-09-08 2021-12-07 河南理工大学 A Precise Grouting Reinforcement Method for High-rise Buildings Affected by Mining
CN114215592A (en) * 2021-11-30 2022-03-22 中国矿业大学 A green mining method filled with gangue and ultra-high water material in long-wall working face
CN114707744A (en) * 2022-04-18 2022-07-05 煤炭科学研究总院有限公司 Method and device for determining top-cutting, crushing and swelling filling construction parameters and electronic equipment
CN117291044A (en) * 2023-10-10 2023-12-26 西南交通大学 Mountain railway goaf tunnel drilling arrangement method
CN118728473A (en) * 2024-05-29 2024-10-01 北京科技大学 Large-size filling body water filtering equipment and method for unmanned aerial vehicle towing pre-buried water filtering pipe

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1004418A (en) * 1911-03-06 1911-09-26 William Griffith Method of mining.
US2846205A (en) * 1952-04-19 1958-08-05 Philip B Bucky Mining method for supporting geological structures

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1004418A (en) * 1911-03-06 1911-09-26 William Griffith Method of mining.
US2846205A (en) * 1952-04-19 1958-08-05 Philip B Bucky Mining method for supporting geological structures

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
H. HARTMAN ET AL.: "SME Mining Handbook", vol. 1, ISBN: 0-87335-100-2, article AIMONE, C.T. ET AL.: "Rock Breakage: Explosives", pages: 722 - 745 *

Cited By (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102705002A (en) * 2012-05-12 2012-10-03 山东科技大学 Roadside proper yielding unequal combined filling structure of gob-side entry retaining and construction method
CN102705002B (en) * 2012-05-12 2014-08-06 山东科技大学 Roadside proper yielding unequal combined filling structure of gob-side entry retaining and construction method
CN102705001A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section two-hole split-layer grouting filling well location method for mining overburden rock
CN102705001B (en) * 2012-05-25 2014-08-20 中国矿业大学 Isolated-section two-hole split-layer grouting filling well location method for mining overburden rock
CN102704934A (en) * 2012-06-28 2012-10-03 中钢集团马鞍山矿山研究院有限公司 High-yield and low-cost subsequent filling mining method for underground mine
CN103614984B (en) * 2013-12-14 2015-10-07 山东建筑大学 For the ecological treatment method of the geological environmental disaster that goaf, river course is brought
CN103614984A (en) * 2013-12-14 2014-03-05 山东建筑大学 Ecological treatment method oriented to geological environment disasters caused by riverway goafs
WO2015169080A1 (en) * 2014-05-08 2015-11-12 中国矿业大学 Water-preserved-mining roof-contacted filling method for controlling fissure of overlying strata and surface subsidence
CN103953390A (en) * 2014-05-08 2014-07-30 中国矿业大学 Water-preserved-mining roof-contacted filling method for controlling fissure of overlying strata and surface subsidence
US9689258B2 (en) 2014-05-08 2017-06-27 China University Of Mining And Technology Water-preserved-mining roof-contacted filling method for controlling fissure of overlying strata and surface subsidence
CN104484713A (en) * 2014-11-24 2015-04-01 辽宁工程技术大学 Prediction method for height of filling and mining water flowing fracture zone
CN104564075A (en) * 2015-01-30 2015-04-29 河北煤炭科学研究院 Process for instructing filling mining by observing variation of filling sensitive layer
CN105221185A (en) * 2015-08-26 2016-01-06 冀中能源股份有限公司邢东矿 A kind of coal winning technology
CN105604552A (en) * 2015-12-21 2016-05-25 冀中能源集团有限责任公司 Solid material filling mining gob side entry retaining method
CN106014480B (en) * 2016-07-29 2018-03-23 山东唐口煤业有限公司 A kind of Single thick coal seam Gas Full-Mechanized Caving Face cooperates with administering method with coal spontaneous combustion
CN106014480A (en) * 2016-07-29 2016-10-12 山东唐口煤业有限公司 Method for collaborative governance of gas and coal spontaneous combustion of fully-mechanized caving face with single thick coal seam
CN106677780A (en) * 2017-02-21 2017-05-17 中冶北方(大连)工程技术有限公司 Upward and downward staged rock drilling, sublevel bottom cutting and ore removal subsequent backfilling mining method
CN108412540A (en) * 2018-03-08 2018-08-17 山东科技大学 A kind of expansion filling method based on waste filling
CN108590655A (en) * 2018-03-27 2018-09-28 山东科技大学 Assemble the method that wall realizes gob side entry retaining
CN108590655B (en) * 2018-03-27 2019-05-31 山东科技大学 Assemble the method that wall realizes gob side entry retaining
CN108757022A (en) * 2018-05-29 2018-11-06 中国煤炭地质总局勘查研究总院 The restorative procedure of mined-out region
WO2020098033A1 (en) * 2018-11-16 2020-05-22 山东科技大学 Supporting structural body for local goaf filling under hard roof conditions and construction method therefor
CN109667569A (en) * 2019-01-07 2019-04-23 中国矿业大学 Caving Roof Coal Mining Face coal caving ability Enhancement Method
CN109854297A (en) * 2019-02-22 2019-06-07 中煤科工集团西安研究院有限公司 A kind of coalfield mined-out Areas grouting method based on directional drilling technique
CN109854297B (en) * 2019-02-22 2021-01-29 中煤科工集团西安研究院有限公司 Small coal kiln goaf grouting method based on directional drilling process
CN111042821A (en) * 2019-11-12 2020-04-21 山东科技大学 Double-index method for quantitatively judging excavation time of gob-side roadway of extra-thick coal seam
CN111042821B (en) * 2019-11-12 2021-03-30 山东科技大学 Double-index method for quantitatively judging excavation time of gob-side roadway of extra-thick coal seam
CN110863828A (en) * 2019-11-12 2020-03-06 山东科技大学 A quantitative solution to the tight replacement of gob-side roadway in extra thick coal seam
CN111305896B (en) * 2020-03-11 2022-02-22 西安科技大学 Method for reducing damage by utilizing filling point source type interval support of hydraulic support rear bag
CN111305896A (en) * 2020-03-11 2020-06-19 西安科技大学 Method for reducing damage by utilizing filling point source type interval support of hydraulic support rear bag
CN112114359A (en) * 2020-08-13 2020-12-22 中南大学 Dangerous area detection method, system, terminal and readable storage medium based on active and passive source signals
CN112114359B (en) * 2020-08-13 2021-07-02 中南大学 Dangerous area detection method, system, terminal and readable storage medium based on active and passive source signals
CN112632717A (en) * 2020-12-10 2021-04-09 扎赉诺尔煤业有限责任公司 Method for predicting movement deformation of dam in coal mining subsidence area
CN112695739A (en) * 2020-12-18 2021-04-23 中国矿业大学(北京) Grouting reinforcement method for thick flowing sand layer under mining influence area building structure group
CN113756282A (en) * 2021-09-08 2021-12-07 河南理工大学 A Precise Grouting Reinforcement Method for High-rise Buildings Affected by Mining
CN113756282B (en) * 2021-09-08 2022-09-16 河南理工大学 A Precise Grouting Reinforcement Method for High-rise Buildings Affected by Mining
CN114215592A (en) * 2021-11-30 2022-03-22 中国矿业大学 A green mining method filled with gangue and ultra-high water material in long-wall working face
CN114707744A (en) * 2022-04-18 2022-07-05 煤炭科学研究总院有限公司 Method and device for determining top-cutting, crushing and swelling filling construction parameters and electronic equipment
CN114707744B (en) * 2022-04-18 2023-08-22 煤炭科学研究总院有限公司 Method and device for determining construction parameters of cutting, crushing, expanding and filling and electronic equipment
CN117291044A (en) * 2023-10-10 2023-12-26 西南交通大学 Mountain railway goaf tunnel drilling arrangement method
CN117291044B (en) * 2023-10-10 2024-03-26 西南交通大学 A method for drilling holes in tunnels in mountainous railway goaf areas
CN118728473A (en) * 2024-05-29 2024-10-01 北京科技大学 Large-size filling body water filtering equipment and method for unmanned aerial vehicle towing pre-buried water filtering pipe

Similar Documents

Publication Publication Date Title
WO2011103620A1 (en) A method of reducing subsidence or windblast impacts from longwall mining
CN103821558B (en) Coal mine gob filling mining and gob side entry retaining filling process
CN102536239B (en) Long-wall working face coal pillar-free mining method
CN110984987B (en) Large-inclination-angle coal seam working face local filling pillar-free mining method and system
CN104847355B (en) Open field continuous mining method of medium-thick steeply inclined ore body
CN108625856A (en) A kind of mining methods in the two neighboring one ore removal lane of stope of underground mine
CN104532818A (en) Treatment method for strip mine goaf
CN104632220B (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN103216264B (en) Method for controlling deformation of surrounding rock of basic rimrock layer on presplitting blasting mining roadway
CN104712358A (en) Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief
CN112377193A (en) Deep well small coal pillar gob-side entry retaining method based on roof breaking and pressure relief of lower key layer of roof
CN111411962A (en) Coal mine rock burst treatment method
CN110966002B (en) A method of roof cutting and pressure relief based on dense drilling
CN112922598A (en) Method for reducing gob-side entry driving roof pressure through roof cutting and pressure relief
CN1865660A (en) Construction method for weakening zone of floor plate wall rock
CN103806917B (en) Vertical strip roadway tunneling method
CN108343418A (en) The method for controlling Affected areas by mining from earth's surface directional hydraulic fracturing presplitting basement rock
CN107975373A (en) A kind of lower continuous digging hard-rock mine method of mechanization of liquid-gas phase transition induction
CN104533419A (en) Method for partial recovery of residual coal from wide coal pillar
Li et al. Trial of small gateroad pillar in top coal caving longwall mining of large mining height
CN104989408A (en) Safe and high-efficiency mining method for metal mine in mountainous area
CN116838342A (en) Near-field control and far-field isolation coal and rock dynamic disaster area prevention and control methods
Konicek Destressing
CN108049870A (en) The induction caving mining methods of high-dipping middle thickness orebody of the upper disk containing unstable rock stratum
RU2755287C1 (en) Method for developing thin and low-powered steel-falling ore bodies

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11746747

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11746747

Country of ref document: EP

Kind code of ref document: A1