WO2011004540A1 - 原子炉容器の管台作業システム - Google Patents

原子炉容器の管台作業システム Download PDF

Info

Publication number
WO2011004540A1
WO2011004540A1 PCT/JP2010/003503 JP2010003503W WO2011004540A1 WO 2011004540 A1 WO2011004540 A1 WO 2011004540A1 JP 2010003503 W JP2010003503 W JP 2010003503W WO 2011004540 A1 WO2011004540 A1 WO 2011004540A1
Authority
WO
WIPO (PCT)
Prior art keywords
nozzle
unit
work
reactor vessel
working
Prior art date
Application number
PCT/JP2010/003503
Other languages
English (en)
French (fr)
Inventor
杉浦篤
堀匠
西川賢二
大西献
下鍋典昭
都築鋭
若元郁夫
Original Assignee
三菱重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工業株式会社 filed Critical 三菱重工業株式会社
Priority to US13/263,938 priority Critical patent/US9524803B2/en
Priority to EP10796854.7A priority patent/EP2405445B1/en
Publication of WO2011004540A1 publication Critical patent/WO2011004540A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C17/00Monitoring; Testing ; Maintaining
    • G21C17/017Inspection or maintenance of pipe-lines or tubes in nuclear installations
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C17/00Monitoring; Testing ; Maintaining
    • G21C17/003Remote inspection of vessels, e.g. pressure vessels
    • G21C17/01Inspection of the inner surfaces of vessels
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/14Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel characterised by their adaptation for use with horizontal channels in the reactor core
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C17/00Monitoring; Testing ; Maintaining
    • G21C17/003Remote inspection of vessels, e.g. pressure vessels
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/20Arrangements for introducing objects into the pressure vessel; Arrangements for handling objects within the pressure vessel; Arrangements for removing objects from the pressure vessel
    • G21C19/207Assembling, maintenance or repair of reactor components
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Definitions

  • the present invention relates to a reactor vessel nozzle work system for performing operations inside a reactor vessel of a nuclear reactor.
  • a gantry is installed inside.
  • a worker inserts and fixes a UT inspection device inside the pedestal, and performs a UT inspection within a desired range.
  • the present invention has been made in view of the above-described circumstances, and a reactor vessel nozzle capable of shortening the work period and reducing the cost while minimizing the radiation exposure dose of the worker. Provide a working system.
  • a reactor vessel nozzle work system that is provided to project outward from a side surface of a reactor vessel and performs an operation inside a nozzle that communicates the inside and outside of the reactor vessel with an upper structure and
  • a gantry having an approximately cylindrical side wall portion and a bottom portion closing the lower end of the side wall portion, provided above from the inside of the reactor vessel whose inner structure is removed and the upper portion is open,
  • An access window provided in the side wall portion of the pedestal for communicating with the nozzle, an access window operating device for opening and closing the access window, and the inside of the pedestal from the inside of the gantry to the inside of the nozzle
  • a control device that is provided outside the reactor vessel and controls the access window operating device and the work device.
  • the control device drives the access window operating device. Let After opening the scan window, the drives the work device to perform the work inside the pipe base, to close the access window by driving the access window operating device after the working is complete.
  • the inside of the gantry can be made into an air environment with a reduced radiation dose. And if the water level of the cooling water inside the reactor vessel is lowered below the nozzle, it becomes possible to access the inside of the gantry from the inside of the gantry through the access window in the air environment. Then, the control device provided outside the reactor vessel drives the access window operating device to open the access window, and then drives the work device to perform work inside the nozzle. The work can be automatically performed inside the nozzle without being placed inside the gantry. Further, the control device drives the access window operating device after completion of the operation to close the access window, thereby automatically returning the inside of the reactor vessel to the underwater environment again without placing an operator inside the gantry. Can be made possible.
  • the reactor vessel nozzle work system may further include a work floor provided above the reactor vessel and a lifting device for raising and lowering the work device from the work floor to the inside of the gantry.
  • the control device may drive the lifting device to lower the working device into the gantry.
  • the reactor vessel nozzle work system may further include a moving device that is provided inside the gantry, detachably mounts the work device, and moves the mounted work device.
  • the control device drives the moving device to deliver the working device between the moving device and the lifting device inside the gantry, and the working device mounted on the moving device is placed inside the gantry. And a predetermined position inside the nozzle.
  • a moving device is provided inside the gantry, and the working device can be transferred to and from the lifting device under the control of the control device. It is also possible to move the attached working device. Therefore, it is not necessary to provide the moving function in the working device itself, and it is possible to provide a minimum function for performing work. Therefore, the working device can be reduced in size. Thereby, the weight of the working device that is lifted and lowered by the lifting device can be reduced, and the lifting device can be reduced in size. Moreover, movement and work in a narrow space inside the gantry and the nozzle can be made easier.
  • the moving device may be provided so as to be rotatable around a central axis of the gantry.
  • the moving device is provided so as to be rotatable around the central axis of the gantry inserted into the reactor vessel, the positioning can be accurately performed with respect to the plurality of nozzles provided radially in the reactor vessel. It can be done easily.
  • the moving device has a first moving unit that detachably attaches the working device to a tip, moves the working device around a plurality of axes, and a support plate on which the working device can be placed, You may provide the 2nd moving unit which slide-moves the said working device mounted in the support plate.
  • the working device is detachably attached to the tip of the first moving unit, and is mounted on the support plate of the second moving unit, a first working unit that drives in the attached state, You may provide the 2nd operation
  • the first moving unit that can move around a plurality of axes performs the work inside the nozzle by the first working unit while finely adjusting the position of the first working unit. It can be carried out.
  • the second moving unit can be moved to the inside of the nozzle while being stably supported by the support plate.
  • the second working unit can perform work while maintaining a stable posture inside the nozzle by the fixing means for fixing itself. That is, the work performed while moving finely by the combination of the first moving unit and the first working unit can be suitably performed. And by the combination of a 2nd movement unit and a 2nd operation
  • the reactor vessel nozzle work system may further include a storage for storing a plurality of the work devices.
  • the elevating device may elevate a storage that accommodates the plurality of working devices.
  • a plurality of work devices can be moved up and down while being housed in the storage box by the lifting device under the control of the control device. Thereby, it is possible to raise and lower a plurality of working devices efficiently.
  • the working device is moved between the storage and the moving device without using a lifting device each time. Can be replaced. Thereby, work can be performed efficiently.
  • the reactor vessel nozzle work system may include a plurality of the work devices.
  • the reactor vessel nozzle work system may include a plurality of the storages corresponding to the types of the work devices.
  • the said working device may be accommodated in each storage for every kind.
  • the said control apparatus drives the said raising / lowering apparatus, You may raise / lower the said storage selectively according to the kind of work.
  • the lifting device under the control of the control device, the lifting device is driven, and the storage is selectively lifted according to the type of work, so that the same type of work is stored in a single storage. It can be done simultaneously by the working device. Moreover, a some operation
  • work can be performed sequentially by changing a storage. Thereby, work can be performed more efficiently.
  • the reactor vessel nozzle work system may further include a nozzle clogging device that clogs the nozzle inside the nozzle.
  • the control device drives the nozzle block closing device, and before the work inside the nozzle by the working device, the control device inside the nozzle at a position deeper than the work position when viewed from the reactor vessel.
  • the nozzle may be closed.
  • the nozzle blockage device under the control of the control device, the nozzle blockage device is driven, and before the work device carries out the work inside the nozzle table, the position inside the nozzle vessel as viewed from the reactor vessel is the position behind the work position. With this, the nozzle can be closed. Therefore, it is possible to reliably prevent foreign matter from entering the back side of the nozzle when working with the working device.
  • It may further comprise a gap closing device that closes a gap between the access window and the nozzle, and the control device drives the access window operating device before or after opening the access window.
  • the gap closing device may be driven to close the gap between the access window and the nozzle.
  • the access window operating device is driven under the control of the control device, and the gap closing device is driven before or immediately after the access window is opened to close the gap between the access window and the nozzle. Accordingly, it is possible to reliably prevent foreign matter from entering between the reactor vessel and the gantry when the working device is moved into the nozzle and is operated.
  • the work device may include an inspection unit that inspects the inner surface of the nozzle and a construction unit that performs inner surface construction on the inner surface of the nozzle.
  • the control device may cause the inspection unit to inspect the inner surface of the nozzle, and cause the construction unit to perform inner surface construction on the inner surface of the nozzle based on an inspection result by the inspection unit.
  • the construction unit can automatically perform the inner surface construction at a necessary location on the inner surface of the nozzle base based on the inspection result by the inspection unit.
  • the construction unit may include a cutting unit that cuts the inner surface of the nozzle.
  • the said control apparatus may drive the said cutting unit and perform the cutting of the inner surface of a nozzle in the range judged to be a defective location based on the test result by the said test
  • the defective portion on the inner surface of the nozzle can be automatically cut and removed by the cutting unit based on the inspection result by the inspection unit.
  • the control device may cause the inspection unit to inspect a range cut by the cutting unit after the cutting by the cutting unit is performed. When a defective portion is found based on the inspection result by the inspection unit, the cutting unit may be driven again to perform cutting.
  • the construction unit may further include a welding unit for welding the inner surface of the nozzle.
  • the said control apparatus may drive the said welding unit about the range cut with the said cutting unit, and may perform welding.
  • the defective portion can be automatically repaired by welding the area cut by the cutting unit by the welding unit under the control of the control device.
  • the construction unit may further include a finishing unit for finishing the inner surface of the nozzle.
  • the control device may cause the finishing unit to drive and finish the range welded by the welding unit.
  • the repaired portion can be automatically finished by finishing the range welded by the welding unit by the cutting unit under the control of the control device.
  • the control device may cause the inspection unit to inspect the range welded by the welding unit, and when it is determined that the construction is good in all ranges based on the inspection result by the inspection unit,
  • the access device may be closed by the access window operating device by retracting the work device into the frame.
  • the welding unit it is possible to automatically determine whether or not a defective portion has occurred due to welding by the welding unit by inspecting a range welded by the welding unit by the inspection unit under the control of the control device. .
  • the control device determines that the construction is good in all areas based on the inspection results from the inspection unit, the work device is moved back into the gantry under the control of the control device and accessed by the access window operating device. Close the window. Thereby, the inside of the reactor vessel can be brought into the underwater environment again by making the nozzles in an appropriate state by repairing.
  • the control device may drive the cutting unit again to perform cutting within a range determined to be defective construction.
  • the reactor vessel nozzle work system of the present invention it is possible to shorten the work period and reduce the cost while minimizing the radiation exposure of the worker.
  • the nozzle work system of the embodiment of the present invention it is a perspective view showing the details of the storage and details of the installation state inside the gantry of the storage.
  • FIG. 1 is an overall view showing an outline of a nozzle work system for performing a nozzle work in a nuclear reactor vessel.
  • FIG. 2 is a block diagram showing the system configuration of the nozzle work system.
  • FIG. 1 shows a reactor vessel 2 in which an upper lid that is an upper structure and a core structure that is an inner structure are removed and an upper portion is opened inside the reactor 1.
  • the reactor vessel 2 is provided with at least one set of an inlet nozzle 3 ⁇ / b> A and an outlet nozzle 3 ⁇ / b> B as a nozzle 3.
  • three sets of the inlet nozzle 3A and the outlet nozzle 3B are provided.
  • the cooling water can be taken into the interior from each set of the inlet nozzles 3A, and the cooling water can be discharged from the outlet nozzles 3B.
  • the nozzle work system 10 of the present embodiment includes a bottomed cylindrical gantry 11 having a lower end inserted into the reactor vessel 2 from the upper opening 2a and extending upward.
  • a work floor 12 installed above the reactor vessel 2 and a control device 13 that is installed on the work floor 12 outside the reactor vessel 2 and controls each component.
  • the control device 13 receives a plurality of control panels 14 for electrically controlling each component, and operation information for each component is input from the control panel 14, and an operation for controlling the operation of each component.
  • a general computer 15 that outputs a command to the control panel 14.
  • the control panel 14 includes a first control panel 14A to a sixth control panel 14F.
  • the first control panel 14 ⁇ / b> A controls the lifting device 44, the container 43, the access window operating device 21, and the gap closing device 28.
  • the second control panel 14B controls the second moving unit 42B.
  • the third control panel 14C controls the first working unit 160 among the first moving unit 42A and the working device 40.
  • the fourth control panel 14 ⁇ / b> D controls the cutting unit 81.
  • the fifth control panel 14E controls the nozzle closing device 41.
  • the sixth control panel 14F controls the decontamination unit 84. Details of each component which is a control target of each control panel 14 will be described later. Further, the configuration of the control panel 14 is not limited to this, and may be further subdivided, or may be represented by a single control panel 14.
  • the central computer 15 may be configured such that a plurality of computers perform processing in cooperation.
  • the gantry 11 includes a platform 16 disposed inside the reactor vessel 2, and a substantially cylindrical shape that is connected to the platform 16 and disposed above the reactor vessel 2 along the vertical direction.
  • Connection pipe 17 The platform 16 has a substantially cylindrical side wall 16a having an outer diameter smaller than the inner diameter of the reactor vessel 2, a bottom plate 16b that closes the lower end of the side wall 16a, and projects from the upper end of the side wall 16a to the outer peripheral side. And a flange 16c supported on the upper edge.
  • the platform 16 is fixed to the reactor vessel 2 using fixing holes 16d formed in the flange 16c.
  • the connection pipe 17 has a lower end fixed to the flange 16 c of the platform 16.
  • a side wall portion 11 a of the gantry 11 is configured by the side wall 16 a of the platform 16 and the connection pipe line 17.
  • the bottom plate 16 b of the platform 16 constitutes the bottom 11 b of the gantry 11.
  • the connection pipe line 17 communicates with a communication hole 12a formed at a position above the reactor vessel 2 on the work floor 12 at the upper end. For this reason, on the work floor 12, it is possible to access the inside of the gantry 11 through the communication hole 12a.
  • the flange 16 c of the platform 16 and the upper end of the reactor vessel 2 are sealed, and the flange 16 c of the platform 16 and the lower end of the connection pipe line 17 are sealed.
  • FIG. 1 even if the interior of the reactor vessel 2 is drained so that the water level is lower than the nozzle 3, the reactor vessel 2 is filled around the connection pipe line 17. The cooled water does not leak into the reactor vessel 2 and the gantry 11.
  • an access window 20 is formed on the side wall 16 a of the platform 16 so as to communicate with the interior of the gantry 11 and each nozzle 3, and an access window operating device 21 capable of opening and closing the access window 20 is provided.
  • the access window operating device 21 includes a substantially plate-shaped lid body 22, a pair of guide rails 23, and an electric winch 24.
  • the lid 22 is provided in each access window 20 on the inner peripheral surface of the side wall 16a.
  • the pair of guide rails 23 sandwich the lid 22 between the inner peripheral surface of the side wall 16a and guide the lid 22 up and down.
  • the electric winch 24 is an elevating unit that is provided above the access window 20 and moves the lid 22 up and down along the guide rail 23.
  • a drive motor (not shown) of the electric winch 24 is connected to the first control panel 14A.
  • the drive motor is driven by control by the first control panel 14A, and can move the lid 22 up and down.
  • a pair of support members 25 spanned between the pair of guide rails 23 are provided at the upper and lower portions of the access window 20.
  • a hydraulic cylinder capable of advancing and retracting toward a cover body 22 disposed so as to close the access window 20 on the surface of the pair of guide rails 23 and the pair of support members 25 facing the side walls 16a. 26 is provided.
  • the hydraulic cylinder 26 is provided on the work floor 12 by piping (not shown), and is connected to a working water supply device 27 (see FIG. 2) connected to the first control panel 14A. Therefore, under the control of the first control panel 14A, the hydraulic water is supplied to the hydraulic cylinder 26 by the hydraulic water supply device 27 to apply the hydraulic pressure, so that the lid 22 is attached to the side wall 16a at four locations, top, bottom, left and right. It is possible to make it press toward.
  • FIG. 1 As shown in FIG.
  • O-rings 22 a are doubly arranged around the access window 20 on the side wall 16 a of the platform 16. For this reason, when the lid 22 is pressed toward the side wall 16a by the hydraulic cylinder 26, the O-ring 22a is elastically deformed. Thereby, even if the outside of the platform 16 is an underwater environment, it is possible to prevent water from entering the inside through the access window 20.
  • a leak detection port 22b is formed between the double O-rings 22a inside the side wall 16a, and the presence or absence of water intrusion into the leak detection port 22b is detected by a liquid level sensor (not shown). It is possible.
  • the detection result of the liquid level sensor is connected to the central computer 15 via the first control panel 14A by a communication line (not shown). Thereby, when water intrusion is detected, it is possible to take measures such as immediately stopping the work.
  • the protection ring 29 is provided on the outer peripheral side of the main body 29a and the main body 29a for filling the gap 2b between the access window 20 and the reactor vessel 2, and can contact the inner peripheral surface of the reactor vessel 2.
  • the abutting portion 29b forms a substantially T-shaped cross section.
  • An elastically deformable seal material 29c is attached to the abutting portion 29b on the side facing the inner peripheral surface 2c of the reactor vessel 2. Thereby, the sealing material 29 c can be brought into close contact with the inner peripheral surface 2 c of the nuclear reactor vessel 2.
  • the expansion / contraction member 30 has a sufficient length from the state in which the protective ring 29 is accommodated in the access window 20 to the contact with the inner peripheral surface 2c of the reactor vessel 2.
  • a plurality of pneumatic cylinders 28a are provided between the telescopic member 30 and the inner peripheral surface 2c of the access window 20 at intervals in the circumferential direction.
  • the pneumatic cylinder 28a is connected to a compressed air supply device 31 (see FIG. 2) that is provided on the work floor 12 by a pipe (not shown) and connected to the first control panel 14A.
  • a recovery port 32 is provided at the lower end of the protective ring 29 of each gap closing device 28.
  • the recovery port 32 opens at a position on the inner peripheral surface 2 c side of the reactor vessel 2 in the protection ring 29, and connects to a recovery facility 109 described later on the work floor 12 through the side wall 16 a of the platform 16. Has been. Thereby, the collection port 32 can suck and collect water collected near the opening of the nozzle 3.
  • the nozzle work system 10 includes a working device 40, a nozzle closing device 41, a moving device 42, a storage 43, a lifting device 44, and a portal crane 45.
  • the working device 40 performs various types of nozzles.
  • the nozzle clogging device 41 closes the nozzle 3 inside the nozzle 3.
  • the moving device 42 is provided inside the gantry 11 and moves the working device 40 and the nozzle block closing device 41.
  • the storage 43 stores each work device 40.
  • the elevating device 44 elevates each device from the work floor 12 to the inside of the gantry 11 through the communication hole 12a.
  • the portal crane 45 moves each device on the work floor 12.
  • the portal crane 45 can travel so as to straddle the communication hole 12a. Thereby, the equipment can be moved by the portal crane 45 between the area around the communication hole 12a and the area away from the communication hole 12a.
  • the elevating device 44 includes a support base 44a, a frame 44b, a pair of first rails 44c and a second rail 44d, a main body 44e, and a pair of grips 44f.
  • the support base 44a is provided on the work floor 12 so as to be able to travel.
  • the frame 44b is provided so as to be rotatable around the vertical axis on the support base 44a.
  • the pair of first rail 44c and second rail 44d are disposed substantially vertically on the inner peripheral surface of the frame 44b and the gantry 11, respectively.
  • the main body 44e can run up and down on the first rail 44c and the second rail 44d.
  • the pair of gripping portions 44 f are provided on the main body portion 44 e so as to be close to and away from each other, and grip the work device 40 and the storage 43.
  • the support base 44a is provided with a travel drive unit and a rotation drive unit (not shown) connected to the first control panel 14A. Under the control of the first control panel 14A, the support platform 44a can be driven on the work floor 12 by the travel drive unit. Further, the frame 44b and the first rail 44c can be rotated around the vertical axis by the rotation driving unit.
  • the main body 44e is provided with a lifting drive unit (not shown) connected to the first control panel 14A, and is controlled by the lifting drive unit on the first rail 44c under the control of the first control panel 14A.
  • the main body 44e is provided with a grip driving unit (not shown) connected to the first control panel 14A. Then, under the control of the first control panel 14A, the work device 40 and the container 43 can be gripped by bringing the pair of gripping portions 44f close to each other by the gripping drive portion.
  • the moving device 42 includes a first moving unit 42 ⁇ / b> A that can be rotated around a plurality of axes, and a second device that can slide the work device 40 and the nozzle blockage device 41.
  • the first moving unit 42 ⁇ / b> A is movable in the circumferential direction about the center axis C ⁇ b> 11 of the gantry 11 along the guide rail 50 and the guide rail 50 formed in an arc shape on the outer peripheral side on the bottom 11 b of the gantry 11.
  • a unit main body 51 In the present embodiment, three unit main bodies 51 are installed on the guide rail 50 so as to correspond to the number of sets of the inlet nozzle 3 ⁇ / b> A and the outlet nozzle 3 ⁇ / b> B constituting the nozzle 3.
  • the unit main body 51 includes a first support body 52, a second support body 53, a manipulator 54, and a connection portion 55.
  • the first support body 52 is movable along the guide rail 50.
  • the second support 53 can rotate on the first support 52 around a first rotation axis R1 substantially parallel to the central axis C11 of the gantry 11.
  • the manipulator 54 is provided on the second support 53.
  • the connecting portion 55 is provided at the tip of the manipulator 54 and makes the work device 40 detachable.
  • the first support 52 includes a travel drive unit 52a that travels along the guide rail 50, and a first rotation that rotates the second support 53 about the first rotation axis R1 with respect to the first support 52.
  • the drive part 52b is provided.
  • the second support 53 includes a lower plate 53a, an upper plate 53b, and a slide drive unit (not shown).
  • the second support 53 is attached to the first support 52 so as to be rotatable around the first rotation axis R1.
  • the upper plate 53b is slidably provided on the lower plate 53a in a sliding direction L1 orthogonal to the first rotation axis R1.
  • the slide drive unit is provided between the upper plate 53b and the lower plate 53a and slides the upper plate 53b with respect to the lower plate 53a.
  • the manipulator 54 has a multi-joint structure having a plurality of joint portions 54a. Thereby, it is freely rotatable around three axes, that is, an axis parallel to the slide direction L1 and two axes orthogonal to the axis.
  • each joint portion 54a is provided with a rotation drive unit that rotates the joint portion 54a on the distal end side.
  • the connecting portion 55 provided at the distal end 54b of the manipulator 54 and the work device 40 attached to the connecting portion 55 can be rotated around an arbitrary axis.
  • each drive unit is provided with a position sensor such as an encoder for detecting the movement state of each drive unit.
  • the detection result detected by the position sensor is input to the third control panel 14C as a position detection signal.
  • the third control panel 14C outputs a control signal to each drive unit based on a command from the overall computer 15, and drives each drive unit to operate the first moving unit 42A.
  • feedback control is performed based on the position detection signal input from each position sensor, and accurate position control can be performed.
  • connection portion 55 of the first moving unit 42 ⁇ / b> A some work devices 40 are provided with a connection portion, and the connection portion 55, the connection portion, The tool changer is configured to be detachable from each other.
  • Each of the connecting portion 55 and the connected portion is connected to the connecting portion main body 55a and the connected portion main body that can be rigidly held, and the wiring (not shown) disposed on the manipulator 54 side and the work device 40 side, respectively.
  • the wiring and piping built in the manipulator 54 the wiring is electrically connected between the working device 40 and each device on the work floor 12, and the operation water supply device or the compressed air supply device on the work floor 12 is operated.
  • Various pipes are provided for supplying water and compressed air, or for connecting to the recovery facility 109 and performing suction from the working device 40 side.
  • positioned in the manipulator 54 are selectively connected to the working device 40 connected to the connection part 55.
  • the work device 40 is supplied with power from the third control panel 14C by the wiring / pipe connector 55b and operates by receiving necessary control signals.
  • the working device 40 can output the detected result to the third control panel 14C as a detection signal by the wiring / pipe connector 55b. Furthermore, the working device 40 operates with working water or compressed air supplied from a working water supply device or a compressed air supply device. Alternatively, the working device 40 can supply water or supply air to the inside of the nozzle 3. Furthermore, the working device 40 can be sucked by a negative pressure acting from the recovery facility 109. Details will be described in the description of each working device 40.
  • the second moving unit 42 ⁇ / b> B includes a base 56, a plurality of slide plates 57, a support plate 58, and a pressing member 59.
  • the base 56 is provided on the bottom 11b of the gantry 11 on the inner peripheral side of the guide rail 50 of the first moving unit 42A so as to be rotatable around the central axis C11 of the gantry 11.
  • the plurality of stages of slide plates 57 are provided on the base portion 56 so as to be slidable along a slide direction L2 orthogonal to the central axis C11 of the gantry 11.
  • the support plate 58 is provided on the uppermost slide plate 57 so as to be slidable along the slide direction L2, and the working device 40 can be placed on the upper surface.
  • the pressing member 59 protrudes from the base end of the support plate 58 and can advance and retract toward the distal end side.
  • the base portion 56 includes a rotation drive portion that rotates itself around the central axis C11 of the gantry 11, and a slide drive that sequentially slides the plurality of slide plates 57, the support plate 58, and the pressing member 59 in the slide direction L2. Are provided. Thereby, it is possible to move the working device 40 placed on the support plate 58 in the slide direction L2.
  • each driving unit is provided with a position sensor for detecting a moving state by each driving unit.
  • the detection result detected by the position sensor is input to the second control panel 14B as a position detection signal. Therefore, the second control panel 14B outputs a control signal to each drive unit based on a command from the overall computer 15, and drives each drive unit to operate the second moving unit 42B.
  • feedback control is performed based on the position detection signal input from each position sensor, and accurate position control can be performed.
  • the nozzle block closing device 41 includes a seal main body 60 that closes the inside of the nozzle 3, and a guide portion 61 that is detachably connected to the seal main body 60.
  • the seal main body 60 includes a substantially disc-shaped seal plug 62, an inflatate seal 63, a fixing jack 64, and a caster 65.
  • the substantially disc-shaped seal plug 62 has an outer diameter smaller than the inner diameter of the nozzle 3.
  • the inflate seal 63 is fitted on the outer peripheral surface of the seal plug 62.
  • a plurality of fixing jacks 64 are provided radially on the seal plug 62 and can be advanced and retracted toward the radially outer peripheral side.
  • the fixing jack 64 includes a guide 64a, a contact portion 64b, and a hydraulic cylinder 64c.
  • the guide 64a is disposed from the center position of the seal plug 62 toward the radially outer peripheral side.
  • the abutting portion 64 b can advance and retreat along the guide 64 a and abuts against the inner surface of the nozzle 3.
  • the hydraulic cylinder 64c can be expanded and contracted from the center position of the seal plug 62 toward the outer peripheral side in the radial direction, and a contact portion 64b is attached to the tip of the rod.
  • the fixing jack 64 extends the hydraulic cylinder 64c to advance the contact portion 64b toward the outer peripheral side in the radial direction along the guide 64a so as to be located on the outer peripheral side of the seal plug 62. Can be brought into contact with the inner surface of the plate.
  • the seal plug 62 can be fixed to the inner surface of the nozzle 3 by a plurality of fixing jacks 64.
  • the inflate seal 63 has a space between the outer peripheral surface of the seal plug 62 and expands to the outer peripheral side by supplying compressed air. Thereby, the clearance gap between the seal plug 62 arrange
  • the guide portion 61 is a substantially rod-like member that can be inserted into the nozzle 3 and is provided at the distal end side with the photographing means 66 for monitoring the distal end side, and is similar to the connection portion 55 of the first moving unit 42A.
  • the connecting portion 67 having the configuration and a caster 68 for running on the inner surface of the nozzle 3 are provided.
  • the seal body 60 is provided with a connected portion 69 corresponding to the connecting portion 67 of the guide portion 61, and a tool changer is configured so that the connecting portion 67 and the connected portion 69 can be attached to and detached from each other. .
  • the connecting portion 67 and the connected portion 69 can be rigidly held together.
  • a pipe for supplying the working water to the hydraulic cylinder 64c of the fixing jack 64 and a pipe for supplying the compressed air to the inflatate seal 63 are connected to the connection portion.
  • 67 and the connected portion 69 are provided so as to be connectable to each other.
  • a wiring serving as a communication line for transmitting a control signal for driving the photographing unit 66 and photographing data output from the photographing unit 66 to the fifth control panel 14E is disposed inside the guide unit 61. ing.
  • the working water supply device 70 connected to the fifth control panel 14E is driven and the sealing plug 62 is driven by the fixing jack 64. Can be fixed to the inner surface of the nozzle 3.
  • the compressed air supply device 71 connected to the fifth control panel 14E is driven in this state to expand the inflate seal 63 to seal the gap between the seal plug 62 and the inner surface of the nozzle 3. can do.
  • the inside of the nozzle 3 is sealed by the seal body 60 by separating the connecting portion 67 provided at the tip of the guide portion 61 and the connected portion 69 provided on the seal body 60. State.
  • the construction unit 40B includes a welding unit 80, a cutting unit 81, a finishing unit 82, a recovery unit 83, and a decontamination unit 84.
  • the welding unit 80 welds the inner surface of the nozzle 3.
  • the cutting unit 81 cuts the inner surface of the nozzle 3.
  • the finishing unit 82 performs finishing of the inner surface of the nozzle 3.
  • the collection unit 83 collects processing waste and the like in the nozzle 3.
  • the decontamination unit 84 cleans the inner surface of the nozzle 3.
  • the inspection unit 40A includes a UT inspection unit 85, a PT inspection unit 86, and a dimension measurement unit 87.
  • the UT inspection unit 85 performs an ultrasonic flaw detection test on the welded portion 5 on the inner surface of the nozzle 3.
  • the PT inspection unit 86 performs a penetration flaw detection test.
  • the dimension measuring unit 87 measures the target dimension.
  • the welding unit 80 includes a welding torch 90, a welding material supply unit 91, an illumination unit 92, an imaging unit 93, a position sensor 94, a support member 95, and a connected portion 96.
  • the welding torch 90 performs arc discharge.
  • the welding material supply means 91 supplies the wire W as a welding material to the tip side of the welding torch 90.
  • the illumination means 92 illuminates the tip side of the welding torch 90.
  • the photographing means 93 photographs the tip side of the welding torch 90.
  • the position sensor 94 detects a relative position with respect to the nozzle 3.
  • the support member 95 supports the position sensor 94 and the like.
  • the connected portion 96 is attached to the support member 95 and connected to the connecting portion 55 of the first moving unit 42A.
  • the welding material supply means 91 includes a wire reel 91a around which a wire W as a welding material is wound, a sending portion 91b for feeding out the wire W wound around the wire reel 91a, and a wire W sent by the sending portion 91b. And a guide portion 91c that guides the welding torch 90 to the tip side.
  • the sending unit 91b has, for example, a configuration including a pair of rollers that sandwich the wire W fed from the wire reel 91a and a roller rotation driving unit that rotates the roller.
  • the roller rotation drive unit is provided with an encoder, and the feeding length of the wire W can be acquired from the detected number of rotations.
  • the connected portion 96 includes a connected portion main body 96a rigidly held by the connecting portion main body 55a of the first moving unit 42A, and a connector receiving portion 96b connected to the wiring / pipe connector 55b.
  • Wiring and piping can be connected to the connector receiving portion 96b.
  • power supply and control signals are transmitted from the welding power source panel 97 and the welding control panel 98 installed on the work floor 12 to the illumination unit 92, the imaging unit 93, the welding torch 90, and the welding material supply unit 91.
  • wiring for supplying cooling water from a welding cooling facility 99 on the work floor 12 to a cooling pipe (not shown) can be connected.
  • the relative position of the welding unit 80 with respect to the nozzle 3 is adjusted by the first moving unit 42A under the control of the third control panel 14C. And the electric discharge is generated between the nozzles 3 with the welding torch 90 in the said position, and the wire W which is a welding material is supplied one by one. Thereby, welding can be performed at a desired position.
  • the cutting unit 81 includes a substantially cylindrical tube body portion 100, a fixing means 101, a disk 102, a cutting means 103, a grinding means 104, a water supply pipe 105, and a suction pipe 106. And have.
  • the tube part 100 can be inserted into the nozzle 3.
  • the fixing means 101 is provided on the outer peripheral surface of the tube part 100, and can fix the tube part 100 to the inner surface of the nozzle 3.
  • the disk 102 is provided at the distal end of the tubular body portion 100 and can rotate around the axis with respect to the tubular body portion 100.
  • the cutting means 103 and the grinding means 104 are provided on the front end surface of the disk 102 and cut the inner surface of the nozzle 3.
  • the water supply pipe 105 supplies water to the inner surface of the nozzle 3 at the time of cutting and grinding.
  • the suction pipe 106 is provided in the vicinity of the cutting means 103 and collects cutting waste.
  • the fixing means 101 is provided on the outer peripheral surface of the tube part 100 at four locations at regular intervals in the circumferential direction and two locations in the axial direction. That is, a total of eight fixing means 101 are provided.
  • the tube body 100 is fixed to the inner surface of the nozzle pedestal 3 by these eight fixing means 101.
  • two fixing means 101 are illustrated as being arranged at the upper and lower ends.
  • the fixing means 101 is shifted by 45 degrees from the vertical axis and the horizontal axis by shifting the position to the left and right so that the fixing means 101 can be placed on the support plate 58 of the second moving unit 42B as will be described later.
  • the inner surface of the nozzle 3 is provided so as to be pressed.
  • a rotational drive shaft 100a is disposed coaxially with the central axis, and a disk 102 is attached to the tip.
  • a disk rotation drive unit that rotates the rotation drive shaft 100a around the axis is provided inside the tube unit 100.
  • a guide portion 102 a is provided along the radial direction on the front end surface of the disk 102.
  • the cutting means 103 and the grinding means 104 are attached so as to be adjustable in the radial direction along the guide portion 102a.
  • the cutting means 103 includes a frame 103a, a disk portion 103b, a blade holder 103c, and a cutting blade 103d.
  • the disk portion 103b By rotating the disk portion 103b by the replacement drive portion 103e, it is possible to select a cutting blade 103d that protrudes toward the inner surface of the nozzle 3 on the radially outer peripheral side and can be cut. Further, by driving a disk rotation drive unit (not shown) to rotate the rotation drive shaft 100a about the axis, the disk 102 and the cutting means 103 attached to the disk 102 also rotate about the rotation drive shaft 100a. Thereby, it is possible to cut the inner surface of the nozzle 3 in the circumferential direction.
  • the grinding means 104 includes a frame 104a provided so as to be movable along the guide portion 102a, and a substantially disc-shaped grinder 104b attached to the frame 104a so as to be rotatable about an axis parallel to the central axis of the tube portion 100.
  • a grinding drive unit 104c that rotates the grinder 104b is attached to the frame 104a. By rotating the grinder 104b by the grinding drive unit 104c, the inner surface of the nozzle 3 can be ground.
  • a disk rotation drive unit (not shown) is driven to rotate the rotation drive shaft 100a at a predetermined rotation speed.
  • the replacement drive unit 103e it is possible to drive the replacement drive unit 103e as necessary to select a predetermined cutting blade 103d and project it to the outer peripheral side.
  • the grinding drive unit 104c is driven to rotate the grinder 104b at a predetermined rotational speed, and a disk rotation drive unit (not shown) is driven as necessary to rotate the rotary drive shaft 100a. As a result, the position of grinding by the grinder 104b can be adjusted.
  • the water supply pipe 105 is connected to the water supply device 106 provided on the work floor 12 and connected to the fourth control panel 14D through a pipe, so that it is necessary under the control of the fourth control panel 14D. A large amount of water can be supplied.
  • the suction pipe 106 is connected to a recovery facility 109 that is provided on the work floor 12 and includes a suction means 109a that generates a negative pressure, and a recovery box 109b that recovers the substance sucked by the suction means 109a. For this reason, by driving the suction means 109a of the recovery equipment 109 under the control of the fourth control panel 14, the cutting waste can be sucked from the suction pipe 106 and recovered in the recovery box 109b. As shown in FIG.
  • a cutting monitoring camera 102b and a grinding monitoring camera 102c capable of photographing the cutting position by the cutting means 103 and the grinding position by the grinding means 104 are attached to the front end surface of the disk 102. Thereby, it is possible to check the cutting state and the grinding state with a monitor (not shown) provided on the work floor 12.
  • the connected portion 117 is attached to the support plate 116 and connected to the connecting portion 55 of the first moving unit 42A.
  • the first grinding means 110 includes a holder 110b to which a cutter 110a made of a super steel alloy is attached, and a first grinding drive unit 110c that rotates the holder 110b about its axis.
  • the second grinding means 111 includes a substantially disc-shaped wire brush 111a and a second grinding drive unit 111b that rotates the wire brush 111a around its axis.
  • the photographing means 113 is provided corresponding to each of the cutters 110a of the first grinding means 110 and the wire brushes 111a of the second grinding means 111 so that they can be monitored. In addition to this, in order to monitor the finishing state of the inner surface of the nozzle 3, another photographing means 113 is provided.
  • the connected portion 117 includes a connected portion main body 117a rigidly connected to the connecting portion main body 55a, and a connector receiving portion (not shown) connected to the wiring / pipe connector 55b.
  • the connector 55b receiving section transmits power supply and control signals to the illumination means 112, the photographing means 113, the position sensor 115, the first grinding means 110, and the second grinding means 111, and outputs a detection signal.
  • Various electrical wirings can be connected.
  • piping for supplying compressed air from the compressed air supply device 118 connected to the third control panel 14C on the work floor 12 to each air supply means 114 can be connected.
  • the cutter 110a can drive the first grinding drive unit 110c in the first grinding means 110 under the control of the third control panel 14C.
  • the second grinding means 111 can drive the second grinding drive section 111b to perform finish cutting with the wire brush 111a. Further, it is possible to remove grinding dust generated at the grinding position by the air supply means 114.
  • the recovery unit 83 includes a vacuum 120 that sucks an object inside the nozzle 3, a position sensor 121 that detects a relative position with respect to the nozzle 3, and a connecting portion of the first moving unit 42 ⁇ / b> A. 55 to be connected.
  • the connected portion 122 includes a connected portion main body 122a that is rigidly connected to the connected portion main body 55a, and a connector receiving portion 122b that is connected to the wiring / pipe connector 55b.
  • the connector receiving part 122b it is possible to connect the vacuum 120 with the pipe connected to the recovery facility 109.
  • the connector receiver 122b is connected to the third control panel 104C and can be connected to a wiring for transmitting a detection signal from the position sensor 121. Then, under the control of the third control panel 14C, the suction means 109a of the recovery equipment 109 is driven so that the substance existing near the vacuum 120 of the recovery unit 83 is sucked and recovered in the recovery box 109b. Can do.
  • the decontamination unit 84 shown in FIG. 2 is configured to be placed on the support plate 58 of the second moving unit 42B and movable to the inside of the nozzle 3, and is a blast for decontamination. It has a discharge port capable of discharging the material.
  • the decontamination unit 84 is connected to a sixth control panel 14F provided on the work floor 12, a cleaning water supply device 125 for supplying cleaning water, and a blasting facility 126 for supplying blasting material together with compressed air. ing.
  • the blast equipment 126 is driven to supply the blast material and spray it from the discharge port of the decontamination unit 84 onto the inner surface of the nozzle 3, and further the water pressure supply device 125. By spraying the cleaning water supplied from, the radioactive material adhering to the inner surface can be removed.
  • the position sensor 133 detects a relative position with respect to the nozzle 3.
  • the illumination means 134 illuminates the inspection position by the probe 130.
  • the imaging unit 135 images the inspection position.
  • the support plate 136 supports these position sensors 133 and the like.
  • the connected portion 137 is attached to the support plate 136 and connected to the connecting portion 55 of the first moving unit 42A.
  • the connected portion 137 includes a connected portion main body 137a rigidly connected to the connecting portion main body 55a and a connector receiving portion (not shown) connected to the wiring / pipe connector 55b.
  • the connector receiving portion power is supplied to the illuminating means 134, the photographing means 135, the position adjusting means 132, and the unit body 131 to transmit a control signal, and wiring for outputting a detection signal can be connected. Yes. Therefore, the distance between the probe 130 and the inner surface of the nozzle 3 can be adjusted by driving the position adjusting means 132 under the control of the third control panel 14C. Then, the unit main body 131 is driven to generate an ultrasonic wave to oscillate from the probe 130, and the detected ultrasonic wave can be analyzed to detect a defect.
  • the third control panel 14 ⁇ / b> C can acquire defect data on defects such as cracks based on the input defect detection signal from the unit main body 131 and the position information from the position sensor 133.
  • the PT inspection unit 86 includes a permeate spraying means 140, a vacuum 141, an air supply means 142, a position sensor 143, an imaging means 144, a support plate 145, and a connected member.
  • Part 146 The osmotic fluid spraying means 140 sprays the osmotic fluid onto the inner surface of the nozzle 3.
  • the vacuum 141 can suck the liquid on the inner surface of the nozzle 3.
  • the air supply means 142 can spray compressed air onto the inner surface of the nozzle 3.
  • the position sensor 143 detects a relative position with respect to the nozzle 3.
  • the imaging means 144 images the inner surface of the nozzle 3 that has been sprayed with the penetrant.
  • the support plate 145 supports the position sensor 143 and the like.
  • the connected portion 146 is attached to the support plate 145 and connected to the connecting portion 55 of the first moving unit 42A.
  • the connected portion 146 includes a connected portion main body 146a rigidly connected to the connecting portion main body 55a, and a connector receiving portion (not shown) connected to the wiring / pipe connector 55b.
  • Wiring and piping can be connected to the connector receiving part.
  • piping for suctioning by the suction means 109a of the recovery facility 109 and for sending compressed air of the compressed air supply device 118 from the air feeding means 142 can be connected.
  • the permeate spraying means 140 is driven to spray the permeate onto the inner surface of the nozzle 3, and the vacuum 141 removes the excess permeate by suction.
  • a defect such as a crack can be visualized in the weld 5 on the inner surface of the nozzle 3.
  • the dimension measurement unit 87 includes a frame 150, a measurement image acquisition unit 151, a travel drive unit 152, a position sensor 153, a photographing unit 154, and a connected unit 155.
  • the frame 150 is provided with a guide post 150a.
  • the measurement image acquisition unit 151 is provided so as to be movable along the guide post 150 a and images the inner surface of the nozzle 3.
  • the travel drive unit 152 causes the measurement image acquisition unit 151 to travel along the guide post 150a.
  • the position sensor 153 detects a relative position with respect to the nozzle 3.
  • the imaging unit 154 images the entire range captured by the measurement image acquisition unit 151.
  • the connected portion 155 is attached to the frame 150 and connected to the connecting portion 55 of the first moving unit 42A.
  • the travel drive unit 152 is, for example, an electric motor, and is mounted with an encoder (not shown). Thereby, the position information of the measurement image acquisition unit 151 on the guide post 150a can be acquired.
  • the connected portion 155 includes a connected portion main body 55a rigidly connected to the connecting portion main body 55a and a connector receiving portion (not shown) connected to the wiring / pipe connector 55b.
  • the connector receiving unit transmits a control signal for driving the measurement image acquisition unit 151, the travel drive unit 152, the position sensor 153, and the photographing unit 154 and supplies power, and an encoder (not shown) of the travel drive unit 152, Wirings for outputting detection signals from the photographing unit 154 and the position sensor 153 can be connected.
  • the work device 40 is divided into the first work unit 160 and the second work unit 161.
  • the first work unit 160 is detachably connected to the connection portion 55 of the first moving unit 42A, and is driven by a control signal, power supply, working water, compressed air, or the like input through the connection portion 55.
  • the second work unit 161 can be placed on the support plate 58 of the second moving unit 42B. Further, the second work unit 161 has a fixing means that can be fixed to the inner surface of the nozzle 3 while being slid into the nozzle 3.
  • the welding unit 80, the finishing unit 82, the recovery unit 83, the UT inspection unit 85, the PT inspection unit 86, and the dimension measuring unit 87 correspond to the first work unit 160, and the cutting unit 81 and the decontamination unit. 84 corresponds to the second work unit 161.
  • the cutting unit 81 and the decontamination unit 84 corresponding to the second work unit 161 and the nozzle blockage device 41 are temporarily placed on the work floor 12 at predetermined arrangement positions where planar position information is acquired in advance. Has been placed. Then, the overall computer 15 of the control device 13 moves the lifting / lowering device 44 to the arrangement position and selectively grips it according to the progress of the work inside the nozzle 3 and lowers it to the inside of the gantry 11. Is possible.
  • a plurality of units corresponding to the first work unit 160 are housed in the housing 43.
  • the container 43 is supported by the leg 43a and the leg 43a that can be arranged between the first moving unit 42A and the second moving unit 42B in the gantry 11.
  • a substantially cylindrical main body 43b is provided with accommodating recesses 43c capable of accommodating the target working device 40 at a plurality of locations in the circumferential direction.
  • a total of six locations are provided in three or two stages in the circumferential direction corresponding to the number of sets of the inlet nozzle 3A and the outlet nozzle 3B constituting the nozzle 3.
  • Each working device 40 is stored and stored in the storage 43 according to its type on the work floor 12.
  • the storage 43 is prepared corresponding to the type of the work device 40 stored in the storage 43.
  • the welding unit 80 is stored in one storage 43. Has been.
  • each storage 43 is temporarily placed at a predetermined arrangement position where planar position information is acquired in advance. Then, the overall computer 15 of the control device 13 moves and holds the lifting device 44 to the arrangement position according to the progress of the work inside the nozzle 3 and accommodates it while being accommodated in the storage 43.
  • the storage 43 is lowered to the inside of the gantry 11.
  • FIG. 22 is a flowchart showing a procedure of repair work of the welded portion 5 (see FIG. 1) between the nozzle 3 and the pipe 4 performed in the nozzle work system 10.
  • FIG. 23 to FIG. 49 are explanatory diagrams in each process of the repair work. In FIG. 23 to FIG. 49, each component is simplified and displayed for easy understanding of the operation of each component. As shown in FIG. 23, first, the gantry 11 and the work floor 12 are constructed in advance.
  • the gantry 11 is constructed by, for example, assembling on the work floor 12 after the work floor 12 is constructed, and suspending it with a crane or the like and inserting the lower end into the reactor vessel 2.
  • a control device 13 On the work floor 12, a control device 13, each work device 40, a gap closing device 41, a lifting device 44, and a portal crane 45 are installed.
  • wiring and piping for connecting the gantry 11 and the work floor 12 are installed.
  • the access window 20 of the gantry 11 is closed by the lid 22 of the access window operating device 21, and the moving device 42 and the second rail 44 d of the lifting device 44 are installed in the gantry 11 in advance. ing.
  • the inside of the reactor vessel 2 is drained in advance with cooling water until the water level is lower than the nozzle 3.
  • the overall computer 15 when an instruction to start work is input to the overall computer 15 in the control device 13, the overall computer 15 opens the access window to the first control panel 14A as an access window opening step S1. Send a command. For this reason, the first control panel 14A drives the electric winch 24 of the access window operating device 21 to raise the lid 22, thereby opening the access window 20 (step S1a). Next, the overall computer 15 transmits a gap closing command to the first control panel 14A. For this reason, as shown in FIG. 25, the first control panel 14A drives the compressed air supply device 31 to supply the compressed air to the pneumatic cylinder 28a of the gap closing device 28, thereby protecting it by the pneumatic cylinder 28a.
  • the ring 29 can be advanced toward the inner surface of the reactor vessel 2 to contact the sealing material 29c (step S1b). Thereby, the clearance 2b between the nozzle 3 and the access window 20 can be closed by the protective ring 29 and the expansion / contraction member 30, and when accessing the nozzle 3 from the access window 20, something is removed from the clearance 2b. Intrusion into the reactor vessel 2 can be reliably prevented.
  • the nozzle block closing step S ⁇ b> 2 the nozzle 3 is closed at a position on the back side of the working position as viewed from the reactor vessel 2 inside the nozzle 3. That is, the overall computer 15 transmits a nozzle block closing device lowering command to the first control panel 14A. For this reason, the first control panel 14A drives the elevating device 44 to lower the nozzle block closing device 41 temporarily placed at a predetermined arrangement position into the gantry 11 and to move the second moving unit 42B. (See FIG. 1). When the nozzle closing device 41 is placed on the support plate 58 by the lifting device 44, the first control panel 14 ⁇ / b> A transmits a nozzle block closing device lowering completion notification to the overall computer 15.
  • the central computer 15 receives the notification and transmits a plug insertion command to the second control panel 14B.
  • the second control panel 14B drives the second moving unit 42B to select either the inlet nozzle 3A or the outlet nozzle 3B, and to the nozzle 3
  • the slide plate 57 is slid to move the nozzle closing device 41 from the support plate 58 to the inside of the nozzle 3.
  • the guide portion 61 of the nozzle closing device 41 is pushed out by the pressing member 59.
  • the seal body portion 60 and the guide portion 61 of 41 are moved into the nozzle 3 by the casters 65 and 68 thereof.
  • the second control panel 14B inserts the seal main body 60 to a position on the back side when viewed from the reactor vessel 2 with respect to the welded portion 5 as a predetermined working position
  • the pressing member of the second moving unit 42B is inserted.
  • the movement of 59 is stopped, and a plug insertion completion notice is transmitted to the central computer 15.
  • the central computer 15 receives the notification and transmits a plug installation command to the fifth control panel 14E. Therefore, the fifth control panel 14E drives the working water supply device 70 to supply the working water, thereby fixing the seal plug 62 to the inner surface of the nozzle 3 by the fixing jack 64 of the nozzle closing device 41.
  • the fifth control panel 14 ⁇ / b> E drives the compressed air supply device 71 to supply compressed air, thereby expanding the infrastructure seal 63 to create a gap between the seal plug 62 and the inner surface of the nozzle 3. Seal.
  • the fifth control panel 14E transmits the plug installation completion notification to the overall computer 15 after detaching the connecting portion 67 of the guide portion 61 and the connected portion 69 of the seal main body portion 60.
  • the central computer 15 receives the notification and transmits a guide retreat command to the second control panel 14B.
  • the second control panel 14B drives the second moving unit 42B again to press the pressing member 59,
  • the slide plate 57 and the support plate 58 are retracted.
  • the guide part 61 moves away from the seal plug 62 and moves backward, and only the seal body part 60 remains inside the nozzle 3.
  • the second control panel 14B transmits a guide unit retraction completion notification to the general computer 15.
  • the general computer 15 transmits a guide unit pull-up command to the first control panel 14A.
  • the first control panel 14A drives the lifting device 44 to move the guide unit 61 inside the gantry 11.
  • the work floor 12 is raised and temporarily placed at a predetermined position on the work floor 12, and a guide section pull-up completion notification is transmitted to the general computer 15.
  • the overall computer 15 manages whether or not the nozzle block closing process is performed for each nozzle 3, and when the nozzle block closing process is performed for all the nozzles 3, that is, all the nozzles 3 respond.
  • the process proceeds to the decontamination step S3 as shown in FIG.
  • the overall computer 15 transmits a decontamination unit lowering command to the first control panel 14A.
  • the first control panel 14A drives the lifting device 44 to lower the decontamination unit 84 on the work floor 12 to the inside of the gantry 11, and the support plate 58 of the second moving unit 42B.
  • the decontamination unit lowering completion notification is transmitted to the central computer 15 (see FIGS. 1 and 2).
  • the general computer 15 transmits a decontamination unit insertion command to the second control panel 14B.
  • the second moving unit 42B is driven, and the decontamination unit 84 is inserted into the predetermined nozzle 3.
  • the second control panel 14B transmits a decontamination unit insertion completion notification to the central computer 15, and the central computer 15 receives the notification to the sixth control panel 14F.
  • the radioactive material adhering to the inner surface can be removed by driving the blast equipment 126 and the water supply device 125 and injecting the blast material inside the nozzle 3. .
  • the sixth control panel 14F stops driving the blast equipment 126 and the water supply device 125 and removes it to the central computer 15.
  • Send a dyeing completion notification the central computer 15 receives the notification and transmits a decontamination unit backward command to the second control panel 14B, and the second control panel 14B drives the second moving unit 42B again to support the support plate 58. And the slide plate 57 is retracted.
  • the second control unit 14B moves the decontamination unit 84 to the inside of the gantry 11 by the second moving unit 42B
  • the second control panel 14B transmits a decontamination unit retraction completion notice to the general computer 15.
  • the central computer 15 transmits a decontamination unit insertion command to the second control panel 14B again, which causes the second control unit 14B to drive the second moving unit 42B for removal.
  • the dyeing unit 84 is inserted into the next nozzle 3 and the decontamination work is repeated as described above.
  • the central computer 15 manages whether or not the decontamination process S3 is performed for each nozzle 3, and when the decontamination process S3 is performed for all the nozzles 3, that is, the decontamination unit is completely retracted for all the nozzles 3.
  • the overall computer 15 transmits a decontamination unit pull-up command to the first control panel 14A.
  • the lifting device 44 is driven, the decontamination unit 84 inside the gantry 11 is gripped and raised, and placed at a predetermined placement position on the work floor 12 to complete the placement.
  • a post-contamination unit pull-up completion notification is transmitted to the central computer 15.
  • the general computer 15 receives the notification and shifts to the next pre-repair ultrasonic flaw detection inspection step S4. That is, the overall computer 15 transmits a UT inspection unit lowering command to the first control panel 14A. As shown in FIG. 27, in the first control panel 14A, the elevator 44 is driven by receiving the notification to lower the storage 43 containing the UT inspection unit 85 to the inside of the gantry 11, and after completion of the lowering A UT inspection unit descent completion notification is transmitted to the central computer 15.
  • the central computer 15 transmits an ultrasonic flaw detection inspection execution command to the third control panel 14C.
  • the first moving unit 42 ⁇ / b> A is driven based on the command, and each of the components stored in the storage 43 in the connection portion 55 at the tip of each manipulator 54.
  • the UT inspection unit 85 is attached.
  • three manipulators 54 are installed in correspondence with the number of sets of the inlet nozzle 3A and the outlet nozzle 3B. Therefore, first, for example, the ultrasonic flaw detection test is simultaneously performed by the UT inspection unit 85 attached to each manipulator 54 in all the inlet nozzles 3A.
  • the third control panel 14C drives the first moving unit 42A to insert the UT inspection unit 85 attached to each manipulator 54 to the welded portion 5 between each inlet nozzle 3A and the pipe 4, When positioned at the welded portion 5, the UT inspection unit 85 is driven.
  • the third control panel 14 ⁇ / b> C drives the position adjusting unit 132 to place the pair of probes 130 at positions separated from the inner surface of the nozzle 3 by a predetermined distance.
  • the third control panel 14 ⁇ / b> C drives the unit main body 131 to oscillate ultrasonic waves from the pair of probes 130, detects reflected ultrasonic waves, and analyzes them in the unit main body 131.
  • the third control panel 14 ⁇ / b> C drives the first moving unit 42 ⁇ / b> A to inspect the entire welded portion 5 on the inner surface of the nozzle 3 so that the UT inspection unit 85 extends in the circumferential direction and the axial direction of the nozzle 3. Move. Thereby, an ultrasonic flaw detection test can be carried out by the UT inspection unit 85 over the entire welded portion 5 of each inlet nozzle 3A (step S4a). And the result analyzed by the unit main body 131 of each UT inspection unit 85 is integrated through the third control panel 14C as UT inspection data before repairing in correspondence with the axial and circumferential positions of the inner surface of the nozzle 3. It is transmitted to the computer 15.
  • the third control panel 14C drives the first moving unit 42A, retracts the UT inspection unit 85 from the inlet nozzle 3A, and inserts it into each outlet nozzle 3B. Similarly, an ultrasonic flaw detection test is performed, and the result is transmitted to the general computer 15 through the third control panel 14C as UT inspection data before repair. Then, the third control panel 14 ⁇ / b> C drives the first moving unit 42 ⁇ / b> A to deliver the UT inspection unit 85 to each housing recess 43 c of the housing 43.
  • the overall computer 15 transmits a UT inspection unit pull-up command to the first control panel 14A.
  • the first control panel 14 ⁇ / b> A drives the lifting / lowering device 44 based on the command to move the storage 43 containing the UT inspection unit 85 from the inside of the gantry 11 onto the work floor 12. Pulled up and placed at a predetermined placement position.
  • the first control panel 14 ⁇ / b> A transmits a UT inspection unit pull-up completion notification to the overall computer 15.
  • the general computer 15 analyzes the inputted pre-repair ultrasonic flaw detection inspection data, and repairs the range including the defective portion identified from the pre-repair UT inspection data as a repair range and indicates the position and size of the range. Generate range data. If no defective part is identified from the pre-repair UT inspection data, it is assumed that there is no defect, and the entire operation is terminated (step S4b).
  • the overall computer 15 shifts to the next cutting step S5 as shown in FIG. That is, the overall computer 15 transmits a cutting unit lowering command to the first control panel 14A.
  • the first control panel 14A drives the lifting device 44 to lower the cutting unit 81 on the work floor 12 to the inside of the gantry 11, and the second moving unit 42B. It is placed on the support plate 58 and a cutting unit lowering completion notice is transmitted to the overall computer 15.
  • the central computer 15 transmits a cutting unit insertion command to the second control panel 14B.
  • the second control panel 14 ⁇ / b> B drives the second moving unit 42 ⁇ / b> B and inserts the cutting unit 81 into the predetermined nozzle 3.
  • the second control panel 14B transmits a cutting unit insertion completion notification to the general computer 15, and the general computer 15 receives the notification to the fourth control panel 14D.
  • the fourth control panel 14D drives the working water supply device 106 to supply the working water to the hydraulic cylinder 26 of the fixing means 101 in the cutting unit 81, thereby contacting the contact portion 29b. Comes into contact with the inner surface of the nozzle 3, and the tube body 100 is fixed to the inner surface of the nozzle 3.
  • the fourth control panel 14D transmits a cutting unit fixing completion notification to the overall computer 15, while driving a disk rotation driving unit (not shown) to rotate the disk 102.
  • the repair range is cut by the cutting blade 103d.
  • the overall computer 15 receives a cutting unit fixing completion notification from the fourth control panel 14D and transmits a moving unit retraction command to the second control panel 14B, whereby the second control panel 14B
  • the moving unit 42B is driven to move the slide plate 57 and the support plate 58 backward. Since the cutting unit 81 has already been fixed to the inner surface of the nozzle 3 by its own fixing means 101, only the slide plate 57, the support plate 58 and the pressing member 59 of the second moving unit 42B are retracted.
  • the second control panel 14 ⁇ / b> B moves the slide plate 57, the support plate 58, and the pressing member 59 to the inside of the gantry 11, the second control panel 14 ⁇ / b> B transmits a moving unit retraction completion notice to the overall computer 15.
  • the central computer 15 transmits a cutting unit insertion command to the first control panel 14A again.
  • the lifting device 44 is driven so that the next cutting unit 81 is placed on the support plate 58 of the second moving unit 42B from the work floor 12 inside the gantry 11. It becomes.
  • the cutting unit 81 is inserted into the other inlet nozzle 3A by the second control panel 14B and the fourth control panel 14D to start cutting. In this way, the cutting by the cutting unit 81 is performed simultaneously with the three inlet nozzles 3A.
  • the fourth control panel 14D can determine that the cutting blade 103d is at the use limit when rotated for a predetermined condition, for example, for a predetermined time, and drive the replacement drive unit 103e to cut another cutting blade 103d. Place in position.
  • the fourth control panel 14D transmits a cutting completion notice to the overall computer 15.
  • the central computer 15 receives the notification and transmits a cutting unit reception command to the second control panel 14B.
  • the second control panel 14B drives the second moving unit 42B and inserts the slide plate 57 and the support plate 58 into the corresponding inlet nozzle 3A.
  • the second control panel 14B sends a notification of completion of support plate insertion to the central computer 15, and the central computer 15 receives the notification and the fourth control panel 14D. Send a fixed release command to. Then, the fourth control panel 14 ⁇ / b> D releases the fixation of the cutting unit 81 by the fixing means 101 based on the command and transmits a fixation release notification to the general computer 15. As a result, the cutting unit 81 is delivered to the support plate 58 of the second moving unit 42B. The central computer 15 receives the notification and transmits a cutting unit replacement command to the second control panel 14B. As shown in FIG. 34, the second control panel 14B drives the second moving unit 42B based on the command to pull up the cutting unit 81 from the inlet nozzle 3A to the corresponding outlet nozzle 3B. Insert it.
  • the repair range is cut on the inner surface of the outlet nozzle 3B by the cutting unit 81 by the second control panel 14B and the fourth control panel 14D.
  • the fixing of the cutting unit 100 to the nozzle 3 is released under the control of the overall computer 15, and the inside of the gantry 11 is retracted.
  • the second control panel 14B moves the cutting unit 81 back to the inside of the gantry 11 by the second moving unit 42B, the second control panel 14B transmits a cutting unit retraction completion notice to the overall computer 15. As shown in FIG.
  • the central computer 15 receives the notification and transmits a cutting unit pull-up command to the first control panel 14A, and the first control panel 14A receives the notification and drives the lifting device 44. Then, the cutting unit 81 is pulled up, and a cutting unit pull-up completion notification is transmitted to the overall computer 15.
  • the overall computer 15 When the overall computer 15 receives the cutting unit pull-up completion notification corresponding to all the cutting units 81, the overall computer 15 shifts to the first recovery step S6 of the next step as shown in FIG. That is, the overall computer 15 transmits a recovery unit lowering command to the first control panel 14A. As shown in FIG. 36, the first control panel 14A drives the lifting device 44 based on the command to lower the storage 43 containing the recovery unit 83 into the gantry 11, and after the completion of the lowering A collection unit descent completion notification is transmitted to the central computer 15. In response to the notification, the central computer 15 transmits a collection work execution command to the third control panel 14C. As shown in FIG.
  • the central computer 15 transmits a penetrant inspection execution command to the third control panel 14C.
  • the third control panel 14C receives the command, drives the first moving unit 42A, and attaches each PT inspection unit 86 housed in the housing 43 to each manipulator 54.
  • the penetration inspection test is performed in the repair range where the cutting is completed in the inlet nozzle 3A by the attached PT inspection unit 86, similarly to the ultrasonic inspection process S4,
  • the penetrant inspection is also performed in the repair range where the cutting has been completed in the outlet nozzle 3B (step S7a).
  • the third control panel 14 ⁇ / b> C drives the first moving unit 42 ⁇ / b> A to deliver the PT inspection unit 86 to each housing recess 43 c of the housing 43. Even if no defect is detected, the pre-repair PT inspection data is transmitted. When the pre-repair PT inspection data is received for all the nozzles 3, the overall computer 15 transmits a PT inspection unit pull-up command to the first control panel 14A.
  • the first control panel 14 ⁇ / b> A drives the lifting / lowering device 44 based on the command to pull up the storage 43 containing the PT inspection unit 86 from the inside of the gantry 11 onto the work floor 12 and arrange it at a predetermined position.
  • the first control panel 14A transmits a PT inspection unit pull-up completion notification to the overall computer 15.
  • the overall computer 15 refers to the received pre-repair PT inspection data to determine whether or not a defect has been detected (step S7b). If no defect has been detected, the PT inspection unit pull-up is completed. Upon receiving the notification, the process proceeds to the welding step S9. On the other hand, if a defect is detected, the overall computer 15 receives a notification of completion of pulling up the PT inspection unit and moves to the defect dimension measuring step S8.
  • the overall computer 15 transmits a dimension measurement unit lowering command to the first control panel 14A.
  • the first control panel 14A drives the lifting device 44 based on the command to lower the storage 43 in which the dimension measurement unit 87 is stored into the gantry 11 and lower it.
  • a dimension measurement unit lowering completion notification is transmitted to the overall computer 15.
  • the central computer 15 transmits a dimension measurement execution command to the third control panel 14C.
  • the third control panel 14C receives the command, drives the first moving unit 42A, and attaches each manipulator 54 to each dimension measuring unit 87 housed in the housing 43.
  • the dimension of the defect detected in the pre-repair penetrant inspection step S7 in the inlet nozzle 3A is measured by the mounted dimension measuring unit 87, and the third control panel 14C is used as defect dimension data.
  • the central computer 15 receives all the defects from the central computer 15.
  • the measurement is also performed with the outlet nozzle 3B, and the defect dimension data is similarly transmitted to the central computer 15 via the third control panel 14C.
  • the third control panel 14 ⁇ / b> C drives the first moving unit 42 ⁇ / b> A to deliver the dimension measuring unit 87 to each housing recess 43 c of the housing 43.
  • the overall computer 15 transmits a dimension measurement unit pull-up command to the first control panel 14A, and the first control panel 14A drives the lifting device 44 based on the command so that the dimension measurement unit 87 accommodates it.
  • the storage 43 thus formed is pulled up from the inside of the gantry 11 onto the work floor 12 and arranged at a predetermined arrangement position. Then, the first control panel 14 ⁇ / b> A transmits a dimension measurement unit pull-up completion notification to the overall computer 15.
  • the general computer 15 performs recutting based on the measurement result of the defect dimension data and a preset reference value. It is determined whether or not is necessary. If it is determined that re-cutting is necessary, the overall computer 15 causes the same work to be performed again from the cutting step S5 as shown in FIG. On the other hand, if it is determined that recutting is not necessary, the overall computer 15 shifts to the next welding step S9.
  • the overall computer 15 transmits a welding unit lowering command to the first control panel 14A.
  • the first control panel 14A drives the lifting device 44 based on the command to lower the storage 43 containing the welding unit 80 into the gantry 11, and after the completion of the lowering A welding unit lowering completion notification is transmitted to the central computer 15.
  • the central computer 15 transmits a welding execution command to the third control panel 14C.
  • the third control panel 14 ⁇ / b> C the first moving unit 42 ⁇ / b> A is driven based on the command, and each welding unit 80 accommodated in the storage 43 is attached to each manipulator 54. Then, as shown in FIG.
  • the third control panel 14C causes welding to be performed in the range cut in the cutting step S5 in the inlet nozzle 3A by the attached welding unit 80.
  • the third control panel 14 ⁇ / b> C monitors the number of rotations output from the encoder provided in the roller rotation driving unit of the sending unit 91 in the welding unit 80. If it is determined that the wire W wound around the wire reel 91a is gone based on the number of rotations, the first moving unit 42A is driven and replaced with another welding unit 80 in the storage box 43, and then the welding operation is performed again. Be started.
  • the third control panel 14C drives the first moving unit 42A to insert the welding unit 80 into the outlet nozzle 3B, and the outlet pipe. Welding is performed for the cut range of the table 3B.
  • the third control panel 14 ⁇ / b> C drives the first moving unit 42 ⁇ / b> A to deliver the mounted welding unit 80 to the storage 43.
  • the third control panel 14C transmits a welding completion notification to the central computer 15, and the central computer 15 receives the notification and transmits a welding unit pull-up command to the first control panel 14A.
  • the first control panel 14A drives the lifting device 44 to pull up the storage 43 containing the welding unit 80 from the inside of the gantry 11 to the work floor 12, and arranges it at a predetermined arrangement position.
  • the first control panel 14 ⁇ / b> A transmits a welding unit pull-up completion notification to the overall computer 15. As shown in FIG. 22, the overall computer 15 receives the notification and shifts to the next finishing step S10.
  • the overall computer 15 transmits a finishing unit lowering command to the first control panel 14A, and as shown in FIG. 44, the first control panel 14A drives the lifting device 44 based on the command,
  • the storage 43 in which the finishing unit 82 is stored is lowered into the gantry 11.
  • the first control panel 14 ⁇ / b> A transmits a finishing unit descent completion notification to the overall computer 15 when the storage 43 is lowered into the gantry 11.
  • the central computer 15 receives the notification and transmits a finishing execution command to the third control panel 14C.
  • the third control panel 14C drives the first moving unit 42A based on the command, receives the finishing unit 82 stored in the storage 43 by the manipulator 54, and receives the inlet pipe. Insert into table 3A.
  • the first grinding means 110 When reaching the welded range, first, the first grinding means 110 is driven and roughing of the range to be welded by the cutter 110a attached to the holder 110b is performed. After the entire ground area is ground by the first grinding means 110 of the finishing unit 82, the second grinding means 111 is driven and finishing is performed by the wire brush 111a. Then, when the entire ground area is ground by the second grinding means 111 of the finishing unit 82, the third control panel 14C causes the finishing unit 82 to be inserted into the outlet nozzle 3B and the outlet nozzle 3B. Finishing is performed on the welded area in the same manner as described above.
  • the third control panel 14 ⁇ / b> C drives the first moving unit 42 ⁇ / b> A to deliver the mounted finishing unit 82 to the storage 43. .
  • the third control panel 14C transmits a finishing completion notification to the central computer 15, and the central computer 15 receives the notification and transmits a finishing unit pull-up command to the first control panel 14A.
  • the first control panel 14A drives the elevating device 44 to pull up the storage 43 containing the finishing unit 82 from the inside of the gantry 11 to the work floor 12, and a predetermined arrangement position. To be placed.
  • the first control panel 14 ⁇ / b> A transmits a finishing processing unit pull-up completion notification to the overall computer 15.
  • the overall computer 15 shifts to the second recovery step S11 for recovering the shavings and the like generated in the nozzle 3 in the finishing step S10.
  • the general computer 15 causes the second collection step S11, the post-repair penetrant flaw inspection step S12, the post-repair dimension measurement step S13, and the post-repair ultrasonic flaw detection step S14 to be performed in order.
  • the after-repair penetrant flaw inspection step S12 a penetrant flaw test is performed in the range welded in the welding step S9.
  • the dimension measurement step S13 after repair the dimension of the defect detected by the penetration flaw detection test is measured.
  • an ultrasonic flaw detection test is performed in the range welded in the welding step.
  • the details of the control and the details of the collection operation in the second collection step S11 are the same as those in the first collection step S6.
  • the details of the control in the penetration flaw detection test (step S12a) in the post-repair penetrant flaw inspection step S12 are the same as the control in step S4a.
  • details of the control in the ultrasonic flaw detection test in the post-repair ultrasonic flaw detection inspection step S14 are the same as the control in step S7a of the pre-repair ultrasonic penetrant flaw inspection step S7. For this reason, description of any process is omitted.
  • the general computer 15 determines the presence or absence of a defect from the result of the penetrant test in step S12a (step S12b). No. 15 is transferred to the after-repair ultrasonic flaw detection inspection step S14.
  • the third control panel 14C sends an ultrasonic flaw detection completion notification to the central computer 15. Send.
  • the overall computer 15 is based on the penetrant inspection data and defect size data input in the post-repair penetrant inspection step S12 and the ultrasonic flaw inspection data input in step S14a of the post-repair ultrasonic flaw inspection step S14.
  • the presence / absence of a defect is determined (step S14b). If it is determined that a defect exists, the overall computer 15 shifts to the cutting step S5 again, and again performs the steps after the cutting step S5. On the other hand, when it is determined that no defect exists, the overall computer 15 shifts to the nozzle opening step S15 which is the next step.
  • the overall computer 15 transmits a guide unit lowering command to the first control panel 14A, and the first control panel 14A controls the guide unit 61 of the nozzle blockage device 41 temporarily placed on the work floor 12. It is lowered into the gantry 11 and placed on the support plate 58 of the second moving unit 42B.
  • the first control panel 14 ⁇ / b> A transmits a guide unit lowering completion notification to the general computer 15.
  • the central computer 15 transmits a guide section insertion command to the second control panel 14B.
  • the second control panel 14B transmits a notification of completion of the nozzle closing device 41 retreat to the overall computer 15.
  • the general computer 15 transmits a nozzle closing device pull-up command to the first control panel 14A.
  • 14 A of 1st control panels drive the raising / lowering apparatus 44, pulls up the nozzle blockage
  • a notification of completion of pulling up the nozzle closing device is transmitted to the central computer 15.
  • the overall computer 15 manages whether or not the nozzle block closing step S15 is performed for each nozzle 3, and when the nozzle opening process S15 is performed for all the nozzles 3, that is, all the nozzles 3
  • the process proceeds to the next access window closing step S16.
  • the general computer 15 transmits an access window closing command to the first control panel 14A. For this reason, as shown in FIG. 48, the first control panel 14 ⁇ / b> A drives the electric winch 24 of the access window operating device 21 to lower the lid 22.
  • the O-ring 22a provided between the lid body 22 and the gantry 11 is brought into close contact with the hydraulic water supply device 27 by driving the hydraulic water supply device 27 and supplying the hydraulic water to advance the hydraulic jack 26. Thereby, the access window 20 is closed (step S16a).
  • the overall computer 15 transmits a clearance opening command to the first control panel 14A.
  • the first control panel 14A drives the compressed air supply device 31 to reduce the air pressure of the pneumatic cylinder 28a of the gap closing device 28, whereby the protective ring is operated by the pneumatic cylinder 28a. 29 is separated from the inner surface 2c of the reactor vessel 2 and accommodated in the access window 20 (step S16b).
  • the access window operating device 21 is driven and the access window 20 is opened by the control device 13 provided outside the reactor vessel 2 as described above. Then, each working device 40 is driven to perform work inside the nozzle 3. Thereby, it is possible to automatically perform operations such as welding and various inspections inside the nozzle 3 without placing an operator inside the gantry 11. Further, the control device 13 drives the access window operating device 21 after the completion of the operation to close the access window 20, so that an operator can be automatically installed in the reactor vessel 2 without being placed inside the gantry 11. It is possible to return the interior to the underwater environment.
  • the work floor 12 above the reactor vessel 2 allows a large number of necessary equipment such as the work device 40 to be arranged outside the reactor vessel 2. Further, by driving the lifting device 44 under the control of the control device 13, the work device 40 can be lowered into the gantry 11 as needed to perform various operations inside the nozzle 3. . For this reason, it is possible to minimize the devices to be arranged inside the gantry 11, and it is possible to efficiently perform the work inside the nozzle 3 in a narrow space. Further, by replacing the working device 44 by raising and lowering the lifting device 44, it is also possible to sequentially perform a plurality of types of work described above. Furthermore, a moving device 42 is provided inside the gantry 11, and the work device 40 can be transferred to and from the lifting device 44 under the control of the control device 13.
  • the attached working device 40 it is possible to move the attached working device 40. Therefore, it is not necessary to provide the work device 40 with a moving function, and the work device 40 can be miniaturized as having a minimum function for performing work. Therefore, it is possible to reduce the weight of the working device 40 that is moved up and down by the lifting device 44, and to reduce the size of the lifting device 44. Thereby, the movement and operation
  • the moving devices 42 are provided so as to be rotatable around the central axis C11 of the gantry 11 in a state in which the moving devices 42 are inserted into the reactor vessel 2, the plurality of radially provided nozzles 3 in the reactor vessel 2 are provided. On the other hand, alignment can be performed accurately and easily.
  • the moving device 42 includes a first moving unit 42A and a second moving unit 42B.
  • the work device 40 includes a first work unit 160 and a second work unit 161.
  • the work can be performed while maintaining a stable posture inside the nozzle 3 by the fixing means for fixing itself. That is, the work performed while moving finely by the combination of the first moving unit 42A and the first working unit 160 can be suitably performed.
  • the combination of the second moving unit 42B and the second work unit 161 can be suitably performed even in work that receives reaction force or vibration from the nozzle 3.
  • the welding unit 80 and the like constituting the first work unit 160 are arranged on the work floor 12 in a state of being housed in the storage box 43. For this reason, in the case of the 1st work unit 160, it is possible to raise / lower efficiently because it can be raised / lowered simultaneously by the raising / lowering apparatus 44 in the state accommodated in the storage 43. In a state where the storage 43 is lowered to the inside of the gantry 11, it is possible to perform a work by selecting from the plurality of first work units 160 stored in the storage 43.
  • the first moving unit 42 ⁇ / b> A is connected between the container 43 and the first moving unit 42 ⁇ / b> A without replacement using the lifting device 44 each time. It is efficient because one work unit 160 may be replaced.
  • a plurality of storage boxes 43 are provided according to the type of work, and each first work unit 160 is stored in the storage box 43 for each type. For this reason, by driving the lifting / lowering device 44, the storage 43 can be selectively lifted according to the type of work, and a plurality of first operations stored in the same storage 43 can be performed. This can be done simultaneously by unit 160. Moreover, a plurality of operations can be performed sequentially by replacing the storage 43. Thereby, work can be performed efficiently.
  • the reactor vessel nozzle work system of the present invention it is possible to shorten the work period and reduce the cost while minimizing the radiation exposure of the worker.

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

 原子炉容器の管台の内部での作業を行う原子炉容器の管台作業システムであって、前記原子炉容器の内部から上方に設けられ、略筒状の側壁部、及び、該側壁部下端を閉塞する底部を有する架台と、前記架台内部と前記管台とを連通するために前記架台の前記側壁部に設けられたアクセス窓と、前記アクセス窓を開閉するアクセス窓稼動装置と、前記架台内部から前記管台内部へ進出して管台内部での作業を可能にする作業装置と、前記原子炉容器の外側に設けられ、前記アクセス窓稼動装置及び前記作業装置を制御する制御装置とを備え、前記制御装置は、前記アクセス窓稼動装置を駆動させて前記アクセス窓を開放した後に、前記作業装置を駆動させて前記管台内部で作業を行わせ、該作業完了後に前記アクセス窓稼動装置を駆動させて前記アクセス窓を閉塞する。

Description

原子炉容器の管台作業システム
 本発明は、原子炉の原子炉容器内部で作業を行うための原子炉容器の管台作業システムに関する。
 本願は、2009年7月10日に日本出願された特願2009-163875に基づいて優先権を主張し、その内容をここに援用する。
 従来、原子炉容器の管台内部での保守作業は、原子炉容器内部が通常時において冷却水で満たされたていることから、水中環境下で実施する必要があった。しかしながら、水中環境下での作業では全ての機器を防水仕様とする必要がある。そのため、これら機器を防水仕様とすることで機器の容積及び質量が増加し取扱いが困難となる。また、使用した機器は、冷却水に含まれる放射線に曝されるため、引き上げ後に除染作業が必要となってしまう。このため、近年、原子炉容器の管台内部での保守作業を気中環境で行う方法が提案されている。
 具体的には、原子炉容器内部の冷却水の水位を管台よりも低下させた後に内部に架台を設置する。この架台内部において、作業員が管台内部にUT検査装置を挿入して固定し、所望の範囲でUT検査を行う方法が提案されている。
特開2007-3442号公報
 しかしながら、特許文献1の方法では、架台内部といえども放射線に曝される環境であるため、一人の作業員が一回の作業でいられる時間は限られている。そのため、架台内部において効率良く作業を行うためには複数人の作業員で同時に作業を行い、かつ、複数組の作業員を交代させて作業を行う必要があった。その一方、架台は原子炉容器の内部に配置されることから、架台内部の空間は非常に狭く、同時に配置可能な作業員及び作業用機器には限界があった。このため、架台を用いた気中環境での作業を実現したとしても、効率化には限界があり、作業期間の短縮、コスト低減のためのさらなる改善が求められていた。
 本発明は、上述した事情に鑑みてなされたものであって、作業員の放射線被曝量を最小限に抑えつつ、作業期間の短縮、コストの低減を図ることが可能な原子炉容器の管台作業システムを提供する。
 上記課題を解決するために、本発明は以下の手段を提案している。
 原子炉容器の側面から外部に突出して設けられ、該原子炉容器の内部と外部とを連通させる管台の内部での作業を行う原子炉容器の管台作業システムであって、上部構造体及び内部構造体が取り外されて上部が開口する前記原子炉容器の内部から上方に設けられ、略筒状の側壁部、及び、該側壁部下端を閉塞する底部を有する架台と、前記架台内部と前記管台とを連通するために前記架台の前記側壁部に設けられたアクセス窓と、前記アクセス窓を開閉するアクセス窓稼動装置と、前記架台内部から前記管台内部へ進出して管台内部での作業を可能にする作業装置と、前記原子炉容器の外側に設けられ、前記アクセス窓稼動装置及び前記作業装置を制御する制御装置とを備え、前記制御装置は、前記アクセス窓稼動装置を駆動させて前記アクセス窓を開放した後に、前記作業装置を駆動させて前記管台内部で作業を行わせ、該作業完了後に前記アクセス窓稼動装置を駆動させて前記アクセス窓を閉塞する。
 この構成によれば、架台によりその内部を、受ける放射線量を抑えた気中環境にすることができる。そして、原子炉容器の内部の冷却水の水位を管台よりも下側に降下させれば、アクセス窓を介して気中環境で架台内部から管台内部へとアクセスすることが可能となる。そして、原子炉容器の外側に設けられた制御装置により、アクセス窓稼動装置を駆動させてアクセス窓を開放させた後に、作業装置を駆動させて管台内部で作業を行わせることで、作業員を架台内部に配置させることなく自動的に管台内部で作業を行うことができる。さらに、制御装置により、作業完了後にアクセス窓稼動装置を駆動させてアクセス窓を閉塞させることにより、同様に作業員を架台内部に配置させることなく自動的に原子炉容器内部を再び水中環境に戻すことが可能な状態にすることができる。
 原子炉容器の管台作業システムは、前記原子炉容器の上方に設けられた作業床と、該作業床上から前記架台の内部へと前記作業装置を昇降させる昇降装置とをさらに備えてもよい。前記制御装置は、前記昇降装置を駆動させて前記作業装置を前記架台内部へ降下させてもよい。
 この場合、原子炉容器の上方に作業床を設けることで、作業装置などの必要な機器を原子炉容器外に多数配置可能である。また、制御装置による制御のもと、昇降装置を駆動させることで、必要に応じて作業装置を架台内部に降下させて管台内部での作業を行わせることができる。このため、架台内部に配置する機器類を必要最小限にすることができ、狭いスペースの中で効率良く管台内部の作業を行うことができる。そして、昇降装置の昇降で作業装置を入れ替えることで、複数種類の作業を順次行うこともできる。
 原子炉容器の管台作業システムは、前記架台の内部に設けられ、前記作業装置を着脱可能に装着し、装着された前記作業装置を移動させる移動装置をさらに備えてもよい。前記制御装置は、前記移動装置を駆動させて前記架台内部において前記移動装置と前記昇降装置との間で前記作業装置の受け渡しを行わせ、前記移動装置に装着された前記作業装置を前記架台内部と前記管台内部の所定位置との間で移動させてもよい。
 この場合、架台内部に移動装置が設けられており、制御装置による制御のもと昇降装置との間で作業装置を受け渡し可能である。また、装着した作業装置を移動させることが可能である。そのため、作業装置自体に移動機能を備えさせる必要がなく、作業を行うのに最小限の機能を備えるものとできる。したがって、作業装置の小型化を図ることができる。これにより、昇降装置によって昇降させる作業装置の軽量化を図ることができ、昇降装置の小型化を図ることができる。また、架台及び管台内部における狭いスペースでの移動及び作業をより容易にできる。
 前記移動装置は、前記架台の中心軸回りに回転可能に設けられていてもよい。
 この場合、移動装置が原子炉容器に挿入された状態の架台の中心軸回りに回転可能に設けられていることで、原子炉容器に放射状に複数設けられる管台に対して位置合わせを正確かつ容易に行うことができる。
 前記移動装置は、先端に前記作業装置を着脱可能に装着し、複数の軸回りに前記作業装置を移動する第一の移動ユニットと、前記作業装置を載置可能な支持板を有し、該支持板に載置された前記作業装置をスライド移動させる第二の移動ユニットとを備えてもよい。前記作業装置は、前記第一の移動ユニットの前記先端に着脱可能に装着され、装着された状態で駆動する第一の作業ユニットと、前記第二の移動ユニットの前記支持板に載置され、前記管台内部において該管台内面に固定する固定手段を有する第二の作業ユニットとを備えてもよい。
 この場合、制御装置による制御のもと、複数の軸回りに移動可能な第一の移動ユニットによって、第一の作業ユニットの細かい位置調整を行いながら第一の作業ユニットによって管台内部で作業を行うことができる。一方、制御装置による制御のもと、第二の移動ユニットによって、第二の作業ユニットを支持板で安定的に支持しつつ管台内部まで移動させることができる。そして、第二の作業ユニットは、自らを固定する固定手段によって管台内部で安定的な姿勢を保ちつつ作業を行うことができる。すなわち、第一の移動ユニットと第一の作業ユニットとの組み合わせによって細かく移動しながら行う作業を好適に行うことができる。そして、第二の移動ユニットと第二の作業ユニットとの組み合わせによって、管台から反力や振動を受ける作業でも好適に行うことができる。
 原子炉容器の管台作業システムは、複数の前記作業装置を収容する収容庫をさらに備えてもよい。前記昇降装置は、複数の前記作業装置を収容した収容庫を昇降させてもよい。
 この場合、制御装置による制御のもと、昇降装置によって収容庫に収容された状態のまま複数の作業装置を昇降させることができる。これにより、効率良く複数の作業装置を昇降させることが可能である。また、収容庫を架台内部に降下させた状態で、収容庫の収容された複数の作業装置から選択して作業を行わせることが可能となる。また、消耗材を利用して作業を行う作業装置の場合では、消耗材が無くなったときに、その都度昇降装置を利用して入れ替えを行うことなく、収容庫と移動装置との間で作業装置の入れ替えを行えば良い。これにより、作業を効率的に行うことができる。
 原子炉容器の管台作業システムは、前記作業装置を複数種類備えてもよい。原子炉容器の管台作業システムは、前記作業装置の種類に対応させた複数の前記収容庫を備えていてもよい。種類毎に前記作業装置が各収容庫に収容されてもよい。前記制御装置は、前記昇降装置を駆動させて、作業の種類に応じて選択的に前記収容庫を昇降させてもよい。
 この場合、制御装置による制御のもと、昇降装置を駆動させて、作業の種類に応じて選択的に収容庫を昇降させることで、同種類の作業を一つの収容庫に収容された複数の作業装置によって同時に行うことができる。また、収容庫を入れ替えることで、複数の作業を順次行うことができる。これにより、さらに効率的に作業を行うことができる。
 原子炉容器の管台作業システムは、前記管台内部で該管台の閉塞を行う管台閉塞装置をさらに備えてもよい。前記制御装置は、該管台閉塞装置を駆動させて、前記作業装置による前記管台内部の作業の前に、前記管台内部で前記原子炉容器からみて作業位置よりも奥側の位置で前記管台を閉塞させてもよい。
 この場合、制御装置による制御のもと、管台閉塞装置を駆動させて、作業装置によって管台内部の作業を実施させる前に管台内部で原子炉容器からみて作業位置よりも奥側の位置で管台を閉塞させることができる。そのため、作業装置で作業する際に管台の奥側へ異物が侵入してしまうことを確実に防止することができる。
 前記アクセス窓と前記管台との間の隙間を閉塞させる隙間閉塞装置をさらに備えてもよく、前記制御装置は、前記アクセス窓稼動装置を駆動させて前記アクセス窓を開放させる前または直後に、前記隙間閉塞装置を駆動させて前記アクセス窓と前記管台との隙間を閉塞させてもよい。
 この構成では、制御装置による制御のもと、アクセス窓稼動装置を駆動させて、アクセス窓を開放させる前または直後に隙間閉塞装置を駆動させてアクセス窓と管台との隙間を閉塞させる。これにより、作業装置を管台内部に進出させて作業を行わせる際に、原子炉容器と架台との間に異物が侵入してしまうことを確実に防止することができる。
 前記作業装置は、前記管台内面の検査を行う検査ユニットと、前記管台内面で内面施工を行う施工ユニットとを備えてもよい。前記制御装置は、前記検査ユニットによって前記管台内面の検査を行わせ、該検査ユニットによる検査結果に基づいて前記施工ユニットによって前記管台内面で内面施工を行わせてもよい。
 この場合、制御装置による制御のもと、検査ユニットによる検査結果に基づいて施工ユニットによって管台内面において必要箇所で自動的に内面施工を行うことができる。
 前記施工ユニットは、前記管台内面を切削する切削ユニットを備えてもよい。前記制御装置は、前記検査ユニットによる検査結果に基づいて不良箇所と判断した範囲で、前記切削ユニットを駆動させて前記管台内面の切削を行わせてもよい。
 この場合、制御装置による制御のもと、検査ユニットによる検査結果に基づいて切削ユニットによって管台内面において不良箇所を自動的に切削して除去することができる。
 前記制御装置は、前記切削ユニットによる切削が行われた後に、前記検査ユニットによって該切削ユニットで切削された範囲の検査を行わせてもよい。該検査ユニットによる検査結果に基づいて不良箇所を見つけた場合、再度前記切削ユニットを駆動させて切削を行わせてもよい。
 この場合、制御装置による制御のもと、切削ユニットによる切削の後、検査ユニットで切削された範囲を検査することで、切削ユニットによる切削で除去しきれなかった不良箇所を自動的に発見し、再度切削ユニットによって切削して除去することができる。
 前記施工ユニットは、前記管台内面を溶接する溶接ユニットをさらに備えてもよい。前記制御装置は、前記切削ユニットで切削された範囲について前記溶接ユニットを駆動させて溶接を行わせてもよい。
 この場合、制御装置による制御のもと、溶接ユニットによって切削ユニットで切削された範囲について溶接を行うことで、自動的に不良箇所の補修を行うことができる。
 前記施工ユニットは、前記管台内面の仕上げ加工を行う仕上げ加工ユニットをさらに備えてもよい。前記制御装置は、前記溶接ユニットで溶接された範囲について、前記仕上げ加工ユニットを駆動させて仕上げ加工を行わせてもよい。
 この場合、制御装置による制御のもと、切削ユニットによって溶接ユニットで溶接された範囲について仕上げ加工を行うことで、自動的に補修された箇所の仕上げを行うことができる。
 前記制御装置は、前記溶接ユニットによって溶接された範囲について前記検査ユニットによって検査を行わせてもよく、該検査ユニットによる検査結果に基づいて全ての範囲で良施工と判定された場合には、前記作業装置を前記架台内部に後退させて前記アクセス窓稼動装置により前記アクセス窓を閉塞させてもよい。
 この場合、制御装置による制御のもと、検査ユニットによって溶接ユニットで溶接された範囲について検査を行うことで、溶接ユニットによる溶接によって不良箇所が発生したか否かを自動的に判断することができる。そして、制御装置によって検査ユニットによる検査結果に基づいて全ての範囲で良施工と判定された場合に、制御装置による制御のもと、作業装置を架台内部に後退させて、アクセス窓稼動装置によりアクセス窓を閉塞させる。これにより、管台を補修により適正な状態として原子炉容器内部を再び水中環境にすることができる。
 前記制御装置は、不良施工と判断した範囲で、再度前記切削ユニットを駆動させて切削を行わせてもよい。
 この場合、制御装置による制御のもと、検査ユニットによる検査結果に基づいて不良施工と判断した範囲で、再度切削ユニットを駆動させて切削することで、不良施工により生じた欠陥を除去することができる。
 本発明の原子炉容器の管台作業システムによれば、作業員の放射線被曝量を最小限に抑えつつ、作業期間の短縮、コストの低減を図ることが可能である。
本発明の実施形態の管台作業システムの概要を示す一部を破断した全体斜視図である。 本発明の実施形態の管台作業システムのシステム構成の詳細を示すブロック図である。 本発明の実施形態の管台作業システムにおいて、アクセス窓稼動装置の詳細を示す断面図である。 本発明の実施形態の管台作業システムにおいて、アクセス窓稼動装置の詳細を示す正面図である。 本発明の実施形態の管台作業システムにおいて、アクセス窓稼動装置の蓋体部分の詳細を示す断面図である。 本発明の実施形態の管台作業システムにおいて、アクセス窓稼動装置のシール部分の詳細を示す断面図である。 本発明の実施形態の管台作業システムの隙間閉塞装置において、収納した状態を示す断面図である。 本発明の実施形態の管台作業システムの隙間閉塞装置において、隙間を閉塞した状態を示す断面図である。 本発明の実施形態の管台作業システムにおいて、移動装置の詳細を示す斜視図である。 本発明の実施形態の管台作業システムにおいて、第一の移動ユニットの先端部分の詳細を示す側面図である。 本発明の実施形態の管台作業システムにおいて、管台閉塞装置の詳細を示す斜視図である。 本発明の実施形態の管台作業システムにおいて、溶接ユニットの詳細を示す斜視図である。 本発明の実施形態の管台作業システムにおいて、切削ユニットの詳細を示す一部を破断した側面図である。 本発明の実施形態の管台作業システムにおいて、仕上げ加工ユニットの詳細を示す斜視図である。 本発明の実施形態の管台作業システムにおいて、回収ユニットの詳細を示す斜視図である。 本発明の実施形態の管台作業システムにおいて、UT検査ユニットの詳細を示す斜視図である。 本発明の実施形態の管台作業システムにおいて、UT検査ユニットの詳細を示す正面図である。 本発明の実施形態の管台作業システムにおいて、PT検査ユニットの詳細を示す斜視図である。 本発明の実施形態の管台作業システムにおいて、PT検査ユニットの詳細を示す側面図である。 本発明の実施形態の管台作業システムにおいて、寸法計測ユニットの詳細を示す斜視図である。 本発明の実施形態の管台作業システムにおいて、収容庫の詳細及び収容庫の架台内部での設置状態の詳細を示す斜視図である。 本発明の実施形態の管台作業システムによる管台作業の制御手順を示すフロー図である。 本発明の実施形態の管台作業システムによる管台作業の開始時の状態を示す断面図である。 本発明の実施形態の管台作業システムによるアクセス窓開放工程において、アクセス窓を開放する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによるアクセス窓開放工程において、隙間を閉塞する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる管台シール工程の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる補修前UT検査工程において、UT検査ユニットを準備する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる補修前UT検査工程において、超音波探傷試験の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる補修前UT検査工程において、入口管台から出口管台へ移行する際の詳細を示す上方視した断面図である。 本発明の実施形態の管台作業システムによる補修前UT検査工程において、UT検査ユニットを引き上げる際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる切削工程において、切削ユニットを準備する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる切削工程において、切削ユニットを管台に挿入する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる切削工程において、切削ユニットで切削する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる切削工程において、入口管台から出口管台へ移行する際の詳細を示す上方視した断面図である。 本発明の実施形態の管台作業システムによる切削工程において、切削ユニットを引き上げる際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる第一回収工程において、回収ユニットを準備する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる第一回収工程において、回収作業の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる補修前PT検査工程において、PT検査ユニットを準備する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる補修前PT検査工程において、浸透探傷試験の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる補修前寸法計測工程において、寸法計測ユニットを準備する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる補修前寸法計測工程において、寸法計測作業の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる溶接工程において、溶接ユニットを準備する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる溶接工程において、溶接作業の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる仕上げ加工工程において、仕上げ加工ユニットを準備する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる仕上げ加工工程において、仕上げ加工作業の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる管台開放工程において、案内部を準備する際の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる管台開放工程において、管台閉塞装置の引上げ作業の詳細を示す断面図である。 本発明の実施形態の管台作業システムによるアクセス窓閉塞工程の詳細を示す断面図である。 本発明の実施形態の管台作業システムによる隙間開放工程の詳細を示す断面図である。
 以下、本発明に係る実施形態について図面を参照して説明する。図1は、原子炉容器において管台作業を行う管台作業システムの概要を示す全体図である。また、図2は、管台作業システムのシステム構成を示すブロック図である。図1では、原子炉1の内部において、上部構造体である上蓋、及び、内部構造体である炉心構造物が取り外され、上部が開口した原子炉容器2を示している。図1に示すように、原子炉容器2には管台3として入口管台3A及び出口管台3Bが少なくとも一組設けられている。本実施形態では入口管台3A及び出口管台3Bが三組設けられている。各組の入口管台3Aから内部に冷却水を取り込むことが可能であり、出口管台3Bから冷却水を排出することが可能である。
 図1に示すように、本実施形態の管台作業システム10は、下端側が原子炉容器2に上部開口2aから挿入され、上方へと延出して設けられている有底円筒状の架台11と、原子炉容器2の上方に架設された作業床12と、原子炉容器2の外側となる作業床12上に設置され各構成を制御する制御装置13とを備える。制御装置13は、図2に示すように、各構成を電気的に制御する複数の制御盤14と、制御盤14から各構成の動作情報が入力され、各構成の動作を制御するための動作指令を制御盤14に出力する統括コンピュータ15とを備える。本実施形態においては、制御盤14としては、第一の制御盤14A~第六の制御盤14Fがある。第一の制御盤14Aは、昇降装置44、収容庫43、アクセス窓稼動装置21及び隙間閉塞装置28を制御する。第二の制御盤14Bは、第二の移動ユニット42Bを制御する。第三の制御盤14Cは、第一の移動ユニット42A及び作業装置40の内、第一の作業ユニット160を制御する。第四の制御盤14Dは、切削ユニット81を制御する。第五の制御盤14Eは、管台閉塞装置41を制御する。第六の制御盤14Fは、除染ユニット84を制御する。なお、各制御盤14の制御対象たる各構成の詳細は後述する。また、制御盤14の構成としては、これに限るものではなく、さらに細分化しても良く、あるいは、一台の制御盤14で代表するものとしても良い。また、統括コンピュータ15についても、複数台が連携して処理を行うものとしても良い。
 図1に示すように、架台11は、原子炉容器2の内部に配置されるプラットフォーム16と、プラットフォーム16と接続されて原子炉容器2の上方へと鉛直方向に沿って配設された略円筒状の接続管路17とを有する。プラットフォーム16は、原子炉容器2の内径よりも小さい外径を有する略円筒状の側壁16aと、側壁16aの下端を閉塞する底板16bと、側壁16aの上端から外周側に張り出して原子炉容器2の上縁に支持されたフランジ16cとを有する。そして、プラットフォーム16は、フランジ16cに形成された固定用孔16dを利用して原子炉容器2に固定されている。接続管路17は、下端がプラットフォーム16のフランジ16cに固定されている。プラットフォーム16の側壁16aと接続管路17によって架台11の側壁部11aが構成されている。プラットフォーム16の底板16bによって架台11の底部11bが構成されている。接続管路17は、上端において作業床12に原子炉容器2の上方となる位置で形成された連絡孔12aと連通している。このため、作業床12上では、連絡孔12aを介して架台11の内部にアクセスすることが可能となっている。なお、プラットフォーム16のフランジ16cと原子炉容器2の上端との間、また、プラットフォーム16のフランジ16cと接続管路17の下端との間は、それぞれシーリングされている。これにより、図1に示すように、原子炉容器2の内部を管台3よりも水位が下側になるように排水しても、原子炉容器2の上方で接続管路17の周囲に満たされた冷却水が原子炉容器2の内部、及び架台11の内部に漏洩しない。
 ここで、架台11においてプラットフォーム16の側壁16aには、架台11の内部と各管台3と連通するアクセス窓20が形成され、アクセス窓20を開閉可能なアクセス窓稼動装置21が設けられている。図2から図4に示すように、アクセス窓稼動装置21は、略板状の蓋体22と、一対のガイドレール23と、電動ウインチ24とを備える。蓋体22は、側壁16aの内周面において各アクセス窓20に設けられている。一対のガイドレール23は、蓋体22を側壁16aの内周面との間で挟み込み、上下に蓋体22を案内する。電動ウインチ24は、アクセス窓20の上方に設けられてガイドレール23に沿って蓋体22を上下に移動させる昇降手段である。電動ウインチ24の図示しない駆動モータは、第一の制御盤14Aと接続されている。駆動モータは、第一の制御盤14Aによる制御によって駆動し、蓋体22を上下に移動させることができる。また、アクセス窓20の上部及び下部には、一対のガイドレール23間に掛け渡された一対の支持部材25が設けられている。
 図5に示すように、一対のガイドレール23及び一対の支持部材25の側壁16aと対向する面には、アクセス窓20を閉塞するように配置された蓋体22に向かって進退可能な水圧シリンダ26が設けられている。水圧シリンダ26は、図示しない配管によって作業床12上に設けられ、第一の制御盤14Aと接続されている作動水供給装置27(図2参照)と接続されている。このため、第一の制御盤14Aによる制御のもと作動水供給装置27によって水圧シリンダ26に作動水を供給して水圧を付与することにより、上下左右の4箇所で蓋体22を側壁16aに向かって押圧させることが可能である。また、図6に示すように、プラットフォーム16の側壁16aにおいてアクセス窓20の周囲には、Oリング22aが二重に配置されている。このため、水圧シリンダ26によって蓋体22を側壁16aに向かって押圧させることで、Oリング22aが弾性変形することになる。これにより、プラットフォーム16の外側が水中環境であったとしても、アクセス窓20を介して内部に水が侵入してしまうのを防止することができる。なお、側壁16aの内部において二重のOリング22aの間には、リーク検知ポート22bが形成されており、図示しない液面センサにより該リーク検知ポート22b内への水の浸入の有無を検知することが可能となっている。この液面センサの検知結果は図示しない通信線によって第一の制御盤14Aを介して統括コンピュータ15に接続されている。これにより、水の浸入が検知された場合には、直ちに作業を中止するなどの処置を取ることができる。
 図7及び図8に示すように、各アクセス窓20の内周面には、アクセス窓20と管台3との間の隙間2bを閉塞する隙間閉塞装置28が設けられている。隙間閉塞装置28は、略環状の金属などの硬質の部材で形成されている。隙間閉塞装置28は、アクセス窓20の内側に収容された状態から原子炉容器2の内面に向かって進退可能な保護リング29と、アクセス窓20の内周面から突出した鍔部20aと保護リング29との間に設けられ、略筒状で可撓性を有する材質で形成された伸縮部材30とを有する。保護リング29は、アクセス窓20と原子炉容器2との間の隙間2bを埋めるための本体部29aと、本体部29aの外周側に設けられ原子炉容器2の内周面に当接可能な当接部29bとによって断面略T形に形成されている。当接部29bにおいて原子炉容器2の内周面2cと対向する側には弾性変形可能なシール材29cが貼設されている。これにより、原子炉容器2の内周面2cにシール材29cを密着させることが可能となっている。
 伸縮部材30は、保護リング29がアクセス窓20の内部に収容された状態から原子炉容器2の内周面2cに当接するまでの長さに対して十分な長さを有している。そして、伸縮部材30とアクセス窓20の内周面2cとの間には、周方向に間隔を有して複数の空気圧シリンダ28aが設けられている。空気圧シリンダ28aは、図示しない配管によって作業床12上に設けられて第一の制御盤14Aと接続されている圧縮空気供給装置31(図2参照)と接続されている。このため、第二の制御盤14Bによる制御のもと圧縮空気供給装置31によって空気圧シリンダ28aに圧縮空気を供給して空気圧を付与することにより、複数箇所で保護リング29を原子炉容器2の内周面2cに向かって進出させて押圧させることが可能である。なお、各隙間閉塞装置28の保護リング29において下端部には、回収ポート32が設けられている。回収ポート32は、保護リング29において原子炉容器2の内周面2c側となる位置に開口しており、プラットフォーム16の側壁16aの内部を通って作業床12上において後述する回収設備109と接続されている。これにより、回収ポート32は、管台3の開口近傍に溜まった水などを吸引回収することが可能となっている。
 図1に示すように、管台作業システム10は、作業装置40と、管台閉塞装置41と、移動装置42と、収容庫43と、昇降装置44と、門型クレーン45とを備える。作業装置40は、各種管台の作業を行う。管台閉塞装置41は、管台3の内部で管台3の閉塞を行う。移動装置42は、架台11の内部に設けられて作業装置40や管台閉塞装置41を移動させる。収容庫43は、各作業装置40を収容する。昇降装置44は、連絡孔12aを介して各機器を作業床12上から架台11の内部へ昇降させる。門型クレーン45は、作業床12上で各機器を移動させる。門型クレーン45は、連絡孔12aを跨ぐようにして走行可能となっている。これにより、連絡孔12a周辺のエリアと、連絡孔12aから離れたエリアとの間で資機材を門型クレーン45により移動させることが可能となっている。
 また、昇降装置44は、支持台44aと、フレーム44bと、一対の第一のレール44c及び第二のレール44dと、本体部44eと、一対の把持部44fとを有する。支持台44aは、作業床12上に走行可能に設けられている。フレーム44bは、支持台44a上で鉛直軸回りに回転可能に設けられている。一対の第一のレール44c及び第二のレール44dは、該フレーム44b及び架台11の内周面にそれぞれ略鉛直に配設されている。本体部44eは、第一のレール44c及び第二のレール44d上を上下に走行可能である。一対の把持部44fは、本体部44eに互いに近接離間可能に設けられ、作業装置40及び収容庫43を把持する。支持台44aには、第一の制御盤14Aと接続された図示しない走行駆動部及び回転駆動部が設けられている。そして、第一の制御盤14Aによる制御のもと、該走行駆動部により作業床12上で支持台44aを走行させることが可能である。また、該回転駆動部によってフレーム44b及び第一のレール44cを鉛直軸回りに回転移動させることが可能となっている。また、本体部44eには、第一の制御盤14Aと接続された図示しない昇降駆動部が設けられ、第一の制御盤14Aによる制御のもと、該昇降駆動部によって第一のレール44c上または第二のレール44d上を鉛直方向に走行することが可能となっている。また、本体部44eには、第一の制御盤14Aと接続された図示しない把持駆動部が設けられている。そして、第一の制御盤14Aによる制御のもと、該把持駆動部によって一対の把持部44fを近接させることで、作業装置40及び収容庫43を把持することが可能となっている。
 図9に示すように、上記移動装置42としては、複数の軸回りに回転移動可能な第一の移動ユニット42Aと、作業装置40や管台閉塞装置41をスライド移動させることが可能な第二の移動ユニット42Bとを具備している。第一の移動ユニット42Aは、架台11の底部11b上に外周側に円弧状に形成されたガイドレール50と、ガイドレール50に沿って架台11の中心軸C11を中心として周方向に移動可能なユニット本体51とを有する。本実施形態では、ガイドレール50上には、管台3を構成する入口管台3A及び出口管台3Bの組数と対応させて三基のユニット本体51が設置されている。
 ユニット本体51は、第一支持体52と、第二支持体53と、マニュピレータ54と、接続部55とを有する。第一支持体52は、ガイドレール50に沿って移動可能である。第二支持体53は、第一支持体52上に架台11の中心軸C11と略平行な第一回転軸R1回りに回転可能である。マニュピレータ54は、第二支持体53上に設けられている。接続部55は、マニュピレータ54の先端に設けられ、作業装置40を着脱可能にする。第一支持体52には、自身をガイドレール50に沿って走行させる走行駆動部52aと、第一支持体52に対して第一回転軸R1回りに第二支持体53を回転させる第一回転駆動部52bとが設けられている。また、第二支持体53は、下部板53aと、上部板53bと、図示しないスライド駆動部とを有する。第二支持体53は、第一支持体52に第一回転軸R1回りに回転可能に取り付けられている。上部板53bは、下部板53a上で第一回転軸R1に直交するスライド方向L1にスライド移動可能に設けられている。スライド駆動部は、上部板53bと下部板53aとの間に設けられ下部板53aに対して上部板53bをスライドさせる。
 マニュピレータ54は、複数の関節部54aを有する多関節構造で構成されている。これにより、スライド方向L1に平行な軸、及び、該軸に直交する二軸の三軸回りに自在に回転可能となっている。なお、図示しないが、各関節部54aにはその先端側の関節部54aを回転させる回転駆動部が設けられている。これにより、マニュピレータ54の先端54bに設けられた接続部55、及び、接続部55に装着された作業装置40を任意の軸回りに回転移動させることが可能となっている。また、図示しないが、各駆動部には、各駆動部による移動状態を検出するためのエンコーダなどの位置センサが設けられている。該位置センサで検出された検出結果は、位置検出信号として、第三の制御盤14Cに入力されている。このため、第三の制御盤14Cは、統括コンピュータ15からの指令に基づいて、制御信号を各駆動部に出力して、各駆動部を駆動させて第一の移動ユニット42Aを動作させる。これにより、各位置センサから入力された位置検出信号に基づいてフィードバック制御を行い、正確な位置制御を行うことが可能となっている。
 ここで、図10に示すように、第一の移動ユニット42Aの接続部55と対応して、一部の作業装置40には被接続部が設けられていて、接続部55と被接続部とで互いに着脱可能とするツールチェンンジャが構成されている。接続部55と被接続部のそれぞれは、互いを剛結保持することが可能な接続部本体55a及び被接続部本体と、マニュピレータ54側と作業装置40側のそれぞれに配設された図示しない配線及びは配管とを互いに接続する配線・配管コネクタ55b及びコネクタ受部とを有する。マニュピレータ54に内蔵されている配線、配管としては、作業装置40と作業床12上の各装置とを電気的に接続する配線や、作業床12上の作動水供給装置や圧縮空気供給装置から作動水や圧縮空気を供給するため、あるいは回収設備109と接続されて作業装置40側から吸引を行うための各種配管がそれぞれ配設されている。このため、接続部55に接続された作業装置40には、当該作業装置40の作業内容に応じて、マニュピレータ54内に配設された配線、配管が選択的に接続されるようになっている。そして、作業装置40は、この配線・配管コネクタ55bにより、第三の制御盤14Cから電源供給を受け、必要な制御信号を受けて動作する。また、作業装置40は、この配線・配管コネクタ55bにより、検出した結果を検出信号として第三の制御盤14Cに出力することが可能となっている。さらに、作業装置40は、作動水供給装置や圧縮空気供給装置から供給される作動水や圧縮空気により動作する。あるいは、作業装置40は、管台3の内部に送水、送気等することが可能である。さらには、作業装置40は、回収設備109から作用する負圧により吸引することが可能となっている。詳細は、各作業装置40の説明で述べる。
 また、図9に示すように、第二の移動ユニット42Bは、基部56と、複数段のスライド板57と、支持板58と、押付部材59とを有する。基部56は、架台11の底部11b上で第一の移動ユニット42Aのガイドレール50の内周側に、架台11の中心軸C11回りに回転可能に設けられている。複数段のスライド板57は、基部56上に架台11の中心軸C11に直交するスライド方向L2に沿ってスライド移動可能に設けられている。支持板58は、最上段のスライド板57上にスライド方向L2に沿ってスライド移動可能に設けられ、上面に作業装置40を載置可能である。押付部材59は、支持板58の基端に突出して設けられて先端側に向かって進退可能である。基部56には、図示しないが、自身を架台11の中心軸C11回りに回転させる回転駆動部と、複数のスライド板57、支持板58及び押付部材59を順次スライド方向L2へスライド移動させるスライド駆動部とが設けられている。これにより、支持板58上に載置された作業装置40をスライド方向L2に移動させることが可能となっている。なお、第一の移動ユニット42Aと同様に、図示しないが、各駆動部には、各駆動部による移動状態を検出するための位置センサが設けられている。該位置センサで検出された検出結果は、位置検出信号として、第二の制御盤14Bに入力されている。このため、第二の制御盤14Bは、統括コンピュータ15からの指令に基づいて、制御信号を各駆動部に出力して、各駆動部を駆動させて第二の移動ユニット42Bを動作させる。これにより、各位置センサから入力された位置検出信号に基づいてフィードバック制御を行い、正確な位置制御を行うことが可能となっている。
 次に、管台閉塞装置41について説明する。図11に示すように、管台閉塞装置41は、管台3の内部を閉塞するシール本体部60と、シール本体部60に着脱可能に連結された案内部61とを有する。シール本体部60は、略円盤状のシールプラグ62と、インフラートシール63と、固定用ジャッキ64と、キャスタ65とを有する。略円盤状のシールプラグ62は、管台3の内径よりも小さくその外径が設定されている。インフラートシール63は、シールプラグ62の外周面に嵌め込まれている。固定用ジャッキ64は、シールプラグ62に放射状に複数設けられ、径方向外周側に向かって進退可能である。キャスタ65は、管台3の内面を走行する。固定用ジャッキ64は、ガイド64aと、当接部64bと、水圧シリンダ64cとを有する。ガイド64aは、シールプラグ62の中心位置から径方向外周側に向かって配設されている。当接部64bは、ガイド64aに沿って進退可能であり、管台3の内面に当接する。水圧シリンダ64cは、シールプラグ62の中心位置から径方向外周側に向かって伸縮可能でロッド先端に当接部64bが取り付けられている。このため、固定用ジャッキ64は、水圧シリンダ64cを伸張させることで、当接部64bをガイド64aに沿って径方向外周側に向かって進出させてシールプラグ62の外周側に位置する管台3の内面に当接させることができる。複数の固定用ジャッキ64によりシールプラグ62を管台3の内面に固定することができる。インフラートシール63は、シールプラグ62の外周面との間に空間を有しており、圧縮空気を供給することで外周側に膨張する。これにより、管台3の内部に配置されたシールプラグ62と管台3の内面との間の隙間を封止することができる。
 案内部61は、管台3の内部に挿入可能な略棒状の部材で、先端側を監視するための撮影手段66と、先端に設けられ、第一の移動ユニット42Aの接続部55と同様の構成の接続部67と、管台3の内面を走行させるためのキャスタ68とを有する。シール本体部60には、案内部61の接続部67と対応して被接続部69が設けられていて、接続部67と被接続部69とで互いに着脱可能とするツールチェンジャが構成されている。接続部67と被接続部69とは、互いを剛結保持することが可能である。これらは、シールプラグ62と案内部61の内部とにそれぞれ配設された図示しない配線及び配管を接続する配線・配管コネクタとしても機能する。具体的には、シール本体部60及び案内部61の内部には、固定用ジャッキ64の水圧シリンダ64cに作動水を供給する配管、及びインフラートシール63に圧縮空気を供給する配管が、接続部67と被接続部69とにより互いに接続可能に設けられている。また、案内部61の内部には、さらに撮影手段66を駆動させる制御信号及び撮影手段66から出力される撮影データを第五の制御盤14Eに送信するための通信線となる配線が配設されている。
 このため、図2に示すように、第五の制御盤14Eによる制御のもと、第五の制御盤14Eと接続された作動水供給装置70を駆動させて、固定用ジャッキ64によってシールプラグ62を管台3の内面に固定することができる。これとともに、この状態で第五の制御盤14Eと接続された圧縮空気供給装置71を駆動させて、インフラートシール63を膨張させることでシールプラグ62と管台3の内面との隙間を封止することができる。そして、この状態で案内部61の先端に設けられた接続部67と、シール本体部60に設けられた被接続部69とを離脱させることで、シール本体部60により管台3の内部を封じた状態とすることができる。
 次に、作業装置40について説明する。図1及び図2に示すように、本実施形態では、作業装置40として、管台3の内面の検査を行う検査ユニット40Aと、管台3の内部で内面施工を行う施工ユニット40Bとを具備する。より具体的には、施工ユニット40Bは、溶接ユニット80と、切削ユニット81と、仕上げ加工ユニット82と、回収ユニット83と、除染ユニット84とを具備する。溶接ユニット80は、管台3の内面の溶接を行う。切削ユニット81は、管台3の内面を切削する。仕上げ加工ユニット82は、管台3の内面の仕上げ加工を行う。回収ユニット83は、管台3の内部にある加工屑等を回収する。除染ユニット84は、管台3の内面を洗浄する。検査ユニット40Aは、UT検査ユニット85と、PT検査ユニット86と、寸法計測ユニット87とを具備する。UT検査ユニット85は、管台3の内面の溶接部5について、超音波探傷試験を行う。PT検査ユニット86は、浸透探傷試験を行う。寸法計測ユニット87は、対象の寸法測定を行う。
 図12に示すように、溶接ユニット80は、溶接トーチ90と、溶接材供給手段91と、照明手段92と、撮影手段93と、位置センサ94と、支持部材95と、被接続部96とを有する。溶接トーチ90は、アーク放電を行う。溶接材供給手段91は、溶接トーチ90の先端側へ溶接材となるワイヤWを供給する。照明手段92は、溶接トーチ90の先端側を照明する。撮影手段93は、溶接トーチ90の先端側を撮影する。位置センサ94は、管台3に対する相対位置を検出する。支持部材95は、これら位置センサ94などを支持する。被接続部96は、支持部材95に取り付けられ、第一の移動ユニット42Aの接続部55に接続される。溶接材供給手段91は、溶接材であるワイヤWが巻回されたワイヤリール91aと、ワイヤリール91aに巻回されたワイヤWを繰り出させる送出部91bと、送出部91bによって送出されたワイヤWを溶接トーチ90の先端側に案内する案内部91cとを有する。送出部91bは、例えば、ワイヤリール91aから繰り出されたワイヤWを挟み込む一対のローラと、該ローラを回転させるローラ回転駆動部とを有する構成となっている。ローラ回転駆動部には図示しないがエンコーダが設けられており、検出される回転数からワイヤWの繰り出し長さを取得することが可能となっている。
 被接続部96は、第一の移動ユニット42Aの接続部本体55aに剛結保持される被接続部本体96aと、配線・配管コネクタ55bと接続されるコネクタ受部96bとを有する。コネクタ受部96bには、配線や配管などが接続可能となっている。具体的には、作業床12上に設置された溶接電源盤97及び溶接制御盤98から照明手段92、撮影手段93、溶接トーチ90及び溶接材供給手段91に電力の供給及び制御信号を送信するための配線や、作業床12上の溶接冷却設備99から図示しない冷却配管に冷却水を供給するための配管などが接続可能である。第一の移動ユニット42Aの接続部55に接続された状態において、第三の制御盤14Cによる制御のもと、第一の移動ユニット42Aによって管台3に対する溶接ユニット80の相対位置を調整する。そして、当該位置において溶接トーチ90で管台3との間で放電を発生させて溶接材であるワイヤWを順次供給する。これにより、所望の位置に溶接を行うことが可能となっている。
 図13に示すように、切削ユニット81は、略円筒状の管体部100と、固定手段101と、ディスク102と、切削手段103と、研削手段104と、水供給配管105と、吸引管106とを有する。管体部100は、管台3の内部に挿入可能である。固定手段101は、管体部100の外周面に設けられ、管台3の内面に対して管体部100を固定可能である。ディスク102は、管体部100の先端に設けられ、管体部100に対して軸回りに回転可能である。切削手段103及び研削手段104は、ディスク102の先端面に設けられ、管台3の内面の切削を行う。水供給配管105は、切削、研削時に管台3の内面に水を供給する。吸引管106は、切削手段103の近傍に設けられて切削屑を回収する。
 固定手段101は、フレーム101aと、水圧シリンダ101cと、一対のリンク部材101d、101eとを有する。フレーム101aは、管体部100の外周面に取り付けられている。水圧シリンダ101cは、管体部100の軸方向に沿ってロッド101bを進退可能にする。一対のリンク部材101d、101eは、ロッド101bの先端に管体部100の中心軸を含む面内で回転可能に取り付けられている。一対のリンク部材101d、101eは、一方のリンク部材101dが外周側に配設され、他方のリンク部材101eが内周側に配設されていて、略V字形として互いの基端となる中央部分でロッド101bの先端に回転可能に取り付けられている。そして、一方のリンク部材101dの先端には管台3の内面に当接する当接部101fが回転可能に取り付けられている。また、他方のリンク部材101eの先端は、フレーム101aに回転可能に取り付けられている。このため、水圧シリンダ101cのロッド101bを進退させることで、一対のリンク部材101d、101eの互いの先端を近接離間させることが可能である。これにより、一方のリンク部材101dの先端に取り付けられた当接部101fにより管台3の内面に当接し、押圧することが可能である。
 本実施形態において、固定手段101は、管体部100の外周面に周方向に等間隔に四箇所、軸方向に二箇所ずつ設けられている。つまり、固定手段101は、計八基設けられている。そして、これら八基の固定手段101により管体部100を管台3の内面に対して固定している。図13においては、固定手段101の詳細を示すために、固定手段101が上下端に2つずつ配置されているように図示されている。実際には、固定手段101は、後述するように第二の移動ユニット42Bの支持板58で載置可能となるように、左右に位置をずらして鉛直軸及び水平軸から45度ずつずらした方向で管台3の内面を押圧可能に設けられている。
 管体部100の内部には、当該中心軸と同軸で回転駆動軸100aが配設され、先端にディスク102が取り付けられている。管体部100の内部には、図示しないが、回転駆動軸100aを軸回りに回転させるディスク回転駆動部が設けられている。ディスク102の先端面には、径方向に沿ってガイド部102aが設けられている。切削手段103及び研削手段104は、このガイド部102aに沿って径方向に位置調整可能に取り付けられている。切削手段103は、フレーム103aと、円盤部103bと、刃ホルダ103cと、切削刃103dとを有する。フレーム103aは、ガイド部102aに沿って移動可能に設けられている。円盤部103bは、フレーム103aにディスク102の外周接線方向に沿う軸回りに回転可能に設けられている。刃ホルダ103cは、円盤部103bに放射状に複数取り付けられている。切削刃103dは、各刃ホルダ103cに取り付けられている。また、フレーム103aには、フレーム103aに対して円盤部103bを軸回りに回転させる交換駆動部103eが設けられている。該交換駆動部103eにより円盤部103bを回転させることで、径方向外周側に管台3の内面に向かって突出して切削可能な切削刃103dを選択することが可能となっている。また、図示しないディスク回転駆動部を駆動させて回転駆動軸100aを軸回りに回転させることで、ディスク102及びディスク102に取り付けられた切削手段103も回転駆動軸100a回りに回転する。これにより、管台3の内面を周方向に切削していくことが可能となっている。
 研削手段104は、ガイド部102aに沿って移動可能に設けられたフレーム104aと、フレーム104aに管体部100の中心軸と平行な軸回りで回転可能に取り付けられた略円盤状のグラインダ104bとを有する。フレーム104aには、グラインダ104bを回転させる研削駆動部104cが取り付けられている。該研削駆動部104cによりグラインダ104bを回転させることで、管台3の内面を研削することが可能となっている。
 ここで、図示しないが管体部100の基端からは各種配線、配管が作業床12まで延びている。そして、図示しないディスク回転駆動部、交換駆動部103e及び研削駆動部104cは、作業床12上の第四の制御盤14Dと配線により接続されている。また、ディスク回転駆動部、交換駆動部103e及び研削駆動部104cのそれぞれには、図示しないがエンコーダが取り付けられており、検出信号が第四の制御盤14Dに入力されている。第四の制御盤14Dでは、各駆動部に制御信号を出力して駆動させ、各駆動部に設けられたエンコーダからの入力を受けてフィードバック制御を行う。これにより、切削時には図示しないディスク回転駆動部を駆動させて所定の回転数で回転駆動軸100aを回転させる。また、第四の制御盤14Dでは、必要に応じて交換駆動部103eを駆動させて所定の切削刃103dを選択して外周側に突出させることが可能である。また、研削時には、研削駆動部104cを駆動させて所定の回転数でグラインダ104bを回転させ、必要に応じて図示しないディスク回転駆動部を駆動させて回転駆動軸100aを回転させる。これにより、グラインダ104bによって研削する位置を位置調整することが可能となっている。
 水供給管105は、作業床12上に設けられて第四の制御盤14Dと接続された水供給装置106と配管により接続されており、これにより第四の制御盤14Dによる制御のもと必要な量の水を供給することが可能となっている。吸引管106は、作業床12に設けられて負圧を発生させる吸引手段109aと、吸引手段109aで吸引された物質を回収する回収ボックス109bとを有する回収設備109に接続されている。このため、第四の制御盤14の制御のもと、回収設備109の吸引手段109aを駆動させることで、吸引管106から切削屑を吸引し、回収ボックス109b内に回収することができる。図12に示すように、ディスク102の先端面には、切削手段103よる切削位置及び研削手段104による研削位置を撮影可能な切削用監視カメラ102b及び研削用監視カメラ102cが取り付けられている。これにより、作業床12上に設けられた図示しないモニタで切削状況及び研削状況を確認することが可能となっている。
 図14に示すように、仕上げ加工ユニット82は、第一の研削手段110及び第二の研削手段111の二つの研削手段と、照明手段112と、各種撮影手段113と、送気手段114と、位置センサ115と、支持板116と、被接続部117とを有する。第一の研削手段110及び第二の研削手段111は、管台3の内面を研削する。照明手段112は、各研削手段で研削する位置を照明する。各種撮影手段113は、研削する位置を撮影する。送気手段114は、研削屑を取り除くための送風を行う。位置センサ115は、管台3に対する相対位置を検出する。支持板116は、これら位置センサ115などを支持する。被接続部117は、支持板116に取り付けられ、第一の移動ユニット42Aの接続部55に接続される。第一の研削手段110は、超鋼合金からなるカッタ110aが取り付けられたホルダ110bと、該ホルダ110bを軸回りに回転させる第一研削駆動部110cとを有する。また、第二の研削手段111は、略円盤状のワイヤブラシ111aと、ワイヤブラシ111aを軸回りに回転させる第二研削駆動部111bとを有する。撮影手段113は、第一の研削手段110のカッタ110a及び第二の研削手段111のワイヤブラシ111aのそれぞれの状態を監視可能にそれぞれに対応して設けられている。これに加えて、管台3の内面の仕上げ状態を監視するために、さらにもう一基の撮影手段113が設けられている。
 被接続部117は、接続部本体55aと剛結される被接続部本体117aと、配線・配管コネクタ55bと接続される図示しないコネクタ受部とを有する。コネクタ55b受部では、照明手段112、撮影手段113、位置センサ115、第一の研削手段110及び第二の研削手段111に電力の供給及び制御信号を送信し、また、検出信号を出力するための各種電気系配線が接続可能となっている。さらに、コネクタ受部では、作業床12上で第三の制御盤14Cに接続された圧縮空気供給装置118から各送気手段114に圧縮空気を供給するための配管が接続可能となっている。このため、第三の制御盤14Cによる制御のもと、第一の研削手段110において第一研削駆動部110cを駆動させることでカッタ110aによって粗削りを実施することができる。これとともに、第二の研削手段111において第二研削駆動部111bを駆動させることでワイヤブラシ111aによって仕上げ削りを行うことが可能である。また、送気手段114によって研削位置に発生する研削屑を取り除くことが可能である。
 図15に示すように、回収ユニット83は、管台3の内部の対象物を吸引するバキューム120と、管台3に対する相対位置を検出する位置センサ121と、第一の移動ユニット42Aの接続部55に接続される被接続部122とを有する。被接続部122は、接続部本体55aと剛結される被接続部本体122aと、配線・配管コネクタ55bと接続されるコネクタ受部122bとを有する。コネクタ受部122bでは、回収設備109と接続されている配管とバキューム120とを接続することが可能となっている。また、コネクタ受部122bでは、第三の制御盤104Cと接続され、位置センサ121から検出信号を送信するための配線と接続することが可能となっている。そして、第三の制御盤14Cの制御のもと、回収設備109の吸引手段109aを駆動させることで、回収ユニット83のバキューム120近傍に存在する物質を吸引し、回収ボックス109b内に回収することができる。
 図2に示す除染ユニット84は、図示しないが、第二の移動ユニット42Bの支持板58に載置されて管台3の内部に移動可能な構成となっており、除染のためのブラスト材を吐出可能な吐出口を有している。また、除染ユニット84は、作業床12に設けられた第六の制御盤14F、洗浄水を供給する洗浄水供給装置125、及び、ブラスト材を圧縮空気とともに供給するブラスト設備126とそれぞれ接続されている。このため、第六の制御盤14Fによる制御のもと、ブラスト設備126が駆動されてブラスト材を供給させて除染ユニット84の吐出口から管台3の内面に吹き付け、さらに、水圧供給装置125から供給される洗浄水を吹き付けることで、内面に付着した放射能物質を除去することができる。
 次に、検査ユニット40Aについてそれぞれ説明する。図16及び図17に示すように、UT検査ユニット85は、一対の探触子130と、ユニット本体131と、位置調整手段132と、位置センサ133と、照明手段134と、撮影手段135と、支持板136と、被接続部137とを有する。一対の探触子130は、管台3の内面の溶接部5に超音波を発振し、検出することが可能である。ユニット本体131は、超音波を生成するとともに検出した超音波を解析し欠陥を検出する。位置調整手段132は、一対の探触子130を管台3の内面に対して進退させて位置調整をする。位置センサ133は、管台3に対する相対位置を検出する。照明手段134は、探触子130による検査位置を照明する。撮影手段135は、検査位置を撮影する。支持板136は、これら位置センサ133などを支持する。被接続部137は、支持板136に取り付けられて第一の移動ユニット42Aの接続部55に接続される。
 被接続部137は、接続部本体55aと剛結される被接続部本体137aと、配線・配管コネクタ55bと接続される図示しないコネクタ受部とを有する。コネクタ受部では、照明手段134、撮影手段135、位置調整手段132及びユニット本体131に電力を供給し、制御信号を送信するため、また、検出信号を出力するための配線が接続可能となっている。このため、第三の制御盤14Cによる制御のもと、位置調整手段132を駆動させて探触子130と管台3の内面との距離を調整することができる。そして、ユニット本体131を駆動させて超音波を生成して探触子130から発振させるとともに検出した超音波を解析し欠陥を検出することができる。そして、第三の制御盤14Cでは、入力されるユニット本体131からの欠陥検出信号と、位置センサ133からの位置情報とに基づいて亀裂などの欠陥についての欠陥データを取得することができる。
 図18及び図19に示すように、PT検査ユニット86は、浸透液吹付手段140と、バキューム141と、送気手段142と、位置センサ143と、撮影手段144と、支持板145と、被接続部146とを有する。浸透液吹付手段140は、管台3の内面に浸透液を吹き付ける。バキューム141は、管台3の内面の液体などを吸引可能である。送気手段142は、管台3の内面に圧縮空気を吹付可能である。位置センサ143は、管台3に対する相対位置を検出する。撮影手段144は、浸透液を吹き付けた管台3の内面を撮影する。支持板145は、これら位置センサ143などを支持する。被接続部146は、支持板145に取り付けられ、第一の移動ユニット42Aの接続部55に接続される。
 被接続部146は、接続部本体55aと剛結される被接続部本体146aと、配線・配管コネクタ55bと接続される図示しないコネクタ受部とを有する。コネクタ受部には、配線や配管をそれぞれ接続可能となっている。具体的には、浸透液吹付手段140、洗浄液吹付手段141、撮影手段144及び位置センサ143を駆動させる制御信号の送信や電力供給のため、及び、検出信号を出力するための配線や、バキューム141で回収設備109の吸引手段109aよって吸引するため、及び、送気手段142から圧縮空気供給装置118の圧縮空気を送気させるための配管が接続可能となっている。このため、第三の制御盤14Cによる制御のもと、浸透液吹付手段140を駆動させて管台3の内面に浸透液を吹き付け、バキューム141で吸引して余分な浸透液を除去することで、管台3の内面の溶接部5において亀裂等の欠陥を可視化することができる。さらに、撮影手段144によって撮影した画像を取得し、二値化処理等必要な画像処理を行って亀裂などの欠陥を検出することが可能である。また、位置センサ143による位置検出信号と対応させることで検出された欠陥の位置情報を取得することができる。
 図20に示すように、寸法計測ユニット87は、フレーム150と、計測用画像取得部151と、走行駆動部152と、位置センサ153と、撮影手段154と、被接続部155とを有する。フレーム150は、ガイドポスト150aが配設されている。計測用画像取得部151は、ガイドポスト150aに沿って移動可能に設けられて管台3の内面を撮影する。走行駆動部152は、計測用画像取得部151をガイドポスト150aに沿って走行させる。位置センサ153は、管台3に対する相対位置を検出する。撮影手段154は、計測用画像取得部151で撮影する範囲全体を撮影する。被接続部155は、フレーム150に取り付けられ、第一の移動ユニット42Aの接続部55に接続される。走行駆動部152は、例えば電気モータであり、図示しないがエンコーダが搭載されている。これにより、ガイドポスト150a上の計測用画像取得部151の位置情報を取得することが可能となっている。被接続部155は、接続部本体55aと剛結される被接続部本体55aと、配線・配管コネクタ55bと接続される図示しないコネクタ受部とを有する。コネクタ受部では、計測用画像取得部151、走行駆動部152、位置センサ153及び撮影手段154を駆動させる制御信号の送信及び電力の供給を行うため、また、走行駆動部152の図示しないエンコーダ、撮影手段154、位置センサ153からの検出信号などを出力するための配線が接続可能となっている。
 以上、各作業装置40の詳細について説明したが、これに限らず、その作業目的に応じて様々な構成を適用することが可能である。ここで、上記のとおり、作業装置40は、第一の作業ユニット160と、第二の作業ユニット161とに分けられる。第一の作業ユニット160は、第一の移動ユニット42Aの接続部55に着脱可能に接続されて、接続部55を介して入力される制御信号、電源、作動水、圧縮空気等により駆動する。第二の作業ユニット161は、第二の移動ユニット42Bの支持板58に載置可能である。また、第二の作業ユニット161は、管台3の内部にスライド移動された状態で該管台3の内面に対して固定することが可能な固定手段を有する。本実施形態では、溶接ユニット80、仕上げ加工ユニット82、回収ユニット83、UT検査ユニット85、PT検査ユニット86、寸法計測ユニット87が第一の作業ユニット160に該当し、切削ユニット81及び除染ユニット84が第二の作業ユニット161に該当する。
 第二の作業ユニット161に該当する切削ユニット81及び除染ユニット84と、管台閉塞装置41とは、作業床12上において、予め平面的な位置情報が取得されている所定の配置位置に仮置きされている。そして、制御装置13の統括コンピュータ15は、管台3の内部での作業の進捗に応じて、上記配置位置に昇降装置44を移動させて選択的に把持し、架台11内部へと降下させることが可能である。
 一方、第一の作業ユニット160に該当する各ユニットは、収容庫43に複数個ずつ収容されている。図20に示すように、収容庫43は、架台11の内部において、第一の移動ユニット42Aと、第二の移動ユニット42Bとの間に配置可能な脚部43aと、脚部43aによって支持された略円柱状の本体部43bとを有する。本体部43bには対象となる作業装置40を収容可能な収容凹部43cが周方向に複数箇所に設けられている。本実施形態では、管台3を構成する入口管台3A及び出口管台3Bの組数と対応させて周方向に三箇所、二段で、計六箇所設けられている。そして、各作業装置40は、作業床12上でその種類別に収容庫43に収容され保管されている。すなわち、図1に示すように、収容庫43は、当該収容庫43に収容される作業装置40の種類と対応して用意されており、例えば、溶接ユニット80は、一つの収容庫43に収容されている。また、作業床12上において、各収容庫43は、予め平面的な位置情報が取得されている所定の配置位置に仮置きされている。そして、制御装置13の統括コンピュータ15は、管台3の内部での作業の進捗に応じて、上記配置位置に昇降装置44を移動させて把持し、収容庫43に収容された状態のまま収容庫43ごと架台11の内部へと降下させる。
 次に、この実施形態の管台作業システム10の作用、並びに、該管台作業システム10の制御装置13による制御の詳細について説明する。
 図22は、管台作業システム10で実施する管台3と配管4との溶接部5(図1参照)の補修作業の手順を示すフロー図である。また、図23~図49は、当該補修作業の各工程における説明図である。なお、図23~図49では、各構成の動作の理解を容易とするため各構成を簡略化して表示している。図23に示すように、まず、予め架台11、作業床12が構築される。架台11は、例えば、作業床12が構築された後に、作業床12上で組立てられて、クレーン等で吊り込んで原子炉容器2の内部に下端を挿入させることで構築される。作業床12上には、制御装置13、各作業装置40、隙間閉塞装置41、昇降装置44、門型クレーン45が設置されている。また、架台11と作業床12とを接続する配線・配管が設置されている。ここで、架台11のアクセス窓20は、アクセス窓稼動装置21の蓋体22によって閉塞された状態で、架台11の内部には予め移動装置42及び昇降装置44の第二のレール44dが設置されている。原子炉容器2の内部は、水位が管台3よりも下側となるまで、予め冷却水の排水が行われている。
 図22及び図24に示すように、制御装置13において統括コンピュータ15に作業開始の指令が入力されると、アクセス窓開放工程S1として、統括コンピュータ15は、第一の制御盤14Aにアクセス窓開放指令を送信する。このため、第一の制御盤14Aは、アクセス窓稼動装置21の電動ウインチ24を駆動させて蓋体22を上昇させ、これによりアクセス窓20が開放される(ステップS1a)。次に、統括コンピュータ15は、第一の制御盤14Aに隙間閉塞指令を送信する。このため、図25に示すように、第一の制御盤14Aは、圧縮空気供給装置31を駆動させて、隙間閉塞装置28の空気圧シリンダ28aに圧縮空気を供給することで、空気圧シリンダ28aにより保護リング29を原子炉容器2の内面に向かって進出させてシール材29cを当接させることができる(ステップS1b)。これにより、保護リング29と伸縮部材30とによって管台3とアクセス窓20の間の隙間2bを閉塞することができ、アクセス窓20から管台3にアクセスする際に、何らかのものを隙間2bから原子炉容器2内部に侵入させてしまうことを確実に防止することができる。
 次に、図22に示すように、管台閉塞工程S2として、管台3の内部で原子炉容器2からみて作業位置よりも奥側の位置で管台3を閉塞する。すなわち、統括コンピュータ15は、第一の制御盤14Aに管台閉塞装置降下指令を送信する。このため、第一の制御盤14Aは、昇降装置44を駆動させて、予め所定の配置位置に仮置きされた管台閉塞装置41を架台11の内部へと降下させて第二の移動ユニット42Bの支持板58上に載置させる(図1参照)。昇降装置44によって支持板58上に管台閉塞装置41を載置させたら、第一の制御盤14Aは、統括コンピュータ15に管台閉塞装置降下完了通知を送信する。そして、統括コンピュータ15では、当該通知を受けて第二の制御盤14Bにプラグ挿入指令を送信する。これにより図26に示すように、第二の制御盤14Bは、第二の移動ユニット42Bを駆動させて、いずれかの入口管台3Aまたは出口管台3Bを選択して、当該管台3に第二の移動ユニット42Bのスライド方向L1が一致するように回転させた後、スライド板57をスライドさせて、管台閉塞装置41を支持板58上から管台3内部へと移動可能な状態とする。そして、さらに第二の移動ユニット42Bの押付部材59を基端側から先端側へ移動させることで、押付部材59により管台閉塞装置41の案内部61が押し出されることになり、管台閉塞装置41のシール本体部60及び案内部61は管台3の内部へと自身のキャスタ65、68により走行していく。
 第二の制御盤14Bは、シール本体部60を所定の作業位置となる溶接部5よりも原子炉容器2から見て奥側となる位置まで挿入させたら、第二の移動ユニット42Bの押付部材59の移動を停止させ、統括コンピュータ15にプラグ挿入完了通知を送信する。そして、統括コンピュータ15は、当該通知を受けて第五の制御盤14Eにプラグ設置指令を送信する。このため、第五の制御盤14Eは、作動水供給装置70を駆動させて作動水を供給することで、管台閉塞装置41の固定用ジャッキ64によってシールプラグ62を管台3の内面に固定させる。さらに、第五の制御盤14Eは、圧縮空気供給装置71を駆動させて圧縮空気を供給することで、インフラートシール63を膨張させてシールプラグ62と管台3の内面との間の隙間を封止する。次に、第五の制御盤14Eは、案内部61の接続部67と、シール本体部60の被接続部69を離脱させた後、統括コンピュータ15にプラグ設置完了通知を送信する。そして、統括コンピュータ15は、当該通知を受けて第二の制御盤14Bに案内部後退指令を送信、第二の制御盤14Bは、再び第二の移動ユニット42Bを駆動させて、押付部材59、スライド板57及び支持板58を後退させる。これにより、案内部61はシールプラグ62から離間して後退し、シール本体部60のみが管台3の内部に留まることとなる。
 次に、第二の移動ユニット42Bによって案内部61が架台11の内部の位置まで後退されたら、第二の制御盤14Bは、統括コンピュータ15に案内部後退完了通知を送信する。統括コンピュータ15では、当該通知を受けて案内部引上指令を第一の制御盤14Aに送信し、第一の制御盤14Aは、昇降装置44を駆動させて架台11の内部の案内部61を作業床12まで上昇させて作業床12上の所定の配置位置に仮置きをし、統括コンピュータ15に案内部引上完了通知を送信する。
 以上の工程を、各管台3について繰り返すことで、全ての管台3について、作業位置となる管台3と配管4との溶接部5よりも原子炉容器2側からみて奥側となる位置で内部を閉塞することができる。このため、後述するように管台3の内部において溶接部5で作業装置40によって作業する際に、管台3の奥側へ異物が侵入してしまうことを確実に防止することができる。ここで、統括コンピュータ15は、各管台3について管台閉塞工程実施の有無を管理しており、全ての管台3で管台閉塞工程を実施したら、すなわち、全ての管台3で対応する案内部引上完了通知を受信したら、図22に示すように除染工程S3に移行させる。
 すなわち、統括コンピュータ15は、第一の制御盤14Aに除染ユニット降下指令を送信する。これにより、まず、第一の制御盤14Aが、昇降装置44を駆動させて、作業床12上の除染ユニット84を架台11の内部に降下させて、第二の移動ユニット42Bの支持板58上に載置し、除染ユニット降下完了通知を統括コンピュータ15に送信する(図1、図2参照)。統括コンピュータ15では、当該通知を受けて第二の制御盤14Bに除染ユニット挿入指令を送信する。これにより第二の制御盤14Bでは、第二の移動ユニット42Bを駆動させて、除染ユニット84を所定の管台3の内部に挿入する。そして、除染ユニット84の挿入が完了したら、第二の制御盤14Bは、統括コンピュータ15に除染ユニット挿入完了通知を送信し、これを受けて統括コンピュータ15は、第六の制御盤14Fに除染開始指令を送信する。これにより第六の制御盤14Fでは、ブラスト設備126と水供給装置125を駆動させて、管台3の内部でブラスト材を噴射させることで、内面に付着した放射能物質を除去することができる。
 そして、所定時間、あるいは、所定量ブラスト材を噴射するなど、所定条件を満たしたら、第六の制御盤14Fは、ブラスト設備126及び水供給装置125の駆動を停止させるとともに、統括コンピュータ15に除染完了通知を送信する。そして、統括コンピュータ15は、当該通知を受けて第二の制御盤14Bに除染ユニット後退指令を送信、第二の制御盤14Bは、再び第二の移動ユニット42Bを駆動させて、支持板58及びスライド板57を後退させる。そして、第二の制御盤14Bは、第二の移動ユニット42Bにより除染ユニット84を架台11の内部まで移動させたら、統括コンピュータ15に除染ユニット後退完了通知を送信する。統括コンピュータ15では、当該通知を受けて、再び第二の制御盤14Bに除染ユニット挿入指令を送信し、これにより第二の制御盤14Bでは、第二の移動ユニット42Bを駆動させて、除染ユニット84を次の管台3内部に挿入し、上記同様に除染作業を繰り返す。
 統括コンピュータ15では、各管台3について除染工程S3実施の有無を管理しており、全ての管台3で除染工程S3を実施したら、すなわち、全ての管台3について除染ユニット後退完了通知を受信したら、統括コンピュータ15は、第一の制御盤14Aに除染ユニット引上指令を送信する。これにより、第一の制御盤14Aでは、昇降装置44を駆動させて、架台11の内部の除染ユニット84を把持して上昇させて、作業床12の所定の配置位置に配置させ、配置完了後除染ユニット引上完了通知を統括コンピュータ15に送信する。
 図22に示すように、統括コンピュータ15では、当該通知を受けて次の補修前超音波探傷検査工程S4に移行させる。すなわち、統括コンピュータ15は、第一の制御盤14Aに、UT検査ユニット降下指令を送信する。図27に示すように、第一の制御盤14Aでは、当該通知を受けて昇降装置44を駆動させてUT検査ユニット85が収容された収容庫43を架台11の内部へ降下させ、降下完了後にUT検査ユニット降下完了通知を統括コンピュータ15に送信する。
 統括コンピュータ15では、当該通知を受けて第三の制御盤14Cに超音波探傷検査実施指令を送信する。図28に示すように、第三の制御盤14Cでは、当該指令に基づいて、第一の移動ユニット42Aを駆動させて、各マニュピレータ54の先端の接続部55に収容庫43に収容された各UT検査ユニット85を装着させる。ここで、本実施形態では、入口管台3A及び出口管台3Bの組数と対応させて三基のマニュピレータ54が設置されている。このため、まず、例えば全ての入口管台3Aで、各マニュピレータ54に装着したUT検査ユニット85によって超音波探傷試験を同時に実施する。
 すなわち、第三の制御盤14Cは、第一の移動ユニット42Aを駆動させて、各マニュピレータ54に装着されたUT検査ユニット85を各入口管台3Aと配管4との溶接部5まで挿入し、当該溶接部5に位置したら、UT検査ユニット85を駆動させる。まず、第三の制御盤14Cは、位置調整手段132を駆動させて一対の探触子130を管台3の内面と所定距離離間した位置に配置させる。次に、第三の制御盤14Cは、ユニット本体131を駆動させて、一対の探触子130から超音波を発振させるとともに、反射してくる超音波を検出し、ユニット本体131において解析する。さらに、第三の制御盤14Cは、第一の移動ユニット42Aを駆動させて、管台3の内面の溶接部5全体を検査するように管台3の周方向及び軸方向にUT検査ユニット85を移動させる。これにより、UT検査ユニット85により各入口管台3Aの溶接部5全域において超音波探傷試験を実施することができる(ステップS4a)。そして、各UT検査ユニット85のユニット本体131で解析された結果は、管台3の内面の軸方向及び周方向の位置と対応させて補修前UT検査データとして第三の制御盤14Cを経て統括コンピュータ15に送信される。
 次に、図29に示すように、第三の制御盤14Cは、第一の移動ユニット42Aを駆動させて、UT検査ユニット85を入口管台3Aから後退させて、各出口管台3Bに挿入させ、同様に超音波探傷試験を実施し、その結果を補修前UT検査データとして第三の制御盤14Cを経て統括コンピュータ15に送信する。そして、第三の制御盤14Cは、第一の移動ユニット42Aを駆動させて、UT検査ユニット85を収容庫43の各収容凹部43cに引き渡す。
 全ての管台3において補修前UT検査データを受信したら、統括コンピュータ15は、第一の制御盤14AにUT検査ユニット引上指令を送信する。図30に示すように、第一の制御盤14Aは、当該指令に基づいて昇降装置44を駆動させて、UT検査ユニット85が収容された収容庫43を架台11の内部から作業床12上に引上げ、所定の配置位置に配置させる。次に、第一の制御盤14Aは、統括コンピュータ15にUT検査ユニット引上完了通知を送信する。統括コンピュータ15では、入力された補修前超音波探傷検査データについて解析を行い、補修前UT検査データから、識別される欠陥部分を含む範囲を補修範囲として、当該範囲の位置及び大きさを表わす補修範囲データを生成する。なお、補修前UT検査データから欠陥部分が識別されない場合には欠陥がないものとして、全作業を終了する(ステップS4b)。
 一方、欠陥部分が識別され、補修範囲データを生成したら、統括コンピュータ15は、図22に示すように、次の切削工程S5に移行させる。すなわち、統括コンピュータ15は、第一の制御盤14Aに切削ユニット降下指令を送信する。まず、図31に示すように、第一の制御盤14Aが、昇降装置44を駆動させて、作業床12上の切削ユニット81を架台11の内部に降下させて、第二の移動ユニット42Bの支持板58上に載置し、統括コンピュータ15に切削ユニット降下完了通知を送信する。統括コンピュータ15では、当該通知を受けて第二の制御盤14Bに切削ユニット挿入指令を送信する。これにより、図32及び図33に示すように、第二の制御盤14Bでは、第二の移動ユニット42Bを駆動させて、切削ユニット81を所定の管台3の内部に挿入する。
 そして、切削ユニット81の挿入が完了したら第二の制御盤14Bは、統括コンピュータ15に切削ユニット挿入完了通知を送信し、統括コンピュータ15は、当該通知を受けて第四の制御盤14Dに補修範囲切削指令を送信する。このため、図33に示すように、第四の制御盤14Dは、作動水供給装置106を駆動させ、切削ユニット81において固定手段101の水圧シリンダ26に作動水を供給することで当接部29bが管台3内面に当接し、管体部100が管台3の内面に固定される。そして、固定手段101による固定が完了すると、第四の制御盤14Dは、統括コンピュータ15に切削ユニット固定完了通知を送信する一方、図示しないディスク回転駆動部を駆動させてディスク102を回転させることで、切削刃103dによって補修範囲を切削することになる。
 ここで、統括コンピュータ15は、第四の制御盤14Dから切削ユニット固定完了通知を受けて第二の制御盤14Bに移動ユニット後退指令を送信し、これにより第二の制御盤14Bは、第二の移動ユニット42Bを駆動させてスライド板57及び支持板58を後退させる。既に、切削ユニット81は自らの固定手段101により管台3の内面に固定されているので、第二の移動ユニット42Bのスライド板57、支持板58及び押付部材59のみが後退することとなる。そして、第二の制御盤14Bは、スライド板57、支持板58及び押付部材59を架台11の内部まで移動させたら、統括コンピュータ15に移動ユニット後退完了通知を送信する。統括コンピュータ15では、当該通知を受けて、再び第一の制御盤14Aに切削ユニット挿入指令を送信する。これにより第一の制御盤14Aでは、昇降装置44を駆動させて、次の切削ユニット81を作業床12上から架台11の内部で第二の移動ユニット42Bの支持板58上に載置させることとなる。その後、再び統括コンピュータ15による制御のもと、第二の制御盤14B及び第四の制御盤14Dにより、他の入口管台3Aに切削ユニット81を挿入し、切削を開始させていく。このようにして、三つの入口管台3Aで同時に切削ユニット81による切削を行っていく。なお、第四の制御盤14Dは、所定の条件、例えば所定時間回転させたら切削刃103dが使用限界であると判定して、交換駆動部103eを駆動させ、別の切削刃103dを切削可能な位置に配置させる。
 そして、所定の条件、例えば所定時間回転させて切削が完了したら、次に、研削手段104の研削駆動部104cを駆動させてグラインダ104bによって切削した範囲で研削を行う。そして、所定の条件、例えば所定時間回転させて研削が完了したら、第四の制御盤14Dは、統括コンピュータ15に切削完了通知を送信する。統括コンピュータ15は、当該通知を受けて第二の制御盤14Bに切削ユニット受取指令を送信する。これにより、第二の制御盤14Bは、第二の移動ユニット42Bを駆動させて、対応する入口管台3Aへとスライド板57及び支持板58を挿入していく。支持板58が切削ユニット81の下に挿入されたら、第二の制御盤14Bは、統括コンピュータ15は支持板挿入完了通知を送信、統括コンピュータ15は、該通知を受けて第四の制御盤14Dに固定解除指令を送信する。そして、第四の制御盤14Dは、当該指令に基づいて、切削ユニット81の固定手段101による固定を解除し、統括コンピュータ15に固定解除通知を送信する。これにより、切削ユニット81が第二の移動ユニット42Bの支持板58に引き渡されることとなる。そして、統括コンピュータ15は、当該通知を受けて第二の制御盤14Bに切削ユニット入替指令を送信する。図34に示すように、第二の制御盤14Bは、当該指令に基づいて、第二の移動ユニット42Bを駆動させて、切削ユニット81を入口管台3Aから引き上げて対応する出口管台3Bに挿入させる。
 以降同様に統括コンピュータ15による制御のもと、第二の制御盤14B及び第四の制御盤14Dによって、切削ユニット81で出口管台3Bの内面において補修範囲を切削させる。そして、同様に第四の制御盤14Dから切削完了通知を受けたら、統括コンピュータ15による制御のもと、切削ユニット100の管台3に対する固定を解除し、架台11の内部へ後退させる。第二の制御盤14Bは、第二の移動ユニット42Bによって架台11の内部まで切削ユニット81を後退させたら、統括コンピュータ15に切削ユニット後退完了通知を送信する。図35に示すように、統括コンピュータ15では、当該通知を受けて第一の制御盤14Aに切削ユニット引上指令を送信し、第一の制御盤14Aでは当該通知を受けて昇降装置44を駆動させて切削ユニット81を引き上げ、統括コンピュータ15に切削ユニット引上完了通知を送信する。
 統括コンピュータ15は、全ての切削ユニット81と対応して切削ユニット引上完了通知を受信したら、図22に示すように、次工程の第一回収工程S6に移行させる。すなわち、統括コンピュータ15は、第一の制御盤14Aに回収ユニット降下指令を送信する。図36に示すように、第一の制御盤14Aは、該指令に基づいて、昇降装置44を駆動させて回収ユニット83が収容された収容庫43を架台11の内部に降下させ、降下完了後に統括コンピュータ15に回収ユニット降下完了通知を送信する。統括コンピュータ15では、当該通知を受けて第三の制御盤14Cに回収作業実施指令を送信する。図37に示すように、第三の制御盤14Cでは、当該指令に基づいて、第一の移動ユニット42Aを駆動させて、各マニュピレータ54の接続部55に収容庫43に収容された各回収ユニット83を装着させる。第三の制御盤14Cでは、回収設備109を駆動させて、装着した回収ユニット83によって管台3の内部の切削等で発生した屑を回収する。
 補修前超音波探傷検査工程S4と同様に、入口管台3Aにおいて回収作業を行った後に、出口管台3Bにおいても回収作業を行ったら、第三の制御盤14Cは、統括コンピュータ15に回収作業完了通知を送信する。統括コンピュータ15は、当該通知を受けて、同様に収容庫43を引き上げた後に、図22に示すように、次工程の補修前浸透探傷検査工程S7に移行させる。すなわち、統括コンピュータ15は、第一の制御盤14AにPT検査ユニット降下指令を送信する。図38に示すように、第一の制御盤14Aは、該指令に基づいて、昇降装置44を駆動させて、PT検査ユニット86が収容された収容庫43を架台11の内部に降下させ、降下完了後にPT検査ユニット降下完了通知を統括コンピュータ15に送信する。
 統括コンピュータ15では、当該通知を受けて第三の制御盤14Cに浸透探傷検査実施指令を送信する。図39に示すように、第三の制御盤14Cでは、当該指令を受けて、第一の移動ユニット42Aを駆動させて、各マニュピレータ54に収容庫43に収容された各PT検査ユニット86を装着させる。そして、第三の制御盤14Cでは、装着したPT検査ユニット86によって、超音波探傷検査工程S4と同様に、入口管台3Aにおいて切削が完了している補修範囲で浸透探傷試験を行った後に、出口管台3Bにおいて切削が完了している補修範囲でも浸透探傷検査を行う(ステップS7a)。そして、各管台3で浸透探傷試験を行い、PT検査ユニット86で取得された欠陥の位置情報が補修前PT検査データとして統括コンピュータ15に送信される。そして、第三の制御盤14Cは、第一の移動ユニット42Aを駆動させて、PT検査ユニット86を収容庫43の各収容凹部43cに引き渡す。なお、欠陥が検出されない場合にも補修前PT検査データは送信される。そして、全ての管台3について補修前PT検査データを受信したら、統括コンピュータ15は、第一の制御盤14AにPT検査ユニット引上指令を送信する。第一の制御盤14Aは、当該指令に基づいて昇降装置44を駆動させて、PT検査ユニット86が収容された収容庫43を架台11の内部から作業床12上に引上げ、所定の位置に配置させる。
 次に、第一の制御盤14Aは、統括コンピュータ15にPT検査ユニット引上完了通知を送信する。ここで、統括コンピュータ15は、受信した補修前PT検査データを参照して欠陥が検出されたか否かを判定し(ステップS7b)、欠陥が検出されなかった場合には、PT検査ユニット引上完了通知を受けて溶接工程S9に移行させる。一方、欠陥が検出された場合には、統括コンピュータ15は、PT検査ユニット引上完了通知を受けて欠陥寸法計測工程S8に移行させる。
 すなわち、統括コンピュータ15は、第一の制御盤14Aに寸法計測ユニット降下指令を送信する。図40に示すように、第一の制御盤14Aは、該指令に基づいて、昇降装置44を駆動させて、寸法計測ユニット87が収容された収容庫43を架台11の内部に降下させ、降下完了後に統括コンピュータ15に寸法計測ユニット降下完了通知を送信する。統括コンピュータ15では、当該通知を受けて第三の制御盤14Cに寸法計測実施指令を送信する。図41に示すように、第三の制御盤14Cでは、当該指令を受けて、第一の移動ユニット42Aを駆動させて、各マニュピレータ54に収容庫43に収容された各寸法計測ユニット87を装着させる。第三の制御盤14Cでは、装着した寸法計測ユニット87によって、入口管台3Aにおいて補修前浸透探傷検査工程S7で検出された欠陥の寸法を測定し、欠陥寸法データとして第三の制御盤14Cを介して統括コンピュータ15に送信する。そして、入口管台3Aで全ての欠陥を計測したら、次に、出口管台3Bでも計測を行い、同様に欠陥寸法データとして第三の制御盤14Cを介して統括コンピュータ15に送信する。
 第三の制御盤14Cは、第一の移動ユニット42Aを駆動させて、寸法計測ユニット87を収容庫43の各収容凹部43cに引き渡す。統括コンピュータ15は、第一の制御盤14Aに寸法計測ユニット引上指令を送信し、第一の制御盤14Aは、当該指令に基づいて、昇降装置44を駆動させて、寸法計測ユニット87が収容された収容庫43を架台11の内部から作業床12上に引上げ、所定の配置位置に配置させる。そして、第一の制御盤14Aは、統括コンピュータ15に寸法計測ユニット引上完了通知を送信する。一方、統括コンピュータ15は、補修前PT検査データに記録されている全ての欠陥について欠陥寸法データが取得されたら、当該欠陥寸法データの測定結果と予め設定された基準値とに基づいて、再切削が必要か否かの判定を行う。再切削が必要と判定された場合には、図22に示すように、統括コンピュータ15は、再度切削工程S5から同様の作業を行わせる。一方、再切削が不要であると判定された場合には、統括コンピュータ15は、次工程である溶接工程S9へ移行させる。
 すなわち、統括コンピュータ15は、第一の制御盤14Aに溶接ユニット降下指令を送信する。図42に示すように、第一の制御盤14Aは、該指令に基づいて、昇降装置44を駆動させて溶接ユニット80が収容された収容庫43を架台11の内部に降下させ、降下完了後に統括コンピュータ15に溶接ユニット降下完了通知を送信する。統括コンピュータ15では、当該通知を受けて第三の制御盤14Cに溶接実施指令を送信する。第三の制御盤14Cでは、当該指令に基づいて、第一の移動ユニット42Aを駆動させて、各マニュピレータ54に収容庫43に収容された各溶接ユニット80を装着させる。そして、図43に示すように、第三の制御盤14Cは、装着した溶接ユニット80によって、入口管台3Aにおいて切削工程S5で切削された範囲で溶接を行わせる。この際、第三の制御盤14Cでは、溶接ユニット80において送出部91のローラ回転駆動部に設けられたエンコーダから出力される回転数を監視している。当該回転数に基づいて、ワイヤリール91aに巻回されたワイヤWがなくなったと判断したら、第一の移動ユニット42Aを駆動させて収容庫43の別の溶接ユニット80と交換した後に再び溶接作業が開始される。
 各入口管台3Aにおいて切削した範囲の全てで溶接を完了したら、第三の制御盤14Cは、第一の移動ユニット42Aを駆動させて、溶接ユニット80を出口管台3Bに挿入させ、出口管台3Bの切削した範囲について溶接を行う。管台3全ての切削した範囲で溶接が完了したら、第三の制御盤14Cは、第一の移動ユニット42Aを駆動させて、装着している溶接ユニット80を収容庫43に引き渡す。第三の制御盤14Cは、統括コンピュータ15に溶接完了通知を送信し、統括コンピュータ15は、当該通知を受けて第一の制御盤14Aに溶接ユニット引上指令を送信する。第一の制御盤14Aは、当該指令に基づいて、昇降装置44を駆動させて溶接ユニット80が収容された収容庫43を架台11の内部から作業床12まで引き上げ、所定の配置位置に配置させる。第一の制御盤14Aは、統括コンピュータ15に溶接ユニット引上完了通知を送信する。図22に示すように、統括コンピュータ15は、当該通知を受けて、次工程の仕上げ加工工程S10に移行させる。
 すなわち、統括コンピュータ15は、第一の制御盤14Aに仕上げ加工ユニット降下指令を送信し、図44に示すように、第一の制御盤14Aは、当該指令に基づいて昇降装置44を駆動させ、仕上げ加工ユニット82が収容された収容庫43を架台11の内部に降下させる。第一の制御盤14Aは、収容庫43が架台11の内部に降下されたら、統括コンピュータ15に仕上げ加工ユニット降下完了通知を送信する。統括コンピュータ15は当該通知を受けて、第三の制御盤14Cに仕上げ実施指令を送信する。図45に示すように、第三の制御盤14Cは、当該指令に基づいて第一の移動ユニット42Aを駆動させて、マニュピレータ54によって収容庫43に収容された仕上げ加工ユニット82を受け取り、入口管台3Aに挿入させる。
 溶接した範囲まで到達したら、まず、第一の研削手段110を駆動させてホルダ110bに取り付けられたカッタ110aにより溶接する範囲の粗削りを行う。溶接した範囲全てについて仕上げ加工ユニット82の第一の研削手段110で研削を行ったら、次に第二の研削手段111を駆動させて、ワイヤブラシ111aによって仕上げ削りを行う。そして、溶接した範囲全てについて仕上げ加工ユニット82の第二の研削手段111で研削を行ったら、第三の制御盤14Cは、仕上げ加工ユニット82を出口管台3Bに挿入させ、出口管台3Bの溶接した範囲について上記同様仕上げ加工を行う。そして、管台3全ての溶接した範囲で仕上げ加工が完了したら、第三の制御盤14Cは、第一の移動ユニット42Aを駆動させて、装着している仕上げ加工ユニット82を収容庫43に引き渡す。第三の制御盤14Cは、仕上げ完了通知を統括コンピュータ15に送信し、統括コンピュータ15は、当該通知を受けて第一の制御盤14Aに仕上げ加工ユニット引上指令を送信する。第一の制御盤14Aは、当該指令に基づいて、昇降装置44を駆動させて、仕上げ加工ユニット82が収容された収容庫43を架台11の内部から作業床12上まで引き上げ、所定の配置位置に配置させる。第一の制御盤14Aは、統括コンピュータ15に仕上げ加工ユニット引上完了通知を送信する。
 図22に示すように、統括コンピュータ15は、当該通知を受けて、仕上げ加工工程S10で管台3の内部に発生した削り屑などを回収する第二回収工程S11に移行させる。統括コンピュータ15は、当該第二の回収工程S11、補修後浸透探傷検査工程S12、補修後寸法計測工程S13、補修後超音波探傷検査工程S14を順に実施させる。補修後浸透探傷検査工程S12では、溶接工程S9で溶接した範囲で浸透探傷試験を行う。補修後寸法計測工程S13では、浸透探傷試験で検出した欠陥の寸法計測を行う。補修後超音波探傷検査工程S14では、溶接工程で溶接した範囲で超音波探傷試験を行う。なお、第二の回収工程S11における制御の詳細及び回収作業の詳細は、第一の回収工程S6と同様である。また、補修後浸透探傷検査工程S12における浸透探傷試験(ステップS12a)での制御の詳細は、ステップS4aにおける制御と同様である。また、補修後超音波探傷検査工程S14における超音波探傷試験での制御の詳細(ステップS14a)は、補修前超音波浸透探傷検査工程S7のステップS7aにおける制御と同様である。このため、いずれの工程も説明を省略する。
 なお、補修後浸透探傷検査工程S12において、ステップS12aで浸透探傷試験を行った結果から、統括コンピュータ15は欠陥の有無を判定し(ステップS12b)、欠陥がないと判定した場合には、統括コンピュータ15は、補修後超音波探傷検査工程S14に移行させる。また、補修後超音波探傷検査工程S14においては、ステップS14aで全ての管台3で超音波探傷試験を実施した後、第三の制御盤14Cは、超音波探傷検査完了通知を統括コンピュータ15に送信する。統括コンピュータ15は、補修後浸透探傷検査工程S12で入力された浸透探傷検査データ及び欠陥寸法データと、補修後超音波探傷検査工程S14のステップS14aで入力された超音波探傷検査データとに基づいて、欠陥の有無を判定する(ステップS14b)。そして、欠陥が存在していると判定された場合には、統括コンピュータ15は、再度切削工程S5に移行させて、切削工程S5以降の工程を再度実施させる。一方、欠陥が存在していないと判定された場合には、統括コンピュータ15は、次工程である管台開放工程S15に移行させる。
 すなわち、統括コンピュータ15は、第一の制御盤14Aに案内部降下指令を送信し、第一の制御盤14Aは、作業床12上に仮置きされている管台閉塞装置41の案内部61を架台11の内部に降下させ、第二の移動ユニット42Bの支持板58上に載置させる。昇降装置44によって案内部61を支持板58上に載置させたら、第一の制御盤14Aは、統括コンピュータ15に案内部降下完了通知を送信する。統括コンピュータ15では、当該通知を受けて第二の制御盤14Bに案内部挿入指令を送信する。これにより図46に示すように、第二の制御盤14Bは、第二の移動ユニット42Bを駆動させて、いずれかの入口管台3Aまたは出口管台3Bを選択する。選択した管台3に第二の移動ユニット42Bのスライド方向L2が一致するように架台11を回転させた後、スライド板57をスライドさせて、案内部61を支持板58上から管台3の内部へと移動可能な状態とする。そして、図47に示すように、第二の移動ユニット42Bの押付部材59を移動させることで、管台閉塞装置41の案内部61が押し出されることになり、案内部61は、管台3の内部へと自身のキャスタ68により走行する。そして、第二の制御盤14Bの制御のもと、第二の移動ユニット42Bによって案内部61を管台3の内部に固定されているシール本体部60の位置まで走行させることで、案内部61先端の接続部67とシール本体部60の被接続部69とが接続された状態となる。第二の制御盤14Bは、統括コンピュータ15に案内部挿入完了通知を送信する。
 統括コンピュータ15は、当該通知を受けて第五の制御盤14Eにプラグ固定解除指令を送信する。第五の制御盤14Eは、作動水供給装置70を駆動させて固定用ジャッキ64によって管台3の内面に固定された状態を解除する。さらに、第五の制御盤14Eは、圧縮空気供給装置71を駆動させてインフラートシール63の内部の圧力を低下させることで、インフラートシール63を収縮させる。第五の制御盤14Eは、統括コンピュータ15にプラグ固定解除完了通知を送信する。これにより統括コンピュータ15は、第二の制御盤14Bに管台閉塞装置後退指令を送信、第二の制御盤14Bは、再び第二の移動ユニット42Bを駆動させて、支持板58を後退させる。これにより、互いに接続された案内部61及びシールプラグ62からなる管台閉塞装置41が後退し架台11の内部に位置することとなる。
 次に、第二の移動ユニット42Bによって管台閉塞装置41が架台11の内部の位置まで後退したら、第二の制御盤14Bは、統括コンピュータ15に管台閉塞装置41後退完了通知を送信する。統括コンピュータ15は、当該通知を受けて管台閉塞装置引上指令を第一の制御盤14Aに送信する。第一の制御盤14Aは、昇降装置44を駆動させて、架台11の内部の管台閉塞装置41を作業床12まで引き上げて、作業床12上の所定の配置位置に配置させ、配置完了後に統括コンピュータ15に管台閉塞装置引上完了通知を送信する。
 以上の工程を、各管台3について繰り返すことで、全ての管台3について再び開放された状態となる。ここで、統括コンピュータ15は、各管台3について管台閉塞工程S15の実施の有無を管理しており、全ての管台3で管台開放工程S15を実施したら、すなわち、全ての管台3で対応する管台閉塞装置引上完了通知を受信したら、次工程であるアクセス窓閉塞工程S16に移行する。統括コンピュータ15は、第一の制御盤14Aにアクセス窓閉塞指令を送信する。このため、図48に示すように、第一の制御盤14Aは、アクセス窓稼動装置21の電動ウインチ24を駆動させて蓋体22を下降させる。次に、作動水供給装置27を駆動させて作動水を供給して水圧ジャッキ26を進出させることで、蓋体22と架台11との間に設けられたOリング22aが密着する。これにより、アクセス窓20が閉塞される(ステップS16a)。次に、統括コンピュータ15は、隙間開放指令を第一の制御盤14Aに送信する。このため、図49に示すように、第一の制御盤14Aは、圧縮空気供給装置31を駆動させて、隙間閉塞装置28の空気圧シリンダ28aの空気圧を低下させることで、空気圧シリンダ28aにより保護リング29を原子炉容器2の内面2cから離間させてアクセス窓20の内部に収容させることとなる(ステップS16b)。
 以上のように、本実施形態の管台作業システム10によれば、上記のとおり原子炉容器2の外側に設けられた制御装置13により、アクセス窓稼動装置21を駆動させてアクセス窓20を開放させた後に、各作業装置40を駆動させて管台3の内部で作業を行わせる。これにより、作業員を架台11の内部に配置させることなく自動的に管台3の内部で溶接や各種検査などの作業を行うことができる。さらに、制御装置13により、作業完了後にアクセス窓稼動装置21を駆動させてアクセス窓20を閉塞させることにより、同様に作業員を架台11の内部に配置させることなく自動的に原子炉容器2の内部を再び水中環境に戻すことが可能な状態にすることができる。
 原子炉容器2の上方の作業床12により、作業装置40などの必要な機器を原子炉容器2の外部に多数配置可能である。また、制御装置13による制御のもと、昇降装置44を駆動させることで、必要に応じて作業装置40を架台11内部に降下させて管台3の内部での各種作業を行わせることができる。このため、架台11の内部に配置する機器類を必要最小限にすることができ、狭いスペースの中で効率良く管台3の内部の作業を行うことができる。また、昇降装置44の昇降で作業装置44を入れ替えることで、上記種類の複数種類の作業を順次行うこともできる。さらに、架台11の内部に移動装置42が設けられており、制御装置13による制御のもと昇降装置44との間で作業装置40を受け渡し可能である。また、装着した作業装置40を移動させることが可能である。そのため、作業装置40に移動機能を備えさせる必要がなく、作業装置40を、作業を行うのに最小限の機能を備えるものとして、小型化を図ることができる。このため、昇降装置44によって昇降させる作業装置40の軽量化を図ることができ、昇降装置44の小型化を図ることができる。これにより、架台11及び管台3の内部における狭いスペースでの移動及び作業をより容易なものとすることができる。特に、移動装置42がいずれも原子炉容器2に挿入された状態の架台11の中心軸C11回りに回転可能に設けられていることで、原子炉容器2に放射状に複数設けられる管台3に対して位置合わせを正確かつ容易に行うことができる。
 本実施形態では、移動装置42が、第一の移動ユニット42Aと第二の移動ユニット42Bからなる。そして、作業装置40が、第一の作業ユニット160と、第二の作業ユニット161からなっている。このため、第一の移動ユニット42によって、第一の作業ユニット160の細かい位置調整を行いながら第一の作業ユニット160によって管台3の内部で作業を行うことができる。一方、第二の作業ユニット161では、自らを固定する固定手段によって管台3の内部で安定的な姿勢を保ちつつ作業を行うことができる。すなわち、第一の移動ユニット42Aと第一の作業ユニット160との組み合わせによって細かく移動しながら行う作業を好適に行うことができる。また、第二の移動ユニット42Bと第二の作業ユニット161との組み合わせによって、管台3から反力や振動を受ける作業でも好適に行うことができる。
 本実施形態では、第一の作業ユニット160を構成する溶接ユニット80などは、収容庫43に収容された状態で作業床12上に配置されている。このため、第一の作業ユニット160の場合、昇降装置44によって収容庫43に収容された状態のまま複数同時に昇降させることができることで、効率良く昇降させることが可能である。収容庫43を架台11の内部に降下させた状態で、収容庫43の収容された複数の第一の作業ユニット160から選択して作業を行わせることが可能となる。消耗材を利用して作業を行う場合では、消耗材が無くなった場合に、その都度昇降装置44を利用して入れ替えを行うことなく、収容庫43と第一の移動ユニット42Aとの間で第一の作業ユニット160の入れ替えを行えば良いので効率的である。上記において、収容庫43は、作業の種類に応じて複数個備え、各第一の作業ユニット160は、種類毎に収容庫43に収容されている。このため、昇降装置44を駆動させて、作業の種類に応じて選択的に収容庫43を昇降させることができ、同種類の作業を一つの収容庫43に収容された複数の第一の作業ユニット160によって同時に行うことができる。また、収容庫43を入れ替えることで、複数の作業を順次行うことができる。これにより、効率的に作業を行うことができる。
 以上、本発明の実施形態について図面を参照して詳述したが、具体的な構成はこの実施形態に限られるものではなく、本発明の要旨を逸脱しない範囲の設計変更等も含まれる。
 本発明の原子炉容器の管台作業システムによれば、作業員の放射線被曝量を最小限に抑えつつ、作業期間の短縮、コストの低減を図ることが可能になる。
2  原子炉容器
3  管台
10  管台作業システム
11  架台
12  作業床
13  制御装置
20  アクセス窓
21  アクセス窓稼動装置
28  隙間閉塞装置
40  作業装置
40A  検査ユニット
40B  施工ユニット
41  管台閉塞装置
42  移動装置
42A  第一の移動ユニット
42B  第二の移動ユニット
43  収容庫
44  昇降装置
80  溶接ユニット
81  切削ユニット
82  仕上げ加工ユニット
160  第一の作業ユニット
161  第二の作業ユニット

Claims (16)

  1.  原子炉容器の側面から外部に突出して設けられ、該原子炉容器の内部と外部とを連通させる管台の内部での作業を行う原子炉容器の管台作業システムであって、
     上部構造体及び内部構造体が取り外されて上部が開口する前記原子炉容器の内部から上方に設けられ、略筒状の側壁部、及び、該側壁部下端を閉塞する底部を有する架台と、
     前記架台内部と前記管台とを連通するために前記架台の前記側壁部に設けられたアクセス窓と、
     前記アクセス窓を開閉するアクセス窓稼動装置と、
     前記架台内部から前記管台内部へ進出して管台内部での作業を可能にする作業装置と、
     前記原子炉容器の外側に設けられ、前記アクセス窓稼動装置及び前記作業装置を制御する制御装置とを備え、
     前記制御装置は、前記アクセス窓稼動装置を駆動させて前記アクセス窓を開放した後に、前記作業装置を駆動させて前記管台内部で作業を行わせ、該作業完了後に前記アクセス窓稼動装置を駆動させて前記アクセス窓を閉塞する原子炉容器の管台作業システム。
  2.  請求項1に記載の原子炉容器の管台作業システムにおいて、
     前記原子炉容器の上方に設けられた作業床と、
     該作業床上から前記架台の内部へと前記作業装置を昇降させる昇降装置とをさらに備え、
     前記制御装置は、前記昇降装置を駆動させて前記作業装置を前記架台内部へ降下させる原子炉容器の管台作業システム。
  3.  請求項2に記載の原子炉容器の管台作業システムにおいて、
     前記架台の内部に設けられ、前記作業装置を着脱可能に装着し、装着された前記作業装置を移動させる移動装置をさらに備え、
     前記制御装置は、前記移動装置を駆動させて前記架台内部において前記移動装置と前記昇降装置との間で前記作業装置の受け渡し行わせ、前記移動装置に装着された前記作業装置を前記架台内部と前記管台内部の所定位置との間で移動させる原子炉容器の管台作業システム。
  4.  請求項3に記載の原子炉容器の管台作業システムにおいて、
     前記移動装置は、前記架台の中心軸回りに回転可能に設けられている原子炉容器の管台作業システム。
  5.  請求項3または請求項4に記載の原子炉容器の管台作業システムにおいて、
     前記移動装置は、
     先端に前記作業装置を着脱可能に装着し、複数の軸回りに前記作業装置を移動する第一の移動ユニットと、
     前記作業装置を載置可能な支持板を有し、該支持板に載置された前記作業装置をスライド移動させる第二の移動ユニットとを備え、
     前記作業装置は、
     前記第一の移動ユニットの前記先端に着脱可能に装着され、装着された状態で駆動する第一の作業ユニットと、
     前記第二の移動ユニットの前記支持板に載置され、前記管台内部において該管台内面に固定する固定手段を有する第二の作業ユニットとを備える原子炉容器の管台作業システム。
  6.  請求項3から請求項5のいずれか一項に記載の原子炉容器の管台作業システムにおいて、
     複数の前記作業装置を収容する収容庫をさらに備え、
     前記昇降装置は、複数の前記作業装置を収容した収容庫を昇降させる原子炉容器の管台作業システム。
  7.  請求項6に記載の原子炉容器の管台作業システムにおいて、
     前記作業装置を複数種類備え、
     前記作業装置の種類に対応させた複数の前記収容庫を備えて、種類毎に前記作業装置が各収容庫に収容され、
     前記制御装置は、前記昇降装置を駆動させて、作業の種類に応じて選択的に前記収容庫を昇降させる原子炉容器の管台作業システム。
  8.  請求項1から請求項7のいずれか一項に記載の原子炉容器の管台作業システムにおいて、
     前記管台内部で該管台の閉塞を行う管台閉塞装置をさらに備え、
     前記制御装置は、該管台閉塞装置を駆動させて、前記作業装置による前記管台内部の作業の前に、前記管台内部で前記原子炉容器からみて作業位置よりも奥側の位置で前記管台を閉塞させる原子炉容器の管台作業システム。
  9.  請求項1から請求項8のいずれか一項に記載の原子炉容器の管台作業システムにおいて、
     前記アクセス窓と前記管台との間の隙間を閉塞させる隙間閉塞装置をさらに備え、
     前記制御装置は、前記アクセス窓稼動装置を駆動させて前記アクセス窓を開放させる前または直後に、前記隙間閉塞装置を駆動させて前記アクセス窓と前記管台との隙間を閉塞させる原子炉容器の管台作業システム。
  10.  請求項1から請求項9のいずれか一項に記載の原子炉容器の管台作業システムにおいて、
     前記作業装置は、
     前記管台内面の検査を行う検査ユニットと、
     前記管台内面で内面施工を行う施工ユニットとを備え、
     前記制御装置は、前記検査ユニットによって前記管台内面の検査を行わせ、該検査ユニットによる検査結果に基づいて前記施工ユニットによって前記管台内面で内面施工を行わせる原子炉容器の管台作業システム。
  11.  請求項10に記載の原子炉容器の管台作業システムにおいて、
     前記施工ユニットは、前記管台内面を切削する切削ユニットを備え、
     前記制御装置は、前記検査ユニットによる検査結果に基づいて不良箇所と判断した範囲で、前記切削ユニットを駆動させて前記管台内面の切削を行わせる原子炉容器の管台作業システム。
  12.  請求項11に記載の原子炉容器の管台作業システムにおいて、
     前記制御装置は、前記切削ユニットによる切削が行われた後に、前記検査ユニットによって該切削ユニットで切削された範囲の検査を行わせ、該検査ユニットによる検査結果に基づいて不良箇所を見つけた場合には再度前記切削ユニットを駆動させて切削を行わせる原子炉容器の管台作業システム。
  13.  請求項11または請求項12に記載の原子炉容器の管台作業システムにおいて、
     前記施工ユニットは、前記管台内面を溶接する溶接ユニットをさらに備え、
     前記制御装置は、前記切削ユニットで切削された範囲について前記溶接ユニットを駆動させて溶接を行わせる原子炉容器の管台作業システム。
  14.  請求項13に記載の原子炉容器の管台作業システムにおいて、
     前記施工ユニットは、前記管台内面の仕上げ加工を行う仕上げ加工ユニットをさらに備え、
     前記制御装置は、前記溶接ユニットで溶接された範囲について、前記仕上げ加工ユニットを駆動させて仕上げ加工を行わせる原子炉容器の管台作業システム。
  15.  請求項13または請求項14に記載の原子炉容器の管台作業システムにおいて、
     前記制御装置は、前記溶接ユニットによって溶接された範囲について前記検査ユニットによって検査を行わせ、該検査ユニットによる検査結果に基づいて全ての範囲で良施工と判定された場合には、前記作業装置を前記架台内部に後退させて前記アクセス窓稼動装置により前記アクセス窓を閉塞させる原子炉容器の管台作業システム。
  16.  請求項15に記載の原子炉容器の管台作業システムにおいて、
     前記制御装置は、不良施工と判断した範囲で、再度前記切削ユニットを駆動させて切削を行わせる原子炉容器の管台作業システム。
PCT/JP2010/003503 2009-07-10 2010-05-26 原子炉容器の管台作業システム WO2011004540A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US13/263,938 US9524803B2 (en) 2009-07-10 2010-05-26 Nozzle stub working system for reactor vessel
EP10796854.7A EP2405445B1 (en) 2009-07-10 2010-05-26 Intra-tube work system for reactor vessel

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009163875A JP5610718B2 (ja) 2009-07-10 2009-07-10 原子炉容器の管台作業システム
JP2009-163875 2009-07-10

Publications (1)

Publication Number Publication Date
WO2011004540A1 true WO2011004540A1 (ja) 2011-01-13

Family

ID=43428973

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/003503 WO2011004540A1 (ja) 2009-07-10 2010-05-26 原子炉容器の管台作業システム

Country Status (4)

Country Link
US (1) US9524803B2 (ja)
EP (1) EP2405445B1 (ja)
JP (1) JP5610718B2 (ja)
WO (1) WO2011004540A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8349792B2 (en) 2006-12-19 2013-01-08 Cyclacel Limited Combination comprising CNDAC (2′-cyano-2′-deoxy-N4-palmitoyl-1-beta-D-arabinofuranosyl-cytosine) and a cytotoxic agent
JP2013040823A (ja) * 2011-08-12 2013-02-28 Mitsubishi Heavy Ind Ltd 原子炉容器の管台処理装置
EP2791500B1 (en) 2011-12-16 2019-03-06 Vestas Wind Systems A/S Wind turbine blade and production method

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013129003A (ja) * 2011-12-20 2013-07-04 Mitsubishi Heavy Ind Ltd 産業用ロボット
JP5989221B2 (ja) * 2013-02-12 2016-09-07 株式会社日立製作所 遠隔作業マニピュレータ
US9844167B2 (en) * 2015-06-26 2017-12-12 Microsoft Technology Licensing, Llc Underwater container cooling via external heat exchanger
US9801313B2 (en) 2015-06-26 2017-10-24 Microsoft Technology Licensing, Llc Underwater container cooling via integrated heat exchanger
CN107123453A (zh) * 2017-06-08 2017-09-01 清华大学天津高端装备研究院 一种用于反应堆堆内部件的更换平台
EP3717168A4 (en) * 2017-11-28 2021-09-01 Candu Energy Inc. PROCESSES AND APPARATUS FOR REPAIRING A TUBULAR STRUCTURE

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3756915A (en) * 1971-01-25 1973-09-04 Maximov L Rnals device for detecting flaws on nuclear reactor inner surfaces and inte
JPS547987A (en) * 1977-06-20 1979-01-20 Hitachi Ltd Method and system for inspecting reactor
JPS5638899U (ja) * 1979-09-03 1981-04-11
JPS57113397A (en) * 1980-11-19 1982-07-14 Framatome Sa Module unit for enter to nuclear reactor container
JP2006349596A (ja) * 2005-06-20 2006-12-28 Mitsubishi Heavy Ind Ltd 原子力容器の管台内面の切削方法および切削装置
JP2007003442A (ja) 2005-06-27 2007-01-11 Mitsubishi Heavy Ind Ltd 原子炉容器の管台溶接部のut検査方法および装置
JP2007178334A (ja) * 2005-12-28 2007-07-12 Toshiba Corp 原子炉内作業架台
WO2007116532A1 (ja) * 2006-04-11 2007-10-18 Ihi Corporation 溶接継手部の保全装置及び保全方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5518962A (en) * 1978-07-27 1980-02-09 Hitachi Ltd Device for detecting in nuclear reactor vessel
GB9215346D0 (en) * 1992-07-18 1992-09-02 Rolls Royce & Ass An apparatus for detecting defects
JP2002168992A (ja) * 2000-11-30 2002-06-14 Hitachi Ltd 原子炉圧力容器内補修方法及び補修装置
US20070121776A1 (en) * 2005-11-30 2007-05-31 General Electric Company System and method for multiple usage tooling for pressurized water reactor
FR2895790B1 (fr) 2005-12-29 2008-09-12 Framatome Anp Sas Dispositif et procede d'intervention dans une boite a eau d'un echangeur de chaleur.
US20100325859A1 (en) * 2009-06-26 2010-12-30 Areva Np Inc. Method for Repairing Primary Nozzle Welds

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3756915A (en) * 1971-01-25 1973-09-04 Maximov L Rnals device for detecting flaws on nuclear reactor inner surfaces and inte
JPS547987A (en) * 1977-06-20 1979-01-20 Hitachi Ltd Method and system for inspecting reactor
JPS5638899U (ja) * 1979-09-03 1981-04-11
JPS57113397A (en) * 1980-11-19 1982-07-14 Framatome Sa Module unit for enter to nuclear reactor container
JP2006349596A (ja) * 2005-06-20 2006-12-28 Mitsubishi Heavy Ind Ltd 原子力容器の管台内面の切削方法および切削装置
JP2007003442A (ja) 2005-06-27 2007-01-11 Mitsubishi Heavy Ind Ltd 原子炉容器の管台溶接部のut検査方法および装置
JP2007178334A (ja) * 2005-12-28 2007-07-12 Toshiba Corp 原子炉内作業架台
WO2007116532A1 (ja) * 2006-04-11 2007-10-18 Ihi Corporation 溶接継手部の保全装置及び保全方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2405445A4 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8349792B2 (en) 2006-12-19 2013-01-08 Cyclacel Limited Combination comprising CNDAC (2′-cyano-2′-deoxy-N4-palmitoyl-1-beta-D-arabinofuranosyl-cytosine) and a cytotoxic agent
JP2013040823A (ja) * 2011-08-12 2013-02-28 Mitsubishi Heavy Ind Ltd 原子炉容器の管台処理装置
EP2791500B1 (en) 2011-12-16 2019-03-06 Vestas Wind Systems A/S Wind turbine blade and production method
US11371482B2 (en) 2011-12-16 2022-06-28 Vestas Wind Systems A/S Wind turbine blades
US11629690B2 (en) 2011-12-16 2023-04-18 Vestas Wind Systems A/S Wind turbine blades

Also Published As

Publication number Publication date
JP5610718B2 (ja) 2014-10-22
US9524803B2 (en) 2016-12-20
EP2405445B1 (en) 2014-09-03
EP2405445A4 (en) 2014-02-26
US20120027154A1 (en) 2012-02-02
JP2011017670A (ja) 2011-01-27
EP2405445A1 (en) 2012-01-11

Similar Documents

Publication Publication Date Title
WO2011004540A1 (ja) 原子炉容器の管台作業システム
JP4865334B2 (ja) 先端工具案内装置及び先端工具案内装置の搬入方法
JP4444168B2 (ja) 原子力容器の管台内面の切削方法および切削装置
US6636579B2 (en) Device and method for repairing inside of reactor pressure vessel
US8881355B2 (en) Repair device and repair method
US9168615B2 (en) Repair device
CN103760178B (zh) 一种储罐焊缝x射线检测机器人
CN113386930A (zh) 一种应用于桥墩检修的水下机器人及其检修方法
JPH0915377A (ja) 遠隔炉内作業装置および方法
JP2010078433A (ja) 遠隔作業装置
JPH09203647A (ja) 遠隔操作式探傷検査装置
JP6436304B2 (ja) 炉内デブリの回収方法及び回収装置
JP3918217B2 (ja) 容器ノズル内面の補修方法
JP2007107979A (ja) 管内面除染システム
JP2000075080A (ja) ジェットポンプ検査装置および取扱い装置
US7139356B2 (en) Procedure and means for replacing and procedure for repairing a section of a pipe in the primary circuit of a nuclear reactor
JP3710539B2 (ja) 遠隔炉内作業装置およびその作業方法
JPH0763884A (ja) 原子炉内遠隔作業装置
US4762670A (en) Cleaning apparatus for atomic reactor control rod driving means (CRD)
JP4352255B2 (ja) 水中検査装置および水中検査方法
KR102608456B1 (ko) Ect검사를 위한 열교환기 튜브내 세관수 및 이물질제거장치의 이송장치
JP7489542B2 (ja) 使用済燃料プールのライニングを修理するための設備及びシステム
JP6793212B2 (ja) 原子力プラントにおける核燃料物質の搬出方法
JP5762883B2 (ja) 制御棒駆動機構取扱装置及び方法
JPS60177247A (ja) セル内点検補修装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10796854

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2010796854

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 13263938

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE