WO2010106805A1 - 空気調和装置 - Google Patents

空気調和装置 Download PDF

Info

Publication number
WO2010106805A1
WO2010106805A1 PCT/JP2010/001942 JP2010001942W WO2010106805A1 WO 2010106805 A1 WO2010106805 A1 WO 2010106805A1 JP 2010001942 W JP2010001942 W JP 2010001942W WO 2010106805 A1 WO2010106805 A1 WO 2010106805A1
Authority
WO
WIPO (PCT)
Prior art keywords
temperature
magnetic field
refrigerant
electromagnetic induction
state quantity
Prior art date
Application number
PCT/JP2010/001942
Other languages
English (en)
French (fr)
Inventor
木下英彦
山田剛
Original Assignee
ダイキン工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ダイキン工業株式会社 filed Critical ダイキン工業株式会社
Priority to EP10753301A priority Critical patent/EP2410262A1/en
Priority to KR1020117024510A priority patent/KR101233903B1/ko
Priority to CN2010800127619A priority patent/CN102348943A/zh
Priority to US13/256,480 priority patent/US20120006040A1/en
Priority to AU2010225944A priority patent/AU2010225944B2/en
Priority to RU2011142193/06A priority patent/RU2484390C1/ru
Publication of WO2010106805A1 publication Critical patent/WO2010106805A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B47/00Arrangements for preventing or removing deposits or corrosion, not provided for in another subclass
    • F25B47/02Defrosting cycles
    • F25B47/022Defrosting cycles hot gas defrosting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/008Refrigerant heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/02741Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using one four-way valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/031Sensor arrangements
    • F25B2313/0312Pressure sensors near the indoor heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/031Sensor arrangements
    • F25B2313/0314Temperature sensors near the indoor heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/031Sensor arrangements
    • F25B2313/0315Temperature sensors near the outdoor heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/01Heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/26Problems to be solved characterised by the startup of the refrigeration cycle

Definitions

  • the present invention relates to an air conditioner.
  • Patent Document 1 Japanese Patent Laid-Open No. 2000-97510
  • the heating capacity is increased by heating the refrigerant flowing into the refrigerant heater with a gas burner.
  • Patent Document 1 Japanese Patent Application Laid-Open No. 2000-97510
  • the temperature of the refrigerant is prevented from excessively increasing, so that the protection operation is not frequently performed.
  • a technique for adjusting the combustion amount of the gas burner based on the detection value of the thermistor has been proposed.
  • An air conditioner uses air that uses a refrigeration cycle that includes a refrigerant mechanism and / or a member that makes thermal contact with a refrigerant flowing in the refrigerant pipe, and includes a compression mechanism that circulates the refrigerant.
  • the harmony device includes a magnetic field generation unit, a refrigerant state quantity detection unit, and a control unit.
  • the magnetic field generation unit generates a magnetic field for induction heating of a portion to be heated by induction heating.
  • the refrigerant state quantity detection unit detects a state quantity relating to the refrigerant flowing through the predetermined state quantity detection part that is at least a part of the refrigeration cycle.
  • the state quantity here includes, for example, at least one of temperature and pressure.
  • the control unit performs startup magnetic field generation control and post-startup magnetic field generation control.
  • start-up magnetic field generation control the control unit starts a state in which the output from the magnetic field generation unit is set to a predetermined maximum output at the start of heating operation in the refrigeration cycle from the time when the compression mechanism is in the drive state. The process is terminated when the state quantity detected by the refrigerant state quantity detection unit reaches the first predetermined target state quantity.
  • post-startup magnetic field generation control the control unit performs a state in which the first magnetic field limit reference value lower than the predetermined maximum output is constrained as the upper limit of the output of the magnetic field generation unit after the start-up magnetic field generation control ends.
  • “when the refrigeration cycle is performing the heating operation” does not include, for example, an operation such as a defrosting operation.
  • the heating by the electromagnetic induction heating unit for example, in the case of electromagnetic induction heating of a heat generating member that is in thermal contact with the refrigerant pipe, heat generation that is in thermal contact with the refrigerant flowing in the refrigerant pipe.
  • the air conditioner according to the second aspect is the air conditioner according to the first aspect, wherein the portion to be heated for induction heating includes a magnetic material.
  • the magnetic field generator since the magnetic field generator generates a magnetic field for a portion containing the magnetic material, it is possible to efficiently generate heat by electromagnetic induction.
  • the predetermined state quantity detection part is a part where a magnetic field is generated by the magnetic field generation part.
  • the predetermined state quantity detection part is a part where a magnetic field is generated by the magnetic field generation part.
  • the air conditioner according to a fourth aspect is the air conditioner according to any one of the first to third aspects, wherein the state quantity detected by the refrigerant state quantity detection unit relates to the refrigerant flowing through the predetermined state quantity detection part. It is at least one of temperature and pressure. In this air conditioner, it is possible to perform detection here using various sensors used for state control of the refrigeration cycle.
  • An air conditioner is the air conditioner according to any one of the first aspect to the fourth aspect, wherein the refrigerant state quantity detector detects a temperature related to the refrigerant flowing through the predetermined state quantity detector. It is a detection unit.
  • the control unit performs post-startup magnetic field generation PI control for PI control of the output value or output frequency of the magnetic field generation unit so that the temperature detected by the temperature detection unit is maintained at the target maintenance temperature.
  • the target maintenance temperature here may be the same temperature as the first predetermined target temperature.
  • the temperature change due to electromagnetic induction heating is generally more rapid than the temperature change caused by the change in the state of the refrigerant passing through the predetermined state quantity detection part.
  • the magnitude of the magnetic field generated in the magnetic field generator and / or the frequency of generating the magnetic field in the magnetic field generator is controlled by PI. It becomes possible to stabilize the temperature detected by the temperature detector at the second predetermined target temperature.
  • the air conditioner according to a sixth aspect is the air conditioner according to any one of the first aspect to the fifth aspect, wherein the refrigerant state quantity detector detects a temperature related to the refrigerant flowing through the predetermined state quantity detector. It is a detection unit.
  • the control unit executes startup magnetic field generation control after satisfying the magnetic field level increase condition.
  • the condition for increasing the magnetic field level is that the temperature detected by the temperature detector is changed by performing a magnetic field level change process that raises or lowers the level of the magnetic field generated by the magnetic field generator within a range lower than the predetermined maximum output.
  • the temperature detection unit detects a temperature change.
  • the heating target part of the induction heating is generating heat due to the generation of the magnetic field by the magnetic field generation part, the installation state of the temperature detection part is good, and the temperature of the heating target part of the induction heating is good. Can be recognized accurately. As a result, it is possible to suppress damage to the device due to an abnormal temperature rise due to electromagnetic induction heating, and it is possible to improve the reliability of the device.
  • the maximum magnetic field level output in the magnetic field level change process is a value smaller than the first magnetic field restriction reference value.
  • this air conditioner it is possible to prevent electromagnetic induction heating due to a magnetic field having a magnitude of about the first magnetic field limit reference value at a stage where it is not confirmed that the temperature detector is attached in a good state.
  • An air conditioner is the air conditioner according to any one of the first to seventh aspects, wherein the refrigerant state quantity detector detects a temperature related to the refrigerant flowing through the predetermined state quantity detector. It is a detection unit.
  • the control unit executes the determination of the magnetic field level increase condition after satisfying the flow condition.
  • the flow condition is that when the compression mechanism realizes both compression mechanism states in which the output of the compression mechanism is different between the first compression mechanism state and the second compression mechanism state whose output level is higher than the first compression mechanism state. That is, there is a change in the detected temperature of the temperature detection unit between the first compression mechanism state and the second compression mechanism state.
  • the first compression mechanism state includes a state where the compression mechanism is stopped.
  • this air conditioner if the flow condition is not satisfied, the refrigerant flow is insufficient, and even if the output from the magnetic field generation unit is at a level for determining the magnetic field level increase condition, There is a risk of causing an increase in temperature.
  • this air conditioner it is possible to execute the determination of the magnetic field level increase condition while ensuring the flow of the refrigerant that passes through the predetermined state quantity detection portion, so that the magnetic field can be maintained while maintaining the reliability of the device. It is possible to determine the level increase condition.
  • An air conditioning apparatus is the air conditioning apparatus according to any one of the first to eighth aspects, wherein the refrigerant state quantity detection unit detects a temperature related to the refrigerant flowing through the predetermined state quantity detection part. It is a detection unit. After starting the magnetic field generation control after startup, and when the defrosting operation different from the heating operation is being performed in the refrigeration cycle, the control unit sets the upper limit of the output of the magnetic field generation unit as a predetermined maximum output and detects the temperature. Defrosting operation output control for controlling the output of the magnetic field generation unit based on the detected temperature of the unit is performed. In this air conditioner, the output from the magnetic field generation unit can be increased in the same manner as the startup magnetic field generation control, so that the defrosting process can be speeded up.
  • An air conditioner according to a tenth aspect is the air conditioner according to the ninth aspect, in which the control unit is a second unit in which the temperature detected by the temperature detection unit is lower than the first predetermined target temperature during the defrosting operation output control.
  • Defrost PI control is performed to perform PI control so that the temperature is maintained at a predetermined target temperature.
  • the temperature of the startup magnetic field generation control is the second predetermined target temperature. It becomes possible to reduce the overshoot at the time of defrosting operation by making it lower than 1 predetermined target temperature.
  • An air conditioner according to an eleventh aspect is the air conditioner according to any one of the first aspect to the tenth aspect, wherein the refrigerant state quantity detector detects a temperature related to the refrigerant flowing through the predetermined state quantity detector. It is a detection unit. An elastic member that gives an elastic force to the temperature detection unit is further provided. The temperature detection unit is in pressure contact with the predetermined state quantity detection portion by the elastic force of the elastic member.
  • the air conditioner according to the first aspect it is possible to suppress the control overshoot to be small while quickly starting the supply of warm air to the user.
  • heat generation by electromagnetic induction can be efficiently performed.
  • the air conditioner according to the third aspect it is possible to improve control responsiveness.
  • the air conditioning apparatus according to the fourth aspect it is possible to perform detection here using various sensors used for state control of the refrigeration cycle.
  • the temperature detected by the temperature detector can be stabilized at the second predetermined target temperature.
  • the air conditioner according to the seventh aspect it is possible to prevent electromagnetic induction heating due to a magnetic field having a magnitude of about the first magnetic field limit reference value at a stage where it is not confirmed that the temperature detector is properly attached. It becomes possible.
  • the air conditioner according to the eighth aspect it is possible to determine the condition for increasing the magnetic field level while maintaining the reliability of the device.
  • overshoot during defrosting operation can be reduced.
  • control with improved responsiveness can be performed.
  • FIG. 1 is a refrigerant circuit diagram showing a refrigerant circuit 10 of the air conditioner 1.
  • the air conditioner 1 is an air conditioner in a space where a use side device is arranged by connecting an outdoor unit 2 as a heat source side device and an indoor unit 4 as a use side device by a refrigerant pipe.
  • An electromagnetic induction heating unit 6 and the like are provided.
  • the compressor 21, the four-way switching valve 22, the outdoor heat exchanger 23, the outdoor electric expansion valve 24, the accumulator 25, the outdoor fan 26, the hot gas bypass valve 27, the capillary tube 28, and the electromagnetic induction heating unit 6 are included in the outdoor unit 2. Is housed in.
  • the indoor heat exchanger 41 and the indoor fan 42 are accommodated in the indoor unit 4.
  • the refrigerant circuit 10 includes a discharge pipe A, an indoor gas pipe B, an indoor liquid pipe C, an outdoor liquid pipe D, an outdoor gas pipe E, an accumulator pipe F, a suction pipe G, a hot gas bypass circuit H, and a branch pipe K. And a merging pipe J.
  • the indoor side gas pipe B and the outdoor side gas pipe E pass a large amount of refrigerant in the gas state, but the refrigerant passing therethrough is not limited to the gas refrigerant.
  • the indoor side liquid pipe C and the outdoor side liquid pipe D pass a large amount of liquid refrigerant, but the refrigerant passing therethrough is not limited to liquid refrigerant.
  • the discharge pipe A connects the compressor 21 and the four-way switching valve 22.
  • the indoor side gas pipe B connects the four-way switching valve 22 and the indoor heat exchanger 41.
  • a pressure sensor 29a for detecting the pressure of the refrigerant passing therethrough is provided.
  • the indoor side liquid pipe C connects the indoor heat exchanger 41 and the outdoor electric expansion valve 24.
  • the outdoor liquid pipe D connects the outdoor electric expansion valve 24 and the outdoor heat exchanger 23.
  • the outdoor gas pipe E connects the outdoor heat exchanger 23 and the four-way switching valve 22.
  • the accumulator pipe F connects the four-way switching valve 22 and the accumulator 25, and extends in the vertical direction when the outdoor unit 2 is installed.
  • An electromagnetic induction heating unit 6 is attached to a part of the accumulator tube F.
  • the accumulator tube F At least a heat generating portion whose periphery is covered by a coil 68, which will be described later, is a copper tube F1 in which a coolant is flowing inside, and a magnetic tube provided so as to cover the periphery of the copper tube F1.
  • F2 is configured (see FIG. 15).
  • the magnetic tube F2 is made of SUS (Stainless Used Steel) 430.
  • the SUS430 is a ferromagnetic material, and generates eddy currents when placed in a magnetic field, and generates heat due to Joule heat generated by its own electrical resistance.
  • Portions other than the magnetic pipe F2 in the pipe constituting the refrigerant circuit 10 are made of a copper pipe made of the same material as the copper pipe F1.
  • tube is not limited to SUS430,
  • at least 2 or more types of metals chosen from conductors, such as iron, copper, aluminum, chromium, nickel, and these groups are used. It can be an alloy or the like.
  • the magnetic material include ferrite, martensite, and combinations thereof, but are ferromagnetic and have a relatively high electrical resistance and have a Curie temperature higher than the operating temperature range. High materials are preferred.
  • the accumulator tube F here requires more electric power, but does not have to include a magnetic body and a material containing the magnetic body, and contains a material to be subjected to induction heating. It may be a thing.
  • the magnetic material may constitute all of the accumulator tube F, or may be formed only on the inner surface of the accumulator tube F, and is contained in the material constituting the accumulator tube F. May exist.
  • the accumulator tube F can be heated by electromagnetic induction, and the refrigerant sucked into the compressor 21 via the accumulator 25 can be warmed.
  • the heating capability of the air conditioning apparatus 1 can be improved.
  • the lack of capacity at the time of starting can be compensated for by the rapid heating by the electromagnetic induction heating unit 6.
  • the electromagnetic induction heating unit 6 quickly opens the accumulator tube F.
  • the compressor 21 can compress the rapidly heated refrigerant as a target. For this reason, the temperature of the hot gas discharged from the compressor 21 can be raised rapidly. Thereby, the time required to thaw frost by defrost operation can be shortened. Thereby, even if it is necessary to perform a defrost operation in a timely manner during the heating operation, the operation can be returned to the heating operation as soon as possible, and the user's comfort can be improved.
  • the suction pipe G connects the accumulator 25 and the suction side of the compressor 21.
  • the hot gas bypass circuit H connects a branch point A1 provided in the middle of the discharge pipe A and a branch point D1 provided in the middle of the outdoor liquid pipe D.
  • the hot gas bypass circuit 27 is provided with a hot gas bypass valve 27 that can switch between a state that allows passage of refrigerant and a state that does not allow passage of the refrigerant.
  • a capillary tube 28 is provided between the hot gas bypass valve 27 and the branch point D1 to reduce the pressure of refrigerant passing therethrough.
  • the capillary tube 28 can be brought close to the pressure after the refrigerant pressure is reduced by the outdoor electric expansion valve 24 during heating operation, the capillary tube 28 is a chamber by supplying hot gas to the outdoor liquid pipe D through the hot gas bypass circuit H. An increase in the refrigerant pressure in the outer liquid pipe D can be suppressed.
  • the branch pipe K constitutes a part of the outdoor heat exchanger 23, and a refrigerant pipe extending from the gas side inlet / outlet 23e of the outdoor heat exchanger 23 will be described later in order to increase the effective surface area for heat exchange. It is a pipe branched into a plurality of lines at a branching junction 23k.
  • the branch pipe K includes a first branch pipe K1, a second branch pipe K2, and a third branch pipe K3 that extend independently from the branch junction point 23k to the junction branch point 23j.
  • the pipes K1, K2, and K3 merge at the merge branch point 23j. Note that, when viewed from the merging pipe J side, the branch pipe K extends at a merging branch point 23j.
  • the junction pipe J constitutes a part of the outdoor heat exchanger 23 and extends from the junction branch point 23j to the liquid side inlet / outlet 23d of the outdoor heat exchanger 23.
  • the junction pipe J can unify the degree of supercooling of the refrigerant flowing out of the outdoor heat exchanger 23 during the cooling operation, and can defrost frosted ice near the lower end of the outdoor heat exchanger 23 during the heating operation.
  • the junction pipe J has a cross-sectional area that is approximately three times the cross-sectional area of each of the branch pipes K1, K2, and K3, and the amount of refrigerant passing through is approximately three times that of each of the branch pipes K1, K2, and K3. .
  • the four-way switching valve 22 can switch between a cooling operation cycle and a heating operation cycle.
  • the connection state when performing the heating operation is indicated by a solid line
  • the connection state when performing the cooling operation is indicated by a dotted line.
  • the indoor heat exchanger 41 functions as a refrigerant cooler
  • the outdoor heat exchanger 23 functions as a refrigerant heater
  • the indoor heat exchanger 41 functions as a refrigerant heater.
  • the outdoor heat exchanger 23 includes a gas side inlet / outlet 23e, a liquid side inlet / outlet 23d, a branch junction 23k, a junction branch point 23j, a branch pipe K, a junction pipe J, and a heat exchange fin 23z.
  • the gas side inlet / outlet 23 e is located at the end of the outdoor heat exchanger 23 on the outdoor gas pipe E side, and is connected to the outdoor gas pipe E.
  • the liquid side inlet / outlet 23 d is located at the end of the outdoor heat exchanger 23 on the outdoor liquid pipe D side, and is connected to the outdoor liquid pipe D.
  • the branch junction 23k branches a pipe extending from the gas side inlet / outlet port 23e, and can branch or join the refrigerant according to the direction of the flowing refrigerant.
  • a plurality of branch pipes K extend from each branch portion at the branch junction 23k.
  • the junction branch point 23j joins the branch pipe K and can join or branch the refrigerant according to the direction of the flowing refrigerant.
  • the junction pipe J extends from the junction branch point 23j to the liquid side inlet / outlet 23d.
  • the heat exchange fins 23z are configured by arranging a plurality of plate-like aluminum fins in the thickness direction and arranged at predetermined intervals.
  • the branch pipe K and the merge pipe J both have the heat exchange fins 23z as a common penetration target.
  • the branch pipe K and the junction pipe J are disposed so as to penetrate in the plate pressure direction at different portions of the common heat exchange fin 23z.
  • an outdoor air temperature sensor 29b for detecting the outdoor air temperature is provided on the windward side of the outdoor fan 26 in the air flow direction.
  • the outdoor heat exchanger 23 is provided with an outdoor heat exchange temperature sensor 29c that detects the temperature of the refrigerant flowing through the branch pipe air conditioner.
  • an indoor temperature sensor 43 that detects the indoor temperature is provided.
  • the indoor heat exchanger 41 is provided with an indoor heat exchanger temperature sensor 44 that detects the refrigerant temperature on the indoor liquid pipe C side to which the outdoor electric expansion valve 24 is connected.
  • the outdoor control unit 12 that controls the devices arranged in the outdoor unit 2 and the indoor control unit 13 that controls the devices arranged in the indoor unit 4 are connected by the communication line 11a, so that the control unit 11 is constituted.
  • the control unit 11 performs various controls for the air conditioner 1.
  • the outdoor control unit 12 is provided with a timer 95 that counts elapsed time when performing various controls. Note that a controller 90 that accepts a setting input from the user is connected to the control unit 11. ⁇ 1-2> Outdoor unit 2 In FIG.
  • FIG. 2 the external appearance perspective view of the front side of the outdoor unit 2 is shown.
  • FIG. 3 the perspective view about the positional relationship with the outdoor heat exchanger 23 and the outdoor fan 26 is shown.
  • FIG. 4 the perspective view of the back side of the outdoor heat exchanger 23 is shown.
  • the outdoor unit 2 has an outer surface formed by a substantially rectangular parallelepiped outdoor unit casing configured by a top plate 2a, a bottom plate 2b, a front panel 2c, a left side panel 2d, a right side panel 2f, and a back panel 2e.
  • a substantially rectangular parallelepiped outdoor unit casing configured by a top plate 2a, a bottom plate 2b, a front panel 2c, a left side panel 2d, a right side panel 2f, and a back panel 2e.
  • an outdoor heat exchanger 23, an outdoor fan 26, and the like are arranged, a blower room on the left side panel 2d side, a compressor 21 and an electromagnetic induction heating unit 6 are arranged, and the right side panel 2f side.
  • the machine room is separated by a partition plate 2h.
  • the outdoor unit 2 is fixed by being screwed to the bottom plate 2b, and has an outdoor unit support 2g that forms the lowermost end portion of the outdoor unit 2 on the right side and the left side.
  • the electromagnetic induction heating unit 6 is disposed at an upper position in the vicinity of the left side panel 2d and the top plate 2a in the machine room.
  • the heat exchange fins 23z of the outdoor heat exchanger 23 described above are arranged side by side in the plate thickness direction so that the plate thickness direction is substantially horizontal.
  • the joining pipe J is disposed in the lowermost portion of the heat exchange fins 23z of the outdoor heat exchanger 23 by penetrating the heat exchange fins 23z in the thickness direction.
  • the hot gas bypass circuit H is arranged along the lower side of the outdoor fan 26 and the outdoor heat exchanger 23.
  • the partition plate 2h of the outdoor unit 2 includes a fan room in which the outdoor heat exchanger 23 and the outdoor fan 26 are arranged, a machine room in which the electromagnetic induction heating unit 6, the compressor 21, the accumulator 25, and the like are arranged, Is partitioned from the upper end to the lower end from the front to the rear.
  • the compressor 21 and the accumulator 25 are disposed in a space below the machine room of the outdoor unit 2.
  • the electromagnetic induction heating unit 6, the four-way switching valve 22, and the outdoor control unit 12 are disposed in a space above the machine room of the outdoor unit 2 and above the compressor 21, the accumulator 25, and the like. .
  • the tube 28 and the electromagnetic induction heating unit 6 include a discharge pipe A, an indoor side gas pipe B, an outdoor side liquid pipe D, an outdoor side gas pipe E, an accumulator so as to execute the refrigeration cycle by the refrigerant circuit 10 shown in FIG. They are connected via a tube F, a hot gas bypass circuit H, and the like.
  • the hot gas bypass circuit H is configured by connecting nine parts of the first bypass part H1 to the ninth bypass part H9, and when the refrigerant flows into the hot gas bypass circuit H, , Flows in the direction from the first bypass portion H1 toward the ninth bypass portion H9 in order.
  • the joining pipe J shown in FIG. 7 has an area equivalent to the sectional area of each of the first branch pipe K1, the second branch pipe K2, and the third branch pipe K3.
  • the heat exchange effective surface area can be increased in comparison with the merged pipe J in the first branch pipe K1, the second branch pipe K2, and the third branch pipe K3.
  • the joining pipe J is configured by connecting the first joining pipe part J1, the second joining pipe part J2, the third joining pipe part J3, and the fourth joining pipe part J4 to each other.
  • the refrigerant that has flowed through the branch pipe K in the outdoor heat exchanger 23 is merged at the merge branch point 23j, and the refrigerant flow in the refrigerant circuit 10 is combined into one, and the refrigerant of the outdoor heat exchanger 23 is merged.
  • merging piping part J1 is extended from the confluence
  • the second joining pipe portion J2 extends from the end of the first joining pipe portion J1 so as to penetrate the plurality of heat exchange fins 23z.
  • the 4th junction piping part J4 is extended so that the several heat exchanger fin 23z may be penetrated similarly to the 2nd junction piping part J2.
  • the third joining pipe part J3 is a U-shaped pipe that connects the second joining pipe part J2 and the fourth joining pipe part J4 at the end of the outdoor heat exchanger 23.
  • the flow of the refrigerant in the refrigerant circuit 10 is divided into a plurality of flows in the branch pipe K, so that the merge pipe J is combined into one. Even if the degree of supercooling in the immediately preceding portion is different for each refrigerant flowing through the individual pipes constituting the branch pipe K, the refrigerant flow can be made one in the junction pipe J, so that the supercooling at the outlet of the outdoor heat exchanger 23 The degree can be adjusted.
  • the hot gas bypass valve 27 is opened, and the high-temperature refrigerant discharged from the compressor 21 is placed outside the outdoor heat exchanger 23 before the outdoor part.
  • Hot gas bypass circuit H In FIG. 8, the top view in the state which removed the ventilation mechanism of the outdoor unit 2 is shown.
  • FIG. 9 is a plan view showing the positional relationship between the bottom plate of the outdoor unit 2 and the hot gas bypass circuit H.
  • the hot gas bypass circuit H has a first bypass portion H1 to an eighth bypass portion H8 and a ninth bypass portion H9 (not shown).
  • the hot gas bypass circuit H branches from the discharge pipe A at the branch point A1 and extends to the hot gas bypass valve 27, and a portion further extending from the hot gas bypass valve 27 is the first bypass portion H1.
  • the second bypass portion H2 extends from the end of the first bypass portion H1 to the blower chamber side in the vicinity of the back surface side.
  • the third bypass portion H3 extends from the end of the second bypass portion H2 toward the front side.
  • the fourth bypass portion H4 extends from the end of the third bypass portion H3 toward the left side that is the opposite side to the machine room side.
  • the fifth bypass portion H5 extends from the end of the fourth bypass portion H4 toward the back side to a portion where a space can be ensured between the back panel 2e of the outdoor unit casing.
  • the sixth bypass portion H6 extends from the end of the fifth bypass portion H5 on the right side which is the machine room side and toward the back side.
  • the seventh bypass portion H7 extends from the end of the sixth bypass portion H6 toward the right side, which is the machine room side, in the blower chamber.
  • the eighth bypass portion H8 extends in the machine room from the end of the seventh bypass portion H7.
  • the ninth bypass portion H9 extends from the end of the eighth bypass portion H8 to the capillary tube 28.
  • the hot gas bypass circuit H causes the refrigerant to flow from the first bypass portion H1 to the ninth bypass portion H9 in order with the hot gas bypass valve 27 being opened. For this reason, the refrigerant branched at the branch point A1 of the discharge pipe A extending from the compressor 21 flows on the first bypass portion H1 side before the refrigerant flowing through the ninth bypass portion H9. For this reason, the refrigerant flowing through the hot gas bypass circuit H as a whole, the refrigerant after flowing through the fourth bypass portion H4 flows to the fifth to eighth bypass portions H8, and therefore the fourth bypass portion H4. Is more likely to be higher than the refrigerant temperature flowing through the fifth to eighth bypass portions H8.
  • the hot gas bypass circuit H is disposed so as to pass through the vicinity of the lower part of the outdoor fan 26 and the lower part of the outdoor heat exchanger 23 in the bottom plate 2b of the outdoor unit casing. For this reason, without using a separate heat source such as a heater, the vicinity of the portion through which the hot gas bypass circuit H passes can be warmed by the high-temperature refrigerant branched and supplied from the discharge pipe A of the compressor 21. Therefore, even if the upper side of the bottom plate 2b gets wet by rain water or the drain water generated in the outdoor heat exchanger 23, ice grows below the outdoor fan 26 and below the outdoor heat exchanger 23 in the bottom plate 2b. Can be suppressed.
  • Electromagnetic induction heating unit 6 shows a schematic perspective view of the electromagnetic induction heating unit 6 attached to the accumulator tube F.
  • FIG. 11 shows an external perspective view of the electromagnetic induction heating unit 6 with the shielding cover 75 removed.
  • tube F is shown.
  • the electromagnetic induction heating unit 6 is disposed so as to cover the magnetic tube F2 that is a heat generating portion of the accumulator tube F from the outside in the radial direction, and causes the magnetic tube F2 to generate heat by electromagnetic induction heating.
  • the heat generating portion of the accumulator tube F has a double tube structure having an inner copper tube F1 and an outer magnetic tube F2.
  • the electromagnetic induction heating unit 6 includes a first hexagon nut 61, a second hexagon nut 66, a first bobbin lid 63, a second bobbin lid 64, a bobbin body 65, a first ferrite case 71, a second ferrite case 72, and a third ferrite.
  • a case 73, a fourth ferrite case 74, a first ferrite 98, a second ferrite 99, a coil 68, a shielding cover 75, an electromagnetic induction thermistor 14, a fuse 15 and the like are provided.
  • the first hexagon nut 61 and the second hexagon nut 66 are made of resin, and stabilize the fixed state between the electromagnetic induction heating unit 6 and the accumulator pipe F using a C-shaped ring (not shown).
  • the first bobbin lid 63 and the second bobbin lid 64 are made of resin and cover the accumulator tube F from the radially outer side at the upper end position and the lower end position, respectively.
  • the first bobbin lid 63 and the second bobbin lid 64 have four screw holes for screws 69 for screwing first to fourth ferrite cases 71 to 74, which will be described later, through the screws 69. ing. Furthermore, the second bobbin lid 64 has an electromagnetic induction thermistor insertion opening 64f for inserting the electromagnetic induction thermistor 14 shown in FIG. 12 and attaching it to the outer surface of the magnetic tube F2. The second bobbin lid 64 has a fuse insertion opening 64e for inserting the fuse 15 shown in FIG. 13 and attaching it to the outer surface of the magnetic tube F2 (see FIG. 14). As shown in FIG.
  • the electromagnetic induction thermistor 14 is an electromagnetic induction thermistor wiring that transmits the detection results of the electromagnetic induction thermistor detector 14a, the outer protrusion 14b, the side protrusion 14c, and the electromagnetic induction thermistor detector 14a as signals to the controller 11. 14d.
  • the electromagnetic induction thermistor detection unit 14a has a shape that follows the curved shape of the outer surface of the accumulator tube F, and has a substantial contact area.
  • the fuse 15 includes a fuse detection unit 15a, an asymmetric shape 15b, and a fuse wiring 15d that transmits a detection result of the fuse detection unit 15a to the control unit 11 as a signal.
  • the control unit 11 performs control to stop the power supply to the coil 68 to avoid thermal damage of the device.
  • the bobbin main body 65 is made of resin, and the coil 68 is wound around it.
  • the coil 68 is wound spirally around the outside of the bobbin main body 65 with the direction in which the accumulator tube F extends as the axial direction.
  • the coil 68 is connected to a control printed board (not shown) and is supplied with a high-frequency current.
  • the output of the control printed circuit board is controlled by the control unit 11. As shown in FIG. 14, the electromagnetic induction thermistor 14 and the fuse 15 are attached in a state where the bobbin main body 65 and the second bobbin lid 64 are fitted together.
  • the plate spring 16 is pushed inward in the radial direction of the magnetic body tube F ⁇ b> 2, thereby maintaining a good pressure contact state with the outer surface of the magnetic body tube F ⁇ b> 2.
  • the attachment state of the fuse 15 is also pushed inward in the radial direction of the magnetic tube F2 by the leaf spring 17, so that a good pressure contact state with the outer surface of the magnetic tube F2 is maintained.
  • the first ferrite case 71 has a first bobbin lid 63 and a second bobbin lid 64 sandwiched from the direction in which the accumulator tube F extends, and is screwed and fixed by screws 69.
  • the first ferrite case 71 to the fourth ferrite case 74 contain a first ferrite 98 and a second ferrite 99 made of ferrite, which is a material having a high magnetic permeability.
  • the first ferrite 98 and the second ferrite 99 take in the magnetic field generated by the coil 68 and form a path for the magnetic flux. It is designed to prevent leakage to the outside.
  • the shielding cover 75 is disposed on the outermost peripheral portion of the electromagnetic induction heating unit 6 and collects magnetic flux that cannot be drawn by the first ferrite 98 and the second ferrite 99 alone. Almost no leakage magnetic flux is generated outside the shielding cover 75, and the location where the magnetic flux is generated can be determined.
  • Electromagnetic Induction Heating Control The electromagnetic induction heating unit 6 described above is configured so that the accumulator pipe F is activated when starting the heating operation when the refrigeration cycle is operated for heating, when assisting the heating capacity, and when performing the defrost operation. Control is performed to generate heat in the magnetic tube F2.
  • the control unit 11 starts the heating operation.
  • the controller 11 waits for the pressure detected by the pressure sensor 29a to rise to 39 kg / cm 2 after the compressor 21 is started, and drives the indoor fan 42. Thereby, at the stage where the refrigerant passing through the indoor heat exchanger 41 is not warmed, an unpleasant user's discomfort caused by causing an air flow in the unwarmed room is prevented.
  • electromagnetic induction heating using the electromagnetic induction heating unit 6 is performed.
  • the control unit 11 performs control to determine whether or not the electromagnetic induction heating can be started before the electromagnetic induction heating is started.
  • a determination there are a flow condition determination process, a sensor detachment detection process, a rapid pressure increase process, and the like, as shown in the time chart of FIG. ⁇ 1-8> Flow Condition Determination Processing
  • the heating load is applied to the portion of the accumulator tube F where the electromagnetic induction heating unit 6 is attached. It becomes only the refrigerant which is staying.
  • the temperature of the accumulation tube F rises abnormally enough to deteriorate the refrigerator oil. . Further, the temperature of the electromagnetic induction heating unit 6 itself also rises, and the reliability of the device is lowered. Therefore, here, the accumulator tube is in a stage before starting the electromagnetic induction heating so that the electromagnetic induction heating by the electromagnetic induction heating unit 6 is not performed in a state where the refrigerant does not flow into the accumulator tube F in this way. Flow condition determination processing for confirming that the refrigerant is flowing in F is performed.
  • step S11 the controller 11 determines whether or not the controller 90 has received a command for heating operation instead of cooling operation from the user. Since the refrigerant heating by the electromagnetic induction heating unit 6 is necessary in an environment where the heating operation is performed, such a determination is made.
  • step S12 the controller 11 starts the compressor 21 and gradually increases the frequency of the compressor 21.
  • step S13 the control unit 11 determines whether or not the frequency of the compressor 21 has reached the predetermined minimum frequency Qmin. If it is determined that the frequency has reached, the process proceeds to step S14.
  • step S14 the control unit 11 starts the flow condition determination process, and the detected temperature data of the electromagnetic induction thermistor 14 when the frequency of the compressor 21 reaches the predetermined minimum frequency Qmin (see point a in FIG. 16) and The temperature data detected by the outdoor heat exchange temperature sensor 29c is stored, and the timer 95 starts counting the flow detection time.
  • the frequency of the compressor 21 does not reach the predetermined minimum frequency Qmin
  • the refrigerant flowing through the accumulator tube F and the outdoor heat exchanger 23 is in a gas-liquid two-phase state and is maintained at a constant temperature at a saturation temperature. Therefore, the temperature detected by the electromagnetic induction thermistor 14 and the outdoor heat exchange temperature sensor 29c is constant at the saturation temperature and does not change.
  • the frequency of the compressor 21 increases after a while, the refrigerant pressure in the outdoor heat exchanger 23 and the accumulator pipe F further decreases, and the saturation temperature starts to decrease, so that the electromagnetic induction thermistor 14
  • the temperature detected by the outdoor heat exchanger temperature sensor 29c also starts to decrease.
  • the outdoor heat exchanger 23 exists downstream of the accumulator pipe F with respect to the suction side of the compressor 21, the temperature of the refrigerant passing through the accumulator pipe F starts to decrease.
  • the timing at which the temperature of the refrigerant passing through the outdoor heat exchanger 23 begins to decrease is earlier than the timing (see points b and c in FIG. 16).
  • step S15 the control unit 11 determines whether or not the flow detection time of 10 seconds has elapsed from the start of the count of the timer 95. If the flow detection time has elapsed, the control unit 11 proceeds to step S16. On the other hand, if the flow detection time has not yet elapsed, step S15 is repeated.
  • step S16 the control unit 11 detects the detected temperature data and the outdoor heat of the electromagnetic induction thermistor 14 in a state where the refrigerant temperature in the outdoor heat exchanger 23 and the accumulator tube F is lowered when the flow detection time has elapsed. The detected temperature data of the alternating temperature sensor 29c is acquired, and the process proceeds to step S17.
  • step S17 the control unit 11 determines whether or not the detected temperature of the electromagnetic induction thermistor 14 acquired in step S16 is lower by 3 ° C. or more than the detected temperature data of the electromagnetic induction thermistor 14 stored in step S14, and It is determined whether or not the detected temperature of the outdoor heat exchanger temperature sensor 29c acquired in step S16 is lower by 3 ° C. or more than the detected temperature data of the outdoor heat exchanger temperature sensor 29c stored in step S14. That is, it is determined whether or not a decrease in the refrigerant temperature has been detected during the flow detection time.
  • the detected temperature of the electromagnetic induction thermistor 14 or the detected temperature of the outdoor heat exchange temperature sensor 29c is lowered by 3 ° C.
  • the refrigerant is flowing through the accumulator tube F.
  • the flow condition determination process is terminated when it is determined that the flow of the gas is secured, and the process proceeds to the rapid pressure increase process at the start-up that uses the output of the electromagnetic induction heating unit 6 to the maximum, or the sensor disconnection detection process, etc. To do.
  • step S18 the control unit 11 determines that the amount of refrigerant flowing through the accumulator tube F is insufficient for performing induction heating by the electromagnetic induction heating unit 6, and the control unit 11 displays a flow abnormality on the display screen of the controller 90. Output the display.
  • the sensor detachment detection process is performed after the electromagnetic induction thermistor 14 is attached to the accumulator tube F and the installation of the air conditioner 1 is completed (after the installation is completed, the electromagnetic induction heating unit 6 This is a process for confirming the mounting state of the electromagnetic induction thermistor 14 that is performed when the heating operation is started for the first time. Specifically, after it is determined that the amount of refrigerant flowing in the accumulator tube F is secured in the above-described flow condition determination process, and the output of the electromagnetic induction heating unit 6 is maximized. Before performing the rapid pressure increase process at the time of startup, the control unit 11 performs a sensor detachment detection process.
  • the electromagnetic induction heating unit 6 is only activated after the carry-in.
  • the sensor detachment detection process is performed at the timing described above. In the sensor detachment detection process, as shown in the flowchart of FIG.
  • the temperature supply of the electromagnetic induction thermistor 14 (see point d in FIG. 16) is stored while the power supply to the coil 68 of the electromagnetic induction heating unit 6 is started.
  • the supply of electric power to the coil 68 of the electromagnetic induction heating unit 6 here is a sensor outage detection with a power outage detection supply power M1 (1 kW) of 50%, which is an output smaller than a predetermined maximum supply power Mmax (2 kW). It takes only 20 seconds as time.
  • the electromagnetic induction thermistor 14 is The output is suppressed to 50% so that the fuse 15 is not damaged due to the inability to detect an abnormal temperature rise and the resin member of the electromagnetic induction heating unit 6 is not melted.
  • the control unit 11 continues the output by the electromagnetic induction heating unit 6. The elapsed time is counted by the timer 95.
  • the supply of electric power to the coil 68 of the electromagnetic induction heating unit 6 and the magnitude of the magnetic field generated around the coil 68 are values having a correlation.
  • step S22 the control unit 11 determines whether the sensor detachment detection time has ended. If the sensor detachment detection time has ended, the process proceeds to step S23. On the other hand, if the sensor detachment detection time has not ended yet, step S22 is repeated.
  • step S23 the control unit 11 acquires the detected temperature of the electromagnetic induction thermistor 14 at the time when the sensor detachment detection time ends (see point e in FIG. 16), and proceeds to step S24.
  • step S24 the controller 11 detects that the detected temperature of the electromagnetic induction thermistor 14 at the time when the sensor disconnection detection time acquired in step S23 has ended is the electromagnetic induction thermistor at the start of the sensor disconnection detection time stored in step S21.
  • the detected temperature data of 14 is higher by 10 ° C. or more. That is, it is determined whether or not the refrigerant temperature has increased by 10 ° C. or more due to induction heating by the electromagnetic induction heating unit 6 during the sensor detachment detection time.
  • the detection temperature of the electromagnetic induction thermistor 14 is increased by 10 ° C. or more, the attachment state of the electromagnetic induction thermistor 14 with respect to the accumulator tube F is good, and induction heating by the electromagnetic induction heating unit 6 is performed.
  • the sensor detachment detection process is terminated, and the process proceeds to a rapid pressure increase process at the start-up that uses the output of the electromagnetic induction heating unit 6 to the maximum.
  • the process proceeds to step S25.
  • step S25 the control unit 11 counts the number of sensor detachment retry processes. If the number of retries is less than 10, the process proceeds to step S26. If the number of retries exceeds 10, the process proceeds to step S27 without proceeding to step S26.
  • step S ⁇ b> 26 the control unit 11 performs a sensor removal retry process.
  • the detected temperature data (not shown in FIG. 16) of the electromagnetic induction thermistor 14 when 30 seconds have elapsed is stored in the coil 68 of the electromagnetic induction heating unit 6 and the power at the detected detection supply power M1. Supply is performed for 20 seconds, and the same processing as in steps S22 and S23 is performed. When the detection temperature of the electromagnetic induction thermistor 14 is increased by 10 ° C.
  • the sensor detachment detection processing is terminated and the output of the electromagnetic induction heating unit 6 is Shift to rapid high pressure processing at start-up for maximum use.
  • the process returns to step S25.
  • step S ⁇ b> 27 the control unit 11 determines that the attachment state of the electromagnetic induction thermistor 14 to the accumulator tube F is unstable or not good, and outputs a sensor detachment abnormality display on the display screen of the controller 90.
  • Rapid pressure increase processing After the flow condition determination processing and the sensor detachment detection processing are completed, sufficient refrigerant flow is secured in the accumulator tube F, and the electromagnetic induction thermistor 14 is attached to the accumulator tube F in a good state. In a state where it is confirmed that the accumulator tube F has been appropriately heated by induction heating by the electromagnetic induction heating unit 6, the control unit 11 starts the rapid pressure increase processing.
  • the induction heating by the electromagnetic induction heating unit 6 is performed at a high output, it has been confirmed that the accumulator tube F does not rise abnormally, so the reliability of the air conditioner 1 can be improved. ing.
  • step S31 the control unit 11 does not set the power supply to the coil 68 of the electromagnetic induction heating unit 6 as the detachment detection supply power M1 whose output is limited to 50% as in the sensor detachment detection process described above.
  • a predetermined maximum supply power Mmax (2 kW) is assumed.
  • the output by the electromagnetic induction heating unit 6 here is continuously performed until the pressure sensor 29a reaches a predetermined target high pressure Ph.
  • the control unit 11 forcibly stops the compressor 21 when the pressure sensor 29a detects an abnormal high pressure Pr.
  • the target high pressure Ph in the rapid high pressure process is provided as a separate threshold value that is a pressure value smaller than the abnormal high pressure Pr.
  • step S32 the control unit 11 determines whether or not 10 minutes of the maximum continuous output time of the electromagnetic induction heating unit 6 that has started counting in step S21 of the sensor detachment detection process has elapsed. If the maximum continuous output time has not elapsed, the process goes to step S33. On the other hand, if the maximum continuous output time has elapsed, the process goes to step S34.
  • step S33 the control unit 11 determines whether or not the pressure detected by the pressure sensor 29a has reached the target high pressure Ph. If the target high pressure Ph has been reached, the process proceeds to step S34. On the other hand, if the target high pressure Ph is not reached, step S32 is repeated. In step S34, the control unit 11 starts driving the indoor fan 42, finishes the rapid pressure increase process, and shifts to the steady output process.
  • step S34 when the process is changed from step S33 to step S34, the indoor fan 42 starts to operate in a state in which sufficiently warm conditioned air can be provided to the user.
  • step S32 to step S34 it has not reached a state in which sufficient warm conditioned air can be provided to the user, but is in a state in which a certain amount of warm conditioned air can be provided, and the elapsed time from the start of heating operation. Provision of warm air can be started within a range that does not become too long.
  • the steady supply power M2 (1.4 kW), which is an output that is greater than or equal to the detection power supply M1 (1 kW) and less than or equal to the maximum supply power Mmax (2 kW), is a fixed output value.
  • the power supply frequency of the electromagnetic induction heating unit 6 is PI controlled so that the detected temperature of the electromagnetic induction thermistor 14 is maintained at 80 ° C., which is the target accumulator temperature at startup.
  • step S41 the control unit 11 stores the detected temperature of the electromagnetic induction thermistor 14, and proceeds to step S42.
  • step S42 the control unit 11 compares the detected temperature of the electromagnetic induction thermistor 14 stored in step S41 with the activation target accumulator tube temperature of 80 ° C. so that the detected temperature of the electromagnetic induction thermistor 14 is equal to the activation target accumulator. It is determined whether or not a predetermined maintenance temperature lower than the tube temperature of 80 ° C. by a predetermined temperature is reached. If the temperature is equal to or lower than the predetermined maintenance temperature, the process proceeds to step S43.
  • step S43 the control part 11 grasps
  • step S44 the control unit 11 continuously supplies power to the electromagnetic induction heating unit 6 while keeping the constant supply power M2 (1.4 kW) constant for 30 seconds, and sets the frequency of this set as the set.
  • the PI control is performed to increase the frequency as the elapsed time grasped in step S43 is longer.
  • connection state of the four-way switching valve 22 is set in the same manner as in the cooling operation (connection state indicated by the dotted line in FIG. 1), and the high-pressure high-temperature gas refrigerant discharged from the compressor 21 is supplied to the indoor heat exchanger 41. It is provided to the outdoor heat exchanger 23 before passing, and the frost adhering to the outdoor heat exchanger 23 is melted using the heat of condensation of the refrigerant.
  • step S51 the control unit 11 is capable of performing electromagnetic induction heating by the flow condition determination process that the frequency of the compressor 21 is equal to or higher than the predetermined minimum frequency Qmin and a predetermined refrigerant circulation amount is secured.
  • the control unit 11 determines whether or not the temperature detected by the outdoor heat exchanger temperature sensor 29c is less than 10 ° C. If it is lower than 10 ° C., the process proceeds to step S53. If it is not less than 10 ° C., step S52 is repeated.
  • Step S53 the control unit 11 stops the induction heating by the electromagnetic induction heating unit 6, and transmits a defrost signal.
  • step S54 after the defrost signal is transmitted, the control unit 11 sets the connection state of the four-way switching valve 22 to the connection state of the cooling operation, and further changes the connection state of the four-way switching valve 22 to the connection state of the cooling operation. After that, the elapsed time after defrosting is counted by the timer 95.
  • step S55 the control unit 11 determines whether or not 30 seconds have elapsed after the start of defrosting. If 30 seconds have elapsed, the process proceeds to step S56. If 30 seconds have not elapsed, step S55 is repeated.
  • step S56 the control unit 11 sets the power supply to the coil 68 of the electromagnetic induction heating unit 6 to a predetermined maximum supply power Mmax (2 kW), and the detected temperature of the electromagnetic induction thermistor 14 is 40 ° C., which is the target defrost temperature.
  • Mmax 2 kW
  • PI control is performed on the frequency of induction heating by the electromagnetic induction heating unit 6 so as to be different (different from the startup target accumulator temperature during steady output processing).
  • the hot gas bypass valve 27 of the hot gas bypass circuit H is further opened, and the outdoor fan 26 on the upper surface of the bottom plate 2b of the outdoor unit 2 is opened.
  • the high-temperature and high-pressure gas refrigerant is supplied below the outdoor heat exchanger 23 and below the outdoor heat exchanger 23, and the ice generated on the upper surface of the bottom plate 2b is removed.
  • the connection state of the four-way switching valve 22 is switched to the cooling operation state, the high-temperature and high-pressure gas refrigerant discharged from the compressor 21 is joined from the branch junction point 23k of the outdoor heat exchanger 23 to the junction branch point. 23j, and merge at the merge branch point 23j to be combined into one, so that the flow rate becomes three times the flow rate of the branch pipe K and flows through the merge pipe J in a concentrated manner. Since this junction pipe J is located in the vicinity of the lower end of the outdoor heat exchanger 23, a large amount of condensation heat can be concentrated in the vicinity of the lower end of the outdoor heat exchanger 23. Thereby, defrosting can be made quicker.
  • step S57 the control unit 11 determines whether or not the elapsed time after the start of defrost has exceeded 10 minutes. If 10 minutes has not elapsed, the process proceeds to step S58. If 10 minutes have passed, the process proceeds to step S59. This prevents the passage of 10 minutes or more while the connection state of the four-way switching valve 22 remains in the cooling state, and makes it difficult for the user to feel uncomfortable due to a decrease in the room temperature.
  • step S58 the control unit 11 determines whether or not the temperature detected by the outdoor heat exchanger temperature sensor 29c exceeds 10 ° C. If it exceeds 10 ° C., the process proceeds to step S59. If the temperature does not exceed 10 ° C., the process returns to step S56 and is repeated.
  • step S59 the control unit 11 stops the compressor 21 and finishes induction heating by the electromagnetic induction heating unit 6 while equalizing high and low pressures in the refrigeration cycle.
  • step S60 the control part 11 switches the connection state of the four-way switching valve 22 to the connection state of heating operation. And the control part 11 transmits the signal which finishes defrost. Further, the control unit 11 increases the frequency of the compressor 21 to a predetermined minimum frequency Qmin or more, and performs a steady output process until the defrost process is performed again. Further, the hot gas bypass valve 27 of the hot gas bypass circuit H is closed after 5 seconds after a signal to finish defrosting is transmitted.
  • the output from the electromagnetic induction heating unit 6 is set to the maximum supply power Mmax (2 kW), and the high temperature and pressure increase of the refrigerant flowing toward the indoor heat exchanger 41 is quickly performed. Processing to achieve. Thereby, it is possible to shorten the time required from the start of the heating operation until warm air is provided to the user. Further, by performing steady output processing when the room is warmed to some extent, the steady supply power M2 (1.4 kW) in which the output from the electromagnetic induction heating unit 6 is limited to be smaller than the maximum supply power Mmax (2 kW) is set as a fixed output value. Yes. Thereby, it is possible to suppress the overshoot of the control due to excessive increase of the output of the electromagnetic induction heating unit 6.
  • the electromagnetic induction heating unit 6 of the air conditioner 1 When electromagnetic induction heating is performed, in general, a rapid temperature increase is more likely to occur than a temperature increase due to a change in the circulation state of the refrigerant in the refrigeration cycle.
  • the electromagnetic induction thermistor 14 that is pressed against the magnetic tube F ⁇ b> 2 by the elastic force of the leaf spring 16 is used in the above-described steady output processing by electromagnetic induction heating. Responsiveness to rapid temperature changes due to induction heating is well maintained. For this reason, the responsiveness of the steady output process is improved, and the control overshoot can be further suppressed.
  • the induction heating by the electromagnetic induction heating unit 6 is performed with the maximum supply power Mmax (2 kW), so that the defrosting process can be speeded up.
  • Mmax the maximum supply power
  • the temperature detected by the electromagnetic induction thermistor 14 is set to 40 ° C., which is the target defrost temperature, and is kept lower than the target accumulator temperature at the time of steady output processing, the overshoot due to control is kept small. I have to.
  • the electromagnetic induction heating unit 6 For example, at the end of the rapid pressure-increasing process for causing the electromagnetic induction heating unit 6 to output at the maximum supply power Mmax (2 kW), based on the temperature corresponding to the refrigerant of the target high-pressure pressure Ph that passes through the mounting portion of the pressure sensor 29a.
  • the temperature determined by the electromagnetic induction thermistor 14 may be detected.
  • the temperature change detection when determining the end of the rapid pressure increase process has a magnetic pipe F 2 in the refrigerant flow direction. It may be the detection temperature of the electromagnetic induction downstream thermistor 214 that detects a temperature change in the vicinity of the downstream side of the accumulator tube F, and is not limited to the one that detects the temperature of the accumulator tube F.
  • the electromagnetic induction thermistor 14 is attached by detecting that the temperature detected by the electromagnetic induction thermistor 14 changes due to the electromagnetic induction heating unit 6 changing from a stopped state to generate a magnetic field.
  • the case of confirming that the state is good has been described as an example.
  • the mounting state of the electromagnetic induction thermistor 14 may be confirmed by changing from a state where the electromagnetic induction heating unit 6 generates a magnetic field to a state where no magnetic field is generated. In this case, it can be confirmed that the state of attachment of the electromagnetic induction thermistor 14 is good due to a change in the detection temperature that the detection temperature of the electromagnetic induction thermistor 14 decreases. Further, by simply changing the electric power supplied to the coil 68 of the electromagnetic induction heating unit 6, the magnitude of the magnetic field to be generated is changed, and the change in the detected temperature of the electromagnetic induction thermistor 14 caused by this change is examined, thereby electromagnetic induction. The attachment state of the thermistor 14 may be confirmed.
  • the present invention is not limited to this.
  • the predetermined temperature of the detection device is a value between the temperature before and after the sensor detachment detection process. By doing so, the temperature change of the accumulator tube F may be detected. In this case, even if it is not possible to detect a specific temperature when performing the sensor detachment detection process, the sensor mounting state can be confirmed by detecting the temperature change.
  • the output frequency is controlled while fixing the output by the electromagnetic induction heating unit 6 for electromagnetic induction heating at 70% in the steady output processing has been described.
  • the present invention is not limited to this.
  • the output by the electromagnetic induction heating unit 6 may be controlled based on the detected temperature of the electromagnetic induction thermistor 14 while fixing the frequency of performing the electromagnetic induction heating.
  • both the frequency of electromagnetic induction heating and the output of the electromagnetic induction heating unit 6 may be controlled based on the temperature detected by the electromagnetic induction thermistor 14.
  • a magnetic material such as the magnetic material tube F2 is provided in the refrigerant piping portion where the electromagnetic induction heating unit 6 is provided.
  • the accumulation pipe F was comprised as a double pipe
  • the present invention is not limited to this.
  • the magnetic member F2a and the two stoppers F1a and F1b may be arranged inside the accumulator pipe F or the refrigerant pipe to be heated.
  • the magnetic member F2a contains a magnetic material, and is a member that generates heat by electromagnetic induction heating in the above embodiment.
  • the stoppers F1a and F1b always allow the refrigerant to pass through at two locations inside the copper tube F1, but do not allow the magnetic member F2a to pass through. Thereby, the magnetic member F2a does not move even when the refrigerant flows. For this reason, the target heating position of the accumulator tube F or the like can be heated. Furthermore, since the magnetic member F2a that generates heat and the refrigerant are in direct contact, the heat transfer efficiency can be improved.
  • the magnetic member F2a described in the other embodiment (F) may be positioned with respect to the pipe without using the stoppers F1a and F1b.
  • the copper pipe F1 may be provided with two bent portions FW, and the magnetic body member F2a may be disposed inside the copper pipe F1 between the two bent portions FW. Even in this case, the movement of the magnetic member F2a can be suppressed while allowing the refrigerant to pass therethrough.
  • H In the above embodiment, the case where the coil 68 is spirally wound around the accumulator tube F has been described. However, the present invention is not limited to this.
  • the coil 168 wound around the bobbin main body 165 may be arranged around the accumulator tube F without being wound around the accumulator tube F.
  • the bobbin main body 165 is disposed so that the axial direction is substantially perpendicular to the axial direction of the accumulator tube F.
  • the bobbin main body 165 and the coil 168 are arranged separately in two so as to sandwich the accumulator tube F. In this case, for example, as shown in FIG. 26, even if the first bobbin lid 163 and the second bobbin lid 164 penetrating the accumulator tube F are disposed in a state of being fitted to the bobbin main body 165. Good. Further, as shown in FIG.
  • the first bobbin lid 163 and the second bobbin lid 164 may be sandwiched and fixed by the first ferrite case 171 and the second ferrite case 172.
  • the case where the two ferrite cases are arranged so as to sandwich the accumulator tube F is described as an example, but may be arranged in four directions as in the above embodiment. Moreover, you may accommodate the ferrite similarly to the said embodiment.
  • ⁇ Others> The embodiments of the present invention have been described above with some examples, but the present invention is not limited to these. For example, combined embodiments obtained by appropriately combining different portions of the above-described embodiments within the scope that can be implemented by those skilled in the art from the above description are also included in the present invention.
  • the electromagnetic induction heating unit and the air conditioner for heating the refrigerant using electromagnetic induction it is possible to suppress the overshoot after the startup while keeping the startup capability quickly while using the present invention. It is particularly useful.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)
  • Devices For Blowing Cold Air, Devices For Blowing Warm Air, And Means For Preventing Water Condensation In Air Conditioning Units (AREA)
  • Compression-Type Refrigeration Machines With Reversible Cycles (AREA)

Abstract

 起動時の能力を迅速に確保しつつ、起動後のオーバーシュートを小さく抑えるコトが可能な空気調和装置を提供する。圧縮機(21)と、磁性体管(F2)が外周を構成している冷媒配管(F)を有する冷凍サイクルを利用する空気調和装置(1)であって、コイル(68)、圧力センサ(29a)、および、制御部(11)を備えている。コイル(68)は、磁性体管(F2)を誘導加熱するための磁界を発生させる。圧力センサ(29a)は、冷凍サイクルの少なくとも一部の高圧側の冷媒圧力を検知する。制御部(11)は、冷凍サイクルが暖房運転を実行している時においてコイル(68)による磁界の発生を最大供給電力(Mmax)とする状態を、圧縮機(21)の周波数が所定最低周波数(Qmin)以上の時から開始して圧力センサ(29a)が検知する圧力が目標高圧圧力(Ph)に到達するまで行い。到達した時点以降は、最大供給電力(Mmax)よりも低い定常供給電力(M2)を出力の上限として制約をかけた運転を行う。

Description

空気調和装置
 本発明は、空気調和装置に関する。
 暖房運転可能な空気調和装置について、暖房能力を増大させる目的で冷媒加熱機能を備えたものが提案されている。
 例えば、以下に示す特許文献1(特開2000-97510号公報)に記載の空気調和機では、冷媒加熱器に流入した冷媒をガスバーナーによって加熱することで暖房能力を増大させている。
 ここで、この特許文献1(特開2000-97510号公報)に記載の空気調和機では、暖房運転時に、冷媒の温度が上昇し過ぎて保護動作が頻繁に行われてしまうことを防止するために、サーミスタの検知値に基づいてガスバーナーの燃焼量を調節する技術が提案されている。
 上述の特許文献1に記載の技術では、保護動作の頻度を抑えるだけであり、起動時と起動後との負荷の違いに着目した制御はなんら提案されていない。
 例えば、空気調和装置の起動時には周囲の温度と設定温度との差が大きく、迅速に設定温度に近づけることが望まれる、他方、起動時と起動後の負荷が異なる場合には、目標値を大きく超えるオーバーシュートが生じてしまうおそれがある。
 なお、冷媒の加熱方式が電磁誘導加熱方式である場合には、加熱速度が速いため、上述のオーバーシュートは特に問題となりやすい。
 本発明は上述した点に鑑みてなされたものであり、本発明の課題は、起動時の能力を迅速に確保しつつ、起動後のオーバーシュートを小さく抑えることが可能な空気調和装置を提供することにある。
 第1の観点にかかる空気調和装置は冷媒配管および/または冷媒配管中を流れる冷媒と熱的接触をする部材の誘導加熱を行い、冷媒を循環させる圧縮機構を含んだ冷凍サイクルを利用する、空気調和装置であって、磁界発生部、冷媒状態量検知部、および、制御部を備えている。磁界発生部は、誘導加熱の加熱対象部分を誘導加熱するための磁界を発生させる。冷媒状態量検知部は、冷凍サイクルの少なくとも一部である所定状態量検知部分を流れる冷媒に関する状態量を検知する。ここでの状態量は、例えば、温度および圧力の少なくともいずれか一方が含まれる。制御部は、起動時磁界発生制御および起動後磁界発生制御を行う。起動時磁界発生制御では、制御部は、冷凍サイクルで暖房運転を行う起動時において、磁界発生部による出力を所定最大出力とする状態を、圧縮機構が駆動状態となっている時から開始して冷媒状態量検知部が検知する状態量が第1所定目標状態量に到達した時に終了させる。起動後磁界発生制御では、制御部は、所定最大出力よりも低い第1磁界制限基準値を磁界発生部の出力の上限として制約をかける状態を、起動時磁界発生制御が終了した後に行う。なお、ここで「冷凍サイクルが暖房運転を実行している時」には、例えば、除霜運転等の運転は含まれない。また、ここでの電磁誘導加熱ユニットによる加熱としては、例えば、冷媒配管と熱的接触をしている発熱部材を電磁誘導加熱する場合、冷媒配管中を流れる冷媒と熱的接触をしている発熱部材を電磁誘導加熱する場合、および、冷媒配管の少なくとも一部を構成する発熱部材を電磁誘導加熱する場合、が少なくとも含まれる。
 この空気調和装置では、起動時における磁界発生部の出力が最大となるようにする起動時磁界発生制御を行うことで、暖房運転の起動開始からユーザに暖かい空気が提供されるまでに要する時間を短縮化させることが可能になる。起動後磁界発生制御においては磁界発生部による出力を上げ過ぎることによる制御のオーバーシュートを小さく抑えることが可能になる。これにより、ユーザに対する暖かい空気の供給を迅速に開始させつつ制御のオーバーシュートを小さく抑えることが可能になる。
 第2の観点にかかる空気調和装置は、第1の観点の空気調和装置において、誘導加熱の加熱対象部分は、磁性体材料を含んでいる。
 この空気調和装置では、磁性体材料を含んでいる部分を対象として、磁界発生部が磁界を生じさせるため、電磁誘導による発熱を効率的に行わせることが可能になる。
 第3の観点にかかる空気調和装置は、第1の観点または第2の観点の空気調和装置において、所定状態量検知部分は、磁界発生部によって磁界が生じている部分である。
 この空気調和装置では、電磁誘導加熱による迅速な温度変化を把握することができるようになるため、制御の応答性を向上させることが可能になる。
 第4の観点にかかる空気調和装置は、第1の観点から第3の観点のいずれかの空気調和装置において、冷媒状態量検知部が検知する状態量は、所定状態量検知部分を流れる冷媒に関する温度および圧力の少なくとも何れか一方である。
 この空気調和装置では、冷凍サイクルの状態制御のために用いられる各種センサを利用してここでの検知を行うことが可能になる。
 第5の観点にかかる空気調和装置は、第1の観点から第4の観点のいずれかの空気調和装置において、冷媒状態量検知部は、所定状態量検知部分を流れる冷媒に関する温度を検知する温度検知部である。制御部は、起動後磁界発生制御では、温度検知部が検知する温度が目標維持温度で維持されるように磁界発生部による出力値もしくは出力頻度をPI制御する起動後磁界発生PI制御を行う。なお、ここでの目標維持温度は、第1所定目標温度と同一温度であってもよい。
 この空気調和装置では、所定状態量検知部分を通過する冷媒の状態変化に起因する温度変化よりも、電磁誘導加熱による温度変化の方が一般に急激になる。ここでは、このように電磁誘導加熱によって急激に温度変化する場合であっても、磁界発生部に発生させる磁界の大きさおよび/または磁界発生部に磁界を発生させる頻度をPI制御することで、温度検知部が検知する温度を第2所定目標温度で安定させることが可能になる。
 第6の観点にかかる空気調和装置は、第1の観点から第5の観点のいずれかの空気調和装置において、冷媒状態量検知部は、所定状態量検知部分を流れる冷媒に関する温度を検知する温度検知部である。制御部は、磁界レベル増加条件を満たした後に起動時磁界発生制御を実行する。この磁界レベル増加条件とは、磁界発生部に発生させる磁界のレベルを所定最大出力よりも低い範囲内で上げるもしくは下げるという磁界レベル変化処理を行うことで温度検知部の検知温度に変化があることもしくは温度検知部が温度変化を検知することである。
 電磁誘導加熱を行った場合であっても温度検知部が温度変化を検出できない場合には、温度検知部の取付状態が不安定であったり外れていたりするおそれがある。
 これに対して、この空気調和装置では、このように温度検知部の取付状態が不安定であったり外れていたりした場合には、温度変化が十分に生じずに磁界レベル増加条件を満たすことが無い。このため、制御部は、所定最大出力よりも低いレベルになるように磁界の発生が制限され、高いレベルでの磁界の発生が行われないため、機器の信頼性を向上させることができている。磁界レベル増加条件を満たした場合には、磁界発生部による磁界の発生によって誘導加熱の加熱対象部分が発熱しており、温度検知部の設置状態が良好であり、誘導加熱の加熱対象部分の温度を的確に認識できていることを把握することができる。これにより、電磁誘導加熱による異常な温度上昇によって機器にダメージが生ずることを抑制することが可能となり、機器の信頼性を向上させることが可能になる。
 第7の観点にかかる空気調和装置は、第6の観点の空気調和装置において、磁界レベル変化処理で出力される最大の磁界レベルは、第1磁界制限基準値よりも小さい値である。
 この空気調和装置では、温度検知部の取付状態が良好であることが確認されていない段階で第1磁界制限基準値程度の大きさの磁界による電磁誘導加熱を防止させることが可能になる。
 第8の観点にかかる空気調和装置は、第1の観点から第7の観点のいずれかの空気調和装置において、冷媒状態量検知部は、所定状態量検知部分を流れる冷媒に関する温度を検知する温度検知部である。制御部は、流動条件を満たした後に、磁界レベル増加条件の判定を実行する。流動条件とは、第1圧縮機構状態と第1圧縮機構状態よりも出力レベルの高い第2圧縮機構状態との圧縮機構の出力が異なる両方の圧縮機構状態を圧縮機構に実現させた際に、第1圧縮機構状態と第2圧縮機構状態とで温度検知部の検知温度に変化があることである。なお、第1圧縮機構状態には、圧縮機構が停止している状態が含まれる。
 この空気調和装置では、流動条件を満たしていない場合には冷媒の流れが不足していることになり、磁界レベル増加条件を判定するためのレベルでの磁界発生部による出力であっても、異常温度上昇を生じさせてしまうおそれがある。これに対して、この空気調和装置では、所定状態量検知部分を通過する冷媒の流れを確保しつつ磁界レベル増加条件の判定を実行することができるため、機器の信頼性を維持したままで磁界レベル増加条件の判断を行うことが可能になる。
 第9の観点にかかる空気調和装置は、第1の観点から第8の観点のいずれかの空気調和装置において、冷媒状態量検知部は、所定状態量検知部分を流れる冷媒に関する温度を検知する温度検知部である。制御部は、起動後磁界発生制御を開始した後であって、冷凍サイクルに暖房運転とは異なる除霜運転を実行させている時には、磁界発生部の出力の上限を所定最大出力として、温度検知部の検知温度に基づいて磁界発生部による出力を制御する除霜運転出力制御を行う。
 この空気調和装置では、起動時磁界発生制御と同様に磁界発生部による出力を高くすることができるため、除霜処理を迅速化させることが可能になる。
 第10の観点にかかる空気調和装置は、第9の観点の空気調和装置において、制御部は、除霜運転出力制御時には、温度検知部が検知する温度が第1所定目標温度よりも低い第2所定目標温度で維持されるようにPI制御する除霜PI制御を行う。
 この空気調和装置では、除霜運転時には、起動時磁界発生制御の時と比べて温度の異常上昇が生じにくいため、温度検知部の検知温度を第2所定目標温度として起動時磁界発生制御の第1所定目標温度よりも低くすることで、除霜運転時のオーバーシュートを低減させることが可能になる。
 第11の観点にかかる空気調和装置は、第1の観点から第10の観点のいずれかの空気調和装置において、冷媒状態量検知部は、所定状態量検知部分を流れる冷媒に関する温度を検知する温度検知部である。温度検知部に対して弾性力を与える弾性部材をさらに備えている。温度検知部は、弾性部材による前記弾性力によって所定状態量検知部分に圧接している。
 この空気調和装置では、電磁誘導加熱が行われる場合には、一般に、冷凍サイクルにおいて冷媒の循環状況が変化することによる温度上昇よりも、急激な温度上昇が生じやすい。
 これに対して、この空気調和装置では、弾性部材によって所定状態量検知部分に対して圧接した状態を維持されているため、温度検知部の応答性をより良好にすることができる。これにより、応答性を向上させた制御を行うことが可能になる。
 第1の観点にかかる空気調和装置では、ユーザに対する暖かい空気の供給を迅速に開始させつつ制御のオーバーシュートを小さく抑えることが可能になる。
 第2の観点にかかる空気調和装置では、電磁誘導による発熱を効率的に行わせることが可能になる。
 第3の観点にかかる空気調和装置では、制御の応答性を向上させることが可能になる。
 第4の観点にかかる空気調和装置では、冷凍サイクルの状態制御のために用いられる各種センサを利用してここでの検知を行うことが可能になる。
 第5の観点にかかる空気調和装置では、温度検知部が検知する温度を第2所定目標温度で安定させることが可能になる。
 第6の観点にかかる空気調和装置では、電磁誘導加熱による異常な温度上昇によって機器にダメージが生ずることを抑制することが可能となり、機器の信頼性を向上させることが可能になる。
 第7の観点にかかる空気調和装置では、温度検知部の取付状態が良好であることが確認されていない段階で第1磁界制限基準値程度の大きさの磁界による電磁誘導加熱を防止させることが可能になる。
 第8の観点にかかる空気調和装置では、機器の信頼性を維持したままで磁界レベル増加条件の判断を行うことが可能になる。
 第9の観点にかかる空気調和装置では、除霜処理を迅速化させることが可能になる。
 第10の観点にかかる空気調和装置では、除霜運転時のオーバーシュートを低減させることが可能になる。
 第11の観点にかかる空気調和装置では、応答性を向上させた制御を行うことが可能になる。
本発明の一実施形態にかかる空気調和装置の冷媒回路図である。 室外機の正面側を含む外観斜視図である。 室外機の内部配置構成斜視図である。 室外機の内部配置構成の背面側を含む外観斜視図である。 室外機の機械室の内部構造を示す全体前方斜視図である。 室外機の機械室の内部構造を示す斜視図である。 室外機の底板と室外熱交換器との斜視図である。 室外機の送風機構を取り除いた状態での平面図である。 室外機の底板とホットガスバイパス回路との配置関係を示す平面図である。 電磁誘導加熱ユニットの外観斜視図である。 電磁誘導加熱ユニットから遮蔽カバーを取り除いた状態を示す外観斜視図である。 電磁誘導サーミスタの外観斜視図である。 ヒューズの外観斜視図である。 電磁誘導サーミスタおよびヒューズの取付状態を示す概略断面図である。 電磁誘導加熱ユニットの断面構成図である。 電磁誘導加熱制御のタイムチャートを示す図である。 流動条件判定処理のフローチャートを示す図である。 センサ外れ検知処理のフローチャートを示す図である。 急速高圧化処理のフローチャートを示す図である。 定常出力処理のフローチャートを示す図である。 デフロスト処理のフローチャートを示す図である。 他の実施形態(A)にかかる電磁誘導サーミスタの取付位置を示す図である。 他の実施形態(F)の冷媒配管の説明図である。 他の実施形態(G)の冷媒配管の説明図である。 他の実施形態(H)のコイルと冷媒配管との配置例を示す図である。 他の実施形態(H)のボビン蓋の配置例を示す図である。 他の実施形態(H)のフェライトケースの配置例を示す図である。
 以下、図面を参照しつつ、本発明の一実施形態における電磁誘導加熱ユニット6を備えた空気調和装置1を例に挙げて説明する。
<1-1>空気調和装置1
 図1に、空気調和装置1の冷媒回路10を示す冷媒回路図を示す。
 空気調和装置1は、熱源側装置としての室外機2と、利用側装置としての室内機4とが冷媒配管によって接続されて、利用側装置が配置された空間の空気調和を行うものであって、圧縮機21、四路切換弁22、室外熱交換器23、室外電動膨張弁24、アキュームレータ25、室外ファン26、室内熱交換器41、室内ファン42、ホットガスバイパス弁27、キャピラリーチューブ28および電磁誘導加熱ユニット6等を備えている。
 圧縮機21、四路切換弁22、室外熱交換器23、室外電動膨張弁24、アキュームレータ25、室外ファン26、ホットガスバイパス弁27、キャピラリーチューブ28および電磁誘導加熱ユニット6は、室外機2内に収容されている。室内熱交換器41および室内ファン42は、室内機4内に収容されている。
 冷媒回路10は、吐出管A、室内側ガス管B、室内側液管C、室外側液管D、室外側ガス管E、アキューム管F、吸入管G、ホットガスバイパス回路H、分岐配管Kおよび合流配管Jを有している。室内側ガス管Bおよび室外側ガス管Eは、ガス状態の冷媒が多く通過するものではあるが、通過する冷媒をガス冷媒に限定しているものではない。室内側液管Cおよび室外側液管Dは、液状態の冷媒が多く通過するものではあるが、通過する冷媒を液冷媒に限定しているものではない。
 吐出管Aは、圧縮機21と四路切換弁22とを接続している。
 室内側ガス管Bは、四路切換弁22と室内熱交換器41とを接続している。この室内側ガス管Bの途中には、通過する冷媒の圧力を検知する圧力センサ29aが設けられている。
 室内側液管Cは、室内熱交換器41と室外電動膨張弁24とを接続している。
 室外側液管Dは、室外電動膨張弁24と室外熱交換器23とを接続している。
 室外側ガス管Eは、室外熱交換器23と四路切換弁22とを接続している。
 アキューム管Fは、四路切換弁22とアキュームレータ25とを接続しており、室外機2の設置状態で鉛直方向に伸びている。アキューム管Fの一部に対して、電磁誘導加熱ユニット6が取り付けられている。アキューム管Fのうち、少なくとも後述するコイル68によって周囲を覆われている発熱部分は、内側に冷媒を流している銅管F1、および、銅管F1の周囲を覆うように設けられた磁性体管F2によって構成されている(図15参照)。この磁性体管F2は、SUS(Stainless Used Steel:ステンレス鋼)430によって構成されている。このSUS430は、強磁性体材料であって、磁界に置かれると渦電流を生じつつ、自己の電気抵抗によって生ずるジュール熱により発熱する。冷媒回路10を構成する配管のうち磁性体管F2以外の部分は、銅管F1と同じ材質の銅管で構成されている。なお、上記銅管の周囲を覆う管の材質はSUS430に限定されるものではなく、例えば、鉄、銅、アルミ、クロム、ニッケル等の導体およびこれらの群から選ばれる少なくとも2種以上の金属を含有する合金等とすることができる。また、磁性体材料としては、例えば、フェライト系、マルテンサイト系およびこれらの組み合わせが例として挙げられるが、強磁性体であって電気抵抗が比較的高いものであり使用温度範囲よりもキュリー温度が高い材料が好ましい。なお、ここでのアキューム管Fは、より多くの電力が必要とされるが、磁性体および磁性体を含有する材料を備えていなくてもよく、誘導加熱が行われる対象となる材質を含有するものであってもよい。なお、磁性体材料は、例えば、アキューム管Fのすべてを構成していてもよいし、アキューム管Fの内側表面のみに形成されていてもよく、アキューム管Fを構成する材料中に含有されることで存在していてもよい。このように電磁誘導加熱を行うことで、アキューム管Fを電磁誘導によって加熱させることができ、アキュームレータ25を介して圧縮機21に吸入される冷媒を暖めることができる。これにより、空気調和装置1の暖房能力を向上させることができる。また、例えば、暖房運転の起動時においては、圧縮機21が十分に暖まっていない場合であっても、電磁誘導加熱ユニット6による迅速な加熱によって起動時の能力不足を補うことができる。さらに、四路切換弁22を冷房運転用の状態に切り換えて、室外熱交換器23等に付着した霜を除去するデフロスト運転を行う場合には、電磁誘導加熱ユニット6がアキューム管Fを迅速に加熱することで、圧縮機21は迅速に暖められた冷媒を対象として圧縮することができる。このため、圧縮機21から吐出するホットガスの温度を迅速に上げることができる。これにより、デフロスト運転によって霜を解凍させるのに必要とされる時間を短縮化させることができる。これにより、暖房運転中に適時デフロスト運転を行うことが必要となる場合であっても、できるだけ早く暖房運転に復帰させることができ、ユーザの快適性を向上させることができる。
 吸入管Gは、アキュームレータ25と圧縮機21の吸入側とを接続している。
 ホットガスバイパス回路Hは、吐出管Aの途中に設けられた分岐点A1と室外側液管Dの途中に設けられた分岐点D1とを接続している。ホットガスバイパス回路Hは、途中に冷媒の通過を許容する状態と許容しない状態とを切換可能なホットガスバイバス弁27が配置されている。なお、ホットガスバイパス回路Hは、ホットガスバイバス弁27と分岐点D1との間に、通過する冷媒圧力を下げるキャピラリーチューブ28が設けられている。このキャピラリーチューブ28は、暖房運転時の室外電動膨張弁24による冷媒圧力の低下後の圧力に近づけることができるため、ホットガスバイパス回路Hを通じた室外側液管Dへのホットガスの供給による室外側液管Dの冷媒圧力上昇を抑えることができる。
 分岐配管Kは、室外熱交換器23の一部を構成しており、熱交換を行うための有効表面積を増大させるために、室外熱交換器23のガス側出入口23eから伸びる冷媒配管が後述する分岐合流点23kで複数本に分岐した配管である。この分岐配管Kは、分岐合流点23kから合流分岐点23jまでそれぞれ独立して延びている第1分岐配管K1、第2分岐配管K2および第3分岐配管K3を有しており、これらの各分岐配管K1、K2、K3は合流分岐点23jで合流している。なお、合流配管J側から見ると、合流分岐点23jで分岐して分岐配管Kが延びている。
 合流配管Jは、室外熱交換器23の一部を構成しており、合流分岐点23jから室外熱交換器23の液側出入口23dまで伸びている配管である。合流配管Jは、冷房運転時に室外熱交換器23から流れ出る冷媒の過冷却度を統一させることができるとともに、暖房運転時に室外熱交換器23の下端近傍に着霜した氷を解凍させることができる。合流配管Jは、各分岐配管K1、K2、K3の断面積の略3倍の断面積を有しており、通過冷媒量が、各分岐配管K1、K2、K3の略3倍になっている。
 四路切換弁22は、冷房運転サイクルと暖房運転サイクルとを切換可能である。図1では、暖房運転を行う際の接続状態を実線で示し、冷房運転を行う際の接続状態を点線で示している。暖房運転時には、室内熱交換器41が冷媒の冷却器として、室外熱交換器23が冷媒の加熱器として機能する。冷房運転時には、室外熱交換器23が冷媒の冷却器として、室内熱交換器41が冷媒の加熱器として機能する。
 室外熱交換器23は、ガス側出入口23e、液側出入口23d、分岐合流点23k、合流分岐点23j、分岐配管K、合流配管Jおよび熱交フィン23zを有している。ガス側出入口23eは、室外熱交換器23の室外側ガス管E側の端部に位置しており、室外側ガス管Eと接続される。液側出入口23dは、室外熱交換器23の室外側液管D側の端部に位置しており、室外側液管Dと接続される。分岐合流点23kは、ガス側出入口23eから伸びる配管を分岐させており、流れる冷媒の方向に応じて冷媒を分岐もしくは合流させることができる。分岐配管Kは、分岐合流点23kにおける各分岐部分から複数本伸びている。合流分岐点23jは、分岐配管Kを合流させており、流れる冷媒の方向に応じて冷媒を合流もしくは分岐させることができる。合流配管Jは、合流分岐点23jから液側出入口23dまで伸びている。熱交フィン23zは、板状のアルミフィンが板厚方向に複数枚並んで、所定の間隔で配置されて構成されている。分岐配管Kおよび合流配管Jは、いずれも、熱交フィン23zを共通の貫通対象としている。具体的には、分岐配管Kおよび合流配管Jは、共通の熱交フィン23zの異なる部分で板圧方向に貫通して配置されている。この室外熱交換器23に対して、室外ファン26の空気流れ方向風上側には、室外の気温を検知する室外気温センサ29bが設けられている。また、室外熱交換器23には、分岐配管空気調和装置を流れる冷媒温度を検知する室外熱交温度センサ29cが設けられている。
 室内機4内には、室内温度を検知する室内温度センサ43が設けられている。また、室内熱交換器41には、室外電動膨張弁24が接続されている室内側液管C側の冷媒温度を検知する室内熱交温度センサ44が設けられている。
 室外機2内に配置される機器を制御する室外制御部12と、室内機4内に配置されている機器を制御する室内制御部13とが、通信線11aによって接続されることで、制御部11を構成している。この制御部11は、空気調和装置1を対象とした種々の制御を行う。
 また、室外制御部12には、各種制御を行う際に経過時間をカウントするタイマ95が設けられている。
 なお、制御部11には、ユーザからの設定入力を受け付けるコントローラ90が接続されている。
<1-2>室外機2
 図2に、室外機2の正面側の外観斜視図を示す。図3に、室外熱交換器23および室外ファン26との位置関係についての斜視図を示す。図4に、室外熱交換器23の背面側の斜視図を示す。
 室外機2は、天板2a、底板2b、フロントパネル2c、左側面パネル2d、右側面パネル2fおよび背面パネル2eによって構成される略直方体形状の室外機ケーシングによって外面を構成している。
 室外機2は、室外熱交換器23および室外ファン26等が配置されており左側面パネル2d側である送風機室と、圧縮機21や電磁誘導加熱ユニット6が配置されており右側面パネル2f側である機械室と、に仕切り板2hを介して区切られている。また、室外機2は、底板2bに対して螺着されることで固定され、室外機2の最下端部を右側と左側において構成する室外機支持台2gを有している。なお、電磁誘導加熱ユニット6は、機械室のうちの左側面パネル2dおよび天板2aの近傍である上方の位置に配置されている。ここで、上述した室外熱交換器23の熱交フィン23zは、略水平方向に板厚方向が向くようにしつつ、板厚方向に複数並んで配置されている。合流配管Jは、室外熱交換器23の熱交フィン23zのうち最も下の部分において、熱交フィン23zを厚み方向に貫通することで配置されている。ホットガスバイパス回路Hは、室外ファン26および室外熱交換器23の下方を沿うように配置されている。
<1-3>室外機2の内部構造
 図5に、室外機2の機械室の内部構造を示す全体前方斜視図を示す。図6に、室外機2の機械室の内部構造を示す斜視図を示す。図7に、室外熱交換器23と底板2bとの配置関係についての斜視図を示す。
 室外機2の仕切り板2hは、室外熱交換器23および室外ファン26等が配置されている送風機室と、電磁誘導加熱ユニット6、圧縮機21およびアキュームレータ25等が配置されている機械室と、を区切るように前方から後方に向けて上端から下端に掛けて仕切っている。圧縮機21およびアキュームレータ25は、室外機2の機械室の下方の空間に配置されている。そして、電磁誘導加熱ユニット6、四路切換弁22および室外制御部12は、室外機2の機械室の上方の空間であって、圧縮機21やアキュームレータ25等の上の空間に配置されている。室外機2を構成する機能要素であって機械室に配置されている圧縮機21、四路切換弁22、室外熱交換器23、室外電動膨張弁24、アキュームレータ25、ホットガスバイパス弁27、キャピラリーチューブ28および電磁誘導加熱ユニット6は、図1において示した冷媒回路10による冷凍サイクルを実行するように、吐出管A、室内側ガス管B、室外側液管D、室外側ガス管E、アキューム管F、ホットガスバイパス回路H等を介して接続されている。ここで、ホットガスバイパス回路Hは、後述するように、第1バイパス部分H1~第9バイパス部分H9の、9つの部分が繋がって構成されており、ホットガスバイパス回路Hに冷媒が流れる際は、第1バイパス部分H1から順番に第9バイパス部分H9に向かう方向に流れる。
<1-4>合流配管Jおよび分岐配管K
 図7に示す合流配管Jは、上述したように、断面積が、第1分岐配管K1、第2分岐配管K2および第3分岐配管K3の各配管の断面積相当の面積を有しているため、室外熱交換器23のうち、第1分岐配管K1、第2分岐配管K2および第3分岐配管K3の部分では、合流配管Jよりも熱交換有効表面積を増大させることができている。また、合流配管Jの部分には、第1分岐配管K1、第2分岐配管K2および第3分岐配管K3の部分と比較して、大量の冷媒がまとまって集中的に流れているため、室外熱交換器23の下方における氷の成長をより効果的に抑制させることができている。ここで、合流配管Jは、図7に示すように、第1合流配管部分J1、第2合流配管部分J2、第3合流配管部分J3および第4合流配管部分J4が互いに接続されることで構成されている。そして、室外熱交換器23のうち分岐配管Kを流れてきた冷媒は、合流分岐点23jにおいて合流され、冷媒回路10における冷媒の流れを1つにまとめた状態で、室外熱交換器23の最下端部分を一往復するように配置されている。ここで、第1合流配管部分J1は、合流分岐点23jから室外熱交換器23の最縁部に配置された熱交フィン23zまで延びている。第2合流配管部分J2は、第1合流配管部分J1の端部から複数枚の熱交フィン23zを貫通するように延びている。また、第4合流配管部分J4は、第2合流配管部分J2と同様に、複数枚の熱交フィン23zを貫通するように延びている。第3合流配管部分J3は、第2合流配管部分J2と第4合流配管部分J4とを室外熱交換器23の端部において接続するU字管である。冷房運転時には、冷媒回路10における冷媒の流れは、分岐配管Kにおいて複数に分かれている流れを合流配管Jが1つにまとめることになるため、たとえ分岐配管Kを流れる冷媒の合流分岐点23jの直前部分における過冷却度が分岐配管Kを構成する個々の配管を流れる冷媒毎に異なっていたとしても、合流配管Jにおいて冷媒流れを1つにできるため、室外熱交換器23の出口の過冷却度を整えることができる。そして、暖房運転時おいてデフロスト運転をする場合には、ホットガスバイパス弁27を開けて、圧縮機21から吐出した温度の高い冷媒を、室外熱交換器23の他の部分より先に、室外熱交換器23の下端に設けられている合流配管Jに供給することができる。このため、室外熱交換器23の下方近傍に着霜した氷を効果的に解凍させることができる。
<1-5>ホットガスバイパス回路H
 図8に、室外機2の送風機構を取り除いた状態での平面図を示す。図9に、室外機2の底板とホットガスバイパス回路Hとの配置関係について平面図で示す。
 ホットガスバイパス回路Hは、図8および図9に示すように、第1バイパス部分H1~第8バイパス部分H8および図示しない第9バイパス部分H9を有している。ここで、ホットガスバイパス回路Hは、吐出管Aから分岐点A1で分岐してホットガスバイパス弁27まで延びており、このホットガスバイパス弁27からさらに延びる部分が第1バイパス部分H1である。第2バイパス部分H2は、第1バイパス部分H1の端部から、背面側近傍において送風機室側に延びている。第3バイパス部分H3は、第2バイパス部分H2の端部から、正面側に向けて延びている。第4バイパス部分H4は、第3バイパス部分H3の端部から、機械室側とは反対側である左側に向けて延びている。第5バイパス部分H5は、第4バイパス部分H4の端部から、背面側に向けて、室外機ケーシングの背面パネル2eとの間に間隔が確保できる部分まで延びている。第6バイパス部分H6は、第5バイパス部分H5の端部から、機械室側である右側であってかつ背面側に向けて延びている。第7バイパス部分H7は、第6バイパス部分H6の端部から、機械室側である右側に向けて送風機室内を延びている。第8バイパス部分H8は、第7バイパス部分H7の端部から、機械室内を延びている。第9バイパス部分H9は、第8バイパス部分H8の端部から、キャピラリーチューブ28に至るまで延びている。このホットガスバイパス回路Hは、上述したように、ホットガスバイパス弁27が開けられた状態で、第1バイパス部分H1から順番に、第9バイパス部分H9に向けて冷媒を流していく。このため、圧縮機21から延びている吐出管Aの分岐点A1で分岐する冷媒は、第9バイパス部分H9を流れる冷媒よりも先に、第1バイパス部分H1側を流れる。このため、ホットガスバイパス回路Hを流れる冷媒は、全体として見ると、第4バイパス部分H4を流れた後の冷媒が第5~第8バイパス部分H8へと流れていくため、第4バイパス部分H4を流れる冷媒温度のほうが、第5~第8バイパス部分H8を流れる冷媒温度よりも高温となりやすくなっている。
 このように、ホットガスバイパス回路Hは、室外機ケーシングの底板2bのうち、室外ファン26の下方および室外熱交換器23の下方の部分近傍を通過するように配置されている。このため、ヒータ等の別熱源を利用することなく、ホットガスバイパス回路Hが通過する部分近傍を、圧縮機21の吐出管Aから分岐して供給される高温冷媒によって暖めることができる。よって、底板2bの上側が雨水や室外熱交換器23において生じたドレン水によって濡れることがあっても、底板2bのうち室外ファン26の下方および室外熱交換器23の下方において氷が成長してしまうことを抑制することができる。これにより、室外ファン26の駆動が氷によって妨げられる状況や室外熱交換器23の表面が氷で覆われて熱交換効率が低減してしまう状況を回避することができている。また、ホットガスバイパス回路Hは、吐出管Aの分岐点A1で分岐した後、室外熱交換器23の下を通過する前に、室外ファン26の下を通過するように配置されている。このため、室外ファン26の下方における氷の成長をより優先的に防止することができる。
<1-6>電磁誘導加熱ユニット6
 図10に、アキューム管Fに取り付けられた電磁誘導加熱ユニット6概略斜視図を示す。図11に、電磁誘導加熱ユニット6から遮蔽カバー75を取り除いた状態の外観斜視図を示す。図12に、アキューム管Fに取り付けられた電磁誘導加熱ユニット6の断面図を示す。
 電磁誘導加熱ユニット6は、アキューム管Fのうち発熱部分である磁性体管F2を径方向外側から覆うように配置されており、電磁誘導加熱によって磁性体管F2を発熱させる。このアキューム管Fの発熱部分は、内側の銅管F1と外側の磁性体管F2とを有する二重管構造となっている。
 電磁誘導加熱ユニット6は、第1六角ナット61、第2六角ナット66、第1ボビン蓋63、第2ボビン蓋64、ボビン本体65、第1フェライトケース71、第2フェライトケース72、第3フェライトケース73、第4フェライトケース74、第1フェライト98、第2フェライト99、コイル68、遮蔽カバー75、電磁誘導サーミスタ14およびヒューズ15等を備えている。
 第1六角ナット61および第2六角ナット66は、樹脂製であって、図示しないC型リングを用いて、電磁誘導加熱ユニット6とアキューム管Fとの固定状態を安定させる。第1ボビン蓋63および第2ボビン蓋64は、樹脂製であって、アキューム管Fをそれぞれ上端位置および下端位置において径方向外側から覆っている。この第1ボビン蓋63および第2ボビン蓋64は、後述する第1~第4フェライトケース71~74をネジ69を介して螺着させるための、ネジ69用の螺着孔を4つ有している。さらに、第2ボビン蓋64は、図12に示す電磁誘導サーミスタ14を差し込んで、磁性体管F2の外表面に取り付けるための電磁誘導サーミスタ差し込み開口64fを有している。また、第2ボビン蓋64は、図13に示すヒューズ15を差し込んで、磁性体管F2の外表面に取り付けるためのヒューズ差し込み開口64eを有している(図14参照)。電磁誘導サーミスタ14は、図12に示すように、電磁誘導サーミスタ検知部14a、外側突起14b、側面突起14cおよび電磁誘導サーミスタ検知部14aの検知結果を信号にして制御部11まで伝える電磁誘導サーミスタ配線14dを有している。電磁誘導サーミスタ検知部14aは、アキューム管Fの外表面の湾曲形状に沿うような形状を有しており、実質的な接触面積を有している。ヒューズ15は、図13に示すように、ヒューズ検知部15a、非対称形状15bおよびヒューズ検知部15aの検知結果を信号にして制御部11まで伝えるヒューズ配線15dを有している。ヒューズ15から所定制限温度を超えた温度検知の知らせを受けた制御部11は、コイル68への電力供給を停止させる制御を行って、機器の熱損傷を回避させる。ボビン本体65は、樹脂製であって、コイル68が巻き付けられる。コイル68は、ボビン本体65の外側においてアキューム管Fの延びる方向を軸方向として螺旋状に巻き付けられている。コイル68は、図示しない制御用プリント基板に接続されており、高周波電流の供給を受ける。制御用プリント基板は、制御部11によって出力制御される。図14に示すように、ボビン本体65と第2ボビン蓋64とが勘合している状態で、電磁誘導サーミスタ14およびヒューズ15が取り付けられる。ここで、電磁誘導サーミスタ14の取り付け状態では、板バネ16によって磁性体管F2の径方向内側に押されることで、磁性体管F2の外表面との良好な圧接状態を維持している。また、ヒューズ15の取り付け状態も同様に、板バネ17によって磁性体管F2の径方向内側に押されることで、磁性体管F2の外表面との良好な圧接状態を維持している。このように、電磁誘導サーミスタ14およびヒューズ15がアキューム管Fの外表面との密着性を良好に保たれているために、応答性を向上させ、電磁誘導加熱による急激な温度変化も迅速に検出できるようにしている。第1フェライトケース71は、第1ボビン蓋63と第2ボビン蓋64とをアキューム管Fの延びている方向から挟み込み、ネジ69によって螺着固定されている。第1フェライトケース71~第4フェライトケース74は、透磁率の高い素材であるフェライトによって構成された第1フェライト98および第2フェライト99を収容している。第1フェライト98および第2フェライト99は、図15のアキューム管Fおよび電磁誘導加熱ユニット6の断面図において示すように、コイル68によって生じる磁界を取りこんで磁束の通り道を形成することで、磁界が外部に漏れ出しにくいようにしている。遮蔽カバー75は、電磁誘導加熱ユニット6の最外周部分に配置されており、第1フェライト98および第2フェライト99だけでは呼び込みきれない磁束を集める。この遮蔽カバー75の外側にはほとんど漏れ磁束が生じず、磁束の発生場所について自決することができている。
<1-7>電磁誘導加熱制御
 上述した電磁誘導加熱ユニット6は、冷凍サイクルを暖房運転させる場合に暖房運転を開始させる起動時、暖房能力補助時、および、デフロスト運転を行う時にアキューム管Fの磁性体管F2を発熱させる制御を行う。
 以下、起動時に関する説明を行う。
 コントローラ90に対してユーザから暖房運転指示が入力された場合に、制御部11は、暖房運転を開始させる。暖房運転が開始されると、制御部11は、圧縮機21が起動した後であって圧力センサ29aが検知する圧力が39kg/cm2まで上昇するのを待って、室内ファン42を駆動させる。これにより、室内熱交換器41を通過する冷媒が暖まっていない段階で、暖まっていない室内に空気流れを生じさせてしまうことによるユーザの不快感を防止している。ここで、圧縮機21が起動して圧力センサ29aが検知する圧力が39kg/cm2まで上昇するまでの時間を短くするために、電磁誘導加熱ユニット6を用いた電磁誘導加熱を行う。この電磁誘導加熱では、アキューム管Fの温度が急上昇するため、電磁誘導加熱を開始させる前に、電磁誘導加熱を開始してよい状況になったか否かを判定する制御を制御部11が行う。このような判定として、図16のタイムチャートに示すように、流動条件判定処理と、センサ外れ検知処理と、急速高圧化処理等がある。
<1-8>流動条件判定処理
 電磁誘導加熱を行う際に、アキューム管Fに冷媒が流れていない状況では、加熱負荷は、アキューム管Fのうち電磁誘導加熱ユニット6が取り付けられている部分に滞留している冷媒だけになってしまう。このようにアキューム管Fに冷媒が流れていない状況で、電磁誘導加熱ユニット6による電磁誘導加熱を行ってしまうと、アキューム管Fの温度が冷凍機油を劣化させてしまうほどに異常上昇してしまう。また、電磁誘導加熱ユニット6自体も温度が上昇してしまい、機器の信頼性を低下させてしまう。このため、ここでは、このようにアキューム管Fに冷媒が流れていない状況で電磁誘導加熱ユニット6による電磁誘導加熱が行われることが無いように、電磁誘導加熱を開始する前の段階でアキューム管Fに冷媒が流れていることを確認する流動条件判定処理を行う。
 流動条件判定処理では、図17のフローチャートに示すように、以下の各処理が行われる。
 ステップS11では、制御部11は、コントローラ90が、ユーザから、冷房運転ではなく、暖房運転の指令を受け付けたか否か判断する。電磁誘導加熱ユニット6による冷媒加熱は、暖房運転が行われる環境下で必要になるため、このような判断を行う。
 ステップS12では、制御部11は、圧縮機21の起動を開始させ、圧縮機21の周波数を徐々に上げていく。
 ステップS13では、制御部11は、圧縮機21の周波数が所定最低周波数Qminに到達したか否かを判断し、到達していると判断した場合には、ステップS14に以降する。
 ステップS14では、制御部11は、流動条件判定処理を開始して、圧縮機21の周波数が所定最低周波数Qminに到達した時(図16の点a参照)の電磁誘導サーミスタ14の検出温度データおよび室外熱交温度センサ29cの検知温度データを格納し、タイマ95による流動検知時間のカウントを開始する。この圧縮機21の周波数が所定最低周波数Qminに達していない状態では、アキューム管Fおよび室外熱交換器23を流れる冷媒は、気液二相状態であって飽和温度で一定温度に保たれているため、電磁誘導サーミスタ14および室外熱交温度センサ29cが検知する温度は、飽和温度で一定であり、変化しない。しかし、しばらくして圧縮機21の周波数が上昇していき、室外熱交換器23内およびアキューム管F内の冷媒圧力がさらに低下していき、飽和温度が低下し始めることで、電磁誘導サーミスタ14および室外熱交温度センサ29cが検知する温度も低下し始める。なお、ここでは、圧縮機21の吸入側に対して、室外熱交換器23の方が、アキューム管Fよりも下流側に存在しているため、アキューム管Fを通過する冷媒の温度が下がり始めるタイミングよりも、室外熱交換器23を通過している冷媒温度が低下し始めるタイミングのほうが早い(図16の点bおよび点c参照)。
 ステップS15では、制御部11は、タイマ95のカウント開始から10秒間の流動検知時間が経過したか否かを判断し、流動検知時間が経過していた場合にはステップS16に移行する。他方、流動検知時間が未だ経過していない場合は、ステップS15を繰り返す。
 ステップS16では、制御部11は、流動検知時間が経過したときの、室外熱交換器23内およびアキューム管F内の冷媒温度が低下した状態での、電磁誘導サーミスタ14の検出温度データおよび室外熱交温度センサ29cの検知温度データを取得し、ステップS17に移行する。
 ステップS17では、制御部11は、ステップS16で取得した電磁誘導サーミスタ14の検出温度が、ステップS14で格納した電磁誘導サーミスタ14の検出温度データよりも3℃以上低下しているか否か、および、ステップS16で取得した室外熱交温度センサ29cの検知温度が、ステップS14で格納した室外熱交温度センサ29cの検知温度データよりも3℃以上低下しているか否かを判断する。すなわち、流動検知時間中に冷媒温度の低下を検出できたか否かを判断する。ここで、電磁誘導サーミスタ14の検出温度または室外熱交温度センサ29cの検知温度のいずれか一方が3℃以上低下している場合には、アキューム管Fに冷媒が流れている状態であり、冷媒の流動が確保された状態にあると判断して流動条件判定処理を終了し、電磁誘導加熱ユニット6の出力を最大限利用する起動時の急速高圧化処理、もしくは、センサ外れ検知処理等に移行する。
 他方、電磁誘導サーミスタ14の検出温度または室外熱交温度センサ29cの検知温度のいずれもが3℃以上低下していない場合には、ステップS18に移行する。
 ステップS18では、制御部11は、アキューム管Fを流れている冷媒量が電磁誘導加熱ユニット6による誘導加熱を行うには不十分であるとして、制御部11が、コントローラ90の表示画面に流動異常表示を出力する。
<1-9>センサ外れ検知処理
 センサ外れ検知処理は、電磁誘導サーミスタ14がアキューム管Fに取り付けられて空気調和装置1の据え付けが終了した後(据え付けが終了した後、電磁誘導加熱ユニット6に電力を供給しているブレーカが落ちた後も含む)であって、初めて暖房運転が開始される際に行う、電磁誘導サーミスタ14の取付状態を確認するための処理である。具体的には、上述の流動条件判定処理においてアキューム管F内の冷媒の流動量が確保されていると判断された後であって、かつ、電磁誘導加熱ユニット6の出力を最大限にして利用する起動時の急速高圧化処理を行う前に、制御部11が、センサ外れ検知処理を行う。
 空気調和装置1の搬入作業時には、予期しない振動等が加わることで電磁誘導サーミスタ14の取付状態が不安定になったり外れてしまったりすることがあり、搬入して初めて電磁誘導加熱ユニット6を稼働させる場合には、特に、その信頼性が求められ、搬入して初めての電磁誘導加熱ユニット6の稼働が適正に行われた場合には、その後の稼働も安定して行われることがある程度予測できる。このため、上述のタイミングでセンサ外れ検知処理が行われる。
 センサ外れ検知処理では、図18のフローチャートに示すように、以下の各処理が行われる。
 ステップS21では、制御部11は、流動条件判定処理によって確認されたアキューム管Fでの冷媒流動量もしくはそれ以上の冷媒流動量を確保しつつ、流動検知時間が終了した時点(=センサ外れ検知時間の開始時点)での電磁誘導サーミスタ14の検知温度データ(図16の点d参照)を格納しつつ、電磁誘導加熱ユニット6のコイル68に電力供給を開始する。ここでの電磁誘導加熱ユニット6のコイル68に対する電力の供給は、所定の最大供給電力Mmax(2kW)よりも小さな出力である50%の出力の外れ検知供給電力M1(1kW)で、センサ外れ検知時間としての20秒間だけ行われる。この段階では、未だ電磁誘導サーミスタ14の取付状態が良好であることが確認されていない段階であるため、アキューム管Fが異常な温度上昇をしているにもかかわらず、電磁誘導サーミスタ14がこの異常な温度上昇を検出できないことによってヒューズ15を損傷してしまったり、電磁誘導加熱ユニット6の樹脂製の部材を溶かしてしまったりすることが無いように、出力を50%に抑えている。また、同時に、電磁誘導加熱ユニット6による連続加熱時間が最大連続出力時間の10分を超えることが無いように予め設定しているため、制御部11は、電磁誘導加熱ユニット6による出力を継続している間の経過時間をタイマ95によってカウントし始める。なお、電磁誘導加熱ユニット6のコイル68に対する電力の供給と、コイル68が周囲に生じさせる磁界の大きさとは相関関係がある値である。
 ステップS22では、制御部11は、センサ外れ検知時間が終了したか否か判断する。センサ外れ検知時間が終了している場合には、ステップS23に移行する。他方、センサ外れ検知時間が未だ終了していない場合には、ステップS22を繰り返す。
 ステップS23では、制御部11は、センサ外れ検知時間が終了した時点での電磁誘導サーミスタ14の検出温度を取得し(図16の点e参照)、ステップS24に移行する。
 ステップS24では、制御部11は、ステップS23で取得したセンサ外れ検知時間が終了した時点での電磁誘導サーミスタ14の検出温度が、ステップS21で格納したセンサ外れ検知時間の開始時点での電磁誘導サーミスタ14の検出温度データよりも10℃以上上昇しているか否かを判断する。すなわち、センサ外れ検知時間中に電磁誘導加熱ユニット6による誘導加熱によって冷媒温度が10℃以上上昇しているか否かを判断する。ここで、電磁誘導サーミスタ14の検出温度が10℃以上上昇している場合には、電磁誘導サーミスタ14のアキューム管Fに対する取付状態が良好であること、および、電磁誘導加熱ユニット6による誘導加熱でアキューム管Fが適切に暖められていることを確認できたと判断してセンサ外れ検知処理を終了し、電磁誘導加熱ユニット6の出力を最大限利用する起動時の急速高圧化処理に移行する。他方、電磁誘導サーミスタ14の検出温度が10℃以上上昇していない場合には、ステップS25に移行する。
 ステップS25では、制御部11は、センサ外れリトライ処理の回数をカウントする。リトライ回数が10回未満である場合にはステップS26に移行し、リトライ回数が10回を超えている場合にはステップS26に移行することなくステップS27に移行する。
 ステップS26では、制御部11は、センサ外れリトライ処理を実行する。ここでは、さらに30秒経過した時点での電磁誘導サーミスタ14の検知温度データ(図16には示していない)を格納しつつ、電磁誘導加熱ユニット6のコイル68に外れ検知供給電力M1での電力供給を20秒間行い、ステップS22、23同様の処理を行い、電磁誘導サーミスタ14の検出温度が10℃以上上昇している場合にはセンサ外れ検知処理を終了し、電磁誘導加熱ユニット6の出力を最大限利用する起動時の急速高圧化処理に移行する。他方、電磁誘導サーミスタ14の検出温度が10℃以上上昇していない場合には、ステップS25に戻る。
 ステップS27では、制御部11は、電磁誘導サーミスタ14のアキューム管Fに対する取付状態が不安定もしくは良好でないと判断して、コントローラ90の表示画面にセンサ外れ異常表示を出力する。
<1-10>急速高圧化処理
 流動条件判定処理と、センサ外れ検知処理とを終えて、アキューム管Fにおける十分な冷媒の流動が確保され、電磁誘導サーミスタ14のアキューム管Fに対する取付状態が良好であること、および、電磁誘導加熱ユニット6による誘導加熱でアキューム管Fが適切に暖められていることを確認した状態で、制御部11は、急速高圧化処理を開始する。
 ここでは、電磁誘導加熱ユニット6による誘導加熱を、高い出力で行ったとしても、アキューム管Fを異常温度上昇させることがないことが確認されているため、空気調和装置1の信頼性を向上できている。
 急速高圧化処理では、図19のフローチャートに示すように、以下の各処理が行われる。
 ステップS31では、制御部11は、電磁誘導加熱ユニット6のコイル68に対する電力の供給を、上述のセンサ外れ検知処理のときのように50%に出力制限した外れ検知供給電力M1とすることなく、所定の最大供給電力Mmax(2kW)とする。ここでの電磁誘導加熱ユニット6による出力は、圧力センサ29aが、所定の目標高圧圧力Phに達するまで継続して行う。
 この空気調和装置1の冷凍サイクルにおける高圧異常上昇を防止させるために、圧力センサ29aが異常高圧圧力Prを検知した場合に、制御部11は、圧縮機21を強制的に停止する。この急速高圧処理の際の目標高圧圧力Phは、この異常高圧圧力Prよりも小さな圧力値である別個の閾値として設けられている。
 ステップS32では、制御部11は、センサ外れ検知処理のステップS21でカウントを開始した電磁誘導加熱ユニット6の最大連続出力時間の10分を経過しているか否かを判断する。ここで、最大連続出力時間を経過していない場合には、ステップS33に以降する。他方、最大連続出力時間を経過している場合には、ステップS34に以降する。
 ステップS33では、制御部11は、圧力センサ29aの検知圧力が目標高圧圧力Phに達したか否か判断する。ここで、目標高圧圧力Phに達している場合には、ステップS34に移行する。他方、ここで、目標高圧圧力Phに達していない場合には、ステップS32を繰り返す。
 ステップS34では、制御部11は、室内ファン42の駆動を開始させ、急速高圧化処理を終え、定常出力処理に移行する。
 ここでは、ステップS33からステップS34に以降された場合には、ユーザに対して十分に暖かい調和空気を提供できる状態になった状況で室内ファン42が稼働し始める。ステップS32からステップS34に以降した場合には、ユーザに対して十分な暖かい調和空気を提供できる状態に至っていないが、ある程度の暖かい調和空気を提供できる状態であって暖房運転開始からの経過時間が長くなりすぎない範囲で温風の提供を開始させることができるようになる。
<1-11>定常出力処理
 定常出力処理では、外れ検知供給電力M1(1kW)以上であって最大供給電力Mmax(2kW)以下の出力である定常供給電力M2(1.4kW)を固定出力値として、電磁誘導サーミスタ14の検知温度が起動時目標アキューム管温度である80℃で維持されるように、電磁誘導加熱ユニット6の電力供給頻度をPI制御する。
 定常出力処理では、図20のフローチャートに示すように、以下の各処理が行われる。
 ステップS41では、制御部11は、電磁誘導サーミスタ14の検知温度を格納し、ステップS42に移行する。
 ステップS42では、制御部11は、ステップS41で格納した電磁誘導サーミスタ14の検知温度を、起動時目標アキューム管温度の80℃と比較して、電磁誘導サーミスタ14の検知温度が、起動時目標アキューム管温度の80℃よりも所定温度だけ低い所定維持温度以下となったか否かを判断する。所定維持温度以下となっている場合には、ステップS43に移行する。所定維持温度以下になっていない場合には、所定維持温度以下になるのを待つ。
 ステップS43では、制御部11は、最近の電磁誘導加熱ユニット6への電力供給を終えた時からの経過時間を把握する。
 ステップS44では、制御部11は、連続して30秒間定常供給電力M2(1.4kW)で一定に保ったままで電磁誘導加熱ユニット6に電力を供給することを1セットとして、このセットの頻度を、ステップS43で把握した経過時間が長ければ長い程頻度を上げる、PI制御を行う。
<1-12>デフロスト処理
 上述の定常出力処理を継続している際に、室外熱交換器23の室外熱交温度センサ29cの検知温度が所定値以下になった場合に、室外熱交換器23に付着している霜を溶かす運転であるデフロスト処理を行う。具体的には、四路切換弁22の接続状態を冷房運転と同様にして(図1の点線で示す接続状態)、圧縮機21から吐出される高圧高温ガス冷媒を、室内熱交換器41を通過させる前に室外熱交換器23に提供し、冷媒の凝縮熱を利用して室外熱交換器23に付着している霜を溶かす。
 デフロスト処理では、図21のフローチャートに示すように、以下の各処理が行われる。
 ステップS51では、制御部11は、圧縮機21の周波数が所定最低周波数Qmin以上であって所定の冷媒循環量が確保されていること、流動条件判定処理によって電磁誘導加熱を行うことができる程度の冷媒流動量が確保されていること、および、センサ外れ検知処理によって電磁誘導サーミスタ14の取付状態が適正であることを確認し、ステップS52に移行する。
 ステップS52では、制御部11は、室外熱交温度センサ29cの検知温度が10℃未満になったか否かを判断する。10℃未満になっている場合には、ステップS53に移行する。10℃未満になっていない場合にはステップS52を繰り返す。
 ステップS53では、制御部11は、電磁誘導加熱ユニット6による誘導加熱を停止させた状態にするとともに、デフロスト信号を送信する。
 ステップS54では、制御部11は、デフロスト信号が送信された後、四路切換弁22の接続状態を冷房運転の接続状態とし、さらに、四路切換弁22の接続状態が冷房運転の接続状態になってからタイマ95によってデフロスト開始後経過時間をカウントする。
 ステップS55では、制御部11は、デフロスト開始後30秒経過したか否か判断する。ここで30秒経過している場合には、ステップS56に移行する。30秒経過していない場合には、ステップS55を繰り返す。
 ステップS56では、制御部11は、電磁誘導加熱ユニット6のコイル68に対する電力の供給を所定の最大供給電力Mmax(2kW)としつつ、電磁誘導サーミスタ14の検出温度が目標デフロスト温度である40℃となるように(定常出力処理時の起動時目標アキューム管温度とは異なる)、電磁誘導加熱ユニット6による誘導加熱の頻度をPI制御する。なお、室外熱交温度センサ29cの検知温度が0℃を下回っている場合にはさらにホットガスバイパス回路Hのホットガスバイパス弁27が開けられ、室外機2の底板2bの上面のうち室外ファン26の下方および室外熱交換器23の下方に高温高圧ガス冷媒が供給され、底板2bの上面に生じている氷を除去する。ここで、四路切換弁22の接続状態が冷房運転の状態に切り換えられているため、圧縮機21から吐出された高温高圧ガス冷媒は、室外熱交換器23の分岐合流点23kから合流分岐点23jまで流れて、合流分岐点23jにおいて合流して1本にまとめられることで、分岐配管Kの流量の3倍の流量となって集中的に合流配管Jを流れていく。この合流配管Jは、室外熱交換器23の下端近傍に位置しているので、室外熱交換器23の下端近傍に多くの凝縮熱を集中的に供給することができる。これにより、除霜をより迅速化させることができている。
 ステップS57では、制御部11は、デフロスト開始後経過時間が10分を超えたか否か判断する。ここで10分を経過していない場合には、ステップS58に移行する。10分を経過している場合には、ステップS59に移行する。これにより、四路切換弁22の接続状態が冷房状態のままで10分以上経過してしまうことを防ぎ、室内温度の低下によるユーザの不快感が生じにくいようにしている。
 ステップS58では、制御部11は、室外熱交温度センサ29cの検知温度が10℃を超えているか否かを判断する。10℃を超えている場合には、ステップS59に移行する。10℃を超えていない場合にはステップS56に戻って繰り返す。
 ステップS59では、制御部11は、圧縮機21を停止させて冷凍サイクル内の高低圧を均圧させつつ、電磁誘導加熱ユニット6による誘導加熱を終了する。
 ステップS60では、制御部11は、四路切換弁22の接続状態を暖房運転の接続状態に切り換える。
 そして、制御部11は、デフロストを終える信号を送信する。さらに、制御部11は、圧縮機21の周波数を所定最低周波数Qmin以上に上げていき、再度デフロスト処理を行う状況になるまで定常出力処理を行う。また、ホットガスバイパス回路Hのホットガスバイパス弁27は、デフロストを終える信号が送信された後、5秒後に閉じられる。
 <本実施形態の空気調和装置1の特徴>
 空気調和装置1では、急速高圧化処理を行うことで、電磁誘導加熱ユニット6による出力を最大供給電力Mmax(2kW)にして、室内熱交換器41に向けて流れる冷媒の高温高圧化を迅速に達成させる処理を行っている。これにより、暖房運転の起動開始からユーザに暖かい空気が提供されるまでに要する時間を短縮化させることが可能になっている。さらに、室内がある程度暖まった状態では定常出力処理を行うことで、電磁誘導加熱ユニット6による出力を最大供給電力Mmax(2kW)より小さく制限した定常供給電力M2(1.4kW)を固定出力値としている。これにより、電磁誘導加熱ユニット6の出力を上げ過ぎることによる制御のオーバーシュートを小さく抑えることが可能になっている。
 なお、電磁誘導加熱が行われる場合には、一般に、冷凍サイクルにおいて冷媒の循環状況が変化することによる温度上昇よりも、急激な温度上昇が生じやすい。これに対して、この空気調和装置1の電磁誘導加熱ユニット6では、板バネ16の弾性力によって磁性体管F2に圧接され電磁誘導サーミスタ14は、上述の電磁誘導加熱による定常出力処理において、電磁誘導加熱による迅速な温度変化に対する応答性が良好に維持されている。このため、定常出力処理の応答性を良好にして、制御のオーバーシュートをより小さく抑えることができている。
 デフロスト処理では、電磁誘導加熱ユニット6による誘導加熱を最大供給電力Mmax(2kW)で行っているため、除霜処理を迅速化させることが可能になっている。ただし、電磁誘導サーミスタ14の検出温度が目標デフロスト温度である40℃となるようにして、定常出力処理時の起動時目標アキューム管温度よりも低く抑えているので、制御によるオーバーシュートを小さく抑えるようにしている。
 <他の実施形態>
 以上、本発明の実施形態について図面に基づいて説明したが、具体的な構成は、これらの実施形態に限られるものではなく、発明の要旨を逸脱しない範囲で変更可能である。
 (A)
 上記実施形態では、電磁誘導加熱ユニット6において最大供給電力Mmax(2kW)での出力を行わせる急速高圧化処理の終了時を、圧力センサ29aの検知圧力が目標高圧圧力Phに達した時点とした場合について例に挙げて説明した。
 しかし、本発明はこれに限られるものではない。
 例えば、電磁誘導加熱ユニット6において最大供給電力Mmax(2kW)での出力を行わせる急速高圧化処理の終了時は、圧力センサ29a取付部分を通過する目標高圧圧力Phの冷媒に相当する温度に基づいて定まる温度を、電磁誘導サーミスタ14が検知した時としてもよい。
 この場合であっても、室内熱交換器41に供給される冷媒温度が十分高いことを確認できるため、暖房運転開始時のユーザへの暖かい調和空気の提供を開始するための判断指標として利用することが可能になる。
 なお、このような電磁誘導サーミスタ14については、例えば、図22に示すように、急速高圧化処理の終了時を判断する場合の温度変化の検知は、冷媒流れ方向において、磁性体管F2を有しているアキューム管Fの下流側近傍の温度変化を検知する電磁誘導下流側サーミスタ214の検知温度等であってもよく、アキューム管Fの温度を検知するものに限られない。
 (B)
 上記実施形態では、電磁誘導加熱ユニット6が停止状態から磁界を生じさせるように変化させることに起因して電磁誘導サーミスタ14の検知温度が変化することを検出することで、電磁誘導サーミスタ14の取付状態が良好であることを確かめる場合について例に挙げて説明した。
 しかし、本発明はこれに限られるものではない。
 例えば、電磁誘導加熱ユニット6が磁界を発生させている状態から、磁界を発生させない状態に変化させるようにして、電磁誘導サーミスタ14の取付状態を確認するようにしてもよい。この場合には、電磁誘導サーミスタ14の検出温度が低下するという検知温度の変化によって、電磁誘導サーミスタ14の取付状態が良好であることを確かめることができる。
 また、単に電磁誘導加熱ユニット6のコイル68に供給する電力を変えることで、生じさせる磁界の大きさを変更させ、これに起因する電磁誘導サーミスタ14の検出温度の変化を調べることで、電磁誘導サーミスタ14の取付状態を確認するようにしてもよい。
 (C)
 上記実施形態では、アキューム管Fの外側を構成している磁性体管F2の温度を検出する電磁誘導サーミスタ14の検知温度の変化に着目して、電磁誘導サーミスタ14の取付状態が良好であるか否かを判断する場合について説明した。
 しかし、本発明はこれに限られるものではない。
 例えば、所定温度以上であるか所定温度以下であるかを検知するバイメタル等の検出機器を用いつつ、検出機器の所定温度がセンサ外れ検知処理の前の温度と後の温度との間の値となるようにすることで、アキューム管Fの温度変化を検出するようにしてもよい。この場合には、センサ外れ検知処理を行う際の具体的な温度を検出できなくても、温度変化を検知することにより、センサの取付状態を確認することができる。
 (D)
 上記実施形態では、定常出力処理では電磁誘導加熱のための電磁誘導加熱ユニット6による出力を70%で固定しつつ、その出力頻度を制御する場合について説明した。
 しかし、本発明はこれに限られるものではない。
 例えば、定常出力処理において、電磁誘導加熱を行う頻度を固定しつつ、電磁誘導加熱ユニット6による出力を、電磁誘導サーミスタ14の検知温度に基づいて制御するようにしてもよい。
 また、定常出力処理において、電磁誘導加熱を行う頻度、および、電磁誘導加熱ユニット6による出力の両方を、電磁誘導サーミスタ14の検知温度に基づいて制御するようにしてもよい。
 (E)
 上記実施形態では、冷媒回路10のうち、アキューム管Fに対して電磁誘導加熱ユニット6が取り付けられる場合について説明した。
 しかし、本発明はこれに限られるものではない。
 例えば、アキューム管F以外の他の冷媒配管に設けられていてもよい。この場合には、電磁誘導加熱ユニット6を設ける冷媒配管部分に磁性体管F2等の磁性体を設ける。
 (F)
 上記実施形態では、アキューム管Fは、銅管F1と磁性体管F2との二重管として構成されている場合を挙げて説明した。
 しかし、本発明はこれに限られるものではない。
 図23に示すように、例えば、磁性体部材F2aと、2つのストッパーF1a、F1bと、がアキューム管Fや加熱対象となる冷媒配管の内部に配置されていてもよい。ここで、磁性体部材F2aは、磁性体材料を含有しており、上記実施形態における電磁誘導加熱によって発熱を生じる部材である。ストッパーF1a、F1bは、銅管F1の内側二カ所において、冷媒の通過を常時許容するが、磁性体部材F2aの通過は許容しない。これにより、磁性体部材F2aは、冷媒が流れても移動しない。このため、アキューム管F等の目的の加熱位置を加熱させることができる。さらに、発熱する磁性体部材F2aと冷媒とが直接接触するため、熱伝達効率を向上させることができる。
 (G)
 上記他の実施形態(F)で説明した磁性体部材F2aは、ストッパーF1a、F1bを用いることなく配管に対して位置が定まるようにしてもよい。
 図24に示すように、例えば、銅管F1に二カ所で曲げ部分FWを設け、当該二カ所の曲げ部分FWの間の銅管F1の内側に磁性体部材F2aを配置させてもよい。このようにしても、冷媒を通過させつつ、磁性体部材F2aの移動を抑制させることができる。
 (H)
 上記実施形態では、コイル68がアキューム管Fに対して螺旋状に巻き付けられている場合について説明した。
 しかし、本発明はこれに限られるものではない。
 例えば、図25に示すように、ボビン本体165に巻き付けられたコイル168が、アキューム管Fに巻き付くことなく、アキューム管Fの周囲に配置されていてもよい。ここでは、ボビン本体165は、軸方向がアキューム管Fの軸方向に対して略垂直となるように配置されている。また、ボビン本体165およびコイル168は、アキューム管Fを挟むように2つに別れて配置されている。
 この場合には、例えば、図26に示すように、アキューム管Fを貫通させている第1ボビン蓋163および第2ボビン蓋164が、ボビン本体165に対して勘合した状態で配置されていてもよい。
 さらに、図27に示すように、第1ボビン蓋163および第2ボビン蓋164が、第1フェライトケース171および第2フェライトケース172によって挟み込まれて固定されていてもよい。図27では、2つのフェライトケースがアキューム管Fを挟み込むように配置されている場合を例に挙げたが、上記実施形態と同様に、4方向に配置されていてもよい。また、上記実施形態と同様に、フェライトを収容させていてもよい。
<その他>
 以上、本発明の実施形態について、いくつかの例を挙げて説明したが、本発明はこれらに限られない。例えば、上記記載から当業者が実施可能な範囲で、上述の実施形態の異なる部分を適宜組み合わせて得られる組合せ実施形態も、本発明に含まれる。
 本発明を利用すれば、起動時の能力を迅速に確保しつつ、起動後のオーバーシュートを小さく抑えることが可能なため、電磁誘導を用いて冷媒を加熱させる電磁誘導加熱ユニットおよび空気調和装置において特に有用である。
  1 空気調和装置
  6 電磁誘導加熱ユニット
 10 冷媒回路
 11 制御部
 14 電磁誘導サーミスタ(冷媒状態量検知部、温度検知部)
 15 ヒューズ
 16 板バネ(弾性部材)
 17 板バネ(弾性部材)
 21  圧縮機
 22  四路切換弁
 23  室外熱交換器
 24  電動膨張弁
 25  アキュームレータ
 29a 圧力センサ(冷媒状態量検知部)
 29b 室外気温センサ
 29c 室外熱交温度センサ
 41  室内熱交換器
 43 室内温度センサ
 44 室内熱交温度センサ
 65  ボビン本体
 68  コイル(磁界発生部)
 71~74  第1フェライトケース~第4フェライトケース
 75  遮蔽カバー
 90 コントローラ
 95 タイマ
 98、99  第1フェライト、第2フェライト
  F  アキューム管、冷媒配管(所定状態量検知部分)
  F2 磁性体管(加熱対象部分)
 M1 外れ検知供給電力(磁界レベル)
 M2 定常供給電力(第1磁界制限基準値)
 Mmax 最大供給電力(所定最大出力)
 Ph 目標高圧圧力(第1所定目標状態量)
特開2000-97510号公報

Claims (11)

  1.  冷媒配管(F)および/または前記冷媒配管(F)中を流れる冷媒と熱的接触をする部材の誘導加熱を行い、冷媒を循環させる圧縮機構(21)を含んだ冷凍サイクルを利用する、空気調和装置(1)であって、
     前記誘導加熱の加熱対象部分(F2)を誘導加熱させるために磁界を発生させる磁界発生部(68)と、
     前記冷凍サイクルの少なくとも一部である所定状態量検知部分(F)を流れる冷媒に関する状態量を検知する冷媒状態量検知部(14、29a)と、
     前記冷凍サイクルで暖房運転を行う起動時において、前記磁界発生部(68)による出力を所定最大出力(Mmax)とする状態を、前記圧縮機構が駆動状態となっている時から開始して前記冷媒状態量検知部(14、29a)が検知する状態量が第1所定目標状態量(Ph)に到達した時に終了させる起動時磁界発生制御、および、
     前記所定最大出力(Mmax)よりも低い第1磁界制限基準値(M2)を前記磁界発生部(68)の出力の上限として制約をかける状態を、前記起動時磁界発生制御が終了した後に行う起動後磁界発生制御、
    を少なくとも行う制御部(11)と、
    を備えた空気調和装置(1)。
  2.  前記誘導加熱の加熱対象部分(F2)は、磁性体材料を含んでいる、
    請求項1に記載の空気調和装置(1)。
  3.  前記所定状態量検知部分(F)は、前記磁界発生部(68)によって磁界が生じている部分である、
    請求項1または2に記載の空気調和装置(1)。
  4.  前記冷媒状態量検知部(14、29a)が検知する状態量は、前記所定状態量検知部分(F)を流れる冷媒に関する温度および圧力の少なくとも何れか一方である、
    請求項1から3のいずれか1項に記載の空気調和装置(1)。
  5.  前記冷媒状態量検知部(14、29a)は、前記所定状態量検知部分(F)を流れる冷媒に関する温度を検知する温度検知部(14)であって、
     前記制御部(11)は、前記起動後磁界発生制御では、前記温度検知部(14)が検知する温度が目標維持温度で維持されるように前記磁界発生部(68)に発生させる磁界の大きさおよび/または前記磁界発生部(68)に磁界を発生させる頻度をPI制御する起動後磁界発生PI制御を行う、
    請求項1から4のいずれか1項に記載の空気調和装置(1)。
  6.  前記冷媒状態量検知部(14、29a)は、前記所定状態量検知部分(F)を流れる冷媒に関する温度を検知する温度検知部(14)であって、
     前記制御部(11)は、前記磁界発生部(68)に発生させる前記磁界のレベルを前記所定最大出力(Mmax)よりも低い範囲内で上げるもしくは下げるという磁界レベル変化処理を行うことで前記温度検知部(14)の検知温度に変化があることもしくは前記温度検知部(14)が温度変化を検知することの磁界レベル増加条件を満たした後に、前記起動時磁界発生制御を実行する、
    請求項1から5のいずれか1項に記載の空気調和装置(1)。
  7.  前記磁界レベル変化処理で出力される最大の前記磁界レベルは(M1)は、前記第1磁界制限基準値(M2)よりも小さい値である、
    請求項6に記載の空気調和装置(1)。
  8.  前記冷媒状態量検知部(14、29a)は、前記所定状態量検知部分(F)を流れる冷媒に関する温度を検知する温度検知部(14)であって、
     前記制御部(11)は、第1圧縮機構状態と前記第1圧縮機構状態よりも出力レベルの高い第2圧縮機構状態との前記圧縮機構の出力が異なる両方の圧縮機構状態を前記圧縮機構に実現させた際に、前記第1圧縮機構状態と前記第2圧縮機構状態とで前記温度検知部(14)の検知温度に変化があるという流動条件を満たした後に、前記磁界レベル増加条件の判定を実行する、
    請求項1から7のいずれか1項に記載の空気調和装置(1)。
  9.  前記冷媒状態量検知部(14、29a)は、前記所定状態量検知部分(F)を流れる冷媒に関する温度を検知する温度検知部(14)であって、
     前記制御部(11)は、前記起動後磁界発生制御を開始した後であって、前記冷凍サイクルに前記暖房運転とは異なる除霜運転を実行させている時には、前記磁界発生部(68)の出力の上限を前記所定最大出力(Mmax)として、前記温度検知部(14)の検知温度に基づいて前記磁界発生部(68)による出力を制御する除霜運転出力制御を行う、
    請求項1から8のいずれか1項に記載の空気調和装置(1)。
  10.  前記制御部(11)は、前記除霜運転出力制御時には、前記温度検知部(14)が検知する温度が前記第1所定目標温度よりも低い第2所定目標温度で維持されるようにPI制御する除霜PI制御を行う、
    請求項9に記載の空気調和装置(1)。
  11.  前記冷媒状態量検知部(14、29a)は、前記所定状態量検知部分(F)を流れる冷媒に関する温度を検知する温度検知部(14)であって、
     前記温度検知部(14)に対して弾性力を与える弾性部材(16、17)をさらに備え、
     前記温度検知部(14)は、前記弾性部材(16、17)による前記弾性力によって前記所定状態量検知部分(F)に圧接している、
    請求項1から10のいずれか1項に記載の空気調和装置(1)。
PCT/JP2010/001942 2009-03-19 2010-03-18 空気調和装置 WO2010106805A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
EP10753301A EP2410262A1 (en) 2009-03-19 2010-03-18 Air conditioner
KR1020117024510A KR101233903B1 (ko) 2009-03-19 2010-03-18 공기 조화 장치
CN2010800127619A CN102348943A (zh) 2009-03-19 2010-03-18 空调装置
US13/256,480 US20120006040A1 (en) 2009-03-19 2010-03-18 Air conditioning apparatus
AU2010225944A AU2010225944B2 (en) 2009-03-19 2010-03-18 Air conditioning apparatus
RU2011142193/06A RU2484390C1 (ru) 2009-03-19 2010-03-18 Кондиционер

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009069132A JP4826643B2 (ja) 2009-03-19 2009-03-19 空気調和装置
JP2009-069132 2009-03-19

Publications (1)

Publication Number Publication Date
WO2010106805A1 true WO2010106805A1 (ja) 2010-09-23

Family

ID=42739473

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/001942 WO2010106805A1 (ja) 2009-03-19 2010-03-18 空気調和装置

Country Status (8)

Country Link
US (1) US20120006040A1 (ja)
EP (1) EP2410262A1 (ja)
JP (1) JP4826643B2 (ja)
KR (1) KR101233903B1 (ja)
CN (1) CN102348943A (ja)
AU (1) AU2010225944B2 (ja)
RU (1) RU2484390C1 (ja)
WO (1) WO2010106805A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2437009A3 (en) * 2010-09-29 2013-06-26 Panasonic Corporation Air conditioner

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2410257B1 (en) * 2009-03-19 2018-08-29 Daikin Industries, Ltd. Air conditioning device
KR101387541B1 (ko) 2011-10-12 2014-04-21 엘지전자 주식회사 공기조화기 및 공기조화기의 제상방법
US9528865B2 (en) 2012-11-02 2016-12-27 Johnson Controls Technology Company Methods and systems for determining flow direction using a bidirectional pressure sensor
US20150114018A1 (en) * 2013-10-30 2015-04-30 Denso International America, Inc. Viscous heater for heat pump system
JP6330779B2 (ja) * 2015-10-16 2018-05-30 ダイキン工業株式会社 ヒートポンプ式加熱装置
CN105571228A (zh) * 2016-01-18 2016-05-11 珠海格力电器股份有限公司 压缩机系统及压缩机频率检测和调频方法
EP3926244B1 (en) * 2019-04-08 2024-05-08 GD Midea Heating & Ventilating Equipment Co., Ltd. Heating assembly and air conditioner having same
CN112797706B (zh) * 2019-11-14 2022-09-23 青岛海尔电冰箱有限公司 一种冰箱及其化霜控制方法
CN113357848B (zh) * 2020-03-06 2023-08-18 青岛海尔智能技术研发有限公司 换热器和家电设备

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6277574A (ja) * 1985-09-30 1987-04-09 株式会社東芝 冷凍サイクル
JPH0415446A (ja) * 1990-05-07 1992-01-20 Matsushita Electric Ind Co Ltd 冷媒加熱装置を具備した空気調和機
JP2000097510A (ja) 1998-09-21 2000-04-04 Sanyo Electric Co Ltd 冷媒加熱式空気調和機
JP2001255025A (ja) * 2000-03-10 2001-09-21 Daikin Ind Ltd ヒートポンプ装置
JP2007178114A (ja) * 2005-12-02 2007-07-12 Daikin Ind Ltd 冷媒加熱装置
JP2007212036A (ja) * 2006-02-08 2007-08-23 Daikin Ind Ltd 冷媒加熱装置およびその加熱容量制御方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2027125C1 (ru) * 1992-08-27 1995-01-20 Научно-исследовательский институт энергетического машиностроения МГТУ им.Н.Э.Баумана Парокомпрессионная холодильная установка с дроссельным регулятором расхода хладагента
CN2302446Y (zh) * 1997-04-29 1998-12-30 李文山 燃气热泵空调机
JP2001174055A (ja) 1999-12-14 2001-06-29 Daikin Ind Ltd 誘導加熱装置
CN2444194Y (zh) * 2000-09-29 2001-08-22 邓兆山 热管热泵冷暖空调机
CN1389693A (zh) * 2001-06-06 2003-01-08 邓兆山 热泵空调热管辅助加热器装置
JP3801006B2 (ja) * 2001-06-11 2006-07-26 ダイキン工業株式会社 冷媒回路
RU2241911C1 (ru) * 2003-06-26 2004-12-10 Ивакин Олег Александрович Способ дистанционного контроля работы кондиционеров и/или холодильных машин
CN201196507Y (zh) * 2008-05-01 2009-02-18 杨迈 数码变频电磁热泵空调加热装置
CN101270939A (zh) * 2008-05-16 2008-09-24 王全龄 反馈辅热式低温空气源热泵空调

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6277574A (ja) * 1985-09-30 1987-04-09 株式会社東芝 冷凍サイクル
JPH0415446A (ja) * 1990-05-07 1992-01-20 Matsushita Electric Ind Co Ltd 冷媒加熱装置を具備した空気調和機
JP2000097510A (ja) 1998-09-21 2000-04-04 Sanyo Electric Co Ltd 冷媒加熱式空気調和機
JP2001255025A (ja) * 2000-03-10 2001-09-21 Daikin Ind Ltd ヒートポンプ装置
JP2007178114A (ja) * 2005-12-02 2007-07-12 Daikin Ind Ltd 冷媒加熱装置
JP2007212036A (ja) * 2006-02-08 2007-08-23 Daikin Ind Ltd 冷媒加熱装置およびその加熱容量制御方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2437009A3 (en) * 2010-09-29 2013-06-26 Panasonic Corporation Air conditioner

Also Published As

Publication number Publication date
RU2484390C1 (ru) 2013-06-10
US20120006040A1 (en) 2012-01-12
JP2010223459A (ja) 2010-10-07
CN102348943A (zh) 2012-02-08
JP4826643B2 (ja) 2011-11-30
AU2010225944B2 (en) 2012-11-15
EP2410262A1 (en) 2012-01-25
KR101233903B1 (ko) 2013-02-15
RU2011142193A (ru) 2013-04-27
KR20110139288A (ko) 2011-12-28
AU2010225944A1 (en) 2011-11-03

Similar Documents

Publication Publication Date Title
JP4826643B2 (ja) 空気調和装置
JP4605306B2 (ja) 空気調和装置
JP5370474B2 (ja) 空気調和装置
JP5647396B2 (ja) 空気調和装置
WO2010106821A1 (ja) 空気調和装置
JP5067505B2 (ja) 空気調和装置
JP2011002190A (ja) 冷凍装置
WO2010106803A1 (ja) 空気調和装置
WO2010146807A1 (ja) 冷凍装置
WO2010146803A1 (ja) 冷凍装置
JP2010243149A (ja) 空気調和装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080012761.9

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10753301

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 13256480

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2010753301

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 20117024510

Country of ref document: KR

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2011142193

Country of ref document: RU

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2010225944

Country of ref document: AU

Date of ref document: 20100318

Kind code of ref document: A