WO2010103779A1 - 機器管理システム - Google Patents
機器管理システム Download PDFInfo
- Publication number
- WO2010103779A1 WO2010103779A1 PCT/JP2010/001592 JP2010001592W WO2010103779A1 WO 2010103779 A1 WO2010103779 A1 WO 2010103779A1 JP 2010001592 W JP2010001592 W JP 2010001592W WO 2010103779 A1 WO2010103779 A1 WO 2010103779A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- violation
- amount
- unit
- management system
- equipment
- Prior art date
Links
- 238000003860 storage Methods 0.000 claims abstract description 21
- 238000001514 detection method Methods 0.000 claims abstract description 15
- 238000012545 processing Methods 0.000 claims description 35
- 238000004364 calculation method Methods 0.000 claims description 21
- 230000009471 action Effects 0.000 claims description 15
- 238000005265 energy consumption Methods 0.000 claims description 8
- 230000007613 environmental effect Effects 0.000 claims description 2
- 238000003754 machining Methods 0.000 claims 2
- 238000007726 management method Methods 0.000 description 105
- 238000004378 air conditioning Methods 0.000 description 50
- 230000000694 effects Effects 0.000 description 17
- 238000009826 distribution Methods 0.000 description 15
- 238000004891 communication Methods 0.000 description 14
- 239000003507 refrigerant Substances 0.000 description 7
- 238000012552 review Methods 0.000 description 6
- 230000006870 function Effects 0.000 description 4
- 238000005259 measurement Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 238000012986 modification Methods 0.000 description 4
- 238000001816 cooling Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000015556 catabolic process Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000003203 everyday effect Effects 0.000 description 2
- 230000001771 impaired effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000008520 organization Effects 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000002354 daily effect Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000007791 dehumidification Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/52—Indication arrangements, e.g. displays
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Definitions
- the present invention relates to a device management system for managing equipment.
- an equipment management system is constructed so that equipment always follows the operation rules, the comfort of the installation environment of the equipment may be impaired. This is because the operation rules are not necessarily created appropriately. Therefore, an actual device management system is often constructed so as to allow a facility device to violate a violation of the operation rules. For example, when a path for giving a control command outside the operating rules is prepared separately from a path for giving a control command in accordance with the operating rules to the equipment, and the equipment control equipment is preferentially executed. is there. However, in the above aspect, if the operation rule is set too low, the original purpose of the operation rule may not be achieved. Therefore, for equipment users (including not only general users but also managers), it is possible to accurately grasp the violation behavior of equipment that violates the operating rules in relation to the management goals of the operating rules. Become important.
- An object of the present invention is to make it possible to accurately grasp the influence of a violation action of a facility device that violates the operation rule on the management target of the facility device embodied in the operation rule.
- the device management system includes a storage unit, a detection unit, and a calculation unit, and manages equipment.
- the storage unit stores operation rules for equipment.
- the detection unit detects a violation operation of the equipment that violates the operation rules.
- the calculation unit calculates a violation amount that quantitatively represents the violation action.
- the violation operation of the equipment that violates the operation rule is detected and quantified as the violation amount. Therefore, it is possible to accurately grasp the influence of the violating operation of the facility equipment that violates the operation rule on the management target (energy saving, etc.) of the facility device embodied in the operation rule.
- a device management system is the device management system according to the first invention, further comprising an operation command section.
- the operation command unit transmits a control command according to the operation rule to the equipment.
- a control command according to the operation rule is given to the equipment.
- the equipment operates in accordance with the operation rules in principle. Therefore, it becomes easy to realize the management target embodied in the operation rule.
- the device management system according to the third aspect of the present invention is the device management system according to the first or second aspect of the present invention, and the violating operation includes an operation that contributes to energy increase more than the operation rule.
- an operation that contributes to an increase in energy is allowed in the equipment device more than the operation rule, and such a violation operation is quantified as a violation amount. Therefore, it is possible to accurately grasp the influence of the violation operation of the equipment that violates the operation rules on the energy increase side on the energy saving activity.
- a device management system is the device management system according to any one of the first to third aspects, wherein the facility device is an air conditioner.
- the violation operation includes an operation other than the set temperature defined in the operation rule.
- the air conditioner is allowed to operate at a set temperature outside the operating rules, and such operation is quantified as a violation amount. Therefore, it is possible to accurately grasp the influence of the air conditioner operating at a set temperature outside the operation rules.
- a device management system is the device management system according to any one of the first to fourth aspects of the present invention, wherein the violating operation includes at least one of a start operation and a stop operation other than the timing defined in the operation rules. Is included.
- the equipment is allowed to start or stop, or start and stop against the operation rule, and such an operation is quantified as a violation amount. Therefore, it is possible to accurately grasp the effect of starting or stopping the facility device against the operation rule, or starting and stopping.
- a device management system is the device management system according to any one of the first to fifth aspects of the present invention, further comprising a violation amount output unit.
- the violation amount output unit outputs the violation amount.
- the violation operation of the equipment is quantified as a violation amount and further output. Therefore, the user can accurately grasp the influence of the violation operation of the equipment.
- a device management system is the device management system according to any one of the first to sixth aspects of the present invention, further comprising a processing unit and a processing information output unit.
- the processing unit creates processing information obtained by processing the violation amount.
- the processing information output unit outputs processing information.
- the violation operation of the equipment is quantified as the violation amount, further processed, and output. Therefore, the user can accurately grasp the influence of the violation operation of the equipment.
- a device management system is the device management system according to any one of the first to seventh aspects, further comprising a measuring unit.
- the measurement unit measures the energy consumption of the equipment.
- the calculation unit refers to the energy consumption and calculates the violation amount.
- the violation amount is calculated, an actual measurement value of the energy consumption amount of the equipment is taken into consideration. Therefore, the violation operation of the equipment that violates the operation rules is accurately quantified.
- a device management system is the device management system according to any one of the first to eighth aspects of the invention, and the violating operation includes an operation that contributes to energy saving rather than an operation rule.
- an operation that contributes to energy saving rather than an operation rule is allowed in the equipment, and such an operation is quantified as a violation amount. Therefore, it is possible to accurately grasp the influence of the violation operation of the equipment that violates the operation rules on the energy saving side on the energy saving activity.
- a device management system is the device management system according to any one of the first to eighth aspects of the present invention, further comprising a collection unit.
- the collection unit collects device information related to equipment.
- the processing unit refers to the violation amount and the device information, and creates information indicating the content of the future operation of the facility device for offsetting the violation amount as the processing information.
- information suggesting the contents of the operation that will be required in the future in order to offset the violation amount is output. Therefore, it is possible to review the operation rules applied to the equipment.
- a device management system includes a plurality of storage units, a plurality of detection units, and a plurality of calculation units, and manages a plurality of management points in an integrated manner.
- the management point is composed of one or a plurality of facility devices.
- Each of the plurality of storage units stores an operation rule for the equipment regarding a corresponding one of the plurality of management points.
- Each of the plurality of detection units detects a violation operation of the equipment that violates the operation rule with respect to a corresponding one of the plurality of management points.
- Each of the plurality of calculation units calculates a violation amount that quantitatively represents the violation operation with respect to a corresponding one of the plurality of management points.
- a violation operation of the equipment that violates the operation rule is detected and quantified as a violation amount. Therefore, it is possible to accurately grasp the influence of the violating operations of a plurality of facility devices that violate the operation rules on the management target (energy saving, etc.) of the facility devices embodied in the operation rules.
- a device management system is the device management system according to the eleventh aspect of the present invention, further comprising a plurality of collection units and a creation unit.
- Each of the plurality of collection units collects device information related to the facility device with respect to a corresponding one of the plurality of management points.
- the creation unit refers to the violation amount and device information regarding a plurality of management points, and creates information indicating the relationship between the violation amount and the environmental comfort provided by the facility device.
- information distributed map or the like
- the violation operation of the equipment that violates the operation rule is detected and quantified as the violation amount. Therefore, it is possible to accurately grasp the influence of the violating operation of the facility equipment that violates the operation rule on the management target (energy saving, etc.) of the facility device embodied in the operation rule.
- the figure of the graph which shows the relationship between the relaxation amount of setting temperature, and cancellation time.
- the figure of the graph which shows the breakdown of the number of stores for every offset time. Distribution map of stores by violation amount and discomfort index.
- the store management system 100 shown in FIG. 1 is a headquarter 3 of an organization that supervises energy-saving activities in a large number of stores 1a, 1b,. It is a system for supporting management in the system.
- the energy-saving activity in this embodiment is intended for the air conditioning facilities 50a, 50b,... Installed in the stores 1a, 1b,.
- the remote management server 20 includes a remote management server 20 and a management terminal 30 that can be connected to the remote management server 20 via the Internet 6.
- the remote management server 20 is installed in a remote management center 2 operated by an organization that provides remote management services (including services that support energy-saving activities) that remotely manage the air conditioning facilities 50a, 50b,. Yes.
- the management terminal 30 is installed in the headquarter 3.
- the store management system 100 detects violation actions of the air conditioning equipment 50a, 50b,... Violating the energy saving operation rules established by the staff of the headquarters 3, and quantifies the violation amount.
- the amount of violation is the original data of the energy saving activity report created for Headquarters 3.
- the energy saving operation rule is an operation rule for the purpose of achieving energy saving in the stores 1a, 1b,.
- the air conditioning equipment 50a includes an outdoor unit 51 and one or a plurality of indoor units 52 connected to the outdoor unit 51 via a refrigerant pipe, and as a whole, includes a compressor, a heat exchanger, and the like not shown.
- a refrigerant circuit is formed.
- Each indoor unit 52 has a control unit 55.
- Each control unit 55 is connected to a control unit (not shown) of the outdoor unit 51 and the controller 10a via a communication line 5b dedicated to the air conditioning equipment 50a.
- Each control unit 55 commands an operation command from the remote controller 56 or the controller 10a (for example, starts or stops the corresponding indoor unit 52, or changes the set temperature, set humidity, set air volume, or set wind direction of the corresponding indoor unit 52) Or controlling the operation of various components included in the refrigerant circuit in cooperation with a control unit (not shown) of the outdoor unit 51 in accordance with a command to change the operation mode of the corresponding indoor unit 52), Air-condition the room.
- the remote controller 56 is for receiving an input of an operation command for the indoor unit 52 from a user in the store 1a, and is dedicated to one-to-one or one-to-many dedicated communication with the control unit 55 of the indoor unit 52. They are connected via a line 5c.
- the air conditioning equipment 50a is designed to be operable at two levels of capability restriction levels. More specifically, the air-conditioning equipment 50a has an unrestricted mode (normal mode) in which the capacity is not limited, and a capacity-restricted mode that is controlled to operate with about 50% power consumption when operating in the unrestricted mode. Can be switched. Switching processing between the two modes is executed by a control unit (not shown) of the outdoor unit 51. In addition, each control unit 55 transmits information related to the corresponding indoor unit 52 (hereinafter referred to as device information) to the controller 10a in accordance with a command from the controller 10a.
- device information information related to the corresponding indoor unit 52
- the equipment information of the indoor unit 52 includes the operation parameters of the indoor unit 52 (starting / stopping state of the indoor unit 52, setting temperature, setting humidity, setting air volume, setting air direction, and operation such as cooling / heating / fan / dehumidification) Mode), indoor temperature, indoor humidity, state values of various components included in the indoor unit 52 (for example, including the rotational speed of the indoor fan, the temperature and pressure of the refrigerant at a predetermined position of the refrigerant circuit), and the operation of the remote controller 56 Information indicating the history is included.
- the control part (not shown) of the outdoor unit 51 transmits information related to the outdoor unit 51 (hereinafter referred to as device information) to the controller 10a in response to a command from the controller 10a.
- the equipment information of the outdoor unit 51 includes the set value of the capacity restriction level, the outdoor temperature, the outdoor humidity, and the state values of various components included in the outdoor unit 51 (for example, the frequency of the compressor, the rotational speed of the outdoor fan, the refrigerant) Information including the temperature and pressure of the refrigerant at a predetermined location in the circuit.
- the room temperature, the room humidity, the outside air temperature, the outside air humidity, the state values of various components included in the indoor unit 52 and the outdoor unit 51 are detected by a sensor (not shown) or the like.
- the controller 10a mainly includes a communication unit 11, a control unit 12, and a storage unit 15, and has a function of monitoring and controlling the air conditioning equipment 50a.
- the controller 10a is a device that does not have user interface devices such as an input device and a display device.
- the communication unit 11 is a network interface that allows the controller 10a to be connected to the LAN 5a and, consequently, the Internet 6, and the communication line 5b dedicated to the air conditioning equipment 50a.
- the control unit 12 mainly includes a CPU, a ROM, and a RAM, and reads and executes a program stored in the storage unit 15 to thereby execute an information collection unit 12a, a violation detection unit 12b, an energy amount calculation unit 12c, and It operates as the operation command unit 12d.
- the information collection unit 12a collects device information of each indoor unit 52 from the control unit 55 of the indoor unit 52 at a predetermined time interval (in this embodiment, every minute). Further, the information collecting unit 12a collects device information of the outdoor unit 51 from a control unit (not shown) of the outdoor unit 51 at predetermined time intervals (in this embodiment, every minute). The device information collected by the information collecting unit 12a is accumulated in a predetermined storage area secured in the storage unit 15. In order to be used for various remote management services in the remote management server 20, the device information is used at regular communication between the controller 10a and the remote management server 20 (every 30 minutes in the present embodiment) at regular intervals. The data is transmitted from the controller 10a to the remote management server 20 via the Internet 6. The communication between the controller 10a and the remote management server 20 is realized by the controller 10a operating as a Web client and the remote management server 20 operating as a Web server.
- the operation command unit 12d transmits an appropriate operation command to the appropriate indoor unit 52 in accordance with the operation schedule stored in the storage unit 15. For example, when an operation schedule is set such that “a specific indoor unit 52 is operated in a cooling mode at a set temperature of 27 ° C. and a low air flow from 9:00 to 18:00 every day”
- the command unit 12d transmits a command for setting the set temperature to 27 ° C., the set air volume to be weak, and the operation mode to the cooling mode to the indoor unit 52 together with the start command at 9 o'clock every day.
- a stop command is transmitted to the indoor unit 52.
- the operation schedule can be different for each indoor unit 52. Note that the latest operation command received by the indoor unit 52 is preferentially executed on the indoor unit 52 regardless of whether it is from the controller 10 a or the remote controller 56.
- the remote management server 20 is a server computer mainly composed of a communication unit 21, a control unit 22, an output unit 23, an input unit 24, and a storage unit 25.
- the controller 10a , 10b,... Has a function of monitoring and controlling the air conditioning equipment 50a, 50b,.
- the remote management server 20 has a Web server function, and the management screen 30 of the stores 1a, 1b,... (Report of energy saving activities in the stores 1a, 1b,. Can be provided).
- the communication unit 21 is a network interface that enables the remote management server 20 to be connected to the Internet 6.
- the control unit 22 is mainly composed of a CPU, a ROM, and a RAM, and reads and executes a program stored in the storage unit 25 to thereby execute a violation amount calculation unit 22a, a violation amount processing unit 22b, and a report creation unit. It operates as 22c. The operation of each unit 22a to 22c will be described later.
- the output unit 23 mainly includes a display and a speaker, and the input unit 24 mainly includes a mouse and a keyboard.
- the storage unit 25 is mainly composed of a hard disk, and holds a device information database 25a, an indoor unit database 25b, and a violation amount database 25c. In the device information database 25a, device information of the air conditioners 50a, 50b,...
- the device information in the device information database 25a is used for various remote management services provided by the remote management server 20 such as an abnormality detection service as well as an energy saving activity report creation service in the stores 1a, 1b,.
- the Details of the indoor unit database 25b and the violation amount database 25c will be described later.
- the management terminal 30 mainly includes a communication unit 31, a control unit 32, an output unit 33, an input unit 34, and a storage unit 35. It is a general-purpose personal computer used for A web browser having a web client function is installed in the management terminal 30.
- the staff of the headquarter 3 can manage the stores 1a, 1b,... By acquiring the management screen of the stores 1a, 1b,... On the Web browser from the remote management server 20 that is a Web server. it can.
- the communication unit 31 is a network interface that can connect the management terminal 30 to the Internet 6.
- the control unit 32 mainly includes a CPU, a ROM, and a RAM.
- the output unit 33 mainly includes a display and a speaker
- the input unit 34 mainly includes a mouse and a keyboard.
- the storage unit 35 is mainly composed of a hard disk. (6) Flow of processing until report is distributed Hereinafter, with reference to FIG. 5, until a report of energy saving activities at stores 1 a, 1 b,... Is distributed to the management terminal 30 of the headquarter 3. The flow of processing will be described.
- FIG. 5 shows the time of processing executed by four elements (air conditioning equipment 50a, 50b,..., Controllers 10a, 10b,..., Remote management server 20 and management terminal 30) involved in the creation of the report. It shows the relationship and the flow of data passed between the elements.
- the flow of time is defined from top to bottom.
- the headquarters 3 staff remotely manages the energy-saving operation rules applied to the stores 1a, 1b,... Via the Web browser of the management terminal 30 in the form of operation schedules of the air conditioning facilities 50a, 50b,. Upload to the server 20 (step S1).
- the operation schedule can be different for each of the air conditioners 50a, 50b,.
- the operation schedules of the air conditioning equipment 50a, 50b,... Uploaded to the remote management server 20 are the controllers 10a, 10b,. (Step S2). Incidentally, as described above, the controllers 10a, 10b,... Collect the device information of the air conditioning equipment 50a, 50b,.
- the violation detection unit 12b of each of the controllers 10a, 10b,... Is currently operated by the air conditioning equipment 50a, 50b,... Based on device information (particularly, operation parameters of the indoor unit 52) collected every minute. A state is judged and violation operation of air-conditioning equipment 50a, 50b, ... contrary to an operation schedule is detected.
- the energy amount calculation unit 12c of the controllers 10a, 10b,... Calculates the amount of increased energy and the amount of energy saving during regular communication with the remote management server 20 at 30-minute intervals based on the detection result. (Step S3).
- the operation command unit 12d of the controllers 10a, 10b,... followss the operation schedule after a predetermined time (in this embodiment, 30 minutes) when a violation operation is detected by the violation detection unit 12b.
- An appropriate operation command for instructing operation is transmitted to the control unit 55 of the indoor unit 52 related to the violation operation. That is, in the air conditioning equipment 50a, 50b,..., A violation operation contrary to the operation schedule is executed if there is an operation command from the remote controller 56, but after a predetermined time has elapsed, the operation is corrected to the operation schedule. It has become so.
- the amount of increased energy is determined according to a predetermined rule that contributes to more energy than the operation schedule among the violation operations of the air conditioning equipment 50a, 50b,... It has become.
- the amount of energy saving is quantified according to a predetermined rule that contributes to energy saving rather than the driving schedule among the violating actions of the air conditioning equipment 50a, 50b,... Contrary to the driving schedule for the last 30 minutes. is there.
- the rules include: violation time (time when the violation action was performed), violation time converted into basic unit, violation energy amount (energy amount increased or decreased from the predetermined energy amount due to violation action, or predetermined CO 2 amount) decrease the amount of CO 2), violation amount of energy is converted into basic unit, and those of calculating the like number of violations operation of the remote controller 56.
- the amount of energy can be calculated, for example, by multiplying the violation time by a value obtained by subtracting the set temperature according to the operation schedule from the actual set temperature.
- step S3 the energy increase amount and the energy saving amount are calculated for each indoor unit 52. That is, the energy increase amount and the energy saving amount calculated in step S3 serve as an index representing the degree of violation for 30 minutes from the previous execution of step S3 to the current execution for each indoor unit 52.
- the controllers 10a, 10b,... Receive the data on the increased energy amount and the energy saving amount calculated in step S3 together with the device information for the last 30 minutes during the regular communication with the remote management server 20.
- the remote management server 20 stores the energy increase amount and energy saving amount data sent from the controllers 10a, 10b,... In the violation amount database 25c (step S5).
- the violation amount database 25c is a tabular database as shown in FIG. 3, and is for each indoor unit 52 and for a period (the time width is 30 minutes. For example, “January 15, 2009 from 10:00 to 10:00 on the same day. Data indicating the amount of increased energy and the amount of energy saving (defined as “half”) are held as one record.
- the remote management server 20 can be requested to distribute the report at an arbitrary timing (step S6).
- the report distribution command is uploaded to the remote management server 20 via the Web browser of the management terminal 30 by the staff of the headquarters 3 together with various parameters that determine the report format.
- the remote management server 20 executes step S7 for creating a report as soon as there is a request for report distribution.
- the report created in step S7 is downloaded from the communication unit 21 of the remote management server 20 to the management terminal 30 and displayed on the web browser (step S8).
- (7) Contents of report Hereinafter, the items included in the report of energy saving activities in the stores 1a, 1b,... Will be described with reference to FIGS. 7a)
- Violation amount refers to a specific target (store 1a, 1b,... Whole, specific store 1a, 1b,. It is an arithmetic average value of the amount of energy increase and energy saving in a department or a specific indoor unit 52), and is calculated by the violation amount calculation unit 22a.
- the specific period and the specific object are determined by parameters input by the staff at the headquarter 3 in step S6 requesting the creation of a report.
- the violation amount calculation unit 22a refers to the indoor unit database 25b and the violation amount database 25c, and the total amount of energy increase and the total energy saving in a specific period in all the indoor units 52 belonging to a specific target. Calculate the arithmetic mean value of the quantity and use it as the violation quantity.
- the indoor unit database 25b is a tabular database as shown in FIG. 3, and data indicating the affiliation of each indoor unit 52 (which store 1a, 1b,..., Which department) is one record. Hold as.
- the report creation unit 22c outputs the violation amount calculated by the violation amount calculation unit 22a on the report. Therefore, the staff of the headquarters 3 can easily grasp the degree of violation of a specific target in a specific period designated by the headquarters 3.
- the arithmetic mean value of the energy increase amount and the energy saving amount is calculated on a daily basis, and only the arithmetic mean value on the day when the arithmetic mean value of the day increases (that is, becomes 0 or more). It is good also as a violation amount.
- the violation amount processing unit 22b is the entire store 1a, 1b,... 50b,..., And at each store 1a, 1b,... (That is, at each air conditioner 50a, 50b,...) Information indicating the content of the operation of the air conditioning equipment 50a, 50b,... Is created.
- the specific period is determined by parameters input by the staff of the headquarter 3 in step S6 requesting the creation of a report. More specifically, in the violation amount processing unit 22b, the total amount of violations in the stores 1a, 1b,... ), The following three offset times required to cancel the energy amount corresponding to the violation amount (total violation energy amount) are calculated.
- the first offset time is the total violation energy amount when the set temperature of all the indoor units 52 of all the air conditioning facilities 50a, 50b,... Is relaxed by ⁇ T ° C. from the current operation schedule. Is a time in which the stores 1a, 1b,.
- the second offset time is that when all air-conditioning equipment 50a, 50b,... Are stopped against the current operation schedule, the total amount of violating energy is offset across the stores 1a, 1b,. It is time that can be done.
- the third offset time is that when all the air-conditioning equipment 50a, 50b,... Are operated in the capacity restriction mode against the current operation schedule, the total violating energy amount is stored in the stores 1a, 1b,. ⁇ Time that can be offset as a whole.
- the first offset time is graphed as shown in FIG. In the graph of FIG. 6, the vertical axis represents the offset time, and the horizontal axis represents the set temperature relaxation amount ⁇ T.
- the violation amount processing unit 22b performs the same processing as the above three offset time calculation processing and the graph creation processing of FIG. 6 for the stores 1a, 1b,. Execute for. That is, the violation amount processing unit 22b has the violation amount in a specific period larger than 0 (that is, the energy is increased more than the target of the energy saving operation rule) for each store 1a, 1b,. The following three offset times required to offset the energy amount (individual violation energy amount) corresponding to the violation amount are calculated.
- the first offset time is when the set temperature of all indoor units 52 of all air conditioning facilities in the store is relaxed by ⁇ T ° C from the current operation schedule, It is time that can be offset by.
- the second offset time is a time during which the individual violating energy amount can be offset at the store when all the air conditioning facilities in the store are stopped against the current operation schedule.
- the third offset time is the time when the individual violating energy amount can be offset at the store when all the air-conditioning facilities in the store are operated in the capacity limit mode against the current operation schedule.
- the first offset time is graphed as in FIG.
- the violation amount processing unit 22b has a violation amount in the stores 1a, 1b,... In the specific period larger than 0 (that is, the energy is increased more than the target of the energy saving operation rule).
- the graph shown in FIG. 7 is created.
- the graph of FIG. 7 shows that when the set temperature of all the indoor units 52 of all the air conditioning facilities 50a, 50b,...
- the device information database 25a is referred to.
- the violation amount processing unit 22b performs the specific operation of the air conditioning equipment 50a, 50b,... Based on the past operation results of the air conditioning equipment 50a, 50b,. The relationship with the energy consumption is judged and used for prediction of offset time.
- the report creation unit 22c outputs the information created by the violation amount processing unit 22b on the report. Therefore, the staff at Headquarters 3 makes decisions on future actions necessary to offset the amount of violation, formulates future operating policies for the air conditioning facilities 50a, 50b,... And reviews the operation schedule. It becomes easy to do.
- the violation amount processing unit 22b creates a distribution diagram shown in FIG.
- the distribution chart shown in FIG. 8 is a distribution chart showing the relationship between the violation amount and the discomfort index at each store 1a, 1b,.
- the specific period is determined by parameters input by the staff of the headquarter 3 in step S6 requesting the creation of a report.
- the discomfort index is taken on the vertical axis, and the amount of violation is taken on the horizontal axis.
- the discomfort index is an index of the comfort of the environment in the stores 1a, 1b,... Provided by the air-conditioning equipment 50a, 50b,.
- each point on the distribution map of FIG. 8 corresponds to one store 1a, 1b,..., And points for all the stores 1a, 1b,. It will be.
- the area near the upper left on the distribution chart of FIG. 8 is an area where comfort is impaired and the amount of violation is small. In other words, “the driving schedule is kept, but an uncomfortable environment is provided. It is an area where there is a high possibility that there is a store that Therefore, a comment to that effect is output near the upper left.
- the area near the left center of the distribution chart of FIG. 8 is an area where comfort is moderately maintained and the amount of violation is small. In other words, “the driving schedule is maintained and comfortable. This is an area where there is a high possibility that there are stores that provide the environment. Therefore, a comment to that effect is output near the left center.
- the report creation unit 22c outputs the distribution map created by the violation amount processing unit 22b on the report. Therefore, the staff at headquarters 3 determines whether or not the driving schedule is appropriate to meet the needs of the site (that is, whether or not the people in the stores 1a, 1b,... Feel uncomfortable). It is easy to evaluate and review the operation schedule.
- the air conditioning equipment 50a, 50b,... In the above embodiment is controlled according to the operation schedule by the controllers 10a, 10b,. ing.
- violation operations are detected by the controllers 10a, 10b,..., And then quantified as violation amounts and output on a report for the head office 3. Therefore, the manager of the headquarters 3 can accurately grasp the influence of the violation operation of the air conditioning equipment 50a, 50b,... Contrary to the operation schedule on the energy saving activities embodied in the energy saving operation rules. It has become.
- the violation amount quantitatively indicating the violation operation of the air conditioning equipment 50a, 50b,... Contrary to the operation schedule is the future of the air conditioning equipment 50a, 50b,. Is processed by the violation amount processing unit 22b as information indicating the content of the operation and as information indicating the relationship between the violation amount and the discomfort index in the store 1a, 1b,... It is output on the document. Accordingly, the manager of the headquarters 3 can accurately grasp the influence of the violating operation on the energy saving activity and review the operation schedule.
- the violation amount is calculated and analyzed for the air conditioning facilities 50a, 50b,..., But the system 100 is replaced with another facility device (for example, lighting device, water heater) or air conditioner.
- the present invention can also be applied to the calculation and analysis of violation amounts for a combination of equipment and such other equipment.
- the violation amount may be calculated based on only the increased energy amount or only the saved energy amount among the increased energy amount and the energy saving amount.
- the energy increase amount and the energy saving amount calculated every 30 minutes and every indoor unit 52 by the energy amount calculation unit 12c of the controllers 10a, 10b,. It can be said that this is a violation amount at the machine 52.
- store 1a, 1b, ... unit, department unit, and indoor unit 52 unit can be employ
- the entire store 1a, 1b,..., A specific store 1a, 1b,..., A specific department, or a specific indoor unit 52 can be arbitrarily selected as a target for calculating the violation amount. Therefore, the controller 10a, 10b,... Calculates the energy increase amount and the energy saving amount in units of the indoor unit 52 which is the minimum unit. However, when the violation amount is measured only in the store 1a, 1b,..., The controller 10a, 10b,... Also calculates the amount of increased energy and the energy saving amount in the store 1a, 1b,. Good.
- the report is generated by the remote management server 20 at the request from the management terminal 30, that is, at an arbitrary timing desired by the staff of the headquarters 3. However, the report is generated periodically. Alternatively, it may be created at both timings.
- the manner of providing the report is not limited to that via the Internet 6, but may be provided by FAX, mail, or other means.
- the amount of increased energy and the amount of energy saving are not calculated by the controllers 10a, 10b,... But based on the device information of the air conditioning equipment 50a, 50b,. It may be calculated by the remote management server 20.
- the operation schedule is downloaded from the remote management server 20 to the controllers 10a, 10b,..., But the controllers 10a, 10b,. -It may be set directly to.
- various items included in the report are calculated when the report is created. However, some or all of these values may be periodically calculated by the remote management server 20 and stored in a database in the storage unit 25. In this case, after the report delivery command (step S6) is issued, the time until the report is actually created is shortened.
- the operation schedule can be different for each store 1a, 1b,..., And for each indoor unit 52 in the same store 1a, 1b,. It is also possible to apply the same operation schedule to the entire stores 1a, 1b,... Or apply the same operation schedule to all the indoor units 52 in the same store 1a, 1b,. (10) In the above embodiment, when placing points corresponding to each store on the distribution diagram of FIG. 8, specific conditions (number of m 2, number of customers, sales, business hours, environment (outside air temperature), Only the points corresponding to the stores in which the region, the number of indoor units 52 and the number of outdoor units 51, etc.) match may be arranged.
- the specific condition for each store needs to be stored in the remote management server 20 so that the specific condition can be determined. Moreover, it is preferable that the specific conditions can be designated by the staff of the headquarters 3 in step S6 for requesting the creation of a report. According to the modified example, it is easy to review the operation schedule applied to the store under the same conditions.
- the violation amount calculation unit 22a calculates the violation amount in consideration of the characteristics of the air conditioning facilities 50a, 50b,... While referring to the device configuration data of the air conditioning facilities 50a, 50b,. It is good.
- the device configuration data is data relating to, for example, the installation area, model and date of manufacture of the air conditioning equipment 50a, 50b,... It is preferable to store the information in the remote management server 20.
- the increased energy amount and the energy saving amount are calculated by detecting violation actions of the air conditioning equipment 50a, 50b,... Contrary to the operation schedule and converting the violation actions according to a predetermined rule. It has become.
- the wattmeter 80 see FIG. 9 in the stores 1a, 1b,..., The energy consumption of the air conditioning facilities 50a, 50b,.
- the amount of increased energy and the amount of energy saving may be obtained based on the difference from the threshold value.
- an actual measurement value by the wattmeter 80 may be taken into consideration in a predetermined rule for converting the violating operation into an increased energy amount and an energy saving amount.
- the information collection unit 12a performs the air conditioning equipment 50a, at an appropriate timing as necessary (for example, when a violation operation is detected or when an operation command for correcting the violation operation is transmitted 30 minutes later). It is preferable to collect actually measured values of energy consumption of 50b,.
- the present invention has an effect that it is possible to accurately grasp the influence of a violation operation of a facility device that violates the operation rule on the management target of the facility device embodied in the operation rule, and as a device management system that manages the facility device Useful.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Public Health (AREA)
- Human Computer Interaction (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air Conditioning Control Device (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
しかしながら、上記態様では、運用規則があまり蔑ろにされると、運用規則の本来の目的が達成されない虞がある。従って、設備機器の利用者(一般利用者のみならず、管理者も含まれる)にとっては、運用規則に反する設備機器の違反動作を、運用規則の管理目標との関係で的確に把握することが重要になる。
ここでは、運用規則に反する設備機器の違反動作が検出され、違反量として定量化される。従って、運用規則に反する設備機器の違反動作が、運用規則に具現化される設備機器の管理目標(省エネルギーなど)に与える影響を的確に把握することができる。
ここでは、設備機器に運用規則に従う制御命令が与えられる。言い換えると、必要に応じて違反動作が許容されるものの、設備機器は、原則として運用規則に従って動作する。従って、運用規則に具現化される管理目標の実現が容易になる。
ここでは、設備機器に運用規則よりも増エネルギーに寄与する動作が許容され、そのような違反動作が違反量として定量化される。従って、増エネルギー側に運用規則に反する設備機器の違反動作が省エネ活動にもたらす影響を的確に把握することができる。
ここでは、空調機に運用規則外の設定温度での動作が許容され、そのような動作が違反量として定量化される。従って、空調機が運用規則外の設定温度で動作することの影響を的確に把握することができる。
ここでは、設備機器に運用規則に反し起動もしくは停止し、又は起動および停止することが許容され、そのような動作が違反量として定量化される。従って、設備機器が運用規則に反し起動もしくは停止し、又は起動および停止することの影響を的確に把握することができる。
ここでは、設備機器の違反動作が違反量として定量化され、さらに出力される。従って、設備機器の違反動作の影響を利用者が的確に把握することができる。
ここでは、設備機器の違反動作が違反量として定量化され、さらに加工され、出力される。従って、設備機器の違反動作の影響を利用者が的確に把握することができる。
ここでは、違反量の算出時に、設備機器のエネルギー消費量の実測値が加味される。従って、運用規則に反する設備機器の違反動作が正確に定量化される。
ここでは、設備機器に運用規則よりも省エネルギーに寄与する動作が許容され、そのような動作が違反量として定量化される。従って、省エネルギー側に運用規則に反する設備機器の違反動作が省エネ活動にもたらす影響を的確に把握することができる。
ここでは、違反量を相殺するべく設備機器に今後必要とされる動作の内容を示唆する情報が出力される。従って、設備機器に適用する運用規則の見直しを図ることができる。
ここでは、複数の管理点のそれぞれに関し、運用規則に反する設備機器の違反動作が検出され、違反量として定量化される。従って、運用規則に反する複数の設備機器の違反動作が、運用規則に具現化される設備機器の管理目標(省エネルギーなど)に与える影響を的確に把握することができる。
ここでは、複数の管理点における違反量に基づいて、違反量と、設備機器が提供する環境の快適性との関係性を示す情報(分布図など)が作成される。従って、設備機器に適用する運用規則の見直しを図ることができる。
<店舗管理システム>
(1)全体構成
図1に示す店舗管理システム100は、全国に点在する多数の店舗1a,1b,・・・における省エネ活動を、店舗1a,1b,・・・を統括する組織の本部3において管理することを支援するためのシステムである。なお、本実施形態における省エネ活動とは、店舗1a,1b,・・・内にそれぞれ設置されている空調設備50a,50b,・・・を対象とするものである。
店舗管理システム100は、主として、店舗1a,1b,・・・内にそれぞれ設置されているコントローラ10a,10b,・・・と、コントローラ10a,10b,・・・がインターネット6を介して接続可能な遠隔管理サーバ20と、遠隔管理サーバ20にインターネット6を介して接続可能な管理端末30とから構成されている。遠隔管理サーバ20は、空調設備50a,50b,・・・を遠隔から管理する遠隔管理サービス(省エネ活動を支援するサービスを含む)を提供する組織により運営される遠隔管理センター2内に設置されている。管理端末30は、本部3内に設置されている。
(2)空調設備
以下、図2を参照しつつ、空調設備50aについて説明するが、その他の空調設備50b,・・・についても同様であるものとする。
空調設備50aは、室外機51と、室外機51に冷媒配管を介して接続される1又は複数の室内機52とを有しており、全体として、図示されない圧縮機や熱交換器等から構成される冷媒回路を形成している。
各制御部55は、リモコン56又はコントローラ10aからの運転指令(例えば、対応する室内機52の起動又は停止を命じたり、対応する室内機52の設定温度、設定湿度、設定風量又は設定風向の変更を命じたり、対応する室内機52の運転モードの変更を命じたりするもの)に従って、室外機51の制御部(図示されない)と協調しつつ、冷媒回路に含まれる各種部品の動作を制御し、室内を空調する。具体的には、圧縮機の周波数、ファンの回転数および各種弁の開度の調整等を行う。なお、リモコン56は、店舗1a内の利用者から室内機52に対する運転指令の入力を受け付けるためのものであり、室内機52の制御部55に1対1、あるいは、1対多で専用の通信線5cを介して接続されている。
また、各制御部55は、対応する室内機52に関する情報(以下、機器情報という)をコントローラ10aからの命令に応じてコントローラ10aに送信する。室内機52の機器情報には、室内機52の運転パラメータ(室内機52の起動/停止の起動状態、設定温度、設定湿度、設定風量、設定風向、および冷房/暖房/送風/除湿等の運転モード)、室内温度、室内湿度、室内機52に含まれる各種部品の状態値(例えば、室内ファンの回転数、冷媒回路の所定の位置における冷媒の温度および圧力を含む)、ならびにリモコン56操作の履歴を示す情報が含まれる。また、室外機51の制御部(図示されない)は、室外機51に関する情報(以下、機器情報という)をコントローラ10aからの命令に応じてコントローラ10aに送信する。室外機51の機器情報には、能力制限レベルの設定値、外気温度、外気湿度、および、室外機51に含まれる各種部品の状態値(例えば、圧縮機の周波数、室外ファンの回転数、冷媒回路の所定の位置における冷媒の温度および圧力を含む)を示す情報が含まれる。なお、室内温度、室内湿度、外気温度、外気湿度、室内機52および室外機51に含まれる各種部品の状態値は、図示されないセンサ等により検知される。
以下、図2を参照しつつ、コントローラ10aについて説明するが、その他のコントローラ10b,・・・についても同様であるものとする。
コントローラ10aは、主として通信部11、制御部12および記憶部15から構成されており、空調設備50aを監視および制御する機能を有している。なお、コントローラ10aは、入力装置および表示装置などのユーザインタフェース機器を有さない装置である。
通信部11は、コントローラ10aをLAN5aひいてはインターネット6、および空調設備50a専用の通信線5bに接続可能にするネットワークインターフェースである。
制御部12は、主としてCPU、ROMおよびRAMから構成されており、記憶部15に記憶されているプログラムを読み出して実行することにより、情報収集部12a、違反検出部12b、エネ量算出部12cおよび動作命令部12dとして動作する。
(4)遠隔管理サーバ
図3に示すように、遠隔管理サーバ20は、主として通信部21、制御部22、出力部23、入力部24および記憶部25から構成されるサーバコンピュータであり、コントローラ10a,10b,・・・経由でそれぞれ空調設備50a,50b,・・・を監視および制御する機能を有している。遠隔管理サーバ20は、Webサーバ機能を有しており、Webクライアント機能を有する管理端末30に店舗1a,1b,・・・の管理画面(店舗1a,1b,・・・における省エネ活動の報告書を表示する画面を含む)を提供可能である。
通信部21は、遠隔管理サーバ20をインターネット6に接続可能にするネットワークインターフェースである。
出力部23は、主としてディスプレイおよびスピーカから構成されており、入力部24は、主としてマウスおよびキーボードから構成されている。
記憶部25は、主としてハードディスクから構成されており、機器情報データベース25a、室内機データベース25bおよび違反量データベース25cとを保持している。機器情報データベース25aには、コントローラ10a,10b,・・・から送られてくる空調設備50a,50b,・・・の機器情報が適当な形式で蓄積される。機器情報データベース25a内の機器情報は、店舗1a,1b,・・・における省エネ活動の報告書の作成サービスのみならず、異常検知サービスなどの遠隔管理サーバ20が提供する各種遠隔管理サービスに利用される。室内機データベース25bおよび違反量データベース25cの詳細については、後述する。
図4に示すように、管理端末30は、主として通信部31、制御部32、出力部33、入力部34および記憶部35から構成されており、本部3の職員が日常業務に使用する汎用のパーソナルコンピュータである。管理端末30には、Webクライアント機能を有するWebブラウザがインストールされている。本部3の職員は、Webサーバである遠隔管理サーバ20からWebブラウザ上に店舗1a,1b,・・・の管理画面を取得することにより、店舗1a,1b,・・・の管理を行うことができる。
通信部31は、管理端末30をインターネット6に接続可能するネットワークインターフェースである。
制御部32は、主としてCPU、ROMおよびRAMから構成されている。出力部33は、主としてディスプレイおよびスピーカから構成されており、入力部34は、主としてマウスおよびキーボードから構成されている。
(6)報告書が配信されるまでの処理の流れ
以下、図5を参照しつつ、店舗1a,1b,・・・における省エネ活動の報告書が本部3の管理端末30に配信されるまでの処理の流れについて説明する。図5は、報告書の作成に関与する4つの要素(空調設備50a,50b,・・・、コントローラ10a,10b,・・・、遠隔管理サーバ20および管理端末30)が実行する処理の時間的関係、および当該要素間で受け渡されるデータの流れを示している。なお、図5では、上から下に時間の流れが規定されている。
本部3の職員は、店舗1a,1b,・・・に適用する省エネ運用規則を、それぞれ空調設備50a,50b,・・・の運転スケジュールの形式で、管理端末30のWebブラウザを介して遠隔管理サーバ20にアップロードする(ステップS1)。なお、運転スケジュールは、空調設備50a,50b,・・・毎に異なるものとすることができる。
ところで、上記のとおり、コントローラ10a,10b,・・・は、それぞれ空調設備50a,50b,・・・の機器情報を1分毎に収集している。コントローラ10a,10b,・・・の違反検出部12bは、それぞれ1分毎に収集される機器情報(特に、室内機52の運転パラメータ)に基づき空調設備50a,50b,・・・の現在の動作状態を判断し、運転スケジュールに反する空調設備50a,50b,・・・の違反動作を検出する。なお、違反動作とは、例えば、設定温度が運転スケジュールよりも高く又は低く設定されている場合や、運転スケジュールによると停止中であるべきところ起動している場合、逆に運転スケジュールによると起動中であるべきところ停止している場合などの、運転スケジュールに定められている動作と異なる動作全般を意味する。一方、コントローラ10a,10b,・・・のエネ量算出部12cは、当該検出の結果に基づいて、30分間隔での遠隔管理サーバ20との定期通信時に、増エネ量および省エネ量を算出する(ステップS3)。
ところで、増エネ量とは、直前の30分間の運転スケジュールに反する空調設備50a,50b,・・・の違反動作のうち、運転スケジュールよりも増エネルギーに寄与するものを所定のルールに沿って定量化したものである。省エネ量とは、直前の30分間の運転スケジュールに反する空調設備50a,50b,・・・の違反動作のうち、運転スケジュールよりも省エネルギーに寄与するものを所定のルールに沿って定量化したものである。当該ルールとしては、違反時間(違反動作が行われていた時間)、原単位に換算された違反時間、違反エネルギー量(違反動作により所定のエネルギー量から増減したエネルギー量又は所定のCO2量から増減したCO2量)、原単位に換算された違反エネルギー量、およびリモコン56の違反操作の回数などとして算出するというものがある。エネルギー量は、例えば、現実の設定温度から運転スケジュールによる設定温度を減じたものを違反時間に乗ずることにより算出することができる。なお、ステップS3では、増エネ量および省エネ量は、室内機52単位で算出される。つまり、ステップS3で算出される増エネ量および省エネ量は、各室内機52についての、ステップS3が前回実行されてから今回実行されるまでの30分間の違反の程度を表す指標となる。
一方、遠隔管理サーバ20は、コントローラ10a,10b,・・・から送られてくる増エネ量および省エネ量のデータを違反量データベース25c内に保存する(ステップS5)。違反量データベース25cは、図3に示されるような表形式のデータベースであり、室内機52毎かつ期間(時間幅は30分であり、例えば、「2009年1月15日10時から同日10時半」のように定義される)毎の増エネ量および省エネ量を示すデータを1のレコードとして保持する。
ステップS3からステップS5が多数回繰り返されることにより、報告書の作成に十分な量の増エネ量および省エネ量のデータが違反量データベース25c内に蓄積された後であれば、本部3の職員は、任意のタイミングで、遠隔管理サーバ20に対し報告書の配信を要求することができる(ステップS6)。報告書の配信命令は、報告書の形式を決定する各種パラメータとともに、本部3の職員により管理端末30のWebブラウザを介して遠隔管理サーバ20にアップロードされる。
(7)報告書の内容
以下、図6から図8を参照しつつ、店舗1a,1b,・・・における省エネ活動の報告書に掲載される項目について説明する。
7a)違反量
違反量とは、特定の期間(前日、今週、先月、今年など)における特定の対象(店舗1a,1b,・・・全体、特定の店舗1a,1b,・・・、特定の部署又は特定の室内機52)での増エネ量および省エネ量の相加平均値であり、違反量算出部22aにより算出される。特定の期間および特定の対象については、報告書の作成を要求するステップS6において本部3の職員により入力されるパラメータにより決定される。
報告書作成部22cは、違反量算出部22aにより算出された違反量を報告書上に出力する。従って、本部3の職員は、自身が指定した特定の期間における特定の対象での違反の程度を容易に把握することができる。
なお、1日単位で増エネ量および省エネ量の相加平均値を算出し、1日の当該相加平均値が増エネになる(つまり、0以上になる)日の当該相加平均値のみを集計し、違反量としてもよい。
違反量加工部22bは、特定の期間における店舗1a,1b,・・・全体での(つまり、空調設備50a,50b,・・・全体での)、および各店舗1a,1b,・・・での(つまり、各空調設備50a,50b,・・・での)違反量を相殺するために今後必要とされる空調設備50a,50b,・・・の動作の内容を示唆する情報を作成する。特定の期間については、報告書の作成を要求するステップS6において本部3の職員により入力されるパラメータにより決定される。
より具体的には、違反量加工部22bは、特定の期間における店舗1a,1b,・・・全体での違反量が0より大きい(つまり、省エネ運用規則の目標よりも増エネとなっている)場合には、当該違反量に相当するエネルギー量(全体違反エネルギー量)を相殺するのに必要となる以下の3つの相殺時間を算出する。
つまり、違反量加工部22bは、特定の期間における違反量が0より大きくなっている(つまり、省エネ運用規則の目標よりも増エネとなっている)各店舗1a,1b,・・・に対し、当該違反量に相当するエネルギー量(個別違反エネルギー量)を相殺するのに必要となる以下の3つの相殺時間を算出する。
1つ目の相殺時間は、当該店舗内の全ての空調設備の全ての室内機52の設定温度を現在の運転スケジュールよりも△T℃だけ緩和させるとした場合に、個別違反エネルギー量を当該店舗で相殺できる時間である。2つ目の相殺時間は、当該店舗内の全ての空調設備を現在の運転スケジュールに反して停止させるとした場合に、個別違反エネルギー量を当該店舗で相殺できる時間である。3つ目の相殺時間は、当該店舗内の全ての空調設備を現在の運転スケジュールに反して能力制限モードで運転させるとした場合に、個別違反エネルギー量を当該店舗で相殺できる時間である。1つ目の相殺時間については、図6と同様にグラフ化される。
報告書作成部22cは、違反量加工部22bにより作成された上記情報を報告書上に出力する。従って、本部3の職員は、違反量を相殺するために必要な今後の行動を意思決定し、空調設備50a,50b,・・・の今後の運用方針を具体的に策定し、運転スケジュールの見直しを行うことが容易になる。
違反量加工部22bは、図8に示す分布図を作成する。図8に示す分布図は、特定の期間における各店舗1a,1b,・・・での違反量と不快指数との関係性を示す分布図である。特定の期間については、報告書の作成を要求するステップS6において本部3の職員により入力されるパラメータにより決定される。
図8の分布図では、縦軸に不快指数がとられ、横軸に違反量がとられている。不快指数は、空調設備50a,50b,・・・により提供される店舗1a,1b,・・・内の環境の快適性を指標化したものであり、例えば、運転スケジュールに定められている設定温度と現実の室内温度との乖離温度、又は設定温度の変更に関するリモコン56の操作回数、あるいはこれらを反映する値等として、機器情報データベース25aを参照し算出される。図8の分布図上の各点は1の店舗1a,1b,・・・に対応しており、図8の分布図上には全店舗1a,1b,・・・分の点が配置されることになる。
<特徴>
(1)
上記実施形態における空調設備50a,50b,・・・は、原則としてコントローラ10a,10b,・・・により運転スケジュールに従って制御されるものの、リモコン56操作等に起因する違反動作が許容されるようになっている。かかる違反動作は、コントローラ10a,10b,・・・により検出され、その後、違反量として定量化され、本部3向けの報告書上に出力される。従って、本部3の管理者は、運転スケジュールに反する空調設備50a,50b,・・・の違反動作が、省エネ運用規則に具現化される省エネ活動に与える影響を的確に把握することができるようになっている。
上記実施形態では、運転スケジュールに反する空調設備50a,50b,・・・の違反動作を定量的に表す違反量が、当該違反量を相殺するための空調設備50a,50b,・・・の今後の動作の内容を示唆する情報として、および当該違反量と店舗1a,1b,・・・内の不快指数との関係性を示す情報として違反量加工部22bにより加工され、その後、本部3向けの報告書上に出力されるようになっている。従って、本部3の管理者は、違反動作が省エネ活動に与える影響を的確に把握し、運転スケジュールの見直しを図ることができるようになっている。
<変形例>
(1)
上記実施形態では、空調設備50a,50b,・・・を対象とする違反量の算出および分析を行っているが、上記システム100を、他の設備機器(例えば、照明機器、給湯器)又は空調設備とそのような他の設備機器との組合せを対象とする違反量の算出および分析にも応用することができる。
上述した方法に加えて又は代えて、違反量を、増エネ量および省エネ量のうち増エネ量のみ又は省エネ量にのみに基づき算出してもよい。
当該変形例によれば、コントローラ10a,10b,・・・のエネ量算出部12cにより30分毎かつ室内機52毎に算出される増エネ量および省エネ量は、特定の30分間における特定の室内機52での違反量であると言える。
(3)
上記実施形態では、違反量を算出する単位として、店舗1a,1b,・・・単位、部署単位および室内機52単位を採用可能になっている。しかしながら、他の単位、例えば、地域単位、建物種別単位、営業形態種別(例えば、営業時間、事業内容などで区別される)単位、面積レベル単位、設置ゾーン種別(客席、厨房など)単位、割り当てられている運転スケジュール単位が採用されてもよい。他の単位で違反量を算出するためには、当該単位と室内機52との関係を示す情報を保持しておく必要がある。
上記実施形態では、違反量を算出する対象として、店舗1a,1b,・・・全体、特定の店舗1a,1b,・・・、特定の部署又は特定の室内機52を任意に選択可能にするべく、コントローラ10a,10b,・・・がその最小の単位である室内機52単位で増エネ量および省エネ量を算出している。しかしながら、違反量を店舗1a,1b,・・・単位のみで測る場合には、コントローラ10a,10b,・・・も増エネ量および省エネ量を店舗1a,1b,・・・単位で算出すればよい。
(5)
上記実施形態では、報告書は、管理端末30からの要求時に、すなわち本部3の職員が所望する任意のタイミングで遠隔管理サーバ20により作成されるものとしたが、定期的に作成されるものとしてもよいし、両方のタイミングで作成されるものとしてもよい。また、報告書の提供の態様も、インターネット6を介するものに限らず、FAX、郵送、その他の手段により提供されるようになっていてもよい。
増エネ量および省エネ量がコントローラ10a,10b,・・・で算出されるのではなく、コントローラ10a,10b,・・・から送られてくる空調設備50a,50b,・・・の機器情報に基づいて遠隔管理サーバ20で算出されるものとしてもよい。
(7)
上記実施形態では、運転スケジュールは、遠隔管理サーバ20からコントローラ10a,10b,・・・にダウンロードされるようになっているが、店舗1a,1b,・・・内でコントローラ10a,10b,・・・に直接設定されるようになっていてもよい。
(8)
上記実施形態では、報告書に掲載される各種項目は、報告書の作成時に計算されるようになっている。しかしながら、これらの値の一部又は全部が遠隔管理サーバ20で定期的に計算され、記憶部25内のデータベースに保存されるようになっていてもよい。この場合には、報告書の配信の命令(ステップS6)があった後、実際に報告書が作成されるまでの時間が短縮されることになる。
上記実施形態では、運転スケジュールは、店舗1a,1b,・・・毎、さらには同じ店舗1a,1b,・・・内の室内機52毎に異なるものとすることができるようになっているが、店舗1a,1b,・・・全体に同じ運転スケジュールを適用したり、同じ店舗1a,1b,・・・内の全ての室内機52に同じ運転スケジュールを適用したりすることも可能である。
(10)
上記実施形態において、図8の分布図上に各店舗に対応する点を配置する際に、同じ分布図上に特定の条件(m2数、客数、売り上げ、営業時間、環境(外気温度)、地域、室内機52や室外機51の台数など)が合致する店舗に対応する点のみを配置するようにしてもよい。
当該変形例によれば、同様の条件の店舗に適用する運転スケジュールの見直しが容易になる。
(11)
上記実施形態において、違反量算出部22aは、空調設備50a,50b,・・・の機器構成データを参照しつつ、空調設備50a,50b,・・・の特性を加味した違反量を算出するものとしてもよい。なお、機器構成データは、例えば、空調設備50a,50b,・・・の設置地域、機種および製造日、ならびに室内機52の設置場所(南向き、西向き、階、窓際など)などに関するデータであり、遠隔管理サーバ20内に記憶させておくことが好ましい。
上記実施形態では、運転スケジュールに反する空調設備50a,50b,・・・の違反動作を検出し、当該違反動作を所定のルールで換算することにより、増エネ量および省エネ量が算出されるようになっている。しかしながら、電力計80(図9参照)を店舗1a,1b,・・・内に設置することにより空調設備50a,50b,・・・のエネルギー消費量を実測し、当該エネルギー消費量と予め定められている閾値との差により、増エネ量および省エネ量を求めるようにしてもよい。あるいは、違反動作を増エネ量および省エネ量に換算するための所定のルールにおいて、電力計80による実測値が考慮されるようになっていてもよい。
当該変形例では、必要に応じて適当なタイミングで(例えば、違反動作の検出時点で、あるいは違反動作を30分後に是正する運転指令を送信する時点で)、情報収集部12aが空調設備50a,50b,・・・のエネルギー消費量の実測値を電力計80から収集するようにすることが好ましい。
10a,10b,・・・ コントローラ
12a 情報収集部(収集部)
12b 違反検出部(検出部)
12c エネ量算出部(算出部)
12d 動作命令部
15 記憶部
20 遠隔管理サーバ(コンピュータ)
22 制御部
22a 違反量算出部(取得部)
22b 違反量加工部(加工部、作成部)
22c 報告書作成部(違反量出力部、加工情報出力部)
25 記憶部
50a,50b,・・・ 空調設備
52 室内機(設備機器、管理点)
80 電力計(測定部)
100 店舗管理システム(機器管理システム)
Claims (12)
- 設備機器(50a,50b,・・・)を管理する機器管理システム(100)であって、
前記設備機器の運用規則を記憶する記憶部(15)と、
前記運用規則に反する前記設備機器の違反動作を検出する検出部(12b)と、
前記違反動作を定量的に表す違反量を算出する算出部(12c,22a)と、
を備える、機器管理システム。 - 前記設備機器(50a,50b,・・・)に前記運用規則に従う制御命令を送信する動作命令部(12d)、
をさらに備える、
請求項1に記載の機器管理システム(100)。 - 前記違反動作には、前記運用規則よりも増エネルギーに寄与する動作が含まれる、
請求項1又は2に記載の機器管理システム(100)。 - 前記設備機器(50a,50b,・・・)は、空調機であり、
前記違反動作には、前記運用規則に定める設定温度以外での動作が含まれる、
請求項1から3のいずれかに記載の機器管理システム(100)。 - 前記違反動作には、前記運用規則に定めるタイミング以外での起動動作および停止動作の少なくとも一方が含まれる、
請求項1から4のいずれかに記載の機器管理システム(100)。 - 前記違反量を出力する違反量出力部(22c)、
をさらに備える、
請求項1から5のいずれかに記載の機器管理システム(100)。 - 前記違反量を加工した加工情報を作成する加工部(22b)と、
前記加工情報を出力する加工情報出力部(22c)と、
をさらに備える、
請求項1から6のいずれかに記載の機器管理システム(100)。 - 前記設備機器(50a,50b,・・・)のエネルギー消費量を実測する測定部(80)、
をさらに備え、
前記算出部(12c,22a)は、前記エネルギー消費量を参照し、前記違反量を算出する、
請求項1から7のいずれかに記載の機器管理システム(100)。 - 前記違反動作には、前記運用規則よりも省エネルギーに寄与する動作が含まれる、
請求項1から8のいずれかに記載の機器管理システム(100)。 - 前記設備機器(50a,50b,・・・)に関する機器情報を収集する収集部(12a)、
をさらに備え、
前記加工部(22b)は、前記違反量および前記機器情報を参照し、前記違反量を相殺するための前記設備機器の今後の動作の内容を示唆する情報を前記加工情報として作成する、
請求項6に記載の機器管理システム(100)。 - それぞれ1又は複数の設備機器(50a,50b,・・・)からなる複数の管理点(1a,1b,・・・)を統括して管理する機器管理システム(100)であって、
それぞれ前記複数の管理点のうち対応するものに関し、前記設備機器の運用規則を記憶する複数の記憶部(15)と、
それぞれ前記複数の管理点のうち対応するものに関し、前記運用規則に反する前記設備機器の違反動作を検出する複数の検出部(12b)と、
それぞれ前記複数の管理点のうち対応するものに関し、前記違反動作を定量的に表す違反量を算出する複数の算出部(12c,22a)と、
を備える、機器管理システム。 - それぞれ前記複数の管理点(1a,1b,・・・)のうち対応するものに関し、前記設備機器(50a,50b,・・・)に関する機器情報を収集する複数の収集部(12a)と、
前記複数の管理点に関する前記違反量および前記機器情報を参照し、前記違反量と前記設備機器が提供する環境の快適性との関係性を示す情報を作成する作成部(22b)と、
をさらに備える、
請求項11に記載の機器管理システム(100)。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201080010938.1A CN102341657B (zh) | 2009-03-12 | 2010-03-08 | 设备管理系统 |
EP20100750537 EP2410255A4 (en) | 2009-03-12 | 2010-03-08 | DEVICE MANAGEMENT SYSTEM |
BRPI1011693A BRPI1011693A2 (pt) | 2009-03-12 | 2010-03-08 | sistema de gerenciamento de dispositivo |
US13/203,571 US9135592B2 (en) | 2009-03-12 | 2010-03-08 | Device management system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009059640A JP4586927B2 (ja) | 2009-03-12 | 2009-03-12 | 機器管理システム |
JP2009-059640 | 2009-03-12 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2010103779A1 true WO2010103779A1 (ja) | 2010-09-16 |
Family
ID=42728075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2010/001592 WO2010103779A1 (ja) | 2009-03-12 | 2010-03-08 | 機器管理システム |
Country Status (7)
Country | Link |
---|---|
US (1) | US9135592B2 (ja) |
EP (1) | EP2410255A4 (ja) |
JP (1) | JP4586927B2 (ja) |
KR (1) | KR20110134441A (ja) |
CN (1) | CN102341657B (ja) |
BR (1) | BRPI1011693A2 (ja) |
WO (1) | WO2010103779A1 (ja) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4989801B1 (ja) * | 2011-05-30 | 2012-08-01 | 株式会社ユビテック | 省エネルギー装置、省エネルギーシステム及び省エネルギープログラム |
WO2013061532A1 (ja) | 2011-10-27 | 2013-05-02 | パナソニック株式会社 | 電気機器および電気機器制御方法 |
KR101356081B1 (ko) * | 2013-07-11 | 2014-01-28 | 한국과학기기공업협동조합 | 과학기기 관리 시스템 |
JP6758752B2 (ja) * | 2016-03-29 | 2020-09-23 | ミサワホーム株式会社 | 省エネ診断システム |
JP7244743B2 (ja) | 2019-02-07 | 2023-03-23 | ダイキン工業株式会社 | 管理装置又は機器情報送信装置 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05256482A (ja) * | 1992-03-16 | 1993-10-05 | Toshiba Corp | 熱源機器運転制御装置 |
JP2000121126A (ja) * | 1998-10-21 | 2000-04-28 | Toshiba Corp | ビル監視制御装置 |
JP2001014026A (ja) * | 1999-06-30 | 2001-01-19 | Matsushita Electric Works Ltd | 運転管理装置、運転管理システム、運転管理装置のプログラムを記録した記録媒体 |
JP2001349598A (ja) * | 2000-06-05 | 2001-12-21 | Shimizu Corp | 建物運用時性能評価システム |
JP2003074943A (ja) * | 2001-09-03 | 2003-03-12 | Daikin Ind Ltd | 空調制御方法およびその装置 |
JP2004116820A (ja) * | 2002-09-25 | 2004-04-15 | Daikin Ind Ltd | 運転制御装置 |
JP2007172406A (ja) * | 2005-12-22 | 2007-07-05 | E-Cubic Co Ltd | エネルギー等消費量算定システム及びエネルギー等消費量適切性情報出力装置 |
JP2008164228A (ja) | 2006-12-28 | 2008-07-17 | Daikin Ind Ltd | 空調管理システム及び空調管理方法 |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2492735A (en) * | 1945-10-19 | 1949-12-27 | Mallinckrodt Chemical Works | Firming agent and method of using same |
US4336273A (en) * | 1980-10-03 | 1982-06-22 | Del Monte Corporation | Vegetable and fruit preservation process |
US5332589A (en) * | 1992-12-30 | 1994-07-26 | Van Den Bergh Foods Co., Division Of Conopco, Inc. | Tomato calcification process |
US20020083430A1 (en) * | 2000-12-26 | 2002-06-27 | Tadao Kusuda | Uninstall control apparatus which controls uninstallation of device control software |
AU2003244073A1 (en) * | 2002-07-19 | 2004-02-09 | Matsushita Electric Industrial Co., Ltd. | Device linkage control apparatus |
JP2004116972A (ja) * | 2002-09-30 | 2004-04-15 | Daikin Ind Ltd | 空気調和機の省エネルギー制御システム、省エネルギー制御装置、省エネルギー制御プログラムおよび省エネルギー制御方法 |
GB0223339D0 (en) * | 2002-10-08 | 2002-11-13 | Unilever Plc | Freezing vegetables |
KR100565486B1 (ko) * | 2003-06-11 | 2006-03-30 | 엘지전자 주식회사 | 에어컨의 중앙제어 시스템 및 그 동작방법 |
JP4473552B2 (ja) * | 2003-10-24 | 2010-06-02 | 三菱電機ビルテクノサービス株式会社 | 空気調和機の運転状況判定方法及び運転状況判定システム |
US7114554B2 (en) * | 2003-12-01 | 2006-10-03 | Honeywell International Inc. | Controller interface with multiple day programming |
US20060065750A1 (en) * | 2004-05-21 | 2006-03-30 | Fairless Keith W | Measurement, scheduling and reporting system for energy consuming equipment |
US20060253205A1 (en) * | 2005-05-09 | 2006-11-09 | Michael Gardiner | Method and apparatus for tabular process control |
JP4725559B2 (ja) * | 2007-08-03 | 2011-07-13 | ブラザー工業株式会社 | 情報処理装置、及びインストール用プログラム |
US20090236910A1 (en) * | 2008-03-24 | 2009-09-24 | Jose Luiz Yamada | Point of use and network control of electrical appliances and method |
-
2009
- 2009-03-12 JP JP2009059640A patent/JP4586927B2/ja active Active
-
2010
- 2010-03-08 WO PCT/JP2010/001592 patent/WO2010103779A1/ja active Application Filing
- 2010-03-08 BR BRPI1011693A patent/BRPI1011693A2/pt not_active Application Discontinuation
- 2010-03-08 US US13/203,571 patent/US9135592B2/en active Active
- 2010-03-08 KR KR20117023206A patent/KR20110134441A/ko not_active Application Discontinuation
- 2010-03-08 EP EP20100750537 patent/EP2410255A4/en not_active Ceased
- 2010-03-08 CN CN201080010938.1A patent/CN102341657B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05256482A (ja) * | 1992-03-16 | 1993-10-05 | Toshiba Corp | 熱源機器運転制御装置 |
JP2000121126A (ja) * | 1998-10-21 | 2000-04-28 | Toshiba Corp | ビル監視制御装置 |
JP2001014026A (ja) * | 1999-06-30 | 2001-01-19 | Matsushita Electric Works Ltd | 運転管理装置、運転管理システム、運転管理装置のプログラムを記録した記録媒体 |
JP2001349598A (ja) * | 2000-06-05 | 2001-12-21 | Shimizu Corp | 建物運用時性能評価システム |
JP2003074943A (ja) * | 2001-09-03 | 2003-03-12 | Daikin Ind Ltd | 空調制御方法およびその装置 |
JP2004116820A (ja) * | 2002-09-25 | 2004-04-15 | Daikin Ind Ltd | 運転制御装置 |
JP2007172406A (ja) * | 2005-12-22 | 2007-07-05 | E-Cubic Co Ltd | エネルギー等消費量算定システム及びエネルギー等消費量適切性情報出力装置 |
JP2008164228A (ja) | 2006-12-28 | 2008-07-17 | Daikin Ind Ltd | 空調管理システム及び空調管理方法 |
Non-Patent Citations (1)
Title |
---|
See also references of EP2410255A4 * |
Also Published As
Publication number | Publication date |
---|---|
US9135592B2 (en) | 2015-09-15 |
CN102341657B (zh) | 2014-05-14 |
JP4586927B2 (ja) | 2010-11-24 |
BRPI1011693A2 (pt) | 2018-06-12 |
EP2410255A4 (en) | 2013-01-23 |
JP2010210209A (ja) | 2010-09-24 |
EP2410255A1 (en) | 2012-01-25 |
KR20110134441A (ko) | 2011-12-14 |
US20110307099A1 (en) | 2011-12-15 |
CN102341657A (zh) | 2012-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5227707B2 (ja) | 空調省エネ制御装置 | |
JP4910020B2 (ja) | 需要家エネルギーマネジメントシステム | |
JP2013142494A (ja) | 空調機器制御システムおよび空調機器の制御方法 | |
JP4611920B2 (ja) | 空調制御装置 | |
KR101641258B1 (ko) | 설비를 관제하는 중앙 제어 장치, 이를 포함하는 설비 제어 시스템 및 설비 제어 방법 | |
JP6252673B2 (ja) | パラメータ学習装置およびパラメータ学習方法 | |
JP5914210B2 (ja) | エネルギー管理システム | |
KR20160042673A (ko) | 설비를 관제하는 중앙 제어 장치, 이를 포함하는 설비 제어 시스템 및 설비 제어 방법 | |
JP5475546B2 (ja) | 省エネ診断システム | |
JP4586927B2 (ja) | 機器管理システム | |
KR20160042669A (ko) | 설비를 관제하는 중앙 제어 장치, 이를 포함하는 설비 제어 시스템 및 설비 제어 방법 | |
JP2008025908A (ja) | 最適化制御支援システム | |
JP2011248568A (ja) | エネルギー管理システム | |
JP4569370B2 (ja) | 設備制御システム | |
JP2010038471A (ja) | 空調機管理装置及び空調機管理方法 | |
WO2019176546A1 (ja) | 空調制御装置、空調システム、空調制御方法及びプログラム | |
JP5692961B2 (ja) | 資源表示システム | |
JP2011106698A (ja) | 設備機器制御装置 | |
JP6843720B2 (ja) | 計画生成装置、計画生成方法、空調システムおよびプログラム | |
JP4985658B2 (ja) | 機器管理システムおよび機器管理プログラム | |
JP2010281467A (ja) | 機器管理システム | |
JP5146435B2 (ja) | 機器管理システムおよび機器管理プログラム | |
JP4816536B2 (ja) | 空調制御システム | |
JP2011237936A (ja) | 管理支援装置 | |
JP2011002151A (ja) | コントローラ |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201080010938.1 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10750537 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13203571 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 20117023206 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2010750537 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 4179/KOLNP/2011 Country of ref document: IN |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: PI1011693 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: PI1011693 Country of ref document: BR Kind code of ref document: A2 Effective date: 20110909 |