WO2009157188A1 - ガス遮断装置 - Google Patents

ガス遮断装置 Download PDF

Info

Publication number
WO2009157188A1
WO2009157188A1 PCT/JP2009/002878 JP2009002878W WO2009157188A1 WO 2009157188 A1 WO2009157188 A1 WO 2009157188A1 JP 2009002878 W JP2009002878 W JP 2009002878W WO 2009157188 A1 WO2009157188 A1 WO 2009157188A1
Authority
WO
WIPO (PCT)
Prior art keywords
flow rate
measurement
gas
abnormality
ratio
Prior art date
Application number
PCT/JP2009/002878
Other languages
English (en)
French (fr)
Inventor
植木浩一
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Priority to US13/000,582 priority Critical patent/US8620601B2/en
Priority to EP09769898A priority patent/EP2293025A1/en
Priority to CN2009801241638A priority patent/CN102077063B/zh
Publication of WO2009157188A1 publication Critical patent/WO2009157188A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N5/00Systems for controlling combustion
    • F23N5/24Preventing development of abnormal or undesired conditions, i.e. safety arrangements

Definitions

  • the present invention relates to a gas shut-off device, and more particularly to a gas shut-off device that prevents erroneous measurement or false shut-off caused by malfunction of electronic components due to intrusion of rainwater or the like.
  • FIG. 4 shows a front view of the gas shut-off device 1 and the adapter 2
  • FIG. 5 is a cross-sectional view in the Z-axis direction as seen from the side.
  • the adapter 2 is equipped with a control circuit 3 capable of adding a predetermined function to the gas shut-off device 1 and is detachable from the gas shut-off device 1.
  • the gas shut-off device 1 includes a gas inlet 1a and a supply port 1b for supplying gas to a facility that uses the gas.
  • the gas shut-off device 1 is provided with measuring means (not shown) for measuring the gas flow rate, and measures the gas flow rate flowing from the inlet 1a and supplied from the supply port 1b.
  • a display means 1c is provided in front of the gas shut-off device 1, and an integrated value of the amount used is displayed.
  • a shut-off valve (not shown) for shutting off the gas supply at the time of detecting an abnormality is provided, and a return operation portion 1d for returning from the shut-off state that detects an abnormality and stops the gas supply is provided.
  • connection terminal 1j having a communication terminal to which a communication device can be connected appears.
  • the control circuit 3 capable of adding a predetermined function is connected to the gas shut-off device 1, various functions, for example, a function of performing wireless communication as a communication device, or a function of storing a gas usage amount every predetermined time from a predetermined date and time Etc.
  • the adapter 2 has a box-like shape, and includes a case main body 2 b, an outer lid 2 c, and an inner lid 2 d.
  • the control circuit 3 is accommodated in this case, and the adapter part 2 is comprised.
  • the case body 2b has a part of the side surface as an opening, and houses the control circuit 3 from here.
  • the inner lid 2d covers the opening of the case main body 2b and is removable.
  • the outer lid portion 2c further covers the inner lid portion 2d and can be detached.
  • a concave portion 2e is provided at the lower portion of the case main body portion 2b, and a convex portion 2f corresponding to the lower portion of the inner lid portion 2d is provided and fitted therein. And it fixes with the fixing member (screw etc.) 2a.
  • a sealing member (O-ring or the like) 2g is sealed between the case main body 2b and the inner lid 2d to prevent rainwater from entering the case main body 2b.
  • the inner lid portion 2d is provided with a wiring hole 2h through which the wiring 1h of the control circuit 3 is drawn.
  • the wiring 1h passes from the control circuit 3 through the wiring hole 2h of the inner lid portion 2d, and further has a wiring hole with a wiring seal member 2j above the adapter.
  • 2k passes through the wiring hole 1k provided in the lower part of the gas shut-off device 1, and is further connected to a connection terminal 1j provided in the gas shut-off device control circuit 1g.
  • the wiring 1h connecting the control circuit 3 and the connection terminal 1j is drawn from the upper part of the adapter 2, and is accommodated in the gas shut-off device 1 by attaching the terminal lid 1e to the gas shut-off device 1 with the fixing member 1f. The structure is not exposed to the outside.
  • the construction worker who installs the gas shut-off device opens and connects the front terminal cover to connect the wiring from the communication device, alarm device or control device, and then the terminal cover is fixed with a fixing member.
  • the terminal cover is fixed with a fixing member.
  • Rainwater or the like may enter from the gap, and water may accumulate in the gas shutoff device main body, or rainwater may enter the adapter 2 through the wiring holes 1k and 2k, and the control device 3 may be submerged.
  • the present invention solves the above-mentioned problem.
  • rainwater or the like enters due to incorrect construction and the gas shutoff device enters a flooded state
  • the flooded state is detected at an early stage and immediately notified to the center of the gas company.
  • the present invention provides a highly safe gas shut-off device that secures safety by stopping gas supply.
  • a gas shut-off device is a gas shut-off device that shuts off the supply of gas when an abnormality occurs, and includes a flow rate detection unit that measures a flow rate, and a detection value of the flow rate detection unit.
  • a flow rate calculating means for calculating an instantaneous flow rate value; an amplification degree determining means for determining a signal amplification level adjusted by the flow rate detecting means; and an instantaneous flow rate value calculated by the flow rate calculating means is not more than a predetermined flow rate, and When the signal amplification degree determined by the amplification degree determination means is greater than or equal to a predetermined value, a time measurement means for starting timing, and a measurement condition setting means for setting the measurement condition of the flow rate detection means from the flow rate obtained by the flow rate calculation means And a measurement ratio calculation means for obtaining a ratio measured under a predetermined measurement condition during a predetermined time measured by the time measurement means, and an average flow rate for obtaining an average flow rate from an instantaneous flow rate obtained by the flow rate calculation means An abnormality determining means for determining that an abnormality has occurred in the flow rate detecting means when the ratio determined by the measurement ratio calculating means is equal to or greater than a predetermined ratio, or for determining whether there is an
  • the flow rate detection means amplifies to detect the flow rate signal, and the flow rate value fluctuates, so the measurement condition is changed to stably measure,
  • the degree of amplification exceeds a predetermined value, time measurement is started and the ratio of measurement conditions for stable measurement is obtained after a predetermined time has elapsed. Since the gas supply to the gas appliance is stopped, it is possible to prevent the abnormal measurement state from continuing and improve safety.
  • the gas shutoff device of the present invention when rainwater or the like enters accidentally and the inside becomes inundated, correctly determines the state and stops the gas supply to the gas appliance. This makes it possible to prevent monitoring from being performed as it is even though monitoring cannot be performed.
  • the first invention is a gas shut-off device that shuts off the supply of gas when an abnormality occurs, a flow rate detecting means for measuring a flow rate, a flow rate calculating means for calculating an instantaneous flow rate value from a detection value of the flow rate detecting means, An amplification degree determination means for determining a signal amplification degree adjusted by the flow rate detection means, and an instantaneous flow rate value calculated by the flow rate calculation means is equal to or less than a predetermined flow rate, and the signal amplification degree determined by the amplification degree determination means is A time measuring means for starting timing, a measurement condition setting means for setting a measurement condition of the flow rate detecting means from a flow rate obtained by the flow rate calculating means, and a predetermined time timed by the time measuring means if the predetermined value or more Measurement ratio calculation means for obtaining a ratio measured under a predetermined measurement condition, average flow rate calculation means for obtaining an average flow rate from an instantaneous flow rate obtained by the flow rate calculation means, and a
  • the flow rate detection means amplifies to detect the flow rate signal, and the flow rate value fluctuates, so the measurement condition is changed to stably measure,
  • the degree of amplification exceeds a predetermined value, time measurement is started and the ratio of measurement conditions for stable measurement is obtained after a predetermined time has elapsed. Since the gas supply to the gas appliance is stopped, it is possible to prevent the abnormal measurement state from continuing and improve safety.
  • a second invention is a gas shut-off device that shuts off the supply of gas when an abnormality occurs, a flow rate detecting means for measuring a flow rate, a flow rate calculating means for calculating an instantaneous flow rate value from a detection value of the flow rate detecting means, An amplification degree determining means for determining a signal amplification degree adjusted by the flow rate detecting means; a time measuring means for starting timing when the signal amplification degree determined by the amplification degree determining means is a predetermined value or more; and the flow rate calculation.
  • Measurement condition setting means for setting the measurement condition of the flow rate detection means from the flow rate obtained by the means, and a measurement ratio calculation means for obtaining a ratio measured under a predetermined measurement condition during a predetermined time measured by the time measurement means;
  • An average flow rate calculation unit that obtains an average flow rate from the instantaneous flow rate obtained by the flow rate calculation unit, and when the ratio obtained by the measurement ratio calculation unit is equal to or greater than a predetermined ratio, it is determined that an abnormality has occurred in the flow rate detection unit.
  • abnormality determining means for determining the presence or absence of an abnormality from the average flow rate determined, in which a shut-off means for cutting off the supply of abnormality determination establishment during gas by said abnormality judgment means.
  • the flow rate detection means amplifies to detect the flow rate signal, and the flow rate value fluctuates, so the measurement conditions are changed to stably measure, but when the amplification level exceeds the predetermined value, the time measurement starts and the predetermined time elapses If the ratio of the measurement conditions for post-stable measurement is determined and exceeds the specified value, it is determined that the flow rate detection means has entered the inundation state due to intrusion of rainwater, etc., and the gas supply to the gas appliance is stopped. Can be prevented by blocking the continuation, and safety is high.
  • FIG. 1 is a diagram showing a schematic configuration diagram of a gas cutoff device according to Embodiment 1 of the present invention
  • FIG. 2 is a control block diagram of a control device mounted on the gas cutoff device. The same number is attached
  • the gas shut-off device 1 is installed in a garden or the like of each household, and after passing through the gas shut-off device 1, is piped to a place where various gas appliances used in each home are installed, and gas is supplied.
  • the The internal structure of the gas cutoff device 1 includes a flow path 4 and a control device 5.
  • the flow path 4 is connected from the inlet 1a of the gas shut-off device 1 to the supply port 1b for supplying gas to each gas appliance via the inlet-side flow path 4a, the bottom-side flow path 4b, and the outlet-side flow path 4c. ing.
  • An upstream transmitter / receiver 6 and a downstream transmitter / receiver 7 that transmit and receive ultrasonic signals are attached to the flow path 4 so as to face each other in the flow direction.
  • Each of the upstream side transceiver 6 and the downstream side transceiver 7 has terminals 6 a and 7 a connected to the control device 5.
  • FIG. 2 is a control block diagram of the control device.
  • the flow rate detection unit 8 includes an upstream side transceiver 6, a downstream side transceiver 7, a switching unit 9, a transmission unit 10, a reception unit 11, a propagation time measurement unit 12, an amplitude determination unit 13, and an amplification degree adjustment unit 14.
  • the upstream side transceiver 6 that transmits or receives ultrasonic waves and the downstream side transceiver 7 that also receives or transmits ultrasound can be switched between transmission and reception by the switching means 9.
  • Transmitting means 10 for outputting an ultrasonic signal is connected to the upstream transmitter / receiver 6 or the downstream transmitter / receiver 7, and the switching means 9 receives the ultrasonic signal via the upstream transmitter / receiver 6 or the downstream transceiver 7. 11 to receive.
  • an ultrasonic signal is transmitted by the transmitting / receiving unit 6 by the transmitting unit 10, received by the downstream transmitting / receiving unit 7, and the propagation time is measured by the propagation time measuring unit 12 for the received signal from the receiving unit 11.
  • switching is performed by the switching means 9, and similarly, an ultrasonic signal is transmitted from the downstream to the upstream, and the propagation time is measured.
  • the ultrasonic propagation time difference between the upstream side transceiver 6 and the downstream side transceiver 7 is obtained every predetermined period (for example, every 2 seconds).
  • the ultrasonic signal received by the receiving unit 11 is determined by the amplitude determining unit 13 to determine whether the amplitude is an appropriate magnitude.
  • the amplitude is adjusted by the amplification degree adjusting unit 14 so as to be an appropriate size.
  • the amplification degree adjusting means 14 can control the amplification degree within a gain value range of 1 to 100 (30 to 60 dB) so that the peak voltage of the received wave becomes, for example, about 500 mV.
  • an ultrasonic signal is transmitted from the transmission means 10 at the next measurement with the adjusted amplification.
  • the measurement condition setting means 16 detects the pressure fluctuation state in the flow path 4 from the obtained instantaneous flow rate, and sets measurement conditions such as the number of measurements and a measurement cycle (measured in a time much shorter than a normal measurement cycle, for example, 2 seconds).
  • the flow rate detecting means 8 is controlled so that the flow rate can be stably measured without being affected by pressure fluctuations or the like by changing stepwise.
  • the instantaneous flow rate value is input to the average flow rate calculation means 17, and a predetermined number of instantaneous flow rate values are collected and calculated as an average flow rate value.
  • the amplification degree determination means 18 monitors the amplification degree for adjusting the amplitude level of the ultrasonic signal of the flow rate detection means 8.
  • the ultrasonic signal reception sensitivity is lowered, so that the amplification degree tends to be increased.
  • the time measurement means 19 is used to monitor the abnormality of the flow rate detection means 8.
  • the abnormality monitoring timer is started, and the measurement condition calculation means 20 starts monitoring the measurement conditions of the measurement condition setting means 16.
  • the measurement condition setting means 16 counts the number of times the measurement has started under the measurement conditions of a predetermined level or more, and the flow rate is within a one-hour monitoring timer. The ratio of the number of times measured under a measurement condition of a predetermined level or more with respect to the total number of samplings that can be measured is obtained.
  • the abnormality determination means 21 monitors the equipment used at the obtained average flow rate, or monitors whether there is an abnormality in the current flow rate detection means 8.
  • the frequency ratio obtained by the measurement ratio calculation means 20 is equal to or greater than a predetermined ratio
  • the abnormality determination means 21 is caused by the flow rate detection means 8 because of an abnormally large amplification within a normal small flow rate range.
  • the abnormality determination means 21 stores a time limit value for use time corresponding to each flow rate region, a monitor determination value for the maximum use flow rate, or the like.
  • the usage time cutoff time limit that defines the usage time limit time corresponding to the case of use for a much longer time is stored.
  • the flow rate value does not exceed the maximum use flow rate value, or the use time of the appliance is set to the time limit for continuous use corresponding to the registered flow rate. Monitor whether it has exceeded.
  • the abnormality determining means 21 determines that an abnormality has been established, a cutoff signal is sent to the cutoff means 22 to stop the gas supply.
  • the notification communication means 23 displays the shut-off state and the shut-off content on a liquid crystal display element or the like, and notifies the center of the gas company that is monitoring the safety of the gas by communication such as a telephone line.
  • the gas company installs the gas shut-off device 1 at the gas customer's home, opens the terminal lid 1e, connects the communication device, alarm device (not shown), etc., and then attaches the terminal lid 1e to the fixing member 1f (screw etc.) If the fixing member 1f is loosely fixed, loosely tightened, or the connection line is caught for some reason, rainwater enters through the gap between the terminal lid 1e and the gas shut-off device 1 main body. There is. In this case, the rainwater that has entered enters the portion of the flow path 4 located at the lower part of the gas cutoff device 1, and the upstream transmitter / receiver 6, the downstream transmitter / receiver 7, etc.
  • the flow rate is detected by the flow rate detection means 8.
  • the propagation time of the ultrasonic signal is measured as a detected value, and this signal is sent to the flow rate calculation means 15 and converted as an instantaneous flow rate value.
  • the upstream side transceiver 6 and the downstream side transceiver 7 Since the impedance between the terminals 6a and 7a is reduced, the magnitude of the ultrasonic signal is unstable and fluctuates. Therefore, the propagation time measured by the propagation time measuring means 12 even in a flow rate state where no instrument is used. Since the value changes, the flow rate value obtained by the result flow rate calculation means 15 varies.
  • the amplification degree adjusting means 14 increases the amplification degree. As a result, the degree of amplification of the signal for detecting the flow rate signal is gradually increased even in a low flow rate state where the device is not used.
  • the measurement condition setting means 16 determines that the state is the same as the flow rate state when the supplied gas pressure fluctuates even though the instrument is not used. Change control to the measurement conditions. That is, the measurement is normally performed every 2 seconds, but the measurement conditions are changed, for example, the measurement interval is shortened to increase the number of times of measurement and the flow rate is stably measured.
  • the instantaneous flow rate from the flow rate calculating means 15 is not more than a predetermined flow rate (for example, 1000 L / h or less), and the amplification degree determining means 18 is for a predetermined amplification degree (for example, a gain value of 60 or more).
  • the flow rate detecting means 8 located below the gas shut-off device 1 may be in an abnormal state due to a decrease in impedance between the terminals due to water immersion or the like.
  • the means 19 starts measuring the abnormality monitoring timer of the flow rate detecting means 8.
  • the measurement ratio calculation means 20 changes the measurement condition for the number of times of flow measurement in the abnormality monitoring timer of the time measurement means 19 to obtain the number ratio of the flow rate measurement.
  • the flow rate detecting means 8 determines that the impedance between the terminals is lowered due to water immersion or the like, and an abnormal state is output, and a cutoff signal is output to the abnormality determining means 21.
  • the measurement condition setting means 14 detects the pulsation state, the measurement condition rises to the upper rank (measurement condition with higher accuracy), and detects a stable flow rate.
  • the measurement conditions change alternately when the measurement conditions are lowered step by step, but when the flow rate detection means 8 in the gas shutoff device 1 is submerged and the impedance between the terminals decreases, the measurement condition is always measured with the highest measurement condition. Keep doing.
  • the power supply (not shown) of the gas shut-off device normally uses a battery.
  • a large-capacity battery is required when the measurement is always performed under higher measurement conditions as in the above-described conventional case, this is an early stage.
  • detecting an abnormal state also has a great effect in that a configuration with a small-capacity battery is possible.
  • the abnormality determining means 21 determines that an abnormality has been established, a cutoff signal is sent to the cutoff means 22 to stop the gas supply.
  • the notification communication means 23 displays the shut-off state and the shut-off content on a liquid crystal display element or the like, and notifies the center of the gas company that is monitoring the safety of the gas by communication such as a telephone line.
  • the gas company can immediately take countermeasures such as exchanging the gas shut-off device 1, and can quickly avoid an abnormal state.
  • the average flow rate calculated by the flow rate calculation unit 15 is calculated by the average flow rate calculation unit 12 as an average flow rate value for each predetermined number.
  • the abnormality determining means 21 stores a time limit value for use time corresponding to each flow rate region, a monitor determination value for the maximum use flow rate, or the like. For example, when the hose that supplies gas to a stove or the like is disconnected for some reason, an abnormally large flow rate is generated, but the total flow cutoff value for monitoring such a condition and the maximum use time of the appliance normally The usage time cutoff time limit that defines the usage time limit time corresponding to the case of use for a much longer time is stored.
  • the flow rate value does not exceed the maximum use flow rate value, or the use time of the appliance is set to the time limit for continuous use corresponding to the registered flow rate. Monitors whether it exceeds the limit, and outputs a cut-off signal if exceeded.
  • the terminal lid 1e of the gas shut-off device 1 is fixed in a loose state for some reason, rainwater or the like enters and the flow rate detecting means 8 located below the gas shut-off device 1 enters the flooded state.
  • the control device 5 located in the upper part is submerged, and the change in the detected flow rate signal from the flow rate detecting means 8 and the amplification degree of the amplification degree adjusting means 14 for detecting and controlling the flow rate are adjusted.
  • abnormalities in the flow rate detecting means 8 can be detected at an early stage. Therefore, by submerging, the flow rate can be measured and integrated as an abnormal gas usage amount even though the instrument is not originally used.
  • the safety function works and the gas shut-off device for preventing abnormal operation such as erroneous shut-off such as shutting off the gas and preventing the gas consumer using the gas appliance safely is abnormal.
  • abnormal operation such as erroneous shut-off such as shutting off the gas and preventing the gas consumer using the gas appliance safely is abnormal.
  • FIG. 3 is a control block diagram of a control device mounted on the gas cutoff device according to Embodiment 2 of the present invention. 1, 4, and 5 are denoted by the same reference numerals.
  • FIG. 3 is a control block diagram of the control device.
  • the flow rate detection unit 8 includes an upstream side transceiver 6, a downstream side transceiver 7, a switching unit 9, a transmission unit 10, a reception unit 11, a propagation time measurement unit 12, an amplitude determination unit 13, and an amplification degree adjustment unit 14.
  • the switching means 9 can switch the transmission / reception of the upstream transceiver 6 for transmitting or receiving ultrasonic waves and the downstream transceiver 7 for receiving or transmitting ultrasonic waves.
  • Transmitting means 10 for outputting an ultrasonic signal is connected to the upstream transmitter / receiver 6 or the downstream transmitter / receiver 7, and the switching means 9 receives the ultrasonic signal via the upstream transmitter / receiver 6 or the downstream transceiver 7. 11 to receive.
  • the upstream transmitter / receiver 6 transmits an ultrasonic signal by the transmitter 10, and is received by the downstream transmitter / receiver 7.
  • the reception time from the receiver 11 is measured by the propagation time measuring unit 12.
  • switching is performed by the switching means 9, and similarly, an ultrasonic signal is transmitted from the downstream to the upstream, and the propagation time is measured.
  • the ultrasonic wave propagation time difference between the upstream side transceiver 6 and the downstream side transceiver 7 is obtained every predetermined period.
  • the ultrasonic signal received by the receiving unit 11 is determined by the amplitude determining unit 13 to determine whether the amplitude is an appropriate magnitude.
  • the amplitude is adjusted by the amplification degree adjusting unit 14 so as to be an appropriate size.
  • the amplification degree adjusting means 14 can control the amplification degree within a gain value range of 1 to 100 (30 to 60 dB), for example, so that the peak voltage of the received wave is about 500 mV, for example.
  • an ultrasonic signal is transmitted from the transmission means 10 at the next measurement with the adjusted amplification.
  • the measurement condition setting unit 16 determines the flow state in the flow path 4 from the obtained instantaneous flow rate, and controls the flow rate detection unit 8 so that the flow rate can always be stably measured by changing measurement conditions such as the number of measurements and the measurement cycle. .
  • the instantaneous flow rate value is input to the average flow rate calculation means 17, and a predetermined number of instantaneous flow rate values are collected and calculated as an average flow rate value.
  • the amplification degree determination means 18 monitors the amplification degree for adjusting the amplitude level of the ultrasonic signal of the flow rate detection means 8. When the normal flow rate is increased, the ultrasonic signal reception sensitivity is lowered, so that the amplification degree tends to be increased.
  • the time measurement means 19 starts measuring the abnormality monitoring timer of the flow rate detection means 8.
  • the abnormality monitoring timer is started, and the measurement condition calculation means 20 starts monitoring the measurement conditions of the measurement condition setting means 16.
  • the abnormality determination means 21 monitors the equipment used at the obtained average flow rate, or monitors whether there is an abnormality in the current flow rate detection means 8.
  • the frequency ratio obtained by the measurement ratio calculation means 20 is equal to or greater than a predetermined ratio
  • the abnormality determination means 21 is caused by the flow rate detection means 8 because of an abnormally large amplification within a normal small flow rate range.
  • a cutoff signal is output.
  • the gas company installs the gas shut-off device 1 at the gas customer's home, opens the terminal lid 1e, connects the communication device, alarm device (not shown), etc., and then attaches the terminal lid 1e to the fixing member 1f (screw etc.) If the fixing member 1f is loosely fixed, loosely tightened, or the connecting wire is caught for some reason, rainwater may enter through the gap between the terminal lid 1e and the gas shut-off device 1 main body. is there.
  • the rainwater soaked in the water is accumulated in the portion of the flow path 4 located at the lower part of the gas shut-off device 1, and the upstream transmitter / receiver 6 and the downstream transmitter / receiver 7 are submerged and become submerged.
  • the flow rate is detected by the flow rate detection means 8.
  • the propagation time of the ultrasonic signal is measured as a detected value, and this signal is sent to the flow rate calculation means 15 and converted as an instantaneous flow rate value.
  • the upstream side transceiver 6 and the downstream side transceiver 7 Since the impedance between the terminals 6a and 7a is reduced, the magnitude of the ultrasonic signal is unstable and fluctuates.
  • the propagation time measured by the propagation time measuring means 12 even though the flow rate is not using any instrument. Since the value changes, the flow rate value obtained by the result flow rate calculation means 15 varies. In addition, since the impedance between terminals decreases, the ultrasonic signal becomes small. However, when the reception means 11 receives this state and the amplitude determination means 13 determines that the signal level is below a predetermined value, the amplification adjustment means 14 always The amplification is increased so that the peak value is 500 mV. As a result, the degree of amplification of the signal for detecting the flow rate signal is gradually increased even in a low flow rate state where the device is not used.
  • the measurement condition setting means 16 determines that the state is the same as the flow rate state when the supplied gas pressure fluctuates even though the instrument is not used. Change control to the measurement conditions. In other words, the measurement is performed periodically, but the number of measurements is increased at that time, or the flow rate is stably measured by measuring at a measurement cycle shorter than the normal measurement cycle.
  • the time measurement means 19 and the measurement ratio calculation means 20 determine that the amplification degree determination means 18 has reached a predetermined amplification degree (for example, a gain value of 60 or more), the flow rate detection means located below the gas shut-off device 1.
  • the measurement ratio calculation means 20 changes the measurement condition for the number of times of flow measurement in the abnormality monitoring timer of the time measurement means 19 to obtain the number ratio of the flow rate measurement.
  • the frequency ratio reaches a predetermined ratio such as 80% or more, for example, the flow rate detecting means 8 determines that the impedance between the terminals is lowered due to water immersion or the like, and an abnormal state is output, and a cutoff signal is output to the abnormality determining means 21.
  • the measurement condition setting means 14 increases the measurement condition (measurement condition with increased accuracy) when a pulsation state is detected, and the measurement condition is stepped when a stable flow rate is detected.
  • the flow rate detecting means 8 in the gas cutoff device 1 is submerged and the impedance between the terminals is lowered, the measurement condition is always measured under the highest measurement condition.
  • the power supply (not shown) of the gas shut-off device normally uses a battery.
  • a large-capacity battery is required when the measurement is always performed under higher measurement conditions as in the above-described conventional case, this is an early stage. It is very effective to detect an abnormal condition and take countermeasures such as warning or blocking.
  • the abnormality determining means 21 determines that an abnormality has been established, it sends a cutoff signal to the cutoff means 22 to stop the gas supply.
  • the notification communication means 23 displays the shut-off state and the shut-off content on a liquid crystal display element or the like, and notifies the center of the gas company that is monitoring the safety of the gas by communication such as a telephone line. The gas company can immediately take countermeasures such as exchanging the gas shut-off device 1, and can quickly avoid an abnormal state.
  • the average flow rate calculated by the flow rate calculation unit 15 is calculated by the average flow rate calculation unit 12 as an average flow rate value for each predetermined number.
  • the abnormality determining means 21 stores a time limit value for use time corresponding to each flow rate region, a monitor determination value for the maximum use flow rate, or the like. For example, when the hose that supplies gas to a stove or the like is disconnected for some reason, an abnormally large flow rate is generated, but the total flow cutoff value for monitoring such a condition and the maximum use time of the appliance normally The usage time cutoff time limit that defines the usage time limit time corresponding to the case of use for a much longer time is stored.
  • the flow rate value does not exceed the maximum use flow rate value, or the use time of the appliance is set to the time limit for continuous use corresponding to the registered flow rate. Monitors whether it exceeds the limit, and outputs a cut-off signal if exceeded.
  • the terminal lid 1e of the gas shut-off device 1 is fixed in a loose state for some reason, rainwater or the like enters and the flow rate detecting means 8 located below the gas shut-off device 1 enters the flooded state.
  • the control device 5 located in the upper part is submerged, and the change in the detected flow rate signal from the flow rate detecting means 8 and the amplification degree of the amplification degree adjusting means 14 for detecting and controlling the flow rate are adjusted.
  • abnormalities in the flow rate detection means 8 can be detected at an early stage, so that by submerging, the flow rate can be measured and integrated as an abnormal gas usage amount even if the instrument is not originally used.
  • the safety function works and the gas shutoff device for preventing the abnormal operation such as malfunction such as shutting off the gas from continuing and monitoring the gas consumer using the gas appliance safely is abnormal.
  • notification determines the period, safety and reliability is extremely high, and it is highly effective usability.
  • the present invention can be implemented using a microcomputer or the like. Can be distributed and installed easily by recording them on a recording medium or distributing them using a communication line.
  • the gas shutoff device is capable of detecting an abnormal state when inundated with rainwater or the like and determining that it is difficult to continue security monitoring or flow rate measurement. It can be applied to general equipment monitoring devices such as meters and digital power meters.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Measuring Volume Flow (AREA)
  • Feeding And Controlling Fuel (AREA)

Abstract

 ガス遮断装置内が浸水時異常検知することを目的とする。  流量を計測する流量検出手段8と、検出値より瞬時流量を流量演算手段15で演算し、流量検出手段8で調整した信号増幅を増幅度判定手段18で判定し、増幅度が所定値以上の場合に計時を開始し、流量演算手段15で求めた流量より流量検出手段8の計測条件を計測条件設定手段16で設定するが、時間計測手段19と計測条件設定手段16とから計測時間中の計測条件比率を計測比率演算手段20で求め、計測比率が所定比率以上の時、流量検出手段8の異常と判定し、ガスの供給を遮断手段22で遮断する。

Description

ガス遮断装置
 本発明は、ガス遮断装置に関し、特に雨水等の浸入による電子部品等の誤動作に起因する誤計測や誤遮断を防止するガス遮断装置に関するものである。
 従来、この種のガス遮断装置としては、図4、図5に示すようなものがあった(例えば、特許文献1参照)。
 図4はガス遮断装置1とアダプタ2との正面図を示し、図5はその側面から見たZ軸方向の断面図である。アダプタ2はガス遮断装置1に所定の機能を追加可能な制御回路3を搭載しかつガス遮断装置1に着脱可能な構成になっている。
 ガス遮断装置1は、ガス流入口1aとガスを使用する設備等にガスを供給する供給口1bを備えている。また、ガス遮断装置1内部にはガス流量を計測する計測手段を備えており(図示せず)、流入口1aから流入し供給口1bから供給されるガス流量を計測する。ガス遮断装置1の正面に表示手段1cが設けられ、使用量の積算値等が表示される。また、異常検出時ガスの供給を遮断するための遮断弁(図示せず)が設けられ、異常検出しガス供給を停止する遮断状態から復帰するための復帰操作部1dが設けられている。端子蓋1eを取り外すと通信装置を接続可能な通信端子等を有する接続端子1jが現れる。ガス遮断装置1に所定の機能を追加可能な制御回路3を接続すると、種々の機能、例えば通信装置として無線通信を行う機能であったり、所定日時より一定時間毎のガス使用量を記憶する機能等がある。
 アダプタ2は図5に示すように、ケース部は箱状の形状を有しており、ケース本体部2bと外蓋部2cと中蓋部2dとで構成されている。このケース内に制御回路3を収納され、アダプタ部2を構成する。
 ケース本体部2bは側面の一部を開口部としており、ここより制御回路3を収納する。中蓋部2dはケース本体部2bの開口部を覆い、脱着可能である。外蓋部2cは中蓋部2dを更に覆い、脱着が可能である。図4に示すように、ケース本体部2bの下部に凹部2eを設け、中蓋部2dの下部に対応した凸部2fを設け、はめ込んでいる。そして固定部材(ネジ等)2aで、固定する。ケース本体部2bと中蓋部2dとの間には密閉部材(Oリング等)2gを用いて密閉し、雨水がケース本体2b内部に浸入するのを抑制する。
 中蓋部2dには制御回路3の配線1hを引き出す配線孔2h設けられ、配線1hは制御回路3から中蓋部2dの配線孔2hを通り、更にアダプタ上部の配線シール部材2j付の配線孔2kを通ってガス遮断装置1の下部に設けられた配線孔1kを通り、更にガス遮断装置用制御回路1gに設けられた接続端子1jに接続される。制御回路3と接続端子1jとを接続する配線1hは、アダプタ2の上部より引き出されており、端子蓋1eをガス遮断装置1に固定部材1fで取り付けることにより、ガス遮断装置1内に収納されて、外部に露出しない構造としている。
日本国特開2005-61864号公報
 しかしながら、上記従来の構成では、ガス遮断装置を設置する工事担当者が通信装置や警報器或いは制御装置からの配線を接続する為に前面の端子蓋を開け接続した後、端子蓋を固定部材でとめる際、2箇所を固定すべきところを誤って1箇所のみで固定したり、あるいは何らかの物がはさまった状態で固定される場合があり、端子蓋とガス遮断装置との間に隙間ができ、この隙間から雨水等が浸入し、ガス遮断装置本体内に水がたまったり、或いは配線孔1k、2kを通りアダプタ2内部に雨水が入り、制御装置3が水没したりすることがある。特にガス遮断装置本体に水がたまったりすると流量計測が正常に行われなくなり、場合によっては誤って流量を計測したり、誤って計測した流量に基づいて保安判定された結果、ガス通路が誤って遮断されたり、逆に異常時であるにもかかわらずガス通路が遮断されない等の不具合が発生することになる。これはガス需要家にとって不便であったり、或いは万が一の場合に保安確保ができないという安全性の面で課題を有している。
 本発明は、上記課題を解決するもので、誤った工事によって雨水等が浸入しガス遮断装置内が浸水状態となった場合、浸水状態を早期に検出し直ちにガス事業者のセンターに通報したり、ガス供給を停止し保安を確保する安全性の高いガス遮断装置を提供するものである。
 上記従来の課題を解決するために、本発明のガス遮断装置は、異常発生時にガスの供給を遮断するガス遮断装置であって、流量を計測する流量検出手段と、前記流量検出手段の検出値より瞬時流量値を演算する流量演算手段と、前記流量検出手段で調整した信号増幅度を判定する増幅度判定手段と、前記流量演算手段で演算された瞬時流量値が所定流量以下で、かつ前記増幅度判定手段で判定された信号増幅度が所定値以上の場合、計時を開始する時間計測手段と、前記流量演算手段で求めた流量より前記流量検出手段の計測条件を設定する計測条件設定手段と、前記時間計測手段で計時される所定時間中に所定の計測条件で計測された比率を求める計測比率演算手段と、前記流量演算手段で求めた瞬時流量より平均流量を求める平均流量演算手段と、前記計測比率演算手段で求めた比率が所定比率以上の時に前記流量検出手段に異常発生と判定したり、或いは求めた平均流量から異常の有無を判定する異常判定手段と、前記異常判定手段で異常判定成立時にガスの供給を遮断する遮断手段とからなる。
 そして、雨水等が浸入しガス遮断装置内が浸水状態となると、流量検出手段で流量信号を検出する為に増幅すると共に、流量値が変動するので安定計測する為に計測条件を変更するが、増幅度が所定値以上になると時間計測開始し所定時間経過後安定計測の為の計測条件の比率を求め所定値以上の場合、流量検出手段が雨水等の浸入で浸水状態となったと判定し、ガス器具へのガス供給を停止するので、異常な計測状態が継続するのを防止でき、かつ安全性を高めることが出来る。
 本発明のガス遮断装置は、誤って雨水等が入り内部が浸水状態になった場合に、その状態を正しく判定し、ガス器具へのガス供給を停止するので、ガス需要家の安全な器具使用を監視できなくなったのにそのままの状態で監視しようとすることを防止することができる。
本発明の実施の形態1におけるガス遮断装置の構成図 同ガス遮断装置の制御ブロック図 本発明の実施の形態2における同ガス遮断装置の制御ブロック図 従来のガス遮断装置の正面図 同ガス遮断装置の断面図
 第1の発明は、異常発生時にガスの供給を遮断するガス遮断装置であって、流量を計測する流量検出手段と、前記流量検出手段の検出値より瞬時流量値を演算する流量演算手段と、前記流量検出手段で調整した信号増幅度を判定する増幅度判定手段と、前記流量演算手段で演算された瞬時流量値が所定流量以下で、かつ前記増幅度判定手段で判定された信号増幅度が所定値以上の場合、計時を開始する時間計測手段と、前記流量演算手段で求めた流量より前記流量検出手段の計測条件を設定する計測条件設定手段と、前記時間計測手段で計時される所定時間中に所定の計測条件で計測された比率を求める計測比率演算手段と、前記流量演算手段で求めた瞬時流量より平均流量を求める平均流量演算手段と、前記計測比率演算手段で求めた比率が所定比率以上の時に前記流量検出手段に異常発生と判定したり、或いは求めた平均流量から異常の有無を判定する異常判定手段と、前記異常判定手段で異常判定成立時にガスの供給を遮断する遮断手段とを備えたものである。
 そして、雨水等が浸入しガス遮断装置内が浸水状態となると、流量検出手段で流量信号を検出する為に増幅すると共に、流量値が変動するので安定計測する為に計測条件を変更するが、増幅度が所定値以上になると時間計測開始し所定時間経過後安定計測の為の計測条件の比率を求め所定値以上の場合、流量検出手段が雨水等の浸入で浸水状態となったと判定し、ガス器具へのガス供給を停止するので、異常な計測状態が継続するのを防止でき、かつ安全性を高めることが出来る。
 第2の発明は、異常発生時にガスの供給を遮断するガス遮断装置であって、流量を計測する流量検出手段と、前記流量検出手段の検出値より瞬時流量値を演算する流量演算手段と、前記流量検出手段で調整した信号増幅度を判定する増幅度判定手段と、前記増幅度判定手段で判定された信号増幅度が所定値以上の場合、計時を開始する時間計測手段と、前記流量演算手段で求めた流量より前記流量検出手段の計測条件を設定する計測条件設定手段と、前記時間計測手段で計時される所定時間中に所定の計測条件で計測された比率を求める計測比率演算手段と、前記流量演算手段で求めた瞬時流量より平均流量を求める平均流量演算手段と、前記計測比率演算手段で求めた比率が所定比率以上の時に前記流量検出手段に異常発生と判定したり、或いは求めた平均流量から異常の有無を判定する異常判定手段と、前記異常判定手段で異常判定成立時ガスの供給を遮断する遮断手段とを備えたものである。
 そして、流量検出手段で流量信号を検出する為に増幅すると共に、流量値が変動するので安定計測する為に計測条件を変更するが、増幅度が所定値以上になると時間計測開始し所定時間経過後安定計測の為の計測条件の比率を求め所定値以上の場合、流量検出手段が雨水等の浸入で浸水状態となったと判定し、ガス器具へのガス供給を停止するので、異常な計測状態が継続するのを遮断することで防止でき、かつ安全性が高い。
 (実施の形態1)
 図1は本発明の実施の形態1におけるガス遮断装置の概略構成図を示す図で、図2は同ガス遮断装置に搭載される制御装置の制御ブロック図である。図4、図5と同相当物には同一番号を付している。
 図1で、ガス遮断装置1は各家庭の庭等に設置され、このガス遮断装置1を経由した後、各家庭で使用する種々のガス器具が設置された場所まで配管され、ガスが供給される。そのガス遮断装置1の内部構成は流路4と制御装置5とがある。流路4はガス遮断装置1の流入口1aより入口側流路4aを介し、底部の流路4bを経て、出口側流路4cを介し、各ガス器具へガスを供給する供給口1bにつながっている。流路4には超音波信号を送受信する上流側送受信器6と下流側送受信器7とが流れ方向に対向して取り付けられている。上流側送受信器6、及び下流側送受信器7には各々制御装置5と接続する端子6a、7aがある。
 図2は制御装置の制御ブロック図である。流量検出手段8は上流側送受信器6、下流側送受信器7、切替手段9、送信手段10、受信手段11、伝搬時間計測手段12、振幅判定手段13、及び増幅度調整手段14とからなる。超音波を送信または受信する上流側送受信器6と、同じく受信または送信する下流側送受信器7が切替手段9によって送受信の切り換えが可能になっている。この上流側送受信器6或いは下流側送受信器7に超音波信号を出力する送信手段10が接続され、切替手段9によって上流側送受信器6或いは下流側送受信器7を介して超音波信号を受信手段11で受信する。まず送信手段10により上流側送受信器6で超音波信号を送信し、下流側送受信器7で受信し、受信手段11からの受信信号を伝搬時間計測手段12で伝搬時間を計測する。次に、切換手段9により切替えて同様に下流から上流に向かって超音波信号を送信し、伝搬時間を計測する。そして、上流側送受信器6と下流側送受信器7との超音波の伝搬時間差は予め定めた周期毎(例えば2秒毎等)に求められる。受信手段11で受信した超音波信号は振幅判定手段13で適正な大きさの振幅かを判定するが、大きすぎたり小さすぎたりする場合適正な大きさになるように増幅度調整手段14で調整する。増幅度調整手段14は例えば受信波のピーク電圧が例えば500mV程度になるように利得値1から100(30~60dB)の範囲で増幅度の制御が可能である。そして次回には調整された増幅度で次回計測時送信手段10より超音波信号を送信する。
 そして、所定周期毎計測し求めた伝搬時間は流量演算手段15で瞬時流量値に換算される。計測条件設定手段16は求めた瞬時流量より流路4内の圧力変動状態を検出し、計測回数や計測周期(通常の計測周期、例えば2秒よりはるかに短い時間で計測)等の計測条件を段階的に変えて、常に圧力変動等の影響を受けず安定して流量を計測できるように流量検出手段8を制御する。又瞬時流量値は平均流量演算手段17に入力され、所定個数の瞬時流量値を集合して平均流量値として算出される。一方流量検出手段8の超音波信号の振幅レベルを調節する増幅度を増幅度判定手段18で監視する。通常流量が大きくなると超音波信号受信感度が低下するので増幅度が大きくなる傾向がある。
 流量演算手段15で求めた瞬時流量が所定流量、例えば1000L/h以下の状態で増幅度判定手段18の増幅度が所定値以上の場合、時間計測手段19により流量検出手段8の異常監視の1時間のタイマを計測スタートする。異常監視のタイマをスタートすると共に、計測条件設定手段16の計測条件の監視を計測比率演算手段20でスタートする。計測条件は圧力変動等の状態に応じ、数段階の計測条件があり、計測条件設定手段16は、所定段階以上の計測条件で計測し始めた回数をカウントし、1時間の監視タイマ内で流量計測できる全サンプリング回数に対する所定段階以上の計測条件で計測した回数比率を求める。
 そして、異常判定手段21は、求められた平均流量で使用器具の監視を行ったり、現在の流量検出手段8に異常はないか監視を行う。異常判定手段21は、計測比率演算手段20で求めた回数比率が所定比率以上になった場合、通常の小流量の範囲で異常に大きな増幅度になっているのは流量検出手段8が何らかの原因で、例えば雨水等の浸水で異常な流量検出をしていると判定し、遮断信号を出力する。又異常判定手段21には、流量域毎に対応した使用時間の制限時間値、あるいは使用最大流量の監視判定値等が記憶されている。例えばストーブ等へガスを供給するホースが何らかの原因で外れた時、異常な大流量が発生するが、そのような状態を監視するための合計流量遮断値や、器具の通常使用する最大使用時間よりはるかに長く使用された場合に対応して使用時間の制限時間を規定した使用時間遮断の制限時間等が記憶されている。この設定値と平均流量値とを異常判定手段21で比較判定することで、流量値が使用最大流量値を超えていないか、或いは器具の使用時間が登録流量に対応した連続使用の制限時間を超えていないか等を監視する。
 この異常判定手段21で異常成立と判定した時、遮断手段22に遮断信号を送ってガス供給を停止する。また、報知通信手段23は、遮断状態や遮断内容を液晶表示素子等に表示すると共にガスの安全監視を行っているガス事業者のセンターに電話回線等の通信により通報する。
 次に、以上のように構成されたガス遮断装置1の動作を説明する。ガス需要家宅にガス事業者がガス遮断装置1を設置し、端子蓋1eを開けて、通信装置や警報器(図示せず)等を接続した後、端子蓋1eを固定部材1f(ビス等)で固定しようとして、固定部材1fの固定が緩かったり、締め方が甘かったり、或いは接続線等が何らかの原因ではさまった場合、雨水が端子蓋1eとガス遮断装置1本体との隙間より進入する場合がある。この場合で浸入した雨水がガス遮断装置1の下部に位置している流路4の部分に溜まり、上流側送受信器6や下流側送受信器7等が浸水し水没状態となる。このような状態で流量を流量検出手段8で検出する。超音波信号の伝搬時間が検出値として計測され、この信号が流量演算手段15に送られて瞬時流量値として換算されるが、水没した状態のため上流側送受信器6や下流側送受信器7の端子6aや7a間のインピーダンスが低下するため、超音波信号の大きさが不安定でかつ変動するので、器具を全く使用していない流量状態であっても伝搬時間計測手段12で計測した伝搬時間値が変化するので、結果流量演算手段15で求めた流量値が変動する。又端子間インピーダンスが低下する為、超音波信号が小さくなるが、その状態を受信手段11で受信し信号レベルが振幅判定手段13で所定値以下であるのを判定すると、常にピーク値が500mVになるように増幅度調整手段14では増幅度を大きくする。結果器具が使用されていない低流量状態であるのに流量信号を検出する信号の増幅度が次第に大きくなる。
 流量演算手段15で求めた瞬時流量が変動すると計測条件設定手段16はその状態より器具を使用していないのに供給するガス圧が変動した場合の流量状態と同じ状態と判定し、圧力変動時の計測条件に変更制御する。即ち、通常は2秒毎に定期的に計測しているが、その計測条件を変更し、例えば、計測間隔を短くして計測回数を増加させ流量を安定的に計測する。時間計測手段19や計測比率演算手段20は流量演算手段15からの瞬時流量が所定流量以下(例えば1000L/h以下等)で、増幅度判定手段18が所定増幅度(例えば利得値60以上等)以上に達した状態と判定すると、ガス遮断装置1の下部に位置する流量検出手段8が何らかの原因で浸水等により端子間インピーダンスが低下し異常状態になった可能性があると判定し、時間計測手段19は流量検出手段8の異常監視タイマを計測スタートする。同時に計測比率演算手段20は時間計測手段19の異常監視タイマ中の流量計測回数に対する計測条件を変更して流量を計測している回数比率を求める。そして、この回数比率が、例えば80%以上等の所定比率に達すると流量検出手段8が浸水等により端子間インピーダンスが低下し異常状態になったと判定し異常判定手段21に遮断信号を出力する。通常GHP(ガスヒートポンプ装置)等の圧力変動を起こす器具が使用された場合、計測条件設定手段14は脈動状態を検出すると計測条件が上位(精度を上げた測定条件)に上がり、安定流量を検出すると計測条件が段階的に下がったりと交互に計測条件が変化するが、ガス遮断装置1内の流量検出手段8等が水没し端子間インピーダンスが低下すると常に計測条件が最も上位の計測条件で計測し続ける。
 しかしながらガス遮断装置の電源(図示せず)は通常は電池を使用するが、上記従来のような、常に上位の計測条件で計測されると大容量の電池が必要となるため、このように早期に異常状態を検出することは、小容量の電池での構成が可能となる点でも大きな効果を奏する。
 この異常判定手段21で異常成立と判定した時、遮断手段22に遮断信号を送ってガス供給を停止する。また、報知通信手段23は、遮断状態や遮断内容を液晶表示素子等に表示すると共にガスの安全監視を行っているガス事業者のセンターに電話回線等の通信により通報する。ガス事業者は直ちにガス遮断装置1を交換する等の対応措置を実施でき、速やかに異常状態を回避することが可能である。
 一方並行して、平均流量演算手段12で流量演算手段15で求めた瞬時流量を所定個数毎の平均流量値として演算される。求められた平均流量は異常判定手段21には、流量域毎に対応した使用時間の制限時間値、あるいは使用最大流量の監視判定値等が記憶されている。例えばストーブ等へガスを供給するホースが何らかの原因で外れた時、異常な大流量が発生するが、そのような状態を監視するための合計流量遮断値や、器具の通常使用する最大使用時間よりはるかに長く使用された場合に対応して使用時間の制限時間を規定した使用時間遮断の制限時間等が記憶されている。この設定値と平均流量値とを異常判定手段21で比較判定することで、流量値が使用最大流量値を超えていないか、或いは器具の使用時間が登録流量に対応した連続使用の制限時間を超えていないか等監視し、超えた場合遮断信号を出力する。
 なお、本実施の形態に使用した構成は一例であり、又使用形態も本実施の形態に限定されるものではない。
 以上のように、何からの原因でガス遮断装置1の端子蓋1eが緩んだ状態で固定され、雨水等が浸入しガス遮断装置1の下部に位置する流量検出手段8が浸水状態になったり、最悪その上部に位置する制御装置5迄が水没するような状態になったのを、流量検出手段8からの検出した流量信号の変化や流量を検出制御する増幅度調整手段14の増幅度を監視することにより、流量検出手段8の異常を早期に検出できるので、浸水することにより本来器具を使用していないのに流量を計測して異常なガス使用量として積算したり、異常な流量が検出されたとして保安機能が働き、ガスを遮断する等の誤遮断といった異常動作を継続して起すことを防止し、ガス器具を使用するガス需要家を安全に監視するためのガス遮断装置が異常であることを早期に判定し通報するので、安全性や信頼性が極めて高く、かつ使い勝手が高い効果がある。
 (実施の形態2)
 図3は本発明の実施の形態2におけるガス遮断装置に搭載される制御装置の制御ブロック図である。図1、図4及び図5と同相当物には同一番号を付している。
 図3は制御装置の制御ブロック図である。流量検出手段8は上流側送受信器6、下流側送受信器7、切替手段9、送信手段10、受信手段11、伝搬時間計測手段12、振幅判定手段13、及び増幅度調整手段14とからなる。超音波を送信または受信する上流側送受信器6と受信または送信する下流側送受信器7が切替手段9によって送受信の切り換えが可能になっている。この上流側送受信器6或いは下流側送受信器7に超音波信号を出力する送信手段10が接続され、切替手段9によって上流側送受信器6或いは下流側送受信器7を介して超音波信号を受信手段11で受信する。まず送信手段10により上流側送受信器6が超音波信号を送信し、下流側送受信器7で受信し、受信手段11からの受信信号を伝搬時間計測手段12で伝搬時間を計測する。次に、切換手段9により切替えて同様に下流から上流に向かって超音波信号を送信し、伝搬時間を計測する。そして、上流側送受信器6と下流側送受信器7との超音波の伝搬時間差は予め定めた周期毎に求められる。受信手段11で受信した超音波信号は振幅判定手段13で適正な大きさの振幅かを判定するが、大きすぎたり小さすぎたりする場合適正な大きさになるように増幅度調整手段14で調整する。増幅度調整手段14は例えば受信波のピーク電圧が例えば500mV程度になるように利得値1から100(30~60dB)の範囲で増幅度制御が可能である。そして次回には調整された増幅度で次回計測時送信手段10より超音波信号を送信する。
 そして、所定周期毎計測し求めた伝搬時間は流量演算手段15で瞬時流量値に換算される。計測条件設定手段16は求めた瞬時流量より流路4内の流れ状態を判定し、計測回数や計測周期等の計測条件を変えて常に安定して流量計測できるように流量検出手段8を制御する。又瞬時流量値は平均流量演算手段17に入力され、所定個数の瞬時流量値を集合して平均流量値として算出される。一方流量検出手段8の超音波信号の振幅レベルを調節する増幅度を増幅度判定手段18で監視する。通常流量が大きくなると超音波信号受信感度が低下するので増幅度が大きくなる傾向がある。
 増幅度判定手段18の増幅度が所定値以上の場合、時間計測手段19により流量検出手段8の異常監視のタイマを計測スタートする。異常監視のタイマをスタートすると共に、計測条件設定手段16の計測条件の監視を計測比率演算手段20でスタートする。
 そして、異常判定手段21は、求められた平均流量で使用器具の監視を行ったり、現在の流量検出手段8に異常はないか監視を行う。異常判定手段21は、計測比率演算手段20で求めた回数比率が所定比率以上になった場合、通常の小流量の範囲で異常に大きな増幅度になっているのは流量検出手段8が何らかの原因で、例えば雨水等の浸入で異常な流量検出をしていると判定し、遮断信号を出力する。
 次に、以上のように構成されたガス遮断装置1の動作を説明する。ガス需要家宅にガス事業者がガス遮断装置1を設置し、端子蓋1eを開けて、通信装置や警報器(図示せず)等を接続した後、端子蓋1eを固定部材1f(ビス等)で固定しようとして、固定部材1fの固定が緩かったり、締め方が甘かったり、或いは接続線が何らかの原因ではさまった場合、雨水が端子蓋1eとガス遮断装置1本体との隙間より進入する場合がある。この場合で浸水した雨水がガス遮断装置1の下部に位置している流路4の部分に溜まり、上流側送受信器6や下流側送受信器7等が浸水し水没状態となる。このような状態で流量を流量検出手段8で検出する。超音波信号の伝搬時間が検出値として計測され、この信号が流量演算手段15に送られて瞬時流量値として換算されるが、水没した状態のため上流側送受信器6や下流側送受信器7の端子6aや7a間のインピーダンスが低下するため、超音波信号の大きさが不安定でかつ変動するので、器具を全く使用していない流量状態であるのに伝搬時間計測手段12で計測した伝搬時間値が変化するので、結果流量演算手段15で求めた流量値が変動する。又端子間インピーダンスが低下する為、超音波信号が小さくなるが、その状態を受信手段11で受信し信号レベルが振幅判定手段13で所定値以下であるのを判定すると増幅度調整手段14では常にピーク値が500mVになるように増幅度を大きくする。結果器具が使用されていない低流量状態であるのに流量信号を検出する信号の増幅度が次第に大きくなる。
 流量演算手段15で求めた瞬時流量が変動すると計測条件設定手段16はその状態より器具を使用していないのに供給するガス圧が変動した場合の流量状態と同じ状態と判定し、圧力変動時の計測条件に変更制御する。即ち、定期的に計測を行っているが、その時計測回数を増加させたり、通常の計測周期より短い計測周期で計測し流量を安定的に計測する。時間計測手段19や計測比率演算手段20は、増幅度判定手段18が所定増幅度(例えば利得値60以上等)以上に達した状態と判定すると、ガス遮断装置1の下部に位置する流量検出手段8が何らかの原因で浸水等により端子間インピーダンスが低下し異常状態になった可能性があると判定し、時間計測手段19は流量検出手段8の異常監視タイマを計測スタートする。同時に計測比率演算手段20は時間計測手段19の異常監視タイマ中の流量計測回数に対する計測条件を変更して流量を計測している回数比率を求める。そして、この回数比率が、例えば80%以上等の所定比率に達すると流量検出手段8が浸水等により端子間インピーダンスが低下し異常状態になったと判定し異常判定手段21に遮断信号を出力する。通常GHP等の圧力変動を起こす器具が使用された場合、計測条件設定手段14は脈動状態を検出すると計測条件が上位(精度を上げた測定条件)に上がり、安定流量を検出すると計測条件が段階的に下がったりと交互に計測条件が変化するが、ガス遮断装置1内の流量検出手段8等が水没し端子間インピーダンスが低下すると常に計測条件が最も上位の計測条件で計測し続ける。
 しかしながらガス遮断装置の電源(図示せず)は通常は電池を使用するが、上記従来のような、常に上位の計測条件で計測されると大容量の電池が必要となるため、このように早期に異常状態を検出し、警告もしくは遮断等の対応措置をとることは大きな効果を奏する。
 この異常判定手段21で異常成立と判定した時遮断手段22に遮断信号を送ってガス供給を停止する。また、報知通信手段23は、遮断状態や遮断内容を液晶表示素子等に表示すると共にガスの安全監視を行っているガス事業者のセンターに電話回線等の通信により通報する。ガス事業者は直ちにガス遮断装置1を交換する等の対応措置を実施でき、速やかに異常状態を回避することが可能である。
 一方並行して、平均流量演算手段12で流量演算手段15で求めた瞬時流量を所定個数毎の平均流量値として演算される。求められた平均流量は異常判定手段21には、流量域毎に対応した使用時間の制限時間値、あるいは使用最大流量の監視判定値等が記憶されている。例えばストーブ等へガスを供給するホースが何らかの原因で外れた時、異常な大流量が発生するが、そのような状態を監視するための合計流量遮断値や、器具の通常使用する最大使用時間よりはるかに長く使用された場合に対応して使用時間の制限時間を規定した使用時間遮断の制限時間等が記憶されている。この設定値と平均流量値とを異常判定手段21で比較判定することで、流量値が使用最大流量値を超えていないか、或いは器具の使用時間が登録流量に対応した連続使用の制限時間を超えていないか等監視し、超えた場合遮断信号を出力する。
 なお、本実施の形態に使用した構成は一例であり、又使用形態も本実施の形態に限定されるものではない。
 以上のように、何からの原因でガス遮断装置1の端子蓋1eが緩んだ状態で固定され、雨水等が浸入しガス遮断装置1の下部に位置する流量検出手段8が浸水状態になったり、最悪その上部に位置する制御装置5迄が水没するような状態になったのを、流量検出手段8からの検出した流量信号の変化や流量を検出制御する増幅度調整手段14の増幅度を監視することにより、流量検出手段8の異常を早期に検出できるので、浸水することにより本来器具を使用していないのに流量を計測し異常なガス使用量として積算したり、異常な流量が検出されたとして保安機能が働き、ガスを遮断する等の誤作動といった異常動作を継続して起すことを防止し、ガス器具を使用するガス需要家を安全に監視するためのガス遮断装置が異常であることを早期に判定し通報するので、安全性や信頼性が極めて高く、かつ使い勝手が高い効果がある。
 なお、以上の実施の形態に係る本ガス遮断装置の手段の全てもしくは一部を実行させるためのプログラムを作成すれば、マイコン等を用いて本発明を実施することができるし、また、このプログラムを記録媒体に記録したり、通信回線を用いて配信することにより配布やインストール作業を簡単行うことができる。
 本出願は、2008年6月24日出願の日本特許出願、特願2008-164091に基づくものであり、その内容はここに参照として取り込まれる。
 以上、本発明の各種実施形態を説明したが、本発明は前記実施形態において示された事項に限定されず、明細書の記載、並びに周知の技術に基づいて、当業者がその変更・応用することも本発明の予定するところであり、保護を求める範囲に含まれる。
 以上のように、本発明に係るガス遮断装置は、雨水等で浸水された時の異常状態を検出して、保安監視や流量計測継続が困難であると判定するできるものであり、同様に水道メータやディジタル電力メータ等の器具監視装置全般に適用できるものである。
 8 流量検出手段
 15 流量演算手段
 16 計測条件設定手段
 17 平均流量演算手段
 18 増幅度判定手段
 19 時間計測手段
 20 計測比率演算手段
 21 異常判定手段
 22 遮断手段

Claims (2)

  1.  異常発生時にガスの供給を遮断するガス遮断装置であって、
     流量を計測する流量検出手段と、前記流量検出手段の検出値より瞬時流量値を演算する流量演算手段と、
     前記流量検出手段で調整した信号増幅度を判定する増幅度判定手段と、
     前記流量演算手段で演算された瞬時流量値が所定流量以下で、かつ前記増幅度判定手段で判定された信号増幅度が所定値以上の場合、計時を開始する時間計測手段と、
     前記流量演算手段で求めた流量より前記流量検出手段の計測条件を設定する計測条件設定手段と、
     前記時間計測手段で計時される所定時間中に所定の計測条件で計測された比率を求める計測比率演算手段と、
     前記流量演算手段で求めた瞬時流量より平均流量を求める平均流量演算手段と、
     前記計測比率演算手段で求めた比率が所定比率以上の時に前記流量検出手段に異常発生と判定したり、或いは求めた平均流量から異常の有無を判定する異常判定手段と、
     前記異常判定手段で異常判定成立時にガスの供給を遮断する遮断手段と、
     を備えたガス遮断装置。
  2.  異常発生時にガスの供給を遮断するガス遮断装置であって、
     流量を計測する流量検出手段と、
     前記流量検出手段の検出値より瞬時流量値を演算する流量演算手段と、
     前記流量検出手段で調整した信号増幅度を判定する増幅度判定手段と、
     前記増幅度判定手段で判定された信号増幅度が所定値以上の場合、計時を開始する時間計測手段と、
     前記流量演算手段で求めた流量より前記流量検出手段の計測条件を設定する計測条件設定手段と、
     前記時間計測手段で計時される所定時間中に所定の計測条件で計測された比率を求める計測比率演算手段と、
     前記流量演算手段で求めた瞬時流量より平均流量を求める平均流量演算手段と、
     前記計測比率演算手段で求めた比率が所定比率以上の時に前記流量検出手段に異常発生と判定したり、或いは求めた平均流量から異常の有無を判定する異常判定手段と、
     前記異常判定手段で異常判定成立時ガスの供給を遮断する遮断手段と、
     を備えたガス遮断装置。
PCT/JP2009/002878 2008-06-24 2009-06-23 ガス遮断装置 WO2009157188A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US13/000,582 US8620601B2 (en) 2008-06-24 2009-06-23 Gas cutoff apparatus
EP09769898A EP2293025A1 (en) 2008-06-24 2009-06-23 Gas circuit breaker
CN2009801241638A CN102077063B (zh) 2008-06-24 2009-06-23 气体截断装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008164091A JP5277749B2 (ja) 2008-06-24 2008-06-24 ガス遮断装置
JP2008-164091 2008-06-24

Publications (1)

Publication Number Publication Date
WO2009157188A1 true WO2009157188A1 (ja) 2009-12-30

Family

ID=41444261

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/002878 WO2009157188A1 (ja) 2008-06-24 2009-06-23 ガス遮断装置

Country Status (5)

Country Link
US (1) US8620601B2 (ja)
EP (1) EP2293025A1 (ja)
JP (1) JP5277749B2 (ja)
CN (1) CN102077063B (ja)
WO (1) WO2009157188A1 (ja)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5222648B2 (ja) * 2008-07-23 2013-06-26 矢崎エナジーシステム株式会社 電子式ガスメータ
JP5317816B2 (ja) * 2009-04-30 2013-10-16 パナソニック株式会社 ガス遮断装置
JP5691014B2 (ja) * 2010-06-14 2015-04-01 パナソニックIpマネジメント株式会社 ガス遮断装置
JP6890255B2 (ja) * 2018-03-13 2021-06-18 パナソニックIpマネジメント株式会社 メータ用無線装置
JP6890256B2 (ja) * 2018-03-13 2021-06-18 パナソニックIpマネジメント株式会社 ガス遮断装置
CN112729488A (zh) * 2020-12-30 2021-04-30 浙江威星智能仪表股份有限公司 一种超声波燃气表进水检测方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005061864A (ja) 2003-08-18 2005-03-10 Toyo Gas Meter Kk ガスメータ用アダプタ、及びガスメータ
JP2005214894A (ja) * 2004-01-30 2005-08-11 Yazaki Corp 流体計測装置及びガスメータ
JP2005257445A (ja) * 2004-03-11 2005-09-22 Yazaki Corp ゲイン履歴装置
JP2005315717A (ja) * 2004-04-28 2005-11-10 Toyo Gas Meter Kk ガスメータ
JP2006133156A (ja) * 2004-11-09 2006-05-25 Matsushita Electric Ind Co Ltd ガス保安装置
JP2006242659A (ja) * 2005-03-01 2006-09-14 Yazaki Corp 電子式ガスメータ
JP2008164091A (ja) 2006-12-28 2008-07-17 Honda Motor Co Ltd 等速ジョイント用ボール

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE68915011T2 (de) * 1988-02-10 1994-08-25 Matsushita Electric Ind Co Ltd Gasabschaltvorrichtung.
JP4487552B2 (ja) * 2003-12-10 2010-06-23 パナソニック株式会社 ガス遮断装置
US20090035121A1 (en) * 2007-07-31 2009-02-05 Dresser, Inc. Fluid Flow Modulation and Measurement
US7885790B2 (en) * 2008-03-19 2011-02-08 Daniel Measurement And Control, Inc. Method and system of determining forthcoming failure of transducers

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005061864A (ja) 2003-08-18 2005-03-10 Toyo Gas Meter Kk ガスメータ用アダプタ、及びガスメータ
JP2005214894A (ja) * 2004-01-30 2005-08-11 Yazaki Corp 流体計測装置及びガスメータ
JP2005257445A (ja) * 2004-03-11 2005-09-22 Yazaki Corp ゲイン履歴装置
JP2005315717A (ja) * 2004-04-28 2005-11-10 Toyo Gas Meter Kk ガスメータ
JP2006133156A (ja) * 2004-11-09 2006-05-25 Matsushita Electric Ind Co Ltd ガス保安装置
JP2006242659A (ja) * 2005-03-01 2006-09-14 Yazaki Corp 電子式ガスメータ
JP2008164091A (ja) 2006-12-28 2008-07-17 Honda Motor Co Ltd 等速ジョイント用ボール

Also Published As

Publication number Publication date
US20110106461A1 (en) 2011-05-05
US8620601B2 (en) 2013-12-31
JP5277749B2 (ja) 2013-08-28
CN102077063B (zh) 2012-11-07
CN102077063A (zh) 2011-05-25
EP2293025A1 (en) 2011-03-09
JP2010008053A (ja) 2010-01-14

Similar Documents

Publication Publication Date Title
WO2009157188A1 (ja) ガス遮断装置
US8305231B2 (en) Gas appliance monitoring apparatus
JP5317816B2 (ja) ガス遮断装置
WO2006043630A1 (ja) ガス遮断装置及びガス遮断方法
JP4110908B2 (ja) ガス遮断装置
JP4163168B2 (ja) ガス遮断装置
JP4487552B2 (ja) ガス遮断装置
JP5516182B2 (ja) ガス遮断装置
JPH1164055A (ja) 流量計測装置
JP4867740B2 (ja) ガス器具監視装置
JP2010014584A (ja) 通報機能付きガスメータ
JP4294834B2 (ja) ガス遮断装置
JP4538134B2 (ja) ガス遮断装置
JP4013355B2 (ja) ガス遮断装置
JP4670238B2 (ja) ガス遮断装置
JP5487696B2 (ja) ガス器具監視装置
JP4580506B2 (ja) ガス遮断装置
JP4552952B2 (ja) ガス遮断装置
JP4449424B2 (ja) ガス遮断装置
JP5013519B2 (ja) ガス遮断装置およびガス供給システム
JP2006118763A (ja) ガス遮断装置
JP2001336741A (ja) ガス遮断装置
JP4580507B2 (ja) ガス遮断装置
JP2001336740A (ja) ガス遮断装置
JP2007232672A (ja) ガス遮断装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200980124163.8

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09769898

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 13000582

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2009769898

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE