WO2001088786A1 - Systeme et procede de gestion de planning, et support enregistre - Google Patents

Systeme et procede de gestion de planning, et support enregistre Download PDF

Info

Publication number
WO2001088786A1
WO2001088786A1 PCT/JP2001/003799 JP0103799W WO0188786A1 WO 2001088786 A1 WO2001088786 A1 WO 2001088786A1 JP 0103799 W JP0103799 W JP 0103799W WO 0188786 A1 WO0188786 A1 WO 0188786A1
Authority
WO
WIPO (PCT)
Prior art keywords
user
schedule
management system
schedule management
terminal
Prior art date
Application number
PCT/JP2001/003799
Other languages
English (en)
French (fr)
Inventor
Kenichi Ohmae
Original Assignee
Kenichi Ohmae
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kenichi Ohmae filed Critical Kenichi Ohmae
Priority to AU2001255065A priority Critical patent/AU2001255065A1/en
Publication of WO2001088786A1 publication Critical patent/WO2001088786A1/ja

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management

Definitions

  • Schedule management system schedule management method, and recording medium
  • the present invention relates to a schedule management system, a schedule management method, and a recording medium for managing a personal schedule on a network, and particularly to automatically changing a delivery time with a logistics agent or a promised time with a friend.
  • the present invention relates to a schedule management system, a schedule management method, and a recording medium that can be used.
  • BACKGROUND ART Personal schedule management is performed, for example, by writing in a personal organizer or requesting a secretary, or when working for a corporation, an electronic personal organizer such as an office (product name) manufactured by Microsoft Corporation. Was used.
  • process management and work management are performed to improve work efficiency.
  • a logistics company manages the business schedule by formulating a vehicle allocation plan, etc., and formulates a plan for the operation route of each delivery vehicle and loading and unloading of cargo at the distribution bases, and develops the existing delivery vehicles. And logistics bases to achieve optimal logistics.
  • the courier service delivers the cargo requested by the sender to the recipient, but if the recipient is a single person, the courier will often be absent even if delivered to home, and the same will be repeated many times There was a problem that the delivery cost had to be increased due to having to visit the receiving home.
  • a first object of the present invention is to provide a schedule management system and a management method that can ensure the contact between the trader and the user by adjusting the schedule between the trader and the user who provide the product or service. It is in.
  • a second object of the present invention is to adjust a schedule between users, such as a conference or a dinner, to ensure contact between users, and a schedule management system and a record for creating such a management system. To provide a medium.
  • a schedule management system 100 for managing a user's schedule on a network;
  • a user schedule database 102 for storing user schedules of users, and a schedule of a company that provides goods or services to the users, including a business schedule to be matched with the user schedules.
  • Means 104 for receiving schedule data from the trader terminal 130; and matching means 106 for checking the user schedule against the trader schedule data.
  • Schedule management configured so that the user can access from the user terminal 120 via the Provide system.
  • the schedule management system typically includes a schedule management server.
  • the matching result is input to the user schedule database. The user can access the user schedule database.
  • the goods or services provided to the user may be, for example, goods or services delivered to the user by a third party.
  • the trader terminal is a terminal of a trader (for example, a distributor) who has a management contract with the person who manages the schedule, and is a server. There may be.
  • the schedule management system may be under the management of the trader together with the trader terminal.
  • the supplier's schedule data is the scheduled execution of business such as delivery of luggage and service visits. Accessible means that the user can browse, for example, from a user terminal, and can input and output information. Matching is a schedule adjustment where the time and place are the same, such as an encounter between a trader and a user.
  • the user schedule database 102 stores the user schedule of the user who uses the schedule management.
  • the supplier schedule receiving means 104 receives a schedule of a provider who provides goods or services to users.
  • the schedule collation means 106 compares the user schedule with the vendor schedule data, matches the user schedule with the vendor schedule data, and provides a product or service to the vendor user once. Adjust so that it can be fulfilled at the encounter.
  • the user terminal access means 108 provides the user schedule and the vendor schedule data matched by the schedule collating means 106 for viewing on the user terminal 120.
  • the collating means may collate the business execution schedule in the supplier schedule data with the user schedule to calculate an optimal business execution date.
  • the business execution schedule refers to, for example, a schedule for delivery of luggage or a service visit.
  • the business execution date refers to, for example, a delivery date or a service visit date.
  • the concept includes not only days but also time zones such as time, morning, and afternoon.
  • the adjustment means, for example, change or approval.
  • the adjustment is a request from a user to change the business execution date
  • the change request is linked to the delivery schedule data of the trader or the current information of the trader to determine a new execution date.
  • the delivery schedule data of the trader means, for example, a schedule of a delivery car, a service person, or the like.
  • the current information of the trader is, for example, the current position of a delivery car, a service person, or the like.
  • the newly confirmed execution date may be reported to delivery personnel.
  • the change request may include a plurality of desired dates and times with the user's priority, and the new execution date may be determined according to the priority.
  • the user schedule may include information on a time zone desired by the user.
  • the time zone desired by the user is a weekday, a holiday, the morning, the afternoon, and the like.
  • a schedule management method for managing a user's schedule on a network in order to achieve the first object comprising: storing a user schedule of a user who uses the schedule management in a user schedule database.
  • Means and a schedule management system configured to determine a fee based on the calculated labor difference.
  • the actual labor is calculated, for example, by the number of times the trader has visited the user based on schedule management.
  • the standard labor is determined, for example, by the average value of the number of times the delivery service provider has visited the delivery destination when not using the management system of the present invention.
  • a schedule management system for managing schedules between users on a network to achieve the second object; storing user schedules of first and second users using the schedule management.
  • a first and a second user schedule database to be compared with the first user schedule; and a collation means for collating the second user schedule to be matched with the first user schedule;
  • the first or second user is a first or second user terminal
  • the present invention provides a schedule management system for managing schedules between users on a network, the first system storing a user schedule of a first user using the schedule management.
  • a first user terminal having a user schedule database of the first user terminal; a second user terminal having a second user schedule database storing a user schedule of a second user using the schedule management;
  • Provide a schedule management system that is configured to be able to be browsed by using.
  • the matching means may be provided in the first user terminal or the second user terminal, or may be provided in a separate server connected to the network.
  • a schedule management system for managing a schedule between a first user and a second user on a network 110 is required.
  • Processing and from the second user terminal 124 having the second user schedule database 126 storing the user schedule of the second user using the schedule management, A receiving process in which the first user terminal 123 receives the second user schedule to be matched with the second user schedule via the network 110; and the first user schedule A matching process for matching the second user schedule to be matched with the first user and a process for allowing the first or second user to view the matching result;
  • User terminal readable recording medium storing a program for controlling user terminal 1 2 3 1 a I will provide a.
  • the recording medium 123 a may be any one that can be generally read by a computer such as a personal computer, such as a CD-ROM, an FD, a magnetic disk, and a magnetic tape. With this configuration, a schedule management system can be formed by installing this recording medium in a user terminal.
  • FIG. 1 is a configuration block diagram illustrating an embodiment of the present invention.
  • FIG. 2 is a configuration block diagram showing an example of the schedule management system.
  • FIG. 3 is a configuration block diagram illustrating an example of a user terminal used by each user.
  • FIG. 4 is a flowchart of the first embodiment for explaining information transfer between the schedule management system, the business terminal, and the user terminal.
  • FIG. 5 is a flowchart of the second embodiment for explaining information transfer between the schedule management system, the trader terminal, and the user terminal.
  • Figure 6 shows that users change with respect to the optimal business execution date and time, such as the delivery date and service visit date.
  • 9 is a flowchart showing a first embodiment of a process for performing update approval.
  • Fig. 7 is a flow chart showing a continuation of Fig. 6 for the first embodiment of the process when the user performs change approval for the optimal business execution date and time such as the delivery date and the service visit date. is there.
  • FIG. 8 is a flow chart showing a continuation of FIG. 7 for the first embodiment of a process when a user performs a change approval for an optimal business execution date such as a delivery date or a service visit date. It is.
  • FIG. 9 is a main part flowchart showing a second embodiment of a process when a user performs a change approval for an optimal business execution date such as a delivery date or a service visit date.
  • FIG. 10 is a main part flowchart showing a third embodiment of a process when a user changes or approves an optimal business execution date and time such as a delivery date and a service visit date.
  • FIG. 11 is a configuration block diagram of a system in which benefit calculation means is added to the system of FIG.
  • Figure 12 is a block diagram of the first system that manages schedules among users.
  • Figure 13 is a configuration block diagram of a second system that manages schedules among users.
  • FIG. 1 is a configuration block diagram illustrating an embodiment of the present invention.
  • a schedule management system 100 is implemented on various computers such as a personal computer, a workstation, and a mainframe, and is managed by a provider of an interlocking schedule service.
  • the user schedule database 102 is a database in which user schedules of users who use schedule management are stored. For example, a relational database is used.
  • Receiving contractor schedule The communication means 104 receives a schedule of a company that provides goods or services to users.
  • the schedule collation means 106 collates the user schedule with the business schedule data, matches the user schedule with the business schedule data, and provides the goods or services to the business user. Adjust so that it can be fulfilled at each encounter.
  • the user terminal access means 108 provides the user terminal 120 with the user schedule and the vendor schedule data matched by the schedule collating means 106.
  • the network 110 is a communication line that connects the schedule management system 100, the user terminal 120, and the company terminal 130, and is not limited to computer networks such as the Internet and telephone lines, but also includes TV radio waves, satellite Internet, Various forms such as cable lines and TV gap radio waves are used.
  • the user terminal 120 is a terminal device used by the user of the schedule management system 100, and may be a personal computer, a Web TV, an information appliance, a mobile phone, a pager, or the like. A plurality of user terminals 120 can exist as many as the number of users.
  • the contractor terminal 130 is a work schedule management system of a contracted contract with the automatic schedule service provider.
  • the trader terminal 130 exists for each contracted trader.
  • the business terminal 130 and the user terminal 120 of each trader are connected to the schedule management system 100 via the network 110.
  • FIG. 2 is a configuration block diagram illustrating an example of the schedule management system.
  • the server 200 is a server of the schedule management system, and can be implemented on various computers such as a personal computer, a workstation, and a mainframe.
  • the control unit 201 controls the schedule management system, and manages the user's schedule, links the user's schedule with the contractor's business schedule, manages the user's users, controls the equipment, and the like. Do.
  • the storage unit 202 stores a user DB (database) storing user basic information such as a user number, a name, an address, and the like, and a user schedule DB storing a user's schedule.
  • the communication interface unit 203 is a network transmission / reception function for exchanging information between the server 200 and the user terminal used by the user.
  • FIG. 3 is a configuration block diagram illustrating an example of a user terminal used by each user.
  • the user terminal 300 is a terminal device for the user to use the schedule management system, and may be a device equipped with a browser function on a general-purpose device such as a personal computer, a Web TV, a television, or an information home appliance. A dedicated device may be used.
  • the input device 301 is used by a user to issue an operation command to the user terminal 300 and to input schedule information. Examples of the input device 301 include a keyboard, a mouse, a remote controller, a microphone, and a touch screen.
  • the output device 302 is, for example, a display or a printer.
  • the input device 301 and the output device 302 may be provided as devices independent of the user terminal 300, or may be integrated with the user terminal 300.
  • the IZO interface section 303 is a device that controls the input device 301 and the output device 302.
  • the communication interface section 304 is a communication interface for transmitting and receiving information to and from the server of the schedule management system.
  • the storage unit 305 stores the schedule data of the user who uses the user terminal 300.
  • the control unit 303 is connected to the ⁇ ⁇ ⁇ interface unit 303, the communication interface unit 304, and the storage unit 305, and controls the entire user terminal 300.
  • a processor is used.
  • Fig. 4 is a flow chart of the first embodiment for explaining the information exchange between the schedule management system, the trader terminal, and the user terminal.
  • the schedule management system manager contracts with the trader.
  • the contractor is a courier service provider.
  • business schedule data is input to the courier terminal 130 (step 400).
  • the business schedule data includes the business, for example, to whom the delivery of the courier is to be performed (the destination of the courier), the condition of the date and time (such as after the month X), the delivery identification number. Etc. are included.
  • the input delivery work schedule data is transmitted from the trader terminal 130 to the schedule management system 100 (step 401).
  • the schedule management system 100 receives the delivery work schedule data. (Step 4002), the user number of the system user who is the delivery destination is searched with reference to the user DB (Step 4003). Then, using the user number as a key, the user's schedule is extracted from the user schedule DB (step 4404). Then, the optimum delivery date is calculated by comparing the extracted user's schedule with the conditions of the delivery date and time of the delivery schedule data (in this case, delivery on or after X days of the month) (step 405). Then, enter the schedule in the user (Step 406). Here, this user's schedule has been newly updated. Then, the schedule management system 100 sends the business (delivery) schedule data including the calculated delivery date to the dealer terminal 130 (step 407). In addition, the information is transmitted to the user terminal 120 by using e-mail or the like (step 408). Further, the user can know the delivery schedule to himself by activating the client function of the schedule management system of the user terminal 120 (step 409).
  • FIG. 5 is a flowchart of the second embodiment for explaining information transfer between the schedule management system, the trader terminal, and the user terminal.
  • the user uses the user terminal 120 to register in advance the desired date and time zone in the case of delivery, etc., in the schedule management system 100 (step 4 1 0) point.
  • the schedule management system 100 can calculate a business execution date such as a delivery date or a service visit date and time suitable for the user's convenience.
  • the user uses the user terminal 120 to input the desired date and time zone of the delivery in the case of the user's delivery to the schedule management system 100, regardless of whether the delivery is made or not. deep. For example, weekday, holiday, day of the week, morning, afternoon, night, etc. are specified.
  • the entered date and time zone is transmitted to the schedule management system 100 and stored in the user DB.
  • the schedule management system 100 extracts the user number and the desired delivery date and time zone of the corresponding user from the user DB (step 4003). Further, the schedule registered in advance for the corresponding user is extracted from the user schedule DB (step 404). And The optimal delivery date and time is calculated by comparing the user's schedule, the desired delivery date and time zone, and the date and time conditions of the received delivery schedule data (step 405). The following is the same as FIG.
  • FIG. 6 is a flowchart showing a first embodiment of a process when a user gives a change approval to an optimal business execution date and time such as a delivery date and a service visit date. Subsequently, as an example, the contractor is assumed to be a courier service.
  • the schedule management system 1 notifies the delivery schedule including the delivery date and time. Receive from 0 0 (step 6 01).
  • the user determines whether the delivery date and time notified by the schedule management system 100 may be used or whether the user wants to change the date and time (step 62).
  • a message to approve the delivery date and time is sent to the schedule management system 100 (step 603).
  • the data transmitted and received here includes a delivery identification number, a delivery date OK flag, and the like.
  • the schedule management system 100 receives the approval of the delivery date and time (step 604), and the process ends here.
  • step 602. since the user wants to change the delivery date and time, he or she inputs the desired change from the user terminal 120 into the schedule management system 100 (step 605).
  • the changes to be input include the delivery date after the change, the time zone after the change, and the like.
  • the change contents input by the user, the corresponding delivery number, delivery date / time change flag, and the like are transmitted to the schedule management system 100 as a change request (step 600).
  • the schedule management system 100 When the schedule management system 100 receives the user's change request (step 607), the schedule management system 100 converts the data into the delivery number, the destination of the courier service (user name), and the desired change delivery date and time. The change request is transmitted to the business schedule management system provided at the delivery terminal 130 of the courier service (step 608). ⁇
  • the data requested to change the delivery date and time is received (step 609), and first, whether the delivery date and time to this destination can be changed is determined. Is determined by referring to the contents of the delivery schedule DB (another delivery schedule) (step 610). If it can be changed, the new delivery time after the change is newly written in the delivery schedule (step 611). Then, to the schedule management system 100, the delivery number, the destination name of the courier service, and a notice to approve the change of the delivery date and time, such as the delivery date change OK flag, are transmitted (step 612). The schedule management system 100 receives the approval of the change of the delivery date and time (step 613), and inputs the determined delivery date and time into the schedule of the user corresponding to the destination of the courier service (step 614). ).
  • the schedule management system 100 reports to the user that the delivery date and time has been changed as desired using e-mail or the like (step 6 15).
  • the desired change in the delivery date and time is received (step 6 16).
  • the user can also know the confirmed delivery date and time by activating the schedule management system of the user terminal 120 (step 6 17).
  • the data transmitted and received between the schedule management system 100 and the user using e-mail or the like is not limited to text data, and includes, for example, audio data, image data, or predetermined information. May be an identifier.
  • any format can be used as long as it is data that can include predetermined information, such as exchange between the schedule management system 100 and the user and changes in the delivery date and time as desired. This is the same in other embodiments.
  • a message indicating that the delivery date and time cannot be changed is transmitted to the schedule management system 100, such as a delivery number, a home delivery destination name, and a delivery date change NG flag (step 618).
  • the schedule management system 100 receives the notification that the delivery date and time cannot be changed (step 6 19), and notifies the user corresponding to the destination name of the courier service that the delivery date and time cannot be changed using an electronic mail or the like. , And specify a new desired date and time (step 620). The user receives the notification that the delivery date and time cannot be changed (step 6 2 1). Return to step 605 to enter the desired delivery date and time.
  • FIG. 9 is a main part flowchart showing a second embodiment of the processing when the user changes or approves the optimal business execution date and time such as the delivery date and the service visit date.
  • the business schedule management system of the contractor such as a courier service
  • receives a request for changing the delivery date and time and requests the delivery date in the subsequent processing.
  • This figure shows the case where the current position of the assigned delivery vehicle and the delivery schedule data are taken into account in addition to the delivery schedule data when determining whether or not the change can be made as expected.
  • the processing from step 700 to step 706 in FIG. 9 is an alternative to the processing from step 609 to step 612 in FIG.
  • the business schedule management system of the courier company receives the delivery number, the destination of the courier service (user name), and the desired change data of the delivery date and time including the desired change delivery date and time (step 700).
  • the business schedule management system determines the delivery vehicle responsible for the relevant delivery, and grasps its current position using a device such as a GPS (satellite positioning system) (step 701).
  • the business schedule management system can change the delivery date and time of the corresponding delivery number by referring to the delivery schedule in the delivery schedule DB, the delivery schedule of the assigned delivery vehicle in the delivery database, and the current location of the assigned delivery vehicle. It is determined whether or not it is (step 702). If it can be changed, the business schedule management system writes the changed delivery date and time into the delivery schedule (step 70.3), and creates a new dispatch schedule (step 704). Then, the new delivery schedule is notified to the delivery staff of the delivery vehicle in charge (step 705). In addition, the schedule management system 100 transmits to the schedule management system 100 a notification that the change of the delivery date and time including the delivery date change OK flag is approved (step 706).
  • FIG. 10 is a main part flowchart showing a third embodiment of a process when a user performs a change approval for an optimal business execution date and time such as a delivery date and a service visit date.
  • a replacement target step in FIG. 6, (B) is a step replaced by the third embodiment. For clarity, it is shown in contrast.
  • the process in which the user changes the optimal business execution date and time such as the delivery date and the service visit date calculated by the schedule management system 100 is described.
  • the user instead of indicating the case where a single desired date and time is specified, the user is given a separate priority for the desired date and time instead of one. To be presented.
  • the user inputs a plurality of desired changes to the schedule management system of the user terminal 120 in the process of step 605 in FIG.
  • the changes to be entered are the priority of the change request (first request, second request, third request, etc.), delivery date after change, time zone after change, and the like.
  • the business schedule management system of a contractor such as a courier service receives the change request (step 609 in FIG. 7) and determines whether the delivery date can be changed to the desired date and time (see FIG. 7).
  • Step 6 10 The processing is changed as shown in FIG. 10 (B).
  • the contents of the change request received by the business schedule management system of the contractor include the delivery number, the destination, and the N desired delivery dates and times from the first request to the Nth request (step 8). 0 0).
  • the following processing is sequentially performed from the first request to the Nth request (step 801). It is determined whether or not the delivery date and time can be changed to the desired date and time with reference to the contents of the delivery schedule DB (step 802). If it cannot be changed, the same judgment is made as to the desired date and time of the next rank. When the change is made, the process proceeds to the process of writing the new delivery date and time into the delivery schedule (step 611 in FIG. 7).
  • Step 6 18 in Figure 8 a message indicating that the delivery date and time including the delivery number, courier destination name and delivery date and time change NG flag cannot be changed is sent to the schedule management system 100.
  • Step 6 18 in Figure 8 the same processing as the steps shown in FIG. 8 is performed.
  • FIG. 11 is a block diagram of the configuration of a system in which benefit calculation means is added to the system of FIG.
  • the schedule management system administrator calculates the benefits obtained by the schedule management system 100 and the users by the schedule management system, and uses the calculated data as basic data for setting fees for the companies and users and promoting the participation.
  • the benefit calculation means 140 is the actual labor calculation means 142 that calculates the actual labor required by the trader to provide goods or services to users, the calculated labor and the standard labor.
  • labor calculating means 144 for calculating the difference between the two, and a fee calculating means 144 for determining a fee based on the calculated labor difference.
  • the actual labor in the actual labor calculation means 142 is calculated, for example, based on the schedule management based on the number of times the trader has visited the user.
  • the standard labor used in the difference labor calculating means 144 is determined, for example, by the average value of the number of times the delivery service provider has visited the delivery destination when not using the management system of the present invention.
  • the fee calculation means 146 may be, for example, a proportional formula defined by the trader at a certain rate of the benefits obtained by using the schedule management system 100, or may be a step-by-step fee according to the benefits.
  • FIG. 12 is a block diagram showing the configuration of a system for managing schedules between users.
  • the schedule management system 100 includes first and second user schedule data 'bases 102 and 103 storing user schedules of the first and second users using the schedule management, A matching means 107 for matching the first user schedule with the second user schedule for matching, and a user terminal access means 108 are provided.
  • the first user registers his / her schedule in the user schedule of the schedule management system 100 using his / her user terminal 121.
  • the second user registers his / her own schedule in the user schedule of the schedule management system 100 using his / her user terminal 122.
  • the collation unit 107 is requested to make an adjustment.
  • the matching means 107 adjusts the user schedule of the first and second users, and adjusts the schedule so that the two parties can have a dinner.
  • the first and second users can access the adjusted user schedule from the first and second user terminals 12 1 and 12 2 to know their own action schedule. It is suitable for use in multi-schedule management systems that require complex schedule adjustments, and for mobile phones and pagers that have a smaller processing capacity than personal computers.
  • Figure 13 is a block diagram of the configuration of a system that manages schedules among users. Compared to the system in Fig. 12, the system in Fig. 13 manages schedules via the network between user terminals 123 and 124 without using a server for the schedule management system 100. This is suitable for small-scale users who use relatively large-capacity user terminals such as PC terminals.
  • the first user terminal 123 has a first user schedule database 125 that stores a user schedule of the first user who uses schedule management.
  • the second user terminal 124 has a second user schedule database 126 that stores a user schedule of a second user who uses schedule management.
  • the collating means 127 is provided in the first user terminal 123, and collates the first user schedule with the second user schedule to be matched.
  • the matching means 128 is provided in the second user terminal 124, and matches the second user schedule with the first user schedule that matches. Since the collation results of the collation means 127 and 128 need to be the same, the network 110 is used to perform the equivalence processing of the collation results. The first and second users are configured to be able to browse the collation results using their own user terminals 123 and 124. Even with such a system configuration, almost the same functions as the system of FIG. 12 can be exhibited.
  • a recording medium storing the above-described processing program for example, FD 123a or 124a is read into the user terminal. Then install the program.
  • the recording medium 123a is not limited to an FD, but may be a medium such as a CD-ROM, a magnetic disk, a magnetic tape, etc., which can be generally read by a computer such as a personal computer. This is the same in the systems shown in FIGS. 1 and 12, and the recording media 120a, 121a, and 122a can be used for the user terminals 120, 121, and 122, respectively.
  • the business terminal and user terminal of each trader are connected to a schedule management system via a network, and the date and time of the goods and services provided by the trader are adjusted.
  • the present invention is not limited to this case.For example, personal schedule adjustment of individuals or schedule between non-profit organizations and members It can be applied to various things such as adjustment.
  • a user schedule database is provided in the schedule management system, and a configuration is shown in which a user terminal accesses the database at any time.
  • the present invention is not limited to this.
  • User schedule A rule database may be provided to update information so that the latest user schedule is obtained by communication between the user terminal and the schedule management system. According to this, since only the difference information between the user terminal and the user schedule database in the schedule management system is made the same in one communication, the communication load can be reduced.
  • a schedule management system for managing user schedules on a network; a user schedule database storing user schedules of users who use the schedule management; Means for receiving, from the terminal of the trader, trader schedule data including a trader's schedule which is to be matched with the above-mentioned user's schedule, which is a schedule of a trader providing goods or services to the user; Matching means for checking the schedule data with the trader; the check result is configured so that the user can access the check result from the user terminal via the network; And adjust the schedule with the user User and the contact with the user and it is possible to to be reliably performed.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Warehouses Or Storage Devices (AREA)
  • Traffic Control Systems (AREA)

Description

明 細 書
スケジュール管理システム、 スケジュール管理方法及び記録媒体
技術分野 本発明は、 ネットワーク上で個人のスケジュール管理を行うスケジュール管理 システム、 スケジュール管理方法及び記録媒体に関し、 特に物流業者等との受け 渡し時刻や友人との約束時間の変更を自動的に行うことのできるスケジュール管 理システム、 スケジュール管理方法及び記録媒体に関する。
背景技術 個人のスケジュール管理は、 例えば手帳に記載したり、 或いは秘書に依頼した り、 あるいは法人に勤務している場合には、 例えばマイクロソフト社製のオフィ ス (商品名) のような電子的手帳を用いていた。 また、 利用者に商品やサービス を提供する業者においては、 作業効率を高める為に工程管理や作業管理が行われ ている。 例えば物流業者においては、 配車計画の策定などで業務スケジュールの 管理が行われ、 各配送車の運行経路や物流拠点での貨物の積込みや荷降し作業の 計画を立案して、現有する配送車や物流拠点を用いて最適な物流を実現していた。
ところで、 物流業者には宅配便業者のように個人や法人を利用者とする事業者 も少なくない。 この場合、 宅配便業者は送り主から依頼された貨物を受取り主に 配送しているが、 例えば受取り主が単身者の場合には自宅に配送しても不在の場 合が多く、 何回も同じ受取り主宅を訪問しなければならならず、 配送コストが増 大するという課題があった。
この事情は受取り主にとつても同様である。'即ち、 受取り主は配送された貨物 を受領したいのであるが、 他にも用事のある関係で自宅に居ることができず、 貨 物を迅速に受取ることができない。 そこで、 留守宅に貨物を置いておくことを宅 配便業者に依頼することもできるが、 その場合は宅配便業者が置いていった貨物 が留守中に盗難に会ったり、 或いはいたずらされる虞があり、 確実に受取ること が困難であるという課題があった。
そこで本発明の第 1の目的は、 商品やサービスを提供する業者と利用者とのス ケジュールを調整して、 業者と利用者との接触が確実に行えるスケジュール管理 システムと管理方法を提供することにある。 本発明の第 2の目的は、 会議や会食 のように利用者間のスケジュールを調整して、 利用者間の接触が確実に行える„ズ ケジュール管理システムとそのような管理システムを作るための記録媒体を提供 することにある。
発明の開示 上記第 1の目的を達成するために、 例えば図 1に示すように、 ネッ トワーク上 で利用者のスケジュール管理を行うスケジュール管理システム 1 0 0であって; 前記スケジュール管理を利用する利用者の利用者スケジュールを記憶する利用者 スケジュールデータベース 1 0 2と ;前記利用者を対象として商品またはサービ スを提供する業者のスケジュールであって前記利用者スケジュールとマッチング すべき業者スケジュールを含む、 業者スケジュールデータを、 業者端末 1 3 0か ら受信する手段 1 0 4と ;前記利用者スケジュールと前記業者スケジュールデー タとを照合する照合手段 1 0 6とを備え;前記照合結果に、 前記ネットワークを 介して前記利用者が利用者端末 1 2 0からアクセスできるように構成されたスケ ジュール管理システムを提供する。 スケジュール管理システムは、 典型的にはスケジュール管理サーバを含んで構 成される。 典型的には、 照合結果は前記利用者スケジュールデータベースに入力 される。 利用者はその利用者スケジュールデータベースにアクセスできる。 利用 者を対象として提供される商品、 またはサービスは、 例えば第 3者が利用者に届 ける商品またはサービスであってもよい。 業者端末とは、 該スケジュール管理を 行う者と管理契約をしている業者 (例えば流通業者) の端末であって、 サーバで あってもよい。 また、 スケジュール管理システムは、 業者端末と共に、 業者の管 理下にあってもよい。 業者スケジユ^"ルデータとは、 例えば荷物の配達やサービ ス訪問等の業務執行予定である。 アクセス可能とは、 例えば利用者端末から利用 者が閲覧可能であり、 また情報を入力 ·出力可能であることをいう。 マッチング とは、 業者と利用者との出会いのように、 両者が時間と場所を同じくするスケジ ユール調整をいう。 ·
このように構成すると、 利用者スケジュールデータべ ス 1 0 2にはスケジュ ール管理を利用する利用者の利用者スケジュールが記憶されている。 業者スケジ ユール受信手段 1 0 4は、 利用者を対象として商品またはサービスを提供する業 者のスケジュールを受信する。 スケジュール照合手段 1 0 6は、 利用者スケジュ ールと業者スケジュールデータとを照合して、 利用者スケジュールと業者スケジ ユールデータとが適合して、 業者の利用者に対する商品またはサービスの提供が 1回の出会いで履行できるように調整する。 利用者端末アクセス手段 1 0 8は、 スケジュール照合手段 1 0 6でマッチングされた利用者スケジュールと業者スケ ジュールデータを利用者端末 1 2 0で閲覧に供する。
また好ましくは、 前記照合手段は、 前記業者スケジュールデータ中の業務執行 予定と前記利用者スケジュールとを照合して、 最適な業務執行日を算定するよう に構成するとよい。 ここで、 業務執行予定とは、 例えば荷物の配達やサービス訪 問等の予定を言う。 業務執行日とは、 例えば配送日やサービス訪問日等を言う。 また日に限らず、 時刻、 午前、 午後等の時間帯も含む概念とする。
更に、 前記算定された業務執行日に対して、 前記利用者に調整を行わせ、 前記 業者端末に調整結果を送信する構成としても良い。 ここで、 調整とは、 例えば変 更、 承認を言う。
また、 前記調整が、 業務執行日に対する利用者からの変更要求であり、 該変更 要求と、 業者の配送スケジュールデータまたは業者の現在情報とを連動して新た な執行日を確定するように構成されていてもよい。 ここで、 業者の配送スケジュ ールデータとは、 例えば配送車やサービスマン等のスケジュールをいう。 業者の 現在情報とは、 例えば配送車やサービスマン等の現在位置を言う。 新たに確定さ れた執行日は、 配送要員等にそれを報告するようにしてもよい。 また、 前記変更要求が、 前記利用者の優先順位のついた複数の希望する日時を 含み、 前記優先順位に従って前記新たな執行日を確定するように構成されていて あよい。
さらに、 前記利用者スケジュールは、 利用者の希望する時間帯に関する情報を 含む構成としてもよい。 ここで、 利用者の希望する時間帯とは、 平日、 休日、 午 前、 午後等である。
上記第 1の目的を達成するために、 ネットワーク上で利用者のスケジュール管 理を行うスケジュール管理方法であって;前記スケジュール管理を利用する利用 者の利用者スケジュールを利用者スケジュールデータベースに記憶する記憶工程 と ;前記利用者スケジュールとマッチングすべき、 業者スケジュールを含む業者 スケジュールデータを業者端末から受信する受信工程と ;前記利用者スケジユー ルと前記業者スケジュールデータとを照合する照合工程と ;前記照合工程で得ら れた照合結果を、 前記ネットワークを介して前記利用者が利用者端末からァクセ スできるように照合結果ファイルに保存する工程とを備えるスケジュール管理方 法を提供する。 さらに、 前記業者が前記利用者を対象として商品またはサービスを提供するの に実際に要した労力を算定する実際労力算定手段と ;前記算定された労力と標準 労力との差を算出する差労力算出手段と ;前記算出された労力差に基づいて手数 料を定めるように構成されるスケジュール管理システムを提供する。 ここで、 実 際労力は、 例えばスケジュール管理に基づいて業者が利用者を訪問した回数で算 定する。標準労力は、例えば宅配業者が本発明の管理システムを用いないときに、 届け先を訪問していた回数の平均値で定められる。
上記第 2の目的を達成するために、 ネットワーク上で利用者間のスケジュール 管理を行うスケジュール管理システムであって;前記スケジュール管理を利用す る第 1及び第 2の利用者の利用者スケジュールを記憶する第 1及び第 2の利用者 スケジュールデータベースと ;前記第 1の利用者スケジュールとマッチングすべ き第 2の利用者スケジュールを照合する照合手段とを備え;前記照合結果に、 前 記ネットワークを介して前記第 1又は第 2の利用者が第 1又は第 2の利用者端末 からアクセスできるように構成されているスケジュール管理システムを提供する c このように構成すると、 個人間の日程調整や私的グループ間でのスケジュール調 整が円滑に行える。 また、 照合手段はスケジ ール管理システムのサーバーに設 けられているので、 第 1又は^ 2の利用者端末の負荷が少なくて済み、 携帯電話 '機に用いて最適である。
上記第 2の目的を達成するために、 ネットワーク上で利用者間のスケジュール 管理を行うスケジュール管理システムであって;前記スケジュール管理を利用す る第 1の利用者の利用者スケジュールを記憶する第 1の利用者スケジュールデー タベースを有する第 1の利用者端末と ;前記スケジュール管理を利用する第 2の 利用者の利用者スケジュールを記憶する第 2の利用者スケジュールデータベース を有する第 2の利用者端末と ;前記第 1の利用者スケジュールとマッチングすべ き第 2の利用者スケジュールを照合する照合手段とを備え;前記第 1又は第 2の 利用者は前記照合結果に第 1又は第 2の利用者端末を用いて閲覧できるように構 成されるスケジュール管理システムを提供する。 照合手段は、 第 1の利用者端末 や第 2の利用者端末に設けられていてもよく、 またネットワーク接続された別め サーバーに設けられていてもよい。
上記第 2の目的を達成するために、 例えば図 1 3に示すように、 ネットワーク 1 1 0上で第 1の利用者と第 2の利用者との間のスケジュール管理を行うスケジ ユール管理システムを制御するプログラムであって;前記スケジュール管理を利 用する第 1の利用者の利用者端末 1 2 3内の利用者スケジュールデータベース 1 2 5に前記第 1の利用者の利用者スケジュールを記憶する記憶処理と ;前記スケ ジュール管理を利用する第 2の利用者の利用者スケジュールを記憶した第 2の利 用者スケジュールデータベース 1 2 6を有する第 2の利用者端末 1 2 4から、 前 記第 1の利用者スケジュールとマツチングすべき第 2の利用者スケジュールを前 記ネットワーク 1 1 0を介して、 前記第 1の利用者の端末 1 2 3が受信する受信 処理と ;前記第 1の利用者スケジュールとマッチングすべき前記第 2の利用者ス ケジュールとを照合する照合処理と ;前記第 1又は第 2の利用者が前記照合結果 を閲覧するようにする処理とを行うように;前記第 1の利用者の端末 1 2 3を制 御するためのプログラムを格納した利用者端末読み取り可能な記録媒体 1 2 3 a を提供する。
記録媒体 1 2 3 aは、 C D— R OM、 F D、 磁気ディスク、 磁気テープ等、 一 般的にパソコン等のコンピュータが読み取り可能なものであればよい。 このよう に構成すれば、 この記録媒体を利用者端末にインス トールすることにより、 スケ ジュール管理システムを形成することができる。
この出願は、 日本国で 2 0 0 0年 5月 1 8日に出願された特願 2 0 0 0 - 1 4 5 9 0 7号に基づいており、 その内容は本出願の内容として、 その一部を形成 する。. また、 本発明は以下の詳細な説明によりさらに完全に理解できるであろう。 本 発明のさらなる応用範囲は、 以下の詳細な説明により明らかとなろう。 しかしな がら、 詳細な説明及び特定の実例は、 本発明の望ましい実施の形態であり、 説明 の目的のためにのみ記載されているものである。 この詳細な説明から、 種々の変 更、 改変が、本発明の精神と範囲内で、 当業者にとって明らかであるからである。 出願人は、 記載された実施の形態のいずれをも公衆に献上する意図はなく、 開 示された改変、 代替案のうち、 特許請求の範囲内に文言上含まれないかもしれな いものも、 均等論下での発明の一部とする。
図面の簡単な説明 図 1は、 本発明の一実施の形態を説明する構成プロック図である。
図 2は、 スケジュール管理システムの一例を示す構成プロック図である。
図 3は、 各利用者が使用する利用者端末の一例を示す構成ブロック図である。 図 4は、 スケジュール管理システムと業煮端末、 利用者端末間の情報授受を説 明する第 1の実施の形態のフローチャートである。
図 5は、 スケジュール管理システムと業者端末、 利用者端末間の情報授受を説 明する第 2の実施の形態のフローチャートである。
図 6は、 配送日やサービス訪問日等の最適業務執行日時に対して、 利用者が変 更ゃ承認を行う際の処理の第 1の実施の形態を示すフローチャートである。
図 7は、 配送日やサービス訪問日等の最適業務執行日時に対して、 利用者が変 更ゃ承認を行う際の処理の第 1の実施の形態について、 図 6の続きを示すフロー チャートである。
図 8は、 配送日やサービス訪問日等の最適業務執行日時に対して、 利用者が変 更ゃ承認を行う際の処理の第 1の実施の形態について、 図 7の続きを示すフロー チヤ一トである。
図 9は、 配送日やサービス訪問日等の最適業務執行日時に対して、 利用者が変 更ゃ承認を行う際の処理の第 2の実施の形態を示す要部フローチャートである。 図 1 0は、 配送日やサービス訪問日等の最適業務執行日時に対して、 利用者が 変更や承認を行う際の処理の第 3の実施の形態を示す要部フロ一チャートである。 図 1 1は、 図 1のシステムに便益算出手段を付加したシステムの構成ブロック 図である。
図 1 2は、 利用者間でのスケジュール管理を行う第 1のシステムの構成ブロッ ク図である。
図 1 3は、 利用者間でのスケジュール管理を行う第 2のシステムの構成プロッ ク図である。
発明を実施するための最良の形態 以下、 本発明の実施の形態について、 図面を参照して 明する。 なお、 各図に おいて互いに同一あるいは相当する部材には同一符号を付し、 重複した説明は省 略する。
図 1は、本発明の一実施の形態を説明する構成ブロック図である。図において、 スケジユーノレ管理システム 1 0 0はパソコン、 ワークステーション、 メインフレ ームなど、 種々のコンピュータ上に実装されるもので、 連動型スケジュールサー ビスの提供者が管理するものである。 利用者スケジュールデータベース 1 0 2は スケジュール管理を利用する利用者の利用者スケジュールが記憶されるデータべ ースで、 例えばリ レーショナルデータベースが用いられる。 業者スケジュール受 信手段 1 0 4は、 利用者を対象として商品またはサービスを提供する業者のスケ ジュールを受信する。 スケジュール照合手段 1 0 6は、 利用者スケジュールと業 者スケジュールデータとを'照合して、 利用者スケジュールと業者スケジュールデ ータとが適合して、 業者の利用者に対する商品またはサービスの提供が 1回の出 会いで履行できるように調整する。 利用者端末アクセス手段 1 0 8は、 スケジュ ール照合手段 1 0 6でマッチングされた利用者スケジュールと業者スケジュール データを利用者端末 1 2 0での閲覧に供する。
ネットワーク 1 1 0は、 スケジュール管理システム 1 0 0、 利用者端末 1 2 0 並びに業者端末 1 3 0を接続する通信回線で、 インターネット、 電話回線などの コンピュータネットワークに限らず、 T V電波、 衛星インターネット、 ケーブル 線、 T V隙間電波など、 様々な形態が用いられる。 利用者端末 1 2 0は、 スケジ ユール管理システム 1 0 0の利用者の使用する端末機器であり、 パソコン、 W e b T V、 情報家電、 携帯電話機、 ページャ一等が用いられる。 利用者端末 1 2 0 は、 利用者の数だけ複数個存在しうる。
業者端末 1 3 0は、 ¾動型スケジュールサービスの提供者が契約している業者 の、 業務スケジュール管理システムである。 業者端末 1 3 0は、 契約している業 者ごとに存在することになる。 各業者の業務端末 1 3 0と利用者端末 1 2 0は、 ネットワーク 1 1 0を介してスケジュール管理システム 1 0 0と接続されている。 図 2は、 スケジュール管理システムの一例を示す構成ブロック図である。 サー バ 2 0 0は、 スケジュール管理システムのサーバであり、 パソコン、 ワークステ ーシヨン、 メインフレームなど、 種々のコンピュータ上で実装され得る。 制御部 2 0 1は、 スケジュール管理システムの制御を行うもので、 利用者のスケジユー ル管理、 利用者のスケジュールと契約業者の業務スケジュールとの連動、 利用者 の利用者管理、 装置の制御等を行う。 記憶部 2 0 2は、 利用者番号、 氏名、 住所 等の利用者の基本情報を格納した利用者 D B (データベース) 、 利用者のスケジ ユールを格納した利用者スケジュール D B等が保管されている。 通信インターフ エース部 2 0 3は、 サーバ 2 0 0と利用者の使用する利用者端末との間で情報を やりとりするための、 ネットワークに対する送受信機能である。
図 3は、 各利用者が使用する利用者端末の一例を示す構成ブロック図である。 利用者端末 3 0 0は利用者がスケジュール管理システムを利用するための端末機 器で、 パソコンや W e b T V、 テレビ、 情報家電のような汎用機器にブラウザ機 能を搭載した機器でもよく、 また専用機器でもよい。 入力装置 3 0 1は、 利用者 が利用者端末 3 0 0に対する操作命令を発したり、 スケジュール情報を入力する もので、 例えばキーボード、 マウス、 リモコン、 マイク、 タッチスクリーン等が' ある。 出力装置 3 0 2は、 例えばディスプレイやプリンタなどである。 入力装置 3 0 1と出力装置 3 0 2は、 利用者端末 3 0 0とは独立した機器として設けても 良く、 また利用者端末 3 0 0と一体化されていてもよレ、。 I ZOインターフエ一 ス部 3 0 3は、. 入力装置 3 0 1と出力装置 3 0 2を制御する機器である。 通信ィ ンターフェース部 3 0 4は、 スケジュール管理システムのサーバと情報の送受信 をするための通信インターフェースである。 記憶部 3 0 5は、 利用者端末 3 0 0 を使用している利用者のスケジュールデータを保存する。 制御部 3 0 6は、 Ι Ζ Οインターフェース部 3 0 3、 通信インターフェース部 3 0 4、 記憶部 3 0 5と 接続しており、 利用者端末 3 0 0全体の制御を行うもので、 例えばマイクロプロ セッサが使用される。
図 4は、 スケジュール管理システムと業者端末、 利用者端末間の情報授受を説 明する第 1の実施の形態のフローチヤ一トで、 ここではスケジュール管理システ ム管理者が契約している業者に、 荷物の配達やサービス訪問の予定等の業務予定 が発生した際に、 該当する利用者のスケジュールと連動して配送日やサービス訪 問日等に対する最適な日時を算定する処理の一例を示している。 ここでは、 一例 として、 契約業者を宅配便業者としている。
まず、 宅配便業者の業務スケジュ―ルシステムでは、 宅配便の配送依頼を利用 者や代理店から受取ると、 業者端末 1 3 0に業務スケジュールデータを入力する (ステップ 4 0 0 ) 。 この場合の、 業務スケジュールデータには、 その業務、 例 えば、宅配便の配達は誰に対して行うのか(宅配便の宛先) 、その日時の条件(口 月 X日以降など) 、 配達識別番号等が含まれている。 入力した配達業務スケジュ ールデータは、 業者端末 1 3 0からスケジュール管理システム 1 0 0へ送信され る (ステップ 4 0 1 ) 。
スケジュール管理システム 1 0 0では、 配達業務スケジュールデータを受信し (ステップ 4 0 2 ) 、 利用者 D Bを参照しながら、 配達先となっているシステム 利用者の利用者番号を検索する (ステップ 4 0 3 ) 。 続いて、 利用者番号をキー にして、利用者スケジュール D Bより、該当利用者のスケジュールを取り出す(ス テツプ 4 0 4 ) 。 そして、 取り出した該当利用者のスケジュールと、 配達スケジ ユールデータの配達日時の条件 (この場合、 口月 X日以降配達) とを照らし合わ せ、 最適な配達日を算定し (ステップ 4 0 5 ) 、 利用者のスケジュールに入力す る (ステップ 4 0 6 ) 。 ここで、 この利用者のスケジュールは新たに更新された ことになる。 そして、 スケジュール管理システム 1 0 0は、 ここで算定した配達 日を含む、 業務 (配達) スケジュールデータを業者端末 1 3 0へ送信する (ステ ップ 4 0 7 ) 。 また、 利用者端末 1 2 0にも、 電子メールなどを利用して送信す る (ステップ 4 0 8 ) 。 更に、 利用者は、 利用者端末 1 2 0のスケジュール管理 システムのクライアント機能を起動させることによつても、 自分への配達予定を 知ることが出来る (ステップ 4 0 9 ) 。
図 5は、 スケジュール管理システムと業者端末、 利用者端末間の情報授受を説 明する第 2の実施の形態のフローチャートである。 図 4と相違する点を説明する と、 利用者が利用者端末 1 2 0を用いてスケジュール管理システム 1 0 0に、 配 達等があった場合の希望日時帯をあらかじめ登録しておく (ステップ 4 1 0 ) 点 にある。 すると、 スケジュール管理システム 1 0 0では、 利用者の都合に適した 配達日やサービス訪問日時等の業務執行日を算定することができる。具体的には、 利用者は利用者端末 1 2 0を用いてスケジュール管理システム 1 0 0に、 配達が あるなしに関わらず、 利用者の配達がある場合の配達の希望日時帯を入力してお く。 例えば、 平日 ·休日 ·曜日指定、 午前 ·午後 ·夜間指定等を行う。 入力され た日時帯は、 スケジュール管理システム 1 0 0に送信され、 利用者 D Bに保管さ れる。
そして、 宅配便業者等の契約業者の配達スケジュールが発生した時点で 図 4 で示す処理と同様の処理が開始されるのである。 即ち、 スケジュール管理システ ム 1 0 0が、 利用者 D Bより、 該当する利用者の利用者番号おょぴ、 配達希望日 時帯を取り出す (ステップ 4 0 3 ) 。 更に、 利用者スケジュール D Bより、 該当 利用者の事前に登録されたスケジュールを取り出す (ステップ 4 0 4 ) 。 そして 利用者のスケジュール、 配達希望日時帯、 および受信した配達スケジュールデー タの日時条件を照合して最適な配達日時を算定する (ステップ 4 0 5 ) 。 以下図 4と同様である。
図 6は、 配送日やサービス訪問日等の最適業務執行日時に対して、 利用者が変 更ゃ承認を行う際の処理の第 1の実施の形態を示すフローチャートである。 引き 続き、 ここでは、 例として、 契約業者を宅配便業者とする。 まず、 利用者が、 利 用者端末 1 2 0のスケジュール管理システムを立ち上げると (ステップ 6 0 0 ) 、 配達の予定がある場合は、 配達日時を含む配達予定の告知をスケジュール管理シ ステム 1 0 0から受信する (ステップ 6 0 1 ) 。 ここで利用者は、 スケジュール 管理システム 1 0 0によって告知された配達日時のままでよいか、 それとも日時 を変更したいかの判断を行う (ステップ 6 0 2 ) 。 このままでよい場合は、 配達 日時を承認する旨をスケジュール管理システム 1 0 0 へ送信する (ステップ 6 0 3 ) 。 ここで送受信されるデータには、 配達識別番号、 配達日時 O Kのフラグ等 が含まれる。 スケジュール管理システム 1 0 0は配達日時の承認を受信して (ス テツプ 6 0 4 ) 、 処理はここで終了する。
次に図 7を参照して、 ステップ 6 0 2で利用者がスケジュール管理システム 1 0 0によつて告知された配送日時のままでは都合が悪いと判断した場合の処理を 説明する。 このときは、 利用者が配送日時を変更したいので、 その希望する変更 内容を、 利用者端末 1 2 0からスケジュール管理システム 1 0 0に入力する (ス テツプ 6 0 5 ) 。 入力される変更内容とは、 変更後の配送日、 変更後の時間帯等 である。 そして、 利用者の入力した変更内容、 および、 該当する配達番号、 配達 日時変更フラグ等が、 変更要求としてスケジュール管理システム 1 0 0へ送信さ れる (ステップ 6 0 6 ) 。 スケジュール管理システム 1 0 0は、 利用者の変更要 求を受信すると (ステップ 6 0 7 ) 、 配達番号、 宅配便の宛先 (利用者名) 、 変 更希望配達日時というデータにして、 配達日時の変更希望を、 宅配業者の業者端 末 1 3 0に設けられている業務スケジュール管理システムへ送信する (ステップ 6 0 8 ) 。 ·
宅配業者の業務スケジュール管理システムでは、 配達日時の変更希望データを 受信し (ステップ 6 0 9 ) 、 まず、 この宛先への配達日時を変更できるかどうか の判断を、 配達スケジュール D Bの内容 (他の配達スケジュール) を参照するこ と よって行う (ステップ 6 1 0 ) 。 変更できる場合は、 変更後の新しい配達曰 時を、 配達スケジュールに新たに書き込む (ステップ 6 1 1 ) 。 そして、 スケジ ユール管理システム 1 0 0へ、 配達番号、 宅配便の宛先名、 配達日時変更 O Kフ ラグ等の配達日時の変更を承認する旨を送信する (ステップ 6 1 2 ) 。 スケジュ ール管理システム 1 0 0は、 配達日時の変更承認を受信し (ステップ 6 1 3 ) 、 宅配便の宛先に該当する利用者のスケジュールに、 確定した配達日時を入力する (ステップ 6 1 4 ) 。
スケジュール管理システム 1 0 0は、 同時に、 利用者に対して、 電子メール等 を利用して、配達日時が希望どおり変更されたことを報告し (ステップ 6 1 5 ) 、 利用者は、 利用者端末 1 2 0で配達日時の希望どおりの変更を受信する (ステツ プ 6 1 6 ) 。 また利用者は、 利用者端末 1 2 0のスケジュール管理システムを起 動させることによつても、 確定した配達日時を知ることが出来る (ステップ 6 1 7 ) 。
ここでスケジュール管理システム 1 0 0と利用者との間で、 電子メール等を利 用して送受信されるデータは、 テキス トデータに限らず、 例えば、 音声データ、 画像データ、 あるいは所定の情報を含んだ識別子であってもよい。 要は、 スケジ ユール管理システム 1 0 0と利用者との間でやり取りする、 配達日時の希望どお りの変更等、所定の情報を含めることができるデータであれば、形式を問わない。 これは、 他の実施の形態でも同様である。
図 8を参照して、 ステップ 6 1 0において、 宅配便業者の業務スケジュール管 理システムが、 利用者の希望する日時へ配達日時を変更できないと判断した場合 の処理を説明する。 この場合は、 スケジュール管理システム 1 0 0 へ、配達番号、 宅配便の宛先名、 配達日時変更 N Gのフラグ等の配達日時変更不可の旨を送信す る (ステップ 6 1 8 ) 。
スケジュール管理システム 1 0 0は、 配達日時変更不可を受信し (ステップ 6 1 9 ) 、 宅配便の宛先名に該当する利用者に対して、 電子メール等を利用して、 配達日時変更不可の告知、 および新たな希望日時を指定するように指示する (ス テツプ 6 2 0 ) 。 利用者は配達日時変更不可を受信し (ステップ 6 2 1 ) 、 新た な配達希望日時を入力するために、 ステップ 6 0 5へ戻る。
図 9は配送日ゃサービス訪問日等の最適業務執行日時に対して、 利用者が変更 や承認を行う際の処理の第 2の実施の形態を示す要部フローチャートである。 第 2の実施の形態では、 図 7におけるステップ 6 0 9で、 宅配便業者等の契約業者 の業務スケジュール管理システムが、 配達日時の変更希望を受信してから以降の 処理で、 配達日を希望通りに変更できるかどうかを判断する際、 配達スケジユー ルデータに加えて、 担当配送車の現在位置や、 配車スケジュールデータも加味す る場合を示している。 図 9のステップ 7 0 0からステップ 7 0 6の処理は、 図 7 におけるステップ 6 0 9からステップ 6 1 2の処理を代替するものである。
まず、 配達番号、'宅配便の宛先 (利用者名) 、 変更希望配達日時を含む配達日 時の変更希望データを、宅配業者の業務スケジュール管理システムが受信する(ス テツプ 7 0 0 ) 。 業務スケジュール管理システムは該当配達を担当している配送 車を割り出し、 G P S (衛星測位システム) 等の装置を利用して、 その現在位置 を把握する (ステップ 7 0 1 ) 。
次に、 業務スケジュール管理システムは配達スケジュール D Bにある配達のス ケジュール、 配車 D Bにある担当配送車の配車スケジュール、 および担当配送車 の現在位置を参照しながら、 該当配達番号の配達日時が変更できるかどうかを判 断する (ステップ 7 0 2 ) 。 変更できる場合は、 業務スケジュール管理システム は変更後の配達日時を、 配達スケジュールへ書き込み (ステップ 7 0. 3 ) 、 新た な配車スケジュールを作成する (ステップ 7 0 4 ) 。 そして、 担当配送車の配達 要員へ、 新たな配車スケジュールを連絡する (ステップ 7 0 5 ) 。 また、 スケジ ユール管理システム 1 0 0へ、 配達番号、 宅配便の宛先名、 配達日時変更 O Kフ ラグを含む配達日時の変更を承認する旨を送信する (ステップ 7 0 6 ) 。
図 1 0は配送日やサービス訪問日等の最適業務執行日時に対して、 利用者が変 更ゃ承認を行う際の処理の第 3の実施の形態を示す要部フローチャートで、 (A) は図 6における置換え対象ステップ、 (B ) は第 3の実施の形態により置き換え るステップである。 分かり易いように、 対照して示すものである。 (B ) の第 3 の実施の形態では、 スケジュール管理システム 1 0 0によって算定された、 配送 日ゃサービス訪問日等の最適業務執行日時に対して、 利用者が変更を行う処理に 'おいて、 (A) の第 1の実施の形態では希望する日時を一個指定する場合を示す のに換えて、 利用者に、 別途希望する日時を、 一つではなく複数、 優先順位を付 けて提示させている。 最適業務執行日時の変更の場合、 利用者は図 7におけるス テツプ 6 0 5の処理において、 希望する変更内容を利用者端末 1 2 0のスケジュ —ル管理システムに複数個、 入力する。 入力される変更内容は、 変更希望の優先 順位 (第一希望、 第二希望、 第三希望等) 、 変更後の配送日、 変更後の時間帯等 である。また、宅配便業者のような契約業者の業務スケジュール管理システムが、 変更希望を受信して (図 7のステップ 6 0 9 ) 、 その希望日時に配達日を変更で きるか判断する (図 7のステップ 6 1 0 ) 処理は、 図 1 0 ( B ) で示すように変 更される。
図 1 0 ( B ) において、 契約業者の業務スケジュール管理システムが受信する 変更希望の内容は、 配達番号、 宛先、 および第一希望から第 N希望までの希望配 達日時 N個である (ステップ 8 0 0 ) 。 以下の処理は、 第一希望から第 N希望ま で順次行われる (ステップ 8 0 1 ) 。 配達日時をこの希望日時に変更できるかど うかを、配達スケジュール D Bの内容を参照しながら判断する(ステップ 8 0 2 )。 変更できない場合は、 次の順位の希望日時について同様の判断を行うが、 変更で きた時点で、 新しい配達日時を、 配達スケジュールに書き込む処理へと進む (図 7のステップ 6 1 1 ) 。 第 N希望まで、 すべて変更不可と判断された場合には、 スケジュール管理システム 1 0 0へ、 配達番号、 宅配便の宛先名、 配達日時変更 N Gのフラグを含む配達日時変更不可の旨を送信する (図 8のステップ 6 1 8 )。 そして、 以後図 8で示すステップと同様の処理を行う。
図 1 1は、 図 1のシステムに便益算出手段を付加したシステムの構成プロック 図である。 スケジュール管理システム 1 0 0によって業者や利用者が得た便益を スケジュール管理システム管理者が算出することで、 業者や利用者に対する料金 の設定や加入促進に用いる基礎データとする。 図において、 便益算出手段 1 4 0 は、 業者が利用者を対象として商品またはサービスを提供するのに実際に要した 労力を算定する実際労力算定手段 1 4 2と、 算定された労力と標準労力との差を 算出する差労力算出手段 1 4 4と、 算出された労力差に基づいて手数料を定める 手数料算出手段 1 4 6を有している。 実際労力算定手段 1 4 2における実際労力は、 例えばスケジュール管理に基づ いて業者が利用者を訪問した回数で算定する。 差労力算出手段 1 4 4で用いる標 準労力は、 例えば宅配業者が本発明の管理システムを用いないときに、 届け先を 訪問していた回数の平均値で定められる。 手数料算出手段 1 4 6は、 例えば業者 がスケジュール管理システム 1 0 0の利用によって得た便益の一定割合に定めた 比例式でもよく、 或いは便益に応じた段階的料金であってもよい。
図 1 2は利用者間でのスケジュール管理を行うシステムの構成ブロック図であ る。 スケジュール管理システム 1 0 0は、 スケジュール管理を利用する第 1及ぴ 第 2の利用者の利用者スケジュールを記憶する第 1及び第 2の利用者スケジユー ルデータ'ベース 1 0 2、 1 0 3と、 第 1の利用者スケジュールとマッチングすぺ き第 2の利用者スケジュールとを照合する照合手段 1 0 7と利用者端末アクセス 手段 1 0 8を備えている。
このように構成された装置においては、 第 1の利用者は自己の利用者端末 1 2 1を用いてスケジュール管理システム 1 0 0の利用者スケジュールに自己のスケ ジュールを登録する。 第 2の利用者は自己の利用者端末 1 2 2を用いてスケジュ ール管理システム 1 0 0の利用者スケジュールに自己のスケジュールを登録する。 そして、 第 1の利用者と第 2の利用者が会食をする場合のように両者の日程調整 が必要な場合には、 照合手段 1 0 7に調整を依頼する。 すると、 照合手段 1 0 7 は第 1及ぴ第 2の利用者の利用者スケジュールを調整して、 両者の会食が行える ように日程調整を行う。 第 1及び第 2の利用者は第 1及び第 2の利用者端末 1 2 1 、 1 2 2から調整された利用者スケジュールにアクセスして、 自分の行動予定 を知る事ができる。日程調整が複雑になる多人数のスケジュール管理システムや、 演算処理能力がパソコンに比較して小さい携帯電話機やページャ一に用いて好適 である。
図 1 3は利用者間でのスケジュール管理を行うシステムの構成ブロック図であ る。 図 1 3のシステムは、 図 1 2のシステムと比較すると、 スケジュール管理シ ステム 1 0 0用のサーバーを用いることなく利用者端末間 1 2 3、 1 2 4でネッ トワークを介してスケジュール管理を行うもので、 小規模の利用者間でパソコン 端末のように比較的処理能力の大きな利用者端末を用いる場合に適している。 図 において、 第 1の利用者端末 123は、 スケジュール管理を利用する第 1の利用 者の利用者スケジュールを記憶する第 1の利用者スケジュールデータベース 12 5を有する。 第 2の利用者端末 124は、 スケジュール管理を利用する第 2の利 用者の利用者スケジュールを記憶する第 2の利用者スケジュールデータベース 1 26を有する。照合手段 127は、第 1の利用者端末 123に設けられたもので、 第 1の利用者スケジュールとマツチングすべき第 2の利用者スケジュールを照合 する。 照合手段 1 28は、 第 2の利用者端末 124に設けられたもので、 第 2の 利用者スケジュールとマツチングすぺき第 1の利用者スケジュールを照合する。 照合手段 127、 128の照合結果は同一である必要があるから、 ネットワーク 1 10を用いて照合結果の同値化処理をする。 第 1及ぴ第 2の利用者は照合結果 に自己の利用者端末 1 23、 124を用いて閲覧できるように構成されている。 このようなシステム構成によっても、 図 1 2のシステムとほぼ同一の機能 発揮 できる。
また例えば汎用のパソコンをこのような利用者端末 123又は 124として構 成するには、 以上説明したような処理プログラムを格納した記録媒体、 例えば F D 123 a、 124 aを、 利用者端末に読み込ませて、 プログラムをインストー ルすればよい。 記録媒体 123 aは、 FDに限らず、 CD— ROM、 磁気ディス ク、 磁気テープ等、 一般的にパソコン等のコンピュータが読み取り可能なもので あればよい。 これは、 図 1、 図 12のシステムにおいても同様であり、 利用者端 末 120、 121、 122用として、 それぞれ記録媒体 1 20 a、 121 a、 1 22 aを利用することができる。
なお、 図 1の実施の形態においては各業者の業務端末と利用者端末をネットヮ ークを介してスケジュール管理システムと接続して、 業者の提供する商品ゃサー ビスの日時を調整して、 業者と利用者にとって最適な日時に商品やサービスを授 受できる場合を示したが、 本発明はこれに限定されるものではなく、 例えば個人 の私的な日程調整や非営利団体と会員との日程調整など各種のものにも適用でき る。 また、 図 1の実施の形態においては利用者スケジュールデータベースをスケ ジュール管理システムに設け、利用者端末から随時アクセスする構成を示した力 本発明はこれに限定されるものではなく、 例えば利用者端末にも利用者スケジュ ールデータベースを設け、 利用者端末とスケジュール管理システムとの交信によ り最新の利用者スケジュールとなるように情報の更新をする構成としてもよい。 これによれば、 利用者端末とスケジュール管理システムにおける利用者スケジュ ールデータベースの差異情報のみが一回の交信で同一化されるので、 通信負荷が 少なくてすむ。
産業上の利用可能性
以上のように本発明によれば、 ネットワーク上で利用者のスケジュール管理を 行うスケジュール管理システムであって;前記スケジュール管理を利用する利用 者の利用者スケジュールを記憶する利用者スケジュールデータベースと ;前記利 用者を対象として商品またはサービスを提供する業者のスケジュールであって前 記利用者スケジュールとマッチングすべき業者スケジュールを含む、 業者スケジ ユールデータを、 業者端末から受信する手段と ;前記利用者スケジュールと前記 業者スケジュールデータとを照合する照合手段とを備え;前記照合結果に、 前記 ネットワークを介して前記利用者が利用者端末からアクセスできるように構成さ れたので、 例えば商品やサービスを提供する業者と利用者とのスケジュールを調 整して、 業者と利用者との接触が確実に行われるようにすることが可能となる。

Claims

請 求 の 範 囲
1 . ネットワーク上で利用者のスケジュール管理を行うスケジュール管理シス テムであって ;
前記スケジュール管理を利用する利用者の利用者スケジュールを記憶する利用 者スケジュールデータベースと ;
前記利用者を対象として商品またはサービスを提供する業者のスケジュールで あって前記利用者スケジュールとマッチングすべき業者スケジュールを含む、 業 者スケジュールデータを、 業者端末から受信する手段と ;
前記利用者スケジュールと前記業者スケジュールデータとを照合する照合手段 とを備え;
前記照合結果に、 前記ネットワークを介して前記利用者が利用者端末からァク セスできるように構成された;
スケジュール管理システム。
2 . 前記照合手段は、 前記業者スケジュールデータ中の業務執行予定と前記利 用者スケジュールとを照合して、最適な業務執行日を算定するように構成された、 請求項 1に記載のスケジュール管理システム。
3 . 前記算定された業務執行日に対して、 前記利用者に調整を行わせ、 前記業 者端末に調整結果を送信するように構成された、 請求項 2に記載のスケジュール 管理システム。
4 . 前記調整が、 業務執行日に対する利用者からの変更要求であり、 該変更要 求と、 業者の配送スケジュールデータまたは業者の現在情報とを連動して新たな 執行日を確定するように構成された、 請求項 3に記載のスケジュール管理システ ム。
5 . 前記変更要求が、 前記利用者の優先順位のついた複数の希望する日時を含 み、 前記優先順位に従って前記新たな執行日を確定するように構成された、 請求 項 4に記載のスケジュール管理システム。
6 . 前記利用者スケジュールは、利用者の希犟する時間帯に関する情報を含む、 請求項 1または 2に記載のスケジユ^ "ル管理システム。
7 . ネットワーク上で利用者のスケジュール誉理を行うスケジュール管理方法 であって;
前記スケジュール管理を利用する利用者の利用者スケジュールを利用者スケジ ユールデータベースに記憶する記憶工程と ;
前記利用者スケジュールとマツチングすべき、 業者スケジュールを含む業者ス ケジュールデータを業者端末から受信する受信工程と ;
前記利用者スケジュールと前記業者スケジュ一ルデータとを照合する照合工程 と ;
前記照合工程で得られた照合結果を、 前記ネットワークを介して前記利用者が 利用者端末からアクセスできるように照合結果ファイルに保存する工程とを備え た;
スケジュール管理方法。
8 . 前記業者が前記利用者を対象として商品またはサービスを提供するのに実 際に要した労力を算定する実際労力算定手段と ;
前記算定された労力と標準労力との差を算出する差労力算出手段と ; 前記算出された労力差に基づいて手数料を定めるように構成された; 請求項 1乃至請求項 6のいずれかに記載のスケジュール管理システム。
9 . ネットワーク上で利用者間のスケジュール管理を行うスケジュール管理シ ステムであって;
前記スケジュール管理を利用する第 1及び第 2の利用者の利用者スケジュール を記憶する第 1及び第 2の利用者スケジュールデータベースと ;
前記第 1の利用者スケジュールとマッチングすべき第 2の利用者スケジュール を照合する照合手段とを備え;
前記照合結果に、 前記ネットワークを介して前記第 1又は第 2の利用者が第 1 又は第 2の利用者端末からアクセスできるように構成された;
スケジュール管理システム。
1 0 . ネットワーク上で利用者間のスケジュール管理を行うスケ ュール管理 システムであって; 前記スケジュール管理を利用する第 1の利用者の利用者スケジュールを記憶す る第 1の利用者スケジュールデータベースを有する第 1の利用者端末と ; 前記スケジュール管理を利用する第 2の利用者の利用者スケジュールを記憶す る第 2の利用者スケジュールデータベースを有する第 2の利用者端末と ; 前記第 1の利用者スケジュールとマツチングすべき第 2の利用者スケジュール とを照合する照合手段を備え;
前記第 1又は第 2の利用者は前記照合結果に第 1又は第 2の利用者端末を用い て閲覧できるように構成された;
スケジュール管理システム。
1 1 . ネットワーク上で第 1の利用者と第 2の利用者との間のスケジュール管 理を行うスケジュール管理システムを制御するプログラムであって;
前記スケジュール管理を利用する第 1の利用者の利用者端末内の利用者スケジ ュ一ルデータベースに前記第 1の利用者の利用者スケジュールを記憶する記憶処 理と ;
前記スケジュール管理を利用する第 2の利用者の利用者スケジュールを記憶し た第 2の利用者スケジュールデータベースを有する第 2の利用者端末から、 前記 第 1の利用者スケジュールとマッチングすべき第 2の利用者スケジュールを前記 ネットワークを介して、 前記第 1の利用者の端末が受信する受信処理と ; 前記第 1の利用者スケジュールとマツチングすべき前記第 2の利用者スケジュ 一ルとを照合する照合処理と ;
前記第 1又は第 2の利用者が前記照合結果を閲覧するようにする処理とを行う ように;
前記第 1の利用者の端末を制御するためのプログラムを格納した利用者端末読 み取り可能な記録媒体。
PCT/JP2001/003799 2000-05-18 2001-05-02 Systeme et procede de gestion de planning, et support enregistre WO2001088786A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2001255065A AU2001255065A1 (en) 2000-05-18 2001-05-02 Schedule managing system, schedule managing method, and recorded medium

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2000-145907 2000-05-18
JP2000145907A JP4486218B2 (ja) 2000-05-18 2000-05-18 スケジュール管理システム、スケジュール管理方法及び記録媒体

Publications (1)

Publication Number Publication Date
WO2001088786A1 true WO2001088786A1 (fr) 2001-11-22

Family

ID=18652344

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2001/003799 WO2001088786A1 (fr) 2000-05-18 2001-05-02 Systeme et procede de gestion de planning, et support enregistre

Country Status (3)

Country Link
JP (1) JP4486218B2 (ja)
AU (1) AU2001255065A1 (ja)
WO (1) WO2001088786A1 (ja)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005284837A (ja) * 2004-03-30 2005-10-13 Arcadia Consulting Inc スケジューリング装置
KR101101194B1 (ko) * 2009-10-27 2012-01-03 동국대학교 산학협력단 미팅 스케줄 결정 시스템
CN107844908B (zh) * 2011-12-27 2021-12-07 尼兹特马奇株式会社 匹配支持装置
JP6254652B1 (ja) * 2016-08-26 2017-12-27 ヤフー株式会社 決定装置、決定方法、及び決定プログラム
JP7192632B2 (ja) * 2019-04-11 2022-12-20 トヨタ自動車株式会社 管理装置、管理方法および管理プログラム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0438558A (ja) * 1990-06-04 1992-02-07 Hitachi Ltd 配送スケジユール問合せ処理システム
JPH05330607A (ja) * 1992-06-01 1993-12-14 J I S I:Kk 配送ネットワークシステム及び配送情報確認端末機
JPH10162065A (ja) * 1996-11-28 1998-06-19 Hitachi Ltd 配送管理システム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0438558A (ja) * 1990-06-04 1992-02-07 Hitachi Ltd 配送スケジユール問合せ処理システム
JPH05330607A (ja) * 1992-06-01 1993-12-14 J I S I:Kk 配送ネットワークシステム及び配送情報確認端末機
JPH10162065A (ja) * 1996-11-28 1998-06-19 Hitachi Ltd 配送管理システム

Also Published As

Publication number Publication date
JP4486218B2 (ja) 2010-06-23
AU2001255065A1 (en) 2001-11-26
JP2001325409A (ja) 2001-11-22

Similar Documents

Publication Publication Date Title
US7139726B2 (en) Method and system for supplying automatic status updates using electronic mail
US20180075411A1 (en) Apparatus and method for providing building management information
US5875302A (en) Communication management system having communication thread structure including a plurality of interconnected threads
US7356481B2 (en) Delivery management method and device, and delivery information service method
US20050102152A1 (en) Commercial real estate property management system
US20020103687A1 (en) System and method for ordering contract workers
US20060047571A1 (en) System and method for selecting targets for sales and marketing campaigns
JP2009219124A (ja) 移動コンピューティングおよび通信
US7979510B2 (en) Method, system, and storage medium for providing automated execution of pre-defined events
US20090113428A1 (en) Method and apparatus for facilitating a location-based, distributed to-do list
US20060053047A1 (en) System and method for selecting targets for sales and marketing campaigns
JP5128258B2 (ja) 到来及び発送する出荷情報を提供する方法及びシステム
JP4486218B2 (ja) スケジュール管理システム、スケジュール管理方法及び記録媒体
US20020093673A1 (en) System and method for fulfilling information requests
WO2001016817A1 (fr) Systeme d'orientation et d'information domestique
US7991886B1 (en) Method and apparatus for individual-centric use of the internet
TW472476B (en) Method for creating a location independent (non-embedded) data control and communications office system for event driven businesses
JP2004213375A (ja) 業務管理サーバ、業務管理システム及び業務管理方法
KR101049685B1 (ko) 광고 메일을 이용한 개인 일정 관리 서비스 제공 방법
JP2005258865A (ja) 広告仲介システム及びメール配信サーバ並びにプログラム
US20200111058A1 (en) System and methods for a geographically based scheduling system
US20180293560A1 (en) Systems and methods for a centralized payment management system
JP2002215863A (ja) プロジェクト管理システム、プロジェクト管理プログラム及びプロジェクト管理プログラムを記録した記録媒体
JPH11191121A (ja) 企業間取引における案件投入状況の管理方法及びシステム
JP2002015102A (ja) 業務管理システム

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
122 Ep: pct application non-entry in european phase