WO1998048331A1 - Device and method for calculating required quantity of material - Google Patents
Device and method for calculating required quantity of material Download PDFInfo
- Publication number
- WO1998048331A1 WO1998048331A1 PCT/JP1998/001774 JP9801774W WO9848331A1 WO 1998048331 A1 WO1998048331 A1 WO 1998048331A1 JP 9801774 W JP9801774 W JP 9801774W WO 9848331 A1 WO9848331 A1 WO 9848331A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- item
- calculation
- mrp
- requirement
- child
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Program-control systems
- G05B19/02—Program-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32082—Planing, material requiring planning MRP, request
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/33—Director till display
- G05B2219/33081—Parallel computing, pipeline
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/40—Minimising material used in manufacturing processes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Definitions
- the present invention relates to a material requirement calculator for calculating a material requirement plan for obtaining various parts and raw materials required for producing a product according to a given production plan.
- the MRP and the conventional MRP calculation method are disclosed in, for example, “Illustrated MRP Term Selection 500” (Nikkan Kogyo Shimbun, published in 1983). The following briefly describes the conventional MRP calculation method.
- MRP Master Production Schedule
- the items such as parts and raw materials are “necessary (items), When needed (delivery time), as much as needed (required quantity) "Get an arrangement plan for purchasing or manufacturing. This calculation requires the following three pieces of information.
- MPS is generally used for items (manufacturers) at the top level Product) or the standard production plan.
- the bill of material shows the data specific to the item, called the “item list”, and the relationship between the item and the item, called the “parts list”, such as products and parts, parts and parts, and parts and raw materials.
- Two Masters of Data-Meaning a list based on data.
- Inventory and backlog mean the current inventory and work-in-progress for each item, or the expected delivery date and number of items that have already been ordered and will be delivered in the future (backlog information).
- the required data for the item is read, and the required amount is collected for each period to calculate the total requirement for each period.
- the period will be one day and daily planning will be explained.
- the quantity is set to the most suitable for the order, using the mouth size set for the item.
- the order is created by subtracting the lead time from the delivery date of the quantity obtained by lot aggregation and calculating the order date or start date. (5) Child item development
- the created order is expanded to lower-level items using the BOM. More specifically, using the day before the start date of the order as the request date, the required amount of each child item is calculated based on the child items and the number of members in the product composition data, and written to the required amount data for each item.
- the MRP calculation for all the products set in the MPS, the parts development calculation of all the items required when manufacturing the product is executed. However, the calculation of each item cannot be performed until all of the parent product expansion calculations have been completed in order to determine the total required amount. In order to control such a calculation order, the conventional MRP calculation introduces a low-level code.
- a level code can be assigned to each part depending on which layer in the parts configuration each item belongs to. Since some items can have multiple level codes, the lowest level code is the low level code. Here, “lower” refers to the direction of progressing to a more basic item level on the parts exploded view.
- the oral level code for each item is set by searching for all items in the bill of material before the MRP calculation begins, and is included in the item data as item-specific information.
- the order of the component development calculation of each item is determined on a level-by-level basis using the one-level code. More specifically, the process proceeds according to the following procedure.
- the product level items in the MPS are given the requested quantity read from the MPS. At this time, give the item name to the level 0 queue.
- the present applicant has been conducting research to speed up processing by executing conventional MRP calculations in parallel.
- This achievement is: For example, it is disclosed in International Publication No. 9629666 (“Parallel processing method and apparatus for calculating material requirement using low-level code”).
- the MRP calculation is realized by one control unit and a plurality of data processing units. Each data processing unit executes a component development calculation of each assigned item. At this time, if the parts development calculation for a certain item is completed and the required amount of the child item is calculated, if the child item is assigned to a data processing unit different from the parent item, the data processing unit The requirements for the child material are transferred.
- the speed of the MRP calculation can be increased by performing the parts development calculation of each item in parallel while performing such data transfer.
- FIG. 18 is a block diagram showing an outline of the apparatus disclosed in the above publication
- the child items of item A are items BG
- items A, B and C are stored in the MRP calculation unit 1.
- the items D and E are assigned to the MRP calculator 2 and the items F and G are assigned to the MRP calculator 3, the following problems occur in the conventional parallel processing method of the MRP calculation.
- An object of the present invention is to provide a device for calculating a required material amount in which a processing speed is improved by equalizing a load generated at the time of calculation and minimizing an overhead.
- An object of the present invention is to calculate a type, a quantity, and a delivery date of an item necessary for producing a product based on a production plan of a predetermined product, and a plurality of material requirement plans arranged in parallel ( MRP)
- a material requirement calculation system with calculation means
- the first MRP calculating means of the plurality of MRP calculating means calculates a net requirement of a certain item and supplies the calculated net requirement to another MRP calculating means, and the first MRP calculating means and the other MRP calculating means.
- Calculating means for executing, in parallel, based on the net required amount of the item, a component development calculation of an assigned child item among a plurality of items constituting the item. This is achieved by the characteristic material requirement calculation system.
- a material requirement calculation system including a plurality of MRP calculation means for calculating at least an item constituting the product and its required amount based on a production plan of the product, wherein the plurality of MRP calculation means include the product in the plurality of MRP calculation means. This is achieved by allocating the calculation of the composing items and performing the part development calculation of the allocated items by each of the plurality of MRP calculation means.
- the part development calculation includes gross requirement calculation, net requirement calculation, lot summarization, lead time calculation, and child item development
- the MRP calculation means calculates the calculated net requirement. It is preferable to send to other MRP calculation means.
- each MRP calculation means the component expansion calculation of the assigned item is performed in parallel, so that the load between the MRP calculation means can be equalized. Also, the first MRP calculation means only needs to transfer the net requirement of the item to the other MRP calculation means, so that the time required for the transfer can be reduced.
- the first MRP calculation means includes work instruction means for giving necessary work instructions to itself and other MRP calculation means, and the first MRP calculation means and The other MRP calculation means were allocated based on the given net requirements, and the data storage means for storing the data related to the item, the calculateable item extraction means for extracting the child items capable of MRP calculation, respectively.
- Child item development means for calculating the required quantity of child items, and computable item management means for managing data on the extracted child items and providing data on child items for which MRP can be calculated to the part development calculation means
- the part expansion calculation means for executing the part expansion calculation of the child item by accepting the data on the child item, and transmitting the net required amount of the obtained item to the MRP calculation means other than its own.
- each of the MRP calculation means includes a mouth-to-mouth level code, which is the lowest level code among the level codes indicating the hierarchy to which the items constituting the product belong, mutually. It is configured to perform MRP calculations on equal items in parallel.
- an object of the present invention is to provide a plurality of material requirement planning (MRP) calculators arranged in parallel, and to determine the type and quantity of items required to produce a product based on a predetermined product production plan. And a material requirement calculation method for calculating a delivery date thereof, wherein a first MRP calculation device of the plurality of MRP calculation devices calculates a net requirement of a certain item, And wherein the first MRP calculator and the other MRP calculator are each assigned a child among a plurality of child items constituting the item based on a net requirement of the item.
- MRP material requirement planning
- FIG. 1 is a block diagram showing a configuration of an MRP calculation system according to an embodiment of the present invention.
- FIG. 2 is a diagram for explaining the outline of the present invention.
- FIG. 3 is a diagram showing a configuration of a distributed memory type parallel computer to which the present invention is applied.
- Figure 4 is a block diagram showing the configuration of an MRP calculation system realized by a distributed memory parallel computer.
- FIG. 5 illustrates the item list used in the present embodiment.
- FIG. FIG. 6 is a flowchart showing processing of the control process according to the present embodiment.
- FIG. 7 is a flowchart illustrating the processing of the MRP calculation process according to the present embodiment.
- FIG. 8 is a diagram for explaining the structure of the item cell according to the present embodiment.
- FIG. 1 is a block diagram showing a configuration of an MRP calculation system according to an embodiment of the present invention.
- FIG. 2 is a diagram for explaining the outline of the present invention.
- FIG. 3 is a diagram showing a configuration of
- FIG. 9 is a diagram showing the relationship between the parts configuration table and the item cells.
- FIG. 10 is a flowchart showing the MRP calculation processing according to the present embodiment.
- FIG. 11 is a diagram illustrating a data structure of a job counter and a job queue according to the present embodiment.
- FIG. 12 is a flowchart illustrating a component development calculation process according to the present embodiment.
- FIG. 13 is a flowchart showing child item development processing according to the present embodiment.
- FIG. 14 is a flowchart illustrating the taste required amount carrier writing process according to the present embodiment.
- FIG. 15 is a diagram showing a data structure of a net required carrier according to the present embodiment.
- FIG. 16 is a flowchart showing the Carry_MSG corresponding process according to the present embodiment.
- FIG. 17 is a diagram for explaining the low-level code.
- FIG. 18 is a diagram schematically showing a conventional MRP calculation system. BEST MODE FOR CARRYING OUT THE INVENTION
- FIG. 1 is a block diagram showing a configuration of an MRP calculation system according to an embodiment of the present invention.
- this MRP calculation system manages the status of each MRP calculation unit, including a plurality of MRP calculation units 10-1, 1, 0-2,.
- a work instruction unit 12 for giving necessary work instructions.
- the plurality of MRP calculation units 10 _ 1, 10-2,... Are connected to the work instruction unit 12, respectively, and a message management unit 36 described later. Are connected to each other.
- the MRP calculation unit 10 includes a data holding unit 21 for inputting / outputting data relating to each item, a computable item extraction unit 22 for managing data transfer between parent and child items, and extracting a computable item. And a data management unit 20 with a child item development unit 23 that calculates the required amount of the child item based on the net requirement of the parent item, and an initial processing unit 3 that executes the initial processing for MRP calculation 1 and the items extracted by the calculation item extraction unit 2 2 are managed, and given items are sequentially put into the component development calculation unit 34 in consideration of the priority order.
- a parts expansion calculation unit 34 that executes the parts expansion calculation for each item, a net requirements transmission / reception unit 35 that performs the processing required for the transfer of the net requirements between the parent and child items, and a message that manages the message transmission and reception A management unit 36 is provided.
- a parts expansion calculation unit 34 that executes the parts expansion calculation for each item, a net requirements transmission / reception unit 35 that performs the processing required for the transfer of the net requirements between the parent and child items, and a message that manages the message transmission and reception A management unit 36 is provided.
- FIG. 1 only one component development calculator 34 is shown, but there may be more than one.
- the parts development calculation section 34 executes inventory allocation, lot consolidation, and lead time calculation in the MRP calculation, and the child item development section 23 of the data management section 20 executes the net requirement of the parent item. Based on the requirements, the required quantity of the child item is calculated.
- FIGS. 4 and 18 schematically showing the present invention.
- the processing of child item development for a certain item is performed by the calculation unit that executes inventory allocation and lot aggregation for the item (in FIG. 18, the MRP calculation unit 10
- the required amount of each child item obtained by executing the child item development process at 0-1) is calculated by another MRP calculation unit (MRP calculation unit 100-0-2 in Fig. 18). , 100-3) or used by itself.
- each MRP calculation section 10-1 to 10-3 executes the processing of the corresponding child item development. ing. For this reason, the MRP calculation unit 10-1 only needs to transfer the net required amount to another MRP calculation unit, and the time for data transfer can be reduced. In addition, it is possible to improve the calculation load of the MRP calculation units 10-1 to 10-3.
- the MRP calculation system configured in this way is actually realized by the distributed memory parallel computer shown in Fig. 3.
- This distributed memory parallel computer has multiple PEs (Processing Elements)
- Each cell has a CPU 211 and a memory 221 respectively.
- a hard disk device 231 is connected to each PE.
- the hard disk drive 231 connected to PE 0 (201) stores a program for controlling the MRP calculation according to the present embodiment, and stores PE 0 to PE n (201 to 20 (n + D) stores programs for actually executing the MRP calculation.These programs do not need to be stored in the hard disk drive.For example, these programs are stored on a floppy disk or CD-ROM.
- the program may be stored in a portable storage medium such as a ROM, and the necessary program may be read by a portable storage medium reading device connected to the PE.
- the MRP calculation process 60 and the control process 70 are executed by the CPU 221 of the PE 0 (201) of the distributed memory type parallel computer, but by executing the MRP calculation process 60, Data management unit 20 of MRP calculation unit 10 in Fig. 1
- the functions of the initial processing unit 31, the computable item management unit 33, the parts development calculation unit 34, the net requirement transmission / reception unit 25, and the message management unit 36 are realized, and by executing the control process 70, the work instruction unit 12 Function is realized.
- the MRP calculation process is executed by the CPU.
- the data management unit 20 By executing each MRP calculation process, the data management unit 20, the initial processing unit 31 of the other MRP calculation units, the computable item management unit 33, the parts development calculation unit 34, and the net requirement transmission / reception unit 25 The function of the message management unit 36 is realized.
- control process 70 of PE 0 manages the processing state of the MRP calculation process of PE 0 to P En and instructs the start and end of the MRP calculation by each MRP calculation process.
- the data manager of the MRP calculation process in each PE manages the input of data to the memory and the output of data from the memory.
- This memory corresponds to the data holding unit 21 in FIG.
- the memory stores an item cell 811 that includes parts list data, inventory, and backlog data for each item.
- the computable item management unit (see reference numeral 33 in FIG. 1) included in the MRP calculation process 60 includes a job queue 314 that stores the item cell head addresses of the computable items for each low level, A job counter 315 that indicates the number of jobs in the job queue. Further, the computable item management unit is provided with a level counter 316 that indicates a low level being calculated.
- the net requirement transmitter / receiver (see reference numeral 35 in Fig. 1) included in the MRP calculation process 60 includes the parent item in the MRP calculation process of other PEs.
- assign items to each PE There are various ways to assign items to each PE. For example, the simplest of these is to assign the BOM items to each PE in turn. Determine the PE to which the item is assigned, that is, the PE to which the item is assigned, by using an appropriate method, and create the item assignment table, and then create the MPS, parts bill and inventory For each of these data, a new table is created for each PE, transmitted to the corresponding PE, and stored in the PE's hard disk.
- the table for each PE is created by copying each record in the item table to the table for PE by referring to the assigned PE number of the item included in the record. For example, as shown in Figure 5, calculations for item numbers 1 and 3 in item table 500 should be performed at PE 0, and calculations for item numbers 2 and 4 should be performed at PE 1. In some cases, by referring to the item allocation table 5 10, information about item numbers 1 and 3 is written into the item list 520 for PE 0, and information about item numbers 2 and 4 is Written in item list 530 for It is.
- a BOM for PE 1 is created to include not only the record indicating the item A but also the record indicating the parent-child relationship between item A and its parent item.
- an item assignment table for each PE for example, if an item A is assigned to PE 1, not only records for item A but also child items and parent items of item A Records should also be included in the PE1 item allocation table. This is because these pieces of information are needed in the component development calculation for item A.
- the original table that is, the item list itself, may be distributed and allocated to each PE as it is.
- FIG. 6 is a flowchart showing the processing of the control process.
- the control process 70 generates an MRP calculation process in each PE (Step 601), and receives the PE number and the process number of the MRP calculation process transmitted from the generated MRP calculation process. (Step 602).
- Step 603 it is determined whether or not information from all the MRP calculation processes has been received (step 603). If any information has not been received, the process returns to step 602.
- control process 70 receives the PE number and process number from all the MRP calculation processes (Yes in step 602), based on the received information, the MRP calculation process exists. A list of PE names and MRP calculation process numbers is created and given to the MRP calculation processes of all PEs (step 604).
- the MRP calculation process for each PE creates a demand carrier and an item cell carrier based on the distributed list.
- the control process 70 instructs all of the MRP calculation processes to read in a batch of data such as a bill of materials necessary for MRP calculation (step 605), and collectively executes the MRP calculation process. It waits for an end report indicating the end of reading (step 606).
- control process 70 Upon receiving the batch read completion report from all MRP calculation processes (Yes in step 607), the control process 70 instructs all MRP calculation processes to perform MRP calculation (step 608), Wait for the end of level report from the MRP calculation process (Step 609) o
- step 609 If it is determined in step 609 that a level completion report has been received, and if it is determined in step 610 that all MRP calculation processes have received a level completion report for the calculated item at that level, then the level is incremented. And instruct all MRP calculation processes to perform the next level of MRP calculation. (Step 6 1 1). Steps 608 to 61 1 are repeated, and the MRP calculation for all levels is completed (step 6
- step 413 instructs batch writing such as the required data of each item as the MRP calculation result (step 413), and waits for the batch writing completion report from the MRP calculation process (step 414). ). If the batch write completion report is received from all the MRP calculation processes (Yes in step 61), the control process 70 instructs all the MRP calculation processes to finish the MRP calculation. (Stay Step 6 16) This terminates the processing by the control process 70.
- FIG. 7 is a flowchart showing the processing of the MRP calculation process.
- the MRP calculation process is generated by the control process (see step 601 in FIG. 6)
- the PE number of the PE where the MRP calculation process is located exists
- the process of the MRP calculation process The number is transmitted to the control process (step 701), and a list of MRP calculation process numbers is received from the control process (step 702).
- the MRP calculation process determines, from the received list, the required amount carrier for transmitting the required amount to the child items assigned to the other MRP calculation processes, and the item cell carrier for transferring the load. It is created for each of the other MRP calculation processes (Step 703). Then, the state becomes a state of waiting for a work instruction message from the control process.
- the work instruction message is received (step 704), the type of the received work instruction message is determined (step 705), and according to the message from the control process, Perform one of the following four processes.
- the batch reading process is executed in response to a batch reading instruction.
- data required for MRP calculation such as MPS and bill of materials for the assigned items is read from the hard disk connected to the PE, and these data are loaded all together in memory. You.
- an item cell is created for each assigned item, and data showing the BOM, inventory, backorder, etc., for that item. Evening is stored in the specified data area so that it is included in the item cell.
- FIG. 8 is a diagram for explaining the structure of an item cell. As shown in Figure 8, item cell 811 contains item number 830, parent item counter 831, low-level code 820, requirement data 832, item data
- Each item cell is obtained by using the item number of the item stored in the item cell as a key and converting the key into a key using a well-known Hash function.
- Hash tables are stored in the corresponding table from [0] to [n].
- the item data 8 21 includes parent item data 8 3 3 relating to the parent item of the item and child item data 8 3 4 relating to the child item of the item.
- the parent item data includes a data set consisting of the parent item number, the corresponding PE number, and the required number of members.
- the child item data includes the child item number, the corresponding PE number, and the required number of members. Data sets are included.
- the MRP calculation process refers to the component configuration table 91 stored on the hard disk connected to the PE, and identifies the item and its child items. Reads the record indicating the parent-child relationship of the child item, stores the data indicating the child item number and the number of members in the child item data column, and reads the record indicating the parent-child relationship between the item and its parent item. Data indicating the number and the number of members are stored in the parent item data column.
- the MRP calculation process uses the item allocation table stored on the hard disk connected to the PE. Referring to 902, the PE numbers assigned to each child item and parent item, that is, the assigned PE numbers are also stored in predetermined columns. However, the parent item's assigned PE number and the number of child items need not be stored in the corresponding columns of the item cell.
- the MRP calculation unit initializes the level counter and other various counters to zero. After that, the MPS data indicating the production plan at the product level is read, and the required numerical values are written in the required data column (reference numeral 832). At this time, for the item for which the required amount data has been written, the job queue of the mouth-level code of the Computable Item Management Department (see reference numerals 34 and 4 in FIG. 1) (see reference numeral 31 in FIG. 4) ), The item address is registered, and the job counter (see reference numeral 3 14 in FIG. 4) indicating the number of items registered in the queue with the low level is incremented.
- the MRP calculation process returns to step 704 after reporting the end of batch reading to the control process (step 707), and waits for reception of a work instruction message.
- FIG. 10 is a flowchart showing the MRP calculation process.
- this processing will be described with reference to FIG. 8, FIG. 10, and FIG. 11, which is a diagram showing the data structure of the job counter and the job queue.
- a job counter 314 is provided for each level, and stores the number of items that can be calculated at a certain level. For example, in Figure 11, the number of items that can be calculated at level 0 is “5 5”.
- the job queue 315 stores the address of the item cell in the data management unit (see reference numeral 20 in FIG. 1 and FIG. 4) of the item that can be calculated at the relevant level. More specifically, Jo The queue 3 15 has a list structure as shown in Fig. 11, and the first column of the job queue stores the head address of the job that can be calculated at that level and the address of the next column. The address in the next column stores the address of the item cell of the item that can be calculated next at that level and the address of the next column.
- each column the item cell address of the item that can be calculated at the corresponding level and the address of the next column are sequentially stored.
- each column is connected like a chain, and therefore, by entering these addresses, it is possible to sequentially access items that can be calculated at this level.
- a transmission message counter is initialized to 0 (zero) (step 1001).
- step 1002 After referring to the job counter of the level indicated by the level counter (step 1002), it is determined what kind of message has been received (step 1003). This message is provided by another MRP calculation process, as described below.
- step 1003 when the MRP calculation process receives Carry_MSG indicating the net required quantity carrier, it executes “Carry_MSG corresponding processing” in step 104. Alternatively, if Arrived_MSG indicating that the transmitted message has been successfully received is received, the transmission message counter is decremented (step 1105). After the processing of step 1004 and / or step 105 is performed and all processing is performed in response to the received message, the job counter of the level indicated by the level counter is referred to (step 1 0 6).
- the value of the job counter referred to in step 106 is It is determined whether it is 0 (zero) (step 1 0 7). If the value of the job counter is 0, that is, if it is determined to be Yes (Yes) in step 107, the destination MRP calculation process name is sent to all the requested carrier except for the empty requested carrier. A Carry—MSG is created with this and sent to another MRP calculation process, and the value of the transmission message counter is incremented by the number of transmitted carriers (step 1008). Next, the transmitted request amount carrier is initialized (step 109). If all the requested amount carriers are empty, no processing is performed in steps 1008 and 1109.
- step 11010 it is determined whether or not the value of the transmission message counter is 0 (step 11010). If the value of the transmission message counter is 0, that is, if the value of step 11010 is Yes, If judged, the end of the level is reported to the control process, the level counter is incremented (step 101), and the process is terminated. On the other hand, if it is determined that the answer is no (No) in step 100, the process returns to step 103.
- step 1007 If it is determined in step 1007 that the value of the job counter is not 0, that is, if it is determined to be No, the item cell address of the calculable item is extracted from the job queue (step Step 102), and then, a part development calculation process is executed (step 1013). Thereafter, the value of the job count is decremented (step 101), and the process returns to step 103.
- This part development calculation process executed in step 101 will be described with reference to FIG.
- This part development calculation process is the same as the conventional one, and it calculates the total requirement, the net requirement, the lot consolidation, the lead It is realized by sequentially executing time calculation (above, step 1 201) and development of required amount.
- This embodiment is different from the conventional component deployment process in that a plurality of PEs execute a process related to a child item assigned to the PE. More specifically, the following processing is executed by sequentially referring to the child item data 8334 in the eye cell (see FIG. 8) as shown in FIG.
- step 1204 execute child item development processing.
- the item number 830 ie, , Own item number
- child item number in child item data 834 ie, , Own item number
- net requirement data 835 execute child item development processing.
- the net required carrier writing processing is executed (step 1 205).
- step 124 or step 125 the pointer is advanced to the next child item, that is, the processing target is set to the next child item, and the process returns to step 122 . If such processing is repeated and the processing is completed for all the child items (Yes in step 122), the part development calculation processing ends.
- FIG. 13 is a flowchart showing child item development processing.
- the process proceeds with the parent item number, child item number, and net requirement data of the parent item as input data.
- This child item development process is executed in response to step 1204 in FIG. 12 and, as described later, when executed in the process shown in step 1603 in FIG. There is.
- the net requirement data contained in the item cell shown in Figure 8 is used, while in the latter process, the net requirement data contained in the net requirement carrier shown in Figure 15 is used. Required data is used.
- the MRP calculation process finds the item cell of the child item based on the input child item number (step 1301).
- the number of child items for the parent item in the parent item data of the found item cell is referred to (step 1302).
- the pointer is advanced to the first lot in the net requirement data (step 1333), and the delivery date and requirement of the child item are determined based on the net requirement data and the number of the lot.
- the obtained data is stored as required amount data of the item cell (step 135).
- the lot in the net requirement data means a data in which the start date and the net requirement are paired. Note that the delivery date and required amount can be calculated by a conventional method.
- the parent item in the item cell is calculated.
- Item counter reference number 8 3 in Figure 8
- step 1308 1) is incremented (step 1308).
- step 1309 the address of the item 100 cells is stored in the job queue of the level code of the item (3 in FIG. 4). 15 (refer to FIG. 11 and FIG. 11)) (step 1310), and register the job counter (3 in FIG. 4) of the level code.
- the process proceeds with the parent item number, child item number, assigned PE number of the child item, and the net requirement data of the parent item as input data. It is. In this process, only the required body data of the item cell shown in Fig. 8 is used.
- the net requirement transmission / reception unit of the MRP calculation process (reference numeral 60 in FIG. 4) has a net requirement that is a sending buffer for sending the net requirement of the parent item to the MRP calculation process of other PEs.
- the quantity carrier 3 17 is provided.
- Figure 15 is a diagram showing the data structure of this net required carrier.
- the net required carrier 3 17 has a destination PE number storage field 1540, a destination process number field 1541, and a parent item data column 1 containing the parent item number. 5 4 3, Child item data column 1 54 4 including child item number and 1 5 4 5 column for storing net requirement data.
- the data in the net requirement carrier configured as described above is written, or the net requirement carrier is sent to the MRP calculation process of another PE.
- the MRP calculation process involves the net requirement carrier with the same destination PE number as the entered child item's assigned PE number (see reference numeral 1504 in Figure 15).
- Select 3 17 (Step 14 01).
- the data area 1 5 4 2 refers to a block in a carrier that includes parent item data, child item data, and net requirement data.
- the net requirement carrier 3 17 has one or more data areas 1 5 4 2.
- only one parent item number is stored in the parent item data column 1543, but multiple child item numbers may be stored in the child item data column 1544. .
- Parent item same as parent item number entered If the data area 1 542 of the eye number exists (Yes in step 1402), the given child item number is added to the child item data field 154 4 of that data area. (Step 1403) The process ends.
- step 1402 if it is determined to be No (No) at step 1402, a new data area 1542 is secured and the parent item number, child item number, and net Write all the required data (step 1405). If the net requirement carrier 17 is overdue and the new parent's data area 1 542 cannot be obtained (No in step 144), the net requirement carrier 3 17 Is transmitted to the MRP calculation process of a predetermined PE via the message management unit 6, and the transmission message counter is incremented (step 1406). After the transmission of the net requirement carrier 3 17, it is initialized (step 140 7) to secure a new data area and enter
- FIG. 8 is a flowchart showing Carry-MSG processing.
- Arrived_MSG is transmitted to the MRP calculation process of the net requirement carrier sender (step Step 166), and terminates the processing.
- the required amount data of each item which is the output result of the MRP calculation in the memory, is written to the hard disk at a time (step 709).
- the MRP calculation process reports the end of batch writing to the control process (step 7110), and waits for a work instruction message.
- the end process of the MRP calculation process is executed.
- the child item development unit provided in each MRP calculation unit 10 determines the necessary child item based on the net requirement data and the like. Execute the deployment process. Therefore, it is possible to reduce the load on the MRP calculation section that executes the processing for the parent item, and The accompanying overhead can be reduced.
- the present invention is not limited to the above embodiments, and various modifications are possible within the scope of the invention described in the claims, and these are also included in the scope of the present invention. Needless to say, for example, in the above embodiment, the present invention is applied to a distributed memory type parallel computer. However, the present invention is not limited to this. The present invention is applicable to a single CPU computer and a shared memory type parallel computer. The invention can be applied.
- means does not necessarily mean physical means, but also includes a case where the function of each means is realized by software. Further, the function of one means or member may be realized by two or more physical means or members, or the function of two or more means or members may be realized by one means or member. . Industrial applicability
- a plurality of MRP calculation units can simultaneously perform a component development calculation of each item, thereby improving the load balance between the MRP calculation units, and transferring data between the MRP calculation units.
- the amount can be reduced. This makes it possible to obtain a calculation result equivalent to that of the conventional sequential algorithm in a shorter time.
- the processing load is reduced by equalizing the load generated during the calculation and minimizing the overhead. It is possible to provide a material requirement calculation system with improved speed.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
- Control By Computers (AREA)
- Multi-Process Working Machines And Systems (AREA)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP98914075A EP0992868B1 (en) | 1997-04-23 | 1998-04-17 | Device and method for calculating required quantity of material |
| US09/381,099 US6535773B1 (en) | 1997-04-23 | 1998-04-17 | Device and method for calculating required quantity of material |
| DE69826126T DE69826126T2 (de) | 1997-04-23 | 1998-04-17 | Verfahren und vorrichtung zur berechnung einer erforderlichen werkstoffmenge |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP10574397A JPH10301604A (ja) | 1997-04-23 | 1997-04-23 | 資材所要量計算装置および資材所要量計算方法 |
| JP9/105743 | 1997-04-23 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO1998048331A1 true WO1998048331A1 (en) | 1998-10-29 |
Family
ID=14415752
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP1998/001774 Ceased WO1998048331A1 (en) | 1997-04-23 | 1998-04-17 | Device and method for calculating required quantity of material |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US6535773B1 (enExample) |
| EP (1) | EP0992868B1 (enExample) |
| JP (1) | JPH10301604A (enExample) |
| DE (1) | DE69826126T2 (enExample) |
| WO (1) | WO1998048331A1 (enExample) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110458327A (zh) * | 2019-07-09 | 2019-11-15 | 浙江墨煌信息科技有限公司 | 应急物资调度方法及其系统 |
| CN111768048A (zh) * | 2020-07-04 | 2020-10-13 | 浙江锐制软件技术有限公司 | 预测物料数量的精准计算方法及其系统 |
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10105205A (ja) * | 1996-09-27 | 1998-04-24 | Hitachi Ltd | 資材所要量計算方法およびシステム |
| US6223094B1 (en) | 1998-08-21 | 2001-04-24 | Sap Aktiengesellschaft | Multi-tiered structure for storing and displaying product and process variants |
| JP3764139B2 (ja) * | 2000-09-12 | 2006-04-05 | 本田技研工業株式会社 | 積層リングの組立装置 |
| WO2002022305A1 (en) * | 2000-09-12 | 2002-03-21 | Honda Giken Kogyo Kabushiki Kaisha | Assembly device for stacked ring |
| US20020143669A1 (en) * | 2001-01-22 | 2002-10-03 | Scheer Robert H. | Method for managing inventory within an integrated supply chain |
| US7117164B2 (en) * | 2001-01-26 | 2006-10-03 | I2 Technologies Us, Inc. | System and method of demand planning for intermediate and by-products |
| US7036123B2 (en) * | 2001-04-25 | 2006-04-25 | Sun Microsystems, Inc. | System using fair-share scheduling technique to schedule processes within each processor set based on the number of shares assigned to each process group |
| US7640180B1 (en) * | 2002-03-19 | 2009-12-29 | I2 Technologies Us, Inc. | Demand planning using exchange balances |
| US7529686B2 (en) * | 2002-10-16 | 2009-05-05 | International Business Machines Corporation | Supply planning system and method utilizing constrained and unconstrained explosion and implosion of flagged demand statements |
| ATE317145T1 (de) * | 2003-09-09 | 2006-02-15 | Sap Ag | Verfahren und rechnersystem für die verminderung der ausführungszeit eines rechnerprogramms zur berechnung einer erforderlichen werkstoffmenge |
| JP2005135280A (ja) * | 2003-10-31 | 2005-05-26 | Fujitsu Ltd | 生産計画立案方法及び装置 |
| US20090307026A1 (en) * | 2008-06-10 | 2009-12-10 | International Business Machines Corporation | Priority-based system for netting available coverage |
| CN111080148A (zh) * | 2019-12-20 | 2020-04-28 | Oppo(重庆)智能科技有限公司 | Erp系统的净值计算方法、装置、电子设备以及存储介质 |
| JP7392070B1 (ja) * | 2022-09-26 | 2023-12-05 | 三菱電機Itソリューションズ株式会社 | 計画立案支援装置、計画立案支援方法、および計画立案支援プログラム |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0744505A (ja) * | 1993-08-03 | 1995-02-14 | Agency Of Ind Science & Technol | 並列計算機における負荷分散方法 |
| JPH08249377A (ja) * | 1995-03-08 | 1996-09-27 | Hitachi Ltd | 資材所要量計算方法および装置 |
| JPH08320850A (ja) * | 1995-05-26 | 1996-12-03 | Hitachi Ltd | 資材所要量計算の負荷分散方法及び装置 |
| JPH1015785A (ja) * | 1996-06-28 | 1998-01-20 | Hitachi Ltd | 生産計画方法及び生産計画システム |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4646238A (en) * | 1984-10-26 | 1987-02-24 | Analog Devices, Inc. | Material requirements planning system and procedures for use in process industries |
| AU4543993A (en) | 1992-07-01 | 1994-01-31 | Maspar Computer Corporation | Systems and methods for planning and simulation |
| JP3230628B2 (ja) * | 1993-08-06 | 2001-11-19 | トヨタ自動車株式会社 | 発注量算出方法とそのための装置 |
| US5630070A (en) * | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
| US5796614A (en) * | 1994-04-21 | 1998-08-18 | Nec Corporation | Level-by-level explosion method for material requirements planning |
| US5787000A (en) * | 1994-05-27 | 1998-07-28 | Lilly Software Associates, Inc. | Method and apparatus for scheduling work orders in a manufacturing process |
| US5764519A (en) * | 1995-03-08 | 1998-06-09 | Hitachi, Inc. | Method and device for computing material requirements |
| WO1996029666A1 (en) * | 1995-03-17 | 1996-09-26 | Hitachi, Ltd. | Method and apparatus for parallel processing a calculation of a required amount of material |
| US5943484A (en) * | 1997-09-26 | 1999-08-24 | International Business Machines Corporation | Advanced material requirements planning in microelectronics manufacturing |
-
1997
- 1997-04-23 JP JP10574397A patent/JPH10301604A/ja active Pending
-
1998
- 1998-04-17 DE DE69826126T patent/DE69826126T2/de not_active Expired - Fee Related
- 1998-04-17 EP EP98914075A patent/EP0992868B1/en not_active Expired - Lifetime
- 1998-04-17 WO PCT/JP1998/001774 patent/WO1998048331A1/ja not_active Ceased
- 1998-04-17 US US09/381,099 patent/US6535773B1/en not_active Expired - Fee Related
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0744505A (ja) * | 1993-08-03 | 1995-02-14 | Agency Of Ind Science & Technol | 並列計算機における負荷分散方法 |
| JPH08249377A (ja) * | 1995-03-08 | 1996-09-27 | Hitachi Ltd | 資材所要量計算方法および装置 |
| JPH08320850A (ja) * | 1995-05-26 | 1996-12-03 | Hitachi Ltd | 資材所要量計算の負荷分散方法及び装置 |
| JPH1015785A (ja) * | 1996-06-28 | 1998-01-20 | Hitachi Ltd | 生産計画方法及び生産計画システム |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110458327A (zh) * | 2019-07-09 | 2019-11-15 | 浙江墨煌信息科技有限公司 | 应急物资调度方法及其系统 |
| CN111768048A (zh) * | 2020-07-04 | 2020-10-13 | 浙江锐制软件技术有限公司 | 预测物料数量的精准计算方法及其系统 |
Also Published As
| Publication number | Publication date |
|---|---|
| EP0992868A4 (en) | 2001-11-14 |
| EP0992868B1 (en) | 2004-09-08 |
| US6535773B1 (en) | 2003-03-18 |
| EP0992868A2 (en) | 2000-04-12 |
| JPH10301604A (ja) | 1998-11-13 |
| DE69826126T2 (de) | 2005-01-20 |
| DE69826126D1 (de) | 2004-10-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101980169B (zh) | 信息处理装置及信息处理方法 | |
| JPH02297634A (ja) | 製造又は他のリソースを処理する装置及び方法 | |
| JPH10301604A (ja) | 資材所要量計算装置および資材所要量計算方法 | |
| WO2012026056A1 (ja) | 工程設計・生産計画装置 | |
| WO2020144879A1 (ja) | 入出庫管理装置、入出庫管理システム、入出庫管理方法およびプログラム | |
| CN100414530C (zh) | 处理多网络连接上的定序记录的设备和方法 | |
| JP7013535B1 (ja) | アイテムピッキング情報を提供する電子装置及びその方法 | |
| CN119513069A (zh) | 一种基于单元化架构数据迁移的数据验证方法及相关装置 | |
| CN112925640A (zh) | 一种集群训练节点分配方法、电子设备 | |
| CN113449943A (zh) | 订单下发处理方法、装置和系统 | |
| JPH10105205A (ja) | 資材所要量計算方法およびシステム | |
| CN101169742B (zh) | 用于大规模并行处理系统的资源保留 | |
| CN113407322B (zh) | 多终端的任务分配方法、装置、电子设备及可读存储介质 | |
| CN115630908A (zh) | 管理方法、系统及相关设备 | |
| JPH1015785A (ja) | 生産計画方法及び生産計画システム | |
| US20040122749A1 (en) | System and method for managing manufacturing orders | |
| JP3621467B2 (ja) | 資材所要量計算の負荷分散方法及び装置 | |
| JP2001100829A (ja) | 生産品納期回答処理方法及びその装置並びに情報記録媒体 | |
| JP3408012B2 (ja) | 資材所要量計算方法および装置 | |
| TWI851466B (zh) | 零件分配方法、裝置、設備及儲存媒體 | |
| JP4477649B2 (ja) | 資材所要量計算システム | |
| JP2002258930A (ja) | 予定組システム、プログラムおよび記録媒体 | |
| TWI853736B (zh) | 原料成套的生產管理方法、系統、設備及儲存媒體 | |
| JP3475794B2 (ja) | 部品発注システム | |
| JP3225762B2 (ja) | 複社納入指示管理方法及び複社納入指示管理システム |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AK | Designated states |
Kind code of ref document: A1 Designated state(s): CN KR US |
|
| AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE |
|
| DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
| WR | Later publication of a revised version of an international search report | ||
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
| WWE | Wipo information: entry into national phase |
Ref document number: 1998914075 Country of ref document: EP |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 09381099 Country of ref document: US |
|
| WWP | Wipo information: published in national office |
Ref document number: 1998914075 Country of ref document: EP |
|
| WWG | Wipo information: grant in national office |
Ref document number: 1998914075 Country of ref document: EP |