WO1994029532A1 - Method for building a structure in the ground - Google Patents

Method for building a structure in the ground Download PDF

Info

Publication number
WO1994029532A1
WO1994029532A1 PCT/NL1994/000138 NL9400138W WO9429532A1 WO 1994029532 A1 WO1994029532 A1 WO 1994029532A1 NL 9400138 W NL9400138 W NL 9400138W WO 9429532 A1 WO9429532 A1 WO 9429532A1
Authority
WO
WIPO (PCT)
Prior art keywords
construction
foil
ground
excavation
level
Prior art date
Application number
PCT/NL1994/000138
Other languages
English (en)
French (fr)
Inventor
Rudolf Hans Knulst
Original Assignee
Ballast Nedam Beton- En Waterbouw B.V.
Hollandse Beton- En Waterbouw B.V.
Van Hattum En Blankevoort B.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ballast Nedam Beton- En Waterbouw B.V., Hollandse Beton- En Waterbouw B.V., Van Hattum En Blankevoort B.V. filed Critical Ballast Nedam Beton- En Waterbouw B.V.
Priority to EP94917834A priority Critical patent/EP0655099B1/en
Priority to AU69383/94A priority patent/AU6938394A/en
Priority to DK94917834T priority patent/DK0655099T3/da
Priority to DE69409205T priority patent/DE69409205T2/de
Publication of WO1994029532A1 publication Critical patent/WO1994029532A1/en
Priority to GR980400810T priority patent/GR3026614T3/el

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles

Definitions

  • the invention relates to a method as designated in the preamble of claim 1.
  • the invention has for its object to reduce at least partly the drawbacks of the said known method.
  • the method according to the invention has for this purpose the characteristic of claim 1.
  • the invention also relates to and provides a struc ⁇ ture built with use of the invented method. If the steel profiles are removed from the ground after arranging of the foil (14) the costs of this method are reduced con ⁇ siderably. Mentioned and other features of the invention will be elucidated in the description of the invention follow ⁇ ing hereinbelow with reference to drawings, in which:
  • Figure 1 shows a top view of a structure during application of the method according to the invention
  • Figures 2-12 show on a larger scale the sections II- II to XII-XII indicated in figure 1;
  • Figure 13 shows the section XIII-XIII of figure 1;
  • Figures 14 and 16 show on a larger scale a top view of fraction XIV in figure 1 with two different embodi- ments;
  • Figure 15 shows the section XV-XV of figure 14
  • Figure 17 shows a vertical section along the line XVII-XVII in figure 16;
  • Figures 18-20 show sections corresponding with figures 6-8 relating to another embodiment variant of the method according to the invention; and Figure 21 shows on a larger scale detail XXI of figure 18.
  • FIG. 1 In order to build a structure 1 according to the invention, which is drawn as example in completed state in figure 12 with dimensions in millimetres and which comprises carriageways 2 for road traffic located below ground level (MV) , the method according to the invention is applied as shown schematically in successive steps in figures 1-11 and 13.
  • Figure 2 Steel sheet piling profiles 3 are struck into the ground to form sheet-pile walls 4 to enclose a construction excavation area 5.
  • FIG. 3 The sheet-pile walls 4 are anchored in transverse direction by means of grouted anchors 6 or by means of cross struts 7 indicated with dashed lines.
  • the ground is excavated from the construction exca ⁇ vation area 5 to a level 8 lower than the floor level 9 of the carriageways 2 and higher than the bottom edge 10 of the sheet-pile walls 4.
  • the excavation level 8 is a thickness of the sand layer 13 deeper than the laying level of the foil 14.
  • the laying level of foil 14 is such that the water pressure under foil 14 is smaller than the total pressure of water and ballast material which is present above the foil 14 for arranging.
  • Figure 4 Support shields 11 are placed which are lined on their inner sides with a drainage layer 99.
  • Figure 5 In the channels 18 between sheet-pile walls 4 and support shields 11 are arranged water-inhib ⁇ iting layers 12 and in addition a sand layer 13 of clas- sified sand, without sharp portions, is arranged above the level 8.
  • FIG 6 A long watertight foil 14 is laid on the sand layer 13, wherein its side pieces 15 are folded over.
  • the spreading out flat of foil 14 takes place for instance by means of sinking under its own weight in combination with cables 16 which are already pre-arranged through the support shield 11 (see figure 5) .
  • the side pieces 15 are erected against support shields 11 by means of cables 17 or optionally in that the ends of cables 16 are first moved to the edges 98 which are then pulled outward in horizontal direction by cables 16 and in that the edges 98 are thereafter pulled upward by means of cables 17.
  • Figure 7 Ground is arranged evenly up to floor level 9 inside the foil 14 and in the channels 18, pref ⁇ erably such that the ground level inside the foil is continually slightly higher than in the channels 18, wherein the necessary drainage pipes 20 are incorporated in this ground.
  • Classified sand is herein arranged against foil 14.
  • FIG 8 The space inside foil 14 above the drain ⁇ age pipes 20 is pumped dry. Draining takes place simulta ⁇ neously in the channels 18 by means of drainage pipes 90.
  • the water level in channels 18 is always kept slightly lower than the water level inside foil 14.
  • the water level is likewise kept lower than the water level inside foil 14, this making use of the drainage mat 99 and provisions (not drawn) in the support shield 11.
  • Supporting ground is arranged above floor level 9 as a natural slope or, preferably, supported by means of concrete retaining walls 22.
  • Figure 9 The sheet-pile wall profiles 3 can be pulled out of the ground and be re-used.
  • the structure 1 is then finished by laying of the carriageways 2 and sewage pipes 23.
  • the struc ⁇ ture 1 is built, if it is long, in a number of construc ⁇ tion excavations 25 which are located in succession and which are for instance 200 m long and mutually separated by means of partitions 26 (figures 10, 11, 14, 15).
  • partitions 26 At the position of a partition 26 a connecting excavation area 27 is created between sheet-pile walls 4 by driving in sheet-pile wall profiles 33 to form transverse walls 34.
  • This connecting excavation area 27 is divided into two spaces 29 by driving in sheet-pile wall profiles 35 to form an intermediate wall 36.
  • a parti ⁇ tion 26 can be realized by means of the removable door 40 of figures 16 and 17.
  • a special U-shaped sheet-pile wall profile 41 is then employed in which a U-shaped coupling profile 42 is received slidably which is provided with flanges 43 for coupling on an edge of a foil 14 by means of strips 44 and bolts 45.
  • a door 40 is arranged in the coupling profile 42 slidably and sealed by means of sealing strips 46.
  • the door 40 is slid downward in two sheet-pile wall profiles 41, while being held in place on the two cou ⁇ pling profiles 42 and on a coupling profile 48 which is situated on the bottom edge of the door 40, until this coupling profile 48 comes to support on sand layer 13.
  • both foils 14 are fixed to coupling profiles 42 and 48 the door 40 can be pulled up therefrom.
  • a support shield 11 is not used but the side pieces 15 of foil 14 are held in place in a different way.
  • the folded edge 50 is drawn tighter by means of cables 51 which run through tubes 52 which are fixed to the sheet-pile wall 4, while the top edges 53 of the side pieces 15 are erected by means of cables 17 and thereafter held fixedly on means 55 present above the ground.
  • the created structure 1 can contain a carriageway for road or rail vehicles, can also contain a storage space for separating the stored material from groundwa- ter.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
PCT/NL1994/000138 1993-06-10 1994-06-10 Method for building a structure in the ground WO1994029532A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP94917834A EP0655099B1 (en) 1993-06-10 1994-06-10 Method for building a structure in the ground
AU69383/94A AU6938394A (en) 1993-06-10 1994-06-10 Method for building a structure in the ground
DK94917834T DK0655099T3 (da) 1993-06-10 1994-06-10 Fremgangsmåde til opførelse af et anlæg under terræn
DE69409205T DE69409205T2 (de) 1993-06-10 1994-06-10 Konstruktionsverfahren eines unterirdischen bauwerkes
GR980400810T GR3026614T3 (en) 1993-06-10 1998-04-10 Method for building a structure in the ground.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BE9300586 1993-06-10
BE9300586A BE1007279A3 (nl) 1993-06-10 1993-06-10 Werkwijze voor het in de grond bouwen van een bouwwerk.

Publications (1)

Publication Number Publication Date
WO1994029532A1 true WO1994029532A1 (en) 1994-12-22

Family

ID=3887089

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NL1994/000138 WO1994029532A1 (en) 1993-06-10 1994-06-10 Method for building a structure in the ground

Country Status (8)

Country Link
EP (1) EP0655099B1 (el)
AU (1) AU6938394A (el)
BE (1) BE1007279A3 (el)
DE (1) DE69409205T2 (el)
DK (1) DK0655099T3 (el)
ES (1) ES2114201T3 (el)
GR (1) GR3026614T3 (el)
WO (1) WO1994029532A1 (el)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1010170C2 (nl) * 1998-09-23 2000-03-24 Genap B V Werkwijze voor het vervaardigen van een waterdichte bouwput, een bouwput verkregen met de werkwijze en een folie bestemd voor gebruik bij de werkwijze.
NL2002008C (nl) * 2008-09-22 2010-03-23 Attema Kunststoffenind Slab.
CN110924399A (zh) * 2019-11-11 2020-03-27 中国电建集团华东勘测设计研究院有限公司 一种深基坑土方开挖方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480944B (zh) * 2014-11-27 2016-04-06 中建一局集团第五建筑有限公司 出土坡道结构及其施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6059229A (ja) * 1983-09-12 1985-04-05 Hazama Gumi Ltd 気密シ−トを使用した土留工法
JPS6436818A (en) * 1987-07-31 1989-02-07 Toyo Tire & Rubber Co Water-proofing work for cut-off wall construction

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6059229A (ja) * 1983-09-12 1985-04-05 Hazama Gumi Ltd 気密シ−トを使用した土留工法
JPS6436818A (en) * 1987-07-31 1989-02-07 Toyo Tire & Rubber Co Water-proofing work for cut-off wall construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 13, no. 223 (M - 829) 24 May 1989 (1989-05-24) *
PATENT ABSTRACTS OF JAPAN vol. 9, no. 194 (M - 403) 10 August 1985 (1985-08-10) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1010170C2 (nl) * 1998-09-23 2000-03-24 Genap B V Werkwijze voor het vervaardigen van een waterdichte bouwput, een bouwput verkregen met de werkwijze en een folie bestemd voor gebruik bij de werkwijze.
NL2002008C (nl) * 2008-09-22 2010-03-23 Attema Kunststoffenind Slab.
EP2166394A1 (en) * 2008-09-22 2010-03-24 B.V. Kunststoffenindustrie Attema Slab assembly for underground vault
CN110924399A (zh) * 2019-11-11 2020-03-27 中国电建集团华东勘测设计研究院有限公司 一种深基坑土方开挖方法

Also Published As

Publication number Publication date
EP0655099B1 (en) 1998-03-25
AU6938394A (en) 1995-01-03
ES2114201T3 (es) 1998-05-16
GR3026614T3 (en) 1998-07-31
EP0655099A1 (en) 1995-05-31
DE69409205D1 (de) 1998-04-30
DE69409205T2 (de) 1998-07-16
BE1007279A3 (nl) 1995-05-09
DK0655099T3 (da) 1998-12-28

Similar Documents

Publication Publication Date Title
US5836115A (en) Foundation waterproofing and drainage system
US6672016B2 (en) Wall and sub-floor water drain barrier panel for basement water-control systems
US7500807B2 (en) Method of construction using sheet piling sections
JP3281376B2 (ja) シートパイル
CN111749275B (zh) 一种盖挖逆作地下通道结构及其施工方法
US4459063A (en) Building construction
HU226433B1 (en) Foundation slab of underground passage for road
CN109629582B (zh) 一种异形排水抗滑桩及其施工方法
EP0655099B1 (en) Method for building a structure in the ground
US4836718A (en) Earth retaining method and structure with improved corrosion protection and drainage
CN112813757B (zh) 一种用于桥头过渡处理的泡沫轻质土复合路基施工方法
GB2264739A (en) Diaphragm wall with liquid tight joints
US6220789B1 (en) Integrated excavation shoring building foundation method
CN107326932A (zh) 一种地下车库的准半逆作施工方法
JP4083334B2 (ja) アーチ屋根を有する地下構造物およびその構築方法
WO1986006133A1 (en) Improvements relating to construction of submerged roadways and other structures
JP3930954B2 (ja) 構造物の構築方法
CA1115972A (en) Method and device for building in the ground vertical walled structures starting from a subterranean conduit
US1877351A (en) Trench bracing
CN219219784U (zh) 一种地下车库顶板伸缩缝模具化施工体系
EP1348812A1 (en) Building methods and apparatus
JPS6033160Y2 (ja) 土木建築用ブロツク
EP0910710B1 (en) Process for carrying out a sheet piling underneath an existing bearing wall or partition
CN216156390U (zh) 一种弃土场排水渠漫水涵洞
CN115182383B (zh) 软土富水区深埋大跨度明挖隧道结构及其建造方法

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AT AU BB BG BR BY CA CH CN CZ DE DK ES FI GB GE HU JP KE KG KP KR KZ LK LU LV MD MG MN MW NL NO NZ PL PT RO RU SD SE SI SK TJ TT UA US UZ VN

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN ML MR NE SN TD TG

WWE Wipo information: entry into national phase

Ref document number: 1994917834

Country of ref document: EP

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWP Wipo information: published in national office

Ref document number: 1994917834

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

NENP Non-entry into the national phase

Ref country code: CA

WWG Wipo information: grant in national office

Ref document number: 1994917834

Country of ref document: EP