US5511266A - Continuous incrementally erecting viaduct construction system - Google Patents

Continuous incrementally erecting viaduct construction system Download PDF

Info

Publication number
US5511266A
US5511266A US08/349,875 US34987594A US5511266A US 5511266 A US5511266 A US 5511266A US 34987594 A US34987594 A US 34987594A US 5511266 A US5511266 A US 5511266A
Authority
US
United States
Prior art keywords
vehicle
piers
viaduct
span
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
US08/349,875
Other languages
English (en)
Inventor
Antonio A. Dinis
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bridgesys Corp
Original Assignee
Bridgesys Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to US08/349,875 priority Critical patent/US5511266A/en
Application filed by Bridgesys Corp filed Critical Bridgesys Corp
Priority to JP8517657A priority patent/JPH11511822A/ja
Priority to AT95943633T priority patent/ATE169075T1/de
Priority to AU45055/96A priority patent/AU4505596A/en
Priority to CA002205997A priority patent/CA2205997A1/en
Priority to EP95943633A priority patent/EP0796373B1/en
Priority to PCT/US1995/015590 priority patent/WO1996017999A1/en
Priority to DE69503806T priority patent/DE69503806D1/de
Application granted granted Critical
Publication of US5511266A publication Critical patent/US5511266A/en
Assigned to BRIDGESYS CORORATION reassignment BRIDGESYS CORORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: DINIS, ANTONIO A.
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Definitions

  • the present invention relates generally to the design and construction of precast segmental viaducts, and more particularly, to the erection and assembly systems and equipment of bridge segments during the construction of the viaducts of spans of up to 60M, with continuous or simple supported spans, with straight or moderately curved alignments.
  • Precast segmental viaducts are commonly built using the following three methods:
  • the first method is the Span-by-Span Construction method illustrated in FIGS. 1-6.
  • precast concrete segments 10 having match-cast joints are assembled end to end along one span of the viaduct over two consecutive piers A, B and B, C, and are placed temporarily on steel trusses 11 and 12 that are supported by steel brackets 13 fixed on the piers.
  • FIG. 3 illustrates boxguiders 14 supported on a pair of steel beams 15 and 16. These conditions considerably reduce the area of application of this method. For the safety of people and vehicles moving close to the construction area, a system relying on temporary supports is not recommended.
  • the second method is the Progressive Placing Construction method illustrated in FIG. 5, 7a, b and c.
  • the Span-by-Span method is not usually applicable.
  • the progressive placing construction has been used in precast segmental viaduct construction.
  • the segments are placed and assembled one by one, from one end of the viaduct to the other, in cantilever construction, self-supported.
  • the segments are usually transported using the viaduct being constructed.
  • a swivel crane 19 placed over the last segment assembled takes the new segment from behind and places it in front. Cantilever type cables are then inserted and stressed.
  • the swivel crane is moved to the top of the newly assembled segment and the cycle repeats itself until the cantilever reaches either the next pier, which may be the actual pier, or a temporary pier.
  • This method allows to span up to 70M (210 FT) and can be used in curved viaducts with continuous spans, but has some disadvantages. In particular, it requires the swivel crane to be moved after erection of each segment; it cannot be applied when the viaduct is too narrow; it is very slow; and it requires additional post-tensioning.
  • the third method is the Balanced Cantilever method of construction illustrated in FIG. 8 which is usually used for viaducts with spans from 70M (210 FT) to 150M (450 FT). It was previously used with cast-in-situ segments and is now more commonly applied on precast segmental viaducts of large spans. As illustrated FIG. 8 the principle of this method that can be used on viaducts with curved alignments and different types and shapes of box girders an overhead gentry 20 supported on a pier is used to move the segments from the completed section to build out from each pier.
  • the prior art methods suffer from different disadvantages.
  • the Span-by-Span construction requires that trusses be supported by pier brackets outside the pier which are difficult to install and remove, and as previously noted, can interfere with traffic clearances and security. Furthermore, it requires the movement of cranes at ground level and has limitations concerning curvature of viaducts, is not applicable for continuous structures, wide single box girders, bridge deck sections U shaped, or generally, girders without wings.
  • a construction method for precast segmental, match-cast joints that is fast, structurally stable, does not require temporary supports, pier brackets or trusses that can interfere with vehicle traffic underneath the viaduct being built.
  • a precast segmental viaduct construction system comprises an elongated erection and assembly vehicle for spanning between at least two viaduct piers and for moving between successive piers, said vehicle having a top deck, an elongated central longitudinal beam having a down facing elongated planar bottom support surface, a pair of elongated trusses secured to and inclined outward from said beam, and a pair of elongated longitudinal planar top support surfaces extending along opposite side edges of said top deck, a plurality of jacks spaced along said vehicle for cooperatively engaging piers on which said vehicle is supported for positioning said vehicle relative to piers on which it is supported, and a support assembly for supporting said vehicle on a pier, said support assembly having jacks for selectively elevating and lowering the vehicle.
  • a method for constructing a precast segmental viaduct comprising the steps of constructing a first viaduct pier to support the rear end of a span to be constructed, said viaduct pier having a "Y" shape, constructing a second viaduct pier to support a front end of a span to be constructed, said viaduct pier having a "Y" shape, mounting first and second vehicle support means on said respective first and second piers for supporting an erection and assembly vehicle, providing an elongated erection and assembly vehicle for spanning between at least two viaduct piers and for moving between successive piers, said vehicle having a top deck, an elongated central longitudinal beam having a down facing elongated planar bottom support surface, a pair of elongated trusses secured to and inclined outward from said beam, and a pair of elongated longitudinal planar top support surfaces extending along opposite side edges of said top deck positioning the longitudinal erection and assembly vehicle that passes through said first and
  • FIG. 1 is an elevation view of the prior art of Span-by-Span Construction.
  • FIG. 2 is a cross section of the viaduct with the prior art system of two parallel trusses supported by pier brackets fixed to the pier, in the case of a box girder with wings.
  • FIG. 3 is a cross section of the viaduct with the prior art Span-By-Span method adapted for a box without wings.
  • FIG. 4 is a perspective view of the prior art viaduct construction system of FIG. 1.
  • FIG. 5 is the schematic representation of the erection and assembly system of FIG. 1.
  • FIG. 6 illustrates the problem of using the prior art for curved spans.
  • FIG. 7 is an elevation view of the prior art of Progressive Placing Construction method.
  • FIG. 8 is an elevation view of the prior art of Balanced Cantilever Construction method.
  • FIG. 9 illustrates the safety working area required for the prior art Span-by-Span method underneath.
  • FIG. 10 illustrates the problem of the stability of prior art parallel trusses used in the Span-by-Span system.
  • FIG. 11 illustrates the adaptation of the prior art Span-by-Span in a U-shaped girder for precast segmental viaducts:
  • FIG. 12 is a perspective view of a preferred embodiment of the present invention with the vehicle for erection and assembly of viaducts in operative position on a pair of spaced piers.
  • FIG. 13 is an end view of the embodiment of FIG. 12 illustrating the safety working area required by the invention.
  • FIGS. 14, 15, 16 are like end views like FIG. 13 that illustrate applications of the invention for different types of viaduct girders.
  • FIG. 17 is a partial detailed perspective view of a typical assembly and erection vehicle of FIG. 12.
  • FIG. 18 is a detailed perspective end view of the embodiment of FIG. 12.
  • FIG. 19a is a view like FIG. 18 of an alternative embodiment.
  • FIG. 19b is a view like FIG. 18 of another alternative embodiment.
  • FIG. 20 is a detailed end view of the embodiment of FIG. 12 illustrating details of the supporting assembly and jack system.
  • FIG. 21 is a perspective view of the invention illustrating the assembling of U-sections of a curved span.
  • FIG. 22 is a top plan view of the vehicle an the pivoting nose and tail in a curved span.
  • FIG. 23 is a perspective schematic illustration of the forces to be applied in the vehicle by jacks inserted between the pier arms and the vehicle that introduce a pre-torsion that balances the torsions of the curved span.
  • FIG. 24 is a side elevation view of the sequence of erection of a typical span according to the invention.
  • FIG. 25 is a perspective of the FIG. 24 sequence of erection.
  • FIG. 26 a and b is a side elevation view of the sequences of self-launching of the vehicle from one span to the next span.
  • FIG. 27 is a detailed perspective of the erection section of the vehicle.
  • FIG. 28 is an end elevation view illustrating the eccentric position of the swivel crane to reduce to a minimum its rotating arm.
  • FIGS. 29, 30, 31, 32 are like end views illustrating the system pier-deck-bearings that enables the use the pier segment as the tie of the two arms of the "Y" shaped pier.
  • FIGS. 33 is a side elevation view of the use of the invention in continuous spans with progressive erection and assembly.
  • FIG. 12 of the drawing a preferred embodiment of the apparatus of the present invention designated generally by the numeral 22 is illustrated in position to carry out the construction in accordance with the method of the invention.
  • the present invention was devised primarily for erecting viaduct structures which are generally designed with "Y" shaped piers in order to support, between pairs of piers, the longitudinal erection and assembly apparatus which will hereinafter be termed a vehicle.
  • the vehicle is elongated to span at least two piers and has a generally V or trapezoid transverse cross section to fit within the upturned legs of the piers.
  • the pier 24 includes two arms 26 and 28 that are inclined and that are connected over a vertical column 30 that is built on normal foundations.
  • the vehicle 22 is mounted or supported between the two arms of the "Y" piers and generally is constructed of a triangular steel space truss with preferably a central spine that supports the weight of the segments.
  • the vehicle has a top deck with at least a pair of elongated top support surfaces 32 and 34 extending along the side edges of the top deck.
  • the vehicle is also preferably provided with an elongated nose section 36 hinged at 38 for pivoting about a vertical axis.
  • a tail section 40 is hinged for pivoting about a vertical axis at the tail end of the vehicle.
  • the vehicle body includes two outwardly inclined trusses that give the vehicle the torsional stability and allow the adjustment to the exact geometry of the segments constituting the span.
  • the vehicle rests between the vertical legs of the piers and assemble the viaduct girders as shown in FIGS. 13-16.
  • a swivel crane 42 is mounted on the top deck, preferably at one end and lifts the girders onto the deck.
  • the assembly vehicle can handle girders of three or four webs or U-shaped girders. This system allows space for street or surface traffic as shown in FIG. 13.
  • the two inclined trusses may be advantageously replaced by two spines giving to the vehicle a triangular cross section.
  • the viaduct piers are usually built of reinforced concrete but may also be built in precast segmental match-cast units, assembled vertically.
  • the longitudinal assembly vehicle has appropriately a triangular or a trapezoidal cross section so as to fit inside the arms of the piers and below the girders.
  • the preferred form of construction of the vehicle is as illustrated in FIGS. 17-19 with a vertical spine and lateral trusses generally fabricated in steel.
  • the vertical spine is a plain I-section steel girder 44 or a box girder and the trusses 46 and 48 are space trusses fabricated with laminated steel sections.
  • the trusses are inclined and have upper beams forming longitudinal planar support surfaces.
  • Both trusses are connected to the spine with steel trusses at the top and bottom of the flanges to constitute a rigid structure that will work as a tubular space truss between the two adjacent piers.
  • the central I beam has an upper flange 50 providing and elongated central planar support surface to support rollers or dollies 52 for supporting the girders for movement into place.
  • the top of the spine or I beam has a smooth surface to allow the sliding of the segments from the front end to the backside of the vehicle.
  • the bottom of the I beam spine also has an elongated smooth planar surface 54 to slide over the jacking roller support assemblies placed between the arms at the bottom during the self-launching of the vehicle to the next span. Segments will be moved with winches or with hydraulic jacks integrated in the vehicle structure.
  • the top of the inclined trusses is used as the adjusting lines of each segment individually, and will have 3 jacks for each segment, two on one side, and one on the other side and vice-versa in the adjacent segment. This system will allow 3 points levelling of each segment to the exact span geometry in the space.
  • unbonded deviated post-tensioning cables will be fixed to the central spine and/or to the inclined trusses or inclined spines, so to be able to introduce post-tension forces that may reduce or cancel the vehicle deflections during erection.
  • the vehicle once positioned between the pier arms, will be blocked against these arms by applying hydraulic jacking forces between the vehicle and the pier arms, in designated locations thus giving complete stability to the system during the erection and assembly cycle.
  • the vehicle may not remain in the central line of the piers and the horizontal blocking jacks may push the vehicle sideways so to reduce to a minimum the eccentricity of the segments in relation to the center line of the vehicle.
  • the horizontal blocking allows the vehicle to take current torsional moments of the curved spans common in roadway or railway viaducts.
  • the vehicle can create active pretorsional moments that will be created during erection of the curved spans. This is obtained by stressing unsymmetrically the cables integrated to the spines and trusses and/or by applying at the piers different forces and pre-torsion the vehicle sections as required by the specific curved span.
  • the vehicle is self-launched, once the assembly of segments is completed.
  • This self-launching operation monitored hydraulically from a central board, will allow the vehicle to lower and release itself from the precast concrete span assembled.
  • the jacks placed at the bottom of the arms of the piers, will push the vehicle forward counteracting against the piers.
  • Once the nose of the vehicle starts being supported by the following pier, its tail will progressively pass through the rear pier of the span assembled. This determines the total length of the vehicle, including nose and tail, which is generally twice the larger span.
  • the upper deck also has alignment and leveling jacks 54, 56 and 58 for aligning and leveling the girders.
  • Other forms of construction may be as shown in FIG. 19a, wherein the body of the vehicle is constructed a pair of inclined trusses 60 and 62 with a central bottom beam 64 and top truss 66. The top of the side trusses have beams 68 and 70 providing planar support surfaces.
  • a variation, as shown in FIG. 19b, has side steel plates 72 and 74 instead of trusses.
  • the preferred embodiment as shown in FIG. 20 has a support assembly including a base 76 which falls into a socket or recess in the pier.
  • the support assembly includes a pair of jacks 78 and 80 with a support member 82 on top thereof having rollers 84 for engaging the bottom surface 54 for supporting the vehicle for movement between piers.
  • Upper blocking jacks 86 and 90 and lower blocking and positioning jacks 88 and 92 support the vehicle at each pier. These enable the vehicle to be centered and to tilt as in FIG. 23 to accommodate a curved section of viaducts.
  • the piers are each provided with sphere guide bearing sockets 94 and 96 to receive corresponding spherical bearings of a girder.
  • the vehicle is constructed with post-tension cables as shown at 98 and 100 in FIG. 17 and FIG. 20 to pre-tension the vehicle.
  • post-tension cables as shown at 98 and 100 in FIG. 17 and FIG. 20 to pre-tension the vehicle.
  • Such cable tensioning is taught generally in U.S. Pat. No. 3,909,863, which is incorporated herein as though fully set forth.
  • the most novel aspect of the system is the integration of the erection equipment with the assembly vehicle, thus allowing the two operations erection and assembly to be done by the same unit which then can move, along the complete viaduct alignment, together.
  • the appropriate erection equipment for the system is a swivel crane that is basically composed of a pylon rigidly fixed in the nose of the vehicle and by a rotating arm that is equipped with a movable winch. This swivel crane takes the precast segments at ground level, directly from the low-boys or trucks, lift, turn and place the segments in sequential order over the top of the sliding tracks of the vehicle. During the time the segment is pushed to its final position in the span, the swivel crane can already be lifting the next segment.
  • the swivel crane may also be used as a pulling device to pull the vehicle to the next span. Other uses of the crane are the lifting of post-tension cables. By placing the swivel crane just in front of the front pier of the span being assembled, it can pick up and place heavy segments with an arm of the reduced length and with relatively light torsional moments.
  • the swivel crane can also be fixed eccentrically in relation to the center line of the vehicle reducing considerably the length of its rotating arm. ⁇ FIG. 28 ⁇
  • An additional advantage that gives the swivel crane installed on the front of the vehicle, is that the transport of segments does not need to be done over the viaduct being built. This improves the safety of the overall system, allows the already built viaduct to be completely finished immediately behind the assembly of the spans. This allows to open to traffic partial sections of the viaduct without interference with the construction operations.
  • FIGS. 24 and 25 the assembly of a plurality of girders 102 between a pair of piers 104 and 106 is illustrated.
  • the girders are lifted by the crane from a truck at ground level and placed on the assembly vehicle where they are moved together.
  • the assembly continues until the two piers are spanned as shown in FIG. 26a.
  • the assembly vehicle is then advanced to the next pier 108 as shown in FIG. 26b.
  • the vehicle is the properly secured in place and aligned.
  • the assembly of girder sections then continues.
  • FIG. 33 The continuous construction of a span is illustrated in FIG. 33 with first, second and third post-tension cables shown.
  • FIGS. 29-32 the supporting of viaduct sections on the vehicle for assembly is illustrated with assembled units lowered onto piers into guide bearings.
  • the same effect is obtained by using the bottom slab of the pier segment as a tie by the introduction of special spherical guided bearings placed perpendicular to the arms of the piers.
  • the pier segment bottom slab is transversely post-tensioned to resist the tension forces of the pier arms.
  • the invention covers also the extension of the construction system to continuous structures.
  • the present invention allows, without any difficulty, the construction of the continuous structures over 3, 4 or more spans.
  • the continuity of structures allow the increase in span lengths and for a given span length, offers savings in materials, in particular, post-tension and labor, and has a better structural behavior.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)
US08/349,875 1994-12-06 1994-12-06 Continuous incrementally erecting viaduct construction system Expired - Fee Related US5511266A (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
US08/349,875 US5511266A (en) 1994-12-06 1994-12-06 Continuous incrementally erecting viaduct construction system
AT95943633T ATE169075T1 (de) 1994-12-06 1995-11-30 Brückenbauherstellungssystem in kontinuierlicher bauweise
AU45055/96A AU4505596A (en) 1994-12-06 1995-11-30 Continuous incrementally erecting viaduct construction system
CA002205997A CA2205997A1 (en) 1994-12-06 1995-11-30 Continuous incrementally erecting viaduct construction system
JP8517657A JPH11511822A (ja) 1994-12-06 1995-11-30 連続した、漸進的に架設する陸橋建設システム
EP95943633A EP0796373B1 (en) 1994-12-06 1995-11-30 Continuous incrementally erecting viaduct construction system
PCT/US1995/015590 WO1996017999A1 (en) 1994-12-06 1995-11-30 Continuous incrementally erecting viaduct construction system
DE69503806T DE69503806D1 (de) 1994-12-06 1995-11-30 Brückenbauherstellungssystem in kontinuierlicher bauweise

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US08/349,875 US5511266A (en) 1994-12-06 1994-12-06 Continuous incrementally erecting viaduct construction system

Publications (1)

Publication Number Publication Date
US5511266A true US5511266A (en) 1996-04-30

Family

ID=23374340

Family Applications (1)

Application Number Title Priority Date Filing Date
US08/349,875 Expired - Fee Related US5511266A (en) 1994-12-06 1994-12-06 Continuous incrementally erecting viaduct construction system

Country Status (8)

Country Link
US (1) US5511266A (ja)
EP (1) EP0796373B1 (ja)
JP (1) JPH11511822A (ja)
AT (1) ATE169075T1 (ja)
AU (1) AU4505596A (ja)
CA (1) CA2205997A1 (ja)
DE (1) DE69503806D1 (ja)
WO (1) WO1996017999A1 (ja)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5940916A (en) * 1997-09-03 1999-08-24 J. Muller International Bridge span-by-span construction apparatus and method
ES2156758A1 (es) * 1999-10-06 2001-07-01 R & C Res A And Concrete S A Vigas curvas y su sistema de empalme.
US20050154288A1 (en) * 1996-06-24 2005-07-14 Computer Motion, Inc. Method and apparatus for accessing medical data over a network
US20070006401A1 (en) * 2005-07-09 2007-01-11 James Thomson Load bearing construction and method for installation
KR100706052B1 (ko) * 1999-08-28 2007-04-13 삼성중공업 주식회사 교량 가설 공법
US20080184504A1 (en) * 2007-02-07 2008-08-07 Powers James M Method of rebuilding a viaduct without interrupting service on the old structure
US20090282626A1 (en) * 2008-01-28 2009-11-19 Powers James M Method of launching bridge spans in bridge construction
CN101338683B (zh) * 2007-07-04 2010-09-15 祐彬营造股份有限公司 逐跨逆打桥梁工法
US20120036811A1 (en) * 2009-04-15 2012-02-16 Vsl International Ag Overhead form traveller and method
NL2005876C2 (nl) * 2010-12-17 2012-06-19 Leonardus Karel Tol Baan op reeks pijlers.
US8522381B1 (en) * 2010-09-07 2013-09-03 OCCI, Inc. System and method for bridge pier replacement
WO2018196928A1 (de) * 2017-04-28 2018-11-01 David Mann Verfahren zur errichtung von bauwerken, bauwerk und verlegevorrichtung
CN109356031A (zh) * 2018-11-19 2019-02-19 北京城建道桥建设集团有限公司 轨道交通高架桥面错车运梁平台及其方法
CN112942132A (zh) * 2021-04-01 2021-06-11 中交二航局第二工程有限公司 前支点复合式挂篮及其移位方法
CN114351602A (zh) * 2022-01-21 2022-04-15 江苏中车城市发展有限公司 一种高架桥用挂篮滑移系统

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19904738A1 (de) 1999-02-05 2000-08-10 Volkswagen Ag Fahrzeugsitz mit einer crashaktiven Kopfstütze

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU357317A1 (ja) *
US3027633A (en) * 1955-08-19 1962-04-03 Yuba Cons Ind Inc Method and apparatus for bridge construction
SU950847A1 (ru) * 1976-03-01 1982-08-15 Саратовский политехнический институт Способ монтажа поперечно члененных на блоки пролетных строений мостов и подмости дл монтажа поперечно члененных на блоки пролетных строений мостов
US4497153A (en) * 1981-06-19 1985-02-05 Mueller Eberhard Method and device for erecting building structures such as bridges, using pre-fabricated concrete beams
US4646379A (en) * 1985-12-27 1987-03-03 Figg And Muller Engineers, Inc. Concrete deck truss bridge and method of construction

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2251475C3 (de) * 1972-10-20 1975-04-30 Polensky & Zoellner, 5000 Koeln- Bayenthal Verfahren zum Herstellen eines Tragwerkes, insbesondere des Überbaus einer Brücke aus Spannbeton

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU357317A1 (ja) *
US3027633A (en) * 1955-08-19 1962-04-03 Yuba Cons Ind Inc Method and apparatus for bridge construction
SU950847A1 (ru) * 1976-03-01 1982-08-15 Саратовский политехнический институт Способ монтажа поперечно члененных на блоки пролетных строений мостов и подмости дл монтажа поперечно члененных на блоки пролетных строений мостов
US4497153A (en) * 1981-06-19 1985-02-05 Mueller Eberhard Method and device for erecting building structures such as bridges, using pre-fabricated concrete beams
US4646379A (en) * 1985-12-27 1987-03-03 Figg And Muller Engineers, Inc. Concrete deck truss bridge and method of construction

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050154288A1 (en) * 1996-06-24 2005-07-14 Computer Motion, Inc. Method and apparatus for accessing medical data over a network
US5940916A (en) * 1997-09-03 1999-08-24 J. Muller International Bridge span-by-span construction apparatus and method
KR100706052B1 (ko) * 1999-08-28 2007-04-13 삼성중공업 주식회사 교량 가설 공법
ES2156758A1 (es) * 1999-10-06 2001-07-01 R & C Res A And Concrete S A Vigas curvas y su sistema de empalme.
US20070006401A1 (en) * 2005-07-09 2007-01-11 James Thomson Load bearing construction and method for installation
US8347441B2 (en) * 2005-07-09 2013-01-08 James Thomson Load bearing construction and method for installation
US20080184504A1 (en) * 2007-02-07 2008-08-07 Powers James M Method of rebuilding a viaduct without interrupting service on the old structure
CN101338683B (zh) * 2007-07-04 2010-09-15 祐彬营造股份有限公司 逐跨逆打桥梁工法
US20090282626A1 (en) * 2008-01-28 2009-11-19 Powers James M Method of launching bridge spans in bridge construction
US7669272B2 (en) * 2008-01-28 2010-03-02 Powers James M Method of launching bridge spans in bridge construction
US20120036811A1 (en) * 2009-04-15 2012-02-16 Vsl International Ag Overhead form traveller and method
US8869336B2 (en) * 2009-04-15 2014-10-28 Vsl International Ag Overhead form traveller and method
US8522381B1 (en) * 2010-09-07 2013-09-03 OCCI, Inc. System and method for bridge pier replacement
EP2466009A3 (en) * 2010-12-17 2012-09-19 Leonardus Karel Van Tol Track on a series of piers
EP2466009A2 (en) 2010-12-17 2012-06-20 Leonardus Karel Van Tol Track on a series of piers
NL2005876C2 (nl) * 2010-12-17 2012-06-19 Leonardus Karel Tol Baan op reeks pijlers.
WO2018196928A1 (de) * 2017-04-28 2018-11-01 David Mann Verfahren zur errichtung von bauwerken, bauwerk und verlegevorrichtung
CN110799706A (zh) * 2017-04-28 2020-02-14 大卫·曼尼 用于建造建筑物的方法、建筑物和铺设装置
CN110799706B (zh) * 2017-04-28 2022-06-24 大卫·曼尼 用于建造建筑物的方法、建筑物和铺设装置
CN109356031A (zh) * 2018-11-19 2019-02-19 北京城建道桥建设集团有限公司 轨道交通高架桥面错车运梁平台及其方法
CN109356031B (zh) * 2018-11-19 2023-10-31 北京城建道桥建设集团有限公司 轨道交通高架桥面错车运梁平台及其方法
CN112942132A (zh) * 2021-04-01 2021-06-11 中交二航局第二工程有限公司 前支点复合式挂篮及其移位方法
CN114351602A (zh) * 2022-01-21 2022-04-15 江苏中车城市发展有限公司 一种高架桥用挂篮滑移系统
CN114351602B (zh) * 2022-01-21 2023-10-17 江苏中车城市发展有限公司 一种高架桥用挂篮滑移系统

Also Published As

Publication number Publication date
EP0796373A1 (en) 1997-09-24
WO1996017999A1 (en) 1996-06-13
ATE169075T1 (de) 1998-08-15
JPH11511822A (ja) 1999-10-12
AU4505596A (en) 1996-06-26
DE69503806D1 (de) 1998-09-03
EP0796373B1 (en) 1998-07-29
CA2205997A1 (en) 1996-06-13

Similar Documents

Publication Publication Date Title
US5511266A (en) Continuous incrementally erecting viaduct construction system
CN110042769B (zh) 一种组合梁斜拉桥辅助跨全悬臂拼装施工方法
US5511268A (en) Construction of large structures by robotic crane placement of modular bridge sections
US5896609A (en) Safety method of construction a prestressed cable-stay bridge
US4799279A (en) Method of constructing the approach and main spans of a cable stayed segmental bridge
US4301565A (en) Method and system for the removal and replacement of a bridge
WO1996005375A9 (en) Construction of large structures by robotic crane placement of modular bridge sections
CN112962459B (zh) 一种打桩、装墩、架梁一体化架桥机及建桥方法
CN109183618B (zh) 一种用于预制装配式桥梁快速施工的架桥机
CN111139749A (zh) 一种大跨度上承式连续钢桁梁悬臂架设施工方法
US5940916A (en) Bridge span-by-span construction apparatus and method
CN110656570A (zh) 一种伸缩式人行桥梁、施工装置与施工方法
CN114214920B (zh) 大跨度双层合建钢桁架拱桥及其施工方法
CN110396942B (zh) 上承式拱桥施工用钢拱架拼装与横移系统及方法
CN210684480U (zh) 上承式拱桥施工用钢拱架拼装与横移系统
CN112211112A (zh) 一种在既有桥梁上采用双导梁架桥机的钢箱梁安装方法
WO2022233226A1 (zh) 用于斜拉桥主梁安装的三跨缆索吊机及其施工方法
CN115748413A (zh) 一种连续钢桁腹-板桁双层组合转体桥梁结构
CN114991006A (zh) 一种多桁架式超宽桥面施工用菱形挂篮装置
CN212895958U (zh) 下挂移动式桥面吊机
CN214328478U (zh) 一种三塔自锚式悬索桥
CN113148867A (zh) 一种斜拉桥超重缆索起升的提升站装置
EP0164936A2 (en) Bridge construction
CN111335188A (zh) 小曲率半径预制1号块箱梁与现浇0号块箱梁悬拼的吊梁
CN214733976U (zh) 一种斜拉桥超重缆索起升的提升站装置

Legal Events

Date Code Title Description
AS Assignment

Owner name: BRIDGESYS CORORATION, CALIFORNIA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:DINIS, ANTONIO A.;REEL/FRAME:007932/0318

Effective date: 19951115

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
FP Lapsed due to failure to pay maintenance fee

Effective date: 20000430

STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362