US20220042268A1 - Improvements in and relating to pile foundations - Google Patents
Improvements in and relating to pile foundations Download PDFInfo
- Publication number
- US20220042268A1 US20220042268A1 US17/416,276 US201917416276A US2022042268A1 US 20220042268 A1 US20220042268 A1 US 20220042268A1 US 201917416276 A US201917416276 A US 201917416276A US 2022042268 A1 US2022042268 A1 US 2022042268A1
- Authority
- US
- United States
- Prior art keywords
- pile
- bore
- sections
- column
- liquid material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000011440 grout Substances 0.000 claims abstract description 20
- 239000000463 material Substances 0.000 claims abstract description 6
- 238000000034 method Methods 0.000 claims description 41
- 239000011344 liquid material Substances 0.000 claims description 34
- 239000004567 concrete Substances 0.000 claims description 17
- 238000005304 joining Methods 0.000 claims description 5
- 239000011178 precast concrete Substances 0.000 description 6
- 239000002689 soil Substances 0.000 description 6
- 239000007788 liquid Substances 0.000 description 5
- 238000004891 communication Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 239000012530 fluid Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000001788 irregular Effects 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 239000011347 resin Substances 0.000 description 2
- 229920005989 resin Polymers 0.000 description 2
- 239000011343 solid material Substances 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 241000597800 Gulella radius Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000012779 reinforcing material Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000009827 uniform distribution Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1685—Shapes cylindrical
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Definitions
- the present invention concerns piles. More particularly, but not exclusively, this invention concerns a pile within a bore and a method and a kit of parts for forming the same. The invention also concerns a building including a pile within a bore and a method of forming the same.
- Piles are deep foundations providing support for buildings or other structures. They are typically long, narrow columns of reinforced concrete or steel.
- Prior-art piles include pre-cast concrete piles that are driven into the ground using a pile-driver and cast solid concrete piles that are formed by digging a bore in the ground (typically using an auger), pouring concrete directly into the hole and allowing it to set.
- WO 2008/047151 A1 (City University) discloses a method of forming a pile comprising: forming a bore in the ground to a required depth; disposing a cylinder in the bore; filling the bore with uncast concrete so that, on hardening, a cast concrete pile is formed in the bore, the pile having a longitudinal cavity permitting access to the pile along at least a portion of its length.
- the longitudinal cavity is sufficiently wide to allow access to the longitudinal cavity so that cast concrete can be tested at a time after construction.
- the present invention seeks to mitigate the above-mentioned problems.
- a first aspect of the invention provides a method of forming a pile within a bore, the method comprising:
- a second aspect of the invention provides a method of constructing a building, the method including forming a pile within a bore by the method of the first aspect of the invention.
- a third aspect of the invention provides a pile within a bore, the pile within a bore having the features set out in claim 8 below.
- a fourth aspect of the invention provides a building including a pile within a bore according to the third aspect of the invention.
- a fifth aspect of the invention provides a kit of parts having the features set out in claim 15 below.
- FIGS. 1 a to 1 h are a sequence of side views of a pile being formed, according to a first embodiment of the present disclosure
- FIG. 2 is a perspective view of a pile section according to a second embodiment of the present disclosure
- FIG. 3 is a perspective view of a pile section according to a third embodiment of the present disclosure.
- FIG. 4 is a perspective view of a pile section according to a fourth embodiment of the present disclosure.
- FIG. 5 is a side view of a pair of pile sections according to a fifth embodiment of the present disclosure.
- FIG. 6 is a plan view of a pile section according to a sixth embodiment of the present disclosure.
- FIG. 7 is a plan view of a pile section according to a seventh embodiment of the present disclosure.
- a first aspect of the invention provides a method of forming a pile within a bore, the method comprising:
- the pile sections are preferably concrete.
- the pile sections are preferably pre-formed (for example pre-cast) at a location remote from the location at which the pile is to be formed.
- the method may comprise the step of receiving the pile sections from a remote location.
- the surface of the bore will be understood to be the surface of the surrounding soil into which the bore is made (typically longitudinally and circumferentially extending).
- the method may include the step of joining together a plurality of section components to form each pile section.
- the section components are preferably pre-formed (for example pre-cast) at a location remote from the location at which the pile is to be formed.
- the method may comprise the step of receiving the plurality of section components from a remote location, and then joining together the plurality of section components to form each pile section.
- the curable liquid when in place and cured, is preferably configured to transfer the skin friction generated at the interface with the pile bore to the interface between the grout and the sections of the pile.
- the curable liquid material may be grout.
- the grout may comprise reinforcing material.
- the curable liquid material may be for example resin.
- grout is not concrete. Providing a pile formed from a stack of pile sections and then filling the gap between the pile and the bore, with the curable liquid, has been found to be especially advantageous because it tends to be possible to use on a variety of soil types (whereas the pile in WO 2008/047151 tends to be limited to use of clay soils).
- the method may include the step of pouring the curable liquid material directly into the gap.
- the curable liquid material may be inserted under relatively low pressure.
- the method may comprise the step of applying additional curable liquid material after the previous liquid material has cured.
- the additional curable liquid material may be supplied at relatively high pressure, for example such that it cracks and percolates through the first cured material. This step may be advantageous on fine soils as it enables the additional curable liquid to percolate into the soil.
- the additional curable liquid material may be grout, preferably finer grout than the first curable liquid material.
- the method may include the step of directing the curable liquid material into the gap through channels in the sections.
- the stacking may include aligning the channels of one section with the channels of an adjacent section, such that the liquid material may flow from the channel in one section to the channel in an adjacent section. Alignment may be achieved visually but is more preferably achieved via an alignment arrangement (such as interlocking male and female members located at a common location on the opposing ends of the adjacent pile sections).
- the adjacent pile sections may be configured to be self-aligning (for example they may comprise suitable inclined surfaces to ensure correct alignment as the adjacent sections are stacked together).
- the method may include the step of digging the bore, for example using an auger.
- the method may include the step of forming impressions into the interior wall of the bore.
- the method may include lowering the pile sections into the bore sequentially, for example one-at-a-time.
- the column may have a length that is substantially the same as the depth of the bore.
- the column may be shorter than the depth of the bore.
- the column may for example have a length that is between half the depth of the bore, and the full depth of the bore. Alternatively, the column may be longer than the depth of the bore.
- the column may have a length that is more than three times its breadth.
- the gap may be continuous.
- the gap may extend across the majority, (preferably, all or substantially all) of the outside surface of the column and the surface of the bore.
- the gap may be substantially uniform around the outside surface of the column.
- the curable liquid material may fill all or substantially all of the gap.
- the method may comprise the step of installing a pile cap on the top of the final pile section to close off the top of the stack of pile sections.
- the method may comprise the step of selecting the pile cap from a plurality of differently-sized (more preferably different length) pile caps.
- the pile caps may be pre-cast. This may ensure the correct height of the pile may be obtained (for example a relatively short cap can be provided if the stack of pile sections is relatively tall in the bore, and likewise a relatively long cap can be provided if the stack of pile sections is relatively short in the bore).
- the method may comprise the step of initially installing a pile base piece in the base of the bore, to close off the base of the pile.
- the pile base piece may facilitate increased end bearing resistance of the pile.
- the pile base piece may be shaped to facilitate increased end bearing resistance of the pile.
- a second aspect of the invention provides a method of constructing a building, the method including forming a pile within a bore by the above-mentioned method.
- a third aspect of the invention provides a pile within a bore, comprising:
- a column comprising a stack of a plurality of pile sections arranged end-to-end within the bore, and a cured material between at least a part of an outside surface of the column and the surface of the bore.
- the plurality of pile sections may include pile sections that have different widths from each other.
- the column may taper in width, for example so that it has a smaller width at its base and a larger width at its top (or vice versa).
- the pile sections forming the column may increase in width with height up the column (or vice versa).
- the pile sections may have the same internal width (e.g. internal diameter).
- a taper in the column may be achieved by varying the thickness of the wall of adjacent pile sections.
- a channel in each pile section may be at the same spacing (e.g. radius) from the centre of the column. That spacing may be defined by the smallest width pile section.
- the pile sections may be tubes.
- the tubes may have a constant inner width along the height of the column (even in embodiments in which the outer width of the tubes is not the same along the height of the column, for example where the tubes forming the column increase in width with height up the column).
- the tubes may have an internal width that is at least half their external width.
- the pile sections may be circular in cross-section.
- the pile sections may be polygonal in cross-section.
- the pile sections may comprise elements (for example castellations) at each of their axial ends, the axial end elements being sized and shaped to interlock with the corresponding axial end elements of another of the pile sections.
- the pile sections may comprise a plurality of section components.
- Each pile section may for example be made from between 2 and 10 section components.
- the plurality of section components may be identical to each other.
- the section components may be segments of an annulus. Providing section components in each pile section may facilitate efficient transport of the components of the pile (compared to transporting fully assembled, or cast, pile sections).
- Each pile section and preferably each pile section component, may comprise elements (for example, tongue-and-groove elements) at each axial end, sized and shaped to interlock with the corresponding elements of another of the pile section/pile section component.
- the method may comprise the step of joining adjacent pile sections together, for example with a fastener.
- At least some of the pile sections may include a raised and/or indented pattern on their outer surfaces, i.e. a textured pattern.
- the pattern may be irregular.
- the pattern may be a regular pattern of repeating shapes. Such an arrangement may facilitate effective binding of the curable liquid to the outer surface of the sections and/or increase the resistance between the outer surface of the pile and the cured liquid.
- At least some of the sections may include protrusions on their outer surface, which may be arranged in a regular pattern. The protrusions may be dome-shaped.
- At least some of the sections may include channels configured to allow the transport of a curable liquid material along the length of the column.
- the channels may be within the sections, for example entirely enclosed in the solid material of the sections (save at inlets and outlets).
- the channels may be wholly or partly on the surface of the sections, for example the channels may be exposed channels running along a face of the sections.
- the channels may comprise transport channels in fluid communication with outlet channels.
- the transport channels may be vertical.
- the outlet channels may be horizontal.
- the transport channels may be in fluid communication with the outlet channels.
- There may, for example, be a multiplicity, for example 1 to 10, transport channels in each pile section.
- the transport channels may be at the same radial position in each pile section in the column.
- the hollow pile sections may be concrete, for example pre-cast concrete.
- Use of pre-cast concrete has the advantage that the pile sections (or the section components) can be manufactured remotely from the site of the bore and then transported to the bore for use.
- Manufacturing the pile sections (or the section components) as pre-cast concrete, before their use in the bore has the advantage that quality checks can be carried out on them before their installation in the ground.
- the pile sections may be reinforced concrete.
- a fourth aspect of the invention provides a building including a pile within a bore, as described herein.
- the pile may be load-bearing within the building.
- a fifth aspect of the invention provides a kit of parts for forming a pile within a bore, the kit comprising:
- FIG. 1 a to 1 h show in side view an example embodiment of the method of forming a pile.
- bore 110 has been excavated in the ground 10 using an auger (not shown), which has been operated by piling rig 100 .
- Piling rig 100 includes attachment point 102 that is used to attach various apparatus that is to be lowered into bore 110 . (For example, the auger was attached to attachment point 102 during the digging of the bore 110 ).
- impression-forming attachment 104 is attached to attachment point 102 and is lowered into bore 110 .
- Impression-forming attachment 104 comprises a plurality of impression-forming elements 106 that are configured to form impressions in the interior wall of bore 110 when impression-forming attachment 104 is actuated to expand outwards in a radial direction. The actuation and expansion of impression forming attachment 104 is shown in FIG. 1 c .
- Impression forming elements 106 are pressed into the wall of bore 110 to form impressions 112 .
- Impression forming attachment 104 is then withdrawn from bore 110 by piling rig 100 as shown in FIG. 1 d .
- the result of this operation as shown in FIGS. 1 b to 1 d is that impressions 112 are formed in the wall of bore 110 .
- impressions 112 are that when the pile is finally constructed, the skin friction between the pile and the bore is increased, thereby increasing the pull-out resistance and/or providing a piling structure that better reacts loads into the ground.
- this feature is not essential to the invention and in alternative embodiments of the present disclosure, the steps of FIGS. 1 b to 1 d may be omitted, and substantially no impressions are formed in the wall of bore 110 .
- pile section 200 a has been attached to attachment point 102 .
- Pile section 200 a is a hollow cylinder of prefabricated concrete.
- Piling rig 100 lowers pile section 200 a into bore 110 as indicated by directional arrow 105 .
- Successive pile sections 200 b , 200 c , 200 d , 200 e are attached to attachment point 102 and lowered into bore 110 respectively in turn. As shown in FIG. 1 f , each successive pile section is stacked on top of the previous section to form vertical column 250 . Dashed line 202 indicated the continuous inner surface of hollow column 250 . The size of pile sections 200 a - 200 e is selected such that when pile sections 200 a - 200 e are stacked to form column 250 , there is a gap 114 between the outer surface of column 250 and the inner surface of bore 110 .
- column 250 has a length that is substantially the same as the height of bore 110
- column 250 may have a length that is shorter than the height of the bore, for example, to leave some space at the top of bore 110 for other structural features in the construction.
- the length of column 250 may correspond to between half the height of bore 110 , and the full height of bore 110 .
- the length of column 250 may correspond to a height greater than the height of bore 110 .
- FIG. 1 g shows that grout 260 is poured into gap 114 .
- the insertion of grout 260 is indicated by directional arrow 113 .
- FIG. 1 h shows that grout 260 has filled gap 114 , including impressions 112 within the wall of bore 110 . This forms completed pile 270 .
- grout 260 may be an alternative curable liquid material, for example a resin.
- An advantage of grout is that it is light and cheap, and has relatively low viscosity (compared to more coarse materials such as concrete).
- Column 250 is formed of concrete and can bear the majority of the primary longitudinal loads from any construction above.
- the grout is arranged to transfer the skin friction generated at the interface with the pile bore to the interface between the grout and the pre-cast sections of the pile (i.e. such that the loads can be reacted/transferred from the pile to the surrounding soil).
- pile sections 200 a - 200 e may comprise channels.
- Grout 260 is poured into the channels within column 250 to achieve a uniform distribution of grout 260 across the entire length of column 250 .
- FIG. 2 shows a perspective view of pile section 300 according to an embodiment of the present disclosure.
- Pile section 300 comprises vertical channels 302 in fluid communication with horizontal channels 304 (shown in dashed lines in FIG. 2 ).
- Vertical channels 302 are designed to allow for a vertical flow of curable liquid material through section 300 .
- Horizontal channels 304 allow for the curable liquid material to flow out of pile section 300 .
- the curable liquid material would flow out of horizontal channels 304 and into a gap (such as gap 114 in the embodiments of FIGS. 1 a -1 e ).
- vertical channel 302 is not entirely enclosed in the solid material of pile section 300 .
- vertical channel 302 may be an exposed channel running along the outside face of pile section 300 .
- FIG. 3 shows a perspective view of pile section 400 according to an embodiment of the present disclosure.
- Pile section 400 comprises textured pattern 402 on its exterior surface.
- Textured pattern 402 comprises protrusions that extend outwardly from the surface of pile section 400 . These protrusions have the effects of increasing the friction between the outer surface of pile section 400 and any grout that may be in contact with it (such as grout 260 in the embodiments of FIGS. 1 a -1 h ).
- textured pattern 402 may be irregular.
- textured pattern 402 may be a regular pattern of repeating shapes.
- FIG. 4 shows a perspective view of pile section 500 according to an embodiment of the present disclosure.
- Pile section 500 comprises regular, circular-shaped protrusions 502 at regular intervals around the outer surface of pile section 500 .
- the function of protrusions 502 are similar to the function of textured pattern 402 in the embodiment of FIG. 3 .
- protrusions 502 may be non-circular but may for example be any other regular shape, such as an oval, or square.
- FIG. 5 shows a side view of a pair of pile sections 600 a , 600 b according to an embodiment of the present disclosure.
- Each pile section 600 a , 600 b comprises a castellations at an axial end.
- the castellations of first pile section 600 a are sized and shaped to interlock with the castellations of second pile section 600 b . This is achieved by the provision of female alignment portion 602 a , and the provision of male alignment portion 602 b .
- first pile section 600 a is brought together with second pile section 600 b , the respective alignment portions fit within one another and prevents pile sections 600 a , 600 b from experiencing any radial or circumferential displacement.
- the castellations enable a more straightforward alignment of the vertical channels of adjoining pile sections.
- FIG. 6 shows a plan view of pile section 700 according to an embodiment of the present disclosure.
- Pile section 700 is composed of three equally sized pre-cast concrete section components 702 , 704 , 706 . When the section components 702 , 704 , 706 are assembled together, they form a concrete cylinder that is pile section 700 .
- each section component comprises protrusion 702 b and recess 702 a at each end.
- Protrusion 702 b interlocks with recess 704 b of adjacent pile section 704 .
- recess 702 a interlocks with protrusion 704 a of the same adjacent pile section 704 .
- the protrusions and recesses ensure that once the pile sections are in position, the pile sections are only free to move in an axial direction, and are fully restricted in the radial and circumferential directions. Assembling the pile section from a plurality of section components allows the pile sections to be readily transported (as section components, that can typically be stacked or otherwise efficiently stored).
- FIG. 7 shows a plan view of pile section 800 according to an embodiment of the present disclosure.
- Pile section 800 is composed of five equally sized pre-cast concrete section components 802 , 804 , 806 , 808 , and 810 .
- the section components 802 , 804 , 806 , 808 , and 810 are assembled together, they form a hollow concrete pentagon that is pile section 800 .
- the pile sections need not necessarily be circular cylindrical.
- the pile sections may be other shapes such as polygonal. It may be that the section components of the pile sections are configured such that they can form different shaped/sized polygonal sections by altering the angle of the join between adjacent section components and/or by choosing differently sized section components.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
- Revetment (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1820764.7 | 2018-12-19 | ||
GB1820764.7A GB2580041B8 (en) | 2018-12-19 | 2018-12-19 | Improvements in and relating to pile foundations |
PCT/GB2019/053606 WO2020128466A1 (fr) | 2018-12-19 | 2019-12-18 | Perfectionnements dans et relatifs aux fondations sur pieux |
Publications (1)
Publication Number | Publication Date |
---|---|
US20220042268A1 true US20220042268A1 (en) | 2022-02-10 |
Family
ID=65147239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/416,276 Abandoned US20220042268A1 (en) | 2018-12-19 | 2019-12-18 | Improvements in and relating to pile foundations |
Country Status (6)
Country | Link |
---|---|
US (1) | US20220042268A1 (fr) |
EP (1) | EP3899146A1 (fr) |
AU (1) | AU2019411524A1 (fr) |
CA (1) | CA3123745A1 (fr) |
GB (1) | GB2580041B8 (fr) |
WO (1) | WO2020128466A1 (fr) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2606724B (en) | 2021-05-17 | 2024-06-05 | Hiper Pile Ltd | Pile assembly and method of making a pile assembly |
GB2607006A (en) | 2021-05-17 | 2022-11-30 | Keltbray Ltd | Pile cap |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3820347A (en) * | 1971-11-01 | 1974-06-28 | Oolite Ind Inc | Tapered piles and methods of using tapered piles |
US3992890A (en) * | 1974-01-28 | 1976-11-23 | Pynford Limited | Method of forming foundations |
US5288175A (en) * | 1992-02-10 | 1994-02-22 | Knight David W | Segmental precast concrete underpinning pile and method |
US20030159377A1 (en) * | 2002-02-22 | 2003-08-28 | Marshall Frederick S. | Cable end wedge lock |
US7909541B1 (en) * | 2008-10-24 | 2011-03-22 | Synchro Patents, Inc. | Apparatus and method for improved grout containment in post-grouting applications |
US20130160380A1 (en) * | 2011-12-22 | 2013-06-27 | Hubbell Incorporated | Helical pole support bracket and method for supporting a pole |
US8500368B1 (en) * | 2011-02-17 | 2013-08-06 | Patents of Tomball, LLC | Underpinning pile assembly and process for installing such pile assembly |
US20140212223A1 (en) * | 2013-01-30 | 2014-07-31 | Michael Hill | System and Apparatus for Repairing a Foundation |
US20160115763A1 (en) * | 2014-10-22 | 2016-04-28 | SFI Inc. | Tip-grouting tools including distribution materials and related methods |
US20190271131A1 (en) * | 2018-03-02 | 2019-09-05 | Magnum Piering, Inc. | Grouted helical pile |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE604793C (de) * | 1931-08-24 | 1934-10-29 | Andrew Hood | Verfahren zur Herstellung von Betonpfaehlen im Erdreich und vorher gefertigter Pfahlabschnitt fuer das Verfahren |
GB430378A (en) * | 1934-04-12 | 1935-06-18 | British Steel Piling Co Ltd | Improvements in and relating to concrete piles and columns |
FR1003517A (fr) * | 1947-01-16 | 1952-03-19 | Procédé d'exécution de fondations et ouvrages en résultant | |
GB870497A (en) * | 1959-11-16 | 1961-06-14 | Raymond Int Inc | Methods and apparatus for making concrete pile shells and piles |
FR1347660A (fr) * | 1960-05-25 | 1964-01-04 | Nippon Sharyo Seizo Kk | Pieux ou piles de fondation |
US3449918A (en) * | 1967-01-13 | 1969-06-17 | Gabriel Fuentes Jr | Concrete piles and methods and apparatus for forming and splicing them together |
US4239419A (en) * | 1977-10-27 | 1980-12-16 | Gillen William F Jr | Precast concrete threaded pilings |
NL8100094A (nl) * | 1981-01-09 | 1982-08-02 | Cor Groot | Paalconstructie. |
JPS5934329A (ja) * | 1982-08-17 | 1984-02-24 | Fujita Corp | 杭 |
ATE207168T1 (de) * | 1995-07-31 | 2001-11-15 | Helmut Hemmerlein Gmbh & Co Ba | Verfahren zur einbringung von sich verjüngenden pfählen, zugehörige pfähle, und daraus hergestellte gründungen und fundamentbildungen |
GB2330370B (en) * | 1997-10-18 | 2001-11-28 | Roxbury Ltd | Improvements in piling arrangements |
US7735273B2 (en) * | 2006-01-17 | 2010-06-15 | Morton Buildings | Poured concrete column hole |
GB0621013D0 (en) | 2006-10-20 | 2006-11-29 | Univ City | A pile and method of constructing the same |
CN101949150B (zh) * | 2010-10-15 | 2012-08-22 | 安徽亚坤建设集团有限公司 | 装配式透水薄壁锥形桩 |
KR20150050273A (ko) * | 2013-10-31 | 2015-05-08 | 남정호 | 지중파일 연결 및 시공방법 |
KR101945369B1 (ko) * | 2016-07-12 | 2019-02-08 | 주식회사 파일웍스 | Phc 말뚝 연결장치 및 그 제조방법 |
CN107964948B (zh) * | 2017-11-20 | 2023-09-19 | 长安大学 | 一种超大直径拼装式空心桩及其拼接方法 |
-
2018
- 2018-12-19 GB GB1820764.7A patent/GB2580041B8/en active Active
-
2019
- 2019-12-18 US US17/416,276 patent/US20220042268A1/en not_active Abandoned
- 2019-12-18 AU AU2019411524A patent/AU2019411524A1/en active Pending
- 2019-12-18 EP EP19832990.6A patent/EP3899146A1/fr active Pending
- 2019-12-18 CA CA3123745A patent/CA3123745A1/fr active Pending
- 2019-12-18 WO PCT/GB2019/053606 patent/WO2020128466A1/fr unknown
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3820347A (en) * | 1971-11-01 | 1974-06-28 | Oolite Ind Inc | Tapered piles and methods of using tapered piles |
US3992890A (en) * | 1974-01-28 | 1976-11-23 | Pynford Limited | Method of forming foundations |
US5288175A (en) * | 1992-02-10 | 1994-02-22 | Knight David W | Segmental precast concrete underpinning pile and method |
US20030159377A1 (en) * | 2002-02-22 | 2003-08-28 | Marshall Frederick S. | Cable end wedge lock |
US7909541B1 (en) * | 2008-10-24 | 2011-03-22 | Synchro Patents, Inc. | Apparatus and method for improved grout containment in post-grouting applications |
US8500368B1 (en) * | 2011-02-17 | 2013-08-06 | Patents of Tomball, LLC | Underpinning pile assembly and process for installing such pile assembly |
US20130160380A1 (en) * | 2011-12-22 | 2013-06-27 | Hubbell Incorporated | Helical pole support bracket and method for supporting a pole |
US20140212223A1 (en) * | 2013-01-30 | 2014-07-31 | Michael Hill | System and Apparatus for Repairing a Foundation |
US20160115763A1 (en) * | 2014-10-22 | 2016-04-28 | SFI Inc. | Tip-grouting tools including distribution materials and related methods |
US20190271131A1 (en) * | 2018-03-02 | 2019-09-05 | Magnum Piering, Inc. | Grouted helical pile |
Also Published As
Publication number | Publication date |
---|---|
WO2020128466A1 (fr) | 2020-06-25 |
GB2580041B (en) | 2023-05-31 |
GB201820764D0 (en) | 2019-01-30 |
CA3123745A1 (fr) | 2020-06-25 |
GB2580041A8 (en) | 2023-06-07 |
GB2580041A (en) | 2020-07-15 |
EP3899146A1 (fr) | 2021-10-27 |
AU2019411524A1 (en) | 2021-07-22 |
GB2580041B8 (en) | 2023-06-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5096333A (en) | Foundation repair method and apparatus | |
CN104018518B (zh) | 预制式地下连续墙以及施工地下室外墙和楼板的方法 | |
KR101179778B1 (ko) | 비개착식 지하구조물 시공방법 | |
US10851512B2 (en) | Foundation pile, a grouting method for the said pile and a manufacturing method therefor | |
US20220042268A1 (en) | Improvements in and relating to pile foundations | |
GB2478362A (en) | A pile with a tube extending lengthwise of the pile | |
CN114215042A (zh) | 一种加固地基基础的微型钢管桩及其施工方法 | |
TW202117138A (zh) | 波浪狀殼支承樁及其設置方法 | |
KR100617526B1 (ko) | 일체형으로 조립되는 조립식 프리캐스트 콘크리트 오수 맨홀 | |
KR102156277B1 (ko) | 연약지반의 기초 파일 시공 방법 및 이에 적용되는 연약지반의 기초 파일장치 | |
KR100849226B1 (ko) | ClP에 의한 흙막이 가시설 및 이 시공 방법 | |
KR20190109890A (ko) | 차수 성능을 향상시키기 위한 흙막이 벽체용 합성 phc 파일 | |
KR20190077888A (ko) | 흙막이 벽체용 합성 phc 파일 | |
CN109898505B (zh) | 软弱地层中具有补强结构的复合管桩 | |
JP5456627B2 (ja) | 杭と鉄骨柱との接合構造および接合方法 | |
KR100991248B1 (ko) | 팩을 이용한 마이크로 파일 기초공법 및 이에 사용되는파일 조립체 | |
KR20180131042A (ko) | 말뚝 및 그 시공방법 | |
KR101452185B1 (ko) | 강관 콘크리트 복합말뚝과 이의 제조장치 및 제조방법 | |
JP7057726B2 (ja) | 地下空間の形成方法、および地下空間の利用方法 | |
KR200342335Y1 (ko) | 일체형으로 조립되는 조립식 프리캐스트 콘크리트 오수맨홀 | |
RU129522U1 (ru) | Инъекционная свая для слабых глинистых грунтов | |
KR200427561Y1 (ko) | 복합 프리스트레스트 콘크리트 널말뚝 | |
EP4341493A1 (fr) | Ensemble pieu et procédé de fabrication d'un ensemble pieu | |
KR20200005837A (ko) | 탑다운 공법을 이용한 지하 수직구조물 시공 방법 및 이에 사용되는 세그먼트 | |
KR20200005841A (ko) | 탑다운 공법을 이용한 빗물저류조 시공 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: KELTBRAY LIMITED, UNITED KINGDOM Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:PELKEN, PAUL MICHAEL;NORMAN, STUART;REEL/FRAME:056588/0589 Effective date: 20210617 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |