EP3899146A1 - Perfectionnements dans et relatifs aux fondations sur pieux - Google Patents

Perfectionnements dans et relatifs aux fondations sur pieux

Info

Publication number
EP3899146A1
EP3899146A1 EP19832990.6A EP19832990A EP3899146A1 EP 3899146 A1 EP3899146 A1 EP 3899146A1 EP 19832990 A EP19832990 A EP 19832990A EP 3899146 A1 EP3899146 A1 EP 3899146A1
Authority
EP
European Patent Office
Prior art keywords
pile
bore
sections
column
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP19832990.6A
Other languages
German (de)
English (en)
Inventor
Paul Michael Pelken
Stuart Norman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hiper Pile Ltd
Original Assignee
Keltbray Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Keltbray Ltd filed Critical Keltbray Ltd
Publication of EP3899146A1 publication Critical patent/EP3899146A1/fr
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1685Shapes cylindrical
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Definitions

  • the present invention concerns piles. More particularly, but not exclusively, this invention concerns a pile within a bore and a method and a kit of parts for forming the same. The invention also concerns a building including a pile within a bore and a method of forming the same.
  • Piles are deep foundations providing support for buildings or other structures. They are typically long, narrow columns of reinforced concrete or steel.
  • Prior-art piles include pre-cast concrete piles that are driven into the ground using a pile-driver and cast solid concrete piles that are formed by digging a bore in the ground (typically using an auger), pouring concrete directly into the hole and allowing it to set.
  • WO 2008/047151 A1 (City University) discloses a method of forming a pile comprising: forming a bore in the ground to a required depth; disposing a cylinder in the bore; filling the bore with uncast concrete so that, on hardening, a cast concrete pile is formed in the bore, the pile having a longitudinal cavity permitting access to the pile along at least a portion of its length.
  • the longitudinal cavity is sufficiently wide to allow access to the longitudinal cavity so that cast concrete can be tested at a time after construction.
  • the present invention seeks to mitigate the above-mentioned problems.
  • a first aspect of the invention provides a method of forming a pile within a bore, the method comprising: stacking a plurality of hollow pile sections end-to-end within the bore to form a column, there being a gap between at least a part of an outside surface of the column and the surface of the bore;
  • a second aspect of the invention provides a method of constructing a building, the method including forming a pile within a bore by the method of the first aspect of the invention.
  • a third aspect of the invention provides a pile within a bore, the pile within a bore having the features set out in claim 8 below.
  • a fourth aspect of the invention provides a building including a pile within a bore according to the third aspect of the invention.
  • a fifth aspect of the invention provides a kit of parts having the features set out in claim 15 below.
  • FIGS la to lh are a sequence of side views of a pile being formed, according to a first embodiment of the present disclosure
  • FIG. 2 is a perspective view of a pile section according to a second embodiment of the present disclosure
  • FIG. 3 is a perspective view of a pile section according to a third embodiment of the present disclosure.
  • FIG. 4 is a perspective view of a pile section according to a fourth embodiment of the present disclosure
  • FIG. 5 is a side view of a pair of pile sections according to a fifth embodiment of the present disclosure
  • FIG. 6 is a plan view of a pile section according to a sixth embodiment of the present disclosure.
  • FIG. 7 is a plan view of a pile section according to a seventh embodiment of the present disclosure.
  • a first aspect of the invention provides a method of forming a pile within a bore, the method comprising:
  • the pile sections may be tubular pile sections; thus, the column may be a tube.
  • the pile sections are preferably concrete.
  • the pile sections are preferably pre-formed (for example pre-cast) at a location remote from the location at which the pile is to be formed.
  • the method may comprise the step of receiving the pile sections from a remote location.
  • the surface of the bore will be understood to be the surface of the surrounding soil into which the bore is made (typically longitudinally and circumferentially extending).
  • the method may include the step of joining together a plurality of section components to form each pile section.
  • the section components are preferably pre formed (for example pre-cast) at a location remote from the location at which the pile is to be formed.
  • the method may comprise the step of receiving the plurality of section components from a remote location, and then joining together the plurality of section components to form each pile section.
  • the curable liquid when in place and cured, is preferably configured to transfer the skin friction generated at the interface with the pile bore to the interface between the grout and the sections of the pile.
  • the curable liquid material may be grout.
  • the grout may comprise reinforcing material.
  • the curable liquid material may be for example resin.
  • grout is not concrete. Providing a pile formed from a stack of pile sections and then filling the gap between the pile and the bore, with the curable liquid, has been found to be especially advantageous because it tends to be possible to use on a variety of soil types (whereas the pile in WO 2008/047151 tends to be limited to use of clay soils).
  • the method may include the step of pouring the curable liquid material directly into the gap.
  • the curable liquid material may be inserted under relatively low pressure.
  • the method may comprise the step of applying additional curable liquid material after the previous liquid material has cured.
  • the additional curable liquid material may be supplied at relatively high pressure, for example such that it cracks and percolates through the first cured material. This step may be advantageous on fine soils as it enables the additional curable liquid to percolate into the soil.
  • the additional curable liquid material may be grout, preferably finer grout than the first curable liquid material.
  • the method may include the step of directing the curable liquid material into the gap through channels in the sections.
  • the stacking may include aligning the channels of one section with the channels of an adjacent section, such that the liquid material may flow from the channel in one section to the channel in an adjacent section. Alignment may be achieved visually but is more preferably achieved via an alignment arrangement (such as interlocking male and female members located at a common location on the opposing ends of the adjacent pile sections).
  • the adjacent pile sections may be configured to be self-aligning (for example they may comprise suitable inclined surfaces to ensure correct alignment as the adjacent sections are stacked together).
  • the method may include the step of digging the bore, for example using an auger.
  • the method may include the step of forming impressions into the interior wall of the bore.
  • the method may include lowering the pile sections into the bore sequentially, for example one-at-a-time.
  • the column may have a length that is substantially the same as the depth of the bore.
  • the column may be shorter than the depth of the bore.
  • the column may for example have a length that is between half the depth of the bore, and the full depth of the bore. Alternatively, the column may be longer than the depth of the bore.
  • the column may have a length that is more than three times its breadth.
  • the gap may be continuous.
  • the gap may extend across the majority, (preferably, all or substantially all) of the outside surface of the column and the surface of the bore.
  • the gap may be substantially uniform around the outside surface of the column.
  • the curable liquid material may fill all or substantially all of the gap.
  • the method may comprise the step of installing a pile cap on the top of the final pile section to close off the top of the stack of pile sections.
  • the method may comprise the step of selecting the pile cap from a plurality of differently-sized (more preferably different length) pile caps.
  • the pile caps may be pre-cast. This may ensure the correct height of the pile may be obtained (for example a relatively short cap can be provided if the stack of pile sections is relatively tall in the bore, and likewise a relatively long cap can be provided if the stack of pile sections is relatively short in the bore).
  • the method may comprise the step of initially installing a pile base piece in the base of the bore, to close off the base of the pile.
  • the pile base piece may facilitate increased end bearing resistance of the pile.
  • the pile base piece may be shaped to facilitate increased end bearing resistance of the pile.
  • a second aspect of the invention provides a method of constructing a building, the method including forming a pile within a bore by the above-mentioned method.
  • a third aspect of the invention provides a pile within a bore, comprising: a column comprising a stack of a plurality of pile sections arranged end-to-end within the bore, and a cured material between at least a part of an outside surface of the column and the surface of the bore.
  • the plurality of pile sections may include pile sections that have different widths from each other.
  • the column may taper in width, for example so that it has a smaller width at its base and a larger width at its top (or vice versa).
  • the pile sections forming the column may increase in width with height up the column (or vice versa).
  • the pile sections may have the same internal width (e.g. internal diameter).
  • a taper in the column may be achieved by varying the thickness of the wall of adjacent pile sections.
  • a channel in each pile section may be at the same spacing (e.g. radius) from the centre of the column. That spacing may be defined by the smallest width pile section.
  • the pile sections may be tubes.
  • the tubes may have a constant inner width along the height of the column (even in embodiments in which the outer width of the tubes is not the same along the height of the column, for example where the tubes forming the column increase in width with height up the column).
  • the tubes may have an internal width that is at least half their external width.
  • the pile sections may be circular in cross-section.
  • the pile sections may be polygonal in cross-section.
  • the pile sections may comprise elements (for example castellations) at each of their axial ends, the axial end elements being sized and shaped to interlock with the corresponding axial end elements of another of the pile sections.
  • the pile sections may comprise a plurality of section components.
  • Each pile section may for example be made from between 2 and 10 section components.
  • the plurality of section components may be identical to each other.
  • the section components may be segments of an annulus. Providing section components in each pile section may facilitate efficient transport of the components of the pile (compared to transporting fully assembled, or cast, pile sections).
  • Each pile section and preferably each pile section component, may comprise elements (for example, tongue-and-groove elements) at each axial end, sized and shaped to interlock with the corresponding elements of another of the pile section/pile section component.
  • the method may comprise the step of joining adjacent pile sections together, for example with a fastener.
  • At least some of the pile sections may include a raised and/or indented pattern on their outer surfaces, i.e. a textured pattern.
  • the pattern may be irregular.
  • the pattern may be a regular pattern of repeating shapes. Such an arrangement may facilitate effective binding of the curable liquid to the outer surface of the sections and/or increase the resistance between the outer surface of the pile and the cured liquid.
  • At least some of the sections may include protrusions on their outer surface, which may be arranged in a regular pattern. The protrusions may be dome shaped.
  • At least some of the sections may include channels configured to allow the transport of a curable liquid material along the length of the column.
  • the channels may be within the sections, for example entirely enclosed in the solid material of the sections (save at inlets and outlets).
  • the channels may be wholly or partly on the surface of the sections, for example the channels may be exposed channels running along a face of the sections.
  • the channels may comprise transport channels in fluid communication with outlet channels.
  • the transport channels may be vertical.
  • the outlet channels may be horizontal.
  • the transport channels may be in fluid communication with the outlet channels.
  • There may, for example, be a multiplicity, for example 1 to 10, transport channels in each pile section.
  • the transport channels may be at the same radial position in each pile section in the column.
  • the hollow pile sections may be concrete, for example pre-cast concrete.
  • Use of pre-cast concrete has the advantage that the pile sections (or the section
  • the pile sections can be manufactured remotely from the site of the bore and then transported to the bore for use.
  • Manufacturing the pile sections (or the section components) as pre-cast concrete, before their use in the bore, has the advantage that quality checks can be carried out on them before their installation in the ground.
  • the pile sections may be reinforced concrete.
  • a fourth aspect of the invention provides a building including a pile within a bore, as described herein.
  • the pile may be load-bearing within the building.
  • a fifth aspect of the invention provides a kit of parts for forming a pile within a bore, the kit comprising:
  • the plurality of pile sections are configured to be stacked end-to-end to form a column
  • the number of pile sections corresponds to a length of the column, said length being equal to at least half of the depth of the bore; and a curable liquid material.
  • Figs la to lh show in side view an example embodiment of the method of forming a pile.
  • bore 110 has been excavated in the ground 10 using an auger (not shown), which has been operated by piling rig 100.
  • Piling rig 100 includes attachment point 102 that is used to attach various apparatus that is to be lowered into bore 110. (For example, the auger was attached to attachment point 102 during the digging of the bore 110).
  • impression- forming attachment 104 is attached to attachment point 102 and is lowered into bore 110.
  • Impression- forming attachment 104 comprises a plurality of impression- forming elements 106 that are configured to form impressions in the interior wall of bore 110 when impression-forming attachment 104 is actuated to expand outwards in a radial direction. The actuation and expansion of impression forming attachment 104 is shown in Fig. lc.
  • Impression forming elements 106 are pressed into the wall of bore 110 to form impressions 112.
  • Impression forming attachment 104 is then withdrawn from bore 110 by piling rig 100 as shown in Fig.
  • impressions 112 are that when the pile is finally constructed, the skin friction between the pile and the bore is increased, thereby increasing the pull-out resistance and/or providing a piling structure that better reacts loads into the ground.
  • this feature is not essential to the invention and in alternative embodiments of the present disclosure, the steps of Figs lb to Id may be omitted, and substantially no impressions are formed in the wall of bore 110.
  • Pile section 200a has been attached to attachment point 102.
  • Pile section 200a is a hollow cylinder of prefabricated concrete.
  • Piling rig 100 lowers pile section 200a into bore 110 as indicated by directional arrow 105.
  • Successive pile sections 200b, 200c, 200d, 200e are attached to attachment point 102 and lowered into bore 110 respectively in turn. As shown in Fig. If, each successive pile section is stacked on top of the previous section to form vertical column 250. Dashed line 202 indicated the continuous inner surface of hollow column 250. The size of pile sections 200a-200e is selected such that when pile sections 200a-200e are stacked to form column 250, there is a gap 114 between the outer surface of column 250 and the inner surface of bore 110.
  • column 250 has a length that is substantially the same as the height of bore 110
  • column 250 may have a length that is shorter than the height of the bore, for example, to leave some space at the top of bore 110 for other structural features in the construction.
  • the length of column 250 may correspond to between half the height of bore 110, and the full height of bore 110.
  • the length of column 250 may correspond to a height greater than the height of bore 110.
  • Fig. lg shows that grout 260 is poured into gap 114.
  • the insertion of grout 260 is indicated by directional arrow 113.
  • Fig. lh shows that grout 260 has filled gap 114, including impressions 112 within the wall of bore 110. This forms completed pile 270.
  • grout 260 may be an alternative curable liquid material, for example a resin.
  • An advantage of grout is that it is light and cheap, and has relatively low viscosity (compared to more coarse materials such as concrete).
  • Column 250 is formed of concrete and can bear the majority of the primary longitudinal loads from any construction above.
  • the grout is arranged to transfer the skin friction generated at the interface with the pile bore to the interface between the grout and the pre-cast sections of the pile (i.e. such that the loads can be
  • pile sections 200a-200e may comprise channels.
  • Grout 260 is poured into the channels within column 250 to achieve a uniform distribution of grout 260 across the entire length of column 250.
  • Fig. 2 shows a perspective view of pile section 300 according to an embodiment of the present disclosure.
  • Pile section 300 comprises vertical channels 302 in fluid communication with horizontal channels 304 (shown in dashed lines in Figure 2).
  • Vertical channels 302 are designed to allow for a vertical flow of curable liquid material through section 300.
  • Horizontal channels 304 allow for the curable liquid material to flow out of pile section 300.
  • the curable liquid material would flow out of horizontal channels 304 and into a gap (such as gap 114 in the embodiments of Figs la-le).
  • vertical channel 302 is not entirely enclosed in the solid material of pile section 300. Instead vertical channel 302 may be an exposed channel running along the outside face of pile section 300.
  • Fig. 3 shows a perspective view of pile section 400 according to an
  • Pile section 400 comprises textured pattern 402 on its exterior surface.
  • Textured pattern 402 comprises protrusions that extend outwardly from the surface of pile section 400. These protrusions have the effects of increasing the friction between the outer surface of pile section 400 and any grout that may be in contact with it (such as grout 260 in the embodiments of Figs la-lh).
  • textured pattern 402 may be irregular.
  • textured pattern 402 may be a regular pattern of repeating shapes.
  • Fig. 4 shows a perspective view of pile section 500 according to an
  • Pile section 500 comprises regular, circular - shaped protrusions 502 at regular intervals around the outer surface of pile section 500.
  • the function of protrusions 502 are similar to the function of textured pattern 402 in the embodiment of Fig. 3.
  • protrusions 502 may be non-circular but may for example be any other regular shape, such as an oval, or square.
  • Fig. 5 shows a side view of a pair of pile sections 600a, 600b according to an embodiment of the present disclosure.
  • Each pile section 600a, 600b comprises a castellations at an axial end.
  • the castellations of first pile section 600a are sized and shaped to interlock with the castellations of second pile section 600b. This is achieved by the provision of female alignment portion 602a, and the provision of male alignment portion 602b.
  • first pile section 600a is brought together with second pile section 600b, the respective alignment portions fit within one another and prevents pile sections 600a, 600b from experiencing any radial or circumferential displacement.
  • pile sections 600a, 600b comprise channels (such as those of Fig.
  • FIG. 6 shows a plan view of pile section 700 according to an embodiment of the present disclosure.
  • Pile section 700 is composed of three equally sized pre-cast concrete section components 702, 704, 706. When the section components 702, 704, 706 are assembled together, they form a concrete cylinder that is pile section 700.
  • each section component comprises protrusion 702b and recess 702a at each end.
  • Protrusion 702b interlocks with recess 704b of adjacent pile section 704.
  • recess 702a interlocks with protrusion 704a of the same adjacent pile section 704.
  • the protrusions and recesses ensure that once the pile sections are in position, the pile sections are only free to move in an axial direction, and are fully restricted in the radial and circumferential directions. Assembling the pile section from a plurality of section components allows the pile sections to be readily transported (as section components, that can typically be stacked or otherwise efficiently stored).
  • Fig. 7 shows a plan view of pile section 800 according to an embodiment of the present disclosure.
  • Pile section 800 is composed of five equally sized pre-cast concrete section components 802, 804, 806, 808, and 810. When the section components 802, 804, 806, 808, and 810 are assembled together, they form a hollow concrete pentagon that is pile section 800.
  • the pile sections need not necessarily be circular cylindrical.
  • the pile sections may be other shapes such as polygonal. It may be that the section components of the pile sections are configured such that they can form different shaped/sized polygonal sections by altering the angle of the join between adjacent section components and/or by choosing differently sized section components.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Revetment (AREA)

Abstract

L'invention concerne un pieu (270) dans un trou (110) qui comprend une colonne (250). La colonne (250) comprend un empilement d'une pluralité de sections de pieu (300) agencées bout à bout dans le trou (110). Il y a un matériau durci (260) entre au moins une partie d'une surface extérieure de la colonne (250) et la surface du trou (110). Le matériau durci, par exemple du coulis, peut être fourni à travers des canaux dans les sections de pieu.
EP19832990.6A 2018-12-19 2019-12-18 Perfectionnements dans et relatifs aux fondations sur pieux Pending EP3899146A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB1820764.7A GB2580041B8 (en) 2018-12-19 2018-12-19 Improvements in and relating to pile foundations
PCT/GB2019/053606 WO2020128466A1 (fr) 2018-12-19 2019-12-18 Perfectionnements dans et relatifs aux fondations sur pieux

Publications (1)

Publication Number Publication Date
EP3899146A1 true EP3899146A1 (fr) 2021-10-27

Family

ID=65147239

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19832990.6A Pending EP3899146A1 (fr) 2018-12-19 2019-12-18 Perfectionnements dans et relatifs aux fondations sur pieux

Country Status (6)

Country Link
US (1) US20220042268A1 (fr)
EP (1) EP3899146A1 (fr)
AU (1) AU2019411524A1 (fr)
CA (1) CA3123745A1 (fr)
GB (1) GB2580041B8 (fr)
WO (1) WO2020128466A1 (fr)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2607006A (en) 2021-05-17 2022-11-30 Keltbray Ltd Pile cap
GB2606724B (en) 2021-05-17 2024-06-05 Hiper Pile Ltd Pile assembly and method of making a pile assembly

Family Cites Families (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE604793C (de) * 1931-08-24 1934-10-29 Andrew Hood Verfahren zur Herstellung von Betonpfaehlen im Erdreich und vorher gefertigter Pfahlabschnitt fuer das Verfahren
GB430378A (en) * 1934-04-12 1935-06-18 British Steel Piling Co Ltd Improvements in and relating to concrete piles and columns
FR1003517A (fr) * 1947-01-16 1952-03-19 Procédé d'exécution de fondations et ouvrages en résultant
GB870497A (en) * 1959-11-16 1961-06-14 Raymond Int Inc Methods and apparatus for making concrete pile shells and piles
FR1347660A (fr) * 1960-05-25 1964-01-04 Nippon Sharyo Seizo Kk Pieux ou piles de fondation
US3449918A (en) * 1967-01-13 1969-06-17 Gabriel Fuentes Jr Concrete piles and methods and apparatus for forming and splicing them together
US3820347A (en) * 1971-11-01 1974-06-28 Oolite Ind Inc Tapered piles and methods of using tapered piles
US3992890A (en) * 1974-01-28 1976-11-23 Pynford Limited Method of forming foundations
US4239419A (en) * 1977-10-27 1980-12-16 Gillen William F Jr Precast concrete threaded pilings
NL8100094A (nl) * 1981-01-09 1982-08-02 Cor Groot Paalconstructie.
JPS5934329A (ja) * 1982-08-17 1984-02-24 Fujita Corp
US5288175A (en) * 1992-02-10 1994-02-22 Knight David W Segmental precast concrete underpinning pile and method
ATE207168T1 (de) * 1995-07-31 2001-11-15 Helmut Hemmerlein Gmbh & Co Ba Verfahren zur einbringung von sich verjüngenden pfählen, zugehörige pfähle, und daraus hergestellte gründungen und fundamentbildungen
GB2330370B (en) * 1997-10-18 2001-11-28 Roxbury Ltd Improvements in piling arrangements
US6718707B2 (en) * 2002-02-22 2004-04-13 Frederick S. Marshall Cable end wedge lock
US7735273B2 (en) * 2006-01-17 2010-06-15 Morton Buildings Poured concrete column hole
GB0621013D0 (en) 2006-10-20 2006-11-29 Univ City A pile and method of constructing the same
US7909541B1 (en) * 2008-10-24 2011-03-22 Synchro Patents, Inc. Apparatus and method for improved grout containment in post-grouting applications
CN101949150B (zh) * 2010-10-15 2012-08-22 安徽亚坤建设集团有限公司 装配式透水薄壁锥形桩
US8500368B1 (en) * 2011-02-17 2013-08-06 Patents of Tomball, LLC Underpinning pile assembly and process for installing such pile assembly
US8631627B2 (en) * 2011-12-22 2014-01-21 Hubbell Incorporated Helical pole support bracket and method for supporting a pole
US9022694B2 (en) * 2013-01-30 2015-05-05 Michael Hill System and apparatus for repairing a foundation
KR20150050273A (ko) * 2013-10-31 2015-05-08 남정호 지중파일 연결 및 시공방법
US9732585B2 (en) * 2014-10-22 2017-08-15 Shimmick/Fcc/Impregilo Joint Venture Tip-grouting tools including distribution materials and related methods
KR101945369B1 (ko) * 2016-07-12 2019-02-08 주식회사 파일웍스 Phc 말뚝 연결장치 및 그 제조방법
CN107964948B (zh) * 2017-11-20 2023-09-19 长安大学 一种超大直径拼装式空心桩及其拼接方法
US10767334B2 (en) * 2018-03-02 2020-09-08 Magnum Piering, Inc. Grouted helical pile

Also Published As

Publication number Publication date
GB201820764D0 (en) 2019-01-30
WO2020128466A1 (fr) 2020-06-25
GB2580041B (en) 2023-05-31
GB2580041A8 (en) 2023-06-07
GB2580041B8 (en) 2023-06-07
AU2019411524A1 (en) 2021-07-22
US20220042268A1 (en) 2022-02-10
CA3123745A1 (fr) 2020-06-25
GB2580041A (en) 2020-07-15

Similar Documents

Publication Publication Date Title
US5096333A (en) Foundation repair method and apparatus
US7416367B2 (en) Lateral force resistance device
CN100516383C (zh) 构建桩基础的方法
US20220042268A1 (en) Improvements in and relating to pile foundations
CA2974682C (fr) Pieu pour fondation, procede d'injection dudit pieu et procede de fabrication de celui-ci
US8172483B2 (en) Foundation underpinning
TW202117138A (zh) 波浪狀殼支承樁及其設置方法
KR100617526B1 (ko) 일체형으로 조립되는 조립식 프리캐스트 콘크리트 오수 맨홀
KR100849226B1 (ko) ClP에 의한 흙막이 가시설 및 이 시공 방법
KR20190109890A (ko) 차수 성능을 향상시키기 위한 흙막이 벽체용 합성 phc 파일
KR100991248B1 (ko) 팩을 이용한 마이크로 파일 기초공법 및 이에 사용되는파일 조립체
EP1600561A1 (fr) Rideau de palplanches résistant à l'eau forme in-situ et son procede de fabrication
KR102156277B1 (ko) 연약지반의 기초 파일 시공 방법 및 이에 적용되는 연약지반의 기초 파일장치
KR102021496B1 (ko) 하향식 계단형 흙막이 시공방법 및 이를 통해 시공된 흙막이 구조체
KR20190077888A (ko) 흙막이 벽체용 합성 phc 파일
CN111549750B (zh) 一种用于控制不均匀沉降的海塘与水闸连接段地基结构及其施工方法
CN213233417U (zh) 一种组合桩以及组合基础
KR102124772B1 (ko) 자립식 옹벽 및 이를 이용한 시공방법
CN108677931B (zh) 一种大直径超长组合灌注桩施工方法
JP7057726B2 (ja) 地下空間の形成方法、および地下空間の利用方法
RU129522U1 (ru) Инъекционная свая для слабых глинистых грунтов
KR200427561Y1 (ko) 복합 프리스트레스트 콘크리트 널말뚝
EP4341493A1 (fr) Ensemble pieu et procédé de fabrication d'un ensemble pieu
CN218027734U (zh) 一种嵌入注浆管的埋入式隔离桩
CN116575496B (zh) 一种桥梁全预制桩基承台连接结构和施工方法

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20210628

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: HIPER PILE LIMITED

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20240318