US20160083222A1 - Guide rail alignment systems for elevators - Google Patents

Guide rail alignment systems for elevators Download PDF

Info

Publication number
US20160083222A1
US20160083222A1 US14/956,009 US201514956009A US2016083222A1 US 20160083222 A1 US20160083222 A1 US 20160083222A1 US 201514956009 A US201514956009 A US 201514956009A US 2016083222 A1 US2016083222 A1 US 2016083222A1
Authority
US
United States
Prior art keywords
guide rail
spring
connecting element
alignment system
compression elements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/956,009
Other languages
English (en)
Inventor
Alejandro Revuelta FERNANDEZ
Mikael Haag
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kone Corp
Original Assignee
Kone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kone Corp filed Critical Kone Corp
Assigned to KONE CORPORATION reassignment KONE CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: FERNANDEZ, ALEJANDRO REVUELTA, HAAG, MIKAEL
Publication of US20160083222A1 publication Critical patent/US20160083222A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor
    • B66B7/026Interconnections
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/002Mining-hoist operation installing or exchanging guide rails
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/0087Devices facilitating maintenance, repair or inspection tasks

Definitions

  • the present disclosure relates to a device and a method for correcting guide rail alignment errors.
  • Guide rails are used to guide the vertical movement of an elevator in an elevator shaft.
  • Guide rails are constructed from multiple guide rail sections that are connected to each other from their vertical ends to form a continuous guiding structure for the elevator. The connection between two adjacent guide rail sections is secured through a connecting element, for example a fishplate, that is attacked to both guide rail sections through bolts or similar.
  • the guide rails are attached to the walls of the elevator shaft through brackets.
  • the accurate alignment of the adjacent guide rail sections is necessary to prevent disturbances in the elevator path when it moves over a junction of two guide rail sections and to ascertain that the guide shoes or guide rollers touch the guide rails appropriately throughout the entire length of the elevator movement.
  • the correction of alignment errors is achieved through adding washers or shims between the guide rail section and the fishplate. When done appropriately, this both flattens out bends in the guide rail sections and moves the ends of the two guide rail sections to accurately face each other.
  • Guide rails are typically installed in the elevator shaft in a bottom-up manner.
  • the vertical line in which each guide rail should run is first established with the aid of a plumb line or a laser beam.
  • the two bottom-most guide rail sections, one on each opposite wall of the elevator shaft, are then attached to the walls through the brackets.
  • the straightness of the guide rail sections is checked and adjusted through the brackets if necessary.
  • the next pair of guide rail sections is mounted on top of the first pair and attached to the wall as the previous guide rail sections.
  • the straightness of the guide rail sections is checked in relation to the guide rail section below and adjusted through the brackets if necessary.
  • the fishplate is then added at the formed junction and the ends are aligned. The process is repeated until both guide rails are complete.
  • the final adjustment of the guide rail sections is carried out by shimming, i.e. by adding shims or washers between the guide rail section and the fishplate to force a slight curvature in the guide rail section in order to change the position of the end of a guide rail section. This corrects alignment errors in different directions that can result from tensions within the completed guide rail.
  • a fish-plate comprising an intermediate portion to which the ends of the guide rail sections to be joined are affixed, and integral extensions which are spaced from the back surfaces of the adjacent guide rail sections is disclosed.
  • the integral extensions include jacking bolts which are adjusted to provide forces on the guide rail sections correcting the misalignment of the guide rail sections and restraining the guide rail sections to hold the accurate position. Since the intermediate portion of the fishplate is thicker than the integral extensions, the jacking bolts can be adjusted to force the guide rail section to an appropriate position.
  • the bolts are screwed to the guide rail section from different directions depending on the direction of the misalignment of the guide rail sections (i.e. whether the bend is towards the inside of the elevator shaft or towards its wall). This means, that it might be necessary to remove the fishplate after it has been installed for changing the direction of the jacking bolts. Furthermore, in one orientation of the jacking bolts, there is no corresponding hole in the guide rail section (the jacking bolt needs to push the guide rail section relative to the fishplate), whereas in the other orientation a hole is needed for the adjustment (the jacking bolt needs to pull the guide rail section relative to the fishplate).
  • An object of the present invention is to provide an improved guide rail alignment system and a method for correcting guide rail alignment errors.
  • the guide rail alignment system and the method for correcting guide rail alignment errors are in particular, but not only, intended for elevators, especially for passenger or cargo elevators of buildings.
  • the guide rail alignment system and the method for correcting guide rail alignment errors may be used with other guide rails as well.
  • a guide rail herein is meant a continuous rail that guides the substantially vertical movement of an elevator in an elevator shaft.
  • a guide rail section is meant a section of a guide rail that is attached from its one end to an adjacent guide rail section or from its both ends to two adjacent guide rail sections.
  • shimming By correcting guide rail alignment errors herein is meant a procedure in which the curvature of a guide rail section or the relative positions of two adjacent guide rail sections is adjusted with the aid of a connecting element, typically a fishplate, and components attached thereto in order to correct guide rail alignment errors.
  • a guide rail alignment system By a guide rail alignment system is herein meant the connecting element, such as a fishplate, attached to two adjacent guide rail sections, intermediate elements, such as washers, shims, cup springs, leaf, springs or elastic spacers located between the guide rail section and the connecting element, the portions of both guide rail sections that are in contact with the connecting element, possibly through the said intermediate elements, and compression elements, such as bolts, screws, adjustable pins, clamps or tighteners, that attach the connecting element to the guide rail sections.
  • the intermediate elements can be either separate or integrated into other elements of the guide rail alignment system.
  • a spring is herein meant a body that is elastic and more compliant than the surrounding load-bearing structures.
  • the guide rail alignment system presented here is characterized by comprising at least one connecting element, two guide rail sections, each section having two ends, joined to each other from one of their ends by the at least one connecting element, compression elements attaching the at least one connecting element to the guide rail sections, and intermediate elements between the at least one connecting element and at least one of the guide rail sections, and further characterized in that at least one of the intermediate elements is a spring that is compressible in response to tightening one or more of the compression elements.
  • a guide rail of an elevator characterized in that it comprises at least one pair of guide rail sections connected through a guide rail alignment system according to the present disclosure.
  • an elevator comprising an elevator shaft, at least one guide rail, an elevator car arranged to move within the elevator shaft along the at least one guide rail, characterized in that the elevator comprises at least one guide rail with at least one pair of guide rail sections connected through a guide rail alignment system according to the present disclosure.
  • a method for correcting guide rail alignment errors comprising joining two guide rail sections, each section having two ends, to each other from one of their ends by at least one connecting element, attaching the at least one connecting element to the guide rail sections by compression elements, characterized in that the method comprises using spring force between the connecting element and at least one of the guide rail sections to correct guide rail section alignment errors, and adjusting the spring force by altering the tightness of at least one compression element.
  • the at least one connecting element and the two guide rail sections comprise holes that are arranged so, that the holes in the guide rail sections can be aligned with the holes in the connecting element and that the compression elements attach the at least one connecting element to the guide rail sections through the holes.
  • the at least one spring is configured to exert pressure on the guide rail section to create a bending tension in it in the direction of the spring force in response to loosening one or more of the compression elements.
  • the guide rail is configured to be attached to a solid support, wherein the bending tension in the guide rail section caused by the pressure from the partially released at least one spring is configured to alter curvature in the guide rail section and/or to adjust the relative positions of two adjacent guide rail sections.
  • curvature of the guide rail section and/or the relative positions of two adjacent guide rail sections is configured to be altered by tightening one or more of the compression elements to a predetermined torque during installation and by thereafter loosening or further tightening one or more of the compression elements by a predetermined amount.
  • the at least one spring is a cup spring, elastic spacer, leaf spring, helical spring, wave spring, or an integrated spring achieved through local elasticity of the connecting element or of the guide rail section.
  • the at least one spring is sunken into the connecting element so, that when the compression elements are completely tightened, the connecting element is in contact with the guide rail sections with its whole guide-rail facing surface.
  • the at least one spring is incorporated to the connecting element prior to the assembly of the guide rail alignment system.
  • the guide rail alignment system contains one connecting element in which there are at least eight holes arranged in two rows of four in the direction of the guide rail.
  • the method for correcting guide rail alignment errors is characterized in that the spring force is produced by at least one spring, and that the method comprises the steps of
  • the method for correcting guide rail alignment errors is characterized in that the spring force is produced by at least one spring, and that the method comprises the steps of
  • FIG. 1 presents a schematic overview of one embodiment of the guide rail alignment system according to the present disclosure.
  • FIG. 2 presents a schematic overview of the embodiment in FIG. 1 viewed from the side.
  • FIG. 3A presents a schematic overview of the embodiment in FIG. 1 as a cross-sectional view along the plane A-A′ in preload position before correcting guide rail alignment errors.
  • FIG. 3B presents a schematic overview of the embodiment in FIG. 1 as a cross-sectional view along the plane B-B′ after correcting guide rail alignment errors.
  • FIG. 4A presents a pair of guide rail sections joined by a guide rail alignment system according to the present disclosure in preload position before correcting guide rail alignment errors.
  • FIG. 4B presents a pair of guide rail sections joined by a guide rail alignment system according to the present disclosure after correcting guide rail alignment errors.
  • FIG. 5 presents a schematic overview of an elevator in which a guide rail alignment system according to the present disclosure is used.
  • FIG. 1 presents a guide rail alignment system 1 with two guide rail sections 2 , 3 joined by one connecting element 4 , which in this case is a fishplate.
  • the guide rail sections 2 , 3 have a T-shaped cross-sectional profile (shown more closely in FIG. 3 ) and the guide rollers or guide shoes of the elevator car 11 move along the ridge ( 2 ′, 3 ′) of the guide rail sections 2 , 3 .
  • the fishplate 4 is located on the side of the guide rail sections 2 , 3 that faces the elevator shaft 10 wall.
  • the guide rail sections 2 , 3 are typically about 5 m long, although the length can vary. They also vary in their width in different elevator constructions, but can have a width of, for example, 127 mm.
  • the fishplate 4 is approximately as wide as the guide rail sections 2 , 3 , and in the above-mentioned case 130 mm. Also the length of the fishplate 4 varies and can be, for example, 305 mm for the above guide rail sections 2 , 3 .
  • the thinnest fish-plates 4 can be only 5 mm thick, but a thickness of, for example, 17 mm can be considered typical.
  • the fishplates 4 can also have additional rigidifying structures, such as ridges in them, which are omitted from the figure.
  • the fishplate 4 is attached to each guide rail section 2 , 3 through four compression elements 6 , which in this case are bolts and their respective holes 5 ′, 5 in the fishplate 4 and in the guide rail sections 2 , 3 .
  • the holes are arranged in two rows of four holes 5 , 5 ′ in the direction of the guide rail 12 , but this does not need to be the only arrangement.
  • a smaller or larger number of holes 5 , 5 ′ and their respective bolts 6 is possible, depending on the heaviness of the structure and the forces necessary to correct the alignment errors in the guide rail sections 2 , 3 .
  • the number of the bolts 6 and their respective holes 5 , 5 ′ do not need to be the same for both guide rail sections 2 , 3 in a given guide rail alignment system 1 .
  • the bolts 6 can alternatively be screws, adjustable pins, clamps or tighteners, or other compression elements depending on the specific embodiment in question and also the spacing of the holes 5 , 5 ′ with compression elements 6 can vary.
  • the guide rail section 2 , 3 and the connecting element 4 do not need to be attached to each other through compression elements 6 that need holes 5 , 5 ′.
  • the compression elements 6 can be adjustable clamps, presses or other tighteners.
  • the holes 5 , 5 ′ do not need to be circular. Further, they can have an opening to the side of the guide rail section 2 , 3 or connecting element 4 or both, forming a slot rather than a hole with a closed circumference.
  • connecting element 4 per guide rail alignment system 1 : for example a configuration of two narrow connecting elements 4 with a single row of holes 5 ′ and compression elements 6 in each can be envisaged.
  • FIG. 1 There are intermediate elements 7 between the guide rail sections 2 , 3 and the fishplate 4 that in the embodiment of FIG. 1 are cup springs 7 through which the bolts 6 are fitted.
  • the guide rail alignment system 1 is depicted in the preload position, i.e. with the cup springs 7 fully compressed by the bolts 6 .
  • the fishplate 4 does not touch the guide rail sections 2 , 3 directly, but only through the springs 7 .
  • the cup springs or other intermediate elements 7 could be sunken into the connecting element 4 so, that in the preload position the connecting element 4 and the guide rail sections 2 , 3 would contact each other directly.
  • springs 7 in all positions of the bolts 6 and holes 5 , 5 ′, this is not necessary, if sufficient adjustment can be achieved with a smaller number of springs 7 .
  • springs 7 in conjunction only with the bolts 6 on one side of the guide rail junction 8 or only in certain positions on both sides of the guide rail junction 8 .
  • the intermediate elements 7 are fully compressed, it is possible to compress them only to a predetermined torque, for example 120 Nm by using, for example, a torque wrench. This allows the correction of guide rail 12 alignment errors by either increasing the bending moment or by decreasing it through tightening the compression element 6 further or loosening it, respectively.
  • the springs 7 have to be compressible enough to allow them to be released, for example, 0.5 mm from the preload position, and to still retain enough mechanical energy to exert a sufficiently large force on the guide rail section 2 , 3 .
  • the magnitude of the force and movement parameters vary broadly in different constructions and have to be adjusted for different guide rail section 2 , 3 configurations.
  • the material for the construction of all parts is usually steel, but also other materials might be suitable.
  • the guide rail alignment system 1 of the present disclosure can be used in a guide rail 12 together with guide rail alignment systems 1 known in prior art.
  • FIG. 2 presents the guide rail alignment system 1 of FIG. 1 viewed from one side.
  • the guide rail sections 2 , 3 are accurately aligned and the cup springs 7 fully compressed between the fishplate 4 and the guide rail sections 2 , 3 by the bolts 6 .
  • This is the ideal initial preload position after the installation of the guide rail sections 2 , 3 . If the springs 6 were sunken into holes, the fishplate 4 and the guide rail 12 could be pressed against each other throughout the length of the fishplate 4 .
  • FIG. 3A presents the guide rail alignment system 1 of FIG. 1 as a cross-sectional view along the plane A-A′ in preload position before correcting guide rail 12 alignment errors.
  • the guide rail section 3 has a T-shaped cross-sectional profile with a ridge 3 ′.
  • the surface of the guide rail section 3 that the bolts 6 attach to is slightly sloped relative to the surface facing the fishplate 4 . Therefore, there are indentations in the guide rail section 3 around each hole 5 to provide a horizontal surface for the bolts 6 in the direction of their tightening.
  • the cup springs 7 are fully compressed. However, it would be possible to tighten the springs 7 to a predetermined torque instead of compressing them fully before correcting the guide rail 12 alignment errors. Thereafter, the guide rail 12 alignment errors could be corrected either by loosening the springs 7 or tightening them further by a predetermined amount.
  • FIG. 3B presents the guide rail alignment system 1 of FIG. 1 as a cross-sectional view along the plane B-B′ after correcting guide rail 12 alignment errors.
  • the bolts 6 have been loosened and, compared to FIG. 3A , the guide rail section 3 and the fishplate 4 are further apart.
  • the cup springs 7 are less compressed and exert a bending tension on the guide rail section 3 .
  • FIG. 4A presents a pair of guide rail sections 2 , 3 joined by a guide rail alignment system 1 in preload position before correcting guide rail 12 alignment errors.
  • the guide rail sections 2 , 3 are mounted on the elevator shaft 10 wall by brackets 14 (not shown).
  • a detail view of the guide rail alignment system 1 is also shown.
  • the intermediate elements 7 which in this embodiment are cup springs, are sunken in the connecting element 4 , which in this embodiment is a fishplate, allowing the fishplate 4 and the guide rail sections 2 , 3 to contact each other directly throughout the length of the fishplate 4 .
  • All the compression elements which in this embodiment are bolts 6 , are tightened completely, i.e. the complete length of their compression range is used. In cases where the alignment errors would be of different magnitude, direction or position, it is possible that not all the bolts 6 are fully tightened even in the preload position.
  • the guide rail sections 2 , 3 are twisted so, that they do not form a straight guide rail 12 structure (indicated by the dashed line).
  • FIG. 4B presents the pair of guide rail sections 2 , 3 joined by a guide rail alignment system 1 of FIG. 4A after correcting guide rail 12 alignment errors.
  • a detail view of the guide rail alignment system 1 is also shown.
  • the bolts 6 attached to the guide rail section 3 of the guide rail alignment system 1 have been loosened.
  • the partially released bolts 6 allow the cup springs 7 to press against the guide rail section 3 creating a bending tension and force between the guide rail sections 2 and 3 .
  • Both the guide rail sections 2 and 3 have straightened relative to the straight line as was aimed for by the procedure (indicated by the dashed line).
  • FIG. 5 presents an elevator 9 comprising an elevator shaft 10 , an elevator car 11 arranged to move within the elevator shaft 10 (indicated by the double-headed arrow), a guide rail 12 and guide shoes or rollers 13 that move along the guide rail 12 .
  • the guide rail 12 comprises guide rail sections 2 , 3 and guide rail alignment systems 1 , and is attached to the elevator shaft 10 wall through brackets 14 .
  • Guide rail alignment systems 1 according to the present disclosure can be used in all guide rail junctions 8 of the elevator 9 or one or more guide rail alignment systems 1 can be according to prior art and used in combination with the guide rail alignment systems 1 disclosed herein.

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
US14/956,009 2013-07-03 2015-12-01 Guide rail alignment systems for elevators Abandoned US20160083222A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP13174819.6A EP2821358B1 (en) 2013-07-03 2013-07-03 Guide rail alignment system for elevators
EP13174819.6 2013-07-03
PCT/FI2014/050537 WO2015001183A1 (en) 2013-07-03 2014-06-27 Guide rail alignment system for elevators

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
PCT/FI2014/050537 Continuation WO2015001183A1 (en) 2013-07-03 2014-06-27 Guide rail alignment system for elevators

Publications (1)

Publication Number Publication Date
US20160083222A1 true US20160083222A1 (en) 2016-03-24

Family

ID=48745780

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/956,009 Abandoned US20160083222A1 (en) 2013-07-03 2015-12-01 Guide rail alignment systems for elevators

Country Status (8)

Country Link
US (1) US20160083222A1 (zh)
EP (1) EP2821358B1 (zh)
JP (1) JP6316416B2 (zh)
CN (1) CN105358463B (zh)
AU (1) AU2014286041A1 (zh)
SA (1) SA516370343B1 (zh)
SG (1) SG11201509843XA (zh)
WO (1) WO2015001183A1 (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180079624A1 (en) * 2015-04-09 2018-03-22 Thyssenkrupp Elevator Ag Guide rail for an elevator system
ES2665562A1 (es) * 2016-10-25 2018-04-26 S.A.. De Vera (Savera) Sistema de unión con auto-alineado, para guías de ascensor
US20180170712A1 (en) * 2016-12-20 2018-06-21 Otis Elevator Company Foldable guide rail tracks for elevator systems
CN113772513A (zh) * 2021-10-15 2021-12-10 广州塞维拉电梯轨道系统有限公司 一种电梯导轨检测方法及系统
US11199091B2 (en) * 2018-07-27 2021-12-14 Hefei Design & Research Inst. Of Coal Industry Co., LTD. Cageway connecting device and connecting method thereof
US11358834B2 (en) * 2019-07-16 2022-06-14 Kone Corporation Elevator guide rail element
CN115962704A (zh) * 2023-03-16 2023-04-14 蒂升电梯(中国)有限公司成都分公司 一种高效测量电梯导轨直线度的装置及其测量方法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3280673B1 (en) 2015-04-10 2019-06-05 Otis Elevator Company Elevator safety gear alignment system and method
MX2019006015A (es) * 2016-11-24 2019-08-01 Inventio Ag Metodo para montaje y dispositivo de alineacion para alineacion de riel guia de sistema de elevador.
EP3336040B1 (en) * 2016-12-19 2021-03-17 KONE Corporation Arrangement and method for aligning guide rails of an elevator
CN111056402A (zh) * 2018-10-17 2020-04-24 广州广日电梯工业有限公司 电梯导轨的调节设备及电梯导轨的调节方法
WO2020193186A2 (de) * 2019-03-26 2020-10-01 Inventio Ag Ausrichtvorrichtung und verfahren zum ausrichten einer führungsschiene einer aufzuganlage

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1720202A (en) * 1928-06-06 1929-07-09 Union Drawn Steel Company Guide rail
US1836713A (en) * 1930-03-26 1931-12-15 William B Hewitt Tie plate
US2848077A (en) * 1956-01-24 1958-08-19 Otis Elevator Co Elevator guide rail fastener
US3199642A (en) * 1964-02-21 1965-08-10 Otis Elevator Co Rail positioning and fastening device
US3420337A (en) * 1967-09-21 1969-01-07 John E Magee Rail fastener
US4431087A (en) * 1981-05-29 1984-02-14 Westinghouse Electric Corp. Guide rail clamping method and assembly
US4577729A (en) * 1984-12-05 1986-03-25 Westinghouse Electric Corp. Guide rail clamping assembly
US5020641A (en) * 1990-06-20 1991-06-04 Otis Elevator Company Method and apparatus for erecting hydraulic elevator rails
US5214947A (en) * 1990-11-28 1993-06-01 Kone Elevator Gmbh Procedure and apparatus for checking the straightness of elevator guide rails and straightening deflections
US5346131A (en) * 1992-02-28 1994-09-13 Hilti Aktiengesellschaft Device for supporting rails
US6991070B1 (en) * 1999-12-23 2006-01-31 S.A. De Vera (Savera) Elevator guide assembly system
US7717352B2 (en) * 2005-04-02 2010-05-18 Kölner Verkehrs-Betriebe AG Rail seat

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4079817A (en) 1976-11-16 1978-03-21 Westinghouse Electric Corporation Elevator system with fish plate for correcting an out-of-tolerance between guide dimension
CH680786A5 (zh) * 1990-03-26 1992-11-13 Inventio Ag
FI92314C (fi) * 1992-07-23 1994-10-25 Kone Oy Järjestely hissijohteen kiinnittämiseksi johdealustaan
JP3396534B2 (ja) * 1994-04-26 2003-04-14 株式会社東芝 エレベータガイドレールの固定装置
JPH0952675A (ja) * 1995-08-15 1997-02-25 Toshiba Fa Syst Eng Kk エレベータ用ガイドレール取付装置
JP3488550B2 (ja) * 1995-09-20 2004-01-19 東芝エレベータ株式会社 エレベータガイドレールの接続装置
JPH1087224A (ja) * 1996-09-11 1998-04-07 Hitachi Ltd エレベータ用ガイドレール
JP4756771B2 (ja) * 2001-05-17 2011-08-24 三菱電機株式会社 エレベーターの案内レール装置
EP1414730B1 (de) * 2001-07-30 2006-04-05 Inventio Ag Verfahren und vorrichtung zum befestigen einer führungsschiene
JP2003266261A (ja) * 2002-03-12 2003-09-24 Toshiba Elevator Co Ltd ガイドレールの加工方法
ATE443019T1 (de) * 2003-07-15 2009-10-15 Monteferro S P A Positioniervorrichtung für die führungsschienen von aufzügen
JP2005132597A (ja) * 2003-10-31 2005-05-26 Mitsubishi Electric Corp エレベータ用ガイドレール固定装置
FI119983B (fi) * 2006-05-24 2009-05-29 Kone Corp Menetelmä ja järjestelmä hissin johteiden asentamiseksi
FI20100129A (fi) * 2010-03-24 2011-09-25 Kone Corp Hissin johde ja hissi

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1720202A (en) * 1928-06-06 1929-07-09 Union Drawn Steel Company Guide rail
US1836713A (en) * 1930-03-26 1931-12-15 William B Hewitt Tie plate
US2848077A (en) * 1956-01-24 1958-08-19 Otis Elevator Co Elevator guide rail fastener
US3199642A (en) * 1964-02-21 1965-08-10 Otis Elevator Co Rail positioning and fastening device
US3420337A (en) * 1967-09-21 1969-01-07 John E Magee Rail fastener
US4431087A (en) * 1981-05-29 1984-02-14 Westinghouse Electric Corp. Guide rail clamping method and assembly
US4577729A (en) * 1984-12-05 1986-03-25 Westinghouse Electric Corp. Guide rail clamping assembly
US5020641A (en) * 1990-06-20 1991-06-04 Otis Elevator Company Method and apparatus for erecting hydraulic elevator rails
US5214947A (en) * 1990-11-28 1993-06-01 Kone Elevator Gmbh Procedure and apparatus for checking the straightness of elevator guide rails and straightening deflections
US5346131A (en) * 1992-02-28 1994-09-13 Hilti Aktiengesellschaft Device for supporting rails
US6991070B1 (en) * 1999-12-23 2006-01-31 S.A. De Vera (Savera) Elevator guide assembly system
US7717352B2 (en) * 2005-04-02 2010-05-18 Kölner Verkehrs-Betriebe AG Rail seat

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180079624A1 (en) * 2015-04-09 2018-03-22 Thyssenkrupp Elevator Ag Guide rail for an elevator system
US10723591B2 (en) * 2015-04-09 2020-07-28 Thyssenkrupp Elevator Innovation And Operations Gmbh Guide rail for an elevator system
ES2665562A1 (es) * 2016-10-25 2018-04-26 S.A.. De Vera (Savera) Sistema de unión con auto-alineado, para guías de ascensor
US20180170712A1 (en) * 2016-12-20 2018-06-21 Otis Elevator Company Foldable guide rail tracks for elevator systems
US11199091B2 (en) * 2018-07-27 2021-12-14 Hefei Design & Research Inst. Of Coal Industry Co., LTD. Cageway connecting device and connecting method thereof
US11358834B2 (en) * 2019-07-16 2022-06-14 Kone Corporation Elevator guide rail element
CN113772513A (zh) * 2021-10-15 2021-12-10 广州塞维拉电梯轨道系统有限公司 一种电梯导轨检测方法及系统
CN115962704A (zh) * 2023-03-16 2023-04-14 蒂升电梯(中国)有限公司成都分公司 一种高效测量电梯导轨直线度的装置及其测量方法

Also Published As

Publication number Publication date
AU2014286041A1 (en) 2016-02-18
JP6316416B2 (ja) 2018-04-25
WO2015001183A1 (en) 2015-01-08
CN105358463A (zh) 2016-02-24
SA516370343B1 (ar) 2020-03-22
JP2016523217A (ja) 2016-08-08
CN105358463B (zh) 2018-01-30
EP2821358A1 (en) 2015-01-07
SG11201509843XA (en) 2016-01-28
EP2821358B1 (en) 2016-11-30

Similar Documents

Publication Publication Date Title
US20160083222A1 (en) Guide rail alignment systems for elevators
KR101200589B1 (ko) 볼트 조임력을 이용한 프리스트레스트 강재 보의 제작방법
US20150010343A1 (en) Profile bar, profile assembly and method for producing a profile assembly
US8960512B2 (en) Cast back clamp and mounting component
MX2011006444A (es) Forma estructural para miembros de torre de enfriamiento.
CN110785369B (zh) 用于连接电梯设备的轨道的轨道区段的轨道连接装置
US11198326B2 (en) Axle system
KR20180000638U (ko) 길이 조절이 가능한 안전 난간대
JP6593952B2 (ja) 免震装置の取付け方法
CN109235244B (zh) 一种用于桥梁支座的调节装置
JP2660828B2 (ja) 横桁支承用弾性支承装置およびその据付方法
CN210704626U (zh) 法兰校正器
JP6474575B2 (ja) 既存建物のブレース耐震補強構造および耐震補強方法
GB2043590A (en) Elevator guide rail mounting arrangement
KR20220080111A (ko) 벽에 엘리베이터 설비의 레일 시스템의 콘솔을 장착하기 위한 체결 시스템, 레일 시스템 및 장착 방법
KR102638540B1 (ko) 태양광모듈 설치용 신속 체결장치
CN109629395B (zh) 一种混凝土斜拉索索导管定位的限位v型卡板及使用方法
CN1833078A (zh) 带拉紧装置
CN217358864U (zh) 车窗淋雨试验装置
JP2001027282A (ja) 免震部材の位置調整方法および装置
JP7083284B2 (ja) 中間クランプ
KR20100067354A (ko) 횡압력 감쇄장치와 이를 이용한 침목 체결구조 및 방법
CN114570793A (zh) 一种钢板混凝土剪力墙中的钢板焊接残余变形矫正方法
KR20150012188A (ko) 현장 맞춤형 프리스트레스트 공법을 이용한 지보장치 및 이를 이용한 시공방법
CN118390838A (zh) 一种钢柱校正限位装置

Legal Events

Date Code Title Description
AS Assignment

Owner name: KONE CORPORATION, FINLAND

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:FERNANDEZ, ALEJANDRO REVUELTA;HAAG, MIKAEL;SIGNING DATES FROM 20151125 TO 20151216;REEL/FRAME:037408/0072

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION