US20140373435A1 - Reformed coal production equipment, and method for controlling same - Google Patents

Reformed coal production equipment, and method for controlling same Download PDF

Info

Publication number
US20140373435A1
US20140373435A1 US14/373,573 US201314373573A US2014373435A1 US 20140373435 A1 US20140373435 A1 US 20140373435A1 US 201314373573 A US201314373573 A US 201314373573A US 2014373435 A1 US2014373435 A1 US 2014373435A1
Authority
US
United States
Prior art keywords
gas
pyrolysis
inner cylinder
heating
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/373,573
Other languages
English (en)
Inventor
Keiichi Nakagawa
Setsuo Omoto
Fumiaki Sato
Jun Satou
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Assigned to MITSUBISHI HEAVY INDUSTRIES, LTD. reassignment MITSUBISHI HEAVY INDUSTRIES, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: NAKAGAWA, KEIICHI, OMOTO, SETSUO, SATO, FUMIAKI, SATOU, JUN
Publication of US20140373435A1 publication Critical patent/US20140373435A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G OR C10K; LIQUIFIED PETROLEUM GAS; USE OF ADDITIVES TO FUELS OR FIRES; FIRE-LIGHTERS
    • C10L5/00Solid fuels
    • C10L5/02Solid fuels such as briquettes consisting mainly of carbonaceous materials of mineral or non-mineral origin
    • C10L5/04Raw material of mineral origin to be used; Pretreatment thereof
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B1/00Retorts
    • C10B1/10Rotary retorts
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B47/00Destructive distillation of solid carbonaceous materials with indirect heating, e.g. by external combustion
    • C10B47/28Other processes
    • C10B47/30Other processes in rotary ovens or retorts
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B49/00Destructive distillation of solid carbonaceous materials by direct heating with heat-carrying agents including the partial combustion of the solid material to be treated
    • C10B49/02Destructive distillation of solid carbonaceous materials by direct heating with heat-carrying agents including the partial combustion of the solid material to be treated with hot gases or vapours, e.g. hot gases obtained by partial combustion of the charge
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B51/00Destructive distillation of solid carbonaceous materials by combined direct and indirect heating
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G OR C10K; LIQUIFIED PETROLEUM GAS; USE OF ADDITIVES TO FUELS OR FIRES; FIRE-LIGHTERS
    • C10L9/00Treating solid fuels to improve their combustion
    • C10L9/08Treating solid fuels to improve their combustion by heat treatments, e.g. calcining
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P20/00Technologies relating to chemical industry
    • Y02P20/10Process efficiency
    • Y02P20/129Energy recovery, e.g. by cogeneration, H2recovery or pressure recovery turbines

Definitions

  • the present invention relates to upgraded coal production equipment and a method for controlling the same, and is particularly useful when used to upgrade coal of low rank (low-rank coal), such as brown coal or subbituminous coal, which is porous and has a high water content.
  • low rank low-rank coal
  • brown coal or subbituminous coal which is porous and has a high water content.
  • Coal of low rank such as brown coal or subbituminous coal, which is porous and has a high water content generates a low amount of heat per unit weight, and is therefore dried through a heating treatment to have improved amount of heat generation per unit weight.
  • equipment including: an indirect-heating pyrolysis device which performs pyrolysis on low-rank coal by heating the low-rank coal indirectly by use of a heating gas; and a combustion furnace which generates the heating gas by combusting a pyrolysis gas generated in the pyrolysis device and supplied to the combustion furnace through a pyrolysis gas supply pipe.
  • the pyrolysis gas described above is composed of a low-boiling component.
  • the pyrolysis gas is accompanied by tar (pyrolysis oil) which is a high-boiling component.
  • tar pyrolysis oil
  • the tar is attached to a wall surface of a duct or the like through which the pyrolysis gas flows.
  • a problem might occur, such as clogging the duct.
  • various techniques have been developed to remove the tar.
  • Patent Document 1 discloses a decoking method for combusting and removing coke attached to the inside of a pipe by use of a gas which is obtained by adjusting air to have an oxygen concentration of 3 vol % to 21 vol % through dilution with water vapor or an inert gas, and which is also adjusted to have a temperature of 350° C. to 500° C.
  • Patent Document 2 discloses a method for performing a pyrolysis treatment on a processed object by using an external heating kiln.
  • an oxygen-containing gas is supplied into an inner cylinder of the external heating kiln to combust a carbide of organic matter in the processed object and/or a combustible gas, which are produced by pyrolysis.
  • the temperature of a pyrolysis gas increases, so that liquefaction or solidification is prevented.
  • Patent Document 1 Japanese Patent Application Publication No. Hei 5-188653 (see, e.g., paragraphs [0013], [0017], and the like)
  • Patent Document 2 Japanese Patent Application Publication No. 2004-3738 (see, e.g., paragraphs [0011], [0014], [0015], and the like)
  • the present invention has been made to solve the problems described above, and has an objective of providing upgraded coal production equipment and a controlling method for the same, capable of efficient tar removal without lowering the production volume of upgraded coal even in shutting down the equipment.
  • upgraded coal production equipment which includes drying means for drying coal, pyrolysis means for performing pyrolysis on the dried coal, and cooling means for cooling the coal subjected to the pyrolysis
  • the pyrolysis means being an indirect-heating pyrolysis device having an inner cylinder into which the dried coal is transferred and an outer cylinder supplied with a heating gas for heating the inner cylinder
  • the equipment comprises: heating gas generation means for generating the heating gas; pyrolysis gas supply means for supplying the heating gas generation means with a pyrolysis gas generated in the inner cylinder; waste-heat gas generation means for receiving supply of part of the heating gas generated in the heating gas generation means and generating a waste-heat gas by subjecting the heating gas to heat exchange; and mixed gas distribution supply means for distributing and supplying, to the inner cylinder, the waste-heat gas and a low-temperature heating gas generated when the heating gas heats the coal indirectly inside the outer
  • Upgraded coal production equipment for solving the above problems is the upgraded coal production equipment according to the first aspect of the invention described above, characterized in that the mixed gas distribution supply means is connected to the inner cylinder at an inlet side of the inner cylinder which receives the dried coal.
  • Upgraded coal production equipment for solving the above problems is the upgraded coal production equipment according to the second aspect of the invention described above, characterized in that the indirect-heating pyrolysis device includes gas temperature measurement means for measuring a gas temperature, the gas temperature measurement means being provided at an outlet side from which the dried coal is discharged, and the mixed gas distribution supply means includes: gas flow rate adjustment means for adjusting a flow rate of the low-temperature heating gas and the waste-heat gas supplied to the inner cylinder; and control means for controlling the gas flow rate adjustment means based on the gas temperature measured by the gas temperature measurement means.
  • Upgraded coal production equipment for solving the above problems is the upgraded coal production equipment according to the third aspect of the invention described above, characterized in that the equipment comprises a plurality of equipment main bodies being arranged in parallel and each having the drying means, the indirect-heating pyrolysis device, and the cooling means.
  • a method for controlling upgraded coal production equipment according to a fifth aspect of the invention for solving the above problems is a method for controlling the upgraded coal production equipment according to the third aspect of the invention described above, characterized in that the method comprises: stopping supply of the coal to the inner cylinder; supplying the low-temperature heating gas and the waste-heat gas to the inner cylinder through control of the gas flow rate adjustment means by the control means, and meanwhile increasing an amount of fuel supplied to the heating gas generation means; and stopping the supply of the low-temperature heating gas and the waste-heat gas to the inner cylinder through control of the gas flow rate adjustment means by the control means when the gas temperature measured by the gas temperature measurement means falls below a predetermined temperature.
  • a method for controlling upgraded coal production equipment for solving the above problems is a method for controlling the upgraded coal production equipment according to the fourth aspect of the invention described above, characterized in that the method comprises: in the equipment main body to be shut down, stopping supply of the coal to the inner cylinder, and meanwhile, in the equipment main body in steady operation, increasing an amount of the coal supplied to the drying means and increasing an amount of the heating gas supplied to the outer cylinder; in the equipment main body to be shut down, starting supply of the low-temperature heating gas and the waste-heat gas to the inner cylinder through control of the gas flow rate adjustment means by the control means; in the equipment main body to be shut down, stopping the supply of the heating gas to the inner cylinder when all the coal is discharged from the inner cylinder, and meanwhile, in the equipment main body in steady operation, bringing the supply of the heating gas to the outer cylinder to a steady state; and in the equipment main body to be shut down, stopping the supply of the low-temperature heating gas and the waste-heat gas to
  • the heating gas can be supplied to the indirect-heating pyrolysis means until the coal (pyrolysis coal) is discharged from the indirect-heating pyrolysis means, so as to prevent tar from being newly generated by cooling of the coal.
  • the indirect-heating pyrolysis means and the pyrolysis gas supply means can be purged of the pyrolysis gas.
  • tar can be prevented from being attached to the inner wall surfaces of the indirect-heating pyrolysis means and of the pyrolysis gas supply means.
  • the oxygen concentration of each of the low-temperature heating gas and the waste-heat gas is about 2 to 3%.
  • FIG. 1 is a schematic diagram showing the overall configuration of upgraded coal production equipment according to a first embodiment of the present invention.
  • FIG. 2 is a diagram showing a control flow performed by the upgraded coal production equipment according to the first embodiment of the present invention.
  • FIG. 3 is a schematic diagram showing the overall configuration of upgraded coal production equipment according to a second embodiment of the present invention.
  • FIG. 4 is a diagram showing a control flow performed by the upgraded coal production equipment according to the second embodiment of the present invention.
  • Upgraded coal production equipment and a method for controlling the upgraded coal production equipment according to the present invention are described using embodiments.
  • low-rank coal 1 such as brown coal or subbituminous coal is supplied to a drying device 111 by a hopper or the like (not shown), the drying device 111 being drying means for drying the low-rank coal 1 .
  • An outlet of the drying device 111 communicates with an inlet 122 a of a pyrolysis device 121 configured to perform pyrolysis on dried coal 2 .
  • An outlet 122 b of the pyrolysis device 121 communicates with an inlet of a cooling device 131 being cooling means for cooling pyrolysis coal 3 .
  • the pyrolysis device 121 has an inner cylinder 122 and an outer cylinder 123 surrounding the inner cylinder 122 .
  • the outer cylinder 123 is supplied with a heating gas 11 to be described later.
  • the dried coal 2 supplied into the inner cylinder 122 is indirectly heated and is subjected to pyrolysis, to generate the pyrolysis coal 3 .
  • the pyrolysis device 121 is an indirect-heating device, such as, e.g., an external heating kiln, in which a hot gas (heating gas) being a heat source does not come into direct contact with the low-rank coal 1 .
  • the pyrolysis device 121 forms indirect-heating pyrolysis means.
  • a gas exhaust port of the inner cylinder 122 of the pyrolysis device 121 communicates with a gas intake port of a combustion furnace 124 via a pyrolysis gas supply pipe 101 .
  • a pyrolysis gas 14 containing gaseous tar (pyrolysis oil) generated by the pyrolysis is supplied to the gas intake port of the combustion furnace 124 .
  • the gas intake port of the combustion furnace 124 is also supplied with a fuel (not shown) such as a natural gas.
  • the combustion furnace 124 generates the heating gas 11 by combusting the pyrolysis gas 14 and the fuel such as a natural gas. In other words, the combustion furnace 124 forms heating gas generation means.
  • a gas exhaust port of the combustion furnace 124 communicates with a gas intake port of the outer cylinder 123 of the pyrolysis device 121 via a heating gas feed pipe 51 .
  • the heating gas feed pipe 51 communicates with a gas intake port of a steam generator 125 via a heating gas branch pipe 53 .
  • the steam generator 125 forms waste-heat gas generation means for generating a waste-heat gas 13 through heat exchange between the heating gas 11 and water to thereby generate water vapor.
  • a gas exhaust port of the steam generator 125 communicates with an exhaust pipe 52 to be described later via a waste-heat gas feed pipe 54 .
  • a gas exhaust port of the outer cylinder 123 of the pyrolysis device 121 communicates with a gas intake port of an exhaust-gas treatment device 127 via the exhaust pipe 52 , the exhaust-gas treatment device 127 being exhaust-gas purification means for purifying the waste-heat gas 13 and a low-temperature heating gas 12 which is generated when the heating gas 11 heats the inner cylinder 122 .
  • the low-temperature heating gas 12 and the waste-heat gas 13 are discharged to the outside of the system after undergoing the purification treatment in the exhaust-gas treatment device 127 .
  • the exhaust pipe 52 communicates with a gas intake port of a blower 126 via a mixed gas feed pipe 55 .
  • a gas exhaust port of the blower 126 communicates with a gas intake port of the combustion furnace 124 via a mixed gas supply pipe 56 .
  • the mixed gas supply pipe 56 communicates with a mixed gas branch pipe 102 .
  • the mixed gas branch pipe 102 communicates with a mixed gas communication pipe 104 via a flow rate adjustment valve (three-way valve) 103 , and also communicates with a mixed gas distribution pipe 105 via the flow rate adjustment valve 103 .
  • the mixed gas communication pipe 104 communicates with the pyrolysis gas supply pipe 101 .
  • the mixed gas distribution pipe 105 communicates with a gas intake port of the inlet 122 a side of the inner cylinder 122 of the pyrolysis device 121 .
  • the pyrolysis gas supply pipe 101 is provided with a gas temperature measurement instrument 106 which is gas temperature measurement means for measuring the temperature of a gas inside the pipe.
  • the gas temperature measurement instrument 106 is connected to a control device 109 such that the measured gas temperature can be sent to the control device 109 .
  • the pyrolysis gas supply pipe 101 is provided with differential-pressure measurement instruments 107 a , 107 b configured to measure the differential pressure inside the pipe.
  • the differential-pressure measurement instruments 107 a , 107 b are connected to the control device 109 such that the measured differential pressure inside the pipe can be sent to the control device 109 .
  • the outlet 122 b of the inner cylinder 122 of the pyrolysis device 121 is provided with an inner-cylinder gas temperature measurement instrument 108 which is gas temperature measurement means for measuring the temperature of a gas inside the inner cylinder 122 .
  • the inner-cylinder gas temperature measurement instrument 108 is connected to the control device 109 such that the measured gas temperature inside the inner cylinder can be sent to the control device 109 .
  • the exhaust pipe 52 , the waste-heat gas feed pipe 54 , the mixed gas feed pipe 55 , the blower 126 , the mixed gas supply pipe 56 , the mixed gas branch pipe 102 , the flow rate adjustment valve 103 , the mixed gas distribution pipe 105 , and the like form mixed gas distribution supply means.
  • the flow rate adjustment valve 103 forms gas flow rate adjustment means for adjusting the amount of the low-temperature heating gas 12 and the waste-heat gas 13 supplied to the pyrolysis device 121 .
  • the control device 109 controls the flow rate adjustment valve 103 , the amount of fuel supplied to the combustion furnace 124 , the amount of the low-rank coal 1 supplied to the drying device 111 , the amount of the heating gas 11 supplied to the pyrolysis device 121 , and the like.
  • the control device 109 forms control means for adjusting the valve position of the flow rate adjustment valve 103 and the like based on the measurement values obtained by the various measurement instruments.
  • the hopper supplies the low-rank coal 1 at a room temperature to the drying device 111 a predetermined amount at a time.
  • the low-rank coal 1 supplied to the drying device 111 is removed of water and becomes the dried coal 2 by being heated up to about 200° C. by a drying combustion gas (about 150 to 300° C.) from a drying combustor (not shown). Then, the dried coal 2 is transferred into the inner cylinder 122 of the pyrolysis device 121 .
  • the dried coal 2 transferred to the pyrolysis device 121 is subjected to pyrolysis by being indirectly heated by the heating gas 11 (gas temperature: about 1050° C., oxygen concentration: about 2 to 3%) from the combustion furnace 124 .
  • the dried coal 2 becomes the pyrolysis coal 3 as a result of removal of components such as the pyrolysis gas 14 containing gaseous tar, and the pyrolysis coal 3 is fed to the cooling device 131 .
  • the pyrolysis coal 3 fed to the cooling device 131 becomes upgraded coal 4 by being cooled down to about 50° C.
  • the heating gas 11 (gas temperature: about 1050° C., oxygen concentration: about 2 to 3%) generated in the combustion furnace 124 is fed to the outer cylinder 123 of the pyrolysis device 121 via the heating gas feed pipe 51 .
  • the heating gas 11 used inside the outer cylinder 123 to heat the inner cylinder 122 becomes the low-temperature heating gas 12 (gas temperature: about 350° C., oxygen concentration: about 2 to 3%).
  • the low-temperature heating gas 12 is fed to the exhaust pipe 52 .
  • the heating gas 11 is also fed to the steam generator 125 via the heating gas feed pipe 51 and the heating gas branch pipe 53 .
  • the heating gas 11 used in the steam generator 125 for generation of water vapor becomes the waste-heat gas 13 (gas temperature: about 350° C., oxygen concentration: about 2 to 3%).
  • the waste-heat gas 13 is fed to the exhaust pipe 52 via the waste-heat gas feed pipe 54 .
  • Part of the low-temperature heating gas 12 and the waste-heat gas 13 is supplied to the exhaust-gas treatment device 127 .
  • the low-temperature heating gas 12 and the waste-heat gas 13 undergo the purification treatment in the exhaust-gas treatment device 127 and are then discharged to the outside of the system.
  • the rest of the low-temperature heating gas 12 and the waste-heat gas 13 (gas temperature: about 350° C., oxygen concentration: about 2 to 3%) is fed to the blower 126 via the mixed gas feed pipe 55 .
  • Part of the low-temperature heating gas 12 and the waste-heat gas 13 fed to the blower 126 is supplied to the combustion furnace 124 via the mixed gas supply pipe 56 .
  • the rest of the low-temperature heating gas 12 and the waste-heat gas 13 (gas temperature: about 350° C., oxygen concentration: about 2 to 3%) fed to the blower 126 is supplied to the mixed gas branch pipe 102 .
  • the rest of the low-temperature heating gas 12 and the waste-heat gas 13 (gas temperature: about 350° C., oxygen concentration: about 2 to 3%) supplied to the mixed gas branch pipe 102 is supplied to the pyrolysis gas supply pipe 101 via the flow rate adjustment valve 103 and the mixed gas communication pipe 104 , or supplied to the inlet 122 a side of the inner cylinder 122 of the pyrolysis device 121 via the flow rate adjustment valve 103 and the mixed gas distribution pipe 105 .
  • the valve position of the flow rate adjustment valve 103 is controlled by the control device 109 based on the gas temperature measured by the gas temperature measurement instrument 106 .
  • the control device 109 adjusts the flow rate adjustment valve 103 by opening it to increase the aperture when the gas temperature measured by the gas temperature measurement instrument 106 is equal to or higher than 400° C., and adjusts the flow rate adjustment valve 103 by narrowing it when the gas temperature exceeds 550° C.
  • the low-temperature heating gas 12 and the waste-heat gas 13 oxygen concentration: about 2 to 3%) are mixed with the pyrolysis gas 14 (gas temperature: about 400° C., oxygen concentration: about 0%), and this mixed gas has an oxygen concentration adjusted to about 1 to 2%.
  • gaseous tar (pyrolysis oil) is oxidatively decomposed (decoking) to become light in weight, and thereby attachment of the tar to the pyrolysis gas supply pipe 101 can be prevented.
  • the tar is reduced in weight to become a light gas, and this light gas is combusted.
  • decrease in the gas temperature is prevented.
  • attachment of the tar to the pyrolysis gas supply pipe 101 can be prevented.
  • the decoking is performed just when the tar is about to be attached to the inner wall surface of the pyrolysis gas supply pipe 101 by adjustment of the amount of the low-temperature heating gas 12 and the waste-heat gas 13 supplied to the pyrolysis gas supply pipe 101 based on the gas temperature inside the pyrolysis gas supply pipe 101 .
  • the tar can be efficiently removed.
  • Step SA 1 the upgraded coal production equipment 100 is in steady operation.
  • Step SA 2 transfer of the dried coal 2 to the inner cylinder 122 of the pyrolysis device 121 is stopped.
  • Step SA 11 since the dried coal 2 is not newly transferred to the inner cylinder 122 of the pyrolysis device 121 , the amount of the pyrolysis gas 14 generated decreases. The decrease in the generated amount of the pyrolysis gas 14 results in a decreased amount of the pyrolysis gas 14 supplied to the combustion furnace 124 . However, by increasing the amount of fuel, such as a natural gas, supplied to the combustion furnace 124 to increase the amount of additional gas to be supplied to the combustion furnace 124 , decrease in the gas temperature and generated amount of the heating gas 11 can be suppressed. In sum, the amount of additional gas to be supplied to the combustion furnace is increased (Step SA 12 ). Thereafter, all the pyrolysis coal 3 is discharged from the pyrolysis device 121 (Step SA 13 ). This means that the pyrolysis device 121 generates no more pyrolysis gas 14 .
  • Step SA 3 the control device 109 adjusts the flow rate adjustment valve 103 to start supply of the low-temperature heating gas 12 and the waste-heat gas 13 to the inlet 122 a side of the inner cylinder 122 of the pyrolysis device 121 via the mixed gas distribution pipe 105 .
  • the low-temperature heating gas 12 and the waste-heat gas 13 are forcibly supplied into the inner cylinder 122 of the pyrolysis device 121 from the inlet 122 a side thereof.
  • the inner cylinder 122 of the pyrolysis device 121 and the pyrolysis gas supply pipe 101 are purged of the pyrolysis gas 14 .
  • Step SA 4 the amount of additional gas to be supplied to the combustion furnace 124 is decreased. This consequently decreases the gas temperature and generated amount of the heating gas 11 generated in the combustion furnace 124 (Step SA 5 ).
  • Step SA 6 since the heating gas 11 which is less in amount and lower in temperature than in the steady operation is supplied to the outer cylinder 123 of the pyrolysis device 121 , the temperature of the pyrolysis device 121 decreases (Step SA 6 ). This consequently decreases the temperature of the low-temperature heating gas 12 itself and also the temperature of the waste-heat gas 13 (Step SA 7 ).
  • Step SA 8 the control device 109 makes a judgment based on the gas temperature inside the inner cylinder measured by the inner-cylinder gas temperature measurement instrument 108 .
  • the flow returns to Step SA 4 .
  • the flow proceeds to Step SA 9 in which the control device 109 controls the flow rate adjustment valve 103 to close the flow rate adjustment valve 103 . In other words, supply of the low-temperature heating gas 12 and the waste-heat gas 13 to the inner cylinder 122 of the pyrolysis device 121 is stopped.
  • the low-temperature heating gas 12 and the waste-heat gas 13 are supplied to the inlet 122 a side of the inner cylinder 122 of the pyrolysis device 121 to forcibly discharge the pyrolysis gas 14 inside the inner cylinder 122 of the pyrolysis device 121 and inside the pyrolysis gas supply pipe 101 .
  • this pyrolysis gas 14 is combusted in the combustion furnace 124 .
  • the oxygen concentration of the low-temperature heating gas 12 and the waste-heat gas 13 is about 2 to 3%, tar can be oxidatively decomposed to become light in weight.
  • the gas thus reduced in weight flows the combustion furnace 124 and combusted inside the combustion furnace 124 . Even if tar is attached to the inner wall surface of the inner cylinder 122 of the pyrolysis device 121 or the inner wall surface of the pyrolysis gas supply pipe 101 , the tar can be removed by combustion.
  • tar can be efficiently removed without lowering the production volume of the upgraded coal 4 .
  • tar can be prevented from being attached to the inner wall surfaces of the inner cylinder 122 of the pyrolysis device 121 and the pyrolysis gas supply pipe 101 , maintenance and inspection work can be efficiently performed.
  • the upgraded coal production equipment includes three upgraded coal production equipment main bodies 100 A, 100 B, and 100 C arranged in parallel.
  • the upgraded coal production equipment main bodies 100 A, 100 B, and 100 C each include a drying device 111 , a pyrolysis device 121 , and a cooling device 131 .
  • the upgraded coal production equipment includes one combustion furnace 124 , one blower 126 , and one exhaust-gas treatment device 127 .
  • a gas exhaust port of the blower 126 communicates with a gas intake port of the combustion furnace 124 via a mixed gas supply pipe 56 .
  • a gas exhaust port of the combustion furnace 124 communicates with an outer cylinder 123 of a pyrolysis device 121 of each of the equipment main bodies 100 A, 100 B, and 100 C via a corresponding one of heating gas feed pipes 51 a to 51 c.
  • the heating gas feed pipes 51 a to 51 c communicate with gas intake ports of steam generators 125 via heating gas branch pipes 53 a to 53 c , respectively.
  • Gas exhaust ports of the steam generators 125 communicate with waste-heat gas feed pipes 54 a to 54 c , respectively.
  • Gas exhaust ports of the outer cylinders 123 of the pyrolysis devices 121 communicate with exhaust pipes 52 a to 52 c , respectively.
  • Part of a waste-heat gas 13 and a low-temperature heating gas 12 which is generated when a heating gas 11 heats inner cylinders 122 is supplied via waste-heat gas feed pipe 54 a to 54 c or the exhaust pipes 52 a to 52 c to the exhaust-gas treatment device 127 being exhaust gas purification means for performing purification treatment on the low-temperature heating gas 12 and the waste-heat gas 13 , and is discharged to the outside of the system after undergoing the purification treatment in the exhaust-gas treatment device 127 .
  • the rest of the low-temperature heating gas 12 and the waste-heat gas 13 is supplied to the blower 126 via the exhaust pipes 52 a to 52 c or the waste-heat gas feed pipes 54 a to 54 c and the mixed gas feed pipe 55 .
  • Gas exhaust ports of the inner cylinders 122 of the pyrolysis devices 121 communicate with gas intake ports of the combustion furnace 124 via pyrolysis gas supply pipes 101 a to 101 c , respectively.
  • the mixed gas supply pipe 56 communicates with mixed gas branch pipes 102 a to 102 c .
  • the mixed gas branch pipes 102 a to 102 c communicate with mixed gas communication pipes 104 a to 104 c via flow rate adjustment valves (three-way valves) 103 a to 103 c , respectively, and also communicate with mixed gas distribution pipes 105 a to 105 c via the flow rate adjustment valves 103 a to 103 c , respectively.
  • the mixed gas communication pipes 104 a to 104 c communicate with the pyrolysis gas supply pipes 101 a to 101 c , respectively.
  • the mixed gas distribution pipes 105 a to 105 c communicate with gas intake ports of the inlet 122 a side of the inner cylinders 122 of the pyrolysis devices 121 , respectively.
  • the pyrolysis gas supply pipe 101 a is provided with a gas temperature measurement instrument 106 being gas temperature measurement means for measuring the gas temperature inside the pipe.
  • the gas temperature measurement instrument 106 is connected to the control device 109 such that the measured gas temperature can be sent to the control device 109 .
  • the pyrolysis gas supply pipes 101 b and 101 c are each provided with a gas temperature measurement instrument (not shown), as well. These gas temperature measurement instruments are also connected to the control device 109 such that the gas temperature measured by the gas temperature measurement instruments can be sent to the control device 109 .
  • the pyrolysis gas supply pipe 101 a is provided with the differential-pressure measurement instruments 107 a , 107 b configured to measure the differential pressure in the pipe.
  • the differential-pressure measurement instruments 107 a , 107 b are connected to the control device 109 such that the measured differential pressure in the pipe can be sent to the control device 109 .
  • the pyrolysis gas supply pipes 101 b and 101 c are each provided with differential-pressure measurement instruments (not shown), as well. These differential-pressure measurement instruments are also connected to the control device 109 such that the differential pressure in the pipe measured by the differential-pressure measurement instruments can be sent to the control device 109 .
  • the outlet 122 b of the inner cylinder 122 of the pyrolysis device 121 of the equipment main body 100 A is provided with an inner-cylinder gas temperature measurement instrument 108 configured to measure the temperature of the gas inside the inner cylinder 122 .
  • the inner-cylinder gas temperature measurement instrument 108 is connected to the control device 109 such that the measured temperature of the gas inside the inner cylinder can be sent to the control device 109 .
  • the outlet 122 b of the inner cylinder 122 of the pyrolysis device 121 of each of the equipment main bodies 100 B and 100 C is also provided with an inner-cylinder gas temperature measurement instrument (not shown) configured to measure the temperature of the gas inside the inner cylinder 122 .
  • These inner-cylinder gas temperature measurement instruments are also connected to the control device 109 such that the measured temperature of gas inside the inner cylinder can be sent to the control device 109 .
  • the exhaust pipes 52 a to 52 c , the waste-heat gas feed pipes 54 a to 54 c , the mixed gas feed pipe 55 , the blower 126 , the mixed gas supply pipe 56 , the mixed gas branch pipes 102 a to 102 c , the flow rate adjustment valves 103 a to 103 c , the mixed gas distribution pipes 105 a to 105 c , and the like form mixed gas distribution supply means.
  • the flow rate adjustment valves 103 a to 103 c form gas flow rate adjustment means for adjusting the amount of the low-temperature heating gas 12 and the waste-heat gas 13 supplied to the pyrolysis devices 121 of the equipment main bodies 100 A, 100 B, and 100 C, respectively.
  • the control device 109 controls the flow rate adjustment valves 103 a to 103 c , the amount of fuel supplied to the combustion furnace 124 , the amount of the low-rank coal 1 supplied to the drying device 111 of each of the equipment main bodies 100 A, 100 B, and 100 C, the amount of the heating gas 11 supplied to the pyrolysis device 121 of each of the equipment main bodies 100 A, 100 B, and 100 C, and the like.
  • the control device 109 forms control means for adjusting the valve positions of the flow rate adjustment valves 103 a to 103 c and the like based on the measurement values obtained by the various measurement instruments.
  • the operation for performing control to prevent attachment of tar to the pyrolysis gas supply pipes 101 a , 101 b , and 101 c during the steady operation is the same as that performed by the upgraded coal production equipment 100 according to the first embodiment described above, and is therefore not described again here.
  • the upgraded coal production equipment main body 100 A is shut down and then returns to the steady operation state.
  • the upgraded coal production equipment main body 100 A is in steady operation (Step SB 1 ).
  • the upgraded coal production equipment main bodies 100 B and 100 C are also in steady operation (Step SC 1 ).
  • Step SB 2 To shut down the upgraded coal production equipment main body 100 A, transfer of the dried coal 2 to the inner cylinder 122 of the pyrolysis device 121 is stopped (Step SB 2 ). Since this decreases the amount of the dried coal 2 inside the inner cylinder 122 of the pyrolysis device 121 of the equipment main body 100 A, the amount of the heating gas 11 supplied from the combustion furnace 124 to the outer cylinder 123 of the pyrolysis device 121 is decreased (Step SB 3 ). Thus, thermal load in the pyrolysis device 121 of the equipment main body 100 A decreases.
  • Step SC 2 the amount of the dried coal 2 transferred to the inner cylinder 122 of the pyrolysis device 121 of each of the equipment main bodies 100 E and 100 C is increased. Since this increases the amount of the dried coal 2 inside the inner cylinder 122 of the pyrolysis device 121 of each of the equipment main bodies 100 E and 100 C, the amount of the heating gas 11 supplied from the combustion furnace 124 to the outer cylinder 123 of each pyrolysis device 121 is increased (Step SC 3 ). Thus, thermal load in the pyrolysis device 121 of each of the equipment main bodies 100 E and 100 C increases.
  • the control device 109 adjusts the flow rate adjustment valve 103 a to supply the low-temperature heating gas 12 and the waste-heat gas 13 to the inlet 122 a side of the inner cylinder 122 of the pyrolysis device 121 via the mixed gas distribution pipe 105 a (Step SB 4 ).
  • the inner cylinder 122 of the pyrolysis device 121 and the pyrolysis gas supply pipe 101 a of the equipment main body 100 A are purged of the pyrolysis gas 14 .
  • the oxygen concentration of the gas inside the inner cylinder 122 and the pyrolysis gas supply pipe 101 a becomes about 1 to 2%, so that the tar is oxidatively decomposed to be reduced in weight. Then, the light gas obtained by the weight reduction is combusted. Hence, attachment of the tar to the wall surface of the inner cylinder 122 and the wall surface of the pyrolysis gas supply pipe 101 a is prevented.
  • Step SB 5 all the pyrolysis coal 3 is discharged from the inner cylinder 122 of the pyrolysis device 121 of the equipment main body 100 A (Step SB 5 ), and the supply of the heating gas 11 to the outer cylinder 123 of the pyrolysis device 121 of the equipment main body 100 A is stopped (Step SB 6 ). Consequently, thermal load in the pyrolysis device 121 of the equipment main body 100 A decreases. Meanwhile, in the equipment main bodies 100 B and 100 C, the supply of the heating gas 11 to the outer cylinder 123 of the pyrolysis device 121 of each of the equipment main bodies 100 E and 100 C is brought to the steady state (Step SC 4 ). Thereby, the pyrolysis device 121 of each of the equipment main bodies 100 E and 100 C maintains the state of the increased thermal load.
  • Step SB 7 when a predetermined period of time elapses after the stop of the supply of the heating gas 11 to the outer cylinder 123 of the pyrolysis device 121 of the equipment main body 100 A (Step SB 7 ), the pyrolysis gas 14 is no longer in the inner cylinder 122 of the pyrolysis device 121 and the pyrolysis gas supply pipe 101 a of the equipment main body 100 A, and therefore no more supply of the low-temperature heating gas 12 and the waste-heat gas 13 is necessary.
  • Step SB 8 the supply of the low-temperature heating gas 12 and the waste-heat gas 13 to the inlet 122 a side of the inner cylinder 122 of the pyrolysis device 121 of the equipment main body 100 A is stopped (Step SB 8 ).
  • work such as maintenance and inspection is performed on the equipment main body 100 A when necessary.
  • Step SB 9 transfer of the dried coal 2 from the drying device 111 into the inner cylinder 122 of the pyrolysis device 121 is started.
  • Step SB 10 the amount of the heating gas 11 supplied from the combustion furnace 124 to the outer cylinder 123 of the pyrolysis device 121 is increased.
  • thermal load in the pyrolysis device 121 of the equipment main body 100 A increases.
  • Step SC 5 the amount of the dried coal 2 transferred to the inner cylinder 122 of the pyrolysis device 121 of each of the equipment main bodies 100 E and 100 C is decreased. Since this decreases the amount of the dried coal 2 inside the inner cylinder 122 of the pyrolysis device 121 of each of the equipment main bodies 100 E and 100 C, the amount of the heating gas 11 supplied from the combustion furnace 124 to the outer cylinder 123 of each pyrolysis device 121 is decreased (Step SC 6 ). Consequently, thermal load in the pyrolysis device 121 of each of the equipment main bodies 100 E and 100 C decreases.
  • Step SB 11 when the amount of the dried coal 2 supplied to the inner cylinder 122 of the pyrolysis device 121 of the equipment main body 100 A reaches a predetermined amount and also when the amount of the heating gas 11 supplied to the outer cylinder 123 of the pyrolysis device 121 reaches a predetermined amount, the equipment main body 100 A is back in the steady operation state (Step SB 11 ).
  • operation according to the procedures as described for the equipment main body 100 A above can also prevent attachment of tar to the inner wall surfaces of the inner cylinder 122 of the pyrolysis device 121 and the pyrolysis gas supply pipe 101 b or 101 c of the equipment main body 100 B or 100 C.
  • tar can be efficiently removed in each equipment main body to be shut down, while suppressing lowering of the operating rate of the entire upgraded coal production equipment.
  • the low-temperature heating gas 12 and the waste-heat gas 13 are supplied to the inlet 122 a side of the inner cylinder 122 of the pyrolysis device 121 of the equipment main body to be shut down, in order to forcibly discharge the pyrolysis gas 14 inside the inner cylinder 122 of the pyrolysis device 121 and inside the pyrolysis gas supply pipe.
  • This pyrolysis gas 14 is combusted in the combustion furnace 124 .
  • the oxygen concentration of the low-temperature heating gas 12 and the waste-heat gas 13 is about 2 to 3%, tar can be oxidatively decomposed to become light in weight.
  • the gas thus reduced in weight flows the combustion furnace 124 and is combusted inside the combustion furnace 124 . Even if tar is attached to the inner wall surface of the inner cylinder 122 of the pyrolysis device 121 or the inner wall surface of the pyrolysis gas supply pipe, the tar can be removed by the combustion.
  • tar can be efficiently removed without lowering the production volume of the upgraded coal 4 .
  • tar can be prevented from being attached to the inner wall surfaces of the inner cylinder 122 of the pyrolysis device 121 and the pyrolysis gas supply pipe, maintenance and inspection work can be efficiently performed.
  • the upgraded coal production equipment described above has three upgraded coal production equipment main bodies 100 A, 100 B, and 100 C arranged in parallel
  • the number of the upgraded coal production equipment main bodies is not limited to three, but the upgraded coal production equipment may have two or four or more upgraded coal production equipment main bodies arranged in parallel.
  • the upgraded coal production equipment described above is configured to stop supply of the low-temperature heating gas 12 and the waste-heat gas 13 to the inner cylinder 122 of the pyrolysis device 121 of the equipment main body 100 A based on a period of time elapsed after the stop of the supply of the heating gas 11 to the outer cylinder 123 of the pyrolysis device 121 of the equipment main body 100 A.
  • the upgraded coal production equipment can also stop the supply of the low-temperature heating gas and the waste-heat gas to the inner cylinder of the pyrolysis device of the equipment main body to be shut down, based on measurement values obtained by measurement instruments, such as the differential-pressure measurement instruments 107 a , 107 b , of the equipment main body to be shut down.
  • the upgraded coal production equipment and the method for controlling the same according to the present invention can remove tar efficiently without lowering the production volume of upgraded coal even in shutting down the equipment, and can therefore be utilized significantly beneficially in various industries.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Solid Fuels And Fuel-Associated Substances (AREA)
  • Gasification And Melting Of Waste (AREA)
  • Coke Industry (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
US14/373,573 2012-02-24 2013-02-21 Reformed coal production equipment, and method for controlling same Abandoned US20140373435A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2012038518A JP5804972B2 (ja) 2012-02-24 2012-02-24 改質石炭製造設備およびその制御方法
JP2012-038518 2012-02-24
PCT/JP2013/054252 WO2013125609A1 (ja) 2012-02-24 2013-02-21 改質石炭製造設備およびその制御方法

Publications (1)

Publication Number Publication Date
US20140373435A1 true US20140373435A1 (en) 2014-12-25

Family

ID=49005789

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/373,573 Abandoned US20140373435A1 (en) 2012-02-24 2013-02-21 Reformed coal production equipment, and method for controlling same

Country Status (7)

Country Link
US (1) US20140373435A1 (enrdf_load_stackoverflow)
JP (1) JP5804972B2 (enrdf_load_stackoverflow)
CN (1) CN104066824B (enrdf_load_stackoverflow)
AU (1) AU2013223201B9 (enrdf_load_stackoverflow)
DE (1) DE112013001121T5 (enrdf_load_stackoverflow)
IN (1) IN2014DN05895A (enrdf_load_stackoverflow)
WO (1) WO2013125609A1 (enrdf_load_stackoverflow)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109205623A (zh) * 2018-11-13 2019-01-15 贵州森环活性炭有限公司 一种分段进气的外加热式活化炉
CN111998346A (zh) * 2020-08-18 2020-11-27 内蒙古航天金岗重工有限公司 一种垃圾处理设备

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015040273A (ja) * 2013-08-23 2015-03-02 三菱重工業株式会社 石炭乾留装置
EP2843032A1 (en) * 2013-09-02 2015-03-04 Kunimichi Sato Method for increasing calorific value of low-grade coals
CN105838391A (zh) * 2016-06-06 2016-08-10 沈阳农业大学 一种连续炭化设备
CN107189834B (zh) * 2017-07-10 2023-08-15 自贡通达机器制造有限公司 一种蒸养釜釜身及蒸养方法
CN108893127A (zh) * 2018-07-03 2018-11-27 西安建筑科技大学 一种常规内热式低温干馏炉改造为富氧干馏炉的方法
CN111793506B (zh) * 2020-07-20 2021-10-12 程建坤 一种节能减排带清洗功能的煤焦油提取机

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0584413B1 (en) * 1991-04-05 1997-02-26 Pasco Nominees Pty Ltd Pyrolysis process

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB216691A (en) * 1923-05-26 1924-06-05 Jacques Beaudequin The manufacture of artificial coal or coal-like substances and by-products from vegetable matters or matters of vegetable origin
JPS5940185B2 (ja) * 1980-03-31 1984-09-28 日本鋼管株式会社 高揮発分非微粘結炭の予備処理方法及び装置
US4668244A (en) * 1984-08-22 1987-05-26 Hitachi, Ltd. Method and apparatus for upgrading low rank coal
JPS6153390A (ja) * 1984-08-24 1986-03-17 Hitachi Ltd 低品位炭の高品質化装置の温度制御方法
JP2002003855A (ja) * 2000-06-23 2002-01-09 Ngk Insulators Ltd 炭化物の製造方法
CN101608126B (zh) * 2009-07-09 2013-04-10 神华集团有限责任公司 一种煤热解提质装置
CN101608125B (zh) * 2009-07-09 2012-09-05 神华集团有限责任公司 一种煤热解提质方法
JP2011127010A (ja) * 2009-12-18 2011-06-30 Mitsubishi Heavy Ind Ltd 石炭改質設備

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0584413B1 (en) * 1991-04-05 1997-02-26 Pasco Nominees Pty Ltd Pyrolysis process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109205623A (zh) * 2018-11-13 2019-01-15 贵州森环活性炭有限公司 一种分段进气的外加热式活化炉
CN111998346A (zh) * 2020-08-18 2020-11-27 内蒙古航天金岗重工有限公司 一种垃圾处理设备

Also Published As

Publication number Publication date
JP2013173833A (ja) 2013-09-05
CN104066824A (zh) 2014-09-24
WO2013125609A1 (ja) 2013-08-29
DE112013001121T5 (de) 2014-11-06
IN2014DN05895A (enrdf_load_stackoverflow) 2015-06-05
AU2013223201A1 (en) 2014-08-14
JP5804972B2 (ja) 2015-11-04
AU2013223201B2 (en) 2015-07-23
AU2013223201B9 (en) 2015-08-20
CN104066824B (zh) 2016-03-16

Similar Documents

Publication Publication Date Title
US20140373435A1 (en) Reformed coal production equipment, and method for controlling same
US9057023B2 (en) Method and device for keeping coke furnace chambers hot when a waste heat boiler is stopped
CN101376813B (zh) 高含水有机物的碳化处理方法及其装置
US20110104575A1 (en) Generating clean syngas from biomass
KR20120120162A (ko) 열회수 코크스 오븐으로부터 연도 가스 엔탈피 손실을 보정하는 방법
WO2005085397A1 (ja) バイオマスガス化システムおよびその運転方法
WO2017134829A1 (ja) 高炉シャフト部への水素含有還元ガス供給方法
US20140373436A1 (en) Reformed coal production equipment
JP2009161391A (ja) 炭酸ガス循環式石灰石焼成炉
WO2019166873A4 (en) Method and apparatus for biomass torrefaction
RU2573837C2 (ru) Система и способ получения заменителя природного газа
CN109593561B (zh) 一种水冷壁气化炉的烘炉系统及烘炉方法
KR20130078816A (ko) 가연성폐기물 기체화시스템
TWI526655B (zh) 廢熱回收裝置以及廢熱回收方法
TW201418444A (zh) 用於在焦爐組中產生多個蒸汽流或熱水流之設備及方法
CN102563666A (zh) 污泥焚烧方法和污泥焚烧设备
KR101842132B1 (ko) 다단 바이오매스 반탄화 장치
RU2605733C2 (ru) Способ и установка для предварительной обработки прокатываемого изделия перед горячей прокаткой
CN102690668B (zh) 煤重整系统
JP5782982B2 (ja) コークス炉の燃焼管理方法および流量分布制御装置
JP5685893B2 (ja) 廃棄物熱分解ガス化装置
CN209522820U (zh) 一种水冷壁气化炉的烘炉系统
RU2388789C2 (ru) Установка и способ сухого тушения кокса
CN113540525A (zh) 一种固体氧化物燃料电池系统热部件测试装置和方法
CN221254489U (zh) 炉膛温度场可调节的乙烯裂解炉系统

Legal Events

Date Code Title Description
AS Assignment

Owner name: MITSUBISHI HEAVY INDUSTRIES, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:NAKAGAWA, KEIICHI;OMOTO, SETSUO;SATO, FUMIAKI;AND OTHERS;REEL/FRAME:033994/0165

Effective date: 20141003

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION