US20110129301A1 - Piling barge - Google Patents
Piling barge Download PDFInfo
- Publication number
- US20110129301A1 US20110129301A1 US12/754,514 US75451410A US2011129301A1 US 20110129301 A1 US20110129301 A1 US 20110129301A1 US 75451410 A US75451410 A US 75451410A US 2011129301 A1 US2011129301 A1 US 2011129301A1
- Authority
- US
- United States
- Prior art keywords
- piling
- supporting
- luffing
- hull
- barge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/24—Anchors
- B63B21/26—Anchors securing to bed
- B63B21/27—Anchors securing to bed by suction
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/021—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/04—Guide devices; Guide frames
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0073—Details of sea bottom engaging footing
- E02B2017/0078—Suction piles, suction cans
Definitions
- the present invention relates to offshore engineering technology, and in particular, to a piling barge used for offshore piling.
- a piling barge includes a hull, supporting legs and a piling device.
- the supporting legs are slidably mounted at the periphery of the hull.
- the supporting legs are lowered all the way to the seabed by means of a suitable hoisting mechanism, and are supported on the ground to provide a supporting force for the hull of the piling barge, such that the piling barge can perform predetermined piling operations.
- the piling device includes a pile frame that can fix a pile for positioning the pile, sinking the pile to a predetermined position at a predetermined area and thus forming a pile foundation.
- the piling process of an existing piling barge includes the following steps:
- the piling barge itself moves to fetch a pile near a pile-stop at a pile-sinking zone and then carries the pile back to a predetermined sea area.
- the piling barge is positioned in the predetermined pile-sinking sea area. Specifically, at first, the piling barge is initially positioned by a windlass vessel, then the supporting legs of the piling barge are sunk through into the seabed ground, therefore achieving positioning of the piling barge and thus providing a foundation for the subsequent pile-turning and pile-sinking operations. 3.
- the piling barge After being positioned, the piling barge turns the pile, i.e., transfers the position of the pile from a horizontal state to a vertical state or a predetermined state, so as to provide a precondition for pile sinking. 4.
- the Pile-sinking operation is performed, the pile is sunk into the seabed ground by applying a predetermined force thereon through a suitable mechanism, thereby, a predetermined pile foundation is formed. After that, the positioning of the piling barge is removed, it then moves to the pile-sinking zone to fetch a pile for another cycle of piling operation.
- FIG. 1 is a schematic diagram of the load bearing of a supporting leg of the existing piling barge when being supported on the seabed ground.
- the supporting leg 200 will be trapped into the mollisol ground 300 , which in turn generates two force acting on the lower end of the supporting leg 200 , i.e., a supporting force F 1 to a bottom surface of the supporting leg 200 , and a friction force F 2 to side surfaces of the supporting leg 200 , the resultant force of these two forces being the supporting force that could be provided to the hull 100 by the supporting leg 200 . Due to the fact that the mollisol ground has fluidity, ground grains at the bottom surface of the supporting leg 200 will flow to the periphery when receiving force from the supporting leg 200 .
- the mollisol ground 300 fails to generate a large force to act on the bottom surface of the supporting leg 200 , which results a smaller supporting force F 1 ; and for the same reason, the friction force F 2 is also severely limited by the fluidity of the mollisol ground 300 .
- the supporting leg 200 it is difficult for the supporting leg 200 to provide a large supporting force to the hull 100 , and thus the piling device on the piling barge could not operate stably, and it would be difficult to implement the piling operation on sea areas with mollisol ground.
- the friction force F 2 would be applied to the supporting leg 200 in an opposite direction to make it difficult to extract the supporting leg 200 from the mollisol ground 300 , resulting in difficulty in relocating of the piling barge.
- a first object of the present invention is to provide a piling barge that can perform piling on a mollisol ground.
- a second object of the present invention is to provide a piling barge with high piling efficiency.
- the piling barge provided by the present invention includes a transversely extended hull, a piling device and a plurality of supporting legs, the piling device includes a pile frame mounted on the hull, differing from the prior art in that, the supporting leg includes a supporting arm and a supporting base; the supporting arm is extended in vertical direction and is mounted on the body of the base to be slidable in vertical direction; and the supporting base has a transverse section larger than that of the supporting arm, a lower end of the supporting arm is fixed with an upper surface of the supporting base.
- the supporting base includes a cavity having an opening at an bottom surface of the supporting base; and the piling barge further includes a charging and discharging pump communicated with the cavity through a pipe.
- the supporting leg also has a charging and discharging passage, which has an outer port positioned on an outer surface of the supporting base and an inner port positioned on a wall surface of the cavity; and the charging and discharging pump is communicated with the outer port of the charging and discharging passage.
- a charging and discharging passage which has an outer port positioned on an outer surface of the supporting base and an inner port positioned on a wall surface of the cavity; and the charging and discharging pump is communicated with the outer port of the charging and discharging passage.
- the piling barge also has a charging and discharging passage, which has an outer port positioned on an outer surface of the supporting arm and an inner port positioned on an upper wall surface of the cavity; and the charging and discharging pump is communicated with the outer port of the charging and discharging passage.
- the charging and discharging passage has a plurality of outer ports positioned at a side surface of the supporting arm, which outer ports have different distances from an upper end of the supporting arm.
- the piling device further includes a luffing oil cylinder, a boom, hanging hooks and a hoisting winch mechanism; one end of the luffing oil cylinder is hingedly connected with an lower hinge point of the pile frame while the other end thereof is hingedly connected with the hull, an upper end of the boom is hingedly connected with an upper hinge point of the pile frame while an lower end thereof is mounted on the hull, the upper hinge point and the lower hinge point are respectively adjacent to the upper end and the lower end of the pile frame; and the hanging hook is suspended from a fixed pulley block at the upper end of the pile frame, the hoisting winch drum is mounted on a turntable and is connected with the fixed pulley block via a hoisting steel wire rope.
- a luffing oil cylinder is hingedly connected with an lower hinge point of the pile frame while the other end thereof is hingedly connected with the hull
- an upper end of the boom is hingedly connected with an upper hinge point of the pile frame while an lower end thereof is
- the piling barge further includes a luffing steel wire rope and a luffing winch drum; the lower end of the boom is hingedly connected with the hull; and the luffing winch drum is mounted on the hull, one end of the luffing steel wire rope is connected with the luffing winch drum while the other end thereof is fixed with the upper end of the boom.
- the piling device further includes a turntable, on which the pile frame is mounted, the turntable is mounted on the hull by means of a turning mechanism so as to rotate around a vertical axis relative to the hull.
- the piling device further includes a luffing oil cylinder, a boom, hanging hooks and a hoisting winch mechanism; one end of the luffing oil cylinder is hingedly connected with an lower hinge point of the pile frame while the other end thereof is hingedly connected with the turntable, an upper end of the boom is hingedly connected with an upper hinge point of the pile frame while an lower end thereof is mounted on the turntable; the upper hinge point and lower hinge point are respectively adjacent to the upper end and the lower end of the pile frame; and the hanging hook is suspended from a fixed pulley block at the upper end of the pile frame, the hoisting winch drum is mounted on the turntable and is connected with the fixed pulley block via a hoisting steel wire rope.
- a luffing oil cylinder is hingedly connected with an lower hinge point of the pile frame while the other end thereof is hingedly connected with the turntable
- an upper end of the boom is hingedly connected with an upper hinge point of the pile frame while an lower end thereof is mounted on
- the piling barge further includes a luffing steel wire rope and a luffing winch drum; the lower end of the boom is hingedly connected with the turntable; and the luffing winch drum is mounted on the turntable, one end of the luffing steel wire rope is connected with the luffing winch drum while the other end thereof is fixed with the upper end of the boom.
- the supporting leg includes a supporting base, which is fixed with the lower end of the supporting arm and has a transverse section larger than that of the supporting arm. Therefore, when piling operation is performed in a predetermined sea area with mollisol ground, the supporting base having larger transverse section may receive support from a larger area of mollisol ground and thus provide a larger supporting force for the hull, which increases stability of the piling barge and enables the piling barge to perform the piling operation on sea areas with mollisol ground. Moreover, due to the fact that the supporting base is arranged at the lower end of the supporting arm, the supporting arm is allowed to have a smaller transverse section, and thus the supporting leg is allowed to maintain a smaller overall weight.
- the supporting base includes a cavity having an opening at the bottom surface of the supporting base.
- a charging and discharging pump may be used to depressurize the cavity, establish a negative pressure in the cavity, and discharge air and water from the cavity, which allows the base of the supporting arm to be sunk into sea water smoothly and enables grains of mollisol ground to flow into the cavity. Therefore, the supporting base is sunk through into the mollisol ground and enables the supporting leg to provide supporting force for the hull.
- the charging and discharging pump may be used to pressurize in the cavity, charge water or air into the cavity and establish a positive pressure in the cavity. Therefore, under the pressure of the water and air, the supporting base is separated from the mollisol ground and the supporting leg is extracted smoothly from the mollisol ground, so as to facilitate relocating of the piling barge.
- the supporting base also has a charging and discharging passage, which has an outer port on the outer surface of the supporting base and an inner port on the wall surface of the cavity.
- the charging and discharging pump may be connected with the cavity through the charging and discharging passage, which facilitates pressurize and depressurize the cavity.
- the outer port of the charging and discharging passage is located on the outer surface of the supporting arm.
- a suitable charging and discharging pump may be provided on the hull, then, depressurizing and pressurizing the cavity and thus establishing a negative or positive pressure therewithin may be implemented through the charging and discharging pump on the hull.
- the inner port is located at an upper wall surface of the cavity, such that, it is possible to discharge more thoroughly the air and water inside the cavity as the supporting leg is sunk; and it is possible to charge air and/or water from the upper portion of the cavity as the supporting lag is lifted, therefore the supporting leg is lifted more smoothly.
- the charging and discharging passage has a plurality of outer ports, which are located on the side surface of the supporting arm, the plurality of outer ports have different distances form the upper end of the supporting arm.
- the charging and discharging pump when pressurizing and depressurizing the cavity, it is possible to connect the charging and discharging pump with a suitable outer port according to practical requirement, so as to facilitate connection between the charging and discharging pump and the outer ports.
- the piling device further includes a turntable mounted on the hull through a turning mechanism, and a pile frame is mounted on the turntable.
- the piling device of the piling barge provided by this technical solution may rotate around a vertical axis relative to the hull.
- the piling device further includes a luffing oil cylinder, with both ends thereof being hingedly connected with the upper end portion of the pile frame and the turntable respectively, and, the upper end portion of the pile frame is hingedly connected with the boom.
- a luffing oil cylinder with both ends thereof being hingedly connected with the upper end portion of the pile frame and the turntable respectively, and, the upper end portion of the pile frame is hingedly connected with the boom.
- the lower end of the boom is hingedly connected, and the piling barge also has a luffing winch mechanism, through which the luffing angle of the boom, i.e., the angle between the boom and the hull may be changed; the combination of the luffing winch mechanism and the luffing oil cylinder allows to further precisely adjust the contacting point between the pile and the seabed ground as well as the inclination angle of the pile, therefore improving the working efficiency of the piling barge.
- FIG. 1 is a schematic diagram of the load bearing of a supporting leg of the existing piling barge when being supported on the seabed ground;
- FIG. 2 is an overall structural view of the piling barge provided by the present invention.
- FIG. 3 is a perspective structural schematic view of a first embodiment of the supporting leg in the piling barge provided by the prevent invention
- FIG. 4 is a structural schematic view of the longitudinal section of the first embodiment of the supporting leg
- FIG. 5 is a schematic view of the piling barge provided by the present invention in a positioned state
- FIG. 6 is a schematic view of the piling barge provided by the present invention in another state
- FIG. 7 is a structural schematic view of a second embodiment of the supporting leg in the piling barge provided by the prevent invention.
- FIG. 8 is a structural schematic view of a third embodiment of the supporting leg in the piling barge provided by the prevent invention.
- FIG. 9 is a structural schematic view of a fourth embodiment of the supporting leg in the piling barge provided by the prevent invention.
- FIG. 10 is a side structural schematic view of the piling barge provided by the present invention.
- FIG. 11 is a schematic diagram of position adjustment of the pile frame of the piling device, in which the position of the pile frame in original state is indicated by solid lines, and the adjusted position of the pile frame in operating state is indicated by broken lines.
- a longitudinal direction is a direction parallel to the vertical direction
- a transverse direction is a direction perpendicular to the vertical direction
- FIG. 2 an overall structural view of the piling barge provided by the present invention.
- the piling barge includes a hull 100 extended transversely, a plurality of supporting legs 200 , anchor windlasses 400 and a piling device 500 .
- the supporting legs 200 are respectively mounted on the periphery of the hull 100 .
- the anchor windlasses 400 are located at four corners of a deck of the hull 100 .
- the piling device 500 is mounted on the deck of the hull 100 .
- FIG. 3 is a perspective structural schematic view of a first embodiment of the supporting leg in the piling barge provided by the prevent invention.
- FIG. 4 is a structural schematic view of the longitudinal section of the first embodiment of the supporting leg.
- the supporting leg 200 includes a supporting arm 210 and a supporting base 220 .
- the supporting arm 210 is formed of a hollow steel pipe extended in a vertical direction
- the supporting base 220 is a plate-like body extended in a transverse direction, which has a transverse section larger than that of the supporting arm 210 .
- the lower end of the supporting arm 210 is fixed with the upper surface of the supporting base 220 .
- a plurality of reinforcing ribs 211 are provided between the side surface of the supporting arm 210 adjacent to its lower end and the upper surface of the supporting base 220 .
- the ends of the reinforcing ribs 211 are fixed with the side surface of the supporting arm 210 , and the bottom surfaces thereof are fixed with the supporting base 220 .
- the plurality of reinforcing ribs 211 are arranged radially around the lower end of the supporting arm 210 . Further, in order to facilitate the assembly of the supporting leg 200 and the hull 100 , the connection between the supporting arm 210 and the supporting base 220 is deviated from the center of the supporting base 220 and toward one side of the supporting base 220 .
- the hull 100 is provided with a plurality of sliding sleeves 110 protruding outward, within which sliding tracks extending in vertical direction are provided.
- Each of the supporting arms 210 of the plurality of supporting legs 200 cooperates with the sliding track in one sliding sleeve 110 .
- a hoisting mechanism (not shown in the drawing) is further provided between the supporting arm 210 and sliding sleeve 110 for driving the supporting arm 210 to slide in vertical direction relative to the sliding sleeve 110 , therefore the supporting legs 200 is allowed to move upward and downward.
- the slidable connection between the supporting arms 210 and the hull 100 can also be realized in other ways, for example, a “T”-shaped sliding rail may be provided on the supporting arm 210 and a “T”-shaped sliding groove complementary with the rail is provided on the hull 100 .
- the hoisting mechanism may be a hydraulic cylinder with its two ends being respectively connected with the supporting arm 210 and the sliding sleeve 110 , for driving the supporting arm 210 to move in vertical direction relative to the sliding sleeve 110 as the hydraulic cylinder is stretched or contracted.
- the hoisting mechanism may also be a worm gear and a worm screw that are respectively fixed to the supporting arm 210 and the sliding sleeve 110 and cooperates with each other. When rotating, the worm screw may drive the worm gear to rotate and thus drive the supporting arm 210 to move in vertical direction relative to the sliding sleeve 110 .
- the hoisting mechanism may also be other structures in prior art for driving the supporting leg 200 to slide relative to the sliding sleeve 110 (the hull 100 ).
- the process for positioning the piling barge described above at a predetermined sea area includes the following steps:
- FIG. 5 a schematic view of the piling barge provided by the present invention in a positioned state is shown, wherein the piling device is removed for clear illustration of the structure of the supporting leg and the hull.
- the supporting base 220 with larger transverse section that receives the supporting force by the ground.
- the supporting base 220 with larger transverse section may receive support from a larger area of mollisol ground 300 .
- the supporting leg 200 can provide a larger supporting force for the hull 100 , thus the stability and reliability of the piling barge is improved, allowing the piling barge to perform piling operation stably.
- the supporting base 220 is located at the lower end of the supporting arm 210 , the supporting arm 210 is maintained to have a smaller transverse section, therefore, the supporting leg 200 is maintained to have a smaller overall weight.
- the bottom surface of the hull 100 may be made with a flat configuration. As such, when the piling operation is performed at a predetermined sea area or tidal flat where the water level is shallow, the piling barge may be stably positioned by resting on the ground.
- the piling barge provided by the present invention may also be adapted to different conditions by adjusting its operating state according to the variation of the condition.
- the supporting leg 200 is allowed to be supported on the seabed ground, with a part of the hull 100 being submerged below water surface and the hull 100 is in a semi-submerged state, therefore the bearing capacity of the piling barge may be improved.
- the hull 100 is subjected to large impact by seawater form the sea with deep water and heavy wind, as shown in a schematic view of the piling barge provided by the present invention in another state of FIG.
- the hull 100 may be moved upward in relative to the supporting leg 200 through the hoisting mechanism. Since the supporting leg 200 is able to provide a larger supporting force, which allows the hull 100 to be maintained above the water surface, therefore the impact to the hull 100 from sea waves may be avoid and the positioning of the piling barge is stably maintained.
- the above-described supporting leg 200 is capable of providing a larger supporting force for the piling barge and thus meets the requirement for piling operation.
- the supporting leg 200 needs to be extracted from the seabed ground. Accordingly, to facilitate separation of the supporting leg 200 from the seabed ground, especially from the mollisol ground 300 , a supporting leg 200 with another structure is further provided by the prevent invention.
- FIG. 7 is a structural schematic view of a second embodiment of the supporting leg in the piling barge provided by the prevent invention.
- the supporting base 220 includes a cavity 221 having an opening at the bottom surface of the supporting base 220 .
- a suitable charging and discharging pump may be used to depressurize the cavity 221 , discharge air and water inside the cavity 221 , and thus establish a negative pressure therein, such that the supporting leg 200 is lowered smoothly and sunk through to the seabed ground, therefore providing a supporting force for the hull 100 ;
- the charging and discharging pump may be used to pressurize the cavity 221 , charge water or air into the cavity 221 , and gradually establish a positive pressure inside the cavity 221 , such that the supporting base 220 is separated from the mollisol ground 300 and then the supporting leg 200 is raised smoothly.
- the charging and discharging pump may be a vacuum pump, a centrifugal pump or any other pumps with other structures that can discharge water and/or air from the cavity 221 and charge water and/or air into the cavity 221 .
- a suitable hole is provided on the upper portion of the cavity 221 as a charging and discharging passage 222 for discharging or charging water and/or air from or into the cavity 221 .
- the charging and discharging passage 222 has an outer port at the lower end inside the supporting arm 210 .
- one end of a delivery pipe 230 is inserted from an opening at the upper end of the supporting arm 210 , through a central cavity of the supporting arm 210 and is connected with the charging and discharging passage 222 , the other end of the delivery pipe 230 is connected with a charging and discharging port of the charging and discharging pump on the hull 100 .
- the charging and discharging pump when it operates, it can depressurize or pressurize the cavity 221 , establish a negative or positive pressure therewithin, and discharge or charge water and/or air from or into the cavity 221 , therefore the supporting leg 200 will be moved downward and upward smoothly.
- the cavity 221 may be pressurized or depressurized, as long as the outer port of the charging and discharging passage 222 is positioned on the outer surface of the supporting base 220 and the inner port thereof is on the wall of the cavity 221 . Therefore, the outer port of the charging and discharging passage 222 may be positioned at other portions of the outer surface of the supporting base 220 . As shown in the structural schematic view of a third embodiment of the supporting leg in the piling barge provided by the prevent invention in FIG. 8 , herein, the outer port of the charging and discharging passage 222 is positioned between the reinforcing ribs 211 at the outer surface of the supporting base 220 . In this way, the charging and discharging passage 222 can be connected with the charging and discharging pump provided on the hull 100 through the delivery pipe 230 . Also, the charging and discharging pump may be disposed directly on the supporting base 220 under predetermined condition.
- the charging and discharging passage 222 may be provided with a plurality of outer ports on the side surface of the supporting arm, which have different distances from the upper end of the supporting arm, for example, the plurality of outer ports may be arranged in vertical direction on the side surface of the supporting arm 210 . In this case, it is possible in practice to choose a suitable outer port to communicate with the charging and discharging pump while keep the other outer ports closed.
- the inner port of the charging and discharging passage 222 it is preferred to arrange it on the upper wall surface of the cavity 221 , such that, it is possible to discharge water and/or air in the cavity 221 more thoroughly when a negative pressure is established in the cavity 221 , and it is also possible to remove ground grains and/or water in the cavity 221 more thoroughly when a positive pressure is established in the cavity 221 .
- a charging and discharging passage as shown in the structural schematic view of a fourth embodiment of the supporting leg in the piling barge provided by the prevent invention in FIG. 9 .
- the purpose of pressurizing and depressurizing the cavity 221 may also be achieved with the delivery pipe 230 entering into the cavity 221 across the bottom surface of the supporting base 220 .
- FIG. 10 is a side structural schematic view of the piling barge provided by the present invention.
- the piling device 500 includes a pile frame 510 , a hanging hook 520 , a boom 530 , a turntable 550 and a luffing oil cylinder 540 .
- the turntable 550 is mounted on the hull 100 by means of a turning mechanism, and may be driven to rotate around a vertical axis relative to the hull 100 by a hydraulic motor.
- One end of the luffing oil cylinder 540 is hingedly connected with a lower hinge point of the pile frame 510 while the other end thereof is hingedly connected to the turntable 550 .
- An upper end of the boom 530 is hingedly connected with an upper hinge point of the pile frame 510 while a lower end thereof is hingedly connected on the turntable 550 .
- Axes of hinge shafts at all hinge joints are parallel to each other and to a horizontal plane.
- the upper and lower hinge points of the pile frame 510 are respectively positioned near the upper and lower end thereof.
- the hanging hook 520 is suspended from a fixed pulley block at the top end of the pile frame 510 .
- the piling device 500 includes a hoisting winch mechanism and a luffing winch mechanism (not shown in the drawings).
- a hoisting winch drum of the hoisting winch mechanism is rotatably mounted on the turntable 550 and is connected with the fixed pulley block at the top end of the pile frame 510 via a hoisting steel wire rope 561 .
- the hoisting winch drum may drive the fixed pulley block to act, so that the up and down of the hanging hook 520 is achieved, and thus the pile fetching, pile-turning and pile-sinking are facilitated.
- the luffing winch mechanism includes a luffing steel wire rope and a luffing winch drum rotatably mounted on the turntable 550 .
- One end of the luffing steel wire rope 571 is connected to the luffing winch drum while the other end thereof is fixed to the upper end of the boom.
- the luffing winch drum rotates, it may drive the boom 530 to rotate by a predetermined angle relative to the hull 100 , and thus the luffing angle of the boom 530 is changed to adjust the position of the pile frame 510 .
- the piling device described above may provide convenience for the position adjustment of the pile in three aspects.
- the turntable 550 is connected with the hull 100 by means of the tuning mechanism, such that the whole piling device 500 may be turned relative to the hull 100 in a horizontal plane. Therefore, the position of the pile frame 510 and thus the contacting point between the pile and the seabed ground may be adjusted in a horizontal plane. The adjustment of the operating position is achieved, facilitating the piling operation.
- FIG. 11 is the schematic diagram of position adjustment of the pile frame of the piling device, and in which the position of the pile frame in original state is indicated by solid lines, and the adjusted position of the pile frame in operating state is indicated by broken lines.
- the luffing angle of the boom 530 i.e., the angle between the boom 530 and the hull 100 may be changed by means of the luffing winch mechanism.
- the pile frame 510 With the luffing oil cylinder remaining unchanged, the pile frame 510 will be transferred from the state A 0 to a state A 2 , thereby the contacting position between the pile and the seabed ground and also the inclination angle of the pile is changed, meeting requirements for offshore foundation engineering operation.
- the pile frame 510 may be transferred from the state A 0 to a state A 3 . Accordingly, the contact position between the pile and the seabed ground is changed, while the inclination angle of the pile may also be adjusted, so that the position of the pile frame 510 may be adjusted in a wider range and in more aspects, which provides more conveniences for the position adjustment of the pile. In combination of the above described three aspects, adjustments for the pile frame 510 in all directions may be achieved.
- the position of the pile frame 510 can be adjusted within a wide range through the turntable 550 , the luffing oil cylinder 540 and the luffing winch mechanism, thus repeatedly positioning for the piling barge is no longer needed. Therefore, the working efficiency of the piling barge is improved.
- the luffing oil cylinder 540 may be directly hingedly connected with the hull 100 .
- the lower end of the boom 530 may also be directly hingedly connected to the hull 100 and the luffing winch mechanism is mounted on the hull 100 , which may also change the luffing angle of the boom 530 and thus adjust the position of the pile frame 510 .
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Combustion & Propulsion (AREA)
- Chemical & Material Sciences (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910237986.3 | 2009-11-27 | ||
CN2009102379863A CN102079365A (zh) | 2009-11-27 | 2009-11-27 | 一种打桩船 |
Publications (1)
Publication Number | Publication Date |
---|---|
US20110129301A1 true US20110129301A1 (en) | 2011-06-02 |
Family
ID=43646219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/754,514 Abandoned US20110129301A1 (en) | 2009-11-27 | 2010-04-05 | Piling barge |
Country Status (3)
Country | Link |
---|---|
US (1) | US20110129301A1 (de) |
EP (1) | EP2327620A3 (de) |
CN (1) | CN102079365A (de) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20180355575A1 (en) * | 2017-06-12 | 2018-12-13 | Ship And Ocean Industries R&D Center | Operating method of pile guide frame coupled with rotatable arm |
US20180355574A1 (en) * | 2017-06-12 | 2018-12-13 | Ship And Ocean Industries R&D Center | Pile guide frame coupled with rotatable arm |
CN109371965A (zh) * | 2018-11-13 | 2019-02-22 | 南通市海洋水建工程有限公司 | 一种精准定位沉桩稳固平台桩及其安装方法 |
CN110952550A (zh) * | 2019-10-28 | 2020-04-03 | 广东力源液压机械有限公司 | 一种悬空自支撑式打桩方法及打桩机 |
CN112249883A (zh) * | 2020-10-19 | 2021-01-22 | 临沂会宝岭铁矿有限公司 | 一种铁矿建井期间矿车装卸料装置的矿用抓斗机构 |
CN112502151A (zh) * | 2020-12-11 | 2021-03-16 | 徐州恒兴金桥机械科技有限公司 | 一种液压打桩机桩架的倾角调整装置 |
CN114014231A (zh) * | 2021-11-02 | 2022-02-08 | 中国华电科工集团有限公司 | 一种打桩船的转场辅助装置及转场辅助系统 |
US20220177081A1 (en) * | 2019-04-15 | 2022-06-09 | Itrec B.V. | Vessel and method for installation of a pile adapted to support an offshore wind turbine |
CN115009433A (zh) * | 2022-06-16 | 2022-09-06 | 安徽省交通航务工程有限公司 | 一种打桩护岸应急抢险救援船基集成设备平台 |
CN115233672A (zh) * | 2022-06-29 | 2022-10-25 | 中交四航局第二工程有限公司 | 一种海上施工管板结构的施工装置及施工方法 |
CN116605352A (zh) * | 2023-05-18 | 2023-08-18 | 建湖宝迪工程机械有限公司 | 一种便于多向调整的打桩船 |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102011109251A1 (de) * | 2011-08-02 | 2013-02-07 | Werner Möbius Engineering GmbH | Katamaran-Ponton |
CN102556292A (zh) * | 2012-02-15 | 2012-07-11 | 上海佳豪船舶工程设计股份有限公司 | 一种可自航的、能坐底作业的海上风电工程作业船 |
CN104443289A (zh) * | 2014-11-13 | 2015-03-25 | 广州打捞局 | 一种打桩船 |
CN106696917B (zh) * | 2016-11-28 | 2023-06-09 | 零八一电子集团四川红轮机械有限公司 | 一种蛙腿机构及一种装备车 |
CN106801430A (zh) * | 2017-03-17 | 2017-06-06 | 王燏斌 | 一种用于水中基础的施工船及其施工法 |
CN112989571B (zh) * | 2021-02-09 | 2024-04-09 | 中交第三航务工程局有限公司 | 一种超大型打桩船变幅油缸的受力优化方法 |
CN114164827B (zh) * | 2021-12-03 | 2024-09-20 | 中国电建集团河北省电力勘测设计研究院有限公司 | 一种潮间带箱体移动式打桩机及其施工方法 |
CN115217144B (zh) * | 2022-07-06 | 2023-12-26 | 江苏天能海洋重工有限公司 | 一种多功能稳定的海上风力发电基础桩 |
CN115162335B (zh) * | 2022-07-06 | 2024-01-26 | 中国建筑第五工程局有限公司 | 深基坑支护结构 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2774218A (en) * | 1955-11-18 | 1956-12-18 | Raymond Concrete Pile Co | Methods and means for facilitating removal of offshore platform supports from mud |
US3118283A (en) * | 1964-01-21 | Xkilling barge | ||
US3412563A (en) * | 1967-01-03 | 1968-11-26 | Offshore Co | Jet closing device |
US3797256A (en) * | 1972-09-08 | 1974-03-19 | Sharp Inc G | Jack-up type offshore platform apparatus |
US4063426A (en) * | 1975-06-11 | 1977-12-20 | Frode Johan Hansen | Three column tower |
US4106302A (en) * | 1976-05-17 | 1978-08-15 | Maschinenfabrik Augsburg-Nurnberg Aktiengesellschaft | Off-shore drilling and production platform and method of building same |
US4109477A (en) * | 1974-02-18 | 1978-08-29 | Salzgitter Maschinen Ag | Offshore driller rig |
US4270877A (en) * | 1977-12-09 | 1981-06-02 | Steven Baggeren V.V. | Working platform |
US4761096A (en) * | 1987-02-24 | 1988-08-02 | Lin Sheng S | Universal footing with jetting system |
US6299385B1 (en) * | 1999-08-04 | 2001-10-09 | Paragon Engineering Services Incorporated | Mini-jacket and method for installation using caisson |
US6481932B1 (en) * | 1999-11-18 | 2002-11-19 | Suction Pile Technology B.V. | Marine structure |
US6488446B1 (en) * | 1998-04-02 | 2002-12-03 | Suction Pile Technology Bv | Marine structure |
US20080199259A1 (en) * | 2007-02-21 | 2008-08-21 | Cannon James R | Marine pile driving and boring apparatus |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA936005A (en) * | 1971-05-31 | 1973-10-30 | Peter Bawden Drilling Services Ltd. | Off shore drilling platform construction |
US4102094A (en) * | 1975-09-26 | 1978-07-25 | The Foundation Equipment Corporation | Bottom brace for crane |
CN87209232U (zh) * | 1987-06-19 | 1988-09-07 | 交通部第一航务工程局第四工程公司 | 浮箱式打设机 |
NO314133B1 (no) * | 1998-12-07 | 2003-02-03 | Master Marine As | Fremgangsmåte ved lastoverföringsoperasjoner til havs og flyter for transport, installasjon og fjerning av konstruksjonselementer til havs |
US6203248B1 (en) * | 2000-02-03 | 2001-03-20 | Atwood Oceanics, Inc. | Sliding-resistant bottom-founded offshore structures |
CN1131356C (zh) * | 2001-03-22 | 2003-12-17 | 上海交通大学 | 海底打桩装置 |
CN1384018A (zh) * | 2001-04-27 | 2002-12-11 | 胜利石油管理局钻井工艺研究院 | 一种可移动桶形基础采油平台 |
CN1509938A (zh) * | 2002-12-24 | 2004-07-07 | 奇 郑 | 一种具有转桩装置的打桩船 |
CN2701749Y (zh) * | 2004-03-19 | 2005-05-25 | 上海海运学院 | 打桩船新型可挑式冲霄型龙口 |
WO2007093842A1 (en) * | 2005-04-18 | 2007-08-23 | Compass Energy Pte Ltd | Offshore bottom supported platform with reduced buoyancy |
JP2007302352A (ja) * | 2006-05-08 | 2007-11-22 | Kobelco Cranes Co Ltd | クレーン及びクレーンのブーム起伏装置 |
CN1958968A (zh) * | 2006-11-23 | 2007-05-09 | 邓长峰 | 多功能打桩机 |
-
2009
- 2009-11-27 CN CN2009102379863A patent/CN102079365A/zh active Pending
-
2010
- 2010-03-24 EP EP10003171A patent/EP2327620A3/de not_active Withdrawn
- 2010-04-05 US US12/754,514 patent/US20110129301A1/en not_active Abandoned
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3118283A (en) * | 1964-01-21 | Xkilling barge | ||
US2774218A (en) * | 1955-11-18 | 1956-12-18 | Raymond Concrete Pile Co | Methods and means for facilitating removal of offshore platform supports from mud |
US3412563A (en) * | 1967-01-03 | 1968-11-26 | Offshore Co | Jet closing device |
US3797256A (en) * | 1972-09-08 | 1974-03-19 | Sharp Inc G | Jack-up type offshore platform apparatus |
US4109477A (en) * | 1974-02-18 | 1978-08-29 | Salzgitter Maschinen Ag | Offshore driller rig |
US4063426A (en) * | 1975-06-11 | 1977-12-20 | Frode Johan Hansen | Three column tower |
US4106302A (en) * | 1976-05-17 | 1978-08-15 | Maschinenfabrik Augsburg-Nurnberg Aktiengesellschaft | Off-shore drilling and production platform and method of building same |
US4270877A (en) * | 1977-12-09 | 1981-06-02 | Steven Baggeren V.V. | Working platform |
US4761096A (en) * | 1987-02-24 | 1988-08-02 | Lin Sheng S | Universal footing with jetting system |
US6488446B1 (en) * | 1998-04-02 | 2002-12-03 | Suction Pile Technology Bv | Marine structure |
US6299385B1 (en) * | 1999-08-04 | 2001-10-09 | Paragon Engineering Services Incorporated | Mini-jacket and method for installation using caisson |
US6481932B1 (en) * | 1999-11-18 | 2002-11-19 | Suction Pile Technology B.V. | Marine structure |
US20080199259A1 (en) * | 2007-02-21 | 2008-08-21 | Cannon James R | Marine pile driving and boring apparatus |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20180355575A1 (en) * | 2017-06-12 | 2018-12-13 | Ship And Ocean Industries R&D Center | Operating method of pile guide frame coupled with rotatable arm |
US20180355574A1 (en) * | 2017-06-12 | 2018-12-13 | Ship And Ocean Industries R&D Center | Pile guide frame coupled with rotatable arm |
US10487470B2 (en) * | 2017-06-12 | 2019-11-26 | Ship And Ocean Industries R&D Center | Operating method of pile guide frame coupled with rotatable arm |
US10494785B2 (en) * | 2017-06-12 | 2019-12-03 | Ship And Ocean Industries R&D Center | Pile guide frame coupled with rotatable arm |
CN109371965A (zh) * | 2018-11-13 | 2019-02-22 | 南通市海洋水建工程有限公司 | 一种精准定位沉桩稳固平台桩及其安装方法 |
US20220177081A1 (en) * | 2019-04-15 | 2022-06-09 | Itrec B.V. | Vessel and method for installation of a pile adapted to support an offshore wind turbine |
CN110952550A (zh) * | 2019-10-28 | 2020-04-03 | 广东力源液压机械有限公司 | 一种悬空自支撑式打桩方法及打桩机 |
CN112249883A (zh) * | 2020-10-19 | 2021-01-22 | 临沂会宝岭铁矿有限公司 | 一种铁矿建井期间矿车装卸料装置的矿用抓斗机构 |
CN112502151A (zh) * | 2020-12-11 | 2021-03-16 | 徐州恒兴金桥机械科技有限公司 | 一种液压打桩机桩架的倾角调整装置 |
CN114014231A (zh) * | 2021-11-02 | 2022-02-08 | 中国华电科工集团有限公司 | 一种打桩船的转场辅助装置及转场辅助系统 |
CN115009433A (zh) * | 2022-06-16 | 2022-09-06 | 安徽省交通航务工程有限公司 | 一种打桩护岸应急抢险救援船基集成设备平台 |
CN115233672A (zh) * | 2022-06-29 | 2022-10-25 | 中交四航局第二工程有限公司 | 一种海上施工管板结构的施工装置及施工方法 |
CN116605352A (zh) * | 2023-05-18 | 2023-08-18 | 建湖宝迪工程机械有限公司 | 一种便于多向调整的打桩船 |
Also Published As
Publication number | Publication date |
---|---|
EP2327620A2 (de) | 2011-06-01 |
CN102079365A (zh) | 2011-06-01 |
EP2327620A3 (de) | 2012-11-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20110129301A1 (en) | Piling barge | |
US10337499B1 (en) | Self-installing column stabilized offshore wind turbine system and method of installation | |
US5421676A (en) | Tension leg platform and method of instalation therefor | |
EP2171159B1 (de) | Vorrichtung und verfahren für eine meeresturmstruktur | |
US9758941B2 (en) | Offshore tower for drilling and/or production | |
US9914505B2 (en) | Installation method for water-submersible platforms and installation vessel | |
EP3784904B1 (de) | Offshore-windturbinen und verfahren zur entfaltung und installation derselben | |
US20110129304A1 (en) | Support Leg and A Mobile Offshore Work Platform | |
US20110129303A1 (en) | Foundation Construction Platform Used In a Beach or Offshore Areas | |
KR20210010997A (ko) | 윈드 터빈 및 윈드 터빈을 설치하기 위한 방법 | |
CN113482033B (zh) | 一种偏心多筒导管架基础及其风电整机施工方法 | |
CN103119222A (zh) | 用于安装一个或多个浸没柱/桩的可再用的打破表面的可浸没模板 | |
US6945737B1 (en) | Single column extendable draft offshore platform | |
NL2021129B1 (en) | Process to place a wind turbine | |
KR102192116B1 (ko) | 스파형 풍력발전기 및 이의 설치 및 해체 방법 | |
CN107288114B (zh) | 一种小型海洋平台自升式桩腿的升降方法 | |
EP2440708B1 (de) | Gründung für einen off-shore turm | |
WO2019240570A2 (en) | Process to place a wind turbine | |
KR102601484B1 (ko) | 부유식 해상구조물 고정장치 | |
CN213414163U (zh) | 船体固定桩及平台安装船 | |
KR20120053984A (ko) | 수력 터빈 엔진을 침강시키기 위한 시스템 및 방법 | |
JP2023073733A (ja) | 昇降式作業船及びそれを使用した筒状体の設置方法 | |
CN117449300A (zh) | 移动式沉桩定位装置和定位系统 | |
JP2024517828A (ja) | 洋上自昇式船舶とともに使用することに適合した輸送船舶用のラック構造体のためのシステムおよび方法 | |
CN117022543A (zh) | 移动式自助抛锚定位的海工平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SANY ELECTRIC CO., LTD., CHINA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:WANG, XINMING;ZHANG, JIANG;GU, YANBIN;REEL/FRAME:024192/0185 Effective date: 20100315 |
|
AS | Assignment |
Owner name: SANY ELECTRIC CO., LTD., CHINA Free format text: CORRECTIVE ASSIGNMENT TO CORRECT THE SPELLING OF THE SECOND INVENTOR'S NAME PREVIOUSLY RECORDED ON REEL 024192 FRAME 0185. ASSIGNOR(S) HEREBY CONFIRMS THE CORRECT SPELLING SHOULD BE JIAN ZHANG;ASSIGNORS:WANG, XINMING;ZHANG, JIAN;GU, YANBIN;REEL/FRAME:024493/0912 Effective date: 20100315 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |