UA107501U - THE METHOD OF USING THE DRYING PILE IN THE PRODUCTION PROCESS IN THE FIELD CONDITIONS FOR THE ADJUSTMENT OF ROAD REINFORCEMENT FROM REINFORCED CONCRETE PLATES - Google Patents
THE METHOD OF USING THE DRYING PILE IN THE PRODUCTION PROCESS IN THE FIELD CONDITIONS FOR THE ADJUSTMENT OF ROAD REINFORCEMENT FROM REINFORCED CONCRETE PLATESInfo
- Publication number
- UA107501U UA107501U UAU201512164U UAU201512164U UA107501U UA 107501 U UA107501 U UA 107501U UA U201512164 U UAU201512164 U UA U201512164U UA U201512164 U UAU201512164 U UA U201512164U UA 107501 U UA107501 U UA 107501U
- Authority
- UA
- Ukraine
- Prior art keywords
- well
- hole
- concrete
- reinforced concrete
- mixture
- Prior art date
Links
Landscapes
- Press-Shaping Or Shaping Using Conveyers (AREA)
- Road Paving Structures (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Спосіб використання буронабивної палі в процесі виготовлення в польових умовах для улаштування дорожнього покриття із залізобетонних плит включає виготовлення буронабивної палі шляхом розпушування ґрунту по всій глибині свердловини, подачі водоцементного розчину з розрахунковою додатковою кількістю води в свердловину і перемішування зворотним обертанням бурового інструмента з розпушеним ґрунтом; після твердіння, створеної в свердловині ґрунтоцементної суміші, в ній бурять отвір розрахункового діаметра на потрібну висоту палі. Знімають шар ґрунту товщиною 10-15 см навколо отвору в затверділій ґрунтоцементній суміші свердловини і спланованій смузі дороги, захищають торцеву поверхню свердловини водостійким покриттям. Відкриту (оголену) верхню частину зовнішньої поверхні свердловини - водостійким і теплоізоляційним неорганічним покриттям; сплановану поверхню ґрунту дороги вкривають ущільненим шаром підстилаючої суміші піску з подрібненими синтетичними і/або природними неорганічними матеріалами. Обмежують вздовж майбутньої дороги створений шар покриття бордюрами. Накладають на торцеву поверхню свердловини бетонний або асфальтобетонний шар суміші, далі на нього вкладають залізобетонну дорожню плиту з розрахунковим діаметром наскрізного отвору в конусному гнізді, що розташований напроти отвору з ідентичним діаметром в затверділій ґрунтоцементній суміші. Через отвір в плиті в отвір в свердловині затверділої ґрунтоцементної суміші вводять бетонну суміш; вкривають бетонною або асфальтобетонною сумішшю поверхню конусного гнізда і внутрішню поверхню циліндричної частини наскрізного отвору залізобетонної плити. Опускають нижньою частиною Т-подібний залізобетонний стержень або Т-подібну залізобетонну балку на всю глибину отвору в затверділій ґрунтоцементній суміші свердловини. Верхню частину виробу, з жорстко з'єднаним з торцем стержня або балки конусним залізобетонним диском малого діаметра, розміщують на основі поверхні конусного гнізда залізобетонної плити. Над встановленим конусним диском малого діаметра розміщують конусний залізобетонний диск більшого діаметра, який конусною поверхнею опирається на попередньо вкриту бетонною або асфальтобетонною сумішшю поверхню конусного гнізда плити, але не контактує з плоскою поверхнею конусного диска малого діаметра; дають затверднути суміші. .The method of using the drilling pile in the field production process for the arrangement of the pavement of reinforced concrete slabs includes the production of drilling piles by loosening the soil along the entire depth of the well, supplying a water-cement mortar with the estimated additional amount of water in the well and mixing and re-mixing; after the curing created in the well of the soil-cement mixture, the hole of the calculated diameter is drilled into it to the required pile height. Remove the soil layer with a thickness of 10-15 cm around the hole in the hardened soil-cement mixture of the well and the planned lane of the road, protect the end surface of the well with a waterproof coating. Open (bare) upper part of the outer surface of the well - waterproof and heat insulating inorganic coating; the planned soil surface of the road is covered with a compacted layer of underlying sand mixture with crushed synthetic and / or natural inorganic materials. A boundary layer is created along the future road. A concrete or asphalt layer of the mixture is placed on the end face of the well, then a reinforced concrete floor slab with a calculated diameter of the through hole in the conical socket opposite the hole with the same diameter in the solidified layer is placed thereon. A concrete mixture is introduced through the hole in the slab into the hole in the well of the solidified cement-cement mixture; cover the surface of the conical socket with the concrete or asphalt concrete mixture and the inner surface of the cylindrical part of the through hole of the reinforced concrete slab. Lower the lower part of the T-shaped reinforced concrete rod or T-shaped reinforced concrete beam to the entire depth of the hole in the solidified cement-cement mixture of the well. The upper part of the product, with a rigidly connected to the end face of the rod or beam conical small-diameter disc, is placed on the basis of the surface of the conical slot of the reinforced concrete plate. Above the established small diameter cone disc, a larger diameter conical concrete disk is placed, which on the cone surface rests on the surface of the conical plate socket covered with concrete or asphalt, but does not come into contact with the flat surface of the small diameter cone disk; allow to cure mixtures. .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UAU201512164U UA107501U (en) | 2015-12-08 | 2015-12-08 | THE METHOD OF USING THE DRYING PILE IN THE PRODUCTION PROCESS IN THE FIELD CONDITIONS FOR THE ADJUSTMENT OF ROAD REINFORCEMENT FROM REINFORCED CONCRETE PLATES |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UAU201512164U UA107501U (en) | 2015-12-08 | 2015-12-08 | THE METHOD OF USING THE DRYING PILE IN THE PRODUCTION PROCESS IN THE FIELD CONDITIONS FOR THE ADJUSTMENT OF ROAD REINFORCEMENT FROM REINFORCED CONCRETE PLATES |
Publications (1)
Publication Number | Publication Date |
---|---|
UA107501U true UA107501U (en) | 2016-06-10 |
Family
ID=56561684
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
UAU201512164U UA107501U (en) | 2015-12-08 | 2015-12-08 | THE METHOD OF USING THE DRYING PILE IN THE PRODUCTION PROCESS IN THE FIELD CONDITIONS FOR THE ADJUSTMENT OF ROAD REINFORCEMENT FROM REINFORCED CONCRETE PLATES |
Country Status (1)
Country | Link |
---|---|
UA (1) | UA107501U (en) |
-
2015
- 2015-12-08 UA UAU201512164U patent/UA107501U/en unknown
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207987964U (en) | A kind of reinforcing inspection shaft | |
PH12017501665A1 (en) | Hard road construction method for natural groundwater recharge | |
CN106812219A (en) | Filling wall top stuff up a crack construction method | |
KR20190006233A (en) | Construction method of water-permeable pavement with excellent properties of stability, economy and conduct ability for pavement and road | |
CN104018407A (en) | Road structure and road construction method | |
CN103276645A (en) | Precast pile, beam and slab renovation technology for diseases of existing line tunnel base | |
UA107501U (en) | THE METHOD OF USING THE DRYING PILE IN THE PRODUCTION PROCESS IN THE FIELD CONDITIONS FOR THE ADJUSTMENT OF ROAD REINFORCEMENT FROM REINFORCED CONCRETE PLATES | |
CN204940039U (en) | Plant stone Bridge Surface Paving by Cement structure for one kind | |
CN103774645B (en) | The construction method of a kind of soil cement and the stake of Combined concrete material | |
CN102704478A (en) | Building anchor rod construction technology | |
CN104878672A (en) | Stone-planted cement concrete bridge deck paving structure and method | |
CN204370463U (en) | Ultra-soft cob brick loose tool assists suspended deck structure | |
RU2657576C1 (en) | Road and aerodrome beds construction method | |
RU2510441C1 (en) | Erection method of pile of shallow embedding | |
KR101755435B1 (en) | Salt farm flooring and constructing method thereof | |
RU2010108585A (en) | METHOD FOR STRENGTHENING RAILWAY | |
CN206428708U (en) | It is a kind of to use six ribs block with holes and the combination protective slope structure of soil nailing | |
CN102388189B (en) | Monolithic foundation system with homopolymer/resistan aggregate pavement with a semi -continuous configuration | |
RU94248U1 (en) | BUILDING BLOCK | |
JP2021055506A (en) | Guidance apparatus of fluidized object | |
RU2439239C1 (en) | Method to reinforce cement-concrete coatings | |
CN203700897U (en) | Pervious concrete ground | |
KR100556546B1 (en) | Slope block building method to use soil nail and its manufacturing method | |
CN106380218B (en) | Square brick preparation process | |
US845910A (en) | Road construction. |