CN204370463U - Ultra-soft cob brick loose tool assists suspended deck structure - Google Patents
Ultra-soft cob brick loose tool assists suspended deck structure Download PDFInfo
- Publication number
- CN204370463U CN204370463U CN201420843936.6U CN201420843936U CN204370463U CN 204370463 U CN204370463 U CN 204370463U CN 201420843936 U CN201420843936 U CN 201420843936U CN 204370463 U CN204370463 U CN 204370463U
- Authority
- CN
- China
- Prior art keywords
- brick
- ultra
- loose tool
- slope
- side wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a kind of ultra-soft cob brick loose tool and assists suspended deck structure, domatic and bottom surface, slope is formed at ultra-soft soil original ground excavation, spill existing pile foundation, carry out brick loose tool in bottom surface, slope and build the construction with bed course by laying bricks or stones, in the space that brick loose tool and bed course surround, finally carry out the construction of cushion cap.Described brick loose tool is made up of collar tie beam, brick side wall and middle board, and described collar tie beam and middle board are prefabricated, directly hoisted in position at the scene, and described brick side wall can be that scene builds by laying bricks or stones also can be prefabricated in advance.
Description
Technical field
The utility model relates to a kind of low suspended deck structure, and particularly in a kind of super soft ground, brick loose tool assists suspended deck structure.
Background technology
Ultra-soft soil has this extensively to distribute in areas such as China's littoral plain, delta, lake basin ground, lake, rivers, ultra-soft soil often has the characteristics such as water content is high, void ratio is large, compressibilty is strong, shear resistance is weak, therefore, the construction that ultra-soft soil carries out low cushion cap is faced with many difficulties, and the ultra-soft soil as: flowing is often deep in cushion cap affects that cushion cap quality, cushion cap formwork are more difficult, cushion cap concrete flow deformation in casting process comparatively has a strong impact on cushion cap outward appearance and quality, cushion cap are built and the problem such as between curing time sedimentation is excessive.Low cushion cap foundation construction quality is related to quality and the life-span of top-out, how to resolve the construction problem of low cushion cap foundation in super soft clay area, counts for much.Therefore, for solving the above-mentioned problems exposed, in super soft clay area, before carrying out low bearing platform construction, need carry out suitable process to the ultra-soft soil body in advance, the method adopted at present mainly contains: shallow-layer solidification method, paddling process, preloading, heavy tamping replacement method etc., but above-mentioned processing mode is all carry out full wafer process to the ultra-soft soil in low bearing platform construction region, the cycle of process is long, cost is high, efficiency is low, have impact on the construction speed of low cushion cap.
Many methods are also had to be do not carry out treatment of soft foundation, directly on ultra-soft soil, excavation spills stake and pushes up then formwork and build low cushion cap, but this method is difficult to ensure that ultra-soft soil is mixed in cushion cap, affect the supporting capacity of cushion cap, and the outer shape of cushion cap changes, under the concrete effect of top flowing, the super deformation of soft soil of bottom is larger, cause cushion cap concrete to be left to beyond cushion cap template, cause waste of material, add difficulty of construction and cost.
No matter in summary it can be seen, be process in advance ultra-soft soil, still adopts the mode of direct formwork all completely cannot resolve low bearing platform construction problem all sidedly, be difficult to the quality ensureing low cushion cap.
Therefore, need badly at present seek a kind of can ensure low cushion cap speed of application and quality and the not high low suspended deck structure in super soft clay area of cost and construction method measure seem very important.
Utility model content
The purpose of this utility model overcomes deficiency of the prior art, provides a kind of ultra-soft cob brick loose tool to assist suspended deck structure.
This ultra-soft cob brick loose tool assists suspended deck structure, is included in the domatic and bottom surface, a slope that ultra-soft soil original ground excavation is formed; Bottom surface, described slope is exposed and has pile foundation; Bottom surface, slope is coated with bed course, arranges brick side wall respectively, board in the stage casing of brick side wall is provided with in bottom surface, slope and domatic junction, in middle board and the domatic space surrounded, be filled with backfill under plate, the two ends up and down of described brick side wall are provided with collar tie beam; It is the cushion cap of fill concrete in the space that described brick side wall and bed course surround; Wall side backfill is filled with in described brick side wall and the domatic space surrounded.
As preferably: be describedly domaticly provided with side slope spray and protect.
The beneficial effects of the utility model are:
When the utility model effectively prevents and build low cushion cap in ultra-soft soil layer, around mud enters in cushion cap template from surrounding and bottom, ensure that the pouring quality of cushion cap.
The utility model respectively arranges a collar tie beam at brick loose tool, ensure that brick loose tool is conducted oneself with dignity sinking uniformly, suitably arrange in the middle part of brick loose tool one protrude in board effectively can control the settling amount of brick loose tool, thus the requirement that thickness built by cushion cap can be met.
The utility model, in brick loose tool installation process, arranges bed course in brick loose tool, prevents bottom ultra-soft soil from pouring in cushion cap, also enhances the supporting capacity of cushion cap simultaneously to a certain extent.
The utility model is after the excavation of super soft ground, gunite is carried out on domatic, enhance domatic stability, after the installation of brick loose tool, backfill on domatic, serve the effect of the lateral restraint strengthening cushion cap together with brick loose tool, thus ensure that the lateral stability of cushion cap to a certain extent.
Thered is provided brick loose tool of the present utility model assists bearing platform construction process without the need to taking too much place, effectively reduce the difficulty of construction of ultra-soft soil site manpower and machinery, after the backfill of cushion cap surrounding, the supporting capacity of ultra-soft soil can be strengthened to a certain extent, along with increasing of cushion cap quantity, the region of process ultra-soft soil also increases, and further reduces difficulty of construction.
Accompanying drawing explanation
Fig. 1 is that excavation original ground and pile foundation spill figure;
Fig. 2 is that domatic spray is protected and built figure by laying bricks or stones with brick loose tool;
Fig. 3 is that middle board is installed and cushion construction figure;
Fig. 4 is that brick loose tool has built figure by laying bricks or stones;
Fig. 5 is that cushion cap is built and wall side backfill figure;
Fig. 6 is that brick loose tool assists cushion cap top view.
Description of reference numerals: the spray of cushion cap 1, collar tie beam 2, pile foundation 3, middle board 4, bed course 5, brick side wall 6, side slope protects 7, backfill 11 under wall side backfill 8, original ground 9, anchor rib 10, plate, domatic 12, bottom surface, slope 13.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described further.Although the utility model will be described in conjunction with preferred embodiment, should know, not represent the utility model restriction in the described embodiment.On the contrary, the utility model will contain can be included in attached claims limit scope of the present utility model in alternative, modified and equivalent.
With reference to Fig. 1, pile foundation 3 spacing in ultra-soft soil original ground 9 is 1m, pile foundation 3 diameter is 0.6m, pile foundation 3 length is 18m, pile foundation 3 top buried depth be 2m 3 × 3 pile groups directly over excavate that the top length of side is 5m, the bottom length of side is 3m, be highly the inverted trapezoidal space body of 2.5m, formation domatic 12 broken rate be 1:1, and form the bottom surface, slope 13 of 3m × 3m, pile foundation 3 exposed length on bottom surface, slope 13 is about 0.5m, and the length of anchor rib 10 that pile foundation 3 top is exposed is no less than 0.5m.
With reference to Fig. 2, carry out side slope spray and protect 7 on domatic 12, be 3m simultaneously by the length of side, collar tie beam 2 that deck-siding is 25cm is lifted on bottom surface, slope 13, collar tie beam 2 is built by laying bricks or stones brick side wall 6, and under Gravitative Loads, collar tie beam 2 and brick side wall 6 progressively sink.
With reference to Fig. 3, when brick side wall 6 builds 125cm by laying bricks or stones, brick side wall 6 is installed board 4 in length of side 4.5m, the wide 1m of plate, meanwhile, backfill 11 under plate is filled in middle board 4 bottom, in the middle of board 4 when touching backfill 11 under plate, the sedimentation of brick loose tool progressively reduces, and when stopping, brick loose tool sinks to 13 times, bottom surface, slope 75cm, at bottom surface, slope 13 grouting stirring, form the bed course 5 that thickness is 50cm.
With reference to Fig. 4, middle board 4 is built by laying bricks or stones brick side wall 6 to 125cm, the collar tie beam 2 that the length of side is 3m, deck-siding is 25cm is installed on brick side wall 6 again, wall side backfill 8 is filled at brick loose tool, cushion cap 1 is formed at the inner concreting of brick loose tool, as shown in Figure 5, the final brick loose tool formed assists the top view of cushion cap 1 as shown in Figure 6.
Claims (2)
1. ultra-soft cob brick loose tool assists a suspended deck structure, it is characterized in that: be included in domatic (12) and bottom surface, a slope (13) that ultra-soft soil original ground (9) excavation is formed; Bottom surface, described slope (13) is exposed and has pile foundation (3); Bottom surface, slope (13) are coated with bed course (5), in the junction of bottom surface, slope (13) and domatic (12), brick side wall (6) is set respectively, middle board (4) is provided with in the stage casing of brick side wall (6), in the space that middle board (4) and domatic (12) surround, be filled with backfill (11) under plate, the two ends up and down of described brick side wall (6) are provided with collar tie beam (2); It is the cushion cap (1) of fill concrete in the space that described brick side wall (6) and bed course (5) surround; Wall side backfill (8) is filled with in the space that described brick side wall (6) and domatic (12) surround.
2. ultra-soft cob brick loose tool according to claim 1 assists suspended deck structure, it is characterized in that: described domatic (12) are provided with side slope spray and protect (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420843936.6U CN204370463U (en) | 2014-12-26 | 2014-12-26 | Ultra-soft cob brick loose tool assists suspended deck structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420843936.6U CN204370463U (en) | 2014-12-26 | 2014-12-26 | Ultra-soft cob brick loose tool assists suspended deck structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204370463U true CN204370463U (en) | 2015-06-03 |
Family
ID=53326695
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420843936.6U Active CN204370463U (en) | 2014-12-26 | 2014-12-26 | Ultra-soft cob brick loose tool assists suspended deck structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204370463U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612174A (en) * | 2014-12-26 | 2015-05-13 | 浙江大学城市学院 | Ultrasoft soil brick molding bed auxiliary bearing platform structure and construction method thereof |
CN105297756A (en) * | 2015-11-12 | 2016-02-03 | 中建三局集团有限公司 | Assembling type formwork structure |
-
2014
- 2014-12-26 CN CN201420843936.6U patent/CN204370463U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612174A (en) * | 2014-12-26 | 2015-05-13 | 浙江大学城市学院 | Ultrasoft soil brick molding bed auxiliary bearing platform structure and construction method thereof |
CN105297756A (en) * | 2015-11-12 | 2016-02-03 | 中建三局集团有限公司 | Assembling type formwork structure |
CN105297756B (en) * | 2015-11-12 | 2018-05-11 | 中建三局集团有限公司 | A kind of assembled template structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103967031B (en) | A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof | |
CN105696427B (en) | The construction method and its road structure of a kind of consolidation process newly built railway karst foundation | |
CN103774514B (en) | A kind of prefabricated tubular pile embankment structure and construction method thereof | |
CN203755334U (en) | Single-pipe tower prefabricated spiral steel pipe pile foundation | |
CN104452829B (en) | A kind of pile-raft foundation float Structure and construction method | |
CN203213136U (en) | Caisson and pile combined foundation of consolidated subsoil | |
CN103774687A (en) | Single-pipe tower prefabricated spiral steel pipe pile foundation | |
CN108547641A (en) | The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel | |
CN103215950B (en) | Pile foundation extension construction method in backfilling area | |
CN104328790B (en) | Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed | |
RU2582530C2 (en) | Drive pile device in punched well with wider base | |
CN204370463U (en) | Ultra-soft cob brick loose tool assists suspended deck structure | |
CN104612174B (en) | A kind of ultra-soft cob brick loose tool assists the construction method of suspended deck structure | |
CN206971247U (en) | A kind of concrete plinth foundation ruggedized construction being placed on Unloading Rock | |
CN102626946A (en) | Manufacture method for concrete irregular fender post | |
CN202830673U (en) | Existing embankment heightening structure for limited using land area | |
CN204000848U (en) | A kind of socketed pile for subaqueous construction | |
CN106869153A (en) | A kind of method of the quick soft soil foundation treatment of well-points dewatering | |
CN106245641A (en) | PHC pile tube post grouting construction technique and PHC pile tube composite pile | |
CN105862560B (en) | The method repaired at the Bridge back wall of environmentally safe road pavement | |
CN104153350A (en) | Octagonal meshed water-stopping rectangular pile of support | |
CN205024694U (en) | Superplasticity concrete drilling bored concrete pile dado | |
CN209636780U (en) | Composite pile | |
CN202787211U (en) | Low-strength rigid pile-permeable concrete pile novel dual compound foundation | |
CN207143843U (en) | A kind of explosion-proof earth embankment of precast splice type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |