CN105862560B CN201610199179.7A CN201610199179A CN105862560B CN 105862560 B CN105862560 B CN 105862560B CN 201610199179 A CN201610199179 A CN 201610199179A CN 105862560 B CN105862560 B CN 105862560B
Authority
CN
China
Prior art keywords
injected hole
nothing
come
slip casting
soil layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610199179.7A
Other languages
Chinese (zh)
Other versions
CN105862560A (en
Inventor
张腊花
何伟兴
陈云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd
Original Assignee
JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd filed Critical JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd
Priority to CN201610199179.7A priority Critical patent/CN105862560B/en
Publication of CN105862560A publication Critical patent/CN105862560A/en
Application granted granted Critical
Publication of CN105862560B publication Critical patent/CN105862560B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/10Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for raising or levelling sunken paving; for filling voids under paving; for introducing material into substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a kind of method repaired at Bridge back wall of environmentally safe road pavement, its step includes:Position of being come to nothing in the attachment strap of impaired bridge is detected using detection radar, the position of injected hole one and drilling are marked on attachment strap surface, injected hole one arranged as deep as hard stratum, injected hole one with array way, and the center spacing of adjacent injected hole one is 10 20cm and makes to come to nothing and falls into array range;Each injected hole two penetrates the Soft Soil Layer and intersected with injected hole one, and the check valve of exhaust is provided with each both ends of injected hole two;Injected hole one is carried out slip casting and using the detection immediately of three-dimensional detection radar come to nothing and each injected hole one, injected hole two inside filled therewith situation, when slurry comes to nothing full of this and stops slip casting when each injected hole one, injected hole two;Slip casting reuses detection radar to filling location detection check after stopping, to not re-started drilling, slip casting at filled therewith;It this method solve the problem of hard stratum is with Soft Soil Layer differential settling velocity.

Description

The method repaired at the Bridge back wall of environmentally safe road pavement
Technical field
, can be to being repaiied at Bridge back wall the present invention relates to a kind of method repaired at Bridge back wall of road pavement It is multiple, eliminate vehicle bump at bridge ends.
Background technology
With being continuously increased for highway in China and railway mileage, the shared proportion of the highway such as bridge, culvert construction is increasingly Greatly, generally existing " bumping at bridge-head " phenomenon at the back filling behind abutment of many this kind of constructions, so-called " bumping at bridge-head " refers to bridge, culvert Deng construction in itself and the platform back of the body continues to settle due to the effect of driving load and deadweight, the back of the body sedimentation of tectonic subsidence and platform it is inconsistent and Caused differential settlement, the platform back of the body and the road surface of construction junction is caused step occur, the vehicle run at high speed is carried on the back back by platform The place of filling out produces the phenomenon for jump of jolting.
The vertical of above-mentioned phenomenon occur wants reason to be, general bridge floor is higher than road surface and by bridge pier and roadbed(Hard stratum) It is connected, therefore is connected between the bridge floor with difference in height and road surface by attachment strap, in order to support the attachment strap to need below attachment strap Existing roadbed on heap set the artificial soil horizon of compacting(Soft Soil Layer), the artificial soil horizon is to be formed in the later stage therefore to compare former roadbed(Firmly Soil layer)Softer, because natural subsidence acts on during later stage operation, the height on its bridge floor and road surface can all decline bridge, But the infall process of above-mentioned Soft Soil Layer is than hard stratum faster, therefore there is difference in height between bridge floor and attachment strap and cause bumping at bridge-head Phenomenon;It can be formed between Soft Soil Layer and attachment strap simultaneously and come to nothing and make to misplace between bridge floor and attachment strap, so as to exacerbate bumping at bridge-head Phenomenon.
China Patent No. proposes for CN102051861 document and is injected into coming to nothing for attachment strap bottom using high polymer material Inside eliminate the attachment strap for depression of coming to nothing, lifted to eliminate vehicle bump at bridge ends, but this method fails to causing bumping at bridge-head The differential settling velocity of the different soil of phenomenon takes measures, therefore fails fundamentally solve the problems, such as bumping at bridge-head.
The content of the invention
, can the technical problem to be solved in the present invention is to provide a kind of method repaired at Bridge back wall of road pavement Solve the problems, such as hard stratum and Soft Soil Layer differential settling velocity.
In order to solve the above-mentioned technical problem, the invention provides the side repaired at a kind of Bridge back wall of road pavement Method, it comprises the following steps:
A. position of being come to nothing in the attachment strap of impaired bridge is detected using detection radar, the position come to nothing is gone out in the surface markers of attachment strap Put and measure this and come to nothing and the depth of hard stratum;
B. the position of injected hole one and drilling are marked on attachment strap surface, injected hole one is as deep as hard stratum, and injected hole one is with battle array Row mode arranges that making to come to nothing falls into array range;
C. mark the position of injected hole two and drilling in the side of Soft Soil Layer, each injected hole two penetrate the Soft Soil Layer and with note It is intersecting to starch hole one;
D. slip casting is carried out to injected hole one and detection is come to nothing and each injected hole one, injected hole immediately using three-dimensional detection radar Filled therewith situation inside two, when slurry comes to nothing full of this and stops slip casting when each injected hole one, injected hole two;
E. slip casting reuses detection radar to filling location detection check after stopping, to not entered again at filled therewith Row drilling, slip casting;
F. after slip casting terminates 10 minutes, sealing of hole is carried out to each injected hole one, injected hole two.
A diameter of 3-15cm of the injected hole one and injected hole two, the center spacing of adjacent injected hole one is 8-25cm.
The injected hole two is horizontal to penetrate the Soft Soil Layer and perpendicular to attachment strap center line, each injected hole one respectively with lower section of coming to nothing Multiple injected holes two it is intersecting.
The present invention also provides a kind of reparation slurry, and the slurry is used at the Bridge back wall of above-mentioned road pavement the side repaired The slip casting process of method.
The slurry is high intensity foam-type resin.
The elative free swelling ratio of the slurry is up to 20:1, it can fill and come to nothing after injecting 3 minutes, injection reaches most after 10 minutes Whole intensity.
The machine viscosity that goes out of the slurry is 100 ± 45mPa s, and its final strength meets compressive strength >=20MPa, bending strength ≥15MPa。
Relative to prior art, what the present invention had has the technical effect that:
1)The method repaired at the Bridge back wall of the road pavement of the present invention, detected by detection radar with drilling, note Slurry is combined, and has not only filled up coming to nothing below attachment strap and lifting attachment strap smoothes out end of the bridge, also by intersecting injected hole one and Injected hole two makes the slurry body after solidification form network structure, attachment strap, Soft Soil Layer and hard stratum is linked into an integrated entity, so that soft The sinking speed of soil layer and hard stratum is consistent, and the sinking speed of attachment strap will be consistent with hard stratum, prevent Soft Soil Layer with Formed and come to nothing between attachment strap, so as to avoid bridge floor and attachment strap vehicle bump at bridge ends because of caused by respective differential settling velocity;
2)Come to nothing and form a pulp layer after the slurry curing of position injection, connection attachment strap, lower section lead to above the pulp layer Cross slurry column to be connected with hard stratum, injected hole one and slurry column diameter are 5-10cm, can be by the fractional load on attachment strap Hard stratum is transferred directly to by slurry column, so as to reduce the settling amount after Soft Soil Layer is pressurized;Injected hole two and slurry crossbeam A diameter of 5-10cm, the attachment strap load that part is conducted through Soft Soil Layer can be made to be conducted through slurry crossbeam to slurry column, then through slurry Material column is conducted to hard stratum, so as to reduce the load conducted through Soft Soil Layer, further reduces the settling amount of Soft Soil Layer;Adjacent note The center spacing for starching hole one is 10-20cm, can not only make the arrangement of slurry column close but also be beneficial to drill to injected hole one;
3)Injected hole two is horizontal to penetrate the Soft Soil Layer and perpendicular to attachment strap center line, is easy to slurry during drilling and slip casting Flowing and filling, set multiple injected holes two intersected with injected hole one in the Soft Soil Layer for coming to nothing lower section, can increase weak soil Layer and the bonding strength between hard stratum, attachment strap, while be also beneficial to the load more through Soft Soil Layer conduction is horizontal by slurry Beam, slurry column are directly conducted to hard stratum;
4) the water-free high intensity foam-type resin of the slurry, will not produce drying shrinkage phenomenon, can dense packing effect come to nothing;Slurry There are pliability and elasticity after material solidification, it is not easy to ftracture, while the resin material has good impermeability, can prevent Rainwater infiltration enters in attachment strap, and fracture and seam have good sealing function;
5)The slurry can fill after injecting 3 minutes to come to nothing, and injection reaches its final strength, hardening time after 10 minutes It is short, reduce engineering time and the influence to traffic, foaming shape solid is formed after slurry curing, its density is the 20% of cement mortar, Structure will not be produced compared with big load;
6)The elative free swelling ratio of the slurry is up to 20:1, can Fast Filling come to nothing, be further compacted in expansion process The soil layer for surrounding of coming to nothing;
7)Stability of Slurry after solidification is strong, non-aging deformation, and its durability is up to century-old;
8)After slurry curing, each chemical composition will not dissolve or decompose and is lost in in rainwater, environmentally safe;
9)Attachment strap structure after slurry reparation, later stage without periodic maintenance, maintenance, reduce maintenance cost.
Brief description of the drawings
Innovative principle for the clear explanation present invention and its technical advantage compared to existing product, below by way of attached Figure illustrates possible embodiment by the non-limiting examples of the application principle.In figure:
Fig. 1 is the sectional drawing that bridge is damaged in the present invention;
Fig. 2 is the sectional drawing of the bridge after being drilled in the present invention;
Fig. 3 is the top view for the attachment strap that injected hole one is provided with the present invention;
Fig. 4 is the left view of the slurry body after solidifying in the present invention.
Embodiment
Embodiment 1
As shown in figure 1, impaired bridge generally comprises:To mat formation face 1, attachment strap 2 comes to nothing 3, bridge floor 4, road surface 5, Soft Soil Layer 6, Hard stratum 7.
Come to nothing and be generally present between attachment strap 2 and Soft Soil Layer 6, as the sedimentation of Soft Soil Layer volume of coming to nothing can gradually increase, Because Soft Soil Layer 6 is higher by roadbed, it is easy to drill to Soft Soil Layer 6 from side.
As shown in Fig. 1-3, the method repaired at the Bridge back wall of road pavement of the invention comprises the following steps:
(1)3 positions of coming to nothing are damaged in the attachment strap of bridge using three-dimensional detection detections of radar, are gone out in the surface markers of attachment strap 2 Come to nothing 3 position and measure the depth of come to nothing 3 and the hard stratum 7;
(2)Position and the drilling of each injected hole 1, the diameter of injected hole 1 are marked on the surface of attachment strap 2 above 3 of coming to nothing Arranged for 5-10cm and as deep as hard stratum 7, all injected holes 1 in a manner of square array, the center spacing of adjacent injected hole 1 For 10-20cm and coming to nothing for above-mentioned mark is set 3 to fall into the array range of the injected hole 1;
(3)The position of injected hole 29 and drilling are marked in the side of Soft Soil Layer 6, each injected hole 29 is horizontal to penetrate the weak soil Layer and intersect at injected hole 1, each injected hole 1 intersects with located at three injected holes 29 to come to nothing below 3, each injected hole 29 perpendicular to attachment strap center line and a diameter of 5-10cm;
(4)Grouting Pipe 11 is installed in the position of each injected hole 1, Grouting Pipe 11 stretches to the bottom of injected hole 1, each Filling adaptor is installed, debugging grouting equipment simultaneously be connected with filling adaptor, and inspection injecting paste material simultaneously adds slip casting and set in Grouting Pipe 11 In standby, the check valve that can only discharge air is provided with each both ends of injected hole 29;
(5)Slip casting is carried out to injected hole 1 and detects come to nothing 3 and each injected hole 1, note immediately using three-dimensional detection radar The filled therewith situation inside hole 29 is starched, stops slip casting when slurry comes to nothing 3 and each injected hole 1, injected hole 29 full of this;
(6)Slip casting reused after stopping detection radar detecting in come to nothing 3 and each injected hole 1, injected hole 29 whether Drilling, slip casting are not also re-started to the position that the above situation be present by filled therewith position;
(7)After waiting 10 minutes, the slurry curing of filling simultaneously reaches final strength, removes check valve and to each injected hole one 8th, injected hole 29 carries out sealing of hole.
Slurry after cured forms slurry body 10 as shown in Figure 4, including multiple rows of by multiple vertical slurry columns 101st, horizontal slurry crossbeam 103 forms network structure and full of come to nothing 3 pulp layer 102, the slurry body 10 and attachment strap 2, Soft Soil Layer 6 and hard stratum 7 are fixedly connected.
Embodiment 2
Heretofore described slurry uses a kind of high intensity foam-type resin, its model SZ3, by the resin during slip casting Add in above-mentioned grouting equipment, the resin viscosity flowed out from the grouting equipment(Go out machine viscosity)For 100 ± 45mPa s, the tree Fat slurry volume in flowing constantly increases, and its penetrating power is strong, comes to nothing in position or entrance gap, is pressing suitable for quick arrival Power effect is lower to be suitable to be expelled from ponding, can be filled and be come to nothing after above-mentioned slurry injects 3 minutes, injection reaches it most after 10 minutes Whole intensity, its compressive strength >=20MPa, bending strength >=15MPa.
The slurry has the characteristics that:
(1)The slurry is not aqueous, will not produce drying shrinkage phenomenon, can dense packing effect come to nothing;There is pliability after slurry curing With elasticity, it is not easy to ftracture, while the resin material has good impermeability, rainwater infiltration can be prevented to enter weak soil Layer, fracture and seam have good sealing function;
(2)Foaming shape solid is formed after slurry curing, its density is the 20% of cement mortar, will not produce larger load to structure Lotus;
(3)The elative free swelling ratio of the slurry is up to 20:1, can Fast Filling come to nothing, be further compacted in expansion process The soil layer for surrounding of coming to nothing;
(4)Stability of Slurry after solidification is strong, non-aging deformation, and its durability is up to century-old;
(5)After slurry curing, each chemical composition will not dissolve or decompose and is lost in in rainwater, environmentally safe;
(6)Attachment strap structure after slurry reparation, later stage without periodic maintenance, maintenance, reduce maintenance cost.
Obviously, above-described embodiment is only intended to clearly illustrate example of the present invention, and is not to the present invention The restriction of embodiment.For those of ordinary skill in the field, it can also be made on the basis of the above description Its various forms of changes or variation.There is no necessity and possibility to exhaust all the enbodiments.And these belong to this hair Among the obvious changes or variations that bright spirit is extended out is still in protection scope of the present invention.

Claims (1)

1. a kind of method repaired at Bridge back wall of road pavement, it is characterised in that comprise the following steps:
A. detected using detection radar and come to nothing in the attachment strap of impaired bridge(3)Position, in attachment strap(2)Surface markers go out to come to nothing (3)Position and measure this and come to nothing(3)And hard stratum(7)Depth;
B. in attachment strap(2)Surface marks injected hole one(8)Position and drilling, injected hole one is as deep as hard stratum(7), injected hole one (8)Arranged with array way, make to come to nothing(3)Fall into array range;
C. in Soft Soil Layer(6)Side mark injected hole two(9)Position and drilling, each injected hole two(9)Penetrate the Soft Soil Layer And with injected hole one(8)It is intersecting;
D. to injected hole one(8)Carry out slip casting and detection is come to nothing immediately using three-dimensional detection radar(3)And each injected hole one(8)、 Injected hole two(9)Internal filled therewith situation, when slurry comes to nothing full of this(3)And each injected hole one(8), injected hole two(9) When stop slip casting;
E. slip casting reuses detection radar to filling location detection check after stopping, to not re-started brill at filled therewith Hole, slip casting;
F. after slip casting terminates 10 minutes, to each injected hole one(8), injected hole two(9)Carry out sealing of hole;Attachment strap, Soft Soil Layer and pan soil Layer links into an integrated entity;
A diameter of 3-15cm of the injected hole one and injected hole two, adjacent injected hole one(8)Center spacing be 8-25cm;
The injected hole two(9)Level penetrates the Soft Soil Layer and perpendicular to attachment strap center line, each injected hole one(8)Respectively with coming to nothing (3)Multiple injected holes two of lower section(9)It is intersecting.
CN201610199179.7A 2014-05-26 2014-05-26 The method repaired at the Bridge back wall of environmentally safe road pavement Active CN105862560B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610199179.7A CN105862560B (en) 2014-05-26 2014-05-26 The method repaired at the Bridge back wall of environmentally safe road pavement

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610199179.7A CN105862560B (en) 2014-05-26 2014-05-26 The method repaired at the Bridge back wall of environmentally safe road pavement
CN201410223493.5A CN104047235B (en) 2014-05-26 2014-05-26 The Bridge back wall place of road pavement carries out the method for repairing

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410223493.5A Division CN104047235B (en) 2014-05-26 2014-05-26 The Bridge back wall place of road pavement carries out the method for repairing

Publications (2)

Publication Number Publication Date
CN105862560A CN105862560A (en) 2016-08-17
CN105862560B true CN105862560B (en) 2018-02-02

Family

ID=51500606

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610199179.7A Active CN105862560B (en) 2014-05-26 2014-05-26 The method repaired at the Bridge back wall of environmentally safe road pavement
CN201410223493.5A Active CN104047235B (en) 2014-05-26 2014-05-26 The Bridge back wall place of road pavement carries out the method for repairing

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201410223493.5A Active CN104047235B (en) 2014-05-26 2014-05-26 The Bridge back wall place of road pavement carries out the method for repairing

Country Status (1)

Country Link
CN (2) CN105862560B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108330848B (en) * 2018-03-10 2019-05-31 青海省恒立公路勘测设计有限公司 A kind of bridge pavement repairing construction technology
CN112252111A (en) * 2020-08-25 2021-01-22 徐州成瑞建筑科技研究院有限公司 Desilting and grouting reinforcement method for slab bottom void pavement crack
CN112627168A (en) * 2020-12-23 2021-04-09 河南长安交通科技发展有限公司 High-density polymer grouting reinforcement method for roadbed at sunken part of bridge and culvert butt strap

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU977789A1 (en) * 1981-04-28 1982-11-30 Научно-исследовательский институт строительства угольных и горнорудных предприятий Method for plugging rocks
NL9001117A (en) * 1990-05-10 1991-12-02 Voorbij Groep Bv METHOD FOR MOVING A PLATE-SHAPED CARRIER AND SEAL THEREFOR
JP2000204554A (en) * 1999-01-08 2000-07-25 Tenox Corp Reinforcing structure for embankment
CN2793158Y (en) * 2005-03-04 2006-07-05 铁道科学研究院铁道建筑研究所 Porous pipe for cement casting at transitting section of present bridge
CN101168957A (en) * 2007-10-01 2008-04-30 于心然 Bridge brow plate emptying shallow layer grouting reinforcement technique
CN102051861B (en) * 2009-11-02 2012-05-23 郑州优特基础工程维修有限公司 Bridgehead vehicle bump prevention and control high polymer grouting technique
CN102052081A (en) * 2009-11-02 2011-05-11 郑州优特基础工程维修有限公司 High polymer grouting technology for treating tunnel void and construction method thereof
CN102409598A (en) * 2011-09-29 2012-04-11 河海大学 Method for processing vehicle bump at bridge head of existing highway
CN102888796A (en) * 2012-09-13 2013-01-23 山西路众道桥有限公司 Method for quickly repairing cavity disease of cement concrete pavement
CN203334152U (en) * 2013-07-09 2013-12-11 中铁第四勘察设计院集团有限公司 Bridge road transition section roadbed structure at deep layer yielding ground area
CN103669385A (en) * 2013-12-30 2014-03-26 中铁二十四局集团有限公司 Method for improving pile group bearing capacity by means of reticular pile foundations
FR3017398B1 (en) * 2014-02-07 2017-06-23 Electricite De France METHOD FOR STABILIZING A TECHNICAL FILLER

Also Published As

Publication number Publication date
CN105862560A (en) 2016-08-17
CN104047235B (en) 2016-04-27
CN104047235A (en) 2014-09-17

Similar Documents

Publication Publication Date Title
CN104047236B (en) The restorative procedure on bumping at bridge-head road surface
CN106522037B (en) Side broad way based structures based on existing railway roadbed and its construction method
CN104033164B (en) Come to nothing and the harmful method repaired that seeps water to what encircle in tunnel
CN105696427B (en) The construction method and its road structure of a kind of consolidation process newly built railway karst foundation
CN101666081B (en) Abrupt slope bare rock drilling platform and technology in huge reservoir
CN104328782B (en) A kind of expansiveness perfusion support arrangement and the method administering railroad bed settlement deformation thereof
CN105735151B (en) A kind of method for repairing road surface
CN109138011B (en) Foundation reinforcing and deviation rectifying method for existing building
CN203462484U (en) Existing retaining wall reinforcement structure
CN108951334B (en) Construction method of road subgrade structure
CN105862560B (en) The method repaired at the Bridge back wall of environmentally safe road pavement
CN105887613B (en) Method for repairing road surface that is environmentally safe, eliminating vehicle bump at bridge ends
CN104033165B (en) Tunnel defect restorative procedure and reparation slurry
CN108611985A (en) Framed underpass bridge construction method that special geology is overweight
CN104047237B (en) A kind of method for repairing road surface
CN109704656A (en) A kind of bridge joint hillside fields polymer grouting strengthening method
CN104047305A (en) Fast repairing method of house sinking
CN105780673B (en) Solve the hard, restorative procedure on the bumping at bridge-head road surface of Soft Soil Layer differential settling velocity
CN205024694U (en) Superplasticity concrete drilling bored concrete pile dado
CN108193706A (en) A kind of downward construction concrete pouring procedure of part contrary sequence method vertical structure
CN104612174B (en) A kind of ultra-soft cob brick loose tool assists the construction method of suspended deck structure
CN204370463U (en) Ultra-soft cob brick loose tool assists suspended deck structure
CN210946334U (en) Soft foundation reinforcement and butt strap jacking repair system for sunk bridge head butt strap
CN208870637U (en) A kind of high water head rich water tunnel tunnel bottom construction
CN208184752U (en) The bottom stab ilization system in rich water soft stratum heavy haul railway tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Chen Zan

Inventor before: Zhang Lahua

Inventor before: He Weixing

Inventor before: Chen Yun

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A method for repairing the bridge head and back of the road surface without pollution to the environment