CN104047237B - A kind of method for repairing road surface - Google Patents

A kind of method for repairing road surface Download PDF

Info

Publication number
CN104047237B
CN104047237B CN201410223554.8A CN201410223554A CN104047237B CN 104047237 B CN104047237 B CN 104047237B CN 201410223554 A CN201410223554 A CN 201410223554A CN 104047237 B CN104047237 B CN 104047237B
Authority
CN
China
Prior art keywords
injected hole
nothing
hole
come
attachment strap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410223554.8A
Other languages
Chinese (zh)
Other versions
CN104047237A (en
Inventor
陈国贤
何伟兴
吴国平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd
Original Assignee
JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd filed Critical JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd
Priority to CN201610158620.7A priority Critical patent/CN105735151B/en
Priority to CN201410223554.8A priority patent/CN104047237B/en
Publication of CN104047237A publication Critical patent/CN104047237A/en
Application granted granted Critical
Publication of CN104047237B publication Critical patent/CN104047237B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of method for repairing road surface, its step comprises: utilize detection radar to detect in the attachment strap of impaired bridge position of coming to nothing, mark the position of injected hole one on attachment strap surface and hole, injected hole one reaches hardpan deeply, injected hole one is arranged with array way, and the center distance of adjacent injected hole one is 10-20cm and makes to come to nothing to fall within the scope of array; Each injected hole two this Soft Soil Layer through is also crossing with injected hole one, is provided with the one way valve of exhaust at each injected hole two two ends; Slip casting is carried out to injected hole one and utilize three-dimensional detection radar immediately to detect to come to nothing and each injected hole one, injected hole two inside filled therewith situation, when slurry be full of this come to nothing and each injected hole one, injected hole two time stop slip casting; Slip casting utilizes detection radar to the check of filling location detection again after stopping, to not re-started boring, slip casting by filled therewith place; This method solve the problem of hardpan and Soft Soil Layer differential settling velocity.

Description

A kind of method for repairing road surface
Technical field
The present invention relates to a kind of method for repairing road surface, can repair Bridge back wall place, eliminate vehicle bump at bridge ends.
Background technology
Along with the continuous increase of highway in China and railway mileage, proportion shared by the highway such as bridge, culvert structure is increasing, back filling behind abutment place ubiquity " bumping at bridge-head " phenomenon of this class formation a lot, so-called " bumping at bridge-head " refers to that the structure such as bridge, culvert itself and the platform back of the body continue sedimentation due to the effect of drive a vehicle load and deadweight, tectonic subsidence and platform carry on the back the inconsistent and differential settlement produced of sedimentation, cause platform to be carried on the back and occur step with the road surface of structure junction, the vehicle of running at high speed produces the phenomenon of jolting and jumping by back filling behind abutment place.
Occur that the vertical of above-mentioned phenomenon wants reason to be, general bridge floor is higher than road surface and is connected with roadbed (hardpan) by bridge pier, therefore there is the bridge floor of difference in height be connected by attachment strap with between road surface, heap on the existing roadbed below attachment strap is needed to establish artificial soil horizon's (Soft Soil Layer) of compacting in order to support this attachment strap, therefore to compare former roadbed (hardpan) softer for the later stage is formed for this artificial soil horizon, bridge in later stage operation process due to natural subsidence effect, the height on its bridge floor and road surface all can decline, but the infall process of above-mentioned Soft Soil Layer is faster than hardpan, therefore occur between bridge floor and attachment strap that difference in height causes vehicle bump at bridge ends, can be formed between Soft Soil Layer and attachment strap simultaneously and come to nothing and make to misplace between bridge floor and attachment strap, thus exacerbate vehicle bump at bridge ends.
China Patent No. is that the document of CN102051861 proposes and utilizes high polymer material to be injected into the interior attachment strap eliminating depression of coming to nothing, promote that comes to nothing bottom attachment strap to eliminate vehicle bump at bridge ends, but the method fails to take measures to the differential settling velocity of the different soil causing vehicle bump at bridge ends, therefore fail fundamentally to solve the problem of bumping at bridge-head.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of method for repairing road surface, can solve the problem of hardpan and Soft Soil Layer differential settling velocity.
In order to solve the problems of the technologies described above, the invention provides a kind of method for repairing road surface, it comprises the steps:
A. utilize detection radar or ultrasonic detection device to detect in the attachment strap of impaired bridge position of coming to nothing, measure this come to nothing and the degree of depth of hardpan in the position that the surface markers of attachment strap goes out to come to nothing;
B. mark the position of injected hole one on attachment strap surface and hole, injected hole one reaches hardpan deeply, and injected hole one is arranged with array way, and making to come to nothing falls within the scope of array;
C. mark the position of injected hole two in the side of Soft Soil Layer and hole, each injected hole two this Soft Soil Layer through is also crossing with injected hole one;
D. slip casting is carried out to injected hole one and utilize three-dimensional detection radar immediately to detect to come to nothing and each injected hole one, injected hole two inside filled therewith situation, when slurry be full of this come to nothing and each injected hole one, injected hole two time stop slip casting;
E., after slip casting terminates 10 minutes, sealing of hole is carried out to each injected hole one, injected hole two.
Described injected hole one is 3-15cm with the diameter of injected hole two, and the center distance of adjacent injected hole one is 8-25cm.
Described injected hole two level this Soft Soil Layer through and perpendicular to attachment strap center line, each injected hole one is crossing with multiple injected holes two of below of coming to nothing respectively.
The present invention also provides a kind of and repairs slurry, and this slurry is used for the slip casting process of above-mentioned a kind of method for repairing road surface.
This slurry is high strength foam-type resin.
The elative free swelling ratio of this slurry reaches 20:1, can fill come to nothing in injection after 3 minutes, injects and reaches final strength after 10 minutes.
The machine viscosity that goes out of this slurry is 100 ± 45mPas, and its final strength meets compressive strength >=20MPa, bending strength >=15MPa
Relative to prior art, the technique effect that the present invention has is:
1) a kind of method for repairing road surface of the present invention, detected and boring by detection radar, slip casting combines, the also lifting attachment strap that comes to nothing not only filled up below attachment strap makes end of the bridge smooth-going, also the slurry body after solidification is made to form net structure by crossing injected hole one and injected hole two, by attachment strap, Soft Soil Layer and hardpan link into an integrated entity, thus the settling rate of Soft Soil Layer and hardpan is consistent, the settling rate of attachment strap will be consistent with hardpan, prevent from being formed between Soft Soil Layer and attachment strap coming to nothing, thus avoid the vehicle bump at bridge ends that bridge floor and attachment strap cause because of respective differential settling velocity,
2) come to nothing position inject slurry curing after formed a pulp layer, connect attachment strap above this pulp layer, below is connected with hardpan by slurry column, injected hole one and slurry column diameter are 5-10cm, fractional load on attachment strap directly can be passed to hardpan by slurry column, thus reduce the settling amount after Soft Soil Layer pressurized; Injected hole two and slurry crossbeam diameter are 5-10cm, the attachment strap load that part is conducted through Soft Soil Layer can be made to conduct to slurry column through slurry crossbeam, conduct to hardpan through slurry column again, thus reduce the load through Soft Soil Layer conduction, reduce the settling amount of Soft Soil Layer further; The center distance of adjacent injected hole one is 10-20cm, slurry column not only can have been made to arrange closely but also be beneficial to and holed to injected hole one;
3) injected hole two level this Soft Soil Layer through and perpendicular to attachment strap center line, be convenient to flowing and the filling of slurry in boring and slip casting process, in the Soft Soil Layer of below that comes to nothing, multiple injected hole two crossing with injected hole one is set, the bonding strength between Soft Soil Layer and hardpan, attachment strap can be strengthened, be also conducive to more load through Soft Soil Layer conduction to be directly conducted to hardpan by slurry crossbeam, slurry column simultaneously;
4) the water-free high strength foam-type resin of this slurry, can not produce drying shrinkage phenomenon, can come to nothing by dense packing effect; Have pliability and elasticity after slurry curing, cracking is less likely to occur, and this resin material has good impermeability simultaneously, and rainwater infiltration can be stoped to enter in attachment strap, and fracture and seam have good sealing function;
5) can fill after this slurry injects 3 minutes and come to nothing, inject and reach its final strength after 10 minutes, hardening time is short, decrease engineering time and the impact on traffic, form foaming shape solid after slurry curing, its density is 20% of cement paste, can not produce larger load to structure;
6) elative free swelling ratio of this slurry can reach 20:1, can come to nothing by Fast Filling, and in expansion process, further compacting is come to nothing the soil layer of surrounding;
7) Stability of Slurry after solidification is strong, not easily aging distortion, and its durability can reach a century;
8), after slurry curing, each chemical composition can not be dissolved or decompose and be run off in rainwater, environmentally safe;
9) the attachment strap structure after this slurry is repaired, the later stage, without the need to periodic maintenance, maintenance, decreases maintenance cost.
Accompanying drawing explanation
In order to clearly demonstrate innovative principle of the present invention and the technical advantage compared to existing product thereof, by the limiting examples applying described principle, possible embodiment is described by means of accompanying drawing below.In the drawings:
Fig. 1 is the profile of impaired bridge in the present invention;
Fig. 2 is the profile of the bridge in the present invention after boring;
Fig. 3 is the top view of the attachment strap being provided with injected hole one in the present invention;
Fig. 4 is the left view of the slurry body in the present invention after solidification.
Detailed description of the invention
Embodiment 1
As shown in Figure 1, impaired bridge generally comprises: face 1 of mating formation, and attachment strap 2, comes to nothing 3, bridge floor 4, road surface 5, Soft Soil Layer 6, hardpan 7.
Come to nothing and generally appear between attachment strap 2 and Soft Soil Layer 6, the volume that comes to nothing of the sedimentation along with Soft Soil Layer can increase gradually, because Soft Soil Layer 6 exceeds roadbed, is convenient to hole to Soft Soil Layer 6 from the side.
As Figure 1-3, a kind of method for repairing road surface of the present invention, comprises the following steps:
(1) utilize three-dimensional detection radar or ultrasonic detection device to detect in the attachment strap of impaired bridge 3 positions of coming to nothing, the surface markers of attachment strap 2 go out to come to nothing 3 position and measure the degree of depth of this come to nothing 3 and hardpan 7;
(2) mark the position of each injected hole 1 on attachment strap 2 surface above 3 of coming to nothing and hole, the diameter of injected hole 1 is 5-10cm and deeply reaches hardpan 7, all injected holes 1 are arranged in square array mode, and the center distance of adjacent injected hole 1 is 10-20cm and makes coming to nothing of above-mentioned mark 3 fall within the scope of the array of described injected hole 1;
(3) mark the position of injected hole 29 in the side of Soft Soil Layer 6 and hole, each injected hole 29 level this Soft Soil Layer through and intersect at injected hole 1, each injected hole 1 is crossing with being located at three injected holes 29 come to nothing below 3, and each injected hole 29 is perpendicular to attachment strap center line and diameter is 5-10cm;
(4) in the position of each injected hole 1, Grouting Pipe 11 is installed, Grouting Pipe 11 stretches to the bottom of injected hole 1, each Grouting Pipe 11 installs filling adaptor, debugging grouting equipment is also connected with filling adaptor, inspection injecting paste material also adds in grouting equipment, is provided with at each injected hole 29 two ends the one way valve only can discharging air;
(5) slip casting is carried out to injected hole 1 and utilize three-dimensional detection radar immediately to detect to come to nothing 3 and each injected hole 1, injected hole 29 inside filled therewith situation, when slurry be full of this come to nothing 3 and each injected hole 1, injected hole 29 time stop slip casting;
(6) slip casting utilizes detection radar to detect this to come to nothing 3 and each injected hole 1, whether to also have not by filled therewith position in injected hole 29, re-start boring, slip casting to the position that there is above-mentioned situation again after stopping;
(7) wait for after 10 minutes, the slurry curing of filling also reaches final strength, takes off one way valve and carries out sealing of hole to each injected hole 1, injected hole 29.
Slurry after solidification forms slurry body 10 as shown in Figure 4, comprise the net structure arranging more and be made up of the slurry crossbeam 103 of multiple vertical slurry column 101, level and be full of come to nothing 3 pulp layer 102, this slurry body 10 is fixedly connected with attachment strap 2, Soft Soil Layer 6 and hardpan 7.
Embodiment 2
Slurry described in the present invention adopts a kind of high strength foam-type resin, its model is SZ3, during slip casting, this resin is added in above-mentioned grouting equipment, the resin viscosity (going out machine viscosity) flowed out from this grouting equipment is 100 ± 45mPas, this resin slurry volume in flowing constantly increases, its penetrating power is strong, be suitable for arriving fast the position or enter in gap of coming to nothing, be suitable under pressure squeezing ponding, can fill after above-mentioned slurry injects 3 minutes and come to nothing, inject and reach its final strength after 10 minutes, its compressive strength >=20MPa, bending strength >=15MPa.
This slurry has following characteristics:
(1) this slurry is not moisture, can not produce drying shrinkage phenomenon, can come to nothing by dense packing effect; Have pliability and elasticity after slurry curing, cracking is less likely to occur, and this resin material has good impermeability simultaneously, and rainwater infiltration can be stoped to enter Soft Soil Layer, and fracture and seam have good sealing function;
(2) form foaming shape solid after slurry curing, its density is 20% of cement paste, can not produce larger load to structure;
(3) elative free swelling ratio of this slurry can reach 20:1, can come to nothing by Fast Filling, and in expansion process, further compacting is come to nothing the soil layer of surrounding;
(4) Stability of Slurry after solidification is strong, not easily aging distortion, and its durability can reach a century;
(5), after slurry curing, each chemical composition can not be dissolved or decompose and be run off in rainwater, environmentally safe;
(6) the attachment strap structure after this slurry is repaired, the later stage, without the need to periodic maintenance, maintenance, decreases maintenance cost.
Obviously, above-described embodiment is only for example of the present invention is clearly described, and is not the restriction to embodiments of the present invention.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here exhaustive without the need to also giving all embodiments.And these belong to spirit institute's apparent change of extending out of the present invention or change and are still among protection scope of the present invention.

Claims (3)

1. a method for repairing road surface, is characterized in that comprising the steps:
A. utilize detection radar or ultrasonic detection device to detect in the attachment strap of impaired bridge (3) position of coming to nothing, the surface markers of attachment strap (2) go out to come to nothing (3) position and measure this and come to nothing (3) and the degree of depth of hardpan (7);
B. mark the position of injected hole one (8) on attachment strap (2) surface and hole, injected hole one reaches hardpan (7) deeply, and injected hole one (8) is arranged with array way, and make to come to nothing (3) fall within the scope of array;
C. mark the position of injected hole two (9) in the side of Soft Soil Layer (6) and hole, each injected hole two (9) this Soft Soil Layer through is also crossing with injected hole one (8);
D. slip casting carried out to injected hole one (8) and utilize three-dimensional detection radar immediately to detect to come to nothing (3) and filled therewith situation that each injected hole one (8), injected hole two (9) are inner, when slurry be full of this and come to nothing (3) and each injected hole one (8), injected hole two (9) time stop slip casting; Slurry adopts high strength foam-type resin, and during slip casting, this resin slurry volume in flowing constantly increases, and is suitable under pressure squeezing ponding;
E., after slip casting terminates 10 minutes, sealing of hole is carried out to each injected hole one (8), injected hole two (9), and attachment strap, Soft Soil Layer and hardpan are linked into an integrated entity.
2. a kind of method for repairing road surface according to claim 1, is characterized in that: described injected hole one is 3-15cm with the diameter of injected hole two, and the center distance of adjacent injected hole one (8) is 8-25cm.
3. a kind of method for repairing road surface according to claim 1, is characterized in that: described injected hole two (9) level this Soft Soil Layer through and perpendicular to attachment strap center line, and each injected hole one (8) is crossing with multiple injected holes two (9) of (3) below of coming to nothing respectively.
CN201410223554.8A 2014-05-26 2014-05-26 A kind of method for repairing road surface Active CN104047237B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610158620.7A CN105735151B (en) 2014-05-26 2014-05-26 A kind of method for repairing road surface
CN201410223554.8A CN104047237B (en) 2014-05-26 2014-05-26 A kind of method for repairing road surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410223554.8A CN104047237B (en) 2014-05-26 2014-05-26 A kind of method for repairing road surface

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201610158620.7A Division CN105735151B (en) 2014-05-26 2014-05-26 A kind of method for repairing road surface

Publications (2)

Publication Number Publication Date
CN104047237A CN104047237A (en) 2014-09-17
CN104047237B true CN104047237B (en) 2016-04-20

Family

ID=51500608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410223554.8A Active CN104047237B (en) 2014-05-26 2014-05-26 A kind of method for repairing road surface

Country Status (1)

Country Link
CN (1) CN104047237B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544368A (en) * 2015-12-07 2016-05-04 江美娣 Method and system for pre-repairing road before road damage
CN108330848B (en) * 2018-03-10 2019-05-31 青海省恒立公路勘测设计有限公司 A kind of bridge pavement repairing construction technology
CN108385549B (en) * 2018-03-25 2019-05-31 江苏惠淳建设有限公司 A kind of bridge pavement method for repairing and constructing

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0456331A1 (en) * 1990-05-10 1991-11-13 Voorbij Groep B.V. Method for the displacement of a slab-shaped carrier, and seal therefor
CN101168957A (en) * 2007-10-01 2008-04-30 于心然 Bridge brow plate emptying shallow layer grouting reinforcement technique
CN101967794A (en) * 2010-09-18 2011-02-09 余闯 New technology for treating vehicle bump at bridge ends
CN102051861A (en) * 2009-11-02 2011-05-11 郑州优特基础工程维修有限公司 Bridgehead vehicle bump prevention and control high polymer grouting technique and construction method thereof
CN102127890A (en) * 2011-03-31 2011-07-20 湖南恒盾岩土工程注浆科技有限公司 Reinforcing construction method of existing railway subgrade
CN102392402A (en) * 2011-11-11 2012-03-28 中铁六局集团有限公司 Road and bridge transition section grouting construction method used during jacking construction
CN103669385A (en) * 2013-12-30 2014-03-26 中铁二十四局集团有限公司 Method for improving pile group bearing capacity by means of reticular pile foundations

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0456331A1 (en) * 1990-05-10 1991-11-13 Voorbij Groep B.V. Method for the displacement of a slab-shaped carrier, and seal therefor
CN101168957A (en) * 2007-10-01 2008-04-30 于心然 Bridge brow plate emptying shallow layer grouting reinforcement technique
CN102051861A (en) * 2009-11-02 2011-05-11 郑州优特基础工程维修有限公司 Bridgehead vehicle bump prevention and control high polymer grouting technique and construction method thereof
CN101967794A (en) * 2010-09-18 2011-02-09 余闯 New technology for treating vehicle bump at bridge ends
CN102127890A (en) * 2011-03-31 2011-07-20 湖南恒盾岩土工程注浆科技有限公司 Reinforcing construction method of existing railway subgrade
CN102392402A (en) * 2011-11-11 2012-03-28 中铁六局集团有限公司 Road and bridge transition section grouting construction method used during jacking construction
CN103669385A (en) * 2013-12-30 2014-03-26 中铁二十四局集团有限公司 Method for improving pile group bearing capacity by means of reticular pile foundations

Also Published As

Publication number Publication date
CN104047237A (en) 2014-09-17

Similar Documents

Publication Publication Date Title
CN104047236B (en) The restorative procedure on bumping at bridge-head road surface
CN104033164B (en) Come to nothing and the harmful method repaired that seeps water to what encircle in tunnel
CN106012697B (en) Ballastless track roadbed high polymer grouting lifting method
CN104695343B (en) Long-distance jacking construction method based on back wall pushing technology
CN104047217A (en) Rapid pavement restoration method
CN104047213B (en) A kind of method for repairing road surface that can solve hard stratum and Soft Soil Layer sinking speed difference
CN105735151B (en) A kind of method for repairing road surface
CN104047237B (en) A kind of method for repairing road surface
CN104047235B (en) The Bridge back wall place of road pavement carries out the method for repairing
CN104033165B (en) Tunnel defect restorative procedure and reparation slurry
CN103912290B (en) Grouting method used for vibration isolating and denoising outside subway tunnel segments
CN203890900U (en) Structure for quickly restoring hollow slab bridge hinge joint
CN105926376A (en) Construction method of rubber springs of point support type track structure
CN109704656A (en) A kind of bridge joint hillside fields polymer grouting strengthening method
CN113737624A (en) Bridge head bump bag type grouting repair construction method
CN104047305A (en) Fast repairing method of house sinking
CN109750561B (en) Structure for preventing slurry pumping on surface layer of ballastless track bed plate foundation bed and construction method
CN105780673B (en) Solve the hard, restorative procedure on the bumping at bridge-head road surface of Soft Soil Layer differential settling velocity
CN102644266B (en) Method utilizing fracture anchor rod piles for reinforcing soft soil stratum pavements in abutment areas
CN210946334U (en) Soft foundation reinforcement and butt strap jacking repair system for sunk bridge head butt strap
CN104047306A (en) Method for lifting and centralizing sinking house
CN109033714B (en) Design method for controlling coordinated deformation of roadbed and pavement
CN203160089U (en) Anti-settling bridgehead slope structure
CN208184752U (en) The bottom stab ilization system in rich water soft stratum heavy haul railway tunnel
CN206667292U (en) It is a kind of to justify pile foundation counterfort wall station road structure close to bridge pier

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Chen Zan

Inventor before: Chen Guoxian

Inventor before: He Weixing

Inventor before: Wu Guoping

CB03 Change of inventor or designer information
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Road Repair Method

Granted publication date: 20160420

Pledgee: Industrial and Commercial Bank of China Danyang Branch

Pledgor: JIANGSU DINGTAI ENGINEERING MATERIAL CO.,LTD.

Registration number: Y2024980002806

PE01 Entry into force of the registration of the contract for pledge of patent right