CN108330848B - A kind of bridge pavement repairing construction technology - Google Patents

A kind of bridge pavement repairing construction technology Download PDF

Info

Publication number
CN108330848B
CN108330848B CN201810196673.7A CN201810196673A CN108330848B CN 108330848 B CN108330848 B CN 108330848B CN 201810196673 A CN201810196673 A CN 201810196673A CN 108330848 B CN108330848 B CN 108330848B
Authority
CN
China
Prior art keywords
high polymer
nothing
slip casting
coming
region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810196673.7A
Other languages
Chinese (zh)
Other versions
CN108330848A (en
Inventor
林光琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai traffic engineering consulting Co.,Ltd.
Original Assignee
Qinghai Hengli Highway Survey And Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Hengli Highway Survey And Design Co Ltd filed Critical Qinghai Hengli Highway Survey And Design Co Ltd
Priority to CN201810196673.7A priority Critical patent/CN108330848B/en
Publication of CN108330848A publication Critical patent/CN108330848A/en
Application granted granted Critical
Publication of CN108330848B publication Critical patent/CN108330848B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Abstract

A kind of bridge pavement method for repairing and constructing, detections of radar is carried out to transition slab at bridge head section by Ground Penetrating Radar, determine region of coming to nothing caused by Bridgehead by Blastig differential settlement, high polymer is injected into region of coming to nothing by injected hole, plat-bottom escape position is effectively filled, and it can effectively solve the problem that attachment strap absolute altitude, reach equal with abutment, to realize the consolidation effect for the soil body.Meanwhile in high polymer grouting repair process, the accurate grouting amount for determining high polymer avoids high polymer grouting excessively caused road surface lifting.

Description

A kind of bridge pavement repairing construction technology
Technical field
The present invention relates to a kind of highway bridge maintenance and repair technologies, more particularly, to a kind of bridge pavement repairing construction skill Art.
Background technique
With flourishing for China's economy and being constantly progressive for society, highway bridge is increasing to the effect of people, All pay much attention to highway bridge construction in all parts of the country.Highway bridge not only becomes the main artery for linking up north and south economy, more can be one Determine to promote the development of economy in degree.
Currently, China's highway is in fast-developing period, with highway mileage increase and use the time Extend, road maintenance engineering amount is also increasing.Maintenance project is generally divided into specific aim maintenance and preventive maintenance, and specific aim is supported Shield refers to when road surface is destroyed, and is taken appropriate measures according to Damage Types, improves the service performance on road surface.It is preventative to support Shield refers to when bituminous pavement property is still in shape, implements the technologies such as micro-surface area, ultra-thin wearing layer, mist envelope, the cementation of fissures and arranges It applies road pavement and implements protectiveness maintenance, improve the function status on road surface under the premise of not increasing structural-load-carrying capacity, to prevent The development of small disease delays serious destruction.
For highway since design speed per hour is high, the sedimentation and deformation and stability requirement to highway are high.Bridgehead by Blastig is uneven The phenomenon that sedimentation, can have a huge impact the life security of passing vehicle and pedestrian, and only take appropriate measures progress Control, just can guarantee the quality on road surface.
Bridgehead by Blastig differential settlement causes transition slab at bridge head to come to nothing and then forms bumping at bridge-head, and bumping at bridge-head is universal and multiple Miscellaneous problem, it is all that it is related to Embankment Subsidence, back filling behind abutment, abutment type, seam, transition slab at bridge head, road surface and construction method etc. It is multifactor.The immediate cause that transition slab at bridge head comes to nothing is the settlement difference of abutment and roadbed.Abutment is rigid structures, its underpart one As have a pile foundation, thus the deformation and sedimentation of abutment are very small, and roadbed and ground are flexible, have under load action compared with Big plastic deformation, so the settling ratio abutment of Bridgehead by Blastig is big, to cause the relative settlement of the two.Once longitudinal poor Different sedimentation is big, will cause road surface transverse crack, and running car is caused to slow down, jolt, shake, jump the problems such as vehicle, influences driving and relaxes Adaptive, safety reduce running speed, increase the operation cost of vehicle and highway itself.
High polymer grouting technology has achieved in the rapid-maintenance of the infrastructure such as road, airfield runway and bumping at bridge-head Very big success.Since high polymer has a characteristic that (1) density is small, ungauged regions, the additional stress generated after maintenance is small;(2) Speed of application is fast, and without maintenance, the influence to traffic is smaller;(3) material volume expands rapidly when reacting, can be having generated Settlement difference narrow down to most preferably;(4) slip casting aperture is small, influences on former hazard to bridge's pier globality small;(5) infiltration coefficient is small, material Expect that waterproof performance is good, and durability is good, pollution-free.So compared with traditional cement injection technology, with very big Advantage, at home promotional value with higher in the processing of bumping at bridge-head.After Bridgehead by Blastig uses high polymer grouting, board bottom is de- Empty position is efficiently filled, and can effectively solve the problem that attachment strap absolute altitude, reaches equal with abutment, to realize adding for the soil body Gu effect, while the position come to nothing in road surface structare layer, crack are filled, moisture is closed, the bearing capacity of pavement structure is promoted.
Since high polymer volume expansion during the reaction prevents high polymer in the prior art in order to control slip casting process It is lifted road surface, usually needs to monitor the height change on road surface during slip casting by laser level, when there is ground fine motion Or grouting port slurry stops slip casting when emerging;But monitoring process is complicated, is unable to accurately control grouting amount, and occur ground When face height change or slurry are emerged, may slip casting it is excessive, cause road surface to continue to be lifted.
Summary of the invention
The present invention provides a kind of bridge pavement repairing construction technology, can be in high polymer grouting repair process, accurately The grouting amount for determining high polymer avoids high polymer grouting excessively caused road surface lifting.
As one aspect of the present invention, bridge pavement method for repairing and constructing is provided, includes the following steps: that (1) passes through benefit Detections of radar is carried out to transition slab at bridge head section with Ground Penetrating Radar, determines region of coming to nothing;(2) in regional location setting slip casting of coming to nothing Hole;(3) it excavates and blocks spillage position of seriously coming to nothing under attachment strap two sides and abutment with concrete after roadbed side slope;(4) pass through slip casting Implement the first slip casting of high polymer to the region of coming to nothing in hole;(5) after the high polymer solidification of first slip casting of high polymer, pass through The injected hole is filled the water to the region of coming to nothing;(6) water of the water filling is detected by flow sensing equipment;(7) when described Injected hole has water body to emerge road surface, records the total Water of the flow sensing equipment at this time;(8) according to the flow sensing equipment Total Water, by the injected hole to it is described come to nothing region implement the second slip casting of high polymer;(9) filling restores roadbed side slope.
Preferably, further include that step (10) backfills injected hole concrete and pitch cold-repairing material, restore road surface.
Preferably, come to nothing setting multiple injected holes in region described in the step (2), forms slip casting hole array.
Preferably, in the step (8), the water of flow sensing equipment described in the high polymer volume ratio of second slip casting Low 5% ~ 10%.
Preferably, in the step (4), first slip casting is used to form watertight area in the sections bottom that comes to nothing.
Preferably, the high polymer includes polyurethane material.
Preferably, in the step (8), when the high polymer of the second slip casting solidifies, the water filling of step (5) is discharged.
Preferably, in the step (8), slip casting is carried out by the part injected hole of slip casting hole array.
Specific embodiment
In order to illustrate more clearly of technical solution of the present invention, embodiment will be used simply to be situated between the present invention below Continue, it should be apparent that, be described below in be only one embodiment of the present of invention, for those of ordinary skill in the art come It says, without any creative labor, other technical solutions can also be obtained according to these embodiments, also belonged to Disclosure of the invention range.
The bridge pavement method for repairing and constructing of the embodiment of the present invention, for leading to end of the bridge for Bridgehead by Blastig differential settlement It is repaired in the region of brow plate emptying.
Implementation steps include the following: (1) by carrying out detections of radar to transition slab at bridge head section using Ground Penetrating Radar when specific, Determine region of coming to nothing caused by Bridgehead by Blastig differential settlement.
(2) in the regional location setting injected hole that comes to nothing, multiple injected holes can be arranged according to the distribution in region of coming to nothing, is formed Slip casting hole array.
(3) roadbed side slope is excavated, blocks spillage position of seriously coming to nothing under attachment strap two sides and abutment with concrete.Pass through the step Suddenly, two sides are on the one hand repaired to come to nothing position, on the other hand avoids the infiltration filled the water in subsequent step.
(4) the first slip casting of high polymer is implemented to the region of coming to nothing by injected hole, which is used in area of coming to nothing Watertight area is formed on domain bottom.High polymer may include polyurethane material, using the fast foaming coherency of polyurethane foam with And caking property, it being capable of limited space formation quick blocking.
(5) it after the high polymer solidification of first slip casting of high polymer, is infused by the injected hole to the region of coming to nothing Water.
(6) when filling the water by the injected hole to the region of coming to nothing, the water filling is detected by flow sensing equipment Water.
(7) when there is water body to emerge road surface in the injected hole, the total Water of flow sensing equipment detection at this time is recorded.
(8) total Water detected according to the flow sensing equipment, passes through the part injected hole in the slip casting hole array Implement the second slip casting of high polymer to the region of coming to nothing, remaining injected hole is as drainage hole, for the high polymer in the second slip casting When solidification, the water filling of step (5) is discharged.Due to the infiltration of water filling and the expansion of high polymer, it is preferred that second slip casting High polymer volume ratio described in flow sensing equipment total Water low 5% ~ 10%.
(9) after the high polymer solidification of the second slip casting, filling restores roadbed side slope.
(10) injected hole concrete and pitch cold-repairing material are backfilled, restores road surface.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the scope of the present invention.This hair Particular features, structures, materials, or characteristics described in bright can be in any one or more of the embodiments or examples with suitable Mode combines.In addition, without conflicting with each other, those skilled in the art can be by difference described in this specification The feature of embodiment or example and different embodiments or examples is combined.It is all the spirit and principles in the present invention it Interior any modification, equivalent replacement, improvement and so on, are included within the scope of protection of the present invention.

Claims (3)

1. a kind of bridge pavement method for repairing and constructing includes the following steps: (1) by utilizing Ground Penetrating Radar to transition slab at bridge head section Detections of radar is carried out, determines region of coming to nothing;(2) in the regional location setting injected hole that comes to nothing;(3) coagulation is used after excavating roadbed side slope Grave blocks up under attachment strap two sides and abutment spillage position of seriously coming to nothing;It is characterized by further comprising: (4) are by injected hole to described Come to nothing region implement the first slip casting of high polymer;(5) after the high polymer solidification of first slip casting of high polymer, pass through the slip casting Hole is filled the water to the region of coming to nothing;(6) water of the water filling is detected by flow sensing equipment;(7) when the injected hole has Water body is emerged road surface, and the total Water of the flow sensing equipment at this time is recorded;(8) according to total water of the flow sensing equipment Amount implements the second slip casting of high polymer to the region of coming to nothing by the injected hole;(9) filling restores roadbed side slope.
2. bridge pavement method for repairing and constructing according to claim 1, it is characterised in that: further include step (10) by slip casting Hole concrete and the backfill of pitch cold-repairing material, restore road surface.
3. bridge pavement method for repairing and constructing according to claim 2, it is characterised in that: the high polymer includes polyurethane Material.
CN201810196673.7A 2018-03-10 2018-03-10 A kind of bridge pavement repairing construction technology Active CN108330848B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810196673.7A CN108330848B (en) 2018-03-10 2018-03-10 A kind of bridge pavement repairing construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810196673.7A CN108330848B (en) 2018-03-10 2018-03-10 A kind of bridge pavement repairing construction technology

Publications (2)

Publication Number Publication Date
CN108330848A CN108330848A (en) 2018-07-27
CN108330848B true CN108330848B (en) 2019-05-31

Family

ID=62930623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810196673.7A Active CN108330848B (en) 2018-03-10 2018-03-10 A kind of bridge pavement repairing construction technology

Country Status (1)

Country Link
CN (1) CN108330848B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004263542A (en) * 2003-02-12 2004-09-24 Anderson Technology Kk Device for injecting grout into cable sheath of pc structure and grout injection method
JP2006322267A (en) * 2005-05-20 2006-11-30 Asuton:Kk Repair method for concrete
CN102051861A (en) * 2009-11-02 2011-05-11 郑州优特基础工程维修有限公司 Bridgehead vehicle bump prevention and control high polymer grouting technique and construction method thereof
CN104047235A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Method for repairing bridgehead abutment position of road surface
CN104047236A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Repair method of vehicle bump pavement of bridgehead
CN104047237A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Pavement restoration method
CN105442425A (en) * 2015-12-18 2016-03-30 安徽优特公路养护科技有限公司 Rapid repairing device and method for diseases of roadbase
CN105586835A (en) * 2014-10-23 2016-05-18 马晶晶 Bump-at-bridge-end disease control high polymer grouting technology and construction method thereof
CN105735151A (en) * 2014-05-26 2016-07-06 江苏鼎泰工程材料有限公司 Pavement rehabilitation method
CN105887613A (en) * 2014-05-26 2016-08-24 江苏鼎泰工程材料有限公司 Pavement repairing method free of environmental pollution and capable of eliminating vehicle bumping at bridge head

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004263542A (en) * 2003-02-12 2004-09-24 Anderson Technology Kk Device for injecting grout into cable sheath of pc structure and grout injection method
JP2006322267A (en) * 2005-05-20 2006-11-30 Asuton:Kk Repair method for concrete
CN102051861A (en) * 2009-11-02 2011-05-11 郑州优特基础工程维修有限公司 Bridgehead vehicle bump prevention and control high polymer grouting technique and construction method thereof
CN104047235A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Method for repairing bridgehead abutment position of road surface
CN104047236A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Repair method of vehicle bump pavement of bridgehead
CN104047237A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Pavement restoration method
CN105735151A (en) * 2014-05-26 2016-07-06 江苏鼎泰工程材料有限公司 Pavement rehabilitation method
CN105887613A (en) * 2014-05-26 2016-08-24 江苏鼎泰工程材料有限公司 Pavement repairing method free of environmental pollution and capable of eliminating vehicle bumping at bridge head
CN105586835A (en) * 2014-10-23 2016-05-18 马晶晶 Bump-at-bridge-end disease control high polymer grouting technology and construction method thereof
CN105442425A (en) * 2015-12-18 2016-03-30 安徽优特公路养护科技有限公司 Rapid repairing device and method for diseases of roadbase

Also Published As

Publication number Publication date
CN108330848A (en) 2018-07-27

Similar Documents

Publication Publication Date Title
CN102051861B (en) Bridgehead vehicle bump prevention and control high polymer grouting technique
CN203174453U (en) Light-mass embankment structure for managing bump at bridge head
CN110258586A (en) Increase the structure and method of existing high roadbed tunnel backfill height
CN105586835A (en) Bump-at-bridge-end disease control high polymer grouting technology and construction method thereof
CN110820471A (en) Crossing plate, level crossing structure and laying method
CN108330848B (en) A kind of bridge pavement repairing construction technology
CN108385549B (en) A kind of bridge pavement method for repairing and constructing
Phares et al. Identification and evaluation of pavement-bridge interface ride quality improvement and corrective strategies.
CN103541287A (en) Pavement structure with comprehensive waterproof reinforced roadbed as well as construction method of pavement structure
CN112695656B (en) Box culvert construction method for road widening and box culvert
EP0385971A1 (en) Method for forming road and ground constructions
CN203960701U (en) The relative settlement coordination structure of soft soil roadbed the old and new's subgrade and pavement joining place
CN109033714B (en) Design method for controlling coordinated deformation of roadbed and pavement
CN208167421U (en) A kind of underground water cutting location Ballast track high-speed railway anti-freeze expansion road structure
KR20140114711A (en) Improvement Method for Base Ground of Pavement Block using Light-Weighted Foam Soil
CN209162531U (en) A kind of Ballast track high-speed railway anti-freeze expansion road structure
CN208183459U (en) Under wear the embankment structures of both wired bridges
Sharp Concrete in Highway Engineering: International Series of Monographs in Civil Engineering
CN217203422U (en) Be used for prosthetic road surface structure of bridgehead attachment strap
CN209456874U (en) A kind of bridgehead sinking attachment strap structure
RU2795020C1 (en) Method for constructing subgrade of additional track on weak base in case of thawing
CN220166579U (en) Splicing structure of new and old pavement structural layers of highway
CN111058346B (en) Carbon rock roadbed structure and construction method thereof
CN217651543U (en) Highway subgrade settlement-preventing structure
Uhlmeyer et al. Design and construction of rock cap roadways: Case study in Northeast Washington State

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190509

Address after: 810001 No. 5 East Traffic Lane, Chengxi District, Xining City, Qinghai Province

Applicant after: Qinghai Hengli Highway Survey and Design Co., Ltd.

Address before: 355003 No. 23 Zhongxing Street, Fuan City, Ningde City, Fujian Province

Applicant before: Lin Guangqin

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 810008, No. 5 East traffic lane, Chengxi District, Qinghai, Xining

Patentee after: Qinghai traffic engineering consulting Co.,Ltd.

Address before: 810001 No. 5 East Traffic Lane, Chengxi District, Xining City, Qinghai Province

Patentee before: QINGHAI HENGLI ROAD SURVEY AND DESIGN Co.,Ltd.

CP03 Change of name, title or address