CN103669385A - Method for improving pile group bearing capacity by means of reticular pile foundations - Google Patents

Method for improving pile group bearing capacity by means of reticular pile foundations Download PDF

Info

Publication number
CN103669385A
CN103669385A CN201310742517.3A CN201310742517A CN103669385A CN 103669385 A CN103669385 A CN 103669385A CN 201310742517 A CN201310742517 A CN 201310742517A CN 103669385 A CN103669385 A CN 103669385A
Authority
CN
China
Prior art keywords
pile
netted
group
bearing capacity
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310742517.3A
Other languages
Chinese (zh)
Inventor
王剑明
蒋孝云
钱寅星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201310742517.3A priority Critical patent/CN103669385A/en
Publication of CN103669385A publication Critical patent/CN103669385A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention relates to a method for improving the pile group bearing capacity by means of reticular pile foundations. A pile group is composed of a plurality of sets of reticular pile foundations, each reticular pile foundation is formed by arranging a plurality of single piles which vertically penetrate into a soil body, and the method comprises the following steps: arranging the single piles in the reticular pile foundations in each set according to a certain shape, and respectively arranging a pile beam for connecting every two adjacent piles at the bottom and middle positions of the adjacent single piles so as to increase the bearing areas of the reticular pile foundations and enable the pile beam and the single piles to be of an integral structure. The method has the advantages that the pile group is simple in structure, the pile beam for connecting the adjacent single piles is additionally arranged at the bottom and middle positions of the pile foundations so as to form the whole stable pile group structure, pile feet are additionally arranged on each single pile so as to increase the whole bearing areas of the reticular pile foundations, the whole bearing capacity and the anti-toppling capacity of the pile group are effectively improved, and in addition, compared with a conventional pile group with the same bearing capacity, the length of the pile group is greatly shortened.

Description

Utilize netted pile foundation to improve the method for pile group bearing capacity
Technical field
The invention belongs to pile foundation technical field, be specifically related to a kind of method of utilizing netted pile foundation to improve pile group bearing capacity.
Background technology
Campshed basis is the building pile basis structure arrange forming by queue-type with certain type, and it is large with bearing capacity, good stability, sedimentation value are little, can adapt to the features such as various geological conditionss and load situation and be widely applied in building, the hydraulic engineerings such as highrise building, large-sized workshop, water conservancy and hydropower hinge, railway engineering, highway engineering, bridge engineering, offshore production platform, nuclear power station.
Campshed basis specifically consists of jointly some foundation piles and the cushion cap that is connected in stake top, is used to the building on it that enough bearing capacities are provided; The load of building passes to ground by its below pile foundation, the frictional resistance that wherein vertical load is generally produced by the resistance of stake substratum and pile body side and the soil body supports, and that is to say that pile foundation is broadly divided into two kinds of end bearing pile and friction piles by Force principle.
As shown in Figure 1, it is hard soil layer or rock stratum that end bearing pile 1 reaches hard formation 3(through Soft Soil Layer 2), the superstructure load of end bearing pile 1 is mainly born by hard formation 3 resistances; During construction, take pile penetration as main, and pile top enters bearing stratum depth or pile top absolute altitude can be for referencial use.
As shown in Figure 2,4 of friction piles are arranged in Soft Soil Layer 2 completely, by its pile body by the compacted reality of Soft Soil Layer 2, to improve native compactness and supporting capacity, the load of its superstructure is born jointly by the frictional resistance between end-resistance and pile body side and Soft Soil Layer 2, during construction, take and control pile top design elevation as main, pile penetration can be for referencial use.
The existing problem of pile group consisting of campshed basis is at present: 1. in order to ensure it, to upper building, can provide enough bearing capacities, very big for the length requirement of pile body, the pressure that this has not only increased construction cost aspect, has also improved the difficulty of construction; 2. at adjacent foundation pile top, coupling beam is set conventionally and interconnects, to increase the resistance to overturning of pile group, but its effect is very limited, and cost is higher, affects the construction of upper building.
Summary of the invention
The object of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of method of utilizing netted pile foundation to improve pile group bearing capacity is provided, the method by each adjacent single pile bottom and medium position a crossbeam be set realize the netted pile foundation that is interconnected to constitute one, so that the loaded area much larger than conventional pile group to be provided, improve the whole stress-bearing capability of pile group.
The object of the invention realizes and being completed by following technical scheme:
A kind of method of utilizing netted pile foundation to improve pile group bearing capacity, described pile group is comprised of many networkings shape pile foundation, described netted pile foundation is rearranged by some single piles that vertically go deep in the soil body, it is characterized in that described method comprises the following steps: the some described single pile in the described netted pile foundation of each group to arrange by definite shape; In each adjacent described single pile bottom and medium position place, the stake crossbeam that connects both is set respectively, to increase the loaded area of described netted pile foundation, described stake crossbeam and described single pile is structure as a whole.
Described in each, single pile pile body and described stake crossbeam intersection arrange the footing horizontally outward extending, and make described footing bearing of trend and the perpendicular setting of described stake crossbeam.
Described footing and described pile body are structure as a whole, and the development length of described footing is not more than the length of described single pile.
Described footing is semicircle panel, and two described semicircle panels are symmetricly set in respectively described stake crossbeam both sides.
Described footing is strip structure, is symmetricly set in described stake crossbeam side.
Advantage of the present invention is, the pile group that should be comprised of netted pile foundation is simple in structure, by in pile foundation bottom and middle part set up a stake crossbeam that connects adjacent single pile and make it to form stable whole pile group structure, and by set up footing on each single pile, to increase the integrated carrying area of netted pile foundation, effectively improve integrated carrying ability and the resistance to capsizing of pile group, in addition, compare with the conventional pile group with equal supporting capacity, its pile group length can shorten greatly.
Accompanying drawing explanation
Fig. 1 is end bearing pile schematic diagram in prior art;
Fig. 2 is friction pile schematic diagram in prior art;
Fig. 3 is the part elevation figure of netted pile foundation in the embodiment of the present invention one;
Fig. 4 is the partial plan layout of netted pile foundation in the embodiment of the present invention one;
Fig. 5 is the whole elevation of netted pile foundation in the embodiment of the present invention one;
Fig. 6 is the overall plan view of netted pile foundation in the embodiment of the present invention one;
Fig. 7 is the part elevation figure of netted pile foundation in the embodiment of the present invention two;
Fig. 8 is the partial plan layout of netted pile foundation in the embodiment of the present invention two;
Fig. 9 is the part elevation figure of netted pile foundation in the embodiment of the present invention three;
Figure 10 is the partial plan layout of netted pile foundation in the embodiment of the present invention three.
The specific embodiment
Below in conjunction with accompanying drawing, by embodiment, feature of the present invention and other correlated characteristic are described in further detail, so that technician's of the same trade understanding:
As Fig. 1-10, in figure, mark 1-9 is respectively: end bearing pile 1, Soft Soil Layer 2, hard formation 3, friction pile 4, single pile 5, stake crossbeam 6, netted pile foundation 7, bar shaped footing 8, semicircle footing 9.
Embodiment mono-: being used at present superstructure that the existing common problem in pile group basis of enough bearing capacities is provided is exactly that bearing capacity is less and pile body length is larger.As Fig. 5, shown in 6, in order to improve this phenomenon, the present embodiment provides a kind of method of utilizing netted pile foundation to improve pile group bearing capacity, described pile group is comprised of many networkings shape pile foundation 7, and each networking shape pile foundation is rearranged by several single piles 5, the whole rectangular shape of this netted pile foundation 7, most of pile body of each single pile 5 is arranged in the soil body, with respect to normal pile foundation, the method of this raising pile group bearing capacity arranges twice stake crossbeam 6 by the bottom in netted pile foundation 7 and medium position, so that each single pile 5 in it is connected, make it to provide the loaded area much larger than existing pile foundation plinth, and improve whole stress-bearing capability and the stability of pile group.
As shown in Fig. 3,4,5,6, the rectangular profile shape pile group that the netted pile foundation 7 in the present embodiment is specifically rearranged by some single piles 5 that go deep in the soil body, this method of utilizing netted pile foundation to improve pile group bearing capacity specifically comprises following measures:
Twice stake crossbeam 6 is set between adjacent single pile 5 so that it interconnects, this twice stake crossbeam 6 lays respectively at bottom and the medium position of adjacent single pile 5, and the single pile 5 that this twice stake crossbeam 6 is connected with it is integrated builds molding structure, so that form net structure between each adjacent single pile 5 in netted pile foundation 7; Wherein each single pile 5 is the cylindrical pile body of vertical setting, 6, each crossbeam is horizontally disposed cylindrical pile body, and the diameter of stake crossbeam 6 is identical with the diameter of single pile 5, in addition, be connected to the lower crossbeam 6 of adjacent single pile 5 bottoms and be connected to the dimensions of king-pile crossbeam 6 at adjacent single pile 5 middle parts just the same.
As shown in Fig. 3,4,5,6, for realizing the above-mentioned Specific construction step of utilizing netted pile foundation to improve the method for pile group bearing capacity, be:
1. first on two ground, place separated by a distance, adopt the mode of machinery or manually digging hole to carry out vertical pore-forming, adjacent single pile 5 is carried out to pore-forming;
2. after, in this vertical hole, transfer cross drilling device to bottom and the middle part of vertical hole and carry out respectively horizontal pore-forming, so that be communicated with between adjacent vertical hole, respectively a lower crossbeam 6 and king-pile crossbeam 6 are carried out to pore-forming;
3. according to above-mentioned steps 1. to step 2. described in, to remaining hole stake in netted pile foundation, adopt same construction method pore-forming;
4. after treating all pile hole constructions, determine as required whether below arranges the specification of reinforcing cage and reinforcing cage, last concreting pile, forms netted pile foundation 7, and improves pile group integrated carrying ability with this.
The beneficial effect that utilizes netted pile foundation to improve the method for pile group supporting capacity in the present embodiment is specially: the method is set up the stake crossbeam that is connected both by the single pile bottom adjacent and middle part, not only make each single pile be linked to be whole force structure, promote pile group holistic resistant behavior, loaded area much larger than conventional pile group is provided simultaneously, its supporting capacity is promoted greatly, compare with the conventional campshed basis with equal supporting capacity, single pile length can shorten greatly.
Embodiment bis-: as shown in Figure 7,8, with respect to the netted pile foundation of utilizing described in embodiment mono-, improve the method for pile group bearing capacity, netted pile foundation in the present embodiment has been set up respectively bar shaped footing 8 in each single pile 5 bottoms and middle part, further to increase loaded area on the basis in netted pile foundation described in embodiment mono-, and promote the resistance to capsizing of pile group.
As shown in Figure 7,8, the rectangular profile shape pile group that the netted pile foundation 7 in the present embodiment is specifically rearranged by some single piles 5 that go deep in the soil body, this method of utilizing netted pile foundation to improve pile group bearing capacity specifically comprises following measures:
(1) twice stake crossbeam 6 is set between adjacent single pile 5 so that it interconnects, this twice stake crossbeam 6 lays respectively at bottom and the medium position of adjacent single pile 5, and the single pile 5 that this twice stake crossbeam 6 is connected with it is integrated builds molding structure, so that form net structure between each adjacent single pile 5 in netted pile foundation 7;
(2) in the bottom of each single pile 5 and medium position place all arrange one group with the perpendicular bar shaped footing 8 of stake crossbeam 6, in each single pile 5 pile bodies and stake crossbeam 6 intersections, the bar shaped footing 8 horizontally outward extending is set, every group of bar shaped footing 8 is comprised of the bar shaped footing 8 of two apportion stake crossbeam 6 both sides, and bar shaped footing 8 is perpendicular with the axis of single pile 5; Wherein bar shaped footing 8 is cylindrical pile body, can be also square pile body, and the length of this bar shaped footing 8 is not more than the length of single pile 5, and its length also can suitably lengthen according to soil property and requirement for bearing capacity certainly.
As shown in Figure 7,8, for realizing the above-mentioned Specific construction step of utilizing netted pile foundation to improve the method for pile group bearing capacity, be:
1. first on two ground, place separated by a distance, adopt the mode of machinery or manually digging hole to carry out vertical pore-forming, adjacent single pile 5 is carried out to pore-forming;
2. after, in this vertical hole, transfer cross drilling device to bottom and the middle part of vertical hole and carry out respectively horizontal pore-forming, so that be communicated with between adjacent vertical hole, respectively a lower crossbeam 6 and king-pile crossbeam 6 are carried out to pore-forming;
3. thereafter again by this cross drilling device carrying out pore-forming with the perpendicular direction of stake crossbeam 6 holes, to being positioned at the bar shaped footing 8 at single pile 5 bottoms and middle part, carry out pore-forming respectively;
4. according to step 1. to step 3. described in, to remaining hole stake in netted pile foundation, adopt same construction method pore-forming;
5. after treating all pile hole constructions, determine as required whether below arranges the specification of reinforcing cage and reinforcing cage, last concreting pile, forms netted pile foundation, and improves pile group integrated carrying ability with this.
The beneficial effect that utilizes netted pile foundation to improve the method for pile group supporting capacity in the present embodiment is specially:
The method is set up the stake crossbeam that is connected both by the single pile bottom adjacent and middle part, not only make each single pile be linked to be whole force structure, promote pile group holistic resistant behavior, the loaded area much larger than conventional pile group is provided simultaneously, its supporting capacity is promoted greatly;
In addition by the bottom at single pile and medium position place, set up the loaded area that bar shaped footing has further increased netted pile foundation, supporting capacity is able to further lifting, and by means of the interaction force between bar shaped footing and the soil body, can effectively promote its resistance to capsizing;
This netted pile foundation is compared with the conventional pile group with equal supporting capacity, and pile group length can shorten greatly.
Embodiment tri-: as shown in Fig. 9,10, with respect to the netted pile foundation of utilizing described in embodiment mono-, improve the method for pile group bearing capacity, netted pile foundation in the present embodiment has been set up semicircle footing 9 at bottom and the middle part of each single pile 5, further to increase loaded area on the basis in netted pile foundation described in embodiment mono-, and promote the resistance to capsizing of pile group.
As shown in Fig. 9,10, the rectangular profile shape pile group that the netted pile foundation 7 in the present embodiment is specifically rearranged by some single piles 5 that go deep in the soil body, this method of utilizing netted pile foundation to improve pile group bearing capacity specifically comprises following measures:
(1) twice stake crossbeam 6 is set between adjacent single pile 5 so that it interconnects, this twice stake crossbeam 6 lays respectively at bottom and the medium position of adjacent single pile 5, and the single pile 5 that this twice stake crossbeam 6 is connected with it is integrated builds molding structure, so that form net structure between each adjacent single pile 5 in netted pile foundation 7;
(2) the semicircle panel that at bottom and the medium position place of each single pile 5, one group of level is all set, in each single pile 5 pile bodies and stake crossbeam 6 intersections, the semicircle panel horizontally outward extending is set, every group of semicircle panel is comprised of the semicircle footing 9 of apportion stake crossbeam 6 both sides; Each semicircle footing 9 is integrated and builds molding structure with single pile 5, its semicircular radius is not more than the length of single pile 5, certainly its radius size also can suitably lengthen according to soil property and requirement for bearing capacity, obviously, the semicircle footing 9 in the present embodiment provides loaded area and the stability against overturning energy than bar shaped footing is larger in embodiment bis-.
As shown in Fig. 9,10, for realizing the above-mentioned Specific construction step of utilizing netted pile foundation to improve the method for pile group bearing capacity, be:
1. first on two ground, place separated by a distance, adopt the mode of machinery or manually digging hole to carry out vertical pore-forming, adjacent single pile 5 is carried out to pore-forming;
2. after, in this vertical hole, transfer cross drilling device to bottom and the medium position place of vertical hole and carry out respectively horizontal pore-forming, so that be communicated with between adjacent vertical hole, respectively a lower crossbeam 6 and king-pile crossbeam 6 being carried out to pore-forming;
3. by this cross drilling device, form semicircle intervally carrying out reaming with the perpendicular direction of stake crossbeam 6 holes more thereafter, to being positioned at the semicircle footing 9 at single pile 5 bottoms and middle part, carry out reaming-forming respectively;
4. according to step 1. to step 3. described in, to remaining hole stake in netted pile foundation, adopt same construction method pore-forming;
5. after treating all pile hole constructions, determine as required whether below arranges the specification of reinforcing cage and reinforcing cage, last concreting pile, forms netted pile foundation, and improves pile group integrated carrying ability with this.
The beneficial effect that utilizes netted pile foundation to improve the method for pile group supporting capacity in the present embodiment is specially:
The method is set up the stake crossbeam that is connected both by the single pile bottom adjacent and middle part, not only make each single pile be linked to be whole force structure, promote pile group holistic resistant behavior, the loaded area much larger than conventional pile group is provided simultaneously, its supporting capacity is promoted greatly;
In addition by the bottom at single pile and medium position place, set up the loaded area that semicircle panel has further increased netted pile foundation, supporting capacity is able to further lifting, and by means of the interaction force between semicircle panel and the soil body, can effectively promote pile group resistance to capsizing;
This pile group is compared with the conventional pile group with equal supporting capacity, and pile group length can shorten greatly.

Claims (5)

1. a method of utilizing netted pile foundation to improve pile group bearing capacity, described pile group is comprised of many networkings shape pile foundation, described netted pile foundation is rearranged by some single piles that vertically go deep in the soil body, it is characterized in that described method comprises the following steps: the some described single pile in the described netted pile foundation of each group to arrange by definite shape; In each adjacent described single pile bottom and medium position place, the stake crossbeam that connects both is set respectively, to increase the loaded area of described netted pile foundation, described stake crossbeam and described single pile is structure as a whole.
2. a kind of method of utilizing netted pile foundation to improve pile group bearing capacity according to claim 1, it is characterized in that single pile pile body and described the footing that the setting of crossbeam intersection is horizontally outward extended described in each, make described footing bearing of trend and the perpendicular setting of described stake crossbeam.
3. a kind of method of utilizing netted pile foundation to improve pile group bearing capacity according to claim 2, is characterized in that described footing and described pile body are structure as a whole, and the development length of described footing is not more than the length of described single pile.
4. a kind of method of utilizing netted pile foundation to improve pile group bearing capacity according to claim 2, is characterized in that described footing is semicircle panel, and two described semicircle panels are symmetricly set in respectively described stake crossbeam both sides.
5. a kind of method of utilizing netted pile foundation to improve pile group bearing capacity according to claim 2, is characterized in that described footing is strip structure, is symmetricly set in described stake crossbeam side.
CN201310742517.3A 2013-12-30 2013-12-30 Method for improving pile group bearing capacity by means of reticular pile foundations Pending CN103669385A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310742517.3A CN103669385A (en) 2013-12-30 2013-12-30 Method for improving pile group bearing capacity by means of reticular pile foundations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310742517.3A CN103669385A (en) 2013-12-30 2013-12-30 Method for improving pile group bearing capacity by means of reticular pile foundations

Publications (1)

Publication Number Publication Date
CN103669385A true CN103669385A (en) 2014-03-26

Family

ID=50308099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310742517.3A Pending CN103669385A (en) 2013-12-30 2013-12-30 Method for improving pile group bearing capacity by means of reticular pile foundations

Country Status (1)

Country Link
CN (1) CN103669385A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047236A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Repairing method for bridge-head bump road surface
CN104047235A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 The method of repairing the back of the bridge head and abutment of the pavement
CN104047213A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 A Pavement Restoration Method That Can Solve the Difference of Settlement Velocity Between Hard Soil Layer and Soft Soil Layer
CN104047237A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 A road repair method
CN105040670A (en) * 2015-07-30 2015-11-11 湖北工业大学 Rhombus foundation reinforcement handling method
CN105735151A (en) * 2014-05-26 2016-07-06 江苏鼎泰工程材料有限公司 Pavement rehabilitation method
CN105780673A (en) * 2014-05-26 2016-07-20 江苏鼎泰工程材料有限公司 Bridge-head vehicle bump road surface repairing method for solving problem of settling velocity difference between hard soil layer and soft soil layer
CN113323000A (en) * 2021-07-13 2021-08-31 徐州工程学院 Disaster prevention and reduction structure of near-fault pile group foundation
CN114541457A (en) * 2022-03-09 2022-05-27 华能陕西靖边电力有限公司 Pile foundation for photovoltaic support

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070092341A1 (en) * 2005-10-21 2007-04-26 John Schmertmann Method and apparatus for increasing the force needed to move a pile axially
CN202705883U (en) * 2012-05-24 2013-01-30 中国水电建设集团十五工程局有限公司 Deepwater steel trestle and platform built on shallow sea bare bedrock
CN103321237A (en) * 2013-06-04 2013-09-25 中交第二航务工程勘察设计院有限公司 Tubular pile combined structure and construction method for wharf engineering

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070092341A1 (en) * 2005-10-21 2007-04-26 John Schmertmann Method and apparatus for increasing the force needed to move a pile axially
CN202705883U (en) * 2012-05-24 2013-01-30 中国水电建设集团十五工程局有限公司 Deepwater steel trestle and platform built on shallow sea bare bedrock
CN103321237A (en) * 2013-06-04 2013-09-25 中交第二航务工程勘察设计院有限公司 Tubular pile combined structure and construction method for wharf engineering

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887613A (en) * 2014-05-26 2016-08-24 江苏鼎泰工程材料有限公司 Pavement repairing method free of environmental pollution and capable of eliminating vehicle bumping at bridge head
CN105735151A (en) * 2014-05-26 2016-07-06 江苏鼎泰工程材料有限公司 Pavement rehabilitation method
CN104047213A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 A Pavement Restoration Method That Can Solve the Difference of Settlement Velocity Between Hard Soil Layer and Soft Soil Layer
CN104047237A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 A road repair method
CN105735151B (en) * 2014-05-26 2017-07-21 江苏鼎泰工程材料有限公司 A kind of method for repairing road surface
CN104047236B (en) * 2014-05-26 2016-04-13 江苏鼎泰工程材料有限公司 Repair method of bridge head jumping road surface
CN104047237B (en) * 2014-05-26 2016-04-20 江苏鼎泰工程材料有限公司 A road repair method
CN104047235B (en) * 2014-05-26 2016-04-27 江苏鼎泰工程材料有限公司 The method of repairing the back of the bridge head and abutment of the pavement
CN104047235A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 The method of repairing the back of the bridge head and abutment of the pavement
CN105780673A (en) * 2014-05-26 2016-07-20 江苏鼎泰工程材料有限公司 Bridge-head vehicle bump road surface repairing method for solving problem of settling velocity difference between hard soil layer and soft soil layer
CN104047213B (en) * 2014-05-26 2016-05-25 江苏鼎泰工程材料有限公司 A Pavement Restoration Method That Can Solve the Difference of Settlement Velocity Between Hard Soil Layer and Soft Soil Layer
CN105862560A (en) * 2014-05-26 2016-08-17 江苏鼎泰工程材料有限公司 Method for repairing abutment backwall of pavement without environmental pollution
CN104047236A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Repairing method for bridge-head bump road surface
CN105780673B (en) * 2014-05-26 2017-06-30 江苏鼎泰工程材料有限公司 Solve the hard, restorative procedure on the bumping at bridge-head road surface of Soft Soil Layer differential settling velocity
CN105040670A (en) * 2015-07-30 2015-11-11 湖北工业大学 Rhombus foundation reinforcement handling method
CN113323000A (en) * 2021-07-13 2021-08-31 徐州工程学院 Disaster prevention and reduction structure of near-fault pile group foundation
CN114541457A (en) * 2022-03-09 2022-05-27 华能陕西靖边电力有限公司 Pile foundation for photovoltaic support

Similar Documents

Publication Publication Date Title
CN103669385A (en) Method for improving pile group bearing capacity by means of reticular pile foundations
CN106926989B (en) A kind of combined simple ocean platform and its construction method
CN204370431U (en) A kind of occlusion long-short pile space enclosing structure
WO2009094912A1 (en) Caisson structure and method of sinking the caisson structure into the ground exactly
CN105421477A (en) Construction method for tower crane foundation
CN104195956B (en) Falsework formula waters continuous beam cast-in-place support and building method thereof
CN203846450U (en) Riverway retaining wall
CN204000897U (en) A kind of for the multipurpose anti-slide pile structure system on sliding mass
CN104594360A (en) Composite double-row pile foundation pit supporting structure
CN103993580A (en) River way retaining wall
CN203238642U (en) Supporting retaining wall of foundation pit
CN202730785U (en) Anti-floating blind ditch water drainage structure for underground structure
CN202416252U (en) L-shaped flood prevention retaining wall with high piles
CN203684256U (en) Mesh pile foundation
CN203420294U (en) Stacked pile body self-reaction force balance load box
CN203684255U (en) #-shaped soldier pile foundation
CN208167770U (en) Assembled drilledpier foundation
CN203603162U (en) Construction elevator load basic system based on foundation pit edge
CN207032222U (en) A kind of prefabricated pile of assembled pile foundation support table revetment
CN107447741B (en) An evaluation method and evaluation structure of cave safety
CN207017169U (en) A kind of high-filled subgrade culvert off-loading structure
CN203684252U (en) U-shaped row pile foundation
CN203684267U (en) Novel offshore wind power basic structure
CN103669386A (en) Method for improving pile group bearing capacity by means of U-shaped row pile foundations
CN204645056U (en) A kind of combined type double-row pile foundation pit support structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140326