CN203684255U - #-shaped soldier pile foundation - Google Patents

#-shaped soldier pile foundation Download PDF

Info

Publication number
CN203684255U
CN203684255U CN201320880479.3U CN201320880479U CN203684255U CN 203684255 U CN203684255 U CN 203684255U CN 201320880479 U CN201320880479 U CN 201320880479U CN 203684255 U CN203684255 U CN 203684255U
Authority
CN
China
Prior art keywords
pile
basis
campshed
pile foundation
single pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320880479.3U
Other languages
Chinese (zh)
Inventor
朱克宏
谢钦方
柳明佳
钱寅星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
China Railway 24th Bureau Group Co Ltd Road and Bridge Branch
Original Assignee
China Railway 24th Bureau Group Co Ltd
China Railway 24th Bureau Group Co Ltd Road and Bridge Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd, China Railway 24th Bureau Group Co Ltd Road and Bridge Branch filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201320880479.3U priority Critical patent/CN203684255U/en
Application granted granted Critical
Publication of CN203684255U publication Critical patent/CN203684255U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a #-shaped soldier pile foundation. The soldier pile foundation is formed by arraying a plurality of single piles vertically deepening into soil; the #-shaped soldier pile foundation is characterized in that bottom and middle positions of the pile bodies between adjacent single piles in the soldier pile foundation are respectively connected by two pile crossbeams; the pile crossbeams and the single piles are of integral structures, so the soldier pile foundation is #-shaped. The #-shaped soldier pile foundation has the advantages that the #-shaped soldier pile foundation is simple in structure, the #-shaped soldier pile foundation forms a stable integral structure by additionally arranging the pile crossbeams at the bottom and middle of the soldier pile foundation for connecting adjacent single piles, and pile feet are additionally arranged on all single piles to increase the integral loading section of the soldier pile foundation, so the integral loading capacity and antidumping capacity of the pile group are effectively improved, and in addition, the length of the single pile can be reduced compared with the conventional soldier pile foundation with the same loading capacity.

Description

Intersecting parallels campshed basis
Technical field
The utility model relates to pile foundation, is specifically related to a kind of intersecting parallels campshed basis.
Background technology
Campshed basis is the building pile basis structure of arranging composition with certain type by queue-type, and it is large with bearing capacity, good stability, sedimentation value are little, can adapt to the features such as various geological conditionss and load situation and be widely applied in building, the hydraulic engineerings such as highrise building, large-sized workshop, water conservancy and hydropower hinge, railway engineering, highway engineering, bridge engineering, offshore production platform, nuclear power station.
Campshed basis is specifically made up of jointly some foundation piles and the cushion cap that is connected in stake top, is used to the building on it that enough bearing capacities are provided; The load of building passes to ground by its below pile foundation, the frictional resistance that wherein vertical load is generally produced by the resistance of stake substratum and pile body side and the soil body supports, and that is to say that pile foundation is broadly divided into two kinds of end bearing pile and friction piles by Force principle.
As shown in Figure 1, it is hard soil layer or rock stratum that end bearing pile 1 reaches hard formation 3(through Soft Soil Layer 2), the superstructure load of end bearing pile 1 is mainly born by hard formation 3 resistances; When construction, taking pile penetration as main, pile top enters bearing stratum depth or pile top absolute altitude can be for referencial use.
As shown in Figure 2,4 of friction piles are arranged in Soft Soil Layer 2 completely, by its pile body by compacted Soft Soil Layer 2 reality, to improve native compactness and supporting capacity, the load of its superstructure is born jointly by the frictional resistance between end-resistance and pile body side and Soft Soil Layer 2, when construction, to control pile top design elevation as main, pile penetration can be for referencial use.
The current existing problem in campshed basis is: 1. can provide enough bearing capacities in order to ensure it to upper building, very big for the length requirement of pile body, the pressure that this has not only increased construction cost aspect, has also improved the difficulty of construction; 2. at adjacent foundation pile top, coupling beam is set conventionally and interconnects, to increase the resistance to overturning on campshed basis, but its effect is very limited, and cost is higher, affects the construction of upper building.
Summary of the invention
The purpose of this utility model is according to above-mentioned the deficiencies in the prior art part, a kind of intersecting parallels campshed basis is provided, this campshed basis by each adjacent single pile bottom and middle part twice stake crossbeam is set realizes and be interconnected to constitute one, to provide much larger than the pressure-bearing cross section on conventional campshed basis, improve its overall stress-bearing capability.
The utility model object realizes and being completed by following technical scheme:
A kind of intersecting parallels campshed basis, this campshed basis is rearranged by some single piles that vertically go deep in the soil body, it is characterized in that being positioned between described single pile adjacent in described campshed basis pile body bottom and medium position interconnects by twice stake crossbeam respectively, described stake crossbeam and described single pile are structure as a whole, and make described campshed basis be intersecting parallels stake shape.
Described stake crossbeam diameter is identical with described single pile diameter.
Described single pile pile body and described stake crossbeam intersection location place have footing, and described footing and described crossbeam are perpendicular, and described footing and described single pile axis perpendicular.
The length of described footing is at least the twice of described single pile diameter.
Described footing is strip.
Described footing semicircular in shape shape.
Described semicircular radius is at least the twice of described single pile diameter.
The utility model has the advantages that, intersecting parallels campshed foundation structure is simple, a stake crossbeam that connects adjacent single pile by setting up at campshed foundation bottom and middle part makes it to form stable overall structure, and by set up footing on each single pile, to increase the overall pressure-bearing cross section on campshed basis, effectively improve overall bearing capacity and the resistance to capsizing of pile group, in addition, compared with having the conventional campshed basis of equal bearing capacity, its single pile length can shorten greatly.
Brief description of the drawings
Fig. 1 is end bearing pile schematic diagram in prior art;
Fig. 2 is friction pile schematic diagram in prior art;
Fig. 3 is the part elevation figure on intersecting parallels campshed basis in the utility model embodiment mono-;
Fig. 4 is the partial plan layout on intersecting parallels campshed basis in the utility model embodiment mono-;
Fig. 5 is the overall elevation on intersecting parallels campshed basis in the utility model embodiment mono-;
Fig. 6 is the part elevation figure on intersecting parallels campshed basis in the utility model embodiment bis-;
Fig. 7 is the partial plan layout on intersecting parallels campshed basis in the utility model embodiment bis-;
Fig. 8 is the part elevation figure on intersecting parallels campshed basis in the utility model embodiment tri-;
Fig. 9 is the partial plan layout on intersecting parallels campshed basis in the utility model embodiment tri-.
Detailed description of the invention
Feature of the present utility model and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
As Fig. 1-9, in figure, mark 1-9 is respectively: end bearing pile 1, Soft Soil Layer 2, hard formation 3, friction pile 4, single pile 5, stake crossbeam 6, campshed basis 7, bar shaped footing 8, semicircle footing 9.
Embodiment mono-: as shown in Figure 5, the present embodiment is specifically related to a kind of intersecting parallels campshed basis 7 that is used to its upper building that enough bearing capacities are provided, by the bottom on campshed basis 7 and medium position, twice stake crossbeam 6 is set respectively, so that the each single pile 5 in it is connected, the overall stress-bearing capability that improves pile group provides much larger than the pressure-bearing cross section on conventional campshed basis simultaneously.
As shown in Fig. 3,4,5, campshed basis 7 in the present embodiment is specifically rearranged by some single piles 5 that go deep in the soil body, between adjacent single pile 5, connect by twice stake crossbeam 6, this twice stake crossbeam 6 lays respectively at bottom and the medium position of adjacent single pile 5, and the single pile 5 that this twice stake crossbeam 6 is connected with it is formed by integrally casting reinforced concrete molding structure, so that form intersecting parallels structure in campshed basis 7 between each adjacent single pile 5; Wherein each single pile 5 is the cylindrical pile body of vertical setting, each 6, crossbeam is horizontally disposed cylindrical pile body, and the diameter of stake crossbeam 6 is identical with the diameter of single pile 5, in addition, be connected to the lower crossbeam 6 of adjacent single pile 5 bottoms and be connected to the dimensions of upper stake crossbeam 6 at adjacent single pile 5 middle parts just the same.
As shown in Fig. 3,4,5, intersecting parallels campshed basis 7 in the present embodiment is in the time of construction, first adopt the mode of machinery or manually digging hole to carry out vertical pore-forming on two ground, place separated by a distance, adjacent single pile 5 is carried out to pore-forming, in this vertical hole, transfer afterwards cross drilling device to bottom and the medium position of vertical hole and carry out respectively horizontal pore-forming, so that be communicated with between adjacent vertical hole, respectively a lower crossbeam 6 and upper stake crossbeam 6 are carried out to pore-forming; After treating these pile hole constructions, determine as required whether below arranges the specification of reinforcing cage and reinforcing cage, last concreting pile, forms intersecting parallels campshed basis 7.
In the present embodiment, adopt the beneficial effect on intersecting parallels campshed basis to be specially: intersecting parallels campshed foundation structure is simple, set up the stake crossbeam that is connected both by the single pile bottom adjacent and middle part, not only make each single pile be linked to be overall force structure, promote pile group holistic resistant behavior, provide much larger than the pressure-bearing cross section on conventional campshed basis simultaneously, its bearing value is promoted greatly, and compared with having the conventional campshed basis of equal bearing value, single pile length can shorten greatly.
Embodiment bis-: as shown in Figure 6,7, with respect to the intersecting parallels campshed basis described in embodiment mono-, bar shaped footing 8 has been set up respectively in each single pile 5 bottoms and middle part in campshed basis in the present embodiment, further to increase pressure-bearing cross section on the basis on campshed basis described in embodiment mono-, and promote the resistance to capsizing on campshed basis.
As shown in Figure 6,7, the bottom of each single pile 5 and medium position place be provided with one group with the perpendicular bar shaped footing 8 of stake crossbeam 6, be provided with in the single pile 5 pile bodies position crossing with stake crossbeam 6 the bar shaped footing 8 horizontally outward extending, every group of bar shaped footing 8 is made up of the bar shaped footing 8 of two apportion stake crossbeam 6 both sides, and bar shaped footing 8 is perpendicular with the axis of single pile 5; Wherein bar shaped footing 8 is cylindrical pile body, can be also square pile body, and the length of this bar shaped footing 8 is the twice of single pile diameter, and its length also can suitably lengthen according to soil property and requirement for bearing capacity certainly.
As shown in Figure 6,7, the intersecting parallels campshed basis in the present embodiment, in the time of construction, first adopts the mode of machinery or manually digging hole to carry out vertical pore-forming on two ground, place separated by a distance, adjacent single pile 5 is carried out to pore-forming; In this vertical hole, transfer afterwards cross drilling device to bottom and the medium position of vertical hole and carry out respectively horizontal pore-forming, so that be communicated with between adjacent vertical hole, respectively a lower crossbeam 6 and upper stake crossbeam 6 being carried out to pore-forming; Thereafter again by this cross drilling device carrying out pore-forming with the perpendicular direction of stake crossbeam 6 holes, respectively the bar shaped footing 8 that is positioned at single pile 5 bottoms and middle part is carried out to pore-forming; After treating pile hole construction, determine as required whether below arranges the specification of reinforcing cage and reinforcing cage, last concreting pile, forms intersecting parallels campshed basis.
In the present embodiment, adopt the beneficial effect on intersecting parallels campshed basis to be specially:
Intersecting parallels campshed foundation structure is simple, set up with medium position place the stake crossbeam that is connected both by the single pile bottom adjacent, not only make each single pile be linked to be overall force structure, promote pile group holistic resistant behavior, provide much larger than the pressure-bearing cross section on conventional campshed basis simultaneously, its bearing value is promoted greatly;
In addition setting up bar shaped footing 8 by the bottom at single pile 5 and medium position place has further increased the pressure-bearing cross section on campshed basis, and by means of the interaction force between bar shaped footing 8 and the soil body, can effectively promote its resistance to capsizing;
This campshed basis is compared with having the conventional campshed basis of equal bearing value, and single pile length can shorten greatly.
Embodiment tri-: as shown in Figure 8,9, with respect to the intersecting parallels campshed basis described in embodiment mono-, semicircle footing 9 has been set up at bottom and the middle part of each single pile 5 in campshed basis in the present embodiment, further to increase pressure-bearing cross section on the basis on campshed basis described in embodiment mono-, and promote the resistance to capsizing on campshed basis.
As shown in Figure 8,9, the bottom of each single pile 5 and medium position place all have one group of horizontally disposed semicircle enlarged body, be provided with the semicircle enlarged body of horizontally outward extending in the single pile 5 pile bodies position crossing with stake crossbeam 6, every group of semicircle enlarged body is made up of the semicircle footing 9 of apportion stake crossbeam 6 both sides; Each semicircle footing 9 is formed by integrally casting reinforced concrete molding structure with single pile 5, its semicircular radius is the twice of single pile 5 diameters, certainly its radius size also can suitably lengthen according to soil property and requirement for bearing capacity, obviously, the semicircle footing 9 in the present embodiment provides pressure-bearing cross section and the stability against overturning energy than bar shaped footing is larger in embodiment bis-.
As shown in Figure 8,9, the intersecting parallels campshed basis in the present embodiment, in the time of construction, first adopts the mode of machinery or manually digging hole to carry out vertical pore-forming on two ground, place separated by a distance, adjacent single pile 5 is carried out to pore-forming; In this vertical hole, transfer afterwards cross drilling device to bottom and the medium position place of vertical hole and carry out respectively horizontal pore-forming, so that be communicated with between adjacent vertical hole, respectively a lower crossbeam 6 and upper stake crossbeam 6 being carried out to pore-forming; Again by this cross drilling device with stake crossbeam 6 holes perpendicular direction carry out reaming form semicircle interval, respectively the semicircle footing 9 that is positioned at single pile 5 bottoms and middle part is carried out to reaming-forming thereafter; After treating pile hole construction, determine as required whether below arranges the specification of reinforcing cage and reinforcing cage, last concreting pile, forms intersecting parallels campshed basis.
It should be noted that, in the present embodiment, semicircle footing 9 is not limited to be the semicircle of 180 °, also comprises the fan-shaped of 180 ° of less thaies.
In the present embodiment, adopt the beneficial effect on intersecting parallels campshed basis to be specially:
Intersecting parallels campshed foundation structure is simple, set up with medium position place the stake crossbeam that is connected both by the single pile bottom adjacent, not only make each single pile be linked to be overall force structure, promote pile group holistic resistant behavior, provide much larger than the pressure-bearing cross section on conventional campshed basis simultaneously, its bearing value is promoted greatly;
In addition setting up semicircle footing 9 by the bottom at single pile 5 and medium position place has further increased the pressure-bearing cross section on campshed basis, and by means of the interaction force between semicircle footing 9 and the soil body, can effectively promote its resistance to capsizing;
This campshed basis is compared with having the conventional campshed basis of equal bearing value, and single pile length can shorten greatly.

Claims (7)

1. an intersecting parallels campshed basis, this campshed basis is rearranged by some single piles that vertically go deep in the soil body, it is characterized in that being positioned between described single pile adjacent in described campshed basis pile body bottom and medium position interconnects by twice stake crossbeam respectively, described stake crossbeam and described single pile are structure as a whole, and make described campshed basis be intersecting parallels stake shape.
2. a kind of intersecting parallels campshed according to claim 1 basis, is characterized in that described stake crossbeam diameter is identical with described single pile diameter.
3. a kind of intersecting parallels campshed according to claim 1 basis, is characterized in that described single pile pile body and described stake crossbeam intersection location place have footing, and described footing and described crossbeam are perpendicular, and described footing and described single pile axis perpendicular.
4. a kind of intersecting parallels campshed according to claim 3 basis, is characterized in that the length of described footing is at least the twice of described single pile diameter.
5. a kind of intersecting parallels campshed according to claim 3 basis, is characterized in that described footing is strip.
6. a kind of intersecting parallels campshed according to claim 3 basis, is characterized in that described footing semicircular in shape shape.
7. a kind of intersecting parallels campshed according to claim 6 basis, is characterized in that described semicircular radius is at least the twice of described single pile diameter.
CN201320880479.3U 2013-12-30 2013-12-30 #-shaped soldier pile foundation Expired - Fee Related CN203684255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320880479.3U CN203684255U (en) 2013-12-30 2013-12-30 #-shaped soldier pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320880479.3U CN203684255U (en) 2013-12-30 2013-12-30 #-shaped soldier pile foundation

Publications (1)

Publication Number Publication Date
CN203684255U true CN203684255U (en) 2014-07-02

Family

ID=51006178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320880479.3U Expired - Fee Related CN203684255U (en) 2013-12-30 2013-12-30 #-shaped soldier pile foundation

Country Status (1)

Country Link
CN (1) CN203684255U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464118A (en) * 2014-09-03 2016-04-06 五冶集团上海有限公司 Foundation pit slope engineering pile protection method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464118A (en) * 2014-09-03 2016-04-06 五冶集团上海有限公司 Foundation pit slope engineering pile protection method
CN105464118B (en) * 2014-09-03 2017-11-28 五冶集团上海有限公司 Excavation slope engineering pile guard method

Similar Documents

Publication Publication Date Title
CN103669385A (en) Method for improving pile group bearing capacity by means of reticular pile foundations
CN204370431U (en) A kind of occlusion long-short pile space enclosing structure
CN102677592B (en) Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN103422510A (en) Steel pipe frame type cofferdam structure and construction method
CN103437346A (en) Steel pipe pile with burrs and construction method
CN203846450U (en) Riverway retaining wall
CN105672231B (en) A kind of self-elevating drilling platform pile shoe structure
CN104195956B (en) Falsework formula waters continuous beam cast-in-place support and building method thereof
CN103485333A (en) Corrugated hollow steel pipe friction pile and construction method thereof
CN203238642U (en) Supporting retaining wall of foundation pit
CN105421477A (en) Construction method for tower crane foundation
CN103993580A (en) River way retaining wall
CN204875495U (en) No abutment body seat formula abutment
CN204151798U (en) A kind of steel reinforced concrete anti-slide pile structure
CN203684255U (en) #-shaped soldier pile foundation
CN203034383U (en) Load reduction high filling arch culvert
CN203684256U (en) Mesh pile foundation
CN204112363U (en) Barricade, blocking dam, river levee, the drainage groove of a kind of brick body and formation thereof
CN206800434U (en) A kind of bridge pile foundation composite reinforcing structure
CN203420294U (en) Stacked pile body self-reaction force balance load box
CN203684252U (en) U-shaped row pile foundation
CN202989942U (en) Wall foundation structure for soft soil or high backfill soil area
CN202969405U (en) Cup-shaped concrete foundation of wind power generation tower
CN104131535A (en) High-polymer composite reinforced earth stone dam anti-seismic structure and construction method thereof
CN102936901A (en) Wind power tower foundation with inverted frustum and independent column combined

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140702

Termination date: 20211230

CF01 Termination of patent right due to non-payment of annual fee