CN105464118A - Foundation pit slope engineering pile protection method - Google Patents
Foundation pit slope engineering pile protection method Download PDFInfo
- Publication number
- CN105464118A CN105464118A CN201410443749.3A CN201410443749A CN105464118A CN 105464118 A CN105464118 A CN 105464118A CN 201410443749 A CN201410443749 A CN 201410443749A CN 105464118 A CN105464118 A CN 105464118A
- Authority
- CN
- China
- Prior art keywords
- exposed
- engineering pile
- pile
- piles
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Disclosed is a foundation pit slope engineering pile protection method. Engineering piles are pipe piles. The foundation pit slope engineering pile protection method is characterized by including the following technical measures that a, exposed pile groups are protected through steel pipes in a cross framework mode; b, exposed piles on the two sides of a foundation pit are protected through the steel pipes in a mode of a framework in a shape of a Chinese character 'jing'; and c, single exposed piles are protected through the steel pipes in a mode of a framework in a shape of a Chinese character 'jing'. The foundation pit slope engineering pile protection method has the advantages that it is guaranteed that displacement, inclining and pile breaking and other damages to the engineering piles on a foundation pit slope cannot occur, and the safety of a foundation pit and people is guaranteed.
Description
Technical field
The present invention relates to a kind of civil works stake guard method, specifically, is the guard method of a kind of excavation slope engineering pile.
Background technology
In the metallurgical equipment basis of continuous overlength, be all densely covered with engineering pile (bearing pile), during equipment Foundations construction, according to the difference of embedded depth of foundation, need layering, block construction.To the deep foundation ditch (more than-5m) putting slope heavy excavation, side slope just there is the engineering pile of a lot of adjacent foundation by out exposed, when the discrepancy in elevation that stake both sides are exposed reaches 1.5m and is above, there is the side pressure of the soil body in pile body side, if domatic side is contiguous carry track road, its lateral pressure is enough to cause stake to produce displacement, inclination, even broken pile equivalent risk, causes jeopardizing personnel and deep pit monitor.
Therefore the engineering pile on known excavation slope also exists above-mentioned all inconvenience and problem.
Summary of the invention
Object of the present invention, is to propose a kind of excavation slope engineering pile guard method preventing engineering pile displacement, inclination, broken pile.
For achieving the above object, technical solution of the present invention is:
The guard method of a kind of excavation slope engineering pile, described engineering pile is pile tube, it is characterized in that comprising following technical measures:
A, protect an exposed clump of piles with steel pipe with " intersection flower rack type "
When excavation slope engineering pile is an exposed clump of piles, be interconnected with an exposed clump of piles with " intersection flower rack type " with some steel pipes, steel pipe adopts the supporting fastener of scaffold tube to be connected and fixed, and an exposed clump of piles is connected into rigid unitary, protects an exposed clump of piles to resist soil body lateral pressure;
B, protect the exposed stake of foundation ditch both sides with " double crossed frame type " with steel pipe
When both sides are foundation ditches, when the middle engineering pile of both sides excavation slope is exposed stake, with some steel pipes with " double crossed frame type " the symmetrical drawknot of middle engineering pile with both sides excavation slope, steel pipe adopts the supporting fastener of scaffold tube to be connected and fixed, to resist the exposed stake of soil body lateral pressure protection foundation ditch both sides;
C, protect single exposed stake with steel pipe with " double crossed frame type "
When excavation slope engineering pile is exposed single pile; by the stake of foundation ditch external works; with some steel pipes with " double crossed frame type " with the engineering pile in side slope and foundation ditch external works stake drawknot, steel pipe adopts scaffold tube supporting fastener to be connected and fixed, to resist the single exposed stake of soil body lateral pressure protection.
Excavation slope engineering pile of the present invention guard method can also be further achieved by the following technical measures.
Aforesaid method, wherein said steel pipe is the steel pipe of scaffolding, and it is of a size of 48 × 3.5mm.
After adopting technique scheme, excavation slope engineering pile of the present invention guard method has the following advantages:
1, the destructions such as the engineering pile on excavation slope is not subjected to displacement, inclination broken pile are guaranteed;
2, foundation ditch and personal security is ensured.
Accompanying drawing explanation
Fig. 1 is the structural representation that a clump of piles under the clump of piles naked state of the embodiment of the present invention connects into rigid unitary;
Fig. 2 is the A-A sectional view in Fig. 1;
Fig. 3 is the structural representation of the symmetrical drawknot of both sides stake under the both sides foundation pit pile naked state of the embodiment of the present invention;
Fig. 4 is the B-B sectional view in Fig. 3;
Fig. 5 is the structural representation of the outside stake drawknot of single pile in the side slope under the single pile naked state of the embodiment of the present invention and foundation ditch;
Fig. 6 is the C-C sectional view in Fig. 5.
In figure: 1 foundation ditch, 2 pile tubes, 3 steel pipes, the outside stake of 4 foundation ditches.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Embodiment 1
Now refer to Fig. 1 and 2, Fig. 1 is the structural representation that a clump of piles under the clump of piles naked state of the embodiment of the present invention connects into rigid unitary, and Fig. 2 is the A-A sectional view in Fig. 1.As shown in the figure; the slope project stake of described foundation ditch 1 is an exposed clump of piles; when being pile tube 2; with the steel pipe 3 of some scaffoldings; it is of a size of 48 × 3.5mm; be interconnected with an exposed clump of piles with " intersection flower rack type ", an exposed clump of piles is connected into rigid unitary, protect an exposed clump of piles to resist soil body lateral pressure.
Embodiment 2
Fig. 3 is the structural representation of the symmetrical drawknot of both sides stake under the both sides foundation pit pile naked state of the embodiment of the present invention, and Fig. 4 is the B-B sectional view in Fig. 3.As shown in the figure, described both sides are foundation ditches 1, the middle engineering pile of both sides excavation slope, when being pile tube 2, when being exposed stake, with some steel pipes with " double crossed frame type " the symmetrical drawknot of middle engineering pile with both sides excavation slope, steel pipe adopts scaffold tube φ 48 × 3.5mm, be connected and fixed by scaffold steel pipe fastener, namely object is interconnected with two corresponding root canal piles 2, at their both sides and two ends with the steel pipe 3 of some scaffoldings, it is of a size of 48 × 3.5mm, be connected and fixed with groined type, to resist the exposed stake of soil body lateral pressure protection foundation ditch both sides.
Embodiment 3
Fig. 5 is the structural representation of the outside stake drawknot of single pile in the side slope under the single pile naked state of the embodiment of the present invention and foundation ditch, and Fig. 6 is the C-C sectional view in Fig. 5.As shown in the figure, described excavation slope engineering pile, when being pile tube 2, when being exposed single pile, by foundation ditch external works stake 4, with the steel pipe 3 of some scaffoldings, it is of a size of 48 × 3.5mm, with " double crossed frame type " with the engineering pile in side slope and foundation ditch external works stake drawknot, steel pipe employing scaffold steel pipe fastener is connected and fixed, namely object is interconnected with a corresponding root canal pile 2 and foundation hole external works stake 4, at their both sides and two ends with the steel pipe 3 of some scaffoldings, it is of a size of 48 × 3.5mm, be connected and fixed with groined type, to resist the single exposed stake of soil body lateral pressure protection.
The present invention has substantive distinguishing features and significant technological progress; excavation slope engineering pile of the present invention guard method is in the mode of gathering materials on the spot; the steel pipe of the scaffolding adopting building site common; be connected and fixed various excavation slope engineering pile; reach the engineering pile guaranteed on excavation slope not to be subjected to displacement, inclination broken pile etc. destroy and ensure the effect of foundation ditch and personal security.
Excavation slope engineering pile of the present invention guard method is used in the cold rolling engineering of the profound steel of Baosteel, after two continuous galvanizing line excavation of foundation pit, carries out drawknot protection, Be very effective, guarantee deep pit monitor to the engineering pile in side slope.
Above embodiment is used for illustrative purposes only, but not limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes also should belong to category of the present invention, should be limited by each claim.
Claims (2)
1. an excavation slope engineering pile guard method, described engineering pile is pile tube, it is characterized in that comprising following technical measures:
A, protect an exposed clump of piles with steel pipe with " intersection flower rack type "
When excavation slope engineering pile is an exposed clump of piles, be interconnected with an exposed clump of piles with " intersection flower rack type " with some steel pipes, steel pipe adopts the supporting fastener of scaffold tube to be connected and fixed, and an exposed clump of piles is connected into rigid unitary, protects an exposed clump of piles to resist soil body lateral pressure;
B, protect the exposed stake of foundation ditch both sides with " double crossed frame type " with steel pipe
When both sides are foundation ditches, when the middle engineering pile of both sides excavation slope is exposed stake, with some steel pipes with " double crossed frame type " the symmetrical drawknot of middle engineering pile with both sides excavation slope, steel pipe adopts the supporting fastener of scaffold tube to be connected and fixed, to resist the exposed stake of soil body lateral pressure protection foundation ditch both sides;
C, protect single exposed stake with steel pipe with " double crossed frame type "
When excavation slope engineering pile is exposed single pile; by the stake of foundation ditch external works; with some steel pipes with " double crossed frame type " with the engineering pile in side slope and foundation ditch external works stake drawknot, steel pipe adopts scaffold tube supporting fastener to be connected and fixed, to resist the single exposed stake of soil body lateral pressure protection.
2. excavation slope engineering pile guard method as claimed in claim 1, it is characterized in that, described steel pipe is the steel pipe of scaffolding, and it is of a size of 48 × 3.5mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410443749.3A CN105464118B (en) | 2014-09-03 | 2014-09-03 | Excavation slope engineering pile guard method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410443749.3A CN105464118B (en) | 2014-09-03 | 2014-09-03 | Excavation slope engineering pile guard method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105464118A true CN105464118A (en) | 2016-04-06 |
CN105464118B CN105464118B (en) | 2017-11-28 |
Family
ID=55602236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410443749.3A Active CN105464118B (en) | 2014-09-03 | 2014-09-03 | Excavation slope engineering pile guard method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105464118B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862883A (en) * | 2016-06-28 | 2016-08-17 | 周霜林 | Warp and weft type foundation pit supporting structure |
CN107288128A (en) * | 2017-06-29 | 2017-10-24 | 中国二十冶集团有限公司 | Concrete pre-stress pile tube Anti-inclining method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002138486A (en) * | 2000-11-07 | 2002-05-14 | Tone Geo Tech Co Ltd | Head rigidly-coupling member for landslide suppressing combined pile group composed of steel pipe |
CN203684255U (en) * | 2013-12-30 | 2014-07-02 | 中铁二十四局集团有限公司 | #-shaped soldier pile foundation |
CN203768911U (en) * | 2014-03-13 | 2014-08-13 | 南京工业大学 | Formula of sloping double row pile underground structure |
CN203768912U (en) * | 2014-03-13 | 2014-08-13 | 南京工业大学 | Double prestressing force high-strength concrete rectangular pile foundation ditch supporting construction |
-
2014
- 2014-09-03 CN CN201410443749.3A patent/CN105464118B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002138486A (en) * | 2000-11-07 | 2002-05-14 | Tone Geo Tech Co Ltd | Head rigidly-coupling member for landslide suppressing combined pile group composed of steel pipe |
CN203684255U (en) * | 2013-12-30 | 2014-07-02 | 中铁二十四局集团有限公司 | #-shaped soldier pile foundation |
CN203768911U (en) * | 2014-03-13 | 2014-08-13 | 南京工业大学 | Formula of sloping double row pile underground structure |
CN203768912U (en) * | 2014-03-13 | 2014-08-13 | 南京工业大学 | Double prestressing force high-strength concrete rectangular pile foundation ditch supporting construction |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862883A (en) * | 2016-06-28 | 2016-08-17 | 周霜林 | Warp and weft type foundation pit supporting structure |
CN105862883B (en) * | 2016-06-28 | 2017-12-01 | 周霜林 | A kind of longitude and latitude foundation pit supporting construction |
CN107288128A (en) * | 2017-06-29 | 2017-10-24 | 中国二十冶集团有限公司 | Concrete pre-stress pile tube Anti-inclining method |
Also Published As
Publication number | Publication date |
---|---|
CN105464118B (en) | 2017-11-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203034464U (en) | Truss type foundation pit supporting structure | |
CN204510230U (en) | Rich groundwater and the bad deep pit digging supporting and protection structure of geology | |
CN105220654B (en) | Earth and rockfill dam reinforcing structure and construction method thereof | |
CN109403169A (en) | A kind of interim door opening of municipal administration bridge construction | |
CN106368219B (en) | A kind of the support reinforcement structure and construction method of deep basal pit | |
CN104404979B (en) | H type stake panel wall construction method | |
CN112281877A (en) | Cutting high slope construction method | |
CN104518473A (en) | Suspension protection structure and method of cable box culvert pipeline | |
CN207452602U (en) | Both wired temperature pier structure of existing railway roadbed is worn under a kind of | |
CN109339078B (en) | Combined anti-slide pile with rectangular pile internally connected with circular pile | |
CN105464118A (en) | Foundation pit slope engineering pile protection method | |
CN203716046U (en) | Steel trestle for earthwork transportation of foundation pit | |
CN103541371A (en) | Bearing platform for heating pipe channels to stride reserved subway station and construction method thereof | |
CN205024600U (en) | A work platform that is used for bridge aquatic pile foundation to be under construction | |
CN105862659A (en) | High-frequency debris flow shore protection and diversion method | |
CN212452681U (en) | In-situ protection device for pressure pipeline in underground foundation pit | |
CN206070542U (en) | A kind of new stone blocking net Cable Structure for avalanche preventing and treating | |
CN210946836U (en) | Double wall type protection bent frame that leans on of high slope rock face | |
CN205444232U (en) | Stock - gravity type infiltration retaining wall | |
CN108179762A (en) | A kind of retaining wall reinforcement device and reinforced construction method | |
CN208870053U (en) | Deep well dado steel construction supports | |
CN203531010U (en) | Supporting platform of heat pipe trench and for crossing reserved subway station | |
CN213512367U (en) | Pipe jacking construction system for high-water-level road section of natural gas pipeline | |
CN203924072U (en) | The retaining wall supporting and protection structure of the super dark hand excavated pile of a kind of super large | |
CN204163734U (en) | Highway tunnel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |