CN207452602U - Both wired temperature pier structure of existing railway roadbed is worn under a kind of - Google Patents

Both wired temperature pier structure of existing railway roadbed is worn under a kind of Download PDF

Info

Publication number
CN207452602U
CN207452602U CN201721470881.9U CN201721470881U CN207452602U CN 207452602 U CN207452602 U CN 207452602U CN 201721470881 U CN201721470881 U CN 201721470881U CN 207452602 U CN207452602 U CN 207452602U
Authority
CN
China
Prior art keywords
wired
buttress
railway roadbed
existing railway
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721470881.9U
Other languages
Chinese (zh)
Inventor
张剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201721470881.9U priority Critical patent/CN207452602U/en
Application granted granted Critical
Publication of CN207452602U publication Critical patent/CN207452602U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model is related to wear both wired temperature pier structure of existing railway roadbed under a kind of, both wired above newly-built under-traverse tunnel is arranged in parallel twice for both wired just beams for carrying out holding up reinforcing, just beam end to be supported by buttress, and buttress is located at tunnel both sides;Buttress pier top is provided with sleeper pile.The constructing tunnel structure of the utility model is using subsurface excavation method by if Shed-pipe Advanced Support is aided with grouting with small pipe and carries out pre support.The short drilling depth of in-cavity construction, strong supporting, fast lining cutting, construction safety utmostly reduce the influence to both wired operations, and ensure that both wired construction period does not cut off traffic.

Description

Both wired temperature pier structure of existing railway roadbed is worn under a kind of
Technical field
The utility model is related to Tunnel Engineering technical fields, and in particular to the both wired of existing railway roadbed is worn under a kind of and is faced When ruggedized construction.
Background technology
With the Large scale construction of urban rail transit in China, new route wears the situation of existing line increasingly under needing It is more.The mode of passing through have on wear, under wear and wear three kinds with side, wherein under wear existing railway circuit engineering technology difficulty maximum, risk is most It is high.During Tunnel Passing existing line, the existing country rock soil body can be generated and disturb and cause stratum deformation, when deformation reaches The operation security of existing line or even generation damaging influence will be influenced when to a certain degree, correlation will be also influenced when serious The security of the lives and property of personnel.
The content of the invention
The purpose of this utility model be to provide it is a kind of under wear both wired temperature pier structure of existing railway roadbed, it is ensured that both Wired operation and construction safety.
Technical solution is used by the utility model:
Both wired temperature pier structure of existing railway roadbed is worn under a kind of, it is characterised in that:
Both wired above under-traverse tunnel is arranged in parallel twice for both wired just beams for carrying out holding up reinforcing, just beam End is supported by buttress, and buttress is located at tunnel both sides;
Buttress pier top is provided with sleeper pile.
Just the circuit both sides of beam, which are extended, I-steel, and I-steel end is docked with just beam end, I-steel end It is supported by buttress.
I-steel bottom surface has been evenly arranged sleeper pile.
The utility model has the following advantages:
The utility model is created under-traverse tunnel constructing structure and used to both wired temperature pier measures risen using just corbel Subsurface excavation method is by if Shed-pipe Advanced Support is aided with grouting with small pipe and carries out pre support.The short drilling depth of in-cavity construction, strong supporting, fast lining cutting are applied Work safety utmostly reduces the influence to both wired operations, and ensures that both wired construction period does not cut off traffic.
Description of the drawings
Fig. 1 is the utility model plan view.
Fig. 2 is I-I sectional views.
Fig. 3 is II-II sectional views.
In figure, 1- just beams, 2- I-steel, 3- sleeper piles, 4- buttresses.
Specific embodiment
The utility model is described in detail With reference to embodiment.
The utility model is related to it is a kind of under wear both wired temperature pier structure of existing railway roadbed, on newly built tunnels Side it is both wired be arranged in parallel twice for both it is wired carry out hold up reinforcing just beam 1, just 1 end of beam supported by buttress 4, prop up Pier 4 is located at tunnel both sides;4 pier top of buttress is provided with sleeper pile 3.
Just the circuit both sides of beam 1, which are extended, I-steel 2, and 2 end of I-steel is docked with just 1 end of beam, I-steel 2 End is supported by buttress 4;2 bottom surface of I-steel has been evenly arranged sleeper pile 3.
Embodiment:
Existing railway Roadbed Soil is worn under tunnel exit, vault is away from the high about 5.5m of existing railway rail level, using following measures:
1st, both wired using the widened D types of 2 hole 24m, just beam 1 holds up reinforcing, and carries out button rail to both wired, just 1 base of beam Plinth uses the caisson of φ 120cm, i.e. buttress 4, digging hole pile foundation should go deep into complete basement rock 2m.
2nd, banket existing line base using grouting and reinforcing.φ 42mm ductules, 4 ~ 6m of length, 1.0 × 1.0m of spacing, plum Flower pattern is arranged, notes single liquid cement mortar.
3rd, construction is worn under creating using subsurface excavation method by if Shed-pipe Advanced Support is aided with grouting with small pipe and carries out pre support.In hole Construction has to do things steadily and surely, short drilling depth, strong supporting, fast lining cutting.
4th, strengthen deformation monitoring measure, including being restrained in surface subsidence and hole, especially to strengthen both wired rail level absolute altitude, The measurement of gauge etc. will take the measures such as parking, reinforcing, it is ensured that both wired operation and construction safety immediately if any abnormal.
The content of the utility model is not limited to cited by embodiment, and those of ordinary skill in the art are new by reading this practicality Type specification and to any equivalent conversion that technical solutions of the utility model are taken, be the claim institute of the utility model Cover.

Claims (3)

1. both wired temperature pier structure of existing railway roadbed is worn under a kind of, it is characterised in that:
Both wired twice that are arranged in parallel above under-traverse tunnel are for both wired just beams for carrying out holding up reinforcing(1), just beam (1)End is by buttress(4)Support, buttress(4)Positioned at tunnel both sides;
Buttress(4)Pier top is provided with sleeper pile(3).
2. it is according to claim 1 it is a kind of under wear both wired temperature pier structure of existing railway roadbed, it is characterised in that:
Just beam(1)Circuit both sides be extended have I-steel(2), I-steel(2)End and just beam(1)End is docked, work Word steel(2)End is by buttress(4)Support.
3. it is according to claim 2 it is a kind of under wear both wired temperature pier structure of existing railway roadbed, it is characterised in that:
I-steel(2)Bottom surface has been evenly arranged sleeper pile(3).
CN201721470881.9U 2017-11-07 2017-11-07 Both wired temperature pier structure of existing railway roadbed is worn under a kind of Active CN207452602U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721470881.9U CN207452602U (en) 2017-11-07 2017-11-07 Both wired temperature pier structure of existing railway roadbed is worn under a kind of

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721470881.9U CN207452602U (en) 2017-11-07 2017-11-07 Both wired temperature pier structure of existing railway roadbed is worn under a kind of

Publications (1)

Publication Number Publication Date
CN207452602U true CN207452602U (en) 2018-06-05

Family

ID=62254023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721470881.9U Active CN207452602U (en) 2017-11-07 2017-11-07 Both wired temperature pier structure of existing railway roadbed is worn under a kind of

Country Status (1)

Country Link
CN (1) CN207452602U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110107303A (en) * 2019-04-19 2019-08-09 同济大学 The deformation control method of shallow earthing shield boring across underneath high-speed railway
CN110438855A (en) * 2019-07-19 2019-11-12 中国十七冶集团有限公司 A kind of construction method of undercrossing tunnel bridges and culverts railway roadbed backfill

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110107303A (en) * 2019-04-19 2019-08-09 同济大学 The deformation control method of shallow earthing shield boring across underneath high-speed railway
CN110438855A (en) * 2019-07-19 2019-11-12 中国十七冶集团有限公司 A kind of construction method of undercrossing tunnel bridges and culverts railway roadbed backfill
CN110438855B (en) * 2019-07-19 2020-12-04 中国十七冶集团有限公司 Construction method for backfilling underneath-crossing railway bridge and culvert road bed

Similar Documents

Publication Publication Date Title
CN101818505B (en) Soil pressure testing method for a cutting edge of caisson
Chen et al. Recent advances in high slope reinforcement in China: Case studies
CN103147442A (en) Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method
CN103437341A (en) Effective grooving construction method for underground continuous wall in slightly-weathered limestone with overlying sandy soil
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN102518453A (en) Quick tunnel-entrance construction method for bias-pressure shallow-buried or single-pressure tilting arenaceous loess tunnels
CN102561330A (en) Integrated construction method for artificial dug pile and steel pipe concrete column
CN105239586A (en) Support structure for supporting foundation pit and method for supporting foundation pit
CN103321260A (en) Rectifying method by drilling at intervals and pile cutting off
CN108979659A (en) The ruggedized construction and method of structures are worn under weak soil rich water large cross-section tunnel group
CN103741605B (en) Suppressing beam body produces crack and suppresses the method that beam cracks expands
CN112627832A (en) Method for integrating detection, treatment and monitoring operation and maintenance of water inrush and mud inrush of karst tunnel
CN207878473U (en) Layer depth foundation pit hangs foot stake supporting construction to Tu Yan in combination
CN207452602U (en) Both wired temperature pier structure of existing railway roadbed is worn under a kind of
CN112576265A (en) Sedimentation control method for old villages penetrated by shield
CN115539048A (en) Construction method for shallow-buried bias tunnel portal
Ni et al. Field investigation of the influence of basement excavation and dewatering on ground and structure responses
CN107100157A (en) Study test platform and method that unfavorable geologic body interacts with bridge structure
CN210195766U (en) Underground structure is built in same direction as digging to hunch lid
CN208605199U (en) The ruggedized construction of structures is worn under a kind of weak soil rich water large cross-section tunnel group
KR100626820B1 (en) Shallow overbuden tunnel construction method
CN110258606A (en) Projecting wall encloses well construction
CN110528522B (en) Accurate tracking grouting construction method
CN207862907U (en) Study the test platform of unfavorable geologic body and bridge structure interaction
KR101437882B1 (en) Tunnel excavating method having various cross sectional shapes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant