CN103276645A - Precast pile, beam and slab renovation technology for diseases of existing line tunnel base - Google Patents

Precast pile, beam and slab renovation technology for diseases of existing line tunnel base Download PDF

Info

Publication number
CN103276645A
CN103276645A CN2013101692467A CN201310169246A CN103276645A CN 103276645 A CN103276645 A CN 103276645A CN 2013101692467 A CN2013101692467 A CN 2013101692467A CN 201310169246 A CN201310169246 A CN 201310169246A CN 103276645 A CN103276645 A CN 103276645A
Authority
CN
China
Prior art keywords
slab
tunnel
beams
piles
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101692467A
Other languages
Chinese (zh)
Other versions
CN103276645B (en
Inventor
郑余朝
仇文革
张俊
杨天春
冯冀蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201310169246.7A priority Critical patent/CN103276645B/en
Publication of CN103276645A publication Critical patent/CN103276645A/en
Application granted granted Critical
Publication of CN103276645B publication Critical patent/CN103276645B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a precast pile, beam and slab renovation technology for diseases of an existing line tunnel base. The technology is used for reinforcing and renovating of a tunnel which is large in base disease range and serious in disease condition. Piles, beams and slabs are prefabricated outside a hole, restrained beams are used for erecting lines overhead, drilling is conducted, precast piles are embedded, cement slurry is poured, the beams are erected on the piles, the slabs are paved, and railway ballast is backfilled. According to the precast pile, beam and slab renovation technology for the diseases of the existing line tunnel base, the piles, the beams and the slabs are all prefabricated outside the hole, the aspects of materials, dimensions, maintenance and the like are all guaranteed, end product quality is high, and durability is achieved. The pile, beam and slab prefabricating technology is adopted, concentrated batch production can be achieved, the construction time inside the hole can be reduced, the time limit for a project is shortened, and an operation influence is reduced. After the precast piles, the beams and the slabs are constructed, later period maintenance is relatively easy. The precast pile, beam and slab renovation technology has the advantages of being practical, rapid, safe, easy to renovate and thorough in disease treatment.

Description

Existing line tunnel substrate disease preformed pile beam slab regulation technology
Affiliated technical field
The present invention relates to the constructing tunnel field, be specially adapted to the tunnel on a large scale, serious bottom disease regulation problem.
Background technology
The railway tunnel bottom is the underlying structure of track, and the solid of underlying structure firmly is the most important condition that guarantees the track kilter.The existing line tunnel bottom is because a little less than the structure durability design of thin, Drainage Design is unreasonable, construction technology defective, of poor quality, the routine servicing maintenance is not in place, and tunnel bottom is subjected to train nature and the human factor effect of aspect such as power, groundwater erosion repeatedly, substrate occur cracking, damaged, sink, to both sides outside, squeeze and burst and become muddy when a thaw sets in, emit phenomenon such as mud.These diseases all can cause the gauge deviation, rail and joint breaking.If things go on like this, railway operation and passenger's comfortableness is caused adverse effect, when serious even jeopardize traffic safety.How realizing existing line tunnel bottom disease is renovated safely and fast effectively is the current important topic that needs to be resolved hurrily.
For stablizing bedding, eliminate the unfavorable variation of track.At present tunnel bottom disease regulation method is mainly contained: railway roadbed is overhauled, the railway roadbed substrate is changed and filled out, railway roadbed substrate pressure drop etc.
Railway roadbed is overhauled: workload is bigger, repairs slowlyer, and disturbance is bigger, influences the normal operation of train, causes enormous economic loss.
The railway roadbed substrate is changed and filled out: the characteristics of this method are that construction is simple, fast, normal operation influence to train is little, but there is bigger limitation in it, specifically, when the base layer thickness will of substrate is big, it is also relatively large to change the amount of filling out, and the substrate slope excavation also will be taked corresponding supporting measure, from economy and these two words that the aspect is taken all factors into consideration of safety, adopt this method just to seem not too suitable to the darker tunnel of basal layer, and this method is applicable to that the substrate argillic horizon degree of depth is the tunnel of 2.0-5.0m.
Railway roadbed substrate mud jacking: this grouting reinforcement technique mainly refers to build on the ground earlier the slip casting platform, and by holing until the degree of depth of designing requirement downwards outside the position of platform.Insert Grouting Pipe then and in the mode of static pressure grouting consolidation process is carried out in substrate.This method construction is simple, convenient, fast, can effectively improve the intensity on stratum, but consolidation effect is relatively poor on the location that lithic drainage is grown.
After tunnel defect taked above reinforcement measure, through long-term observation, development speed to tunnel defect has had certain alleviation, reinforcement measure plays a role, but tunnel defect does not obtain basic solution, crack quantity can continue to increase, and the width of crack occurrence is also strengthening lentamente, and the length of its cracking also has development.After several years, tunnel defect can be had a relapse, and haves no alternative but and need renovate once again, influences traffic, increases the tunnel maintenance expense.
Along with developing rapidly of China Transportation Industry, the quantity of operation tunnel is also more and more.Because tunnel structure is disguised strong, adds the restriction of existing detection means, the order of severity of tunnel defect and development trend can only deeply exposing along with the regulation construction gradually.Therefore, the long term growth of domestic railway operation must make disease management develop to systematization, standardization direction from existing blindness and local surprise from the existing disease of thorough radical cure tunnel, forms scientific and reasonable tunnel substrate disease regulation worker law system.
Summary of the invention
In view of all drawbacks of existing method, the objective of the invention is to solve the existing line tunnel on a large scale, effective construction difficult problem safely and fast under the disease situation of serious bottom, and reduce the duration in the work progress as far as possible, reduce the influence to operation.
The objective of the invention is to realize by following means.
1) size as required, prefabricated required stake, the prefabricated finished product of Liang Heban in the hole;
2) adopting the restained beam overhead wire, cut slotting according to the riding position of beam to renovating the subbasal soil layer in tunnel, is that beam is prepared placement space;
3) 2) the basis on, the arrangement requirement by stake in slotting is vertically holed, basement rock 40cm is at least goed deep in boring, cleans the stake hole subsequently and imbeds preformed pile, the operation of being in the milk;
4) treat that preformed pile fills after the intensity of slurries reaches 10Mpa, precast beam is erected on the stake, spread precast plate, recover railway ballast and circuit.
It is prefabricated that the present invention requires stake, Liang Heban to adopt outside the hole, and aspects such as material, size and maintenance are all guaranteed, and the end product quality height is durable in use.Adopt stake beam slab prefabricating technique, practicable concentrated batch process can reduce the in-cavity construction time, the reduction of erection time, reduces the influence to operation.After the preformed pile beam slab applied, later maintenance was relatively easy.Preformed pile beam slab regulation technology has practicality, quick, safe, easy reparation, disease management characteristics completely.
Adopt method of the present invention, have the following advantages:
(1) concentrate prefabricated production outside stake, beam and the firm and hard capable hole, quality is secure, reduces the disease recurrence rate, has higher throughput rate and operation degree of freedom.
Facts have proved that (2) after the employing preformed pile beam slab regulation technology, rail level is stable, recovery is fast, it is few that curing time reaches workload less, has good practicality and economic benefit, has broad application prospects.
(3) it is simple to have a job practices, and the efficiency of construction height is repaired workablely again, to advantages such as environmental disturbances are little, is applicable to the regulation of existing line tunnel bottom disease engineering.
Description of drawings
Fig. 1 is beam of the present invention and stake layout schematic diagram
Fig. 2 is Ι among Fig. 1-Ι cross section arrangement diagram
Fig. 3 is II-II sectional drawing among Fig. 2
Fig. 4 is III-III sectional drawing among Fig. 3
Fig. 5 is IV-IV sectional drawing among Fig. 3.
Illustrate: 1 is beam (girder construction) among the figure, and 2 is stake (pilework), and 3 is plate (plated construction), and 4. metallic gasket is the tunnel bottom disease management measure structure that patent content adds, and remainder is original engineering structures in the railway tunnel.
Reference numeral explanation: 1 beam, 2,3 plates, 4 metallic gaskets, 5 substrate fillers, 6 tunnel inverts, 7 Tunnel Second Lining, 8 cable channels and ditch 9, railway ballast structure, 11 grooves.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing:
(1) according to the requirement of tunnel substrate disease regulation, prefabricated production cylinder pile, Liang Heban, beam as shown in Figure 4, plate is as shown in Figure 5.
(2) adopt the restained beam overhead wire, as shown in Figure 1, according to the riding position requirement of girder construction 2, underlying structure is carried out slotting 11 earlier, groove 11 is vertical with track.According to the placement requirement of pilework 2, carry out bore operation at beam in slotting.
(3) as shown in Figure 2, clean the stake hole and imbed preformed pile 2, the space around the operation compaction pile that is in the milk;
(4) after the intensity for the treatment of the filling slurries of preformed pile and hole wall reaches 10Mpa, place metal caul 4 at the stake top, precast beam is erected in the stake that is placed with metal caul, as shown in Figure 3.
(5) lay precast plate 3 at beam, recover railway ballast, remove restained beam and circuit.
Obviously, those skilled in the art also can make other applications in basic scheme of the present invention enforcement changes, and the variation that these are done according to spirit of the present invention all should be included in the present invention's scope required for protection.

Claims (1)

1. existing line tunnel substrate disease preformed pile beam slab regulation technology is used for the comparatively serious tunnel reinforcement regulation of the big disease of substrate disease scope, and its working procedure comprises the steps:
1) size as required, prefabricated required stake, the prefabricated finished product of Liang Heban in the hole;
2) adopting the restained beam overhead wire, cut slotting according to the riding position of beam to renovating the subbasal soil layer in tunnel, is that beam is prepared placement space;
3) 2) the basis on, the arrangement requirement by stake in slotting is vertically holed, basement rock 40cm is at least goed deep in boring, cleans the stake hole subsequently and imbeds preformed pile, the operation of being in the milk;
Treat that preformed pile fills after the intensity of slurries reaches 10Mpa, precast beam is erected on the stake, spread precast plate, recover railway ballast and circuit.
CN201310169246.7A 2013-05-09 2013-05-09 Precast pile, beam and slab renovation technology for diseases of existing line tunnel base Expired - Fee Related CN103276645B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310169246.7A CN103276645B (en) 2013-05-09 2013-05-09 Precast pile, beam and slab renovation technology for diseases of existing line tunnel base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310169246.7A CN103276645B (en) 2013-05-09 2013-05-09 Precast pile, beam and slab renovation technology for diseases of existing line tunnel base

Publications (2)

Publication Number Publication Date
CN103276645A true CN103276645A (en) 2013-09-04
CN103276645B CN103276645B (en) 2015-04-22

Family

ID=49059251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310169246.7A Expired - Fee Related CN103276645B (en) 2013-05-09 2013-05-09 Precast pile, beam and slab renovation technology for diseases of existing line tunnel base

Country Status (1)

Country Link
CN (1) CN103276645B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510532A (en) * 2013-09-26 2014-01-15 西南交通大学 Railway tunnel bottom defect treatment technology based on assembly type beam slab pile
CN105821729A (en) * 2016-04-05 2016-08-03 上海同罡建筑工程有限公司 Track board lifting device and method
CN105863667A (en) * 2016-05-06 2016-08-17 西南交通大学 Novel bottom structure suitable for water-rich soft rock overloaded railway tunnel
CN106049195A (en) * 2016-05-27 2016-10-26 中铁三局集团有限公司 Method for strengthening subgrade basement of existing high speed railway line
CN111321636A (en) * 2020-03-25 2020-06-23 福建工程学院 Beam structure and method for rapidly and in-situ treating railway tunnel bottom plate diseases

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10333613A1 (en) * 2003-07-24 2005-02-24 Keller Grundbau Gmbh Process to enhance railway line soil load bearing characteristics by insertion of concrete columns
JP2005344475A (en) * 2004-06-07 2005-12-15 Railway Technical Res Inst Method of repairing base course and base course
CN101413235A (en) * 2008-11-25 2009-04-22 中国第一冶金建设有限责任公司 Method for reinforcing railway before paving railway rail construction under underground way bridge
CN101440622A (en) * 2008-12-17 2009-05-27 何志红 CFG pile, pipe pile embankment reinforcement system and construction method thereof
KR20090084054A (en) * 2008-01-31 2009-08-05 한국철도기술연구원 Structure of concrete track reinforced by piled raft foundation and its constructing and maintaining method
CN201538934U (en) * 2009-06-29 2010-08-04 中铁二院工程集团有限责任公司 Collapsible loess tunnel foundation basic structure of high-speed railway
CN102031736A (en) * 2010-06-12 2011-04-27 中铁十六局集团有限公司 Construction technology for under-passing existing line under complicated geological condition
CN102071607A (en) * 2011-01-26 2011-05-25 北京中铁瑞威基础工程有限公司 Railroad bed repair method without affecting existing running conditions
CN202595591U (en) * 2012-05-11 2012-12-12 中铁第四勘察设计院集团有限公司 Micro steel pipe pile network structure for tunnel cavern roadbed in karst region
CN202865708U (en) * 2012-11-19 2013-04-10 房士杰 Railway aerial fixing device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10333613A1 (en) * 2003-07-24 2005-02-24 Keller Grundbau Gmbh Process to enhance railway line soil load bearing characteristics by insertion of concrete columns
JP2005344475A (en) * 2004-06-07 2005-12-15 Railway Technical Res Inst Method of repairing base course and base course
KR20090084054A (en) * 2008-01-31 2009-08-05 한국철도기술연구원 Structure of concrete track reinforced by piled raft foundation and its constructing and maintaining method
CN101413235A (en) * 2008-11-25 2009-04-22 中国第一冶金建设有限责任公司 Method for reinforcing railway before paving railway rail construction under underground way bridge
CN101440622A (en) * 2008-12-17 2009-05-27 何志红 CFG pile, pipe pile embankment reinforcement system and construction method thereof
CN201538934U (en) * 2009-06-29 2010-08-04 中铁二院工程集团有限责任公司 Collapsible loess tunnel foundation basic structure of high-speed railway
CN102031736A (en) * 2010-06-12 2011-04-27 中铁十六局集团有限公司 Construction technology for under-passing existing line under complicated geological condition
CN102071607A (en) * 2011-01-26 2011-05-25 北京中铁瑞威基础工程有限公司 Railroad bed repair method without affecting existing running conditions
CN202595591U (en) * 2012-05-11 2012-12-12 中铁第四勘察设计院集团有限公司 Micro steel pipe pile network structure for tunnel cavern roadbed in karst region
CN202865708U (en) * 2012-11-19 2013-04-10 房士杰 Railway aerial fixing device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510532A (en) * 2013-09-26 2014-01-15 西南交通大学 Railway tunnel bottom defect treatment technology based on assembly type beam slab pile
CN105821729A (en) * 2016-04-05 2016-08-03 上海同罡建筑工程有限公司 Track board lifting device and method
CN105863667A (en) * 2016-05-06 2016-08-17 西南交通大学 Novel bottom structure suitable for water-rich soft rock overloaded railway tunnel
CN106049195A (en) * 2016-05-27 2016-10-26 中铁三局集团有限公司 Method for strengthening subgrade basement of existing high speed railway line
CN111321636A (en) * 2020-03-25 2020-06-23 福建工程学院 Beam structure and method for rapidly and in-situ treating railway tunnel bottom plate diseases

Also Published As

Publication number Publication date
CN103276645B (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN103147442B (en) Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method
CN103556579B (en) A kind of comprehensive grouting pressurize adds the box culvert pushing construction method of pipe curtain supporting
CN105696427B (en) The construction method and its road structure of a kind of consolidation process newly built railway karst foundation
CN108547641B (en) Substrate reinforcing system of heavy-duty railway tunnel in water-rich weak stratum and construction method thereof
CN103276645B (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base
CN111577334B (en) Operating tunnel inverted arch repairing method
EA027027B1 (en) Method for forming a retaining wall
CN109610881A (en) Prestressed girder underpins disconnected column construction method in a kind of existing tier building transformation
CN103835217A (en) Method for prevention and treatment on damage and depression of pavement around inspection well
CN103711056B (en) Steel tool-type temporary construction road and construction method thereof
CN105926391B (en) A kind of curb method for widening of existing railway roadbed
CN111663385A (en) Construction method for completing rapid restoration of settlement of integral ballast bed in skylight period
CN103510532A (en) Railway tunnel bottom defect treatment technology based on assembly type beam slab pile
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN103195060B (en) Soft soil foundation prestressing bolt anchorage structure and uses thereof
CN112080972A (en) Method for repairing road surface by adopting grouting to reinforce roadbed
CN107841908A (en) For eliminating the road structure of the high embankment lateral variation sedimentation in high-speed railway abrupt slope
CN102733406B (en) Railway construction method of solid concrete roadbed in large-size industrial plant
CN111379253A (en) Construction method for high-speed railway expanded cement slurry post-grouting discrete material pile composite foundation
CN204533812U (en) A kind of slurry-water balance type jacking construction system
CN108360570A (en) Bituminous paving inspection shaft gug construction method
CN117345283A (en) Method for repairing deformation and uplift of surrounding rock of sedimentary rock tunnel substrate and reconstruction structure
CN103669347B (en) Underwater anchor rod construction method
CN102644266B (en) Method utilizing fracture anchor rod piles for reinforcing soft soil stratum pavements in abutment areas
CN105220582A (en) Based on Disease Treatment method at the bottom of the solid concrete roabed of combined support and slip casting template and tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422

CF01 Termination of patent right due to non-payment of annual fee