SU894198A1 - Method of working thick ore bodies - Google Patents

Method of working thick ore bodies Download PDF

Info

Publication number
SU894198A1
SU894198A1 SU802905043A SU2905043A SU894198A1 SU 894198 A1 SU894198 A1 SU 894198A1 SU 802905043 A SU802905043 A SU 802905043A SU 2905043 A SU2905043 A SU 2905043A SU 894198 A1 SU894198 A1 SU 894198A1
Authority
SU
USSR - Soviet Union
Prior art keywords
ore
pillars
temporary
bookmark
layer
Prior art date
Application number
SU802905043A
Other languages
Russian (ru)
Inventor
Худджахмет Бахаудинович Зиамов
Original Assignee
За витель ,„894198
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by За витель ,„894198 filed Critical За витель ,„894198
Priority to SU802905043A priority Critical patent/SU894198A1/en
Application granted granted Critical
Publication of SU894198A1 publication Critical patent/SU894198A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

(54) СПОСОБ РАЗРАБОТКИ МОЩНЫХ РУДНЫХ ТЕЛ(54) METHOD FOR DEVELOPING POWERFUL ORE BODIES

1one

Изобретение относитс  к горному делу и может быть использовано при подземной разработке мощных месторождений полезных ископаемых.The invention relates to mining and can be used in underground mining of powerful mineral deposits.

Известен способ разработки мощных рудных месторождений камерам, включающий отработку междукамерных целиков опускающимис  блоками в нижележащие отработанные камеры с отбойкой руды взрывными скважинами 1 .There is a known method of developing powerful ore deposits to chambers, which include the testing of interchamber pillars by lowering blocks into the underlying spent chambers with ore blasting by explosive wells 1.

Однако этот способ используетс  только при камерных системах разработки с обрущением налегающих пород и не применим при слоевой разработке полезных ископаемых с закладкой выработанного пространства твердеющими смес ми.However, this method is used only for chamber development systems with overlapping of overburden and is not applicable for layered mining of minerals with laying the developed space with hardening mixtures.

Наиболее близким техническим решением 5 к предлагаемому  вл етс  способ разработки мощных рудных тел, включающий выемку полезного ископаемого сло ми сверху вниз камерно-столбовой системой, закладку выработанного пространства сло ми твердеющими смес ми, оставление временных 20 рудных целиков и последующую их отработку без закладки оставщегос  от целиков выработанного пространства 2.The closest technical solution 5 to the present invention is a method of developing powerful ore bodies, including excavation of mineral deposits from top to bottom by the chamber-and-pillar system, laying the developed space with layers of hardening mixtures, leaving temporary 20 ore pillars and their subsequent development without laying the rest of pillars of the developed space 2.

Недостатками этого способа  вл ютс  высока  опасность работ при выемке целиков вышележащего отработанного сло , потери и разубоживание руды и нарущение массива закладки в результате ведени  взрывных работ в отрабатываемых целиках.The disadvantages of this method are the high risk of work when excavating the pillars of the overlying waste layer, the loss and dilution of the ore and the disruption of the bookmark array as a result of blasting operations in the worked pillars.

Цель изобретени  - снижение потерь и разубоживани  руды, повыщение безопасности работ и уменьшени  воздействи  взрывных работ на массив закладки.The purpose of the invention is to reduce loss and dilution of ore, increase safety of work and reduce the effect of blasting on the bookmark mass.

Поставленна  цель достигаетс  тем, что временные рудные целики оформл ют в форме усеченного конуса или пирамиды и располагают в отрабатываемом слое под временными рудными целиками вышележащего отработанного и заложенного сло  и в промежутке между ними, затем по окончании выемки сло  производ т самообрущение целиков выщележащего сло  путем рузрушени  поддерживающих их целиков нижележащего сло , после чего обрушенные целики разбуривают, взрывают и убирают.The goal is achieved by the fact that temporary ore pillars are designed in the form of a truncated cone or pyramid and are placed in the layer under work under temporary ore pillars of the overlying waste and mortgaged layer and between them, then at the end of the excavation of the layer they produce self-rubbing pillars of the underlying layer by crushing the pillars of the underlying layer that support them, after which the collapsed pillars are drilled, blown up and removed.

Кроме того, на боковую поверхность целиков нанос т материалы, уменьшающие сцепление руды с материалом закладки.In addition, materials that reduce the adhesion of the ore to the material of the bookmark are deposited on the side surface of the pillars.

На фиг. 1 показан участок, перед выемкой временных рудных, целиков, вертикальный разрез; на фиг. 2 - то же, после выемки указанных целиков.FIG. 1 shows the area before excavation of temporary ore, pillars, vertical section; in fig. 2 - the same, after the removal of these pillars.

Выемку руды начинают с отработки первого сло  и закладки его твердеющими смес ми с применение.м известных методов, затем приступают к выемке следующего сло  1 с оставлением временных рудных целиков 2, имеющих форму усеченного конуса или пирамиды соответствующих размеров и частоту установки в зависимости от горнотехнических условий месторождени . После обнажени  рудных целиков 2 их боковые поверхности покрывают материалом, уменьщающим или исключающим сцепление руды с материалом закладки (например, песок, глина , синтетические покрыти  - ткань, нефтепродукты ) и приступают к заполнению очистного пространства закладкой 3. Затем осуществл ют выемку следующего нижележащего сло  4 с оставлением целиков 5 в промежутке 1между целиками выщележащего сло  и целиков 6 под целиками 2 вышележащего сло . Рудные целики 2 могут выниматьс  параллельно с камерными запасами руды каждого сло  или отдельно после полной их выемки.Excavation of the ore begins with the development of the first layer and laying it with hardening mixtures using m known methods, then proceed to the excavation of the next layer 1, leaving temporary ore pillars 2, having the shape of a truncated cone or pyramid of the appropriate size and installation frequency, depending on the mining conditions field. After exposing the ore pillars 2, their side surfaces are covered with a material that reduces or eliminates adhesion of the ore to the bookmark material (for example, sand, clay, synthetic coatings — fabric, oil products) and proceed to fill the cleaning space with bookmark 3. Then, the next underlying layer 4 is dredged leaving the pillars 5 in the gap 1 between the pillars of the overlying layer and the pillars 6 under the pillars 2 of the overlying layer. Ore pillars 2 can be removed in parallel with the chamber reserves of the ore of each layer or separately after their complete excavation.

Дл  этого временные рудные целики 6 разбуривают и разрущают, вызыва  самообрущение рудных целиков 2 под действием собственных масс. Самообрушению целиков способствует уменьщение или полное отсутствие сцеплени  обработанной боковой поверхности целиков с материалом закладки. Затем целики 2 разбуривают, взрывают и убирают.For this purpose, temporary ore pillars 6 are drilled and destroyed, causing self-rubbing of ore pillars 2 under the action of their own masses. Self-degradation of the pillars is facilitated by the reduction or complete lack of adhesion of the treated side surface of the pillars to the material of the bookmark. Then the pillars 2 are drilled, blown up and removed.

Использование предлагаемого способа разработки мощных рудных тел позвол ет повысить технико-экономические показатели слоевой выемки полезных ископаемых с закладкой выработанного пространства твердеющими смес ми.The use of the proposed method of developing powerful ore bodies allows one to increase the technical and economic indicators of the layered excavation of minerals with laying the worked-out space with hardening mixtures.

Claims (2)

Формула изобретени Invention Formula . Способ разработки мощных рудных тел, включающий выемку полезного ископаемого сло ми сверху вниз камерно-столбовой системой, закладку выработанного пространства сло ми твердеющими смес ми, оставление временных рудных целиков и последующую их отработку без закладки оставщегос  от целиков выработанного пространства, отличающийс  тем, что, с целью снижени  потерь и разубоживани  руды, повышени  безопасности работ и уменьщени  воздействи  взрывных работ на массив закладки, BpeMetiные рудные целики оформл ют в форме усеченного конуса или пирамиды и располагают в отрабатываемом слое под временными рудными целиками вышележащего отработанного и заложенного сло  и в промежутке между ними, затем по окончании выемки сло  производ т самообрушение целиков выщележащего сло  путем разрушени  поддерживающих их целиков нижележащего сло , после чего обрущенные целики разбуривают , взрывают и убирают.. A method of developing powerful ore bodies, comprising digging the mineral from top to bottom with a chamber-and-pillar system, laying the mined-out space with layers of hardening mixtures, leaving the temporary ore pillars and then working them out without laying any remaining space of the mined-in space, characterized by In order to reduce losses and dilution of ore, to increase the safety of work and to reduce the impact of blasting on the bookmark mass, BmeMetiny ore pillars are formed in the form of a truncated cone or and pyramids and are located in the layer being worked under temporary ore pillars of the overlying waste layer and laid down and between them; . 2. Способ по п. 1, отличающийс  тем, что. с целью улучшени  условий самообрушени  временных рудных целиков, на боковую поверхность целиков нанос т материалы, уменьшающие сцепление руды с материалом закладки .2. A method according to claim 1, characterized in that. In order to improve the conditions of self-destruction of temporary ore pillars, materials are applied to the lateral surface of the pillars to reduce the adhesion of the ore to the material of the bookmark. Источники информации,Information sources, прин тые во внимание при экспертизеtaken into account in the examination 1. Авторское свидетельство СССР № 314902, кл. Е 21 С 41/06, 1971.1. USSR author's certificate No. 314902, cl. E 21 C 41/06, 1971. 2., Авторское свидетельство СССР № 6(5969, кл. Е 21 С 41/06, 1978.2., USSR Author's Certificate number 6 (5969, class E 21 C 41/06, 1978.
SU802905043A 1980-04-04 1980-04-04 Method of working thick ore bodies SU894198A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802905043A SU894198A1 (en) 1980-04-04 1980-04-04 Method of working thick ore bodies

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802905043A SU894198A1 (en) 1980-04-04 1980-04-04 Method of working thick ore bodies

Publications (1)

Publication Number Publication Date
SU894198A1 true SU894198A1 (en) 1981-12-30

Family

ID=20887567

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802905043A SU894198A1 (en) 1980-04-04 1980-04-04 Method of working thick ore bodies

Country Status (1)

Country Link
SU (1) SU894198A1 (en)

Similar Documents

Publication Publication Date Title
RU2593285C1 (en) Open development method of coal beds group with gross explosive loosening of overburden rocks
SU926288A1 (en) Method for hydraulically deposing muck in stock-piles and tail storage facilities
SU894198A1 (en) Method of working thick ore bodies
RU2184850C1 (en) Method of underground mining of thick flat deposits of low-hardness ores
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
RU2148712C1 (en) Method for underground development of ore deposits
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
SU403853A1 (en) '-' "- INVENTIONS
SU1028846A1 (en) Method of mining steep ore deposit
SU1458574A1 (en) Method of mining ore bodies
SU742589A1 (en) Method of mining super-thin sharply assending seams
RU2187647C1 (en) Method of softening of surface layer of opencast benches in seasonal ground freezing
SU905496A2 (en) Method of protecting development working
SU1203241A1 (en) Method of mining mineral deposits with filling-up of excavated space
SU939752A1 (en) Method of working thick gently-sloping beds
SU901529A1 (en) Method for working thick ore deposits
SU956793A1 (en) Method of working thick ore deposits
SU1638304A1 (en) Method of mining thick ore deposits
SU1452992A1 (en) Method of remining of mineral deposits
SU875048A1 (en) Method of subterranean mining of mineral deposits in ascending layers
SU1461942A1 (en) Method of mining thick ore deposits
RU2083833C1 (en) Method for development of steep coal seams with backing worked-out area
SU848643A1 (en) Method of mining ore bodies
SU1717821A1 (en) Method for mining mineral deposits
SU602684A1 (en) Method of mining mineral deposits