SU1606700A1 - Tubing block - Google Patents

Tubing block Download PDF

Info

Publication number
SU1606700A1
SU1606700A1 SU884362641A SU4362641A SU1606700A1 SU 1606700 A1 SU1606700 A1 SU 1606700A1 SU 884362641 A SU884362641 A SU 884362641A SU 4362641 A SU4362641 A SU 4362641A SU 1606700 A1 SU1606700 A1 SU 1606700A1
Authority
SU
USSR - Soviet Union
Prior art keywords
tubing
ribs
shelf
transverse ribs
concrete
Prior art date
Application number
SU884362641A
Other languages
Russian (ru)
Inventor
Артем Саркисович Зурабян
Владимир Арменович Мкртумян
Original Assignee
Научно-Исследовательский Институт Бетона И Железобетона Госстроя Ссср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-Исследовательский Институт Бетона И Железобетона Госстроя Ссср filed Critical Научно-Исследовательский Институт Бетона И Железобетона Госстроя Ссср
Priority to SU884362641A priority Critical patent/SU1606700A1/en
Application granted granted Critical
Publication of SU1606700A1 publication Critical patent/SU1606700A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Изобретение относитс  к подземному строительству и может быть использовано при возведении тоннелей различного назначени . Цель изобретени  - снижение расхода чугуна и обеспечение водонепроницаемости тюбинга. Тюбинг состоит из замкнутой чугунной рамы 1, образованной контурными ребрами (КР), полки 5 тюбинга и поперечных ребер 6. Полка 5 и поперечные ребра 6 тюбинга выполнены из напр гающего бетона дл  раст жени  КР. В продольных КР образованы проемы 3 дл  обеспечени  сцеплени  бетона с чугуном. Поперечные ребра 6 позвол ют воспринимать значительные усили  от домкратов проходческого щита. 4 ил.The invention relates to underground construction and can be used in the construction of tunnels for various purposes. The purpose of the invention is to reduce the consumption of cast iron and ensure the water resistance of tubing. Tubing consists of a closed cast-iron frame 1 formed by contour ribs (TG), a shelf 5 of tubing and transverse ribs 6. A shelf 5 and transverse ribs 6 of the tubing are made of tension concrete for stretching the KP. In the longitudinal sleeves, openings 3 are formed to adhere concrete to the cast iron. The transverse ribs 6 make it possible to perceive significant forces from the jacks of the tunnel shield. 4 il.

Description

ФигЛFy

Изоб1)ете1гае относитс  к подземному строительству и может быть использовано при -возведении тоннелей различного назначени .Isob1) is related to underground construction and can be used in the construction of tunnels for various purposes.

Цель изобретени  - снижение расхода чугуна и обеспечение водонепроницаемости тюбинга.The purpose of the invention is to reduce the consumption of cast iron and ensure the water resistance of tubing.

Изобретение иллюстрируетс  графически оThe invention is illustrated graphically about

На.фиг о 1 изображен блок со стороны продольного торца, общий вид; на фиг о 2 - блок, в плане; на фиг.3 - разрез А-А на фиго2; на фиг о4 - разрез Б-Б на фиГо2„Fig. 1 shows a block from the side of the longitudinal end, general view; Fig 2 - block, in plan; figure 3 - section aa on figo2; Fig O4 - section bb on fig02

Тюбинг содержит контурные ребра в виде замкнутой чугунной рамы 1 с отверсти ми 2, дл  креплени  его болтами к другим блокам, и с проёмами 3, выполненными в продольных сторонах дл  обеспечени  сцеплени  бетона с чугун ом о Сама рама имеет, чеканную канавку 4 о Полка 5 тюбинга и поперечные ребра 6 вьшолнены из напр гающего железобетона. Полка 5 и ребра 6 имеют арматурньй каркас.The tubing contains contour ribs in the form of a closed cast-iron frame 1 with holes 2, for fastening it with bolts to other blocks, and with apertures 3, made in longitudinal sides to ensure the concrete adheres to the cast iron o. The frame itself has a hammered groove 4 about Shelf 5 tubing and transverse ribs 6 are made of tensile reinforced concrete. Shelf 5 and ribs 6 have a reinforcement cage.

Сборка обделки из тюбингов производитс  в следующей последовательности . Вначале проходческим щитом монтируетс  кольцо обделки, при этом тюбинги соедин ютс  между собой по по - перечным торцам, параллельным оси тоннел  болтами, путем пропуска болтов через отверсти  2, расположенные на поперечных торцах.Затем собранное кольцо при помощи домкратов, наход щихс  на проходческом щите, выставл етс  и прижимаетс  к ранее смонтированному кольцу, а потом крепитс  кThe lining is assembled from tubing in the following sequence. Initially, the tunnel shield is used to mount the lining ring, and the tubing is connected to each other along transverse ends parallel to the tunnel axis with bolts by passing the bolts through the holes 2 located on the transverse ends. Then the assembled ring with the help of jacks located on the tunnel shield is exposed and pressed against the previously mounted ring, and then attached to

нему через отверсти  2, расположенные в продольном контзфном ребре рамы 1, болтами Последуювще операции анало- .it through the holes 2, located in the longitudinal contour edge of frame 1, with bolts. The following operation is similar.

гичны операци м,осуществл емым при проходке тоннелей. Производитс  нагнетание цементно-песчаного раствора в заобделочное пространство и зачекан- ка швов, образованных канавками 4These operations are carried out during tunneling. Cement-sand mortar is injected into the back-dressing space and caulking seams formed by grooves 4

смежных рам 1 тюбингов, раствором на основе напр гающегос  цемента В смонтированном тоннеле основную функцию по обеспечению водонепрони - цаемости несет полка 5 тюбинга, вьшолненна  из напр гающего бетона Поперечные ребра 6, выполненные также из напр гающего бетона и имеющие достаточное поперечное сечение, позвол ют воспринимать значительные усили adjoining frames of 1 tubing, with a solution based on tensioned cement. In a mounted tunnel, the main function for ensuring water tightness is carried out by a shelf of 5 tubing made of tensioned concrete. Transverse ribs 6, also made of tensioning concrete and having a sufficient cross section, allow to be perceived significant effort

от домкратов проходческого щитаfrom jacks tunneling shield

Предложенна  конструкци  тюбинга позвол ет собирать обделку из них с высокой степенью точности, так как боковые поверхности чугунной рамыThe proposed tubing design allows you to assemble the lining of them with a high degree of accuracy, since the side surfaces of the cast-iron frame

обрабатываютс  механически на заводе-изготовителеmachined at the factory

Claims (1)

Формулаизобретени Invention Formula Тюбинг, включающий полку, поперечные и контурные ребра в виде рамы, отличающийс  тем, что, с целью снижени  расхода чугуна и обеспечени  водонепроницаемости тюбинга , его полка и поперечные ребра вьшолнены из напр гающегос  бетона дл  раст жени  контурных- чугунных ребер, а продольные контурные ребра имеют проемыTubing, including a shelf, transverse and contour ribs in the form of a frame, characterized in that, in order to reduce the consumption of cast iron and ensure the watertightness of the tubing, its shelf and transverse ribs are made of tensioned concrete for stretching contour-iron ribs, and the longitudinal contour edges have openings Фиг. 1FIG. one иг.2ig.2 PU2. JPU2. J
SU884362641A 1988-01-12 1988-01-12 Tubing block SU1606700A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884362641A SU1606700A1 (en) 1988-01-12 1988-01-12 Tubing block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884362641A SU1606700A1 (en) 1988-01-12 1988-01-12 Tubing block

Publications (1)

Publication Number Publication Date
SU1606700A1 true SU1606700A1 (en) 1990-11-15

Family

ID=21349306

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884362641A SU1606700A1 (en) 1988-01-12 1988-01-12 Tubing block

Country Status (1)

Country Link
SU (1) SU1606700A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Патент GB f 1400004, кл. Е.21 D 11/00, 1975. Авторское свидетельство СССР № 65563, кло Е 21 D 11/08, 1944, *

Similar Documents

Publication Publication Date Title
IT1281032B1 (en) STRUCTURE OF AN UNDERGROUND WORKS, PARTICULARLY FOR THE RELIABATION OF TUNNELS, SUBWAYS, GARAGES OR SIMILAR, ITS PROCEDURE OF
DE59806744D1 (en) SEALING ARRANGEMENT FOR TUNNEL SEGMENTS
GB1502207A (en) Concrete segment
SU1606700A1 (en) Tubing block
GB1520367A (en) Support members for a tunnel wall support structure
RU93011303A (en) METHOD OF HYDROINSULATING WATER CONSTRUCTION
SU1511411A1 (en) Tunnel lining
SU1420167A1 (en) Prefabricated tunnel lining
RU2115786C1 (en) Tunnel lining
JPS6115078Y2 (en)
SU1130641A1 (en) Method of joining the cylindrical shells of hydraulic structure
SU1573187A1 (en) Method of making joint of underwater tunnel section
RU2112141C1 (en) Process of location of braces on frame members of support and gear for its realization
SU1283405A1 (en) Prefabricated ferroconcrete transport tunnel
SU128036A1 (en) Ribbed block for a national team, mainly a reinforced concrete tunnel lining
JPH0431597A (en) Coupling structure for steel-shell concrete segment
SU1239350A1 (en) Prefabricated tunnel lining
SU928024A1 (en) Prefabricated ferroconcrete tunnel lining
RU95110973A (en) Gypsum building block and methods of its laying
SU1216355A1 (en) Method of constructing tunnel lining
SU1382963A1 (en) Prefabricated tunnel lining
SU1046524A1 (en) Member for supporting mining working roof
SU517679A1 (en) Circular lining of the precast concrete tunnel
RU2018680C1 (en) Prefabricated reinforced concrete support
SU1654465A1 (en) Method of creating openings between tunnels of underground railway station