SU1654465A1 - Method of creating openings between tunnels of underground railway station - Google Patents

Method of creating openings between tunnels of underground railway station Download PDF

Info

Publication number
SU1654465A1
SU1654465A1 SU894698659A SU4698659A SU1654465A1 SU 1654465 A1 SU1654465 A1 SU 1654465A1 SU 894698659 A SU894698659 A SU 894698659A SU 4698659 A SU4698659 A SU 4698659A SU 1654465 A1 SU1654465 A1 SU 1654465A1
Authority
SU
USSR - Soviet Union
Prior art keywords
opening
lining
tunnels
construction
zone
Prior art date
Application number
SU894698659A
Other languages
Russian (ru)
Inventor
Виктор Иванович Акатов
Сергей Петрович Щукин
Original Assignee
Ленинградский государственный проектно-изыскательский институт "Ленметрогипротранс"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ленинградский государственный проектно-изыскательский институт "Ленметрогипротранс" filed Critical Ленинградский государственный проектно-изыскательский институт "Ленметрогипротранс"
Priority to SU894698659A priority Critical patent/SU1654465A1/en
Application granted granted Critical
Publication of SU1654465A1 publication Critical patent/SU1654465A1/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Изобретение относитс  к строительству и может быть использовано при сооружении метрополитенов с целью улучшени  статической работы узла примыкани  обделки проема к станционным тоннел м. Способ реализуют следующим образом. Разборку блоков 3 и 4 обделки станционных тоннелей 1 и 2, разработку грунта проема с установкой временных распорок 8 и возведение его обделки с гидроизол цией выполн ют вначале в зоне нижней части одной стены 5 обделки проема, затем в зоне верхней ее части .После чего в той же последовательности выполн ют операции в зонах второй стены, затем в зонах верхней и нижней арок средней части проема, причем одновременно с возведением обделки проема возвод т поэлементно рамы его обрамлени . 5 ил.The invention relates to the construction and can be used in the construction of subways in order to improve the static operation of the site of the lining of the opening to the station tunnels. The method is implemented as follows. The disassembly of blocks 3 and 4 of the lining of the station tunnels 1 and 2, the excavation of the opening with the installation of temporary struts 8 and the construction of its lining with waterproofing are first carried out in the zone of the lower part of one wall 5 of the shell of the opening, then in the zone of its upper part. the same sequence is performed in the zones of the second wall, then in the zones of the upper and lower arches of the middle part of the opening, and simultaneously with the erection of the lining of the opening, they are erected element by element of the frame of its edging. 5 il.

Description

22

Фиг. fFIG. f

Изобретение относитс  к строительству и может быть использовано при сооружении метрополитенов.The invention relates to the construction and can be used in the construction of subways.

Целью изобретени   вл етс  улучшение статической работы узла примыкани  обделки проема к станционным тоннел м.The aim of the invention is to improve the static operation of the site adjacent the lining of the opening to the station tunnels.

На фиг. 1 показана станци  метрополитена , поперечное сечение; на фиг. 2-5 - последовательность раскрыти  проема.FIG. 1 shows a metro station, cross section; in fig. 2-5 is an opening sequence.

Способ осуществл етс  следующим образом .The method is carried out as follows.

В обделке бокового 1 и среднего 2 тоннелей станции разбирают блоки 3 и 4 обделки на ширину двух колец в зоне нижней части одной стены 5 проема 6, разрабатывают грунт 7 с установкой распорок 8, устанав- ливают арматуру, гидроизол цию и бетонирует нижнюю часть стены 5, объединенную с нижней частью стойки железобетонной рамы обрамлени  проема на всю его длину.In the lining of the side 1 and middle 2 tunnels, the stations disassemble the blocks 3 and 4 of the lining to the width of two rings in the zone of the lower part of one wall 5 of the opening 6, develop soil 7 with the installation of spacers 8, install the reinforcement, waterproofing and concrete the lower part of the wall 5 combined with the bottom of the rack reinforced concrete frame framing the opening for its entire length.

Разбирают блоки 3 и 4 обделки на ширину двух колец в зоне верхней части той же стены 5 проема 6, разрабатывают грунт 7 с установкой распорок 8, устанавливают арматуру , гидроизол цию и бетонируют верхнюю часть стены 5, объединенной с верхней частью стоек железобетонной рамы обрамлени  проема, на всю его длину. В той же последовательности сооружают вторую стену 9 проема 6, объединенную со стойкой железобетонной рамы обрамлени  проема, на всю его длину.Units 3 and 4 of lining are disassembled to the width of two rings in the area of the upper part of the same wall 5 opening 6, soil 7 is being developed with installation of spacers 8, reinforcement is installed, waterproofing and concrete upper part 5 of the wall 5 integrated with the upper part of the aperture frame , for its entire length. In the same sequence, the second wall 9 of the opening 6, combined with the resistant reinforced concrete frame of the opening frame, is constructed to its entire length.

В пределах проема 6 (фиг. 1 и 4) разбирают верхнюю часть блоков 3 и 4 обделки средних между стенами колец в обоих примыкающих тоннел х 1 и 2, разрабатывают грунт 10, устанавливают арматуру, гидроизол цию и бетонируют оставшуюс  часть обделки 11 свода проема 6, объединенную с железобетонной аркой обрамлени  проема , на всю его длину.Within opening 6 (Figs. 1 and 4), the upper part of blocks 3 and 4 of the lining is average between the walls of the rings in both adjacent tunnels 1 and 2, soil 10 is developed, reinforcement is installed, waterproofing and concrete the remaining part of lining 11 of opening 6 is made , combined with the reinforced arch of the edging of the opening, for its entire length.

В пределах проема 6 (фиг. 1 5) разбирают нижнюю часть блоков 3 и 4 обделки сред- них между стенами колец в обоих примыкающих тоннел х 1 и 2, разрабатывают грунт 12, устанавливают арматуру гидроизол цию и бетонируют оставшуюс  часть обделки 13 обратного свода проема 6, объединенную с железобетонной аркой обрамлени  проема 6, на всю его длину.Within opening 6 (Fig. 1 5), the lower part of blocks 3 and 4 of the lining of the middle rings between the walls in both adjacent tunnels 1 and 2 is excavated, soil 12 is installed, the reinforcement is installed waterproofing and the remaining part of the opening 13 is concreted 6, combined with the reinforced arch of the edging of the opening 6, for its entire length.

Сооружение обделки боковых и среднего тоннелей в пределах проемной части станции без фигурных блоков и железобетонных балочных перемычек упрощает их конструкцию, а объединение рамы обрамлени  проемов с их обделкой улучшает статическую работу обделки проемов, включает их в работу станции и тем самым приводит к уменьшению расхода бетона и арматуры на сооружение проемов.The construction of the lining of side and middle tunnels within the station aperture of the station without shaped blocks and reinforced concrete lintels simplifies their design, and combining the framing frame of the openings with their trim improves the static operation of the lining of the openings, puts them into operation of the station and thereby reduces the consumption of concrete and fittings for the construction of openings.

Claims (1)

Формула изобретени  Способ раскрыти  проемов между тоннел ми станции метрополитена, включающий частичную разборку блоков обделокClaim Method A method for opening gaps between metro station tunnels, including partial disassembly of lining blocks тоннелей, возведение рам обрамлени  проема , разработку грунта проема с выполнением обделки проема и гидроизол ции, от- личающийс  тем, что, с целью улучшени  статической работы узла примыкани tunneling, erection of framing frames of the opening, excavation of the opening with the execution of lining of the opening and waterproofing, distinguished by the fact that, in order to improve the static operation of the site обделки проема к станционным тоннел м, разборку блоков обделки станционных тоннелей , разработку грунта проема и возведение его обделки с гидроизол цией выполн ют вначале в зоне нижней частиthe lining of the opening to the station tunnels, the dismantling of the blocks of the lining of the station tunnels, the development of the soil of the opening and the construction of its lining with waterproofing is performed first in the zone of the lower part одной стены обделки проема, затем в зоне верхней ее части, после чего в той же последовательности выполн ют операции в зонах второй смены, затем в зонах верхней и нижней арок средней части проема, причем одновременно с возведением обделки проема возвод т поэлементно рамы его обрамлени .one wall of the lining of the opening, then in the zone of its upper part, after which, in the same sequence, operations are performed in the zones of the second shift, then in the zones of the upper and lower arches of the middle part of the passage, and simultaneously with the erection of the trim of the passage, the frame of its framing is erected. Фиг. 2FIG. 2 Фиг.ЗFig.Z
SU894698659A 1989-06-05 1989-06-05 Method of creating openings between tunnels of underground railway station SU1654465A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894698659A SU1654465A1 (en) 1989-06-05 1989-06-05 Method of creating openings between tunnels of underground railway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894698659A SU1654465A1 (en) 1989-06-05 1989-06-05 Method of creating openings between tunnels of underground railway station

Publications (1)

Publication Number Publication Date
SU1654465A1 true SU1654465A1 (en) 1991-06-07

Family

ID=21451043

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894698659A SU1654465A1 (en) 1989-06-05 1989-06-05 Method of creating openings between tunnels of underground railway station

Country Status (1)

Country Link
SU (1) SU1654465A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2735506C1 (en) * 2019-10-03 2020-11-03 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Double-vaulted pylon subway station, constructed by trenchless method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Тоннели и метрополитены./Под ред. В.П. Волкова. - М.: Транспорт, 1975, с. 519- 520. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2735506C1 (en) * 2019-10-03 2020-11-03 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Double-vaulted pylon subway station, constructed by trenchless method

Similar Documents

Publication Publication Date Title
RU2536539C2 (en) Construction method of deep-laid double-arched underground station
RU2510444C2 (en) Three-arched underground station of column type and its erection methods (yurkevich device and methods)
CN107130968A (en) A kind of tunnel construction mid-board
RU2692518C1 (en) Method for constructing a three-span subway station of an open method of performing works with a lateral arrangement of passenger platforms and a double-track still tunnel
SU1654465A1 (en) Method of creating openings between tunnels of underground railway station
JP3854495B2 (en) Construction method of tunnel junction
CN115653649A (en) Construction method for multi-pilot tunnel subsection step excavation single-span support underground excavation large-section station
JPS62182398A (en) Shielded tunnel
SU1164425A1 (en) Method of constructing the station complex of deep underground railway
RU2102602C1 (en) Method for construction of deep subway station
RU2082883C1 (en) Method of construction of deep-seated subway station
US3914946A (en) Cut and cover construction of subway with utility chamber and air conditioning with minimum street traffic disturbance and method
CN111101956A (en) Secondary starting method for shield in single-hole single-line underground excavation tunnel
SU1266988A1 (en) Method of working pillars
SU1668563A1 (en) Method for building deep underground railway station at existing line
RU2810978C1 (en) Method for reconstructing railway tunnel
SU1564275A1 (en) Method of constructing deep laid underground station on its operative line
RU2057939C1 (en) Process of construction of contiguity of transfer tunnel of built line of underground railway to transfer tunnel of operational line
SU1265235A1 (en) Method of constructing a branch-off section of tunnel
SU1116163A1 (en) Tunnel lining
SU1763584A1 (en) Method of erecting deep undergroung station
JP3646698B2 (en) Construction method for underground structures
SU1696813A1 (en) Lining of pedestrian underpass tunnel
SU574504A2 (en) Column-tyre subway station
CN113550753A (en) Construction method of crossing middle partition wall with through upper step in advance