RU2746610C1 - Three-span metro station constructed in accordance with the open building method with an island passenger platform and single-track running tunnels - Google Patents
Three-span metro station constructed in accordance with the open building method with an island passenger platform and single-track running tunnels Download PDFInfo
- Publication number
- RU2746610C1 RU2746610C1 RU2019124926A RU2019124926A RU2746610C1 RU 2746610 C1 RU2746610 C1 RU 2746610C1 RU 2019124926 A RU2019124926 A RU 2019124926A RU 2019124926 A RU2019124926 A RU 2019124926A RU 2746610 C1 RU2746610 C1 RU 2746610C1
- Authority
- RU
- Russia
- Prior art keywords
- station
- island
- platform
- span
- passenger platform
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
Abstract
Description
Изобретение относится к области строительства станций метрополитена сооружаемых открытым способом производства работ.The invention relates to the field of construction of underground stations constructed by open-cut production of works.
В настоящее время, в связи с необходимостью ускоренного строительства метрополитена возник вопрос создания станций, рассчитанных на поточный метод строительства с соблюдением при этом разнообразия архитектурно-художественного оформления каждой из станций при обеспечении комфортного и безопасного обслуживания пассажиров. Такие станции сооружаются, как правило, в открытых котлованах с временным ограждением выработки в виде металлического шпунта, металлических балок с деревянной затяжкой или монолитных железобетонных стен, возводимых методом "стена в грунте", временное крепление ограждающих стен выполняется металлической распорной или анкерной крепью.At present, in connection with the need to accelerate the construction of the metro, the question of creating stations designed for the flow method of construction has arisen, while observing the diversity of the architectural and artistic design of each of the stations while ensuring comfortable and safe passenger service. Such stations are built, as a rule, in open pits with a temporary fence in the form of a metal sheet pile, metal beams with a wooden tie or monolithic reinforced concrete walls, erected by the "wall in the ground" method, temporary fastening of the enclosing walls is performed with metal spacer or anchor support.
Известна станция метрополитена мелкого заложения, включающая станционные, обслуживающие и специальные дополнительные сооружения, возводимая открытым способом в вертикальной грунтовой выработке (котловане) с полным вскрытием дневной поверхности, например, путем предварительного выполнения отрывки котлована с последующим возведением сооружения традиционными способами (Тоннели и метрополитены. /Волков В.П., Наумов С.Н., Пирожкова А.Н., Храпов В.Г., изд. 2-е перераб. и доп. Москва, "Транспорт", 1975 г., стр. 408-412, 494-500, 502).A well-known subway station is shallow, including station, service and special additional structures, erected by an open method in a vertical excavation (foundation pit) with a complete opening of the day surface, for example, by preliminary execution of excavation excavations followed by the construction of the structure using traditional methods (Tunnels and subways. / Volkov V.P., Naumov S.N., Pirozhkova A.N., Khrapov V.G., ed. 2nd revised and supplemented Moscow, "Transport", 1975, pp. 408-412, 494-500, 502).
Известна станция метрополитена мелкого заложения, включающая замкнутую рамную конструкцию из монолитного железобетона с размещенными в ней рельсовыми путями, платформенным участком с подплатформенным пространством, в которых размещены технические помещения (Патент РФ на полезную модель №104202, опубл. от 10.05.2011, Бюл. №13). Однако данная станция выполнена однопролетной и одноуровневой, что обуславливает сложность строительства станции, необходимость создания значительной толщины покрытия однопролетной станции и отсутствие полезного пространства для размещения служебных и технических помещений.Known subway station shallow, including a closed frame structure made of monolithic reinforced concrete with rails placed in it, a platform section with a sub-platform space in which technical rooms are located (RF patent for utility model No. 104202, publ. From 05/10/2011, bull. 13). However, this station is designed as a single-span and single-level, which causes the complexity of the station construction, the need to create a significant thickness of the single-span station cover and the lack of usable space to accommodate office and technical premises.
Известна многоуровневая трехпролетная станции метрополитена мелкого заложения, содержащая на нижнем уровне островную пассажирскую платформу и однопутные перегонные тоннели (Патент РФ №2505646, опубл. от 27.01.2014, Бюл. №3). Однако данная станция сооружается с использованием полузакрытых способов строительства, известных как, "top-down", "semi-top-down" или "top&down", что значительно сложнее открытого способа производства работ и требует установки большого количества «свай-колонн», а также высокозатратной технологии выемки грунта.Known is a multi-level three-span metro station of shallow ground, containing at the lower level an island passenger platform and single-track running tunnels (RF Patent No. 2505646, publ. From 01/27/2014, Bul. No. 3). However, this station is being constructed using semi-closed construction methods known as "top-down", "semi-top-down" or "top & down", which is much more complicated than the open method of production and requires the installation of a large number of "pile-columns", and also high-cost excavation technology.
Известна трехпролетная станция метрополитена открытого способа производства работ с островным расположением пассажирской платформы и однопутными перегонными тоннелями, представляющая собой подземное многоуровневое сооружение, возводимое открытым способом, состоящее из расположенных друг над другом верхнего и нижнего уровней, в верхнем уровне расположены служебные и технологические помещения, в нижнем уровне расположены рельсовые пути в боковых пролетах, к которым примыкают перегонные тоннели, и островная платформа, в среднем пролете, с светопрозрачными перегородками и автоматическими платформенными дверями для посадки и высадки пассажиров из вагонов поездов метрополитена и подплатформенным пространством (Патент на полезную модель РФ №141153, опубл. от 27.05.2014, Бюл. №15).There is a known three-span metro station of an open method of work with an island arrangement of a passenger platform and single-track tunnels, which is an underground multi-level structure, erected by an open method, consisting of upper and lower levels located one above the other, service and technological premises are located in the upper level, in the lower level, there are rail tracks in the side spans, to which the running tunnels adjoin, and an island platform, in the middle span, with translucent partitions and automatic platform doors for picking up and disembarking passengers from subway train cars and a sub-platform space (Patent for a useful model of the Russian Federation No. 141153, published on 05/27/2014, Bul. No. 15).
Недостатком данной конструкции станции является:The disadvantage of this station design is:
- во-первых, необходимость сооружения колонно-прогонных комплексов для опирания элементов станции, что значительно усложняет конструкцию опалубки при бетонировании перекрытий и мешает пропуску и эксплуатации технологических коммуникаций;- firstly, the need to build column-run complexes to support the station elements, which significantly complicates the formwork design when concreting floors and interferes with the passage and operation of technological communications;
- во-вторых, установка дорогостоящих светопрозрачных перегородок с автоматическими платформенными дверями между боковыми пролетами и средним пролетом, что ведет к удорожанию строительства станции и снижает скорость ее возведения;- secondly, the installation of expensive translucent partitions with automatic platform doors between the side spans and the middle span, which increases the cost of building the station and reduces the speed of its construction;
- в-третьих, наличие светопрозрачных перегородок с автоматическими платформенными дверями, тем не менее, обеспечивает свободный доступ пассажиров на край платформы, что делает необходимым архитектурное оформление боковых пролетов станции с рельсовыми путями. Это ведет к увеличению сроков строительства и удорожанию станции, а также проблемам с транзитом коммуникаций вдоль линии метрополитена;- thirdly, the presence of translucent partitions with automatic platform doors, nevertheless, provides free access for passengers to the edge of the platform, which makes it necessary to architecturally design the side aisles of the station with rail tracks. This leads to an increase in the construction time and a rise in the cost of the station, as well as problems with the transit of communications along the metro line;
- в-четвертых, возможность доступа пассажиров на край платформы снижает уровень безопасности станции для пассажиров.- fourthly, the possibility of passenger access to the edge of the platform reduces the level of station safety for passengers.
Технический результат, который может быть получен при реализации изобретения, заключается в повышение технологичности и скорости строительства трехпролетной станции открытого способа производства работ с островным размещением пассажирской платформы, а также надежности и безопасности эксплуатации станции.The technical result that can be obtained during the implementation of the invention is to increase the manufacturability and speed of construction of a three-span station of an open method of work with an island placement of the passenger platform, as well as the reliability and safety of the station operation.
Для достижения данного технического результата трехпролетная станция метрополитена открытого способа производства работ с островным расположением пассажирской платформы и однопутными перегонными тоннелями, представляющая собой подземное многоуровневое сооружение, возводимое открытым способом в котловане, состоящее из расположенных друг над другом верхнего и нижнего уровней, на верхнем уровне расположены служебные и технологические помещения, на нижнем уровне, в боковых пролетах, к которым примыкают перегонные тоннели, расположены рельсовые пути, в среднем пролете островная пассажирская платформа с раздвижными дверями для посадки и высадки пассажиров из вагонов поездов метрополитена и подплатформенным пространством, выполнена в виде многопролетной рамы (замкнутой рамной конструкции), содержащей монолитные железобетонные лотковую плиту, плиты перекрытия и покрытия, несущие боковые стены, а также промежуточные стены, которые разделяют рамную конструкцию станции на три пролета, при этом плиты покрытия и перекрытия опираются на боковые и промежуточные стены рамной конструкции, а боковые пролеты с рельсовыми путями и средний пролет с островной пассажирской платформой соединены между собой проемами в промежуточных стенах, в которых установлены раздвижные двери для входа и выхода пассажиров в вагоны поезда с платформы станции, при этом шаг осей проемов равен шагу осей дверей в вагонах поезда.To achieve this technical result, a three-span metro station of an open method of work with an island location of the passenger platform and single-track tunnels, which is an underground multi-level structure, erected by an open way in a pit, consisting of upper and lower levels located one above the other, at the upper level there are service and technological rooms, on the lower level, in the side spans, which are adjacent to the running tunnels, there are rail tracks, in the middle span, an island passenger platform with sliding doors for embarking and disembarking passengers from subway train cars and a sub-platform space, is made in the form of a multi-span frame ( closed frame structure), containing monolithic reinforced concrete trough slabs, floor slabs and coverings, bearing side walls, as well as intermediate walls that divide the frame structure of the station into three spans, while pl These coverings and ceilings rest on the side and intermediate walls of the frame structure, and the side spans with rail tracks and the middle span with the island passenger platform are interconnected by openings in the intermediate walls, in which sliding doors are installed for the entry and exit of passengers into train cars from the station platform , in this case, the step of the axes of the openings is equal to the step of the axes of the doors in the train cars.
Введение в предлагаемую трехпролетную станцию метрополитена открытого способа производства работ с островным расположением пассажирской платформы и однопутными перегонными тоннелями, возводимую открытым способом в котловане рамную конструкцию, содержащую монолитные железобетонные лотковую плиту, плиты перекрытия и покрытия, несущие боковые стены, а также промежуточные стены, разделяющие рамную конструкцию станции на три пролета, при этом плиты покрытия и перекрытия опираются на боковые и промежуточные стены рамной конструкции, а также соединение между собой боковых пролетов с рельсовыми путями и среднего пролета с островной пассажирской платформой проемами в промежуточных стенах, в которых установлены раздвижные двери для входа и выхода пассажиров в вагоны поезда с платформы станции, при этом шаг осей проемов равен шагу осей дверей в вагонах поезда, позволяет получить новое свойство, заключающееся в повышении технологичности и скорости строительства станции за счет упрощения конструкции станции, возводимой в виде монолитной железобетонной трехпролетной рамы, и сокращения объема строительных работ в виду отсутствия необходимости архитектурной отделки внутренней поверхности боковых пролетов с рельсовыми путями и возможности уменьшения, в соответствии с нормативными требования к станциям закрытого типа без боковых посадочных платформ, ширины пассажирской платформы до 8 метров, то есть на два метра меньше ширины платформы принятой на станциях других типов, что уменьшает на 10-15% объем разрабатываемого грунта и снижает стоимость станции, а также возможности повышения безопасности эксплуатации станции вследствие исключения случайного падения пассажиров с платформ на рельсовые пути вследствие отсутствия боковых посадочных платформ в зоне пролетов с рельсовыми путями и применения раздвижных дверей, открывающимися синхронно с дверями вагонов поезда, расположенных между островной пассажирской платформой и боковыми пролетами с рельсовыми путями.Introduction to the proposed three-span metro station of an open method of work with an island arrangement of the passenger platform and single-track tunnels, a frame structure erected by an open method in a pit, containing a monolithic reinforced concrete chute slab, floor slabs and coatings, bearing side walls, as well as intermediate walls dividing the frame the structure of the station for three spans, with the cover and floor slabs resting on the side and intermediate walls of the frame structure, as well as the connection between the side spans with the rail tracks and the middle span with the island passenger platform by the openings in the intermediate walls, in which the sliding doors for entry are installed and the exit of passengers to train cars from the station platform, while the step of the axes of the openings is equal to the step of the axes of the doors in the train cars, allows you to obtain a new property, which consists in increasing the manufacturability and speed of construction of the station by simplifying the design and the station, erected in the form of a monolithic reinforced concrete three-span frame, and a reduction in the volume of construction work due to the absence of the need for architectural finishing of the inner surface of the side spans with rail tracks and the possibility of reducing, in accordance with the regulatory requirements for closed-type stations without side landing platforms, the width of the passenger platform up to 8 meters, that is, two meters less than the width of the platform adopted at stations of other types, which reduces the volume of excavated soil by 10-15% and reduces the cost of the station, as well as the possibility of increasing the safety of the station operation due to the elimination of accidental falling of passengers from platforms onto the tracks due to the absence of side landing platforms in the area of spans with rail tracks and the use of sliding doors that open synchronously with the doors of train cars located between the island passenger platform and side spans with rail tracks.
Предлагаемое изобретение поясняется чертежами, где на фиг. 1 представлено поперечное сечение трехпролетной станции метрополитена открытого способа производства работ с островным расположением пассажирской платформы и однопутными перегонными тоннелями, на фиг. 2 - чертеж фрагмента продольного разреза трехпролетной станции метрополитена открытого способа производства работ с островным расположением пассажирской платформы и однопутными перегонными тоннелями с фрагментами проемов для прохода пассажиров, где:The invention is illustrated by drawings, where in FIG. 1 shows a cross-sectional view of a three-span metro station of an open method of production of works with an island arrangement of a passenger platform and single-track running tunnels, in Fig. 2 is a drawing of a fragment of a longitudinal section of a three-span metro station of an open method of work with an island arrangement of a passenger platform and single-track running tunnels with fragments of openings for the passage of passengers, where:
1 - боковые пролеты станции;1 - side spans of the station;
2 - средний пролет со станционным залом;2 - middle span with the station hall;
3 - пассажирская платформа;3 - passenger platform;
4 - монолитное железобетонное перекрытие;4 - monolithic reinforced concrete floor;
5 - боковые монолитные железобетонные стены;5 - lateral monolithic reinforced concrete walls;
6 - промежуточные монолитные железобетонные стены;6 - intermediate monolithic reinforced concrete walls;
7 - проем для посадки пассажиров в вагоны;7 - aperture for boarding passengers in carriages;
8 - раздвижные двери;8 - sliding doors;
9 - конструкции рельсовых путей;9 - rail track structures;
10 - технические и служебные помещения верхнего уровня;10 - technical and office premises of the upper level;
11 - технические помещения под пассажирской платформой;11 - technical rooms under the passenger platform;
12 - монолитная железобетонная лотковая плита;12 - monolithic reinforced concrete tray slab;
13 - конструкция крепления котлована;13 - construction of the pit fastening;
14 - монолитная железобетонная плита покрытия.14 - monolithic reinforced concrete slab.
Предлагаемое изобретение трехпролетной станции метрополитена открытого способа производства работ с островным расположением пассажирской платформы и однопутными перегонными тоннелями сооружается следующим образом.The proposed invention of a three-span metro station of an open method of work with an island arrangement of a passenger platform and single-track running tunnels is constructed as follows.
Станция сооружается в открытом котловане, конструкция крепления стенок которого определяется глубиной заложения станции, градостроительными и инженерно-геологическими условиями строительства, и может быть выполнена различными методами, например, в виде стен 13, созданных по технологии «стена в грунте».The station is being built in an open pit, the wall fastening structure of which is determined by the depth of the station, urban planning and engineering-geological conditions of construction, and can be made by various methods, for example, in the form of
Бетонирование трехпролетной замкнутой рамной конструкции производят методом «снизу вверх» от лотковой плиты 12. Затем возводят боковые стены 5, плиты перекрытия 4 и плиту покрытия 14, а также промежуточные стены 6, разделяющие рамную конструкцию станции на три пролета, два боковых 1 и средний пролет 2 со станционным залом.The concreting of a three-span closed frame structure is carried out using the “bottom-up” method from the
Плиты покрытия 14 и перекрытия 4 опираются на боковые 5 и промежуточные стены 6 рамной конструкции, а боковые пролеты 1 и средний пролет 2 соединены между собой проемами 7 в промежуточных стенах 6.The slabs of the covering 14 and floors 4 rest on the
По окончании возведения станционной обделки сооружаются островная пассажирская платформа 3 в станционном зале среднего пролета 2 нижнего уровня и конструкции рельсовых путей 9 в боковых пролетах 1 станции, под пассажирской платформой 3 и на верхнем ярусе станции, между плитой покрытия 14 и плитами перекрытия 4, размещаются служебные и технические помещения 11 и 10, соответственно.At the end of the construction of the station lining, an island passenger platform 3 is constructed in the station hall of the
Затем монтируются раздвижные двери 8 в проемах 7 для прохода пассажиров от пассажирской платформы 3 станционного зала среднего пролета 2 к вагонам поезда метрополитена. Шаг осей проемов 7 для прохода пассажиров к вагонам поезда равен расстоянию между осями дверных проемов вагонов, при этом раздвижные двери 8 открываются синхронно с дверями вагонов поезда.Then, sliding
Наличие раздвижных дверей 8, открывающихся синхронно с дверями вагонов поезда, обуславливают отсутствие необходимости архитектурного оформления боковых пролетов 1 с рельсовыми путями 9, что упрощает транзит коммуникаций вдоль станции и значительно снижает сроки строительства и расходы на архитектурное оформление станции.The presence of sliding
Применение предлагаемой рамной конструкции трехпролетной станция метрополитена с островным расположением пассажирской платформы 3 и однопутными перегонными тоннелями, примыкающими к боковым пролетам 1 станции, позволяет реализовать проект станции метрополитена без боковых посадочных платформ, что в соответствии с нормативными требования к станциям закрытого типа без боковых посадочных платформ, обеспечивает возможность уменьшения ширины пассажирской платформы до 8 метров, то есть на два метра меньше значений ширины платформ, принятых на станциях других типов, приводящее к сокращению на 10-15% объема разрабатываемого грунта и снижению стоимости строительства станции.The use of the proposed frame structure of a three-span metro station with an island arrangement of the passenger platform 3 and single-track running tunnels adjacent to the side aisles of station 1 makes it possible to implement a metro station project without side landing platforms, which, in accordance with regulatory requirements for closed-type stations without side landing platforms, provides the ability to reduce the width of the passenger platform to 8 meters, that is, two meters less than the widths of platforms adopted at stations of other types, leading to a 10-15% reduction in the volume of excavated soil and a decrease in the cost of construction of the station.
Источники информации, принятые во внимание при составлении заявки:Sources of information taken into account when preparing the application:
1. Тоннели и метрополитены. /Волков В.П., Наумов С.Н., Пирожкова А.Н., Храпов В.Г., изд. 2-е перераб. и доп. Москва, "Транспорт", 1975 г., стр. 408-412, 494-500, 502.1. Tunnels and subways. / Volkov V.P., Naumov S.N., Pirozhkova A.N., Khrapov V.G., ed. 2nd revised and add. Moscow, "Transport", 1975, pp. 408-412, 494-500, 502.
2. Патент РФ на полезную модель №104202, опубл. от 10.05.2011, Бюл. №13.2. RF patent for useful model No. 104202, publ. from 05/10/2011, Bul. No. 13.
3. Патент РФ №2505646, опубл. от 27.01.2014, Бюл. №3.3. RF patent No. 2505646, publ. from 27.01.2014, Bul. Number 3.
4. Патент на полезную модель РФ №141153, опубл. от 27.05.2014, Бюл. №15 - прототип.4. Patent for a useful model of the Russian Federation No. 141153, publ. from 05/27/2014, Bul. # 15 - prototype.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2019124926A RU2746610C1 (en) | 2019-08-05 | 2019-08-05 | Three-span metro station constructed in accordance with the open building method with an island passenger platform and single-track running tunnels |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2019124926A RU2746610C1 (en) | 2019-08-05 | 2019-08-05 | Three-span metro station constructed in accordance with the open building method with an island passenger platform and single-track running tunnels |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2746610C1 true RU2746610C1 (en) | 2021-04-16 |
Family
ID=75521297
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2019124926A RU2746610C1 (en) | 2019-08-05 | 2019-08-05 | Three-span metro station constructed in accordance with the open building method with an island passenger platform and single-track running tunnels |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2746610C1 (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1073385A1 (en) * | 1982-07-05 | 1984-02-15 | Ленинградский Ордена Ленина Институт Инженеров Железнодорожного Транспорта Им.Акад.В.Н.Образцова | Underground electric railway station |
RU103818U1 (en) * | 2011-02-02 | 2011-04-27 | Общество С Ограниченной Ответственностью "Спецметропроект" (Ооо "Спецметропроект") | STATION COMPLEX OF LITTLE LOCATION METRO |
KR20110130196A (en) * | 2010-05-27 | 2011-12-05 | 주식회사 코아이엔씨 | Subway platform and construct method of subway platform |
RU126037U1 (en) * | 2012-04-28 | 2013-03-20 | Общество с ограниченной ответственностью "Инженерное бюро Юркевича" | METRO STATION (DEVICE BY YURKEVICH P.B.) |
RU2505646C2 (en) * | 2012-03-30 | 2014-01-27 | Общество с ограниченной ответственностью "Инженерное бюро Юркевича" | Subway station and method of its construction (device and method named after yurkevich pb) |
RU141153U1 (en) * | 2014-01-23 | 2014-05-27 | Открытое Акционерное Общество "Метрогипротранс" (Оао "Метрогипротранс") | STATION COMPLEX OF LITTLE LOCATION METRO |
CN105003272B (en) * | 2015-07-26 | 2017-05-17 | 北京工业大学 | Reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways |
RU185555U1 (en) * | 2018-07-31 | 2018-12-11 | Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" (ОАО "НИПИИ "Ленметрогипротранс") | Three-vault underground station without side platforms |
-
2019
- 2019-08-05 RU RU2019124926A patent/RU2746610C1/en active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1073385A1 (en) * | 1982-07-05 | 1984-02-15 | Ленинградский Ордена Ленина Институт Инженеров Железнодорожного Транспорта Им.Акад.В.Н.Образцова | Underground electric railway station |
KR20110130196A (en) * | 2010-05-27 | 2011-12-05 | 주식회사 코아이엔씨 | Subway platform and construct method of subway platform |
RU103818U1 (en) * | 2011-02-02 | 2011-04-27 | Общество С Ограниченной Ответственностью "Спецметропроект" (Ооо "Спецметропроект") | STATION COMPLEX OF LITTLE LOCATION METRO |
RU2505646C2 (en) * | 2012-03-30 | 2014-01-27 | Общество с ограниченной ответственностью "Инженерное бюро Юркевича" | Subway station and method of its construction (device and method named after yurkevich pb) |
RU126037U1 (en) * | 2012-04-28 | 2013-03-20 | Общество с ограниченной ответственностью "Инженерное бюро Юркевича" | METRO STATION (DEVICE BY YURKEVICH P.B.) |
RU141153U1 (en) * | 2014-01-23 | 2014-05-27 | Открытое Акционерное Общество "Метрогипротранс" (Оао "Метрогипротранс") | STATION COMPLEX OF LITTLE LOCATION METRO |
CN105003272B (en) * | 2015-07-26 | 2017-05-17 | 北京工业大学 | Reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways |
RU185555U1 (en) * | 2018-07-31 | 2018-12-11 | Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" (ОАО "НИПИИ "Ленметрогипротранс") | Three-vault underground station without side platforms |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2510444C2 (en) | Three-arched underground station of column type and its erection methods (yurkevich device and methods) | |
WO2013147652A2 (en) | Metro station and method for constructing same | |
RU185555U1 (en) | Three-vault underground station without side platforms | |
US20200299982A1 (en) | Method for retrofitting a building using a lift system and component kit for performing the method | |
US6202798B1 (en) | Elevator entrance door assembly and method of installation | |
RU141153U1 (en) | STATION COMPLEX OF LITTLE LOCATION METRO | |
RU2715497C1 (en) | Method of erection and arrangement of a single-span underground metro station of an open method of performing works | |
RU2746610C1 (en) | Three-span metro station constructed in accordance with the open building method with an island passenger platform and single-track running tunnels | |
RU2692518C1 (en) | Method for constructing a three-span subway station of an open method of performing works with a lateral arrangement of passenger platforms and a double-track still tunnel | |
RU103817U1 (en) | STATION DEVELOPMENT METRO COMPLEX | |
RU126037U1 (en) | METRO STATION (DEVICE BY YURKEVICH P.B.) | |
RU2795446C1 (en) | Three-arched underground station of the closed method for the pylon-type works performance | |
RU2565314C2 (en) | Subway station erection method (yurkevich(s method) | |
RU2802893C1 (en) | Three-arch underground station of the closed column-type | |
RU2779168C1 (en) | Method for erecting a three-span metro station with a double-track middle station tunnel and side station halls with passenger platforms | |
RU2735506C1 (en) | Double-vaulted pylon subway station, constructed by trenchless method | |
RU146088U1 (en) | STATION COMPLEX OF THE METRO WITH ONE VESTIBULE SEPARATED BY THE FIRE PARTITION | |
RU2808273C1 (en) | Subway line in deep urban areas | |
RU2715493C1 (en) | Three-vault metro station of closed method for production of pylon type works | |
RU2795011C1 (en) | Single-arch underground station constructed using tunneling with side passenger platforms | |
Garavito-Bruhn et al. | Second Avenue Subway Project, New York: Refurbishment of an Existing Underground Station | |
RU2729474C1 (en) | Method for erection of three-vault subway station of closed method for production of pylon type works | |
CN215562792U (en) | Underground station with inverted station hall layer | |
RU2766876C1 (en) | Method for construction of escalator cascade complex for the entrance to the metro station, constructed using cut-and-cover method | |
Warrior et al. | Reading's new world-class railway station sets a UK benchmark |