RU2705674C2 - Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit - Google Patents

Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit Download PDF

Info

Publication number
RU2705674C2
RU2705674C2 RU2018105663A RU2018105663A RU2705674C2 RU 2705674 C2 RU2705674 C2 RU 2705674C2 RU 2018105663 A RU2018105663 A RU 2018105663A RU 2018105663 A RU2018105663 A RU 2018105663A RU 2705674 C2 RU2705674 C2 RU 2705674C2
Authority
RU
Russia
Prior art keywords
tongue
fence
sheet
soil
vertical
Prior art date
Application number
RU2018105663A
Other languages
Russian (ru)
Other versions
RU2018105663A (en
RU2018105663A3 (en
Inventor
Дмитрий Борисович Ядрихинский
Original Assignee
Дмитрий Борисович Ядрихинский
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Дмитрий Борисович Ядрихинский filed Critical Дмитрий Борисович Ядрихинский
Priority to RU2018105663A priority Critical patent/RU2705674C2/en
Publication of RU2018105663A publication Critical patent/RU2018105663A/en
Publication of RU2018105663A3 publication Critical patent/RU2018105663A3/ru
Application granted granted Critical
Publication of RU2705674C2 publication Critical patent/RU2705674C2/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

FIELD: construction.
SUBSTANCE: invention relates to construction, namely to tongue-and-groove enclosures or retaining walls, erected on sites with gravity free flow of ground water, in particular, and can be used to create sheet piling enclosures in trenches during repair works on main pipelines. Method of sheet piling erection during operations on main pipeline includes creation in soil of vertical guard elements in form of sheet piles with their arrangement along enclosed object in one row, series connection of adjacent vertical elements to each other by links, fixation of enclosure in soil and excavation of soil under protection guard to required depth, wherein vertical elements are made with length depending on depth of soil excavation. First, guide frame is assembled and fixed in place of sheet piling erection by racks clamping, installation of guide frame on them. Edging of enclosure is started with formation of one of angular sections of enclosure perimeter, adjoining vertical elements are arranged next to each other and interconnected detachably by means of locking elements "comb-holder" with closure of guard perimeter and forming perimeter of excavation by combination of vertical elements of row outside on perimeter of guide frame. Securing of enclosure in soil is performed by strictly vertical vibration dumping to dense soil, in front of which inner frame of required size is assembled, which is installed above axis of pipe. Required length of vertical elements depending on depth of recess is provided by their build-up in vertical, which is performed using dismountable connection by means of eye lugs fixed on sheet tongues, fixed by pin with cotter pins.
EFFECT: technical result consists in improvement of sheet piling safety, simplification of sheet piling assembly and disassembly.
2 cl, 11 dwg

Description

Группа изобретений относится к строительству, а именно к шпунтовым ограждениям или подпорным стенкам, возводимым на площадках с безнапорным током грунтовых вод, в частности, и может использоваться для создания шпунтового ограждения в котлованах при проведении ремонтных работ на магистральных трубопроводах.The group of inventions relates to construction, namely to sheet piling or retaining walls, erected on sites with pressureless groundwater flow, in particular, and can be used to create a sheet piling in pits during repairs on main pipelines.

Известен способ формирования шпунтового ограждения, заключающийся в том, что погружают в грунт до проектной отметки на расстоянии друг от друга сваи для получения шпунтового ограждения или подпорной стенки, причем для обеспечения регулируемого истечения безнапорного горизонта грунтовых вод через шпунтовое ограждение или подпорную стенку указанные сваи в виде тел вращения с наконечником в нижней части и с винтовым шнеком на наружной поверхности ввинчивают поперек направления тока грунтовых вод для истечения грунтовых вод через зоны между смежно расположенными сваями, а между указанными сваями дополнительно погружают сваи, выполненные с винтовым шнеком, которым разбуриваются данные межсвайные зоны, и выбранный грунт обратным вращением шнека заменяют в межсвайных зонах фильтрующим элементом (патент RU №2283921, кл. E02D 5/20, 20.09.2006).A known method of forming a sheet piling is that the piles are immersed in the ground to the design mark at a distance from each other to obtain a sheet piling or retaining wall, and to ensure the regulated flow of the pressureless groundwater horizon through the sheet piling or retaining wall, said piles in the form rotation bodies with a tip in the lower part and with a screw screw on the outer surface are screwed across the direction of the groundwater flow for the outflow of groundwater through the m Piles adjacent to each other, and between the indicated piles, additionally immersed are piles made with a screw auger, which drill these inter-pile zones, and the selected soil is replaced by a reverse filter element in the inter-pile zones by reverse rotation of the screw (patent RU No. 2283921, class E02D 5/20, 20.09 .2006).

Из этого же патента известно шпунтовое ограждение для обустройства котлована, содержащее ввинченные в грунт до проектной отметки на расстоянии друг от друга сваи в виде тел вращения с наконечником в нижней части и с винтовым шнеком на наружной поверхности.From the same patent, a tongue-and-groove fence for arranging a pit is known, containing piles screwed into the ground to the design mark at a distance from each other in the form of bodies of revolution with a tip in the lower part and with a screw screw on the outer surface.

Данный способ и устройство для его реализации позволяют сохранить естественный режим тока грунтовых вод при возведении шпунтового ограждения или подпорной стенки для сохранения гидрологического режима и характеристик грунтов на прилегающих к ограждению территориях. Однако возведение такого шпунтового ограждения требует использования сложной техники и трудоемко в полевых условиях при проведении ремонтных работ на магистральном трубопроводе, что сужает область использования данного способа и устройства для его реализации.This method and device for its implementation allows you to maintain the natural flow of groundwater during the construction of a sheet pile fence or retaining wall to maintain the hydrological regime and soil characteristics in the territories adjacent to the fence. However, the construction of such a sheet piling requires the use of sophisticated equipment and is laborious in the field when carrying out repairs on the main pipeline, which narrows the scope of use of this method and device for its implementation.

Известен способ возведения шпунтового ограждения при проведении работ на магистральном трубопроводе, включающий сборку направляющего каркаса и фиксацию на месте возведения шпунтового ограждения путем забивки стоек, установку на них направляющего каркаса и забивку шпунтовых свай ограждения с замыканием их в плане (авторское свидетельство SU №1030461, кл. E02D 7/02, 23.07.1983).There is a method of erecting a sheet pile fence during work on the main pipeline, which includes assembling the guide frame and fixing it at the place of erecting the sheet pile fence by hammering up the racks, installing a guide frame on them and driving the sheet pile piles of the fence with them locked in plan (copyright certificate SU No. 1030461, class E02D 7/02, 07.23.1983).

Из этого же авторского свидетельства известно шпунтовое ограждение для обустройства котлована, содержащее стойки, направляющий каркас и шпунтовые сваи.From the same copyright certificate, a sheet pile fence for arranging a foundation pit is known, containing racks, a guide frame and sheet piles.

Однако необходимость прикреплять направляющие стойки к направляющему каркасу перед его транспортировкой на расстоянии друг от друга, кратном расстоянию между замками, приводит к усложнению конструкции шпунтового ограждения и снижению производительности при реализации описанного выше способа возведения шпунтового ограждения.However, the need to attach the guide racks to the guide frame before transporting it at a distance from each other, a multiple of the distance between the locks, leads to a complication of the construction of the sheet pile fence and a decrease in performance when implementing the method for erecting the sheet pile fence described above.

Известен способ выполнения ограждающей стенки в грунте, представленный в п. РФ №2095520 по кл. E02D 29/00, 5/20, з. 11.06.96, оп. 10.11.1997 г.A known method of performing the enclosing wall in the soil, presented in p. RF №2095520 class. E02D 29/00, 5/20, c. 06/11/96, op. November 10, 1997

Известный способ заключается в следующем.A known method is as follows.

Способ выполнения ограждающей стенки в грунте, включающий создание в грунте вертикальных элементов ограждения с расположением их вдоль ограждаемого объекта рядами на расстоянии в ряду друг от друга и смещением в каждом ряду относительно элементов смежного ряда, последовательное соединение смежных вертикальных элементов смежных рядов связями и выемку грунта под защитой ограждения до требуемой глубины, отличающийся тем, что вертикальные элементы в каждом последующем ряду смещают относительно вертикальных элементов предыдущего ряда на величину, равную 0,2 0,8 шага вертикальных элементов, причем вертикальные элементы выполняют длиной Н, определяемой зависимостью h≅Н≅3h, где h требуемая глубина выемки грунта, причем при выполнении вертикальных элементов длиной, равной требуемой глубине выемки грунта, связи выполняют до глубины, равной длине вертикальных элементов, а при выполнении вертикальных элементов длиной, большей требуемой глубины выемки грунта, связи выполняют до глубины, превышающей требуемую глубину выемки грунта на (0,2 2,0) h, при этом расстояние в свету между вертикальными элементами в ряду принимают равным (0,5 10) d, а расстояние между рядами в свету равным (1 5) d, где d наибольший размер поперечного сечения вертикального элемента.A method of performing a wall in the ground, including the creation of vertical fence elements in the ground with their arrangement along rows to be fenced in rows at a distance in a row from each other and offset in each row relative to elements of an adjacent row, sequential connection of adjacent vertical elements of adjacent rows by ties and excavation under protection of the fence to the required depth, characterized in that the vertical elements in each subsequent row are displaced relative to the vertical elements of the previous row and a value equal to 0.2 0.8 steps of vertical elements, and vertical elements perform a length H, determined by the dependence h≅Н≅3h, where h is the required depth of excavation, and when performing vertical elements with a length equal to the required depth of excavation, communication perform to a depth equal to the length of the vertical elements, and when performing vertical elements with a length greater than the required depth of excavation, communications are performed to a depth exceeding the required depth of excavation by (0.2 2.0) h, while the distance in the light between vert The ikalny elements in the row are taken equal to (0.5 10) d, and the distance between the rows in the light is equal to (1 5) d, where d is the largest cross-sectional dimension of the vertical element.

2. Способ по п. 1, отличающийся тем, что связи в связных грунтах выполняют с разрывами по высоте, причем высота разрывов составляет (0,5 3) d.2. The method according to p. 1, characterized in that the bonds in cohesive soils are performed with discontinuities in height, the height of the discontinuities being (0.5 3) d.

3. Способ по п. 1 или 2, отличающийся тем, что перед выемкой грунта вертикальные элементы всех рядов объединяют поверху горизонтальным шапочным элементом.3. The method according to p. 1 or 2, characterized in that before the excavation of the vertical elements of all rows are combined on top with a horizontal cap element.

4. Способ по пп. 1 3, отличающийся тем, что по мере выемки грунта противолежащие участки ограждения объединяют распорками.4. The method according to PP. 1 to 3, characterized in that as the excavation of the soil opposite sections of the fence combine struts.

5. Способ по пп. 1 3, отличающийся тем, что до выемки грунта и/или в процессе выемки грунта ограждение заанкеривают в грунте посредством анкерных устройств.5. The method according to PP. 1 to 3, characterized in that prior to excavation and / or during excavation, the fence is anchored in the soil by means of anchor devices.

К сожалению, подробно, само ограждение в патенте не описано. Из описания недостатком известного способа и создаваемого с его помощью ограждения представляется сложность и ненадежность конструкции и трудоемкость технологии ее изготовления, обусловленные необходимостью выдерживания определенных расстояний между элементами в ряду и между рядами, очень сильно зависящих от особенностей грунта, выбора длины вертикальных элементов. К тому же ограждение является неразборным, т.к. связи между вертикальными элементами выполняются силикатизацией массива грунта между ними или путем использования цементного раствора либо химзакреплением.Unfortunately, in detail, the fence itself is not described in the patent. From the description, the disadvantage of the known method and the fencing created with its help is the complexity and unreliability of the design and the complexity of the technology for its manufacture, due to the need to maintain certain distances between the elements in the row and between the rows, very much depending on the characteristics of the soil, the choice of the length of the vertical elements. In addition, the fence is not separable, because the bonds between the vertical elements are carried out by silicatization of the soil mass between them or by using a cement mortar or chemical fixing.

Известны способ создания шпунтового ограждения и само шпунтовое ограждение для котлована, представленные в п. РФ №2530142 по кл. E02D 17/04, з. 30.11.2012 г, оп. 10.10.2014 г..A known method of creating a sheet piling and sheet piling for the foundation pit, presented in paragraph. Of the Russian Federation No. 2530142 according to class. E02D 17/04, z. November 30, 2012, op. 10/10/2014 g.

Известные способ и шпунтовое ограждение защищены следующей формулой.The known method and sheet piling are protected by the following formula.

1. Способ возведения шпунтового ограждения при проведении работ на магистральном трубопроводе, включающий сборку направляющего каркаса и фиксацию на месте возведения шпунтового ограждения путем забивки стоек, установку на них направляющего каркаса и забивку шпунтовых свай ограждения с замыканием их в плане, отличающийся тем, что предварительно вырывают ремонтный котлован и магистральный трубопровод вскрывают сверху на глубину не менее 0,6 м от нижней образующей трубы магистрального трубопровода до дна котлована, причем котлован вырывают по длине, превышающей длину вырезаемого участка магистрального трубопровода не менее чем на 2 м, ремонтный котлован обваловывают уплотненной глиной на внешнему периметру, в углах ремонтного котлована устанавливают четыре стойки с выступающей над бровкой ремонтного котлована частью не менее чем 15 см, в отверстия стоек вставляют удерживающие пальцы и затем устанавливают на стойки двутавровые балки направляющего каркаса, после чего вдоль двутавровых балок между стенками ремонтного котлована и двутавровой балкой в грунт задавливают шпунтовые сваи с формированием по периметру направляющего каркаса из двутавровых балок шпунтового ограждения, причем часть шпунтовых свай оставляют над бровкой ремонтного котлована не менее чем на 15 см.1. A method of erecting a sheet pile fence while carrying out work on the main pipeline, including assembling the guide frame and fixing it at the place of erecting the sheet pile fence by hammering up the racks, installing a guide frame on them and driving the sheet pile of the fence with locking them in plan, characterized in that they are previously torn out the repair pit and the main pipeline are opened from above to a depth of at least 0.6 m from the lower generatrix pipe of the main pipeline to the bottom of the pit, and the excavation is torn out length of at least 2 m longer than the length of the cut-out section of the main pipeline, the repair pit is surrounded with compacted clay on the outer perimeter, four racks are installed in the corners of the repair pit with at least 15 cm protruding above the edge of the repair pit, and inserted into the openings of the racks holding fingers and then install the I-beams of the guide frame on the racks, after which, along the I-beams between the walls of the repair pit and the I-beam, push the w untovye piles to form a frame around the perimeter of the guide of the I-beam sheet piling, sheet piling and the part left over the edge of the parapet repair excavation by at least 15 cm.

2. Шпунтовое сборно-разборное ограждение для обустройства котлована, содержащее стойки, направляющий каркас и шпунтовые сваи, отличающееся тем, что оно содержит четыре стойки, установленные по углам ремонтного котлована, направляющий каркас, состоящий из четырех двутавровых балок с отверстиями в стенке, через которые двутавровые балки надеты на стойки, в стойках выполнены отверстия, в которые вставлены удерживающие пальцы для фиксации двутавровых балок на заданной высоте, шпунтовые сваи вдавлены в грунт и расположены вдоль двутавровых балок вокруг направляющего каркаса с формированием замкнутого шпунтового ограждения.2. A tongue-and-groove collapsible fence for arranging a pit, comprising racks, a guide frame and sheet piles, characterized in that it contains four racks installed at the corners of the repair pit, a guide frame consisting of four I-beams with holes in the wall through which I-beams are mounted on racks, holes are made in the racks into which holding fingers are inserted to fix the I-beams at a given height, sheet piles are pressed into the ground and are located along the I-beams Alok around the guide frame with the formation of a closed sheet piling.

3. Шпунтовое сборно-разборное ограждение по п. 2, отличающееся тем, что стойки выполнены с тремя рядами отверстий под удерживающие пальцы.3. Sheet pile collapsible fence according to claim 2, characterized in that the racks are made with three rows of holes for holding the fingers.

4. Шпунтовое сборно-разборное ограждение по п. 2, отличающееся тем, что в отверстия в стенке двутавровых балок вварены направляющие втулки.4. Sheet pile collapsible fence according to claim 2, characterized in that the guide bushings are welded into the holes in the wall of the I-beams.

5. Шпунтовое сборно-разборное ограждение по п. 2, отличающееся тем, что к полкам двутавровых балок с их наружной стороны приварены проушины для строповки шпунтовых свай.5. A tongue-and-groove collapsible fence according to claim 2, characterized in that lugs are welded to the shelves of the I-beams from their outer side for slinging the sheet piles.

Недостатком известных средств является сложность и ненадежность возведения и разборки ограждения при значительной длине шпунтовых свай, поскольку сваи могут быть лишь пристропованы к направляющему каркасу. Кроме того, шпунтовое ограждение, которое не имеет замков, погружаясь по пути наименьшего сопротивления, сильно деформируется (шпунт изгибает, выворачивает, скручивает и загибает), что приводит к невозможности его качественного повторного применения. Фактически шпунт превращается в металлолом.A disadvantage of the known means is the complexity and unreliability of the construction and disassembly of the fence with a significant length of sheet piles, since piles can only be slinged to the guide frame. In addition, the sheet pile fence, which has no locks, plunging along the path of least resistance, is severely deformed (the sheet pile bends, twists, twists and bends), which makes it impossible to use it qualitatively. In fact, the tongue turns into scrap metal.

Данный тип ограждения не гарантирует безопасное нахождение персонала на дне котлована при проведении работ (срок непрерывных работ до 72 часов) и прорыв жидкого грунта может в любой момент привести к -несчастному случаю.This type of fencing does not guarantee the safe location of personnel at the bottom of the pit during work (the period of continuous work is up to 72 hours) and the breakthrough of liquid soil can at any time lead to an accident.

При этом вышеописанный в п. РФ №2530142 известный способ включает в себя предварительную выборку грунта ремонтного котлована, что является весьма далеким по технической сущности от заявляемого способа, поэтому в качестве прототипа к способу выбран способ возведения шпунтового ограждения, описанный в вышепредставленном патенте №2095520.At the same time, the known method described in paragraphs of the Russian Federation No. 2530142 includes preliminary sampling of the soil of the repair pit, which is very far from the technical essence of the proposed method, therefore, as a prototype of the method, the tongue-and-groove construction method described in the above-described patent No. 2095520 is selected.

Вышеописанное известное из патента №2530142 шпунтовое ограждение выбрано в качестве прототипа к заявляемой конструкции шпунтового ограждения. При этом, практически все вышеуказанные типы ограждений не являются шпунтовыми, т.к. между элементами ограждения отсутствуют замковые соединения.The above-described sheet pile fence known from the patent No. 2530142 is selected as a prototype for the claimed design of the sheet piling. Moreover, almost all of the above types of fencing are not sheet pile, because there are no lock connections between the fence elements.

Задачей изобретения является повышение надежности шпунтового ограждения при упрощении процесса возведения и разборки шпунтового ограждения.The objective of the invention is to increase the reliability of the sheet piling while simplifying the process of erecting and disassembling the sheet piling.

Поставленная задача решается тем, что:The problem is solved in that:

- в способе возведения шпунтового ограждения при проведении работ на магистральном трубопроводе, включающем создание в грунте вертикальных элементов ограждения в виде шпунтовых свай с расположением их вдоль ограждаемого объекта в один ряд, последовательное соединение смежных вертикальных элементов между собой связями, закрепление ограждения в грунте и выемку грунта под защитой ограждения до требуемой глубины, при этом вертикальные элементы выполняют длиной, зависящей от глубины выемки грунта, СОГЛАСНО ИЗОБРЕТЕНИЮ, вначале производят сборку направляющего каркаса и фиксацию его на месте возведения шпунтового ограждения путем забивки стоек, установку на них направляющего каркаса, монтаж ограждения начинают с формирования одной из угловых секций периметра ограждения, смежные вертикальные элементы располагают рядом друг с другом и соединяют между собой с помощью сборно-разборных замковых элементов «гребень-обойма» с замыканием периметра ограждения и выполняют формирование периметра котлована путем объединения вертикальных элементов ряда снаружи по периметру направляющего каркаса, закрепление ограждения в грунте производят строго вертикальным вибропогружением до плотного грунта, перед которым собирают внутреннюю рамку необходимого размера, которую выставляют над осью трубы, необходимую длину вертикальных элементов в зависимости от глубины выемки обеспечивают их наращиванием по вертикали, которое выполняют, используя разборное соединение с помощью закрепленных на шпунтовых панелях фиксирующих проушин пальцем со шплинтами.- in the method of erecting a sheet piling during work on the main pipeline, including the creation of vertical fence elements in the soil in the form of sheet piles with the arrangement of them along the enclosed object in a row, sequential connection of adjacent vertical elements with each other, fixing the fence in the ground and excavation under the protection of the fence to the required depth, while the vertical elements are performed in length, depending on the depth of excavation, ACCORDING TO THE INVENTION, first producing the assembly of the guide frame and its fixation at the place of erection of the sheet piling by hammering up the racks, the installation of the guide frame on them, the installation of the fence begin with the formation of one of the corner sections of the perimeter of the fence, adjacent vertical elements are placed next to each other and are interconnected using collapsible locking elements "comb-holder" with the closure of the perimeter of the fence and perform the formation of the perimeter of the pit by combining the vertical elements of the row outside the perimeter of eg the framing frame, the fence is secured in the soil by strictly vertical vibroabsorption to a dense soil, before which an internal frame of the required size is assembled, which is set above the pipe axis, the necessary length of the vertical elements depending on the depth of the recess provide them with vertical extension, which is performed using a collapsible joint with the help of fixing eyes fixed on tongue-and-groove panels with a finger and cotter pins.

- в шпунтовом сборно-разборном ограждении для обустройства котлована при проведении работ на магистральном трубопроводе, содержащем четыре стойки, установленные по углам ремонтного котлована, прикрепленный к ним сверху направляющий прямоугольный каркас из четырех балок, и шпунтовые сваи, которые погружены в грунт и расположены вдоль балок направляющего каркаса вокруг него с формированием замкнутого шпунтового ограждения, СОГЛАСНО ИЗОБРЕТЕНИЮ, смежные шпунтовые сваи ограждения соединены между собой с помощью замкового соединения типа «гребень-обойма», при этом они выполнены в виде шпунтовых панелей с возможностью наращивания их по высоте путем пристыковки к ним дополнительных профилей различной длины с необходимой разбежкой мест стыка с помощью замковых элементов, выполненных из двух частей: нижней и верхней, закрепленных соответственно на нижней и верхней соединяемых сваях, и имеющих конструкцию нижней части из двух соосно расположенных втулок из толстостенной стальной трубы с фасками, выполненных в виде сдвоенной проушины, прикрепляемой посредством сварки к усиленной части полки нижнего элемента составной панели, а конструкцию верхней части - из одной втулки из аналогичной толстостенной трубы с фасками, выполненной в виде одинарной проушины, прикрепляемой посредством сварки к усиленной части полки верхнего элемента составной панели и соединяемых между собой совмещением отверстий в указанных проушинах и вставлением в них круглого пальца, фиксируемого посредством шплинта с обеих его сторон, вблизи верхних кромок стенок нижней и верхней части составных панелей выполнены прямоугольные отверстия для возможности извлечения шпунта с помощью грузоподъемного механизма, служащие также отверстиями для стопора, при этом торцевые шпунтовые панели над трубопроводом имеют стандартные стенки и расширенную полку, в которой в нижней части выполнен вырез в форме полукруга и к торцу приварена металлическая пластина для исключения повреждений изоляции на трубопроводе, сама полка выполнена из двух пластин, сваренных между собой металлической вставкой внахлест с внешней стороны шпунта, в верхней части торцевого шпунта приварена между двумя пластинами небольшая пластина для удобства работы вибропогружателя, соединение верхней и нижней частей торцевых шпунтов также производится с помощью замковых соединений.- in a tongue-and-groove collapsible fence to equip the pit during work on the main pipeline, which contains four racks installed at the corners of the repair pit, a guide rectangular frame of four beams attached to them from above, and sheet piles that are immersed in the ground and located along the beams guide frame around it with the formation of a closed sheet piling, ACCORDING TO THE INVENTION, adjacent sheet piles of the fence are interconnected using a lock connection type and “comb-holder”, while they are made in the form of tongue-and-groove panels with the possibility of increasing them in height by docking additional profiles of various lengths to them with the necessary separation of the joints with the help of locking elements made of two parts: lower and upper, respectively fixed on the lower and upper connected piles, and having the construction of the lower part of two coaxially arranged bushings of thick-walled steel pipe with chamfers, made in the form of a double eyelet, attached by welding to the mustache part of the shelf of the lower element of the composite panel, and the design of the upper part of one sleeve of the same thick-walled pipe with chamfers, made in the form of a single eyelet, fastened by welding to the reinforced part of the shelf of the upper element of the composite panel and interconnected by matching holes in these eyes and by inserting a round finger into them, fixed by means of a cotter pin on both sides, rectangular holes are made near the upper edges of the walls of the lower and upper parts of the composite panels for the possibility of removing the tongue with the help of a lifting mechanism, which also serve as holes for the stopper, while the tongue and groove panels above the pipeline have standard walls and an expanded shelf in which a semicircular cutout is made in the lower part and a metal plate is welded to the end to prevent insulation damage on the pipeline, the shelf itself is made of two plates welded together by a metal insert with an overlap on the outside of the tongue, in the upper part of the end tongue is welded between two small plates for the convenience of the vibrator, the connection of the upper and lower parts of the tongue and grooves is also carried out using lock joints.

В заявляемом способе выполнение вначале сборки направляющего каркаса и фиксации его на месте возведения шпунтового ограждения путем забивки стоек с установкой на них направляющего каркаса в совокупности с монтажом ограждения, начинающимся с формирования одной из угловых секций периметра ограждения упрощает технологию последующего возведения ограждения; расположение смежных вертикальных элементов рядом друг с другом и соединение их между собой разъемно с помощью замковых элементов «гребень-обойма» с замыканием периметра ограждения при выполнении формирования периметра котлована путем объединения вертикальных элементов ряда снаружи по периметру направляющего каркаса обеспечивает его прочность и надежность; закрепление ограждения в грунте строго вертикальным вибропогружением до плотного грунта, перед которым собирают внутреннюю рамку необходимого размера, которую выставляют над осью трубы, позволяет избежать нарушения изоляции трубопровода при его ремонте, что также повышает надежность способа; наращивание по вертикали необходимой длины вертикальных элементов в зависимости от глубины выемки, выполняемое с использованием разборного соединения с помощью закрепленных на шпунтовых панелях фиксирующих проушин пальцем со шплинтами, упрощает технологию сборки и разборки шпунтового ограждения.In the inventive method, the first implementation of the assembly of the guide frame and fixing it at the place of construction of the sheet piling by clogging the racks with the installation of the guide frame in combination with the installation of the fence, starting with the formation of one of the corner sections of the perimeter of the fence simplifies the technology of the subsequent construction of the fence; the location of adjacent vertical elements next to each other and connecting them together using lock elements "comb-holder" with the closure of the perimeter of the fence when performing the formation of the perimeter of the pit by combining the vertical elements of the row outside the perimeter of the guide frame ensures its strength and reliability; securing the enclosure in the soil with strictly vertical vibration absorption to a dense soil, in front of which an internal frame of the required size is assembled, which is set above the axis of the pipe, to avoid violation of the pipeline insulation during its repair, which also increases the reliability of the method; vertical extension of the required length of vertical elements depending on the depth of the excavation, performed using a collapsible connection using the fixing eyes secured to the tongue and groove panels by means of a finger and cotter pins, simplifies the technology of assembly and disassembly of the tongue and groove fence.

В шпунтовом ограждении выполнение шпунтовых свай в виде более широких шпунтовых панелей, соединенных между собой замковым соединением типа «гребень-обойма» и выполненных с возможностью их наращивания по высоте путем пристыковки их друг к другу с необходимой «разбежкой» мест стыка, делает ограждение более надежным и, одновременно, облегчает их сборку и разборку. Наращивание шпунтовых панелей по длине с помощью замковых элементов, состоящих из двух частей - нижней и верхней, приваренных соответственно к усиленным стальными пластинами частям нижней и верхней сочленяемых панелей, и выполненных из толстостенной круглой трубы с фасками в виде сдвоенной и одинарной проушин, соединяемых между собой с помощью круглого пальца, фиксируемого с двух сторон с помощью шплинта, в совокупности с выполнением вблизи верхних кромок стенок нижней и верхней части составных панелей прямоугольных отверстий для возможности извлечения шпунта с помощью грузоподъемного механизма и выполнением торцевых панелей над трубопроводом с расширенной полкой из двух пластин с вырезом в форме полукруга в нижней части и с приваренной к торцу усиливающей металлической пластиной, сваренных между собой металлической вставкой внахлест с внешней стороны шпунта, при соединении верхней и нижней частей торцевых шпунтов с помощью замковых соединений и наличии в верхней части торцевого шпунта приваренной между двумя пластинами небольшой пластины для удобства работы вибропогружателя, в совокупности с соединением верхней и нижней частей торцевых шпунтов с помощью замковых соединений также обеспечивает более надежную конструкцию и удобную сборку и разборку шпунтового ограждения.In a sheet piling, the implementation of sheet piles in the form of wider sheet piles, interconnected by a lock connection of the "comb-holder" type and made with the possibility of increasing them in height by docking them to each other with the necessary "separation" of the joints, makes the fence more reliable and, at the same time, facilitates their assembly and disassembly. The tongue-and-groove extension along the length with the help of locking elements consisting of two parts - the lower and the upper, respectively welded to the parts of the lower and upper jointed panels reinforced with steel plates, and made of a thick-walled round pipe with chamfers in the form of double and single eyes, interconnected with the help of a round finger, fixed on both sides by means of a cotter pin, in conjunction with the execution of near the upper edges of the walls of the lower and upper parts of the composite panels of rectangular holes for the possibility of extracting the tongue with the help of a lifting mechanism and making end panels above the pipeline with an expanded shelf of two plates with a semicircular cutout in the lower part and with a reinforcing metal plate welded to the end face, welded together with a metal insert with an overlap on the outer side of the tongue, when connecting the upper and the lower parts of the end tongues with the help of locking joints and the presence in the upper part of the end tongue of a small plate welded between two plates for the convenience of vibrating The loader, in conjunction with the connection of the upper and lower parts of the end tongues with the help of lock joints, also provides a more reliable design and convenient assembly and disassembly of the sheet piling.

Технический результат - повышение надежности конструкции шпунтового ограждения, упрощение процесса его сборки и разборки.The technical result is to increase the reliability of the construction of the sheet pile fence, simplifying the process of its assembly and disassembly.

Заявляемый способ возведения сборно-разборного шпунтового соединения обладает новизной в сравнении с прототипом, отличаясь от него такими существенными признаками, как выполнение вначале сборки направляющего каркаса и фиксации его на месте возведения шпунтового ограждения путем забивки стоек, установка на них направляющего каркаса, начало монтажа ограждения с формирования одной из угловых секций периметра ограждения, расположение смежных вертикальных элементов рядом друг с другом и соединение смежных вертикальных элементов между собой разъемно с помощью замковых элементов «гребень-обойма» с замыканием периметра ограждения, выполнение формирования периметра котлована путем объединения вертикальных элементов ряда снаружи по периметру направляющего каркаса, закрепление ограждения в грунте посредством строго вертикального вибропогружения до плотного грунта, перед которым собирают внутреннюю рамку необходимого размера, которую выставляют над осью трубы, обеспечение необходимой длины вертикальных элементов в зависимости от глубины выемки их наращиванием по вертикали, выполняемым с использованием разъемного соединения с помощью закрепленных на шпунтовых панелях фиксирующих проушин пальцем со шплинтами, обеспечивающими в совокупности достижение заданного результата.The inventive method of construction of a collapsible tongue-and-groove joint has a novelty in comparison with the prototype, differing from it in such essential features as the first assembly of the guide frame and its fixation at the place of construction of the tongue-and-groove fence by driving up the racks, the installation of the guide frame on them, the beginning of the installation of the fence with the formation of one of the corner sections of the perimeter of the fence, the location of adjacent vertical elements next to each other and the connection of adjacent vertical elements between the wallpaper is detachable with the help of “comb-clip” locking elements with closing the perimeter of the fence, forming the pit perimeter by combining the vertical elements of the row outside the perimeter of the guide frame, securing the fence in the ground by means of strictly vertical vibration immersion to dense soil, in front of which the internal frame of the required size is assembled , which is set over the axis of the pipe, providing the necessary length of vertical elements depending on the depth of the recess by building them along verticals performed using a detachable connection with the help of fixed eyelets secured to the tongue and groove panels by a finger with cotter pins, which together ensure the achievement of a given result.

Заявляемое шпунтовое сборно-разборное ограждение обладает новизной в сравнении с прототипом, отличаясь от него такими существенными признаками как соединение смежных шпунтовых свай между собой с помощью замкового соединения типа «гребень-обойма», выполнение шпунтовых свай в виде шпунтовых панелей с возможностью наращивания их по высоте путем пристыковки к ним дополнительных профилей различной длины с необходимой разбежкой мест стыка с помощью замковых элементов, выполнение замковых элементов из двух частей: нижней и верхней, закрепленных соответственно на нижней и верхней соединяемых сваях и имеющих конструкцию нижней части из двух соосно расположенных втулок из толстостенной стальной трубы с фасками, выполненных в виде сдвоенной проушины, прикрепляемой посредством сварки к усиленной части полки нижнего элемента составной панели с применением усиливающих стальных пластин, а конструкции верхней части - из одной втулки из аналогичной толстостенной трубы с фасками, выполненной в виде одинарной проушины, прикрепляемой посредством сварки к усиленной части полки верхнего элемента составной панели с применением усиливающих стальных пластин, соединение между собой проушин совмещением отверстий в указанных проушинах и вставлением в них круглого пальца, фиксируемого посредством шплинта с обеих его сторон, выполнение вблизи верхних кромок стенок нижней и верхней части составных панелей прямоугольных отверстий для возможности извлечения шпунта с помощью грузоподъемного механизма, служащих также отверстиями для стопора, выполнение торцевых шпунтовых панелей над трубопроводом со стандартными стенками и расширенной полки, в которой в нижней части выполнен вырез в форме полукруга и к торцу приварена металлическая пластина для исключения повреждений изоляции на трубопроводе, выполнение указанной полки из двух пластин, сваренных между собой металлической вставкой внахлест с внешней стороны шпунта, наличие в верхней части торцевого шпунта приваренной между двумя пластинами небольшой пластины для удобства работы вибропогружателя, соединение верхней и нижней частей торцевых шпунтов с помощью замковых соединений, обеспечивающими в совокупности достижение заданного результата.The inventive tongue-and-groove collapsible fence has a novelty in comparison with the prototype, differing from it by such significant features as the connection of adjacent tongue-and-groove piles with each other using the lock connection of the "comb-holder", the design of the tongue-and-groove piles in the form of tongue-and-groove panels with the possibility of increasing them in height by attaching additional profiles of various lengths to them with the necessary separation of the joints with the help of locking elements, making the locking elements of two parts: lower and upper, secured connected respectively on the lower and upper connected piles and having the construction of the lower part of two coaxially arranged bushings of a thick-walled steel pipe with bevels, made in the form of a double eyelet, attached by welding to the reinforced part of the shelf of the lower element of the composite panel using reinforcing steel plates, and the design the upper part - from one sleeve from a similar thick-walled pipe with chamfers, made in the form of a single eyelet, attached by welding to the reinforced part of the shelf an element of a composite panel using reinforcing steel plates, connecting the eyes to each other by combining the holes in these eyes and inserting a round finger into them, fixed by means of a cotter pin on both sides, making rectangular holes near the upper edges of the walls of the lower and upper parts of the composite panels to allow extraction tongue and groove using a lifting mechanism, which also serve as holes for the stopper, the execution of the tongue and groove end panels above the pipeline with a standard wall and an expanded shelf, in which a semicircular cutout is made in the lower part and a metal plate is welded to the end to prevent insulation damage on the pipeline, the specified shelf is made of two plates welded together with a metal insert overlapping from the outside of the tongue, the presence in the upper part end sheet pile welded between two plates of a small plate for the convenience of the vibrator, the connection of the upper and lower parts of the sheet piles with locking joints, providing in okupnosti achieve the desired result.

Несмотря на то, что некоторые признаки заявляемого способа, такие как сборка направляющего каркаса и фиксация его на месте возведения шпунтового ограждения путем забивки стоек и установка на них направляющего каркаса, известны из п. РФ №2530142, их совместное использование с новыми вышеуказанными отличительными признаками заявляемого способа, дающими возможность получить новый технический результат - повышение надежности ограждающей конструкции при упрощении технологии сборки и разборки шпунтового ограждения - позволяет заявителю считать заявляемый способ соответствующим критерию «изобретательский уровень».Despite the fact that some features of the proposed method, such as assembling the guide frame and fixing it at the place of erection of the sheet piling by driving the racks and installing the guide frame on them, are known from the Russian Federation No. 2530142, their combined use with the new above distinctive features of the claimed ways that provide the opportunity to obtain a new technical result - improving the reliability of the enclosing structure while simplifying the technology of assembly and disassembly of sheet piling - allows the applicant to consider It is relevant to the claimed method the criterion "Inventive Level".

В отношении заявляемого шпунтового ограждения заявителю неизвестны технические решения, обладающие указанными отличительными признаками, обеспечивающими в совокупности достижение заданного результата, поэтому он также считает, что заявляемое шпунтовое ограждение соответствует критерию «изобретательский уровень».In relation to the claimed sheet piling, the applicant does not know the technical solutions possessing the indicated distinguishing features, which together ensure the achievement of the desired result, therefore he also considers that the declared sheet piling meets the criterion of “inventive step”.

Как заявляемый способ, так и возводимое с его помощью шпунтовое ограждение, могут использоваться для создания шпунтового ограждения в котлованах при проведении ремонтных работ на магистральных трубопроводах и потому соответствуют критерию «промышленная применимость».Both the claimed method and the sheet piling constructed with its help can be used to create a sheet piling in pits during repairs on main pipelines and therefore meet the criterion of "industrial applicability".

Изобретения иллюстрируются чертежами, где представлены на:The invention is illustrated by drawings, which are presented on:

- фиг. 1 - общий вид шпунтового ограждения;- FIG. 1 - General view of the sheet piling;

- фиг. 2 - вид верхней и нижней частей шпунтовой панели;- FIG. 2 is a view of the upper and lower parts of the tongue-and-groove panel;

- фиг. 3 - вид стыкуемых частей шпунтовой панели и вид замка в сборе;- FIG. 3 - view of the joined parts of the tongue-and-groove panel and the type of lock assembly;

- фиг. 4 - вид стыкованных частей шпунтовой панели в продольном разрезе;- FIG. 4 is a longitudinal sectional view of the joined parts of a tongue-and-groove panel;

- фиг. 5 - вид торцевой панели;- FIG. 5 is a view of the end panel;

- фиг. 6 - вид сверху скрепленных между собой соседних панелей углового соединения и рядовой панели;- FIG. 6 is a plan view of adjacent adjacent corner connection panels and an ordinary panel;

- фиг. 7 - вид спереди нижнего ряда шпунтов;- FIG. 7 is a front view of the lower row of dowels;

- фиг. 8 - вид сверху шпунтовых панелей верхнего ряда с вынутыми торцевыми панелями и очередностью выемки соседних с торцевыми панелей a; b, c, d;- FIG. 8 is a top view of the tongue-and-groove panels of the upper row with the end panels removed and the order of recessing adjacent to the end panels a; b, c, d;

- фиг. 9 - погружение (извлечение) панелей боковым захватом вибропогружателя;- FIG. 9 - immersion (extraction) of the panels with a lateral gripper of a vibrator;

-фиг. 10 - подъем шпунтового профиля с земли, перемещение и укладка на землю;-Fig. 10 - lifting the tongue and groove profile from the ground, moving and laying on the ground;

- фиг. 11 - извлечение панелей с помощью автокрана.- FIG. 11 - removing panels using a truck crane.

Заявляемый способ возведения шпунтового ограждения при проведении работ на магистральном трубопроводе заключается в следующем.The inventive method of construction of a sheet piling during work on the main pipeline is as follows.

Вначале производят сборку направляющего каркаса и фиксацию его на месте возведения шпунтового ограждения путем забивки стоек, установку на них направляющего каркаса. Затем производят монтаж ограждения, который начинают с формирования одной из угловых секций периметра ограждения. Далее создают в грунте вертикальные элементы ограждения в виде шпунтовых свай, располагая их вдоль ограждаемого объекта в один ряд рядом друг с другом. При этом выполняют последовательное соединение смежных вертикальных элементов между собой с помощью замковых элементов «гребень-обойма» с замыканием периметра ограждения торцевыми секциями. Формирование периметра котлована выполняют путем объединения вертикальных элементов ряда снаружи по периметру направляющего каркаса посредством вертикального вибропогружения до плотного грунта. При этом вертикальные элементы выполняют длиной, зависящей от глубины выемки грунта. Необходимую длину вертикальных элементов в зависимости от глубины выемки обеспечивают их наращиванием по вертикали, которое выполняют, используя разъемное соединение с помощью закрепленных на шпунтовых панелях фиксирующих проушин пальцем со шплинтами.First, the guide frame is assembled and fixed at the site of the tongue-and-groove erection by hammering the racks, and the guide frame is installed on them. Then make the installation of the fence, which begins with the formation of one of the corner sections of the perimeter of the fence. Next, create vertical elements of the fence in the soil in the form of sheet piles, placing them along the enclosed object in a row next to each other. In this case, a series connection of adjacent vertical elements to each other is performed using locking elements "comb-holder" with the closure of the perimeter of the fence with end sections. The formation of the perimeter of the pit is performed by combining the vertical elements of the row outside the perimeter of the guide frame by means of vertical vibration immersion to dense soil. In this case, the vertical elements perform a length depending on the depth of the excavation. The necessary length of the vertical elements, depending on the depth of the recess, is provided by their vertical extension, which is performed using a detachable connection using the fixing eyes fixed to the tongue and groove panels with a finger and cotter pins.

Далее осуществляют выемку грунта внутри ограждения до требуемой глубины.Then carry out excavation inside the fence to the desired depth.

Шпунтовое сборно-разборное ограждение для обустройства котлована при проведении работ на магистральном трубопроводе выполнено следующим образом:The tongue-and-groove collapsible fence for the arrangement of the pit during work on the main pipeline is as follows:

Конструкция шпунтового ограждения состоит из опорной рамы 1 из четырех балок 11-14, уложенных по периметру котлована, на краях которых выполнены отверстия 21-4, усиленные трубными накладками, в которых установлены стойки 31-4, заглубляемые в грунт. По периметру котлована вдоль опорной рамы выполнено шпунтовое ограждение из шпунтовых панелей 41-n Смежные шпунтовые сваи 41-n расположены рядом друг с другом и соединены между собой замковым соединением 5 типа «гребень-обойма», где гребень 51 выполнен из стального круглого проката, а обойма 52 - из стальной толстостенной трубы с продольным пазом, приваренных к кромкам стенок профиля. При этом шпунтовые сваи 4 выполнены в виде шпунтовых панелей с возможностью наращивания их по высоте путем пристыковки к ним дополнительных профилей 61-n различной длины с необходимой разбежкой мест стыка с помощью замковых элементов 7. Замковые элементы 7 имеют конструкцию нижней части из двух соосно расположенных втулок 8 из толстостенной стальной трубы с фасками, выполненных в виде сдвоенной проушины 9 прикрепляемой посредством сварки к усиленной части полки нижнего элемента составной панели 4 с применением усиливающей стальной пластины 10. Конструкция их верхней части выполнена из одной втулки 11 из аналогичной толстостенной трубы с фасками, выполненной в виде одинарной проушины 12, прикрепляемой посредством сварки к усиленной части полки верхнего элемента 6 составной панели 4 с применением усиливающих стальных пластин 12. Верхняя и нижняя части замка 7 соединяются между собой совмещением отверстий в проушинах 9 и 12 и вставлением в них круглого пальца 13 фиксируемого посредством шплинта 14 с обеих его сторон. При этом вблизи верхних кромок стенок нижней и верхней части составных панелей 4 выполнены прямоугольные отверстия 15 для возможности извлечения шпунта с помощью грузоподъемного механизма, служащие также отверстиями для стопора 16. Торцевые шпунтовые панели 62 над трубопроводом 17 имеют стандартные стенки и расширенную полку 6т, в которой в нижней части выполнен вырез 18 в форме полукруга и к торцу приварена металлическая пластина 19 для исключения повреждений изоляции на трубопроводе. Сама полка 6т выполнена из двух пластин 6'т' и 6т'', сваренных между собой металлической вставкой 20 внахлест с внешней стороны шпунта. В верхней части торцевого шпунта 6т приварена между двумя пластинами небольшая пластина 21 для удобства работы вибропогружателя (на чертежах не показан). При этом соединение верхней и нижней частей торцевых шпунтов 42 также производится с помощью замковых соединений 7.The design of the sheet piling consists of a support frame 1 of four beams 1 1 -1 4 , laid along the perimeter of the pit, on the edges of which holes 2 1-4 are made , reinforced by pipe plates in which racks 3 1-4 are installed, buried in the ground. A sheet piling of tongue and groove panels 4 1-n is made along the perimeter of the pit along the support frame. Adjoining sheet piles 4 1-n are located next to each other and are interconnected by a locking joint 5 of the “comb-holder” type, where the comb 5 1 is made of steel round rolled, and the holder 5 2 - from a thick-walled steel pipe with a longitudinal groove welded to the edges of the profile walls. In this case, the sheet piles 4 are made in the form of sheet piling panels with the possibility of increasing them in height by joining additional profiles 6 1-n of various lengths to them with the necessary spacing of the joints using the locking elements 7. The locking elements 7 have a lower part construction of two coaxially arranged bushings 8 from a thick-walled steel pipe with chamfers made in the form of a double eye 9 attached by welding to the reinforced part of the shelf of the lower element of the composite panel 4 using reinforcing steel plate 10. The design of their upper part is made of one sleeve 11 of a similar thick-walled pipe with chamfers, made in the form of a single eyelet 12, attached by welding to the reinforced part of the shelf of the upper element 6 of the composite panel 4 using reinforcing steel plates 12. The upper and lower parts the lock 7 are interconnected by combining the holes in the eyes 9 and 12 and inserting into them a round finger 13 fixed by means of a cotter pin 14 on both sides of it. At the same time, rectangular holes 15 are made near the upper edges of the walls of the lower and upper parts of the composite panels 4 to allow the tongue to be removed using a lifting mechanism, which also serve as holes for the stopper 16. The end tongue panels 62 above the pipeline 17 have standard walls and an expanded shelf 6t, in which in the lower part, a cutout 18 in the form of a semicircle is made and a metal plate 19 is welded to the end to prevent damage to the insulation on the pipeline. The shelf 6t itself is made of two plates 6't 'and 6t'', welded together by a metal insert 20 overlapping from the outside of the tongue. In the upper part of the end tongue 6t, a small plate 21 is welded between the two plates for the convenience of the vibrator (not shown in the drawings). Moreover, the connection of the upper and lower parts of the end tongues 42 is also made using the lock joints 7.

Более конкретно сборка шпунтового ограждения производится следующим образом.More specifically, the assembly of sheet piling is as follows.

Выбирают первый угол периметра ограждения, с которого начинается монтаж. Рядом раскладывается необходимое количество шпунтов для удобного и быстрого захвата вибропогружателем шпунтовых панелей 4. Панели 4 с угловыми замками лучше разместить отдельно. Особое внимание необходимо уделить правильному формированию первой угловой секции (2-3 элемента): панели должны быть точно ориентированы по вертикали и плотно установлены к внутренней раме 1. При наличии значительных отклонений от вертикали (заметных невооруженным глазом), необходимо произвести выемку первых панелей 4 и произвести их повторное погружение.Choose the first angle of the perimeter of the fence, from which the installation begins. The required number of dowels is laid out nearby for convenient and quick capture of dowel panels 4. The panels 4 with corner locks are best placed separately. Particular attention must be paid to the correct formation of the first corner section (2-3 elements): the panels must be accurately oriented vertically and tightly mounted to the inner frame 1. If there are significant deviations from the vertical (visible with the naked eye), it is necessary to excavate the first panels 4 and re-dive them.

Оператор погружает стартовую панель 4 длиной 6 метров строго вертикально до плотного грунта. Если длины 6-ти метровой секции недостаточно для ее закрепления в плотном слое грунта, к ней необходимо присоединить дополнительную секцию 6 (надставку).The operator immerses the launch pad 4 6 meters long strictly vertically to dense soil. If the length of the 6-meter section is not enough to secure it in a dense layer of soil, it is necessary to attach an additional section 6 (extension) to it.

Надставка 6 выбирается длиной от 2 до 4 метров, в зависимости от глубины залегания плотных слоев грунта. В первую очередь формируется периметр ограждения из шпунтов 4 длиной 6,0 м. Сначала собираются две П-образные части комплекта с углами вокруг длинных сторон внутренней рамки 1. Оптимальным является такой вариант взаимного расположения ограждения, при котором на торце от противоположных углов до трубы 17 будет погружено одинаковое количество панелей 4.Extension 6 is selected from 2 to 4 meters in length, depending on the depth of the dense layers of soil. First of all, the perimeter of the fence is formed from tongues 4 with a length of 6.0 m. First, two U-shaped parts of the kit are assembled with angles around the long sides of the inner frame 1. The best option is the mutual arrangement of the fence, in which at the end from opposite angles to the pipe 17 the same number of panels 4 will be shipped.

Если оказалось, что внутренняя рамка 1 сместилась по отношению к трубе 17, то допускается погружение меньшего количества панелей 4 с одной из сторон торца, при этом от противоположного угла необходимо погрузить кратно большее количество панелей таким образом, чтобы иметь возможность закрыть периметр двумя торцевыми панелями 43, 4 шириной по 2 метра над трубой 17 (см. фиг. 5).If it turned out that the inner frame 1 has shifted relative to the pipe 17, then it is allowed to immerse a smaller number of panels 4 from one side of the end face, while from the opposite angle it is necessary to immerse a multiple number of panels in such a way as to be able to close the perimeter with two end panels 43 , 4 2 meters wide above the pipe 17 (see Fig. 5).

Если при погружении первого ряда шпунта 4 шестиметровая панель начинает увлекать за собой соседнюю панель, необходимо эту соседнюю панель скрепить с рядом стоящими панелями, прочно опирающимися на твердый грунт, посредством фиксирующего устройства через специально подготовленные отверстия в стенках шпунта.If, when the first row of sheet pile 4 is immersed, the six-meter panel begins to entrain the adjacent panel, it is necessary to fasten this neighboring panel with the adjacent panels firmly resting on solid ground using a fixing device through specially prepared holes in the sheet pile walls.

При необходимости фиксации углового соединения применяется фиксирующий комплект, состоящий из двух фиксирующих устройств и 1-2 соединяющих устройств (см. фиг. 6).-.If it is necessary to fix the corner connection, a fixing kit is used, consisting of two fixing devices and 1-2 connecting devices (see Fig. 6) .-.

При монтаже нижнего ряда шпунтов верхний край соседних панелей должен располагаться уступом с небольшим шагом по высоте около 20 см. (см. фиг. 7).When mounting the lower row of tongues, the upper edge of adjacent panels should be ledge with a small step in height of about 20 cm. (See Fig. 7).

Монтаж второго ряда шпунтового ограждения осуществляется после замыкания периметра.Installation of the second row of sheet piling is carried out after closing the perimeter.

Все 6-ти метровые панели первого ряда ограждения при погружении должны быть точно сориентированы по вертикали и, по возможности, максимально плотно установлены по отношению к внутренней рамке. При формировании всех последующих углов ограждения необходимо руководствоваться теми же требованиями что и при формировании первой угловой секции (см. выше).All 6-meter panels of the first row of the fence during immersion should be accurately oriented vertically and, as far as possible, tightly installed in relation to the inner frame. When forming all subsequent corners of the fence, it is necessary to follow the same requirements as when forming the first corner section (see above).

При монтаже панелей верхнего ряда к нижним панелям сначала должен войти один замок верхней панели в замок соседней (слева или справа) нижней панели, выступающей на 20 см. (см. фиг. 7, 9). Затем необходимо совместить проекцию верхнего и нижнего шпунта, чтобы направляющие пластины верхней панели «сели» на нижний шпунт. Далее соединить панели через фиксирующие проушины пальцем со шплинтами, соблюдая очередность сборки (предварительно собранный со шплинтом с одной стороны палец продевается через проушины панелей верхнего и нижнего ряда и шплинтуется со второй стороны).When mounting the panels of the upper row to the lower panels, one lock of the upper panel must first enter the lock of the neighboring (left or right) lower panel projecting 20 cm (see Fig. 7, 9). Then it is necessary to combine the projection of the upper and lower sheet piles so that the guide plates of the upper panel “sit” on the lower sheet piling. Next, connect the panels through the fixing eyes with a finger to the cotter pins, observing the sequence of assembly (a finger pre-assembled with a cotter pin on one side is threaded through the eyelets of the panels of the upper and lower rows and is cotted off from the second side).

При монтаже состыкованных панелей, для облегчения последующей выемки шпунта, следует избегать погружения нижней панели в плотный грунт (глина и т.п.) на глубину более 1,5 м.When assembling docked panels, to facilitate the subsequent excavation of the tongue, avoid lowering the bottom panel into dense soil (clay, etc.) to a depth of more than 1.5 m.

При наращивании длины панели необходимо надежно фиксировать соединительные пальцы от продольного перемещения (установка шплинтов).When increasing the length of the panel, it is necessary to securely fix the connecting fingers from longitudinal movement (installation of cotter pins).

Разборка (выемка) шпунтового ограждения производится следующим образом.Dismantling (removal) of sheet piling is as follows.

Выемка панелей производится в обратном порядке: сначала снимаются и аккуратно складируются 1,5 м и 2,0 м торцевые панели, затем надставки длиной от 2,0 м до 4,0 м по всему периметру верхнего пояса, начиная со следующих за торцевыми панелями под №№1, 2, 3, 4 фиг. 8).The panels are removed in the reverse order: first, the end panels are removed and neatly stacked 1.5 m and 2.0 m, then extensions from 2.0 m to 4.0 m in length along the entire perimeter of the upper belt, starting from the following end panels under No. 1, 2, 3, 4 of FIG. 8).

Очень важным является следующее. Начинать выемку тех панелей, у которых одна сторона уже не находится в замках соседних панелей. После чего вынимаются панели нижнего пояса. После выемки и окончания использования необходимо очистить все панели и особенно замковые соединения от грязи и грунта.The following is very important. Start excavating those panels for which one side is no longer in the locks of adjacent panels. After that, the panels of the lower belt are removed. After excavation and termination of use, it is necessary to clean all panels and especially the lock joints from dirt and soil.

При погружении и выемке шпунтового ограждения особое внимание следует обратить на правильное расположение погружаемого (вынимаемого) из стены шпунта (см. фиг. 9).When immersing and removing the sheet piling, special attention should be paid to the correct location of the sheet pile (taken) from the wall (see Fig. 9).

Шпунт должен быть строго ориентирован по вертикали в двух плоскостях параллельно ранее погруженному шпунту. При погружении (извлечении) необходимо свести к минимуму движения вибропогружателем, влекущие за собой деформации элементов шпунтового профиля (раскачивание из стороны в сторону, скручивание «винтом» вдоль своей оси и т.п.), т.к. при этом происходит зажим замков в сопрягаемых шпунтах, что в свою очередь приводит к снижению скорости или остановке процесса погружения (выемки) шпунта.The tongue must be strictly oriented vertically in two planes parallel to the previously immersed tongue. When immersing (removing), it is necessary to minimize the movements of the vibrator, entailing deformation of the tongue and groove profile elements (swinging from side to side, twisting with a “screw” along its axis, etc.), because in this case, the locks are clamped in the mating tongues, which in turn leads to a decrease in the speed or to a halt in the process of immersion (removal) of the tongue.

При выемке, погружении, перемещении шпунта с использованием боковых захватов вибропогружателя, фиксацию профиля производить исключительно за стенку с замком-кулачком (с приваренным прутком) (см. фиг. 9). Во избежание деформации замка-обоймы (труба 52 с продольным пазом) категорически запрещено браться за стенку с указанным замковым элементом.When dredging, immersing, moving the tongue using the side grips of the vibrator, the profile should be fixed exclusively behind the wall with a cam lock (with a welded rod) (see Fig. 9). In order to avoid deformation of the lock-holder (pipe 52 with a longitudinal groove) it is strictly forbidden to take on the wall with the specified locking element.

Во избежание деформации полки шпунтового профиля в зоне его захвата вибропогружателем при подъеме с земли, перемещении и укладке шпунта на землю в горизонтальном положении необходимо ориентировать панель таким образом, чтобы профиль панели был перпендикулярен поверхности земли (см. фиг. 10).In order to avoid deformation of the tongue-and-groove shelf in the area of its capture by the vibro driver when lifting from the ground, moving and laying the tongue in the horizontal position, it is necessary to orient the panel so that the panel profile is perpendicular to the ground surface (see Fig. 10).

При извлечении шпунта, во избежание деформации замковых элементов, недопустимы попытки выемки шпунта путем его наклона «на излом». В случае невозможности полного извлечения профиля из замка при вертикальном подъеме из-за нехватки высоты подъема необходимо переместить экскаватор в другое место, обеспечивающее соответствующие условия для выемки, или, в случае отсутствия таковой возможности, вертикально поднять извлекаемую панель на максимально возможную высоту, высвободив ее из плотных слоев грунта, а дальнейший демонтаж производить с использованием бокового захвата вибропогружателя или автокраном (см. фиг. 11).When removing the tongue, in order to avoid deformation of the locking elements, attempts to excavate the tongue by tilting it “at a break” are unacceptable. If it is not possible to completely remove the profile from the lock during vertical ascent due to a lack of elevation, it is necessary to move the excavator to another location that provides appropriate conditions for excavation, or, if this is not possible, to vertically lift the removable panel to the maximum possible height, freeing it from dense layers of soil, and further dismantling to be carried out using lateral grip of a vibro-loader or a truck crane (see Fig. 11).

В сравнении с прототипами заявляемый способ возведения шпунтового ограждения при проведении работ на магистральном трубопроводе и шпунтовое сборно-разборное ограждение для обустройства котлована обеспечивают получение более надежного шпунтового ограждения и более простую сборку и разборку этого ограждения.Compared with prototypes, the inventive method of erecting a sheet pile fence during work on the main pipeline and a sheet pile collapsible fence for arranging a foundation pit provide a more reliable sheet pile fence and easier assembly and disassembly of this fence.

Claims (2)

1. Способ возведения шпунтового ограждения при проведении работ на магистральном трубопроводе, включающий создание в грунте вертикальных элементов ограждения в виде шпунтовых свай с расположением их вдоль ограждаемого объекта в один ряд, последовательное соединение смежных вертикальных элементов между собой связями, закрепление ограждения в грунте и выемку грунта под защитой ограждения до требуемой глубины, при этом вертикальные элементы выполняют длиной, зависящей от глубины выемки грунта, отличающийся тем, что вначале производят сборку направляющего каркаса и фиксацию его на месте возведения шпунтового ограждения путем забивки стоек, установку на них направляющего каркаса, монтаж ограждения начинают с формирования одной из угловых секций периметра ограждения, смежные вертикальные элементы располагают рядом друг с другом и соединяют между собой разъемно с помощью замковых элементов «гребень-обойма» с замыканием периметра ограждения и выполняют формирование периметра котлована путем объединения вертикальных элементов ряда снаружи по периметру направляющего каркаса, закрепление ограждения в грунте производят строго вертикальным вибропогружением до плотного грунта, перед которым собирают внутреннюю рамку необходимого размера, которую выставляют над осью трубы, необходимую длину вертикальных элементов в зависимости от глубины выемки обеспечивают их наращиванием по вертикали, которое выполняют используя разборное соединение с помощью закрепленных на шпунтовых панелях проушин, фиксируемых пальцем со шплинтами.1. A method of erecting a sheet piling during work on the main pipeline, including creating vertical fencing elements in the soil in the form of sheet piles with placing them along the enclosed object in a row, connecting the adjacent vertical elements together, connecting the fence in the ground, and excavating under the protection of the fence to the required depth, while the vertical elements perform a length depending on the depth of excavation, characterized in that at first they produce with the orc of the guide frame and its fixation at the place of erection of the sheet piling by hammering up the racks, the installation of the guide frame on them, the installation of the fence begin with the formation of one of the corner sections of the perimeter of the fence, adjacent vertical elements are placed next to each other and are interconnected using lock elements "Comb-holder" with the closure of the perimeter of the fence and perform the formation of the perimeter of the pit by combining the vertical elements of the row outside the perimeter of the guide the frame, the fastening of the fence in the soil is carried out strictly by vertical vibroabsorption to a dense soil, in front of which an internal frame of the required size is assembled, which is set above the pipe axis, the necessary length of the vertical elements depending on the depth of the excavation is provided by their vertical extension, which is performed using a collapsible connection using eyes fixed on tongue-and-groove panels, fixed with a finger and cotter pins. 2. Шпунтовое сборно-разборное ограждение для обустройства котлована, содержащее четыре стойки, установленные по углам ремонтного котлована, прикрепленный к ним сверху направляющий прямоугольный каркас из четырех балок, и шпунтовые сваи, которые вдавлены в грунт и расположены вдоль балок направляющего каркаса вокруг него с формированием замкнутого шпунтового ограждения, отличающееся тем, что смежные шпунтовые сваи ограждения соединены между собой с помощью замкового соединения типа «гребень-обойма», при этом они выполнены в виде шпунтовых панелей с возможностью наращивания их по высоте путем пристыковки к ним дополнительных профилей различной длины с необходимой разбежкой мест стыка с помощью замковых элементов, имеющих конструкцию нижней части из двух соосно расположенных втулок из толстостенной стальной трубы с фасками, выполненных в виде сдвоенной проушины, прикрепляемой посредством сварки к усиленной части полки нижнего элемента составной панели с применением усиливающих стальных пластин, а конструкцию верхней части - из одной втулки из аналогичной толстостенной трубы с фасками, выполненной в виде одинарной проушины, прикрепляемой посредством сварки к усиленной части полки верхнего элемента составной панели с применением усиливающих стальных пластин и соединяемых между собой совмещением отверстий в проушинах и вставлением в них круглого пальца, фиксируемого посредством шплинта с обеих сторон, а вблизи верхних кромок стенок нижней и верхней части составных панелей выполнены прямоугольные отверстия для обеспечения возможности извлечения шпунта с помощью грузоподъемного механизма, служащие также отверстиями для установки стопора, при этом внизу каждой стенки верхней рядовой панели имеются по две выступающие пластины, образующие направляющие пазы для их надежной фиксации на соответствующих стенках нижней части составной панели, торцевые шпунтовые панели над трубопроводом имеют стандартные стенки и расширенную полку, в которой в нижней части выполнен вырез в форме полукруга и к торцу приварена металлическая пластина для исключения повреждений изоляции на трубопроводе, сама полка выполнена из двух пластин, сваренных между собой металлической вставкой внахлест с внешней стороны шпунта, в верхней части торцевого шпунта приварена между двумя пластинами небольшая пластина для удобства работы вибропогружателя, соединение верхней и нижней частей торцевых шпунтов также выполнено с помощью двух замковых соединений.2. A tongue-and-groove collapsible fence for arranging a pit, comprising four racks installed at the corners of a repair pit, a guide rectangular frame of four beams attached to them from above, and tongue-and-groove piles that are pressed into the ground and located along the beams of the guide frame around it with formation closed sheet piling, characterized in that the adjacent sheet piles of the fence are interconnected using a lock connection of the type "comb-holder", while they are made in the form of a sheet pile exit panels with the possibility of increasing them in height by attaching additional profiles of various lengths to them with the necessary separation of the joints with the help of locking elements having the design of the lower part of two coaxially arranged bushings from a thick-walled steel pipe with chamfers made in the form of a double eye attached by means of welding to the reinforced part of the shelf of the lower element of the composite panel using reinforcing steel plates, and the design of the upper part from one sleeve of the same thickness pipe with bevels, made in the form of a single eyelet, attached by welding to the reinforced part of the shelf of the upper element of the composite panel using reinforcing steel plates and interconnected by combining the holes in the eyes and inserting a round finger into them, fixed by means of a cotter pin on both sides, and rectangular holes are made near the upper edges of the walls of the lower and upper parts of the composite panels to allow the tongue to be extracted using a lifting mechanism, serving there are also holes for installing the stopper, while at the bottom of each wall of the upper row panel there are two protruding plates that form guide grooves for their reliable fixation on the corresponding walls of the lower part of the composite panel, the tongue and groove panels above the pipeline have standard walls and an expanded shelf in which a semicircular cutout is made in the lower part and a metal plate is welded to the end to prevent insulation damage on the pipeline, the shelf itself is made of two plates welded to a metal insert row overlapping the outer side of the tongue, the upper part of the end of the tongue is welded between two plates of a small plate for the convenience of the vibrator, the compound of the upper and lower end portions of the tongues are also formed by two locking joints.
RU2018105663A 2018-02-14 2018-02-14 Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit RU2705674C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2018105663A RU2705674C2 (en) 2018-02-14 2018-02-14 Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2018105663A RU2705674C2 (en) 2018-02-14 2018-02-14 Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit

Publications (3)

Publication Number Publication Date
RU2018105663A RU2018105663A (en) 2019-08-15
RU2018105663A3 RU2018105663A3 (en) 2019-10-08
RU2705674C2 true RU2705674C2 (en) 2019-11-11

Family

ID=67640663

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2018105663A RU2705674C2 (en) 2018-02-14 2018-02-14 Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit

Country Status (1)

Country Link
RU (1) RU2705674C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU212677U1 (en) * 2022-03-29 2022-08-02 Общество с ограниченной ответственностью "Малые мосты и трубы" Retaining wall crossbar

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115434303B (en) * 2021-06-04 2023-12-15 周兆弟 Guard post, guard structure, guard post mold and production process thereof
CN115596276A (en) * 2022-10-14 2023-01-13 中建八局第二建设有限公司(Cn) Fence and building construction protector

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2348323A1 (en) * 1976-04-14 1977-11-10 Lube & Krings Masch DEVICE FOR SUPPORTING THE WALLS OF A TRENCH OR SIMILAR
RU2122071C1 (en) * 1996-02-22 1998-11-20 Институт проблем транспорта энергоресурсов "ИПТЭР" Process of formation of sheet piling of foundation pit in marsh and gear for its implementation
RU2366781C2 (en) * 2007-04-26 2009-09-10 ОАО "Пластик" Design of barrier for reinforcement of trench walls in performance of earth works
RU2530142C2 (en) * 2012-11-30 2014-10-10 Открытое акционерное общество "Сибнефтепровод" Акционерная компания по транспорту нефти "Транснефть" Method of construction of sheet piling when conducting works at major pipeline and mountable-dismountable sheet piling for development of foundation pit
RU161890U1 (en) * 2015-08-21 2016-05-10 Открытое акционерное общество "Акционерная компания по транспорту нефти "Транснефть" (ОАО "АК "Транснефть") DEVICE FOR POSITIONING OF THE THREAD PILES AT THE ESTABLISHMENT OF THE THREAD DOORS

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2348323A1 (en) * 1976-04-14 1977-11-10 Lube & Krings Masch DEVICE FOR SUPPORTING THE WALLS OF A TRENCH OR SIMILAR
RU2122071C1 (en) * 1996-02-22 1998-11-20 Институт проблем транспорта энергоресурсов "ИПТЭР" Process of formation of sheet piling of foundation pit in marsh and gear for its implementation
RU2366781C2 (en) * 2007-04-26 2009-09-10 ОАО "Пластик" Design of barrier for reinforcement of trench walls in performance of earth works
RU2530142C2 (en) * 2012-11-30 2014-10-10 Открытое акционерное общество "Сибнефтепровод" Акционерная компания по транспорту нефти "Транснефть" Method of construction of sheet piling when conducting works at major pipeline and mountable-dismountable sheet piling for development of foundation pit
RU161890U1 (en) * 2015-08-21 2016-05-10 Открытое акционерное общество "Акционерная компания по транспорту нефти "Транснефть" (ОАО "АК "Транснефть") DEVICE FOR POSITIONING OF THE THREAD PILES AT THE ESTABLISHMENT OF THE THREAD DOORS

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2780034C1 (en) * 2021-12-02 2022-09-19 Дмитрий Борисович Ядрихинский Interlocking profile for interlocking fencing of the pit
RU212677U1 (en) * 2022-03-29 2022-08-02 Общество с ограниченной ответственностью "Малые мосты и трубы" Retaining wall crossbar
RU217227U1 (en) * 2022-12-12 2023-03-23 Дмитрий Борисович Ядрихинский Collapsible sheet piling for sheet piling
RU2808268C1 (en) * 2023-02-21 2023-11-28 Дмитрий Борисович Ядрихинский Collapsible sheet pile for sheet pile enclosure

Also Published As

Publication number Publication date
RU2018105663A (en) 2019-08-15
RU2018105663A3 (en) 2019-10-08

Similar Documents

Publication Publication Date Title
US7500807B2 (en) Method of construction using sheet piling sections
KR102009077B1 (en) Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type
CN110499772B (en) Construction method of rock riverbed double-layer steel sheet pile cofferdam
KR102243718B1 (en) Shoring apparatus can bending moment small and a construction method there
AU2011368478B2 (en) Batch-installation-type large-caliber underwater casing installation structure using sheet pile and method for constructing same
KR100967497B1 (en) Method for constructing an underground structure
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
RU2705674C2 (en) Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit
JP2012107479A (en) Method for constructing underground and aboveground structure
JP6454674B2 (en) Construction method of water stop working space
KR20140015019A (en) Arch wall shoring structure
LT6117B (en) Telescopic formwork device for dotted dug up dig and manner of use
KR102021496B1 (en) Retaining wall construction method and retaining wall structure by the method
RU2254417C1 (en) Method and anchor system for securing pit bordering
AU2020100004A4 (en) A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method
US6328503B1 (en) Method for constructing an underground structure
JP7057726B2 (en) How to form underground space and how to use underground space
US20210071380A1 (en) Method for building concrete foundations for lattice-type offshore structures, and foundations built using this method
RU2209268C1 (en) Process of development of foundation pit
RU2465401C1 (en) Method to erect underground structures by "wall in soil" method and wall in soil erected by this method
KR200428941Y1 (en) Strut system of temporary retaining wall
EP1964981A1 (en) Reinforcement elements for in-situ cast walls and method to excavate in situ cast walls
JP4146250B2 (en) Open caisson bottom plate construction method
JP2005240430A (en) Building foundation and construction method therefor
KR20140015980A (en) Method for constructing earth retaining wall using arch pannel

Legal Events

Date Code Title Description
QB4A Licence on use of patent

Free format text: LICENCE FORMERLY AGREED ON 20200131

Effective date: 20200131